Pittsburg State University Kelce College of Business Renovation and Expansion | Gabrielle Foster and Norah Swift Harrington | Arch 609 | Spring 2019


This project proposed a change to the existing school currently housed in a 1950’s high school. The building struggles with study space, adequate teaching classrooms and low ceilings. Posed with renovating the existing building and adding a new wing, 50% of the existing building was demolished. A innovation hub was added to connect the two buildings. Surrounding the hub with classrooms on the first floor, and offices located on the second and collaboration space throughout the building. The proposal created student centered learning and collaboration space.


Table of Contents: Phase 1: Concept Development

Concept Design

Background Research Precedent Study Site Analysis Program Analysis Existing Building

Phase 2: Schematic Design Concept Design

Form Diagrams Demolition First Floor Second Floor Axon Rendering and Elevation

Phase 3: Developed Design Concept Diagrams

First Floor Second Floor Rendering Finish, HVAC, Ceiling Plan

Phase 4: Final Design Concept Diagrams

Site Analysis Form Diagrams Site Plan Space Programing First Floor Second Floor Egress, Structure, HVAC Wall Section Detail, Occupancy Rendering


Concept I

The Mountaineer

Entrepreneurialism spirit is similar to a mountaineer > Mental Strength > Knowledge of terrain > Adaptable > Determined > Discipline > Problem Solving

State University Kelce College of Business 4 Pittsburg Phase 1: Concept Design


Concept II

Neo Materialism Approach

Materials are not subservient to form > Glass ceiling > Breaking down barriers > Jumping hurdles > Growth from challenges > “Smooth seas don’t make skillful sailors”

State University Kelce College of Business 5 Pittsburg Phase 1: Concept Design


Wharton School, University of Pennsylvania 1881- Founded as the first business school in the United States. Meant to train future leaders to conduct corporations and public organizations in a rapidly evolving industrial era.

1921- Industrial Research Unit was established and MBA degrees were awarded.

Early on- Faculty were tightly connected to group of businessmen, bankers and lawyers in the School of Political Economy. Curriculum included social science and law courses.

2014- Student Life Space was opened. Space with additional conference rooms, meeting rooms, study rooms, and serves as a incubator space for startup companies.

1942- During WWII, full-time faculty dropped from 165 to 39 due to being called for special posts.

1972- Vance Hall was constructed 1946- The first multidisciplinary program was created with the for the graduate programs, School of Engineering and admin offices, lecture halls, and Applied Sciences. meeting areas.

1983- Steinberg Hall-Dietrich Hall expanded to house more offices, lecture halls, conference rooms, and common areas.

State University Kelce College of Business 6 Pittsburg Phase 1: Background Research

1959- Adopted changes to curriculum that taught liberal arts education for almost half of the degree program.


Haas School, University of California Berkeley 1898- Founded as the first business school in the United States. Liberal arts education was the core of the business education, drawing professors from other disciplines. Courses included legal, political, and historical studies.

After WWI and through the Great Depression- Enrollment increased from 3 students in 1898 to 1,540 students in 1938.

1915- Changes were made to the curriculum to have a more professional focus. After WWI, the program adopted a two year liberal arts education and two year commerce study.

2008 - 2017- Curriculum overhaul and a $300 million capital campaign were launched to transform the building and curriculum on the School’s approach to leadership and research. Opened fourth building, Connie & Kevin Chou Hall.

1942- New two year track for business administration was offered and the college was renamed to Department of Business Administration.

1980- Began to offer a joint program with the College of Engineering called Management of Technology.

1991- Berkeley-Haas Entrepreneurship Program was founded.

State University Kelce College of Business 7 Pittsburg Phase 1: Background Research

1941 - 1945- Several research centers opened in the school focusing on economics, labor and employment, and real estate.

1955- The Graduate School opened and a year later a doctorate program was offered.

1972 - 1976- An evening MBA program was initiated. A career planning and placement center were to be implemented thru donations.


UTM Innovation Centre

Moriyama & Teshima Architects | Mississauga, ON, Canada | 2014 The new Innovation Complex serves as the new gateway to the University of Toronto Mississauga campus. It also serves as incubator for partnership and collaboration where all users can take part in academic, administrative, and social activities. The heart of the building, or the Rotunda, is the perfect example of a space for these activities.

State University Kelce College of Business 8 Pittsburg Phase 1: Precedent Study


State University Kelce College of Business 9 Pittsburg Phase 1: Precedent Study


Student Center at Georgetown University ikon.5 architects | Washington DC, USA | 2014 The New South Student Center is a renovation and addition located along Georgetown’s campus corridor re imagined in the new master plan. This ‘living room’ gives students a sense of identity and comfort. There are areas for collaboration off of the Great Room, individual study spaces, cafe, and gallery to help foster an environment of creativity and enthusiasm.

