1 minute read

CAMPUS TREE CARE PLAN

2.06.6 The tree transplant contractor or landscape subcontractor shall maintain all transplanted trees during construction and for an additional twelve months following substantial completion. In addition, all transplant trees must survive two years past substantial completion.

2.06.61 To include irrigation, mulching, erosion control, weed control, and any other necessary plant care activities.

Advertisement

2.06.62 If a tree fails to survive the two year timeframe, a new tree will be provided by the general contractor (size and species TBD).

2.07.0 TREE REMOVAL AND REPURPOSING SPECIFICATIONS

2.07.1 Trees approved for removal shall be removed in a manner that does not impact trees to be preserved. Reference Technical Standards Subsection 3.00.0.

2.07.2 Contractor performing tree removal shall coordinate with contracted landscape architects and/or arborist to remove selected trees in a manner that will enable them to be processed into usable materials.

2.07.3 Contractor will transport trees removed for repurposing to a local UTRGV property (exact location TBD).

This article is from: