Passive House Plus (Sustainable building) issue 53 IRL

Page 1


Small but mighty Diminutive off-grid NZ passive house

Victorian retrofit 95% carbon cut with bio-based materials

Interview: Wolfgang Feist

Passive origins in historic arctic ship

CRITICAL MASS

Cairn comes good on passive promise

Design for performance, not just compliance and build with a foundation system that insulates from the ground up KORE’ s Insulated Foundation System wraps the entire foundation in a continuous layer of EPS, virtually eliminating thermal bridging while providing ground floor U-values as low as 0 10W/m2K Maximise efficiencies on-site, speed up foundation construction, reduce labour, waste, concrete and embodied carbon with one high-performance system If only other parts of the build could be this simple

KORE’s Insulated Foundation System offers reduced embodied carbon by over 31% when compared to a traditional foundation system insulated with PIR - and we have the data to prove it. Contact us today for more information.

Publishers

Temple Media Ltd

PO Box 9688, Blackrock, Co. Dublin, Ireland

t +353 (0)1 210 7513

e info@passivehouseplus.ie www.passivehouseplus.ie

Design

Editor Jeff Colley jeff@passivehouseplus.ie

Editorial Manager

Jason Walsh jason@passivehouseplus.ie

Reporter John Hearne john@passivehouseplus.ie

Reporter

Kate de Selincourt kate@passivehouseplus.ie

Production / IT Dudley Colley dudley@passivehouseplus.ie

Accounts Oisin Hart oisin@passivehouseplus.ie

Art Director Lauren Colley lauren@passivehouseplus.ie

Aoife O’Hara aoife@evekudesign.com | evekudesign.com

Contributors

Toby Cambray, Greengauge Building Energy Consultants

Niall Crossan, Ecological Building Systems

Tom Dolton, Momentum structural engineers

Dr Huda Elsherif, Scotch Partners

Joe Garbett, Momentum structural engineers

Amy Hammel, journalist

Steve Hughes, Build Good Architecture

Simon Jones, Air Quality Matters

Madeleina Loughrey-Grant, Cairn

Ian Mawditt, building performance consultant

Marc Ó’Riain, doctor of architecture

Print

GPS Colour Graphics www.gpscolour.co.uk | +44 (0) 28 9070 2020

Cover Piper’s Square

Photo by Donal Murphy

editor’s letter

Acouple of years ago I launched a sustainability-focused communications and strategy consultancy called Zero Ambitions, off the back of a podcast I co-host under the same name, along with my old friend and magazine co-founder Dan Hyde. Long time readers may be noticing it starting to impact this magazine.

Our aim is to take complex information about sustainable building and translate it into meaningful information for different kinds of people with different kinds of needs. The emphasis is on producing accurate, credible information in the plainest language we can, so that it actually stands a chance of being understood – and hopefully winning over hearts and minds, leading to better decisions in terms of how buildings are designed, constructed and operated.

This translation of complexity is something we have always tried to do at Passive house Plus, but the nature of the subject matter we cover sometimes makes that tricky – especially given our unwillingness to ignore often nuanced truths for the sake of telling a simple story. Consequently, at times our belief in the need for accuracy and technical detail has come at the cost of accessibility – which has made the magazine a less breezy read than we would like.

When I was invited to do a TEDx talk on passive house during lockdown, I was forced to think differently about how I communicate. The process of delivering drafts to the organisers and my fellow TEDx talkers, none of whom came from the construction industry, was bruisingly insightful. I was advised to keep only one graph, and only then because it was funny. (It told the story of passive house owner Stephen Tierney logging into his MVHR system on holiday, only to notice the CO2 levels going literally off the scale one evening when a teenage house sitter had an

unsanctioned party.) For the rest of the talk I drew insights from the stories we have had the pleasure of telling over the years – stories about the otherworldly experience of living in a home that is consistently calm, and always in the Goldilocks zone – not too cold, not too hot, not too stuffy, not too drafty, but just right.

There has never been a greater need to translate complex information accurately but accessibly. Fuelled by an energy crisis and the increasingly obvious signs of palpable climate breakdown, interest in making buildings sustainable has never been higher. This has placed us at an inflection point. The hard work done by early adopters and enthusiastic advocates is paying off, and we are beginning to move towards the mass market, a realm where many of the people we meet may have little or no interest in the nerdy bits. It is incumbent on us to find out what matters to these people, whoever they are – from residents, to building managers, to maintenance contractors – to work out how to engage their interest. At the same time, we must continue to delve deeper into the complexity – into everything from life cycle assessment to monitoring how buildings actually perform, both in data terms, and in terms of how they affect real people.

So, we have endeavoured to fill the pages of this issue with extraordinary stories, insightful voices, and carefully curated advertising from companies with the kinds of products, services and expertise to help make buildings more sustainable. We hope it helps inform your thinking and your decisions, with the hope of making buildings that enrich the lives of the people who live in them, while meaningfully tackling the challenges we face.

Regards, The editor

CONTENTS

Big Picture

Small but mighty: off-grid passive house built around sufficiency

In a year when events in the Strait of Hormuz have wreaked havoc on energy bills globally, one remarkable house in the antipodes has sailed serenely through. Steve Hughes of Build Good Architecture tells the story of Maria’s Passive House, a project which combines modesty and cutting-edge ambition.

News

EU Electrification Action Plan to accelerate heat pump transition; new BER takes effect while ZEB details remain unclear; free solar for energy-poor homes under reported €200m government plan; and price regulation promised to address district heating affordability.

Comment

Dr Huda Elsherif says comfort is more subjective than the regulations allow; Dr Marc Ó Riain challenges common assumptions about retrofit costs; Simon Jones argues that today’s energy crisis risks repeating the ventilation mistakes of the 1970s; and Joe Garbett and Tom Dolton show how reusing steel offers a lower-carbon alternative to recycling.

Case Studies

Critical mass

Cairn comes good on high density passive house promise

Passive house has long been typecast as the preserve of deep-pocketed self-builders sold on the dream before pen hits paper. Now Ireland’s largest housebuilder has smashed that assumption, delivering four passive schemes — and 1,755 homes — simultaneously, first time. And the real innovation may be what happened after the builders left: an unprecedented effort to prepare residents, housing staff and maintenance teams for life in a passive house — an effort led, in the interests of full disclosure, by this magazine’s publishers.

Kill bills

End-of-terrace all but ends energy costs

Sometimes a project comes along that redefines what’s possible in a retrofit. One Dublin family went from camping indoors to constant comfort and almost zero energy costs

Wreck and reward

Victorian wreck hits 95% carbon cut through deep retrofit

A dilapidated Victorian house in north London has been transformed into a high-performance home through a deep retrofit that cut carbon emissions by 95 per cent, while also attempting to minimise embodied carbon through careful material choices.

60

Proof of concept

Building to passive house standard is solved; selling it is not

A 52-home development in North Somerset has achieved passive house certification across three standards. The contractor who built it says the technology is the easy part. Convincing the market is another matter entirely.

Insight

The interview: Prof Wolfgang Feist

When the professor who founded the passive house standard visited Dublin this spring, it marked a rare journey for a man who prefers his bicycle to an aeroplane. Passive House Plus editor Jeff Colley met him at a gathering of Ireland’s passive house community to talk childhood frost, Swedish interstitial icicles, and why the world’s most rigorous building standard was born on a ship.

Zero bills? Really

Smart home technology is making energy bill-free living a real prospect

Heat pumps, solar panels and home batteries are converging with smart tariffs to make zero energy bills a genuine possibility for some new homes. But how much does it cost, who benefits, and is the broader promise deliverable on a mass scale.

Marketplace

Keep up with the latest developments from some of the leading companies in sustainable building, including new product innovations, project updates and more.

What building better really means in traditional buildings

Traditional buildings can be made warmer and more efficient, but only through respect, patience and an understanding of how they actually work says Niall Crossan, technical director at Ecological Building Systems.

Enshoddification: a blight on buildings that we must address

The construction industry faces tightening targets to make buildings safe, dry, healthy, low carbon and comfortable in winter and summer. We must stop the industry gaming paper targets, argues leading building physicist Toby Cambray, by focusing on outcomes and regulating competence.

Comfort zone

Ian Mawditt: “Why do we still get the basics wrong?"

Ian Mawditt has spent more than 30 years trying to close the building performance gap. When not helping author Approved Documents F and L for England and Wales, helping lead the UK Centre for Moisture in Buildings or writing the Future Homes Hub's ventilation guide, Mawditt can be found swimming in Bristol's waterways at dawn.

What makes you happy?

Living in Bristol with my partner. It’s such a great place to be. Swimming early in the morning too; the blue space is a good mental boost for the day ahead. Cooking, both indoors and outdoors, but let’s not get on to particulates just yet…

What keeps you up at night?

I sleep very well, actually. However, I do genuinely think about ventilation and air quality as I go to bed. As you might imagine, I have air quality monitors in my home, which I check regularly.

What makes you think?

Why do we still get the basics wrong? I could say that about many aspects of homebuilding and retrofit, but sticking with ventilation, there is still a mentality that it isn’t that important. I keep thinking of ways to shift the dial.

How did you get into sustainable building?

By being an M&E engineer and finding myself designing services for poorly designed buildings that I knew would be energy intensive, uncomfortable, or both. I took myself off to do a masters in sustainable architecture at the Centre for Alternative Technology. It was a  game changer.

What is your favourite building?

Too many to choose from, but a memorable development for me is BedZED. From a ventilation engineer’s perspective, I love it. The ventilation strategy is bold and the multi-coloured roof cowls give the development its unique identity. Ventilation was visibly at the heart of the design.

What is the worst thing you have ever seen on a construction site/finished building?

Ventilation, ventilation and ventilation.

If you could change one thing in construction practice, what would it be?

To end the race to the bottom in mainstream housebuilding. We need to stop using the minimum standards in Building Regulations guidance, especially Parts L, F, and O, as recipe for building specification. They are minimum standards. We must be better than this.

What is your guiltiest pleasure?

Big appetite, big portions. That’s why I swim a lot to counter it!

What is your worst trait as a built environment professional?

Sitting at my desk at home, plugging away at reports. I don’t spend as much time as I should getting out to meet people and having the conversations that help things move faster.

Who or what has been the biggest influence on how you work?

So many people. For brevity, I would mention Mike Thompson, the course director on my MSc. Quite simply, my life would have taken a different direction had he not been part of it then.

What is the most unsustainable thing you do?

I did mention outdoor cooking. I can’t help but love the smell of wood burning with a Dutch oven above and baked spuds cooking in the ashes. Tell Ben Jones not to read this!

What technology gets you excited for the future?

Sensors with simple interfaces in every home that continuously check IEQ, providing diagnostics, prompting planned maintenance. Our cars have had this for years. Our homes should too. We spend much more time in them.

What song would you like played at your funeral?

Burning by Ludovico Einaudi. Or is the title a bit much for a funeral?

What do you want to be remembered for?

Shifting the dial to improve ventilation outcomes and indoor air quality in our homes.

What makes you optimistic about the future?

We have the skills and the knowledge to create amazing things. I’m encouraged by how SMEs are embracing new technologies and delivering quality buildings. The future also depends on better people entering the sector and being given the space to do good work.

Big Picture

SMALL BUT MIGHTY: off-grid passive house built around sufficiency

In a year when events in the Strait of Hormuz have wreaked havoc on energy bills globally, one remarkable house in the antipodes has sailed serenely through. Steve Hughes of Build Good Architecture tells the story of Maria’s Passive House, a project which combines modesty and cutting-edge ambition.

A small house with a very big brief

Before moving to the Coromandel, my family and I were living in a beautifully renovated 1860s villa in Auckland. High ceilings, polished floors, plenty of charm.

In winter it was cold. In summer it was hot.

And when I ran the numbers, it told a clearer story: an airtightness of 14.7 ACH and a heating demand of around 88 kWh/m²/year, roughly $3,500 a year just to stay warm. We had also seen internal temperatures push close to 40C in summer.

It looked great. It did not perform.

Around that time, my wife Amy said, “Let’s get out of the rat race.” That was the catalyst. We started looking for land and found 4.5 hectares of regenerating native bush on the east coast of the Coromandel Peninsula, just north of Tairua. The land is QEII covenanted, protected in perpetuity, with only a small area available for a building platform.

Running power to the site was not viable.

So, the brief became very simple: build a small, off-grid house that performs exceptionally well, and prove what is possible.

The original idea was pragmatic: build a minor dwelling quickly to live in, with a larger home to follow later. Planning rules allowed 50 m², or 60 m² with a Lifemark certification, a New Zealand universal design standard, so we designed to that upper limit.

At this scale, every decision matters.

Smaller buildings are inherently harder to make work from a passive house perspective. Surface-area-to-volume ratios are unforgiving, and there is nowhere to hide poor detailing. But that constraint sharpened the design rather than limiting it.

We embedded Lifemark principles early, not as an add-on, but as part of the thinking, creating a compact, accessible and adaptable home.

The final treated floor area landed at just 52 m².

Small by necessity, precise by design

Building lightly on the land

The house sits on a steep site, so the structure needed to tread lightly.

Driven timber piles were selected, a familiar and efficient New Zealand solution, avoiding heavy excavation and concrete. From there, a straightforward timber frame was developed: 140 mm structure with a 45 mm insulated service cavity inside the airtight layer, and a timber floor and roof assembly insulated with glass fibre batts.

Nothing exotic. Just careful decisions.

Thermal bridging was minimised through simplified junctions and reduced timber content, and the windows, triple-glazed uPVC units imported from Germany, were positioned in line with the insulation layer. At the time, this was still relatively uncommon in New Zealand.

The glazing strategy was driven as much by controlling summer heat gain as by retaining warmth in winter, a reminder that performance cuts both ways. Orientation played a critical role in resolving competing priorities.

The site looks east, out over the Pacific to the offshore islands, and that is where the view is. But in the southern hemisphere, the sun, and therefore the opportunity for passive gain and solar generation, comes from the north.

Rather than defaulting to one or the other, the design resolves both.

The building is carefully positioned and shaped to open to the east for long views and morning light, while the roof geometry and solar array are optimised to the north for generation.

Openings are tuned to manage solar gain, allowing winter sun deep into the space while limiting overheating in summer through proportion, placement and shading.

It becomes a balance of view, sun and performance, each informing the other rather than competing.

Photos: Amy Jane Todd

A calm, durable palette

Material selection was about restraint and belonging.

Externally, a dark-stained Douglas fir cladding allows the building to sit quietly within the bush. Internally, the house is lined almost entirely in pine plywood, finished with a white Danish oil that lifts the natural grain.

The detailing is simple but deliberate, with expressed negative junctions running throughout and lighting used to pick up those lines and add depth.

It is a modest space, but it feels considered.

Performance: small building, serious numbers

The goal was always certification, but the project quickly went beyond that.

Despite the challenges of its size, the house achieved a calculated space heating demand of 12.3 kWh/m²/year, comfortably inside the passive house target of 15 kWh/ m2/yr. The heat load of 9.7 W/m² also came within the passive house target of 10 W/ m2/yr – the maximum amount of energy required to heat the building on the coldest day of the year.

Being off-grid shifted the conversation

further. With on-site generation, passive house plus, and ultimately premium, came into reach.

After fine-tuning through PHPP, the final results landed at a primary energy renewable (PER) demand of 44.3 kWh/m²/year, and PER generation of 219.3 kWh/m²/year.

At the time of certification, it was also identified as the smallest building in the world certified to the passive house premium standard, and New Zealand’s first off-grid passive house premium.

Editor’s note: Strictly speaking, the building’s PER total does not meet the PER threshold limit of 30 kWh/m²/yr for the passive house premium standard, the mere fact of its small size meaning its surface area to volume ratio pushes its totals up when assessed on a per m2 basis. But the institute allows an extra 15 kWh/m²/yr for buildings which generate substantially more than the PER generation target of 120 kWh/m²/yr, and in that regard Maria’s Passive House does more than enough – adding almost 100 kWh/m²/yr more than the threshold.

and Generation

Jargon buster

Primary energy renewable

The passive house standard has always been about delivering significant reductions in energy demand – including not just the final energy use in the building, but the so called “primary” energy at source, taking into account the likes of energy wasted generating electricity and transmitting it.

But the electricity grid is on a trajectory towards becoming fully renewable and therefore carbon neutral, if you ignore growing concerns about whether burning bioenergy can be considered carbon neutral, let alone the impact of unforeseen energy leeches like data centres sucking up renewable capacity). If electricity is carbon neutral, the thinking goes, what does it matter how much energy you use?

One significant problem is that renewable energy is intermittent and unpredictable in nature. If the wind isn’t blowing and the sun isn’t shining, that means exporting or storing energy, both of which lead to losses. That’s why in 2015, those bright sparks at the Passive House Institute created a new metric, Primary Energy Renewable, which peers into the future, assumes a fully renewable grid, but accounts for energy losses from storing, exporting and importing energy.

Passive houses can now be certified based on current grid primary energy, or primary energy renewable, with different targets applying in each case. Energy Demand

ONE SOLUTION, ONE SUPPLIER

We provide an all-encompassing, customized service to ensure your system installation is hassle-free — adding value, not stress. With PIPELIFE, you collaborate with one supplier from conception and layout design through to installation. Whether you’re starting from scratch or planning to retrofit, we’ll find the optimal solution for your individual project requirements, saving you time and money every step of the way.

6

Airtightness: when small gets tricky

Proving airtightness on a building this small came with its own challenges.

The main opening is a large sliding door, not ideal for testing, which left a single operable window to run the blower door through. Even the smallest standard equipment struggled with the scale.

We ended up building custom setups, including a duct blaster mounted in a plywood panel, just to get reliable readings. Strong valley winds on the day did not help either. We were literally watching the trees outside and waiting for calm moments to capture individual data points.

It was not straightforward, but we got there: 0.54 ACH @ 50 Pa.

Off-grid reality

The house is fully off-grid, powered by a solar PV and battery system.

The original setup, twenty-four panels and around 24.5 kWh of battery storage, worked well through summer but proved tight in winter, particularly at 287 metres above sea level where we are often in low cloud.

Since then, we have expanded to approximately 18 kW of solar generation, and approximately 49 kWh of battery storage, with around 43 kWh usable.

We now comfortably run the house, and charge two EVs, largely from the sun between the equinoxes, and manage winter with a bit more awareness.

AeroBarrier is an automated air sealing technology that seals gaps and cracks of up to 12mm in walls, ceilings, and floors.

It is fast, simple, and cost-effective –and guarantees to achieve your target airtightness.

when used as primary airtightness solution

sealed globally each month using AeroBarrier technology in air leakage

Resilience, tested

One of the first questions people asked when we moved off-grid was:

“What happens when you run out of power?”

The more interesting question turned out to be: what happens when everyone else does?

Over the past few years, we have lived through multiple major weather events, including ex-cyclones that cut off nearby towns, knocked out power, and disrupted communications for days.

Up here, the house kept running.

We had power, water, wastewater systems, and internet via Starlink. We were able to stay connected, check in on family, and act as a communication point for others.

Off-grid living is not about isolation. It is about control and resilience.

New Zealand housing has a well-documented performance problem. Too cold, too hot, too damp, and often expensive to run.

This project was not about building something large or complex.

It was about asking a simple question: What happens if you get the fundamentals right, even at the smallest scale?

The answer is a house that is comfortable, efficient, resilient, and quietly generous to live in. And importantly, one that suggests we can do a lot better, with a lot less.

Living with less, and getting more

Life here is intentionally simpler.

We are building a productive garden, working towards a food forest, and raising chickens and ducks. It is an ongoing process, one that evolves with time, but the foundations are there.

Designing and building to the passive house standard gave us a head start.

It reduces the energy we need, stabilises comfort, and frees up time and headspace for everything else.

A different kind of benchmark

NEWS

EU Electrification Action Plan to accelerate heat pump transition

The EU has published plans to reform how electricity and gas are priced, aiming to drive widespread uptake of heat pumps and cut heating bills by up to 60 per cent.

The Electrification Action Plan targets the electricity-to-gas price ratio, known colloquially as the "spark gap". It would limit the consumer spark gap to no more than 2.5 by 2030, achieved partly by taxing electricity less heavily than fossil fuels.

Commission data indicates electricity currently costs about 2.8 times more than gas in Ireland – though that ignores gas's annual standing charge, typically €130-150 a year.

At a spark gap of 2.5, a heat pump needs a seasonal performance factor of just 2.25 to match a condensing gas boiler running at 90 per cent efficiency. Monitoring of more than

300 installations on Heatpumpmonitor.org shows every unit clearing that threshold in the 12 months to 13 July, averaging 3.99.

The commission wants to double heat pump installations by 2030 against 2025 levels, capping national ratios at 2.5 for households and 2.0 for industry. Supporting measures include a clean heat market mechanism by 2027; mandatory heat pumps in public buildings under revised procurement rules, with "Made in Europe" requirements; online quote-comparison platforms; and subsidies, low-interest loans and social leasing funded through the Social Climate Fund and ETS2 revenues.

The plan stresses the dual role of reversible heat pumps for heating and cooling amid intensifying heatwaves, paired with solar PV. It also insists deployment be coordinated with insulation and

renovation, prioritising the worst-performing buildings: "Member states have an opportunity to structurally transform their building stock … with their national building renovation plans." 

New BER takes effect while ZEB details remain unclear

Ireland's Building Energy Rating system has moved to a simplified eight band scale, with a new A0 rating at the top reserved for zero emission buildings (ZEBs). Meanwhile, with the deadline for the ZEB standard less than 18 months away for public buildings, the state is yet to finalise details on the temperature and indoor air quality levels assumed for ZEBs.

The changes to BERs, which apply to all ratings published from 24 May, were introduced under regulations signed in April by housing minister James Browne to transpose the recast EU Energy Performance of Buildings Directive (EPBD), which requires member states to harmonise their energy performance certificates.

The 15 classifications of the old scale, from A1 to G, are replaced by A0, A, B, C, D, E, F and G, with all subcategories removed. Existing certificates remain valid for ten years from their date of issue.

To achieve A0, a dwelling must qualify as a zero emission building, meeting six criteria in all — among them a primary energy value of no more than 42 kWh/m2/yr, CO2eq emissions of no more than 5 kg/m2/yr, and no on-site use of fossil fuels.

The recast EPBD also sets requirements regarding indoor environmental quality (IEQ), including temperature, humidity, ventilation rate, and the presence of air contaminants.

With the ZEB deadline set to apply for public buildings by 1 Jan 2028, Passive House Plus put questions to the Department of Housing regarding the IEQ parameters underpinning Ireland’s ZEB definitions. A spokesperson for the department said, “work is ongoing on this matter”.

The redesigned certificate also discloses considerably more data, including annual primary and final energy use, building energy demand, the renewable share of energy used and the amount produced on site, and operational greenhouse gas emissions.

Two new indicators state whether the building can adjust its energy use in response to external signals, and whether its heat distribution system can operate at low temperatures.

A field for whole life global warming potential appears for the first time, ahead of EU requirements to report embodied carbon on certificates for large new buildings from 2028 and all new buildings from 2030, and a QR code links to tailored upgrade advice.

SEAI has also updated the underlying DEAP calculation, including revised solar photovoltaic inputs covering panel wattage and battery storage, replacing the previous assumption that all electricity generated was used in the home.

For further information, visit our website or read the next edition of Passive House Plus magazine. 

(above) The commission wants heat pump installations doubled by 2030 against 2025 levels.

Free solar for energy-poor homes under reported €200m government plan

Solar PV could be rolled out as standard under the Warmer Homes scheme, alongside a suite of enhanced retrofit grants for low-income households, landlords and businesses, under proposals reportedly being prepared for cabinet.

According to a report published in July by the Irish Examiner newspaper, energy minister Darragh O'Brien is expected to bring a menu of options to government aimed at easing energy costs through deeper and faster uptake of home energy upgrades. The measures, which would be administered by SEAI, are understood to carry a total cost in the region of €200m in a full calendar year.

