Skip to main content

Passive House Plus (Sustainable building) issue 53 UK

Page 1

LOW ENERGY | LOW CARBON | LOW BILLS | HIGH COMFORT

Somerset all set

Affordable homes find optimised route to passive

Interview: Wolfgang Feist Passive origins in historic arctic ship

Zero bills homes

An extraordinary claim explored

Splendid off-grid

08

9 772009 597027

Bio-based London retrofit hits 95% carbon cut

ISSN 2009-597x

Virtuous Victorian

Issue 53 £8.95 UK EDITION

Diminutive NZ passive house untouched by energy crisis


E D I TO R ’S L E T T E R

PA S S I V E H O U S E +

The Same System: Now with Full BBA & Passive House Certifications Design for performance, not just compliance and build with a foundation system that insulates from the ground up. KORE’s Insulated Foundation System wraps the entire foundation in a continuous layer of EPS, virtually eliminating thermal bridging while providing ground floor U-values as low as 0.10W/m2K. Maximise efficiencies on-site, speed up foundation construction, reduce labour, waste, concrete and embodied carbon with one high-performance system. If only other parts of the build could be this simple.

A1-A3

A4-A5

C1-C4

kg CO2e/m2 GIA

100

80

KORE’s Insulated Foundation System offers reduced embodied carbon by over 31% when compared to a traditional foundation system insulated with PIR - and we have the data to prove it. Contact us today for more information.

60

40

20

0

Significantly Reduces CO₂e

Traditional Foundation

2 | passivehouseplus.ie | issue 41

Insulated Foundation

Learn more at kore-system.com


PA S S I V E H O U S E +

Publishers Temple Media Ltd PO Box 9688, Blackrock, Co. Dublin, Ireland t +353 (0)1 210 7513 e info@passivehouseplus.ie www.passivehouseplus.co.uk

Editor

Jeff Colley jeff@passivehouseplus.ie

Editorial Manager

Jason Walsh jason@passivehouseplus.ie

Reporter

John Hearne john@passivehouseplus.ie

Reporter

Kate de Selincourt kate@passivehouseplus.ie

Production / IT

Dudley Colley dudley@passivehouseplus.ie

Accounts

Oisin Hart oisin@passivehouseplus.ie

Art Director

Lauren Colley lauren@passivehouseplus.ie

Design

Aoife O’Hara aoife@evekudesign.com | evekudesign.com

Contributors

Toby Cambray Greengauge Building Energy Consultants Niall Crossan Ecological Building Systems Tom Dolton Momentum structural engineers Dr Huda Elsherif Scotch Partners Joe Garbett Momentum structural engineers Amy Hammel journalist Steve Hughes Build Good Architecture Simon Jones Air Quality Matters Madeleina Loughrey-Grant Cairn Ian Mawditt building performance consultant Marc O’Riain doctor of architecture

E D I TO R ’S L E T T E R

editor’s letter ISSUE 53

A

couple of years ago I launched a sustainability-focused communications and strategy consultancy called Zero Ambitions, off the back of a podcast I co-host under the same name, along with my old friend and magazine co-founder Dan Hyde. Long time readers may be noticing it starting to impact this magazine. Our aim is to take complex information about sustainable building and translate it into meaningful information for different kinds of people with different kinds of needs. The emphasis is on producing accurate, credible information in the plainest language we can, so that it actually stands a chance of being understood – and hopefully winning over hearts and minds, leading to better decisions in terms of how buildings are designed, constructed and operated. This translation of complexity is something we have always tried to do at Passive house Plus, but the nature of the subject matter we cover sometimes makes that tricky – especially given our unwillingness to ignore often nuanced truths for the sake of telling a simple story. Consequently, at times our belief in the need for accuracy and technical detail has come at the cost of accessibility – which has made the magazine a less breezy read than we would like. When I was invited to do a TEDx talk on passive house during lockdown, I was forced to think differently about how I communicate. The process of delivering drafts to the organisers and my fellow TEDx talkers, none of whom came from the construction industry, was bruisingly insightful. I was advised to keep only one graph, and only then because it was funny. (It told the story of passive house owner Stephen Tierney logging into his MVHR system on holiday, only to notice the CO2 levels going literally off the scale one evening when a teenage house sitter had an

unsanctioned party.) For the rest of the talk I drew insights from the stories we have had the pleasure of telling over the years – stories about the otherworldly experience of living in a home that is consistently calm, and always in the Goldilocks zone – not too cold, not too hot, not too stuffy, not too drafty, but just right. There has never been a greater need to translate complex information accurately but accessibly. Fuelled by an energy crisis and the increasingly obvious signs of palpable climate breakdown, interest in making buildings sustainable has never been higher. This has placed us at an inflection point. The hard work done by early adopters and enthusiastic advocates is paying off, and we are beginning to move towards the mass market, a realm where many of the people we meet may have little or no interest in the nerdy bits. It is incumbent on us to find out what matters to these people, whoever they are – from residents, to building managers, to maintenance contractors – to work out how to engage their interest. At the same time, we must continue to delve deeper into the complexity – into everything from life cycle assessment to monitoring how buildings actually perform, both in data terms, and in terms of how they affect real people. So, we have endeavoured to fill the pages of this issue with extraordinary stories, insightful voices, and carefully curated advertising from companies with the kinds of products, services and expertise to help make buildings more sustainable. We hope it helps inform your thinking and your decisions, with the hope of making buildings that enrich the lives of the people who live in them, while meaningfully tackling the challenges we face. Regards, The editor

Print

GPS Colour Graphics www.gpscolour.co.uk | +44 (0) 28 9070 2020

Cover

Maria’s Passive House Photo by Amy Jane Todd Publisher’s circulation statement: Passive House Plus (UK edition) has a print run of 9,000 copies, posted to architects, clients, contractors & engineers. This includes the members of the Passivhaus Trust, the AECB & the Green Register of Construction Professionals, as well as thousands of key specifiers involved in current & forthcoming sustainable building projects. Disclaimer: The opinions expressed in Passive House Plus are those of the authors and do not necessarily reflect the views of the publishers.

About

Passive House Plus is an official partner magazine of The Association for Environment Conscious Building, The International Passive House Assocation and The Passivhaus Trust.

ph+ | editor’s letter | 3


CONTENTS

PA S S I V E H O U S E +

4 | passivehouseplus.co.uk | issue 53


PA S S I V E H O U S E +

CONTENTS

ph+ | contents | 5


CONTENTS

PA S S I V E H O U S E +

CONTENTS COVER STORY

10

30

40

30 10

20

24

A dilapidated Victorian house in north London has been transformed into a high-performance home through a deep retrofit that cut carbon emissions by 95 per cent, while also attempting to minimise embodied carbon through careful material choices.

Small but mighty: off-grid passive house built around sufficiency

40

Comment

Dr Huda Elsherif says comfort is more subjective than the regulations allow; Dr Marc Ó Riain challenges common assumptions about retrofit costs; Simon Jones argues that today’s energy crisis risks repeating the ventilation mistakes of the 1970s; and Joe Garbett and Tom Dolton show how reusing steel offers a lower-carbon alternative to recycling.

6 | passivehouseplus.co.uk | issue 53

Proof of concept

Building to passive house standard is solved; selling it is not

A 52-home development in North Somerset has achieved passive house certification across three standards. The contractor who built it says the technology is the easy part. Convincing the market is another matter entirely.

News

AECB conference to explore how fabric and energy should work together in low-energy buildings; reflections from the 28th International Passive House Conference and its lessons for UK building standards; lesser-known Bankside street to become a green hub for business and community; and £100m LSE retrofit to headline as UK Passivhaus conference returns to London.

Wreck and reward

Victorian wreck hits 95% carbon cut through deep retrofit

Big Picture

In a year when events in the Strait of Hormuz have wreaked havoc on energy bills globally, one remarkable house in the antipodes has sailed serenely through. Steve Hughes of Build Good Architecture tells the story of Maria’s Passive House, a project which combines modesty and cutting-edge ambition.

Case Studies

48

Critical mass

Cairn comes good on high density passive house promise

Passive house has long been typecast as the preserve of deep-pocketed self-builders sold on the dream before pen hits paper. Now Ireland’s largest housebuilder has smashed that assumption, delivering four passive schemes — and 1,755 homes — simultaneously, first time. And the real innovation may be what happened after the builders left: an unprecedented effort to prepare residents, housing staff and maintenance teams for life in a passive house — an effort led, in the interests of full disclosure, by this magazine’s publishers.


PA S S I V E H O U S E +

48

58

66

58

70

Kill bills

End-of-terrace all but ends energy costs

Sometimes a project comes along that redefines what’s possible in a retrofit. One Dublin family went from camping indoors to constant comfort and almost zero energy costs

74

Insight The interview: Prof Wolfgang Feist

When the professor who founded the passive house standard visited Dublin this spring, it marked a rare journey for a man who prefers his bicycle to an aeroplane. Passive House Plus editor Jeff Colley met him at a gathering of Ireland’s passive house community to talk childhood frost, Swedish interstitial icicles, and why the world’s most rigorous building standard was born on a ship.

70

CONTENTS

Zero bills? Really

Smart home technology is making energy bill-free living a real prospect

Heat pumps, solar panels and home batteries are converging with smart tariffs to make zero energy bills a genuine possibility for some new homes. But how much does it cost, who benefits, and is the broader promise deliverable on a mass scale.

Marketplace

Keep up with the latest developments from some of the leading companies in sustainable building, including new product innovations, project updates and more.

81

What building better really means in traditional buildings

82

Enshoddification: a blight on buildings that we must address

Traditional buildings can be made warmer and more efficient, but only through respect, patience and an understanding of how they actually work says Niall Crossan, technical director at Ecological Building Systems.

The construction industry faces tightening targets to make buildings safe, dry, healthy, low carbon and comfortable in winter and summer. We must stop the industry gaming paper targets, argues leading building physicist Toby Cambray, by focusing on outcomes and regulating competence.

ph+ ph+ | contents | contents | 7 | 7


COMFORT ZONE

PA S S I V E H O U S E +

Comfort zone

Ian Mawditt: “Why do we still get the basics wrong?" Ian Mawditt has spent more than 30 years trying to close the building performance gap. When not helping author Approved Documents F and L for England and Wales, helping lead the UK Centre for Moisture in Buildings or writing the Future Homes Hub's ventilation guide, Mawditt can be found swimming in Bristol's waterways at dawn.

What makes you happy? Living in Bristol with my partner. It’s such a great place to be. Swimming early in the morning too; the blue space is a good mental boost for the day ahead. Cooking, both indoors and outdoors, but let’s not get on to particulates just yet… What keeps you up at night? I sleep very well, actually. However, I do genuinely think about ventilation and air quality as I go to bed. As you might imagine, I have air quality monitors in my home, which I check regularly. What makes you think? Why do we still get the basics wrong? I could say that about many aspects of homebuilding and retrofit, but sticking with ventilation, there is still a mentality that it isn’t that important. I keep thinking of ways to shift the dial. How did you get into sustainable building? By being an M&E engineer and finding myself designing services for poorly designed buildings that I knew would be energy intensive, uncomfortable, or both. I took myself off to do a masters in sustainable architecture at the Centre for Alternative Technology. It was a game changer. What is your favourite building? Too many to choose from, but a memorable development for me is BedZED. From a ventilation engineer’s perspective, I love it. The ventilation strategy is bold and the multi-coloured roof cowls give the development its unique identity. Ventilation was visibly at the heart of the design.

What is your guiltiest pleasure? Big appetite, big portions. That’s why I swim a lot to counter it! What is your worst trait as a built environment professional? Sitting at my desk at home, plugging away at reports. I don’t spend as much time as I should getting out to meet people and having the conversations that help things move faster. Who or what has been the biggest influence on how you work? So many people. For brevity, I would mention Mike Thompson, the course director on my MSc. Quite simply, my life would have taken a different direction had he not been part of it then. What is the most unsustainable thing you do? I did mention outdoor cooking. I can’t help but love the smell of wood burning with a Dutch oven above and baked spuds cooking in the ashes. Tell Ben Jones not to read this! What technology gets you excited for the future? Sensors with simple interfaces in every home that continuously check IEQ, providing diagnostics, prompting planned maintenance. Our cars have had this for years. Our homes should too. We spend much more time in them. What song would you like played at your funeral? Burning by Ludovico Einaudi. Or is the title a bit much for a funeral?

What is the worst thing you have ever seen on a construction site/finished building? Ventilation, ventilation and ventilation.

What do you want to be remembered for? Shifting the dial to improve ventilation outcomes and indoor air quality in our homes.

If you could change one thing in construction practice, what would it be? To end the race to the bottom in mainstream housebuilding. We need to stop using the minimum standards in Building Regulations guidance, especially Parts L, F, and O, as recipe for building specification. They are minimum standards. We must be better than this.

What makes you optimistic about the future? We have the skills and the knowledge to create amazing things. I’m encouraged by how SMEs are embracing new technologies and delivering quality buildings. The future also depends on better people entering the sector and being given the space to do good work.

8 | passivehouseplus.co.uk | issue 53


SMALL BUT MIGHTY

BIG PICTUR E

Big Picture

SMALL BUT MIGHTY: off-grid passive house built around sufficiency In a year when events in the Strait of Hormuz have wreaked havoc on energy bills globally, one remarkable house in the antipodes has sailed serenely through. Steve Hughes of Build Good Architecture tells the story of Maria’s Passive House, a project which combines modesty and cutting-edge ambition.

10 | passivehouseplus.co.uk | issue 53


BIG PICTUR E

SMALL BUT MIGHTY

ph+ ph+ || small small but but mighty mighty big big picture picture || 11 11


SMALL BUT MIGHTY

1

BIG PICTUR E

A small house with a very big brief

1

Before moving to the Coromandel, my family and I were living in a beautifully renovated 1860s villa in Auckland. High ceilings, polished floors, plenty of charm. In winter it was cold. In summer it was hot. And when I ran the numbers, it told a clearer story: an airtightness of 14.7 ACH and a heating demand of around 88 kWh/m²/year, roughly $3,500 a year just to stay warm. We had also seen internal temperatures push close to 40C in summer. It looked great. It did not perform. Around that time, my wife Amy said, “Let’s get out of the rat race.” That was the catalyst. We started looking for land and found 4.5 hectares of regenerating native bush on the east coast of the Coromandel Peninsula, just north of Tairua. The land is QEII covenanted, protected in perpetuity, with only a small area available for a building platform. Running power to the site was not viable. So, the brief became very simple: build a small, off-grid house that performs exceptionally well, and prove what is possible.

2

2 Small by necessity, precise by design The original idea was pragmatic: build a minor dwelling quickly to live in, with a larger home to follow later. Planning rules allowed 50 m², or 60 m² with a Lifemark certification, a New Zealand universal design standard, so we designed to that upper limit. At this scale, every decision matters. Smaller buildings are inherently harder to make work from a passive house perspective. Surface-area-to-volume ratios are unforgiving, and there is nowhere to hide poor detailing. But that constraint sharpened the design rather than limiting it. We embedded Lifemark principles early, not as an add-on, but as part of the thinking, creating a compact, accessible and adaptable home. The final treated floor area landed at just 52 m².

25 K

LEGEND

PO

+64 27

7.7.

1. lounge 2. kitchen

3. nook 4. bathroom 5. laundry

steve@buildg

general notes:

1. THE DRAWING IS PROTECT

5. 5.

6. bedroom 7. wardrobe 8. deck

COPYRIGHT. 2. ALL DIMENSIONS & LEVELS BE VERIFIED ON SITE BY THE CONTRACTOR PRIOR TO COMMENCING WORK.

6.

6.

3. REPORT ANY DISCREPANI TO THE DESIGNER PRIOR TO

CONTINUING ASSOCIATED W 4. ALL WORK SHALL COMPLY

THE NEW ZEALAND BUILDING CODE, NZS3604 (RESIDENTI PROJECTS), SPECIFIC ENGINEERING DESIGN AND A TERRITORIAL AUTHORITY REQUIREMENTS. 5. ALL RESTRICTED BUILDING

2.

1. 1.

2.

WORK SHALL BE CARRIED O LICENSED BUILDING

8. 8.

PRACTITIONERS. 6. THE CONTRACTOR SHALL SUBSTITUTE ANY MATERIALS WITHOUT WRITTEN AUTHOR FROM THE DESIGNER.

LEGEND 1. 2. 3. 4. 5. 6. 7. 8.

rev:

Lounge Kitchen Nook Bathroom Laundry Bedroom Wardrobe Deck

description:

project name:

Maria's Passive Hou

4.

4.

project number:

3. 3.

013

client name:

Steven Hughes & Am Jane Todd project address:

25 Koru Rise Pumpkin Hill Whitianga 3591 sheet name:

floor plan

issue: sheet number:

1

12 | passivehouseplus.co.uk | issue 53

da

floor plan 1 : 25

scale A1 100% A3 50%

A101

rev


BIG PICTUR E

SMALL BUT MIGHTY

3

3 Building lightly on the land The house sits on a steep site, so the structure needed to tread lightly. Driven timber piles were selected, a familiar and efficient New Zealand solution, avoiding heavy excavation and concrete. From there, a straightforward timber frame was developed: 140 mm structure with a 45 mm insulated service cavity inside the airtight layer, and a timber floor and roof assembly insulated with glass fibre batts. Nothing exotic. Just careful decisions. Thermal bridging was minimised through simplified junctions and reduced timber content, and the windows, triple-glazed uPVC units imported from Germany, were positioned in line with the insulation layer. At the time, this was still relatively uncommon in New Zealand. The glazing strategy was driven as much by controlling summer heat gain as by retaining warmth in winter, a reminder that performance cuts both ways. Orientation played a critical role in resolving competing priorities. The site looks east, out over the Pacific to the offshore islands, and that is where the view is. But in the southern hemisphere, the sun, and therefore the opportunity for passive gain and solar generation, comes from the north. Rather than defaulting to one or the other, the design resolves both. The building is carefully positioned and shaped to open to the east for long views and morning light, while the roof geometry and solar array are optimised to the north for generation. Openings are tuned to manage solar gain, allowing winter sun deep into the space while limiting overheating in summer through proportion, placement and shading. It becomes a balance of view, sun and performance, each informing the other rather than competing.

Photos: Amy Jane Todd

ph+ | small but mighty big picture | 13


SMALL BUT MIGHTY

BIG PICTUR E

4

4 A calm, durable palette Material selection was about restraint and belonging. Externally, a dark-stained Douglas fir cladding allows the building to sit quietly within the bush. Internally, the house is lined almost entirely in pine plywood, finished with a white Danish oil that lifts the natural grain. The detailing is simple but deliberate, with expressed negative junctions running throughout and lighting used to pick up those lines and add depth. It is a modest space, but it feels considered.

5 Performance: small building, serious numbers The goal was always certification, but the project quickly went beyond that. Despite the challenges of its size, the house achieved a calculated space heating demand of 12.3 kWh/m²/year, comfortably inside the passive house target of 15 kWh/ m2/yr. The heat load of 9.7 W/m² also came within the passive house target of 10 W/ m2/yr – the maximum amount of energy required to heat the building on the coldest day of the year. Being off-grid shifted the conversation

14 | passivehouseplus.co.uk | issue 53

further. With on-site generation, passive house plus, and ultimately premium, came into reach. After fine-tuning through PHPP, the final results landed at a primary energy renewable (PER) demand of 44.3 kWh/m²/year, and PER generation of 219.3 kWh/m²/year. At the time of certification, it was also identified as the smallest building in the world certified to the passive house premium standard, and New Zealand’s first off-grid passive house premium.

Editor’s note: Strictly speaking, the building’s PER total does not meet the PER threshold limit of 30 kWh/m²/yr for the passive house premium standard, the mere fact of its small size meaning its surface area to volume ratio pushes its totals up when assessed on a per m2 basis. But the institute allows an extra 15 kWh/m²/yr for buildings which generate substantially more than the PER generation target of 120 kWh/m²/yr, and in that regard Maria’s Passive House does more than enough – adding almost 100 kWh/m²/yr more than the threshold.


BIG PICTUR E

5

SMALL BUT MIGHTY

Energy Demand and Generation

Primary energy renewable (kWh/m2/yr)

300

219.3

225

150 120

75

60

60 45

44.3

30 0

0 PER Demand

PER Generation

Maria's Passive House

Passive House Plus

Passive House Classic

Passive House Premium

Jargon buster

Primary energy renewable The passive house standard has always been about delivering significant reductions in energy demand – including not just the final energy use in the building, but the so called “primary” energy at source, taking into account the likes of energy wasted generating electricity and transmitting it. But the electricity grid is on a trajectory towards becoming fully renewable and therefore carbon neutral, if you ignore growing concerns about whether burning bioenergy can be considered carbon neutral, let alone the impact of unforeseen energy leeches like data centres sucking up renewable capacity). If electricity is carbon neutral, the thinking goes, what does it matter how much energy you use? One significant problem is that renewable energy is intermittent and unpredictable in nature. If the wind isn’t blowing and the sun isn’t shining, that means exporting or storing energy, both of which lead to losses. That’s why in 2015, those bright sparks at the Passive House Institute created a new metric, Primary Energy Renewable, which peers into the future, assumes a fully renewable grid, but accounts for energy losses from storing, exporting and importing energy. Passive houses can now be certified based on current grid primary energy, or primary energy renewable, with different targets applying in each case.

ph+ | small but mighty big picture | 15


SMALL BUT MIGHTY

BIG PICTUR E

ENERGY EFFICIENT HOMES

Complete Timber Frame Solutions

MBC Timber Frame specialises in designing and building bespoke energy efficient Timber Frame Homes and Passive Houses across the UK.

Our super-insulated, precision engineered timber frame buildings are at the forefront of innovation and design. Perfect for selfbuilders looking to benefit from huge energy savings, which makes MBC the timber frame construction specialists.

With a variety of timber frame construction systems to choose from, including highperformance systems and our awardwinning Passivhaus system. We’ve successfully established a proud reputation as timber frame builders within the UK self-build industry. Airtightness is included within our bespoke service offering, as well as dedicated support and guidance throughout the construction journey. We also provide the option of our Passive Raft Foundation as well as high-performance windows & doors.

Contact us today for a free quotation! www.mbctimberframe.co.uk 01452 346499 info@mbctimberframe.co.uk UK Office: Quedgeley Court, Shepherd Road, GL2 5EL

16 | passivehouseplus.co.uk | issue 53


BIG PICTUR E

6 Airtightness: when small gets tricky

SMALL BUT MIGHTY

6

Proving airtightness on a building this small came with its own challenges. The main opening is a large sliding door, not ideal for testing, which left a single operable window to run the blower door through. Even the smallest standard equipment struggled with the scale. We ended up building custom setups, including a duct blaster mounted in a plywood panel, just to get reliable readings. Strong valley winds on the day did not help either. We were literally watching the trees outside and waiting for calm moments to capture individual data points. It was not straightforward, but we got there: 0.54 ACH @ 50 Pa.

7 Off-grid reality The house is fully off-grid, powered by a solar PV and battery system. The original setup, twenty-four panels and around 24.5 kWh of battery storage, worked well through summer but proved tight in winter, particularly at 287 metres above sea level where we are often in low cloud. Since then, we have expanded to approximately 18 kW of solar generation, and approximately 49 kWh of battery storage, with around 43 kWh usable. We now comfortably run the house, and charge two EVs, largely from the sun between the equinoxes, and manage winter with a bit more awareness.

7

ph+ | small but mighty big picture | 17


SMALL BUT MIGHTY

BIG PICTUR E

WHO’S

THE BOSS? Got a vision for your build using natural materials, wanting a healthier, energy efficient home? When it comes to finding a builder, things can get tricky. They’re hesitant, worried about the unfamiliar and want to stick to their usual way of doing things. At Ecomerchant we provide a full range of healthy building materials and the expertise and reassurance to help you and your builder get it right. With our support, builders can confidently apply their existing skills and embrace the next generation of building. The result? You get the home you want, your builder gains valuable new knowledge and together, we all build better.

Ecomerchant: Build With Us.

Contact us to find out more about building healthy energy efficient homes.

01793 847 444 info@ecomerchant.co.uk www.ecomerchant.co.uk 18 | passivehouseplus.co.uk | issue 53


BIG PICTUR E

8 Resilience, tested

SMALL BUT MIGHTY

8

One of the first questions people asked when we moved off-grid was: “What happens when you run out of power?” The more interesting question turned out to be: what happens when everyone else does? Over the past few years, we have lived through multiple major weather events, including ex-cyclones that cut off nearby towns, knocked out power, and disrupted communications for days. Up here, the house kept running. We had power, water, wastewater systems, and internet via Starlink. We were able to stay connected, check in on family, and act as a communication point for others. Off-grid living is not about isolation. It is about control and resilience.

8

9

9 Living with less, and getting more Life here is intentionally simpler. We are building a productive garden, working towards a food forest, and raising chickens and ducks. It is an ongoing process, one that evolves with time, but the foundations are there. Designing and building to the passive house standard gave us a head start. It reduces the energy we need, stabilises comfort, and frees up time and headspace for everything else.

