HOTELS & HOSPITALITY

WHY PACIFIC

There are numerous construction businesses and many fit-out companies but what marks Pacific Building out as being different – and better – is that we are experts in BOTH fields.

We are an innovative and dynamic company with a proven track record of dependability, delivering high quality projects throughout the UK and Ireland – on time and on budget.

QUALITY DELIVERY FOR BLUE-CHIP CLIENTS

We work within a variety of sectors including:

• Commercial & Retail

• Leisure (including hotels, pubs & restaurants)

• Education (Universities, Schools & Colleges)

• Healthcare

We have a wealth of experience of operating in sensitive and secure locations, including international airports and university campuses.

Our client base includes some of the UK’s biggest names as well as world-renowned businesses. We are also well versed in working within live environments in a manner that ensures clients experience as little disruption as possible. We can fast-track projects for completion or minimise any down-time while works are under way, so that clients can be confident of keeping their businesses running.

Every project is carried out to our exacting standards, and every member of our team is proud to work to the core Pacific Building values of respect, fairness, collaboration, quality and a “right first time” approach to everything we do. Our quality standards are reinforced by an extensive in-house trades team and our own manufactured joinery workshop.

We are well into our second decade in business – testament to our delivering the highest professional standards and strong client relations.

UK-WIDE COVERAGE

The company head office is in Hillington Park in Glasgow, not far from Glasgow International Airport, where we also have an ancillary operations base. When not in one of our offices, our on-site professionals are to be found at various locations across the United Kingdom delivering projects for our diverse array of client companies.

PACIFIC BUILDING

HOTELS & HOSPITALITY

With our background in environments which emphasise safety, security and minimal operational impact, hotel projects were an obvious extension to our portfolio. Our expertise in hotel work has included:

• Room and Bathroom Upgrades

• Corridor Refurbishments

• Leisure facilities including Spas

• Restaurant and Bar fit outs

• Conference facility upgrades

Our clients have included internationally-renowned hotels such as Gleneagles and chains including the Marriott, Waldorf Astoria, Crowne Plaza and the Holiday Inn.

QUALITY DELIVERY

Through our work with leading brands and their professional teams, we understand the importance of delivering projects fully in line with hotel brand & design guides. We are here to help the hotel deliver a welcoming, attractive brand and environment which will attract customers. Our quality processes ensure that work is reviewed at all stages through design, fabrication and install. A successfully delivered project which has delivered on budget, programme and with minimal impact on the hotel operations should not be compromised by postcompletion issues.

ZERO IMPACT ON OPERATIONS

We are conscious of the effect ongoing works can have on a hotel’s operation whether this relates to occupancy rates or the experience of guests during the works. Pacific’s approach is two fold. Firstly, working with the hotel and their team, we will develop a programme of works incorporating fast track delivery/ phasing to minimise impact on hotel operations. Secondly, construction operations will be physically segregated, delivered during agreed periods and with zero noise/ dust impact. Our Project Managers will be available to Hotel Management throughout the works whether it is to discuss planning, operational aspects or timing of the works.

MARRIOTT HOLYROOD HOTEL, EDINBURGH

Client: Gateway Holyrood Hotel

Project duration : 52 weeks

Contract value: £6.1 Million

The Holyrood project for Gateway Hotels involves the refurbishment of 158 guest bedrooms and associated corridors including flooring, decoration, furniture and bathroom upgrades.

The project also includes an extensive renovation of the hotel’s public areas including the reception, lobby bar, lounges and restaurants. CLICK

TO WATCH VIDEO

Marine Hotel, North Berwick

Client: AJ Capital

Project duration: 12 weeks

Contract value: £1.4m

Pacific have delivered a major makeover of the iconic Marine Hotel in North Berwick. The project involves complete refurbishment of the hotel’s 84 bedrooms along with corridor areas.

In addition, Pacific completely renovated the Hotel’s bar, restaurant and front of house areas.

TO
CLICK
WATCH VIDEO

MOUNT ROYAL HOTEL, EDINBURGH

Client: Jupiter Hotels

Project duration : 56 weeks

Contract value: £4.3Million

The project for Jupiter Hotels at the Mount Royal in Princes Street (currently the Mercure Edinburgh) involves the refurbishment of 156 guest bedrooms and associated corridors including flooring, decoration, furniture and bathroom upgrades. The Bell & Swift designed project also includes an extensive renovation of the hotel’s public areas including the reception area. The Pacific workshop team has supplied manufactured joinery on the project including new reception pods and bespoke wall panelling.

