Skip to main content

PORTFOLIO OF 2021 - EARLY 2022

Page 1

DESIGN ARCHITECT

NUR IRDINA LEE CHUN LING PORTFOLIO

S e l e c t e d Wo r k s fr o m 2 0 2 0 - 2 0 2 2


ABOUT

ME

An enthusiastic individual who always passionate in simple yet detailed design. I am willing to learn in order to sharpen my technical and interpersonal skills. To those end, I will continue to work and learn to create the best of my ability. Currently working as a Design Architect with an architecture firm with a focus on residential, commercial and education, renovations and i ndustrial projects. I am an individual with eagerness and motivation along with an activeness at work, with the ability to adapt myself to different types of projects, challenges and to work as a team or individually.


CONTACT

WORK EXPERIENCE Design Architect

+6012 - 2521811

Alexander Poh Architect | April 2021 - Present

nurirdinalee@gmail.com

• •

Worked with teams in (7) ongoing projects with the designing, preperation of plans.

linkedin.com/in/nurirdinalcl

•

Involves in residential, renovations, educational, commercial and more.

Acts as authority liaison, runner and other administrative duties when required.

Internship Trainee MFA Empire Sdn Bhd | November 2020 - January 2021

•

SKILL • • • • • •

EDUCATION

Communication Skills Leadership Skills Hardworking Nature Independent Nature Self-Motivated Teamwork

Bachelor of Science (Architectural Studies) Part 1 - CGPA : 3.161 Infrastructure University Kuala Lumpur | 2018 - 2021

Diploma in Architecture - CGPA : 3.235 Infrastructure University Kuala Lumpur | 2016 - 2018

LANGUAGE • • • •

EXTRACURRICULAR ACTIVITIES

English Bahasa Melayu Chinese (Mandarin) Japanese (Basic)

Penjana Fit4Work Programme (Cohort 2 Batch 4) - Participant Hosted by Invest KL Corp.from 18th October to 12th November 2021

Autodesk Revit Workshop (Basic) - Participant

SOFTWARE • • • • • •

AutoCAD SketchUp Adobe Photoshop Adobe Illustrator Adobe InDesign Revit

3 months industrial training programme

16-hour course by BIM Lecture Network

• • • •

Lumion Enscape / Vray Video Editing MS Office Suite

Home 2030 Competition - Participant Competition hosted by PAM 2021

Mental Health Volunteer Work - Active Listener & Mentor Serve as a mentor and listener for fellow volunteers and customers who face struggles in real life. Volunteered in 4 different platforms through online.


C O N T E N T


OFFICE WORKS • • • • •

MIEGR (MIE Golf Resort) Bukit Tabur Homestay Bahau Kindergarten Heap Wah Factory Yunku Factory

ACADEMIC WORKS •

Seremban Market Hall


OFFICE WORKS


MIEGR | MIE GOLF RESORT MIEGR | MIE GOLF RESORT - O N G O I N G -

PROJECT DESCRIPTION

letoH\n

alP roo l

F\LETO

H_1\FE

Floor Plan\Hotel

RX DA

C\noitc

udorP

pe A.dwg Rooms\Room_Ty

XREF\1_HOTEL\

laniF 0

0\..\..\.

.\.. ferX

Xref ..\..\..\..\00

Floor Plan\Hotel

Xref ..\..\..\..\00

Final Production\CAD

XREF\1_HOTEL\

pe A.dwg Rooms\Room_Ty

gwd.A

epyT_

mooR\ smooR

letoH\n

alP roo

lF\LET

OH_1\

FERX

DAC\n

oitcudo r

P laniF

00\..\..

\..\.. fe

Final Production\CAD

rX

gwd.A

pe A.dwg Floor Plan\Hotel

Rooms\Room_Ty

epyT_

mooR\

smooR

letoH\n

XREF\1_HOTEL\ Final Production\CAD

alP roo

lF\LET

OH_1\

FERX

DAC\n

oitcudo

rP lani

Rooms\Room_Ty

XREF\1_HOTEL\

\..\..\..

Final Production\CAD

8500

ferX

epyT_

mooR\ smooR

letoH\n

alP roo

lF\LET

OH_1\

FERX

DAC\n oitcudo

rP lani

F 00\..

\..\..\..

8500

ferX

gwd.A

epyT_

mooR\

smooR

letoH\n

alP roo

lF\LET

OH_1\ FE

RX DA

C\noitc

udorP

laniF 0

8500

8500

0\..\..\.

.\.. ferX

gwd.A

epyT_ mooR\

smooR

letoH\n

alP roo lF\LET

8500

8500

8500

8500

8500

8500

8500

Staircase 1 Lift 1

OH_1\

FERX

DAC\n

rP lani

F 00\..

\..\..\..

315

oitcudo

ferX 315

4475

3225

3000

7700

8500

Maintenance Office

Staircase 3

500

650

INDOOR SEATING

7700

INDOOR SEATING

4500

4475 2500

2500 315

315

360

360

3225

7700

3000

8500

Lift 2

Staircase 4

8500

7700

KITCHEN AREA

KITCHEN AREA

Staircase 2

7700

INCLUDE SEATING 4500

Xref ..\..\..\..\00

F 00\..

gwd.A

pe A.dwg Floor Plan\Hotel

360

Xref ..\..\..\..\00

RM 400 Million

2500

smooR

Schemetic Design 3D Modelling & Rendering

360

mooR\

PROJECT COST

• •

2500

epyT_

TASK INVOLVED

Schemetic Design Phase

This project is a golf resort masterplan design located at Aeropolis KLIA, Sepang. This project consist of a convention hall, hotel, VIP clubhouse, chalets, multistorey carpark, golf range, museum and agriculture farm and planned to be constructed in 3 phases. gwd.A

PROJECT STATUS

8500

KOREAN RESTAURANT

JAPANESE RESTAURANT

8500

8500

8500

8500

8500

8500

8500

8500

8500

8500

CAR PARK BLOCK B LEFT WING

A

B

C

D

E

F

G

H

H

G

F

E

D

C

B

A

RIGHT WING

ROOF LEVEL FFL = 10.5

ROOF LEVEL FFL = 9.0

(CHINESE) KITCHEN AREA

SECOND FLOOR LEVEL FFL = 7.5

(CHINESE) KITCHEN AREA

SECOND FLOOR LEVEL FFL = 6.0 FIRST FLOOR LEVEL FFL = 4.5 FIRST FLOOR LEVEL FFL = 3.0

GRADIENT 1:10 GRADIENT 1:10 GROUND FLOOR LEVEL FFL = 0.0

CHINESE RESTAURANT

LEFT WING

ENTRANCE

A

B

C

D

E

F

G

H

GROUND FLOOR LEVEL FFL = 0.0

EXIT

H

G

F

E

D

C

B

A

RIGHT WING

ROOF LEVEL FFL = 10.5

ROOF LEVEL FFL = 9.0 SECOND FLOOR LEVEL FFL = 7.5 SECOND FLOOR LEVEL FFL = 6.0 FIRST FLOOR LEVEL FFL = 4.5 FIRST FLOOR LEVEL FFL = 3.0

GROUND FLOOR LEVEL FFL = 0.0

GROUND FLOOR LEVEL FFL = 0.0

HOTEL (DINING AREA) & CARPARK BLOCK CONCEPT DESIGN


OFFICE WORKS 7600

YKDS MUSEUM UNIVERSITY : 12.60 ac

RL 7.00

IL 4.29

GFL 6.50

RL 6.00

6100 2400 2000

8500

RL 7.00

GFL 7.5

8500

8500

8500

CR

8500

CR CR

7600

CR CR

E: RV SE RE AD RO

GFL 7.5

36 HOLE GOLF COURSE GOLF CLUB HOUSE GOLF DRIVING RANGE GOLF MAINTENANCE HUB : 324.06 ac

CR

APE

CR

CR CR

CR

A) ARE

E

ESS REC

N

N TEE CTION

RL 7.00

CAN

INTERA

TEE

OR OUTDO TING SEA

AY

CAN

42

GFL 6.50 WALKW

BOM

NG (SEATI

RAG

STO

LET

TOI

ESS BA ACC

CR

2.0M

37.

LAN

CR

6.1M

DSC

TEN

GAR

KINDER

RL 7.28

M centre

EXA

ac

AIR

T AFF

DEN

STU

ST

APE

K

DSC

PAR

TOILET

LAN

CAR

RL 7.12

ARY

LIBR

7600

UNI

L

FF

STA

E HAL

TUR

LEC

FIRST

AID ST

A

RL 6.00

ANT

BY

LOB TOILET

7600

GFL 7.5

I ARE

Y

LER

7600

GAL

rest

u

area SE ROO

RPO

RL 17.6 GFL 12.6 LG 8.1

7600

TIPU

MUL

RL 7.00

GFL 7.5

M

sura

toilet

7600

7600

PL 6.50

RL 6.50

PL 6.50

RL 7.00

RL 6.50

RL 7.00

RFL 14.5 LG2FL 7.0

PL 6.50 RL 7.50

RL 6.36

RL 6.50

RL 7.50?