State University Kelce College of Business 10 Pittsburg Phase 1: Precedent Study


State University Kelce College of Business 11 Pittsburg Phase 1: Precedent Study


UW Foster School of Business PACCAR Hall lmn Architects | Seattle, Washington| 2010 The core concept of PACCAR Hall is integrated communities: social, natural, and campus context. The central atrium serves as the heart of the building where many community activities are held. This design required a new construction (PACCAR) to connect to a renovation project. Its forward thinking approach to design allows the building to grow as business education does. Flexible common spaces, multiple entry sequences, ‘convergence zones’, developing technology capabilities are just some of the ways its doing this.

State University Kelce College of Business 12 Pittsburg Phase 1: Precedent Study


State University Kelce College of Business 13 Pittsburg Phase 1: Precedent Study


Downtown

Broadway Street

10 Min

Site 5 Min

Pittsburg State University

Right now the proposed masterplan walk from the east side of campus ends at the oval on the north east entrance. Our proposal extends the masterplan walk all the way down Cleveland. Creating a paved pedestrian only pathway until Broadway Street and extending towards downtown.

State University Kelce College of Business 14 Pittsburg Phase 1: Site Analysis


State University Kelce College of Business 15 Pittsburg Phase 1: Program Analysis


State University Kelce College of Business 16 Pittsburg Phase 1: Program Analysis


State University Kelce College of Business 17 Pittsburg Phase 1: Existing Building Analysis


Schematic Design

Paths -Multiple paths to the same destination

Neo Materialism -Materials are not subservient to form

We first looked at the spirit of entrepreneur and compared that to a mountaineer. Where the end goal is clear and there are multiple different ways to get there. Comparing that to a maze with the end located in the center, then simplifying it down and leaving our innovation hub in the center with the north to south walls acting as a way finding mechanism and relating to the spirit of an entrepreneur.

Existing Meets Addition -Integration of existing space into new space

State University Kelce College of Business 18 Pittsburg Phase 2: Concept

Connection -Downtown to Campus


Existing Existing

Circulation Circulation

Demo Demo

Collaboration Collaboration

Remaining Remaining

Learning Learning

Innovation Innovation

Entry Entry

State University Kelce College of Business 19 Pittsburg Phase 2: Form Diagrams


We demolished all of the first floor only spaces with the exception of the band room, leaving about 50% of the building remaining for renovation.

State University Kelce College of Business 20 Pittsburg Phase 2: Demolition Plan


AA

BB

CC

DD

EE

FF

GG

HH

II

18

16

14

15

13 UP

17

19

20

The first floor is mainly catered to students with the classrooms, advising and outreach centers. Collaboration space is spread throughout the floor and the innovation hub acting as the heart of the building and main collaboration space.

State University Kelce College of Business 21 Pittsburg Phase 2: First Floor


AA

BB

CC

DD

EE

FF

GG

HH

II

18

16

14

15

13 DN

17

19

20

The second floor acts as the faculty office neighborhood and collaboration spaces up there to foster faculty student collaboration. AA

BB

CC

DD

EE

FF

State University Kelce College of Business 22 Pittsburg Phase 2: Second Floor 18

GG

HH

II


State University Kelce College of Business 23 Pittsburg Phase 2: Axon


View From Cleveland

South Elevation

State University Kelce College of Business 24 Pittsburg Phase 2: Rendering and Elevation


View From Broadway

West Elevation

State University Kelce College of Business 25 Pittsburg Phase 2: Rendering and Elevation


Developed Design Paths -Multiple paths to the same destination

Neo Materialism -Materials are not subservient to form

Existing Meets Addition -Integration of existing space into new space

Connection -Downtown to Campus

State University Kelce College of Business 26 Pittsburg Phase 3: Concept


AA

BB

CC

DD

EE

FF

GG

HH

II

000

001

002

DN

003

DN

004

UP

005 DN

006

007

DN

008 DN

DN

009

010

1

Level 1 1/16" = 1'-0"

AA

BB

CC

DD

EE

FF

State University Kelce College of Business 27 Pittsburg Phase 3: First Floor 000

001

GG

HH

II


DN

008 DN

DN

009

010

1

Level 1 1/16" = 1'-0"

AA

BB

CC

DD

EE

FF

000

001

002

003

DN

004

---

005

006

007

008

009

010

2

Level 2 1/16" = 1'-0"

State University Kelce College of Business 28 Pittsburg Phase 3: Second Floor

GG

HH

II


View From Cleveland

South Elevation

State University Kelce College of Business 29 Pittsburg Phase 3: Rendering and Elevation


View From Broadway

West Elevation

State University Kelce College of Business 30 Pittsburg Phase 3: Rendering and Elevation


Finish Floor Plans

HVAC Plan

Ceiling Plan

DN

DN

DN

DN

1

Level 2 1/32" = 1'-0"

2

1

State University Kelce College of Business 31 Pittsburg Phase 3: Finish, HVAC, Ceiling Plan

Level 1 1/32" = 1'-0"

Level 2 1/32" = 1'-0"


Final Design

Concept

State University Kelce College of Business 32 Pittsburg Phase 3: Concept


Student Housing Axe Library Campus Masterplan Walk Grubbs Hall

Yates Hall Planetarium

Horace Mann Welcome Center Hughes Hall

Heckert-Wells Hall

College of Education

College of Biology

Kelce Hall College of Business

Stadium

Hartman Hall Family & Consumer Sciences Porter Hall

Physical Plant

College of the Arts

College of Biology

Russ Hall Administration Dellinger Hall

Overman Student Center

Student Union

McCray Music Hall

Willard Hall Student Housing

Whitesitt Hall

Connect Downtown to Campus Downtown

Broadway Street

Pittsburg, KS 10 Min 5 Min

Site

Pittsburg State University

State University Kelce College of Business 33 Pittsburg Phase 3: Site Analysis


Fill

Existing

Demolition

Surround

Fill

Existing

Project Fill

Existing

Project

Fill

Existing

Demolition

Project

Surround Demolition Fill

Existing Fill

Remaining

Existing

Surround

Project

Fill

Connect

Project

Demolition

Surround Light Light

Demolition Surround Remaining

Surround Fill

Demolition

Connect

Surround Light

Project Connect

Remaining

Connect

Remaining

Light

Light

Surround Connect

Remaining

Remaining

Connect

Light

Connect

State University Kelce College of Business 34 Pittsburg Phase 3: Form Diagrams

Connect


State University Kelce College of Business 35 Pittsburg Phase 3: Site Plan


Elevated to represent the the Elevated to represent spirit of theof entrepreneur spirit the entrepreneur

Innovation HubHub Innovation

Path connects downtown Path connects downtown to campus, extending the the to campus, extending Along the path to foster connection proposed masterplan proposed to the innovationmasterplan hub

Innovation hub in the middle to connect new and old

Clerestory to allow for light to flow in and out of the hub

Elevated aboveabove Elevated roof plane to show roof plane to show path of connection path of connection

Outdoor plaza for events Outdoor plaza for events

Clerestory to allow for light to flow in and out of the hub

Lecture HallHall Lecture

Clerestory aboveabove collaboration Clerestory collaboration Innovation area toarea illustrate the spirit of hubofin the to illustrate the middle tospirit connect the entrepreneur the entrepreneur new and old Clerestory to allow Clerestory to allow for natural light inlight in for natural office office space space Clerestory to minimize student distractions

Clerestory to minimize student distractions

Elevated to represent the spirit of the entrepreneur

Innovation Hub

Entry projected off the facade, Entry projected the facade, Outdoor plaza foroff events to signify main entrances to signify main entrances

Elevated above roof plane to show path of connection

Connection Lecture Hall Connection

Clerestory Elevated to represent the Clerestory illustrating pathof path spirit the entrepreneur illustrating

Clerestory above collaboration area to illustrate the spirit of the entrepreneur

Path connects downtown to campus, extending the proposed masterplan

Innovation Hub

Clerestory to allow for natural light in office space

Connection

Light Light Innovation Hub

Outdoor plaza for events

Lecture Hall Clerestory above collaboration area to illustrate the spirit of the entrepreneur

Path connects downtown to campus, extending the proposed masterplan

Clerestory to allow for natural light in office space

Elevated above roof plane to show path of connection

Innovation Hub

Collaboration Entry projected off the facade, to signify main entrances

Along the path to foster connection to the innovation hub

Collaboration Clerestory illustrating path

Light

Entry projected off the facade, to signify main entrances

Connection

Clerestory illustrating path

Support

Support

Offices

Learning

First Floor

State University Kelce College of Business 36 Pittsburg Phase 3: Space Programing

Second Floor

Light


Existing set up of Kelce in IT area and corridors

Learning Areas

Circulation

Study

Existing

Circulation

Gather

Learning Areas

Development

Collaborate

Renovation Introduction of collaboration space in existing building

Collaboration

Learning Areas

Circulation

Circulation

Learning Areas

Collaboration

Addition Different layouts of collaboration integration into learning and office space

