Skip to main content

Multimedia Tower - Thesis Project Documentation

Page 1

ARCHITECTURAL DESIGN PROJECT PORTFOLIO Parikshith G Chouhan 01FB16AAR019

MULTIMEDIA PARK RAIDURG, HYDERABAD, TELANGANA


Introduction The Multimedia park is an entertainment industry complex of the IT-sector, this is a pioneer project in India.

Methodology AIM

• Telangana government has earmarked about 10 acres (40,406 sq. m.) of land for the Project, which is envisaged to be an Iconic Tower, which is proposed to be developed as an Animation and Gaming Hub, along with other support facilities.

OBJECTIVES

SCOPE

• This project is built along the IT corridor of Hyderabad, HITEC city. It will be fully equipped with world-class infrastructure and state-of-the-art amenities to support the growing AVGC industry that already supports 30,000 employees in the city. • It houses an ideal environment for the Animation, Visual Effects, Gaming & Comics (AVGC) industry with plug and play spaces, state-of-the-art built-up office space at subsidized rates to first generation technocrat entrepreneurs, as well as small and medium enterprises engaged in the sector. The centre will be a key growth engine for tech exports and employment generation.

LIMITATIONS

DATA COLLECTION

PRIMARY DATA

Source: https://www.deccanchronicle.com/nation/current-affairs/211119/hyderabad-image-tower-delayed-to-2022.html

SECONDARY DATA

ANALYSIS

SYNTHESIS

Aim To design a Multimedia park at Telangana

AREA STATEMENT

Objectives

SITE

• To comprehend the requirements of a Multimedia park. • To study the prevailing rules & bye-laws in designing of the Multimedia park. • To study & analyse the functioning of workspace in a AVGC facility. • To study services related to a AVGC facility in a Multimedia park.

SITE ANALYSIS

ZONING

Scope My interest is to design the Multimedia park of 10 acres (40,406 sq. m.) along with other supporting facilities like • AVGC facility • Office spaces • Open air theatre • Gaming arena • Entertainment plaza • Food court • Rental studios • Render farm • Training academy • Administration • Main studios

Limitations

• Time constraint to complete the project within the duration of four months.

Site location

AVGC Tower, Raidurg, Hyderabad, Telangana 500081

Primary case study • ABAI (Association of Bangalore Animation Industry), Bengaluru • MAAC animation institute, Bengaluru

Secondary case study

• SKY STUDIOS, United Kingdom • Columbia Chicago college, USA • SKY Central, United Kingdom

SYNOPSIS 01

QUESTIONNAIRE

Parikshith G Chouhan

Faculty of Architecture & Design PES University, Bengaluru UA16BA551 : Architectural Design Project

01FB16AAR019

• Production This phase transacts the multimedia application when all the pre-production activities have done. Activities in this phase include: 1) Content Research. 2) Interface Design. 3) Graphics Development. 4) Selection of musical background and sound recording. 5) Development of computer animation. 6) Production of digital video. • Post-production This phase following the shooting or taping in which a movie or TV show prepared for the public. (Merriam Dictionary 2017).in other word post production the final stage, where the film released to cinemas or, to purchaser media (DVD, Blu-ray) or direct download from a provider.

Workflow in a AVGC facility PRE-PRODUCTION

CONCEPT

DESIGN PROCESS

DESIGN DEVELOPMENT

PRODUCTION

DESIGN FINALIZATION

Multimedia production Production of the multimedia applications is a compound, involving multiple processes each one has different tasks to reach the final product, so each of the processes has a different consideration in design’s workflow. The process respectively is as follows: 1. Development 2. Pre-production 3. Production 4. Post-production • Development It is Characterized the objectives and goals of the projects; objectives are estimated of evaluated project products, commonly more global in scope. On another hand, the actions to implement the objectives, which called activities. Specific people are responsible for the implantation, a cost is related to their implementation, and there is a time frame binding. • Pre-production The process towards mapping out a “cohesive strategy” for the whole multimedia project, including contented, technical implementation, and marketing. Based on the objectives and targets. Preproduction stage includes: 1) Conceptual design development. 2) Target audience analysis. · 3) Specification creation.

POST-PRODUCTION

Digital media park to be defined is a space for business incubation (company which helps in new startups and companies for their development) other supporting parameters. It matters provide services such as training space or office space. Incubation can also be defined as dynamic process towards business enterprise. Business incubator Definition:an organisation designed to accelerate the growth and success of entrepreneurial companies through array of business support resources and services that include physical space, capital, coaching, common services and networking connections. Other parameters like galleries review theatres and restaurants which is among the vital activity and interactive space in the sector. Easily accessible by employees and visitors too.

MULTIMEDIA PARK HYDERABAD, TELANGANA

All dimensions are in Meters


SKY STUDIOS, United Kingdom

Columbia Chicago college

Sky studios represented as the headquarter for Sky’s Broadcasting and Sports news that including its post-production, transmission facilities, and other various related departments, it was opened in 2011. A ‘factory for creativity’ that is the most sustainable broadcasting studio yet designed. The Harlequin 1 building sets an international benchmark for sustainable architecture in a broadcasting environment.

The media production center the is college 1st new construction building in it’s 120 years history, Is now open. The 3,300 m2 facility designed by studio gang architects, provide adaptable, state-of-the-art facility including two fold is facility including two film production sound stages, a motion capture studio, digital labs, animating suites, a fabrication shop and classrooms.

It will house recording, post-production and transmission facilities for Sky’s Broadcast and Sports News departments. In scale this large building is roughly equivalent to two New York City blocks – 100m long and 50m wide.

Columbia Chicago college media production center -MPC- is a private organization, offering a specific discipline such as arts, media, and business. It is first construction built in 1890. The following information covered some fact numbers relates to the project (Chicago Architecture 2017)

Location

Concept & Philosophy

Zoning and Components

Location

Ground floor: eight studios, control rooms, control system rooms, two of the server room, and demarcation room.

Location : Osterley, London, UK Built Area : 5,000m² Architects: Arup associates

Sky studios are constructed as five floors divided horizontally into three zones -make, shape, share. 1) The lower floors contain the largest studies to make the television content; 2) The middle floors encompass the production facilities, editing suites, and data centers within which the content is shaped. 3) The upper floors provide the transmission facilities to share television signal. Offering a multi-platform broadcasting center for all of Sky’s media channels.

Façades The façades of Sky studios are finished in a glass and aluminum cladding, with a modern wall scheme that has been designed to expression modern style and expresses the internal function. The chimneys protruding from the building that are ventilating the studios, it is a crisp and modern expression.

Sky’s Studios Layout

Second Floor: is completed for the ground floor spaces contains large equipment storage, newsrooms, three of green rooms, makeup rooms, multifunctional hall, and breakout area.

