Essential Guide for the Nuclear New Build Supply Chain - Stage 3

Page 1

6 Codes and Standards

P. 62

• Overview of Applicable Codes and Standards • RCC-M Code for the Design and Construction of Mechanical Equipment • RCC-E Code for Design and Construction of Electrical Equipment • ASME III Boiler and Pressure Vessel Code • ASME vs RCC-M General Organisation • EN Codes • UK Pressure System Regulations

7 Health and Safety Processes

P. 69

• Health and Safety Regulation • Health and Safety Management • Integration of Contractors into Project Health and Safety Arrangements • Audit and Surveillance of the Supply Chain • Construction Design and Management (CDM) Requirements • Training

P. 74

Appendix I. Legal Framework and Regulatory Bodies II. Nuclear Safety Culture III. Quality Arrangements

1

P. 76 P. 81 P. 90

THE ESSENTIAL GUIDE FOR THE NUCLEAR NEW BUILD SUPPLY CHAIN STAGE THREE JUNE 2019

Cover image: Courtesy of EDF Energy

9 Acknowledgements


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.