10

10 A different kind of benchmark New Zealand housing has a well-documented performance problem. Too cold, too hot, too damp, and often expensive to run. This project was not about building something large or complex. It was about asking a simple question: What happens if you get the fundamentals right, even at the smallest scale? The answer is a house that is comfortable, efficient, resilient, and quietly generous to live in. And importantly, one that suggests we can do a lot better, with a lot less.

ph+ | small but mighty big picture | 19


NEWS

PA S S I V E H O U S E +

NEWS w

Fabric or heat pumps first? AECB conference heads to Manchester to unpick the debate

B

uilding envelope specialists and energy systems experts will meet in Manchester in September as the AECB's annual conference tackles one of the most contested questions in low-energy construction: how fabric performance and energy supply should work together. The Association for Environment Conscious Building (AECB) will hold its flagship annual conference on Friday 25 September at the Science and Industry Museum in Manchester, under the banner "Fabric Matters: Unpicking the Interplay Between Envelope and Energy Supply." The one-day event will combine lectures, panel discussions and breakout workshops, with the familiar AECB emphasis on creating buildings that prioritise environmental responsibility without compromising design quality, occupant comfort or health. Organisers promise plenty of scope for questions and lively debate as delegates examine what it really means to deliver fabric-first, energy-conscious construction. Setting the historical scene, architectural and energy historian Barnabas Calder will take the long view of how humans have balanced fabric adaptations against energy inputs in the pursuit of healthy living conditions, in both hot and cold climates. Calder, who heads the History of Architecture Research Cluster at the University of Liverpool, is the author of Architecture: From Prehistory to Climate Emergency and co-author, with Florian Urban, of the newly published Form Follows Fuel. His talk will propose a powerful, cheap and simple tool for radically reducing the environmental harms caused by buildings and their energy use. Professor David Glew, director of the Leeds Sustainability Institute at Leeds Beckett University, will argue that retrofit and heat pumps must go hand in hand. His presentation will explore the concept of "peak heat" and the risk it poses to heat pump rollout in the UK, drawing on his leadership of major building performance evaluation projects for government — including DEEP, the largest research programme of its kind into

20 | passivehouseplus.co.uk | issue 53

(above) Economist and broadcaster, Evan Davies, will be among the speakers at this year’s AECB conference.

making retrofits of solid-walled homes effective and safe. A familiar voice joins the discussion in the form of broadcaster and economist Evan Davis, presenter of BBC Radio 4's PM and The Bottom Line, and former host of Dragons' Den. Davis, who co-hosted The Happy Heat Pump podcast in 2025 and presented a Radio 4 series on heat pumps this year, will examine why the technology is still often perceived as a luxury good for wealthier, environmentally conscious households, as well as what stands in the way of rolling it out at scale. Cutting through the fabric-versus-systems argument altogether, Marianne Heaslip and Helen Grimshaw of Manchester-based People Powered Retrofit will make the case for putting people, context and understanding first. Their session will use case studies to explore what a people-first approach means across a range of homes, and its implications for policymakers and practitioners alike. The breakout workshops offer something for both the technically and the interpersonally minded. Passive house pioneers Nick Grant and Jon Broome will road-test

ideas from their forthcoming Good Building Book, using real-world examples of highly praised but poorly functioning buildings to ask why affordability, performance and beauty are so often treated as mutually exclusive. Business psychologist Sarah Naidoo-Banks will run a practical session on collaborative conversations, equipping delegates with tools for handling challenging workplace interactions with empathy and assertiveness. Meanwhile, the AECB's Tim Martel will host an open question-and-answer session on PHPP, PHribbon and CarbonLite certification. The venue sits in Manchester's Castlefield district, a short walk from the Deansgate-Castlefield Metrolink stop. The museum has no on-site parking and delegates are encouraged to travel by public transport. Tickets are on general sale until 23rd September, priced from £214.80 for AECB members to £298.80 including VAT for non-members, with the day running from 9am to 5pm. To see full programme details and book tickets visit: aecb.net/aecb-2026-annual-conference/ 


PA S S I V E H O U S E +

NEWS

£100m LSE retrofit to headline as passive house conference returns to London

(above) Render of the Firoz Lalji Global Hub at the London School of Economics, by David Chipperfield Architects.

O

and delegates attending in person can apply to join a guided site visit to the project. The conference itself is expected to draw more than 500 professionals from across the built environment, with designing for robustness and affordable long-term resilience as its central theme. More than twenty speakers will present projects and case studies spanning housing, education, commercial and public buildings, reflecting the widening range of building types to which the standard is being applied in the UK. The programme combines technical presentations with sessions on policy, research and measured building performance, and organisers say delegates will hear directly from practitioners delivering buildings with very low operational energy demand alongside improved occupant

Photo: Maurizio Mucciola Photography

ne of the largest non-domestic passive house retrofits yet attempted in the UK, the £100 million Firoz Lalji Global Hub for the London School of Economics (LSE), will be the subject of a dedicated technical masterclass when the UK Passivhaus Conference returns to London this November for the first time in more than a decade. The masterclass, hosted by the Passivhaus Trust, takes place on 17 November, followed by the UK Passivhaus Conference on 18 November at the Queen Elizabeth II Centre in Westminster. Both events can be attended in person or online. Designed by David Chipperfield Architects, the Firoz Lalji Global Hub will transform an existing post-war building on Lincoln's Inn Fields into a new academic hub for the LSE. The project is targeting Enerphit certification, the Passive House Institute's retrofit standard, alongside net zero carbon, BREEAM Outstanding and WELL Platinum. More than 60 per cent of the existing structure and its principal façades are being retained, with new teaching spaces, conference facilities, digital laboratories and a 350-seat theatre integrated within the upgraded building envelope. The retrofit is currently under construction, and the masterclass will examine the project as it is being delivered, rather than as a finished case study. Members of the project team, including representatives of David Chipperfield Architects, building services engineer Max Fordham and project manager 3PM, will set out the rationale for adopting the Enerphit Component Method, along with fabric design, services integration, procurement, material selection, circular economy principles and the practicalities of delivering deep retrofit on a constrained city centre site. The session is aimed at architects, engineers, passive house designers, contractors and clients,

comfort and resilience. A fringe programme of events, Passifest, runs alongside the main conference. The return to London marks a shift for the event, which has been held outside the capital for over ten years, and comes as retrofit rises up the agenda for UK construction. Extending the life of existing buildings while cutting their operational energy demand and carbon emissions is increasingly seen as central to meeting climate targets, and the Trust says the Firoz Lalji Global Hub offers evidence of how demanding performance standards can be met on complex, large scale projects. "The UK Passivhaus Conference has always been about sharing knowledge, challenging assumptions and learning from the people delivering outstanding projects. Returning to London creates an exciting opportunity to bring together an even wider cross-section of the industry as Passivhaus becomes increasingly mainstream and learning from the exciting large-scale development underway in the Capital,” said Ann-Marie Fallon, co-director of the Passivhaus Trust. For certified passive house professionals, both events carry Passive House Institute CPD credits: fifteen points for the conference, four for the masterclass, and a further two for the site visit, allowing delegates attending all three elements to earn up to 21 points across two days. Early bird tickets for both events are on sale now, with discounted rates for Passivhaus Trust members and a limited number of sponsored places for eligible public sector delegates. Booking details are available from the Passivhaus Trust at www.passivhaustrust.org.uk, with conference information at www.ukphc.org.uk. 

(above) Re-use is central to David Chipperfield Architects design for the LSE Firoz Lalji Global Hub, which will be the subject of a Passivhaus Trust masterclass the day before this year’s UK Passivhaus Conference. Most of the original structure and façades of the building were retained, and thousands of bricks were salvaged from deconstructed internal partitions and parts of the exterior and reused in the project.

ph+ | news | 21


NEWS

PA S S I V E H O U S E +

Unlock New Possibilities with Passive House Certified Casement Performance System 4-45 Hi+ Casement Window

PAS 24 Security Tested

Low Air Permeability Performance

For technical information or to discuss your next project please contact us: technicalenquiries@metaltechnology.com Follow us on

| metaltechnology.com

22 | passivehouseplus.co.uk | issue 53

Scan QR code to view our Passive House brochure

26 - 65mm Glazing Capability

Passive House Certified

U-Value 0.8 W/m2K


PA S S I V E H O U S E +

NEWS

From compliance to performance:

reflections from Essen

The 28th International Passive House Conference brought together experts and practitioners in April to discuss the world’s leading low energy building standard. Niall Crosson, group technical director at Ecological Building Systems, summarises this year’s event, which marked the 35th anniversary of the first passive house, and the 30th anniversary of the Passive House Institute. Photo: Florin Pepene

(above) Attendees at the 28th International Passive House Conference in Essen.

here was a strong UK interest at the 28th International Passive House Conference in T Essen, where the themes could hardly have been

more relevant as the industry prepares for the Future Homes Standard, continues under Part L 2021, and confronts the limitations of SAP and EPC-based compliance. A central message was Efficiency First, reinforced by Professor Wolfgang Feist, whose own passive house – now over 35 years old – continues to perform as designed. At a time when the UK industry still questions consistency of delivery, the lesson is clear: measured

performance over time matters more than design intent alone. The UK's regulatory direction broadly aligns with this. Part L 2021 improved fabric standards and lowered carbon targets, and the Future Homes Standard aims to deliver very low operational emissions in new homes. But many standards still fall well short of passive house levels – particularly on airtightness – and compliance rests largely on SAP calculations and EPC ratings, which predict rather than reflect real performance. The performance gap therefore remains critical. The message from Essen was that closing it is less about new technologies and more about process, verification, accountability and build quality – exactly what passive house delivers through rigorous design, airtightness testing, thermal bridge-free detailing and commissioning. The UK's cool, damp, wind-driven climate reinforces the point: moisture, air leakage and thermal bridging present ongoing risks, while overheating is an emerging concern demanding more careful design. Another key theme was the shift beyond operational energy toward embodied carbon and wholelife performance. UK regulations and SAP still focus mainly on operational emissions but calls

for whole-life carbon assessment are growing. It prompts a key question: are we building to meet today's regulations, or preparing for future performance requirements? Case studies reinforced these themes. Deep retrofits demonstrated energy reductions of up to 80 per cent, even in complex heritage buildings – highly relevant to the UK's existing stock. Claridge House in Mayfair, presented by Federica Romeo Bettie of Studio PDP, cut energy use by around 80 per cent despite heritage constraints and occupation, using insulating plaster, vacuum glazing and detailed hygrothermal analysis. In social housing, Glasgow's Dundashill scheme showed high performance delivered with modest capital uplift and lower heating costs, while larger projects such as Oxford University’s Schwarzman Centre for the Humanities highlighted a shift in risk toward coordination, construction quality and verification, especially as delivery expands through MMC (modern methods of construction). Essen reaffirmed that passive house is not about perfection, but predictability, transparency and disciplined delivery. The knowledge already exists – the challenge is moving beyond compliance to consistently deliver better buildings at scale. 

‘Hidden' Bankside street to become green hub for business and community

merica Street SE1, a lesser-known back- environments like Bankside. The sustainable 'stop' on the Low Line." street between Great Guildford Street and drainage system uses a specialist substrate of A The project – a forerunner to Southwark's Southwark Bridge Road in London's Bankside crushed concrete mixed with compost, sand borough-wide Streets for People programme – – with one of the UK capital's best views of the Shard – is to be transformed through a £500,000 ‘climate and community’ project. The scheme is being delivered by local business improvement district Better Bankside in partnership with Southwark Council, with funding support from the Cross River Partnership through the mayor of London's Air Quality Fund and its Healthy Streets Everyday programme. The currently underused thoroughfare will be fully pedestrianised and filled with climate-resilient planting, while new lifestyle businesses – including bar and street food venue FLAV'R, bakery Mustard, Franke Coffee, and training destination Pace Club – move into its restored Victorian railway arches, part of the wider Low Line regeneration of the viaduct. At the heart of the scheme are three rain gardens designed to capture and absorb rainfall that poses a flooding risk to urban

and grit to improve water management and encourage deeper root growth. Influenced by the ecological planting approaches pioneered by landscape designer Nigel Dunnett, native species will make up more than half the planting design, alongside early-flowering bulbs for pollinators, layered grasses, perennials and birch trees. Air quality monitoring technology will also be installed to measure the long-term impact of the interventions. Nicole Gordon, chief executive of Better Bankside, said: "The transformation of America Street is a powerful example of how Better Bankside is delivering on our five-year vision to make Bankside stronger, greener and happier for everyone who lives, works and visits here. "This project will create a greener, more welcoming public space that improves the everyday experience of our neighbourhood. Coinciding with the opening of a diverse mix of businesses, America Street forms a new

will deliver 300 sqm of improved public space, with FM Conway as main contractor and public realm design by JA Projects and Southwark Council. Planting is due to be completed in October 2026. 

(above) A CGI visualisation by JA Projects of America Street, SE1 transformed into a new pedestrianised and climate-resilient destination for community and business in Bankside.

ph+ | news | 23


HUDA ELSHERIF

COLUMN

Quiet or cool: the comfort tug-of-war Part O treats noise and cooling as a zero-sum game, but comfort is more subjective than the regulations allow, says Dr Huda Elsherif, building physics engineer at Scotch Partners.

D

uring my first summer in the UK, I was surprised to discover the birds start singing as early as 2 a.m. and keep going until 10 p.m. So, when my colleague told me her Part O noise levels were being exceeded by robins having a rave, this time I wasn’t surprised. You might think nature’s orchestra surely wouldn’t prevent someone from opening their windows. While Part O’s noise guidance technically agrees by limiting its scope to man-made noise sources, our experience of sound can be just as subjective as thermal comfort. Some people fall asleep to birdsong YouTube videos. I use them as my alarm ringtone. I promise I don’t have a personal grudge against flying jukeboxes, and I quite enjoy it when they are harmonious. But more often than not, there’s always that one off-key crow cursing you and your ancestors. That’s because it’s not just the volume of sound that matters, but also how frequently disturbances occur. Part O accounts for this by allowing only ten loud disturbances per night, as these are more likely to mess with your sleep. As with all hard limits, this can create slightly absurd situations where nine concrete lorries thundering past are totally acceptable, but eleven ordinary cars trigger the “no more openable windows” alarm. This is common in London, where Part O noise limits are often exceeded because of these short disturbances rather than average background noise levels. When feeling generous, the noise consultant might still allow the windows to open, but by such a tiny amount that occupants would need to whip out a ruler every evening to measure a 1.5 cm gap. Not all noise is bad you know. Growing up in a hot climate, I could only sleep under the gentle hum of a ceiling fan, my personal version of white noise. So naturally, I initially found UK homes eerily silent. I could hear every creaky floorboard and every midnight fridge raid my roommates embarked upon. Passive house buildings take this silence even further. High insulation levels, triple glazing, and airtight construction make them incredibly quiet. That’s why it becomes especially important to limit mechanical noise within them. Without background sound to mask it, every gurgle of air through a duct suddenly sounds dramatic. The challenge is that by the time MEP

24 | passivehouseplus.co.uk | issue 53

consultants have worked through Part F, energy efficiency requirements, and the mandatory brawl with the architect over ceiling void heights, asking them to also account for aspirational noise levels is like throwing a rock at a juggler and expecting them to catch it alongside all the other balls already in the air. Passive house pressure targets are often treated as an afterthought. On certified passive house projects, third-party checks at least force engineers to confront the problem. But on projects that merely adopt “passive house principles,” anything not explicitly required by building regulations becomes easy pickings in the next value engineering season. Passive house buildings are a bit like IKEA furniture: every component serves a purpose. You wouldn’t sit on a chair with a missing leg just because the other three looked sturdy enough. The impact of noise on thermal comfort isn’t limited to those moments when we’re trying very hard to fall asleep. In my work with ARC on the Ecovillage Orphanage, we used perforated brick walls internally to maximise airflow in a hot, humid climate. While this might sound like every modern teenager’s worst nightmare, it worked well in its Tanzanian context, keeping the girls cool without compromising privacy too much. But when you try applying the same idea to a school, you’re no longer dealing with ten girls chatting quietly in the evening. You’re dealing with ninety children competing for the teacher’s attention. So, we adapted the concept, creating “compartments” that allowed air to flow while reducing sound transfer. One of the things I enjoy about designing in the Global South is that the lack of rigid regulations gives you more freedom to balance conflicting requirements with a degree of common sense. With temperatures rising in urban environments, Part O noise limits could benefit from becoming just as nuanced. The adaptive thermal comfort model already recognises that if I’m comfortable at 26 degrees Celsius on a hot day, I’m probably not going to start writing my will at 27C. Equally, I’m unlikely to angrily slam my windows shut the moment car number eleven drives past. That is, of course, unless it’s another damned Ferrari. •

It’s not just the volume of sound that matters, but also how frequently disturbances occur.


COLUMN

MOMENTUM

Closing the loop: how re-used steel can drive low-carbon design Recycling steel still burns huge amounts of energy. Reusing it avoids the furnace altogether, and two recent projects show how it can work at scale, say Joe Garbett and Tom Dolton of Momentum structural engineers.

S

teel has been established as a key construction material for almost 150 years, owing to its versatility and durability. It can also be easily recycled without losing its properties, and over 650 million tons are recycled globally every year. In the UK, 99 per cent of structural steelwork from demolished buildings is recovered, and 86 per cent is melted down to make new steel sections. But the process of melting and reforming steel uses huge amounts of energy and resources, resulting in significant embodied carbon even for recycled steel. Reused steel sections offer a simpler solution. By taking existing or recovered sections and reapplying them to a new purpose, the energy-intensive processes of melting down and reforming are avoided altogether. The embodied carbon savings are considerable: reused steel can deliver up to 97 per cent reduction in cradleto-gate embodied carbon compared to a typical steel section. Momentum's recent work on the African Forest habitat at Bristol Zoo Project demonstrates the potential of steel reuse, as well as some of its challenges. We have worked closely with Feilden Clegg Bradley Studios, Grant Associates, and Bristol Zoological Society since 2021 to create a highly sustainable, conservation-focused zoo. Once it became clear that the environmental conditions of the new Gorilla House and Crocodile House were only achievable in steel, reuse became a key part of this vision. Early buy-in was crucial. The project team worked hard at early stages to engage with suppliers and adopt the mindset of working with reused steel. Once the client embraced the idea, it became a driving force behind the project. The approach achieved remarkable savings in the first phase, which is now complete. External works designed around tubular sections reached nearly 90 per cent reuse, while the primary building frames achieved 30–35 per cent. One common worry is appearance. In practice, reused steel can be made to look almost indistinguishable from new, with careful processing to remove old plates and shear studs before shot blasting and painting. Bristol Zoological Society chose to embrace some imperfections as part of its sustainability narrative, which also reduced processing time and cost. The UK Green

Reused steel offers a rare win-win: massive carbon savings while continuing to use a familiar, versatile material. Building Council's proposed visual grading system, running from 'as new' to 'non-compliant', provides a useful framework for specifying acceptable aesthetics. This clarity will be vital as reuse becomes mainstream. The real challenge lies in design flexibility and procurement. Reuse challenges the traditional linear design process, where material sourcing happens after design. Instead, it demands an iterative approach with design informed by availability. For the Bristol Zoo Project, early procurement proved critical. Before tender, the team secured a large quantity of steel from Cleveland Steel, ensuring certainty in availability and allowing the design to be adjusted to suit stock. The team used the HTS StockMatcher tool to compare the Revit model against monthly supplier lists, adjusting specifications to align with available stock. Other approaches include specifying lower grade steel to maximise availability and building in tolerances within structural zones to allow for variation in section size. One of the most critical lessons was to embrace tubular sections, which currently have the best availability. Suppliers like Cleveland Steel and Tubes have built their business on stockpiling surplus stock, and this became a key design driver for elements of Bristol Zoo Project, while shaping the whole design strategy for the Yard Theatre. The Yard Theatre Hackney Wick's Yard Theatre started as a popup theatre in a disused warehouse, so the construction of a new permanent auditorium was a natural opportunity to explore a circular reuse approach. Momentum worked with Takero Shimazaki Architects to incorporate repurposed

steel tubes into the structure: the tubes are welded and bolted together to form the beams and columns of the auditorium frame. The tubular structure and bolted splices will be left visibly exposed, embracing the theatre's DIY ethos and expressing the story of the repurposed material. This project took reuse a step further, reinventing a disused tower crane mast as a permanent natural ventilation tower. The mast creates a striking architectural form, visible from surrounding streets as well as from trains arriving into Hackney Wick station. It functions as a ventilation chimney, providing an air flow route for the building's low-carbon mixed mode ventilation system, while also reducing fabrication requirements and installation time: the sections were simply pinned together on site, then lifted onto a fabricated steel base-frame. Supply remains the biggest hurdle to widespread steel reuse. There are few major stockists, and demolition practices often damage steel beyond reuse. To unlock circular potential, the industry must shift from demolition to deconstruction, disassembly and reuse, preserving structural elements for future projects. Our experiences so far show that with early engagement, clear specifications and flexible design, reuse can work at scale. As we push towards net zero, material choices will be critical. Reused steel offers a rare win-win: massive carbon savings while continuing to use a familiar, versatile material with huge structural benefits. Designing for steel reuse demands early engagement, flexible thinking and a willingness to adapt design language. But it offers a powerful way to cut carbon without compromising design ambition, and a tangible route towards a truly circular economy. •

ph+ | momentum column | 25


MARC Ó RIAIN

COLUMN

Retrofit delta: why the figures really do stack up Retrofit sceptics compare upgrade costs against doing nothing, but once you account for the reinvestment buildings need anyway, the figures look very different, says Dr Marc Ó'Riain.

E

very so often the retrofit debate in Ireland and the UK returns to the same question: do the numbers actually stack up? A recent Irish Times column suggested they do not. The argument is familiar. Deep retrofit costs tens of thousands of euro or pounds, households cannot afford it, and national climate targets therefore look unrealistic. But this argument rests on a flawed assumption: that buildings remain unchanged for decades and that retrofit represents a sudden discretionary expense imposed on homeowners. However, buildings do not work that way. They are assemblies of components with predictable lifespans. Oil boilers fail after fifteen or twenty years. Windows degrade over thirty or forty. Roof coverings eventually require replacement. Houses demand periodic reinvestment simply to remain functional. Lack of proper maintenance leads to further degradation and can be referred to as “deferred maintenance”. Simply put, building elements have defined lifespans, and these parts of your asset need replacement periodically. Yet much of the public discussion compares the cost of deep retrofit with the cost of “doing nothing”. But doing nothing is not actually an option. What much of the retrofit debate misses is what might be called the retrofit delta: the additional investment required to improve building performance beyond normal replacement costs. If a boiler fails, replacing it with another fossil fuel system may cost €3,500-€5,000. A heat pump may cost more, but the relevant figure is not the total installation cost. It is the efficiency premium above the baseline replacement cost. The same principle applies across almost every building element. When roofing materials are renewed, insulation can be upgraded at marginal additional cost. When windows are replaced, airtightness and glazing performance can improve dramatically. When façades require repair, external insulation becomes more feasible. In practice, the retrofit delta is often far smaller than the headline figures used in public debate because homeowners are already facing baseline reinvestment costs. This matters because much of the Irish and UK housing stock was constructed between the 1950s and 1990s. Many of these homes are now approaching a period where multiple components will reach the end of their service life within the same generation.

26 | passivehouseplus.co.uk | issue 53

If these elements are simply replaced on a like-for-like basis, the opportunity to improve building performance may be lost for another thirty or forty years. The importance of these decisions extends beyond the buildings themselves. There is also a wider geopolitical context that increasingly makes this issue impossible to ignore. The war in Ukraine exposed Europe’s dependence on imported fossil fuels, while growing instability involving Iran and the wider Middle East continues to place pressure on global energy markets. Electricity and fuel prices remain volatile, and households are increasingly aware that energy security is no longer an abstract political issue, but something felt directly in monthly bills. That reality says something uncomfortable about the condition of much of our housing stock. Yet even this discussion often remains too narrowly focused on energy bills and payback periods. Homes are not simply energy systems. They are environments in which people live. Anyone who has spent time in a poorly insulated house in winter recognises the experience: cold surfaces, draughts, condensation and rooms that never quite feel comfortable. A well-executed retrofit changes this fundamentally. Internal surface temperatures rise, draughts disappear and ventilation becomes controlled rather than accidental. The result is not simply lower energy use, but healthier and more comfortable indoor environments. Poor housing conditions are linked to respiratory illness, damp, mould and excess winter mortality, with many of these costs ultimately absorbed by public healthcare systems. This does not mean every home requires an immediate deep retrofit. In reality, most buildings will improve incrementally over time through a sequence of replacement and upgrade decisions. Solar PV, attic and cavity insulation upgrades often happen first because they are less disruptive, easier to finance and deliver visible reductions in energy bills. More substantial fabric improvements may occur later as windows and heating systems reach the end of their lives. This sequence may not perfectly align with the ideal technical “fabric first” hierarchy, but it reflects how households actually make investment decisions. The important thing is that these interventions form part of a coherent long-term pathway rather than isolated short-term measures. If this is how most households approach

building investment, then public policy should be designed to support that reality. This is where grant agencies such as the SEAI (Ireland) and local authorities (UK) have a critical role to play. If governments genuinely want to accelerate retrofit uptake, support mechanisms need to better reflect how buildings and household finances actually work. Rather than focusing almost exclusively on large one-off deep retrofit projects, there is a strong argument for supporting staged elemental retrofit measures at meaningful grant levels — potentially up to 50 per cent support for key fabric interventions carried out at the point of renewal. If windows are being replaced, improve their performance properly. If roofs are being renewed, insulate them to a high standard. If façades require repair, support external insulation at that moment. These are precisely the points where homeowners are already preparing to invest. Viewed in terms of the retrofit delta — rather than through the narrow lens of a single retrofit invoice — the figures do stand up to scrutiny. Indeed, growing public awareness of energy performance ratings is increasingly influencing purchasing decisions, with higher-rated properties often attracting a measurable price premium. As a result, investment in what would otherwise be a depreciating asset is being reflected in enhanced market value, with the benefits of improved energy performance increasingly capitalised into sale prices. In fact, the more uncomfortable possibility is that failing to retrofit may ultimately prove to be the more expensive choice of all, as deferred maintenance accumulates and homes become less comfortable, less healthy and less valuable over time. Ultimately, retrofit is not an extraordinary cost but the intelligent modernisation of a valuable asset — one that delivers greater comfort, resilience, energy security and market value for decades to come. •

Dr Marc Ó Riain is a lecturer in the Department of Architecture at Munster Technological University (MTU). He has a PhD in zero energy retrofit and has delivered both residential and commercial NZEB retrofits In Ireland. He is a director of RUA Architects and has a passion for the environment both built and natural. A fully referenced version of this article is published on www.passivehouseplus.co.uk


SIMON JONES

COLUMN

Reverberations of History: The Intersection of Energy Crises and Building Health The 1970s energy crisis sealed our buildings and sickened their occupants. As fuel prices bite again, the same pattern is re-emerging and, says Air Quality Matters founder Simon Jones, this time we should know better.

