PROFESSIONAL TRAINING REPORT JANUARY 2020 - JULY 2020
Niraj Kamal Karunanidhi B. Arch 4th yr (2016 - 2021)
Department of Architecture and Planning, Indian Institute of Technology Roorkee, India.
Title: Professional Training Report January 2020 to July 2020. Student: Niraj Kamal Karunanidhi, B. Arch 4th year, Department of Architecture and Planning, Indian Institute of Technology Roorkee. nk@ar.iitr.ac.in niraj_kamal.karunanidhi@tu-dresden.de Organization(s): 1) WISSENSARCHITEKTUR - Laboratory of Knowledge Architecture, Technische Universitat Dresden, Dresden, Germany. (Research Internship, Professional Training) January 2020 to July 2020. Supervisor: Prof. Jörg Rainer Noennig 2) Ruairi O’Brien. Architecture. Light. Spatial Design., Dresden, Germany. (Voluntary Part-Time training) May 2020 to July 2020. Architect: Ruairi O’Brien. Supervisor and Guide: Prof. Jörg Rainer Noennig. Funding: DAAD; Technische Universitat Dresden. Programme: ARN 402: Professional Training, Department of Architecture and Planning, Indian Institute of Technology Roorkee.
Cover: Karunanidhi, Niraj Kamal - Photo of public installation in Dresden Altstadt city centre.
To my family...
WISSENSARCHITEKTUR Laboratory of Knowledge Architecture
TU Dresden Fakultät Architektur 01062 Dresden
Bearbeiter:
Noennig
Tel / Fax:
0351 463-32210
E-Mail:
joerg.noennig@tu-dresden.de
Erstelldatum:
06.08.2020
INTERNSHIP COMPLETION CERTIFICATE This is to certify that Mr Niraj Kamal Karunanidhi studying Bachelor of Architecture at Indian Institute of Technology Roorkee, India has completed his six months Professional Training at WISSENSARCHITEKTUR Laboratory of Knowledge Architecture, TU Dresden, from 13th January 2020 to 25th July 2020. During his Internship, he worked on various projects in Programmable materials, urban spaces, AI and Intelligent Architecture, and Architectural Design. He was exposed to various activities of research, and he learned to work in collaboration with various domains in the field. His association with us was very fruitful, and we are delighted to be a part of his professional career. He took key initiatives, and played an eminent role in research activities related to intelligent and programmable Architecture. We hope the international exposure he got during this Internship will broaden his horizon for his future endeavours.
Prof. Dr.-Ing. Jörg Rainer Noennig Director WISSENSARCHITEKTUR Laboratory of Knowledge Architecture Technische Universität Dresden Professorship Digital City Science City Science Lab – A Cooperation with the MIT Media Lab HafenCity University Hamburg
Postadresse (Briefe) Technische Universität Dresden 01062 Dresden
Postadresse (Pakete u.ä.) Technische Universität Dresden Helmholtzstraße 10 01069 Dresden
Besucheradresse Zellescher W eg 17 BZW B EG, 008-012
Internet www.tu-dresden.de/ka
WISSENSARCHITEKTUR Laboratory of Knowledge Architecture
TU Dresden Fakultät Architektur 01062 Dresden
Bearbeiter:
Noennig
Tel / Fax:
0351 463-32210
E-Mail:
joerg.noennig@tu-dresden.de
Erstelldatum:
06.08.2020
TO WHOMSOEVER IT MAY CONCERN I, the undersigned, solemnly declare that this internship report contains the work that has been done by Mr. Niraj Kamal Karunanidhi during the tenure of his professional training/ research internship at WISSENSARCHITEKTUR Laboratory of Knowledge Architecture. All the information, illustrations, drawings and reference to the material provided in this report are true to the best of my knowledge. With kind regards,
Prof. Dr.-Ing. Jörg Rainer Noennig Director WISSENSARCHITEKTUR Laboratory of Knowledge Architecture Technische Universität Dresden Professorship Digital City Science City Science Lab – A Cooperation with the MIT Media Lab HafenCity University Hamburg
Postadresse (Briefe) Technische Universität Dresden 01062 Dresden
Postadresse (Pakete u.ä.) Technische Universität Dresden Helmholtzstraße 10 01069 Dresden
Besucheradresse Zellescher W eg 17 BZW B EG, 008-012
Internet www.tu-dresden.de/ka
CONTENTS
Acknowledgements About Wissensarchitektur Laboratory of Knowledge Architecture. About Ruairi O’Brien. Architecture. Light. Spatial Design. The Journey Summary of Projects Architecture Projects Urban Design Projects Research Projects Conclusion and Final Reflection. Bibliography
ACKNOWLEDGEMENTS: I would like to express my sincere gratitude to my Supervisor, Jorg Rainer Noennig. Thanks for introducing me to various incredible fields of digital and knowledge architecture, for teaching me how to handle research projects. Thanks for being supportive of my ambitions and ideas. My research is significantly influenced by collaborators and guides - Jorg Rainer Noennig, Sebastian Wisenhuetter, Martin Sobzyk, Thomas Wallmersperger, Konstantin Doll and Adam Urban. I am grateful for their passion, inspiration, and long talks about programmable and intelligent Architecture. Thank you for listening to my ideas, and collaborating. I am thankful to Ruairi O'Brien, for accepting me as a trainee, giving the opportunity to work on the architectural projects in their firm and introducing me to different architectural topics. I am thankful to Lars Joachim for his guidance, for being an extraordinary mentor in the office and for adjusting with my continually changing university schedules. During my internship at the KA lab, I had a chance to share the workspace with exceptional people. I thank all the members for sharing incredible moments: Jörg Rainer Noennig, Anja Jannack, Sebastian Wiesenhuetter, Konstantin Doll, Anja Beniko Lorenz, David Hick, Adam Urban, Benjamin Stelzle, Michael Kelber, Xiaoping Xie, Olga Kyselova, Malgorzata Flickschu, Isabelle Bartl(esp. for teaching phrases and fowl words in German), Torsten Holmer, Matthias Hauschild, Fabrice Naumann, Florian Saegebrecht, Hong Trang, Linh Vu, Andreas Wilde, Milliena, Vincent Paul Kanig. Thank you for making my life easier at TUD. I thank Nikhil Duggal for virtually collaborating in a project under short notice, for his energetic participation and contribution. Sincere thanks to the TU Dresden International office- Cornelia Hesse, Lieselotte Landgraf-Dietz, and Luise Thalheim, and DAAD, for helping me with the funding and for being very supportive during the pandemic, extending the funding. This wouldn't have been possible without your support. I thank the internship program coordinator, Gaurav Raheja, for supporting, guiding and helping us during the internship, especially during the crisis. I would like to thank professor Smriti Saraswat, Rabi Narayan Mohanty for their incredible support and guidance when I was lost, struggling with visa issues. Thanks to professor Rajasekhar for supporting my crazy ideas and insightful discussions at IITR. I extend my sincere gratitude to all the professors of the architecture department - Avlokita Agrawal, Rita Ahuja, Sonal Atreya, P.S. Chani, Ila Gupta, Saptarshi Kolay, Ram Sateesh Pasupuleti, Tina Pujara, Gaurav Raheja, Rajasekar Elangovan, Uttam Kumar Roy, Subhajit Sadhukhan, Smriti Saraswat, Manavi Suneja, Harshit Sosan Lakra, Pushp Lata, Mahua Mukherjee. , and all the supervisors, faculty. , for tolerating us for four years, imparting invaluable knowledge, guiding us, and for sharing memorable moments during classes, batch trips, and in the department, in IIT Roorkee. I thank the head of department P.S.Chani, Dean International Relations-Arumugam and Director Ajit K Chaturvedi, IITR for their efforts to help me during the crisis. I am very grateful to Manoj(IITRHF) and IITRHF for their sincere efforts to support the internship and during the crisis. I am thankful to my close friend and classmate, Jaswant Parihar for being a good company in Dresden, for introducing me to architect Dirk Friedrich Sehmsdorf, and to his friends with whom I had a wonderful time. I thank Dirk, and his family for the memorable moments during dinners, and insightful discussions. I thank very good friends, Savarna and her family for their support. Sincere thanks to Krishnamoorthy and his family in Delhi, for helping me out. I thank all the amazing friends I met here in Dresden, at Fritz-16, for the dinners, improv trips and wonderful moments. I thank the incredible people I met in IIT Roorkee, seniors and my batchmates for bringing all the vital doses of fun while learning and sharing a ton of knowledge. I am grateful to my mentor, Pal for motivating, encouraging, guiding me through every stage of this journey, and shining his wisdom on me. I am eternally grateful to my amazing family for their unconditional love and their mental support during the long days in ‘home office’, for sharing fun and memorable moments, and staying connected ‘virtually’ during this incredible journey. Thanks to my parents for encouraging me to do whatever I like and helping me with all my crazy ideas. Dresden, August 2020.
The WISSENSARCHITEKTUR Laboratory of Knowledge Architecture is an interdisciplinary think-tank conducting research, design, and consultation at the intersection of design and social sciences. The lab explores the multiple cross-links between environmental structures (spaces, buildings, cities), and knowledge processes (innovation, creativity, co-operation). To investigate knowledge dynamics in space, the lab creates visualisation and modelling tools, and applies them in academic training as well as in professional practice.
LAB UNITS
Participation and Co-creation / Co-design
Innovation and Startup Design
Spatial Robotics and Bionics
Collaborative Workplaces
Digital Future City
Design Planning
PROF. Jörg Rainer NOENNIG LAB DIRECTOR, ARCHITECT
Prof. Dr.-Ing. Jörg Rainer NOENNIG is Professor for Digital City Science at the CityScienceLab- A Co-operation with the MIT Media Lab, at Hafencity Universität Hamburg and the Director of the WISSENSARCHITEKTUR Laboratory of Knowledge Architecture at TU Dresden. From 1992 to 1998, he studied architecture at Bauhaus Universität in Weimar- his birthplace, Polytech Krakow and Waseda University Tokyo. Between 1998 and 2001 he practised as an architect in Tokyo, among others at Ishiyama Experimental Underground Architecture Factory, at Arata Isozaki & Associates, and as a freelance architect. From 2001 he was Research Associate at TU Dresden, where he was appointed Junior Professor for Knowledge Architecture (2009-2015). In 2007 he received his doctoral degree from Bauhaus Universität Weimar. He taught at different universities in Japan, USA, China, Italy, Switzerland and Angola, and was a Visiting Professor at Universit Degli Studi dell l´Aquila, ISEN Toulon and Voronezh State Technical University. He has published several books and more than 100 scientific papers and essays. He has won several prizes, scholarships and awards, including the Grand Prize of the European Association for Architecture Education (EAAE).
RuairĂ O'Brien. Architecture. Light. Space art. - The artistic-interdisciplinary architecture firm holistically combines the areas of architecture - building construction, lighting planning, interior design, urban development and open space planning, monument protection and exhibition design. The firm is known for its lighting design, and very cost-effective modular housing buildings. The firm is in the same building as the Erich Kistner Museum in Dresden which they had designed.
