2026
AN ANNUAL SUPPLEMENT TO WORLD PIPELINES
Tape System? Shrink Sleeve? Liquid Coating? DENSO.
denso-group.com
DENSO. The full range of perfect protection.
Since 1948, Tinker & Rasor has been a trusted name in holiday detection, relied upon by pipeline professionals worldwide. For over 76 years, our holiday detectors have set the benchmark for performance and reliability, ensuring the integrity of protective coatings by detecting coating flaws with precision. With a legacy of innovation and toughness, Tinker & Rasor continues to lead the industry, delivering cutting-edge solutions to safeguard pipeline coatings and maintain quality standards across the globe.
Tinker & Rasor Holiday Detectors – Ensuring Coating Quality, One Spark at a Time! Model APS
3 Year Warranty
US Toll Free
TOUGH &
INTERNATIONAL
YOU BET!
1 833-332-1010 1 830-253-5621
RELIABLE,
SCAN QR CODE TO SEE PROOF
tinker-rasor.com
info@tinker-rasor.com
04
26
CONTENTS
47
WORLD PIPELINES | INTEGRITY 2026
03. Editor's comment INTEGRITY: HYDROGEN AND CARBON DIOXIDE 04. Addressing the challenge Ali Alani, Head of Asset Integrity – UK and Ireland, DNV.
INLINE INSPECTION 36. Engineering integrity data from a dual-diameter pipeline Almir Sobral, Principal Integrity Engineer; Hicham Bensalem, Operations Manager (Americas); and Williams Puentes, Applications Engineer (Americas), Intero Integrity Services.
R
eliable condition data enhances the confidence and quality of pipeline integrity assessments and decisionmaking while minimising unnecessary operational disruption. A recent dual-diameter ultrasonic inline inspection demonstrates how early feasibility work, custom tool configuration, and field validation can transform inspection data from a complex pipeline geometry into valuable information supporting integrity decisions. The integrity challenge behind non-standard pipelines Pipeline integrity programmes are often discussed in terms of assessment intervals, anomaly classification, fitness for service, remaining life calculations, repair ranking, risk assessment and compliance reporting. However, each of these activities depends on one prerequisite: reliable inspection data from the pipeline itself. When the pipeline has a standard configuration and is readily piggable, obtaining that data can be relatively straightforward. When the asset includes diameter transitions with varying thickness, mixed construction types, and strict operational constraints, the inspection strategy becomes a central part of the integrity challenge. This was the case for an energy sector operator that required ultrasonic inline inspection of an approximately 7000 ft (2.13 km) pipeline constructed from both 10 in. and 12 in. sections. The pipeline included seamless and electric resistance welded (ERW) pipes of varying thickness, creating material and geometry variation across the inspected length. The operator also required reporting in line with specific integrity management and compliance expectations, placing a strong emphasis on data accuracy, repeatability and verification. The project was not only a question of moving an inspection tool through the pipeline. It required an inspection approach that could support pipeline integrity decisionmaking by delivering accurate metal loss and deformation data, maintaining data quality through diameter transitions, and reducing unnecessary disruption to operations.
Ali Alani, Head of Asset Integrity – UK and Ireland, DNV, addresses integrity and inspection challenges for hydrogen and CO2 pipelines.
H
ydrogen and carbon dioxide (CO2) transportation networks are increasingly recognised as critical enablers of the global energy transition. Hydrogen has a key role to play in decarbonising hard-to-abate sectors, while carbon capture, utilisation, and storage (CCUS) depends on the safe and reliable transport of captured CO2 from emission sources to storage or utilisation sites. As the scale of these industries grows, pipelines will remain the most practical, safe, and cost-effective means of transporting large volumes of hydrogen and CO2 over long distances. DNV’s Energy Transition Outlook (ETO) highlights the significant growth expected in both hydrogen and CCUS infrastructure over the coming decades. Supporting this trend, a recent
DNV survey of transmission pipeline operators found that more than 50% expect to partially or fully transition existing natural gas systems to hydrogen, hydrogen blends, biomethane, CO2, or other emerging energy carriers within the next five to 10 years. However, while pipelines have an established track record transporting natural gas and hydrocarbons, hydrogen, and CO2 introduce a new set of integrity management challenges that operators must address to ensure continued safe operation.
Hydrogen and CO2 associated challenges Many operators are evaluating whether existing natural gas infrastructure can be repurposed for hydrogen or CO2 service. While repurposing
Why the previous inspection approach was not enough
PAGE 4
5
04
The pipeline had previously been inspected in 2018 by another service provider. Because of the dual-diameter configuration, the earlier project required two separate inline inspection runs: one for each diameter. While this approach collected the required data, it also extended field execution time, increased operational cost, and created greater disruption for the operator. From an integrity management perspective, this matters. Inspection activities need to generate the data required for safe asset management, but they also have to fit within the operational reality of the facility. If the inspection process is too disruptive, too costly or too complex to repeat efficiently, the practicality of future integrity assessments can be affected. The operator therefore needed a more efficient inspection method that could improve data quality while reducing execution time and field exposure.
Almir Sobral, Principal Integrity Engineer; Hicham Bensalem, Operations Manager (Americas); and Williams Puentes, Applications Engineer (Americas), Intero Integrity Services, consider how ultrasonic inline inspection supports integrity decisions for a 10 in. and 12 in. liquid pipeline system.
36
PIPELINE STANDARDS 09. Cracking the code: API RP 1176 Paula Watkins, Senior Director of Standards Development at the American Petroleum Institute (API).
37
PAGE
36
41. Thinking outside the box Jhaniel Osorio-Silva and Andrés Molina, ROSEN Colombia S.A.S., Colombia, and Andrew Wilde, ROSEN (UK) Ltd.
TESTING 47. Raising the bar
COATINGS 14. Ready for CO2
Harri Lipsonen, Product Development Director, Infra and Energy at Teknos Group.
CORROSION 20. Balancing safety, reliability, and lifecycle cost in midstream maintenance Edwin Blom, Executive Advisor for IGS.
26. AC mitigation at a crossroads John Rettig, Chief Operating Officer, Farwest Corrosion Control Co.
31. Understanding corrosion under insulation
Dr Jimmy Campbell, Plastometrex.
ASSET INTEGRITY 50. From static to live Nigel Curson, Executive Vice President – Technical Excellence, and Chris Wood, Director – Asset Integrity (Europe), Penspen.
PIPELINE MATERIALS 53. Advancing the world's infrastructure one fused joint at a time McElroy.
CorrosionRADAR and Tecnofink Ltd.
010_RZ_World Pipelines Cower_260831.qxp_WP 31.08.26 18:24 Seite 1
2026
AN ANNUAL SUPPLEMENT TO WORLD PIPELINES
CBP019982
Reader enquiries [www.worldpipelines.com]
Everything you need for long-lasting pipeline protection. DENSO offers the full range of perfect corrosion protection – whether for new construction or rehabilitation, whether tape systems, heat-shrink sleeves or liquid coatings: our comprehensive portfolio provides the right solution for every application. Backed by over 100 years of experience and guaranteed in-house production, every solution stands for highest DENSO quality, reliability and durability. denso-group.com
Tape System? Shrink Sleeve? Liquid Coating? DENSO.
denso-group.com
Copyright© Palladian Publications Ltd 2026. All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form or by any means, electronic, mechanical, photocopying, recording or otherwise, without the prior permission of the copyright owner. All views expressed in this journal are those of the respective contributors and are not necessarily the opinions of the publisher, neither do the publishers endorse any of the claims made in the articles or the advertisements. Printed in the UK.
DENSO. The full range of perfect protection.
ISSN 1472-7390
ON THIS MONTH'S COVER
MECHANICAL PROTECTION
FIELD JOINT PROTECTION
PIPELINE PROTECTION
Henkel Adhesive Technologies
EDITOR’S COMMENT CONTACT INFO MANAGING EDITOR James Little
james.little@worldpipelines.com
EDITORIAL ASSISTANT Willow Munz
willow.munz@worldpipelines.com
SALES DIRECTOR Rod Hardy
rod.hardy@worldpipelines.com
SALES MANAGER Chris Lethbridge
chris.lethbridge@worldpipelines.com
SALES EXECUTIVE Daniel Farr
daniel.farr@worldpipelines.com
PRODUCTION DESIGNER Siroun Dokmejian
siroun.dokmejian@worldpipelines.com
HEAD OF EVENTS Louise Cameron
louise.cameron@worldpipelines.com
DIGITAL EVENTS COORDINATOR Merili Jurivete
merili.jurivete@palladianpublications.com
DIGITAL CONTENT COORDINATOR Kristian Ilasko kristian.ilasko@worldpipelines.com
MARKETING AND DIGITAL EXECUTIVE Sophie Birss sophie.birss@worldpipelines.com
SENIOR WEB DEVELOPER Ahmed Syed Jafri ahmed.jafri@worldpipelines.com
DIGITAL ADMINISTRATOR Nicole Harman-Smith
nicole.harman-smith@worldpipelines.com
ADMINISTRATION MANAGER Laura White laura.white@worldpipelines.com
Palladian Publications Ltd, 15 South Street, Farnham, Surrey, GU9 7QU, UK Tel: +44 (0) 1252 718 999 Website: www.worldpipelines.com Email: enquiries@worldpipelines.com Annual subscription £120 UK including postage/airmail. Single issue rate (postage/airmail paid) is £30. Claims for non receipt of issues must be made within three months of publication of the issue or they will not be honoured without charge. Applicable only to USA & Canada: World Pipelines (ISSN No: 1472-7390, USPS No: 020-988) is published monthly by Palladian Publications Ltd, GBR and distributed in the USA by Asendia USA, 701C Ashland Avenue, Folcroft, PA 19032. Periodicals postage paid at Philadelphia, PA & additional mailing offices. POSTMASTER: send address changes to World Pipelines, 701C Ashland Avenue, Folcroft, PA 19032.
I
n September, California Governor Gavin Newsom signed into law the Hydrogen Pipeline Safety Act (SB 804), establishing a new regulatory framework for hydrogen pipeline infrastructure in the US state. The Act recognises that the infrastructure required to transport hydrogen safely must account for the particular challenges presented by the product transported. Among its provisions, the legislation addresses hydrogen-compatible materials, leakage minimisation, and continuous monitoring of pipeline operating conditions. It also clarifies regulatory oversight of SENIOR EDITOR Elizabeth Corner elizabeth.corner@palladianpublications.com dedicated hydrogen pipelines, establishing a framework for safety requirements as the state’s hydrogen infrastructure develops. California is actively building a hydrogen economy, supported by major publicprivate investments (although it faces notable infrastructure and supply challenges). This new legislation recognises that a growing hydrogen economy in California will require infrastructure and safety standards that are designed specifically for hydrogen, rather than relying on requirements developed for conventional natural gas pipelines. It also builds on the idea that integrity should be considered from the outset, rather than treated as something to be managed once a pipeline enters service. Design codes, material specifications, construction standards, and integrity management programmes have, of course, long been fundamental to safe pipeline operation. However, the emergence of new energy infrastructure – alongside the increasing sophistication of inspection and monitoring technologies – is bringing renewed attention to how integrity is built into an asset and maintained throughout its operational life. Hydrogen presents particular challenges, including material compatibility, embrittlement, and leakage. Carbon dioxide transportation also brings its own special considerations. In both cases, the pipeline industry cannot expect products and assets to behave in the same way as those associated with conventional hydrocarbon pipelines. California’s new legislation is one example of how the industry’s approach to safety is developing alongside new infrastructure requirements, but the implications extend beyond new assets. Existing pipeline networks are ageing, operating conditions are changing, and operators face continued pressure to maximise asset life while maintaining safety and reliability. Anticipating where problems might develop, and making informed decisions about maintenance and investment requires a combination of sound engineering, reliable data, effective monitoring, and appropriate standards. It also requires an appreciation of the fact that no single technology or approach can provide a complete picture of pipeline condition. These themes are reflected in this year’s World Pipelines Integrity issue. DNV opens the issue by examining the integrity challenges associated with hydrogen and carbon dioxide transportation, and the American Petroleum Institute explores API RP 1176 and its expanded lifecyle management approach to pipeline cracking. Teknos considers internal flow coatings for CO2 service, and our corrosion feature addresses midstream maintenance strategies, AC mitigation, and corrosion under insulation. Elsewhere, contributors explore advances in inline inspection, the use of integrity data, testing methodologies, pipeline materials, and approaches to asset integrity management. The articles in this special issue demonstrate the breadth of technical knowledge required to keep pipeline infrastructure operating safely and efficiently, as the industry faces challenges old and new.
Ali Alani, Head of Asset Integrity – UK and Ireland, DNV, addresses integrity and inspection challenges for hydrogen and CO2 pipelines.
H
ydrogen and carbon dioxide (CO2) transportation networks are increasingly recognised as critical enablers of the global energy transition. Hydrogen has a key role to play in decarbonising hard-to-abate sectors, while carbon capture, utilisation, and storage (CCUS) depends on the safe and reliable transport of captured CO2 from emission sources to storage or utilisation sites. As the scale of these industries grows, pipelines will remain the most practical, safe, and cost-effective means of transporting large volumes of hydrogen and CO2 over long distances. DNV’s Energy Transition Outlook (ETO) highlights the significant growth expected in both hydrogen and CCUS infrastructure over the coming decades. Supporting this trend, a recent
4
DNV survey of transmission pipeline operators found that more than 50% expect to partially or fully transition existing natural gas systems to hydrogen, hydrogen blends, biomethane, CO2, or other emerging energy carriers within the next five to 10 years. However, while pipelines have an established track record transporting natural gas and hydrocarbons, hydrogen, and CO2 introduce a new set of integrity management challenges that operators must address to ensure continued safe operation.
Hydrogen and CO2 associated challenges Many operators are evaluating whether existing natural gas infrastructure can be repurposed for hydrogen or CO2 service. While repurposing
5
offers significant economic and environmental benefits, these products can affect pipeline behaviour in ways that are not fully comparable with conventional natural gas operation. For hydrogen pipelines, material compatibility remains a primary concern. Hydrogen can reduce fracture resistance and increase fatigue crack growth rates (FCGR), potentially accelerating defect growth and reducing remaining life estimates. As a result, integrity assessment methods may require updates to consider the changes in material behaviour, and the effect of stress from internal and external loading, residual welding, or stress concentrations arising from defects, misalignment, or ovality. Hydrogen also presents different leak and dispersion characteristics. Its wider flammability range and lower ignition energy can increase the consequences associated with accidental releases. Existing quantitative risk assessments (QRAs) developed for natural gas service are no longer applicable and would require significant revision. For CO2 transportation systems, integrity challenges are strongly influenced by operating conditions and fluid composition. The presence of impurities, pressure cycling and phase behaviour can introduce complex degradation mechanisms. Where hydrogen is also present in the CO2 stream, the picture becomes more complicated. Beyond a certain blend ratio hydrogen becomes the dominant influence on material behaviour and that threshold has not yet been definitively established. Although it is this uncertainty that has led the industry to question whether repair methodologies developed for hydrogen pipelines can be directly applied to CO2 infrastructure. In addition, DNV’s contribution to the SIF CO2 Transportation Alpha project identified that flow-induced vibration and pulsation may be more problematic during transportation of gaseous-phase CO2 than for natural gas at equivalent flow velocities. This highlights the need for careful design and operational assessment.
