architectural and design
portfolio
2022 - 2023
pablo galarza
/01 /02
RETAIL PROJECT #1
RETAIL PROJECT #2
ntent Con
RENOVATION PROJECTS
NEW CONSTRUCTION PROJECTS
Content
/03 /04 /05 /06 /07
RETAIL PROJECT #3
RETAIL PROJECT #4
RETAIL PROJECT #5
RETAIL PROJECT #6
RETAIL PROJECT #7
PROJECTS NAMES NOT DISCLOSED FOR PRIVACY AND CONTRACT REASONS
tio n no
va
/01
re
PROJECT # 1 MIXED USE RETAIL RENOVATION PROJECT IN THE ORLANDO FLORIDA AREA. THE PROJECT CONSISTS IN THE DEMOLITION OF A WHOLE RETAIL PLAZA’S FACADE AND ITS RENOVATION. DUTIES INCLUDED 3D MODELING, CONSTRUCTION DOCUMENTATION AND CONSTRUCTION ADMINISTRATION.
:I
S TU A ST N N O
C R ST TIO
UC N
io n re n
ov
at
/01 PROJECT # 1 EXISTING CONDITIONS OF THE PROJECT BEFORE RENOVATIONS WERE DOCUMENTED AND DEMOLITION DRAWINGS PROVIDED TO GC FOR REFERENCE IN THE FIELD.
G
TIN IS
EX O
C N D O ITI S
N
io n re no v
at
/01 PROJECT # 1 SCHEMATIC DESIGN OF THE NEW FACADE WAS PROVIDED AND DEVELOPED. CONSTRUCTION DOCUMENTATION WAS DEVELOPED TO PROVIDE GC ENOUGH CONSTRUCTION DETAILS AND INFORMATION TO START BUILDING. CONSTRUCTION ADMINISTRATION FOLLOWED TO MAKE SURE DESIGN INTENT WAS ACHIEVED.
IG ES D N A D N C O D TA EN
UM TIO N
io n re no v
at
/01 PROJECT # 1 PROJECT IS CURRENTLY UNDER CONSTRUCTION AND IN THE CONSTRUCTION ADMINISTRATION PHASE.
C
RU ST
N
O C N
TIO
io n no v
at
/02
re
PROJECT # 2
S: TU
A ST
RESTAURANT RENOVATION PROJECT IN THE ORLANDO FLORIDA AREA. THE PROJECT CONSISTS IN THE DEMOLITION OF INTERIOR PARTITIONS, LIGHTING FIXTURES, FINISHES; EXTERIOR FACADE AND ITS ELEMENTS FOR A NEW FACADE REDESIGN AND INTERIOR. DUTIES INCLUDED EXTERIOR DESIGN OD THE PROJECT, 3D MODELING AND 2D DOCUMENTATION.
O
C N TA TIO N C ME RU U ST C N DO N TIO
io n re no v
at
/02 PROJECT # 2 EXISTING CONDITIONS OF THE PROJECT BEFORE RENOVATIONS WERE DOCUMENTED AND DEMOLITION DRAWINGS PROVIDED TO GC FOR REFERENCE IN THE FIELD.
IS
EX G
TIN O
C D
N O ITI S N
io n re no v
at
/02 PROJECT # 2 PROJECT IS CURRENTLY UNDER CONSTRUCTION DOCUMENTATION
O C TA EN
M N CU TIO DO C RU
ST
N N TIO
co n
st ru
ct io n
/03
ne
w
PROJECT # 3 NEW RETAIL BUILDING ADDITION TO A PLAZA IN THE ORLANDO AREA. CURRENTLY UNDER SCHEMATIC DESIGN BUT WILL BE TAKEN ALL THE WAY TO CONSTRUCTION. DUTIES INCLUDED COORDINATION WITH CLIENT, DESIGN, 3D MODELING AND 2D DOCUMENTATION.
TU A ST S: SC M HE A TIC ES
D N IG
co
ns tru c
tio
n
/03
ne
w
PROJECT # 3 NEW RETAIL BUILDING ADDITION TO A PLAZA IN THE ORLANDO AREA. CURRENTLY UNDER SCHEMATIC DESIGN BUT WILL BE TAKEN ALL THE WAY TO CONSTRUCTION.
TU
A ST S: SC TIC
A
M HE N
IG
ES D
co
ns tru c
tio n
/04
ne
w
PROJECT # 4 NEW RETAIL BUILDING IN THE ORLANDO AREA. CURRENTLY UNDER SCHEMATIC DESIGN AND OWNER REVIEW. DUTIES INCLUDED COORDINATION WITH CLIENT, DESIGN, 3D MODELING AND 2D DOCUMENTATION.
C :S
S TU
A ST M HE TIC
A D N IG
ES
co ns tru
ct
io n
/04
ne
w
PROJECT # 4 NEW RETAIL BUILDING IN THE ORLANDO AREA. CURRENTLY UNDER SCHEMATIC DESIGN AND OWNER REVIEW.
A ST C :S
S TU M HE TIC
A D ES N IG
co
ns
tru c
tio
n
/05
ne
w
PROJECT # 5 NEW RETAIL BUILDING IN THE ORLANDO AREA. CURRENTLY UNDER SCHEMATIC DESIGN AND OWNER REVIEW. DUTIES INCLUDED DESIGN, 3D MODELING AND 2D DOCUMENTATION.
C :S
S TU A ST M HE A TIC D IG ES N
co
ns tru
ct io
n
/05
ne
w
PROJECT # 5 NEW RETAIL BUILDING IN THE ORLANDO AREA. CURRENTLY UNDER SCHEMATIC DESIGN AND OWNER REVIEW.
A ST :S
S TU C TIC
A
M HE D ES IG N
co n
st ru
ct
io n
/06
ne
w
PROJECT # 6
:I
S TU
A ST
NEW CAR WASH RETAIL BUILDING IN THE ORLANDO AREA. CURRENTLY UNDER CONSTRUCTION. DUTIES INCLUDED COORDINATION WITH CLIENT, COORDINATION WITH CONSULTANTS OF OTHER DISCIPLINES, DESIGN, 3D MODELING AND CONSTRUCTION DOCUMENTATION.
N TIO C RU ST
N
O
C N
co
ns tru
ct io
n
/06
ne
w
PROJECT # 6 NEW CAR WASH RETAIL BUILDING IN THE ORLANDO AREA. CURRENTLY UNDER CONSTRUCTION
TU A ST S: IN R ST
N O
C TIO
UC N
co
ns tru
ct io
n
/06
ne
w
PROJECT # 6 NEW CAR WASH RETAIL BUILDING IN THE ORLANDO AREA. CURRENTLY UNDER CONSTRUCTION
ES D IG N PR ES C
O S
co n
st ru
ct
io n
/07
ne
w
PROJECT # 7 BLDG-1
IN ITT
M
ER :P
S TU
A ST
MIXED USE REATAIL BUILDING IN THE ORLANDO AREA. CURRENTLY UNDER PERMITTING . DUTIES INCLUDED COORDINATION WITH CLIENT, COORDINATION WITH CONSULTANTS OF OTHER DISCIPLINES, DESIGN, 3D MODELING AND CONSTRUCTION DOCUMENTATION.
G
co
ns tru ct
io n
/07
ne
w
PROJECT # 7 BLDG-1
M ER :P
S TU A ST
MIXED USE RETAIL BUILDING IN THE ORLANDO AREA. CURRENTLY UNDER PERMITTING. DUTIES INCLUDED COORDINATION WITH CLIENT, COORDINATION WITH CONSULTANTS OF OTHER DISCIPLINES, DESIGN, 3D MODELING AND CONSTRUCTION DOCUMENTATION.
IN ITT G
ne
w
co n
st ru c
tio n
/07 PROJECT # 7 BLDG-2
A ST
NEW RETAIL BUILDING IN THE ORLANDO AREA. CURRENTLY UNDER SCHEMATIC DESIGN AND OWNER REVIEW. DUTIES INCLUDED COORDINATION WITH CLIENT, COORDINATION WITH CONSULTANTS OF OTHER DISCIPLINES, DESIGN, 3D MODELING AND CONSTRUCTION DOCUMENTATION.
M ER :P
S TU IN ITT G
w
co
ns tru
ct
io n
/07 PROJECT # 7
ne
BLDG-2
IN ITT
M
ER :P
S TU
A ST
NEW RETAIL BUILDING IN THE ORLANDO AREA. CURRENTLY UNDER SCHEMATIC DESIGN AND OWNER REVIEW. DUTIES INCLUDED COORDINATION WITH CLIENT, COORDINATION WITH CONSULTANTS OF OTHER DISCIPLINES, DESIGN, 3D MODELING AND CONSTRUCTION DOCUMENTATION.
G
w
co
ns tru
ct
io n
/07 PROJECT # 7
ne
BLDG-1 & 2
IN ITT
M
ER :P
S TU
A ST
TWO NEW RETAIL BUILDING IN THE ORLANDO AREA. CURRENTLY UNDER SCHEMATIC DESIGN AND OWNER REVIEW. DUTIES INCLUDED COORDINATION WITH CLIENT, COORDINATION WITH CONSULTANTS OF OTHER DISCIPLINES, DESIGN, 3D MODELING AND CONSTRUCTION DOCUMENTATION.
G
p/g THEMED PARKS, RESIDENTIAL, COMMERCIAL, PARKING GARAGES AND RETAIL EXPERIENCE