Skip to main content

CHG | San Nicolás 3 | EN

Page 1

SAN NICOLÁS DÉNIA

PLOT 3


ENVIRONMENT

Spain

Valencian Community

Valencia

Dénia Alicante

VIDEO LOCATION

2 - chg.es


PLOT 3

3 - chg.es


DESCRIPTION OF THE HOUSE Special three-storey villa It is located on Urban Plot P-03, in sector 5, on the Hill of San Nicolás in Denia with cadastral reference 0721007BD5002S0001FH and address Calle Caronte 2, with a surface area of 646.35 m². The house is accessed from the car park through a spacious and bright hall located on the upper floor. The upper floor, located at the level of the street Calle Caronte, from where it is accessed, has a large terrace with an infinity pool. The upper floor is complemented by a separate bathroom, the staircase that gives access to the ground floor and the basement, and an elevator. An interior patio opens up in the hall, giving light to the lower floor.

INTERIOR ROOMS

Useful surfaces

01

Bedroom 1

22,29 m2

02

Bedroom 2

14,04 m2

03

Bedroom 3

14,04 m2

04

Bathroom 1

6,55 m2

05

Bathroom 2

6,25 m2

06

Laundry

7,80 m2

07

Machine room

6,90 m2

08

Hallway 2

20,01 m2

09

Living-dining-kitchen-room

67,01 m2

10

Access

4,60 m2

11

Hallway 1

4,84 m2

12

Toilet 1

3,41 m2

13

Toilet 2

2,89 m2

Total

180,63 m2

EXTERIOR AREAS

Useful surfaces

The surface of this floor is 9.84 m² and the surface of the open terrace is 94.69 m².

14

Covered terrace of the basement floor

19,84 m2

15

Basement patio

8,18 m2

The ground floor is intended for the daytime use rooms of the house with a large living room, dining room and kitchen with an island, a guest toilet.

16

Open terrace of the upper floor

94,69 m2

Its surface is 107.64 m².

Total 17

Colina de San Nicolás (Dénia)

122,71 m2 Infinity pool

37,68 m2

This floor opens its views to the sea through a large window.

UPPER FLOOR

4 - chg.es


On the basement floor there are a suite bedroom, two bedrooms and a bathroom, a laundry area, a utility room and a hallway. The surface is 134.36 m².

All bedrooms have access to a covered terrace of 19.84 m² with sea views. The total constructed area of the house is 271.68 m².

GROUND FLOOR

BASEMENT FLOOR

5 - chg.es


SPECIFICATIONS SAN NICOLÁS PLOT 3 STRUCTURAL SYSTEM Surface foundation consists of reinforced concrete laid on a protective barrier of granulated polyethylene sheet. System and calculations according to geotechnical and Technical Code. Aerial structure with reinforced concrete slabs, supported on walls and pillars of the same material or metal where they are necessary for structural calculation. Those elements coinciding with facade enclosure will be seen in white concrete.

FACADES Main sheet with concrete wall of plain texture and off-white color made with phenolic formwork and/or factory coated with continuous projected mortar finish. Exterior coating is based on invisible water- repellent paint based on silicone and siloxanes for absorbent surfaces. Stone masonry in areas marked on plans. Interior sheet is based on self-supporting laminated plasterboard of high strength on metal profiles, incorporating mineral wool insulation inside to reinforce the thermal and acoustic behavior of the facade. Insulation thicknesses depend on energy calculations to optimize the facade to obtain an A energy classification. Minimum insulation thickness in facades is 80 mm.

ROOFS Not passable roofs: Natural green roof with planting of species indicated in the catalog of the P.N Montgó. Insulation thicknesses depend on energy calculations to optimize the roof to obtain an A energy classification.

EXTERIOR CARPENTRY ELEMENTS Aluminum carpentry with thermal break: Lacquered finish in matt silver tone. Tilt/turn or sliding opening system according to plans. The doors to the terrace from the living room will be flush with the floor. Darkening system in bedrooms of foscurit textile type, motorized roller. Solar protection systems will be installed in the rooms that are required by energy calculations. They will consist of external motorized roller screens.