From repurposing guidance to practical implementation Over recent years, DNV has played a significant role in developing guidance for both new-build hydrogen pipelines and repurposing existing infrastructure. Its ‘Repurposing Onshore Pipelines for Hydrogen’ whitepaper outlines a process to assess the safety and feasibility of repurposing pipelines for hydrogen to build the confidence and certainty needed by network operators, governments, and regulators to enable decision making. While earlier industry efforts focused primarily on determining whether repurposing was technically feasible, the industry is now entering a phase where operators require practical methodologies for demonstrating ongoing fitnessfor-service. A recent milestone is the publication of DNV-RP-F123, Hydrogen Pipeline Systems. The recommended practice addresses a broad range of topics associated with offshore hydrogen pipeline design, construction, re-qualification, and operation of systems related to structural integrity. This includes the effect of hydrogen on the material properties
6 World Pipelines / INTEGRITY 2026
of line pipe and connecting welds, providing a foundation for the safe adoption of hydrogen pipeline systems as the energy transition progresses. DNV-RP-F123 recognises that hydrogen in transported fluids can cause hydrogen embrittlement, reducing the fatigue and fracture resistance of pipeline materials, and provides supplementary requirements to address these risks. It also notes that laboratory testing indicates hydrogen can affect the material properties of carbon steels at concentrations below the historical 2 mol% threshold. However, the influence of hydrogen on the brittle-toductile transition behaviour remains an area requiring further research. As operators move from feasibility studies into project execution, resolving such assessment challenges will be essential to achieving safe and economically viable hydrogen transportation systems.
Compliance and HSE expectations One of the main expectations from the UK Health and Safety Executive (HSE) is that pipeline operators understand their pipeline condition and ensure they operate within the safe operating limits to demonstrate compliance with Pipeline Safety Regulations (PSR) 1996. To satisfy these requirements, demonstrating asset condition is expected to become increasingly challenging as hydrogen and CO2 networks expand. Operators must also demonstrate that materials, components and systems remain suitable for their intended operating environment. Sealing systems, gaskets and ancillary equipment may experience different performance characteristics when exposed to hydrogen, potentially increasing fugitive emissions if not properly qualified. Furthermore, hydrogen release behaviour differs significantly from natural gas, exhibiting different dispersion patterns and potentially generating larger overpressures under certain explosion scenarios. Consequently, previous HSE safety cases cannot automatically be transferred to hydrogen service. The same scrutiny is being applied to CO2 infrastructure. DNV’s Skylark JIP, in conjunction with the UK HSE Science Division and industry partners, is addressing key CO2 pipeline safety challenges. Its work focuses on understanding and mitigating the risks associated with transporting CO2 from industrial sources to storage facilities via onshore and offshore pipelines.
Inline inspection (ILI) challenges ILI remains one of the most important tools available to pipeline operators for managing integrity and demonstrating fitness-for-service. For conventional hydrocarbon pipelines, decades of operational experience have established a clear understanding of inspection tool capabilities, limitations and performance expectations. For hydrogen and CO2 pipelines, however, significantly less operational data exists. Several key questions remain: ) Can existing inspection technologies operate effectively in hydrogen and CO2 environments?
PETROLATUM TAPE WRAP SYSTEMS
PROTECTIVE OUTERWRAPS
LIQUID EPOXY COATINGS
BUTYL TAPE WRAP SYSTEMS
SOIL-TO-AIR INTERFACE
HEAT SHRINKABLE SLEEVES
BITUMEN TAPE WRAP SYSTEMS
INTERNAL PIPE LININGS
The value of the programme lies in generating objective performance data under controlled conditions. This information can support integrity management decisions, optimise maintenance programmes and provide greater confidence when demonstrating compliance and fitnessfor-service. As the industry transitions toward new energy carriers, establishing a robust evidence base for inspection capability will be critical for both operators and regulators.
Adapting pipeline repair for hydrogen use
Figure 1. Pipeline epoxy repair sleeve.
) Are defect detection thresholds affected by the
transported medium? ) Can crack-like defects be reliably identified and sized
given the potentially smaller allowable flaw sizes associated with hydrogen service? ) What levels of probability of detection (POD), probability of identification (POI), and probability of sizing (POS) can realistically be achieved? These questions become increasingly important when defect acceptance criteria become more stringent. If allowable flaw sizes decrease, inspection performance requirements inevitably increase. The industry therefore requires independent, high-quality performance data that validate actual ILI performance under representative hydrogen and CO2 operating conditions. To address these challenges, DNV is establishing an industry-leading ILI performance test loop facility. The facility will enable operators and inspection vendors to conduct blind testing of inspection tools on pipeline sections containing predefined defects under realistic operating conditions. Testing environments will include natural gas, hydrogen blends up to 100% hydrogen and gaseous CO2. The objective is to independently verify inspection performance by measuring key metrics including probability of detection, identification and sizing for a range of defect types, including corrosion, cracking, geometric anomalies, and strain-related features.
8 World Pipelines / INTEGRITY 2026
Pipeline repairs represent another important challenge for hydrogen transportation systems in addition to CO2 pipelines which also contain hydrogen. Over decades of operation, operators have installed a wide variety of repair systems across existing pipeline networks. While many of these technologies have proven performance records in natural gas service, uncertainty remains regarding their suitability in hydrogen environments. Questions exist both for existing repairs already installed on pipelines being considered for repurposing and for repair systems that may be installed in the future. Although welded repair solutions remain technically viable, many operators are increasingly interested in technologies that can be installed without hot work to reduce operational risks. To address these uncertainties, DNV is launching a dedicated Hydrogen Repair joint industry project (JIP). The programme is undertaking full-scale testing of ten repair systems that have been widely deployed across the industry, including welded repair sleeves, composite repair systems, compression sleeves, epoxy shell (Figure 1) systems, weld deposition repairs, welded split tees, grouted tees and temporary repair technologies. The project aims to provide the evidence required to verify performance under hydrogen service conditions and establish confidence in both existing and future repair strategies. By generating independent qualification data, the project will help operators make informed decisions regarding repair selection, repurposing feasibility, and long-term asset integrity management.
Driving standards to support the energy transition Hydrogen and CO2 pipelines are expected to become critical components of future energy infrastructure. While many of the integrity management principles developed for natural gas pipelines remain relevant, these new products introduce unique challenges associated with material performance, inspection capability, risk assessment and repair qualification. The industry’s ability to safely deploy large-scale hydrogen and CO2 transportation networks will depend on developing the evidence, standards and technologies required to demonstrate fitness-for-service with confidence. Through initiatives such as joint industry projects, new standards and whitepapers, DNV is working closely with industry partners to address these knowledge gaps and support the safe and reliable expansion of energy transition infrastructure worldwide.
Paula Watkins, Senior Director of Standards Development at the American Petroleum Institute (API), outlines how the second edition of API RP 1176 strengthens the assessment and management of cracking in pipelines.
A
t a pipeline operator’s office, engineers are reviewing the results of a recent inline inspection (ILI). The run has reported several crack-like indications along one segment of pipe: three ILI calls with similar
Figure 1. The second edition of API RP 1176 strengthens guidance for managing pipeline cracking threats.
9
dimensions. On the inspection report, there may be little to distinguish between them. But the team knows that its next steps will depend on more than the dimensions alone. Ultimately, one feature may warrant repair. One may require further evaluation before a decision can be made. And one may prove to be a stable crack anomaly that does not require a response and will be monitored in future assessments. The distinction is important. Excavating and repairing a feature that presents negligible risk can consume resources better directed elsewhere, while failing to act on a significant cracking threat can lead to pipeline failure and potential harm. To reach the right conclusion, the operator must look beyond the inspection data and consider what else is known about the pipe, its operating history, and the conditions in which the feature exists. This is a major challenge in the management of pipeline cracks. Inspection technologies give operators detailed information about cracking, but finding an indication is just the starting point of a pipeline integrity decision. The harder work is determining what the indication represents, how it is likely to behave, and what response it merits. The newly published second edition of API Recommended Practice 1176 (API RP 1176), Assessment and Management of Cracking in Pipelines, strengthens the framework for that work.1 API RP 1176, the industry’s most comprehensive standard on pipeline crack management, carries the integrity decision forward from detection. Operators classify and assess what the inspection found, determine what response is warranted, and establish when the pipeline should be reassessed.
The need for a second edition The tools and information available to support those decisions have evolved significantly since API first published RP 1176 in 2016. Over the past decade, inspection and nondestructive examination technologies have advanced, while the pipeline industry has accumulated additional operating experience, research findings, and lessons learned from integrity management programmes. The second edition incorporates those advances and reflects the broader knowledge operators can bring to integrity decisions, including operational history, inspection data, environmental conditions, metallurgical information and industry experience. The second edition also frames cracking as a threat to be managed at the programme level, rather than evaluated one indication at a time. Engineering assessment of specific features remains critical, but the revised guidance reinforces the case for managing those features within a programme that carries forward from one assessment to the next. The standard serves both hazardous liquid and natural gas pipeline operators across diverse regulatory and geographic environments, and remains broadly applicable internationally. It augments API RP 1160, Managing System Integrity for Hazardous Liquid Pipelines,2 and is complemented by API RP 1193, Pipeline Pressure Cycle
10 World Pipelines / INTEGRITY 2026
Management,3 which provides additional guidance on pressure cycling and fatigue crack growth. The revision of RP 1176 also reflects the breadth of expertise required to manage pipeline cracking effectively. Developed through API’s open, consensus-based standards development process, it draws on subject matter experts spanning all disciplines of pipeline operations and integrity professionals. The result is a comprehensive framework for making consistent, risk-informed pipeline integrity decisions.
Enhanced crack classification Operators draw on that broader body of knowledge when they classify what an inspection has found. An ILI-reported crack-like indication is not a final diagnosis; the operator still has to determine how likely the feature is to represent a crack, what conditions may be acting on it, and what the available evidence says about its significance. The process starts with understanding what inspection technologies can detect. The RP 1176 update expands discussion of modern ILI and nondestructive examination technologies and their capabilities for crack detection. The second edition provides a common set of terms and concepts for that process. Its ILI response methodology groups feature likelihood into three general classifications: likely crack, possible crack, and unlikely crack or stable feature. Further assessment helps determine what happens next. Manufacturing-related features show why further characterization matters. Electric resistance welding (ERW) seam issues, hook cracks, lack of fusion, and hard spots receive more detailed treatment in the revised standard. Operators can use that detail to characterise these features and incorporate them into risk-informed integrity decisions. Consider an operator that identifies a crack-like indication during an inline inspection of a vintage liquid pipeline. Under the first edition, the assessment would center on evaluating the feature against established engineering criteria and determining whether it required immediate repair or could be monitored. The second edition of RP 1176 asks more of that assessment. The same feature is evaluated within a broader pipeline cracking management programme, one that accounts for the quality of the inspection data, the potential for threats to interact, the pipeline’s operating history, the operator’s integrity management practices, and the monitoring that follows. Identifying the cracking mechanism is central to that work. Stress corrosion cracking, fatigue, hydrogenrelated cracking, and manufacturing-related cracking differ in growth characteristics, failure modes and susceptibility factors. Crack growth assumptions used in an engineering evaluation should match the mechanism at work, and those assumptions carry into the remaininglife assessment, which in turn shapes whether a feature can be safely monitored or more immediate action is
needed. Those judgments drive how operators prioritise inspections, repairs, and reassessment schedules.
Expanded guidance on reassessment intervals Once a feature has been characterised, the next question is how it may behave over time. The second edition of RP 1176 expands guidance for crack-growth assessment and reassessment planning, strengthening the connection between what operators know about a feature today and when they should inspect or act again. Stress corrosion cracking (SCC) behaves differently depending on the mechanism at work. The second edition covers near-neutral-pH and high-pH SCC in more detail, including causes and the conditions under which each develops. Knowing which mechanism is present shapes how an operator judges the rate at which a feature may grow. Hydrogen-related threats receive greater attention as the industry evaluates hydrogen transportation, hydrogen blending, and evolving energy infrastructure applications. Expanded guidance on environmentally assisted cracking covers hydrogen-induced cracking and related forms of hydrogen damage. Operators will also notice a shift in vocabulary. Limit state and limit state pressure ratio (LSPR) replace traditional failure terminology. LSPR compares estimated pressure capacity with a defined pressure. Those assessments feed into remaining-life calculations, which estimate the time for a flaw to grow to a defined limit state. Operators use those calculations to set reassessment intervals and plan long-term integrity work.
New guidance on circumferential cracking Pipeline circumferential cracking, which forms around the circumference of a pipeline, requires a different assessment lens. The second edition of RP 1176 expands guidance on circumferential crack threat management, including circumferential stress corrosion cracking (C-SCC), strain-related cracking risks and the challenges associated with longitudinal stresses, geohazards and displacementcontrolled loading conditions. A dedicated discussion of circumferential cracking is included in Annex N. These conditions create a different loading picture from the one typically associated with axial cracking. Internal pressure produces hoop stress that often dominates axial crack assessment, while circumferential cracking can be influenced more significantly by longitudinal stresses and strains. Ground movement, settlement and other geohazards can impose displacement on the pipe, making strain an important consideration in the integrity assessment. That distinction also places limits on the use of LSPR. Because circumferential crack behavior is not directly driven by internal pressure, the customary LSPR approach does not apply. Instead, the second edition provides for conceptually equivalent safety factors based on the relevant strain or stress capacity and demand.
12 World Pipelines / INTEGRITY 2026
An expanded lifecycle management approach Geohazards act on pipelines already in service, but other cracking threats are present well before that. The second edition of RP 1176 places greater emphasis on lifecycle integrity management. Cracking threats can originate during manufacturing, construction or commissioning, and continue through operation and ageing, so managing them requires an ongoing process rather than a series of isolated assessments. Data integration is central to that approach. New ILI data, hydrotest results, operating history, coating condition, and metallurgical findings can refine subsequent assessments as pipeline conditions change over time. Operators also have more to work with on the preventive side, including operational pressure management, pressure cycling reduction, recoating, and cathodic protection practices. Effective lifecycle management also depends on people and processes. The updated standard emphasises organisational integration as an essential element of crack management programmes.