HOTEL CONVENTION CENTER COMMERCIAL PLAZA CAR PARK BLOCK 1 & 2 : 43.70 ac

G 1:12

GFL 14.5 LG2FL 7.0

RL 12.50

PL 7.0

G 1:18 RL 14.50

PL 7.0 RL 6.50

GFL 15.0

RFL 14.5 LG2FL 7.0

GFL 14.5 LG2FL 7.0

FAMILY OUTDOOR ACTIVITIES AREA

RL 14.50

SCULPTURAL GARDEN

PEDESTRIAN ENTRANCE

ADVENTURE TOWERS (GREEN) SKY COURSE (GREEN) STARTING POINT

PL 7.0

RECEPTION

SKY COURSE (BLUE) STARTING POINT

PANTRY HALL OFFICE

OFFICE

RETAIL OFFICE

OFFICE

RETAIL

RETAIL

MEETING ROOM

RETAIL

SKY LINES (GREEN) STARTING POINT

100 FT FUN SLIDE

KARAOKE THEATER

COURTYARD ( 左内院)

GALLERY

GARAGE

MULTIPURPOSE HALL

GARAGE

TOILET COURTYARD (前院)

STORAGE LAUNDRY

PING MEN

YING BI DA MEN

SERVANT

GOLF PAR 3

GFL 15.0

PRIVATE ENTRANCE

DA MEN 2

MAIN ENTRANCE

RL 12.50 G 1:24 RL 7.00

KIDS SKY ADVENTURES MAIN AXIS SKY LINES (BLUE) STARTING POINT

SKY GYM

RL 5.85

TOILET

YUAN

CAFE

SKY LINES (GREEN) ENDING POINT

CENTRAL PLAZA

CAFE

COURTYARD ( 内院)

COURTYARD (右内院)

YING BI

RL 7.00 G 1:18

RL 6.50

PEDESTRIAN ENTRANCE

INFORMATION COUNTER

过厅/ 会客厅 GUESS HALL

YING BI

ADVENTURE TOWERS (BLUE)

SEATING

TOILET

GAMES ROOM 茶艺室

PL 7.0

RESTAURANT

FOUNTAIN

FAMILY MAIN HALL

KITCHEN

GUEST BEDROOM

( 后院)

TOILET

KITCHEN

SKY LINES (BLACK) ENDING POINT

piano

第三进院

GUEST BEDROOM

ROOM 包间

DROP OFF PEDESTRIAN ENTRANCE

LIVING ROOM

FAMILY DINING

SWIMMING POOL GUEST AREA

GUEST BEDROOM YUAN

SKY CLIMB

RL 6.50

CHILDREN PLAYGROUND TOILET

ADVENTURE TOWERS (BLACK)

FAIRY GARDEN

PL 7.0

GARDEN

GFL 11.0 LG 9.5

ENTRANCE HALL LOCKERS

ROLLER GLIDER STARTING/ SKY LINE ENDING PT STARTING PT

AY

LOW ROPES

PEDESTRIAN ENTRANCE/ EXIT

W

ALK

W

MAZE

IA

N

SLIDES

DE S PLAYGROUND

STREET ART

WALL CLIMBING

TR

PEDESTRIAN ENTRANCE/ EXIT

SKY LINES (BLACK) STARTING POINT

TOILET ENTRANCE HALL

GARDEN

POWER LOCKERS STATION

FREE FALL 8M

PE

SKY LINES (BLUE) ENDING POINT SKY COURSE (BLACK) STARTING POINT

RL 9.50 G 1:15

RETAILS

SKY TRAIL

RETAILS RETAILS

F&B 3M H

F&B

RL 12.0

RL 15.0 palms

toilet

aquatic garden

Drop Off

RETAILS

ICE SKATING

Y LKWA TOILET

RETAILS

RETAILS

RL 12.5

GO PEDAL

RL 6.86

GFL 14.0

staff parking

N WA

COUROSEL

SKY LINE ENDING PT

STRIA

TOILET

PEDE

PL 7.0

RL 16.0

MAINTENANCE

TUBBY RIDE TUBBY RIDE

FREE FALL 16M WALL CLIMBING

PARTY ROOM

VILLA CLUB HOUSE VILLA : 27.01 ac

GFL 15.0

mandarin duck feeding ground

RETAILS PUMP TRACK

RL 17.0

ferns

RL 13.0

LAUNCH PAD

WATER F&B 3M H FEATURE

WATER FEATURE

RL 11.00

RL 17.5

PL 7.0

GFL 14.5 LG 13.0

RL 14.0

cafe

orchid

tropical

PL 15.0 children garden

TOILET bus bay

OFFICE

RL 14.0

RECEPTION

south garden

26241

4000

15421

RL 12.0

RL 15.0

GFL 13.0 RL 17.0

RL 15.28 RL 9.33

RL 11.50

RL 12.0

GFL 12.0 EL 13.5

RL 11.0 GFL 12.0 PL 11.0

PREVIOUS MASTERPLAN CONCEPTUAL LAYOUT

EL 10.5 RL 11.5

SERVICES : 4.86 ac PL 11.0

GFL 12.0


MIEGR | MIE GOLF RESORT

01

02

03

04


OFFICE WORKS


BUKIT TABUR HOMESTAY BUKIT TABUR HOMESTAY - O N G O I N G -

PROJECT DESCRIPTION

2

3

4

TASK INVOLVED

PROJECT COST

• • •

Design Development Stage

This project is a homestay project located on Bukit Tabur. This project consist of VIP residence, Main residence, chalets and worker dorm. The design challenge was to intergrate the building into the slope and on an agriculture land.

1

PROJECT STATUS

RM 5 Million

5

1

2

13895 975

11945

1

2

3

1350

ELEV 1

1300

2000 ELEV 1

STORE

4

11225

9600

1020

975 2010

3445

SEC Y

4

11225

3445

3045

3

Schemetic Design Design Development 3D Modelling & Rendering

600 1950

1800

9600

1020

1200

1350

1300

SEC Y

2000 ELEV 1

600 1950

1800

1200

SEC Y

W1

D1

FD1

D2

W1

D2 EL

EL

BEDROOM 2

D2 EL

BEDROOM 3

EL

KITCHEN

W1

ELEV 4

2900

D

ELEV 2

5

270

RUMAH KEBUN JENIS A

(Q IB 29 LA 2.5 T)

3925 SEC X

E

ELEV 2

270

W1

EL

W4

WASHING

W5

W5

DRYING AREA

RUMAH KEBUN JENIS A

(Q IB 29 LA 2.5 T)