I

n the winter of 1973, as global oil prices quadrupled and supply lines were restricted, the ambient temperature inside my family’s home plummeted. I was a newborn, a "baby in arms", and the daily struggle to maintain a safe, warm environment turned into a defining reality for my parents, just as it did for millions of others. That global energy shock did not simply force families to ration heating oil; it catalysed a fundamental, knee-jerk transformation in how architectural and engineering communities approached the built environment. The regulatory and economic mandate was clear and immediate: stop the drafts, seal the building envelopes and save energy at all costs. Yet, in the rush of our industry to seal our buildings from the outdoors, we inadvertently engineered a complex public health challenge. Today, as we face new geopolitical energy shocks, the echoes of those early decisions are reverberating, serving as a stark reminder of what happens when we prioritise energy conservation over holistic building health. Prior to the 1970s, building envelopes were largely forgiving by accident rather than design. This meant that while structures were highly thermally inefficient, they were inadvertently well-ventilated. The oil embargo changed this paradigm overnight. Architects and engineers were tasked with radically reducing heating loads. The industry quickly introduced widespread cavity wall insulation, synthetic vapour barriers and double glazing, systematically sealing buildings to minimise uncontrolled air leakage. However, this aggressive early push for airtightness lacked a parallel progress in ventilation strategies. The mantra "build tight" was universally adopted, but the crucial second half of the equation, "ventilate right", lagged significantly behind both in technology plus regulatory implementation. The physical and biological consequences of this rapid architectural shift soon manifested as a widespread crisis of indoor environmental quality (IEQ). By drastically reducing natural ventilation pathways without providing engineered mechanical alternatives, we fundamentally altered the behaviour of our homes and commercial spaces. We trapped mois-

28 | passivehouseplus.co.uk | issue 53

ture, volatile organic compounds (VOCs) from synthetic building materials, and other pollutants. The industry soon became intimately acquainted with the phenomenon of "sick building syndrome." Furthermore, the application of early insulation often shifted the dew point within wall assemblies; issues previously masked by continuous, draft-driven air movement became localised breeding grounds for mould. The epidemiological ripple effect was measurable, correlating with a sharp rise in childhood asthma and chronic respiratory conditions. We learned a hard, data-driven lesson in building physics. It was the birth of organisations such as the Air Infiltration and Ventilation Centre (AIVC), a direct response to the failures of many buildings and the need for better information. Decades later, our technical understanding of building physics has matured significantly. Modern standards such as passive house demonstrate that extreme airtightness and superior IEQ can successfully coexist through the rigorous application of technologies like MVHR (mechanical ventilation with heat recovery). Yet, despite our engineering advances, we are currently facing a dangerously familiar economic pressure. The severe energy shock catalysed by the conflict in Ukraine, the ensuing global cost of living crisis and the imminent threat of further supply chain interruptions stemming from Middle East tensions have pushed energy affordability back to a precipice not seen since the 1970s. Consequently, occupant behaviour could emulate the past. Again, rationing heat to reduce utility bills. Crucially, we already see evidence of actively sealing trickle vents, blocking passive airbricks and turning off ventilation systems to prevent perceived heat loss. This is particularly problematic in the context of modern buildings. When legacy housing stock is upgraded with high-performance glazing and upgraded insulation, but does not have comprehensive ventilation upgrades, the building physics fail. We are already witnessing a documented, severe resurgence in dampness, condensation and mould across these under-ventilated environments, directly impacting health outcomes once again. This paradigm begs a critical question for our

The mantra 'build tight' was universally adopted, but the crucial second half of the equation, 'ventilate right', lagged significantly behind.

profession: as we navigate these modern fuel shocks, have we truly internalised the lessons of the 1970s, or are our institutional memories too short? Designing for energy efficiency is now a baseline regulatory requirement, but designing for true resilience requires engineering systems that protect indoor air quality even when occupants are forced into thermal rationing. We must prioritise robust ventilation, use modern tools like air quality monitors and double down on quality and standards. We cannot allow short economic memories to override the established physics of building health. The echoes of the past are loud and clear; it is our responsibility to engineer a future that listens. •


WINNER

Best Home Technology Product or Installation


30 | passivehouseplus.co.uk | issue 53


CASE STUDY

MUSWELL HILL

WRECK AND REWARD

VICTORIAN WRECK HITS 95% CARBON CUT THROUGH DEEP RETROFIT

A dilapidated Victorian house in north London has been transformed into a high-performance home through a deep retrofit that cut carbon emissions by 95 per cent, while also attempting to minimise embodied carbon through careful material choices. Words: Jason Walsh Additional reporting: Jeff Colley

IN BRIEF Development type: Deep retrofit of Victorian semi-d Method: Bio-based insulation, timber frame and clay block extensions, basement lowered, ASHP and MVHR Location: Muswell Hill, London Standard: None, but near-Enerphit Space heating cost: £38/month, assuming no contribution from PV. See In Detail panel for more information.

£38 per month

ph+ | muswell hill case study | 31


MUSWELL HILL

CASE STUDY

T

he house, on a corner plot in Muswell Hill, was in such poor condition when purchased in early 2020 that its energy performance certificate scored just one point in Band G. It is now heated entirely by an air source heat pump — for full energy performance figures, see the data panel. Owners Justin and Amma had lived in the area for years and were looking for a home they could stay in long-term — one that matched Justin’s growing interest in sustainable building with a quality of space both could enjoy. Justin, a self-described technology enthusiast, was part of a business that launched one of the first online music stores, later ran an internet service provider, and was an early adopter of electric vehicles. Consequently, when he heard about passive house from a fellow parent at his children’s school, the path forward seemed clear.

32 | passivehouseplus.co.uk | issue 53

“I thought, that’s it: the next house you live in will be a passive house,” he says. The original plan had been to retrofit a house Justin and Amma already owned, and he had engaged an architect, Johanna Ahrberg-Jackson of Ahrberg Jackson Architecture and Design, to work on the design. But when the Muswell Hill property came on the market, it presented a better candidate: a wreck, certainly, but with off-street parking — rare in London — and good access to shops and the tube. The couple bought the house at the start of 2020. Architect Natalie Black, founder of Enbee Architecture and Design, was approached by Ahrberg-Jackson through the Network of Women in Architecture: although they had never met, Black’s name had come up through word of mouth. For his part, Justin says the initial phone call made the decision easy.

“It was crystal clear that she understood everything: insulation, cold bridging, MVHR — she knew it all, so I knew I could work with her,” he said. “Then she introduced me to the concept of embodied carbon and the idea that we could lock away carbon in wood fibre insulation and timber. I was genuinely excited.” Black received the call in March 2020, during the first wave of Covid — which she had contracted at Futurebuild. Nobody was building at that point due to Covid restrictions, so the early months were spent stripping out the property. In addition, initial survey drawings from the previous project proved inadequate for a deep retrofit, so Black brought in a new surveyor. A new structural engineer was also brought on board to concentrate the sustainability thesis: Black’s brother, a sculptor who creates kinetic work, suggested she look at the work


CASE STUDY

MUSWELL HILL

of Toby Maclean, a structural engineer who specialises in low-carbon projects. Maclean was initially reluctant because the project included a basement, something he typically avoids. “As a structural engineer, lowering embodied carbon is my main thing,” Maclean said. “I don’t normally do basements. When you do a retaining wall that’s also part of the house, not in the landscape, there is virtually no option other than concrete because you have the waterproofing and structural integrity to think about.” Black nevertheless persuaded him to treat the basement as an opportunity to test how low carbon it could be made. The answer, Maclean says, was that while the house as a whole achieved major savings, basements remain an issue from a carbon perspective. “What this project proved is that it is impossible to do a low-carbon basement, because we really tried,” he says. To ameliorate the impact, the team used low-density concrete with pumice aggregate, which Maclean says is about half the weight of standard concrete and offers improved thermal performance. The supplementary cementitious material (SCM) ground granulated blast-furnace slag (GGBS) was also used to reduce the amount of highly polluting clinker in the cement.

The basement insulation presented its own challenges. The team chose cork, partly below ground level, which was one of the riskier decisions on the project, Black says. Calculations were commissioned to confirm the material’s longevity, and a membrane was added over the top to prevent moisture ingress. Above ground, the strategy was more straightforward: the house is a London redbrick, and the aim was to use timber and timber-based materials wherever possible. The rear extension was built from Juwo blocks, fired clay blocks 425 mm wide. Maclean says these are relatively high in embodied carbon but have low thermal conductivity, often eliminating the need for additional insulation. They also simplify airtightness detailing significantly. “All the problems with membranes and so on just go away,” he says. The roof of the extension uses glulam beams with sawn softwood secondary members. The back wall of the original house, meanwhile, was in such poor condition that Black consulted Andy Hales of HG Matthews before concluding that full reconstruction was the better option. The rebuilt wall comprises a 140 mm timber frame fully filled with flexible wood fibre, externally lined with 140 mm of solid wood fibre board, with 50 mm allowed for ventilation and a single brick skin hung from the timber frame.

Photos: Rachael Smith

ph+ | muswell hill case study | 33


MUSWELL HILL

CASE STUDY

Internally, an OSB layer provides the airtightness layer, with a wood wool layer carrying a finish of 10 mm of lime plaster built up in layers and painted with a low-VOC, vapour-open paint. The result achieves passive house U-value levels — see data panel — which repair alone could not have matched. Throughout the house, internal alterations and the loft conversion, which would typically require steel, were executed in structural timber. Maclean says the contractor was comfortable working this way, which made a significant difference. “There is an idea that low-carbon houses are more expensive, but that need not be the case,” he says. “If you replace every item like-for-like with a greener alternative, with wood fibre, for instance, then yes, it is more expensive. But if you work with a structural engineer from stage one, costs can be managed.” The human experience of the build — three years of disruption, decisions and compromise — fell equally on Amma, whose steadiness throughout, Justin says, was indispensable. The project went to tender, and three contractors were invited to quote, from whom Oasis was chosen. Two of Oasis’s partners, Black says, arrived with iPads and methodically worked through the specification, an early indication that they were engaged with the process. Indeed, site manager Emmanuel impressed Black sufficiently that she is now working with him on another project. “Once you get your dream team together, you want to keep them,” she says. That team was tested by circumstances beyond anyone’s control. The combination of Brexit, Covid and the war in Ukraine created overlapping supply chain pressures. Prices rose, but more problematically, materials became difficult to source. Wood fibre insulation had to be substituted with wool in places. Elsewhere, the specified 140 mm thickness had to be built up from 100 mm and 40 mm layers because single sheets were unavailable. The contractor, Black says, never simply threw up their hands. The house is heated by a Vaillant Arotherm Plus air source heat pump, working in combination with a Zehnder Q450 mechanical ventilation with heat recovery unit and on-site solar generation. The system was designed and installed by Next Step Heating, whose founder Kaspar Bradshaw oversaw the specification. Heat is distributed via underfloor heating throughout the house — a natural fit for the low flow temperatures at which heat pumps operate most efficiently. The result is a home whose energy profile bears little resemblance to its Victorian origins: total annual electricity consumption, covering heating, hot water, general household use and electric car charging, is a frac-

34 | passivehouseplus.co.uk | issue 53

1

2

3

4

5

6

1 The original house was in a state of disrepair; 2 existing chimneys were infilled and capped; 3 & 4 the basement includes waterproofing membrane under 100 mm cork boards; 5 & 6 Steico woodfibre was used to insulate the existing walls.


CASE STUDY

There is an idea that low-carbon houses are more expensive, but that need not be the case.

tion of the gas the family burned in their previous, smaller home. In his previous home — twenty per cent smaller, gas-heated, with some single-glazed windows — Justin and Amma used 21,000 kWh of gas in a year. In the Muswell Hill house, total electricity consumption is around 16,000 kWh annually. That figure covers heating, hot water, general household use and charging an electric car. The team used Passive House Planning Package (PHPP) software to guide the design, aiming for Enerphit certification — a heating demand of 25 kWh/m²/year and airtightness below 1.0 air changes per hour at 50 pascals. The final results came close but fell short on both counts, so certification was not pursued. Actual carbon emissions, measured rather than modelled, represent a 95 per cent reduction on the original building. Embodied carbon for the project was calculated across modules A to C of a whole-life carbon assessment — figures are in the data

MUSWELL HILL

panel. Maclean had developed his own calculator for this purpose, though Black says her approach was more intuitive: wood is good, so use wood fibre insulation and timber structure wherever possible. For Black, the project demonstrates that performance and aesthetics need not conflict. “You can get people who think about energy but don’t take an interest in how it looks,” she says. “For me, I want a beautiful space as well as an energy efficient one. The things that make it efficient, I want them to be visible yet invisible.” The family moved in during February 2023, after roughly eighteen months of construction. Black received RIBA certification on the back of the project. Justin, for his part, sees embodied carbon and carbon sequestration as two distinct concepts — both of which this house addresses. “The notion of embodied carbon was new to me,” he says. “So, we played the game: we did everything we could.”

7

8

9

10

11

12

7 Juwo clay blocks extension and thermal break at window reveal; 8 25 mm Diathonite thermal plaster to the poroton blocks; 9 architect Natalie Black, founder of Enbee Architecture and Design; 10 dormer and counter battened roof; 11 ducts, woodfibre and grooved board for underfloor heating pipes; 12 reclaimed brick slips.

ph+ | muswell hill case study | 35


MUSWELL HILL

CASE STUDY

THEY’RE BACK Some invasions are welcome. This is one of them.

Skamo Wall. Danish Design.

British Comfort.

The Danes Have Always Had a Way of Changing Britain… A timeline of surprising (and oddly life-improving) invasions. 865 AD – The Danelaw is established They came with axes and stayed for tea. Result: 200 years of administrative reform, and the word “husband.” 1901 – Lurpak butter is born They came with butter. We never looked back. Result: Millions of British Sunday breakfasts improved overnight. 1950s – Danish bacon arrives in UK supermarkets They came with rashers. Result: A national obsession, a full English forever changed. 1958 – The LEGO brick is patented They came with plastic bricks and infinite imagination. Result: Every British child (and adult) learned to step carefully.

2025 – SkamoWall lands in the UK

They came with breathable, mould-resistant insulation boards. Result: Healthier homes, happier families, and the end of damp walls. Available in the UK from Ecomerchant Tel 01793 847 444 info@ecomerchant.co.uk www.ecomerchant.co.uk

HERITAGE CHARACTER.

ENERPHIT PERFORMANCE.

WHERE HERITAGE MEETS HIGH PERFORMANCE We offer high performance triple glazed VictorianSASH and VictorianECO windows and doors, combining traditional aesthetics with modern comfort and energy efficiency.

Our quality-assured products are designed to deliver.

Reduce heat loss & improve comfort

Bespoke solutions for your home

www.eksalta.co.uk

36 | passivehouseplus.co.uk | issue 53

Supply only or supply & Installation

info@eksalta.co.uk

Ideal for refurbs, retrofits & new builds

020 8087 0819


CASE STUDY

MUSWELL HILL

EMBODIED CARBON Structure was designed on a timber-if-possible basis except for the extension which used Juwo clay blocks that perform as both the load-bearing elements and most of the insulation needed. Use of concrete was unavoidable in lowering the basement floor level, but great efforts were made to maximise cement replacements and, by the use of lightweight (low-density) concrete gain a valuable contribution to the thermal insulation performance from it Cradle to grave total: 370 kg CO2e/m² Upfront total excluding sequestration: 280 kg CO2e/m² Upfront total sequestered CO2: 105 kg CO2e/m² Standard/Framework: RIC WLCA 2nd Edition and IStructE HTCEC v2, but with estimates for modules A4, A5 and B and C Calculation tool: Inhouse Reference study period: 60 years Materials included: All structural and non-structural building components and finishes (e.g., wall, roof and floor structure, insulation, internal finishes (plaster / plasterboard), cladding, non-loadbearing walls) included, windows, doors included. Decorative finishes (carpets, finished floors) and fittings (e.g., kitchen) excluded. ME&P estimated Embodied carbon notes: Carbon intensity factors were from specific EPDs where available, generic or representative EPDs were not, or else from the ICE database, or failing that, in-house estimates. Modules A4, A5 and B and C were estimated from IStructE V2 guidance

SELECTED PROJECT TEAM MEMBERS Client: Justin Keery / Dr Amma Kyei-Mensah Architect: Enbee Architecture and Design / Ahrberg-Jackson Design Interior design: JVL Interiors M & E engineer: Next Step Heating Civil / structural engineer: Allt Environmental Energy consultant: Qoda Main contractor: Oasis Construction Life cycle assessment consultant: Allt Environmental Windows and doors: Eksalta / Josko Roof lights: Velux

ph+ | muswell hill case study | 37


MUSWELL HILL

CASE STUDY

Be part of something bigger The Association for Environment Conscious Building (AECB) is an independent, not-for-profit organisation run for its members. Our vision is to create a world in which everyone in the building industry contributes positively to human and planetary health. We work with our members to inspire, develop and share sustainable and environmentally responsible building practice. Our Standards are a key pillar of the deployment of environmentally responsible building practices and the creation of sustainable low energy, low carbon buildings.

Membership

AECB CarbonLite™

Webinars

Be a part of the UK’s largest sustainable building community, a vibrant network to feel part of through collaboration, research, and best practice.

The AECB CarbonLite™ Training Centre offers cutting edge training for the buildings sector, plus expert written, well established courses in Retrofit and PHPP training.

Bringing you a webinar programme ongoing throughout the year to gain knowledge and insight directly from the experts.

Software

Newsletter

Knowledgebase

Our online shop provides software packages such as the Passive House Planning Package, design PH, AECB PHribbon and the AECB Carbon Calculator.

Keep up to date with all the latest news in the sustainable building world with our free newsletter.

Established in 1989, the AECB works to increase awareness within the construction industry and has built up a vast library of technical articles and media resources.

For more information visit our website, and don’t forget to follow us too!

www.aecb.net

38 | passivehouseplus.co.uk | issue 53


CASE STUDY

MUSWELL HILL

WANT TO KNOW MORE? The digital version of this magazine includes access to exclusive galleries of architectural drawings. The digital magazine is available to subscribers on passivehouseplus. ie & passivehouseplus.co.uk

IN DETAIL Project overview: Urban deep retrofit of historic Victorian semi-detached house Development name: Muswell Hill Low-Carbon House Development type: Deep retrofit of semi-detached 215 m2 period property with 3 extensions, ground, top floor and basement, adding 65 m2 to the total. The basement used low-carbon concrete and cork, the ground floor used Juwo bricks, and the top floor timber frame construction was fully filled with woodfibre Site type & location: Urban, fairly main street to Muswell Hill centre Budget: Not disclosed Completion date: February 2023 Passive house certification: Not certified Space heating demand Before: 650 (this is the energy demand on the EPC) kWh/m2/yr After: 32 kWh/m2/yr Heat load: 20 kWh/m2/yr Primary energy non-renewable (PHPP): 118 kWh/m2/yr Primary energy renewable (PHPP): 26 kWh/m2/yr Number of occupants: 4 adults now, though during build one was still under 18 EPC Before: G 1 After: Not established Airtightness (at 50 Pascals) Before: Not conducted After: 1.34 m3/m2/hr Heating costs: calculated by the publisher. This included a unit cost of 24.67p/kWh including VAT,(UK energy price cap for electricity, 1 April to 30 June 2026). Estimates for the 12 kW Vaillant heat pump were taken from heatpumpmonitor.org, based on the available results for this machine - six separate installations, each of which had 12 months of data, showed an average SPF of 4.833 for the 12 months up to 6 June. Based on the PHPP space heating demand and TFA, the total comes to £457/year, or £38.11 per month, ignoring contributions from PV. Thermal bridging: Care was taken to reduce thermal bridging, steels there isolated within insulated encasements. We used an aerogel blanket in locations where there was limited space to insulate elements of the structure. The internal insulation passed through the floors and joist ends were protected and made airtight.

