PIPELINER OF CHOICE

A leader in pipeline construction contracting and horizontal directional drilling, Spiecapag has been operating in Australia for 40 years. We delve into four decades of Australasian pipeline projects with John Walsh, Managing Director of Spiecapag Australia Writer: Jack Salter | Project Manager: Joshua Mann

W

hen John Walsh, Managing Director of Spiecapag Australia, first arrived Down Under in 2013, the gas industry was in the midst of an investment boom. At the time, a wave of liquefied natural gas (LNG) megaprojects were being constructed, including 2 | APAC Outlook Issue 65

upstream production, export facilities and associated pipelines. Sustaining those heady levels of investment was always unlikely, and although there has since been a drop in new gas infrastructure investment, it has largely been counterbalanced by new investment in water

infrastructure. Natural gas, however, will continue to play a key role in firming domestic electricity supply as part of the transition to net zero in many countries across the region. Eventually, hydrogen will also be a key part of the transition, as evidenced by the AUD$127 billion pipeline of


SPIECAPAG AUSTRALIA OIL & GAS

hydrogen projects that has been announced in Australia alone – and that brings with it transmission infrastructure opportunities. “We are currently in early discussions with clients, and it will more than likely become an area of growth in the coming years,” Mr. Walsh outlines.

In the meantime, the existing resources sector remains a strong driving force of the Australian economy, and a number of new mining projects will require both energy and water supplies. With its regional office based in Brisbane, Queensland since 2015,

Spiecapag also regularly monitors how it can bring its wide experience and expertise to specialised projects in Papua New Guinea (PNG), New Zealand, as well as New Caledonia and further out into the Pacific, and northwards to serve Southeast Asia. “We had been operating on a APAC Outlook Issue 65 | 3


SPIECAPAG AUSTRALIA OIL & GAS

APAC OUTLOOK: WHAT MAKES SPIECAPAG AUSTRALIA A LEADER IN EPC PIPELINE PROJECTS GLOBALLY AND IN OCEANIA? John Walsh, Managing Director: “Spiecapag has been building

project-by-project basis across the region for decades before establishing a permanent operation here in Australia, and have now been active in the region for over 40 years. While we operate across the whole region, much of our business is in Australia, and also in PNG, where we have built all the major long-distance, high-pressure gas pipelines,” notes Mr. Walsh.

pipelines for over 100 years and has a huge (and unequalled) volume of experience and expertise. “This comes with deep technical in-house capabilities, supported by specialised equipment and worldclass systems. That competence feeds our ability to offer innovative solutions to clients. “Our team is driven to succeed and never shies away from a challenge, with a culture akin to a small business but backed by one of the largest players in the sector. As part of VINCI Group, we come with a very strong balance sheet that gives clients confidence in our ability to deliver and persist in a challenging time for the construction industry. “JVs with best-in-class companies as well as reliable and highly competent supply chain partners complement our strengths.”

EXPONENTIAL GROWTH Spiecapag is part of the French multinational construction conglomerate, VINCI Group, and has had an ongoing programme of work since establishing its permanent base in Australia, with four or five projects typically live at any given time. The company has grown exponentially from just two employees to 600. With more growth in the pipeline for 2024, staff are at the core of Spiecapag Australia’s strategic focus for the business. “We are proud to employ the most talented and experienced people in our industry, and as we grow, it’s important we continue to attract and retain key staff with various skills, abilities, and backgrounds,” Mr. Walsh recognises. Over those years, more than 20 large pipeline projects have been constructed across the region by Spiecapag, who has since added a horizontal directional drilling (HDD) business whose work stretches into Southeast Asia, South Korea, and Japan.

HDI Lucas, the company’s HDD subsidiary, was formed in 2018 following Spiecapag Australia’s acquisition of Lucas Engineering and Construction, the leading HDD contractor in the Australian market. “Spiecapag Australia has long worked alongside joint venture (JV) partners. This way, we focus on being best-in-class at what we do – pipelines and facilities – and work hand-in-hand with partners who bring additional expertise so that our clients can deliver more complex projects while both reducing costs and having a simpler owner-contractor interface,” Mr. Walsh explains. “The longest-standing local JV partner we had was Lucas Engineering and Construction, a relationship built over decades which culminated in a marriage of the businesses a few years ago.” As a result, Spiecapag Australia added another valuable string to its bow, with HDI Lucas having achieved several industry milestones both in Australia and overseas, and taking on some of the most complex and technically demanding horizontal drilling projects globally.

