Installation Instructions, Post Driver Kit 20500 (MDK-13) Manual Driver 20480 (JDK-10) Jackhammer Driver Accessories 20440 (OH-02) Jackhammer Driver Bit 50740 Post Level 40640 (HSP-HB) 40600 (HSP-13) 40540 (HSP-T6) 40580 (HSP-125) 40520 (HSP-T46)
Installation Instructions, Post Drivers
V2.00 - Installation Instructions, Specifications and Project Plans are effective 3/28/2016 . This information is updated periodically and should not be relied upon after 2 years from 3/28/2016 . Please visit OZCOBP.com to get current information.
1
Manual Driver
OH-01 Driver Bit
HSP-T4 Red Spacer
HSP-T4 Red Spacer
20480 JDK-10 (for use with jackhammer)
20500 MDK-13
Overview Installation Instructions, Post Drivers
V2.00 - Installation Instructions, Specifications and Project Plans are effective 3/28/2016 . This information is updated periodically and should not be relied upon after 2 years from 3/28/2016 . Please visit OZCOBP.com to get current information.
3
Post Level 50740
HSP-HB 40640
HSP-T6 40540
HSP-125 40580 HSP-T46 40520
HSP-13 40600 OH-02 20440
Accessories Installation Instructions, Post Drivers
V2.00 - Installation Instructions, Specifications and Project Plans are effective 3/28/2016 . This information is updated periodically and should not be relied upon after 2 years from 3/28/2016 . Please visit OZCOBP.com to get current information.
4
post level #50740 (sold separately) not installed while driving
jack hammer (rental)
JDK-10 20480
check angle every 1"
repeat
until 1/2 way
JDK-10 Installation Instructions, Post Drivers
V2.00 - Installation Instructions, Specifications and Project Plans are effective 3/28/2016 . This information is updated periodically and should not be relied upon after 2 years from 3/28/2016 . Please visit OZCOBP.com to get current information.
5
post level #50740 (sold separately) not installed while driving upper section slides up & down to drive post anchor MDK-13 20500
check angle every 1"
repeat
until 1/2 way
MDK-13 Installation Instructions, Post Drivers
V2.00 - Installation Instructions, Specifications and Project Plans are effective 3/28/2016 . This information is updated periodically and should not be relied upon after 2 years from 3/28/2016 . Please visit OZCOBP.com to get current information.
6