Ar. Ruairí O'Brien ARCHITECT
Ruairí O'Brien studied architecture and light at universities in London, Edinburgh and New York and worked for various architecture firms in England, the USA and Germany before he founded his own office in Dresden in 1995 : Ruairí O'Brien. Architecture. Light. Space art. In 2010, he founded the lighting design company Archevolucio Lighting Design Ltd. in London and Dresden. He also worked on a variety of innovative, cost-effective buildings, light and light art projects, sculptures, installations, and projects related to the cultural and historical heritage of the past. In 2003 he founded the light poetry festival «Light and Word» in Dresden. He has a substitutive professorship for architecture and light at the Wismar University of Applied Sciences. He played a key role as coordinator of the international master’s course in Architectural Lighting Design and helped the program to achieve full accreditation in 2005. He regularly teaches at various universities in Germany and abroad, including in the Czech Republic and Russia. In 2014 he founded the «Mobile School of Lighting Design», a project that brings the learning of lighting planning/lighting design to a global public in an innovative and mobile form. He is one of the founding members of the Federation of International Lighting Designers, founded in 2014, and served on the board as Vice President of the professional association until the end of 2018. Since 2017 he is the Associate Professor and Head of Architecture and Visual Design Department at the German University in Cairo - GUC active.
The Journey
I first heard about Prof. Jorg, when he gave a lecture on Digital Architecture during the Bauhaus@100 event in IIT Roorkee. Thanks to Professors Gaurav Raheja, P.S. Chani, and Smriti Saraswat for organising the event. My classmate Jaswant Parihar, kept mentioning about this lecture. I was interested in the technological aspects of Architecture and strategical methods in planning. It's an irony that I draw and design a lot while solving physics problems, and vice-versa - both the activities simulate me a lot. I worked with Prof. Rajasekhar in the NetZed lab-IITR, on exciting and very technical projects in Architecture, which involved a ton of coding and math. Thanks to him for supporting my ideas. I also worked on a project with Ar. Suhasini Ayer during December 2019, on the analytical thermal comfort study of Humanscapes, Auroville. I had a wonderful time, and I realised that I also needed the vital dose of the artistic, and creative aspects in work to keep myself motivated - I needed the balance. This was when I decided to send an email to Jorg. He replied immediately sharing about the lab’s projects. I realised that it is a perfect place for me. It was my first time applying for a foreign visa. With the help of Prof. Jorg, Prof. Smriti Saraswat, Prof. Gaurav Raheja, Rabi Mohanty, and TUD international office who guided me with the visa, I was able to reach Germany on time. The lab is interdisciplinary, and it is an academic atmosphere, so I can work on my crazy ideas without risking anything much. The analytical approach to architectural designs was fascinating. I learnt a lot beyond that, to organise everything around my self. I realised on the first day that no one will be assigning tasks for me, or setting any deadlines. I had to either take up initiatives on my own ideas, or be aware of what others are doing, and propose to collaborate with them. I had to keep my own deadlines and meet them. Jorg and the colleagues at the lab were very supportive whenever I got lost, and always opening up on various opportunities to work on projects available from time to time. I learnt a lot working on research projects, especially patterns in both in architectural design and in geometry. I spent a big chunk of time in January in the SLUB maker space, an annex right below the lab, where all the laser cutters and 3D printers were located. When I had finally fixed with my time plan, Germany was hit with the outbreak. Although the home office was not very efficient in my case, the long days gave me time to think, structure my thoughts and write the first draft of a research paper. Prof. Jorg was very supportive and encouraging, guiding me through it. I also had to improvise by finding opportunities to take up architectural projects, since the project we decided in the lab (Kyiv NAUPROSTIR) was delayed due to the crisis. Prof. Jorg supported my decision to take up a voluntary part-time training, and I mailed a few firms in Dresden. Lars Joachim and Ruairi O’Brien replied, I met them, and I liked their way of work. I also liked the firm’s atmosphere, it is in the same building as the Erich Kastner museum which the firm designed, right above it. The projects were interdisciplinary, I volunteered as a primary trainee. I learnt a host of new software used by the firm. Lars, the project manager, made the problems in sequencing and organising the tasks feel impossibly simple, and agile. It is a small but efficient team with Ruairi, Lars and me, working during the crisis, so I was given diverse tasks to do. I learnt a lot about the history of buildings in Europe, its architecture, and also about the importance of lighting. I met a lot of amazing people in Dresden, had a wonderful time, with all the improv plans and dinners. I am currently continuing the work on my research publications. The architecture of Dresden is merely jaw-dropping. I will never forget the long walks every day from the firm (new city centre) to my room (old city centre), walking through the bridges and castles of Dresden, crossing the Elbe river. Research Intern (KA) Jan
2020
Feb
Mar
Apr Home Office
May
Jun
Jul
Part-time training
SUMMARY OF PROJECTS
My contribution, self evaluation
Architecture Client Meetings
Analysis
Design Concept
CAD Drawings
Modelling
Visualization
Site Visit
Annenhoefe Office Space Hoheneck Prison Museum (concept) Volksolidaritat Trachenberge Kiev NAUPROSTIR**
Urban Design Analysis
Concept
Planning
Drawings
Modelling
Visualization
Neustadt Urban Guidance System Urban Mobility Study - Chemnitz Urban Stage Design Potsdam Berlin War Memorial
Research Conception
Brainstorming
Review
Authoring
Prototypes
Simulations
Visualization
Project ADAM (Programmable Materials)** SCORE Resilience for Coronavirus.
Workshops/ Brainstorming Study on German Standards for Office Spaces AI and Architecture
** Project is being continued/ extended.
Illustration method credits: Divyang Purkayastha
ARCHITECTURE PROJECTS
1
2
3
ANNENHÖFE
HOHENECK PRISON MUSEUM
VOLKSSOLIDARITÄT TRACHENBERGE
4
KYIV NAUPROSTIR (PROPOSAL)
ANNENHÖFE
A 2000 sq.m office space for a leading international IT Company, in Dresden.
Client: (Undisclosed) A leading International IT Company. Location: Postplatz, Dresden, Saxony Architect: Ruairí O’Brien. Architecture. Light. Spatial Design., TLG Immobilien AG. - Knerer und Lang Architeckten. Plot Area: 7400 Sq.m Status: Under Construction, to be completed in 2021.
Img - 1.1
Brief: This project is a Large Scale 2300 Sq.m office and R&D space for an international IT company (like Intel). The office comprises of working area for 115 employees, R&D laboratories, and leisure, and reception spaces for visitors. The R&D facility and workspace needed special Faraday shielding and had to be highly secluded while having an excellent working atmosphere.
Site: The site is in the heart of Dresden, Postplatz and in close proximity to the Zwinger palace. It is a modern inner-city office space right in the historic old town.
1 2
Challenges: The office planning needs to stick to the German laws. The space needs a spacial protocol program to work even during a pandemic.
Img - 1.2 1
The R&D facility and workspace has to be secluded. The design of toilets and kitchens should be cost effective, and efficiently connected to the plumbing ducts. There needs to be showering facilities for employees who use bicycles.
Img - 1.3 2
The office needs to be balanced with nooks, leisure spaces etc. The reverberation time should not exceed 1.5 seconds.
Img - 1.4
My contribution: I contributed to the design, planning, and modelling of the 2300 Sq.m office space, and R&D facility. The total plot area is 7400Sq.m. I was also involved in the multiple revisions of the design. Room Plan
Spacial Layout
Archicad Model and Visualization
Workflow: RuairĂ O'Brien was responsible for the planning of the tenant's room programme layout, which was coordinated with the developer/landlord (TLG) to define the requirements and standards for the office space.
Img - 1.5 Interior Office Space
Img - 1.6 Interior Teekuche Img - 1.7 View from South West Side
TYPICAL FLOOR
Default Floor Plan, Floor Area - 3500 Sq.m.
ACOUSTICS Internal walls, and wall cladding: Drywall / metal stud wall Knauf W112, Clad - Double planked on both sides, 4cm mineral wool Sound reduction index R'wR = 45 dB Doors: Rw = 32dB to R'w = 27dB
Reverberation time: For private offices, the RT is less than 1 second. For the meeting rooms, the reverberation time is less than 1.5 seconds. For confidential conversations, and in systems laboratory, the reverberation time is below 0.5 seconds.
1
The stairwells of the building divide the floor plates into zones, and are to be built using firewalls, which compartmentalise the building. This makes the space flexible, thus offering more options and orientations to choose from.
2
Acoustic Panels for Ceiling:
3
Acoustic panels were chosen for the ceiling, due to the aesthetics and cost effectiveness. The Reverberation time calculated to be ~1 second. 4 White Noise A gridded speaker plan was chosen mainly for generating white noise and other multimedia purposes
GES
AM
TM
AS
AC
S
HS
EN
WÄN DE
E12
RO
HB
AU
/Ö
FF
NU
NG
EN
1,36
25
14
E11
F
39
25 5,41 5
2,95
F1
025
39
G
E10
6,20
8,50
E9
D
6,20
5,4 5 1
15
Fah
rra
dste
5,41 5
llplä
30
30
F2
5,40
30
tze
E8
8,6
2
-1.2 Fah 2
F= rrad 54,1 ab U= 29,8 8m² stellra 8m
33,16 5
um -1.2 Fah 3
7,07 5
F= rrad 54 U= ,85m abste 30,1 ² llra 0m um
F3
5,40
5,41 5
25
5,41 5
31 F
1,0 2,1
ahrr
1
3
1,0 1
adst
15,64 5
ellp
lätz
e
60 Fa
2,50
17,9 25
2,13
35
1,01
132
2,1 3
dste
5,05
F4
5,40
hrra
tze
10,0 0%
2,52 5
-1.24 Fahr
F= 10 radabs U= 44 0,05m² tellrau m ,68m
35
130 25
35
25
11,58%
2,52 5
5,10
F5
5,40
9,72 %
2,52 5
35
E
llplä
3,52 5
F
5,15
1,01 2,13
1,57 5
H6
= 13
25 25
2,85
F= 50,73m² U= 40,82m
1,01
Au F= fzugss 4,08 ch Ka m² acht 1,10 binen mx2 innen ,10m maß
2,85
2,13
8,75
2,13
8,00
1,01
4 3 2
-1.0 Tre 9
2,525
2,525
35
5,05
35
5,05
3,005
35
20 35
5,00
18 6,90
2,52
5
35
5,40
88,4 45
5,00
2,00
C 19
5,05
20,5 5
F9
H5
30
21
F8
5,02 5
5,40
9,595
37 5
6,025
E 1
18 /28
F= ppe U= 23,4 nha 27,6 2m² us 5 6m
Stg.
18 /28
11 12 13 14 15 16 17 18 19 20
Stg.
6,025
6
2,00
25
10
10
5
25
F7
7
8
10 9
5,40
Sc F= hach 2,35 t m²
OK De RFB ck = UK e d=32-5.0 0 RD = -5 cm m .32 m
m ,50m ²
-1.1 Sc 0 F= hleu U 8,23 se
C
11,27%
-1.19 Technik
5,15
F6
5,40
1,01 2,13
5,40
5,40
5 3,35
5,40
7,44
5
125 5,22
F1
5
0
5,40
60 1,10
2,52
5
H4
35
35
5,00
40 5,00
35
3,30
2,52
5
5,40
5
5 2,52
C 35
5,05
35
5,05
35
5,05
5 3,00
35
7,09
35
5
35
2,52
5
2,52
J2 F= 4567,61m² U= 674,59m
2,52 25
25 25
En
2,525
2,525
35
2,525
2,525
2,525
35
2,525
2,525
35
2,525
2,525
35
ngF= 7,trauchu TG79m² ngss ch
acht
18 /28
2,525
35
3,005
35
2,88
60
2,88
60
6,97
45
5,10
10,9 25
-1.0 Tre 7
7,70
7,45
F= ppe U= 23,4 nha 27,6 2m² us 4 6m
17
65 5,00
60 5,00
55
Sc ha ch F= 2,35 t m²
15 2,525
35
2,525
2,525
5 2,52
0 35
5 2,52
2,52
35
2,525
2,525
35
2,525
35
2,52
5
5 2,52
35
5 2,52
2,525
5,40
35
2,525
2,525
35
5 2,52
5 2,52
35
5,40
1,57
5
35
14
2,20
6,75
H2
F1
16
Au F= fzug 4,08 ssch Ka m² acht 1,10 binen mx2 innen ,10m maß
1,01 2,13
5,40
3
OK De RFB ck = UK e d=32-5.0 0 RD = -5 cm m .32 m
25
25
= 13
m ,50m ²
-1.0 Sc 8 F= hleu U 8,25 se
1
2
3
4
5
18 /28
5,00
50 Stg.
6
7 5,15
Stg.