The most eye-catching proposal would see solar panels included as standard in the Warmer Homes scheme, which delivers fully funded energy upgrades to homeowners on qualifying welfare payments. A related measure would offer grants of up to €9,000 for solar PV and battery storage to

households on qualifying payments, with estimated savings of up to €878 a year for suitable homes. Significantly for the private rented sector – long the poor relation of Ireland's retrofit programme –a pilot scheme is proposed for landlords with HAP and rental accommodation scheme tenancies, funding attic and cavity wall insulation. Grants for battery storage, enabling homes to use cheaper off-peak electricity, are also reportedly on the table, along with temporarily increased supports for businesses installing solar PV, heat pumps and solar thermal.

Neither SEAI nor the Department of Climate, Energy and the Environment would confirm the measures. SEAI told Passive House Plus it could not provide information as "there has not been an announcement on new measures or grant enhancements".

A department spokesperson said the Nation-

al Energy Affordability Taskforce, chaired by Minister O'Brien, is "working intensively" on an Energy Affordability Action Plan, due for completion in Q3, focused on short-term, medium-term and longer-term measures – including targeted measures – to support households and businesses with energy costs. This includes "examining how to support increased uptake of home energy efficiency upgrades, in particular for lower-income households at risk of energy poverty", and continued development of SEAI retrofit schemes, the spokesperson said, adding that all SEAI schemes are kept under review.

The proposals land amid fresh price hikes and any package is likely to face scrutiny from the Department of Public Expenditure, and would feed into supports for Budget 2027 in October. 

Housing minister calls for faster retrofit to shield homes from energy shocks

I reland must treat building decarbonisation as critical national infrastructure to protect households from future energy price shocks, according to a new policy scorecard launched today.

Ireland needs to dramatically accelerate the retrofitting of its homes, schools and businesses to build resilience against future energy price shocks, the Irish Green Building Council's 2026 Policy Scorecard has warned.

The scorecard was launched at the IGBC's Build Green Now conference at Royal Hospital Kilmainham in Dublin on Wednesday 27 May, where around 250 delegates heard that while progress has been made on decarbonising the built environment, ambition must now be stepped up significantly.

Speaking at the event, Minister for Housing James Browne TD, pointed to timber construction as a particular priority, arguing it could

speed up delivery times and cut costs while still achieving the highest energy ratings. His department is working with the Timber in Construction Steering Group on national technical standards for Mass Engineered Timber, which are close to publication.

IGBC chief executive Pat Barry said Ireland had led on energy renovation for a decade but needed to go further.

"Decarbonising our buildings must be seen as a key national infrastructure project to make us more resilient to energy price shocks, and deliver healthier, more comfortable homes that are more affordable to heat," he said, pointing to Spain and Denmark as countries that had weathered the recent energy crisis better due to heavy investment in renewables.

A panel discussion heard that tackling vacancy and dereliction could play a significant role in both housing delivery and carbon reduction.

John Dobbin, chair of the RIAI Housing Committee, said bringing vacant and derelict buildings back into use offered a unique opportunity to revitalise cities, towns and villages. Because the infrastructure is already in place, it could allow the state to deliver homes faster and more cheaply than new builds on greenfield sites.

The conference also looked at international innovation, including Copenhagen's new Fælledby district, the Danish capital's first all-timber neighbourhood, designed for 7,000 residents as a climate-resilient urban village.

On the business case for sustainability, Steven McGee, chief operating officer at John Sisk & Son, said lower carbon equates to lower cost.

"By investing in sustainability now, we deliver efficient, future-ready assets that create lasting value," he said. 

Price regulation promised to address district heating affordability

The Government has approved revisions to the general scheme of the Heat (Networks and Miscellaneous Provisions) Bill 2024, clearing the way for a regulatory framework intended to accelerate the rollout of district and communal heating in Ireland, with price regulation promised for all heat network customers.

The move comes as analysis by Passive House Plus indicates that the cost of communal heating can be in the region of three times higher than a heat pump.

Announcing cabinet approval on 10 July, minister for climate, energy and the environment Darragh O'Brien said the legislation "will provide the certainty needed to attract investment, accelerate the development of district heating projects across the country and ensure that consumers are protected through robust regulation".

The revisions formally designate the Commission for Regulation of Utilities (CRU) as heat network regulator. In response to queries from Passive House Plus, a department spokesperson said the CRU will have powers to intervene where providers fail to charge according to defined principles: charges must be "non-discriminatory, transparent, cost reflective, cost-efficient", and while they can allow for fair and reasonable returns, "they must take account of consumer impact and affordability".

The spokesperson confirmed that price regulation will apply to all heat network customers, not only those defined as vulnerable, and that it is envisaged the CRU's powers will cover both unit rates and standing charges.

Vulnerable customers, defined in the general scheme as household customers particularly vulnerable to disconnection for reasons of advanced age or physical, sensory, intellectual or mental health, will receive additional protections modelled on other energy sectors. These include a ban on winter disconnection for non-payment between 1 November and 31 March, and a minimum of 24 months to repay debts.

The bill sits alongside a growing funding pipeline. The Tallaght scheme, Ireland's first district heating network using recovered waste heat from a data centre, received €4.92 million from the Climate Action Fund, while €50 million has been allocated to the Dublin District Heating Project, which will use waste heat from the Poolbeg waste to energy plant. A further €50 to €100 million from the Infrastructure, Climate and Nature Fund has been allocated for construction

grants of up to half of eligible costs, expected to run from 2027 to 2030 and administered through a new district heating centre of excellence at the SEAI.

But the department's answers also contained a significant concession on cost. Asked whether district and communal heating could struggle to compete with individual heat pumps on running costs, the spokesperson said: "The department accepts communal or district heating may not be the most cost-efficient heating solution in certain locations." The department noted "the importance of promoting the use of district heating without this resulting in less good value outcomes for customers", adding that the CRU, SEAI and department are working together to ensure the most cost-effective decarbonisation option is available to end users.

The question was informed by the experience of this magazine's editor, Jeff Colley, whose family of four lives in a communally heated, A3 rated 90 square metre apartment in Co Dublin. Metered data shows the household used 3,410 kWh of heat for space heating and hot water over the past 12 months – a remarkably low figure, translating to just 37.9 kWh/m2/yr, reflecting the fact that the low energy mid-block mid-floor apartment uses virtually no space heating. At the scheme's rates of 24.6c per kWh and a 93.07c daily standing charge, including VAT, that equates to an annual bill of €1,179. Heating the same home with direct electric heating at his current electricity rate would cost €1,210, while a heat pump with an unremarkable seasonal efficiency of 300 per cent would cost €403, falling below €260 on the cheapest smart tariff currently advertised, if run half on night rate. Communal standing charges do include plant maintenance costs that heat pump owners bear separately, but the gap remains stark.

While the bill does not create any powers to mandate consumers or developers to connect to district heating networks, it offers no specific mechanism to address the risk of locking in customers, who cannot switch supplier, beyond strengthened CRU powers to intervene "where it considers heat network prices to be unreasonably high".

The department said “Customers of communal heating systems will be protected from excessive prices by the power of the CRU to implement price controls, with licenced providers required to submit their tariffs and charges aligned with principles to ensure they are non-discriminatory, transparent, cost reflective and cost-efficient, allowing for fair and reasonable returns while taking account of consumer impact and affordability.

“The Commission will monitor the heat network market and step in where these principles are not being adhered to,” said the department. “For the purposes of monitoring compliance, the CRU may carry out comparative or benchmarking assessments of charges, costs or performance across Heat Networks or classes of heat networks, having regard to differences in scale, technology, location and customer characteristics.”

The department added that the bill allows for additional or more detailed pricing regulation to be introduced at a later stage if this proves necessary in light of sector development, and obliged the CRU to protect consumers from anti-competitive practices.

Existing heat suppliers will be required to register with the CRU while an enduring licensing system is developed.

Recent media coverage has pointed to problem district heating installations contributing to overheating issues. In July a legal action pursued by the owner of a €6.19m apartment at Lansdowne Place, Ballsbridge, went to mediation, over claims made by the homeowner, which the developers and engineers deny, that overheating had been caused by a failure to maintain or repair the district heating system.

Asked whether the department had analysed the overheating risk posed by constantly circulating high temperature heat through pipework in high density apartment buildings, the spokesperson did not say whether any analysis had been carried out, stating that installation issues "will be addressed by building regulations and the technical standards governing the district heating sector" as they evolve under the new regulatory regime. 

The department noted "the importance of promoting the use of district heating without this resulting in less good value outcomes for customers".

From compliance to performance: reflections from Essen

The 28th International Passive House Conference brought together experts and practitioners in April to discuss the world’s leading low energy building standard. Niall Crosson, group technical director at Ecological Building Systems, summarises this year’s event, which marked the 35th anniversary of the first passive house, and the 30th anniversary of the Passive House Institute.

There was a strong Irish presence among delegates and speakers at the 28th International Passive House Conference in Essen, and the themes could hardly have been more relevant as Ireland navigates tightening Part L requirements, the legacy of NZEB, the evolution of the BER system, and the transition toward Zero Emissions Buildings (ZEB).

A central message was Efficiency First and Resilience, reinforced by Professor Wolfgang Feist, whose own passive house – now over 35 years old

– continues to perform as designed. At a time when the Irish industry still questions consistency of delivery, the lesson is clear: measured performance over time matters more than design intent alone.

Ireland's regulatory direction already reflects aspects of this. Part L (2021) prioritises fabric performance and airtightness, and NZEB has significantly cut energy demand. But compliance does not always translate into real-world outcomes.

As Ireland moves toward ZEB under the EPBD, and as the BER system evolves toward more meaningful metrics, emphasis will shift from compliance to in-use performance. The message from Essen was that closing the performance gap is less about new technologies and more about process, verification and accountability, exactly what passive house delivers through detailed design, rigorous testing and consistent quality control on site. Ireland's mild, damp, wind-driven climate reinforces the point: moisture management, airtightness continuity and thermal bridge-free detailing are well understood, but still inconsistently delivered.

Another key theme was the shift beyond operational energy toward embodied carbon and whole-life performance. ZEB will require broader assessment of materials, emissions and resource use,

with bio-based and low-carbon materials suggesting future compliance will extend beyond Part L and BER calculations.

Case studies reinforced these themes. Deep retrofits demonstrated energy reductions of up to 80 per cent, even within heritage and occupancy constraints – highly relevant to Ireland's existing stock – while Helena McElmeel highlighted the risk of "carbon creep", where emissions from extensions and non-energy works undermine overall gains.

In social housing, Glasgow's Dundashill scheme showed high performance delivered with modest cost uplift and lower running costs, aligning with Ireland's priorities around affordability and energy poverty. Gary Kelly's Hill House in Co Armagh demonstrated bio-based materials, airtight construction and offsite methods delivered efficiently by a small team, while larger projects such as Oxford University’s Schwarzman Centre for the Humanities highlighted a shift in risk toward coordination, quality and verification.

Essen reaffirmed that passive house is not about perfection, but measurable performance and disciplined delivery. The knowledge already exists – the challenge is moving from compliance to consistently delivering better buildings. 

Gyproc marks 90 years in Ireland with Barnardos refurb project

Gyproc, part of Saint-Gobain, is celebrating 90 years of supporting Ireland's construction industry in 2026 – and is marking the milestone by backing a refurbishment project at children's charity Barnardos' central hub in Christchurch, Dublin 8.

The project, part of the charity's Building a Future of Change campaign, will see two floors of the building renovated and modernised, creating space for additional child and family services alongside support staff. Because the hub serves as Barnardos' national office, the impact of the work will be felt by staff, children and families across Ireland.

Barnardos supports vulnerable children, families and individuals throughout the country, and in 2025 helped almost 35,000 families across its fifty-six service locations. Gyproc, a partner of the charity for 10 years, will provide products, expertise and support to transform the floors into a more functional, welcoming and futureready facility.

Kieran Holohan, managing director for Gyproc, Saint-Gobain in Ireland, said: "As we celebrate 90 years of Gyproc, we wanted to mark this milestone by supporting a partner that shares our commitment to building stronger communities. Over our 10-year partnership, we have seen Barnardos' work make a real difference to the lives of children and families across Ireland. We are proud to support its Building a Future of Change campaign by helping create a space that will enable its important work to continue for years to come."

Mary Gamble, chief executive of Barnardos in Ireland, added: "The support of partners like Gyproc plays a vital role in helping us continue our work with children, families and individuals across Ireland. This refurbishment will create a more welcoming and effective space for our teams and those who rely on our services. "Our partnership with Gyproc is built on a shared commitment to positive change. This investment will help ensure we have the facil-

ities needed to support children and families both now and into the future."

More information is available at www.gyproc.ie. 

(above) Attendees at the 28th International Passive House Conference in Essen.
(above, left to right) Kieran Holohan, managing director for Gyproc, Saint-Gobain in Ireland, Halina McNabb, corporate partnerships and fundraising for Barnardos, and Rosemarie Fox, human resource business partner for Saint-Gobain.
Photo: Florin Pepene

Quiet or cool: the comfort tug-of-war

Part O treats noise and cooling as a zero-sum game, but comfort is more subjective than the regulations allow, says Dr Huda Elsherif, building physics engineer at Scotch Partners.

During my first summer in the UK, I was surprised to discover the birds start singing as early as 2 a.m. and keep going until 10 p.m. So, when my colleague told me her Part O noise levels were being exceeded by robins having a rave, this time I wasn’t surprised.

You might think nature’s orchestra surely wouldn’t prevent someone from opening their windows. While Part O’s noise guidance technically agrees by limiting its scope to man-made noise sources, our experience of sound can be just as subjective as thermal comfort. Some people fall asleep to birdsong YouTube videos. I use them as my alarm ringtone. I promise I don’t have a personal grudge against flying jukeboxes, and I quite enjoy it when they are harmonious. But more often than not, there’s always that one off-key crow cursing you and your ancestors.

That’s because it’s not just the volume of sound that matters, but also how frequently disturbances occur.

Part O accounts for this by allowing only ten loud disturbances per night, as these are more likely to mess with your sleep. As with all hard limits, this can create slightly absurd situations where nine concrete lorries thundering past are totally acceptable, but eleven ordinary cars trigger the “no more openable windows” alarm.

This is common in London, where Part O noise limits are often exceeded because of these short disturbances rather than average background noise levels. When feeling generous, the noise consultant might still allow the windows to open, but by such a tiny amount that occupants would need to whip out a ruler every evening to measure a 1.5 cm gap.

Not all noise is bad you know. Growing up in a hot climate, I could only sleep under the gentle hum of a ceiling fan, my personal version of white noise. So naturally, I initially found UK homes eerily silent. I could hear every creaky floorboard and every midnight fridge raid my roommates embarked upon. Passive house buildings take this silence even further. High insulation levels, triple glazing, and airtight construction make them incredibly quiet. That’s why it becomes especially important to limit mechanical noise within them. Without background sound to mask it, every gurgle of air through a duct suddenly sounds dramatic.

The challenge is that by the time MEP

consultants have worked through Part F, energy efficiency requirements, and the mandatory brawl with the architect over ceiling void heights, asking them to also account for aspirational noise levels is like throwing a rock at a juggler and expecting them to catch it alongside all the other balls already in the air. Passive house pressure targets are often treated as an afterthought.

On certified passive house projects, third-party checks at least force engineers to confront the problem. But on projects that merely adopt “passive house principles,” anything not explicitly required by building regulations becomes easy pickings in the next value engineering season. Passive house buildings are a bit like IKEA furniture: every component serves a purpose. You wouldn’t sit on a chair with a missing leg just because the other three looked sturdy enough.

The impact of noise on thermal comfort isn’t limited to those moments when we’re trying very hard to fall asleep. In my work with ARC on the Ecovillage Orphanage, we used perforated brick walls internally to maximise airflow in a hot, humid climate. While this might sound like every modern teenager’s worst nightmare, it worked well in its Tanzanian context, keeping the girls cool without compromising privacy too much.

But when you try applying the same idea to a school, you’re no longer dealing with ten girls chatting quietly in the evening. You’re dealing with ninety children competing for the teacher’s attention. So, we adapted the concept, creating “compartments” that allowed air to flow while reducing sound transfer.

One of the things I enjoy about designing in the Global South is that the lack of rigid regulations gives you more freedom to balance conflicting requirements with a degree of common sense. With temperatures rising in urban environments, Part O noise limits could benefit from becoming just as nuanced. The adaptive thermal comfort model already recognises that if I’m comfortable at 26 degrees Celsius on a hot day, I’m probably not going to start writing my will at 27C. Equally, I’m unlikely to angrily slam my windows shut the moment car number eleven drives past.

That is, of course, unless it’s another damned Ferrari. •

It’s not just the volume of sound that matters, but also how frequently disturbances occur.

Retrofit delta: why the figures really do stack up

Retrofit sceptics compare upgrade costs against doing nothing, but once you account for the reinvestment buildings need anyway, the figures look very different, says Dr Marc Ó'Riain.

Every so often the retrofit debate in Ireland and the UK returns to the same question: do the numbers actually stack up?

A recent Irish Times column suggested they do not. The argument is familiar. Deep retrofit costs tens of thousands of euro or pounds, households cannot afford it, and national climate targets therefore look unrealistic.

But this argument rests on a flawed assumption: that buildings remain unchanged for decades and that retrofit represents a sudden discretionary expense imposed on homeowners.

However, buildings do not work that way. They are assemblies of components with predictable lifespans. Oil boilers fail after fifteen or twenty years. Windows degrade over thirty or forty. Roof coverings eventually require replacement. Houses demand periodic reinvestment simply to remain functional. Lack of proper maintenance leads to further degradation and can be referred to as “deferred maintenance”. Simply put, building elements have defined lifespans, and these parts of your asset need replacement periodically.

Yet much of the public discussion compares the cost of deep retrofit with the cost of “doing nothing”. But doing nothing is not actually an option. What much of the retrofit debate misses is what might be called the retrofit delta: the additional investment required to improve building performance beyond normal replacement costs.

If a boiler fails, replacing it with another fossil fuel system may cost €3,500-€5,000. A heat pump may cost more, but the relevant figure is not the total installation cost. It is the efficiency premium above the baseline replacement cost.

The same principle applies across almost every building element. When roofing materials are renewed, insulation can be upgraded at marginal additional cost. When windows are replaced, airtightness and glazing performance can improve dramatically. When façades require repair, external insulation becomes more feasible.

In practice, the retrofit delta is often far smaller than the headline figures used in public debate because homeowners are already facing baseline reinvestment costs.

This matters because much of the Irish and UK housing stock was constructed between the 1950s and 1990s. Many of these homes are now approaching a period where multiple components will reach the end of their service life within the same generation.

If these elements are simply replaced on a like-for-like basis, the opportunity to improve building performance may be lost for another thirty or forty years.

The importance of these decisions extends beyond the buildings themselves. There is also a wider geopolitical context that increasingly makes this issue impossible to ignore.

The war in Ukraine exposed Europe’s dependence on imported fossil fuels, while growing instability involving Iran and the wider Middle East continues to place pressure on global energy markets. Electricity and fuel prices remain volatile, and households are increasingly aware that energy security is no longer an abstract political issue, but something felt directly in monthly bills.

That reality says something uncomfortable about the condition of much of our housing stock.

Yet even this discussion often remains too narrowly focused on energy bills and payback periods. Homes are not simply energy systems. They are environments in which people live.

Anyone who has spent time in a poorly insulated house in winter recognises the experience: cold surfaces, draughts, condensation and rooms that never quite feel comfortable.

A well-executed retrofit changes this fundamentally. Internal surface temperatures rise, draughts disappear and ventilation becomes controlled rather than accidental.

The result is not simply lower energy use, but healthier and more comfortable indoor environments. Poor housing conditions are linked to respiratory illness, damp, mould and excess winter mortality, with many of these costs ultimately absorbed by public healthcare systems.

This does not mean every home requires an immediate deep retrofit. In reality, most buildings will improve incrementally over time through a sequence of replacement and upgrade decisions. Solar PV, attic and cavity insulation upgrades often happen first because they are less disruptive, easier to finance and deliver visible reductions in energy bills. More substantial fabric improvements may occur later as windows and heating systems reach the end of their lives.

This sequence may not perfectly align with the ideal technical “fabric first” hierarchy, but it reflects how households actually make investment decisions. The important thing is that these interventions form part of a coherent long-term pathway rather than isolated short-term measures.

If this is how most households approach

building investment, then public policy should be designed to support that reality.

This is where grant agencies such as the SEAI (Ireland) and local authorities (UK) have a critical role to play. If governments genuinely want to accelerate retrofit uptake, support mechanisms need to better reflect how buildings and household finances actually work. Rather than focusing almost exclusively on large one-off deep retrofit projects, there is a strong argument for supporting staged elemental retrofit measures at meaningful grant levels — potentially up to 50 per cent support for key fabric interventions carried out at the point of renewal.

If windows are being replaced, improve their performance properly. If roofs are being renewed, insulate them to a high standard. If façades require repair, support external insulation at that moment. These are precisely the points where homeowners are already preparing to invest.

Viewed in terms of the retrofit delta — rather than through the narrow lens of a single retrofit invoice — the figures do stand up to scrutiny. Indeed, growing public awareness of energy performance ratings is increasingly influencing purchasing decisions, with higher-rated properties often attracting a measurable price premium. As a result, investment in what would otherwise be a depreciating asset is being reflected in enhanced market value, with the benefits of improved energy performance increasingly capitalised into sale prices.

In fact, the more uncomfortable possibility is that failing to retrofit may ultimately prove to be the more expensive choice of all, as deferred maintenance accumulates and homes become less comfortable, less healthy and less valuable over time.

Ultimately, retrofit is not an extraordinary cost but the intelligent modernisation of a valuable asset — one that delivers greater comfort, resilience, energy security and market value for decades to come. •

Dr Marc Ó Riain is a lecturer in the Department of Architecture at Munster Technological University (MTU). He has a PhD in zero energy retrofit and has delivered both residential and commercial NZEB retrofits In Ireland. He is a director of RUA Architects and has a passion for the environment both built and natural.

Reverberations of History: The Intersection of Energy Crises and Building Health

The 1970s energy crisis sealed our buildings and sickened their occupants. As fuel prices bite again, the same pattern is re-emerging and, says Air Quality Matters founder Simon Jones, this time we should know better.

In the winter of 1973, as global oil prices quadrupled and supply lines were restricted, the ambient temperature inside my family’s home plummeted. I was a newborn, a "baby in arms", and the daily struggle to maintain a safe, warm environment turned into a defining reality for my parents, just as it did for millions of others.

That global energy shock did not simply force families to ration heating oil; it catalysed a fundamental, knee-jerk transformation in how architectural and engineering communities approached the built environment. The regulatory and economic mandate was clear and immediate: stop the drafts, seal the building envelopes and save energy at all costs. Yet, in the rush of our industry to seal our buildings from the outdoors, we inadvertently engineered a complex public health challenge.

Today, as we face new geopolitical energy shocks, the echoes of those early decisions are reverberating, serving as a stark reminder of what happens when we prioritise energy conservation over holistic building health.

Prior to the 1970s, building envelopes were largely forgiving by accident rather than design. This meant that while structures were highly thermally inefficient, they were inadvertently well-ventilated. The oil embargo changed this paradigm overnight. Architects and engineers were tasked with radically reducing heating loads.

The industry quickly introduced widespread cavity wall insulation, synthetic vapour barriers and double glazing, systematically sealing buildings to minimise uncontrolled air leakage. However, this aggressive early push for airtightness lacked a parallel progress in ventilation strategies. The mantra "build tight" was universally adopted, but the crucial second half of the equation, "ventilate right", lagged significantly behind both in technology plus regulatory implementation.

The physical and biological consequences of this rapid architectural shift soon manifested as a widespread crisis of indoor environmental quality (IEQ). By drastically reducing natural ventilation pathways without providing engineered mechanical alternatives, we fundamentally altered the behaviour of our homes and commercial spaces. We trapped mois-

ture, volatile organic compounds (VOCs) from synthetic building materials, and other pollutants. The industry soon became intimately acquainted with the phenomenon of "sick building syndrome."

