Mixing System for Biogas Digesters


Maximum Reliability. Zero Digester Downtime. Landia GasMix delivers a highly reliable mixing solution for biogas digesters handling a wide range of feedstocks – from manure and energy crops to food waste - designed to keep the digester in operation at all times. All equipment is externally mounted, meaning there are no rotating parts inside the digester. The complete system, including pumps and nozzles, is installed outside the tank.

During operation, the digester contents are pumped from the bottom of the tank through the GasMix chopper pump, where coarse and fibrous materials are chopped into smaller particles before being recirculated into the digester. This:

•

This eliminates the need to open or empty the digester for inspection, service or repair of the mixing system.

Improves substrate homogeneity and supports efficient digestion

•

Reduces the risk of blockages in pipes and nozzles

For the plant operator, this means:

•

Ensures reliable operation with minimal downtime

•

Continuous biogas production with no digester downtime

•

No loss of gas production due to maintenance

•

Full service access without process interruption

•

Improved safety with no confined space entry

•

Low and predictable maintenance costs

Mixing takes place at multiple levels to ensure effective mixing and uniform conditions throughout the digester.

•

Upper-zone injection promotes biogas circulation and helps release trapped gas

•

Lower-zone injection provides powerful bulk mixing and keeps solids in suspension

•

Optional top injection breaks up surface crusts and prevents their formation

Efficient digestion, stable biogas production, and reliable longterm digester operation.

2

Landia GasMix

www.landiaworld.com


Landia GasMix

www.landiaworld.com

3


The Digester Mixing System. Mixing Nozzle Upper Crust Breaker

The mixing process is carried out in stages: In the first stage, biomass is injected into the lower part of the tank, creating powerful bulk mixing and preventing sedimentation.

In the second stage, biomass is injected into the upper part of the digester, where biogas is entrained and mixed into the flow, supporting gas release and process stability.

Landia GasMix Nozzle

Depending on digester type and size, a third stage can be included, where biomass is injected into the top zone to prevent surface crust formation.

Mixing Nozzle Lower

Recirculation through the upper and lower nozzles creates rotational flow throughout the digester, ensuring complete mixing. A key component of the GasMix system is the chopper pump. It delivers the required flow and pressure to the nozzles while reducing solids to smaller particles, supporting a stable and efficient biogas process.

Chopper Pump

4

Landia GasMix

www.landiaworld.com


• Mixing Nozzle Upper

• GasMix Nozzle The specially developed GasMix nozzle is a key component of the system, designed to combine efficient jet mixing with biogas recirculation. As the digester contents pass through the nozzle, the venturi effect draws biogas from the digester headspace and mixes it into the liquid flow before injecting the combined flow back into the digester. The nozzle design and strategic positioning generate both horizontal and vertical flow patterns, providing effective threedimensional mixing throughout the digester.

• Automated Valves • Mixing Nozzle Lower • Chopper Pump

Landia GasMix

www.landiaworld.com

5


Why Choose Landia GasMix? • 100% gas-tight system No loss of methane or CO2

• Easy service & routine maintenance Fewer man-hours required

• Improved health & safety No personnel working in the gas zone

• No gas leaks or temperature drop During maintenance

• Landia chopper pump technology Effective solids reduction - prevents clogging

• Lower lifecycle assessment Reduced demands on tank construction

• Minimal space required for service • No downtime No need to empty the tank for installation

6

Landia GasMix

www.landiaworld.com


Hot Tap Drilling Installation for Zero-Downtime Digester Upgrades The Landia GasMix system can be installed without emptying the digester, as all work is carried out externally. This allows the digester to remain in operation throughout the installation process, eliminating downtime and avoiding loss of biogas production.

A sealing arrangement is then applied to ensure a secure and leak-tight connection, after which the system is inserted without the need to open or empty the digester. The result is a fast, safe and cost-efficient installation with minimal environmental impact.

Installation begins with positioning the tank wall connections, followed by controlled drilling through the tank wall.

• No downtime • Cost-efficient • Safe and quick installation • Environmental benefits

Landia GasMix

www.landiaworld.com

7


AJ03A.C15

Landia A/S Industrivej 2 DK-6940 Lem St. tel +45 97 34 12 44 info@landia.dk


Turn static files into dynamic content formats.

Create a flipbook
Landia GasMix | Biogas ENG by Landia A/S - Issuu