5,00
10 8
9
10
1,01 2,13
5,15
5,40
2 F1
chu
11 12 13 14 15 16 17 18 19 20
2,85
trau
10
H3
En
2,70
2,85
F11
25
5,40
7,15
6,325
-1.21 Tiefgarage
5
2,17
5
6,325
8,60
35
J1
3,50 6,00
8,10
6,00
35
5
35
2,52
5
5
2,52
5
5 2,52
35
2,52
5
35
6,84
5
35
0 35
2,525
70 5,00
2,52
5
75
12
5,00
13
35
H1
F1
5,05
5
5,40
2,52
5
2,52
2,525
35
22,3 5
120
3,52
5
F1
5,05
4
6,65
35
F1
5,05
8,70
2,52 5,40
6
7,445
F
10
2,525
5
11
A8`
A9`
90
A10`
A11`
5
2,52
5
35
2,52
350
2,52
5
5 2,52
35
5 2,52
2,52
5
5 2,52
35
5 2,52
2,52
5
35
2,52
35
2,52
5
5 2,52
35
5
5 2,52
35
5 2,52
2,52
5
5 2,52
35
2,52
5
35
5 2,52
5 2,52
5
5 2,52
5 3,00
35
35
6,97
6,45
7,25
6,45
4,625
1,01 2,13
6,45
-1.1 HA 8
35
2,52
2,00
9
UKRD = -5.32 m
,45
0 15,5
3,07
25
5
35
2,13
1,01
5 5,15 5
35
1,01 2,13
10 Stg. 18/28
14
20 19 18 17 16 15 14 13 12 11
1 2 3 4 5 6 7 8 9 10 11
25
2,85
5,10
25
5,15
25
2,85
35
5 3,52
1,38
105
1,01
-1.04 Schleuse F= 8,24m² U= 13,50m
5,15
5
F= 23,04m² U= 27,66m
2,13
25
2,52
Schacht F= 2,35m²
-1.03 Treppenhaus 2
F= 8,24m² U= 13,50m
5,10
5 2,87
25
2,00
35
5,05
35
5,05
35
5,05
35
2,00
25
25
2,00
35
5,05
35
5,05
35
5,05
35
2,00
25
2,85
25
5,15
25
5,10
35
5,05
35
4,905
25
2,85
25
5,15
25
5,10
35
5,05
35
5 4,90
25
4,90
5,40
5,40
5,40
5,40
5,40
5,40
5,40
5,40
5,40
5,40
5,40
5,40
72,42
D
G3
A1
A2
A3
A4
A5
A6
A7
A8
F
0 15,5
G2
3,01
3,075
25
Aufzugsschacht F= 4,08m²
UKRD = -5.32 m 23 22 21 20 19 18 17 16 15 14 13 12
110 1 2 3 4 5 6 7 8 9 10
F= 23,42m² U= 35,40m
3,015
2,57
8,75
6 OKRFB = -5.00 m Decke d=32 cm
-1.05 Treppenhaus 3
-1.06 Schleuse
2,00
7
OKRFB = -5.00 m Decke d=32 cm
10 Stg. 18/28
Aufzugsschacht F= 4,08m² Kabineninnenmaß 1,10mx2,10m
F
Schacht F= 2,35m²
5
8
2,13
8,75
1,01
5 1,57
6,45
5
2,13
3,52
1,01
35
Kabineninnenmaß 1,10mx2,10m
5
2,13
11 Stg. 17,8/28
-1.1 ern 7
F= w U= 65,3 ärm 33,9 8m² e 2m
3,07
1,01
12 Stg. 17,8/28
F= R W U= 25,21m ass 20,7 er ² 2m
25 25
5,155
A
2,52
35
5
G1
3,88
5 2,52
2,525
3,88
115
5,36
5
2,52
5
25
25
70
35
35
95 2,525
A7`
85
5,00
A6`
D
A5`
5,00
2,52
5
A4`
80
A9
A10
A11
A12
A1
E7
E6
E3
E2
5,415 8,265
2,85
E1
25 5,415
25
5,16
5,415
GESAMTMASS
2,13
WÄNDE
39 ROHBAU / ÖFFNUNGEN
6,055
D9 G
5
6,25
-1.14 Technik
6,25
1 5,40
Kabineninn 1,10mx2,10 enmaß m Aufzugs F= 4,08 schacht m²
25 14
25 14 0
25
90
1,01
855
6,055
25
OKRFB Decke = -5.00 m d=32 cm UKRD = -5.32 m
nhaus 6
F= 37,83m² U= 24,62m
80
-1.25 Ram
2,13
25
14,60m² 19,21m
us 6
5,415
15,895
-1.12 Treppe
-1.11 Treppe nha
F= 5,26 m² U= 9,40 m
ACHSEN
5,415
-1.13 Schleu se
F= 8,59 m² U= 13,7 6m
1,01 2,13
Schach F= 2,35 t m²
10 Stg.
8 + 10
17,9/28
Stg. 17,9 /28
1,01
15,895
18 17 16 15 14 13 12 11 10 F= 9 U=
2,13
1,01
25
19 20 121 2 22 3 23 4 24 5 25 6 26 7 27 8 28
WÄNDE
25
ACHSEN
E4 25
GESAMTMASS
8,12 5
ROHBAU / ÖFFNUNGEN
E5
64,49 5
F= 22 pe U= 78 7,99m² ,78m
5,37
25
25
4,995
4,625
4,625
35
35
5,05
5,05
9,73%
D7
2,525
E
35
D6
35
5,40
5,40
3,10
25
7,70
2,40
20
3,60
5,40
5
C
10
2,525
7,35
5,40
6,90
2,525
5,05
E
35
F= 144,95m² U= 62,78m
5,05
-1.20 Lager / Technik
5,40
2,525
35
25
5,40
6,065
4,82
50
235
5,40
35 5,645
2,75
D8
35
10,00%
2,75
5,43
10,325
35
J5 UZ Stahlverbundträger
5,10
35
2,525
2,775
35
BODENDURCHBRUCH (BD)
WANDDURCHBRUCH (WD)
OK FFB
OK RD
DECKENDURCHBRUCH (DD)
WANDSCHLITZ (WS)
UK FD
UK RD
35
35
SCHRAFFUREN
D5
45,20
2,525
2,525
35
2,85
2,50
STB BESTAND
STB
WU-BETON
FEUERHEMMEND (F30)
MW BESTAND
MW
BETON UNBEW. / ESTRICH
FEUERBESTÄNDIG (F90)
PUTZ BEST.
PUTZ
BT-FERTIGTEIL
BRANDWAND
WERKSTEIN BEST.
WERKSTEIN
HOLZ
UHD
TROCKENBAU BEST.
TROCKENBAU
WÄRMEDÄMMUNG
ABBRUCH
1,85
5,40
7,78
UZ Stahlverbundträger
5,05
J4
= 112,66 m NHN
2,525
J3
8,60
2
35
6,30
D4
5
HÖHENBEZUG ± 0.00:
SYMBOLE
5,40
2,52
5,05
5 2,52
5,05
35
35
5 2,52
LEGENDE
5,40
5 2,52
35
5,05
5 2,52
2,50
5,40
1,98
2,525
5
5
35
35
UZ Stahlverbundträger
2,525
14 13 12 11 10 9 8 7 6 5 4 3 2 1
1
14 Stg. 17,9/28
2 35
D3
35
30
30
2,13
5,40
2,13
4
5,40
2,425 1,01
2,13
F= 16,69m² U= 20,46m
PROJEKT
A
1,01
D2
5,05
1,01
F= 9,07m² U= 13,20m
-1.01 Treppenhaus 1
1,01
MK4 - NEUBAU BÜROGEBÄUDE "ANNENHÖFE"
8,60
FREIBERGER STRAßE/ SCHWERINER STRAßE, 01067 DRESDEN
6,10
5,40
8,60
2,13
BAUHERR
D1
F= 235,29m² U= 81,65m
5,05
35
5,05
35
5,05
35
6,075
25 14
ROHBAU / ÖFFNUNGEN
5,10
35
5,05
35
5,05
35
5,05
35
6,075
14
WÄNDE
0 39 0 71
5,40
B5
1,675
40
14
35
35
5 25 14 58 25
14 25
14
5,10
0 5 25 14 58 25
5,40
5,40
5,40
5,40
60
39
B01 GESAMTMASS
C6
ACHSEN
C5
WÄNDE
C4
ROHBAU / ÖFFNUNGEN
C3
35
B4
C2
B02
B03
A03
17,45
100
GESAMTMASS
5,40
5,05
C1
LAGEPLAN / GEBÄUDEÜBERSICHT
ACHSEN
28,70
6,255