HOLIDAY INN, EDINBURGH ZOO

Client: Ribbon Edinburgh

Project duration : 11 weeks/ 16 weeks

Contract value: £1,300,000

The Holiday Inn project at Edinburgh Zoo involved a complete refurbishment of the front of house facilities and public areas at the hotel. The scope of works included refurbishment of the main reception, bar, lounges and upgrade of the main entrance. Pacific have also recently delivered a phased refurbishment of 68 of bedrooms on a phased basis whilst the hotel remains operational. The upgrade involved the strip-out of the existing rooms, replacement of furniture and fixings and new floor finishes, along with tiling and new shower screens in the en-suite areas. The project also included some corridor works including redecoration

BIRD & SIGNET BAR, GLASGOW AIRPORT

Client: SSP

Project duration : 15 weeks

Contract value: £550k

This project involved the creation of a new 260 cover bar at Glasgow Airport for hospitality specialists SSP. The £550,000 project took 15 weeks to complete and involved new floor coverings, mechanical and electrical  installations, decoration, doors, partitions and new kitchen. Pacific’s manufactured joinery team supplied and fitted the main bar, waiter stations, banquette seating and high tables. The Bird & Signet name is inspired by is the legends associated with Glasgow’s coat of arms that features the bird the never flew, the tree that never grew, the fish with a ring in its mouth that never swam and the bell that never rang. CLICK TO WATCH VIDEO

CROWNE PLAZA REFURBISHMENT, GLASGOW

Client: Valor Hospitality

Project duration : 52 weeks

Contract value: £1,900,000

Major refurbishment of the Crowne Plaza Hotel in Glasgow to install upgraded fire stopping within the bedrooms. Phased on a floor-byfloor basis, the 285 keys were also refurbished internally incorporating decoration, floor coverings and other upgrades,

Gleneagles Hotel Spa

Client: Gleneagles Hotel

Value: £730,000

Timescale: 26 weeks

As a World Leading hotel, Gleneagles is renowned for luxury and exclusivity. Pacific Building were tasked with the conversion of an existing wing of bedrooms and suites into an area suitable for both retail and public use. As the hotel is a 24/7 operation, it was crucial that appropriate shift patterns and task scheduling was utilised to ensure that the work was completed not only within the necessary timescales, but with the minimum disruption for guests and hotel staff: noisy or dusty work is unacceptable in the context of a relaxing hotel and spa experience. Despite working in a very demanding environment, Pacific Building delivered an extremely high standard of finish for a client who consistently demands the best.

The Three Lions, Wembley Stadium

Client: The Football Association

Project duration: 10 weeks with

Contract value: £1,830,000

This project involved the refurbishment of the Three Lions Bar area within Wembley Stadium, a 13,000 square foot facility, which will be visited by hundreds of thousands of visitors every year. The project involved the full strip out of three existing bars and lounge areas, new building services installation, new fixed seating and furniture, tiling, flooring, ornamental metalwork, ceiling features and decoration.

The site was within a live and operational stadium venue with multiple ongoing uses, including office space above and below the site, live stadium tours around the site and other events within the stadium. As such, we had to take account of the many stadium activities, including client employees, other stadium staff, visitors and the general public moving within the site.

RUSACKS Hotel, ST ANDREWS

Client: AJ Capital

Project duration: 9 weeks

Contract value: £450k

The iconic Rusacks Hotel is closely associated with the nearby Old Course in St Andrews. Pacific’s project involved the fit-out of a new fourth floor restaurant within a new extension at the hotel. Our in-house Bespoke Joinery Workshop fabricated and installed a new bar along with wood panelling, column and beam cladding and banquette seating. Other works included decoration, tiling, flooring and building services installation

TO WATCH VIDEO
CLICK

PLAZA PREMIUM, EDINBURGH AIRPORT

Client: Plaza Premium

Project duration: 10 weeks

Contract value: £640k

Fit-out of new Lounge at Edinburgh Airport for Plaza Premium. Project involved extensive manufactured joinery including bar, banquette seating and reception design – provided by Pacific’s in-house workshop team. Lounge also incorporates new flooring, partitions, wall panels and decoration throughout. To ensure comfort and service for Plaza Premium’s customers there is an extensive services and communication installation as part of the project. CLICK

TO WATCH VIDEO

Malmaison Hotel, Dundee

Client: Malmaison

Value: £120,000

Timescale: 8 weeks

Room refurbishments at Malmaison’s Dundee Hotel. Works incorporated upgrade of bedroom floor coverings, lighting, decoration and new manufactured joinery. Programme included the new premium Mal Super Suite.