Better information, better integrity decisions The pipeline crack management framework that API RP 1176 provides is also informing regulatory discussions. The preamble to a July 2026 Pipeline and Hazardous Materials Safety Administration proposal to modernise anomalyresponse criteria for gas transmission and hazardous liquid pipelines cites API RP 1176 more than 20 times, including in its discussion of crack response and repair criteria. The proposal remains under consideration. As inspection technologies advance, operators will have more information about cracking threats and more complex decisions about how to respond. The engineers reviewing those three similarly sized indications still face the same questions: Which feature warrants repair? Which needs further evaluation? Which is a stable anomaly? And now, the second edition of API RP 1176 gives them a more complete framework for answering them.
References 1. 2. 3.
https://www.apiwebstore.org/standards/1176 https://www.apiwebstore.org/standards/1160 https://www.apiwebstore.org/standards/1193
About the author Paula Watkins is Senior Director of Standards Development at the American Petroleum Institute. Engaged in petroleum and natural gas standardisation for over 30 years, she joined API in 1996 and has managed a variety of its standards programmes including petroleum measurement, underground natural gas storage, pipeline and other transportation systems, as well as serving as Secretary to ISO/TC 28 (Petroleum and related products, fuels and lubricants from natural or synthetic sources) for 12 years. She currently chairs the ANSI Board of Standards Review and is a member of the ANSI Executive Committee and the Board of Directors.
MANAGING CRACKS?
DIGGING TOO MANY FALSE POSITIVES?
SOFTWARE THAT HELPS YOU TAKE CONTROL AND SAVE COSTS
Had the platform been available prior to excavating the reported anomalies, it is likely that over 30 digs would have been saved when considering the model prediction. - Gas Transmission Operator Feedback on blind test where Rapid Link predictions were compared to actual field findings along a number of pipelines
Scan QR code for brochure
Enquiries@frontlineintegrity.co.uk
14
Harri Lipsonen, Product Development Director, Infra and Energy at Teknos Group, describes how a joint investigation provides new qualification data for internal flow coatings in CO2 transport pipelines.
A
s Carbon Capture and Storage (CCS) projects continue to expand globally, reliable CO2 transport infrastructure is becoming a critical enabler for large-scale deployment. In many projects, pipelines are expected to form the backbone of this transport infrastructure. While extensive research has been conducted on the behaviour of pipeline steels in CO2 environments, comparatively little publicly available information has been available regarding the performance of internal flow coatings under the operating conditions expected in future CO2 transport networks. This is an important knowledge gap, as internal flow coatings can contribute to flow efficiency, internal cleanliness and reliable operation. To address this gap, Teknos Group, MÜLHEIM PIPECOATINGS (MPC), and Salzgitter Mannesmann Forschung (SZMF) have completed a joint technical investigation evaluating the behaviour of an internal flow coating under CCS-relevant CO2 transport conditions. The study examined coating performance in gaseous, liquid and supercritical CO2, including selected impurity mixtures representative of industrial capture streams.
Growing need for qualification data CO2 transport pipelines differ significantly from conventional hydrocarbon pipelines. Depending on pressure and temperature, CO2 may exist in gaseous, liquid or dense-phase supercritical states. In addition, captured CO2 streams can contain varying concentrations of impurities originating from different capture technologies and industrial processes. These factors introduce operating conditions that require careful consideration during material and coating selection. Pressure and temperature envelopes, impurity concentrations, phase behaviour and transient operating scenarios can all influence how materials perform in service. For this reason, qualification approaches for CCS pipeline infrastructure need to reflect realistic project conditions as closely as possible.
15
Internal flow coatings are widely used in pipeline systems to reduce internal roughness, improve flow efficiency, minimise particulate formation and deposit accumulation, and provide corrosion protection during storage, transportation and commissioning. Despite their importance, systematic qualification data for flow coatings exposed to CCS-relevant CO2 environments has remained limited. “Much of the industry’s research has understandably focused on pipeline steels and corrosion mechanisms,” explains Harri Lipsonen, Product Development Director, Infra and Energy at Teknos. “However, internal flow coatings are an integral part of many pipeline systems. As CCS infrastructure develops, it becomes increasingly important to understand how these coatings behave under realistic CO2 transport conditions and to generate reliable qualification data that supports engineering decisions.”
Test programme reflecting operational conditions The investigation was designed to evaluate both the chemical stability and mechanical integrity of the coating under conditions representative of future CO2 pipeline operation. The test programme included exposure to gaseous, liquid and supercritical CO2, as well as selected impurity compositions representative of capture and transport streams. Additional testing addressed long-term exposure behaviour, rapid decompression events and low-temperature operating scenarios. Exposure conditions covered a range of CCS-relevant pressure and temperature envelopes, with testing periods extending to several months in order to investigate potential time-dependent effects. The aim was to generate applicationrelevant data across a range of conditions that may be relevant for future CO2 transport systems. Following exposure, specimens were evaluated using visual inspections, coating thickness measurements, adhesion testing, mechanical performance assessments and microstructural analyses. These methods were selected to provide a comprehensive comparison against unexposed reference samples and to identify any changes in coating integrity, adhesion or surface condition after exposure.
Stable behaviour across investigated CO2 phases
Results from the investigation showed stable coating performance throughout the tested operating envelope. Across all Figure 1. Surface roughness and Buchholz hardness before and after gaseous CO2 exposure. investigated CO2 phases, no blistering, The measured values remained stable within the investigated test conditions, indicating no cracking or delamination was observed. significant change compared with the reference condition. Coating thickness remained within the range of unexposed reference samples, while adhesion properties showed no measurable changes following exposure. Testing in pure CO2 environments demonstrated maintained coating integrity under gaseous, liquid and supercritical conditions. Similarly, exposure to selected impurity mixtures did not result in measurable changes in coating performance within the investigated range. The consistency of the results across Figure 2. Coated test specimen and cross-cut adhesion test after CO2 exposure. Visual inspection showed different CO2 phases is no blistering, cracking or delamination, and adhesion performance remained comparable to the unexposed particularly relevant for reference samples.
16 World Pipelines / INTEGRITY 2026
OPT IMIZE P ROT E CT I O N , DON’ T CO M P RO M I SE I T. Maintain continuous, reliable cathodic protection with Dairyland decouplers. Dairyland decouplers optimize cathodic protection systems by isolating the flow of DC current to a grounding system or other equipment. Simultaneously, they provide a path to ground for AC faults and lightning, keeping assets and personnel safe from hazardous events. Dairyland decouplers deliver rugged and reliable protection, without compromising CP performance.
Explore our product line and learn more at Dairyland.com /Decouplers
B A C K E D BY THIRD-PARTY CERTI FI CATI O NS TO S TA NDARDS AROUND THE W O RLD:
CCS applications. Pipeline systems may experience varying operating conditions depending on project design, pressure and temperature profile, start-up and shutdown procedures, or transient events. Understanding whether coating behaviour remains stable across these different conditions is therefore important for qualification. “From a coating qualification perspective, one of the most important observations was the consistency of the results across the different CO2 phases,” says Lipsonen. “We did not observe significant differences in coating behaviour between gaseous, liquid and supercritical CO2 within the investigated test envelope. This provides valuable information for pipeline projects that may operate under varying transport conditions.”
Long-term exposure and operational stress testing In addition to phase-specific testing, the investigation examined the effects of prolonged dense-phase CO2 exposure over periods extending to several months. Long-term exposure testing is important because short-duration testing may not fully capture potential time-dependent effects, especially where diffusion, chemical interaction or gradual changes in mechanical properties are of interest. According to the project results, surface condition, adhesion performance and mechanical properties remained comparable to reference samples throughout the exposure period. No degradation trends associated with long-term CO2 exposure were identified within the investigated timeframe. The programme also included operational stress scenarios relevant to pipeline commissioning, operation and upset conditions. Specimens were subjected to rapid decompression from elevated pressure levels as well as low-temperature exposure representative of CCS operating environments. Such scenarios are relevant because CO2 pipeline systems may experience pressure changes, controlled depressurisation or temperature drops during certain operating conditions. Following testing, no coating damage, cracking, delamination or adhesion loss was observed. This indicates that the coating maintained its integrity under steady exposure conditions and after selected operational stress scenarios. “These operational scenarios are particularly relevant because pipeline systems do not operate under steady-state conditions at all times,” notes Lipsonen. “Understanding coating performance during pressure release events and low-temperature exposure helps build confidence in long-term operational reliability.”
Importance of cross-industry collaboration The project combined expertise from coating development, industrial coating application and independent testing. According to the partners, this multidisciplinary approach was essential to ensure that laboratory investigations remained aligned with practical pipeline operating requirements. MÜLHEIM PIPECOATINGS contributed application expertise gained from large-diameter pipeline projects, while Salzgitter Mannesmann Forschung provided independent testing and
18 World Pipelines / INTEGRITY 2026
analytical capabilities. Teknos contributed coating development expertise and experience in pipeline coating technologies. This combination of perspectives was important because coating qualification for emerging CCS infrastructure is not only a laboratory question. It also depends on practical coating application, pipeline manufacturing processes, handling, transport, installation and expected operating conditions. Aligning the test programme with these considerations helped ensure that the generated data would be relevant for real pipeline projects. “Qualification of materials for emerging CCS applications requires collaboration across the value chain,” says Lipsonen. “By bringing together coating specialists, application experts and independent researchers, it becomes possible to generate data that is both technically robust and relevant to real-world pipeline projects,” adds Martin Mehler, Global Key Account Manager, Infra and Energy at Teknos.
Supporting future CCS pipeline development The project partners emphasise that qualification requirements will remain project-specific, depending on factors such as impurity composition, pressure-temperature envelopes, operating scenarios and expected service life. Nevertheless, the investigation provides a valuable technical reference point and contributes to the growing body of knowledge surrounding CO2 pipeline infrastructure. As governments and industry accelerate CCS deployment worldwide, evidence-based qualification approaches for materials and coatings are expected to become increasingly important. CO2 pipeline projects will require confidence that materials and coating systems can perform under the specific conditions expected during operation. The results of this investigation provide applicationrelevant data supporting the development of reliable CO2ready pipeline systems. They also contribute to closing a longstanding knowledge gap regarding the performance of internal flow coatings in CCS applications. For pipeline operators, engineers and project developers, such data can support more informed decision-making during coating selection and specification. It can also help guide future testing requirements, particularly where CO2 phase behaviour, impurity exposure, decompression events or lowtemperature conditions are relevant. By proactively addressing emerging industry challenges through structured testing and cross-industry collaboration, Teknos and its partners are helping to build the technical foundation required for the next generation of CO2 transport infrastructure.
About the article The investigation was conducted jointly by Teknos Group, MPC, and SZMF. Results were presented at the Pipeline Coating Conference 2026 and are available in a technical whitepaper on internal flow coatings for CO2 transport pipelines. Engineers, pipeline operators and project developers interested in reviewing the complete test programme and results can request the technical whitepaper.
Figure 1. Long-term reliability planning must balance immediate maintenance priorities with the future condition of critical assets.
20
Edwin Blom, Executive Advisor for IGS, examines how changing maintenance priorities are affecting long-term asset reliability, and why midstream operators need to consider the full lifecycle consequences of deferring corrosion and performance-related work.
C
orrosion is one of the largest integrity and maintenance challenges for pipeline and midstream operators. According to AMPP, corrosion-related monitoring, maintenance, and replacement costs for US gathering and transmission pipelines are estimated at approximately US$7 billion annually. This is a significant expenditure before the wider consequences of reduced availability, additional maintenance, and premature equipment replacement are considered. At the same time, pipeline and midstream operators are under pressure to control expenditure across extensive and increasingly mature asset networks. Geopolitical uncertainty, changing energy markets and the increasing age of many assets have placed maintenance budgets under greater scrutiny. There is rarely sufficient funding to complete every project that engineering and maintenance teams would ideally address, making effective prioritisation essential. Process safety must remain the priority. Work required to maintain safe operation and containment cannot be compromised, while equipment that could cause an unplanned shutdown or restrict throughput will also command attention. More difficult decisions concern corrosion, erosion, fouling, and declining performance that may not require immediate intervention. Balancing these competing requirements is becoming an increasingly important part of long-term reliability management.
The effect of safety-critical prioritisation One important development across the oil and gas industry, including pipeline and midstream operations, has been the increasingly structured approach to safety-critical equipment. Larger companies, and increasingly smaller operators, classify equipment according to the potential process safety consequences of failure. This generally considers the consequence of a process safety event on people, environment, asset damage and reputation. Equipment identified as safety critical is then subject to defined performance standards outlining inspection and testing activities. Intervals are then determined for these activities accordingly. This represents a considerable improvement in asset integrity management. However, when budgets are constrained, safety-critical expenditure becomes effectively non-negotiable. The remaining budget must accommodate production reliability, corrosion management, performance improvement and other longer-term requirements.
21
As a result, equipment can remain acceptable from a process safety perspective while becoming progressively less reliable or more expensive to maintain. Corrosion, fouling, and other forms of deterioration may not require immediate intervention, allowing work to be deferred even when the longer-term maintenance requirement is increasing.
Annual budgets and lifecycle costs Lifecycle costing is well understood across the industry in principle, but applying it consistently remains difficult. Most organisations continue to operate within annual budgets, creating a mismatch between the period over which expenditure is approved and the much longer period over which assets deteriorate. Asset degradation does not follow a financial year. When corrosion is identified, the relevant engineering question is how it is expected to develop over the next five, ten or fifteen years. The commercial question, however, can become whether sufficient budget is available to address it during the current year. A technically preferable solution with a higher initial cost can consequently be difficult to justify, even where it offers a lower total cost over the remaining life of the equipment. This becomes increasingly important as infrastructure ages. Assets do not reach their original design life and immediately cease to operate. Deterioration develops gradually, with relatively small issues appearing across different parts of the system. Individually, many remain manageable. Collectively, however, they can indicate a broader change in asset condition that requires a different maintenance approach. This gradual progression is one reason aging-related problems can be underestimated. Individual findings may initially appear too minor to justify significant intervention, particularly when more immediate maintenance requirements are competing for the same budget. By the time intervention becomes unavoidable, the extent of deterioration and the required scope may have increased considerably. Deferring expenditure therefore does not necessarily eliminate cost. In some cases, it simply transfers that
Figure 2. Inspection findings must be considered alongside the degradation mechanism, operating history, and expected rate of progression.