TLG IMMOBILIEN AG BUDAPESTER STRAßE 3, 01069 DRESDEN
1,71
5 6,55
14 25
70
3,70
Schacht F= 2,59m²
-1.15 Technik
5,40
5,05
A04
A01
A02 24,36 35
5,40
4,625
B3
5 1,55
5,00
6,55 14 25
-1.16 Technik
6,325
14
14
1,05
B1
F= 41,43m² U= 25,75m
25 14
5 6,32
ROHBAU / ÖFFNUNGEN
25 14 1,10
WÄNDE
5
ACHSEN
GESAMTMASS
A14
ACHSEN
GESAMTMASS
WÄNDE
5,40
PLANINHALT
MASSSTAB
GRUNDRISS TG-1
1:400
TYPICAL BASEMENT PLAN
5,40
6,55 14 25
B2
25
25
5 6,57
ROHBAU / ÖFFNUNGEN
13
-1.02 Schleuse
3
OKRFB = -5.00 m Decke d=32 cm UKRD = -5.32 m
Kabineninnenmaß 1,10mx2,10m Aufzugsschacht F= 4,08m²
2,425
35 4,95
15 16 17 18 19 20 21 22 23 24 25 26 27 28 Schacht F= 3,18m²
2,425
15 14 Stg. 17,9/28
GES
AM
TM
AS
AC
S
HS
EN
WÄN DE
E12
RO
HB
AU
/Ö
FF
NU
NG
EN
1,70
58 5
2,10 5,40
3,02
3,93 5
3,53 5
F1
E11
F
58 5
G
E10
4,60 5,60
33
-1.40
m=
80
111,2
5,4
0
6 NH
5,40
4,6 0 5,6 0 4,60 5,60
F2
5,40
um
80
E8
4,60 5,60
F= rrad 129, ab U= 56,1 51m² stell ra 6m
33,15
5,40
80
4,60 5,60
72 F ahrr adst ellp lätz e
Zu
fa
F= h U= 271, rt TG 95,9 95m 8m ²
5,40 80
4,60 5,60
80
30
4,60 5,60
F3
5,40
0.1 6 Fah
80
10,2 5
E9
D
N
Au
-1.40
10,0
80
11,58%
97
41 5
2,75
4,60
5,60 5,11 5
F
11,27%
H5
BR
5,21
FF 1,35 2,90
m OK 0,8 H: BR
H4
1,35 12 5
FF 1,35 4,80 2,57 5
m OK 0,8 H: BR
C
12 5 62,6 9
FF 1,35 2,90 2,57 5
0,8 H:
585 1,35
2,90
3,36
H3
12 5
112.04
12 5
2,90
1,35
1,35
2,90
1,35 1,35 1,35
5
112.04
4S
m OK
1
H2
0,8 H:
1,35
-0.60 m = 112,06 NHN
N
BR
25
1,35
2,90
1,35 BR
6,845 2,26
112.04
12 5
H: 0,8 m 1,35 OKFF 2,90
FF
J2
1,35
12 5
BR H: 0,8 m 1,35 OKFF 2,90 2,57 5
J1
1,35
1,2
1,35
1,35
111.24
2,90
25
= 11 m -1.4 0
1,35
3,70 2,05
2,90
1,35
25
1,35
H: 0,8 m 1,35 OKFF 2,90
1,35
H1
m 1,35 OKFF 2,90
1,35 1,35
2,90
1,35
A5`
25
1,35
125
5,21
1,35
1,35
3,70
1,35
1,35
A6` 2,575 1,35
125 1,35
2,575 1,35
A7`
125
2,575
1,35
1,35
125
2,575
1,35
125
1,35
1,35
A8`
45,86 2,575 1,35
125
2,575
1,35
1,35
125
A9`
5,215
1,35
1,35
25
1,35
1,35
2,90
2,90
2,90
2,90
2,90
2,90
2,90
2,90
BRH: 0,3 m OKFF
BRH: 0,3 m OKFF
BRH: 0,3 m OKFF
BRH: 0,3 m OKFF
BRH: 0,3 m OKFF
BRH: 0,3 m OKFF
BRH: 0,3 m OKFF
BRH: 0,3 m OKFF
BRH: 0,3 m OKFF
BRH: 0,3 m OKFF
Teeküche F= 12,17m²
Serverraum F= 12,17m²
Büro - 1 AP F= 12,17m²
Büro - 1 AP F= 12,17m²
Büro - 1 AP F= 12,17m²
Büro - 1 AP F= 12,17m²
A10` 2,05
1,35
2,90
15
1,35
2,95 1,35
A11` 8,345
25
1,35
3,20
1,35
1,35
2,90
1,35
2,90
1,35
1,35
2,90
0.03 MIETEINHEIT F= 593,80m² U= 154,06m
5 1,04
1,35 2,90
111.74
112.04
5,40
111.24
1,35
2,90
2,90
2,05
5
1,35
15
2,96
99
2,95
80
25
D
A4`
6,10
F1
4,60 5,60
6
5,40
F
1,35
80
BR H: 0,8 m 1,35 OKFF 2,90 13,4 0
1,35
2,90
0,8 BR
H:
F1
4,60 5,60
5
26,4 8
5,40
1,35
BR
80
1,35
24,60
15
2,95
m 1,35 OKFF 2,90
1,35
BR
H:
0,8
Sc ha ch F= 2,47 t m²
1,35
WC F= H 6,74 m²
2,90
80
WC F= H 5,95 m
4,60 5,60
25
H6
1,07 5 FF
19 5
m OK 0,8
1,35 4,80
BR H:
5,21 5
1,35 0,8 1,35 25
FF m OK 0,8
1,35 3, 2,05 70
-1.4 0m H: 0,8 m 1,35 OKFF 2,90
25
1,35
C
5,21
1,35
²
0.1 Du 1
F= rch U= 15,34mgan 19,3 ² g 4 0m
Sc F= hach 2,35 t m²
111.24
1,35 2,90
Au F= fzug 4,08 ssch Ka m² acht 1,10 binen mx2 innen ,10m maß
43,76
BR
WC F= D 11,5 3m
Sc F= hach 2,47 t m²
5,40
4
BR H: 0,8 m 1,35 OKFF 2,90 2,57 5 H:
4 1
2
3
WC F= D 4,16 m²
s4
6 NH
F1
4,60 5,60
3
5,40
80
OK d=28FFB cm = -1.4 OK 0m De RFB UK cke d= = -1.6 RF B = 32 cm8 m -2.0 0m
66 5 3,48
1,35
²
hau
,7 29,0 3m² 5m
Bü ro F= 12,1 1 AP 7m ²
Pu M F= i 3,12 m
FF
8
5
6
,8/2
85
1,35 4,80 2,57 5
17
,8/2 8
m OK
9
17
7
8 -1.4
0m
= 11
1,2
3,10
6 NH
N
4,60
2 F1
Stg.
17,8 /28
Stg.
0,8
12 11 10
5,40
Stg.
12
25
U=
Bü ro F= 12,1 1 AP 7m ²
acht
13 14 15 16 17 18 19 20 21 22 23 24 12
12
BR
En tra F= uc 7,80 hung m² ssch TG
²
F1
111.24
4,60 5,60 2,85 25 2,05
80
Lauf
66 5 3,48
1,35
Bü ro F= 12,1 1 AP 7m ²
m OK
25
5,40
F11
3.
3,88
E
12 5
4,60 5,60
F= TE U= 298,43 INH 96,9 m EIT 0m ² 4
80
F1
Ser F= verrau 12,1 m 7m ²
OK d= FFB 28 = cm -1.4 OK 0m De RFB UK cke d= = -1 .6 RF B = 32 cm8 m -2.0 0m
0.1 MIE 2
4,60 5,60
0
5,40
80
²
Bü ro F= 12,1 1 AP 7m ²
0.1 Tre 0 F= pp 24 en
66 5
1,35
Tee F= küch 12,1 e 7m ²
4m
ng
85
1,35
²
BR H: 0,8 m 1,35 OKFF 2,90 2,57 5
5,40
89,0 9
20,5 5
F9
WC F= H 11,5 3m
Bü ro F= 12 14 A 7,91 P m² Flu r F= 48,1
uchu
66 5 3,48
2,95
BR H: N = 11
80 80
²
Pu M F= i 3,12 m²
23,35
1,2
6 NH
Sc F= hach 2,47 t m²
66 5 3,48
1,35 2,90
4 3
0.1 Du 4
4,60 5,60
F8
Lag F= er 7,15 m²
F= rch U= 15,3 gan 19,3 4m² g 4 0m
17 ,8/2 8
5,40
Stg.
BR H:
8 7 6
m²
5
Stg. 17 ,8/2 17,8 8 /28
2
Stg.
1
12
12
85
3,48
m OK
WC F= 5,68
10 9 Lauf
FF
12 11
5
13 14 15 16 17 18 19 20 21 22 23 24
3.