Furthermore, the application of early insulation often shifted the dew point within wall assemblies; issues previously masked by continuous, draft-driven air movement became localised breeding grounds for mould. The epidemiological ripple effect was measurable, correlating with a sharp rise in childhood asthma and chronic respiratory conditions. We learned a hard, data-driven lesson in building physics. It was the birth of organisations such as the Air Infiltration and Ventilation Centre (AIVC), a direct response to the failures of many buildings and the need for better information.

Decades later, our technical understanding of building physics has matured significantly. Modern standards such as passive house demonstrate that extreme airtightness and superior IEQ can successfully coexist through the rigorous application of technologies like MVHR (mechanical ventilation with heat recovery). Yet, despite our engineering advances, we are currently facing a dangerously familiar economic pressure. The severe energy shock catalysed by the conflict in Ukraine, the ensuing global cost of living crisis and the imminent threat of further supply chain interruptions stemming from Middle East tensions have pushed energy affordability back to a precipice not seen since the 1970s.

Consequently, occupant behaviour could emulate the past. Again, rationing heat to reduce utility bills.

Crucially, we already see evidence of actively sealing trickle vents, blocking passive airbricks and turning off ventilation systems to prevent perceived heat loss. This is particularly problematic in the context of modern buildings. When legacy housing stock is upgraded with high-performance glazing and upgraded insulation, but does not have comprehensive ventilation upgrades, the building physics fail. We are already witnessing a documented, severe resurgence in dampness, condensation and mould across these under-ventilated environments, directly impacting health outcomes once again.

This paradigm begs a critical question for our

The mantra 'build tight' was universally adopted, but the crucial second half of the equation, 'ventilate right', lagged significantly behind.

profession: as we navigate these modern fuel shocks, have we truly internalised the lessons of the 1970s, or are our institutional memories too short? Designing for energy efficiency is now a baseline regulatory requirement, but designing for true resilience requires engineering systems that protect indoor air quality even when occupants are forced into thermal rationing. We must prioritise robust ventilation, use modern tools like air quality monitors and double down on quality and standards. We cannot allow short economic memories to override the established physics of building health. The echoes of the past are loud and clear; it is our responsibility to engineer a future that listens. •

Closing the loop: how re-used steel can drive low-carbon design

Recycling steel still burns huge amounts of energy. Reusing it avoids the furnace altogether, and two recent projects show how it can work at scale, say Joe Garbett and Tom Dolton of Momentum structural engineers.

Steel has been established as a key construction material for almost 150 years, owing to its versatility and durability. It can also be easily recycled without losing its properties, and over 650 million tons are recycled globally every year. In the UK, 99 per cent of structural steelwork from demolished buildings is recovered, and 86 per cent is melted down to make new steel sections. But the process of melting and reforming steel uses huge amounts of energy and resources, resulting in significant embodied carbon even for recycled steel.

Reused steel sections offer a simpler solution. By taking existing or recovered sections and reapplying them to a new purpose, the energy-intensive processes of melting down and reforming are avoided altogether. The embodied carbon savings are considerable: reused steel can deliver up to 97 per cent reduction in cradleto-gate embodied carbon compared to a typical steel section.

Momentum's recent work on the African Forest habitat at Bristol Zoo Project demonstrates the potential of steel reuse, as well as some of its challenges. We have worked closely with Feilden Clegg Bradley Studios, Grant Associates, and Bristol Zoological Society since 2021 to create a highly sustainable, conservation-focused zoo. Once it became clear that the environmental conditions of the new Gorilla House and Crocodile House were only achievable in steel, reuse became a key part of this vision.

Early buy-in was crucial. The project team worked hard at early stages to engage with suppliers and adopt the mindset of working with reused steel. Once the client embraced the idea, it became a driving force behind the project. The approach achieved remarkable savings in the first phase, which is now complete. External works designed around tubular sections reached nearly 90 per cent reuse, while the primary building frames achieved 30–35 per cent.

One common worry is appearance. In practice, reused steel can be made to look almost indistinguishable from new, with careful processing to remove old plates and shear studs before shot blasting and painting. Bristol Zoological Society chose to embrace some imperfections as part of its sustainability narrative, which also reduced processing time and cost. The UK Green

Reused steel offers a rare win-win: massive carbon savings while continuing to use a familiar, versatile material.

Building Council's proposed visual grading system, running from 'as new' to 'non-compliant', provides a useful framework for specifying acceptable aesthetics. This clarity will be vital as reuse becomes mainstream.

The real challenge lies in design flexibility and procurement. Reuse challenges the traditional linear design process, where material sourcing happens after design. Instead, it demands an iterative approach with design informed by availability. For the Bristol Zoo Project, early procurement proved critical. Before tender, the team secured a large quantity of steel from Cleveland Steel, ensuring certainty in availability and allowing the design to be adjusted to suit stock. The team used the HTS StockMatcher tool to compare the Revit model against monthly supplier lists, adjusting specifications to align with available stock. Other approaches include specifying lower grade steel to maximise availability and building in tolerances within structural zones to allow for variation in section size.

One of the most critical lessons was to embrace tubular sections, which currently have the best availability. Suppliers like Cleveland Steel and Tubes have built their business on stockpiling surplus stock, and this became a key design driver for elements of Bristol Zoo Project, while shaping the whole design strategy for the Yard Theatre.

The Yard Theatre

Hackney Wick's Yard Theatre started as a popup theatre in a disused warehouse, so the construction of a new permanent auditorium was a natural opportunity to explore a circular reuse approach. Momentum worked with Takero Shimazaki Architects to incorporate repurposed

steel tubes into the structure: the tubes are welded and bolted together to form the beams and columns of the auditorium frame. The tubular structure and bolted splices will be left visibly exposed, embracing the theatre's DIY ethos and expressing the story of the repurposed material. This project took reuse a step further, reinventing a disused tower crane mast as a permanent natural ventilation tower. The mast creates a striking architectural form, visible from surrounding streets as well as from trains arriving into Hackney Wick station. It functions as a ventilation chimney, providing an air flow route for the building's low-carbon mixed mode ventilation system, while also reducing fabrication requirements and installation time: the sections were simply pinned together on site, then lifted onto a fabricated steel base-frame.

Supply remains the biggest hurdle to widespread steel reuse. There are few major stockists, and demolition practices often damage steel beyond reuse. To unlock circular potential, the industry must shift from demolition to deconstruction, disassembly and reuse, preserving structural elements for future projects.

Our experiences so far show that with early engagement, clear specifications and flexible design, reuse can work at scale. As we push towards net zero, material choices will be critical.

Reused steel offers a rare win-win: massive carbon savings while continuing to use a familiar, versatile material with huge structural benefits. Designing for steel reuse demands early engagement, flexible thinking and a willingness to adapt design language. But it offers a powerful way to cut carbon without compromising design ambition, and a tangible route towards a truly circular economy. •

The building envelope is not completed by a good build-up alone. It is built in the critical points: on the internal side, where vapour must be controlled, and at the base of the wall, where timber frame walls meet the floor slab.

CLIMA CONTROL 80 contributes to the airtightness and internal moisture management of the building envelope.

WBR completes the timber frame wall base detail with a simple and reliable structural connection.

Two Rothoblaas solutions for Passive House timber frame walls.

Contact your nearest Rothoblaas agent for tailored technical advice.

DYLAN CAHILL +353873433711

dylan.cahill@rothoblaas.com rothoblaas.com

Critical Mass

CAIRN COMES GOOD ON HIGH DENSITY PASSIVE HOUSE PROMISE

Passive house has long been typecast as the preserve of deep-pocketed self-builders sold on the dream before pen hits paper. Now Ireland's largest housebuilder has smashed that assumption, delivering four passive schemes — and 1,755 homes — simultaneously, first time. And the real innovation may be what happened after the builders left: an unprecedented effort to prepare residents, housing staff and maintenance teams for life in a passive house — an effort led, in the interests of full disclosure, by this magazine's publishers.

Words: John Hearne

The resident engagement and handover training programme described in this article was developed by Zero Ambitions Partners, a company owned and run by Passive House Plus founders Dan Hyde and Jeff Colley.

IN BRIEF

Development type: Four schemes totalling 1,755 units of cost rental, social and affordable housing

Method: Concrete structure with steel frame walls, panel heaters and hot water heat pumps, MVHR

Location: Santry, Seven Mills & Charlestown, Co. Dublin

Standard: Passive house classic certified Space heating cost: €14 to €35/month – depending on size. See In detail panel for more information

- €35 per month

Stephen O'Shea, Head of Sustainable Construction at Cairn Homes tells a story about a chance encounter he and his colleagues had at one of the company's developments in Delgany, Co. Wicklow. Archer's Wood predates Cairn's transition to passive, but it does include a 620 m greenway built to complement the development.

“A woman stopped and asked if we were from Cairn. I wasn't sure what was coming next, but I said that we were, and she told us that she'd lived in Delgany all her life. She said, ‘This greenway has transformed the way I move around my neighbourhood. It's the best thing ever.’”

The woman didn't even live in Archer's Wood. She didn't fit into the broadest definition of the word ‘customer’. And yet the company had done something that, in her words, transformed how she interacted with the place in which she'd lived all her life.

This story doesn't tell you much about the ins and outs of building passive at scale, but it does tell you something about how corporate culture can play out in real life.

“It's those impacts, the ones that we're leaving behind us that we're trying to be more forward-thinking and more intentional about,” says O'Shea, “rather than their just being happy outcomes.”

It's the kind of thing you hear from PR departments all the time, but it's not the kind of thing you actually expect to believe. Lest we forget, Cairn is a publicly quoted company, with revenues in 2025 of €944.6 million, and an operating profit of €168.6 million. As I write, Cairn Homes PLC is trading on the London Stock Exchange at a price of £2.12p per share.

This isn’t a not-for-profit organisation.

But to characterise the pivot to passive as wholly altruistic would be an oversimplification. Stephen O'Shea traces the roots of the initiative to the need to address the company's Scope 3 greenhouse gas (GHG) emissions. Scope 3 refers to indirect emissions that occur in the company's value chain. For a builder of houses, that's the houses; in Cairn's case, 98 per cent of their total emissions. The figure was further broken down into embodied carbon and operational carbon – with the latter the larger of the two.

“When you're trying to plot reduction pathways and make savings,” he says, “you start by looking at the biggest figure … At the same time, there was a growing awareness within the industry about the performance gap. The difference between what your BER cert is telling you and what real world performance is likely to be.”

It was at this point that people first started to talk about passive house as a possible solution to both of these issues.

“What made it something that we were prepared to get into at scale was the fact that all of those problems were being answered in a way that gave direct benefits to our cus-

tomers. By comparison – for argument's sake – using 70 percent GGBS in your concrete floor slab has no measurable benefit to customers. It's not something that impacts them in their day to day lives.”

Discussions and feasibility studies followed, together with consultation with other stakeholders. Housing bodies in particular were very enthusiastic about building passive. And the figures stacked up. There was enough evidence out there to say that passive house worked and that it could be built at scale without any great financial premium.

Stephen O'Shea says that as discussions and investigations continued, two “points of nervousness” emerged. The first was airtightness: What happens if we fail to get 0.6? A site visit to Shanganagh Castle Estate was instrumental in demonstrating that maybe this wasn't as difficult as they first thought. Shanganagh is of course the Land Development Agency/ Dún Laoghaire-Rathdown development of nearly 600 passive house homes launched in September 2024. As one of the largest passive house developments in Europe, it's been hugely influential across the sector.

The message from Shanganagh was that you didn't have to turn the building on its head to achieve the minimum thresholds. At the same time, Cairn had just completed another development – this one non-passive. They carried out a full building airtightness test just to see how much further they would have to go to hit the passive standard. It came in at 0.81 ACH.

The building is certified to perform. The people are certified for nothing.

Stephen O'Shea says, “Everybody went, ‘Okay, right. Maybe we can do this.’”

The second point of nervousness centred on heat pumps. Not the technology so much as security of supply. The company needed a supplier who had a presence on the island, the capacity to guarantee delivery of sufficient equipment on time and who had the support infrastructure appropriate to this kind of investment. The Dimplex Edel unit fit the bill perfectly.

Solving these issues provided a lot reassurance, but there were plenty of other challenges in the mix.

“In passive house, because it takes a very holistic view of how the building is going to perform, there is no checklist which says, if you hit this U-value and you have this M&E system and you have this MVHR unit, it will always work in every block, in every orientation across every site,” says O'Shea.

Variations in apartment sizes, locations, orientations and form factor meant significant amounts of bespoke detailing and specification. Moreover, all four schemes started at more or less the same time. That alone tells you something about the breadth of the ambition here. This was no toe in the water.

But building at scale can work in your favour too. In total, there are 1,755 housing units across the four developments.

You learn as you go, so that by the time you get to the tenth apartment, you have a much better understanding of how the different elements combine to meet the standard.

At the same time of course, building at scale means building at pace. Another major challenge involved getting all that thermal bridge detailing modelled and signed off without impacting the critical path. In your standard one-off build, everything is designed and detailed before it goes out to tender, but the developer model is different. The construction phase is biting at the heels of the detailed design phase.

Then there's planning. Three of the four sites were bought with planning permission in place – and there was no thought of passive in those pre-existing plans. That threw up a particular problem for MVHR. Getting exhaust air to external vents required very long duct runs, and because floor to ceiling space was limited, these ducts couldn't overlap. It was a very tight squeeze.

The big question of course is whether or not all of these challenges were met. With most of the units now occupied, it's a question we can explore with some authority, not least because we have the data.

Whitehaven is one of two developments Cairn built in Santry Co. Dublin. It consists of 255 cost rental units. What's special about this one is that it also features 1,100 sensors which are providing detailed live information about energy use, temperature and indoor air quality.

The sensors are being monitored by seasoned passive house experts MosArt. This isn't the company's first experience with Cairn either – far from it. MosArt's feasibility studies on high and low density passive house building – commissioned by Stephen O'Shea – had a significant role in Cairn's decision to go passive.

MosArt founder and MD Tomas O'Leary explains that these sensors are delivering live information on CO2, relative humidity and temperature, as well as energy use for space heating and for hot water.

“This data provides an incredible opportunity to do some very detailed analysis. It's all being done remotely, on a platform that we can interrogate at an apartment level, at a corridor level, at a floor level, at a core level and at a building level … it gives us incredible granularity.”

The first headline: The building works. At 600 parts per million, CO2 levels are very low. Relative humidity is hitting the sweet spot of between 45 per cent and 55 per cent.

“The temperatures are running where we expect. In fact, people seem to be very happy running it at slightly less than 20C, which is the classic PHPP design temperature. That was a surprise to us.”

Space heating energy is “bang on target”. Interestingly, however, energy use for domestic hot water is 9 per cent higher than expected. As O'Leary points out of course, this result says nothing about the thermal envelope or building performance – it's purely behavioural. If these results are borne out over

time and in the other monitored buildings, it may simply be the case that the Passive House Institute needs to adapt its energy model assumptions to suit Irish showering habits.

The other point of course is that just because the monitors are telling you that the building is functioning as expected doesn't mean that the humans inside are happy.

Jennifer Whitty is Sustainability Manager at Tuath Housing, which owns and runs Whitehaven.

“We decided to do quarterly clinics with the tenants out on site,” she explains.

“We've run three at this stage. The idea is to build the relationship, get that extra insight and establish feedback loops from the tenants by carrying out surveys. Overall feedback has been extremely positive.”

For one thing, people are showing up at these clinics – so engagement is high.

“Normally you might expect to see people if there's a problem, but no, it's been the opposite. They come and tell us how happy they are with the scheme.”

Cooper Square in Seven Mills, Co. Dublin is the largest of the four schemes with fully 607 units. It's owned and run by the Land Development Agency (LDA), which also owns and runs the aforementioned Shanganagh Castle Estate.

Kate Joyce, strategic projects and sustainability lead at the agency, says that they carry out a resident survey every year, which includes questions around heating and ventilation systems and addresses ease of use and access to training materials.

“The satisfaction rate is around 87 per cent ... and we'll be doing more surveys and keeping on top of it. If there's an opportunity for additional engagement, we'll be able to step in.”

But you'd be wrong to think that these high levels of resident engagement and satisfaction are the products of building physics alone. The truth is that one of the most innovative aspects of this entire project lies in the way

in which resident engagement was managed.

Stephen O'Shea says that as soon as they were onsite with those first units, his focus switched to the handover.

“I wanted to make sure that we were as prepared as we could be, that we were setting those buildings up to be as successful as possible.”

He points out that in the past, post occupancy evaluations have shown significant differences between passive houses with the lowest energy consumption and those with the highest energy consumption. That difference is almost always down to human behaviour.

“Passive house is often seen as something for highly motivated clients who have deep pockets and are sold on the dream before pen is put to paper. But we were now going into a space that was completely different. There would be people moving into these buildings who had never heard of passive house and who cared less. How would we get them up the knowledge curve as quickly as possible?”

That was the challenge that Zero Ambitions Partners took on. Run by Passive House Plus founders and publishers, Dan Hyde & Jeff Colley, the company – like MosArt – was also involved in Cairn's early ruminations about going passive, and had a major influence on the decision making process.

Dan Hyde says that Zero Ambitions was “relentless” in emphasizing the vital importance of engaging with residents early.

“Because if you're staking your reputation on this shift to passive house,” he says, “you don't want your ambitions to be thwarted by people not understanding how to live in a passive house … the building is certified to perform. The people are certified "for nothing.”

One of the complicating issues here is that the builder/designer typically lies at a significant remove from the end user. Creating the perfect user manual does not mean that anyone is ever going to read it, let alone do what it suggests.

We didn't start with a pair of semi-Ds as a little experiment… We started with a scheme of 600 apartments.

can only train up Cairn people, how do we give them the right advice, training and guidance so that they can pass it down the line to the housing body, so they can deliver it to those further down the line again, eventually landing at the resident.”

Between them, Hyde and Colley conducted more than fifty interviews with academics, clients, experts, contractors, housing managers and professionals from existing passive schemes in Ireland, the UK and beyond.

“Anyone who'd been involved in any of the long-term value chain, we spoke to them to find out what had gone wrong in the past. What went right? Why did it go right?”

They heard a lot of horror stories: housing associations given zero documentation at handover, neglected MVHR systems, heat pumps that never worked as intended because no one had ever told anyone how they should be used.

That research was then distilled into a suite of materials: a before-you-move-in guide, a moving day guide and a bespoke handbook translating MVHR, heat pump, panel heater, cooker hood and window manuals into plain English for building managers, resident liai-

the heart of the human experience of living in a passive building.

"Because the insulation is so much better,you're going to experience noise differently. Because comfort levels are so high, you'll need to check the weather app before you leave the house. If you're used to a fire or a stove or a range, you need to know that you're not going to experience that kind of radiant heat in your new home. You'll wear less clothes around the house, you'll probably put your winter bedding away forever… ," says Hyde.

Zero Ambitions also ran training sessions which were designed to give those dealing directly with residents all the information and insight they would need to make the transition as seamless as possible.

Respond is the housing association which owns and operates Pipers Square – the 590 unit passive development which Cairn built in Charlestown, Dublin 11. John McCormack of Respond says that he was “blown away” by Zero Ambitions' presentation.

“I felt that yes, this is the way forward. I was just so impressed by the efforts Cairn put into their after-sales service, and into their efforts to ensure that the development was successful.”

Tenants have only begun moving into Pipers Square, so it's too early to assess how they are engaging with their new homes, but McCormack says that Respond's housing team will be working closely with them in the coming weeks to ensure a smooth transition.

Kate Joyce of the LDA, which owns and manages Cooper Square, zeros in on the simplicity of the messaging in the training

Castle estate.

“As we move towards zero energy building standards, it's really important for us as an agency to understand the end user experience and how these buildings are performing over the long term.”

She says that between Shanganagh and Cooper Square, by the end of 2026, the LDA will be managing 900 passive homes, which is probably the largest number of any agency in the state.

“Because we have that long-term interest, because we're holding these assets for thirty to forty years, understanding their performance from an asset management point of view is really important, as well as from the user's perspective in terms of thermal comfort and cost.”

The moving-in process wasn't without issues in at least one of the developments. Jennifer Whitty of Tuath explains that in Whitehaven, tenants began taking up residency during a particularly cold week in November. Because the building hadn't been preheated, and because the moving-in process was staggered, it took some time for internal temperatures to get up to target levels.

“That was a learning experience for everybody, across the board,” says Whitty. “We did a review of the home user guide to explain that space heating would actually be needed until the building was at full occupancy.”

Staying with Whitehaven, Tomas O'Leary of MosArt says that the live data being collected at the development has much wider applications than might first appear. He points to a long-running debate on whether or not there is a gap between the

designed performance of a passive house and how it performs in real life. While there have been many post occupancy studies which indicate the absence of this performance gap, there are few that offer the breadth and scale of the Whitehaven data.

He says, “We've been working on passive house in Ireland since 2002. This is the first time that we have a very large data set from a very diverse cohort of occupants. These are not people who set out to build a passive house for themselves. These are people who've just ended up living in a passive housing unit. They're not evangelical. They're just ordinary folk.”

Data monitoring will allow the benefits of these developments to ripple outwards into the wider sector. In addition however, there are other benefits that are being felt much closer to home. O'Leary explains that MosArt has developed a platform – Pulse – which monitors the live data and alerts the team if something goes wrong. The risk register and flagging system at its heart was developed in close collaboration with Tuath, tailored to the specific needs of the association's tenants and its asset management requirements – and Tuath has established a dedicated project team to review and respond to the flags raised. In one case, a spike in CO2 levels in one apartment prompted a call to Tuath who in turn called to the apartment to investigate the issue. It turned out that someone had pushed a laundry basket under a counter and accidentally switched off the MVHR. In another instance, the system flagged unusually high energy use and again, the housing association

reached out to the tenant so they could address the issue.

“It all feeds back into customer care and the philosophy that the customer is king,” says O'Leary. “This system is effectively a risk register that helps us to identify situations where people might benefit from assistance or intervention. The Pulse system that we've set up is helping people get the most out of their passive homes.”

For Tuath, Pulse is one strand of a deliberate effort to understand what passive house living means in a housing association context. Ahead of handover, the association engaged directly with passive house experts and rolled out training across the organisation – from housing officers and building surveyors to customer service teams – recognising that the standard was as new to many of its staff as to its tenants. The aim now is to keep capturing that learning through the seasons – via the energy clinics, tenant surveys, the Pulse system, and knocking on people's doors.

Now as we approach full occupancy across all four schemes, Stephen O'Shea of Cairn says that he looks back on the last two years with a combination of amazement and pride.

“We didn't start with a pair of semi-Ds as a little experiment … We started with a scheme of 600 apartments. It's amazing how such a huge number of people in different functions and different companies have all pulled together and delivered first time.”

That success, that ability to bring an industry with them on the journey has allowed everyone involved to look to the future with a sense of empowerment.

“We've shown how this can be done. Now we're thinking, right, if we can do that, what else can we do? What else can we change?”

MONITORED HEATING USE

IEQ monitors are located in the living rooms in 94 apartments at Whitehaven. Initial results are from the first cohort of residents to move in, starting in November 2025

Monitoring period: Dec 2025-May 2026

Number of apartments monitored: 94

CO2 results: the median value from 94 apartments was an average of 604 PPM, with 98% below 800 PPM. This compares to an outdoor baseline of roughly 420 PPM

Relative humidity: a median of 49% RH, with 99% of apartments having averaged RH in the 40 to 60% RH range

Measured heating use: space heating use at Whitehaven to date is 4.5% lower than the calculated PHPP space heating demand figure – once calibrated to take account of the December-May time period

Measured hot water use: data from 90 apartments shows energy use 7% higher than calculated in PHPP. The calculations assumed an SPF of 2.37 and weekly flashing of hot water to over 60C to prevent the risk of legionella

1 Concrete structure under construction; 2 external wall cross section build up; 3 window installation prior to taping; 4 steel frame system wall build-up as viewed externally; 5 thermally broken balcony support in situ, part of the Sapphire Balconies system; 6 insulated ducts to MVHR unit and uninsulated ducts to rooms; 7 airtightness sealing at windows, walls and ductwork; 8 exterior grills for MVHR (spaced apart) and air source heat pump (close together).