22 World Pipelines / INTEGRITY 2026
expenditure to a later maintenance period when the repair scope is larger and fewer options remain available.
Midstream has a strong inspection culture Pipeline operators are generally advanced in condition monitoring and predictive maintenance, reflecting the nature of infrastructure that extends well beyond the controlled environment of an individual facility. This has encouraged the development of sophisticated inspection and integrity management programmes. The challenge is therefore not simply identifying deterioration, but determining how inspection findings should influence maintenance planning. Inspection may identify wall loss or another developing condition, but the appropriate response depends on the degradation mechanism, expected progression, and future operating conditions. Operators must also consider how the equipment is likely to perform until the next inspection or planned maintenance period. Monitoring provides the information needed to support these decisions, but engineering assessment remains essential in determining when and how to intervene. The same principle applies to associated midstream processing equipment. In amine systems, for example, corrosion can result from acid gas breakout, contaminants, elevated temperatures, and process upsets rather than the amine itself. Understanding the mechanism is important because repairing an affected area does not necessarily prevent recurrence if the underlying operating conditions remain unchanged. This is also why inspection findings should be considered in the context of the wider asset rather than as isolated maintenance requirements. Identifying deterioration is only the first stage. Operators must then determine its cause, likely progression and whether intervention during the current maintenance cycle offers a better technical and economic outcome than continued monitoring.
Understanding the full maintenance scope Even with comprehensive monitoring, the complete extent of deterioration is not always known before equipment becomes accessible. Inspection can indicate an emerging issue, while internal examination during a maintenance window may reveal that the actual scope is considerably larger or smaller than anticipated. For pipeline and midstream operators, effective planning therefore requires establishing as much as possible before a major maintenance event. This includes the probable extent of degradation, available repair methods, expected execution time, and longer-term implications of each option. Specialist assessment can provide additional value where the equipment, operating environment or degradation mechanism requires expertise that may not be routinely available within the operator. Once deterioration has been identified, the assessment should consider: ) The extent, mechanism, and expected progression of the degradation. ) Whether operating conditions have changed from the original design basis.
BEYOND TESTING.
UNDERSTANDING CORROSION.
From mechanisms and root causes to comprehensive reliability assessment.
FTIR
Chemical Characterization & Mechanism Analysis
DSC
Thermal Analysis
TGA Thermal Stability & Composition Evaluation
Electrochemical Testing Chemical Characterization & Mechanism Analysis
EIS
Barrier Performance & Reliability Evaluation
SEM
Microstructural Characterization
200 µm
SEM
Failure / Degradation Characterization
20 µm
THIRD-PARTY TESTING LABORATORY • THIRD-PARTY INSPECTION INSTITUTE • TESTING AND RESEARCH CENTRE At iCoaTek, we go beyond conventional inspection and testing. By investing corrosion mechanisms, material degradation and root causes of failure, we combine in-depth technical research with inspection and laboratory testing to evaluate not only whether a corrosion protection system meets specified requirements, but also why it performs - and whether it can remain reliable in service.
Inspection & Laboratory Testing
Corrosion Mechanism & Root Cause Analysis
Advanced Materials Characterization
Integrated Reliability Assessment
Verify performance against requirements
Understand why corrosion occurs
Reveal structure, composition and changes
Evaluate long-term protection and service risk
Science behind corrosion. Confidence in protection.
info@icoatek.com
+86 21 6430 1097
ISO/IEC 17020
ISO/IEC 17025
Accredited
Accredited
Inspection Body
Testing Laboratory
) The relative benefits of localised repair compared with
protecting a larger affected area. ) The impact of each option on outage duration and future maintenance requirements. ) The total cost of each approach over the remaining operating life of the equipment. This does not mean that every preventative project should be approved. Budget constraints will always require prioritisation. The objective is to ensure that decisions account for expected asset condition, future maintenance requirements, lifecycle cost and consequences of failure, rather than the initial cost of intervention alone.
Reliability requires technical knowledge A further consideration is the changing availability of specialist technical expertise across the oil and gas sector. Experienced engineers are retiring, while the next generation of technical personnel may have fewer opportunities to gain extensive
practical experience across multiple operating assets. This gradual loss of experience can leave operators with fewer internal resources to assess specialised degradation mechanisms and determine the most appropriate maintenance response, a particular challenge for pipeline and midstream organisations responsible for large and diverse asset networks. This becomes particularly important when operators are evaluating complex deterioration or comparing maintenance technologies. An organisation may have comprehensive inspection data but still require specialist knowledge to interpret what those findings mean for future equipment condition, particularly where the degradation mechanism or operating environment falls outside routine maintenance experience. As in-house expertise becomes more limited, specialist providers will increasingly be expected to contribute earlier in the decision-making process. Their value will lie not only in executing a defined scope, but in helping operators understand degradation mechanisms, compare available interventions and improve the predictability of maintenance outcomes. This can provide a stronger technical basis for deciding whether to intervene, continue monitoring or incorporate work into a future maintenance event.
From repeated repair to long-term protection
Figure 3. A long-term corrosion management program has protected more than 200 vessels covering over 6500 m2 of critical equipment.
Figure 4. HVTS alloy cladding creates a corrosion-resistant barrier between the pressure boundary and the aggressive process environment.
24 World Pipelines / INTEGRITY 2026
The value of this more technically informed approach becomes particularly clear when maintenance decisions are considered over the longer term. At one major oil and gas facility, persistent corrosion and process vessel integrity issues had resulted in repeated internal coating repairs, localised patching and equipment replacement. Rather than continuing to address these issues individually as they arose, reliability and metallurgical specialists began evaluating alternative methods of protecting the underlying base material. High velocity thermal spray alloy cladding was subsequently adopted for a range of corrosion applications at the site. Over time, more than 200 vessels covering over 6500 m2 of critical equipment were protected. Although the applications involved process vessels rather than the pipeline itself, the underlying maintenance principle is directly relevant to pipeline and midstream operators managing terminals, compressor stations, processing facilities and other associated infrastructure where recurring corrosion can create significant lifecycle costs. The significance of the program extends beyond the number of applications. Instead of repeatedly responding to individual areas after corrosion had occurred, the approach increasingly involved installing a corrosion-resistant alloy barrier to isolate the underlying pressure boundary from the aggressive process environment. Inspection history indicates the effect on future maintenance requirements. HVTS applied to one cooling tower in 2010 was inspected in 2014 and found to be 100% intact and in good condition. No damage or defects were identified, and the vessel was subsequently removed from the 2018 turnaround scope. Reducing future maintenance scope has value beyond the direct cost of the avoided repair. Every activity removed from a planned outage reduces demands on personnel and
resources and creates additional capacity for work that cannot be deferred.
Using maintenance windows more effectively Access is an important part of the economic calculation. Once equipment has been isolated, cleaned and made available for inspection, a substantial part of the operational impact has already been incurred. Operators should therefore consider whether additional preventative work during that period could reduce the scope or complexity of intervention required at subsequent maintenance events. Technology selection can also influence outage duration. Different repair and protection methods carry different requirements for application, heat treatment, curing and inspection. Where corrosion-related work sits on the critical path, these factors should be considered alongside initial cost, expected service life and future maintenance requirements when comparing available options. The importance of timing is illustrated by an amine regeneration column where severe pitting had progressed through the shell wall in some locations. Temporary repairs had been installed, and sections of the column ultimately required mechanical replacement before a corrosion-resistant alloy barrier could be applied. The case demonstrates how advanced material loss can substantially increase the scope of an intervention and reduce the options available to the operator. Earlier assessment does
not necessarily mean that immediate repair will always be justified. Still, it provides greater flexibility to determine when intervention is most appropriate and which approach offers the best lifecycle outcome.
Taking a longer-term view Safety-critical maintenance will always take priority. The challenge for pipeline and midstream operators is ensuring that necessary short-term prioritisation does not result in progressively larger maintenance requirements elsewhere across the asset base. Corrosion, erosion, fouling, and performance deterioration can often be managed for a period without affecting operation, but the ability to defer intervention should not automatically determine the maintenance strategy. A more complete assessment considers inspection findings, degradation rates, operating history, future production requirements, execution time and the expected durability of each repair option. For infrastructure expected to remain operational for decades, maintenance planning must consider not only what requires attention today, but when intervention will deliver the best technical and economic outcome over the remaining life of the asset. Taking this longer-term view can help operators translate strong inspection and integrity management practices into maintenance decisions that support safety, reliability and lifecycle cost across the wider network.
MAKING THE WORLD A CLEANER PLACE... ONE PIPELINE AT A TIME Pipeline Pigging Solutions Built for Performance
Foam Pigs Steel Mandrel Pigs Solid Cast Pigs Pigging Equipment & Rentals
MANUFACTURED IN THE USA
15719 Treichel Rd. Tomball, TX 77377
CUSTOM & STANDARD SOLUTIONS
SERVING OIL & GAS, INDUSTRIAL & MUNICIPAL MARKETS
SOLVE YOUR PIGGING CHALLENGES WITH US.
TRUSTED SINCE 1995
pigsunlimited.com (800) 578-7436
26
John Rettig, Chief Operating Officer, Farwest Corrosion Control Co., discusses managing interference, integrity, and execution risk on regulated pipelines in North America.
T
he pipeline industry has long understood that corrosion does not announce itself. It works quietly, beneath the surface, against critical assets that both the public and regulators increasingly expect to perform without failure. North America’s electrical grid is expanding at a pace not seen in decades. For pipelines sharing rights-of-way with high-voltage transmission lines, that expansion is creating real consequences for operators. The growth of data centres, artificial intelligence infrastructure, and broader energy needs is placing unprecedented demand on transmission capacity. According to the International Energy Agency, global data centre electricity consumption is projected to nearly double to approximately 945 TWh by 2030, growing around 15%/y from 2024. The US Energy Information Administration has similarly projected record power consumption in 2026 and 2027, with AI-focused infrastructure among the primary drivers. This is not simply a technology headline for pipeline operators; it is an operational concern. When electric utilities respond to growing demand by expanding high-voltage AC transmission lines, reconductoring existing lines, or upgrading substations, the interference environment in shared rights-of-way can change entirely outside the operator’s control. Pipelines and high-voltage transmission lines have long shared corridors, an arrangement that has historically been manageable. What is changing is the pace and scale of power infrastructure upgrades, and the extent to which those upgrades can alter the AC conditions experienced by nearby pipelines. Operators who have previously mitigated AC interference on a given segment may find that their existing systems are undersized for tomorrow’s electrical demands.
What AC interference actually means for a pipeline Understanding why AC interference matters starts with understanding what it does to a pipeline. When a buried
pipeline runs in proximity to a high-voltage transmission line, electrical energy from the power line is induced onto the pipeline through the electromagnetic field of the AC current, and during fault events, that exposure can increase dramatically. This AC interference creates two categories of risk that operators need to manage separately. The first is personnel safety. Workers contacting aboveground appurtenances, including valves, test stations, and exposed pipe, during construction may be exposed to unsafe step/touch voltages. This risk is well understood and has historically been the primary driver of AC mitigation work. The second is more subtle, AC corrosion. Even at AC voltage levels that may not trigger a safety response, alternating current can accelerate corrosion at coating defects on the pipe. What makes this particularly counterintuitive is that modern, high-quality pipeline coating can make the problem worse. When a wellcoated pipeline has only a few small coating holidays, tiny defects where bare steel is exposed, AC discharge concentrates at those locations. The smaller the exposed area, the higher the AC current density at that location. Where AC interference is present, those small holidays may experience elevated AC current density, and it is that density, not coating quality alone, that determines whether an AC corrosion threat is real. Compounding this is the relationship between AC mitigation and cathodic protection (CP). CP systems remain essential for external corrosion control, but traditional CP criteria were not designed to address AC corrosion risk. A pipeline can meet CP compliance thresholds and still carry meaningful AC corrosion risk at isolated coating holidays. Evaluating AC corrosion requires looking at AC voltage, AC current density, DC current density, soil conditions, CP system performance, and coating condition together, not in isolation.
27
Regulatory expectations are catching up
Figure 1. AC mitigation worksite.
Pipeline operators are already navigating a more demanding regulatory environment. PHMSA’s regulatory updates have reinforced the framework around threat identification, integrity assessment, corrosion control, and management of change. That last piece is especially relevant here. Management of change requires operators to reassess integrity conditions when meaningful changes occur in their operating environment. For example, reconductoring a highvoltage line in a shared corridor qualifies. The addition of a new transmission line qualifies. So do load balancing changes, phasing modifications, and substation grounding upgrades. These changes do not always come with direct notice to the pipeline operator, yet all can meaningfully shift the interference environment on a nearby pipeline and affect the validity of prior AC studies and the adequacy of installed mitigation systems. The regulatory question is not simply whether a pipeline has AC mitigation in place. The stronger question is whether the operator can demonstrate that AC conditions have been evaluated, that mitigation decisions are technically justified, and that post-installation performance is being monitored against current conditions.
Design, constructability, and the gap in between
Figure 2. AC power transmission corridor.
Even when the technical case for AC mitigation is clear, getting from design study to installed system involves execution risks that are easy to underestimate. AC mitigation designs are built on assumptions: power line loading, fault current values, soil resistivity, coating condition, pipeline depth, and separation distance. If any of those inputs change or design assumptions are inaccurate, the mitigation system may underperform. Utility data is often one of the harder inputs to obtain. Power companies operate under their own constraints and schedules, and they are not always forthcoming with future loading projections or reconductoring plans. For pipeline operators, this creates a planning gap. A mitigation system designed around today’s loading may need to be revisited when a utility upgrade is completed or when load profiles change.
From installation to long-term programme management Figure 3. AC mitigation test station on AC corridor.
Figure 4. Farwest team installing AC mitigation cable.
28 World Pipelines / INTEGRITY 2026
Then there is the matter of putting the design in the ground. AC mitigation installations must fit within real right-of-way conditions that often do not match what was modelled. Congested corridors, environmental restrictions, landowner constraints, buried foreign utilities, and limited access can all force redesign in the field. Test stations critical to future monitoring need to be placed where workers can reach them, not where the model assumed they would be. Supply chain considerations have also become more relevant in recent years. Solid-state decouplers, gradient control mats, and mitigation cable can experience extended lead times. That window only increases when multiple large projects are drawn from the same supply. Identifying AC mitigation needs late, only to find that key components have
CASE STUDY
From Challenging Inspection to Integrity Insight With no pigging history and limited pipeline records, uncertainty posed a challenge. Intero’s turnkey cleaning and ultrasonic inspection program identified significant corrosion and delivered high-quality data for integrity reporting.