66 5 3,48
3,88
Sc F= hach 2,47 t m²
1,35 2,90
aus
3m ,05m ²
3,88
1,35
2,85 4,60 5,60
25
F7
5,40
= 29
66 5 3,48
15
6 NH
N
4,60
1,2 = 11 -1.4
0m
2,05 80
25
Sc ha ch F= 2,35 t m²
85
111.24
Ver F= kaufs 70,2 rau 1m m ²
WC F= H 4,16 m
tra
3,48
OK d= FFB 28 = cm -1.4 OK 0m De RFB UK cke d= = -1 .6 RF B = 32 cm8 m -2.0 0m
Au F= fzug 4,08 ssch Ka m² acht 1,10 binen mx2 innen ,10m maß
0.1 Tre 3 F= pp e U 24,7 nh
12
En
66 5
30
25 80 3,10 5,40
F6 C
50
4,60 5,60
F5
1,3 5 9
0.1 MIE 5
F= TE U= 84,3 INH 56,4 6m² EIT 3m 5
OK d= FFB 28 = cm -1.4 OK 0m De RFB UK cke d== -1 .6 RF B = 32 cm8 m -2.0 0m
NHN
2,75
9,72 %
80
18 5
ahrt
111,26
0.17 Tran
m
0%
= 11 1,2
6 NH
N
4,60 5,60
F4
-1.4 0
Einf
Zu
F= gan U= 61,6 g Ho 36,0 4m² f 0m
5,21 5
5,40
E
m=
F= 62 sformat oren U= 43 ,20m² ,27m
hrt
5,12 5
5,40
sfa
-0.90 m = 111,76 NHN
WC H F= 11,53m²
25
G1
WC H F= 6,74m²
WC D F= 11,53m²
WC H F= 4,16m²
80
Aufzugsschacht F= 4,08m²
G2
0.07 Treppenhaus 3 OKFFB = -1.40 m d=28 cm
15,9
50 5,4,60
F= 24,73m² U= 29,06m
0
OKRFB = -1.68 m Decke d=32 cm UKRFB = -2.00 m
WC D F= 4,16m²
WC H F= 5,95m²
F= 15,34m² U= 19,30m
Schacht F= 2,47m²
Schacht F= 2,47m²
Kreativwerkstatt-AP 38 F= 546,14m² OKFFB = -0.90 m d=28 cm
Flur F= 48,15m²
-0.90 m = 111,76 NHN
2 Stg. 15/45 -0.60 m = 112,06 NHN
OKRFB = -1.18 m Decke d=32 cm UKRFB = -1.50 m
0.06 MIETEINHEIT 2
24 23 22 21 20 19 18 17 16 15 14 13
F= 308,23m² U= 94,13m
22 21 20 19 18 17 16 15 14 13 12
Büro - 16 AP F= 137,69m²
Kabineninnenmaß 1,10mx2,10m
1
3
11 Stg. 17,9/28
1 2 3 4 5 6 7 8 9 10 11 12
3. Lauf 12 Stg. 17,8/28
Kabineninnenmaß 1,10mx2,10m
Schacht F= 2,35m²
12 Stg. 17,8/28
1 2
Verkaufsraum F= 432,62m² -1.40 m = 111,26 NHN
12 Stg. 17,8/28
1 2 3 4 5 6 7 8 9 10 11
Aufzugsschacht F= 4,08m²
Schacht F= 2,35m²
0.04 Treppenhaus 2 F= 24,73m² U= 29,05m
OKFFB = -0.90 m d=28 cm OKRFB = -1.18 m Decke d=32 cm UKRFB = -1.50 m
5,50 -1.40 m = 111,26 NHN
80
5,60 4,50
80 5 58
5,50
4,60 5,60
80 10,385
5,40
4,60
80
-0.90 m = 111,76 NHN
4,60
80
4,60
5,60
80
5,10 25
5,40
3,10
2,05
25
5,40
2,85
4,60
80
5,10 25
5,40
5,40
4,60
80
4,60
5,10 20,55
5,10
5,40
5,40
80
4,60
80
4,60
80
5,10 25
2,85
25
2,05
5,40
3,10
4,60
80
4,60
4,80
4,80
5,40
5,40
25
5,40
80
4,60
80
4,80 22,33 5,40
72,755
D
G3
A1
A2
A3
A4
A5
A6
A7
A8
F
4,50
3 Stg. 16,7/30
OKRFB = -1.68 m Decke d=32 cm UKRFB = -2.00 m
5,60
5,50
OKFFB = -1.40 m d=28 cm
A
PuMi F= 3,12m²
PuMi F= 3,12m²
3. Lauf 11 Stg. 17,9/28
Schacht F= 2,47m²
F= 15,34m² U= 19,30m
F= 461,22m² U= 141,30m
11 Stg. 17,9/28
80
0.08 Durchgang 3
Umkleide F= 6,27m²
Schacht F= 2,47m²
0.09 MIETEINHEIT 3
0.05 Durchgang 2
2
4,60
-1.40 m = 111,26 NHN
Pausenraum F= 7,23m²
A9
A10
A11
A12
A1
E7
E6
E2
5,40
E1
5,40 5,40
4,95
5,40
GESAMTMASS
25
4,60 4,20
5,40
5,40
10,50 25
1,35
1,485
D9 D8 5,40
4,60 1,35
4,20
1,35 Schacht F= 1,47m²
Umkleide F= 4,03m²
1,35 1,35
80
WC F= 8,15m²
D7
Umkleide F= 5,55m² WC F= 5,76m² 112.64
1,35
112.64 ±0.00 m = 112,66 NHN
1,35
2,195
4,60
125
15
2,47
4,10
5,33 245
1,35
5,79
4,10
5,25
25
1,35
1,45
80
385 1,35
Flur F= 10,60m²
Schacht F= 2,64m ²
0.23 WC
F= 3,92 m² U= 8,30 m
OKFFB = ±0.00 m d=28 cm OKRFB = -0.28 m Decke d=32 cm UKRFB = -0.60 m
4,185
15
5,40
61
2,85
eister 0.21 Hausm
112.64
25
4,20
4,60 35
Küche F= 52,07m²
F= 18,0 1m² U= 18,2 9m
0.22 Lager
F= 16, 01m² U= 22, 61m
11,40
2,86
WÄNDE
Lager F= 19,77m²
Pausenrau m F= 13,60m²
Zugang
F= 66,1 Hof 3m² U= 36,6 7m
Kabineninn 1,10mx2,10 enmaß m Aufzugss F= 4,08m chacht ²
Schacht F= 2,35m ² 112.04
112.04
25
ACHSEN
6 NHN
5,40
6
= 112,6
ROHBAU / ÖFFNUNGEN
G
0.20 Flur
Schach F= 2,47 t m²
4,20
±0.00 m = 112,66 NHN
F= 5,43 m² U= 9,64 m
0.19 WC
F= 6,4 6m U= 10, ² 19m
±0.00 m
OKFFB d=28 cm= ±0.00 m OKRFB Decke = -0.28 m d=32 cm UKRFB = -0.60 m
17,9/28
17,9/28
8 Stg.
0.18 Trepp en
ha F= 25, 53m² us U= 28, 88m
17,9/28
10 Stg.
10 Stg.
4,60
3. Lauf
6,00
11,60
8 7 6 5 4 3 2 1
1,60
9 10 11 12 13 14 15 16 17 18
1,20
80
585
25
4,60
4,20
25
ACHSEN
E3
2,85
ROHBAU / ÖFFNUNGEN
E4 25
8,90
1,085
8,10
GESAMTMASS
E5
64,98 5
80
4,10
D6
1,35
E
J5
15
2,84
WC D F= 4,44m²
D4 D3
1,35
5,40
PuMi F= 2,03m²
4,60
WC F= 6,92m²
F= 69,24m² U= 38,05m
1,35
1,35
2,85
2,85
1,35
1,35
1,35
1,35
1,35
1,35
1,35
1,35
1,35
1,35
1,35
1,35
1,35
1,35
80
80
4,60
80
4,60
80
4,60
4,20
4,20
4,20
4,20
5,40
5,40
5,40
5,40
5,40
STB BESTAND
STB
WU-BETON
FEUERHEMMEND (F30)
MW BESTAND
MW
BETON UNBEW. / ESTRICH
FEUERBESTÄNDIG (F90)
PUTZ BEST.
PUTZ
BT-FERTIGTEIL
BRANDWAND
WERKSTEIN BEST.
WERKSTEIN
HOLZ
UHD
TROCKENBAU BEST.
TROCKENBAU
WÄRMEDÄMMUNG
ABBRUCH
D2 5,40
D1
MK4 - NEUBAU BÜROGEBÄUDE "ANNENHÖFE" FREIBERGER STRAßE/ SCHWERINER STRAßE, 01067 DRESDEN
1,585
ROHBAU / ÖFFNUNGEN
1,185
ACHSEN
28,70
BAUHERR
GESAMTMASS
TLG IMMOBILIEN AG C4
C5
C6
BUDAPESTER STRAßE 3, 01069 DRESDEN GESAMTMASS
C3
ACHSEN
C2
LAGEPLAN / GEBÄUDEÜBERSICHT
80
B4
C1
ROHBAU / ÖFFNUNGEN
5,40
4,60
OKRFB = -0.88 m Decke d=32 cm UKRFB = -1.20 m
4,80
OKFFB = -0.60 m d=28 cm
B01
5,40
4,80
4,60
8 Fahrradstellplätze
B3
80
24,50
B2
4,80
5,40
ROHBAU / ÖFFNUNGEN 58
5,40
5
WÄNDE
1,44
ACHSEN
GESAMTMASS
ACHSEN
GESAMTMASS
A14
PLANINHALT
MASSSTAB
GRUNDRISS EG
1:400
B1
5,40
4,60
4,80
1,385
1,785 1,84
4,80
A01
A02
80
4,60
A04
4,60
B02
B03
A03
ROHBAU / ÖFFNUNGEN
13
4,60
4,20
1,285
1,685 4,60
B5
915 515
T1
0
UK RD
PROJEKT
1,36
±0.00 m = 112,66 NHN
1,515
PuMi F= 3,38m²
4,20
4,60 Schacht F= 2,59m²
1,915
WC D F= 4,43m²
OK RD
UK FD
1,36
Schacht F= 1,05m²
1,35
80
2
1,35
A
4
3
89
WC D F= 13,09m²
WC F= 5,65m²
OK FFB
WANDSCHLITZ (WS)
1,35
WC H F= 12,32m²
0.01 Foyer/Durchgang 1
Stg. 15/45
D5
80 80
WC H F= 4,23m²
OKFFB = ±0.00 m d=28 cm OKRFB = -0.28 m Decke d=32 cm UKRFB = -0.60 m
WANDDURCHBRUCH (WD)
DECKENDURCHBRUCH (DD)
1,35
Lager F= 8,10m²
F= 11,01m² U= 14,91m
15 16 17 18 19 20 21 22 23 24 25 26 27 28 Kabineninnenmaß 1,10mx2,10m Aufzugsschacht F= 4,08m²
Schacht F= 3,18m²
BODENDURCHBRUCH (BD)
SCHRAFFUREN
±0.00 m = 112,66 NHN
0.02 Treppenhaus 1 14 Stg. 17,9/28
45,55
80
WC D F= 8,69m²
4,60
112.64
1,35
14 Stg. 17,9/28
5,40
1,35
Schacht F= 3,16m²
3,49
4,10 112.64
5,40
1,35
1,35
4,10
4,20
±0.00 m = 112,66 NHN
1,35
4,10
14 13 12 11 10 9 8 7 6 5 4 3 2 1 ±0.00 m = 112,66 NHN
1,35
4,20
5,10
1,35
4,10
= 112,66 m NHN
1,35
1,35
112.64
3,49
25
1,35
4,10
1,35
25 1,35
112.64
HÖHENBEZUG ± 0.00:
SYMBOLE
25
5,15
1,35
4,10
1,34
25 1,35
LEGENDE
OKFFB = ±0.00 m d=28 cm
1,10
28,70
7,28
4,20
4,60
F= 506,21m² U= 152,12m
112.64
OKRFB = -0.28 m Decke d=32 cm UKRFB = -0.60 m
6,75
5,40
1,35 1,35
0.24 MIETEINHEIT 6
F= 240,02m² U= 147,87m
1,35
14 Stg. 17,9/28
C
Arkadengang
Gastronomie F= 321,84m²
1,35
J4
4,10
J3
14 13 12 11 10 9 8 7 6 5 4 3 2 1
±0.00 m = 112,66 NHN 1,35
2
14 Stg. 17,9/28
7,85
6,75
17,14
F= 22,57m² U= 21,45m
1,35
0.25 Treppenhaus 7 15 16 17 18 19 20 21 22 23 24 25 26 27 28
4,20
25
4,60
1,35
1,35
1,35
4,10
1,35
6,10
E
GROUND FLOOR PLAN
GES
AM
TM
AS
AC
S
HS
EN
WÄN DE
E12
RO
HB
AU
/Ö
FF
NU
NG
EN
1,80
F
E11
45
G
1,80
F1
5,45
1,35
2,35
BR
4,10
H:
E10
1,35
0,34
6,65
m 1,35 2,37 BR H: 0,34 m
1,3
5,4 5
5
BR
m
1,35 2,35
0,34
H:
5
1,3 5
0,34
1,3 5 2,3 7
Bü ro - 34 F= AP 34 0,87 m²
BR
H:
m
m 0,34
BR
H:
5,40
1,3 5
0,34
m
E8
1,3
5
2,3 7
BR
H:
1,35
0,34
33,16 5
m
1,35 2,35
1,35
BR
H:
1,35 2,35
1,35
F2
E9
D
1,3 2,3 7
BR
5,45
1,35
0,3
4m
1,35
2,37 H: 0,3 4m
1,35
0,34
m
BR
1,35
5,40
2,35
BR
1,35
H: 0,3
1,35
F3
BR
H:
1,35 2,35
7,55
H:
4m
24,4 5
1,35
m
1,35 2,35
BRH: 0,34
H: BR
BRH:
1
0,34m
m 0,34
1,35 2,35
1,35 2,37
1.1 MIE 9
BR
H:
Bü ro F= 40,0 4 AP 4m ²
1,35 BR
H:
0,34
m
1,35 2,35
1,35
0,34m
F= TE U= 636, INH 144, 23m EIT 40 ² 11 m
1,35
30,8 0 5,40
F4
2,37
m 0,34
1,35
H: 0,3
4m
1,35
12 5
2,35 2,75
F
H: 0, 1,35 34m
BR
1,67 5
1,35 5,21 H:
25 m 0,34 H:
5,15 0, 1,35 34m 2,35
H:
H5
BR 1,35
25 H: 0, 1,35 34m 2,35
BR 1,35
5,21
m 1,35 2,35
0,34 H: BR
H4
12 5
m
ROHBAU / ÖFFNUNGEN
1,35 12 5
BR H: 0, 1,35 34m 2,35 2,57 5
ro -1 AP 12,1 7m ²
WÄNDE
GESAMTMASS
BR
1,35 2,35 2,57 5
0,34 H:
Flu r F= 48,1 5m
²
1,35
BR H: 0, 1,35 34m 2,35 2,57 5
BR
12 5
H:
1,35
0,34
2,35
m
1,35 1,35 m
1,35 2,35
0,34 H:
BR 1,35 2,35
0,34 H:
BR
J1
J2
GESAMTMASS WÄNDE
63,0 0
H:
1,35 2,35 2,57 5
0,34
m
12 5
1,35
7
6
-1
12,1 7m
AP
6,845
46 2,15
ROHBAU / ÖFFNUNGEN
1,35
1,35 2,35 BRH: 0,34m
10
9
8
²
25
1,35
2,35 BRH: 0,34m 46
5
F=
H3
3 4
²
1,35
ro
acht
17 ,5/2 8
AP
BR
-1
12 5
1 2
BR
2,05
Stg.