LANDMARK PROJECTS Spiecapag Australia’s modus operandi includes identifying landmark projects that it wants to be a part of. Locally in Australia, the company’s first project in 1982 was the Sydney-Newcastle Pipeline, where a major focus was minimising the environmental impacts on

“ O U R N U M B E R O N E P R I O R I T Y AT A L L T I M E S I S T H E S A F E T Y A N D W E L FA R E O F E V E R Y O N E W E I N T E R A C T W I T H . A S S U C H , O U R H E A LT H A N D S A F E T Y TA R G E T F O R T H E Y E A R A H E A D IS ZERO INCIDENTS OR INJURIES” – J O H N WA L S H , M A N A G I N G D I R E C T O R , S P I E C A P A G A U S T R A L I A

4 | APAC Outlook Issue 65


the Hawkesbury River. It was a good learning experience for the company, as those who worked on it had to negotiate many river and infrastructure crossings, as well as steep, rocky sections encompassing large boulders. Perhaps the most memorable project of the 1990s was the Southwest Queensland Pipeline. Spanning 756 kilometres (km), it bears some similarities to the SEA Gas Pipeline, which at 687km was another long-distance project constructed by

Spiecapag. “Additional client demand for gas meant that 340km of that SEA Gas Pipeline was expanded during construction to install twin 14-inch diameter pipelines. That was a project where we were the engineering, procurement, and construction (EPC) contractor,” Mr. Walsh informs us. Both the Southwest Queensland and SEA Gas Pipeline projects were true tests of Spiecapag’s ability to get the logistics of its remote operations right, and great examples of the

importance of working with local Traditional Owners to protect the cultural heritage. The 2000s brought the second of Spiecapag’s major projects in PNG, with more than 600km of pipelines for the ExxonMobil-led PNG-LNG project, an integrated development that includes gas production and processing facilities. “This was another monumental test of our logistics and ability to operate in harsh, variable conditions,” states Mr. Walsh.

APAC Outlook Issue 65 | 5


Shaping Australia for

Over Three Decades Australia’s premier induction bend manufacturer Inductabend specialises in high integrity heat induction bending of pipe and other sections for gas pipelines, mining and construction. Generally, if it can’t be cold bent, it can be induction formed. Founded in 1992 by Barry Crouch and Rob Stead, the business has been servicing the Australian Industry for over 30 years. Its founders both had extensive experience in manufacturing and engineering. As managing director, Barry has been involved in the day-today operations of Inductabend from the beginning. He and other long serving employees including general manager John Rea, contribute to the wealth of experience and knowledge Inductabend has at its disposal to aid its customers in ensuring their bends are made to fit their purpose. Presently, Inductabend is undergoing an evolution with the directors committing to the long-term future of the business in Australia. Inductabend is currently undertaking significant upgrades on its plant and equipment whilst

maintaining continued investment in it’s R&D programme developing new induction bending (and heat treatment) technologies. This investment will enable Inductabend to assist the evolving Australian gas pipeline industry with any challenges it faces as it works to incorporate hydrogen, biogas and other innovative approaches into its green future.

What Is Induction Bending?

Induction bending is a hot bending process specifically designed to produce high quality pipe bends with mechanical properties equivalent to or exceeding those possessed by the mother pipe the bend it’s produced from. Inductabend has continued to develop and improve its capabilities, product offerings and overall quality as the core value adding proposition for Australia’s industrial markets. “We work with our customers to tailor bending geometries and mechanical characteristics to their needs. In order to ensure consistent performance of our bends we employ a wide range of destructive and non-destructive testing methods to create custom

testing programs tailored to our client’s pipeline application and risk profile”.

Products

Inductabend owns and operates three induction bending machines that cover a wide range of applications. Pipe diameters from DN25 to DN900 with wall thicknesses of up to 100mm can be bent to the purchasers exact desired angle and radius (generally 2.5D and up) with custom tangent lengths on each end of the bend. Complex compound bends can also be produced, including S bends and even helical bends for specialist applications. Induction bending is compatible with a wide range of materials including all carbon steels, alloy steels, high X grade steels, stainless steels and other exotic alloys. Recently, Inductabend internally developed a new world-first method of bending that allows us to utilise induction bending for the forming of bends with radii from 14m and up. This allows for gradual, consistent changes in direction to minimise wear on steel pipelines and deal with any difficult alignments all whilst maintaining


sections such as CHS, RHS, SHS and also UB, UC and PFC. Additional services such as end preparations for welding, Victaulic grooving and coating are also available to customers when placing orders with Inductabend. Inductabend also owns some cold field benders (up to DN1200 capacity) that are available for dry hire.