Location : South Loop district, Chicago, USA Built Area : 3345 m2 Architects: Studio Gang

Third & Fourth Floor: contain the shape’s zones which are: open plan workplace, several of ESL rooms that serves sports channels, graphics room, a large equip room each level, quality rooms, and break-out areas

Concept & Philosophy

Zoning and Components

The design is intended to inspire a new way of teaching media production, through addingvalue in every corner of the building even the lounges, stairs and rest areas. The architect used the different levels and stages as a translation for the phases of media production, creates a dynamic, challenging and cooperative space for students. The building uses diagonal compositional lines and spatial layering; to create depth of field and natural light used to give “deep focus,” to get a simulation of animate movement through a framed view. The building is constructed as one-floor plan, but there are differences of heights and levels to accomplish technical considerations for the studio’s requirements. Also play a role in achieving the main idea, that enables students to participate in filmmaking, and sees all behind the scene aspects of movie making.

The workshop space

Fifth Floor: encompass the platforms from which the television signal is shared the floor has four main areas, the master control room- with a 700 sqm area, two of large equip tools 300 sqm for each, one of digital systems secure room with SCR room and the open-plan workplace.

Cinematic environment by the colored glass

The building includes four classrooms, three large sound stages for film, animation labs, and studios of lighting, audio, and directing. Also, production shop, technical support areas, and production offices.

The large main studio

Shows how to access Sky Studios from the Grant west street

Shows the organisation of cooling system along with other services intergration

Cooling & Ventilation through Chimneys

CONCULSION

The performance of the giant natural ventilation chimneys that serves the main eight studios, offices for 1370 people, and freecooled data rooms for more than 400 computer servers. Cooling and Ventilation System execution: 1- Waste heat from the studio lights rises through the studio ventilation chimneys. 2- As waste heat rises, a small negative pressure is set up in the studios. 3- This pressure drop overcomes the resistance of the sound attenuators, drawing in fresh cool air from the exterior. 4- Exterior intake grilles 5- When external conditions are inappropriate for natural ventilation, mechanical ventilation and cooling of the studio spaces can be implemented using the same chimneys.

CASE STUDY 02

Parikshith G Chouhan

Faculty of Architecture & Design PES University, Bengaluru UA16BA551 : Architectural Design Project

01FB16AAR019

Heat exchange through the studio ventialtion chimney.

Sky Studios discuss the media production spaces particularly the Studio blocks and the spaces for broadcasting services; it also provides a sustainable alternative to ventilation circulation for this kind of buildings. After reviewing the Sky’s Studios project, it has been noticed the following points: 1) Innovative solutions were founded to provide natural ventilation and fresh air for the spaces of the building. 2) The project contains eight studios with two floors height with varying spaces. 3) Flexible and open spaces are offered for office works, which arranged around the exterior for a natural lighting and fresh air. 4) Providing break-out space on each floor, next to the atrium. 5) The broadcasting rooms require a large area for this equipment and its facilities. 6) The project contains five equipment room distributed over a large area.

The break-out space

CONCULSION Columbia college media production center discusses the Educational spaces relates to the media production and understand the relations between these spaces also presents new concepts of link the student to media production environment. In Summary, this case gained some considerations that raise the operating efficiency of designing the studio’s spaces. 1) The student is enabled to participate in teaching spaces, to learn about all the scene aspects of filmmaking. 2) There are four types of the studios which are: the main studio (large area) and the capturing motion, lighting, directing studios, each one requires special consideration. 3)Most of the Studios are enclosure spaces without opens for lighting. 4) The equipment stores in the centric area to serve all spaces of the building. 5) The break-out area’s design elements create a cinematic environment by using natural light through colored glass and innovation artificial element light. 6) Provide green elements to reduce energy consumption, and for isolation.

MULTIMEDIA PARK HYDERABAD, TELANGANA

All dimensions are in Meters


SKY STUDIOS, United Kingdom

ABAI, Bengaluru The Brigade group is known for its elegant, solid infrastructure, and Nalapad Brigade Centre is no exception. Constructed in 2016, this big and spacious development has a floor area of 58,000 sq ft and a total area of 540,000 sq ft, providing ample space for IT companies to conduct their businesses. The building offers both furnished and unfurnished office space and is up to date with all modern and essential amenities such as a large cafeteria, lounge, and landscaped garden. It also has an extraordinary security system that ensures things run smoothly. Association of Bangalore Animation Industry (ABAI) is a non-profit organisation committed to developing the Animation, VFX and Gaming industry in India. This occupies the ground floor of Nalapad Brigade Center, Whitefield.

Sky central is the new headquarters of Sky UK company, sky provides TV, broadband, mobile services, and business. It is a “flagship building” represent as one of Europe’s leading media companies and telecommunication, also the largest pay-TV broadcaster in the UK’s. Architects of Sky Central challenges the “conventional ideas” of the workspace; encirclement and evolving the simplicity of the work environment, through creating spaces encourages ad hoc meetings between individuals and offers a sense of health and comfort between all teams. AL_A along with Hassel and PLP offices breathed life into this vision; it reflectsthe working of the organization with a campus associated with the benefits that initiative the Sky business forward: individuals and creativity.

Location

Concept & Philosophy

Zoning and Components

Location

Concept & Philosophy

Zoning and Components

The design is intended to inspire a new way of teaching media production, through addingvalue in every corner of the building even the lounges, stairs and rest areas. The architect used the different levels and stages as a translation for the phases of media production, creates a dynamic, challenging and cooperative space for students.

Location : Osterley, Isleworth TW7, United Kingdom Built Area : 45,000m² Architects: AL_A, PLP Architecture, HASSELL Sector: Offices and broadcast studios for media campus Status: Completed 2016

As simple “shed typology” carrying the broadcaster’s activities and people together in clusters of neighborhoods symbolize as open and flexible space designed to cater for a new type of creative business. The design promotes flexible, wellbeing, cooperative, ease of access, openness, and communication for users. The central hub is linked the distinct neighborhoods to achieve full flexibility, and the stacked mezzanine space has established a variety of diverse work areas lined together, it is reached via ramps and stairs, allowing for unpredicted and surprising interactions to happen naturally.

Architectural panaroma

Cafe’s area on the ground floor connected with Sky Street in the building.

Extensive planting, equipped six plants per person, creating a quiet zone for individual working,

CASE STUDY 03

Faculty of Architecture & Design PES University, Bengaluru UA16BA551 : Architectural Design Project

The MOCAP studio

Location : Nalapad Brigade Center, Whitefield, Bengaluru Built Area : 5,388 m2 Architects: Brigade group

The stacked central mezzanine space is arranged different work areas lined together, it is accessed via stairs and ramps, and overlying voids within floors plates to formed interactive visual connectivity. Sky central includes studios for media production and broadcasting, library, auditorium, brainstorm spaces, break-out areas, and wellbeing areas. Also, it offers the food services.