0

N

135

SCALE 1:100

EL

SD1

D

315

0

N

135

PELAN PLATFORM

SEC X

W3

EL

SEC Y

ELEV 4

D1

W1

180

315

180

90

45

(QIB LAT 270 292.5 ) 31

90

E

SCALE 1:75

225

180 5

22

5

13

PELAN LANTAI

W2

1250

1175

RUMAH PEKERJA

SEC Y

W2

EL

OPEN WORKING AREA

C

E W2

EL

C

W1

W2

SEC X

ELEV 3

W2

DORM

25KG DP

3070

BEDROOM 1

ELEV 3

10225

25KG DP

ELEV 4

K

3400

25KG DP

SEC X

W1

EL

B

2900

D

W1

14575

1300

D2

SEC X

B

14575

GT

D3 EL

D2

800 1250

TOILET 1

C

EL

W3

25KG DP

EL

D3

3925

LIVING AREA

D3

PANTRY

TOILET 2

10225

TOILET 1

D3

EL

K

3400

25KG DP

W3

1770

7790

10140

GT

EL

EL

90

45

EL

SD2

A

GT

225

W1

25KG DP

B

A

25KG DP

K

25KG DP

1650

W1

25KG DP

W2 K

25KG DP

25KG DP

ELEV 3

SECURITY

25KG DP

D1

A

25KG DP

1175

TOILET

PELAN LANTAI

SEC Y

ELEV 2

SCALE 1:100

WORKER DORM & VIP BUILDING PLAN

SEC X

0

N

45


OFFICE WORKS

A

B

C

D

E

F

G

H

26700 2590

10000mm setback line

1440

7000

1750

3685

2075

ELEV 1

SEC Y

FFL:184.675

K

3900

DORM 1

W3a

D4

TOILET 2

GROUND FLOOR LEVEL

3900

EL

EL

WORKER GAMES

DORM 1

25KG DP

SEC X

EL

25KG DP

I

D1

DORM 2

W3

W2

D2a

D4

W1

EL

W10

25KG DP

K

K

W11

W11

E

D

C

B

24650 2000

W4

K

4000

2000

2245

2455 900

EL

ELEV 4

W5 EL

2795 1250

1200

1500

FD1

D1

4575

1425

FFL:189.26

25KG DP

W6

ROOF BEAM LEVEL WORKING HALL 2

WORKING HALL 1

W7

925

W9

W9

EARTH LEVEL FFL:174.000

ELEV 2

SEC Y

N

90

45

(QIB 270 292LAT) .5

0

5

22

13

5

5

180

RUMAH KEBUN JENIS B

MAIN RESIDENCE PELAN LANTAI SCALE 1:100

1000

LAYOU T

FD1

2400

5005 WORKING HALL 2

3105

4215

WASH & DRYING YARD

31

5945

D1

D1

2000

GROUND FLOOR LEVEL

1110

H

W11

FFL:180.000

25KG DP

25KG DP

EL

W11

D1

W8

W8 EL

I

W9

1400

W11

W11

4000

13970

4325

W7

FFL:184.675

EL

9260

2000

EL

2000

1120

TOP ROOF LEVEL

25KG DP

W6

G

A

29400

FD1

FD1 EL

F

25KG DP

25KG DP

W5

G

3320

1200 1250

FD1

FD1

ELEV 3

H

1955

25KG DP

24650

D3

10000MM SETBACK LINE

25575

K EL

2455

W3

W2

FFL:180.000

DINING HALL & KITCHEN W4

2245

WORKER GAMES D2a

DORM 2 D1

D1 EL

F

D4

850

D2a

D1

D

W1

K

EL

D2

D2 D2a

SEC X

W1

K

D3

850 7500

GT

W2

D2

D2 EL

EL

W3

W3

25KG DP

D4

W2

25KG DP

TOILET 1

GT

3770

1000

W3a

2075

ROOF BEAM LEVEL

13970

2000

W1

2945

FFL:189.26

ENTRANCE

B

C

TOP ROOF LEVEL

3685

2400

1750

1400

3685

4675

22025 2075

5945

1440

A

E

H

1750

3320

G

9260

F

2090

7000

BOUNDARY LINE

E 24900

1750

3050MM SETBACK LINE

D

3685

3050MM SETBACK LINE

C

BOUNDARY LINE

B

3050mm setback line

3050mm setback line

A

22025 2075

D4

DORM 2


BOUNDARY LINE 68

197.0

87

197.3

POKOK

5

15

68 209.0 207.443 52 204.7 3.4 4160 21290.8

218.1

20

POKOK

0

20 .099

19

.481.375 1961 96

62 197.5

POKOK

09

197.6

0

19

POKOK

POKOK

0

17

SCALE 1:25

5

150150 300 600

225 150 225

225 150 225

600

600

PERIMETER FENCING 1 DTL -

ELEVATION - FENCE TYPE ANTI CLIMB SCALE 1:25

5

16

BOUNDARY LINE 12° 36' 30" 126316mm

ELEVATION - FENCE TYPE ANTI CLIMB

0

0

17

BOUNDARY LINE 12° 36' 30" 126316mm

155

155

150

0 16 145

PERIMETER FENCING 1 DTL A

DETAIL A SCALE 1:5

165

155

3050

150

BOUNDARY

PERIMETER FENCING 1 DTL

145

DETAIL A SCALE 1:5

170

A

3050

PERIMETER FENCING TO DETAIL DRAWINGS

LIN

PERIMETER FENCING 1

3050

BOUNDARY

-

155

160

134518mm E 6° 10' 30"

600

16

170

170

185

6° 10' 30" 13

4.518 Ki

165

160

30" 1345 LINE 6° 10'

18mm

10000

10000

10000

56' 00" 130431mm

BOUNDARY LINE 8°

130431mm

4.518 Ki

6° 10' 30" 13

56' 00" BOUNDARY LINE 8°

0

18

3050

41

180

170

225 150 225

600

0mm

185

3050mm setback line

1

BOUNDARY LINE

80

PT 5131 (17690)

3050mm setback line

line

185

180

5

19

3050mm setback

190

line

195

3050mm setback

ack line

3050mm setb

185

PT 5130 (17689)

BOUNDARY LINE 195° 10' 00" 9751

0

20

17.810 Ki

BOUNDARY LINE

PT 5129 (17688) 190

169.6

5

18

225 150 225

PERIMETER FENCING 1

DTL

16

195

0mm

1

600

5

90

2400 2350 50 lapping

150150 300

17

BOUNDARY LINE

line

line

0

20

3050mm setback line

5

20

3050mm setback line

1

3050mm setback

3050mm setback

ack line 3050mm setb

95

5

19

PT 5131 (17690)

17 5

2

2

PT 5130 (17689)

10000

00

5

18

10 10000

10000

5

21

17.810 Ki

220

KOK

BOUNDARY LINE 195° 10' 00" 9751

PT 5129 (17688)