Learning Areas

Collaboration

Collaboration

Circulation

Office

Circulation

Circulation

Collaboration Collaboration Office Circulation

State University Kelce College of Business 37 Pittsburg Phase 3: Space Programing


AA

BB

CC

DD

EE

FF

GG

HH

II

000 Seminar Room Medium Learning Lab Medium Learning Lab

001

Medium Learning Lab

002

Student Faculty Commons

Medium Learning Lab

Student Faculty Commons Team Collaboration

Student Faculty Commons

Team Collaboration

003 IT Closet

Outreach Reception

Internal Auditing Office Conference Room

004

Team Collaboration

Men’s Restroom

Innovation Hub

Economic Development Office

Seminar Room

Women’s Restroom

Economic Education Office

Board Room

Workroom

Computer Support Office

Flex Office Space

Storage

Electrical Closet

005

Team Collaboration Small Learning Lab

Women’s Restroom

Auditorium Cafe Men’s Restroom

Small Learning Lab IT Closet

006

Conference Room Electrical Closet

Workroom

Advising Reception

Small Learning Lab

Advising Office

007

Small Learning Lab

Peer Advising

008

009

010

AA

BB

CC

DD

EE

FF

GG

HH

II

State University Kelce College of Business 38 Pittsburg Phase 3: First Floor 000 Storage Conference Room

Marketing Office

Marketing Office Marketing Office

Conference Room

Marketing Office

Marketing Office Marketing

Marketing


008

009

010

AA

BB

CC

DD

EE

FF

GG

HH

II

000 Storage Conference Room

Marketing Office

Marketing Office Marketing Office

Marketing Office

001

Marketing Office Accounting Office Accounting Office

Marketing Office Marketing Office Marketing Office Adj

Marketing Office Adj

Accounting Office Adj

GA Open Offices

Marketing Office Marketing Office

Accounting Office Accounting Office

Marketing Office Adj

002 Marketing Office Marketing Office

003

Conference Room

Marketing Office

Marketing Office

Co-working Space

Product Development

Collaboration

Idea Generator

Accounting Office Adj

Marketing Office Adj

Accounting Office Admin Accounting Office

Admin Marketing Office Work Room

Men’s Restroom

IT Closet Accounting Office

Women’s Restroom Collaboration

Kitchen Women’s Restroom

004

Accounting Office Accounting Office

Men’s Restroom

Accounting Office

Conference Room

Accounting Office

Accounting Office

Collaboration Electrical Closet

005

Storage

IT Closet Collaboration

006

Accounting Office Adj

Accounting Office

Accounting Office Adj

Faculty Office Reception

Economic Office

Storage Economic Office Economic Office Dean’s Suite Reception

Electrical Closet

Workroom

Economic Office

Kitchen

Economic Office

Economic Office

Dean’s Office Storage Admin Assist

007 Collaboration

008

009

010

State University Kelce College of Business 39 Pittsburg Phase 3: Second Floor

Assistant Dean’s Office

Assistant Dean’s Office

Economic Office

Economic Office Storage

Economic Office Adj

Economic Office Adj

Economic Office


H

H

Egress Axon 1/32” = 1’

State University Kelce College of Business 40 Pittsburg Phase 3: Egress, Structure, HVAC

Structure Axon 1/32” = 1’


HSS Hollow Steel Column 12” x 12”x 3.8”

Multi Zone VAV Systems

BG Joist Girder 36BG

G Joist Girder 20G 15’ Spacing

Composite Roof System

Fan Coil Units in Offices Wide Flange Girder w12 x 14

Multi Zone VAV Systems Wide Flange Beam w6 x 12 6’ Spacing

Chiller Existing Concrete Structure

HSS Hollow Steel Column 10” x 10”x 3.8”

Composite Floor System

Steam Supply in Basement

HVAC Axon 1/32” = 1’

State University Kelce College of Business 41 Pittsburg Phase 3: Egress, Structure, HVAC


Metal Flashing Batt Insulation Rigid Insulation Metal Deck

Level 3 39’ 2”

Acoustic Ceiling Panels Wood Louver Ceiling

3

Terracotta Louver System

TPO Roof Membrane

2

Roof Board Rigid Insulation

Level 3 24’ 3”

2” Expansion Joint

Gypsum Board 1” Double Glass Glazing

Metal Stud Wall Polished Concrete

1 Level 2 11’ 8”

Air Supply Vent Recessed Lighting Suspended Ceiling

Carpet Concrete Rigid Insulation Compacted Earth Concrete Grade Beam Concrete Pile Base Soil

State University Kelce College of Business 42 Pittsburg Phase 3: Wall Section

Level 1 0’ 0”