The waiting lounge

The workshop space

The facility consists of: • Finishing school (3-6 months courses) • Center of Excellence (post-production labs) • Incubators (capacity 60 people) The spaces in the Facility weren’t exactly planned keeping in mind the Circulation or the access. The spaces were accommodated to the area available on the premise of Office building. The capacity of the Incubators was limiting, so had to shift to the Classroom or AR/VR room of the finishing school. ABAI Finishing school will train and provide skilled technicians to the companies in Karnataka.

Space planning

Creative area for team’s work, interactive with each other by the exciting path between it, by adding a homely texture on floors and partitions.

Parikshith G Chouhan

Sky is encompassed a “45,000 sqm” workplace, about “3,500 people” work across three floors at “6.5 sqm” for each one occupying the central, it is employed a mixed-use scheme throughout the building such as offices areas, studios, production facilities, and the wellbeing spaces.

The Break room

The admin room

The green room studio

The large main studio MOCAP

The meeting room

The entrance gateway

SPACES IN FINISHING SCHOOL • CLASSROOM • AR/VR ROOM • MEETING ROOM • EDITING ROOM • LUNCH ROOM • WASH ROOMS

SPACES IN CENTRE OF EXCELLENCE • ADMINISTRATION • RECEPTION AND WAITING AREA • MEETING ROOM 01 • MEETING ROOMO2• AR VR ROOM • DI SUITE • MASTERING SUITE • PERFORMANCE CAPTURE STUDIO • BODY SCANNER • HEAD OF OPERATIONS CHAMBER • CG SUITE • GREEN SCREEN SHOOTING ROOM • EDITING ROOM

The mastering suite

The rigging through MOCAP simulation

A Daylight exterior shot to display the road to the main entrance. Also, it shows the skyline of the building.

A Night outdoor shot, shows the rhythm of facade’s design, with a warmth artificial light for the interior areas.

The atrium involvesfloating mezzanines linked by stairs. Also, the live broadcast studio in the main atriumtakes center stage which allows occupiers see Sky’s daily acts.

01FB16AAR019

Each floor with a large central atrium above the lively 100-meter Sky street, which connects the main entrances with ground workspace, 200- seat cinema, cafes, meeting areas, and support facility. Sky achieve “home zone” idea with representatives of 18 versatile “neighborhoods”that housed 200 staff each, it supported by housing feature, spaces that include, small kitchens, meeting tables, and casual seating.

CONCULSION

Sky Central is chosen as one of the cases studies, to enhance the concept of joining the office work with community zones in a one complex place which is applied by establishing a series of “neighborhoods” housing and flexible spaces support it, within these ‘residential’ feature wipes the borders among work and home and forms an intimate and human scale in the workplace. This enhances the efficiency of offices workplace and community zones: 1) The project provides an open and flexible “neighborhoods” to work; it is presentedas a home zone with the residential feature. 2) A 200-seat cinema is offered with high specifications. 3) Sky’s live broadcast studio in the center stage allows occupiers interact with it. 4) Providing green elements extensively creating a quiet zone for individual work. 5) The atrium boosts the visual communication of the occupants of the building. 6) The project provides a restaurant and café-shop that serve a lot of people.

CONCULSION ABAI center discusses the Educational spaces relates to the media production and understand the relations between these spaces also presents new concepts of link the student to media production environment. 1) The spaces in the facility Wasn’t exactly planned Keeping in mind the circulation or the access. 2) The spaces were accommodated To the area available on the premise of office building. 3) The capacity of the incubators was limiting, So had to shift to the classroom or AR/ VR room of the finishing school. 4) ABAI Finishing school will train and provide skill technicians to the companies in Karnataka.

MULTIMEDIA PARK HYDERABAD, TELANGANA

All dimensions are in Meters


STANDARDS

The Facilities

The production studios in the media building include the following: 1. Reception and Waiting hall: a reception desk nearby the main entrance to the building to the direction the clients to their targets. 2. Administration offices: the department has an administrative section to facilitate the studios’ affairs and scheduling the appointments for those rent the studios. It has several rooms such as the department’s chief office with secretary and meeting The capacity of exits (staircase, ramps and doorways) indicating the number of persons could be safety evacuated room. through a unit exit width of 50 cm 3. Multipurpose T.V production studios: two large studios used for interior movGroup of Occupancy Number of Occupants - Stairways Ramps Doors ies shots and fourth of studios with variant areas used for recording tv shows, Mercantile 50 60 75 programs, or interviews via rent, the studios are equipped to fit various shows by flexible décor to meet the need for whose rent the studio. Joint Open Air Space 4. Studio Control Room(SCR): it also called the production control room (PCR), a small room attached with each studio Height of the Building(m.) Exterior open spaces to be left on all sides in m.(front rear and sides in each plot)As used to produce the actual content and composition, it containing monitors, speakers, audio equipment, effects generators, switching boards, and other equipment. per prescribed set backs 5. Music studio: a space dedicated to music-making giving the musicians the area to perfect compositions and per55 and above 16 formance skill by combining rehearsal and recording function in one space include two room, the isolated room used for recorded actions connected with the control room by glass opens to all the visual For ventilating the spaces for water closets and bathrooms, if not opening on the frontside, rear and interior open connection between the rooms. spaces, shall open on the ventilation shaft 6. Server (SER): room includes a server used to store broadcast quality images and Height of Building(m) Size of ventilation shaft(sq m) Minimum size of shaft (m) allows several users to edit stories using the images they contain simultaneously. Above 30.0 9.0 3.0 7. Makeup Rooms: a space used for the makeup; to get preparing for the show inFor buildings above 30.0 m. height, mechanical ventilation system shall be installed besides the provision of minimum ventilation cludes dressing and wardrobe. 8. Green rooms: a space using for waiting room and lounge for performers before shaft. and after a performance. 9. Equipment Rooms and storages: the studios are provided by large equipment store Water requirement and facilities: for different décor utilize for the required occupants. Type of Occupancy Consumption per head per day (in lt.) 10. Support services include the bathrooms, paths, and other services. Mercantile (Commercial) The minimum width of staircase Educational building 1.5 m Institutional buildings 2.0 m All other buildings 1.5 m