Read the full Case Study
Frontrunner in challenging-to-inspect pipelines intero-integrity.com
significant lead time, is a situation operators are running into more often, and is more avoidable with earlier planning. A completed AC mitigation installation is not the end of the work. It is the beginning of a monitoring obligation. Electrical loading on transmission systems changes seasonally and over time. Utilities upgrade equipment. New lines are added. CP systems are adjusted. Coatings age. Any of these changes can affect the performance of a mitigation system that was performing adequately at the time of commissioning. Effective long-term programmes combine periodic AC pipe-to-soil measurements as a screening tool, current density coupon data, decoupler inspections, and correlation
with CP annual survey results. Where conditions are more dynamic, remote monitoring and more frequent reassessment may be warranted. The management of change principle applies here as well. When a utility notifies an operator of planned transmission work, or when annual survey data shows unexpected AC levels, that is a trigger for reassessment and requires action.
A practical frame for operators
The goal is not to make every pipeline operator an AC interference specialist. It is to help operators recognise when AC conditions may have changed, understand why early engagement reduces risk, and build programmes that treat mitigation systems as long-term assets rather than one-time projects. That means proactively identifying shared pipeline and AC corridors, requesting utility loading data before it is urgently needed, treating transmission upgrades as management-of-change triggers, and ensuring that AC evaluation is integrated with CP, coating, and broader integrity data rather than managed as a separate specialty. The industry has made real progress in n Lightweight, one-piece ergonomic design provides comfortable all-day use moving from reactive corrosion response n One wand covers the entire voltage range from 0.5 to 30 kV to proactive integrity management. n Up to 16 hours of battery life—powerful Li-ion batteries fit neatly within the AC mitigation is one of the clearest compact wand handle eliminating the need for a separate battery box areas where that same transition is now n Built-in Certified Voltmeter and Voltage Calculator feature underway. The operators best positioned n Industry standard connectors and adaptors provide compatibility with for what comes next are those building nearly all existing electrodes programmes capable of adapting to a right-of-way environment that is changing faster than it has in a long time.
High voltage Holiday Detector Detects holidays, pinholes, and other discontinuities using continuous DC
Bibliography
Learn More
No shoulder bag required!
High voltage Holiday Detector
AMPP SP0177-2019, Mitigation of Alternating Current and Lightning Effects on Metallic Structures and Corrosion Control Systems. International Energy Agency, Electricity 2025, global data centre consumption projections. NACE SP21424-2018, Alternating Current Corrosion on Cathodically Protected Pipelines: Risk Assessment, Mitigation, and Monitoring. PHMSA, Pipeline Safety: Safety of Gas Transmission Pipelines: Repair Criteria, Integrity Management Improvements, Cathodic Protection, Management of Change, and Other Related Amendments, Federal Register 87, no. 163 (August 24, 2022): 52224-52302. RIN 2137-AF39. US Energy Information Administration, Short-Term Energy Outlook, December 2025.
Acknowledgements
Stick-type with Pulsed DC Wand-style with Continuous DC
DeFelsko Corporation l Ogdensburg, New York USA Tel: +1-315-393-4450 l www.defelsko.com
Gary Graham, P.E. – Director of Engineering, Farwest Corrosion Control, CP Specialist.
CorrosionRADAR and Tecnofink Ltda consider the challenges, limitations, and the path forward for corrosion under insulation (CUI).
C
orrosion under insulation (CUI) can be understood as any form of external corrosion that occurs under a metallic layer of thermal, acoustic, fireproof insulation. The corrosive process, in turn, is responsible for the degradation of materials through electrochemical reactions. In this sense, one of the main causes of CUI is the water present in that medium, playing an electrolyte role, thus, it is a facilitator of these chemical reactions helping the mobility of charges and ionic species. Thermal insulation plays a central role in enhancing operational efficiency across industrial processes, especially in systems where minimising heat loss is essential to maintain stable reaction conditions and reduce energy consumption. Beyond its direct impact on performance, insulation also acts as a protective barrier for pipelines, helping shield equipment from external factors and supporting safer conditions for personnel working near these installations. It additionally contributes to reducing potential environmental impacts, reinforcing its importance as a key element in ensuring reliable, efficient, and responsible industrial operations.
31
Despite the benefits associated with the use of isolation, it may also be associated with the contribution of the presence of CUI, promoting an annular space that can accumulate moisture and has the presence of oxygen. Therefore, it is recommended that you increase the thickness of the insulation, in order to reduce these two fundamental points for the corrosive process, water and oxygen. Poor installation of thermal insulation or defects found in the material can also open gaps in water to enter the metal surface of the asset.
The threat of CUI CUI is a hidden and constant challenge for industry. Although various anti-corrosion measures are currently in use, it is
Figure 1. Corrosion Under Insulation (CUI) within a pipeline.
impossible to eliminate the corrosion process, and it is only possible to slow it down. One of the biggest obstacles to monitoring and managing CUI is detecting it under insulation. Its presence can cause operational accidents and even fatalities, in addition to the cost associated with the repairs that must be made. Today, CUI accounts for approximately 40 - 60% of the expenses associated with maintaining the pipeline. CUI poses one of the most challenging operational risks for industrial assets, especially in oil and gas facilities. One of the most immediate impacts is the high costs of inspection and maintenance processes. The need to set up scaffolding, hire expert NDT inspection services, and remove large tracts of insulation makes each inspection campaign an expensive and time-consuming process. In addition, removing insulation often damages the protective coating, requiring rework and further increasing costs throughout the equipment’s lifecycle. These factors make CUI management one of the costliest elements of asset integrity. Another critical impact is the risk of loss of primary containment. CUI is one of the most frequent causes of leaks in pipes and insulated equipment. When a loss of containment occurs, the effects can be severe: operational interruptions, risks to people’s safety, environmental damage, and even threats to life. In environments with flammable, toxic, or high-pressure fluids, a leak from CUI can quickly evolve into large-scale incidents. The quiet and progressive nature of corrosion under insulation makes this risk even more concerning. Unplanned downtime not only impacts production revenue, it has another significant operational impact. Because CUI is unpredictable and often invisible until the isolation is removed, failures can arise suddenly. Emergency shutdowns tend to be longer, more expensive, and riskier than planned shutdowns. They require immediate mobilisation of teams, abrupt interruption of production and can generate cascading effects in the operational chain. In offshore installations, this impact is even more critical, as the logistics of response are complex and limited. In addition to operational and financial risks, there is also the challenge of regulatory inspections. Standards such as ANP, NORSOK, and API require documented inspection and maintenance programmes, including evidence that isolated assets are being properly monitored. To comply with these requirements, it is necessary to remove the insulation at specific points, which can compromise the integrity of the coating and accelerate the corrosion process itself. Thus, compliance with regulatory requirements, while essential, can paradoxically increase CUI exposure if not carefully planned. Taken together, these factors show that CUI is not just a technical issue, but a multi-dimensional risk that affects costs, revenue, safety, the environment, operational reliability, and regulatory compliance.
The benefits of continuous CUI monitoring Figure 2. CUI within a pipeline.
32 World Pipelines / INTEGRITY 2026
Effectively managing the hidden risk of CUI requires strategic planning, appropriate technologies, and an ongoing approach to asset integrity.
Over 40 Years Proven Technology
Thru-wall Reference Electrodes www.edi-cp.com | info@edi-cp.com
The evolution of inspection and maintenance processes shows how the industry is adapting to deal with increasingly complex degradation mechanisms, such as CUI. The industry moved from a reactive posture, which only acted after failure, to calendar-based preventive models, which often had a high cost to inspect assets that did not have a real need for inspection. Subsequently, the processes evolved to data-driven predictive approaches, using the Risk Based Inspection (RBI) methodology, made inspections more assertive and, thus, it was possible to reduce maintenance costs and the associated failures, as well as the financial and safety implications. Today, with continuous monitoring and real-time information, such as CorrosionRADAR, the expectation is to anticipate the problem before it manifests. Unlike conventional approaches, which rely on insulation removal and spot inspections, CorrosionRADAR uses proven sensors distributed throughout the pipeline to detect moisture, active corrosion, and loss of integrity in real time, allowing you to identify the problem at the exact moment it begins to form. This 24/7 surveillance capability dramatically reduces the unpredictability of CUI, supports data-driven decisions, and decreases the need for unplanned invasive interventions. Within this scenario, CUI stands out as one of the biggest integrity challenges, precisely because it escapes conventional inspection models. This trajectory shows that traditional methods can no longer keep up with a phenomenon that develops hidden, silent, and in a highly unpredictable way. SENSORS C
DATALOGGER
CONNECTIVITY
CR Node with Battery Power
Wireless: LoRa and BLE
M
Corrosion & Moisture Sensors
Figure 3. CorrosionRADAR CUI monitoring solution.
Figure 4. CorrosionRADAR CR:CLARITY Dashboard
34 World Pipelines / INTEGRITY 2026
Even with the advancement of technologies and methodologies, CUI remains one of the main causes of failures, leaks, and high operating costs. Understanding this evolution is not only contextualising the past, but recognising why current processes need to be smarter, more integrated, and based on continuous monitoring, especially in the face of regulatory requirements and the operational impacts that corrosion under insulation imposes. Traditional CUI detection techniques are still widely used, but they carry important limitations that directly impact the reliability of the results. Visual inspection, for example, requires the complete removal of insulation and often relies on scaffolding, which makes the process expensive, slow, and invasive. Methods such as radiography and Long-Range UT also have high costs, require maintenance shutdowns, and involve operational challenges, especially in areas with complex geometries or supports. Thermography, on the other hand, although useful in some scenarios, has limited application in the identification of CUI in early stages, when corrosion has not yet generated noticeable thermal variations. Among the most widespread techniques, Pulse Eddy Current (PEC) stands out for allowing inspections without removing insulation. However, despite its popularity, the PEC predominantly delivers qualitative rather than quantitative results. This means that it indicates the presence of anomalies, but not necessarily the actual severity of the thickness loss or the stage of corrosion. In assets with complex geometries, supports, joints or areas of difficult access, the PEC can lose sensitivity or generate ambiguous interpretations. In practice, this SOFTWARE can lead to overly conservative decisions, with unnecessary removals from isolation, or, worse, to the CR Clarity Dashboard Risk Analytics underestimation of a critical scenario that continues to evolve undetected. This set of limitations shows that traditional CUI detection, while useful, does not provide the accuracy and predictability required for such a hidden and unpredictable degradation mechanism. The dependence on invasive methods, high costs, and qualitative results reinforces the need for more advanced technologies, capable of providing continuous, quantitative, and contextualised data. It is precisely this gap that drives the adoption of modern monitoring solutions, which complement or even replace traditional approaches, bringing more security, efficiency, and assertiveness to asset integrity management. Continuous CUI monitoring represents a profound change in the way asset integrity is managed, because it replaces punctual and invasive inspections with permanent
surveillance, capable of identifying changes in the environment under isolation at the exact moment they begin to occur. With sensors installed in a distributed manner along the pipeline, technologies such as CorrosionRADAR monitor humidity, corrosivity rate, and asset behaviour in real time, even over long stretches and complex geometries. This eliminates much of the uncertainty that has always marked CUI and significantly reduces reliance on physical interventions, removal of isolation and high-cost inspection campaigns. In addition, continuous monitoring enables truly predictive maintenance, based on hard data rather than assumptions or fixed schedules. By predicting when and where corrosion tends to evolve, the system reduces surprises, avoids emergency shutdowns, and directs resources exactly to the points that really need attention. The result is a safer, more efficient and economical operation, with more assertive decisions aligned with the real condition of the asset. In closing, the industry is undergoing a profound transformation in the way it deals with CUI, abandoning expensive, invasive and often inaccurate traditional methods. Throughout this article, we have seen how visual inspections, PEC, radiography, and other point techniques significant limitations have, especially when the goal is to monitor and anticipate risks and understand the true severity of CUI. We also discuss how CUI’s operational costs, regulatory requirements, and unpredictability make a smarter, more seamless, and data-driven approach indispensable.
It is in this scenario that continuous monitoring is consolidated as the future of asset integrity, bringing a change in mentality as important as the technological evolution itself. Solutions such as CorrosionRADAR raise the industry standard by providing permanent visibility, early detection, accurate risk location, and the real ability to predict when and where corrosion will evolve. This technology not only reduces uncertainties and eliminates surprises, but also allows for more assertive decisions, true predictive maintenance, and a much safer and more efficient operation. The path ahead is clear: the industry that adopts continuous monitoring will be better prepared to meet the hidden challenges of CUI by turning real time data into operational advantage.
Bibliography
CAO, Q., POJTANABUNTOENG, T., ESMAILY, M., THOMAS, S., BRAMELD, M., AMER, A. & BIRBILIS, N. (2022). A review of corrosion under insulation: a critical issue in the oil and gas industry. Metals, 12(4), 561. DOI: https://doi.org/10.3390/met12040561 CorrosionRADAR (n.d.). Can you only manage CUI once an asset is operational? Available at: https://www.corrosionradar.com/news-media/can-you-only-manage-cuionce-an-asset-is-operational/. CorrosionRADAR (n.d.). Case Studies. Available at: https://www.corrosionradar.com/ case-studies/ ELTAI, E.O., MUSHARAVATI, F. & MAHDI, E. (2019). Severity of corrosion under insulation (CUI) to structures and strategies to detect it. Corrosion Reviews, 37(6), 553–564. DOI: https://doi.org/10.1515/corrrev-2018-0102 SANTOS, T.F. (2026). Oral presentation at the Brazilian Forum for Corrosion Mitigation. 12 May 2026. SOUZA, I.S., CAVALCANTI, L.A.P., RÊGO, D.F., SILVA, I.C. & FARIAS, C.T.T. (2023). Corrosion under insulation: a review. Lium Concilium. DOI: 10.53660/CLM-1763-23L09A. World Pipelines (2024). Spotting the invisible risk with CUI monitoring. Available at: https://www.worldpipelines.com/special-reports/13092024/spotting-the-invisible-riskwith-cui-monitoring/
PIG HANDLING EQUIPMENT Propipe manufactures pig handling equipment for a wide variety of applications, from loading of precommissioning pigs, as well as routine maintenance operations, to receiving cassettes, removal tools and storage trays. All equipment is manufactured to suit project specific requirements.
