January 8 2019
WHO CAN YOU CALL TO FIX IT ALL? PLUMBING, GASFITTING AND ROOFING
ALL IN ONE PLACE! CNR Edward & Normanby St. Dargaville
Kaipara’s Only Regional Newspaper | Kaipara owned and Operated
10,450 Copies DELIVERED FREE throughout the Kaipara
Ph: 09 439 7270
Matakohe road diversions in place by Jill Dickie
The Matakohe Bridges realignment of SH12 crosses the existing state highway in two places and diversions will be in place during January and February 2019..
The year that was — 2018
Welcome, everyone, to the first issue for 2019 …
P3
An ideal idea turns four
It all began with a simple concept — having replaced the classic wooden windows …
P4
THE YEAR
That Was
A look back at some noteworthy events from around the Kaipara during 2018.
PAGES 5 – 11
Road diversion map of the areas affected during January and February
From January 7 a 100m diversion will be installed north of Anderson Bridge. The diversion road is suitable for all vehicles and traffic management will be in place with a reduced speed limit. The diversion will allow the construction crew to cut into the existing state highway to form the new road alignment. This diversion is expected to remain in place until the end of February.
From January 14 all vehicles will be diverted onto Matakohe East Road from south of Anderson Bridge, through Matakohe, past Matakohe School and back onto to SH12. The 5km diversion will allow the construction crew to form the new intersection into Matakohe and tie in the western end of the new alignment into the existing state highway.
RANGER FINANCE OFFER 500 RANGER CONFIDENCE FOR THE PRICE OF A QUAD
4.99% P.A. OVER 24 MONTHS
1/3 FREE ROOF AND UPFRONT
DUMP BOX CAPACITY - 227KG
VERSATRAC TURF MODE
ON DEMAND TRUE ALL-WHEEL-DRIVE (AWD)
IRS WITH 24.5CM OF TRAVEL
KG 680
SPEED KEY READY
32 HP
SEAT BELT INTERLOCK
TOWING CAPACITY 680KG
Subject to credit approval, fees, terms and conditions apply. Based on a 24 month Finance Contract.
1/3 1/3
IN 12 MONTHS
IN 24 MONTHS
SCREEN
This diversion is expected to remain in place until mid-February. When the diversion ends, vehicles will run along a section of the new alignment. The diversion passes Matakohe School and the children in the area will not be used to a high volume of traffic on this road without footpaths — please take extra care and reduce your speed. Source NZTA.
C A MOTORCYCLES LTD
725 POUTO RD, ARATAPU 0371 PH: 09 439 0170
ROUSE MOTORCYCLES 1 KING ST, HIKURANGI, WHANGAREI 0114 PH: 09 433 8471
WARKWORTH MOTORCYCLES & MACHINERY 22 WHITAKER RD, WARKWORTH 0910 PH: 09 425 8535
WARKWORTH MOTORCYCLES KAIWAKA’S
1916 STATE HIGHWAY 1, KAIWAKA 0573 PH: 09 431 2123 0800 440 290 | www.polarisnewzealand.com |
/PolarisNZ