Value

their desired mechanical properties. Induction bending is generally synonymous with pipe bending but it also has wide applications for high quality bends in structural

Inductabend prides itself on its quality products and exceptional customer service. Clients who procure bends are also afforded maximum flexibility with the ability to modify their orders right up until production begins. Better still, if a project encounters an issue during construction and an additional bend(s) are required on short notice new bends can be manufactured within a week and sent to site minimising costly project delays.

Production and/or deliveries for large projects can also be manufactured in prioritised batches to supply the right bends at the right time and minimise laydown requirements. For large diameter projects with a high volume of bends talk to us about onsite / near site induction bending and project specific set- ups.

INDUCTABEND Shaping Australia for over 30 years Process control

Quality

Innovation

Customer service

We specialise in applying our induction technology to solve seemingly intractable problems. Induction bending of pipe up to DN900, wall thicknesses up to 100mm.

Structural steel section bending Fully customizable bend geometry

Carbon steels, stainless steels, clad pipe and other exotic alloys

Other specialist heating applications

High X grade bends Compound bends Helix bends Custom OD mandrels

Cold field bending machines also available for hire (up to DN1200)

Onsite induction bending (large diameter high volume projects)

For security of supply and the circular economy we support Australian manufacturing

enquiries@inductabend.com.au +61 (0)3 9315 1244 inductabend.com 32 Frederick Rd Tottenham VIC 3012


SPIECAPAG AUSTRALIA OIL & GAS

“ O U R M A I N G OA L FO R T H E CO M I N G Y E A R I S T O S U C C E S S F U L LY D E L I V E R A L L O F O U R P R O J E C T S S A F E LY, O N T I M E , A N D O N B U D G E T T O T H E C O M P L E T E S AT I S FA C T I O N OF OUR CLIENTS” – J O H N WA L S H , M A N A G I N G D I R E C T O R , S P I E C A P A G A U S T R A L I A

LOGISTICAL CHALLENGES Very soon after the project was commissioned, Spiecapag started work on the Eastern Goldfields Pipeline for APA Group (APA), the first of many for the leading Australian 8 | APAC Outlook Issue 65

energy infrastructure business. At 293km, it was a comparatively shorter project, but its remote location 12 hours northeast of Perth meant logistics again played a key role in delivering ahead of schedule and maintaining a fantastic safety record and a lost time injury frequency rate (LTIFR) of zero. “We averaged a construction rate of 5km per day, and rapidly mobilised to get the project started as quickly as possible,” Mr. Walsh tells us. On projects in remote locations,

such as the Eastern Goldfields Pipeline for APA Group, or the Northern Gas Pipeline for Jemena, Spiecapag also engages with Indigenous groups and works with the client to create economic opportunities for people from these communities. More recently, Spiecapag constructed the Mardi to Warnervale Pipeline, which was completed during the COVID-19 pandemic for the Central Coast Council in New South Wales (NSW).


EXCAVATORS | GRADERS | LOADERS | DOZERS | TELEHANDLERS | TRACTORS | BACKHOES | DUMPERS | MOXYS | VACLIFTS

‘Everything we do begins and ends with our customers’ - Michael Benson, Austrack MD

Managing the building of major pipelines is challenging, complicated, and expensive. One call to Austrack and instantly WE become part of YOUR team. We save you all the stress involved with hiring equipment. Our people bring ‘at the coalface’, hands-on experience to get your project moving.

Our fleet of 300+ machines and 700+ attachments can deploy to anywhere in Australia

We have you covered on all fronts with: • Reliable equipment • Best brands • Superior service • Putting safety first • New technology • Great Rates

26 Culya St, Pinkenba Qld 4008 + 61 419 170 297 sales@austrackequipment.com.au www.austrackequipment.com.au


SPIECAPAG AUSTRALIA OIL & GAS

This was Spiecapag Australia’s inaugural venture into government work in Australia, and its first JV with Seymour Whyte, a sister company within VINCI Group. “Since then, we have continued to pursue water projects with Seymour Whyte on a JV basis,” shares Mr. Walsh. During the pandemic, Spiecapag also built an oil pipeline in the Perth metropolitan area as part of the METRONET project. This was extremely challenging, as the Western Australia (WA) state border was shut due to pandemic restrictions, and it was virtually impossible to get in and out of WA. “Given the specialised nature of what we do, it meant a part of our workforce basically had to move to WA,” Mr. Walsh reveals. The pandemic era also highlighted the key role of the supply chain and the importance of building strong suppliers relationships. 10 | APAC Outlook Issue 65