Exterior glass: based on double glazing with a minimum chamber of 14mm. The composition and thickness of the glass will be the result of the calculation of energy efficiency. In areas with risk of breakage or falling, the glass will be laminated safety 4+4. Pivoting entrance gate, security with metal frame and technological wood cladding.

COMPARTMENTALIZATION SYSTEM Interior partitions are made of laminated plasterboard with improved resistance and 70 mm studs and mineral wool insulation inside. Interior metal reinforcement for hanging TV installation in bedrooms. Finished with smooth plastic paint, in two coats, white RAL 9010.

INTERIOR CARPENTRY ELEMENTS Interior doors, folding or sliding, according to plans, made of DM chipboard, smooth, glued galces and flashing and perimeter rubber weatherstrip, all finished in white. Sheet height from floor to ceiling. Stainless steel handles. Modular wardrobes in MDF panel, interiorly covered with textile imitation laminate; shelves and upper compartments, plain sliding doors lacquered in white color with soft closing system.

FLOOR AND WALL COVERINGS Inside: rectified porcelain stoneware pavement model VELA NATURAL, format 60 x 60, by PORELANOSA GROUP, taken with special glue of high performance adhesion, on the basis of self- leveling mortar. On outdoor terraces: rectified porcelain stoneware pavement model VELA NATURAL, format 60 x 60, non-slip, by PORELANOSA GROUP. The pavement of the outdoor terraces is elevated at the same level as the interior pavement. The joints will be kept open to allow the evacuation of rain without slopes in the finish.

6 - chg.es


In bathrooms, the shower cabins will be covered with XLIGHT porcelain tile with entire floor-to-ceiling pieces by PORELANOSA GROUP. The rest of the bathroom will be finished with washable matt enamel paint in white tone RAL 9010. In dry areas and the rest of the house, finished with white smooth plastic paint in two layers, on the previously prepared support. False smooth interior ceilings are made of plasterboard, with curtain rods according to plans. Finished with white matte plastic paint in three layers. In bathrooms a removable false ceiling will be used to control air conditioning equipment.

PLUMBING INSTALLATION Cold water installation, including: Interior cold water network is based on uprights and derivations from internal general passkey to points of consumption and supply, by channeling of reticulated polyethylene (PEX). Sanitary hot water installation, including: Sanitary hot water generator equipment, by means of high energy efficiency aerothermal system, with heat pump. Recirculation circuit. Internal hot water network is based on uprights and derivations from the aerothermal to points of consumption and supply, by channeling multilayer pipes of cross-linked polyethylene with aluminum core (PEX-AL-PEX).

ENVIRONMENTAL THERMAL CONDITIONING INSTALLATION Installation of hot/cold air conditioning, with thermal production by means of a heat pump, air- liquid refrigerant, inverter, separate compressor- evaporator and emission of conditioned air with a system of ducts and linear grilles. AIR-ZONE regulation system for rooms with individual thermostats in the living-dining room and bedrooms for temperature regulation.

INSTALLATION OF TREATMENT AND INDOOR AIR QUALITY Controlled mechanical extraction installation (VMC) based on a centralized mechanical- controlled extraction system, for indoor air extraction ventilation, consisting of Siber-type in- line extractors or equivalent for heat recovery.

ELECTRIFICATION INSTALLATION Indoor electrical installation in Low Voltage, which includes: Connection facilities and general power line with the street electrical network and general protection box. Indoor distribution network, in Low Voltage, with high electrification, 11 interior distribution circuits and 2 for the exterior. Decorative control mechanisms and bases type Simón 82 Detail or equivalent in white color. Earth-earth protection network, based on an independent protection network, an earth connection network buried in the ground and equipotential protection networks in bathrooms. Elevated degree of electrification, according to specific indications of the Low Voltage Electrotechnical Regulation. Dimensioned circuits for single phase power of 9.2 KW. The house has a photovoltaic capture installation to achieve a contribution of renewable energy of 50% of the theoretical primary energy of annual consumption of the house. Channeling for TV and telephony. RJ45 sockets in all bedrooms, in addition to the living room and kitchen.