BOUNDARY LINE

POKOK 200PO 8 5.965 215 POKOK 98 111.8.2769 .784 52 0 197.5 212.8 221210.134209 POKOK 199.1 12 .403 8 .4 97 2 1 2 2 1 8 2 28 POKOK 18520.6 12.7 2 0 K 215.1 9 7 3 97 210.359 POKO 07.1 199.8 89 POKOK 2.549 201.6 200.3 211.8 BKL2378 28.588 KL 2 0 B 3 2 L 3 .0 K 6 .3 1 8 BOUNDARY LINE 103° 11' 40" 38562mm 1 B 1 8 231 229.57 79 K 13 207.2.870 53 29473mm 21 19.07 39 BOUNDARY LINE 103° 11' 40" 33804mm 193.6 195.5 79.352 2500PO3KO.6 13 682 217.7 222 205.5 POKOK 1 206.3 207.540 204.2 202.32506 219.6 18 1 4 188.9 202.4 .370 98.88 055 .643 17.51 8.609 1 2.1 8 2 1 2 9 2 1 2 1 7 2 66 TAB 85 228.4 1 220.3 203.8 35 87.54 POKOK 8 1 9 K .8 1 KO 4 190.6 8 PO 20 28 .4 .375KOK 1961 1 96 PO 222.3 POKOK 90 POKOK 185.97197.068 13 187.4 1 222.4 83 6 .2 10000mm setback line 1 10000mm setback line 81 18 10000mm setback line 7 221.3204.977 188.3 98 1976.3 91 186.3 POKOK 185.7 POKOK 2 6 .5 K 7 POKO 19 04 51 53 187.7 POKOK 52 26 222.5 205.4 188.1 77 203.0 180.2 78 7.609 68 .121050.984 9 8 BKL 173.8 .0 POKOK 1 7 1 9 3 2 2 0 4 2 71 6 4.7 5 07.4 2 8 2 4 .1 79 205.4205.81 20 .3 3 K 9 3000 3000 20 KO9 179 PO 47 .612745.9 .0 3000 3000 0 .5 2 0 7 5 3000 2 7 1 69 76 204.7 3.460 POKOK 204.9 POKOK .861 2 47 1 20 34 05 185 197.55 178.5 59 95.465 11923.8472.522 3000 197.4 18979.1 27 22 195.9 1 97 19 8 14 2117.4 179.1 2042.703.259 28 182.6 21 4 6.271 89.61 88.4 .835 103867.6 37 185.0 9 1 1 36 .7 1 9 2 1 215.1 6 9 9 1 8 5 1 8 .7 166.8 173.9 9675 2011.6 52 200.3 POKOK 26 178.6 19717.5 5 6 19551.439 8 182.4 190.5 8 .888 97.65 9 195.8 3 7 1BOUNDARY 5 19 .3103° 93.80 6 .4 8 3 1 LINE 11' 40" 38562mm 1 3 1 .2 8 .747 67240" 18 6.3 33804mm .68 6 4 64 .0 207 3 9 4 1 29473mm 7 9 2 8 .9 7 7 BOUNDARY LINE 103° 11' 2 1 8 .4 3 7 7 3 2 1 6 4 5 .9 5 8 5 5 3 1 .4 9 7 9 3 2051.5 96 1 1 200.2 09 202 182.3 89 181.6 179.3 18198.1 192.2192.17 1947.8 19 .7 198.6 59 86 61 08 59 81 76 6 70 9 194.81 1953.7 177.7178.2 50 53 191.7 191.4 189.2 198.8184.311 17754.5 2095.3 .591 195.8 183.0 POKOK 198.2 176.1 91 180 .3 1 3 1 4 5 8 1 8 3 .5 0 .6 1 0 86 88 0 98 189 198.6 17168.47 95.79 POKOK 192.2 17197.69.88 204.843 14 62 12 1 44 POKOK 1 186.4 189.9 197.7 196.4 13 179.2 POKOK 90 1761 .98356.97 174.2 POKOK 781187.4 6 .1 61 4 9 7 .6 10000mm setback line 2 1 1 10000mm setback line 181.2 19 43 78.7 .1 .381 7 POKOK .7 1 10000mm setback line K 5 8 7 4 5 1 8 7 .9 9 1 KO 1 4 8 .0 PO 45 20 17 91 179 3 70 82 POKO 5.769 19806.2 92 1K86.3 191.8 169.8 60 4 .60 POKOK 99 1218 .842 5 8 .0 7 6 .6 .1 KOK 167.3 8 3 1 3 9 1 PO 165.0 4 8 7 7 190.5 .2 1 1 175 172 16 1 177.8 POKOK 176.0 4 66 .6.39316 9.933 0 9 .5 9 7 4 .7 5 6 1 6 7 8 1 3 9 .4 3 8 1 2 3 1 175 169 77 167.2 40 210950.4.6528 POKOK 26 67 1808.15 173.2 191.1 .285 69 203.0 49 185.5 175.31 POKOK 180.2 2 172.7 .781 176 84 167.0BKL 17638.878 8 8 54 8 79 200.9 7 184.854 179.9 .11 9.0 172 80 1694.3 917.014 16204.721 4 5 8.738 8 .1 42 7 5 .1 1 POKOK 2015.4205.8.4 8 3 3 9 1 0 6 3000 3000 2 17 .3 7.547 12745.97 3000 3000 32 .5 12 190.969 4 3000 7 8 .6 1 1 162.4 176 185.861 9 0 3 .3 2 204 2 .0 7 KOK 7 .6 2 4 PO 1 7 1807 17 34 171 178.5 59 95.465 193.8472.522 3000 1 172.1 60 197.4 POKOK 22 728.9 17915.9 9 1 .127 1 186.5 4 1 7 9 8 4 1 7 1 9 K 2042.703.259 1 .0 .6 5 KO .6 .8 5 3 PO 18 82 196.2 74 189 188.413867.537 36 191.8 .93201 5 861 192.7 81 .7 166.8 POKOK 116723.3 79 5.2581971.5 173 9675 90 52 POKOK 26 178.6 89 6 19551.439 183.5 .928 08 182.4 1854 190.5 173.51K 87.888 8 29 169 9.5 188.0 94 197.6 POKOK 5 43 197.3 195.8 6 68 193.8 1831.4 POKO 191.9 47 4 64 161.2 679.73 .016726.33 96 4.2 1 7 .7 2 4 8 .9 7 7 2 8 .4 1 7 3 1 8 6 4 .9 5 8 5 3 .6 1 .4 9 6 .3 2 1 7 9 3 9 1 82400 09 20 158 182 2 89 181.6 18198.1 192.2192.17 POKOK 1947.8 54 191.7 198.6 183.7 59 .7 174.5 53.9 08 59 91 9 58 194.81 18 587m 177.7187681.26661.123 17754.576 8.7 56 1.015.7 6K7 50 53 13 KO 191.7 191.496 189.2 PO .591 95 188.2 1951.8 18147.3 17 0 724183.0 POKOK 1985.2 1 176.1 3.157 159.7 91 180 a) 43 h .3 8 2 .2 3 1 5 7 .6 8 4 8 1 6 8 3 6 3 5 9 5 0 4 .6 1 1 K 1 8 7 .6 0 7 7.654 176.4 0 POKO 88 0 68 189 7.3 198 1 m 77 5.791081.0 192.286 (0 162.3 16.3 7 .094.838 1654.4.7406 11761957.6 16 181.712 19 14 5009 43 POKOK 62 2 87 165.0 1664.566 168.214 186.4 189.9 197.7 ) POKOK 196.4 48 13 179.2 0 m 3 3 166.5 09 ha 90 POKOK 1611676.696.058 174.2.258 176.9 4.66466 .11726817.694 73.17 (0.50 9 2 1 .4 7 6 8 1 1 1 6 .7 9 ) 3 1 1 h50a5 POKOK .74 178 8.155 4 1 0 K 6 7 9 .9 3 6 7 KO 1 74 7 .0 6 PO 6 .9 K 7 17 .4910.24 POKO 70 163 14 171966.80131764.5 161.9 169.882 POKOK 92 K 9.2 191.8177.585 (001 60 KO6 9 86 PO1 6 167.3 178.6 .658 7.848 34 9.612 175.842 39 165.0 2 3.09 19 .5 .25 85 1 2.1 71 POKOK 17 .281 164 126817 172.3 171.3118 34 17 4 158.591 .2 .0 6 .1 3 6 3 1 3 6 7 3 6 1 9 1 .566 99.6.336 79.9 4 5 6 1 6 8 1 7 9 .4 3 1 7 5 3 .2 8 K 17 16 40 190.62 167 0 172.3 67 173.2 .6PO8KO7 191.1 69 9.451676.285 162 49 .0141 185.5 117655.3 POKOK 2 172.7 .7 167.0 8 15 81 8 4 54 68 179.9 48 .11 07 9.0 172 8 80 84.85 19 164.3 191.0 187.2 78.73 5.147 1 1 POKOK 8 3 1 6 7382 0.4 47 9 .5 .5 12 1 .1 4 1 7 8 7 8 1 1 0 1 162.4 18 9 158.99 .620 3 .3 2 .0 7 2 7 1 1 7 4 1 15 17 9 1777 60 72.1007 159.059 186.4 171.0 614704.99 POKOK 17126.91.361 186.5 5K .2 9 .3 1 KO .8 1 PO 1 8 17 182 1 30 7 91 188.7 633.1 POKOK 162.3 42 79 .258 1731.5 90 28 29 89 170.3 183.541 6 8749 173.5 169.9 188.0 94 POKOK 43 17 .3 172.44 36 168.5 POKOK 191.9 161.2 169.7 14 158.6 2 90 183.784 POKOK 19 54 .4382 153.47 174.3 153.8 8.7 18574m 174.5 3 2 8 6 5 5 5 .1 6 6 7 K 724 13 KO PO 166 .02057.7 95 2.6 1861.9 188.2 1 6 7 .4 .7 7 5 7 1 1 9 1 1 6 ) 5 7 .2 3 1 2 1 5 a 85 74 67.24 68 54 163.12.379 1 70548 7h.654 183.6 1 .777 POKOK 7.3 m 181.0 4 3 42 (0 16 16.3 56 70 1654.4.706 165.04 16 3 152.7 181 05 POKOK 5009 183.4 KOK 165.0 164.566 170.5 1796.288.4763 2 174.6 h5a8).373PO 1.35493.2126161.6668.0158 8 6.548 1 660 m 1 9 6 3 4 1 .8 0 7 9 9 0 8 1 4 .1 .6 5 1 4 16 08 9508 (0.5 173 167 21 162.2 175.8 168.41 a) 184.9 93 36 74 67 616707.9h05 148.7 POKOK 163.9 161.9 12 47 .214 166.811764.5 5 (0.4 183.9 159.6 169 58 77.58 9 1 .6 3 2 4 85 1 K .3 6 1 KO 2 1 PO 79 28 17 71.3 34 4.28 .754 .0 158.5 .2 1 6 .1 6 7 3 1 3 7 0 6 6 6 1 1 1 1 1 58 30 146.6 77 180.6 157.6 3 92 87 172.3 4 .0 .6 2 6 3 1 .2 7 2 7 1 8 4 6 8 6 6 7 5 1 1 .6 56 159.4 144.5 165 165.0 91 158.5 1 159.4 11 159.6 07 56 166.4 187.2 14 156.0 44 26 5 84 154.1 160.8 71.578 167.0 47 42.97 5.151 142.9 1 5 4 1 1 0 187.1 90 14 92 58 170.9 158.9 .49898 165.0 47 156.0 154.7 9 .01517507.9 5 1 5 7 186.4 7 .0 6 7 1 9 .6 .3 5 1 87 145 161161.250 1 162.5 171.364 98 81 91 154.7 188.7 52 98 42 77 163.1 20 46 168.2 4.37944 .441659.4 170.3 157.1 21 173.6 138.6 155.9 47 8 17165.3 172 6 .6 0 .5 5 9 1 16 94 89 .2887 162.9 90 19mm15441.4 159.8 3 3.472 .3 .8 5 4 9 3 3 1 7 7 5 1 9.255 1 610 .1918 1K L.39 150.6 41 B 40 6 16 8.000 0 43 27 153.9 618702.66 0" 3 1 16 1741.2 655.5 161.4 30 1' 0 54 .2 0 0 ° 1764.0 4 1 5 216522.742 90 34 18823.4 5 153.8 170.5 63 174.3 74.60 55 9.221 73 168.4 18 40 .7851 1 65.726 144.2 0 90 158.3 1581.3543 149.8 156.8 150.5 1 21 53.77 1 .9 7 4 1 8 3 1 9 55 63 98 148.7 57 .4 143.9 37 93 7 170.3 149.0 9.647 14 12 .8 6 .9 0 4 3 7 1 8 .9 5 .4 1 5L 1 90 1B4K 00 151 BKL 48 146.9 16584.1 79 0m2m 5 3500 11 86 176.7 10 167.0 4 152.6 58 1531.5 150.2 14350.9 146.6 2 7.6 180.6 152.0 0m 3 46.8015 92m 6883 00 4 1 2 L .0 32 2 4 " .2 K 6 7 7 3 16 6 8 '30 0 6 .7 B 8 5 .4 7 1 01 3 .6 7° 5 15 8.5 1 E 27.2 5186.75 159 150.4 1 70.2 DARY 144.5 5 1 9 4 LIN 1 1 6 .6 2 8 6 1 9 .3 0 55 1 BOUN 171 163 63.7 56 1543.7 1 166.4 36 60 1 14 156.0 4 26 .1 .7 4 .8 .0 8 5 5 0 7 5 170.5 84 1 7 6 6 1 1 9 1 12 5 142.9 142.9 155.1 163.304 14 92 58 88 170.9 165.0 65 156.0 154.7 157.4 5 6 171.7 .6 7 3 5 8 95 163.90 14 162.5 98 165.9 154.7 52 98 99 0 77 46 159.4 157.1 22 171.4 168.2 21 1736.6 138.6 155.9 47 166.1 .344 8 5 6 .6 6 0 .5 1 5 9 1 16 4 7 9 9 8 8 .9 .2 2 .8 1 16 14 159 79 0mm 55 L.393 40 150.6 41 41 169.28.000 06143.198 B1K 153.9 80 169.6 0" 3 1 16 165.5 4 1' 0 4.030 0 7 3 ° 1 40.25 7 1 262 90 169.3 82 153.8 174.3 51 40 4.255 6 4 .5 2 1 0 0 .7 7 5 5 169.7 1 16 153.7 55 63 98 577 143.9 170.3 149.0 6.853.9 147 4.4 93 70 901 1B4K L 00 151.4 BKL 48 146.9 168.1 0m 5 3500 11 2m 6 .6 8 .5 .2 2 3 0 .9 5 4 5 5 5 1 1 1 1 4 1:500 152.0 02 1SCALE 146.8 " 32000m8m 06 B8K3L 68 153.742 E 277°01'30 150.4 15 .7 64 170.2UNDA 08LIN163.225 BO 163.7RY 171.3 3.756 5 1 0 6 36 170.5 158.7 29 163.3 65 171.7 3 5 0 9 163.9 165.9 99 171.4 62 166.1