The basement was insulated externally below ground, the concrete included insulation within it and then the remaining insulation was placed internally connected to the internal insulation and ground floor level. Care was taken wherever structural elements passed through the insulation to be isolated and prevent cold bridging Basement floor Before: Earth. This is the basement not the ground floor After: (top to bottom) Basement floor buildup: 15 mm tiles, ambient ambiclip system sitting on cork and full-filled with limecrete screed, including paint-on airtight layer, 100 mm cork board, Oldroyd waterproofing membrane, 80 mm EPS, low-carbon concrete slab as per structural engineers' spec. Depth varies from 150 mm to 250 mm Walls Before: 225-330 mm solid brick walls in yellow stock or red brick (We had 14 different wall build-ups altogether for the retrofit of the main house) After: (Outside in, typical example) Existing wall approx 225 mm thick, 25 mm Diathonite Thermactive 0.037 Wm/k (airtightness layer), 80 mm Steico woodfibre insulation 0.041 Wm/k, 5 mm Baumit RK 70 coat of lime plaster with mesh. U-value: 0.32 W/m2K Roof Before: Sloped, no insulation, slate finish (we had 7 roof type build-ups altogether covering different conditions) After: (outside in, typical example) Natural roof slates on timber battens & counter battens fixed through to rafters. 35 mm permeable sarking board, airtight breather membrane; 120 mm rafters fully filled with wood fibre insulation, 15 mm SmartPly (support & airtightness), 25 mm timber battens to form services void, 15 mm Savolit wood wool board, 8 mm Baumit RK 38 lime plaster including mesh. U-value: 0.15 W/m2K Extension floor: Ty-Mawr limecrete floor system build-up (top to bottom) engineered floorboards on flexible adhesive, 100 mm Ty-Mawr lightweight limecrete slab with 40 mm cork board edge insulation, wet underfloor heating system 'standard' by Jupiter, geotextile, 400 mm Ty-Mawr Glapor SG 600 insulating hardcore, geotextile, subsoil. Uvalue: 0.15 W/m²K Garden room wall example: Clay block walling system buildup (outside in) 25 mm reclaimed brick slips on brick slip adhesive, profiled galvanised square mesh to provide brickwork setting out and to facilitate the adhesive mortar, mechanical fixing to Juwo 425 mm clay blockwork, 25 mm Diathonite thermal plaster, 8 mm Baumit RK 38 lime plaster including mesh, painted finish in breathable paint. U-value: 0.14 W/m²K

Extension roof Before: N/A, we had 2 roof build-ups for the extension roof (sloping and flat) After (flat roof example, from outside in): EPDM (Sd-value 20–40 mm); 25 mm WBP plywood; 100 mm battens for ventilation; Steico UDB breathable roofing membrane; 120 mm permeable sarking board; firring timber pieces to achieve 3° pitch; 225 mm rafters fully filled with flexible woodfibre insulation, set at 3°; airtightness membrane (taped); 25 mm timber battens to form service void; 15 mm Savolit wood wool board; 8 mm Baumit RK 38 lime plaster including mesh; painted finish in breathable paint. U-value: 0.14 W/m²K Windows & doors Before: Single-glazed highly damaged falling-apart sliding sash windows. U-value: 5-7 W/m²K assumed After: Windows and doors included a mix of triple-glazed Eksalta Victorian sash windows; replica front door, 100 mm thick; triple-glazed Josko timber and aluminium contemporary doors and windows; airtightness class 4; IsoBloco airtightness tape to seal installation gap; additional gaps filled with infill insulation; airtightness tape to connect to first layer of plastered surface; external weather seals. Uvalue: 0.74–0.85 W/m²K Roof windows Before: None After: Velux passive house sloping roof window. U-Value: 0.51 W/m²K Heating system

Before: No heating present for EPC assessment, plug in electric heaters assumed After: Phase 1 Vaillant Arotherm Plus 12kW Monobloc air source heat pump Ventilation Before: None present After: Zehnder Comfoair Q450 mechanical ventilation with heat recovery Sustainable materials: The existing house is retrofitted using a combination of Diathonite, Steico woodfibre insulation and lime plaster. Ceilings to the top floor are lined with wood-wool plasterboard alternative and lime plastered. The rear wall is rebuilt and top of the extension is built in timber-frame and fullfilled with flexible woodfibre overlaid with a solid woodfibre board. Basement insulated with cork and established the safety of this using WUFI calcs, which led to the application of airtight paint onto the lime plaster to reduce moisture ingress. The extension was built from Juwo Blocks, had reused yellow stock cut into brick slips. The floor was formed in a limecrete over a foam glass layer formed on Glapor

ph+ | muswell hill case study | 39


EL M GROVE

CASE STUDY

40 | passivehouseplus.co.uk | issue 53


CASE STUDY

EL M GROVE

PROOF OF CONCEPT

BUILDING TO PASSIVE HOUSE STANDARD IS SOLVED; SELLING IT IS NOT

A 52-home development in North Somerset has achieved passive house certification across three standards. The contractor who built it says the technology is the easy part. Convincing the market is another matter entirely. Words: Jason Walsh Additional reporting: Jeff Colley

IN BRIEF Development type: 52-home affordable housing development Method: Timber frame, direct electric heating, heat pump water heating, MVHR and PV Location: Nailsea, North Somerset Standard: Passive House Classic, Passive House Plus and PHI Low Energy Building Space heating cost: £25 to £38 per month, depending on house type, assuming no contribution from PV. See In Detail panel for more

£25-£38 per month

ph+ | elm grove case study | 41


EL M GROVE

CASE STUDY

W

hen Stonewood Homes first attempted to build to passive house standard, airtightness nearly broke them. "Our first scheme cost us an absolute fortune," said Sam Smart, the company's managing director, referring to an 88-home scheme in Cirencester. "We were using tapes and membranes and finding air leakages. It was very labour intensive." If that earlier project – which ended up falling short of passive house and being built to the AECB’s CarbonLite New Build standard – was the education then Elm Grove, a 52home development in Nailsea, North Somerset, was the postgrad degree. Completed in 2024 for North Somerset Council, Elm Grove sits on a suburban site on the western edge of Bristol. Across 20 blocks – a mixture of terraces, semis and bungalows – all homes have received confirmation of certification from the Passive House Institute, spread across three distinct standards. Interestingly, the variation is not a compromise so much as a consequence of geometry. Of the development's 52 homes, 41 houses across 14 blocks achieved Passive House Classic certification, with space heating demands of between 12 and 16 kWh per square metre per year. Two further blocks – six houses in total – met the more demanding

42 | passivehouseplus.co.uk | issue 53

Passive House Plus standard, which additionally requires significant on-site renewable energy generation. The development's eight bungalows, however, are certified to the PHI Low Energy Building standard – not because their specification differs from the houses, but because of the extra heat loss caused by their shape. "The bungalows follow the same construction specification as the rest of the dwellings," says Mitchell Finn of Greengauge Building

Energy Consultants, who led the passive house project planning and building physics. "But they have a higher heating demand due to their high form factor – the ratio of heat loss area to floor area." The passive house standard uses two principal metrics to quantity space heating: space heating demand and heat load. Space heating demand is the total amount of kilowatt hours of heat provided by an active heat source (i.e. a heating system), expressed in kWh/m2/yr.


CASE STUDY

Heat load is the maximum amount of heating power (in Watts per square metre) needed to maintain a comfortable indoor temperature on the coldest, darkest day of the year. To meet the standard, a building must either hit the 15 kWh/m2/yr space heating demand target, or the 10/Wm2 heat load figure. A single-storey bungalow loses heat across a proportionally larger surface than a two-storey house of equivalent floor area. That thermodynamic reality, irrespective of the quality of the insulation, pushed the bungalows' heat loads to between 11 and 14 W/m2 – enough to place them beyond the passive house threshold. All homes are built using a passive house-certified timber frame system from Frame Homes UK, a decision that brought significant advantages for the design process. With many of the thermal performance characteristics – U-values, thermal bridge calculations – pre-certified as part of the system, uncertainty in early-stage energy modelling was substantially reduced. Triple-glazed windows throughout are Ideal Combi Futura+ timber aluclad units. Mechanical ventilation with heat recovery is provided by Zehnder units in every home, with passive house-certified efficiency ratings and summer bypass. Space heating is delivered by direct electric radiators; hot water by a heat pump in each dwelling. Every home has solar photovoltaic panels – it was the scale of the arrays on two blocks that enabled them to generate

sufficient renewable energy to qualify for the Plus standard. Greengauge's involvement began early, advising on site layout, orientation and form factor during the initial design phase, a contribution that Martin Horne of APG Architecture, the project's designer, says shaped everything that followed. "That was a useful lesson," he said, "to get the input early on." The site’s orientation, very close to due north-south, optimised solar gain across the dwellings and reduced space heating demand enough to ease the pressure on insulation thickness – which, in turn, helped contain costs. Sealing the gap Despite the lessons of Cirencester, airtightness remained the defining construction challenge at Elm Grove. What changed was the solution. Stonewood discovered AeroBarrier: an innovative, computer-controlled air sealing system that sprays an aerosolized acrylic mist inside a building to fill gaps and cracks in the building envelope, effectively guaranteeing a final airtightness figure. "We had to get down to 0.6," Smart said, "and losses were down at 0.2." Across the development, airtightness results for the Classic blocks ranged from 0.4 to 0.6 air changes per hour at 50 Pascals; the Plus blocks achieved 0.3 to 0.4. The AeroBarrier system was applied on top of a primary airtightness strategy built around OSB board

EL M GROVE

in the walls and warm roof, a vapour control layer in the cold roof, a concrete slab at ground floor level, and airtight tape at junctions, including a dedicated membrane at the critical ground floor-to-wall interface. For Smart, the shift from tape-and-membrane to spray-applied sealing represents one of the more significant advances in passive house construction practice in recent years. The labour cost of hunting air leakages was substantial on the first project; AeroBarrier converted that unpredictable process into something approaching a guaranteed outcome. It is, he implies, one of the reasons the industry's instinctive nervousness about airtightness targets need not be as paralysing as it once was. "We can deliver it," he said. "It's not hard to deliver." The overheating risk at Elm Grove was managed through dynamic modelling on a sample of dwellings. The strategy that emerged combined modest glazing areas to limit solar gain, natural ventilation through opening windows, MVHR with summer bypass, and, for ground-floor bedrooms, external louvres providing a secure route for night ventilation. Modelled overheating frequency across the development sits at between zero and three per cent of hours above 25 degrees. Horne says that contractor culture around airtightness and mechanical ventilation remains one of the more stubborn challenges in delivering passive houses at any kind of scale. Electrical subcontractors on this

We can deliver it. It's not hard to deliver.

Photos: Stonewood Homes / Rebecca Faith

ph+ | elm grove case study | 43


EL M GROVE

CASE STUDY

It's like a cocoon. It can be noisy outside and yet completely calm inside.

project, he says, were unused to the level of coordination required. "You can't be punching holes through an airtight membrane." There is also, he notes, a broader resistance to timber frame construction in the British market: blockwork remains the default for most contractors, and the shift in approach required to build a certified timber frame system to these tolerances is not automatic. Stonewood's integrated role as both developer and contractor gave Elm Grove an advantage Horne regards as close to essential. The same organisation that determined the commercial outcome also managed what happened on site, which meant passive house principles were embedded in procurement, documentation and subcontractor briefing from the outset rather than bolted on afterwards. Smart says the paperwork and listing obligations around airtightness in particular are extensive. "Whether that is always kept to on-site is another matter," he said. "But really it's about managing the details. People on the ground need information, and things are delivered over a long period." The hard sell Smart is candid about the commercial realities that shaped the development's final form. Elm Grove was designed with a proportion of private market sales in mind (the site carries 40 per cent affordable housing) but the UK’s economic conditions of the period made a bulk sale to Alliance Homes, the local affordable housing provider, the practical outcome. The scheme became, in effect, 100 per cent affordable. The experience sharpened his view of how passive house is, and is not, reaching the market. "It's a hard sell at the minute. We try to sell it in terms of cost of living,” he said. "All it did was secure a sale," Smart said of the passive house standard, "rather than help to sell it,” noting that buyers pit long term economic virtue against consumer aspiration. There are also other factors that seem to have influence. For instance, the development has no garages as the masterplan promotes active travel. "Many people do want garages and parking outside," Smart said. Stonewood has not had a great deal of direct feedback from occupants despite

44 | passivehouseplus.co.uk | issue 53

1

2

3

4

5

6

1 Foundation groundwork and steel reinforcement for concrete slab; 2 250 mm ground floor slab and Aircrete block at edge to reduce thermal bridging; 3 ground floor build-up continues with 300 mm Polyfoam Floorboard Extra in place; 4 timber frame panel fitted with Fronta membrane; 5 panel turned over and fitted with Superglass insulation; 6 panel sealed with OSB and tapes.

the known fact that MVHR in particular is a technology that UK owners often have never encountered. Still, the customer care process has not generated complaints, which appears to be a good sign. What is clear is that Smart's instinct, after two substantial passive house projects – one which didn’t make it, and this project – is

neither despondency nor proselytising. The technology works. The process is manageable. The gap is in how – and to whom – the value gets communicated. The homes themselves may yet close it. "What is most striking," said Horne, "is that they are quiet. It's like a cocoon. It can be noisy outside and yet completely calm inside."


CASE STUDY

EL M GROVE

SELECTED PROJECT TEAM MEMBERS Client and main contractor: Stonewood Homes Architect: APG Architecture / Mikhael Riches Energy consultant and M&E engineer: Greengauge Civil / structural engineer: JDL Consultants Build system supplier: Frame Homes UK Airtightness products: Ecological Building Systems / AeroBarrier Windows and doors: Ideal Combi Thermal breaks: Forterra Floor insulation: Polyfoam Primary DHW system: Dimplex Mechanical ventilation supplier: Zehnder Photovoltaic supplier: Eco Green Partners Airtightness tester / consultant: Eco-Futures Passive house certifier: Etude

7

8

9

10

11

12

13

14

7 Timber frame panels erected on site as another slab sets; 8 insulation of attic floor and airtight taping of OSB; 9 Proclima Tescon Vana airtight grommet for pipe penetration; 10 airtight taping and duct insulation at penetration; 11 50 mm Isover batts to insulate service cavity; 12 15 mm plasterboard finish, with insulated window reveals; 13 Zehnder Comfoair Q MVHR unit; 14 on-site team meeting during construction.

ph+ | elm grove case study | 45


EL M GROVE

CASE STUDY

when used as primary airtightness solution

AeroBarrier is an automated air sealing technology that seals gaps and cracks of up to 12mm in walls, ceilings, and floors. It is fast, simple, and cost-effective – and guarantees to achieve your target airtightness.

sealed globally each month using AeroBarrier technology UP TO

95%

REDUCTION

STEP 1 Preparation & Setup

+44 1432 513 499 enquiries-uk@aeroseal.com 46 | passivehouseplus.co.uk | issue 53

STEP 2 Pressurisation

STEP 3 Sealing

Scan to learn more

in air leakage

STEP 4 Certification & Cleanup


CASE STUDY

EL M GROVE

WANT TO KNOW MORE? The digital version of this magazine includes access to exclusive galleries of architectural drawings. The digital magazine is available to subscribers on passivehouseplus. ie & passivehouseplus.co.uk

IN DETAIL Development name: Elm Grove Development type: 52-home development for North Somerset Site type & location: Suburban site, Nailsea, North Somerset Budget: N/A Completion date: 2025 Passive house certification: 14 blocks, (41 houses) certified to the Passive House Classic standard. 2 blocks (3 houses) certified to the Passive House Plus standard. 4 blocks (8 bungalows) certified to the Passive House Institute Low Energy Building standard Space heating demand: Passive House Classic: 12-16 kWh/m2/yr Passive House Plus: 8-16 kWh/m2/yr Low Energy Building: 23-30 kWh/m2/yr Heat load: Passive House Classic: 8-10 W/m2 Passive House Plus: 8-9 W/m2 Low Energy Building: 11-14 W/m2 Primary energy non-renewable (PHPP): Passive House Classic: 61-71 kWh/m2/yr Passive House Plus: 60-61 kWh/m2/yr Low Energy Building: 86-100 kWh/m2/yr Primary energy renewable (PHPP): Passive House Classic: 50-58 kWh/m2/yr Passive House Plus: 49-50 kWh/m2/yr Low Energy Building: 70-83 kWh/m2/yr Heat loss form factor (PHPP): 2.56 to 3.99. The bungalows sit at the higher end, explaining their PHI Low Energy Building certification. Although they follow the same construction specification as the houses, their less favourable form factor results in a higher heating demand Space heating cost: Based on UK price cap for July to September 2026 of £0.2611/kWh, the annual space heating costs was calculated at £296.80 to £450.94, depending on dwelling type and standard Overheating (state calculation tool, e.g., PHPP): 0-3% chance of overheating > 25 degrees Overheating strategy: Dynamic overheating modelling was carried out on a sample of dwellings to determine overheating risk and inform the mitigation strategy. We worked carefully with the architect and developer to limit

overheating through the design, which included modest glazing areas to limit solar gain, natural ventilation through windows, and MVHR with summer bypass. Ground-floor bedrooms have windows with external louvres to ensure there is a secure night ventilation option Environmental assessment method: N/A Air quality context: Suburban site, no particular issues which may affect indoor air quality Air quality index: The annual average outdoor air quality for Bristol is 34 AQI. This is considered fair, but sensitive groups may experience minor to moderate symptoms from long term exposure, according to Plumelabs Airtightness (at 50 Pascals): Passive House Classic: 0.4-0.6 ACH Passive House Plus: 0.3-0.4 ACH Low Energy Building: 0.7-0.9 ACH Airtightness measures Floor: Concrete slab Wall: 18 mm OSB Warm roof: 18 mm OSB. Cold roof: Intello Plus VCL Windows: Compriband foam tape and Illbruck Pro Foam Airseal Junctions: Connected with airtight tape. Airtightness membrane between ground floor slab and external wall General: AeroBarrier air sealing system used to further improve airtightness Thermal bridging: Thermal bridging at the floor edge is mitigated with an aerated concrete block and cavity insulation between the slab edge and brick/blockwork. The passive house-certified timber frame system meant that many of the thermal performance elements (U-values and thermal bridges) were pre-calculated, simplifying and reducing the uncertainty in the early stage modelling Orientation: Greengauge advised on the form factor and orientation in the project’s early design phase. The orientation is very close to north-south which is beneficial for the dwellings’ solar gain. This optimisation reduced space heating demand which decreased the reliance on other measures such as insulation thickness, helping keep costs down Form factor: The bungalows follow the same construction specification as the rest of the dwellings, but have a higher

heating demand due to their high form factor (ratio of heat loss area to floor area), which is why they were certified to the PHI Low Energy standard Ground floor: 40 mm screed; 250 mm concrete slab (airtight layer); 300 mm Polyfoam Floorboard Extra (0.033 W/ mK). U-value: 0.106 W/m2K. Walls: Frame Homes UK Ultra panel, consisting of (outside in) render on 15 mm render board; 50 mm cavity; Solitex WA breather membrane; 9 mm OSB; 50 mm Superglass Superwall 32 between studs (0.032 W/mK); 9 mm OSB; 235 mm Superglass Superwall 32 between studs (0.032 W/ mK); 18 mm OSB (airtight layer); 50 mm Isover timber frame batt 32 (0.032 W/mK) between services battens; 15 mm plasterboard. U-value: 0.105 W/m2K. Cold pitched roof (insulation at joists): Roof tiles; battens; Tyvek Supro breather membrane; rafters; loft space; 300 mm Knauf Loft roll 44 (0.044 W/mK); 150 mm Knauf Loft roll 44 (0.044 W/mK) between joists; Intello Plus VCL (airtight layer); services cavity; 15 mm plasterboard. U-value: 0.096 W/m2K Warm pitched roof (insulation at rafters): Frame Homes UK Ultra panel; roof tiles; battens; Tyvek Supro breather membrane; battens; 18 mm OSB; 235 mm Superglass Superwall 32 between studs (0.032 W/mK); 18 mm OSB (airtight layer); 50 mm Isover timber frame batt 32 (0.032 W/ mK) between services battens; 15 mm plasterboard. U-value: 0.143 W/m2K Windows & doors: Ideal Combi Futura+ timber aluclad triple-glazed windows, with frame (Uf) U-value of 0.98 W/m²K and glazing U-value (Ug) of 0.54 to 0.60 W/m2K, and a g-value of 0.51 to 0.52. Doors are Ideal Combi Frame IC Heating system: Heating is provided by direct electric radiators. Hot water is provided by a Dimplex Edel hot water heat pump in each dwelling Ventilation:The mechanical ventilation units are Zehnder ComfoAir Q350 for houses and Zehnder Comfo 180 Luxe for bungalows. These are passive house certified units, with high heat recovery and summer bypass. The ducts are insulated with 50 mm Armaflex insulation Water efficiency: Not assessed Electricity: Each dwelling has between 3.44 – 6.075 kWp of solar PV. Two blocks were able to achieve Passive House Plus due to their large PV arrays Embodied carbon: Not assessed Monitoring: Not conducted

ph+ | elm grove case study | 47


CAIRN HOMES

CASE STUDY

Critical Mass

CAIRN COMES GOOD ON HIGH DENSITY PASSIVE HOUSE PROMISE

Passive house has long been typecast as the preserve of deep-pocketed self-builders sold on the dream before pen hits paper. Now Ireland's largest housebuilder has smashed that assumption, delivering four passive schemes — and 1,755 homes — simultaneously, first time. And the real innovation may be what happened after the builders left: an unprecedented effort to prepare residents, housing staff and maintenance teams for life in a passive house — an effort led, in the interests of full disclosure, by this magazine's publishers. Words: John Hearne

The resident engagement and handover training programme described in this article was developed by Zero Ambitions Partners, a company owned and run by Passive House Plus founders Dan Hyde and Jeff Colley.

48 | passivehouseplus.co.uk | issue 53


CASE STUDY

CAIRN HOMES

IN BRIEF Development type: Four schemes totalling 1,755 units of cost rental, social and affordable housing Method: Concrete structure with steel frame walls, panel heaters and hot water heat pumps, MVHR Location: Santry, Seven Mills & Charlestown, Co. Dublin Standard: Passive house classic certified Space heating cost: €14 to €35/month – depending on size. See In detail panel for more information

€14 - €35 per month

ph+ | cairn homes case study | 49


CAIRN HOMES

CASE STUDY

S

tephen O'Shea, Head of Sustainable Construction at Cairn Homes tells a story about a chance encounter he and his colleagues had at one of the company's developments in Delgany, Co. Wicklow. Archer's Wood predates Cairn's transition to passive, but it does include a 620 m greenway built to complement the development. “A woman stopped and asked if we were from Cairn. I wasn't sure what was coming next, but I said that we were, and she told us that she'd lived in Delgany all her life. She said, ‘This greenway has transformed the way I move around my neighbourhood. It's the best thing ever.’” The woman didn't even live in Archer's Wood. She didn't fit into the broadest definition of the word ‘customer’. And yet the company had done something that, in her words, transformed how she interacted with the place in which she'd lived all her life. This story doesn't tell you much about the ins and outs of building passive at scale, but it does tell you something about how corporate culture can play out in real life. “It's those impacts, the ones that we're leaving behind us that we're trying to be more forward-thinking and more intentional about,” says O'Shea, “rather than their just being happy outcomes.” It's the kind of thing you hear from PR departments all the time, but it's not the kind of thing you actually expect to believe. Lest we forget, Cairn is a publicly quoted company, with revenues in 2025 of €944.6 million, and an operating profit of €168.6 million. As I write, Cairn Homes PLC is trading on the London Stock Exchange at a price of £2.12p per share. This isn’t a not-for-profit organisation. But to characterise the pivot to passive as wholly altruistic would be an oversimplification. Stephen O'Shea traces the roots of the initiative to the need to address the company's Scope 3 greenhouse gas (GHG) emissions. Scope 3 refers to indirect emissions that occur in the company's value chain. For a builder of houses, that's the houses; in Cairn's case, 98 per cent of their total emissions. The figure was further broken down into embodied carbon and operational carbon – with the latter the larger of the two. “When you're trying to plot reduction pathways and make savings,” he says, “you start by looking at the biggest figure … At the same time, there was a growing awareness within the industry about the performance gap. The difference between what your BER cert is telling you and what real world performance is likely to be.” It was at this point that people first started to talk about passive house as a possible solution to both of these issues. “What made it something that we were prepared to get into at scale was the fact that all of those problems were being answered in a way that gave direct benefits to our cus-

50 | passivehouseplus.co.uk | issue 53

The building is certified to perform. The people are certified for nothing.

tomers. By comparison – for argument's sake – using 70 percent GGBS in your concrete floor slab has no measurable benefit to customers. It's not something that impacts them in their day to day lives.” Discussions and feasibility studies followed, together with consultation with other stakeholders. Housing bodies in particular were very enthusiastic about building passive. And the figures stacked up. There was enough evidence out there to say that passive house worked and that it could be built at scale without any great financial premium. Stephen O'Shea says that as discussions and investigations continued, two “points of nervousness” emerged. The first was airtightness: What happens if we fail to get 0.6? A site visit to Shanganagh Castle Estate was instrumental in demonstrating that maybe this wasn't as difficult as they first thought. Shanganagh is of course the Land Development Agency/ Dún Laoghaire-Rathdown development of nearly 600 passive house homes launched in September 2024. As one of the largest passive house developments in Europe, it's been hugely influential across the sector. The message from Shanganagh was that you didn't have to turn the building on its head to achieve the minimum thresholds. At the same time, Cairn had just completed another development – this one non-passive. They carried out a full building airtightness test just to see how much further they would have to go to hit the passive standard. It came in at 0.81 ACH.

Stephen O'Shea says, “Everybody went, ‘Okay, right. Maybe we can do this.’” The second point of nervousness centred on heat pumps. Not the technology so much as security of supply. The company needed a supplier who had a presence on the island, the capacity to guarantee delivery of sufficient equipment on time and who had the support infrastructure appropriate to this kind of investment. The Dimplex Edel unit fit the bill perfectly. Solving these issues provided a lot reassurance, but there were plenty of other challenges in the mix. “In passive house, because it takes a very holistic view of how the building is going to perform, there is no checklist which says, if you hit this U-value and you have this M&E system and you have this MVHR unit, it will always work in every block, in every orientation across every site,” says O'Shea. Variations in apartment sizes, locations, orientations and form factor meant significant amounts of bespoke detailing and specification. Moreover, all four schemes started at more or less the same time. That alone tells you something about the breadth of the ambition here. This was no toe in the water. But building at scale can work in your favour too. In total, there are 1,755 housing units across the four developments. You learn as you go, so that by the time you get to the tenth apartment, you have a much better understanding of how the different elements combine to meet the standard.


CASE STUDY

At the same time of course, building at scale means building at pace. Another major challenge involved getting all that thermal bridge detailing modelled and signed off without impacting the critical path. In your standard one-off build, everything is designed and detailed before it goes out to tender, but the developer model is different. The construction phase is biting at the heels of the detailed design phase. Then there's planning. Three of the four sites were bought with planning permission in place – and there was no thought of passive in those pre-existing plans. That threw up a particular problem for MVHR. Getting exhaust air to external vents required very long duct runs, and because floor to ceiling space was limited, these ducts couldn't overlap. It was a very tight squeeze. The big question of course is whether or not all of these challenges were met. With most of the units now occupied, it's a question we can explore with some authority, not least because we have the data. Whitehaven is one of two developments Cairn built in Santry Co. Dublin. It consists of 255 cost rental units. What's special about this one is that it also features 1,100 sensors which are providing detailed live information about energy use, temperature and indoor air quality. The sensors are being monitored by seasoned passive house experts MosArt. This isn't the company's first experience with Cairn either – far from it. MosArt's feasibility studies on high and low density passive house building – commissioned by Stephen O'Shea – had a significant role in Cairn's decision to go passive. MosArt founder and MD Tomas O'Leary explains that these sensors are delivering live information on CO2, relative humidity and temperature, as well as energy use for space heating and for hot water. “This data provides an incredible opportunity to do some very detailed analysis. It's all being done remotely, on a platform that we can interrogate at an apartment level, at a corridor level, at a floor level, at a core level and at a building level … it gives us incredible granularity.” The first headline: The building works. At 600 parts per million, CO2 levels are very low. Relative humidity is hitting the sweet spot of between 45 per cent and 55 per cent. “The temperatures are running where we expect. In fact, people seem to be very happy running it at slightly less than 20C, which is the classic PHPP design temperature. That was a surprise to us.” Space heating energy is “bang on target”. Interestingly, however, energy use for domestic hot water is 9 per cent higher than expected. As O'Leary points out of course, this result says nothing about the thermal envelope or building performance – it's purely behavioural. If these results are borne out over

Photos: Paul McCarthy/Dee Organ

time and in the other monitored buildings, it may simply be the case that the Passive House Institute needs to adapt its energy model assumptions to suit Irish showering habits. The other point of course is that just because the monitors are telling you that the building is functioning as expected doesn't mean that the humans inside are happy. Jennifer Whitty is Sustainability Manager at Tuath Housing, which owns and runs Whitehaven. “We decided to do quarterly clinics with the tenants out on site,” she explains. “We've run three at this stage. The idea is to build the relationship, get that extra insight and establish feedback loops from the tenants by carrying out surveys. Overall feedback has been extremely positive.” For one thing, people are showing up at these clinics – so engagement is high. “Normally you might expect to see people if there's a problem, but no, it's been the opposite. They come and tell us how happy they are with the scheme.” Cooper Square in Seven Mills, Co. Dublin is the largest of the four schemes with fully 607 units. It's owned and run by the Land Development Agency (LDA), which also owns and runs the aforementioned Shanganagh Castle Estate. Kate Joyce, strategic projects and sustainability lead at the agency, says that they carry out a resident survey every year, which includes questions around heating and ventilation systems and addresses ease of use and access to training materials. “The satisfaction rate is around 87 per cent ... and we'll be doing more surveys and keeping on top of it. If there's an opportunity for additional engagement, we'll be able to step in.” But you'd be wrong to think that these high levels of resident engagement and satisfaction are the products of building physics alone. The truth is that one of the most innovative aspects of this entire project lies in the way

CAIRN HOMES

in which resident engagement was managed. Stephen O'Shea says that as soon as they were onsite with those first units, his focus switched to the handover. “I wanted to make sure that we were as prepared as we could be, that we were setting those buildings up to be as successful as possible.” He points out that in the past, post occupancy evaluations have shown significant differences between passive houses with the lowest energy consumption and those with the highest energy consumption. That difference is almost always down to human behaviour. “Passive house is often seen as something for highly motivated clients who have deep pockets and are sold on the dream before pen is put to paper. But we were now going into a space that was completely different. There would be people moving into these buildings who had never heard of passive house and who cared less. How would we get them up the knowledge curve as quickly as possible?” That was the challenge that Zero Ambitions Partners took on. Run by Passive House Plus founders and publishers, Dan Hyde & Jeff Colley, the company – like MosArt – was also involved in Cairn's early ruminations about going passive, and had a major influence on the decision making process. Dan Hyde says that Zero Ambitions was “relentless” in emphasizing the vital importance of engaging with residents early. “Because if you're staking your reputation on this shift to passive house,” he says, “you don't want your ambitions to be thwarted by people not understanding how to live in a passive house … the building is certified to perform. The people are certified "for nothing.” One of the complicating issues here is that the builder/designer typically lies at a significant remove from the end user. Creating the perfect user manual does not mean that anyone is ever going to read it, let alone do what it suggests.

ph+ | cairn homes case study | 51


CAIRN HOMES

CASE STUDY

We didn't start with a pair of semi-Ds as a little experiment… We started with a scheme of 600 apartments.

“We decided, right, let's plan for the worstcase scenario and develop a train the trainers' trainers' trainers' program,” says Hyde. “If we can only train up Cairn people, how do we give them the right advice, training and guidance so that they can pass it down the line to the housing body, so they can deliver it to those further down the line again, eventually landing at the resident.” Between them, Hyde and Colley conducted more than fifty interviews with academics, clients, experts, contractors, housing managers and professionals from existing passive schemes in Ireland, the UK and beyond. “Anyone who'd been involved in any of the long-term value chain, we spoke to them to find out what had gone wrong in the past. What went right? Why did it go right?” They heard a lot of horror stories: housing associations given zero documentation at handover, neglected MVHR systems, heat pumps that never worked as intended because no one had ever told anyone how they should be used. That research was then distilled into a suite of materials: a before-you-move-in guide, a moving day guide and a bespoke handbook translating MVHR, heat pump, panel heater, cooker hood and window manuals into plain English for building managers, resident liai-

52 | passivehouseplus.co.uk | issue 53

son officers and maintenance contractors. Nor was it simply about telling people how the systems worked, it was about getting to the heart of the human experience of living in a passive building. "Because the insulation is so much better,you're going to experience noise differently. Because comfort levels are so high, you'll need to check the weather app before you leave the house. If you're used to a fire or a stove or a range, you need to know that you're not going to experience that kind of radiant heat in your new home. You'll wear less clothes around the house, you'll probably put your winter bedding away forever… ," says Hyde. Zero Ambitions also ran training sessions which were designed to give those dealing directly with residents all the information and insight they would need to make the transition as seamless as possible. Respond is the housing association which owns and operates Pipers Square – the 590 unit passive development which Cairn built in Charlestown, Dublin 11. John McCormack of Respond says that he was “blown away” by Zero Ambitions' presentation. “I felt that yes, this is the way forward. I was just so impressed by the efforts Cairn put into their after-sales service, and into their efforts to ensure that the development was successful.” Tenants have only begun moving into Pipers Square, so it's too early to assess how they are engaging with their new homes, but McCormack says that Respond's housing team will be working closely with them in the coming weeks to ensure a smooth transition. Kate Joyce of the LDA, which owns and manages Cooper Square, zeros in on the simplicity of the messaging in the training

materials, and says that they were so good that elements of them have been taken and used in the aforementioned Shanganagh Castle estate. “As we move towards zero energy building standards, it's really important for us as an agency to understand the end user experience and how these buildings are performing over the long term.” She says that between Shanganagh and Cooper Square, by the end of 2026, the LDA will be managing 900 passive homes, which is probably the largest number of any agency in the state. “Because we have that long-term interest, because we're holding these assets for thirty to forty years, understanding their performance from an asset management point of view is really important, as well as from the user's perspective in terms of thermal comfort and cost.” The moving-in process wasn't without issues in at least one of the developments. Jennifer Whitty of Tuath explains that in Whitehaven, tenants began taking up residency during a particularly cold week in November. Because the building hadn't been preheated, and because the moving-in process was staggered, it took some time for internal temperatures to get up to target levels. “That was a learning experience for everybody, across the board,” says Whitty. “We did a review of the home user guide to explain that space heating would actually be needed until the building was at full occupancy.” Staying with Whitehaven, Tomas O'Leary of MosArt says that the live data being collected at the development has much wider applications than might first appear. He points to a long-running debate on whether or not there is a gap between the


CASE STUDY

designed performance of a passive house and how it performs in real life. While there have been many post occupancy studies which indicate the absence of this performance gap, there are few that offer the breadth and scale of the Whitehaven data. He says, “We've been working on passive house in Ireland since 2002. This is the first time that we have a very large data set from a very diverse cohort of occupants. These are not people who set out to build a passive house for themselves. These are people who've just ended up living in a passive housing unit. They're not evangelical. They're just ordinary folk.” Data monitoring will allow the benefits of these developments to ripple outwards into the wider sector. In addition however, there are other benefits that are being felt much closer to home. O'Leary explains that MosArt has developed a platform – Pulse – which monitors the live data and alerts the team if something goes wrong. The risk register and flagging system at its heart was developed in close collaboration with Tuath, tailored to the specific needs of the association's tenants and its asset management requirements – and Tuath has established a dedicated project team to review and respond to the flags raised. In one case, a spike in CO2 levels in one apartment prompted a call to Tuath who in turn called to the apartment to investigate the issue. It turned out that someone had pushed a laundry basket under a counter and accidentally switched off the MVHR. In another instance, the system flagged unusually high energy use and again, the housing association

reached out to the tenant so they could address the issue. “It all feeds back into customer care and the philosophy that the customer is king,” says O'Leary. “This system is effectively a risk register that helps us to identify situations where people might benefit from assistance or intervention. The Pulse system that we've set up is helping people get the most out of their passive homes.” For Tuath, Pulse is one strand of a deliberate effort to understand what passive house living means in a housing association context. Ahead of handover, the association engaged directly with passive house experts and rolled out training across the organisation – from housing officers and building surveyors to customer service teams – recognising that the standard was as new to many of its staff as to its tenants. The aim now is to keep capturing that learning through the seasons – via the energy clinics, tenant surveys, the Pulse system, and knocking on people's doors. Now as we approach full occupancy across all four schemes, Stephen O'Shea of Cairn says that he looks back on the last two years with a combination of amazement and pride. “We didn't start with a pair of semi-Ds as a little experiment … We started with a scheme of 600 apartments. It's amazing how such a huge number of people in different functions and different companies have all pulled together and delivered first time.” That success, that ability to bring an industry with them on the journey has allowed everyone involved to look to the future with a sense of empowerment.

CAIRN HOMES

“We've shown how this can be done. Now we're thinking, right, if we can do that, what else can we do? What else can we change?”

MONITORED HEATING USE IEQ monitors are located in the living rooms in 94 apartments at Whitehaven. Initial results are from the first cohort of residents to move in, starting in November 2025 Monitoring period: Dec 2025-May 2026 Number of apartments monitored: 94 CO2 results: the median value from 94 apartments was an average of 604 PPM, with 98% below 800 PPM. This compares to an outdoor baseline of roughly 420 PPM Relative humidity: a median of 49% RH, with 99% of apartments having averaged RH in the 40 to 60% RH range Measured heating use: space heating use at Whitehaven to date is 4.5% lower than the calculated PHPP space heating demand figure – once calibrated to take account of the December-May time period Measured hot water use: data from 90 apartments shows energy use 7% higher than calculated in PHPP. The calculations assumed an SPF of 2.37 and weekly flashing of hot water to over 60C to prevent the risk of legionella

1

2

3

4

5

6

7

8

1 Concrete structure under construction; 2 external wall cross section build up; 3 window installation prior to taping; 4 steel frame system wall build-up as viewed externally; 5 thermally broken balcony support in situ, part of the Sapphire Balconies system; 6 insulated ducts to MVHR unit and uninsulated ducts to rooms; 7 airtightness sealing at windows, walls and ductwork; 8 exterior grills for MVHR (spaced apart) and air source heat pump (close together).

ph+ | cairn homes case study | 53


CAIRN HOMES

AECB ANNUAL CONFERENCE

CASE STUDY

2026

FABRIC MATTERS UNPICKING THE INTERPLAY BETWEEN ENVELOPE AND ENERGY SUPPLY

FRIDAY

SPECIAL GUEST

25TH SEPTEMBER 2026

Evan Davis

SCIENCE AND INDUSTRY MUSEUM,

Heat pumps in the UK: problems and possibilites

MANCHESTER

EXPERT SPEAKERS

Museum access included AECB Fringe site visits Thursday 24th September Saturday 26th September Barnabas Calder WORKSHOPS WITH Nick Grant & John Broome | Marianne Heaslip & Helen Grimshaw Ste Garlick & Angela Connelly | Sarah Naidoo-Banks Tim Martel | Oliver Henshall

Join leaders, innovators and practitioners shaping the future of sustainable construction.

54 | passivehouseplus.co.uk | issue 53

0845 456 9773 www.aecb.net contactus@aecb.net

David Glew

Beth Williams

Joe Garbett

TICKETS NOW AVAILABLE

www.aecb.net


CASE STUDY

CAIRN HOMES

EMBODIED CARBON Cairn conducts life cycle assessments on all of its projects, the results being used as part of Cairn’s reporting on scope 3 emissions. The example provided below were done by Richard O’Hegarty and Magdalena Llull Cabrer of RKD, based on Whitehaven – a whole development figure for a 36,127m2 GIA building including 255 apartments.

9

10

11

12

Material impact: The spec included a low carbon concrete mix (50% GGBS + CEM II AL), efficient concrete use, good rebar engineering + Megasa steel reinforcement used everywhere (recycled steel with low embodied carbon) . Many of the materials used in the build had EPDs. Upfront total - excluding sequestration: 383 kgCO2/m2 Cradle to grave total: Not assessed Standard/Framework: The calculation was conducted following the IGBC's Upfront methodology and guided by RICS WLC 2nd edition for default assumptions.

9 Interior doors wedged open for airtightness test; 10 sealing ventilation valves prior to airtightness tests; 11 multi-fan airtightness test to evaluate whole-building performance; 12 each apartment also had individual airtightness tests for Part L compliance.

Calculation tool: RKD's own calculator Reference study period: N/A, as the LCA only covered upfront emissions (A1-A5)

SELECTED PROJECT TEAM MEMBERS

Materials included: Building fabric including exterior walls, roof, ground floor, windows and doors, internal and external finishes and internal walls, and an underground car park. As per Indicate, the embodied carbon of building services was not calculated, with a default value of 20 kg C02e/m2 used. Embodied carbon notes: The calculation used a combination of EPDs for actual materials used, industry association EPDs, EPDs for similar products, and the IGBC's National Inventory of Generic Construction Materials. A4 (transport to site) and A5 (Construction waste and energy use) emissions were based on RICS default assumptions. MosArt's Carly Sterling on site visit demonstrating comfort in low solar g-values

Developer & main contractor: Cairn Homes Architect (Cooper Square): Altu Architects Architect (Whitehaven): MCORM Architect (Piper's Square): Reddy Architecture and Urbanisation M & E engineer (Cooper Square): OCSC M & E engineer (Whitehaven & Piper's Square): IN2 Civil / structural (Cooper Square): Barrett Mahony Civil / structural (Whitehaven): Egis Civil / structural (Piper's Square): BMCE Passive house consultant (Whitehaven, Niven Oaks, Piper's Square): Mosart Passive house consultant (Cooper Square): Altu Passive house certifier (Whitehaven, Niven Oaks, Piper's Square): Max Fordham Passive house certifier (Cooper Square): Mosart Airtightness tester (Whitehaven): BET Airtightness tester (Cooper Square): Evolved Energy LCA consultant (Cooper Square): Evolusion Innovation Ltd. Etex Group LCA consultant (Whitehaven): RKD Ecologist: Landscaping (Cooper Square): Murray & Associates Landscaping (Piper's Square): RMDA Mechanical contractor (all schemes): Gaffney Mechanical Electrical contractor: Daltech SFS, wall insulation and partitions (Cooper Square): SFP Group SFS, wall insulation and partitions (Whitehaven, Niven Oaks & Cooper Square): Platt Reilly Thermally broken balconies (Cooper Square & Piper's Square): Sapphire Balconies Thermally broken balconies (Whitehaven): Forte Pespa Floor insulation: Kwik RC Frames Ltd Airtightness products (Whitehaven, Niven Oaks, Cooper Square): Partel Ireland Airtightness products (Piper's Square): A. Proctor Group / Isover Windows and doors (all schemes): NorDan Vinduer AOVs (Cooper Square): Crossflow Entrance doors/curtain walling (Piper's Square): Hodgins Architectural Facades Structural frame, insulation & screed (all projects): Kwik RC Frames Ltd Green cements: Ecocem, via Kilsaran Roofing (Cooper Square, Piper's Square): Beton Hot water heat pump & radiator: Glen Dimplex MVHR (Cooper Square & Niven Oaks): Vent Axia, via Lindab MVHR (Piper's Square & Whitehaven): Zehnder, via Versatile

Glass colour reveals two different g-values on single elevation for solar protection ph+ | cairn homes case study | 55


CAIRN HOMES

CASE STUDY

Premium Windows for Passivhaus

Internorm offers the most comprehensive range of quality high-performance timber-aluminium and uPVC-aluminium composite windows and doors, as well as exterior shading solutions for Passivhaus and EnerPHit projects. Book one of Internorm’s UK PHT/PHI endorsed ‘Windows & Doors for Passivhaus’ CPDs. Passivhaus Designers get 2 learning points.

Windows – Doors

Find your Scan here to Local find out more Distributor about this case study

Contact us: office@internorm.co.uk | www.internorm.com

MULTI - AWARD WINNING ALL-IN-ONE COMPACT SERVICE UNIT total home total home

Ÿ heat recovery ventilation Ÿ heating Ÿ cooling Ÿ hot water Ÿ energy efcient COP: 6.8 Ÿ ideal for super-insulated &

airtight ats or townhouses

send us floorplans for a quote

info@totalhome.co.uk all you need, is the air that you breathe... 56 | passivehouseplus.co.uk | issue 53

0345 260 0123 | totalhome.co.uk

CERTIFIED COMPONENT

total home


CASE STUDY

CAIRN HOMES

IN DETAIL Development names: Cooper Square (Seven Mills), Piper’s Square (Charlestown), Whitehaven and Niven Oaks (both Santry) Development type: Mixed use developments of circa 1,750 units built in concrete structure with SFS walls and partitions Site type & location: Four urban/suburban sites around north and west Dublin Completion date: Four blocks completed, remaining three blocks by September 2026 Budget: Not disclosed Passive house certification: Passive house classic. Each scheme has certified blocks, with more pending as schemes completed Space heating demand: Between 16.0 and 17.9 kWh/m2/ yr, depending on the block Heat load: Between 9.6 and 10.2 W/m2 Primary energy non-renewable: Between 102 and 107 kWh/m2/yr, depending on the block Primary energy renewable: Ranging between 56 – 59 kWh/m2/yr Heat loss form factor Ranging between 0.97 and 1.35, depending on the block Overheating: PHPP, ranging between 0 and 2% of year above 25C, depending on the block Assumed number of occupants: Ranging between 120 and 239 occupants, depending on the block Energy performance coefficient (EPC): Ranging between 0.17 - 0.33 Carbon performance coefficient (CPC): Ranging between 0.12 and 0.21 BER: Ranging between A1 (22.6 kWh/m2/yr) and A3 (54.4 kWh/m2/yr), depending on the apartment Heating costs: Calculated annual costs of €169 (1-bed apartment, 50 m2 GIA), €275 (2-bed apartment, 81.5 m2 GIA), €306 (2-bed duplex, 90.6 m2 GIA) and €418 (3-bed duplex, 123.9 m2 GIA). This is based on the whole building PHPP file for Core A5 of Piper’s Square, which has a total PHPP calculated space heating demand of 16.4 kWh/m2/ yr. Energy costs are based on Energia - Smart Data 30% tariff, assuming 50% of use at day rate of €0.29C, 50% at night rate of €0.16C, and 0% at peak rate of €0.33C. Prices

are inclusive of VAT Environmental assessment method: Accreditation to the Irish Green Building Council’s Home Performance Index is ongoing Air quality context: Suburban site with busy road along the east border and train line along its north border Air quality index: 33 AQI (“Fair” air quality, based on Plume Labs annual average for Dublin City, though the actual outdoor air quality may differ significantly from site to site). This means the outdoor air is generally acceptable for most people, but that sensitive groups may experience minor to moderate symptoms from long-term exposure Airtightness: Ranging between 0.44 and 0.58 ACH at 50 Pa, depending on the block Thermal bridging: Thermal blocks at partition base and head where they interrupted the soffit or the floor insulation. Thermal breaks for steel balcony stubs and window supports. SVPs, RWPs and HP ducts insulated with 50 mm insulation Ground floor: 15 mm floor finish, 75 mm screed, heavy duty polythene sheet, 100 mm PIR insulation (thermal conductivity 0.022 W/mK) , Monarflex Radon barrier RMB400, 250 mm reinforced concrete slab. U-value: 0.200 W/m2K Floor above unheated spaces (car park): 15 mm floor finish, 250 mm reinforced concrete slab, 210 mm Rockwool Soffit slab (thermal conductivity 0.034 W/mK). U-value: 0.166 W/m2K Brick-clad walls(outside in): 102.5 mm brick on masonry supports fixed to the slab’s edge and restraint system fixed to SFS structure, 50 mm cavity, 100 mm rock mineral fibre (thermal conductivity 0.034 W/mK), Exoperm Mono Duro 200 breather membrane, 12.5 mm Verspanel cement board, 120 mm light steel wall framing system (SFS) with studs at 600 mm centres fully filled with 120 mm Rockwool Steel frame slab (thermal conductivity 0.034 W/mK), Partel Izoperm Plus PHA vapour control and airtight layer, 25 mm service void, 12.5 mm Gyproc wall board 2.5 mm skim. U-value: 0.181 W/m2K Rendered walls (outside in): Render finish, 190 mm CladWool MD Mineral Wool EWI Slab (thermal conductivity 0.035 W/mK),12.5 mm Verspanel cement board, 120 mm light steel wall framing system (SFS) with studs at 600

mm centres fully filled with 120 mm Rockwool Steel frame slab (thermal conductivity 0.034 W/mK), Partel Izoperm Plus PHA vapour control and airtight layer, 25 mm service void, 12.5 mm Gyproc wall board 2.5 mm skim. U-value: 0.144 W/m2K Note: Proctor Wraptite membranes used as external vapour control and airtight layer, and Isover Vario system used internally, for brick clad and rendered walls at Pipers Square Roof: 200 mm sedum roof, drainage board, Ravatherm MK water flow reduction layer, 160 mm Ravatherm XPS 300 SL Insulation (thermal conductivity 0.031 W/mK), Masterseal roof sprayed membrane, 250 mm reinforced concrete slab, 285 mm ceiling void, 12.5 mm Gyproc plasterboard fixed to suspended ceiling system. U-value: 0.188 W/m2K Windows & external doors: Nordan NTech timber frame aluminium cladded windows and doors, overall U-values: around 0.85 W/m2K Heating system: Dimplex PLXE direct electric panel heaters in each room Ventilation Cooper Square and Niven Oaks: Vent-Axia Sentinel Econiq SCP – Passive House Institute certified to heat recovery rate of 85% Piper’s Square and Whitehaven: Zehnder Comfoair Q 350 MVHR systems - Passive House Institute certified to heat recovery rate of 91% Cooking fumes ventilation: Recirculating cooker hoods Electricity: PV panels on the roof to serve the common areas, no storage. Potable water use (Whitehaven used for reference): 99.4 litres/person/day (HPI Level 1) Water efficiency measures (Whitehaven used for reference): 6l/3l Dual flush WCs, 6l/min showers, 5l/min bathroom taps Daylighting (Whitehaven used for reference): Under BRE Guide 3rd Edition / BS EN 17037:2018 Method 2 National Annex and the HPI Guidelines, of the 255 units tested within the proposed development, 17% (41 no. units) achieve Level 1, 12% (30 no. units) achieve Level 2, 15% (39 no. units) achieve Level 3 and 56% (143 no. units) achieve Level 4.

ph+ | cairn homes case study | 57


W I N D S O R AV E N U E

CASE STUDY

KILL BILLS

END-OF-TERRACE ALL BUT ENDS ENERGY COSTS Sometimes a project comes along that redefines what’s possible in a retrofit. One Dublin family went from camping indoors to constant comfort and almost zero energy costs. Words: Amy Hammel

IN BRIEF Development type: End-of-terrace urban infill retrofit Method: Mix of external and internal insulation, heat pump, demand-controlled ventilation and PV Location: Fairview, Dublin 3 Standard: A1-rated deep retrofit Total energy cost: €77/year – measured total for all energy use, including standing charges and VAT. (see In Detail panel for full breakdown)

€77 per year

58 | passivehouseplus.co.uk | issue 53


CASE STUDY

A

n electric car crash, a global pandemic and choosing tiles from the maternity ward of the Rotunda Hospital were not on Greg Sheaf and Rebecca O’Neill’s retrofit bingo card. And yet, having endured life in an 1880s house described throughout survey reports as suffering from “delayed maintenance”, they were well-equipped for the challenges that came their way. The couple moved into their G-rated, endof-terrace home in Fairview in July 2019 and soon adopted what they describe as a “slightly Victorian style of living”. “When we moved in, the house didn’t have working central heating. We had a second-hand oil boiler put in, but the radiator in our room broke fairly instantly so we had no heating in our bedroom. I think it got down to thirteen degrees in our room at one point,” said Greg. “We had curtains up in the doorways to try and keep the heat in, we had the oil radiators going and we had lots of hot water bottles.” “The bathroom was particularly grim because it was on an external corner, so it was incredibly cold,” said Rebecca. “And the bath itself never heated up. Even if you were having a shower and you had the trickle of hot water over you, your feet were always stone cold because it just never warmed up in any

meaningful fashion.” The kitchen presented a different set of problems. Situated within a poorly-constructed extension from the 1960s, it was “probably one of the worst rooms in the house”, according to Rebecca. “It was entirely breeze block and had absolutely no insulation. It had a flat roof, which we had to get re-felted because it was just leaking continuously. If the rain hit the house in a particular way, we had rivulets of rain coming in along the external edges.” A standalone electric cooker was quickly disposed of owing to concerns about wiring, leaving Greg and Rebecca reliant on an air fryer, a toaster oven and one ring for four years. “We were essentially camping,” said Rebecca. Faulty wiring throughout the house meant the pair avoided regular use of electrical appliances as much as possible. They say they lived in constant fear of burning the house down. “It turned out the electrics were incredibly dodgy, and the house was not earthed,” said Rebecca. “But apart from that, it was fine!” said Greg. Drawn to the property for its extensive garden, Greg and Rebecca were under no illusions that the house itself needed extensive work to make it comfortable. However, while they initially hoped to take a piece-

W I N D S O R AV E N U E

The electrics were incredibly dodgy and the house was not earthed.

meal approach, it quickly became clear that tackling the renovation all at once was the only way. A question of fabric It was 2019 when the couple first approached architect Brendan O’Connor of Abode Design, who had been recommended by another architect. “We wanted someone who was experienced in working with both the quirks of a period property and retrofitting with a low-energy mindset, said Greg. “After we had contracted Brendan I realised I had already heard of him ... I'd read about his work within Passive House Plus when I'd been researching retrofits and Enerphit principles.” They were clear about what they wanted – an energy efficient, comfortable home with a fabric-first approach – and were willing to wait and save if that was what it took to do

N

N

Pre retrofit | Ground floor

Pre retrofit | First floor

N

N

Post retrofit | Ground floor

Post retrofit | First floor

ph+ | windsor avenue case study | 59


W I N D S O R AV E N U E

CASE STUDY

it right. After obtaining the initial estimate, which later increased when material costs escalated during the pandemic, it became clear that this is what they would have to do. They spent several more years saving before the construction finally kicked off in 2023. “We were very keen to do it properly,” said Greg. With Brendan leading the project as architect, the team at family-run building contractor Glanmore Construction Ltd. came on board. As the house had been subjected to some questionable DIY throughout the decades, the team had to rectify previous alterations alongside the renovation work. The ground floor had been raised – it is suspected in response to historical flooding – leaving the door heads extremely low and compressing the first riser of the staircase to just

one inch. As part of the project, the original floor level and the step were reinstated, with the team taking the opportunity to install insulation and a radon barrier during this mammoth task. Replacing the aforementioned kitchen extension was another non-negotiable. A new, single-storey extension, which comprises an open-plan kitchen and dining area, is smaller than the original, reducing the overall footprint of the home. This suited Greg and Rebecca, who were keen to preserve as much of their garden as possible. “It is very unusual to get a client saying, ‘I want a smaller house, please’. Usually, they want a bigger house with deep retrofit and for it to cost nothing, whereas Greg and Rebecca knew that the scope of work was what would generate the budget. They could have had a bigger amount of floor area but

BEFORE

AFTER

You forget how much mental space is taken up by being uncomfortable. It is a drag, and we just don’t have that anymore.

chances are the shell would have to suffer in terms of performance,” said Brendan. “They were very clued in to the impact of a brief on a project.” The home was converted from a four-bedroom into a two-bedroom home. Upstairs, a dividing wall which contained asbestos was removed to transform two bedrooms into one large master bedroom, while another bedroom was converted into an upstairs bathroom. As energy efficiency and comfort were priorities for Greg and Rebecca, much of the focus and budget was directed towards insulation and airtightness. Existing windows and doors were replaced with triple-glazed units, fireplaces were fully sealed and the roof, floor and walls were extensively insulated. A mixed insulation strategy was adopted. The side and rear walls were wrapped in external insulation, while the front façade was internally insulated to preserve the brickwork of this period property. For the internal insulation, Brendan opted for an IQ-Therm breathable insulation system. Additionally, a coating of Remmers Funcosil SNL was applied directly to the external brickwork. This clear, siloxane-based coating penetrates the brick, allowing it to repel liquid water while

60 | passivehouseplus.co.uk | issue 53


CASE STUDY

still permitting vapour diffusion. While internally insulating single-leaf walls increases the risk of interstitial condensation if not done carefully, Brendan was acutely aware of the potential pitfalls. As a former colleague of Joseph Little, one of Ireland’s leading authorities on this subject, and with years of experience working on period properties, he approached the project with particular care. “Once I’m doing internal wall insulation, I get very worried about condensation, especially when you’re achieving good airtightness and you want to lose as little heat as possible,” he said. “I don’t go for the same U-values on internal wall insulation as external wall insulation because I want some of the heat to actually get to that wall to help it dry.” “Where you have joists going into the original brickwork, we sand-cemented the joints between them and taped around each one just to achieve the airtightness. But then you have these cut ends of timber in the masonry, and you want to avoid them getting too damp so that’s why you have to be very careful. I did the IQ-Therm internally there. You have to prepare it with a render product and then you apply the IQ-Therm to that and

Photos: Paul Tierney

it has pores in it to help it breathe. If moisture needs to breathe into the house, it can, and then with the siloxane coating on the outside, it means it’s not blocked from breathing outwards as well. So, you shouldn’t get the cyclical build-up of moisture that you can get over a period.” Flood defence was also a consideration for Brendan. Conscious of historical flooding in the area, he replaced the concrete pad around the house with pebbles and a perforated drain. This strategy proved effective. When a water main burst and flooded nearby parts of Fairview during heavy storms in January 2026, Greg and Rebecca’s house was unaffected. The tightly-sealed, highly-insulated envelope is supported by a suite of new systems. The house was fitted with a 5kW Mitsubishi Electric Ecodan air source heat pump, an Aereco demand controlled mechanical extract ventilation system (DCMEV), and a solar PV array and battery. In terms of design, Greg and Rebecca were keen to be as sympathetic as possible to the Victorian character of the house. While few notable original features remained, they preserved the architraves, some original doors and the wooden floors upstairs, which they

W I N D S O R AV E N U E

sanded and stained. Stepping into this house today feels entirely different to how it did in 2019. The deep retrofit has transformed the property from a cold, damp G-rated house into a fully electric A-rated home, achieving an airtightness of approximately 2 m³/hr/m² at 50 Pa. The construction work took 14 months in total, with some unanticipated challenges extending the original timeline. Perhaps the most unusual event occurred when an electric car in an adjacent car park crashed into the gable wall of the house, narrowly missing one of the construction workers on site. “Vlad had just gone past with rubble in a wheelbarrow. And then, in a few seconds, that wall he’d walked past wasn’t there anymore. He would have been killed, I think, if it had happened five seconds earlier. He was very lucky,” said Brendan. “It was a strange one. It wasn’t necessarily the kind of thing covered in my health and safety training.” The incident delayed the project as Greg and Rebecca waited for the insurance payout, while the emergence of some new cracks in the building following the crash required intervention. “We had to get the engineer involved in putting in conservation grout. There’s a bit of

ph+ | windsor avenue case study | 61


W I N D S O R AV E N U E

CASE STUDY

rebar that you embed in the grout lines and then a specialist mortar is used to bond the wall together and make sure it doesn’t move any further,” said Brendan. Another hurdle was the discovery of rot in a dividing wall, which Greg described as being made from “chewing gum and willpower”. This rot issue was linked to the historic raising of the floor and required additional structural intervention. Real living Greg and Rebecca stayed in Rebecca’s family home in Carlow for much of the construction period, which helped to keep overall costs down. In the final few months, they welcomed their son, Xavier into the world, adding to both the busyness and excitement of an already eventful time. “During the project, we did the typical Grand Designs thing. I got pregnant,” said Rebecca. “I remember Greg taking phone calls about the kitchen tiles while we were in the Rotunda.” In June 2024, the family celebrated their long-awaited move-in day with their four cats in tow. “It was kind of insane. We had a six-monthold so there was just a lot going on,” said Rebecca. “Neither of us had family around so every so often, we would call on a friend to literally hold the baby while we shunted furniture and stuff around.” Busy family and work lives mean that adding finishing touches to the house has been slow, but on the upside, this has given them time to really get to know the space. Greg remarks that living in an A1 house has been a learning curve with plenty of experimentation, but one that he has enjoyed. Though noting that the technology is not very intuitive or user-friendly, he adds that he has found some helpful support on online forums and Facebook groups. “The technology isn’t quite at the set-itand-forget-it stage. With the heat pump, there’s been quite a lot of trying to get the compensation curve right, but I’ve got that cracked now. With the solar panels, I had to do a lot of experimentation with charging them at night and selling it back to the grid, and that’s why it’s kind of cost-neutral because you buy cheap and you sell it back to them,” he said. “The batteries are your gamechanger. The solar and the battery system is essentially paying for our energy.” Living in an A1 home requires a “different type of maintenance”, as Rebecca said. “Whereas before we had to think about getting the oil topped up or bleeding radiators, now it’s making sure that, say, if a firmware update comes through and badly affects your batteries, you’re on to the company to revert

62 | passivehouseplus.co.uk | issue 53

the firmware upgrade,” she said. “You’re never worry-free, it is just different. But the comfort is just out of this world compared to what it was like before,” said Greg. Indoor temperatures remain between 21 and 23 degrees year-round, even during heatwaves and cold snaps. Being fully electric, and therefore free from combustion appliances, has also had a positive impact on the air quality in the home. All of this has made a huge difference to Greg and Rebecca’s dayto-day lives. “You kind of forget how much mental space is kind of taken up by being uncomfortable. It is a drag, you know? And we just don’t have that anymore,” said Rebecca. Worries about bills or the fluctuating price of oil are also a thing of the past. Owing to the PV array and battery, the couple have

been able to maintain a very comfortable home at a very low cost. Once income from the PV array is included, their total household energy bill for 2025 amounted to just under €77, including standing charges and taxes. As they do not own a car, they don’t have to factor motor fuel or EV charging into their budget. While bringing the renovation to fruition took time and brought some unique challenges, the outcome has been worth every step. “What we decided was our thing of, you know, keeping up with the Joneses, was to be the most efficient house on the street. That’s what we wanted it to be. We wanted it to be the cheapest to run, the most efficient and the most comfortable house on the street. And I think that’s been nailed,” said Greg.


CASE STUDY

1

2

3

4

5

6

7

8

9

W I N D S O R AV E N U E

1 A car crashed through the boundary wall during construction; 2 the existing single storey extension was demolished; 3 steel beams to remove wall and create open plan space; 4 roof insulation build up; 5 insulated flat roof and parapets; 6 windows proud of wall; 7 side and rear elevations upgraded with 150 mm graphite EPS external wall insulation; 8 counter battened extension roof; 9 fireplace sealed off but retained.

ph+ | windsor avenue case study | 63


W I N D S O R AV E N U E

CASE STUDY

SEL ECTED PROJECT TEAM MEMBERS Clients / homeowners: Rebecca O'Neill & Greg Sheaf Building design & specifications: Abode Design Main contractor / builder: Glanmore Construction Plumbing & heating installer: Blackrock Heating and Plumbing Technical advisor, BER, ventilation validation: Donovan Low Energy Airtightness tester: GreenBuild Electrician: Marino Maintenance Services Limited Solar PV installer: Solar PV Panels Ireland Internal insulation & facade treatment: Conservation Technology EWI manufacturer: EWI Pro Insulation Systems EWI installer: JJR Insulation Windows & doors supplier: Exclusive Wood Company / Viking Window AS Airtightness membrane & tapes: Pro Clima, via Wurth Heat pump manufacturer: Mitsubishi Electric Roofing system: Dryseal, via Hambleside Danelaw Mineral wool insulation: Knauf PIR insulation: Mannok / Unilin Flat roof window: Velux Kitchen: Fitzgerald Kitchens Kitchen countertop: Granite & Marble Crafts Sanitaryware: Bathshack Custom joinery: Clooney Woodcraft

64 | passivehouseplus.co.uk | issue 53


CASE STUDY

W I N D S O R AV E N U E

WANT TO KNOW MORE? The digital version of this magazine includes access to exclusive galleries of architectural drawings. The digital magazine is available to subscribers on passivehouseplus. ie & passivehouseplus.co.uk

IN DETAIL Project overview: Deep retrofit of Victorian end-of-terrace Development type: Deep retrofit and replacement extension of an end-of-terrace solid brick dwelling originally constructed c.1880. Total floor area 107.85 m² Site type & location: Urban site, Fairview, Dublin 3 Budget: N/A Completion date: August 2024 Passive house certification: N/A Number of occupants: 2 adults & 1 child BER Before: F BER (419.51 kwh/m2/yr) kWh/m2/yr After: A1 BER (3.43 kwh/m2/yr) – (A0 on new scale) kWh/m2/yr Energy performance coefficient (EPC): 0.01 Carbon performance coefficient (CPC): 0.007 Environmental assessment method: N/A Air quality context: Urban site on a busy road. Mechanical ventilation strategy adopted to provide continuous fresh air while minimising heat loss and uncontrolled infiltration Airtightness Before: N/A After: Preliminary test after windows installed: 2.952 m³/hr/ m² at 50 Pa. Retest after first fix: 2.343 m³/hr/m². Final test: 2.11 m³/hr/m² Thermal bridging: Careful detailing was undertaken throughout to reduce thermal bridging. Measures included use of external wall insulation to side and rear elevations, insulated plaster system to retained front elevation, thermally broken window fixings, insulated window reveals, dedicated service cavity to reduce penetrations through the airtight layer, and continuity of insulation at roof junctions. Windows were installed using Fischer Thermax thermally broken fixings. Y-value: not calculated Ground floor Before: Existing uninsulated solid floor After: Floor level lowered to reinstate original proportions and levels. Ground floor build-up consists of 150 mm PIR insulation beneath 50 mm hemihydrate screed with integrated certified radon barrier and sealed penetrations. U-value: 0.12 W/m²K

Extension floor: Ground-bearing insulated slab with 150 mm PIR insulation beneath screed and integrated radon barrier. U-value: 0.12 W/m²K Walls Before: Existing solid brick external walls with no insulation After: Front elevation upgraded internally using 80 mm Remmers IQ-Therm breathable insulation system with 30 mm IQ-Therm to reveals. Existing brick facade repaired and treated externally with Remmers Funcosil SNL siloxane impregnation. U-value: ~ 0.26 W/m²K. Side and rear elevations (including replacement extension) upgraded with 150 mm graphite EPS external wall insulation system finished with Baumit mineral render. U-values: ~ 0.19 W/m²K Existing roof After: Minimum 350 mm Earthwool insulation installed within roof structure together with Intello airtightness membrane and plaster skim finish. U-values: ~ 0.10 W/m²K Bathroom coombed ceiling insulated with Knauf Omnifit mineral wool between rafters and 75 mm foil-faced PIR insulation beneath rafters, sealed with proprietary airtightness tapes. U-values: 0.14 W/m2K Extension roof: Warm roof build-up consisting of 125 mm PIR insulation over deck with additional 125 mm Knauf Metstud insulation between joists. Taped Intello membrane used as airtight layer beneath. Finished externally with Agrément-certified Dryseal roof system and washed pebble ballast Windows & doors Before: Existing older single/double-glazed units After: Viking Window AS aluclad triple-glazed windows and doors with thermally broken installation fixings. Approximate overall installed U-value: 0.72 W/m²K. Window restrictors installed for child safety and guarding added where required to comply with Part K Roof windows Before: N/A After: Velux triple-glazed fixed skylight CFU 25Q + ISU 209 U-values: ~ 0.60 W/m²K Heating system Before: >20-year-old oil boiler & radiators throughout

entire building After: 5kW Mitsubishi Electric Ecodan air source heat pump. Heat distributed via underfloor heating at ground floor level and low-temperature aluminium radiators at first floor level Ventilation Before: Natural ventilation through infiltration and window opening After: Aereco demand-controlled mechanical extract ventilation (DCMEV) system providing continuous extract from wet rooms with demand-controlled fresh air inlets to habitable rooms Water efficiency: N/A Renewable electricity: 10-panel Jinki solar photovoltaic array with Solis inverters and 10.6 kWh Weco battery storage system. Electricity is used to support household demand including operation of the air source heat pump, with surplus generation stored within the battery before export Sustainable materials: Retrofit-first approach retaining the existing structure. Remmers IQ-Therm breathable internal insulation, graphite EPS external wall insulation, mineral wool insulation and triple-glazed aluclad timber windows Embodied carbon: Not calculated Material impact: The primary embodied carbon strategy was retention and upgrade of the existing dwelling rather than demolition and rebuild. Existing walls, roof structure and foundations were retained where possible, reducing material consumption and construction waste while improving operational performance Energy bills: Total energy bills for calendar year of 2025 of €77, including standing charges and VAT, based on Pinergy tariff, including €920 of imports and standing charges, and €843 of payments for exports Heating use: Data from the Mitsubishi Ecodan Melcloud system shows 1,783 kWh of electricity use in 2025 to deliver 8,064 kWh of delivered energy (heating and hot water) – meaning a seasonal COP of 4.52 Monitored temperature: Lounge temperatures hovering between 20-21C (Jan-June 2026), with one measurement of below 19C and roughly 25 peaks of over 22C

ph+ | windsor avenue case study | 65


WOLFGANG FEIST

INSIGHT

Prof Wolfgang Feist speaking at the Cairn passive house launch in Seven Mills on 16 April.

The interview Prof Wolfgang Feist When the professor who founded the passive house standard visited Dublin this spring, it marked a rare journey for a man who prefers his bicycle to an aeroplane. Passive House Plus editor Jeff Colley met him at a gathering of Ireland's passive house community to talk childhood frost, Swedish interstitial icicles, and why the world's most rigorous building standard was born on a ship. Words: Jason Walsh

W

olfgang Feist grew up in a house where the bedroom walls iced over in winter. The family home was a traditional German Fachwerkhaus – post and beam timber frame build – heated by two wood-burning ovens. Only the kitchen was kept warm: each morning, his mother would descend to the basement to fetch coal, light the fire, and the family would gather in the one room that offered any comfort against the cold. "In the bedroom it could be that we had frost on the walls," said Feist. "So that is how I grew up." He is quick to add that he does not look back on those years with hardship. Post-war Germany was poor by modern standards, and

66 | passivehouseplus.co.uk | issue 53

the Feist household was no different from most. A chicken on the table was a twiceyearly event in this home where potatoes were the staple, but the memory has sharpened into something more pointed over the decades. At least two billion people on earth still live in similar conditions today, Feist says, but what troubles him is not that fact in itself, but that those living in far greater comfort are the ones doing most of the complaining. A characteristically direct observation, then, from a man who has spent the best part of 50 years thinking about how buildings use energy and why so much of that energy is wasted. Feist is the founder of the Passive House Institute in Darmstadt and the principal architect of the passive house standard, the

most demanding and rigorously evidencebased energy performance framework in construction. Visiting Dublin at the invitation of the Passive House Association of Ireland, Feist was speaking at an evening gathering of practitioners who have spent years building to his standard, with many of them meeting him for the first time. Looking at the world as it is Feist's route into building physics was circuitous. As a young man at the University of Tübingen, Feist had trained as a mathematical physicist, drawn by the question of what, at its most fundamental level, the world is made of. Physics disappointed him in that


INSIGHT

ambition as it gave him deeper questions rather than answers. What saved him was a parallel interest, pursued as a hobby, in the social consequences of how industrialised economies use natural resources. Around 1978, his professor eventually told him that understanding the problem was no longer sufficient and that the time had come to work on solutions. The OPEC oil crisis had already concentrated minds across the western world. In American universities, a generation of researchers was experimenting with heavily insulated buildings in an effort to cut energy demand. Feist was paying attention and later came to know Arthur Rosenfeld of Lawrence Berkeley National Laboratory, one of the central figures in that effort. Rosenfeld told him about a moment he had experienced in his laboratory in 1975, sitting among humming refrigerators and blazing lights, thinking about the power station 120 kilometres away and the reservoir required to keep it running, and asking himself what all of that infrastructure was actually for. The American super-insulated building movement was eventually killed off by Ronald Reagan, who cut the federal funding university programmes depended on. Its findings did not vanish, however. Indeed, a journal called Solar Age, published between 1975 and 1978, in which Feist says almost everything that would later underpin the passive house standard, was already known. "To be honest, we didn't invent much," he said. "It was all known. We just had to make use of it and come to the right conclusions." The crucial insight came from Sweden.

Feist had travelled to Lund University to meet Bo Adamson, a professor who had become an itinerant ambassador for building science. When he arrived, Adamson was not there. He had just returned from southern China, where the Shanghai government had asked him to solve an unusual problem. In parts of the region, domestic heating was prohibited due to fuel shortages. Indoor temperatures in winter could drop to eight degrees. The government wanted to know whether buildings could be made comfortable without any heating system at all. Adamson came back with “passive” houses on his mind. Feist says his immediate reaction was that the professor had lost the plot entirely, but over the following two weeks, as the two men worked through the simulations together on a university mainframe where a single annual building model took around two hours to process, a different picture emerged: the idea was not crazy, it was feasible. "When we ran these kinds of simulations, we came up with something surprising," Feist said. "Almost the criteria we nowadays still use for passive houses. That was a result from this very first simulation." Sweden also furnished a second essential lesson. The super-insulated American buildings had largely failed, but the reasons had never been properly published. The problem, Feist discovered, was airtightness, or rather the lack of it. Warm indoor air carries far more moisture than cold outdoor air. In a heavily insulated but leaky building, that moist air finds its way into the fabric of the structure, meets a cold surface,

WOLFGANG FEIST

and condenses. Over months and years, the damage accumulates. In Sweden, where any gap in a building envelope produces visible icicles in winter, this had been understood, and solved, decades before. Adamson pointed Feist to a small technical booklet on insulation and airtightness. Everything the passive house standard would eventually require of a building, he says, was already in those pages. When it came to building the world's first certified passive house in the Kranichstein district of Darmstadt in 1990, there was no research grant. The four families who moved in to the four-unit terrace paid for it themselves. Feist says the constraint shaped the outcome usefully. The building had to be simple and built using methods that local tradespeople already knew. He and Adamson had visited a Swedish timber frame company, but one look at the prefabrication facility was enough. They walked out and shook their heads. Masonry it would be: wet plaster internally for airtightness, external insulation outside. Triple glazed windows with low-emissivity coatings did not yet exist commercially, so Feist called the research director of Flachglas AG and described what he needed. The windows were made. The building went up. True air One of the most persistent myths in the industry, Feist says, is that a leaky building ventilates itself. Simulations conducted by his institute showed that even in a very leaky building, natural infiltration in typical German winter conditions produces air

The world's first passive house, a four-unit terrace in Darmstadt built in 1991.

ph+ | wolfgang feist insight | 67


WOLFGANG FEIST

INSIGHT

Bringing it together

The excellence behind the façade. strong versatile smart eco-friendly compliant www.ejot.co.uk/CROSSFIX The complete stainless steel support system

68 | passivehouseplus.co.uk | issue 53

EJOT UK

salesUK@ejot.com

T: +44 (0)1977 687040


INSIGHT

change rates of around 0.1 to 0.15 per hour. The standard recommendation for healthy indoor air is 0.5. He says that if CO2 sensors were distributed across one hundred ordinary homes over a winter, readings of between 2,000 and 3,000 parts per million would be routine whenever windows were closed, which is to say most of the time. Jeff Colley, host of the Dublin conversation on behalf of the Passive House Association of Ireland, noted that two UK studies, one in England and one in Glasgow, found that between 60 and 63 per cent of background trickle vents in naturally ventilated homes were closed or blocked when researchers arrived to monitor them. Occupants had sealed them against cold draughts and forgotten about them. The German tradition of Stosslüftung, or burst ventilation, opening all windows fully for a few minutes several times a day, does not resolve the problem either. Feist does the maths. Opening every window twice a day produces two air changes in 24 hours, an exchange rate of roughly 0.08 per hour. You cannot make air fresher than fresh air, he points out, so leaving windows open for longer makes no difference once

the exchange has occurred. To maintain adequate ventilation by window opening alone, a household would need to open up approximately every four hours. "Now you can go around the town and look around," he said. "Where are the windows opened? Never." Change is in the air The Dublin event took place against a backdrop that would have seemed unlikely a decade ago. Ireland now has around 1,500 certified passive houses, many built by the developer Cairn Homes as part of large suburban schemes – with thousands more on the drawing board. The occupants are, in many cases, households that would once have been described as fuel-poor. Colley said the passive house standard has succeeded in part because it refuses to frame energy efficiency as sacrifice. A passive house is not a cold house that uses less energy. It is a warm house, consistently around 20C throughout, that requires very little energy to maintain that temperature. Feist agreed that this framing matters, particularly in the current political climate, which he describes as one in which hostility

WOLFGANG FEIST

has come to substitute for thought. "We shouldn't talk about reducing comfort inside a building," he said. "If we can solve a problem by just adding a little bit of insulation around the building, then that is what we should do." Still, Feist is modest about his own role in what has become a global movement. The standard, he insisted, was built on a century of prior knowledge, on the work of Adamson and Rosenfeld and dozens of others, on insights already present in a Swedish pamphlet and an American journal before he began. Feist also mentioned, in passing, that the very first passive house was not built in Darmstadt in 1990. Completed in 1892, it was a ship. The explorer Fridtjof Nansen designed his vessel, the Fram, with such thoroughness that its crew could maintain habitable temperatures through Arctic winters without continuous heating. Physics, Feist said, has not changed since. Feist finally raised a glass at the end of the evening with the air of a man content to leave it there. "We stopped at the right moment," he said. "Cheers."

(above) Photo by explorer Fridtjof Nansen, March 1895 of his ship Fram in ice, near the North Pole. Credit: National Library of Norway

ph+ | wolfgang feist insight | 69


ZERO BILLS

INSIGHT

Zero Bills Director, Nigel Banks, announcing the Zero Bills Standard.