Propipe Limited - www.piggingsmarter.com For Global Sales Tel: +44 1429 872927 Email: groupsales@propipe.co.uk
For North American Sales Tel: +1 902 417 5075 Email: sales@propipenorthamerica.com
Almir Sobral, Principal Integrity Engineer; Hicham Bensalem, Operations Manager (Americas); and Williams Puentes, Applications Engineer (Americas), Intero Integrity Services, consider how ultrasonic inline inspection supports integrity decisions for a 10 in. and 12 in. liquid pipeline system.
36
R
eliable condition data enhances the confidence and quality of pipeline integrity assessments and decisionmaking while minimising unnecessary operational disruption. A recent dual-diameter ultrasonic inline inspection demonstrates how early feasibility work, custom tool configuration, and field validation can transform inspection data from a complex pipeline geometry into valuable information supporting integrity decisions. The integrity challenge behind non-standard pipelines Pipeline integrity programmes are often discussed in terms of assessment intervals, anomaly classification, fitness for service, remaining life calculations, repair ranking, risk assessment and compliance reporting. However, each of these activities depends on one prerequisite: reliable inspection data from the pipeline itself. When the pipeline has a standard configuration and is readily piggable, obtaining that data can be relatively straightforward. When the asset includes diameter transitions with varying thickness, mixed construction types, and strict operational constraints, the inspection strategy becomes a central part of the integrity challenge. This was the case for an energy sector operator that required ultrasonic inline inspection of an approximately 7000 ft (2.13 km) pipeline constructed from both 10 in. and 12 in. sections. The pipeline included seamless and electric resistance welded (ERW) pipes of varying thickness, creating material and geometry variation across the inspected length. The operator also required reporting in line with specific integrity management and compliance expectations, placing a strong emphasis on data accuracy, repeatability and verification. The project was not only a question of moving an inspection tool through the pipeline. It required an inspection approach that could support pipeline integrity decisionmaking by delivering accurate metal loss and deformation data, maintaining data quality through diameter transitions, and reducing unnecessary disruption to operations.
Why the previous inspection approach was not enough The pipeline had previously been inspected in 2018 by another service provider. Because of the dual-diameter configuration, the earlier project required two separate inline inspection runs: one for each diameter. While this approach collected the required data, it also extended field execution time, increased operational cost, and created greater disruption for the operator. From an integrity management perspective, this matters. Inspection activities need to generate the data required for safe asset management, but they also have to fit within the operational reality of the facility. If the inspection process is too disruptive, too costly or too complex to repeat efficiently, the practicality of future integrity assessments can be affected. The operator therefore needed a more efficient inspection method that could improve data quality while reducing execution time and field exposure.
37
The central question became whether one inspection system could traverse both the 10 and 12 in. sections in a single run while maintaining ultrasonic sensor alignment, stable data acquisition and inspection performance throughout the diameter transition.
Feasibility first: engineering the inspection before field execution For complex pipeline geometries, inspection success is often determined before the tool enters the line. Intero began with a feasibility study for dual-diameter ultrasonic inspection, followed by applications engineering and in-house testing at its Houston facility. This early engineering phase reviewed pipeline construction records, operating parameters, and previous inspection information to determine the most suitable inspection configuration. A custom configuration of Intero’s Pipeline Surveyor ultrasonic (UT), with rotating mirror UT, Speed range of 656 - 2953 ft/h and diameter of 4 - 56 in. tool was developed to navigate both pipe diameters in a single pass. The collapsible architecture of the tool allowed it to adapt to the diameter transition while maintaining the alignment required for high-quality ultrasonic readings. This was a critical inspection requirement: if UT sensors are not properly centralised and aligned, reported wall thickness and metal loss data can be compromised. In-house testing was used to validate feasibility, confirm sensor centralisation, and check data integrity before field deployment. This reduced execution risk by moving key uncertainties into a controlled test environment. For the operator, this provided confidence that the inspection methodology was technically feasible before operational time was committed in the field.
Managing the dual-diameter inspection run The field inspection was completed in a single operational day, with the tool traversing both the 10 in. and 12 in. pipeline segments in one run. The inspection itself took less than four hours, with the average percentage of successful measurements of 98%. Throughout the operation, the field execution team monitored tool passage, verified operating parameters, and maintained the conditions required for optimal data acquisition. The dual-diameter configuration introduced several technical considerations. The tool had to pass through the transition from 10 in. and 12 in. pipe without intervention. Ultrasonic sensor centralisation had to be maintained during the diameter change. Pigging parameters, including tool velocity, also had to be controlled in a way that supported both passage and data quality. In addition, the combination of seamless and ERW pipe sections required consideration of material variation during analysis and reporting. The value of the single-run approach was not simply that it was faster. It reduced the number of field operations required, lowered the burden on the operator, and created a more efficient path to integrity data. In practical terms, the inspection method aligned the technical needs of the integrity programme with the operational need to minimise downtime.
Data quality as the basis for integrity decisions For pipeline integrity teams, an inline inspection is only as useful as the confidence that can be placed in the resulting data. In this case, the ultrasonic inspection produced decisionready data, with the reported metal-loss measurements showing good agreement with subsequent non-destructive testing (NDT) field verification results. This field verification step is important because it connects inspection output to physical evidence. Accurate reporting of metal loss supports anomaly assessment, prioritisation of maintenance activity, and compliance documentation. It also enables the operator to make decisions based on measured conditions rather than assumptions about degradation risk. The inspection therefore delivered more than operational efficiency. It provided validated integrity data from a pipeline that had previously required a more disruptive inspection approach. That combination of data reliability and execution efficiency is particularly valuable for assets where future inspection planning, anomaly verification, and compliance reporting must be supported by clear evidence.
From inspection data to integrity decisions Figure 1. Custom-configured Pipeline Surveyor UT tool prepared for dual-diameter inline inspection.
38 World Pipelines / INTEGRITY 2026
The value of accurate ultrasonic data becomes clearest once it is translated into a severity ranking that integrity engineers can act on. Across the inspected length, the
tool configuration, engineering preparation, and verification process turned a geometrydriven inspection challenge into a practical integrity assessment route. This illustrates a wider point for integrity management. Non-standard pipelines should not automatically be treated as inspection exceptions or accepted as assets with limited data availability. With the right feasibility process and inspection technology, difficult configurations can often be converted into inspectable systems, allowing operators to base their integrity decisions on reliable condition information. Figure 2. Screening structural integrity assessment according to Modified B31G. Beyond the results delivered on this project, the feasibility tool reported 65 features in total, of which 22 were classified work and tool configuration developed for this pipeline’s as metal loss and 23 as laminations or inclusions tied to the specific geometry now exist as a proven, repeatable approach. original manufacturing process, with no geometry anomalies For the operator, that means future inspections of this asset identified above the applicable reporting threshold. can be planned around a validated methodology with the Remaining strength for each metal loss feature was same vendor, rather than treated as a fresh engineering assessed using the Modified B31G method, calculating exercise, reducing the risk of feasibility or execution problems estimated failure pressure from measured depth and axial that can come with reassessing an unfamiliar dual-diameter length and expressing the result as an estimated repair factor configuration through a different provider. This consistency (ERF) relative to maximum allowable operating pressure. Of also provides the foundation for more advanced integrity the 22 metal loss features, nearly all were internal, none management, enabling the current severity classification to be exceeded 30% of nominal wall thickness, and every calculated extended to more reliable run-to-run comparisons, corrosion ERF remained below 0.80, well short of the 1.0 threshold that growth analysis, and remaining life assessments. would indicate a feature reducing safe operating pressure below MAOP or would require advanced assessments. In Conclusion practical terms, no metal loss feature from this inspection Reliable condition data enhances the confidence and quality met the criteria for repair or accelerated reassessment under of pipeline integrity assessments and decision-making while Modified B31G, a result that depends directly on the sizing minimising unnecessary operational disruption. In dual-diameter accuracy the inspection method was able to deliver. or otherwise challenging pipeline systems, the inspection This is where the single-run approach connects to integrity strategy must be engineered around the asset’s geometry, decision-making rather than data collection alone: preserved operating conditions and reporting requirements. data quality through the diameter transition gave the operator In this case, a tailored ultrasonic inline inspection approach a severity-ranked, code-assessed anomaly population it could enabled a 10 in. and 12 in. pipeline to be inspected in a single act on with confidence, and a verified baseline for comparison run, reducing field time and operational disruption while in future inspections. delivering metal loss data validated by field NDT. The success of this single-run methodology also gives the operator a Integrity value of a single-run solution validated basis for future inspections of the same asset, carried The result was a single-run ultrasonic inspection that reduced out with the same vendor and a known risk profile, rather total field time by more than 75% compared with the previous than starting the feasibility process over with an unfamiliar two-run method. The inspection was completed in less than provider. This consistency also establishes the foundation for four hours, and the client achieved cost savings through future integrity assessments, enabling meaningful trend analysis reduced mobilisation requirements and lower operational and more advanced engineering evaluations as additional disruption. inspection data become available. For operators managing From a pipeline integrity standpoint, the most significant complex pipeline systems, the project demonstrates how outcome was the ability to obtain high confidence data from early engineering, adaptable tool design and verification-led a non-standard pipeline configuration without repeating reporting can support more efficient and still reliable integrity the inefficiencies of the earlier inspection campaign. The management.
40 World Pipelines / INTEGRITY 2026
Jhaniel Osorio-Silva and Andrés Molina, ROSEN Colombia S.A.S., Colombia, and Andrew Wilde, ROSEN (UK) Ltd, UK, explore unlocking integrity insights with MFL Data Fusion.
E
ffective pipeline integrity management relies on the quality and reliability of data quantifying the condition of a pipeline. The accuracy of this information influences the classification and assessment of anomalies and the decisions that define maintenance and mitigation strategies. An inaccurate or conservative interpretation can lead to unnecessary interventions, while underestimation of anomaly size may comprise safety and reliability. In the case of the management of metal loss anomalies, Magnetic Flux Leakage (MFL) is the most widely used inline inspection (ILI) technology for detection and sizing.1 The performance of these tools is highly dependent on the anomaly morphology and orientation, since magnetic flux leakage is increased when the field is perpendicular to the anomaly orientation, allowing for improved detection and sizing. This limitation has led to the use of MFL ILI tools with different magnetisation directions for more comprehensive assessments, such as axial MFL (MFL-A) for circumferentially orientated anomalies; and circumferential MFL (MFL-C) for axially orientated anomalies detection. Currently, most of the MFL-A and MFL-C ILIs are evaluated and analysed independently, providing complementary information to the pipeline operator. As a result, differences between datasets often occur, requiring expert interpretation to provide a
definitive result, which can introduce subjectivity to the analysis. To overcome these challenges, ROSEN has developed a novel machine-learning-based process called MFL Data Fusion. This approach aims to reduce subjectivity in combined inspection reports by improving anomaly characterisation across all anomaly morphologies (axial, circumferential, etc.) and enhancing sizing accuracy. This results in many improvements within key integrity management tasks including corrosion cause diagnosis, burst pressure estimation, corrosion growth modelling and, ultimately, cost-effective repair planning.2 The increasing need for high-resolution integrity insights is especially evident in North and South America, where extensive pipeline networks face evolving regulatory and operational challenges. To address this, pilot applications of MFL Data Fusion have been successfully conducted with over a dozen case studies and pilot projects showing very accurate results with multiple operators across the Americas region, highlighting its potential to improve anomaly characterisation and decision-making.
Metal loss morphology and common tools It is estimated that corrosion accounts for at least 30% of pipeline failures globally, making it a primary concern for operators.3 Additionally, metal loss anomalies can present a
41
wide variety of morphologies (i.e. pitting, general corrosion, grooving, etc.), spatial distributions (clustered, isolated, and concentrations), and orientations along the length of the pipeline, depending on the mechanism of formation. This variability makes accurate detection and sizing challenging; however, to address these issues, several ILI technologies are used, including Ultrasonic Testing (UT) tools, Internal Eddy Current (IEC) tools, and the previously mentioned MFL tools. The latter remain as the most widely used technology as it does not require liquid coupling, being able to operate in gas and liquid pipelines and having good coverage of morphologies. These tools have been constantly improved
Figure 1. Example of MFL Data Fusion results of an anomaly with complex morphology: a) Data obtained using MFL-A individually, b) Data obtained using MFL-C individually, c) Fused data of both MFL technologies and d) in-field laser scan of the morphology. Reproduced from Peng et al.2
since their introduction, with higher sensor density, different magnetisation orientations (i.e. MFL-A and MFL-C), and improved detection and sizing algorithms. However, despite these advancements, no single MFL system can fully reconstruct complex corrosion morphologies with high accuracy across all orientations. As a result, combining complementary datasets becomes a natural step toward improving overall accuracy.
MFL Data Fusion basics Taking advantage of the large number of historical in-line inspections and verification data available within ROSEN, a machine learning model has been trained to combine MFL-A and MFL-C datasets into a merged representation. The output of this process is a 3D metal loss depth profile which is comparable to an in-field NDT laser scan.2 The MFL Data Fusion workflow consists of three stages: ) Pre-processing to compensate for tool effects on background magnetisation and remove noise in the raw signal, thereby improving data quality. ) Alignment of the two independent MFL signals with a pixel level matching, ensuring that both signals correspond to the same physical location of the pipeline. ) Fusion of the data is performed using an in-house developed neural network, a machine learning model designed to identify patterns and relationships within complex datasets, which converts the individual MFL signals into unified modalities and subsequently generates 3D metal loss depth maps. This approach is enabled by the significant advancements in computing power and AI algorithms in recent years, allowing large-scale, multi-sensor data fusion to be performed efficiently and accurately.
Figure 2. Morphology of complex corrosion anomalies using ROSEN’s MFL Data Fusion.
Figure 3. Example of effects of MFL Data Fusion: a) Comparison of RStreng burst pressure calculations between box data vs Laser Scan, b) Comparison of RStreng burst pressure calculations between 3D Maps vs Laser Scan, and c) River Bottom Profile Resolution. Reproduced from Peng et al.2
42 World Pipelines / INTEGRITY 2026
Figure 1 shows an example of complex metal loss anomalies detected using both, MFL-A and MFL-C tools, which later were fused and compared against the in-field laser data. MFL-A and MFL-C tools independently have different signal responses. The first one (Figure 1a) shows a stronger signal at circumferentially orientated anomalies, whereas the second one (Figure 1b) has a stronger signal response on axially orientated anomalies. Individually, each data set provides only a partial representation of the anomaly. In contrast, ROSEN’s MFL Data Fusion results (Figure 1c) reconstruct a very similar morphology to the one obtained using external laser scanning (Figure 1d). This illustrates how the approach can provide a better representation of the corrosion shape, which
ACCURATE • TOUGH • RELIABLE HOLIDAY DETECTORS IN ANY ENVIRONMENT For more than 70 years, SPY® Holiday Detectors have operated in extreme temperatures around the globe doing all types of coating inspection jobs. SPY® sets the standard for having the toughest, most reliable and accurate coating inspection equipment in the field, in the manufacturing facility or anywhere else coating inspection jobs need to be done! FOR MORE INFORMATION VISIT
spyinspect.com OR CALL OUR EXPERTS AT
(713) 681-5837
leads to tangible benefits in terms of improved corrosion management.2 The overall performance of the fusion process was investigated using pipelines with different characteristics, such as pipe diameter and wall thickness, and using in-field measured laser scans as ground truth data. Validation conforming to the API STD 1163 Level 3 method resulted in a sizing bias of only 1.78% wt (wall thickness), with tolerances of ±5.19% wt at an 80% confidence level.2 In other terms, the MFL Data Fusion system can achieve a depth tolerance of ±10% tolerance with a certainty of 97.5%, which, in comparison with current MFL tools, is a notable improvement.4
accurate burst pressure estimations. Figure 3a and Figure 3b show how the rupture pressure ratio improves when using 3D depth maps. Additionally, as shown in Figure 3b, the river bottom profile obtained with MFL Data Fusion closely matches the results obtained with the laser scan measurements.2 These improvements raise fundamental questions for pipeline integrity engineers, such as whether inspection tool specifications should focus on providing depth, length and width sizing accuracies or to recognise that burst pressure accuracy provides a more direct indication of tool performance. Latest data indicate that burst pressure performance is trending toward ±7% at an 80% confidence level using MFL Data Fusion.
Integrity management benefits
Corrosion growth estimation
Beyond improving the sizing accuracy of metal loss anomalies, ROSEN’s MFL Data Fusion provides a direct input to long term integrity management decisions relating to corrosion management, including: ) Improved visualisation of the corrosion morphology to support accurate diagnosis of the most likely corrosion cause. ) More accurate estimate of the corrosion profile which leads to significant improvements in the accuracy of burst pressure estimations. ) High resolution metal loss depth map that creates the potential to perform more detailed corrosion growth estimations leading to improved repair planning.
In the case of corrosion growth assessments for CGR estimation, the comparison between different data sets processed through MFL Data Fusion reduces variability and can result in a narrower distribution of CGRs, providing more reliable growth rates, improved pipeline segmentation, and a better estimation of future fitness-for-purpose. Additionally, as previously mentioned, more information about the complex morphology of the anomalies provides greater insight for corrosion diagnosis. This enables more accurate identification of unusual-shaped anomalies, such as preferential corrosion on girth welds and spiral weld interactions, which are often difficult to characterise using single MFL technology signals.
Concluding remarks This is particularly relevant because it increases confidence on corrosion growth rate (CGR) calculation and burst pressure estimations, which are fundamental for integrity management and dig planning.
Corrosion cause diagnosis Reliable diagnosis of the root cause of corrosion activity is key to defining an effective prevention strategy. This demands comprehensive information relating to the status of the corrosion prevention systems (for example the external coating and cathodic protection system), the prevailing environmental conditions and the characteristics of the reported corrosion. As shown in Figure 2 and as previously mentioned, the morphology of corrosion can appear very different based on the MFL-A and MFL-C signals, and this can result in uncertainty on the most likely cause. For example, based on the MFL-C data only, the corrosion appears to be axially orientated and so wrinkling of a tape coating under soil loading may be considered as a potential cause. The true pattern of the corrosion shown in both the MFL Data Fusion image and the photograph from in-field investigation, confirms the presence of an area of general corrosion.
As pipeline systems continues to age and regulatory expectations increase, the need for more accurate and reliable integrity assessments continues to grow. While traditional MFL technologies provide valuable insights, their inherent limitations introduce uncertainty and subjectivity in interpretation. ROSEN’s MFL Data Fusion approach represents a significant advancement by effectively combining complementary inspections datasets using machine learning to produce consistent and high-resolution 3D depth anomaly images. The practical implications are very noticeable as it can improve accuracy in defect sizing and morphology characterisation, increase confidence in corrosion growth and burst pressure estimates, and more efficient and targeted repair planning. Ultimately, MFL Data Fusion supports a transition from conservative strategies to data-driven integrity management, allowing operators to optimise maintenance efforts while maintaining high safety standards.
Referencess 1.
2.
Accurate burst pressure estimation As well as leading to more accurate estimation of the maximum corrosion depth, ROSEN’s MFL Data Fusion produces 3D depth maps that can be used with advanced assessments methods such as the Remaining Strength (RStreng) method and Plausible Profiles (Psqr) leading to more
44 World Pipelines / INTEGRITY 2026
3. 4.
RQIU, Z., , HUANG, P., et al., “The synegistic evolution of pipeline MFL inspection: A review on the fusion of physical models, AI, and multi-modal sensing (https:// doi.org/10.1016/j.sna.2025.117367),” Sensors and Actuators: A. Physical, vol. 398, 2026. PENG, X., SIGGERS, K., et al., “Data Fusion of Complementary Axial and Circumferential Magnetic Flux Leakage Inline Inspections and Effects on Safe Remaining Life (https://doi.org/10.1115/IPC2024-133959),” Proceedings of the 2024 15th International Pipeline Conference (ASME), vol. 2B: Pipeline and Facilities Integrity, 2024. OGULCAN PARLAK, B., and AYHAN YAVASOGLU, H., “A Comprehensive Analysis of In-Line Inspection Tools and Technologies for Steel Oil and Gas Pipelines, (https://doi.org/10.3390/su15032783),” Sustainability, vol. 15, no. 3, 2023. RAHMAH, H., SIGGERS, K., et al., MFL Data Fusion - Reducing Conservativity by Increasing Certainty, Berlin: Pipeline Techonology Conference, 2025.
tled-5 1
GIRARD INDUSTRIES 6531 N. Eldridge Pkwy Houston, TX 77041-3507, USA sales@girardind.com
Toll Free: 800.231.2861 Phone: 713.466.3100 Fax: 713.466.8050 www.GirardIndustries.com
Unmatched Performance and Proven Results
Stay informed
8/1/10 09:4
Keep up to date with us to hear the latest in upstream oil and gas news
www.oilfieldtechnology.com
Precise weld seam protection. It’s in your hands. DENSOLEN®
DENSOLEN®-MB60: The mesh-backed corrosion protection
NEW
tape in premium DENSO Quality Our latest 3-layer tape system with ageing-resistant coating and highly tear-resistant geotextile fabric. Fulfils ISO 21809-3 and EN 12068. denso-group.com
DENSOLEN -MB60 ®
DENSOLEN® Protection for Eternity
Dr Jimmy Campbell, Plastometrex, details why standardised in-situ testing is the next step for pipeline integrity.
E
very inspection method used across pipeline integrity programmes operates within a recognised framework, from magnetic particle testing (ASTM E709) to ultrasonic testing (ASTM E164), and lab-based tensile testing (ASTM A370). These standards exist because the data they produce informs decisions about critical infrastructure, and the consequences of getting that data wrong are severe. A standard is what gives operators, regulators, and legal teams confidence that a result can hold up to scrutiny. In-situ mechanical verification has long been the exception. As adoption of these methods has grown, particularly under the material verification requirements of 49 CFR 192.607 (Mega Rule), operators have been relying on in-situ data to fill critical gaps in their records without the same evidentiary foundation that underpins every other method in their toolkit. That changed in November 2025 with the publication of ASTM E3499-25, which covers in-situ mechanical verification via indentation plastometry. But to understand why it matters, it helps to understand why the gap existed in the first place.
The case for in-situ testing North America’s pipeline network is ageing. Records are incomplete, and operators are under growing regulatory pressure to verify material properties on vintage pipe. Where original mill certificates are missing or unverifiable, operators must find another way to confirm what they have in the ground. In-situ testing has emerged as a practical answer to destructive testing’s well-known limitations, namely that pipelines must be shut down for tests to be performed, as well as the method’s long testing times and high costs. In comparison, in-situ methods can be performed directly on live pipelines, making them faster and more cost-effective than legacy testing options. When records don’t exist for vintage pipelines, operators rely on these in-situ methods to provide tensile-equivalent data that can fill those critical gaps. However, as adoption has grown, so has scrutiny into the data. Inaccurate data collection poses a number of notable risks to pipeline operators. Overly conservative estimates can cause pipelines to be de-rated, reducing the efficiency of the pipeline network as a whole, or they may require costly, destructive re-testing programmes which can keep lines out
47
of commission for weeks at a time. If in-situ results swing too far in the other direction and over-estimate pipeline strength, networks risk pipeline failure. The question the industry faces is how to determine whether the data these methods produce is reliable enough to act on.
Why standardisation matters If an operator has to justify their data to a regulator, or if a legal team is reviewing the results of a dig programme, there must be a recognised framework in place that says the method was performed correctly, consistently, and to a documented standard. That is precisely what ASTM standardisation provides, and it is why every other test method in the pipeline integrity toolkit already has one. A standard gives inspection crews a consistent method and data collection process to follow. Across sites and contractors, variables that could contribute to unreliable data are eliminated. This repeatability is particularly important for operators managing large networks across multiple contractors and geographies. Without a standard, two teams performing what is nominally the same test can produce results that are difficult to compare or audit. With one, the method is fixed:
Figure 1. ASTM E3499-25 is the first time a methodology used for 192.607 compliance has an associated ASTM standard.
Figure 2. Profilometry-based Indentation Plastometry is now the first in-situ method backed by an international testing standard.
48 World Pipelines / INTEGRITY 2026
everything documented and consistent, regardless of who is holding the tool or where the dig is taking place. These consistent inputs lead to defensible decisions regarding pipeline integrity. The strength of an ASTM standard removes ambiguity from the data collection process, protecting organisations from the risks associated with bad data, including unforeseen expenses. When non-standardised tools are used on pipelines, operators can pay the consequences. In one instance, a North American pipeline operator was forced to pay over US$800 000 after a non-standardised tool indicated that pipe de-rating was required. This prompted a shutdown and destructive testing of the pipe, which turned out to be fully compliant. The costs of a bad result are not hypothetical, and the case for standardisation is not abstract. It is financial, operational, and regulatory all at once.
The path to ASTM standardisation Understanding why ASTM E3499-25 is meaningful requires an understanding of the many hurdles that must be overcome on the road to standardisation. It is a multi-year, committeedriven process involving hundreds of industry professionals, independent validation studies, and multiple formal rounds of review and revision. The rigor of this process is precisely why standardised methods can be held in such high regard. The process begins with registering a ballot item with the standards committee. Before any standard can be developed, there must be sufficient evidence of real-world adoption across multiple industries and use cases. A committee of operators, independent laboratories, manufacturers, and researchers must agree that the method warrants a standard and commit to the work of developing one. For ASTM E3499-25, that committee was drawn from across aerospace, energy, additive manufacturing, and general material verification reflecting the breadth of industries where the method was already widely adopted. After the initial ballot is approved, the work of translating practice into procedure begins. Every variable that could affect a result must be defined: equipment specification, test parameters, surface preparation requirements, and how results must be reported. This process interrogates the method, identifying where ambiguity could lead to variation, and resolving that ambiguity before it becomes a problem in the lab or the field. Independent validation is another requirement. For the standard now covering in-situ material verification, validation studies were conducted across institutions including Airbus, Nikon Advanced Manufacturing, and rms Medical, spanning multiple materials, laboratories, and geographies. This ensures that the standard is proven to be repeatable and reliable, whether the method is being applied within a single lab or across a global network, Balloting is the final and most iterative stage. Every negative vote from a committee member must be accompanied by a written technical comment, and the authors are required to formally respond to each one, often with new supporting data and revised documentation. This process repeats until consensus is achieved. For ASTM E3499-25, this meant
eight ballot rounds over three years, with hundreds of technical comments logged and addressed before the standard was approved in October 2025 and published the following month. A method that has been through this process has been scrutinised by hundreds of industry professionals, validated across multiple independent institutions, and revised in response to formal technical challenge over years. That is the threshold that every standardised method in the pipeline integrity toolkit has already met. With the publication of ASTM E3499-25, in-situ mechanical verification via indentation plastometry meets it too.
What this means for operator networks For pipeline operators, ASTM E3499-25 represents a significant first. It is the first time a methodology used for 192.607 compliance has an associated ASTM standard. Compliance requires defined equipment specification, operator qualification requirements, a documented test procedure, and a standardised reporting format. These requirements are what give the standard its practical weight. Profilometry-based Indentation Plastometry, or PIP testing, is now the first in-situ method backed by an international testing standard. This is an indentation-based approach that produces tensile-equivalent mechanical property data directly from live assets in the field. One of the most comprehensive recent evaluations of in-situ methods was a 2024 PRCI round robin study,1 which independently assessed the accuracy of three of the most widely used approaches in a head-to-head trial. The findings established PIP testing as the most accurate method for grade prediction, with a Mean Absolute Percentage Error (MAPE) of just 3.6% for both yield and tensile strength. For operators building or reviewing their Mega Rule compliance programmes, ASTM E3499-25 provides a standardised, independently validated framework that brings the same traceability, repeatability, and defensibility to in-situ material verification that practically every other method in the integrity toolkit already carries.
Where the industry goes from here The publication of ASTM E3499-25 opens a new chapter for the industry. For the first time, operators have access to an in-situ material verification method that has been subjected to the same scrutiny as every other standardised test method. That changes the baseline expectation for what responsible integrity management looks like. Regulatory requirements evolve, and the direction of travel in pipeline safety has consistently been toward greater accountability, more rigorous documentation, and higher evidentiary standards for the data that informs asset decisions. Operators who build their programmes around standardised methods now are better positioned to meet whatever comes next, without having to retrofit their processes or defend historical data collected under a less diligent framework. For in-situ material verification specifically, the standard also raises the bar for the market as a whole. Where previously operators had limited means of distinguishing between methods beyond vendor claims and internal experience, they now have a recognised framework to use as a reference point.
Figure 3. The PLX-Portable by Plastometrex uses PIP testing to produce tensile-equivalent mechanical property data directly from live assets in the field.
Figure 4. PIP testing has been establised as the most accurate method for grade prediction, with a Mean Absolute Percentage Error (MAPE) of just 3.6% for both yield and tensile strength.
A method that carries an ASTM standard has been validated across multiple institutions, reviewed by hundreds of industry professionals, and subjected to formal balloting over years. That is a meaningful threshold worth applying when evaluating any tool used to make decisions about safety-critical infrastructure.