2400 2350

200

POKOK

18 188.9 TAB 35 190.6

5

3

4 198.6

POKOK

51

79

195.5

POKOK

200

BKL PO 3KO.6K 13 40 204.22500 2.356 207.5 202.420 0 2 85 203.8

222.3

13 222.4 83 221.3 222.5

50

199.8

POKOK

200

22

89 7.1 88 0.5 28 20

200

2

POKOK

POKOK

BOUNDARY LINE

10 206.313

POKOK

200

28

220

210.3

1800 200

22

59

97 211.8 32 211.0

600 (DEPTH) 150

5

POKOK

POKOK

8 98221111.8.276934209.784 210.1

2.782

BUKIT TABUR HOMESTAY 2400 2350

50 lapping

1800

2

5 222.1

8.471

5 21 21

BK1L 19.07 39 682 217.7 219.6 14 09 217.5 218.6 0.366

0 22.87

POKOK

212.8

600 (DEPTH) 150

03

228.4

2.549 BKL2378 231.3 229.578

65

215.9

41

219.8

2400 2350

SETTING OUT PLAN

PERIMETER FENCING TO DETAIL DRAWINGS

PERIMETER FENCING 1 DTL B

DETAIL B SCALE 1:5

Pe r i me t e r Fe n c i ng De t a il PERIMETER FENCING 1


OFFICE WORKS


BUKIT TABUR HOMESTAY

03

04

05


OFFICE WORKS


BAHAU KINDERGARTEN BAHAU EARLY CHILDHOOD EDUCATION CENTRE - O N G O I N G -

PROJECT DESCRIPTION

PROJECT STATUS

This project is a charity project located in Bahau. Originally consist of a kindergarten, tuition center, open canteen, library. parent-child centre and a swimming area. Currently it is redesign as a 4 storey school. It uses chinese and vernacular architecture as its main design

TASK INVOLVED

Design Development Stage • • PROJECT COST • RM 1 Million

Schemetic Design Design Development Submission Preparation

FIRST FLOOR LEVEL 4000 5000

FFL:00.000

GROUND LEVEL 4500

FFL:86.300

LOWER GROUND LEVEL FFL:81.800

A

B 8000

C

SEC

8000

A

BUILDING NAME D E

F

SECTION B-B 40000 8000

SCALE 1:200

TUITION CENTER / DAYCARE

8000

8000

G

H

I

2185 6040

6040

J 30200 6040

K

L

M 6190

6040

PARENT CHILD CENTER

6040

N 6710

170975 4915

4915

4915

31690 4915

WALKWAY / POOL AREA

O

P

Q

4000 4915

4915

2200

10000

10000

R 50000 10000

KINDERGARTEN

FIRST FLOOR LEVEL FFL:00.000

16305 4000 4000 5000

3805

TOP ROOF

GROUND LEVEL 4500

FFL:86.300

LOWER GROUND LEVEL FFL:81.800

BUILDING NAME SEC A

SECTION A-A SCALE 1:200

Overall Section View

S 10000

T 10000


OFFICE WORKS 6000 1500

1a

1b

1c

1d

1e

1g

1f

1h

1500

1500

1500

1i

53575 7255

7255

7245

7245

6500

6500

6465

5110

0

80 20

3000

80 62

60

84 60

0

00 18

60

00

84

k

ac

b ad set Ro 20' ce

OSD an jak An

i

rv

Se

an un ng Ba

75

75

75

75

75

' 40

.

qm

5s

.7

93

15

50

50

50

'

20

ry da un Bo

6000

Slope

6000

an

un

K

5590

8000

26

K

42.19sqm. EL

26.92sqm. EL

EL

e lin

A

15.26sqm.

K

K

27

K

52.00sqm.

52.00sqm.

52.00sqm.

52.00sqm.

K

32.04sqm.

EL

EL

K

EL

K

B K

K

16.25sqm.

7000

8000

28

100

100

100

100

100

K

4000

C

29

PERPUSTAKAAN

K

K

K

K

8000

1:12 slope

EL

371.00sqm.

K

K

K

80.54sqm.

80.54sqm.

8000

1500

1500

1500

1110

52.00sqm.

52.00sqm.

TO LOWER GROUND

1500

ck

K

ba

EL

IN

1110

et

40000

52.00sqm.

52.00sqm.

K

's

324.38sqm.

31

8220*

40

TO MSB ROOM

30

D

OUT

7.60sqm.

K

32

E

8000

10.56sqm.

10.56sqm.

9.49sqm.

K

K

11.67sqm.

K

52.00sqm.

52.00sqm.

33

10.91sqm. K

EL

EL

15.24sqm. 10.88sqm.

2185

F G

4.67sqm.

18.48sqm.

34

EL

11.96sqm.

K

K

51.80sqm.

3020

K

1 2 3

K

K

4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

32 31 30 29 28 27 26 25 24 23 22 21 20 19

3020

K

EL 59.57sqm.

K

36.30sqm.

K

K

27.91sqm.

15.43sqm.

35

15.43sqm.

3020

H 51.80sqm.

K

15.43sqm.

3020

K

15.43sqm.

171.97sqm.

500

K

220.776sqm.

3020

3020

FOUNDATION LEVEL

30.82sqm.

587.86sqm.

K

3020

36390

PUSAT PENDIDIKAN ANAK DAN IBU BAPA

K

437.15sqm. 220.776sqm.

J

K

KANTIN

61.72sqm.

3020

K

3020

K

K

4.94sqm.

36.01sqm.

41.00sqm.

FD2A

L

FLAG POLE DETAIL

FD1A

6190

8.79sqm. 22.28sqm.

24.21sqm.

44.81sqm.

41.76sqm.

16.25sqm.

41.76sqm. 2.48sqm.

M

DTL

2.48sqm. 58.76sqm.

117.13sqm.

2625

3600 6225

50.84sqm.

300

250 50

3020

I

6620 19465 90.29sqm.

6620

CROSS SECTION SCALE 1:25

2b 2000

2a

37

38

39

40

41

42

43

KOLAM RENANG 18000

36

K

106.17sqm.

30.24sqm.

620 460 115

42.50sqm.

50.84sqm.

117.13sqm.

N

7300

2300

91.52sqm.

91.52sqm.

30.24sqm.

K

4000

K 20.00sqm.

24.36sqm.

20.00sqm.

O

51.69sqm.

8.05sqm.

20.00sqm.

FOUNDATION LEVEL

K

K

5000

277.00sqm.

12.30sqm.

10000

88.94sqm.

KOMPLEKS TADIKA

FLAG POST BASE

5000

95.07sqm.

676.19sqm.

K

K

DTL

DP

DP

P

K

5000

K

10000

ELEVATION SCALE 1:25

12.30sqm.

93.85sqm. 93.85sqm.

5000

12.30sqm.

K

Q

K K

277.00sqm.

277.00sqm.

10000

54000

5000

K

93.85sqm.

5000

150.00sqm.

K

R

Slope Starts

K K

DP

K

40' set back

K 150.40sqm.