a) Restaurants (per seat) b) Other business building

70 45

Lift lobby doors in lift enclosures shall have fire resistance as per Section 11.7.1 of Chapter 11. High Rise Buildings higher than 24m of height without stilts and above 26.5m of height with stilts shall be considered as high rise building. Plot Area Plots to be used for high rise development should be located in an approved Layout plan, Comprehensive plans or sub division plans as prepared and approved by competent authorities/ as per policy of the Government of India / State Governments. A building shall abut on a street or streets or upon spaces directly connected from the street by a hard surface approach road, width of approach road is not less than 9 meters, If there are any bends or curves on the approach road, a sufficient width shall be provided at the curve to enable the fire appliances to turn, the turning circle being at least of 9.0 m radius. Where entry to the plot is through a slip road the gate width shall not be less than 6 m for entry of the firefighting appliance. Peripheral Open Spaces including set backs There shall be a space of 6 m all around up to 40m height and after that a space of 9m all around should be provided Parking Spaces In case of high-rise buildings parking will be permitted at any / all of the following: i. Basements ii. Stilts iii. Podium c. Stacked/ Multi-level/ Automated parking is also permitted. Doorways No exit doorway shall be less than 1m in width. Doorways shall be not less than 2 m in height. Doorways for bathrooms, water closet, stores etc. shall be not less than 0.75m wide. Handrails shall be provided with a minimum height of 0.9m from the center of the tread. The minimum headroom in a passage under the lading of a staircase and under the staircase shall be 2.2m. Ramps The ramp to basement and parking floors shall not be less than 7.2m wide for two way traffic and 4 m wide for one way traffic, provided with Gradient of 1:10 for cars and 1:15 for heavy vehicles. At curved portions of the ramp or for circular ramps the slope should not be more than 1:12. Ramp may also be provided in setback area which can be sloped considering unhindered movement of fire Engine and in no case the gradient shall be less than 1: 10.

Commercial office space is available at the “Central Show Park” with a range of solutions and flexible floor sizes to meet the specific needs of most businesses. The commercial offices differ in the distribution of their spaces depending on the office function embracing: reception, lounge area, conference room, networking events areas and the support services.

Workplaces

Open-plan workplaces encourage the high concentration work areas while creating large collaboration centers to be used by individuals or groups, includes creating opportunities for individuals from different areas to have spontaneous interactions with each other. Also, there are flexible workspace solutions for smaller creative companies, freelancers or those looking to establish a new foothold at the park.

REQUIREMENTS S.l No.

Components

1 i

AVGC Infrastructure Studios Small studios Large studios MOCAP Studios Green Mat Studios

Schematic Drawings

Studios are surrounded by the technical facilities (SCR, audio control), and the support Lifts facilities make up dressing, and green room. All the floors shall be accessible for 24 hours by the lifts. The lifts provided in the buildings shall not be considered as a means of The dimension of the studio depends on types of the shows will record from it. escape in case of emergency. In a dual line arrangement (lifts opposite to each other) the lobby may be between 1.5 times to 2.5 1) Small studio (6*8 m), it is limited to news or similar static programming with little times the depth of one car. For in-line (single line) arrangements the lobby may be typically half of the above recommendations. movement. 2) Average studio (12*18m). Walls of lift enclosures and lift lobby shall have fire rating of 2 hour; (Refer Section 11.7.1 of Chapter 11); lifts shall have a vent at 3)Large studio (30*30m) for a large facility suitable for all types programming. the top of area not less than 0.2 sq.m Lift car door shall have a fire resistance rating of 1 hour.

Rental Offices

Functional relations

The functional relation for the spaces of the studio’s sections; the strong relation is between the studios, studio control room, makeup, and the equipment store, the medium relation is between the studios with the reception, administration, and the services, the other relation is weak.

ii

iii

Meeting Rooms- Small Meeting Rooms- Large Audiotorium Theatres(Screening) Academy Circulation & Others

2

Office - AVGC

3

Business Centre

4

Other use

5

Amenities Restaurants Support Retail

Productions companies

This section serves the companies and agencies of media production that responsible for the filming, editing, and development of a specific production or multimedia broadcast, the section aimed to offer different areas of spaces to accommodate several sizes of the companies supported with all required services. The Facilities The production companies are divided as follows: 1. Administration: consist of the chief office with a secretary, meeting room, financial office, and the accountant office. 2. Offices (Directors): each one of the production companies has at least one director responsible for producing films or other product for the company. 3. Internal Studios: small or large studios depends on the size of the company, it used for one person shows or interviews, the studios are flexible to fit more than the show. 4. Studio Control Room(SCR) 5. Post Production Rooms-Editing rooms: include several of desktop computers, responsible for the final stage, as mentioned in the first chapter in the last phase of multimedia production. 6. Master control room (MCR): the last monitoring point in the video and audio chain before a signal is transmitted. It includes video monitors, videotape recording (VTR), transmission equipment, video server, and automation broadcast equipment for recording and playback of television programming. 7. Archive: space where such records are kept. 8. Server: as the same as in the previous. 9. Makeup areas: as the same as in the studio’s section. 10. Support services: as the same as in the previous.

General Administration

Labs D.I Suite Editing Labs (Audio/Video) Data Management Labs Dubbing Suite Data Centre

Nos.

Area(sq.ft)

Total Area(sq.ft)

4,500 12,000 10,000 12,000

1,76,200 47,500 13,500 12,000 10,000 12,000

2 4 2 2 1

1,500 1,250 2,500 1,500 5,000

21,000 3,000 5,000 5,000 3,000 5,000

8 2 1 2 1

150 500 7,500 1,500 50,000

3 1 1 1

1,200 1,000 7,500 3,000 50,000 46,000 6,25,000

150

seater

18,750 7,00,050

5%

80,000

Total Parking Area

16,00,000 10,56,000

FAR-NA GroundCoverage-40% GreemSpace-15% SiteArea-10 acres (40,406 sq. m.) MaxHeight-50Floors MaxBuiltup-10,20,149.2Sqm AverageFloorHeight-4.2m ServiceFloorHeight-8m BuildingHeight-240m Helipad-1 Parking-3ECS

The Administration of the park is divided as follows: 1. General management: characterized the significant managing role, consist many items that form a complete management unit which encloses: chief office, secretarial office, archive, assistants and meeting hall. 2. Employees affairs: to describes the project’s philosophy, rules, and procedures for addressing employee-related matters and resolving problems in the workplace. 3. Financial affairs: manages the expenses and the revenues of the project and the Corridors staff finance, this section encloses: accounting office, financial assistant, financial The minimum width of a corridor in a residential building shall be 1.0 m for single loaded and 1.8 m for double loaded and in audit, Salaries Officer. all other buildings shall be 1.5m. Where stairways discharge through corridors and passageways, the height of corridors and pas- 4. Public relations management: managing the announcing and advertising that resageways shall be not less than 2.4 m. lates the project, through the various mass media, encloses: announcing and advertising office and representative offices. Helipad 5. IT department: the IT manager responsible for the technologies equipment of the Buildings above 200 m in height, helipad may be provided. project and the related services, the department consists of IT manager office with asecretary, assistant office, and the server room.

