Roofing Contract Specifications: Supply tools and equipment necessary to complete work. Supply nails required to complete all work. Keep job site and materials in an orderly fashion. Hoist all materials to roof levels. Color and type of shingle to be:_________________________________________________ Quality of shingle to be:_______________________________ year guaranteed by manufacturer.
Supply Install Inspected ______ ______ ______
Ice and water shield.
______ ______ ______
Metal Drip edge.
______ ______ ______
Metal drib edge on gables.
______ ______ ______
Shingles.
______ ______ ______
50lb. Felt under valleys.
______ ______ ______
Metal valleys.
______ ______ ______
15lb. Perforated felt.
______ ______ ______
All flashing.
______ ______ ______
Roof vents.
______ ______ ______
Skylights.
______ ______ ______
Caulk and seal where required.
Extra Charges if any $______________.____ for _____________________________________ $______________.____ for _____________________________________ $______________.____ for _____________________________________
Sub total: $____________________._____