20' set back

10000 5000 5000 10000

T

93.85sqm. 12.30sqm.

DP

S

Boundary line

5000

K

5000

ng

Ba

50

50

30

An

jak

an

94.25sqm.

K

K

20' set back

K

Slope Starts

K

2000 2000 2000 2000 2000 2000 2000

15240

10000

19000

10000

6000

39000

3a

3b

3c

20' SIDE ROAD LANE

FLAG POST BASE DTL

TOP VIEW SCALE 1:25

300


BAHAU KINDERGARTEN


OFFICE WORKS


HEAP WAH FACTORY HEAP WAH FACTORY

1

2

3

4

5

6

7

59425

ELEV 1

3963

5309

5230 SETBACK LINE

6194

PANDANGAN DEPAN SKALA 1:200

5870

505

W5

FFL=24.620

STORE ROOM 1

W4

FFL=24.620

W4

D1

6

7

Technical Drafting Design Development Submission Preparation 6500

TNB SUB STATION 4

100

FFL:+24.510

11424

675

• • •

920

FFL:+24.520

ROAD LEVEL

12000

4000

11667

Submission Preparation GROUND FLOOR LEVEL

6000

TASK INVOLVED

6339

PROJECT STATUS

SETBACK LINE

BOUNDARY LINE

FFL:+37.480

This is a “Pemutihan“ Project in Kajang where the factory is on the process of getting a permit for the existing building and the extension where it is built exceeding the setback line.

6000

675

TOP ROOF LEVEL

PROJECT DESCRIPTION

6000

5

STORE ROOM 2 TOILET 2 FFL=24.620

STORE AREA 2

FFL=24.570

FFL=24.520

PORCH

RS3

FFL=+24.520

4

4630

- O N G O I N G -

6000

BOUNDARY LINE

12000

3

D5

2

1

60070

SETBACK LINE

6000

6000

12000

674

674

BOUNDARY LINE

6129

5294

6000

4623

FFL:+37.480

6000

SETBACK LINE

BOUNDARY LINE

ROOF LEVEL

12000

11424

645

8255

11666 1143 2312

12255

FFL:+24.520 FFL:+24.510

2

SKALA 1:200

6

6000

6000

12000

5230 SETBACK LINE

FFL:+37.480

6194

SETBACK LINE

BOUNDARY LINE

TOP ROOF LEVEL

11424

675

ROOF LEVEL

5535

6000

C 6000

D 6000

E 6000

F 6000

G 6000

H

I

6000

J

6000

K

6000

6000

L 6000

1000

1075

FFL:+37.480

4626

6000

BOUNDARY LINE

6000 675

BOUNDARY LINE

59425 12000

B

72535

7

BOUNDARY LINE

5

SETBACK LINE

4

SETBACK LINE

3

FFL=24.620

RS2

PANDANGAN BELAKANG A

2

LOADING BAY

FFL=24.620

FFL=24.520

RS2

D5

ELEV

1

STORE AREA 1

STORE AREA 2

100

ROAD LEVEL

3497

GROUND FLOOR LEVEL

585

4860 11885

BOUNDARY LINE

ELEV 1

FFL=24.620

STORE ROOM 1 FFL=24.620

11667 16351516 W4

D1

STORE ROOM 2 TOILET 2 FFL=24.620

ROAD LEVEL FFL:+24.510

STORE AREA 2

FFL=24.570

PORCH

RS3

FFL=+24.520

4000

3

4

3

2

L

1

ROOF LEVEL FFL:+37.480

RS2

D5

D

C

B

A

6000

6000

6000

6000

6000

6000

6000

6000

1075

13424

B 6000

C 6000

D 6000

E 6000

F 6000

G 6000

H 6000

I 6000

4865

J 6000

K 6000

L 6000

1000 SETBACK LINE

1075

4860 11885

BOUNDARY LINE

5860

4000

2400

5460

STORE AREA 2 FFL=24.520

FFL=24.520

W6

W6

W6

W6

W6

W6

W6

RS1

W3 RS1

W3

W3

W2

D4

W1

D4

D4

W3

W3

W3

STORE AREA 2 FFL=24.520

PANDANGAN KIRI SKALA 1:200

TNB SUB STATION 4

FFL=24.620

TNB SUB STATION 1 FFL=24.620

D3

FFL=24.620

TNB SUB STATION 3 FFL=24.620

PORCH

FFL=24.520

4000

600

W2

2400

FFL=24.620

1900

STORE AREA 1

2400

FFL=24.620

2100

LOADING BAY D2

4

BOUNDARY LINE

5535

SETBACK LINE

BOUNDARY LINE

4626

6000

W6

ELEV

SKALA 1:200

11667 16351516 3891

E

TNB SUB STATION 2

7425

100

F

RS2

FFL:+37.480

ROAD LEVEL

G

5460

11666 FFL:+24.510

72535

FFL:+24.510

H

5941

100

ROAD LEVEL

FFL=24.620

PANDANGAN BELAKANG A

FFL:+24.520

6000

GROUND FLOOR LEVEL LOADING BAY

FFL=24.620

FFL=24.520

2

GROUND FLOOR LEVEL

6000

FFL:+24.520

STORE AREA 1

STORE AREA 2

ELEV

ROOF LEVEL

I

941

6801

585

100

FFL:+24.510

J

12255

11666 1143 2312 FFL:+24.520

ROAD LEVEL

K

SETBACK LINE

12000 674

8255

3497

GROUND FLOOR LEVEL

FFL=24.520

SETBACK LINE

6000

BOUNDARY LINE

6000

BOUNDARY LINE

SETBACK LINE

1000 6000

674

4623

FFL:+37.480

6000

6129

STORE AREA 2

W3

66000

SETBACK LINE

BOUNDARY LINE

ROOF LEVEL

12000

11424 5294

W3

SKALA 1:200

60070 645

W3

PANDANGAN KANAN

SKALA 1:200

5

FFL=24.520

D5

ELEV

6

STORE AREA 2 FFL=24.520

FFL=24.520

PANDANGAN DEPAN 7

2400

FFL:+24.520

4630 W4

5860 5460

3891

GROUND FLOOR LEVEL

4000

3963

TNB SUB STATION 4

100

FFL:+24.510

505

W5

FFL:+24.520

ROAD LEVEL

6500 5870

5309

GROUND FLOOR LEVEL

920

100

11667

6339

7425


OFFICE WORKS 1

2

3

4

5

6

7

47425 6000

6000

6000

6000

12000

11424

BOUNDARY LINE 257°53'20" 61000mm

1210

6100

600

2730

600

2730

B

ELEV 2

-

setback line 13' / 4000mm

6000

L LOADING BAY

CEMENT RENDER FFL=24.620 73.13 sqm

K

K

D5

EL

1980

6000

RS1

300 1210

2730

600

SKALA 1:50

EL

6000

12438

RS1

1250

PELAN LANTAI (PANDANGAN ATAS)

1920

PERINCIAN PAGAR

I

K

10

H

1980

6000

PERINCIAN PAGAR W3

300

W3

EL

10 1120

ELEV 4

PERINCIAN PAGAR

A -

PANDANGAN DEPAN

DTL

SKALA 1:50

PE

PANDANGAN DEPAN SKALA 1:50

PELAN SKALA 1:25

1980 EL

1980

W2

360 360

CEMENT RENDER FFL=24.620 30.00 sqm

EL D2

CEMENT RENDER FFL=24.620 61.88 sqm

D2 G1

K D1

W4

W5

4

4000

PORCH

5000

REFUSE CHAMBER

D5

W8

B -

GUARD HOUSE CEMENT RENDER FFL=+24.510 10.78 m²

DTL

PANDANGAN DEPAN SKALA 1:25

W8

KERATAN A-A SKALA 1:25

90

5 13 180

PELAN TINGKAT BAWAH

200

5

45

(QIBLAT ) 270 292.5 3 1

5

PERINCIAN KOTAK METER DTL

W8

200

CEMENT RENDER FFL=-24.410 6.35m²

PERINCIAN KOTAK METER

8910

D5

GUARD HOUSE TOILET

1100

20' ROAD PORCH

CEMENT RENDER FFL=+24.460 10.46m²

200

W7

RS4

HOMOG. TILES FFL=+24.510 8.48 m²

2820 200

200

8000

8245

W7

ELEV 1 1

SKALA 1:200

PERINCIAN KOTAK METER JALAN P/1 20' ROAD

DTL

PER

SKALA 1 1100

CEMENT RENDER FFL=24.520 35.98 sqm

4100

1

K

G1

1 W4

HOMOG. TILES FFL=24.570 16.64 sqm

4100

STORE 4

LOBBY & WAITING AREA

EL

A

SURAU 2

HOMOG. TILES FFL=24.570 9.00 sqm

D2

EL

CEMENT RENDER FFL=24.620 30.00 sqm

2820

EL

TNB SUBSTATION 4 W1

CEMENT RENDER FFL=24.620 7.37 sqm

4100

6000

D3

STORE ROOM 2

4100

EL

10

SURAU 1

HOMOG. TILES FFL=24.570 9.00 sqm

D2

640

CEMENT RENDER FFL=24.620 84.00 sqm

1100

STORE ROOM 1

FD2

640

6000

EL

CEMENT RENDER FFL=24.620 15.00 sqm

B

10

G1

TNB SUBSTATION 3 D4

EL

FD1

1080

G1

CEMENT RENDER FFL=24.620 15.00 sqm

1080

TNB SUBSTATION 2 D4

1560

1560

STORE 3

HOMOG. TILES FFL=24.570 16.64 sqm

W2

1100

D4

200

6000

TNB SUBSTATION 1

C

22

SKA

PERINCIAN KOTAK METER

K

RS1

PER

PERINCIAN PAGAR DTL

EL

1920

CEMENT RENDER FFL=24.520 1527.19 sqm

W3

W3

D

0

300

1380

800

20' ROAD

W3

6000

E

FACTORY 2: (OPEN STRUCTURE WORKING AREA)

