Department Plan Environmental Services Department
• Flow Control Valves at all wells checked and inspected
• Yard hydrants install in Molesworth for flushing and sampling purposes
• VFD’s where purchased and installed for Well #4 and #6 in Listowel
• Continued with valve turning program and turned valves in the downtown core
• Spring and Fall Watermain Flushing was completed
• ROV Inspection of the Listowel Water Tower was completed
• New air release valves were installed on chlorine contact tanks at Well #4
• Dalmitch Subdivision in Atwood watermain for phase 2 was connected to the water system
• Various valves, curb stops, and sanitary clean out tops where repaired by staff Ministry of Environment, Conservation, and Parks (MECP) well inspections are completed each year and 2022 saw no non-compliances in any of our water systems, resulting in a 100% rating for each system.
Water system plans for 2023 include the following:
• Hydrant painting program – 100 per year
• Smith Court Well in Atwood Well inspection and maintenance
• Atwood Reservoir Clean Out
• Listowel Water Tower Clean out and Inspection
• Continued valve turning and fire hydrant maintenance
• Automated Meter Infrastructure and Water Meter Replacement Project
• Water System Hydrogeological Assessment in Atwood
Wastewater
The Municipality of North Perth owns and operates the Wastewater Treatment Plant (WWTP) in Listowel, 5 pump stations throughout Listowel and 2 pump stations located in Atwood, as well as the associated collection systems in both Listowel and Atwood.
In addition to the regular operations and preventative maintenance activities required for the wastewater treatment plant, pump stations and collection systems, the following activities took place in 2022:
• All blowers inspected and vibration analysis completed by contractor
• UV bulbs cleaned and replaced as required
• All on-line Dissolved Oxygen and Suspended Solids sensors inspected and calibrated
• Both Filters sand replacement and chemical treatment to porous plates
• New ORP system purchased and installed for the aeration tanks
• Septage Receiving Station tank cleanout and inspection three times
• Roof on the administration building and garage was replaced
• New RAS pump was purchased and installed at the WWTP
• Highway 23 Pumping Station Pump Maintenance completed with overhaul of Pump #2
• Sanitary flushing completed
• New Air Release Valves installed on both Listowel Raw Sewage Forcemains
• Spare pumps refurbished for the Winston Street Pumping Station
• Pump #2 at Atwood Pumping Station #2 full refurbishment
Version 0.1
Last updated: 2023-03-02 08:49