Vent-Axia Sentinel Econiq

Designed for low-energy homes, Sentinel Econiq delivers exceptional efficiency, whisper-quiet operation and intelligent control for healthier, more comfortable living.

High efficiency heat recovery

Up to 95% heat recovery for lower energy bills

Healthy indoor air

Continuous fresh air with effective filtration

Whisper quiet operation

Designed for low sound levels and max comfort

Smart controls

Intuitive user interface and advanced automation

Passive House ready

Meets the demands of high performance building standards

Trusted MVHR solutions for Cairn Homes

Passive House developments.

EMBODIED CARBON

Cairn conducts life cycle assessments on all of its projects, the results being used as part of Cairn’s reporting on scope 3 emissions. The example provided below were done by Richard O’Hegarty and Magdalena Llull Cabrer of RKD, based on Whitehaven – a whole development figure for a 36,127m2 GIA building including 255 apartments.

Material impact:

The spec included a low carbon concrete mix (50% GGBS + CEM II AL), efficient concrete use, good rebar engineering + Megasa steel reinforcement used everywhere (recycled steel with low embodied carbon) . Many of the materials used in the build had EPDs.

Upfront total - excluding sequestration: 383 kgCO2/m2

Cradle to grave total: Not assessed Standard/Framework:

The calculation was conducted following the IGBC's Upfront methodology and guided by RICS WLC 2nd edition for default assumptions.

Calculation tool: RKD's own calculator Reference study period: N/A, as the LCA only covered upfront emissions (A1-A5)

Materials included:

Building fabric including exterior walls, roof, ground floor, windows and doors, internal and external finishes and internal walls, and an underground car park. As per Indicate, the embodied carbon of building services was not calculated, with a default value of 20 kg C02e/m2 used.

Embodied carbon notes:

The calculation used a combination of EPDs for actual materials used, industry association EPDs, EPDs for similar products, and the IGBC's National Inventory of Generic Construction Materials. A4 (transport to site) and A5 (Construction waste and energy use)  emissions were based on RICS default assumptions.

MosArt's Carly Sterling on site visit demonstrating comfort in low solar g-values

9 Interior doors wedged open for airtightness test; 10 sealing ventilation valves prior to airtightness tests; 11 multi-fan airtightness test to evaluate whole-building performance; 12 each apartment also had individual airtightness tests for Part L compliance.

SELECTED PROJECT TEAM MEMBERS

Developer & main contractor: Cairn Homes

Architect (Cooper Square): Altu Architects

Architect (Whitehaven): MCORM

Architect (Piper's Square): Reddy Architecture and Urbanisation

M & E engineer (Cooper Square): OCSC

M & E engineer (Whitehaven & Piper's Square): IN2

Civil / structural (Cooper Square): Barrett Mahony

Civil / structural (Whitehaven): Egis

Civil / structural (Piper's Square): BMCE

Passive house consultant (Whitehaven, Niven Oaks, Piper's Square): Mosart

Passive house consultant (Cooper Square): Altu

Passive house certifier (Whitehaven, Niven Oaks, Piper's Square): Max Fordham

Passive house certifier (Cooper Square): Mosart

Airtightness tester (Whitehaven): BET

Airtightness tester (Cooper Square): Evolved Energy

LCA consultant (Cooper Square):

Evolusion Innovation Ltd. Etex Group

LCA consultant (Whitehaven): RKD

Ecologist:

Landscaping (Cooper Square): Murray & Associates

Landscaping (Piper's Square): RMDA

Mechanical contractor (all schemes): Gaffney Mechanical

Electrical contractor: Daltech

SFS, wall insulation and partitions (Cooper Square): SFP Group

SFS, wall insulation and partitions (Whitehaven, Niven Oaks & Cooper Square): Platt Reilly

Thermally broken balconies (Cooper Square & Piper's Square): Sapphire Balconies

Thermally broken balconies (Whitehaven): Forte Pespa

Floor insulation: Kwik RC Frames Ltd

Airtightness products (Whitehaven, Niven Oaks, Cooper Square): Partel Ireland

Airtightness products (Piper's Square): A. Proctor Group / Isover

Windows and doors (all schemes): NorDan Vinduer

AOVs (Cooper Square): Crossflow

Entrance doors/curtain walling (Piper's Square):

Hodgins Architectural Facades

Structural frame, insulation & screed (all projects):

Kwik RC Frames Ltd

Green cements: Ecocem, via Kilsaran

Roofing (Cooper Square, Piper's Square): Beton

Hot water heat pump & radiator: Glen Dimplex

MVHR (Cooper Square & Niven Oaks): Vent Axia, via Lindab

MVHR (Piper's Square & Whitehaven): Zehnder, via Versatile

Glass colour reveals two different g-values on single elevation for solar protection

IN DETAIL

Development names: Cooper Square (Seven Mills), Piper’s Square (Charlestown), Whitehaven and Niven Oaks (both Santry)

Development type: Mixed use developments of circa 1,750 units built in concrete structure with SFS walls and partitions

Site type & location: Four urban/suburban sites around north and west Dublin

Completion date: Four blocks completed, remaining three blocks by September 2026

Budget: Not disclosed

Passive house certification: Passive house classic. Each scheme has certified blocks, with more pending as schemes completed

Space heating demand: Between 16.0 and 17.9 kWh/m2/ yr, depending on the block

Heat load: Between 9.6 and 10.2 W/m2

Primary energy non-renewable: Between 102 and 107 kWh/m2/yr, depending on the block

Primary energy renewable: Ranging between 56 – 59 kWh/m2/yr

Heat loss form factor

Ranging between 0.97 and 1.35, depending on the block

Overheating: PHPP, ranging between 0 and 2% of year above 25C, depending on the block

Assumed number of occupants: Ranging between 120 and 239 occupants, depending on the block

Energy performance coefficient (EPC): Ranging between 0.17 - 0.33

Carbon performance coefficient (CPC): Ranging between 0.12 and 0.21

BER: Ranging between A1 (22.6 kWh/m2/yr) and A3 (54.4 kWh/m2/yr), depending on the apartment

Heating costs: Calculated annual costs of €169 (1-bed apartment, 50 m2 GIA), €275 (2-bed apartment, 81.5 m2 GIA), €306 (2-bed duplex, 90.6 m2 GIA) and €418 (3-bed duplex, 123.9 m2 GIA). This is based on the whole building PHPP file for Core A5 of Piper’s Square, which has a total PHPP calculated space heating demand of 16.4 kWh/m2/ yr. Energy costs are based on Energia - Smart Data 30% tariff, assuming 50% of use at day rate of €0.29C, 50% at night rate of €0.16C, and 0% at peak rate of €0.33C. Prices

are inclusive of VAT

Environmental assessment method: Accreditation to the Irish Green Building Council’s Home Performance Index is ongoing

Air quality context: Suburban site with busy road along the east border and train line along its north border Air quality index: 33 AQI (“Fair” air quality, based on Plume Labs annual average for Dublin City, though the actual outdoor air quality may differ significantly from site to site). This means the outdoor air is generally acceptable for most people, but that sensitive groups may experience minor to moderate symptoms from long-term exposure

Airtightness: Ranging between 0.44 and 0.58 ACH at 50 Pa, depending on the block

Thermal bridging: Thermal blocks at partition base and head where they interrupted the soffit or the floor insulation. Thermal breaks for steel balcony stubs and window supports. SVPs, RWPs and HP ducts insulated with 50 mm insulation

Ground floor: 15 mm floor finish, 75 mm screed, heavy duty polythene sheet, 100 mm PIR insulation (thermal conductivity 0.022 W/mK) , Monarflex Radon barrier

RMB400, 250 mm reinforced concrete slab. U-value: 0.200 W/m2K

Floor above unheated spaces (car park): 15 mm floor finish, 250 mm reinforced concrete slab, 210 mm Rockwool Soffit slab (thermal conductivity 0.034 W/mK). U-value: 0.166 W/m2K

Brick-clad walls(outside in): 102.5 mm brick on masonry supports fixed to the slab’s edge and restraint system fixed to SFS structure, 50 mm cavity, 100 mm rock mineral fibre (thermal conductivity 0.034 W/mK), Exoperm Mono Duro 200 breather membrane, 12.5 mm Verspanel cement board, 120 mm light steel wall framing system (SFS) with studs at 600 mm centres fully filled with 120 mm Rockwool Steel frame slab (thermal conductivity 0.034 W/mK), Partel Izoperm Plus PHA vapour control and airtight layer, 25 mm service void, 12.5 mm Gyproc wall board 2.5 mm skim. U-value: 0.181 W/m2K

Rendered walls (outside in): Render finish, 190 mm CladWool MD Mineral Wool EWI Slab (thermal conductivity 0.035 W/mK),12.5 mm Verspanel cement board, 120 mm light steel wall framing system (SFS) with studs at 600

mm centres fully filled with 120 mm Rockwool Steel frame slab (thermal conductivity 0.034 W/mK), Partel Izoperm Plus PHA vapour control and airtight layer, 25 mm service void, 12.5 mm Gyproc wall board 2.5 mm skim. U-value: 0.144 W/m2K

Note: Proctor Wraptite membranes used as external vapour control and airtight layer, and Isover Vario system used internally, for brick clad and rendered walls at Pipers

Square

Roof: 200 mm sedum roof, drainage board, Ravatherm MK water flow reduction layer, 160 mm Ravatherm XPS 300 SL Insulation (thermal conductivity 0.031 W/mK), Masterseal roof sprayed membrane, 250 mm reinforced concrete slab, 285 mm ceiling void, 12.5 mm Gyproc plasterboard fixed to suspended ceiling system. U-value: 0.188 W/m2K

Windows & external doors: Nordan NTech timber frame aluminium cladded windows and doors, overall U-values: around 0.85 W/m2K

Heating system: Dimplex PLXE direct electric panel heaters in each room

Ventilation

Cooper Square and Niven Oaks: Vent-Axia Sentinel

Econiq SCP – Passive House Institute certified to heat recovery rate of 85%

Piper’s Square and Whitehaven: Zehnder Comfoair Q

350 MVHR systems - Passive House Institute certified to heat recovery rate of 91%

Cooking fumes ventilation: Recirculating cooker hoods

Electricity: PV panels on the roof to serve the common areas, no storage.

Potable water use (Whitehaven used for reference): 99.4 litres/person/day (HPI Level 1)

Water efficiency measures (Whitehaven used for reference): 6l/3l Dual flush WCs, 6l/min showers, 5l/min bathroom taps

Daylighting (Whitehaven used for reference): Under BRE Guide 3rd Edition / BS EN 17037:2018 Method 2

National Annex and the HPI Guidelines, of the 255 units tested within the proposed development, 17% (41 no. units) achieve Level 1, 12% (30 no. units) achieve Level 2, 15% (39 no. units) achieve Level 3 and 56% (143 no. units) achieve Level 4.

Redefine Your Space with NorDan

Delivering windows and doors that are crafted to last generations.

Redefining quality and luxury for almost a century. Our windows and doors are not just built to last, but crafted to inspire.

For more information visit nordan.ie

Alu-Clad Windows

NorDan’s Timber/Alu-Clad Windows combine the classic warmth and beauty of timber on the inside with a tough weather-resistant aluminium cladding on the outside.

Alu-Clad Doors

Merging timeless elegance and enduring strength, NorDan’s Timber/Alu-Clad Doors are perfect for those seeking stylish yet practical modern living solutions.

Aluminium

Windows

The ideal solution for modern homes and commercial properties, offering a huge range of design possibilities, enhanced energy efficiency, and premium performance.

Aluminium

Door

The perfect solution for the contemporary needs of residential and commercial properties that highlight energy efficiency, low maintenance, and versatile design options.

Entrance Doors

NorDan’s Entrance Doors have been designed with durability and energy efficiency at the core. With contemporary and traditional designs available, there is a perfect match available for your perfect welcome home.

Why going passive is commercially viable for Cairn

Cairn has become the first Irish developer to deliver passive house at scale — thousands of homes built to a standard it was under no obligation to meet. Madeleina Loughrey-Grant, chief of strategy and sustainability, explains why.

The Irish housing sector is not short of ambition statements. What it has been shorter on is developers willing to back them with concrete, measurable commitments. Cairn's decision to build to the passive house standard stands out precisely because nobody asked them to.

"We start with a clear idea of the homes we want to deliver and the kind of business we want to be," said Loughrey-Grant.

"For us, sustainable building and large-scale delivery go together."

Passive house, she says, is not a premium bolt-on or a sustainability exercise in branding. It is a practical and proven system with a clear evidence base: one that reduces regulated energy demand by an estimated 40 per cent over a standard ‘NZEB-rated’ home, and delivers homes that stay comfortable yearround with a constant supply of filtered fresh air. Lower bills. Healthier living. Less exposure to energy price volatility. The case, she says, is not complicated.

What is unusual is the scale at which Cairn chose to move.

Rather than piloting a single scheme, the company launched four passive house projects. "We moved at scale because scale is what Cairn is built to do,” she said.

The company controls the development process end to end – from design and planning through procurement and delivery –and that integration, she says, made the risk manageable. Learning from one project could be transferred quickly to the next.

Still, delivering four schemes simultaneously to a demanding new standard required deep technical expertise, strong supply chain coordination and a willingness to learn quickly. But Loughrey-Grant is candid that one of the most encouraging aspects of the process has been how readily teams across Cairn and its partners took up the challenge.

The company now has more than 2,500 units delivered, under construction or certified to passive house standard.

The commercial question is one LoughreyGrant addresses head on. There has long been a view in the industry that higher standards are admirable but unrealistic, particularly during a housing crisis, when the pressure is to build more, faster, but she is not convinced.

"I think that view is increasingly out of date. Our experience shows that passive house can be delivered at scale and in a commercially viable way, provided it is approached with the right delivery model, the right expertise and the right commitment,” she said.

As a listed company, she says, Cairn is disciplined about capital allocation: "We would not pursue a route that we believed was simply aspirational but not workable in practice."

The more fundamental point, as she sees it, is that quality and volume are not the tradeoff they are often made out to be. Ireland needs more homes. It also needs better ones.

"If we lock in poor performance now, we simply create higher costs and bigger problems later, for residents, asset owners and the State,” she said.

Passive house, she argues, is not idealism in the face of a crisis. It is a practical response to it.

One dimension of that argument that gets less attention is the grid. As Ireland's electricity supply decarbonises, it becomes easier to achieve Part L compliance for all electric homes, not because anything has changed in the building, but because the power source is greener. Why build to passive house standard when the grid is doing some of the work for you?

Loughrey-Grant's answer is straightforward: "Grid decarbonisation is hugely important, but it is only part of the answer."

A greener grid, she says, does not address the problem of a home that uses too much energy in the first place. Passive house works on the building fabric itself – the envelope, the airtightness, the ventilation – and those benefits endure for the life of the structure regardless of what happens to the energy system

around it. Heating technologies may come and go. A well-built building does not.

There is another piece of the picture that Cairn appears to have thought carefully about: what happens after the keys are handed over. Research from TASC found that residents in A-rated homes often do not understand how their homes are supposed to work – which means the performance benefits can go unrealised.

Cairn has invested in resident education and customer care around how passive house homes operate: how the ventilation systems work, what residents can expect in terms of comfort and air quality, how to get the most from the technology in their home. Loughrey-Grant is clear that this is not a nice-to-have.

"Building a high performing home is only part of the job. If residents are not supported to understand how their home works, you risk undermining the very benefits the home was designed to deliver,” she said.

There is, she says, a practical dimension to this. Residents who have a good experience become credible advocates for the standard in a way that no corporate messaging can replicate.

But her framing is more direct than that: "If we are going to make strong claims about performance and resident benefit, we should be equally committed to helping people experience those benefits in practice.”

Passive house now represents a meaningful share of Cairn's output, and Loughrey-Grant suggests the company is still in the early stages of what it wants to do with that foundation. The ambition is not simply to have completed several schemes. It is to help demonstrate that this standard can be delivered credibly and at scale in Ireland – and in doing so, raise expectations for what housing can be.

"If the industry is to move forward," she said, "this cannot be the work of one business alone."

KILL BILLS

END-OF-TERRACE ALL BUT ENDS ENERGY COSTS

Sometimes a project comes along that redefines what’s possible in a retrofit. One Dublin family went from camping indoors to constant comfort and almost zero energy costs.

Words: Amy Hammel IN BRIEF

Development type: End-of-terrace urban infill retrofit

Method: Mix of external and internal insulation, heat pump, demand-controlled ventilation and PV

Location: Fairview, Dublin 3

Standard: A1-rated deep retrofit

Total energy cost: €77/year – measured total for all energy use, including standing charges and VAT.

(see In Detail panel for full breakdown)

per year

An electric car crash, a global pandemic and choosing tiles from the maternity ward of the Rotunda Hospital were not on Greg Sheaf and Rebecca O’Neill’s retrofit bingo card.

And yet, having endured life in an 1880s house described throughout survey reports as suffering from “delayed maintenance”, they were well-equipped for the challenges that came their way.

The couple moved into their G-rated, endof-terrace home in Fairview in July 2019 and soon adopted what they describe as a “slightly Victorian style of living”.

“When we moved in, the house didn’t have working central heating. We had a second-hand oil boiler put in, but the radiator in our room broke fairly instantly so we had no heating in our bedroom. I think it got down to thirteen degrees in our room at one point,” said Greg. “We had curtains up in the doorways to try and keep the heat in, we had the oil radiators going and we had lots of hot water bottles.”

“The bathroom was particularly grim because it was on an external corner, so it was incredibly cold,” said Rebecca. “And the bath itself never heated up. Even if you were having a shower and you had the trickle of hot water over you, your feet were always stone cold because it just never warmed up in any

meaningful fashion.”

The kitchen presented a different set of problems. Situated within a poorly-constructed extension from the 1960s, it was “probably one of the worst rooms in the house”, according to Rebecca.

“It was entirely breeze block and had absolutely no insulation. It had a flat roof, which we had to get re-felted because it was just leaking continuously. If the rain hit the house in a particular way, we had rivulets of rain coming in along the external edges.”

A standalone electric cooker was quickly disposed of owing to concerns about wiring, leaving Greg and Rebecca reliant on an air fryer, a toaster oven and one ring for four years. “We were essentially camping,” said Rebecca.

Faulty wiring throughout the house meant the pair avoided regular use of electrical appliances as much as possible. They say they lived in constant fear of burning the house down.

“It turned out the electrics were incredibly dodgy, and the house was not earthed,” said Rebecca. “But apart from that, it was fine!” said Greg.

Drawn to the property for its extensive garden, Greg and Rebecca were under no illusions that the house itself needed extensive work to make it comfortable. However, while they initially hoped to take a piece-

The electrics were incredibly dodgy and the house was not earthed.

meal approach, it quickly became clear that tackling the renovation all at once was the only way.

A question of fabric

It was 2019 when the couple first approached architect Brendan O’Connor of Abode Design, who had been recommended by another architect. “We wanted someone who was experienced in working with both the quirks of a period property and retrofitting with a low-energy mindset, said Greg. “After we had contracted Brendan I realised I had already heard of him ... I'd read about his work within Passive House Plus when I'd been researching retrofits and Enerphit principles.”

They were clear about what they wanted –an energy efficient, comfortable home with a fabric-first approach – and were willing to wait and save if that was what it took to do

it right. After obtaining the initial estimate, which later increased when material costs escalated during the pandemic, it became clear that this is what they would have to do. They spent several more years saving before the construction finally kicked off in 2023.

“We were very keen to do it properly,” said Greg.

With Brendan leading the project as architect, the team at family-run building contractor Glanmore Construction Ltd. came on board.

As the house had been subjected to some questionable DIY throughout the decades, the team had to rectify previous alterations alongside the renovation work. The ground floor had been raised – it is suspected in response to historical flooding – leaving the door heads extremely low and compressing the first riser of the staircase to just

one inch. As part of the project, the original floor level and the step were reinstated, with the team taking the opportunity to install insulation and a radon barrier during this mammoth task.

Replacing the aforementioned kitchen extension was another non-negotiable. A new, single-storey extension, which comprises an open-plan kitchen and dining area, is smaller than the original, reducing the overall footprint of the home. This suited Greg and Rebecca, who were keen to preserve as much of their garden as possible.

“It is very unusual to get a client saying, ‘I want a smaller house, please’. Usually, they want a bigger house with deep retrofit and for it to cost nothing, whereas Greg and Rebecca knew that the scope of work was what would generate the budget. They could have had a bigger amount of floor area but

BEFORE

AFTER

You forget how much mental space is taken up by being uncomfortable. It is a drag, and we just don’t have that anymore.

chances are the shell would have to suffer in terms of performance,” said Brendan. “They were very clued in to the impact of a brief on a project.”

The home was converted from a four-bedroom into a two-bedroom home. Upstairs, a dividing wall which contained asbestos was removed to transform two bedrooms into one large master bedroom, while another bedroom was converted into an upstairs bathroom.

As energy efficiency and comfort were priorities for Greg and Rebecca, much of the focus and budget was directed towards insulation and airtightness. Existing windows and doors were replaced with triple-glazed units, fireplaces were fully sealed and the roof, floor and walls were extensively insulated.

A mixed insulation strategy was adopted. The side and rear walls were wrapped in external insulation, while the front façade was internally insulated to preserve the brickwork of this period property. For the internal insulation, Brendan opted for an IQ-Therm breathable insulation system. Additionally, a coating of Remmers Funcosil SNL was applied directly to the external brickwork. This clear, siloxane-based coating penetrates the brick, allowing it to repel liquid water while

still permitting vapour diffusion.

While internally insulating single-leaf walls increases the risk of interstitial condensation if not done carefully, Brendan was acutely aware of the potential pitfalls. As a former colleague of Joseph Little, one of Ireland’s leading authorities on this subject, and with years of experience working on period properties, he approached the project with particular care.

“Once I’m doing internal wall insulation, I get very worried about condensation, especially when you’re achieving good airtightness and you want to lose as little heat as possible,” he said. “I don’t go for the same U-values on internal wall insulation as external wall insulation because I want some of the heat to actually get to that wall to help it dry.”

“Where you have joists going into the original brickwork, we sand-cemented the joints between them and taped around each one just to achieve the airtightness. But then you have these cut ends of timber in the masonry, and you want to avoid them getting too damp so that’s why you have to be very careful. I did the IQ-Therm internally there. You have to prepare it with a render product and then you apply the IQ-Therm to that and

it has pores in it to help it breathe. If moisture needs to breathe into the house, it can, and then with the siloxane coating on the outside, it means it’s not blocked from breathing outwards as well. So, you shouldn’t get the cyclical build-up of moisture that you can get over a period.”

Flood defence was also a consideration for Brendan. Conscious of historical flooding in the area, he replaced the concrete pad around the house with pebbles and a perforated drain. This strategy proved effective. When a water main burst and flooded nearby parts of Fairview during heavy storms in January 2026, Greg and Rebecca’s house was unaffected.

The tightly-sealed, highly-insulated envelope is supported by a suite of new systems. The house was fitted with a 5kW Mitsubishi Electric Ecodan air source heat pump, an Aereco demand controlled mechanical extract ventilation system (DCMEV), and a solar PV array and battery.

In terms of design, Greg and Rebecca were keen to be as sympathetic as possible to the Victorian character of the house. While few notable original features remained, they preserved the architraves, some original doors and the wooden floors upstairs, which they

sanded and stained.

Stepping into this house today feels entirely different to how it did in 2019. The deep retrofit has transformed the property from a cold, damp G-rated house into a fully electric A-rated home, achieving an airtightness of approximately 2 m³/hr/m² at 50 Pa.

The construction work took 14 months in total, with some unanticipated challenges extending the original timeline. Perhaps the most unusual event occurred when an electric car in an adjacent car park crashed into the gable wall of the house, narrowly missing one of the construction workers on site.

“Vlad had just gone past with rubble in a wheelbarrow. And then, in a few seconds, that wall he’d walked past wasn’t there anymore. He would have been killed, I think, if it had happened five seconds earlier. He was very lucky,” said Brendan. “It was a strange one. It wasn’t necessarily the kind of thing covered in my health and safety training.”