Bü
BR H: 0, 1,35 34m 2,35 2,57 5
m H:
0,34
2,35
C
m
1,35 1,35 2,85 1,35 1,35
25
AP
²
1,35
2,35 2,35
BRH: 0,34m
Büro - 1 AP F= 12,67m²
2,35
BRH: 0,34m
Büro - 1 AP F= 12,67m²
2,35
BRH: 0,34m
Büro - 1 AP F= 12,67m²
2,35
1,35
BRH: 0,34m
2,35
BRH: 0,34m
2,35
BRH: 0,34m
2,35
BRH: 0,34m
Büro - 1 AP F= 12,67m²
BRH: 0,34m
4,885
Büro - 1 AP F= 12,67m²
1,35 2,43
1,35
1,35 5,21 m
1,35
125
H2
1,35
2,575
: 0, 1,35 34m 2,35
2,575
BR H:
WC F= H 11,5 3m
²
1,35 1,35 1,35
2,575
24,60
125
25 0, 1,35 34m 2,35
²
Pu M F= i 3,1 2m
1,35
125
BR H 1,35
5,15 m BR H: 1,35
0,34 m
WC F= H 4,1 6m
1,35 2,35
1,35
0,34
BR
H:
Sc F= hach 2,47 t m²
BR H:
1,35 2,35
25
1,35
²
1,35
Büro - 1 AP F= 11,94m²
0,34 H:
= 19 ,33m ,75m
0,34
m
BR
H: BR 1,35
1.1 MF 4 F= -G1 /2 U 24
1,01 2,13
Büro - 3 AP F= 33,43m²
125
²
Au F= fzug 4,08 ssch m² acht
Bü ro - 32 F= AP 30 4,78 m²
12 5
m 0,34 H: BR 1,35
WC F= D 11,5 3m
Sc F= hach 2,47 t m²
12 5
H: 0, 1,35 34m 2,35
1,01 2,13
BR
1,01 2,13
m²
WC F= D 4,16 m²
1.1 TR 3
F= H V U= 15,11morb 19,6 ² ere ich 0m
1,35 2,35 2,57 5
20 19 18 17 16 15 14 13 12 11
1,35 m 0,34
1,35 m
Pu M F= i 3,12
17 ,5/2 8
Ka 1,10 binen mx2 innen ,10m maß
3,25
m
1,35 2,35
0,34
H: BR
Stg.
BR
H:
2,35
10
1.1 Tre 2
F= pp U= 25,9 enha 25,1 0m² us 0m 4
3,10 1,35 25
-1
m
1,35 2,35 1,35
12,1
7m
10
0,34
1,35 2,35
ro
12,1
0,34 H:
25
BR
ro
En F= trauc 7,79 hu m² ngss ch
Sc F= hach 2,35 t m²
BR
Bü F=
7m
F=
H:
2,35
1,35
C
²
Ser F= verrau 12,1 m 7m ²
F=
RF De B OK ck = +4.5 RF e d= 7 B = 28 m +4 cm OK d=15 .85 FF cm m B= ±5 .00 m
1,35
WC F= H 11,5 3m
Tee F= küch 12,1 e 7m ²
AP
Bü
UK
m
4
1,35 2,35
1,35
0,34
BR 1,35 BR
H:
0,34
2,35
m
1,35 1,35
- 14
8,18
Bü
0,34
1,35 2,35
BRH: 0,3
1,67 5 15
E
9 10
8
7
6
1,01 2,13
m
1,35 2,35 1,35
ro
31,9 0
1,35 2,35
0,34m
1,35 2,35 2,60
12 5
1,35 2,35
17 ,5/2 8
0,34
BR
20,5 5
Bü 12
0
² 1,35
125 2,575
1,35
5,21
1,35 1,35
125
1,35 12 5
A6`
125
5,21
2,575
125
2,575
125
A7` 2,575
125
2,575
A8`
46,20
125
2,575
2,70
125
A9`
5,215
A10`
25
5,15
A11` 5,215
25
125
2,575
1,35
3,41
25
1,35
A5`
5 5,58
1,35
1,35
BRH: 0,34m
1,35
1,35
1,35
1,35
2,35 BRH: 0,34m
BRH: 0,34m
1,35
1,35
BRH: 0,34m
1,35
1,35
BRH: 0,34m
1,35
1,35
1,35
1,35
2,35 BRH: 0,34m
2,35
2,35 BRH: 0,34m
2,35
1,35
1,35
1,35
BRH: 0,34m
1,35
1,35
1,35
2,35 BRH: 0,34m
BRH: 0,34m
1,35
1,35
1,35
1,35
1,35
1,35
1,35
2,35 BRH: 0,34m
2,35
2,35 BRH: 0,34m
2,35
2,35 BRH: 0,34m
2,35
2,35 BRH: 0,34m
1,35
1,35
1,15
Büro - 2 AP F= 16,79m²
BRH: 0,34m
BR H:
0,34
BRH: 0,34m
1,35
0
1,35
1,10
0, 1,35 34m 2,35
BR H:
1,35
5,15
D
A4`
1,35
1,35 2,35 BR H: 0,34 m
25
125
2,35
BR H:
1,35
0,34
m
BR H
Flu r F= 63,7 6m
1,35
2,575
BR H: 0, 1,35 34m 2,35 2,57 5
BR 1,35 34
m
Bü ro F= 35,9 4 AP 0m ²
12 5
1,35
0,34
m
Tee F= küch 12,1 e 7m ²
H1
1,35
BR H: 0, 1,35 34m 2,35
BR
1,35
1,35 2,35 H: 0,34 m
24,8 5
BRH:
1,67 5
44,15
BR
1
5
4
3
2
1,35
Stg.
m²
H:
1,35 2,35
0,34m
1,35 2,35 3,05
BR
U= 24,33m/2 19,7 ² 5m
WC F= H 4,16 m²
1.1 MIE 5 F= TE
: 0,
1,35 2,35
BRH:
1,67 5 12 5
1,35
20 19 18 17 16 15 14 13 12 11 1,01 2,13
1.1 MF 8 F= -G1
U= 15,11morb 19,6 ² ere ich 1m
Pu M F= i 3,12 m²
U= 298, INH 96,3 63m EIT 0m ² 1
m
1,35 2,35
0,34m
1,35 2,35 2,75
1,35
1.10 MF-G1/2
WC D F= 11,53m²
WC H F= 11,53m²
0,34 m
F= 24,33m² U= 19,75m
Teeküche F= 12,17m²
Serverraum F= 12,17m²
Büro - 1 AP F= 12,17m²
Büro - 1 AP F= 12,17m²
Büro - 1 AP F= 12,17m²
Büro - 1 AP F= 12,17m²
1.06 MF-G1/2
WC D F= 11,53m²
Büro - 2 AP F= 21,10m²
F= 24,33m² U= 19,75m
Büro - 1 AP F= 12,17m²
Archiv
Serverraum F= 12,17m²
F= 14,71m²
m
0,34
OKRFB = +4.85 m Decke d=28 cm UKRFB = +4.57 m
1,01 2,13
5,40
:0 ,3
4m
1,35
BR
H:
F= 234,34m²
1.04 Treppenhaus 2
OKRFB = +4.85 m Decke d=28 cm UKRFB = +4.57 m
F= 25,91m² U= 25,11m
0,3
4m
1,35
2,35
Büro - 27 AP
OKFFB = ±5.00 m d=15cm
F= 25,91m² U= 25,11m
H
Flur F= 82,15m²
Schacht F= 2,35m²
Kabineninnenmaß 1,10mx2,10m
11 12 13 14 15 16 17 18 19 20
2,13
1,01
2,13
1,01
F= 308,46m² U= 93,30m
F= 138,01m²
1.05 TRH Vorbereich
10 9 8 7 6 5 4 3 2 1
1.07 MIETEINHEIT 8 Büro - 16 AP
F= 15,11m² U= 19,60m
2,13
10 9 8 7 6 5 4 3 2 1
Aufzugsschacht F= 4,08m²
1,35
BRH: 0,34m
BRH: 0,34m
2,35
1,35
1,35
BRH: 0,34m 1,35
2,35
1,35
BRH: 0,34m
1,35
1,35
2,35
1,35
BRH: 0,34m 1,35
2,35
5,40
1,35
BRH: 0,34m 1,35
2,35
11,35
5,40
25 5,40
1,35
BRH: 0,34m
BRH: 0,34m 1,35
2,35 3,10
1,35 2,35 2,05
1,35 25
5,40
1,35
BRH: 0,34m 1,35
2,35 2,85
1,35
BRH: 0,34m 1,35
2,35
1,35
BRH: 0,34m 1,35
2,35
1,35
BRH: 0,34m 1,35
2,35
BRH: 0,34m 1,35
1,35
BRH: 0,34m 1,35
2,35
1,35
BRH: 0,34m 1,35
2,35
1,35
BRH: 0,34m 1,35
2,35
5,40
5,40
BRH: 0,34m
1,35
1,35
2,35
20,55 5,40
1,35 2,35 2,85
25
5,40
17,715
BRH: 0,34m 1,35 25
A1
A2
1,35
BRH: 0,34m 1,35
2,35 2,05
5,40
1,35 2,35 3,10
BRH: 0,34m 1,35
1,35
BRH: 0,34m 1,35
2,35
1,35
BRH: 0,34m 1,35
2,35
A4
A5
A6
BRH: 0,34m 1,35
1,35
2,35
BRH: 0,34m 1,35
1,35
2,35
BRH: 0,34m 1,35
2,35
1,35
1,3
2,35
22,35 5,40
5,40
5,40 28,955
26,20
A3
1,35
25
5,40
D
G3
1,35 2,35
25
A7
A8
F
1,35
1.08 Treppenhaus 3
WC D F= 4,16m²
10 Stg. 17,5/28
H:
5 16,0
BR
2,13
PuMi F= 3,12m²
PuMi F= 3,12m²
10 Stg. 17,5/28
BR
5 1,3 5 2,3 0 17,5
G2
F= 475,49m² U= 109,53m
1,35 2,35
11 12 13 14 15 16 17 18 19 20
1,01
OKFFB = ±5.00 m d=15cm
WC H F= 4,16m²
Schacht F= 2,47m²
Schacht F= 2,47m²
Flur F= 48,15m²
10 Stg. 17,5/28
1,01
1,35
1.11 MIETEINHEIT 9
F= 15,11m² U= 19,60m
Aufzugsschacht F= 4,08m² Kabineninnenmaß 1,10mx2,10m
2,35
1,35
BRH: 0,34m
Schacht F= 2,35m²
1.09 TRH Vorbereich
1,01
Schacht F= 2,47m²
2,13
m
1,35
2,35
BRH: 0,34
WC D F= 4,16m²
1,35
5,40
A
PuMi F= 3,12m²
Serverraum F= 10,51m²
Schacht F= 2,47m²
10 Stg. 17,5/28
1,35
BR
H:
1,35 2,35
BRH:
1,67 5 12 5
H6
1,35
²
0, 1,35 34m 2,35
1.1 TR 7 F= H V
17 ,5/2 8
H:
26,2 0 5,40
F9 5,40
0 F1 5,40
F11 5,40
2 F1 5,40
3 F1 5,40
4 F1 5,40
5 F1 5,40
6 F1
4m
F
5,70
H: 0,3
1,35
2,35 3,05
12 5
m H:
Sc F= hach 2,47 t m²
Sc ha ch F= 2,47 t m²
F=
²
G1
BR
1,67 5 12 5
Büro - 1 AP F= 12 ,74m²
4m
Büro - 1 AP F= 14 ,91m²
0,3
Büro F= 13 1 AP ,59m²
H:
1,35
2,37 3,00
12 5
2,35 2,57 5
BR
BR
Büro F= 15 1 AP ,05m²
12 5
H: 0, 1,35 34m
BR
1,67 5 12 5
0,34
WC F= D 11,5 3m
H: BR
10
m
1,35 2,35
m
1,35 2,35
2,13
H:
5,40
0,34
m
m 0,34
H: BR
1,01
BR
2,05
1,35 2,35
25 1,35 2,85
1,35 2,35
m
Stg.