STANDARDS & REQUIREMENTS 04

Parikshith G Chouhan

Faculty of Architecture & Design PES University, Bengaluru UA16BA551 : Architectural Design Project

01FB16AAR019

MULTIMEDIA PARK HYDERABAD, TELANGANA

All dimensions are in Meters


The proposed site for the the multimedia park is located at Raidurg khalsa, Hyderabad, Telangana. 31°C 26°C 39°C

The site is located in the the IT hub of the hitech City with near proximity to the Rai Durga metro station. This provides a growing opportunity for investors and entrepreneur to house there enterprises in the tower.

74%

View of present site condition from main raod

View of rocky outcrop in the surrounding area

View of the main road along Salarpuria-sattva

View of the adjacent road leading towards T-hub

Detailed location map of project site

Hi-tech City

Hyderabad

Telangana

* Existing 45 metre wide inorbit mall road on North East * Proposed 20 metre wide road on southwest

Average rainfall : 66.9mm Driest in December : 5.9mm Rainiest in August : 178.9mm

That is factory air quality index in HITECH City. It may cause minor breathing discomfort to sensitive people. Healthy people may enjoy outdoor activities.

10 acres (40,406 sq. m.)

High noise levels

T-hub Salarpuria sattva knowledge City

The project site admeasures approximately 10 acres and has good connectivity to the city and the international airport. Project site has frontage of approximately 168 m along the 45 metre wide abutting road on the North East. In terms of site attributes, project site is highly undulating with boulders and is contiguous in nature and irregular in shape.

SITE ANALYSIS 05

Parikshith G Chouhan

Faculty Faculty of of Architecture Architecture & & Design Design PES University, University, Bengaluru Bengaluru PES UA16BA551 UA16BA551 :: Architectural Architectural Design Design Project Project

01FB16AAR019

MULTIMEDIA PARK HYDERABAD, TELANGANA

All All dimensions dimensions are are in in Meters Meters


Form Generation

Organisational structure

The plot obtained after off-setting the site, serve as the podium of the tower.

By connecting axis from all the four sides through and through from the podium.

Projecting the entrance axis on top of the podium for further extrusion of the superstructure.

Extruding the super structure to the scale of a high-rise building.

Transforming the structure by tapering the middle floors and top floors.

Twisting the superstructure in response to the aerodynamics and the sun direction.

FORM GENERATION & STRUCTURAL ORGANISATION 06

Parikshith G Chouhan

Faculty of Architecture & Design PES University, Bengaluru UA16BA551 : Architectural Design Project

01FB16AAR019

MULTIMEDIA PARK HYDERABAD, TELANGANA

All dimensions are in Meters


Site zoning - The Space hierarchy in vertical stacking is very crucial in designing a tower catering to both public and office. Here the privacy tend to increase from the podium to the pinnacle. - It provides easy access to the tower with zero traffic congestion both on road as well as pedestrian traffic. - Office spaces are more exclusive and less accessible by the public is zoned in more private areas of the tower.

Site zoning

Macro component - Hi-tech City, Raidurg Khalsa, Hyderabad, Telangana.

Exit

Main component -

Rental Offices AVGC facility Training Academy Public Display

Landscape

Office entry

Academy entry

Central core

Micro component - Office Type-A Type-B - Office leisure - Rental studios - Startup offices - Equipment locker room - MOCAP Studios - Breakout spaces - Administration - Training school - Public display - Parking lot

Public entry

Office entry

Parking lot

Public accessible zone The public display area are zoned in such a way that It doesn’t interrupt training institute and offices on the higher floors.

Private exclusive zone

Render farm

Rental offices

Render farm consists of many computer systems, specialized in the calculation of 3D images. Each of these render nodes has the required 3D software, the renderer and needed plugins installed. This render farm occupies the top floors of AVGC facilities and needs sophisticated monitoring stratergy.

This section serves the companies and agencies of media production that responsible for the filming, editing, and development of a specific production or multimedia broadcast, the section aimed to offer different areas of spaces to accommodate several sizes of the companies supported with all required services.

The offices, all the AVGC facilities, Leisure breakout spaces, locker rooms and administration which need security are zoned separately, So that the activities don’t intervene together.

Equipment locker room

MOCAP Studios

These lockers are dedicated to specific offices for the storage of equipments required for the MOCAP studios and other the main studios. All the required props and cameras are stored in here for the later use.

Motion Capture is a cutting-edge method of capturing all or part of an actor’s performance so that it can be translated into the action of a computer generated 3D character on screen. The exact movements of the actor are captured and rendered onto the digital character. These spaces require a lot of head room for execution.

Training school

Public display

Administration

The training institute is one of the central components in the tower In raising the level of mass media employers and new students through introducing students through introducing a two years diploma designed by an International collaboration And certified high specification courses in the media field.

The tower building also provides a link between the firms in media production and the public. This includes primary facilities for media professionals to present their works and participate to the community.

Here are the departments controlling the complex and managing the facilities are alocated. All the company businesses and work allocated are divided into different departments.

Rental studios These small rental studios cater exclusively for production or pre-production facilities of AVGC facilities. It can be rented for a long period of time based on their requirements.

Vertical stacking

ZONING & VERTICAL STACKING 07

Parikshith G Chouhan

Faculty of Architecture & Design PES University, Bengaluru UA16BA551 : Architectural Design Project

01FB16AAR019

MULTIMEDIA PARK HYDERABAD, TELANGANA

All dimensions are in Meters


MINDSPACE JUNCTION FLYOVER

DURGAM CHERUVU RD

EXIT

ENTRY portal+ security cabin

LANDSCAPING

9 m wide road

TRAINING ACADEMY ENTRANCE

Drop-off zone

Drop-off zone

12 m wide road

Emergency staircase from basement

Emergency staircase from basement

Guest surface parking

OPEN SITE

OFFICE ENTRANCE 2

OFFICE ENTRANCE 1

Drop-off zone

Drop-off zone

12 m wide road

Emergency staircase from basement

Emergency staircase from basement

Towards basement parking

Drop-off zone

PUBLIC ENTRANCE DROP-OFF

9 m wide road

STP

SALARPURIA SATTVA KNOWLEDGE CITY

Drop-off zone

Towards basement parking

9 m wide road

SURFACE PARKING

Transformer yard

T-HUB INCUBATION CENTRE

SITE PLAN 08

Parikshith G Chouhan

Faculty of Architecture & Design PES University, Bengaluru UA16BA551 : Architectural Design Project

01FB16AAR019

MULTIMEDIA PARK HYDERABAD, TELANGANA

All dimensions are in Meters


TRAINING ACADEMY ENTRANCE

Archive stores

Emergency staircase from basement

Emergency staircase from basement

Archive stores

Retail store-3

Retail store-1

Storage

Storage

TRAINING ACADEMY ENTRY

Retail store-4

Retail store-2

Cafe shop

Display Unit

Display Unit

PARKING

Cafe shop

Public Display Hall

Public Display Hall Test lab-1

Discussion Area

PARKING Storage

Storage

Waiting lounge LIFT LOBBY

Waiting lounge

MOCAP studios Main studios Locker rooms

Waiting lounge

Test lab-1

Front desk

Tower development office

Tower development office

Open gallery & critique

Office Type-B

AHU

MEN'S TOILET

Office Type-A

Office Type-A

Rental studios

Rental studios

STORAGE

LIFT LOBBY

Test labs-1

Cafe & Eateries

Render farm

OFFICE ENTRANCE 2

Waiting lounge

Front desk

Cafe & Eateries

Maker space interactive gaming

OFFICE ENTRY

DUCT

Public Display Hall gallery- 4

Public Display Hall gallery- 7

Public Display Hall gallery- 2

Public Display Hall gallery- 5

Public Display Hall gallery- 6

OFFICE ENTRANCE 1

ELECTRICAL ROOM

OFFICE ENTRY

Public Display Hall gallery- 1

LIFT LOBBY

STORAGE HOUSE KEEPING

Office Type-A

Office Type-A

Rental studios

Rental studios WOMEN'S TOILET

Public Display Hall gallery- 3

AHU

Office Type-B Render farm

LIFT LOBBY MOCAP studios Main studios Locker rooms

Waiting lounge

CSR

Security cabin-1

Storage

Open gallery & critique

Waiting lounge

Security cabin-2

CSR

Storage

Cafe & Eateries

Cafe & Eateries Large Display gallery

Large Display gallery Public Interactive Lounge

Display gallery

Digital Installation

Public Interactive Lounge

Display gallery

Open gallery

Open gallery

Reception desk

Waiting lounge

Waiting lounge

Transparent gallery

Transparent gallery

PUBLIC ENTRY Digital Installation

Cafe shop

Retail store-5

Cafe shop

Retail store-7

Digital Installation

Public Breakout spaces

Public Breakout spaces

Storage

Emergency staircase from basement

Emergency staircase from basement

PUBLIC ENTRANCE DROP-OFF

Storage Public Conference Hall-1

Public Conference Hall-2

Retail store-6

Retail store-8 Archive stores

Archive stores

First floor plan

Ground floor plan

PUBLIC DISPLAY GALLERY FLOOR PLAN PUBLIC DISPLAY GALLERY & ENTERTAINMENT PLAZA FLOOR PLANS 09

Parikshith G Chouhan Faculty of Architecture & Design PES University, Bengaluru UA16BA551 : Architectural Design Project

01FB16AAR019

PUBLIC ENTERTAINMENT PLAZA FLOOR PLAN MULTIMEDIA PARK HYDERABAD, TELANGANA

All dimensions are in Meters


Department head office

Dean office

Rehearsal Sound lab

Faculty Studio

Meeting Room

Rehearsal Lighting lab

Independent study hall-1

Storage Area

Independent study hall-2

Waiting lounge Waiting lounge

Rehearsal space

Waiting lounge

Waiting lounge

Faculty cabin

Faculty cabin

Faculty cabin

Secretarial office

Discussion room

Waiting lounge

Assistant office

Faculty cabin

Rehearsal Area

Rehearsal Area

Rehearsal Area

Archive office

Waiting lounge

Library

Waiting lounge

Waiting lounge

Discussion room

Rehearsal Equipment area

Library Audio/Visual Area

Discussion room

Study room

Discussion room

Discussion room

Open gallery & critique

Studio classroom - 3

Library bookshelf

Rehearsal Equipment area

Department Admin office

Discussion room

Open gallery & critique

Studio classroom - 5

Studio classroom - 1

Studio classroom - 7

Studio classroom - 9

Studio classroom - 9

Lecture hall

Studio classroom - 4

Rehearsal Area

Studio classroom - 6

Studio classroom - 2

Studio classroom - 8

Lecture hall

Studio classroom - 10

Studio classroom - 10

Open gallery & critique

Open gallery & critique

Open gallery & critique

Open gallery & critique

Open student Lounge

Public relations Area

Discussion room

Workshop storage area

Independent work area

Workshop Area

Computer lab

High powered Workstation

High powered Workstation

Second floor plan TRAINING ACADEMY FIRST FLOOR PLAN

TRAINING ACADEMY FLOOR PLANS 10

Parikshith G Chouhan

Faculty of Architecture & Design PES University, Bengaluru UA16BA551 : Architectural Design Project

01FB16AAR019

Boys green room

Girls green room

Third floor plan TRAINING ACADEMY SECOND FLOOR PLAN MULTIMEDIA PARK HYDERABAD, TELANGANA

All dimensions are in Meters


SEATING IT Manager Office

Secretary office

IT Manager Office

FIRE SAFETY STAIRCASE

Secretary office

Storage

Cafe & Eateries

Waiting lounge

+600 Discussion room

+300 +150

Discussion room

Assistant officer

CIRCULATION STAIRCASE

OUTDOOR SEATING & GARDEN

OUTDOOR SEATING & GARDEN

+600

+150

Assistant officer

Secretarial office

Assistant office

Archive office

Activities

Activities

Front desk

Waiting lounge Waiting lounge

Front desk

+300

Waiting lounge

CUTOUT

CUTOUT

Chief office

Activities

Activities

LOBBY Front desk

Waiting lounge

Waiting lounge

Front desk

AHU Cinema & Visual arts developmental board

Discussion room

MEN'S TOILET

Breakout open space

Financial audit office

Gaming development board

Salaries officer

Animation development board

STORAGE

SEATING

Financial affairs office

SEATING

Discussion room

ELECTRICAL ROOM DUCT

LOBBY

LOBBY

HOUSE KEEPING

Breakout open space

STORAGE

WOMEN'S TOILET AHU Activities

Activities

LOBBY

Activities

Activities

Meeting conference room

CUTOUT

Breakout open space

CUTOUT

Breakout open space

Waiting lounge

Office front desk

+600

+150

+150

+300

+300

OUTDOOR SEATING & GARDEN

Discussion room

Senior Employer affairs office

OUTDOOR SEATING & GARDEN

Cafe & Eateries

Storage

Discussion booth- 1

Discussion booth- 2

SEATING

Fourth floor plan TRAINING ACADEMY FIRST FLOOR PLAN ADMINISTRATION & LEISURE BREAKOUT FLOOR PLAN 11

Parikshith G Chouhan Faculty of Architecture & Design PES University, Bengaluru UA16BA551 : Architectural Design Project

01FB16AAR019

Podium Fifth floor plan TRAINING ACADEMY SECOND FLOOR PLAN MULTIMEDIA PARK HYDERABAD, TELANGANA