Zero bills? Really

Smart home technology is making energy bill-free living a real prospect Heat pumps, solar panels and home batteries are converging with smart tariffs to make zero energy bills a genuine possibility for some new homes. But how much does it cost, who benefits, and is the broader promise deliverable on a mass scale? Words: Kate de Selincourt

I

t is now well-established that the lowest carbon domestic heat source is electricity – and heat pumps in particular. Biomass has a dirty reputation in many ways, and domestic hydrogen also appears to be a busted flush. But electrifying domestic heat means very large increase in electricity demand – and that demand will vary hour to hour and month to month. While fossil fuels have tended to be straightforward to store and supply to match the ups and downs in demand, electricity, particularly low carbon electricity, is a bit trickier. Electricity distribution is expensive, while supply is to an extent in the lap of the weather gods. Because of these challenges, until recently many were suggesting domestic electrification was a fool's errand. But the picture is changing. The energy efficiency of homes has been improving, albeit disappointingly slowly. With care, heat pumps can more than triple the heat available per unit of electric power. Add in falling battery prices

70 | passivehouseplus.co.uk | issue 53

and advances in computing technology, and possibility of 'smart' home energy may open up. As well as supply responding to demand, demand can now respond to supply. This 'smartness' is strategically invaluable. It can smooth peaky demand, and can also help to accommodate varying renewable generation. Timing is everything By timing energy use, and by adding in batteries to extend that flexibility, a home can now link to the wholesale energy market as its prices fluctuate hour by hour and day by day. Many tariffs already exist that match the predictable daily variations in electricity availability and price. Customers can use energy when it is easier to supply (and, often, greener), and if they have a battery, squirrel more away for later. With the advent of "Smart Export Guarantees", households can also be paid to export the power they do not use themselves – either their own generation, or cheap power they purchased

the previous night. There is an awfully long way to go. Electrification of home heating is still barely in the foothills in the UK . The smart, interconnected home is even more of a rarity. But UK Energy Secretary Ed Milliband wants that to change. The UK government is making the "smart" home the headline theme of the government's revamped home improvement programme, the Warm Homes Plan. At the very end of 2025 a flurry of press coverage suggested that under the forthcoming Plan "households could pay little or nothing for power." The term "zero bills" was used in much of the coverage, with headlines like "Milliband plots £13bn solar panel blitz for 'zero bills'". The idea of free energy is certainly eye-catching – and the conflagration in the Middle East makes the idea more salient than ever. But is using technology and smart connectivity to eliminate energy bills a real possibility at scale? How much equipment would we need?


INSIGHT

And what does it cost? Even without help from the government, some very proactive households have installed enough battery and generation capacity, and are deft enough with their use of import and export tariffs, to end up paying little or nothing overall for electricity – or sometimes even making a profit. For example, engineer Peter McBride boasts in his LinkedIn page that by kitting out his home with a heat pump, solar panels, a 9.5 kWh battery and an EV charger; combining time of use and export tariffs; and scheduling appliance and heat pump use, he earns more than he spends on electricity . Not just for the geeky Householders who have set up this kind of system off their own bats are unashamedly geeky – as well as having access to four- or often fivefigure sums to invest in their equipment (this latter aspect, the government wants to make easier with grants and low interest lending). Optimising the use of generation and storage to get the best performance can be an engrossing and satisfying pursuit – but it is not for everyone. An alternative is to buy into a package whereby the dance of when to use and when to store, when to buy and when to sell, is managed automatically. A house with a battery and PVs can install a control unit to take over these decisions, optimise spending and maximise income. (Despite the promised advent of balcony solar, a full heat pump-PV-battery combo is really only feasible in houses so far.) If such households are grouped together, they can do even more. Connect enough domestic batteries together and you create a sizeable storage resource, able to offer highly tailored 'grid balancing' services. And energy system operators pay for them: for example, network operators offer 'capacity payments' for access to a guaranteed power reserve of a specified size, available at a specified time every day (even if it isn't ever used). Similarly, if generated supply suddenly falls a bit short, there is a drop in frequency that immediately signals a boost is needed – and domestic batteries can collectively respond to that too and again, be paid to do so. Various approaches to setting up these groupings and accessing these payments are being tested out. Northern Power Grid for example is exploring the linking of homes on a neighbourhood basis in its "Community DSO" project. There are commercial services already available that tap into these opportunities. For example, the control unit made by tech firm Levelise enters households into contracts the company sets up, then a share of this income is paid to the households. Levelise claims that the extra income to households, on top of the savings from free solar power and export payments, mean a PV and battery installation can pay for

itself in just a few years. This approach will not necessarily cover the full annual electricity costs – that still depends on the overall energy needs of the individual home. Another option is for householders to enter into a contract that specifically promises that energy bills will be zero. And even, to move into a home where everything – kit, controls and tariff – has been set up for them. The term 'zero bills' was used quite loosely in media coverage of the Warm Homes Plan. But formally, Zero Bills refers to a specific tariff trademarked by energy company Octopus. Under the Octopus Zero Bills the occupant is guaranteed no electricity bills for home energy use for five or even 10 years. EV charging isn’t included. Other than that, the only constraint is to stick within a "fair use" limit for household energy consumption. This is 10,000 kWh/a – around double what Octopus says a typical household uses. The tariff is restricted to homes with a heat pump, sufficient PV generation (assessed in relation to anticipated energy consumption) plus a good-sized installed battery – larger than those typically installed by DIY-ers. Homes also must have a low heat loss (almost all Zero Bills homes in the UK are built to at least the 2021 building regulations). Under the Zero Bills tariff, control of their domestic systems is handed to Octopus' software, Kraken. Kraken uses information about movements in the wholesale electricity price (which as an energy company, Octopus has access to) to determine when to store, when to sell, and when to import, to minimise costs and maximise Octopus' profit. This enables Octopus to cover the residents' day-to-day energy use without charging them anything. As with other interconnected systems, additional revenue is available to Octopus from the electricity network companies for grid services. The battery is crucial to making the tariff work. It enables Octopus to hold back some of the daytime generated power to use or sell during the evening price peak – as an energy company Octopus can charge the market price on the day for this, and this forms a large part of the revenue that makes the tariff work. Residents meanwhile can just go about their

ZERO BILLS

lives, untroubled by headlines about price caps, gas shortages or anything else. As one Zero Bills resident told Sky News: "It's amazing… you just don't have to worry. There is no stress at the end of each month, [wondering] 'have we had too many showers, has the heating been on too much?'" Octopus says it has approved (completed, under construction, or agreed) over 5,000 Zero Bills homes to date, across all tenures including private and affordable rent, private and shared ownership. In very nearly all cases, these homes were constructed specifically to meet Octopus' requirement. Marketing sizzle To developers, letting or selling a home with the promise to your customers that they will not get a single energy bill for five or even 10 years is an attractive proposition. Mike Webb of Seaton Beach developments is exploring the possibility of providing Zero Bills at an Enerphit development in Devon. As he put it: "if you try to explain about energy use and low carbon, customers' eyes tend to glaze over, but tell them they will have no energy bills and their eyes will light up!" This has been experienced by developer Thakeham at a development that included some Zero Bills homes. Thakeham’s chief of sales Julian Rooney said that "Zero Bills draws customer attention - it has been the single biggest driver of enquiries to the site." Octopus is happy to lean into the buzz by visiting development launches and posing for local newspapers, handing pink plush octopus toys to local schoolchildren. What does zero bills cost? In return for marketing pizazz of the Octopus "Guaranteed No Energy Bills for Five Years" sticker on a property listing, the developer needs to spend a fair bit installing the necessary tech. How much extra they spend, depends on what they normally build, but even a fairly 'low carbon' oriented developer will need to include more PVs, and a large battery, to meet Octopus' specification. In many cases the 'extra' also includes the heat pump (gas boilers are still the default option for

Rendering of Zero Bills homes with Barratt Redrow.

ph+ | zero bills insight | 71


ZERO BILLS

INSIGHT

most UK housebuilders - though that is set to change when the Future Homes Standard finally kicks in). In addition, as noted above, the amount of kit also varies with location – colder winters require more compensatory generation in the summer. The extra over costs are therefore generally given as a range. A 2025 paper written with input from Octopus, cited extra capital costs of "£8,000– £15,000,"while Sussex developer Thakeham was quoted in the Daily Telegraph giving an extra cost of "between £10,000 and £20,000". Some have put the cost higher. (Octopus counter that battery and PV costs are 'falling all the time'). Enthusiasts for the DIY approach argue that without Octopus needing a cut of the surplus, it is possible to create a zero bills type set up with a smaller capital investment and/or, better financial returns. For example, Peter McBride (mentioned above) told the Daily Telegraph his 'better than zero bills' installation (on a home built to the 2013 UK building regs) cost around £13,000. Others argue that a better return comes from modest ambitions: sizing a battery to shift daytime solar into the evening peak, rather than investing in larger storage dependent on third-party tariffs. At the end of the day, the leap to 'bill-less living' is only a possibility with insulated, airtight, efficient fabric. But even with insulation, there are many, many homes were getting to zero energy bills would mean more solar than the roof can accommodate. As the current gas to electricity price ratio stands in the UK, a heat pump on average costs a little more to run than a gas boiler (the range is huge, but that's where the median falls). This unpalatable reality is a threat to the whole home electrification programme. If people cannot afford to run a heat pump, then our dependency on gas cannot be beaten, with all the horrors that ties us in to. A judicious amount of smart tech – and, crucially, the right tariffs and controls – could prove an excellent hedge against energy costs in general, and heat pump running costs in particular. In 2026 it looks as though this is as necessary as it has ever been. The strategic case was underlined in May 2026 when Octopus chief executive Greg Jackson told an industry conference that households might rationally accept occasional blackouts in exchange for lower bills. Whatever one thinks of that argument, it captures the moment exactly: the real question is no longer whether smart home energy matters, but how urgently. That said, it is hard to not linger on the word ‘blackout’, and even 'the odd’ one is unlikely to be a proposition most homeowners, or housebuilders, will find easy to sell.

72 | passivehouseplus.co.uk | issue 53

Rendering of gs8's Zero Bills site in Thornwood, Epping. Credit: gs8

ZERO BILLS AND ENERGY EFFICIENCY The less energy a home uses, the easier it becomes to cover the costs of that energy by, for example, saving up or exporting surplus solar generation or even selling cheap overnight energy imports at a profit the next day. When you are organising your own set-up, your focus may or may not be 'zero energy bills' – you might just want to make a good return on your investment. With an Octopus Zero Bills tariff however there is a contractual guarantee to cover all energy costs, and the company is taking all the risk. They have to be confident that the income from selling power will cover the cost of all the imports the dwelling needs, and still enable a profit. This means a lot of generation and storage is needed. According to Octopus guidance for developers, a Zero Bills installation for, say, a 100 m2 Part L 2020 compliant 3-bed house in the midlands of England would require around 13 kWp PV generation (25-30 panels), a 13.5 kWh battery, and of course a heat pump (which one would hope was standard anyway, but isn't always). 25-30 panels are a lot to fit onto one roof. Both sides of the roof are usually needed. Even then, dormers or skylights can be an issue. The exact amount of installed tech Octopus requires, depends on how much energy they believe they are going to have to supply. This in turn depends on the location (you need more heat if you live somewhere cold), and the fabric performance. If a developer wants to reduce the number of PV panels they need to install, while they cannot move the plot, they can improve the fabric performance. Thus, if the same 100 m2 home above were built to passive house, Octopus’s technical director Nigel Banks says this would allow "a 25-35 per cent reduction in the solar PV panel requirements". (The battery and heat pump requirements stay the same.)

The cost saving from fewer panels is not that large, as Banks points out – panels only cost around £200 apiece. However, the reward is also more flexibility in terms of appearance, siting of panels and building form. Passive house might also open the possibility of three-storey houses meeting the criteria for Zero Bills (for a regs building, Octopus can only usually offer the tariff to one- or two-storey homes, to enable a high enough ratio of roof area to heat demand). Because Octopus has a direct commercial interest in the energy performance of Zero Bills homes, the company reserves the right to audit this in its contracts with housebuilders. "We are looking to improve housebuilders' standard practice, to improve performance and to ensure equipment is installed and commissioned well," said Banks. This applies not only to the fabric – the design and set-up of the heat pump system is just as critical. In the UK the delivered efficiency of heat pump systems is notoriously unreliable, with some installed systems delivering less than half the efficiency of the best. To counter this risk Octopus is developing guidance for each brand of heat pump being installed in Zero Bills homes, setting standards for weather compensation and flow temperatures. The guidance also discourages zoning – which often reduces system efficiency, and warns against over-long or under-insulated external pipe runs. In a well-insulated dwelling, hot water can dominate the heat pump's energy use, so hot water control is also important. "We want good efficiencies and so are promoting good practices – keeping the cylinder at 48-50C with a regular legionella cycle, rather than running at a high temperature all the time,” Banks said.


INSIGHT

ZERO BILLS

IS THE PROPERTY MARKET READY FOR SMART HOMES? In the early 2020s, when global events led to the previous energy price crisis, market research suggested a higher EPC home might attract up to a 15 per cent purchase price premium. It isn't clear how closely this reported premium tracked either energy price changes, or indeed general property condition and specification; a higher EPC home is also likely to be new (or extensively renovated), and a home with an exceptional EPC is probably finished to a high specification overall. Dan Jestico, sustainable design director at Savills property agency, takes the sustainability premium with a pinch of salt, at least with regard to the owner occupier sector. Jestico told Passive House Plus that: "There is limited evidence that there is a price premium for sustainability in the build to sell sector – for most builders it's not enough to make it worth changing the specification." Nonetheless, the Energy Transitions Commission, a group including Octopus chief executive Greg Jackson, said in a 2025 report that Zero Bills homes "attract a valuation premium" and customers have been shown to be willing to pay more. The report suggests that most "Zero Bills" sites have so far fully recovered the additional costs for developers." Developer Thakeham told the Daily Telegraph that

the £10-20,000 extra cost of building to Zero Bills in their Sussex development was passed on to the homebuyers, supporting this assertion. But two other developers of zero bills homes, Bellway and Tilia, both told Passive House Plus that while the Zero Bills offer to house-buyers was useful in terms of marketing, the additional outlay per dwelling did not necessarily return to them when the homes were sold. Bellway's Zero Bills homes had "enhanced fabric and ventilation standards, approaching near-passive house levels" alongside the Zero Bills tariff. However, there was no price premium: "The appeal of zero energy bills added significant value for buyers once introduced, although...these homes were marketing at the same market value as other properties on the development, so no premium was added," Bellway told us. Tilia, a housebuilder that piloted some Zero Bills homes on a development near Northampton, were not quite so specific about sales prices, but did not confirm that they had recovered their costs, saying instead: "Although many buyers valued the long-term security a Zero Bills home provides, price, location and design/size of the home were still important factors in their decision making." If you are able to buy a zero bills home for the same asking price as the more typical

home where you pay for the energy you use, it is hard to see why you would not. However, it is also hard to see why developers would build any more of them. On the other hand, Octopus maintains that if purchasers do pay the full extra cost for a Zero Bills home, they still save money in the long run. Octopus has claimed a Zero Bills tariff saves an average household around £1,800 a year on bills, "based off Ofgem Typical Domestic Consumption Value of an average home".Depending on borrowing costs on the one hand, and changes in energy costs on the other, this suggests a net saving might be possible in less than 10 years. However, as the tariff is generally only available on high-performance new build homes, the avoided bills might be expected to be lower. For example, property site Rightmove suggests that for a 3-bed house bills range between around £550 to £1,100 pa for EPCA or B properties (depending on archetype, e.g. terrace vs detached etc.) This suggests the extra capital might just be paid off in more like 15 years – this being an often-quoted estimated lifetime for technologies such as heat pumps and batteries. This makes the financial benefit to homebuyers more equivocal. However, if energy prices rise faster than the cost of purchase and installation of smart equipment, this equation may change again.

The Zero Bills development by Verto Homes at Nexa Fields. Photo: Verto Homes

ph+ | zero bills insight | 73


MARKETPLACE

PA S S I V E H O U S E +

Marketplace News Expanded EJOT range provides soffit insulation boost N ew fastener lengths for EJOT’s DDS-Z range enable soffit insulation depths of up to 375 mm to be installed easily and efficiently, with the screws still only requiring an embedment depth into concrete of just 25 mm. DDS-Z fasteners are a popular choice in projects requiring soffit liners to meet higher thermal performance and fire resistance objectives in projects such as car parks, undercrofts and other ‘cold’ spaces over which residential or commercial accommodation is built. However, to meet more stringent standards, much thicker soffit insulation is increasingly being used, particularly non-combustible mineral fibre where performance to Euroclass A1 non-combustible fire classification is also required. EJOT has responded with the development of a 400 mm option for the EJOT

DDS-Z range. Available now, this fastener enables streamlined installation of insulation with a thickness of 375 mm. Despite the greater fastener lengths, however, all versions still only require a 25 mm embedment into the concrete. This reduces the potential for impacting on reinforcement within the concrete, which could add time, complexity and cost to the project, and because the screw does not expand, it is more favourable for use with pre-stressed concrete beams. The DDS-Z brings together a premium quality concrete screw with the EJOT DD-T washer. As a fastener specifically designed for the attachment of ceiling insulation and acoustic boards to concrete soffits, the DDS-Z is a steel screw featuring a duplex coating and self-tapping thread for use in cracked and non-cracked concrete.

Resistance to corrosion is assured through DDS-Z’s classifications of C1 (very low), C2 (low) and C3 (medium), making it suitable for projects located in urban and industrial environments with moderate levels of sulphur dioxide pollution in the atmosphere. To achieve the most effective and best value fixing methodology when using DDS-Z, the EJOT team supports installers and insulation suppliers at the outset to help them achieve the performance goals without making the installation process complex or costly. 

ISO Chemie joins permanent passive house exhibit in Matlock

(above) Window and door sealant tape specialist ISO-Chemie has invested in an exhibition at Home by Milestone.

W

indow and door sealant tape specialist ISO-Chemie is investing further in supporting the house building sector with a new exhibition at a showroom dedicated to passive house principles, sustainable innovation, and smart eco-living. The move will see a permanent showroom at Home by Milestone - The Passivhaus Centre of Excellence in Matlock, Derbyshire, enabling the company to showcase its thermal insulat-

74 | passivehouseplus.co.uk | issue 53

ing and load bearing bracket support system Winframer Type 1 and Hybratec multi-functional joint sealing tapes, and the easy-to-use and energy efficiency saving benefits these systems provide. Also showing will be Block One high performance window sealing tape and the ISO-Top construction sheets, which are a beneficial addition to Winframer, offering a rapid and effective solution for boarding out the inside of the fenestration reveal section following installation of the window. ISO-Chemie said Home by Milestone is a display space that has been created as a fully realised experience designed to feel like home. Visitors to ISO-Chemie at Home by Milestone will be able to advance their understanding of airtightness and related issues, said Andy Swift, ISO-Chemie’s UK sales and operations manager, enabling passive house specifiers to improve the design of their buildings and technical expertise. A key feature of ISO-Chemie’s investment will be to provide advice on effective fenestration installation techniques - displaying sustainable energy sealing solutions showing how

advanced tape technologies allow windows to be installed in the insulation areas, overcoming thermal bridges. Doors and windows account for almost a quarter of the total air loss of the average house, and adding the joints between walls, floors and ceilings brings the figure up to 50 per cent. Generally, that airflow is desirable, but Swift said that you can eliminate half of the heat loss while still retaining some natural air flow. “Unfortunately, thermal sealing around windows is not specified by law in the UK. That is why ISO-Chemie, whose gap-sealing tapes and solutions provide effective resistance against heat loss, is highlighting the issue through support for initiatives like this exhibition. “It’s part of our strategy to educate all involved in window and door specification about energy efficient improvement solutions in the UK - up to 70 per cent cost savings can be achieved when using these tapes for high performance window sealing, rather than the current three component systems,” he said. Find out more at: www.iso-chemie.eu/ en-GB/home/ 


PA S S I V E H O U S E +

MARKETPLACE

LSFA guide sets out ‘cost-effective route to net zero’ for light steel frame T he Light Steel Frame Association (LSFA) has published a new guide showing how light steel frame construction can help the industry deliver measurable carbon reductions without compromising cost, safety or performance. The guide, called the Cost-Effective Route to Net Zero, arrives as the UK Net Zero Carbon Buildings Standard enters its early adoption phase and the Future Homes Standard moves closer to implementation, putting growing pressure on project teams to cut carbon while maintaining commercial viability. Aimed at designers, developers and specifiers in both the public and private sectors, the guide explores how light steel frame can support the journey to net zero through whole-life carbon reduction, circular construction principles and advances in low-carbon steel production. Central to the publication is the need to consider carbon emissions across a building’s entire lifecycle – from material extraction and manufacture through construction, occupation and adaptation to eventual deconstruction. The LSFA argues that light steel frame is uniquely placed to support this approach. Steel is among the world’s most recyclable construction materials and can be reused or recycled indefinitely without loss of structural performance. Today’s light steel frame systems already contain between 60 and 90 per cent recycled steel, while the industry accelerates its shift to low-carbon production through electric arc furnace technology powered by renewable energy. The new electric arc furnace at Port Talbot, expected to begin production around 2027, should reduce on-site CO2 emissions by up to 90 per cent – a significant milestone in the UK’s transition to green steel. Ben Towe, chair of the LSFA, said: “Our aim is to equip construction professionals with the knowledge and confidence to specify light steel frame systems as a credible net zero solution, demonstrating that high-performance, future-ready buildings can be delivered without a significant cost premium. Early collaboration with the right expertise can transform project outcomes, unlocking a more sustainable, safe and cost-effective pathway to net zero.” The guide also says that net zero must never come at the expense of building safety. With regulations continuing to evolve, non-combustible structural solutions are

(above) 2 South Wales School, a landmark primary school development in South Wales utilised Frameclad’s pioneering ECO-LSF (Light Steel Frame) system, manufactured from up to 100 per cent recycled steel.

becoming increasingly important, and light steel frame’s fire performance, dimensional stability and durability offer reassurance to developers, insurers, regulators and building occupants alike. Towe added: “The challenge facing the construction industry is significant. We must reduce embodied carbon, improve operational performance, extend building lifespans and embrace circular construction principles while continuing to deliver safe, high-quality buildings that remain commercially viable. “For too long, the net zero conversation

has focused almost exclusively on operational energy. While this remains vital, we now recognise that whole-life carbon must sit at the heart of every design decision. By considering structural solutions at the earliest stages of a project, we can unlock significant carbon, programme and cost efficiencies while future-proofing buildings for generations to come. This is where light steel frame comes into its own.” The Cost-Effective Route to Net Zero is available as a free, open-source resource from the LSFA document library at lsf-association.co.uk/document-library. 

ph+ | marketplace news | 75


MARKETPLACE

PA S S I V E H O U S E +

UK offices ‘chronically overcooled’, causing shivering and waste, expert says Static thermostat settings mean two in five office workers are uncomfortable, according to Klimatica’s Dr Victoria Tink, who argues buildings should track the seasons instead.

B

ritain’s offices are being chronically overcooled, leaving staff reaching for cardigans in July while businesses pour money and carbon into air conditioning that nobody asked for, according to a building controls specialist. Dr Victoria Tink, chief technology officer at the smart thermostat firm Klimatica, says cooling in most UK offices is available 12 months a year and used heavily for about six of them – despite the country’s moderate climate. She defines overcooling as cooling that serves no useful purpose: unwanted by occupants and doing nothing to make them comfortable. The scale of the discomfort is striking. Analysis of the Center for the Built Environment’s occupant survey, which draws on responses from almost 100,000 people across 1,000 buildings, found that 39 per cent of office occupants are uncomfortable, Tink says. “This cannot be a surprise to most of us,” she said. “There is almost no one who you cannot ask whether their office is cold in summer and receive an animated response back.” The waste is significant too. Tink estimates that about 30 per cent of cooling loads in UK offices could be removed while keeping occupants comfortable – equivalent to roughly 7.5 per cent of offices’ total energy demand. One peer-reviewed global study cited by the firm puts unnecessary overcooling at 1.3 per cent of worldwide emissions. The culprit, she argues, is the static setpoint: a single target temperature applied all year round. Industry guidance recommends winter temperatures of 21-23C and summer temperatures of 22-25C, but in practice, Tink says, most buildings are simply held at about 21C from January to December. Newer buildings are no better. Even modern servicing and control strategies tend to default to the same year-round setpoint, she says. And while some emerging specifications and operating guides now recommend heating to only 18C and cooling to only 24C in the name of energy saving, Tink sees these as more of the same rigid thinking: “While this may save energy, this is definitely not going to make people comfortable,” she said. Her argument rests on adaptive thermal comfort theory, which holds that people’s expectations shift with their environment, particularly outdoor temperatures. Comfort

76 | passivehouseplus.co.uk | issue 53

is shaped by air temperature, radiant temperature, humidity, air speed, activity levels and clothing – and preferences change through the year as people adapt. In free-running buildings – those neither heated nor cooled at a given time – comfort temperatures are known to track closely with conditions outside. Until recently, that was not thought to apply to air-conditioned buildings. But Tink points to a 2020 reanalysis of adaptive comfort models by researchers at UC Berkeley’s Center for the Built Environment and the University of Sydney, drawing on more than 60,000 comfort measurements from buildings worldwide, which found that occupants adapt to both indoor and outdoor temperatures – suggesting the theory applies far more widely to conditioned buildings than previously assumed. The implication, she says, is that indoor temperatures should follow the seasons: slightly cooler in winter, much warmer in summer, with buildings left free-running for more of the year. In effect, conditioned buildings should behave more passively. How far that adaptation can stretch is less settled, however. The models themselves assume no upper or lower limit, and the effect remains largely untested in conditioned

commercial buildings. Tink believes limits exist but have yet to be identified – and that they would be reached more quickly in the cold than in the heat. Evidence from free-running buildings in countries with more extreme climates suggests people can adapt to surprisingly high temperatures. The right settings will vary with each building’s location, servicing and maintenance, and Tink argues the person best placed to judge is usually the building manager. She describes the opportunity as huge and “incredibly low cost” – cutting emissions and bills while improving comfort – but says realising it demands “a mindset shift”, working with building operators and office managers to “change people’s hearts and minds on temperature and temperature control”. Klimatica, it should be noted, has a commercial interest in the argument: the company sells a dynamic temperature control system that it claims can cut heating and cooling loads by 30 per cent while keeping occupants comfortable. But whether or not building owners buy the technology, the underlying message is harder to dismiss for anyone who has spent an August afternoon at their desk in a fleece: the cheapest kilowatt-hour, and often the most comfortable one, is the one never used. 