SECURITY INSTALLATION Installation of a multi-zone security system using infrared detectors for indoor presence, microprocessed control and alarm central.

BATHROOMS Shower trays of composite resin, with antibacterial sanitary gel coat. Extra flat mass is pigmented with mineral additives. Shower faucet in main bathroom: ShowerSelect S concealed mixer for 2 functions. Raindance S Overhead shower 300 1jet wall shower arm 46 cm Raindance Select S Shower set 120 3jet with shower rod 110 cm L Shower faucets in other bathrooms: Metris Single lever shower mixer for concealed installation Raindance Select S shower set 120 3jet with shower rod 110 cm L

7 - chg.es


Bathroom and toilet equipment In bathrooms. Villeroy & Boch brand furniture, FINION model with semi-recessed basin of the same brand, oval ARTIS model. HANSGROHE brand taps, Vivenis 250 chrome model with automatic waste. In toilets, Villeroy & Boch brand suspended washbasin. Toilets: Villeroy & Boch brand deep-bottom rimless toilets, Venticello model. Mounted “suspended” on the wall, with DirectFlush, Stone White CeramicPlus. Screens, in shower trays, made of 4/4 transparent tempered safety glass and chrome hanging and opening fittings. Polished mirrors on the wall above the sinks.

EQUIPMENT SYSTEM KITCHENS Kitchen furniture and elements German-made kitchen by ROTPUNKT, POWER MX model (or equivalent), finished in matte lacquer according to the distribution indicated on the plans. Full-extraction drawers and drawers with soft closing. Linear quartz-resin countertop, Silestone Blanco Zeus or equivalent. Stainless steel sink of Blanco brand equipped with mixer tap Noken by Porcelanosa. Home appliances BOSCH multifunction oven, with removable guides with maximum security brake, electronic display and electronic programming. BOSCH induction hob with three cooking zones, time setting and residual heat indicator. BORA carbon filter hood.

LANDSCAPING ON THE PLOT • Formation of garden maintaining the vegetation and trees protected by the City Council of Dénia. • Filled with fertile soil. • Construction of levels with stone masonry walls and railings. • Front enclosure of plot with masonry plinth and metal locks. • Parking and access path to the entrance of the house, made with 20x10 cm anthracite colored concrete pavers. • Vehicle access door, with vertical tubular profiles, galvanized iron, motorized, photocells and two controls.

• Pedestrian door of the same design. • Automatic irrigation with auto pop-up sprinklers and programmer. • Enclosure of green laminated metal mesh 1.50 m high, closing the perimeter of the plot, on the edges where there are none. • Design metal door with vertical tubular profiles and door.

SWIMMING POOLS • Pool, overflow type, with tile coating, constant depth 1.40m. Geometry according to plans. • Saline purification. Outside shower. • Cleaning equipment. • Two LED spotlights for underwater lighting.

VARIOUS • Connections of electricity, water and sewerage. • Fees for Architect and Technical Architect. • Building license. • Contracts with water and electricity suppliers.

NOTES Once the structure of each floor of the building is completed, no changes can be made to the interior of the houses. All finishing materials must be selected by that time, otherwise they will be selected by Construcciones Hispano Germanas, S.A.U. and cannot be changed later. This document has no contractual validity and is only valid for informational purposes. The materials, elements, procedures and specifications described in this document are indicative and subject to modification by technical requirements of the Optional Management of the construction works and the regulations in force, guaranteeing in any case the maintenance of the general level of quality of the building and the properties.

8 - chg.es


IN THE UNIQUE ENVIRONMENT

DÉNIA

01.2026

PROMOTES


Turn static files into dynamic content formats.

Create a flipbook
CHG | San Nicolás 3 | EN by OLIVA NOVA - Issuu