All dimensions are in Meters

+600


Dom

storage

storage

security & surveillance

RAMP TO BASE

Fire tank

Emergency staircase from basement

soft tank

Emergency staircase from basement

pump room

storage

Substation security & surveillance

RAMP from BASE 1

EXIT To BASE 2

EXIT From BASE 2

RAMP To BASE

AHU

MEN'S TOILET

MEN'S TOILET

ELECTRICAL ROOM

STORAGE

ELECTRICAL ROOM

DUCT

DUCT HOUSE KEEPING

STORAGE

HOUSE KEEPING

WOMEN'S TOILET

BASEMENT-1 FLOOR PLAN

BASEMENT PARKING FLOOR PLANS 12

Parikshith G Chouhan

Faculty of Architecture & Design PES University, Bengaluru UA16BA551 : Architectural Design Project

01FB16AAR019

RAMP TO BASE

AHU

RAMP FROM BASE

RAMP TO BASE

RAMP FROM BASE

Parking Floor Basement-1

STORAGE

WOMEN'S TOILET

AHU

Emergency staircase from basement

Emergency staircase from basement

Fire tank

RAMP from BASE1

AHU

STORAGE

Fire tank

EXIT To BASE

Raw

EXIT To BASE 1

Emergency staircase from basement

Emergency staircase from basement

Emergency staircase from basement

Emergency staircase from basement

Parking Floor Basement-2 BASEMENT-2 FLOOR PLAN MULTIMEDIA PARK HYDERABAD, TELANGANA

All dimensions are in Meters


Equipment storage room

Server room

MOCAP studio Pantry CSR

Studio loading Corridor

MOCAP main studio

Lighting studio

Lounge

Prop storage

Storage racks

CSR

SCR

Equipment ker-7 storage loc

Equipment ker-9 storage loc

Equipment ker-1 storage loc

Equipment ker-4 storage loc

Workstation

Equipment checkout area

Equipment ker-8 storage loc

Equipment ker-10 storage loc

Director's office

Reception area

Artist's Lounge Make-up area

Prep studio

Locker rooms & wardrobe

Equipment ker-3 storage loc

Equipment ker-6 storage loc

CEO office

Changing rooms Waiting lounge

CA office

Reception area

Project manager office

Entry

Quick hanger area

Equipment ker-2 storage loc

Equipment ker-5 storage loc

Lounge

em secure

Digital syst

storage

Temporary Equipment storage

nge

Workshop

Artist's Lounge

Waiting lou

Entry

Pantry

Director's office

Workstation

CEO office

Project manager office

SCR

Equipment ker-10 storage loc

Equipment ker-9 storage loc

Entry

Equipment storage room

MOCAP main studio Lounge

Reception area

Storage racks

Prep studio

Entry

em secure

Digital syst

CA office

storage

Lounge CSR Prop storage CSR

Server room

AHU

Waiting lounge

Equipment ker-2 storage loc

Equipment ker-3 storage loc

nge

Waiting lou

Reception area

Equipment ker-8 storage loc

AHU

Equipment ker-7 storage loc

Workshop

Studio loading Corridor

Locker rooms & wardrobe

Equipment checkout area

MOCAP studio

Make-up area

Quick hanger area

MEN'S TOILET

Equipment ker-1 storage loc

MEN'S TOILET

STORAGE

Lighting studio

ELECTRICAL ROOM DUCT

Changing rooms

STORAGE Locker rooms & wardrobe

HOUSE KEEPING

Lighting studio

Equipment checkout area

Changing rooms

Equipment ker-4 storage loc

MOCAP studio

Equipment ker-5 storage loc

STORAGE

Temporary Equipment storage

Equipment ker-6 storage loc

ELECTRICAL ROOM

DUCT

STORAGE

HOUSE KEEPING

Equipment ker-6 storage loc

Temporary Equipment storage

Equipment ker-5 storage loc

Equipment ker-4 storage loc

Studio loading Corridor WOMEN'S TOILET Make-up area

Quick hanger area

WOMEN'S TOILET

AHU

Workshop

Waiting lounge

AHU

Server room

CSR Prop storage

Equipment ker-7 storage loc

CSR

Equipment ker-8 storage loc

Reception area

Lounge Lounge

Entry

Prep studio

Reception area

MOCAP main studio

Project manager office

SCR

CEO office

Director's office

Storage racks

nge

CEO office

Entry

CA office Entry

Equipment ker-10 storage loc

Entry

Quick hanger area

Waiting lounge

Reception area

storage

Pantry

Equipment ker-9 storage loc

Project manager office

Workshop

nge

Waiting lou

Temporary Equipment storage

Artist's Lounge

Prep studio

Changing rooms

Equipment ker-1 storage loc

Waiting lou

em secure

Artist's Lounge

Equipment ker-2 storage loc

Equipment storage room Digital syst

Workstation

Equipment ker-3 storage loc

Make-up area CA office

em secure

Digital syst

storage

Reception area

Locker rooms & wardrobe

Director's office

Equipment ker-3 storage loc

Lounge

Equipment checkout area CSR

SCR Equipment ker-2 storage loc

Equipment ker-6 storage loc

Equipment ker-5 storage loc

Equipment ker-8 storage loc

Workstation

Equipment ker-1 storage loc

Prop storage

Equipment ker-9 storage loc

Lighting studio

Storage racks

Lounge

Equipment ker-4 storage loc

Equipment ker-7 storage loc

Equipment ker-10 storage loc

Studio loading Corridor

CSR

MOCAP main studio

Pantry MOCAP studio

Equipment storage room

Server room

MOCAP STUDIOS FLOOR PLAN MOCAP STUDIOS & LOCKER STORAGE ROOM FLOOR PLANS 13

Parikshith G Chouhan Faculty of Architecture & Design PES University, Bengaluru UA16BA551 : Architectural Design Project

01FB16AAR019

LOCKER STORAGE FLOOR PLAN MULTIMEDIA PARK HYDERABAD, TELANGANA

All dimensions are in Meters


Director's cabin

Music studio

Studio 1

Artist lounge

CSR

Studio 2

Archive

CSR Server room

Production office

Editing room

Script writer's office

Air lock passage

Air lock passage

Director's office

Artist lounge

Prep studio

Prep studio

Archive

Pantry

Prop storage area

SCR

MCR

SCR

TSR

Conference room

Discussion Area Prop storage area

Waiting Lounge

Pantry

Studio 2

Store room Breakout space

Air lock passage Editing room

Archive

Director's cabin Waiting Lounge

Conference room

CSR SCR Music studio

AHU

AHU

Pantry

CSR

Server room

MEN'S TOILET

MEN'S TOILET

MCR

TSR Air lock passage

SCR

ELECTRICAL ROOM

STORAGE

STORAGE

Waiting Lounge DUCT

Studio 1

ELECTRICAL ROOM

Studio 1

DUCT

Lift lobby HOUSE KEEPING

Lift lobby

SCR

STORAGE

HOUSE KEEPING

Air lock passage

TSR

Waiting Lounge

STORAGE

MCR WOMEN'S TOILET

WOMEN'S TOILET

Server room CSR

Music studio

AHU SCR

Pantry

CSR Waiting Lounge

AHU

Breakout space/Lounge

Director's cabin Editing room Archive

Air lock passage Prop storage area

Studio 2

Waiting Lounge

Pantry SCR

MCR

Prop storage area

Pantry

TSR

SCR

Script writing desk

Rigging desk

Prep studio

Prep studio Air lock passage

Artist lounge

Workstation

Air lock passage Air lock passage

Editing room

Server room

Studio 2 Studio 1

Archive

CSR

CSR

Artist lounge

Music studio

Director's cabin

MAIN STUDIO FLOOR PLAN

MAIN STUDIOS & OFFICE TYPE -A FLOOR PLANS 14

Parikshith G Chouhan

Faculty of Architecture & Design PES University, Bengaluru UA16BA551 : Architectural Design Project