The incident delayed the project as Greg and Rebecca waited for the insurance payout, while the emergence of some new cracks in the building following the crash required intervention.

“We had to get the engineer involved in putting in conservation grout. There’s a bit of

rebar that you embed in the grout lines and then a specialist mortar is used to bond the wall together and make sure it doesn’t move any further,” said Brendan.

Another hurdle was the discovery of rot in a dividing wall, which Greg described as being made from “chewing gum and willpower”. This rot issue was linked to the historic raising of the floor and required additional structural intervention.

Real living

Greg and Rebecca stayed in Rebecca’s family home in Carlow for much of the construction period, which helped to keep overall costs down. In the final few months, they welcomed their son, Xavier into the world, adding to both the busyness and excitement of an already eventful time.

“During the project, we did the typical Grand Designs thing. I got pregnant,” said Rebecca. “I remember Greg taking phone calls about the kitchen tiles while we were in the Rotunda.”

In June 2024, the family celebrated their long-awaited move-in day with their four cats in tow.

“It was kind of insane. We had a six-monthold so there was just a lot going on,” said Rebecca. “Neither of us had family around so every so often, we would call on a friend to literally hold the baby while we shunted furniture and stuff around.”

Busy family and work lives mean that adding finishing touches to the house has been slow, but on the upside, this has given them time to really get to know the space. Greg remarks that living in an A1 house has been a learning curve with plenty of experimentation, but one that he has enjoyed. Though noting that the technology is not very intuitive or user-friendly, he adds that he has found some helpful support on online forums and Facebook groups.

“The technology isn’t quite at the set-itand-forget-it stage. With the heat pump, there’s been quite a lot of trying to get the compensation curve right, but I’ve got that cracked now. With the solar panels, I had to do a lot of experimentation with charging them at night and selling it back to the grid, and that’s why it’s kind of cost-neutral because you buy cheap and you sell it back to them,” he said.

“The batteries are your gamechanger. The solar and the battery system is essentially paying for our energy.”

Living in an A1 home requires a “different type of maintenance”, as Rebecca said.

“Whereas before we had to think about getting the oil topped up or bleeding radiators, now it’s making sure that, say, if a firmware update comes through and badly affects your batteries, you’re on to the company to revert

the firmware upgrade,” she said.

“You’re never worry-free, it is just different. But the comfort is just out of this world compared to what it was like before,” said Greg.

Indoor temperatures remain between 21 and 23 degrees year-round, even during heatwaves and cold snaps. Being fully electric, and therefore free from combustion appliances, has also had a positive impact on the air quality in the home. All of this has made a huge difference to Greg and Rebecca’s dayto-day lives.

“You kind of forget how much mental space is kind of taken up by being uncomfortable. It is a drag, you know? And we just don’t have that anymore,” said Rebecca.

Worries about bills or the fluctuating price of oil are also a thing of the past. Owing to the PV array and battery, the couple have

been able to maintain a very comfortable home at a very low cost. Once income from the PV array is included, their total household energy bill for 2025 amounted to just under €77, including standing charges and taxes. As they do not own a car, they don’t have to factor motor fuel or EV charging into their budget.

While bringing the renovation to fruition took time and brought some unique challenges, the outcome has been worth every step.

“What we decided was our thing of, you know, keeping up with the Joneses, was to be the most efficient house on the street. That’s what we wanted it to be. We wanted it to be the cheapest to run, the most efficient and the most comfortable house on the street. And I think that’s been nailed,” said Greg.

1 A car crashed through the boundary wall during construction; 2 the existing single storey extension was demolished; 3 steel beams to remove wall and create open plan space; 4 roof insulation build up; 5 insulated flat roof and parapets; 6 windows proud of wall; 7 side and rear elevations upgraded with 150 mm graphite EPS external wall insulation; 8 counter battened extension roof; 9 fireplace sealed off but retained.

NEXT GENERATION

The Grant Aerona R290 GET AHEAD WITH THE

- Designed for the Irish and UK Climate

- Innovative Technology

- Exceptional Performance

- Ultra-Low Noise Levels

- Outputs from 4kW – 16kW

SELECTED PROJECT TEAM MEMBERS

Clients / homeowners: Rebecca O'Neill & Greg Sheaf

Building design & specifications: Abode Design

Main contractor / builder: Glanmore Construction

Plumbing & heating installer: Blackrock Heating and Plumbing

Technical advisor, BER, ventilation validation: Donovan Low Energy

Airtightness tester: GreenBuild

Electrician: Marino Maintenance Services Limited

Solar PV installer: Solar PV Panels Ireland

Internal insulation & facade treatment:

Conservation Technology

EWI manufacturer: EWI Pro Insulation Systems

EWI installer: JJR Insulation

Windows & doors supplier:

Exclusive Wood Company / Viking Window AS

Airtightness membrane & tapes: Pro Clima, via Wurth

Heat pump manufacturer: Mitsubishi Electric

Roofing system: Dryseal, via Hambleside Danelaw

Mineral wool insulation: Knauf

PIR insulation: Mannok / Unilin

Flat roof window: Velux

Kitchen: Fitzgerald Kitchens

Kitchen countertop: Granite & Marble Crafts

Sanitaryware: Bathshack

Custom joinery: Clooney Woodcraft

Join the Irish Green Building Council and accelerate your journey towards a sustainable built environment.

BECOME A MEMBER TODAY

www.igbc.ie/membership

INNOVATE

Drive, develop and deploy innovation in construction.

LEAD

Contribute to the development of new tools, processes and policy.

LEARN

Discover our wide range of on-demand and in-house training at learn.igbc.ie.

Building A Zero Carbon Ireland: 2026 Government Policy Scorecard

In 2022, the Irish Green Building Council published Building a Zero Carbon Ireland, our roadmap to decarbonise Ireland’s built environment. Four years on, how are the industry and policymakers performing against the roadmap’s targets, what barriers stand in the way, and what actions should be taken next?

Read the key findings at www.buildingazerocarbonireland.ie or scan the QR code.

WANT TO KNOW MORE?

The digital version of this magazine includes access to exclusive galleries of architectural drawings. The digital magazine is available to subscribers on passivehouseplus. ie & passivehouseplus.co.uk

IN DETAIL

Project overview: Deep retrofit of Victorian end-of-terrace

Development type: Deep retrofit and replacement extension of an end-of-terrace solid brick dwelling originally constructed c.1880. Total floor area 107.85 m²

Site type & location: Urban site, Fairview, Dublin 3

Budget: N/A

Completion date: August 2024

Passive house certification: N/A

Number of occupants: 2 adults & 1 child

BER

Before: F BER (419.51 kwh/m2/yr) kWh/m2/yr

After:

A1 BER (3.43 kwh/m2/yr) – (A0 on new scale)  kWh/m2/yr

Energy performance coefficient (EPC): 0.01

Carbon performance coefficient (CPC): 0.007

Environmental assessment method: N/A

Air quality context: Urban site on a busy road. Mechanical ventilation strategy adopted to provide continuous fresh air while minimising heat loss and uncontrolled infiltration

Airtightness

Before: N/A

After: Preliminary test after windows installed: 2.952 m³/hr/ m² at 50 Pa. Retest after first fix: 2.343 m³/hr/m². Final test: 2.11 m³/hr/m²

Thermal bridging: Careful detailing was undertaken throughout to reduce thermal bridging. Measures included use of external wall insulation to side and rear elevations, insulated plaster system to retained front elevation, thermally broken window fixings, insulated window reveals, dedicated service cavity to reduce penetrations through the airtight layer, and continuity of insulation at roof junctions. Windows were installed using Fischer Thermax thermally broken fixings. Y-value: not calculated

Ground floor

Before: Existing uninsulated solid floor

After: Floor level lowered to reinstate original proportions and levels. Ground floor build-up consists of 150 mm PIR insulation beneath 50 mm hemihydrate screed with integrated certified radon barrier and sealed penetrations. U-value: 0.12 W/m²K

Extension floor: Ground-bearing insulated slab with 150 mm PIR insulation beneath screed and integrated radon barrier. U-value: 0.12 W/m²K.

Walls

Before: Existing solid brick external walls with no insulation After: Front elevation upgraded internally using 80 mm Remmers IQ-Therm breathable insulation system with 30 mm IQ-Therm to reveals. Existing brick facade repaired and treated externally with Remmers Funcosil SNL siloxane impregnation. U-value: ~ 0.26 W/m²K. Side and rear elevations (including replacement extension) upgraded with 150 mm graphite EPS external wall insulation system finished with Baumit mineral render. U-values: ~ 0.19 W/m²K

Existing roof

After: Minimum 350 mm Earthwool insulation installed within roof structure together with Intello airtightness membrane and plaster skim finish. U-values: ~ 0.10 W/m²K

Bathroom coombed ceiling insulated with Knauf Omnifit mineral wool between rafters and 75 mm foil-faced PIR insulation beneath rafters, sealed with proprietary airtightness tapes. U-values: 0.14 W/m2K

Extension roof: Warm roof build-up consisting of 125 mm PIR insulation over deck with additional 125 mm Knauf Metstud insulation between joists. Taped Intello membrane used as airtight layer beneath. Finished externally with Agrément-certified Dryseal roof system and washed pebble ballast

Windows & doors

Before: Existing older single/double-glazed units

After: Viking Window AS aluclad triple-glazed windows and doors with thermally broken installation fixings. Approximate overall installed U-value: 0.72 W/m²K. Window restrictors installed for child safety and guarding added where required to comply with Part K

Roof windows

Before: N/A

After: Velux triple-glazed fixed skylight CFU 25Q + ISU 209U-values: ~ 0.60 W/m²K

Heating system

Before: >20-year-old oil boiler & radiators throughout

entire building

After: 5kW Mitsubishi Electric Ecodan air source heat pump.

Heat distributed via underfloor heating at ground floor level and low-temperature aluminium radiators at first floor level

Ventilation

Before: Natural ventilation through infiltration and window opening

After: Aereco demand-controlled mechanical extract ventilation (DCMEV) system providing continuous extract from wet rooms with demand-controlled fresh air inlets to habitable rooms

Water efficiency: N/A

Renewable electricity: 10-panel Jinki solar photovoltaic array with Solis inverters and 10.6 kWh Weco battery storage system. Electricity is used to support household demand including operation of the air source heat pump, with surplus generation stored within the battery before export

Sustainable materials: Retrofit-first approach retaining the existing structure. Remmers IQ-Therm breathable internal insulation, graphite EPS external wall insulation, mineral wool insulation and triple-glazed aluclad timber windows

Embodied carbon: Not calculated

Material impact: The primary embodied carbon strategy was retention and upgrade of the existing dwelling rather than demolition and rebuild. Existing walls, roof structure and foundations were retained where possible, reducing material consumption and construction waste while improving operational performance

Energy bills: Total energy bills for calendar year of 2025 of €77, including standing charges and VAT, based on Pinergy tariff, including €920 of imports and standing charges, and €843 of payments for exports

Heating use: Data from the Mitsubishi Ecodan Melcloud system shows 1,783 kWh of electricity use in 2025 to deliver 8,064 kWh of delivered energy (heating and hot water) –meaning a seasonal COP of 4.52

Monitored temperature: Lounge temperatures hovering between 20-21C (Jan-June 2026), with one measurement of below 19C and roughly 25 peaks of over 22C

WRECK AND REWARD

VICTORIAN WRECK HITS 95% CARBON CUT THROUGH DEEP RETROFIT

A dilapidated Victorian house in north London has been transformed into a high-performance home through a deep retrofit that cut carbon emissions by 95 per cent, while also attempting to minimise embodied carbon through careful material choices.

Words: Jason Walsh

Additional reporting: Jeff Colley

IN BRIEF

Development type: Deep retrofit of Victorian semi-d

Method: Bio-based insulation, timber frame and clay block extensions, basement lowered, ASHP and MVHR

Location: Muswell Hill, London

Standard: None, but near-Enerphit

Space heating cost: £38/month, assuming no contribution from PV. See In Detail panel for more information.

per month

The house, on a corner plot in Muswell Hill, was in such poor condition when purchased in early 2020 that its energy performance certificate scored just one point in Band G. It is now heated entirely by an air source heat pump — for full energy performance figures, see the data panel.

Owners Justin and Amma had lived in the area for years and were looking for a home they could stay in long-term — one that matched Justin’s growing interest in sustainable building with a quality of space both could enjoy.

Justin, a self-described technology enthusiast, was part of a business that launched one of the first online music stores, later ran an internet service provider, and was an early adopter of electric vehicles. Consequently, when he heard about passive house from a fellow parent at his children’s school, the path forward seemed clear.

“I thought, that’s it: the next house you live in will be a passive house,” he says.

The original plan had been to retrofit a house Justin and Amma already owned, and he had engaged an architect, Johanna Ahrberg-Jackson of Ahrberg Jackson Architecture and Design, to work on the design. But when the Muswell Hill property came on the market, it presented a better candidate: a wreck, certainly, but with off-street parking — rare in London — and good access to shops and the tube.

The couple bought the house at the start of 2020. Architect Natalie Black, founder of Enbee Architecture and Design, was approached by Ahrberg-Jackson through the Network of Women in Architecture: although they had never met, Black’s name had come up through word of mouth.

For his part, Justin says the initial phone call made the decision easy.

“It was crystal clear that she understood everything: insulation, cold bridging, MVHR — she knew it all, so I knew I could work with her,” he said. “Then she introduced me to the concept of embodied carbon and the idea that we could lock away carbon in wood fibre insulation and timber. I was genuinely excited.”

Black received the call in March 2020, during the first wave of Covid — which she had contracted at Futurebuild. Nobody was building at that point due to Covid restrictions, so the early months were spent stripping out the property. In addition, initial survey drawings from the previous project proved inadequate for a deep retrofit, so Black brought in a new surveyor.

A new structural engineer was also brought on board to concentrate the sustainability thesis: Black’s brother, a sculptor who creates kinetic work, suggested she look at the work

of Toby Maclean, a structural engineer who specialises in low-carbon projects.

Maclean was initially reluctant because the project included a basement, something he typically avoids.

“As a structural engineer, lowering embodied carbon is my main thing,” Maclean said. “I don’t normally do basements. When you do a retaining wall that’s also part of the house, not in the landscape, there is virtually no option other than concrete because you have the waterproofing and structural integrity to think about.”

Black nevertheless persuaded him to treat the basement as an opportunity to test how low carbon it could be made.

The answer, Maclean says, was that while the house as a whole achieved major savings, basements remain an issue from a carbon perspective.

“What this project proved is that it is impossible to do a low-carbon basement, because we really tried,” he says.

To ameliorate the impact, the team used low-density concrete with pumice aggregate,

The basement insulation presented its own challenges. The team chose cork, partly below ground level, which was one of the riskier decisions on the project, Black says. Calculations were commissioned to confirm the material’s longevity, and a membrane was added over the top to prevent moisture ingress.

Above ground, the strategy was more straightforward: the house is a London redbrick, and the aim was to use timber and timber-based materials wherever possible.

The rear extension was built from Juwo blocks, fired clay blocks 425 mm wide.

Maclean says these are relatively high in embodied carbon but have low thermal conductivity, often eliminating the need for additional insulation. They also simplify airtightness detailing significantly.

“All the problems with membranes and so on just go away,” he says.

The roof of the extension uses glulam beams with sawn softwood secondary members.

The back wall of the original house, meanwhile, was in such poor condition that Black consulted Andy Hales of HG Matthews before concluding that full reconstruction was the better option. The rebuilt wall comprises a 140 mm timber frame fully filled with flexible wood fibre, externally lined with 140 mm of solid wood fibre board, with 50 mm allowed for ventilation and a single brick skin hung from the timber frame.

Photos: Rachael Smith

Internally, an OSB layer provides the airtightness layer, with a wood wool layer carrying a finish of 10 mm of lime plaster built up in layers and painted with a low-VOC, vapour-open paint. The result achieves passive house U-value levels — see data panel — which repair alone could not have matched.

Throughout the house, internal alterations and the loft conversion, which would typically require steel, were executed in structural timber.

Maclean says the contractor was comfortable working this way, which made a significant difference.

“There is an idea that low-carbon houses are more expensive, but that need not be the case,” he says. “If you replace every item like-for-like with a greener alternative, with wood fibre, for instance, then yes, it is more expensive. But if you work with a structural engineer from stage one, costs can be managed.”

The human experience of the build — three years of disruption, decisions and compromise — fell equally on Amma, whose steadiness throughout, Justin says, was indispensable.

The project went to tender, and three contractors were invited to quote, from whom Oasis was chosen.

Two of Oasis’s partners, Black says, arrived with iPads and methodically worked through the specification, an early indication that they were engaged with the process. Indeed, site manager Emmanuel impressed Black sufficiently that she is now working with him on another project.

“Once you get your dream team together, you want to keep them,” she says.

That team was tested by circumstances beyond anyone’s control. The combination of Brexit, Covid and the war in Ukraine created overlapping supply chain pressures. Prices rose, but more problematically, materials became difficult to source. Wood fibre insulation had to be substituted with wool in places. Elsewhere, the specified 140 mm thickness had to be built up from 100 mm and 40 mm layers because single sheets were unavailable. The contractor, Black says, never simply threw up their hands.

The house is heated by a Vaillant Arotherm Plus air source heat pump, working in combination with a Zehnder Q450 mechanical ventilation with heat recovery unit and on-site solar generation. The system was designed and installed by Next Step Heating, whose founder Kaspar Bradshaw oversaw the specification. Heat is distributed via underfloor heating throughout the house — a natural fit for the low flow temperatures at which heat pumps operate most efficiently. The result is a home whose energy profile bears little resemblance to its Victorian origins: total annual electricity consumption, covering heating, hot water, general household use and electric car charging, is a frac-

1 The original house was in a state of disrepair; 2 existing chimneys were infilled and capped; 3 & 4 the basement includes waterproofing membrane under 100 mm cork boards; 5 & 6 Steico woodfibre was used to insulate the existing walls.
There is an idea that low-carbon houses are more expensive, but that need not be the case.

tion of the gas the family burned in their previous, smaller home.

In his previous home — twenty per cent smaller, gas-heated, with some single-glazed windows — Justin and Amma used 21,000 kWh of gas in a year. In the Muswell Hill house, total electricity consumption is around 16,000 kWh annually. That figure covers heating, hot water, general household use and charging an electric car.

The team used Passive House Planning Package (PHPP) software to guide the design, aiming for Enerphit certification — a heating demand of 25 kWh/m²/year and airtightness below 1.0 air changes per hour at 50 pascals. The final results came close but fell short on both counts, so certification was not pursued. Actual carbon emissions, measured rather than modelled, represent a 95 per cent reduction on the original building.

Embodied carbon for the project was calculated across modules A to C of a whole-life carbon assessment — figures are in the data

panel. Maclean had developed his own calculator for this purpose, though Black says her approach was more intuitive: wood is good, so use wood fibre insulation and timber structure wherever possible.

For Black, the project demonstrates that performance and aesthetics need not conflict.

“You can get people who think about energy but don’t take an interest in how it looks,” she says. “For me, I want a beautiful space as well as an energy efficient one. The things that make it efficient, I want them to be visible yet invisible.”

The family moved in during February 2023, after roughly eighteen months of construction. Black received RIBA certification on the back of the project. Justin, for his part, sees embodied carbon and carbon sequestration as two distinct concepts — both of which this house addresses.

“The notion of embodied carbon was new to me,” he says. “So, we played the game: we did everything we could.”

7 Poroton extension and thermal break at window reveal; 8 25 mm Diathonite thermal plaster to the poroton blocks; 9 architect Natalie Black, founder of Enbee Architecture and Design; 10 dormer and counter battened roof; 11 ducts, woodfibre and grooved board for underfloor heating pipes; 12 reclaimed brick slips.

SELECTED PROJECT TEAM MEMBERS

Client: Justin Keery / Dr Amma Kyei-Mensah Architect: Enbee Architecture and Design / Ahrberg-Jackson Design Interior design: JVL Interiors M & E engineer: Next Step Heating

/ structural engineer: Allt Environmental

consultant: Qoda

contractor: Oasis Construction

and doors: Eksalta / Josko

EMBODIED CARBON

Structure was designed on a timber-if-possible basis except for the extension which used Juwo clay blocks that perform as both the load-bearing elements and most of the insulation needed. Use of concrete was unavoidable in lowering the basement floor level, but great efforts were made to maximise cement replacements and, by the use of lightweight (low-density) concrete gain a valuable contribution to the thermal insulation performance from it

Cradle to grave total: 370 kg CO2e/m²

Upfront totalexcluding sequestration: 280 kg CO2e/m²

Upfront totalsequestered CO2: 105 kg CO2e/m²

Standard/Framework: RIC WLCA 2nd Edition and IStructE HTCEC v2, but with estimates for modules A4, A5 and B and C

Calculation tool: Inhouse

Reference study period: 60 years

Materials included: All structural and non-structural building components and finishes (e.g., wall, roof and floor structure, insulation, internal finishes (plaster / plasterboard), cladding, non-loadbearing walls) included, windows, doors included. Decorative finishes (carpets, finished floors) and fittings (e.g., kitchen) excluded. ME&P estimated

Embodied carbon notes: Carbon intensity factors were from specific EPDs where available, generic or representative EPDs were not, or else from the ICE database, or failing that, in-house estimates. Modules A4, A5 and B and C were estimated from IStructE V2 guidance

Internorm offers the most comprehensive range of quality high-performance timber-aluminium and uPVC-aluminium composite windows and doors, as well as exterior shading solutions for Passivhaus and EnerPHit projects.

Book one of Internorm’s UK PHT/PHI endorsed ‘Windows & Doors for Passivhaus’ CPDs. Passivhaus Designers get 2 learning points.

Contact us: office@internorm.co.uk | www.internorm.com

WANT TO KNOW MORE?