0,34
m
1,35 2,35
WC F= D 4,16 m²
0,34
BR 1,35
25
F7
s5
H:
5,40
²
Sc F= hach 2,35 t m²
Au F= fzugss 4,08 ch m² acht Ka 1,10 binen mx2 innen ,10m maß
hau
,9 25,1 0m 0m
10
F8
5
2,3 7 2,8 0
2,35 2,57 5
H: BR
25 1,35 2,70 3,10
1,35 2,35
0,34
H: BR 2,70
UK RF De B = ck +4 RF e d= .57 B = 28 m +4 cm OK d=15 .85 FF cm m B= ±5 .00 m
1.1 Tre 6 F= pp 25 en
U=
1,3
61 5 0
1,35
H:
Pu M F= i 3,12 m²
OK
Büro F= 13 - 1 AP ,47m ²
BR
²
0
0,34
m
1,35 2,35
Flu r F= 86,6 7m
Tee F= küch 12,1 e 7m ²
1,35
F6 C
Büro F= 14 - 1 AP ,84m ²
Ser F= verrau 12,1 m 7m ²
1,35
F5
BR
H:
5,40
1,35 2,35
1,35
E
A9
A10
A11
A12
A1
E7
E6
2,95
1,35 2,37 BRH:
E1
5,30
1,35
1,35
0,34m
5,45
25
1,35
2,37
1,35
BRH:
0,34m
5,45
1,35
2,37 BRH:
1,35
0,34m
GESAMTMASS
1,35
2,37 BRH:
1,35
1,35
2,37
0,34m
1,35
6
1,35
5,45
ACHSEN
5,45
1,35
2,37
BRH: 0,34m
1,30 WÄNDE
2,37
2,37
1,35
BRH: 0,34m
1,35
BRH: 0,34m
70
2,37
1,35
1,35
BRH: 0,34m
1,35
2,37
1,35
BRH: 0,34m
1,35
ROHBAU / ÖFFNUNGEN 1,30
70
BRH: 0,34m
30
OKFFB d=15cm = ±5.00 m OKRFB = +4.85 Decke d=28 cm m UKRFB = +4.57 m
95 1,35
1.20 Trepp
F= 24, enhaus 06m² U= 24, 88m
17,5/28
17,5/28 10 Stg.
20 19 18 17 16 15 14 13 12 11
22,20
1,35 2,37
BRH: 0,34m
10 Stg.
1 2 3 4 5 6 7 8 9 10
E2
5,45
25
1,35
0,34m
D9
2,37 BRH:
WÄNDE
E3
25
1,35
45
1,35
0,34m
ACHSEN
E4
1,35 2,37 BRH:
ROHBAU / ÖFFNUNGEN
8,15
GESAMTMASS
E5
65,55
1,35
1,01
1,35
2,35
D8
2,35
1,35 1,35 1,35
BRH: 0,34m
2,35
5,40
1,35
D7
19,30
2,35
1,35
BRH: 0,34m
1,35 2,35
1,35
1,675
2,35
Büro - 2 AP F= 19,97m²
E
1,35
2,35
1,35 1,35
2,35
1,35
Büro - 1 AP F= 12,98m²
BRH: 0,34m
125 2,515
BRH: 0,34m
3,865
4,90
E
D6
3,00
2,35
125
5,40
1,35 2,30
1,35
125
BRH: 0,34m
BRH: 0,34m
1,35
3,45
2,35
2,35
BRH: 0,34m
25
1,35
BRH: 0,34m 1,675
BRH: 0,34m
Schacht F= 1,47m²
0,34m
1,35
1,60
BRH: 1,675
2,35
Serverraum F= 9,13m²
WC H F= 8,26m²
0,34m
1,35 5,80
1,01
2,575
1,35
1,35
125 1,35
2,875
1,35
2,35
2,35
2,35
2,35
2,35
BRH: 0,34m
BRH: 0,34m
BRH: 0,34m
BRH: 0,34m
BRH: 0,34m
WC F= 7,47m²
WC F= 4,31m²
10 9 8 7 6 5 4 3 2 1
2,35 BRH: 0,34m
1.01 Treppenhaus 1
10 Stg. 17,5/28
Büro - 1 AP F= 12,37m²
Büro - 1 AP F= 12,63m²
Büro - 1 AP F= 12,63m²
Büro - 1 AP F= 12,63m²
Teeküche F= 15,77m²
1.02 TRH Vorbereich
25
45,55
OK RD
UK FD
UK RD
STB BESTAND
STB
WU-BETON
FEUERHEMMEND (F30)
MW BESTAND
MW
BETON UNBEW. / ESTRICH
FEUERBESTÄNDIG (F90)
PUTZ BEST.
PUTZ
BT-FERTIGTEIL
BRANDWAND
WERKSTEIN BEST.
WERKSTEIN
HOLZ
UHD
TROCKENBAU BEST.
TROCKENBAU
WÄRMEDÄMMUNG
ABBRUCH
2,35
1,35
1,35
OK FFB
WANDSCHLITZ (WS)
MK4 - NEUBAU BÜROGEBÄUDE "ANNENHÖFE" D1
2,35
1,35
BRH: 0,34m
WANDDURCHBRUCH (WD)
DECKENDURCHBRUCH (DD)
PROJEKT
FREIBERGER STRAßE/ SCHWERINER STRAßE, 01067 DRESDEN
BRH: 0,34m
1,35
BRH: 0,34m 1,35
2,35
1,35
BRH: 0,34m 1,35
2,35
1,35
1,30
70
ROHBAU / ÖFFNUNGEN
27,50
70 5,40
2,81
BAUHERR
2,35
5,40
WÄNDE
1,30
ACHSEN GESAMTMASS
TLG IMMOBILIEN AG
C6
GESAMTMASS
C5
ACHSEN
C4
LAGEPLAN / GEBÄUDEÜBERSICHT
B4
C3
WÄNDE
5,40
125
2,35
BRH: 0,34m 1,35
2,35
5,40
2,35
1,35 1,35
BRH: 0,34m
1,35
24,60
1,35
2,35
BRH: 0,34m
1,35
A04
A01
19,64
2,35
1,35 BRH: 0,34m
B02
B03
5,40
A02
B2
PLANINHALT
MASSSTAB
GRUNDRISS 1.OG
1:400
5,40
2,35
B1 1,50 70
2,25
ROHBAU / ÖFFNUNGEN 70
WÄNDE
5 1,55
ACHSEN
GESAMTMASS
ACHSEN
WÄNDE
GESAMTMASS
A14
BRH: 0,34m 1,35
2,35
5,40
2,35
5,40
1,35
2,35
1,35
1,35 1,35
BRH: 0,34m 1,35
2,35
5,40
BRH: 0,34m 1,35
2,35
ROHBAU / ÖFFNUNGEN
1,35
1,35
2,35
1,35 70
BRH: 0,34m
BRH: 0,34m 1,35
2,35
B01
1,35
BRH: 0,34m
1,35
C2
1,45
BRH: 0,34m
BRH: 0,34m 1,35
2,35
BUDAPESTER STRAßE 3, 01069 DRESDEN
1,35
BRH: 0,34m
F= 575,79m² U= 136,56m
1,35
A03
1,35
1.03 MIETEINHEIT 7
BRH: 0,34m 1,35
28,70
1,35
C1
1,35
BRH: 0,34m
1,35
1,35
5,40
2,35
BRH: 0,34m
40
Teeküche F= 17,92m²
1,35 2,35
125
25
BRH: 0,34m 1,35
2,35
2,20
70
1,35
ROHBAU / ÖFFNUNGEN
1,10
B5
WC H F= 5,29m²
PuMi F= 3,57m²
B3
WC D F= 4,73m²
70
1,40
2,05
Schacht F= 2,59m²
WC H F= 6,95m²
5,40
BRH: 0,34m
F= 246,37m²
Schacht F= 1,05m²
WC D F= 8,99m²
D4
1,35
Büro - 28 AP
F= 16,91m² U= 16,58m
A
D2
F= 409,86m² U= 95,40m
2,35
2,13
1,01
2,13
1,01
Flur F= 53,10m²
BRH: 0,34m
1.27 MIETEINHEIT 13
2,13
1,35
1,01
WC F= 4,90m²
5,40
7,85
2,35 16,80
1,35
1,35
BRH: 0,34m
OKRFB = +4.85 m Decke d=28 cm UKRFB = +4.57 m
Kabineninnenmaß 1,10mx2,10m Aufzugsschacht F= 4,08m²
Schacht F= 3,18m²
Serverraum F= 20,67m²
OKFFB = ±5.00 m d=15cm
5,40
11 12 13 14 15 16 17 18 19 20
10 Stg. 17,5/28
BODENDURCHBRUCH (BD)
SCHRAFFUREN
1,35
F= 13,13m² U= 15,58m
2,35
2,13
PuMi F= 3,28m²
335 90
2,35
125
1,35
1,35
2,575
D3
1,35
BRH: 0,34m
125
= 112,66 m NHN
5,40
1,35
1,35
2,575
2,35
1,35
1,35
125
BRH: 0,34m
1,35
3,60
2,515
HÖHENBEZUG ± 0.00:
SYMBOLE
1,01
Schacht F= 3,16m²
1,10 25 1,35
LEGENDE
25
25 1,35
25
28,70 7,28 6,75
D5
1,35
OKRFB = +4.85 m Decke d=28 cm UKRFB = +4.57 m
1,35
2,13
OKFFB = ±5.00 m d=15cm
2,35
F= 9,99m² U= 12,70m
1,01
2,35
1,35
J5
BRH: 0,34m
J4
1,35
1.24 Treppenhaus 7
J3
2,35
BRH: 0,34m
1,35 1,35
F= 48,30m² U= 28,91m
BRH: 0,34m
1.26 MF-G1/2
F= 31,21m² U= 23,65m
5,40
1.25 TRH Vorbereich
C
1,35
20 19 18 17 16 15 14 13 12 11
10 Stg. 17,5/28
10 Stg. 17,5/28
7,845
6,75
1 2 3 4 5 6 7 8 9 10
17,40
0
BRH: 0,34m
255
1,35
2,13
2
13
BRH:
1,675
2,35
2,35
0,34m
1,35 25
0
BRH:
1,675
Büro - 2 AP F= 22,82m²
Teeküche F= 11,29m²
WC D F= 8,57m²
0,34m
1,35 2,35
Flur F= 51,44m²
WC H F= 4,24m²
1,35
PuMi F= 2,42m²
Schach F= 2,64 t m²
1.22 MF-G1/2 BRH:
1,67 5
5,40
BRH: 0,34m
1,01
2,13
Schach F= 2,47 t m²
F= 24,7 3m² U= 21,4 1m
F= 393,08m² U= 101,81m
WC D F= 4,10m²
WC F= 5,1 3m²
WC H F= 4,4 8m² WC H F= 13, 93m²
1.23 MIETEINHEIT 12
4m
35
BRH: 0,34m
Büro - 24 AP F= 227,52m²
6,12 5
G
1,35
Schach F= 2,35 t m²
Kabineninn 1,10mx2,10 enmaß m Aufzugs F= 4,08 schacht m²
1.21 TRH Vor
bereich F= 16,3 2m² U= 20,0 8m
2,13
1,01
2,13
FIRST FLOOR PLAN
GES
AM
TM
AS
AC
S
HS
EN
WÄN DE