CEMENT RENDER FFL=24.620 1216.13 sqm

BOUNDARY LINE 347°28'20" 91324mm

6000

-

EL FACTORY 1

setback line 13' / 4000mm

A

setback line 13' / 4000mm

ELEV 3

BOUNDARY LINE 167°28'20" 92431mm

6000

66000

7

F

PELAN LANTAI (PANDANGAN ATAS)

W3

SKALA 1:50

G

N

300

2730

EL

6000

EL

600

520

J

6100

1380

DTL

PANDANGAN DEPAN SKALA 1:25

PERINCIAN KOTAK METER DTL

KERATAN A-A SKALA 1:25


HEAP WAH FACTORY A

B

C

A

B

5300 370

5300

3050

1805

B

75

370

A 5300

1805

3050

A

-

HOMOG. TILES FFL=-24.410 6.35m²

ELEV 4

A

-

-

ELEV 4 ELEV 3

3340

A

3490

CEMENT RENDER FFL=+24.510 10.78 m²

ELEV 3

D5

D5

W8

W8

2

W8

2 D5

B

5

SEC A

B

0

5

45

5

90

(QIBLAT ) 270 292.5 3 1

SKALA 1:50

22

5

180

A

B 1805

B 5300 3050

370 3490

1805

W8

3340

GROUND LEVEL

SEC

GH TOILET

GROUND LEVEL

FFL:+24.510

GH TOILET

GROUND LEVEL

B

GUARD HOUSE

FFL=+24.410

1

PANDANGAN DEPAN

ELEV

SKALA 1:50

1

1

2

SKALA 1:50

3

3

2

1695

1 5925

300

3525

1695

300

3525 400

400

400

INTERIOR FINISH SCHEDULE FLOOR RAMP CEILING

TOP OF BEAM LEVEL

TOP OF BEAM LEVEL

SKALA 1:50

JADUAL PENGIRAAN PENGUDARAAN DAN PERCAHAYAAN

PANDANGAN BELAKANG

5925 400

KERATAN B-B

FFL=+24.510

FFL=+24.410

ELEV

FFL=+24.510

150

150

FFL:+24.510

GROUND FLOOR LEVEL

CEMENT RENDER LIGHTWEIGHT GYPSUM BOARD (1200 X 600 X 8mm THK)

FFL:+27.850

FFL:+27.850

FFL=+24.460

150

FFL:+24.510

3490

3340

3490

GROUND FLOOR LEVEL

D5

PORCH

D5

GUARD HOUSE

W8

FFL=+24.460

WALL

110mm BRICKWALL WITH 20mm THK CEMT. PLASTERING AND PAINT FINISH ON BOTHSIDES

BOMBA LEGEND: SYMBOL

Existing Emergency Lighting

K

Existing "KELUAR" Sign Fire Alarm Siren with Flasher

EXTERIOR FINISH SCHEDULE

3340

3490

3340

3490

Existing Hose Reel Drum

ROOF

PORCH

FFL=+24.460

GUARD HOUSE GROUND FLOOR LEVEL FFL:+24.510

GROUND LEVEL

ELEV 3

PANDANGAN KANAN SKALA 1:50

PORCH

FFL=+24.460

150

GROUND LEVEL

150

FFL:+24.510

FFL=+24.510

DESCRIPTION

EL

W8

GROUND FLOOR LEVEL

300

FFL:+27.850

A

W8

GROUND FLOOR LEVEL

1695

TOP OF BEAM LEVEL

C

FFL:+27.850

PORCH

3525 400

TOP OF BEAM LEVEL

D5

3

SKALA 1:50

75

FFL:+27.850

2

400

75

TOP OF BEAM LEVEL

150

1

180

C

3050

SKALA 1:50

PELAN BUMBUNG

5300 370

KERATAN A-A 5925

N

PELAN LANTAI

FFL=+24.510

FFL=+24.410

ELEV 1

-

13

22

13

5

90

(QIBLAT ) 270 292.5 3 1

5

45

GROUND LEVEL

ELEV 1

-

0

FFL:+24.510

3340

400

3

GUARD HOUSE

GH TOILET

GROUND FLOOR LEVEL

1695

1695

PORCH

CEMENT RENDER FFL=+24.460 10.46m²

400

D5

N

370

FFL:+27.850

GUARD HOUSE TOILET

3525

3525

B

75

6020

GUARD HOUSE

-

6020

C

TOP OF BEAM LEVEL

W8

3

75

400

1

W8

A

1805 2 ELEV

-

400

1

3050 B

2 ELEV

-

C

ELEV 4

PANDANGAN KIRI SKALA 1:50

GUARD HOUSE

0.40mm TCT METAL CLADDING SHEET WITH 50mm THK INSULATION & 1 LAYER OF SINGLE SIDED ALUMINIUM SISALATION SHEET SUPPORTED BY WIRE NETTING OR EQUIVALENT

FFL=+24.510

Break Glass DP

9kg ABC Dry Powder Hydrant NEW Gas Compression system (C02)

EL

NEW Emergency Lighting

K

NEW "KELUAR" Sign NEW Hose Reel Drum

ROOF EAVE EXTERNAL WALL GUTTER RWDP

EXPOSED ROOFING PANEL 0.3mm TCT METAL CLADDING SHEET UPVC Ø 150 UPVC RWDP

LEGEND ELEV 1

A -

SIMBOL PANDANGAN SIMBOL KERATAN


OFFICE WORKS NOTA: -LUKISAN INI ADALAH HAKCIPTA TERPELIHARA ALEXANDER POH ARCHITECT

-Lukisan ini tidak boleh dicetak atau disalin semula sama ada sebahagian atau sepenuhnya tanpa izin bertulis daripada arkitek prinsipal. -Kontraktor dikehendaki menyemak semua lukisan dengan teliti. Sebarang perbezaan atau kesilapan hendaklah dilaporkan kepada arkitek dengan serta-merta sebelum meneruskan kerja. -TEMPOH MINIMUM KETAHAN API BAGI ELEMEN DAN STRUKTUR ADALAH 1/2 JAM

FFL : 55.30

FFL : 55.30

FFL : 55.25

FFL : 55.20

H FFL : 55.30

FFL : 55.30

FFL : 55.20

FFL : 55.30 FFL : 55.25

FFL : 55.30

FFL : 55.25

RL : 55.25

RL : 55.15

QI

BL

AT

315

0

N

LALUAN JENTERA BOMBA KOSONGKAN LALUAN

45

Pelan Lantai Tingkat Bawah

225

SKALA : 1 : 150 135

27 0

90

H


hendaklah dilaporkan kepada arkitek dengan serta-merta sebelum meneruskan kerja. -TEMPOH MINIMUM KETAHAN API BAGI ELEMEN DAN STRUKTUR ADALAH 1/2 JAM

YUNKU FACTORY YUNKU FACTORY - O N G O I N G NOTA:

PROJECT DESCRIPTION

NOTA: -LUKISAN INI ADALAH HAKCIPTA TERPELIHARA ALEXANDER POH ARCHITECT

TASK INVOLVED

PROJECT STATUS

-LUKISAN INI ADALAH HAKCIPTA TERPELIHARA ALEXANDER POH ARCHITECT

Yunku Factory is an industrial factory located in Hulu Langat. Consists of a double volume factory and a 2 storey office. TENAGA NASIONAL

TENAGA NASIONAL

-Lukisan ini tidak boleh dicetak atau disalin semula sama ada sebahagian atau sepenuhnya tanpa izin bertulis daripada arkitek prinsipal. NOTA: -Kontraktor dikehendaki menyemak semua lukisan dengan teliti. Sebarang perbezaan atau kesilapan -LUKISAN INI ADALAH HAKCIPTA TERPELIHARA POH ARCHITECT hendaklah dilaporkan kepada arkitek dengan serta-merta ALEXANDER sebelum meneruskan kerja. -Lukisan iniMINIMUM tidak boleh dicetak atau disalinELEMEN semula DAN samaSTRUKTUR ada sebahagian atau1/2 sepenuhnya -TEMPOH KETAHAN API BAGI ADALAH JAM tanpa izin bertulis daripada arkitek prinsipal. -Kontraktor dikehendaki menyemak semua lukisan dengan teliti. Sebarang perbezaan atau kesilapan hendaklah dilaporkan kepada arkitek dengan serta-merta sebelum meneruskan kerja. -TEMPOH MINIMUM KETAHAN API BAGI ELEMEN DAN STRUKTUR ADALAH 1/2 JAM