The digital version of this magazine includes access to exclusive galleries of architectural drawings. The digital magazine is available to subscribers on passivehouseplus. ie & passivehouseplus.co.uk

Project overview:

Urban deep retrofit of historic Victorian semi-detached house Development name: Muswell Hill Low-Carbon House

Development type:

Deep retrofit of semi-detached 215 m2 period property with 3 extensions, ground, top floor and basement, adding 65 m2 to the total. The basement used low-carbon concrete and cork, the ground floor used Juwo bricks, and the top floor timber frame construction was fully filled with woodfibre

Site type & location:

Urban, fairly main street to Muswell Hill centre

Budget:

£1,500,000 including contingency, excluding VAT and professional fees

Completion date: February 2023

Passive house certification: Not certified Space heating demand

Before:

650 (this is the energy demand on the EPC) kWh/m2/yr After: 32 kWh/m2/yr

Heat load: 20 kWh/m2/yr

Primary energy non-renewable (PHPP): 118 kWh/m2/yr

Primary energy renewable (PHPP): 26 kWh/m2/yr

Number of occupants:

4 adults now, though during build one was still under 18 EPC

Before: G 1

After: Not established but we could try to get that now, if they no longer count ASHP and MVHR negatively Airtightness (at 50 Pascals)

Before: 7.4 air changes per hour

After: 0.8 air changes per hour

Thermal bridging: Care was taken to reduce thermal bridging, steels there isolated within insulated encasements. We used an aerogel blanket in locations where there was limited space to insulate elements of the structure. The internal insulation passed through the floors and joist ends were protected and made airtight. The basement was insulated externally below ground, the concrete included insulation within it and then the remaining insulation was placed internally connected to the internal insulation and ground floor level. Care was taken wherever structural elements passed through the insulation to be isolated and prevent cold bridging

Basement floor

Before: Earth. This is the basement not the ground floor

After: (top to bottom) Basement floor buildup: 15 mm tiles, ambient ambiclip system sitting on cork and full-filled with limecrete screed, including paint-on airtight layer, 100 mm cork board, Oldroyd waterproofing membrane, 80 mm EPS, low-carbon concrete slab as per structural engineers' spec. Depth varies from 150 mm to 250 mm

Walls

Before: 225-330 mm solid brick walls in yellow stock or red brick (We had 14 different wall build-ups altogether for the retrofit of the main house)

After: (Outside in, typical example) Existing wall approx 225 mm thick, 25 mm Diathonite Thermactive 0.037 Wm/k (airtightness layer), 80 mm Steico woodfibre insulation 0.041 Wm/k, 5 mm Baumit RK 70 coat of lime plaster with mesh. U-value: 0.32 W/m2K

Roof

Before: Sloped, no insulation, slate finish (we had 7 roof type build-ups altogether covering different conditions)

After: (outside in, typical example) Natural roof slates on timber battens & counter battens fixed through to rafters. 35 mm permeable sarking board, airtight breather membrane; 120 mm rafters fully filled with wood fibre insulation, 15 mm SmartPly (support & airtightness), 25 mm timber battens to form services void, 15 mm Savolit wood wool board, 8 mm Baumit RK 38 lime plaster including mesh. U-value: 0.15 W/m2K

Extension floor: Ty-Mawr limecrete floor system build-up (top to bottom) engineered floorboards on flexible adhesive, 100 mm Ty-Mawr lightweight limecrete slab with 40 mm cork board edge insulation, wet underfloor heating system 'standard' by Jupiter, geotextile, 400 mm Ty-Mawr Glapor SG 600 insulating hardcore, geotextile, subsoil. U-value: 0.15 W/m²K

Garden room wall example: Clay block walling system

build-up (outside in) 25mm reclaimed brick slips on brick slip adhesive, profiled galvanised square mesh to provide brickwork setting out and to facilitate the adhesive mortar, mechanical fixing to Juwo 425 mm clay blockwork, 25 mm Diathonite thermal plaster, 8 mm Baumit RK 38 lime plaster including mesh, painted finish in breathable paint. U-value: 0.14 W/m²K

Extension roof

Before: N/A, we had 2 roof build-ups for the extension roof (sloping and flat)

After (flat roof example, from outside in): EPDM

(Sd-value 20–40 mm); 25 mm WBP plywood; 100 mm battens for ventilation; Steico UDB breathable roofing membrane; 120 mm permeable sarking board; firring timber pieces to achieve 3° pitch; 225 mm rafters fully filled with flexible woodfibre insulation, set at 3°; airtightness membrane (taped); 25 mm timber battens to form service void; 15 mm Savolit wood wool board; 8 mm Baumit RK 38 lime plaster including mesh; painted finish in breathable paint. U-value: 0.14 W/m²K

Windows & doors

Before: Single-glazed highly damaged falling-apart sliding sash windows. U-value: 5-7 W/m²K assumed

After: Windows and doors included a mix of triple-glazed Eksalta Victorian sash windows; replica front door, 100 mm thick; triple-glazed Josko timber and aluminium contemporary doors and windows; airtightness class 4; Iso-Bloco airtightness tape to seal installation gap; additional gaps filled with infill insulation; airtightness tape to connect to first layer of plastered surface; external weather seals.

U-value: 0.74–0.85 W/m²K

Roof windows

Before: None

After: Velux passive house sloping roof window.

U-Value: 0.51 W/m²K

Heating system

Before: No heating present for EPC assessment, plug in electric heaters assumed

After: Phase 1 Vaillant Arotherm Plus 12kW Monobloc air source heat pump

Ventilation

Before: None present

After: Zehnder Comfoair Q450 mechanical ventilation with heat recovery

Sustainable materials: The existing house is retrofitted using a combination of Diathonite, Steico woodfibre insulation and lime plaster. Ceilings to the top floor are lined with wood-wool plasterboard alternative and lime plastered. The rear wall is rebuilt and top of the extension is built in timber-frame and full-filled with flexible woodfibre overlaid with a solid woodfibre board. Basement insulated with cork and established the safety of this using WUFI calcs, which led to the application of airtight paint onto the lime plaster to reduce moisture ingress. The extension was built from Juwo Blocks, had reused yellow stock cut into brick slips. The floor was formed in a limecrete over a foam glass layer formed on Glapor

PROOF OF CONCEPT

BUILDING TO PASSIVE HOUSE STANDARD IS SOLVED; SELLING IT IS NOT

A 52-home development in North Somerset has achieved passive house certification across three standards. The contractor who built it says the technology is the easy part. Convincing the market is another matter entirely.

Words: Jason Walsh

Additional reporting: Jeff Colley

IN BRIEF

Development type:

52-home affordable housing development

Method: Timber frame, direct electric heating, heat pump water heating, MVHR and PV

Location: Nailsea, North Somerset

Standard: Passive House Classic, Passive House

Plus and PHI Low Energy Building

Space heating cost: £25 to £38 per month, depending on house type, assuming no contribution from PV. See In Detail panel for more £25-£38 per month

When Stonewood Homes first attempted to build to passive house standard, airtightness nearly broke them.

"Our first scheme cost us an absolute fortune," said Sam Smart, the company's managing director, referring to an 88-home scheme in Cirencester. "We were using tapes and membranes and finding air leakages. It was very labour intensive."

If that earlier project – which ended up falling short of passive house and being built to the AECB’s CarbonLite New Build standard – was the education then Elm Grove, a 52home development in Nailsea, North Somerset, was the postgrad degree.

Completed in 2024 for North Somerset Council, Elm Grove sits on a suburban site on the western edge of Bristol. Across 20 blocks – a mixture of terraces, semis and bungalows – all homes have received confirmation of certification from the Passive House Institute, spread across three distinct standards. Interestingly, the variation is not a compromise so much as a consequence of geometry.

Of the development's 52 homes, 41 houses across 14 blocks achieved Passive House Classic certification, with space heating demands of between 12 and 16 kWh per square metre per year. Two further blocks – six houses in total – met the more demanding

Passive House Plus standard, which additionally requires significant on-site renewable energy generation.

The development's eight bungalows, however, are certified to the PHI Low Energy Building standard – not because their specification differs from the houses, but because of the extra heat loss caused by their shape.

"The bungalows follow the same construction specification as the rest of the dwellings," says Mitchell Finn of Greengauge Building

Energy Consultants, who led the passive house project planning and building physics.

"But they have a higher heating demand due to their high form factor – the ratio of heat loss area to floor area."

The passive house standard uses two principal metrics to quantity space heating: space heating demand and heat load. Space heating demand is the total amount of kilowatt hours of heat provided by an active heat source (i.e. a heating system), expressed in kWh/m2/yr.

Heat load is the maximum amount of heating power (in Watts per square metre) needed to maintain a comfortable indoor temperature on the coldest, darkest day of the year. To meet the standard, a building must either hit the 15 kWh/m2/yr space heating demand target, or the 10/Wm2 heat load figure.

A single-storey bungalow loses heat across a proportionally larger surface than a two-storey house of equivalent floor area. That thermodynamic reality, irrespective of the quality of the insulation, pushed the bungalows' heat loads to between 11 and 14 W/m2 – enough to place them beyond the passive house threshold.

All homes are built using a passive house-certified timber frame system from Frame Homes UK, a decision that brought significant advantages for the design process. With many of the thermal performance characteristics – U-values, thermal bridge calculations – pre-certified as part of the system, uncertainty in early-stage energy modelling was substantially reduced.

Triple-glazed windows throughout are Ideal Combi Futura+ timber aluclad units. Mechanical ventilation with heat recovery is provided by Zehnder units in every home, with passive house-certified efficiency ratings and summer bypass.

Space heating is delivered by direct electric radiators; hot water by a heat pump in each dwelling. Every home has solar photovoltaic panels – it was the scale of the arrays on two blocks that enabled them to generate

sufficient renewable energy to qualify for the Plus standard.

Greengauge's involvement began early, advising on site layout, orientation and form factor during the initial design phase, a contribution that Martin Horne of APG Architecture, the project's designer, says shaped everything that followed.

"That was a useful lesson," he said, "to get the input early on."

The site’s orientation, very close to due north-south, optimised solar gain across the dwellings and reduced space heating demand enough to ease the pressure on insulation thickness – which, in turn, helped contain costs.

Sealing the gap

Despite the lessons of Cirencester, airtightness remained the defining construction challenge at Elm Grove. What changed was the solution. Stonewood discovered AeroBarrier: an innovative, computer-controlled air sealing system that sprays an aerosolized acrylic mist inside a building to fill gaps and cracks in the building envelope, effectively guaranteeing a final airtightness figure.

"We had to get down to 0.6," Smart said, "and losses were down at 0.2."

Across the development, airtightness results for the Classic blocks ranged from 0.4 to 0.6 air changes per hour at 50 Pascals; the Plus blocks achieved 0.3 to 0.4. The AeroBarrier system was applied on top of a primary airtightness strategy built around OSB board

in the walls and warm roof, a vapour control layer in the cold roof, a concrete slab at ground floor level, and airtight tape at junctions, including a dedicated membrane at the critical ground floor-to-wall interface.

For Smart, the shift from tape-and-membrane to spray-applied sealing represents one of the more significant advances in passive house construction practice in recent years. The labour cost of hunting air leakages was substantial on the first project; AeroBarrier converted that unpredictable process into something approaching a guaranteed outcome. It is, he implies, one of the reasons the industry's instinctive nervousness about airtightness targets need not be as paralysing as it once was.

"We can deliver it," he said. "It's not hard to deliver."

The overheating risk at Elm Grove was managed through dynamic modelling on a sample of dwellings. The strategy that emerged combined modest glazing areas to limit solar gain, natural ventilation through opening windows, MVHR with summer bypass, and, for ground-floor bedrooms, external louvres providing a secure route for night ventilation. Modelled overheating frequency across the development sits at between zero and three per cent of hours above 25 degrees.

Horne says that contractor culture around airtightness and mechanical ventilation remains one of the more stubborn challenges in delivering passive houses at any kind of scale. Electrical subcontractors on this

Photos: Stonewood Homes / Rebecca Faith
It's like a cocoon. It can be noisy outside and yet completely calm inside.

project, he says, were unused to the level of coordination required.

"You can't be punching holes through an airtight membrane."

There is also, he notes, a broader resistance to timber frame construction in the British market: blockwork remains the default for most contractors, and the shift in approach required to build a certified timber frame system to these tolerances is not automatic.

Stonewood's integrated role as both developer and contractor gave Elm Grove an advantage Horne regards as close to essential. The same organisation that determined the commercial outcome also managed what happened on site, which meant passive house principles were embedded in procurement, documentation and subcontractor briefing from the outset rather than bolted on afterwards. Smart says the paperwork and listing obligations around airtightness in particular are extensive.

"Whether that is always kept to on-site is another matter," he said. "But really it's about managing the details. People on the ground need information, and things are delivered over a long period."

The hard sell

Smart is candid about the commercial realities that shaped the development's final form. Elm Grove was designed with a proportion of private market sales in mind (the site carries 40 per cent affordable housing) but the UK’s economic conditions of the period made a bulk sale to Alliance Homes, the local affordable housing provider, the practical outcome. The scheme became, in effect, 100 per cent affordable.

The experience sharpened his view of how passive house is, and is not, reaching the market.

"It's a hard sell at the minute. We try to sell it in terms of cost of living,” he said.

"All it did was secure a sale," Smart said of the passive house standard, "rather than help to sell it,” noting that buyers pit long term economic virtue against consumer aspiration.

There are also other factors that seem to have influence. For instance, the development has no garages as the masterplan promotes active travel.

"Many people do want garages and parking outside," Smart said.

Stonewood has not had a great deal of direct feedback from occupants despite

the known fact that MVHR in particular is a technology that UK owners often have never encountered.

Still, the customer care process has not generated complaints, which appears to be a good sign.

What is clear is that Smart's instinct, after two substantial passive house projects – one which didn’t make it, and this project – is

neither despondency nor proselytising. The technology works. The process is manageable. The gap is in how – and to whom – the value gets communicated. The homes themselves may yet close it.

"What is most striking," said Horne, "is that they are quiet. It's like a cocoon. It can be noisy outside and yet completely calm inside."

1 Foundation groundwork and steel reinforcement for concrete slab; 2 250 mm ground floor slab and Aircrete block at edge to reduce thermal bridging; 3 ground floor build-up continues with 300 mm Polyfoam Floorboard Extra in place; 4 timber frame panel fitted with Fronta membrane; 5 panel turned over and fitted with Superglass insulation; 6 panel sealed with OSB and tapes.
7 Timber frame panels erected on site as another slab sets; 8 insulation of attic floor and airtight taping of OSB; 9 Proclima Tescon Vana airtight grommet for pipe penetration; 10 airtight taping and duct insulation at penetration; 11 50 mm Isover batts to insulate service cavity; 12 15 mm plasterboard finish, with insulated window reveals; 13 Zehnder Comfoair Q MVHR unit; 14 on-site team meeting during construction.

SELECTED PROJECT TEAM MEMBERS

Client and main contractor: Stonewood Homes

Architect: APG Architecture / Mikhael Riches

Energy consultant and M&E engineer: Greengauge

Civil / structural engineer: JDL Consultants

Build system supplier: Frame Homes UK

Airtightness products:

Ecological Building Systems / AeroBarrier

Windows and doors: Ideal Combi

Thermal breaks: Forterra

Floor insulation: Polyfoam

Primary DHW system: Dimplex

Mechanical ventilation supplier: Zehnder

Photovoltaic supplier: Eco Green Partners

Airtightness tester / consultant: Eco-Futures

Passive house certifier: Etude

WANT TO KNOW MORE?

The digital version of this magazine includes access to exclusive galleries of architectural drawings. The digital magazine is available to subscribers on passivehouseplus. ie & passivehouseplus.co.uk

IN DETAIL

Development name: Elm Grove

Development type:

52-home development for North Somerset

Site type & location:

Suburban site, Nailsea, North Somerset Budget: N/A

Completion date: 2025

Passive house certification: 14 blocks, (41 houses) certified to the Passive House Classic standard. 2 blocks (3 houses) certified to the Passive House Plus standard. 4 blocks (8 bungalows) certified to the Passive House Institute Low Energy Building standard

Space heating demand:

Passive House Classic: 12-16 kWh/m2/yr

Passive House Plus: 8-16 kWh/m2/yr

Low Energy Building: 23-30 kWh/m2/yr

Heat load:

Passive House Classic: 8-10 W/m2

Passive House Plus: 8-9 W/m2

Low Energy Building: 11-14 W/m2

Primary energy non-renewable (PHPP):

Passive House Classic: 61-71 kWh/m2/yr

Passive House Plus: 60-61 kWh/m2/yr

Low Energy Building: 86-100 kWh/m2/yr

Primary energy renewable (PHPP):

Passive House Classic: 50-58 kWh/m2/yr

Passive House Plus: 49-50 kWh/m2/yr

Low Energy Building: 70-83 kWh/m2/yr

Heat loss form factor (PHPP): 2.56 to 3.99. The bungalows sit at the higher end, explaining their PHI Low Energy Building certification. Although they follow the same construction specification as the houses, their less favourable form factor results in a higher heating demand

Space heating cost: Based on UK price cap for July to September 2026 of £0.2611/kWh, the annual space heating costs was calculated at £296.80 to £450.94, depending on dwelling type and standard

Overheating (state calculation tool, e.g., PHPP): 0-3% chance of overheating > 25 degrees

Overheating strategy: Dynamic overheating modelling was carried out on a sample of dwellings to determine overheating risk and inform the mitigation strategy. We worked carefully with the architect and developer to limit

overheating through the design, which included modest glazing areas to limit solar gain, natural ventilation through windows, and MVHR with summer bypass. Ground-floor bedrooms have windows with external louvres to ensure there is a secure night ventilation option

Environmental assessment method: N/A

Air quality context: Suburban site, no particular issues which may affect indoor air quality

Air quality index: The annual average outdoor air quality for Bristol is 34 AQI. This is considered fair, but sensitive groups may experience minor to moderate symptoms from long term exposure, according to Plumelabs

Airtightness (at 50 Pascals):

Passive House Classic: 0.4-0.6 ACH

Passive House Plus: 0.3-0.4 ACH

Low Energy Building: 0.7-0.9 ACH

Airtightness measures

Floor: Concrete slab Wall: 18 mm OSB

Warm roof: 18 mm OSB. Cold roof: Intello Plus VCL

Windows:

Compriband foam tape and Illbruck Pro Foam Airseal Junctions: Connected with airtight tape. Airtightness membrane between ground floor slab and external wall

General: AeroBarrier air sealing system used to further improve airtightness

Thermal bridging: Thermal bridging at the floor edge is mitigated with an aerated concrete block and cavity insulation between the slab edge and brick/blockwork. The passive house-certified timber frame system meant that many of the thermal performance elements (U-values and thermal bridges) were pre-calculated, simplifying and reducing the uncertainty in the early stage modelling

Orientation:

Greengauge advised on the form factor and orientation in the project’s early design phase. The orientation is very close to north-south which is beneficial for the dwellings’ solar gain. This optimisation reduced space heating demand which decreased the reliance on other measures such as insulation thickness, helping keep costs down

Form factor: The bungalows follow the same construction specification as the rest of the dwellings, but have a higher

heating demand due to their high form factor (ratio of heat loss area to floor area), which is why they were certified to the PHI Low Energy standard

Ground floor: 40 mm screed; 250 mm concrete slab (airtight layer); 300 mm Polyfoam Floorboard Extra (0.033 W/ mK). U-value: 0.106 W/m2K.

Walls: Frame Homes UK Ultra panel, consisting of (outside in) render on 15 mm render board; 50 mm cavity; Solitex WA breather membrane; 9 mm OSB; 50 mm Superglass Superwall 32 between studs (0.032 W/mK); 9 mm OSB; 235 mm Superglass Superwall 32 between studs (0.032 W/ mK); 18 mm OSB (airtight layer); 50 mm Isover timber frame batt 32 (0.032 W/mK) between services battens; 15 mm plasterboard. U-value: 0.105 W/m2K.

Cold pitched roof (insulation at joists): Roof tiles; battens; Tyvek Supro breather membrane; rafters; loft space; 300 mm Knauf Loft roll 44 (0.044 W/mK); 150 mm Knauf Loft roll 44 (0.044 W/mK) between joists; Intello Plus VCL (airtight layer); services cavity; 15 mm plasterboard. U-value: 0.096 W/m2K Warm pitched roof (insulation at rafters): Frame Homes UK Ultra panel; roof tiles; battens; Tyvek Supro breather membrane; battens; 18 mm OSB; 235 mm Superglass Superwall 32 between studs (0.032 W/mK); 18 mm OSB (airtight layer); 50 mm Isover timber frame batt 32 (0.032 W/ mK) between services battens; 15 mm plasterboard. U-value: 0.143 W/m2K

Windows & doors: Ideal Combi Futura+ timber aluclad triple-glazed windows, with frame (Uf) U-value of 0.98 W/m²K and glazing U-value (Ug) of 0.54 to 0.60 W/m2K, and a g-value of 0.51 to 0.52. Doors are Ideal Combi Frame IC

Heating system: Heating is provided by direct electric radiators. Hot water is provided by a Dimplex Edel hot water heat pump in each dwelling

Ventilation:The mechanical ventilation units are Zehnder ComfoAir Q350 for houses and Zehnder Comfo 180 Luxe for bungalows. These are passive house certified units, with high heat recovery and summer bypass. The ducts are insulated with 50 mm Armaflex insulation

Water efficiency: Not assessed

Electricity: Each dwelling has between 3.44 – 6.075 kWp of solar PV. Two blocks were able to achieve Passive House Plus due to their large PV arrays

Embodied carbon: Not assessed

Monitoring: Not conducted

The interview Prof Wolfgang Feist

When the professor who founded the passive house standard visited Dublin this spring, it marked a rare journey for a man who prefers his bicycle to an aeroplane. Passive House Plus editor Jeff Colley met him at a gathering of Ireland's passive house community to talk childhood frost, Swedish interstitial icicles, and why the world's most rigorous building standard was born on a ship.

Words: Jason Walsh

Wolfgang Feist grew up in a house where the bedroom walls iced over in winter. The family home was a traditional German Fachwerkhaus – post and beam timber frame build – heated by two wood-burning ovens. Only the kitchen was kept warm: each morning, his mother would descend to the basement to fetch coal, light the fire, and the family would gather in the one room that offered any comfort against the cold.

"In the bedroom it could be that we had frost on the walls," said Feist.

"So that is how I grew up."

He is quick to add that he does not look back on those years with hardship. Post-war Germany was poor by modern standards, and

the Feist household was no different from most. A chicken on the table was a twiceyearly event in this home where potatoes were the staple, but the memory has sharpened into something more pointed over the decades. At least two billion people on earth still live in similar conditions today, Feist says, but what troubles him is not that fact in itself, but that those living in far greater comfort are the ones doing most of the complaining.

A characteristically direct observation, then, from a man who has spent the best part of 50 years thinking about how buildings use energy and why so much of that energy is wasted. Feist is the founder of the Passive House Institute in Darmstadt and the principal architect of the passive house standard, the

most demanding and rigorously evidencebased energy performance framework in construction.

Visiting Dublin at the invitation of the Passive House Association of Ireland, Feist was speaking at an evening gathering of practitioners who have spent years building to his standard, with many of them meeting him for the first time.

Looking at the world as it is Feist's route into building physics was circuitous. As a young man at the University of Tübingen, Feist had trained as a mathematical physicist, drawn by the question of what, at its most fundamental level, the world is made of. Physics disappointed him in that

Prof Wolfgang Feist speaking at the Cairn passive house launch in Seven Mills on 16 April.

ambition as it gave him deeper questions rather than answers.

What saved him was a parallel interest, pursued as a hobby, in the social consequences of how industrialised economies use natural resources. Around 1978, his professor eventually told him that understanding the problem was no longer sufficient and that the time had come to work on solutions.

The OPEC oil crisis had already concentrated minds across the western world. In American universities, a generation of researchers was experimenting with heavily insulated buildings in an effort to cut energy demand. Feist was paying attention and later came to know Arthur Rosenfeld of Lawrence Berkeley National Laboratory, one of the central figures in that effort. Rosenfeld told him about a moment he had experienced in his laboratory in 1975, sitting among humming refrigerators and blazing lights, thinking about the power station 120 kilometres away and the reservoir required to keep it running, and asking himself what all of that infrastructure was actually for.

The American super-insulated building movement was eventually killed off by Ronald Reagan, who cut the federal funding university programmes depended on. Its findings did not vanish, however. Indeed, a journal called Solar Age, published between 1975 and 1978, in which Feist says almost everything that would later underpin the passive house standard, was already known.  "To be honest, we didn't invent much," he said. "It was all known. We just had to make use of it and come to the right conclusions."

The crucial insight came from Sweden.

Feist had travelled to Lund University to meet Bo Adamson, a professor who had become an itinerant ambassador for building science. When he arrived, Adamson was not there. He had just returned from southern China, where the Shanghai government had asked him to solve an unusual problem. In parts of the region, domestic heating was prohibited due to fuel shortages. Indoor temperatures in winter could drop to eight degrees. The government wanted to know whether buildings could be made comfortable without any heating system at all.

Adamson came back with “passive” houses on his mind. Feist says his immediate reaction was that the professor had lost the plot entirely, but over the following two weeks, as the two men worked through the simulations together on a university mainframe where a single annual building model took around two hours to process, a different picture emerged: the idea was not crazy, it was feasible.

"When we ran these kinds of simulations, we came up with something surprising," Feist said.

"Almost the criteria we nowadays still use for passive houses. That was a result from this very first simulation."

Sweden also furnished a second essential lesson. The super-insulated American buildings had largely failed, but the reasons had never been properly published. The problem, Feist discovered, was airtightness, or rather the lack of it. Warm indoor air carries far more moisture than cold outdoor air. In a heavily insulated but leaky building, that moist air finds its way into the fabric of the structure, meets a cold surface,

and condenses. Over months and years, the damage accumulates.

In Sweden, where any gap in a building envelope produces visible icicles in winter, this had been understood, and solved, decades before. Adamson pointed Feist to a small technical booklet on insulation and airtightness. Everything the passive house standard would eventually require of a building, he says, was already in those pages.