1” Carpet 1” Carpet Pad 1” Sheathing

12 x 12 HSS Steel Column Polished Concrete Floor

3/4” Metal Welded Plate 1/2” Welded Bolts W12 x14 Wide Flange Beam 2” Backer Rod

2” Spacer

13

1

1

1

13 1

1 1

4” Batt Insulation 5/8” Gypsum Board Rubber Base 1” Carpet 1” Carpet Pad 1” Sheathing

Rubber Sealant 2” Expansion Joint 12 x 12 HSS Steel Column Polished Concrete Floor

1” Double Glass Glazing System

TPO Roof Membrane Gypsum Board

32

2” Spacer

1” Double Glass Glazing System

Rigid Insulation 2” Plywood Sheathing 3” Batt Insulation Rubber Sealant Backer Rod

Metal Flashing

1/2” Welded Bolts

Exterior Concrete Sill 2 1/2” Spacer Limestone Veneer Mortar Setting Bed Vapor Barrier 1” Sheathing 4” Rigid Insulation 7” Batt Insulation 1” Air Barrier

1 28

32

1

2

Building Total: 1,747

1

1

2 1 1

1

2

2

1 1

2

3

1

38

50

67

70

2” Spacer

98

4” Batt Insulation 5/8” Gypsum Board Rubber Base 1” Carpet 1” Carpet Pad 1” Sheathing

17

17 8

1/2” Welded Bolts

8

15

56

2” Spacer

1

2

1/2” Welded Bolts 1” Double Glass Glazing System

2

1 1 1 1 1

6

1 214

1

1 1

3 9

1

1 1

1 1 Total: 1265

36” Wooden Louver Steel Plate 1/2” Welded Bolts

49

62

14 1

State University Kelce College of Business 43 Pittsburg Phase 3: Details, Occupancy

22

68

248

ystem

32

6

Metal Flashing Exterior Concrete Sill 2 1/2” Spacer Limestone Veneer Mortar Setting Bed Vapor Barrier 1” Sheathing 4” Rigid Insulation 7” Batt Insulation 1” Air Barrier

6

1

1

Steel Plate

12 x 12 HSS Steel Column

4

4” Batt Insulation 5/8” Gypsum Board Rubber Base 1” Carpet 1” Carpet Pad 1” Sheathing

Steel Plate

5” Terracotta Louver

1

Total: 482

12 x 12 HSS Steel Column

Welded Plate ” Welded Bolts e Flange Beam 2” Backer Rod

1

1

5” Terracotta Louver

36” Wooden Louver

2

2

95

3/4” Metal Welded Plate Steel Plate 1/2” Welded Bolts W12 x14 Wide Flange Beam 1/2” Welded BoltsRod 2” Backer

Concrete Floor

1

1 1

Rigid Insulation 2” Plywood Sheathing 3” Batt Insulation Rubber Sealant Backer Rod

Polished Concrete Floor 1/2” Welded Bolts

Steel Column

1

2” Gypsum Board

Rubber Sealant 36” Wooden Louver 2” Expansion Joint Steel Plate 12 x 12 HSS Steel Column

ubber Sealant

1

2 13

1

110

2” Gypsum Board

xpansion Joint

1

1

3

6” Batt Insulation

TPO Roof Membrane Gypsum Board

6” Batt Insulation

terior Concrete Sill 1/2” Spacer mestone Veneer ortar Setting Bed por Barrier Sheathing Rigid Insulation Batt Insulation Air Barrier

2

1

1

3

etal Flashing

1

2

2

1” Double Glass Glazing System Weather Flashing

2

1

1/2” Welded Bolts

Double Glass Glazing System

28

13

2

1 28

1

1

2

1 Weather Flashing

3/4” Metal Welded Plate 1/2” Welded Bolts W12 x14 Wide Flange Beam 2” Backer Rod

1

1

73

1


State University Kelce College of Business 44 Pittsburg Phase 3: Rendering


State University Kelce College of Business 45 Pittsburg Phase 3: Rendering


State University Kelce College of Business 46 Pittsburg Phase 3: Rendering


State University Kelce College of Business 47 Pittsburg Phase 3: Rendering


State University Kelce College of Business 48 Pittsburg Phase 3: Rendering


State University Kelce College of Business 49 Pittsburg Phase 3: Rendering


State University Kelce College of Business 50 Pittsburg Phase 3: Rendering


State University Kelce College of Business 51 Pittsburg Phase 3: Rendering


Turn static files into dynamic content formats.

Create a flipbook
Kelce College of Business Documentation Spring 2019 by Norah Swift - Issuu