Construction Stage

• •

TENAGA NASIONAL

Design Amendment Tender Drawing BERHAD

BERHAD

BERHAD

N

Ground Floor Plan Scale 1 : 100

-Lukisan ini tidak boleh dicetak atau disalin semula sama ada sebahagian atau sepenuhnya tanpa izin bertulis daripada arkitek prinsipal. -Kontraktor dikehendaki menyemak semua lukisan dengan teliti. Sebarang perbezaan atau kesilapan hendaklah dilaporkan kepada arkitek dengan serta-merta sebelum meneruskan kerja. -TEMPOH MINIMUM KETAHAN API BAGI ELEMEN DAN STRUKTUR ADALAH 1/2 JAM


OFFICE WORKS NOTA: -LUKISAN INI ADALAH HAKCIPTA TERPELIHARA ALEXANDER POH ARCHITECT

-Lukisan ini tidak boleh dicetak atau disalin semula sama ada sebahagian atau sepenuhnya tanpa izin bertulis daripada arkitek prinsipal. -Kontraktor dikehendaki menyemak semua lukisan dengan teliti. Sebarang perbezaan atau kesilapan hendaklah dilaporkan kepada arkitek dengan serta-merta sebelum meneruskan kerja. -TEMPOH MINIMUM KETAHAN API BAGI ELEMEN DAN STRUKTUR ADALAH 1/2 JAM

EL

STAIRCASE 1 - GROUND FLOOR PLAN

EL

EL

STAIRCASE 2 - GROUND FLOOR PLAN

EL

STAIRCASE 1 - FIRST FLOOR PLAN

STAIRCASE 2 - FIRST FLOOR PLAN

STAIRCASE 1 - SECTION A-A

STAIRCASE 2 - SECTION B-B


DOOR SCHEDULE (TNB) DOOR TYPE

LD1

tanpa izin bertulis daripada arkitek prinsipal. -Kontraktor dikehendaki menyemak semua lukisan dengan teliti. Sebarang perbezaan atau kesilapan hendaklah dilaporkan kepada arkitek dengan serta-merta sebelum meneruskan kerja. -TEMPOH MINIMUM KETAHAN API BAGI ELEMEN DAN STRUKTUR ADALAH 1/2 JAM

WINDOW SCHEDULE (TNB) LD2

TIMBER FRAME DOUBLE LEAF TIMBER FLUSH SWING DOOR TO MANUF'S DETAIL C/W DOOR CLOSER, IRONMONGERY & PAINT

PANEL MILD CASEMENT WINDOW WITH LW1 1VENT BLOCK ON THE BOTTOM TO DETAIL

WINDOW TYPE

TIMBER FRAME DOUBLE LEAF TIMBER FLUSH SWING DOOR TO MANUF'S DETAIL C/W DOOR CLOSER IRONMONGERY & PAINT

LW2

AIR

1 PANEL MILD CASEMENT WINDOW WITH AIR VENT BLOCK ON THE BOTTOM TO DETAIL

LW3

1 PANEL MILD CASEMENT WINDOW WITH AIR VENT BLOCK ON THE BOTTOM TO DETAIL

LW4

1 PANEL MILD CASEMENT WINDOW WITH AIR VENT BLOCK ON THE BOTTOM TO DETAIL

ELEVATION ELEVATION

FFL

FFL

FFL

FFL

FFL

FFL

PLAN Internal

Internal

External

External

LOCATION & NOS.

LOCATION

NOTES

Note(*): With floor level drop Door height is taken from higher floor finished level

(GROUND FLOOR) MSB ROOM (GROUND FLOOR) METER ROOM (GROUND FLOOR) SWITCH GEAR ROOM

NOS. 1 nos. 1 nos. 1 nos.

LOCATION

D1

Internal

Internal

Internal

Internal

External

External

External

External

NOS. 1 nos.

(GROUND FLOOR) TRANSFORMER ROOM

LOCATION & NOS Note(*): With floor level drop Door height is taken from higher floor finished level

DOOR SCHEDULE (GUARD HOUSE) DOOR TYPE

PLAN

LOCATION

NOS.

LOCATION

NOS.

LOCATION

NOS.

LOCATION

NOS.

(GROUND FLOOR) MSB ROOM

1 nos.

(GROUND FLOOR) MSB ROOM

1 nos.

(GROUND FLOOR) TRANSFORMER ROOM

1 nos.

(GROUND FLOOR) SWITCH GEAR ROOM

1 nos.

WINDOW SCHEDULE (GUARD HOUSE) WINDOW TYPE

TIMBER FRAME SINGLE LEAF TIMBER FLUSH SWING DOOR TO MANUF'S DETAIL C/W DOOR CLOSER, IRONMONGERY & PAINT

W1

2 PANEL MILD ALUMN FRAME CASEMENT WINDOW WITH 6MM THK FIXED CLEAR GLASS ON THE UPPER BOTTOM TO DETAIL

W2

WINDOW SCHEDULE (TNB)

4 PANEL MILD ALUMN FRAME CASEMENT WINDOW WITH 6MM THK FIXED CLEAR GLASS SLIDING ON THE UPPER BOTTOM TO DETAIL

WINDOW TYPE

LW5

1 PANEL MILD CASEMENT WINDOW WITH AIR VENT BLOCK ON THE BOTTOM TO DETAIL

ELEVATION ELEVATION

ELEVATION

FFL

FFL

FFL

FFL

PLAN PLAN

Internal External

LOCATION & NOS.

LOCATION

NOTES

Note(*): With floor level drop Door height is taken from higher floor finished level

(GROUND FLOOR) GUARD HOUSE

D1

Internal External

PLAN

Internal External

NOS. 1 nos.

LOCATION & NOS

DOOR SCHEDULE (REFUSE CHAMBER) DOOR TYPE

Internal External

LOCATION

NOS.

LOCATION

NOS.

(GROUND FLOOR) GUARD HOUSE

1 nos.

(GROUND FLOOR) GUARD HOUSE

1 nos.

LOCATION

NOS.

(GROUND FLOOR) SWITCH GEAR ROOM

1 nos.

WINDOW SCHEDULE (REFUSE CHAMBER) WINDOW TYPE

STEEL FRAME SINGLE LEAF ALUM. ROLLER SHUTTER DOOR TO MANUF'S DETAIL C/W DOOR CLOSER, IRONMONGERY & PAINT

LOCATION & NOS

W1

1 PANEL MILD CASEMENT WINDOW WITH AIR VENT BLOCK ON THE BOTTOM TO DETAIL

DOOR SCHEDULE (FACTORY WORKSHOP AREA) DOOR TYPE

ELEVATION

D4

MS. STEEL FRAME WITH METAL DECKING SLIDING DOOR TO MANUF'S DETAIL C/W IRONMONGERY

ELEVATION

ELEVATION

FFL

FFL

FFL

PLAN

Internal

PLAN

External

PLAN

Internal External

LOCATION & NOS.

LOCATION (GROUND FLOOR) REFUSE CHAMBER

NOTES

Note(*): With floor level drop Door height is taken from higher floor finished level

LOCATION & NOS

NOS. 2 nos.

NOTES

LOCATION & NOS

External

Internal

LOCATION

NOS.

(GROUND FLOOR) REFUSE CHAMBER

1 nos.

LOCATION FACTORY WORKSHOP AREA

Note(*): With floor level drop Door height is taken from higher floor finished level

NOS. 2 nos.


ACADEMIC WORKS SEREMBAN MARKET HALL S T U D I O

D E S I G N

P R O J E C T

PROJECT STATEMENT The proposed market hall is to be designed and constructed in Mukim Rasah, Seremban Town. The site is strategically located at the heart of Seremban ‘Old Town’, directly across Haji Shariff Cendol which is recognized by the locals as a placemarker. The site is a rectangular shape that’s 4207sqm area. The site has two districts nearby as context which is China Town and Little India, both which is located on either end of our site. The Seremban Market Hall is envisioned to accommodate the demands of the community for both young and old to build a commercial building fully equipped with a wet and dry market, retail lots, a multipurpose event space as well as an area for administration purposes which is easily accessible within the town center.


SEREMBAN MARKET HALL


ACADEMIC WORKS


END T H A N K Y O U

S e l e c t e d Wo r k s fr o m 2 0 2 0 - 2 0 2 2


Turn static files into dynamic content formats.

Create a flipbook
PORTFOLIO OF 2021 - EARLY 2022 by Nur Irdina Lee - Issuu