When it came to building the world's first certified passive house in the Kranichstein district of Darmstadt in 1990, there was no research grant. The four families who moved in to the four-unit terrace paid for it themselves. Feist says the constraint shaped the outcome usefully.

The building had to be simple and built using methods that local tradespeople already knew. He and Adamson had visited a Swedish timber frame company, but one look at the prefabrication facility was enough. They walked out and shook their heads.

Masonry it would be: wet plaster internally for airtightness, external insulation outside. Triple glazed windows with low-emissivity coatings did not yet exist commercially, so Feist called the research director of Flachglas AG and described what he needed. The windows were made. The building went up.

True air

One of the most persistent myths in the industry, Feist says, is that a leaky building ventilates itself. Simulations conducted by his institute showed that even in a very leaky building, natural infiltration in typical German winter conditions produces air

The world's first passive house, a four-unit terrace in Darmstadt built in 1991.

change rates of around 0.1 to 0.15 per hour. The standard recommendation for healthy indoor air is 0.5. He says that if CO2 sensors were distributed across one hundred ordinary homes over a winter, readings of between 2,000 and 3,000 parts per million would be routine whenever windows were closed, which is to say most of the time.

Jeff Colley, host of the Dublin conversation on behalf of the Passive House Association of Ireland, noted that two UK studies, one in England and one in Glasgow, found that between 60 and 63 per cent of background trickle vents in naturally ventilated homes were closed or blocked when researchers arrived to monitor them. Occupants had sealed them against cold draughts and forgotten about them.

The German tradition of Stosslüftung, or burst ventilation, opening all windows fully for a few minutes several times a day, does not resolve the problem either. Feist does the maths. Opening every window twice a day produces two air changes in 24 hours, an exchange rate of roughly 0.08 per hour. You cannot make air fresher than fresh air, he points out, so leaving windows open for longer makes no difference once

the exchange has occurred. To maintain adequate ventilation by window opening alone, a household would need to open up approximately every four hours.

"Now you can go around the town and look around," he said.

"Where are the windows opened? Never."

Change is in the air

The Dublin event took place against a backdrop that would have seemed unlikely a decade ago. Ireland now has around 1,500 certified passive houses, many built by the developer Cairn Homes as part of large suburban schemes – with thousands more on the drawing board. The occupants are, in many cases, households that would once have been described as fuel-poor.

Colley said the passive house standard has succeeded in part because it refuses to frame energy efficiency as sacrifice. A passive house is not a cold house that uses less energy. It is a warm house, consistently around 20C throughout, that requires very little energy to maintain that temperature.

Feist agreed that this framing matters, particularly in the current political climate, which he describes as one in which hostility

has come to substitute for thought.

"We shouldn't talk about reducing comfort inside a building," he said. "If we can solve a problem by just adding a little bit of insulation around the building, then that is what we should do."

Still, Feist is modest about his own role in what has become a global movement. The standard, he insisted, was built on a century of prior knowledge, on the work of Adamson and Rosenfeld and dozens of others, on insights already present in a Swedish pamphlet and an American journal before he began.

Feist also mentioned, in passing, that the very first passive house was not built in Darmstadt in 1990. Completed in 1892, it was a ship. The explorer Fridtjof Nansen designed his vessel, the Fram, with such thoroughness that its crew could maintain habitable temperatures through Arctic winters without continuous heating. Physics, Feist said, has not changed since.

Feist finally raised a glass at the end of the evening with the air of a man content to leave it there.

"We stopped at the right moment," he said. "Cheers."

(above) Photo by explorer Fridtjof Nansen, March 1895 of his ship Fram in ice, near the North Pole. Credit: National Library of Norway

Zero bills? Really Smart home technology is making energy bill-free living a real prospect

Heat pumps, solar panels and home batteries are converging with smart tariffs to make zero energy bills a genuine possibility for some new homes. But how much does it cost, who benefits, and is the broader promise deliverable on a mass scale?

Words: Kate de Selincourt

It is now well-established that the lowest carbon domestic heat source is electricity –and heat pumps in particular. Biomass has a dirty reputation in many ways, and domestic hydrogen also appears to be a busted flush. But electrifying domestic heat means very large increase in electricity demand – and that demand will vary hour to hour and month to month.

While fossil fuels have tended to be straightforward to store and supply to match the ups and downs in demand, electricity, particularly low carbon electricity, is a bit trickier. Electricity distribution is expensive, while supply is to an extent in the lap of the weather gods. Because of these challenges, until recently many were suggesting domestic electrification was a fool's errand.

But the picture is changing. The energy efficiency of homes has been improving, albeit disappointingly slowly. With care, heat pumps can more than triple the heat available per unit

of electric power. Add in falling battery prices and advances in computing technology, and possibility of 'smart' home energy may open up. As well as supply responding to demand, demand can now respond to supply.

This 'smartness' is strategically invaluable. It can smooth peaky demand, and can also help to accommodate varying renewable generation.

Timing is everything

By timing energy use, and by adding in batteries to extend that flexibility, a home can now link to the wholesale energy market as its prices fluctuate hour by hour and day by day. Many tariffs already exist that match the predictable daily variations in electricity availability and price. Customers can use energy when it is easier to supply (and, often, greener), and if they have a battery, squirrel more away for later.

With the advent of "Smart Export Guarantees", households can also be paid to export the power they do not use themselves – either their

own generation, or cheap power they purchased the previous night.

There is an awfully long way to go. Electrification of home heating is still barely in the foothills in the UK . The smart, interconnected home is even more of a rarity. But UK Energy Secretary Ed Milliband wants that to change.

The UK government is making the "smart" home the headline theme of the government's revamped home improvement programme, the Warm Homes Plan. At the very end of 2025 a flurry of press coverage suggested that under the forthcoming Plan "households could pay little or nothing for power."

The term "zero bills" was used in much of the coverage, with headlines like "Milliband plots £13bn solar panel blitz for 'zero bills'". The idea of free energy is certainly eye-catching – and the conflagration in the Middle East makes the idea more salient than ever.

But is using technology and smart connectivity to eliminate energy bills a real possibility at

Zero Bills Director, Nigel Banks, announcing the Zero Bills Standard.

scale? How much equipment would we need? And what does it cost?

Even without help from the government, some very proactive households have installed enough battery and generation capacity, and are deft enough with their use of import and export tariffs, to end up paying little or nothing overall for electricity – or sometimes even making a profit.

For example, engineer Peter McBride boasts in his LinkedIn page that by kitting out his home with a heat pump, solar panels, a 9.5 kWh battery and an EV charger; combining time of use and export tariffs; and scheduling appliance and heat pump use, he earns more than he spends on electricity .

Not just for the geeky Householders who have set up this kind of system off their own bats are unashamedly geeky – as well as having access to four- or often fivefigure sums to invest in their equipment (this latter aspect, the government wants to make easier with grants and low interest lending).

Optimising the use of generation and storage to get the best performance can be an engrossing and satisfying pursuit – but it is not for everyone. An alternative is to buy into a package whereby the dance of when to use and when to store, when to buy and when to sell, is managed automatically.

A house with a battery and PVs can install a control unit to take over these decisions, optimise spending and maximise income. (Despite the promised advent of balcony solar, a full heat pump-PV-battery combo is really only feasible in houses so far.)

If such households are grouped together, they can do even more. Connect enough domestic batteries together and you create a sizeable storage resource, able to offer highly tailored 'grid balancing' services. And energy system operators pay for them: for example, network operators offer 'capacity payments' for access to a guaranteed power reserve of a specified size, available at a specified time every day (even if it isn't ever used).

Similarly, if generated supply suddenly falls a bit short, there is a drop in frequency that immediately signals a boost is needed – and domestic batteries can collectively respond to that too and again, be paid to do so.

Various approaches to setting up these groupings and accessing these payments are being tested out. Northern Power Grid for example is exploring the linking of homes on a neighbourhood basis in its "Community DSO" project.

There are commercial services already available that tap into these opportunities. For example, the control unit made by tech firm Levelise enters households into contracts the company sets up, then a share of this income is paid to the households. Levelise claims that the extra income to households, on top of the savings from free solar power and export payments,

mean a PV and battery installation can pay for itself in just a few years. This approach will not necessarily cover the full annual electricity costs – that still depends on the overall energy needs of the individual home.

Another option is for householders to enter into a contract that specifically promises that energy bills will be zero. And even, to move into a home where everything – kit, controls and tariff – has been set up for them. The term 'zero bills' was used quite loosely in media coverage of the Warm Homes Plan.

But formally, Zero Bills refers to a specific tariff trademarked by energy company Octopus.

Under the Octopus Zero Bills the occupant is guaranteed no electricity bills for home energy use for five or even 10 years. EV charging isn’t included. Other than that, the only constraint is to stick within a "fair use" limit for household energy consumption. This is 10,000 kWh/a – around double what Octopus says a typical household uses.

The tariff is restricted to homes with a heat pump, sufficient PV generation (assessed in relation to anticipated energy consumption) plus a good-sized installed battery – larger than those typically installed by DIY-ers. Homes also must have a low heat loss (almost all Zero Bills homes in the UK are built to at least the 2021 building regulations).

Under the Zero Bills tariff, control of their domestic systems is handed to Octopus' software, Kraken. Kraken uses information about movements in the wholesale electricity price (which as an energy company, Octopus has access to) to determine when to store, when to sell, and when to import, to minimise costs and maximise Octopus' profit.

This enables Octopus to cover the residents' day-to-day energy use without charging them anything. As with other interconnected systems, additional revenue is available to Octopus from the electricity network companies for grid services.

The battery is crucial to making the tariff work. It enables Octopus to hold back some of the daytime generated power to use or sell during the evening price peak – as an energy company Octopus can charge the market price on the day for this, and this forms a large part of the revenue that makes the tariff work.

Residents meanwhile can just go about their lives, untroubled by headlines about price caps, gas shortages or anything else.

As one Zero Bills resident told Sky News: "It's amazing… you just don't have to worry. There is no stress at the end of each month, [wondering] 'have we had too many showers, has the heating been on too much?'"

Octopus says it has approved (completed, under construction, or agreed) over 5,000 Zero Bills homes to date, across all tenures including private and affordable rent, private and shared ownership. In very nearly all cases, these homes were constructed specifically to meet Octopus' requirement.

Marketing sizzle

To developers, letting or selling a home with the promise to your customers that they will not get a single energy bill for five or even 10 years is an attractive proposition.

Mike Webb of Seaton Beach developments is exploring the possibility of providing Zero Bills at an Enerphit development in Devon.

As he put it: "if you try to explain about energy use and low carbon, customers' eyes tend to glaze over, but tell them they will have no energy bills and their eyes will light up!"

This has been experienced by developer Thakeham at a development that included some Zero Bills homes.

Thakeham’s chief of sales Julian Rooney said that "Zero Bills draws customer attention - it has been the single biggest driver of enquiries to the site."

Octopus is happy to lean into the buzz by visiting development launches and posing for local newspapers, handing pink plush octopus toys to local schoolchildren.

What does zero bills cost?

In return for marketing pizazz of the Octopus "Guaranteed No Energy Bills for Five Years" sticker on a property listing, the developer needs to spend a fair bit installing the necessary tech. How much extra they spend, depends on what they normally build, but even a fairly 'low carbon' oriented developer will need to include more PVs, and a large battery, to meet Octopus' specification.

In many cases the 'extra' also includes the heat

Rendering of Zero Bills homes with Barratt Redrow.

pump (gas boilers are still the default option for most UK housebuilders - though that is set to change when the Future Homes Standard finally kicks in).

In addition, as noted above, the amount of kit also varies with location – colder winters require more compensatory generation in the summer. The extra over costs are therefore generally given as a range.

A 2025 paper written with input from Octopus, cited extra capital costs of "£8,000–£15,000,"while Sussex developer Thakeham was quoted in the Daily Telegraph giving an extra cost of "between £10,000 and £20,000". Some have put the cost higher. (Octopus counter that battery and PV costs are 'falling all the time').

Enthusiasts for the DIY approach argue that without Octopus needing a cut of the surplus, it is possible to create a zero bills type set up with a smaller capital investment and/or, better financial returns. For example, Peter McBride (mentioned above) told the Daily Telegraph his 'better than zero bills' installation (on a home built to the 2013 UK building regs) cost around £13,000. Others argue that a better return comes from modest ambitions: sizing a battery to shift daytime solar into the evening peak, rather than investing in larger storage dependent on third-party tariffs.

At the end of the day, the leap to 'bill-less living' is only a possibility with insulated, airtight, efficient fabric. But even with insulation, there are many, many homes were getting to zero energy bills would mean more solar than the roof can accommodate.

As the current gas to electricity price ratio stands in the UK, a heat pump on average costs a little more to run than a gas boiler (the range is huge, but that's where the median falls).

This unpalatable reality is a threat to the whole home electrification programme. If people cannot afford to run a heat pump, then our dependency on gas cannot be beaten, with all the horrors that ties us in to. A judicious amount of smart tech – and, crucially, the right tariffs and controls – could prove an excellent hedge against energy costs in general, and heat pump running costs in particular. In 2026 it looks as though this is as necessary as it has ever been.

The strategic case was underlined in May 2026 when Octopus chief executive Greg Jackson told an industry conference that households might rationally accept occasional blackouts in exchange for lower bills. Whatever one thinks of that argument, it captures the moment exactly: the real question is no longer whether smart home energy matters, but how urgently. That said, it is hard to not linger on the word ‘blackout’, and even 'the odd’ one is unlikely to be a proposition most homeowners, or housebuilders, will find easy to sell.

ZERO BILLS AND ENERGY EFFICIENCY

The less energy a home uses, the easier it becomes to cover the costs of that energy by, for example, saving up or exporting surplus solar generation or even selling cheap overnight energy imports at a profit the next day. When you are organising your own set-up, your focus may or may not be 'zero energy bills' – you might just want to make a good return on your investment. With an Octopus Zero Bills tariff however there is a contractual guarantee to cover all energy costs, and the company is taking all the risk. They have to be confident that the income from selling power will cover the cost of all the imports the dwelling needs, and still enable a profit. This means a lot of generation and storage is needed. According to Octopus guidance for developers, a Zero Bills installation for, say, a 100 m2 Part L 2020 compliant 3-bed house in the midlands of England would require around 13 kWp PV generation (25-30 panels), a 13.5 kWh battery, and of course a heat pump (which one would hope was standard anyway, but isn't always). 25-30 panels are a lot to fit onto one roof. Both sides of the roof are usually needed. Even then, dormers or skylights can be an issue. The exact amount of installed tech Octopus requires, depends on how much energy they believe they are going to have to supply. This in turn depends on the location (you need more heat if you live somewhere cold), and the fabric performance.

If a developer wants to reduce the number of PV panels they need to install, while they cannot move the plot, they can improve the fabric performance. Thus, if the same 100 m2 home above were built to passive house, Octopus’s technical director Nigel Banks says this would allow "a 25-35 per cent reduction in the solar PV panel requirements". (The battery and heat pump requirements stay the same.)

The cost saving from fewer panels is not that large, as Banks points out –panels only cost around £200 apiece. However, the reward is also more flexibility in terms of appearance, siting of panels and building form. Passive house might also open the possibility of three-storey houses meeting the criteria for Zero Bills (for a regs building, Octopus can only usually offer the tariff to one- or two-storey homes, to enable a high enough ratio of roof area to heat demand). Because Octopus has a direct commercial interest in the energy performance of Zero Bills homes, the company reserves the right to audit this in its contracts with housebuilders.

"We are looking to improve housebuilders' standard practice, to improve performance and to ensure equipment is installed and commissioned well," said Banks.

This applies not only to the fabric – the design and set-up of the heat pump system is just as critical. In the UK the delivered efficiency of heat pump systems is notoriously unreliable, with some installed systems delivering less than half the efficiency of the best.

To counter this risk Octopus is developing guidance for each brand of heat pump being installed in Zero Bills homes, setting standards for weather compensation and flow temperatures. The guidance also discourages zoning – which often reduces system efficiency, and warns against over-long or under-insulated external pipe runs. In a well-insulated dwelling, hot water can dominate the heat pump's energy use, so hot water control is also important.

"We want good efficiencies and so are promoting good practices – keeping the cylinder at 48-50C with a regular legionella cycle, rather than running at a high temperature all the time,” Banks said.

Rendering of gs8's Zero Bills site in Thornwood, Epping.
Credit: gs8

IS THE PROPERTY MARKET READY FOR SMART HOMES?

In the early 2020s, when global events led to the previous energy price crisis, market research suggested a higher EPC home might attract up to a 15 per cent purchase price premium.

It isn't clear how closely this reported premium tracked either energy price changes, or indeed general property condition and specification; a higher EPC home is also likely to be new (or extensively renovated), and a home with an exceptional EPC is probably finished to a high specification overall.

Dan Jestico, sustainable design director at Savills property agency, takes the sustainability premium with a pinch of salt, at least with regard to the owner occupier sector.

Jestico told Passive House Plus that: "There is limited evidence that there is a price premium for sustainability in the build to sell sector – for most builders it's not enough to make it worth changing the specification."

Nonetheless, the Energy Transitions Commission, a group including Octopus chief executive Greg Jackson, said in a 2025 report that Zero Bills homes "attract a valuation premium" and customers have been shown to be willing to pay more.

The report suggests that most "Zero Bills" sites have so far fully recovered the additional costs for developers." Developer Thakeham told the Daily Telegraph that

the £10-20,000 extra cost of building to Zero Bills in their Sussex development was passed on to the homebuyers, supporting this assertion.

But two other developers of zero bills homes, Bellway and Tilia, both told Passive House Plus that while the Zero Bills offer to house-buyers was useful in terms of marketing, the additional outlay per dwelling did not necessarily return to them when the homes were sold.

Bellway's Zero Bills homes had "enhanced fabric and ventilation standards, approaching near-passive house levels" alongside the Zero Bills tariff.

However, there was no price premium: "The appeal of zero energy bills added significant value for buyers once introduced, although...these homes were marketing at the same market value as other properties on the development, so no premium was added," Bellway told us.

Tilia, a housebuilder that piloted some Zero Bills homes on a development near Northampton, were not quite so specific about sales prices, but did not confirm that they had recovered their costs, saying instead: "Although many buyers valued the long-term security a Zero Bills home provides, price, location and design/size of the home were still important factors in their decision making."

If you are able to buy a zero bills home for the same asking price as the more typical

home where you pay for the energy you use, it is hard to see why you would not. However, it is also hard to see why developers would build any more of them.

On the other hand, Octopus maintains that if purchasers do pay the full extra cost for a Zero Bills home, they still save money in the long run. Octopus has claimed a Zero Bills tariff saves an average household around £1,800 a year on bills, "based off Ofgem Typical Domestic Consumption Value of an average home".Depending on borrowing costs on the one hand, and changes in energy costs on the other, this suggests a net saving might be possible in less than 10 years.

However, as the tariff is generally only available on high-performance new build homes, the avoided bills might be expected to be lower. For example, property site Rightmove suggests that for a 3-bed house bills range between around £550 to £1,100 pa for EPCA or B properties (depending on archetype, e.g. terrace vs detached etc.)

This suggests the extra capital might just be paid off in more like 15 years – this being an often-quoted estimated lifetime for technologies such as heat pumps and batteries. This makes the financial benefit to homebuyers more equivocal. However, if energy prices rise faster than the cost of purchase and installation of smart equipment, this equation may change again.

The Zero Bills development by Verto Homes at Nexa Fields.
Photo: Verto Homes

Marketplace News

Panasonic targets apartment overheating with RAC Solo

Apartments are among the most at risk homes to summertime overheating. In compact, well-insulated units – often with large areas of glazing, single-aspect layouts and little scope for cross-ventilation – temperatures can climb quickly and stay high into the evening, disrupting sleep and everyday wellbeing.

While buildings designed and certified to the passive house substantially reduce the risk of overheating given the emphasis the standard places on minimising overheating, as the world warms even passive houses may require some active cooling during prolonged heatwaves. Across the wider apartment stock, however – and as a resilience measure where heat gains cannot be managed through shading, fabric and ventilation alone –controllable heating and cooling has a growing role to play.

The challenge for specifiers is that many apartments cannot easily accommodate a conventional split air conditioning or air-toair heat pump system: external space is tight,

façades may be protected or visually sensitive, and multi-residential developments often restrict what can be fixed to the outside of the building.

Panasonic’s RAC Solo offers a different approach. The compact, all-in-one air-toair heat pump has no separate outdoor unit. Instead, it is installed on a perimeter wall, exchanging air with the outside through two small penetrations – typically 162 mm in diameter, rising to 202 mm for the largest capacity – reducing visual impact on the exterior while delivering efficient, controllable heating and cooling.

“When I first joined Panasonic, RAC Solo was one of the products that immediately caught my attention,” said Panasonic’s Jason Bolton.

Describing it as a “simple but innovative solution that provides heating and cooling without the need for an outdoor unit,” Bolton says that “With both R32 and R290 options available, it offers a practical answer where a traditional split system isn’t suitable.”

With an indoor depth of 165 mm and sound pressure levels down to 29dB(A) on low fan speed, depending on model, the unit suits space and noise-sensitive settings. Nominal cooling outputs range from 1.73 kW to 2.87 kW and heating outputs from 1.71 kW to 2.75 kW, making RAC Solo well suited to targeted comfort control in living areas and bedrooms where a perimeter wall is available.

For more information visit aircon.panasonic.eu/IE_en 

Flynn Heat Recovery marks 20 years of MVHR in Ireland

F

lynn Heat Recovery Systems will celebrate 20 years in the heat recovery ventilation market this September, with founder Maurice Flynn crediting the company’s longevity to a simple philosophy: quality products, properly designed and cared for over their whole life.

The family run company designs, supplies, installs and commissions mechanical ventilation with heat recovery (MVHR) systems for new builds and retrofits, specialising in high-efficiency units such as the Zehnder ComfoAir range,including units certified by the Passive House Institute to recover over 90 per cent of heat from extracted air. The team also offers certified passive house consultancy.

Flynn Heat Recovery System’s focus is on aftercare, seeing MVHR as more than the

installation of a unit. And after 20 years, Flynn Heat Recovery System’s proposition remains the same: “We only sell a high-end, highquality product,” he said.

“If you want a good quality product, you come to us – we are also passive house consultants, so we know how to meet the demands of low energy design.”

Consequently, two decades on from its founding, the company’s focus has increasingly turned to aftercare, servicing and duct cleaning, extending the life of systems that might otherwise be scrapped.

The motors in “most units, after about ten years, have failed, and many units are simply dumped,” Flynn said. “We can change the motors or, in newer units, the bearings in the motors. This works towards our environmental impact goals and makes it very economical for the homeowner.”

Maintenance, he argues, is not an optional extra but fundamental to what an MVHR system is for.

“Putting in MVHR is one thing, but taking care of it is essential – you really need to think about air quality. I have photographs of units

that were never cleaned, and some of them are disgusting.

“If I were to sell you filtered water and you were to drink it through a dirty pipe, it would make no sense. So why would you consume filtered air through dirty ducts?”

The company recommends annual servicing with filter replacement and duct cleaning every three to five years, to keep systems delivering clean air at peak efficiency.

Extended warranty options are also available. “We can upgrade the warranty to a market leading six years,” said Flynn. “We’re very much into looking after people and their health.”

Flynn Heat Recovery Systems supplies and installs MVHR systems throughout Ireland. More information is available at: flynnheatrecovery.com 

(above left) Flynn Heat Recovery Systems office team: Clodagh Murphy, sales manager; Maurice Flynn, founder and managing director; Kelvin McNally, sales manager; and Shane Murphy, operations manager.

Grant launches heat pump-ready cylinder range backed by €8m investment

Home heating manufacturer Grant has unveiled a new generation of hot water cylinders engineered specifically for heat pump systems, backed by an €8m investment in product development and a significant expansion of its manufacturing operations.

The Quick Recovery cylinder range, designed and built at the company’s facilities in Birr, Co Offaly, is intended to meet growing demand for high-performance,

heat pump-ready hot water solutions across Ireland, the UK and Europe.