FEVER-TREE BAR, EDINBURGH AIRPORT

Client: Fever-Tree

Project duration: 3 weeks

Contract value: £160,000

Creation of a new signature bar for the main departure lounge at Edinburgh Airport. Utilising an island bar incorporating a bespoke timber tree canopy feature, the project also involves installation of new banquette seating, new flooring and merchandising display. Our in-house joinery workshop is manufacturing and installing key elements of the project.

Our workshop manufactured the merchandise shelving, banquette seating and corian bar top.

Hotel du Vin, Glasgow

Client: Hotel du Vin

Value: £150,000

Timescale: 7 weeks

Programme of upgrades at the renowned Hotel du Vin in Glasgow’s West End (formerly One Devonshire Gardens). Project involved replacement bathrooms in en-suite areas. Rooms phased to minimise disruption and to keep capacity at an optimum level. Noisy works undertaken during breakfast and dinner periods

BA Lounge, Aberdeen International Airport

Client: British Airways

Project duration: 17 weeks

Contract value: £913,000

The 360m2 BA Executive Lounge at Aberdeen International Airport was to be a brand-new facility created within a recently constructed and empty first-floor concrete extension to the main terminal building. We worked closely with a team of architects and design consultants, ensuring that the works met the rigorous standards and features specified by the client. The works delivered by Pacific included raised access floor, manufactured joinery, partitions, services installation and FF+E. Attention to detail was critical, understanding the clients’ requirements as well as clearly understanding the security measures and site restrictions to ensure that our programming, planning and selection of sub-contractors and supply chain partners was right for this project.

RECEPTION AREA, EDINBURGH

Client: Vastint

Project duration: 16 weeks

Contract value: £510k

This project involved the fit-out of a new reception area to serve a new build office development and Moxy Hotel in Fountainbridge, Edinburgh.

Balloch House, Loch Lomond

Client: Mitchells & Butlers

Value: £160,000

Timescale: Three weeks

The bedroom refurbishment at Balloch House involved the stripout of existing furnishings, fixtures and wall and floor coverings. This was followed up by building alterations to the en-suite shower rooms, the installation of new bed headboards, wallpaper, tiling, carpeting, new lighting, painting, new beds and furniture, plumbing and electrical fixes as well as a comprehensive refresh of the corridors.

Meanwhile, the bar – which is a favourite watering hole of local residents and day visitors enjoying the scenic surroundings –underwent a five-day closure to accommodate an extensive facelift.

All Bar One, George St, Edinburgh

Client: Mitchells & Butlers

Project duration: 3 weeks

Contract value: £400,000

A POPULAR brasserie in one of Scotland’s premier city locations has reopened after undergoing an extensive makeover by Pacific Building. All Bar One in George Street, Edinburgh, reopened to the public in its new guise on June 19 – just three weeks after closing for the refurbishment. The finished article is yet another demonstration of Pacific’s ability to deliver high-quality projects in prestigious locations –where image and materials count for everything – to deadline and to budget.

Gleneagles Hotel Corridor Upgrade

Client: Gleneagles Hotel

Value: £500,000

Timescale: 16 weeks

Renowned for being one of the world’s most luxurious resorts, Gleneagles wanted to ensure that they retained their prestigious reputation by upgrading and modernising the corridors, stairs and circulation areas of all three floors of their five-star hotel. The hotel continued to trade while the works were carried out, and, due to the nature of the work involved, it was essential that guests were segregated from the operations. Working closely with hotel staff, disruption to guests was minimised by the creation of temporary routes and the sectioning off of certain portions of corridors. Works were also phased, in order to incorporate areas afforded by the hotel. it was imperative that the schedule of works did not slip, as rooms were often booked out on the day after planned handover,

Waldorf Astoria, Edinburgh

Client: Waldorf Astoria

Value: £800k

Timescale: 8weeks

Pacific were commissioned by the Waldorf Astoria Hotel to deliver a phased programme of bedroom refurbishments in the hotel. The works included complete upgrade of the bedroom vestibule floor coverings, manufactured fittings along with complete new marble bathroom suites. The 32 rooms were refurbished adjacent to guest areas requiring careful planning and close liaison with hotel staff throughout the ensure the comfort of guests throughout the project.

www.pacificbuilding.co.uk @PacificLtd PacificBuildingLtd