MINIMISING THE ENVIRONMENTAL IMPACT OF INFRASTRUCTURE As environmental requirements have tightened and approval processes toughened, there has been a shift in the past decade to ensure projects are designed and constructed in a more sustainable way. With clients looking at environmental, social, and governance (ESG) as part of their future business plans, Spiecapag has even participated in some of their materiality assessments, which are performed to benchmark a business and help develop a plan to reduce their future environmental impact. In addition to this, Spiecapag Australia has seen the training qualifications issued by the Infrastructure Sustainability Council of Australia (ISCA) grow in popularity on large-scale projects in recent years, which will likely filter down to mediumscale projects. “There is an increased interest within Spiecapag Australia and VINCI Group in the environment. It has become a subject our employees have a vested interest in and want to see us succeed in,” Mr. Walsh emphasises. To harness this interest, Spiecapag Australia has formulated a Green Committee to develop and implement initiatives to decrease its environmental footprint, whilst VINCI Group has also committed to a 40 percent reduction in CO2 emissions by 2030. Spiecapag also has the benefit of being able to reach into the global research and development department within VINCI Group, giving it early insight into emerging technologies to meet customer expectations.


ĂƉĂďŝůŝƚLJ hƉĚĂƚĞ EŽǀ ϮϬϮϯ ůů WƌŽũĞĐƚƐ >ŝƐƚĞĚ ůĞƐƐ ƚŚĂŶ ϭй ZĞƉĂŝƌ ZĂƚĞ ĂŶĚ ĞƌŽ ŚƐĞƋ ƐƚĂƚ ŽŶƚĂĐƚ 'ĞŽĨĨ >ŝƚƚůĞ D WΘ' tĞůĚŝŶŐ WƚLJ >ƚĚ ŐůŝƚƚůĞΛƉŐǁĞůĚŝŶŐ͘ĐŽŵ͘ĂƵ ϬϰϭϯϭϯϮϬϱϬ :ƵƐƚŝŶ &ůŝŶƚ :ĨůŝŶƚΛƉŐǁĞůĚŝŶŐ͘ĐŽŵ͘ĂƵ ϬϰϮϳϳϵϮϲϴϯ DĂƌŬ dǁLJĐƌŽƐƐ ŵƚǁLJĐƌŽƐƐΛƉŐǁĞůĚŝŶŐ͘ĐŽŵ͘ĂƵ ϬϰϬϴϱϭϲϯϮϮ

:ĞŵĞŶĂ ƚůĂƐ WŝƉĞůŝŶĞ tĂŶĚŽĂŶ͕ YůĚ

EŽǀ ϮϬϮϯ

Specialising in Pipeline Welding and Fabrication The proven performer, P&G Welding have a HSE record second to none with zero LTIs, TRIFR and total employee engagement. P& G will ensure the critical path on your pipeline project, quality welding, is delivered safely and ahead of schedule. Geoff Little MD glittle@pgwelding.com.au 0413132050

pandgwelding.com

Justin Flint Jflint@pgwelding.com.au 0427792683

Mark Twycross mtwycross@pgwelding.com.au 0408516322


“It was only a 12.5km pipeline, but due to the urban environment, 70 percent of it was installed using our in-house HDD methodology provided by HDI Lucas.”

SLOPE STABILISATION Currently, Spiecapag Australia is working on a very interesting slope stabilisation project for a mine in the New Ireland region of PNG. In a slight departure from its core business of constructing pipelines, which is the company’s bread and butter, Spiecapag is building a 240-metre high retaining wall in a geothermally active environment, through a JV with Menard Oceania (Menard), another of its VINCI Group sister companies. “Combining our expertise in PNG with Menard’s ground anchor specialty made for another successful JV,” acclaims Mr. Walsh. “As part of VINCI Group, we try to leverage its capabilities and form 12 | APAC Outlook Issue 65