01FB16AAR019

OFFICE TYPE - A FLOOR PLAN MULTIMEDIA PARK HYDERABAD, TELANGANA

All dimensions are in Meters


Pantry

CSR

Green room

CSR

Green screen room Workstation

MOCAP mini studio

Lounge

Conference room

Equipment storage

Server room & archive

Equipment storage

Render node station -1

MOCAP mini studio

Waiting lounge

Prep studio

CEO office

Equipment checkout

Tongue-in-cheek station-1 CEO office Workstation-1

Prep studio

Pantry CSR

Conference room Lounge

File server & render management

CSR

AHU

AHU

waiting lounge

MEN'S TOILET

Green room

MEN'S TOILET

Audio-Visual room

Waiting lounge

STORAGE

ELECTRICAL ROOM

Green screen room

Data centre

DUCT

STORAGE

ELECTRICAL ROOM

Lounge

DUCT

Green screen room STORAGE

HOUSE KEEPING

Pantry

HOUSE KEEPING

Render node station -2

STORAGE

Waiting lounge Green room WOMEN'S TOILET

WOMEN'S TOILET AHU

CSR

Lounge

AHU Waiting lounge

Conference room

CSR

Pantry

Prep studio

Workstation-2

Workstation-1 CEO office

Storage

Waiting lounge

Workstation-1 Audio-Visual room

Equipment checkout

CEO office

Prep studio

Waiting lounge

MOCAP mini studio Server room & archive

Equipment storage

Tongue-in-cheek station-2

Conference room

Equipment storage

Quick pick nodes

MOCAP mini studio

Lounge Workstation

File server & render management

Green screen room CSR

CSR

Green room

Pantry

RENTAL STUDIO FLOOR PLAN RENTAL STUDIO & RENDER FARM PLANS 15

Parikshith G Chouhan Faculty of Architecture & Design PES University, Bengaluru UA16BA551 : Architectural Design Project

01FB16AAR019

RENDER FARM FLOOR PLAN MULTIMEDIA PARK HYDERABAD, TELANGANA

All dimensions are in Meters


Up Director's office

Gym

Script writer's office

Down Changing room

Discussion Area Production office

Breakout space Library

Conference room Front desk

Equipment room

Waiting Lounge

AHU Story board discusssion

Prep studio

AHU

Lift lobby

Meditation room

MEN'S TOILET

MEN'S TOILET

Studio

Workstation-1

STORAGE STORAGE

ELECTRICAL ROOM

Gaming zone

ELECTRICAL ROOM

DUCT

CSR DUCT

HOUSE KEEPING HOUSE KEEPING

STORAGE

STORAGE Script writing desk

Storage WOMEN'S TOILET

WOMEN'S TOILET

AHU

Pantry

Pantry

AHU

Lift lobby

Library

Waiting Lounge

Lounge

Workstation-2

Snooker table

Lounge

Lounge

Changing room Down

Table tennis Staff storage

Gym

Up

OFFICE TYPE - B FIRST FLOOR PLAN RENTAL OFFICE TYPE - B FLOOR PLANS 16

Parikshith G Chouhan Faculty of Architecture & Design PES University, Bengaluru UA16BA551 : Architectural Design Project

01FB16AAR019

OFFICE TYPE - B SECOND FLOOR PLAN MULTIMEDIA PARK HYDERABAD, TELANGANA

All dimensions are in Meters


CSR control room BMS controlled louver BMS responsive louver track MAIN STUDIO FLOOR

Exterior Diagrid 350mm Insulated low-E glass curtain wall RCC Flooring Exterior diagrid LOCKER AREA FLOOR

False ceiling Gyp board light inclusion Stiffened rigging rod Motion track sensor cross web metal scaffolding Mobile track lights

MOCAP STUDIO FLOOR

Double skin louvered fascade detail + Section through MOCAP studio

MOCAP STUDIO SECTIONAL VIEW 17

Parikshith G Chouhan

Faculty of Architecture & Design PES University, Bengaluru UA16BA551 : Architectural Design Project

01FB16AAR019

MULTIMEDIA PARK HYDERABAD, TELANGANA

All dimensions are in Meters


RENDER FARM RENDER FARM

OFFICE B5 OFFICE B4

OFFICE B3 OFFICE B2 OFFICE B1 OFFICE A8 OFFICE A7 OFFICE A6 OFFICE A5 OFFICE A4 OFFICE A3 OFFICE A2 OFFICE A1

OFFICE WAITING AREA RENTAL STUDIOS RENTAL STUDIOS RENTAL STUDIOS RENTAL STUDIOS RENTAL STUDIOS RENTAL STUDIOS MAIN STUDIOS MAIN STUDIOS MAIN STUDIOS MAIN STUDIOS EQUIPMENT ROOMS AND LOCKERS MOCAP MAIN STUDIOS

MOCAP MAIN STUDIOS LEISURE BREAKOUT SPACE ADMINISTRATION TRAINING ACADEMY TRAINING ACADEMY PUBLIC DISPLAY PUBLIC DISPLAY PARKING LOT 1 PARKING LOT 2

NORTH ELEVATION NORTH ELEVATION

Section through the core

SECTION & ELEVATION 18

Parikshith G Chouhan

Faculty of Architecture & Design PES University, Bengaluru UA16BA551 : Architectural Design Project

01FB16AAR019

North elevation

WEST ELEVATIONWEST ELEVATION West elevation

MULTIMEDIA PARK HYDERABAD, TELANGANA

All dimensions are in Meters


RENDERS 19

Parikshith G Chouhan

Faculty of Architecture & Design PES University, Bengaluru UA16BA551 : Architectural Design Project

01FB16AAR019

MULTIMEDIA PARK HYDERABAD, TELANGANA

All dimensions are in Meters


Turn static files into dynamic content formats.

Create a flipbook
Multimedia Tower - Thesis Project Documentation by Parikshith chauhan - Issuu