Conclusion Pipeline network certification demands accuracy. The thousands of miles of vintage pipeline that make up North America’s networks must be tested, rated and certified to the highest possible standards to ensure their longevity. ASTM E3499-25 is the result of more than a decade of research, independent validation, and formal review. Its publication reflects not just the maturity of the method it covers, but the recognition by industry professionals across multiple sectors that it deserves the same evidentiary foundation as other widely used test methods. North America’s pipelines deserve data that meets the same rigorous testing standards as other safety-critical industries. Now, for in-situ material verification, it finally does.
Reference 1.
MILLIGAN, R., and KRISHNAMURTHY, R., ‘In Ditch Material Verification for Fittings and Seamless Pipe’, prepared by: Blade Energy Partners, release date: 29 April 2024.
INTEGRITY 2026 / World Pipelines
49
Nigel Curson, Executive Vice President – Technical Excellence, and Chris Wood, Director – Asset Integrity (Europe), Penspen, explain how connected data and live integrity systems can support more timely, risk-informed asset management decisions.
F
or decades, integrity management has been built around documents: inspection reports, anomaly lists, corrosion reviews, fitness-for-service assessments, risk-ranking spreadsheets, annual integrity reports, repair plans, as-built repair records, key performance indicators, and compliance statements. The names vary slightly, but the principle is the same. These documents ensure traceability, satisfy assurance requirements, and provide the engineering evidence needed to support safe continued operation. However, maintaining, reconciling, and reviewing them can be inefficient and labour-intensive, particularly for complex assets.
From reports to live integrity A possible evolution of integrity management is a shift from static documentation to a more connected, continuously updated integrity-management system that brings together underlying asset data, inspection and monitoring results, operating history, defects, repairs, threats, and risk assessments. The operator is always asking the same questions: 1) “Is the asset fit to continue operating under its current and
50
foreseeable operating conditions?” and 2) “What actions are required to maintain that fitness for service?” Traditionally, integrity status reports are created after an inspection campaign, an engineering review, or a regulatory milestone. By the time they are issued, some of the underlying assumptions may already have changed due to changes in operating conditions, production profiles, corrosion rates, third-party activity, environmental loading, repair status, or consequence classification. The report remains valuable, but it is a time-bound statement of integrity status rather than a complete and continuously current picture. For some assets, things can change fast. Examples include pipelines carrying highly corrosive products, in areas subject to soil movement, sensitive to pressure cycles, or at high risk of third-party interference. For such assets, the underlying risk profile may change more quickly than the reporting cycle. Regulators and standards are already pushing the industry toward a more integrated model. The US pipeline safety regulator, PHMSA, requires operators to perform assessments, integrate results with other relevant information, repair defects,
51
and conduct risk analyses across threats such as corrosion, excavation damage, natural forces, material defects, and operator error. Advances in digital technology, digital twins and connected data environments make a more integrated, continuously updated live approach increasingly practicable. Rather than relying principally on periodic reports, current asset, inspection, monitoring and operational information can be brought together to support timely, continuously informed engineering judgement on whether the asset remains fit for service and what action, if any, is required. For integrity management, this changes the operating model in five important ways.
A live integrity dashboard First, the ‘single report’ becomes a live integrity dashboard. Instead of searching across PDFs, spreadsheets, and email trails, engineers can work from a consolidated view of the controlled asset record. Inspection findings, anomaly growth, repair recommendations, operating envelopes and risk rankings can be linked directly to the asset, location and decision history.
Reassessment triggered by change Second, it enables reassessment to be triggered by change. Formal inspection intervals and integrity reviews remain necessary, but reassessment need not wait for the next scheduled report. Changes such as a significant pressure excursion, a change in fluid composition, an unexpected corrosion-monitoring result, reported third-party activity, a repair delay, or a change in consequence can trigger a review of the relevant integrity assumptions.
Connecting assessment to operations Third, it connects engineering assessments to operational controls. The findings of a fitness-for-service assessment can lead to defined actions: an operating restriction, a revised inspection interval, monitoring requirements, a repair deadline or a management-of-change requirement.
Better allocation of integrity resources Fourth, it improves the allocation of integrity resources. Integrity teams must decide which threats require investigation, where inspection will provide most value, which repairs are urgent, and where monitoring or operational controls are adequate. A connected view of condition, consequence, uncertainty and degradation rate supports these decisions more effectively.
A stronger safety justification Finally, it provides a stronger and more current safety justification. The integrity record can show, at any point in time, the condition of the asset, the material threats, the basis on which fitness for service has been concluded, and the controls required to keep risk within acceptable limits. It provides traceability from raw data and engineering assumptions through to operating restrictions, inspection requirements, repair decisions and outstanding actions.
52 World Pipelines / INTEGRITY 2026
This gives the operator, regulator, insurer and asset owner greater confidence that integrity risks are understood, controlled and being managed as conditions change. This is consistent with ISO 55000:2024’s lifecycle approach to realising value while managing risk and meeting organisational and regulatory requirements.
More than a technology project However, the move to live integrity management is not just a technology project; the change management required should not be underestimated. The industry must avoid simply digitising old habits: a PDF uploaded into a document system is still a static report; a dashboard without assurance of the underlying data flow is still a risk. The real opportunity is to connect people, data, and decisions. Integrity engineers, corrosion specialists, inspection teams, operations, maintenance planners and asset managers need to work from the same evidence base. Data quality, context and accountability become as important as software functionality. The question shifts from “Where is the latest report?” to “What is the current integrity position, what has changed, and what action is required?” For operators, this creates a pathway to safer, more efficient and more defensible asset management. For engineers, it elevates the role of integrity management from retrospective assessment to forward-looking risk management. For the wider industry, it offers a better way to manage ageing infrastructure, changing operating conditions and increasing scrutiny. Paper-based reporting will not disappear overnight. Formal reports will still be needed for regulatory submissions, board assurance, incident investigations and major engineering decisions. But they will increasingly become outputs from a live integrity system, not the system itself.
Applying live integrity proportionately This approach will be most valuable for complex, highconsequence or rapidly changing assets, particularly where there are multiple interacting threats, substantial inspection and monitoring data, frequent operational changes, or a significant repair and intervention programme. It is less likely to be justified for simple, stable, low-consequence assets with few credible degradation mechanisms and long inspection intervals, where a well-controlled periodic review may remain the most proportionate approach. Live integrity should therefore be applied proportionately, based on risk, complexity, and expected value. It is a means of improving engineering awareness and decision-making where improvement is needed, not a substitute for competent engineering judgement or a requirement to digitise every asset to the same extent. The future of integrity management is not a bigger report at the end of the process. It is a continuously updated, auditable view of asset condition, risk and required action. That is the direction of travel: from static evidence to continuously maintained assurance.
McElroy discusses combining digital innovation with the trusted practice of plastic pipe fusion.
A
s the world’s focus increasingly emphasises traceability and oversight, data-driven tools are transforming the way critical infrastructure is built and maintained. Heat-fused high-density polyethylene (HDPE) pipe has long been the material of choice for piping systems because of its durable, long-lasting, and cost-effective properties.
53
Furthermore, oversight tools exist to monitor the pipe fusion and installation process from start to finish, giving an HDPE pipeline the advantage of an extra layer of quality assurance – long before the line goes into service.
Why fused HDPE? HDPE pipe has cemented itself as a safe, reliable, and longlasting piping material for systems worldwide. Butt fusion is a reliable, trusted, and standardised method for joining plastic pipe together. Many standards exist to ensure butt fusion is done properly and consistently. In the US, ASTM F-2620 outlines the standard practice for heat fusion for polyethylene pipe and fittings, including heat and cool times and pressures required for different sizes of HDPE pipe. Since its arrival on the market in the 1960s, butt-fused HDPE has become one of the most trusted materials for installation. Corrosion- and leak-free, HDPE can be expected to last more than a century without any interruption in output – unlike traditional piping methods that are known to corrode or tuberculate. Because it’s lightweight, HDPE does not require the amount of heavy machinery as iron or steel pipe, and its versatility allows it to be bent to fit into spaces that would otherwise call for joints or specialised fittings. As an added benefit, fused HDPE can be installed via trenchless methods, minimising disruption to the project area and reducing machinery, manpower, and time required for the work. When combined with efficiency-boosting equipment that allows a single operator and single machine to complete the fusion job, that equates into countless savings in terms of time, manpower, and money.
A foundation built on quality
Figure 1. Fused high-density polyethylene (HDPE) pipe can be used in a variety of applications, thanks to HDPE’s durability and leak-free properties.
Figure 2. As the need for traceability has grown, so too have the tools available for quality control and oversight when fusing plastic pipe. Pictured here, an operator confirms machine operations with the DataLogger® 7 tablet on a TracStar® 900i machine.
54 World Pipelines / INTEGRITY 2026
The cornerstone of the plastic pipe fusion industry is the confidence that a fused HDPE pipeline can remain in service for up to a century while still remaining leak-free. To ensure that, there are five key considerations that need to be followed: ) A qualified operator: qualified operators undergo classes to ensure they are well-versed in the pipe fusion process. Classes are available worldwide, ensuring operators are ready for the job ahead. ) A qualified procedure: to ensure consistency and quality of each joint, an accepted standard should be used when fusing HDPE or other plastic pipe. These guidelines establish metrics like proper melt depth, the pressure needed for the size and type of pipe being joined, heat and cool times, and more. Many standards exist to ensure butt fusion is performed properly and consistently. In the US, ASTM F-2620 outlines the standard practice for heat fusion for polyethylene pipe and fittings, including heat and cool times and pressures required for different sizes of HDPE pipe. ) Qualified equipment: a high-quality fusion machine is one of the most important tools on any fusion jobsite. A quality machine will be ready for the job ahead and, in many cases, may reduce the need for extra heavy machinery or manpower. ) Quality control: during and after the pipe fusion process, data-logging tools can record and store the fusion parameters. Data-logging devices provide tools to improve decision-making and overall jobsite performance in the field. ) Qualified material: high-quality pipe is critical to the overall fusion process. During pipe fusion, a strong, homogenous
bond is formed between two pipe ends, resulting in a leak-proof joint that matches the strength of the pipe itself. Using high-quality pipe ensures consistent melting and flow, along with structural integrity to prevent weak points.
Beyond the trench Thermoplastic piping systems offer installation options that extend well beyond traditional open-cut trenching. By eliminating the need for extensive excavation, these approaches can significantly reduce labour requirements while minimising disruption to surrounding infrastructure, including roadways, landscapes, and waterways. The result is a more efficient installation process with a smaller footprint on the jobsite. Several proven trenchless installation methods Figure 3. In southeast Michigan in the US, a single fusion operator was able include: to confidently perform fusions start to finish without the need for additional ) Horizontal directional drilling (HDD): this personnel. McElroy’s TracStar 618 and PolyHorse® allowed the operator method begins with drilling a pilot hole along a to load, align, and fuse the pipeline before it was taken to the installation location. predetermined path, which is then enlarged using drilling fluid. The thermoplastic pipe is subsequently pulled through the bore, enabling installation beneath ) Slip-lining: another rehabilitation method, slip-lining obstacles with minimal surface disturbance. involves inserting a new, smaller-diameter pipe into an ) Pipe bursting: in applications involving pipeline replacement, existing pipeline. When working with HDPE, removing the a specialised bursting head is drawn through the existing external bead can help facilitate a smoother insertion, line. As it fractures the old pipe outward, the new improving efficiency during installation. thermoplastic pipe is installed in its place, often improving ) Submerged or floating pipe: for projects that traverse capacity and performance without additional excavation. bodies of water, thermoplastic pipe can be either
LNG Industry Website
The home for the latest LNG industry news, analysis, comment and events Visit our website today:
www.lngindustry.com
ADVERTISERS’ DIRECTORY
submerged below the surface or floated into position before being sunk. These methods provide flexible solutions to meet the challenges of aquatic environments.
Advertiser
Page
Dairyland Electrical Industries
17
Together, these trenchless technologies highlight the versatility of thermoplastic piping systems by delivering efficient, lower-impact installation options that align with the needs of modern infrastructure projects.
DeFelsko Corp.
30
Maximising manpower
Denso GmbH
OFC, 46
Denso, Inc. (Winn & Coales)
07
Deyuan Pipeline
OBC
Electrochemical Devices Inc.
33
Frontline Integrity
13
Girard Industries
45
Henkel
02
iCoaTek
23
Intero Integrity
29
LNG Industry
55
NDT Global
19
Oilfield Technology
45
Pigs Unlimited International Inc.
25
Polyguard Products
39
Propipe Ltd
35
PSS Industrial Group
43
Qapqa B.V.
IBC
STATS Group
11
Tinker & Rasor
IFC
Unlike traditional piping materials like iron or steel, the process of joining HDPE pipe ends together can be done with one person, thanks to a suite of efficiency-boosting tools and equipment designed specifically to maximise manpower. In southeastern Michigan, a single fusion operator working with one machine – McElroy’s TracStar® 618 – was able to confidently handle a large-scale fusion process from start to finish, freeing up others to complete other tasks on the jobsite. Once fused, the pipeline was pulled to the installation site to be put in the ground via directional drilling. For this job, about 10 000 ft (3 km) of 8 in. DR11 pipe and 12 in. DR11 pipe were fused as part of a larger project to replace and update iron pipe lines dating back to the 1920s and 1930s. Along with the TracStar 618, the operator used a PolyHorse®, which is designed to hold multiple sticks of pipe so an operator can load and align pipe in the fusion machine without the need for extra heavy machinery. As an added layer of oversight, the operator logged each fusion on the DataLogger® 7, McElroy’s ruggedised fusion tablet that captures fusion and joint information for recordkeeping and quality assurance. Even though he was a seasoned operator, the DataLogger, he said, helped give him peace of mind that everything had been done correctly – and it made for fast and easy review of the day’s fusion work. HDPE’s versatility and ease of installation also became apparent during a project in northern Venezuela to install a nearly 18 mile (28.7 km) large-diameter pipeline that included a 5 mile (8.53 km) stretch beneath the Golfete de Coro, a sea inlet. Because HDPE is able to withstand higher pressures than traditional piping materials – and because it can bend and shift without compromising its structure – project coordinators were able to take a ‘shortcut’ and run about five miles (8.53 km) of the fused pipeline along the seabed.
Looking ahead The pipe fusion industry is a fast-growing one, and it’s constantly shifting to meet the changing needs of modern infrastructure. McElroy is committed to remaining at the forefront of fusion technology and providing tested, trusted machinery that will improve the world’s infrastructure one joint at a time.