PA S S I V E H O U S E +

MARKETPLACE

Lacuna bifolds showcased in award-worthy passive house

(above) The Laurels, designed by Phi Architects and constructed by Byram Construction.

A

new passive home in West Yorkshire demonstrates that large, glazed openings and exceptional energy efficiency are not mutually exclusive when high-performance products are correctly specified and installed, according to 21 Degrees and Lacuna. Indeed, The Laurels, a new four-bedroom family home near Holmfirth demonstrates how careful design, high-quality construc-

tion and premium building components can deliver outstanding passive house performance without compromising on architecture or connection to the landscape, they said. Designed by Phi Architects and constructed by Byram Construction Ltd, the project achieved passive house certification in 2024, recording an airtightness result of just 0.3 air changes per hour (ACH) at 50 Pascals — twice as good as the passive house requirement. Built to replace an existing bungalow, the house follows the original footprint while responding sensitively to the site’s steep topography, creating strong links between indoor living spaces and the surrounding countryside. A contributor to the home’s performance was the package supplied and installed by 21 Degrees, including high-performance timber windows, entrance doors, mechanical ventilation with heat recovery (MVHR), and

Lacuna timber bifold doors. The outward-opening Lacuna bifolds provide expansive openings from the main living spaces onto outdoor terraces, helping to blur the boundary between inside and out while maintaining the demanding airtightness and thermal performance required for passive house certification. Alongside the bifolds, 21 Degrees supplied GBS98 timber windows and doors, including tilt-and-turn windows, automated opening lights and contemporary entrance doors. Three striking glass-to-glass corner windows maximise natural daylight and panoramic views across the valley while preserving the integrity of the building envelope. Ventilation is provided by a Zehnder ComfoAir Q350 MVHR system, also installed by 21 Degrees, which delivers a constant supply of fresh filtered air while recovering heat from exhaust air to minimise energy demand and enhance year-round comfort. 

Medite Smartply spends €75m to future-proof Clonmel MDF plant

M

edite Smartply has announced a €75m investment programme at its MDF manufacturing facility in Clonmel, Co Tipperary, in what the company describes as the largest current investment in MDF production in western Europe. The announcement coincides with the 50th anniversary of the Medite brand and is intended to underpin the next phase of panel manufacturing at the flagship Irish site, strengthening supply resilience for customers across the UK, Irish and European construction and interiors markets. At the heart of the programme is the replacement of the factory’s biomass boiler system, alongside upgrades to fuel handling, dryer systems and associated infrastructure. Operating around the clock, the Clonmel plant produces approximately 400,000 cubic metres of MDF each year, with the boiler generating the thermal energy needed to dry wood fibre during panel production. The new system will eliminate natural gas from the site entirely, moving to biomass as the primary heat source. The company expects

this to materially cut fossil fuel-related CO₂ emissions and support its efforts to reduce Scope 1 carbon emissions. Neil Foot, chief executive of Medite Smartply, said: “Medite has been a long-standing part of the Clonmel community, and this investment reflects our intention to continue manufacturing here long into the future. This is a significant commitment not only to the site itself, but to the skilled workforce, supply chain and wider regional economy connected to the factory.” He added that renewing critical infrastructure would strengthen process control and product quality, and demonstrated “long-term confidence in the business, our people and the markets we serve”. European equipment manufacturers Dieffenbacher and Sunds Fibertech will supply the project’s core technologies, supporting upgrades to energy generation, fuel handling and fibre drying. The project has secured planning consent through Ireland’s Strategic Infrastructure Development process, with measures covering environmental protection,

waste management, water supply and ecological monitoring. Medite Smartply, part of the state forestry company Coillte, produces MDF and OSB panels at Clonmel and Waterford for construction and interior applications across the UK and Europe. More information is available at mdfosb.com 

Medite Smartply’s MDF factory in Clonmel.

ph+ | marketplace news | 77


Highlands’ first passive house school features offsite membrane installation

(above) The passive house certified Tain Campus features Proctor’s Procheck A2 and Wraptite membranes.

P

Excellent insulation choice for Passive House Projects High performing blown insulation for Timber Frame Specialist technical support to assist with any query Network of Approved Installers Manufactured from recycled newspaper

T: 01938 500 797 E: info@pycgroup.co.uk W: www.warmcel.co.uk

upils in Tain are learning in the Highlands’ first passive house standard school, following completion of the £72m Tain Campus north of Inverness. The new building brings together Tain Royal Academy, Tain Primary School and St Duthus School, serving pupils aged from three to eighteen. It was built and certified to the passive house standard to cut energy consumption and provide a healthy learning environment. The external wall specification called for two membranes from the A Proctor Group: the Wraptite external air barrier system on the outside of the structure and Procheck A2 internally. Both were installed by Veitchi Interiors as part of its work package. Veitchi played a proactive role in shaping how the project was delivered. Because the company operates its own Metframe panel factory, it proposed applying the Wraptite membrane offsite, in factory conditions. The idea was discussed at the project’s pre-start meeting, and both Highland Council, the client, and main contractor Kier agreed to explore it. Weather was a significant consideration for a project on the coast, in one of the most northerly parts of the country. Moving the membrane installation into the factory meant the only work required on site was applying tapes where needed to fully seal the system against wind and rain. Alongside formal passive house training, Veitchi received extensive technical support from the A Proctor Group. Regional sales manager Linda Kay delivered a CPD session on the products and followed up with multiple site visits. According to Proctor, Wraptite’s airtightness and high vapour permeability properties help projects achieve demanding airtightness targets without increasing condensation risk within the structure. Its self-adhered installation is designed to deliver a consistent airtight seal on the outside of the building. Procheck A2, the internal membrane, provides a vapour and airtight layer and achieves an A2-s1, d0 rating when classified to BS EN 13501-1, meaning it is considered non-combustible and makes no contribution to fire. Further information about both products is available at proctorgroup.com. 


PA S S I V E H O U S E +

MARKETPLACE

Passive house components celebrated KORE, Metal Technology, Smartply, Aereco and Partel recognised for passive house component certs

M

anufacturers from across the building envelope and services sectors have been recognised for achieving certified component status from the Passive House Institute, at an event that underlined how far independently verified performance data has spread through the supply chain available to British and Irish specifiers. Prof Wolfgang Feist, founder of the Passive House Institute, handed framed certificates to a procession of manufacturers at the Passive House Association of Ireland’s event on passive house component certification in Dublin on 17 April, in some cases marking the culmination of years of product development, simulation and independent testing. Prof Feist shared firsthand insights in passive house design, and explained the rigorous nature of the institute’s component certification, along with Soraya López García, head of component certification at the institute. Mosart director Tomas O’Leary spoke on the need for more component certification for different product types as passive house transitions into larger buildings and highdensity projects, including everything from fall arrest systems to commercial kitchen extract heat recovery units. PHAI chair Caroline Ashe Brady opened the event and framed passive house in the context of the climate challenge, while PHAI vice chair Helena McElmeel gave an overview on progress to date in Ireland at a point of extraordinary growth. Passivhaus Trust director Ann-Marie Fallon shared

experiences from the UK, noting recent growth in London, where 3,000 units are in development. The certified component scheme, run by the Darmstadt-based institute, was created to address a persistent problem for designers: performance figures published under national and regional standards are frequently optimistic, or derived under conditions that bear little resemblance to a real building. The institute tests products against uniform criteria under conditions intended to replicate in-service performance, in the case of airtightness products, testing the product as part of a system with the materials it will meet on site rather than in isolation. Manufacturers have no influence over the results, and the institute follows the manufacturer’s own installation instructions when testing. For specifiers, certification means values that can be entered directly into the Passive House Planning Package (PHPP), meaningful comparison between products tested to the same criteria, and assessment that goes beyond energy, the institute’s hygiene criterion requires minimum internal surface temperatures to guard against condensation and mould risk. More than 1,000 certified components are now listed on the institute’s database. The certifications recognised in Dublin span the building from the ground up, starting, in KORE’s case, literally. KORE Foundations are often identified as a weak

point in the passive house envelope, and the newest certification announced by Co Cavan-based insulation manufacturer KORE addresses that directly. KORE’s Insulated Foundation System has achieved certified component status for use with insulated concrete formwork (ICF) construction. The system is designed to work across ICF, timber frame, light gauge steel and masonry construction, and additional profiles, including KORE’s twinleaf solution, are being actively optimised with the institute, with further certification targeted in the coming months. The certified profile comprises a 150 mm reinforced concrete floor slab on 300 mm of continuous EPS insulation, giving a floor slab U-value of 0.12 W/m²K at a total build-up of 450 mm. External wall and plinth junctions assessed as part of the certification return U-values in the range of 0.14 to 0.15 W/m²K, with thermal bridge psi values of around 0.01 W/mK. The system departs from conventional raft construction by positioning a reinforced concrete thickening inside the structuralgrade perimeter insulation rather than breaking through it, localising load transfer without interrupting thermal continuity beneath the slab. The thickening can also run between adjoining dwellings, which KORE says makes the system suited to terraced and semi-detached schemes without compromising envelope performance. The concrete slab functions as the primary airtight layer, with the certification requiring a clearly defined strategy for that element.

ph+ | marketplace news | 79


MARKETPLACE

PA S S I V E H O U S E +

Pictured with Prof Wolfgang Feist are (opposite) Connor Corry, senior technical support at Metal Technology, and David Murray, head of technical at Medite Smartply; and (above) Paula Gleeson, head of marketing communications at Partel, Steven Magee, sales director at KORE, and Tony Mahon, MVHR product manager at Aereco.

KORE says the system can also deliver significant embodied carbon reductions against traditional strip foundations, through reduced concrete volumes and an integrated structural and thermal design. “Passive house component certification independently validates what our system has been delivering in practice for years,” said Finnian O’Hanlon, technical manager at KORE Insulation. “It gives designers confidence that foundation performance can be both predictable and repeatable, and it helps unlock high-performance, low-carbon delivery at scale.” Metal Technology Co Antrim-based Metal Technology, which has supplied aluminium window, door and curtain walling systems across the UK and Ireland for 40 years, now holds four fully certified passive house systems. The company’s System 5-45 Hi+ tilt and turn window was its first to achieve certification, in 2021, and has since been installed or is on site across more than 35 certified passive house projects in the UK — among them Woodmill and St Columba’s high school in Dunfermline, one of the world’s largest passive house educational facilities at £122m construction cost and 2,700 pupils, along with much of Scotland’s education building programme over the past four years. It is also specified for the University of Manchester’s forthcoming Fallowfield student accommodation development, set to be Europe’s largest purpose-built student accommodation project with over 3,300 bedrooms and a £400m construction cost. System 5-35D Hi+, which the company describes as the first aluminium passive house certified glazed door system in the UK and Ireland, followed in 2022, and System 4-45 Hi+, the first aluminium certified casement window system in the UK and Ireland, in 2023. System 17 Hi+ curtain walling, for multi-storey applications, was first certified in February 2021 and was used on the Erne Campus in Enniskillen, still the only certified passive house premium project in the UK, the Passive House Institute’s highest building certification.

80 | passivehouseplus.co.uk | issue 53

Changing legislation in Scotland, where the company has long had a strong specification presence, was a driving force in developing the range, Connor Corry, senior technical support at Metal Technology and a certified passive house consultant, wrote in an email to Passive House Plus. “Supported by government and the Scottish Futures Trust, their commitment to reduce carbon emissions, improve building performance and deliver better learning environments in the education sector provided a springboard to develop glazing solutions to assist in achieving these goals,” he wrote. All four systems have been developed using advanced polyamide thermal break technology and optimised profile geometries, “delivering excellent thermal performance while maintaining robust structural capacity, weather resistance, and security,” Corry wrote. The company has also developed a RIBA-approved passive house CPD for architects and specifiers, covering façade U-values, thermal bridging, airtightness, ventilation and solar gain. “From a project perspective, Metal Technology supports clients from concept right through to completion. Our passive house qualified team provides proactive technical support to ensure systems seamlessly integrate into the building’s overall energy model and design strategy.” Medite Smartply Waterford-based Medite Smartply, represented at the event by David Murray, head of technical affairs and Ireland sales, was recognised for the certification of two components: Smartply Airtight and Smartply Sure Step. Smartply Airtight, certified in 2016, combines airtightness, structural racking performance and vapour control in a single OSB panel, removing the need for separate air and vapour control membranes on the warm side of timber frame walls and ceilings. Smartply Sure Step, certified in 2022, combines structural flooring, airtightness, weather resistance, slip resistance and acoustic performance in one product. Used together, the company says, the

two certified components provide continuous airtightness from floor to wall to ceiling, making them particularly suited to commercial, residential and multi-occupancy developments where reliable building envelope performance is essential. Aereco Ventilation specialist Aereco, a pioneer of demand-controlled ventilation, serving the British and Irish market from its base in Little Island in Cork, was recognised for MVHR: the InspirAIR Side range manufactured by its parent group, Aldes. The InspirAIR Side units are designed for new build and renovation, with an emphasis on fitting high performance into tight spaces: at 12 to 14 kg they are among the lightest units on the market, installable by one person, with a low profile suited to standard cupboards and ceiling voids, horizontal or vertical mounting, and reversible airflows at commissioning. The range is ERP-rated A, uses high-efficiency EC motors, and Aereco says it offers the widest range of filters on the market, capable of removing up to 90 per cent of bacteria, pollen and fine particles. Partel Galway building envelope specialist Partel picked up a recognition award at the event. The company hold passive house component certifications for a number of its airtightness components, including its Vara Fluid Spray liquid-applied membrane, Izoperm Plus internal system, Exoperm Mono SA 250 breather membrane, and Kabseal Pro, Kabseal Pro 6 and Kabseal Gas grommet range. Taken together, the new certifications recognised in Dublin mean British and Irish specifiers can now source certified foundations, airtightness systems and structural products, glazing and façades from manufacturers based on these islands, along with a ventilation system from across the channel — adding to a certified supply chain for several of the key product types needed to build to a standard whose credibility rests on delivered performance matching design. 


COLUMN

NIALL CROSSAN

What Building Better really means in traditional buildings Traditional buildings can be made warmer and more efficient, but only through respect, patience and an understanding of how they actually work says Niall Crossan, technical director at Ecological Building Systems.

I

n my experience, after almost 25 years in the building industry, one thing has remained constant: people value beauty, comfort, and stability. This has been true since our earliest ancestors sought refuge in Neolithic caves, and it remains true today in low-energy contemporary buildings. At its simplest, building better should give occupants a sense of wellbeing, comfort, and solidity. Equally applying to both traditional and modern construction. In a changing climate, contemporary construction can learn much from our forebears who built traditional buildings. These structures have stood the test of time and remain one of the clearest expressions of sustainability. Traditional buildings follow different principles to modern construction. Their means of controlling moisture movement, and how they react to climate conditions and risks, are distinct. They respond to local climate through generations of knowledge, using locally sourced materials, regional craftsmanship, and a clear focus on durability. From the stunning thatched cottages of Donegal to the traditional farmhouses across the lake district in the UK, traditional buildings are deeply rooted in place. They embody principles now recognised as essential: reuse of materials compatible with both the building fabric and climate, adaptable use of space, and careful material optimisation. Thermal stability, thoughtful use of light, and natural airflow combine to create a robust and sustainable building fabric. In many cases, demolition and replacement of these buildings carries a significant carbon burden. Refurbishment, by contrast, is key to retaining our built heritage, providing much-needed housing, and reusing materials with minimal environmental impact. Like fingerprints, no two traditional buildings are the same. Each requires an appreciation of its unique characteristics and respect for its setting. There are no quick wins when it comes to the thermal refurbishment of traditional buildings. The most successful outcomes come from careful assessment and a considered, sensitive approach — one that retains key architectural features while delivering meaningful thermal improvements

through breathable materials and finishes. While improving energy performance is vital, it must not come at the expense of a building’s character and integrity. The energy efficiency of most traditional buildings can be significantly enhanced, helping to keep them in use while ensuring they remain comfortable, viable, and relevant long into the future. This requires a careful balancing act. Rash interventions and the use of inappropriate impervious insulation or decorative finishes can cause long-term harm. It is essential that these buildings continue to provide safe, healthy, and beautiful places to live and work. Industry perspective also reinforces the importance of balancing conservation with performance. As Jeff Colley, editor of Passive House Plus, puts it plainly: “Building conservation and energy conservation cannot be treated as opposites.” Care, pragmatism, and understanding how heat, air, and moisture move through fabric are essential. The challenge is not simply improving ener-

ditional buildings behave or how easy it is to make things worse with the wrong materials. “That changed when I started working more closely with breathable materials and approaches designed for traditional buildings. It made me realise traditional buildings aren’t failing, they just work differently. They manage moisture, they move, and they need materials that work with them.” At its core, building better is not about replacing traditional buildings. It is about respecting them, understanding how they work, and applying compatible approaches that improve comfort, wellbeing, and energy performance without compromising character or integrity. By working together — industry experts, government organisations, training bodies, traditional trades and homeowners — we can ensure these buildings remain warm, healthy, characterful, and enduring for decades to come. We believe that the Building Better campaign is the start of a wider conversation, and this is only the beginning. •

By working together we can ensure these buildings remain warm, healthy, characterful,and enduring for decades to come. gy performance. It is doing so without compromising integrity. Cumbrian contractor David Benn of DMB Building Ltd, describes how his approach to traditional buildings evolved through experience. “Building better, for me, starts long before materials are specified. It starts with understanding the building,” he said. “I’ll be honest, I didn’t always think like that. Like most builders, I started out using the usual fixes. Damp? Inject it. Cold wall? Board it. I didn’t really understand how tra-

This article forms part of the wider Building Better campaign, exploring the sensitive retrofit of traditional buildings through the perspectives of conservation experts, designers, installers and homeowners. Read the expanded article and contributor insights at ecologicalbuildingsystems.com

ph+ | niall crossan column | 81


T O B Y C A M B R AY

COLUMN

Enshoddification: a blight on buildings that we must address The construction industry faces tightening targets to make buildings safe, dry, healthy, low carbon and comfortable in winter and summer. We must stop the industry gaming paper targets, argues leading building physicist Toby Cambray, by focusing on outcomes and regulating competence.

T

he Passivhaus Trust has, in two pieces of research over the last decade, shone a light on the energy performance gap created by SAP: conservatively, 50 to 60 per cent. A building passes its assessment, uses far more energy than promised, and nobody bats an eyelid. To a layperson this may seem bonkers – and they would be right. We wave it away by saying SAP is "a compliance model, not a performance one," as though that settles the argument. It is, in part, Goodhart's law: when a metric becomes a target, it stops being a good metric. But it is more than that, and it is worth asking how we got here, because the answer implicates far more than one energy model. The trajectory goes like this. First there are models, built by researchers trying to understand building physics (BREDEM For example). Then a version of the model is codified into regulation, and in the process, the nuance and detail the researchers understood gets boiled down to standardised parameters simple enough to teach to grads or career changers on a five-day course. Once it is codified, developers and their consultants have a well-structured game. They run cost-benefit analysis on every hard-boiled parameter: they know what it costs to go from 5 to 4 m³/m²/ hr at 50 Pa, whether that beats an extra 15 mm of insulation, or whether it is still cheaper to just buy off your airtightness tester. This is the race to the bottom, where everyone is inventing modelling tricks to scrape their building over the line. This gaming risks baking in structural failures that, thanks to the long cycles of design, build and regulatory revision, are discovered too late, once everyone quietly knows the models are nonsense but they are too embedded to abandon. Cory Doctorow coined enshittification for the decay of digital platforms; allow me enshoddification for its construction cousin. The problem is that every rule of this kind regulates the paper building. You can prescribe the element, as England’s pre2006 Part L did with its limiting U-values: divorced from reality and blind to how the whole building performs. You can describe the outcome and free the method, as early

82 | passivehouseplus.co.uk | issue 53

SAP did: prized for its flexibility, until we discovered the flexibility was mostly latitude to game it. Passive house works this way but has more effective oversight. Or you can describe the outcome but prescribe the method in ever-finer detail, which is the fashionable move. The recently updated CIBSE methodology for assessing overheating in homes, TM59, is designed to reduce variation between modellers. But prescribing the method gives us reproducibility, not truth: a method can be prescribed and still be wrong, and you have treated the symptom, modeller variation, while leaving the causes, variable competence and gaming, untouched. All three share the same flaw. Compliance is demonstrated before a brick is laid, and the loop back to reality never closes. There is a fourth thing a rule can pin down: real performance, measured in situ on the finished building. Smart meter enabled thermal efficiency ratings (SMETER) and heat transfer coefficient (HTC) technologies now do exactly this for heat loss, using machine learning to strip out weather and occupant behaviour and leave a number that tells us about the design and construction themselves. This makes an escape from Goodhart possible, because when the metric is the outcome, optimising it is just building well. For passive house it is vindication: we finally get to prove, on essentially every building rather than in another model, the thing we have always claimed: no performance gap. It extends further than space heating. Overheating is, if anything, easier, since you measure temperature directly. Moisture is harder and more interesting (to me at least). Interstitial problems stay hidden inside the build-up until the damage is done, so measurement comes too late to help. But surface condensation and mould are solvable, which opens up something the industry has argued about for decades: the perennial standoff between "lifestyle" and building defect. Continuous data on the actual conditions in a room can begin to tell you whether a home is mouldy because it was built badly or because it is being run in a way no building could withstand; a question that currently generates far more

For passive house it is vindication: we finally get to prove, on essentially every building rather than in another model, the thing we have always claimed: no performance gap.

heat than light. None of this is a panacea, and it is early. The SMETERs are themselves models, of the machine-learning variety, though they are structurally so much harder to game its vanishingly unlikely in the technical realm. But measurement is no guarantee of honesty. Fire performance is about as physical and real as a test can get – you burn the actual assembly at full scale – and it was gamed anyway, systems certified on one build-up and sold as another, with the desktop study as the get-out. All of this shows us that it is not that one kind of rule is weak and another strong, but that in a market with enough money pushing the other way, the pressure will find the soft spot in any rule you write. Where the feedback loop can be closed, measurement makes that harder. Where it cannot, only competent, accountable judgement stands between us (globally speaking) and harm. We cannot expect everyone to be a philosopher. But we can stop pretending the paper building is the real one, measure what we are able to, and regulate the competence of those who must judge the rest. When insurers start really probing competence, we will know we are getting somewhere. •


TRUST THE EXPERTS Holistic Solutions for a Healthy Building Envelope

A self-adhering, vapour-permeable air barrier that delivers reliable airtightness and improved energy performance. BBA certified and compatible with multiple substrates, it’s suitable for projects from timber frame housing to steel-framed high-rise. contact@proctorgroup.com Trinity Square, Manchester

+44 01250 872 261

www.proctorgroup.com


THE SAMEWAY ISN’T ALWAYS THE WISE WAY

STEICO: Predictable. Reliable. Unquestionably the right choice. Mr Sameway doesn’t like change he, like many others, follows the crowd. “Insulation is insulation,” he said, confidently selecting the same synthetic insulation he’d always used. As far as he was concerned, thermal performance was the only thing that mattered. If it kept the heat in, that was what it was supposed to do and that was good enough for him. But what Mr Sameway didn’t realise was that he was missing out—big time. Meanwhile, Mr Wise took a different approach. He understood that insulation wasn’t just about keeping heat in; it was about creating a comfortable, healthy, and durable building. That’s why he chose Steico Wood Fibre Insulation. With Steico, Mr Wise’s building breathed naturally, avoiding the trapped moisture and condensation problems that could plague synthetic insulation. His rooms were warmer in winter and cooler in summer, thanks to Steico’s high heat storage capacity, and his home was quieter too.

Buy direct from the UK’s largest stockist. Trade, Wholesale, DIY

01793 847 444 info@ecomerchant.co.uk www.ecomerchant.co.uk


Turn static files into dynamic content formats.

Create a flipbook