JVs with sister companies, such as Menard, Seymour Whyte, or others further afield. However, we remain open to partnering with other players in the industry if the right opportunity comes up, and regularly do.” In parallel, Spiecapag has teams on the ground on Barrow Island off the coast of WA, where the company is working on the shore approaches for a cable landfall as part of Chevron’s

expansion of the Gorgon LNG project. Spiecapag is also in the process of completing a 51km high-pressure steel gas pipeline in the southeast of Australia. This proved to be on a challenging suburban route, as part of the Western Outer Ring Main (WORM) project on the outskirts of Melbourne on behalf of APA. At the same time, Spiecapag is currently mobilising to build


SPIECAPAG AUSTRALIA OIL & GAS

YOUR TRUSTED ICT PARTNER IN IT SUPPORT, CYBER SECURITY AND CLOUD SERVICES.

For over two decades, Davichi has been a beacon of innovation and reliability in the IT services industry. Our unwavering commitment extends to diverse sectors such as Construction, Manufacturing, and Engineering, providing invaluable support and expertise. Our enduring partnership with Spiecapag Australia since 2010 speaks to our trusted reputation as their ICT service provider. Whether it's embedded IT support in Brisbane, remote assistance across Australia and PNG, or on-site support for Speicapag’s significant projects like the ExxonMobil PNG LNG Project, Lihir Ground Stabilization Project on Lihir Island, PNG, or the Northern Gas Pipeline (NGP) Project for Jemena, QLD, we are there every step of the way.

MANAGED SERVICES CYBERSECURITY MORE INFO:

HIGH SPEED INTERNET VOICE PBX HOSTING

Understanding the complex IT security landscape, our team remains at the forefront of industry advancements, following the Australian Cyber Security Centre's Essential 8 principles. We empower our partners with essential strategies to bolster cybersecurity and mitigate threats effectively. But our commitment doesn't stop there. Davichi isn't just an IT and cybersecurity specialist; we offer high-speed internet, Voice PBX hosting, Microsoft 365 solutions, and a full suite of IT equipment. Join our community of satisfied partners for improved efficiency, reduced risk, and enhanced business operations. Your success is our priority. Contact Davichi today to transform your IT environment and secure your digital future.

D A V I C H I . C O M . A U

underground facilities and a connecting pipeline linking a new gas-fired power station in the town of Kurri Kurri to the existing Sydney to Newcastle Pipeline. This will supplement Snowy 2.0, one of the largest pumped hydro system projects in Australia, ensuring security and stability in electricity supply to support the volatility that arises from intermittent renewables.

HYDROGEN AND LOW-CARBON FUELS ARE THE FUTURE Much like natural gas, hydrogen will need to be produced and transported, as Australia casts itself as a future renewable energy superpower. The company sees pipelines as the most efficient mechanism for its transportation, so the skillsets that Spiecapag Australia has developed over the years through its numerous gas projects are highly transferrable to the hydrogen space. “The hydrogen production

technology is still being proven, but increasingly, scale production facilities are being discussed,” Mr. Walsh says. Spiecapag has already started working on a number of feasibility and constructability studies for hydrogen projects around Australia. The country’s government expects hydrogen exports to be worth up to AUD$10 billion by 2040, with higher growth potential than LNG exports. Spiecapag Australia’s HDD business, meanwhile, is equally wellpositioned to support the emerging offshore wind industry. “There are currently no offshore wind projects in Australia, but we will be watching this space in the coming years,” affirms Mr. Walsh. Several different countries in AsiaPacific are looking at offshore wind, and Spiecapag sees these projects as likely to benefit from the work it has done for clients across the region, assisting them to minimise the environmental impacts of bringing

power onshore and on to existing transmission networks. As transmission lines are increasingly buried, the company also expects increased HDD opportunities alongside pumped hydro, another area of growth that Spiecapag will be looking at along with its other sister companies in VINCI Group. “Our main goal for the coming year is to successfully deliver all of our projects safely, on time, and on budget to the complete satisfaction of our clients, to ensure we maintain our position as the leading pipeline and HHD contractor in Oceania,” Mr. Walsh concludes.

SPIECAPAG AUSTRALIA Tel: +61 7 30142190 www.spiecapag.com.au APAC Outlook Issue 65 | 13


SPIECAPAG AUSTRALIA Level 12, 145 Eagle Street Brisbane, Queensland 4000, Australia Tel: +61 7 30142190 www.spiecapag.com.au

PRODUCED BY APAC OUTLOOK MAGAZINE