Unlike standard cylinders adapted for renewable systems, the new range has been developed from the ground up for low-temperature operation, allowing installers and specifiers to maximise the efficiency and output of air source heat pumps, including Grant’s own Aerona R290 range.

The cylinders feature high surface area heat exchange coils to maximise heat transfer from low-temperature sources, with a large internal coil made from DN25 stainless steel tubing to support rapid recovery. A duplex stainless steel inner shell provides durability and corrosion resistance, while advanced insulation minimises standing heat loss. Grant says the design delivers rapid heat-up times and consistent hot water availability, even under demanding usage profiles.

Available in capacities from 150 to 300 litres, the range comes in standard, slimline, smart pre-plumbed and smart integrated configurations, and suits both new build and deep retrofit projects. Ease of installation has been a priority throughout development,

with smart pre-plumbed models arriving with factory-fitted components to reduce time on site and support consistent system set-up.

The launch strengthens Grant’s integrated approach to home heating, offering installers a complete single-manufacturer solution of heat pumps, cylinders and controls designed to work together – an approach the company says simplifies specification while helping to ensure optimal system performance.

Stephen Grant, the company’s founder, said: “As heat pump adoption continues to grow, the role of the cylinder in overall system performance has never been more important. Our new Quick Recovery cylinders have been specifically developed to work in harmony with low-temperature systems, delivering the recovery performance, efficiency and reliability that installers and homeowners expect.”

He added that the investment reflected the company’s “long-term commitment to innovation”.

For more information, see grant.ie 

Medite Smartply spends €75m to future-proof Clonmel MDF plant

Medite Smartply has announced a €75m investment programme at its MDF manufacturing facility in Clonmel, Co Tipperary, in what the company describes as the largest current investment in MDF production in western Europe.

The announcement coincides with the 50th anniversary of the Medite brand and is intended to underpin the next phase of panel manufacturing at the flagship Irish site, strengthening supply resilience for customers across the UK, Irish and European construction and interiors markets.

At the heart of the programme is the replacement of the factory’s biomass boiler system, alongside upgrades to fuel handling, dryer systems and associated infrastructure. Operating around the clock, the Clonmel plant produces approximately 400,000 cubic metres of MDF each year, with the boiler generating the thermal energy needed to dry wood fibre during panel production.

The new system will eliminate natural gas from the site entirely, moving to biomass as the primary heat source. The company expects

this to materially cut fossil fuel-related CO₂ emissions and support its efforts to reduce Scope 1 carbon emissions.

Neil Foot, chief executive of Medite Smartply, said: “Medite has been a longstanding part of the Clonmel community, and this investment reflects our intention to continue manufacturing here long into the future. This is a significant commitment not only to the site itself, but to the skilled workforce, supply chain and wider regional economy connected to the factory.”

He added that renewing critical infrastructure would strengthen process control and product quality, and demonstrated “long-term confidence in the business, our people and the markets we serve”.

European equipment manufacturers Dieffenbacher and Sunds Fibertech will supply the project’s core technologies, supporting upgrades to energy generation, fuel handling and fibre drying. The project has secured planning consent through Ireland’s Strategic Infrastructure Development process, with measures covering environmental protection,

waste management, water supply and ecological monitoring.

Medite Smartply, part of the state forestry company Coillte, produces MDF and OSB panels at Clonmel and Waterford for construction and interior applications across the UK and Europe.

More information is available at mdfosb.com 

Medite Smartply’s MDF factory in Clonmel.
(above) Grant founder Stephen Grant (left) and CEO Niall Fay (right) at the launch of the company’s Quick Recovery cylinders.

Passive house components celebrated in Dublin

KORE, Metal Technology, Smartply, Aereco and Partel recognised for passive house component certs

Manufacturers from across the building envelope and services sectors have been recognised for achieving certified component status from the Passive House Institute, at an event that underlined how far independently verified performance data has spread through the supply chain available to Irish specifiers.

Prof Wolfgang Feist, founder of the Passive House Institute, handed framed certificates to a procession of manufacturers at the Passive House Association of Ireland’s event on passive house component certification in Dublin on 17 April, in some cases marking the culmination of years of product development, simulation and independent testing.

Prof Feist shared firsthand insights in passive house design, and explained the rigorous nature of the institute’s component certification, along with Soraya López García, head of component certification at the institute.

Mosart director Tomas O’Leary spoke on the need for more component certification for different product types as passive house transitions into larger buildings and highdensity projects, including everything from fall arrest systems to commercial kitchen extract heat recovery units.

PHAI chair Caroline Ashe Brady opened the event and framed passive house in the context of the climate challenge, while PHAI vice chair Helena McElmeel gave an overview on progress to date in Ireland at a point of extraordinary growth. Passivhaus Trust director Ann-Marie Fallon shared

experiences from the UK, noting recent growth in London, where 3,000 units are in development.

The certified component scheme, run by the Darmstadt-based institute, was created to address a persistent problem for designers: performance figures published under national and regional standards are frequently optimistic, or derived under conditions that bear little resemblance to a real building. The institute tests products against uniform criteria under conditions intended to replicate in-service performance, in the case of airtightness products, testing the product as part of a system with the materials it will meet on site rather than in isolation. Manufacturers have no influence over the results, and the institute follows the manufacturer’s own installation instructions when testing.

For specifiers, certification means values that can be entered directly into the Passive House Planning Package (PHPP), meaningful comparison between products tested to the same criteria, and assessment that goes beyond energy, the institute’s hygiene criterion requires minimum internal surface temperatures to guard against condensation and mould risk. More than 1,000 certified components are now listed on the institute’s database.

The certifications recognised in Dublin span the building from the ground up, starting, in KORE’s case, literally.

KORE

Foundations are often identified as a weak

point in the passive house envelope, and the newest certification announced by Co Cavan-based insulation manufacturer KORE addresses that directly. KORE’s Insulated Foundation System has achieved certified component status for use with insulated concrete formwork (ICF) construction. The system is designed to work across ICF, timber frame, light gauge steel and masonry construction, and additional profiles, including KORE’s twinleaf solution, are being actively optimised with the institute, with further certification targeted in the coming months.

The certified profile comprises a 150 mm reinforced concrete floor slab on 300 mm of continuous EPS insulation, giving a floor slab U-value of 0.12 W/m²K at a total build-up of 450 mm. External wall and plinth junctions assessed as part of the certification return U-values in the range of 0.14 to 0.15 W/m²K, with thermal bridge psi values of around 0.01 W/mK.

The system departs from conventional raft construction by positioning a reinforced concrete thickening inside the structuralgrade perimeter insulation rather than breaking through it, localising load transfer without interrupting thermal continuity beneath the slab. The thickening can also run between adjoining dwellings, which KORE says makes the system suited to terraced and semi-detached schemes without compromising envelope performance. The concrete slab functions as the primary airtight layer, with the certification requiring a clearly defined strategy for that element.

KORE says the system can also deliver significant embodied carbon reductions against traditional strip foundations, through reduced concrete volumes and an integrated structural and thermal design.

“Passive house component certification independently validates what our system has been delivering in practice for years,” said Finnian O’Hanlon, technical manager at KORE Insulation.

“It gives designers confidence that foundation performance can be both predictable and repeatable, and it helps unlock high-performance, low-carbon delivery at scale.”

Metal Technology

Co Antrim-based Metal Technology, which has supplied aluminium window, door and curtain walling systems across the UK and Ireland for 40 years, now holds four fully certified passive house systems.

The company’s System 5-45 Hi+ tilt and turn window was its first to achieve certification, in 2021, and has since been installed or is on site across more than 35 certified passive house projects in the UK — among them Woodmill and St Columba’s high school in Dunfermline, one of the world’s largest passive house educational facilities at £122m construction cost and 2,700 pupils, along with much of Scotland’s education building programme over the past four years. It is also specified for the University of Manchester’s forthcoming Fallowfield student accommodation development, set to be Europe’s largest purpose-built student accommodation project with over 3,300 bedrooms and a £400m construction cost.

System 5-35D Hi+, which the company describes as the first aluminium passive house certified glazed door system in the UK and Ireland, followed in 2022, and System 4-45 Hi+, the first aluminium certified casement window system in the UK and Ireland, in 2023. System 17 Hi+ curtain walling, for multi-storey applications, was first certified in February 2021 and was used on the Erne Campus in Enniskillen, still the only certified passive house premium project in the UK, the Passive House Institute’s highest

building certification.

Changing legislation in Scotland, where the company has long had a strong specification presence, was a driving force in developing the range, Connor Corry, senior technical support at Metal Technology and a certified passive house consultant, wrote in an email to Passive House Plus.

“Supported by government and the Scottish Futures Trust, their commitment to reduce carbon emissions, improve building performance and deliver better learning environments in the education sector provided a springboard to develop glazing solutions to assist in achieving these goals,” he wrote.

All four systems have been developed using advanced polyamide thermal break technology and optimised profile geometries, “delivering excellent thermal performance while maintaining robust structural capacity, weather resistance, and security,” Corry wrote. The company has also developed a RIBA-approved passive house CPD for architects and specifiers, covering façade U-values, thermal bridging, airtightness, ventilation and solar gain.

“From a project perspective, Metal Technology supports clients from concept right through to completion. Our passive house qualified team provides proactive technical support to ensure systems seamlessly integrate into the building’s overall energy model and design strategy.”

Medite Smartply

Waterford-based Medite Smartply, represented at the event by David Murray, head of technical affairs and Ireland sales, was recognised for the certification of two components: Smartply Airtight and Smartply Sure Step.

Smartply Airtight, certified in 2016, combines airtightness, structural racking performance and vapour control in a single OSB panel, removing the need for separate air and vapour control membranes on the warm side of timber frame walls and ceilings. Smartply Sure Step, certified in 2022, combines structural flooring, airtightness, weather resistance, slip resistance and acoustic performance in one product.

Used together, the company says, the two certified components provide continuous airtightness from floor to wall to ceiling, making them particularly suited to commercial, residential and multioccupancy developments where reliable building envelope performance is essential.

Aereco

Ventilation specialist Aereco, a pioneer of demand-controlled ventilation, serving the Irish market from its base in Little Island in Cork, was recognised for MVHR: the InspirAIR Side range manufactured by its parent group, Aldes.

The InspirAIR Side units are designed for new build and renovation, with an emphasis on fitting high performance into tight spaces: at 12 to 14 kg they are among the lightest units on the market, installable by one person, with a low profile suited to standard cupboards and ceiling voids, horizontal or vertical mounting, and reversible airflows at commissioning. The range is ERP-rated A, uses high-efficiency EC motors, and Aereco says it offers the widest range of filters on the market, capable of removing up to 90 per cent of bacteria, pollen and fine particles.

Partel

Galway building envelope specialist Partel picked up a recognition award at the event. The company hold passive house component certifications for a number of its airtightness components, including its Vara Fluid Spray liquid-applied membrane, Izoperm Plus internal system, Exoperm Mono SA 250 breather membrane, and Kabseal Pro, Kabseal Pro 6 and Kabseal Gas grommet range.

Taken together, the new certifications recognised in Dublin mean Irish specifiers can now source certified foundations, airtightness systems and structural products, glazing and façades from manufacturers based on these islands, along with a ventilation system from across the channel — a certified supply chain for several of the key product types needed to build to a standard whose credibility rests on delivered performance matching design. 

Pictured with Prof Wolfgang Feist are (opposite) Connor Corry, senior technical support at Metal Technology, and David Murray, head of technical at Medite Smartply; and (above) Paula Gleeson, head of marketing communications at Partel, Steven Magee, sales director at KORE, and Tony Mahon, MVHR product manager at Aereco.

Pipelife launches indoor R290 heat pump designed for Irish apartments

Pipelife Ireland is launching a new indoor monobloc heat pump this July that it says has been designed from the ground up for the realities of Irish apartment construction –and stress-tested to reflect how such buildings are actually built, rather than idealised lab conditions.

The Inova indoor heat pump houses the fan, coil, compressor and expansion valve in a single unit installed entirely within the dwelling, drawing and exhausting air via ducts. It runs on R290 (propane), the ultralow global warming potential refrigerant, with a fully sealed charge of just 450 grams — keeping it within the limits for indoor installation. Safety features include a gas separator to prevent refrigerant entering the water circuit, and an internal gas sensor that ramps the fan to 100 per cent to dissipate any leak to outside.

But the detail likely to catch the eye of building services engineers is how the unit was evaluated. All of Pipelife’s published performance figures are predicated on the unit sitting 10 metres from an external wall, with three 90-degree bends in the ductwork — a deliberately punishing worst-case scenario.

“Nobody’s going to put a heat pump on an external wall; architects have to balance daylight regulations along with everything else, so they won’t have the space to do it,” said Eoghan Considine, specifications manager at Pipelife Ireland.

He contrasted this with the industry habit of publishing fan curves measured on a bench: “This is everything at a worstcase scenario, not a best-case scenario. We restricted the unit – we stress-tested it.”

The unit delivers 3.2 kW capacity, is app-enabled, and is tested to EN 14825, with EN 16147 hot water performance data also available. It pairs with a separate hot water cylinder, pre-plumbed at Pipelife’s Little Island facility in Cork, with an inline version to follow that will visually read as a single column.

Keeping the cylinder separate was a conscious whole-life decision, Considine said: cylinders typically outlast heat pumps, so the heat pump (or individual components such as the fan or compressor, all accessible from the front of the unit) can be replaced without disturbing the store. It also makes it far easier to manoeuvre the equipment through a finished apartment block.

Equally deliberate is what the Inova doesn’t do. Unlike exhaust air heat pumps, it makes no attempt to combine heating and ventilation, and its performance is

not dependent on warm extract air, or on occupants leaving wall vents open.

“The best heat pumps on the market just function as heat pumps. The best ventilation systems just function as ventilation systems,” said Considine. “Why combine things to make them a little bit worse?”

Pipelife instead pairs the unit with its own MEV or MVHR systems, supplied as complete packages including ductwork – an approach it says is cost-competitive with combined exhaust air units, while allowing each system to be specified, commissioned and serviced on its own merits.

For passive house apartment schemes, the company argues the Inova opens up a simpler route: a conventional monobloc heat pump strategy plus MVHR, at a lower cost than compact combined heat pump-ventilation units, and using a heating approach familiar to Irish contractors.

Servicing of the Inova is carried out entirely from within the apartment, supported by installer training held fortnightly in Dublin and Cork, and the unit will ship with a dedicated plain-English homeowner manual alongside the engineering documentation.

The launch draws on considerable experience. Pipelife has been supplying heat pumps to the Irish market since 2009, with more than 10,000 units sold, alongside a fastgrowing mechanical ventilation business.

The Inova was developed to Pipelife’s own specification with its manufacturing partner, informed by the company’s combined knowledge of heat pumps and ventilation, Irish apartment design guidelines and F-gas regulations.

“Restrictions have driven innovation,” said Considine.

The heat pump also lands amid a wider sustainability push at the group, part of Wienerberger’s Pipelife division, which manufactures in 28 countries. The Cork operation, an amalgamation of indigenous firms Quality Plastics, Cork Plastics and MFP, used 7,000 tonnes of recycled material in 2025, with plans to more than double this to 15,000 tonnes by 2030.

Year-on-year, the tonnage of recycled PVC consumed is up 52 per cent, notable given the well-documented difficulty of recycling PVC, while recycled PE consumption has grown by 48 per cent, cutting reliance on virgin material and the embodied carbon of the company’s material inputs.

Pipelife has published seven environmental product declarations to date, and aims to have EPDs for everything it manufactures by 2028, with a group target that 75 per cent of products manufactured or sold support net zero construction.

The company buys 100 per cent renewable electricity, with on-site solar generation planned. 

(above) The Pipelife Inova indoor heat pump, pictured with a Pipelife hot water cylinder.

What Building Better really means in traditional buildings

Traditional buildings can be made warmer and more efficient, but only through respect, patience and an understanding of how they actually work says Niall Crossan, technical director at Ecological Building Systems.

In my experience, after almost 25 years in the building industry, one thing has remained constant: people value beauty, comfort, and stability. This has been true since our earliest ancestors sought refuge in Neolithic caves, and it remains true today in low-energy contemporary buildings. At its simplest, building better should give occupants a sense of wellbeing, comfort, and solidity, equally applying to both traditional and modern construction.

In a changing climate, contemporary construction can learn much from our forebears who built traditional buildings. These structures have stood the test of time and remain one of the clearest expressions of sustainability. Traditional buildings follow different principles to modern construction. Their means of controlling moisture movement, and how they react to climate conditions and risks, are distinct.

They respond to local climate through generations of knowledge, using locally sourced materials, regional craftsmanship, and a clear focus on durability. From the thatched cottages of Donegal to the traditional farmhouses across the lake district in the UK, traditional buildings are deeply rooted in place.

Traditional buildings embody principles now recognised as essential: reuse of materials compatible with both the building fabric and climate, adaptable use of space, and careful material optimisation. Thermal stability, thoughtful use of light, and natural airflow combine to create a robust and sustainable building fabric. In many cases, demolition and replacement of these buildings carries a significant carbon burden. Refurbishment, by contrast, is key to retaining our built heritage, providing much-needed housing, and reusing materials with minimal environmental impact.

Like fingerprints, no two traditional buildings are the same. Each requires an appreciation of its unique characteristics and respect for its setting. There are no quick wins when it comes to the thermal refurbishment of traditional buildings. The most successful outcomes come from careful assessment and a considered, sensitive approach — one that retains key architectural features while delivering meaningful thermal improvements

through breathable materials and finishes.

Architect and retrofit specialist Joseph Little frames it clearly:

“Successful retrofit rests on four principles: respect, enoughness, systems thinking, and a genuinely multi-skilled design team.”

Building better is not just about materials or installation. It is about engaging properly with complexity.

Historic buildings require scale in thinking. They require collaboration. No one discipline can solve them alone.

While improving energy performance is vital, it must not come at the expense of a building’s character and integrity. The energy efficiency of most traditional buildings can be significantly enhanced, helping to keep them in use while ensuring they remain comfortable, viable, and relevant long into the future.

This requires a careful balancing act. Rash interventions and the use of inappropriate impervious insulation or decorative finishes can cause long-term harm. It is essential that these buildings continue to provide safe, healthy, and beautiful places to live and work.

Good retrofit is not rushed. It is assessed. It is sequenced. It is honest.

As Jeff Colley, editor of Passive House Plus, puts it plainly: “Building conservation and energy conservation cannot be treated as opposites.”

Care, pragmatism, and understanding how heat, air, and moisture move through fabric are essential.

The challenge is not simply improving energy performance. It is doing so without compromising integrity.

For traditional lime plasterer Graham Mills, the principle is straightforward.

“After more than 20 years working with traditional buildings, I know that building better starts with preparation and understanding

each property’s character … rather than a business-as-usual approach, industry advisors and suppliers should not be afraid to say no where a building is not ready or suitable. This is where integrity speaks volumes,” he said.

Good retrofit is not rushed. It is assessed. It is sequenced. It is honest.

At its core, building better is not about replacing traditional buildings. It is about respecting them, understanding how they work, and applying compatible approaches that improve comfort, wellbeing, and energy performance without compromising character or integrity.

By working together — industry experts, government organisations, training bodies, traditional trades and homeowners — we can ensure these buildings remain warm, healthy, characterful, and enduring for decades to come.

We believe that our Building Better campaign is the start of a wider conversation, and this is only the beginning. •

This article forms part of the wider Building Better campaign, exploring the sensitive retrofit of traditional buildings through the perspectives of conservation experts, designers, installers and homeowners.

Enshoddification: a blight on buildings that we must address

The construction industry faces tightening targets to make buildings safe, dry, healthy, low carbon and comfortable in winter and summer. We must stop the industry gaming paper targets, argues leading building physicist Toby Cambray, by focusing on outcomes and regulating competence.

The Passivhaus Trust has, in two pieces of research over the last decade, shone a light on the energy performance gap created by SAP: conservatively, 50 to 60 per cent. A building passes its assessment, uses far more energy than promised, and nobody bats an eyelid. To a layperson this may seem bonkers – and they would be right. We wave it away by saying SAP is "a compliance model, not a performance one," as though that settles the argument. It is, in part, Goodhart's law: when a metric becomes a target, it stops being a good metric. But it is more than that, and it is worth asking how we got here, because the answer implicates far more than one energy model.

The trajectory goes like this. First there are models, built by researchers trying to understand building physics (BREDEM For example). Then a version of the model is codified into regulation, and in the process, the nuance and detail the researchers understood gets boiled down to standardised parameters simple enough to teach to grads or career changers on a five-day course. Once it is codified, developers and their consultants have a well-structured game. They run cost-benefit analysis on every hard-boiled parameter: they know what it costs to go from 5 to 4 m³/m²/ hr at 50 Pa, whether that beats an extra 15 mm of insulation, or whether it is still cheaper to just buy off your airtightness tester. This is the race to the bottom, where everyone is inventing modelling tricks to scrape their building over the line. This gaming risks baking in structural failures that, thanks to the long cycles of design, build and regulatory revision, are discovered too late, once everyone quietly knows the models are nonsense but they are too embedded to abandon. Cory Doctorow coined enshittification for the decay of digital platforms; allow me enshoddification for its construction cousin.

The problem is that every rule of this kind regulates the paper building. You can prescribe the element, as England’s pre2006 Part L did with its limiting U-values: divorced from reality and blind to how the whole building performs. You can describe the outcome and free the method, as early

SAP did: prized for its flexibility, until we discovered the flexibility was mostly latitude to game it. Passive house works this way but has more effective oversight. Or you can describe the outcome but prescribe the method in ever-finer detail, which is the fashionable move. The recently updated CIBSE methodology for assessing overheating in homes, TM59, is designed to reduce variation between modellers. But prescribing the method gives us reproducibility, not truth: a method can be prescribed and still be wrong, and you have treated the symptom, modeller variation, while leaving the causes, variable competence and gaming, untouched. All three share the same flaw. Compliance is demonstrated before a brick is laid, and the loop back to reality never closes.

There is a fourth thing a rule can pin down: real performance, measured in situ on the finished building. Smart meter enabled thermal efficiency ratings (SMETER) and heat transfer coefficient (HTC) technologies now do exactly this for heat loss, using machine learning to strip out weather and occupant behaviour and leave a number that tells us about the design and construction themselves. This makes an escape from Goodhart possible, because when the metric is the outcome, optimising it is just building well. For passive house it is vindication: we finally get to prove, on essentially every building rather than in another model, the thing we have always claimed: no performance gap. It extends further than space heating. Overheating is, if anything, easier, since you measure temperature directly. Moisture is harder and more interesting (to me at least). Interstitial problems stay hidden inside the build-up until the damage is done, so measurement comes too late to help. But surface condensation and mould are solvable, which opens up something the industry has argued about for decades: the perennial standoff between "lifestyle" and building defect. Continuous data on the actual conditions in a room can begin to tell you whether a home is mouldy because it was built badly or because it is being run in a way no building could withstand; a question that currently generates far more

For passive house it is vindication: we finally get to prove, on essentially every building rather than in another model, the thing we have always claimed: no performance gap.

heat than light.

None of this is a panacea, and it is early. The SMETERs are themselves models, of the machine-learning variety, though they are structurally so much harder to game its vanishingly unlikely in the technical realm. But measurement is no guarantee of honesty. Fire performance is about as physical and real as a test can get – you burn the actual assembly at full scale – and it was gamed anyway, systems certified on one build-up and sold as another, with the desktop study as the get-out. All of this shows us that it is not that one kind of rule is weak and another strong, but that in a market with enough money pushing the other way, the pressure will find the soft spot in any rule you write. Where the feedback loop can be closed, measurement makes that harder. Where it cannot, only competent, accountable judgement stands between us (globally speaking) and harm.

We cannot expect everyone to be a philosopher. But we can stop pretending the paper building is the real one, measure what we are able to, and regulate the competence of those who must judge the rest. When insurers start really probing competence, we will know we are getting somewhere. •

25 Years of NIBE Heat Pumps in Ireland Built to Last, Ready for the Future

Quiet comfort • Smart control • Long-term value

Future-proof R290 refrigerant • Backed by 25 years of expertise

EXHAUST AIR