E12
RO
HB
AU
/Ö
FF
NU
NG
EN
1,80
E11
F
70 70
46
1,80
F1
5,45
6,63
1,35
2,35
BR
4,10
H:
6,65
m
8,29
1,35 2,37
BR
H:
12 5 1,3
5,4
5
0,34
5
m
1,3 BR H:
0,34
m
1,35 2,35
E10
1,35
0,34
Bes F= prech 55,3 u 1m ngsr au ² m
2,3 7
5,1 5 5
5
1,3 5
0,34
5
2,3
1,35
F2
12 5
1,3
BR
H:
m
7
BR
H:
5,40
1,3
5
0,34
m 0,34
m
BR
12 5
1,35 m 0,34
H:
1,35 2,35
7,55
Bür o4 F= 34,6 AP 8m ²
H:
BR
Büro F= 34 - 4 AP ,36m ²
Büro - 4 AP F= 34 ,37m²
Bür o4 F= 36,2 AP 3m ²
Büro F= 14 - 1 AP ,84m ²
Büro F= 29 2 AP ,15m² H:
0,3
4m
1,35
1,35
H: 0,3
4m
1,35
12 5
2,35 2,75
F
H: 0, 1,35 34m
BR
1,67 5
12 5
2,35 2,57 5
BR
BR
2,37 3,00
BR
1,67 5
H: 0,3
4m
12 5
1,35
12 5
m
BRH:
1,67 5
0,34m
1,35
12 5
H6
1,35
2,35 3,05
2,35 2,75
2,35 3,05
H:
= 19 ,33m ,75m
0,34 H:
1,01 2,13
1,35
9 10
8
7
6
5
m
25
1,35
²
17 ,5/2 8
5,15 0, 1,35 34m 2,35
H: BR
1,35 25 H: 0, 1,35 34m 2,35
BR
BR
1,35 5,21
m 1,35 2,35
0,34 H: BR 1,35
H4
12 5
BR H: 0, 1,35 34m 2,35 2,57 5 1,35 m
WÄNDE
BR 1,35
5 5,27
m H:
1,35 2,35
63,0 0
2,35
46
H3
1,35 BRH: 0,34m
1,35
BR
25
1,35
2,35
3,25
1,35
5 5,27
m
2,35
1,35
1,35
1,35 125
2,35
1,35 1,35
5,13
H2
2,35
BRH: 0,34m
2,35
BRH: 0,34m
25
1,35 1,35
125
BRH: 0,34m
1,35 5,21 m 1,35 2,35
0,34 H: BR BR 1,35
F= 575,96m² U= 135,86m
5,15 m
1,35 1,35
2,35
1,35
BRH: 0,34m
2,35
5,275
25
Büro - 2 AP F= 25,95m²
BRH: 0,34m
24,60
1,35 2,35
0,34 H: BR 1,35 H: 0, 1,35 34m 2,35
BR
²
125
H1
5,21
1,35
1,35 2,35
BR H:
1,35
1,35
1,35
125
2,575
125
125
2,575
5,275
125
1,35
2,35 BRH: 0,34m
BRH: 0,34m
1,35
1,35
BRH: 0,34m
1,35
1,35
BRH: 0,34m
1,35
1,35
1,35
1,35
2,35 BRH: 0,34m
2,35
2,35 BRH: 0,34m
2,35
1,35
1,35
1,35
A10`
25
BRH: 0,34m
1,35
1,35
5,15
1,35
2,35 BRH: 0,34m
A11` 5,215
25
125
BRH: 0,34m
1,35
1,35
1,35
1,35
1,35
1,35
1,35
2,35 BRH: 0,34m
2,35
2,35 BRH: 0,34m
2,35
2,35 BRH: 0,34m
2,35
2,35 BRH: 0,34m
1,35
2,575
2,35
1,35
1,35
Büro - 2 AP F= 16,79m²
1,15
BRH: 0,34m
0,34
BRH: 0,34m
1,35
BRH: 0,34m
1,35
A9`
5,215
125
A8`
46,20
125
D
A7` 2,575
2,35
2,575
1,35
0
1,35
BRH: 0,34m
m
A6`
125
5,21
3,41 1,35
1,10
BR H
25
1,35
1,35
A5`
5 5,58
: 0, 1,35 34m 2,35
5,15
BRH: 0,34m
BR 1,35
12 5
2,35
H: 0, 1,35 34m
BR
A4`
²
25
1,35
5,275
H: 0, 1,35 34m
12 5
1,35
m 34 : 0,
Flu r F= 63,7 6m
Büro - 2 AP F= 25,95m²
2,35 2,57 5
1,35 2,35 BR H: 0,34 m
0,34
m
BR 1,35
Tee F= küch 12,1 e 7m ²
Bü ro F= 34,8 4 AP 6m ²
1,35
1,35
0,34 m
BR
WC F= H 11,5 3m
m²
2.03 MIETEINHE
Büro - 2 AP F= 25,22m²
1,35 H: 0, 1,35 34m 2,35
BR 1,35 m
1,35
WC F= H 4,16 m² Pu M F= i 3,12
BRH: 0,34m
1,35 2,35
4,885
0,34 H: BR
Büro - 3 AP F= 33,43m²
12 5
H: 0, 1,35 34m 2,35
BR
²
= 19 ,33m ,75m
0,34
1,35 2,35
1,35 BRH: 0,34m
10
WC F= D 11,5 3m
Sc F= hach 2,47 t m²
2.1 MF 4 F= -G1 /2 U 24
H:
0,34 m
31,9 0
1,35 2,35
2,15
9
8
7
1,01 2,13
,1 rb 19,6 1m² ere ich 0m
²
1,35
0
6,845
46
ROHBAU / ÖFFNUNGEN
BR
6
5
4
3 1,01 2,13
U=
H:
1,35 2,35
WÄNDE
12 5 0
H: 0, 1,35 34m 2,35
1 2
BR
25 1,35 2,05
20 19 18 17 16 15 14 13 12 11
m²
BR H:
5,40
5,40
4 5,40
J2
m
1,35 2,35
0,34
H: BR 1,35 0,34
1,35 m
Pu M F= i 3,12 WC F= D 4,16 m²
H:
0,34
acht
17 ,5/2 8
J1
GESAMTMASS
0,34
1,35 m 0,34 H:
2,35
1,35
2,85
Bü ro F= 24,9 2 AP 2m ²
ROHBAU / ÖFFNUNGEN
12 5 0
H: 0, 1,35 34m 2,35
BR
H:
1,35
GESAMTMASS
1,35 2,35 2,57 5
0,34 BR
H:
Bü ro F= 24,9 2 AP 2m ²
m
C
12 5
² Flu r F= 48,1 5m
H: BR
H5
BR
H:
1,35 H:
0,34
2,35
m
1,35 5 5,27 1,35 H: m
2,35
0,34 H:
0,34
m
1,35 2,35
1,35
5,27
BR
5
Tee F= küch 12,1 e 7m ²
Bü ro F= 34,8 4 AP 2m ²
1,35
C
²
0,34
m
1,35 2,35
WC F= H 11,5 3m
BR 1,35
2.1 MIE 5
2.1 TR 3 F= H V 15 o
BR
H:
2,35
m
3,10 1,35 25 1,35 m
1,35 2,35
0,34
H:
5,21 2,35
1,35
ro 34,5 4 AP 0m ²
1,35
0
0,34
1,35 2,35
1,35 2,35
2 4
3
Stg.
Sc ha F= ch 2,47 t m²
En F= trauc 7,79 hu m² ngss ch
Stg.
BR H
1,35 2,35
BRH:
1,67 5 15
E
44,15
BR
1
10
F= TE U= 298, INH 95,9 73m EIT 5m ² 17
Sc F= hach 2,47 t m²
Bü ro F= 34,8 4 AP 6m ²
34 m
0,34m
1,35 2,35 2,60
5,21
1,35 17 ,5/2 8
BRH:
1,67 5 12 5
BR
20 19 18 17 16 15 14 13 12 11 1,01 2,13
2.1 MF 8 F= -G1 /2 U 24
U= 15,11morb 19,6 ² ere ich 1m
Ser F= verrau 12,1 m 7m ²
Bü ro F= 35,9 4 AP 0m ²
: 0,
0,34m
1,35
12 5
0, 1,35 34m 2,35
2.1 TR 7 F= H V
²
Sc F= hach 2,35 t m²
Bü ro F= 34,8 4 AP 7m ²
1,35
5,40
BRH:
1,67 5
1,35 2,35
H:
²
Büro - 1 AP F= 12 ,74m²
H: 0, 1,35 34m
BR
2,35 2,57 5
1,67 5 12 5
Büro - 2 AP F= 29 ,13m²
12 5
61 5 0
m 0
1,35
0,34
0,34
WC F= D 11,5 3m
Sc F= hach 2,47 t m²
WC F= H 4,16 m
17 ,5/2 8
Ka 1,10 binen mx2 innen ,10m maß
BR H
1,35 2,35
1
Büro F= 34 4 AP ,37m²
12 5
1,35 m
1,35 2,35
0,34
H:
2,13
BR
m 0,34
H: BR
²
1,01
Pu M F= i 3,12 m²
Au F= fzug 4,08 ssch m² acht
BR
5
5,40
3 F1
Stg.
UK RF De B =
Bü
F1 5,40
5 F1 5,40
1,35
0,34m
BR 1,35 BR
H:
0,34
m
1,35 2,35 12 5
1,35
1,35 0,34
H: BR 1,35 2,70 2,05
1,35 2,35
25 1,35 2,85
BR 1,35 BR
4,81 5
1,35 m
1,35 2,35
1,3 5
2,3 7 2,8 0
m
1,35 2,35
3,10
2,70
1,35
25
BR
H:
0,34
m
1,35 2,35
H:
WC F= D 4,16 m
H:
0,34
m
1,35 2,35
Stg.
1,35
0,34m
2,37
BR
²
0,34
m
s5
H:
1,35 2,35
²
5,30
1,35 2,37
m
1,35 2,35
0,34
H:
Ser F= verrau 15,9 m 8m ²
Flu r F= 86,6 7m
Sc F= hach 2,35 t m²
1,35 m
1,35 2,35
0,34
BR
H:
25
5,40
F11 5,40
2 F1
10
2.1 Tre 2
F= pp U= 25,9 enha 25,1 0m² us 0m 4
1,35
12 5 0
1,35
H: m 0,34
Büro - 4 AP F= 34,90m²
F= 475,67m² U= 108,83m
OKFFB = +8.50 m d=15 cm
Büro - 4 AP F= 34,49m²
OKRFB = +8.35 m Decke d=30 cm UKRFB = +8.07 m
1,35
5 16,0
2.08 Treppenhaus 3 F= 25,91m² U= 25,11m
2.06 MF-G1/2
Büro - 2 AP F= 24,92m²
Büro - 4 AP F= 31,76m²
Büro - 4 AP F= 34,82m²
Büro - 4 AP F= 34,82m²
10 9 8 7 6 5 4 3 2 1
Büro - 4 AP F= 31,76m²
11 12 13 14 15 16 17 18 19 20
1,01 2,13
Archiv F= 14,71m²
Aufzugsschacht F= 4,08m²
Flur F= 82,11m²
Schacht F= 2,35m²
OKFFB = +8.50 m d=15 cm
2.04 Treppenhaus 2
Büro - 4 AP F= 34,50m²
OKRFB = +8.35 m Decke d=30 cm UKRFB = +8.07 m
Büro - 4 AP F= 34,86m²
Büro - 2 AP F= 20,58m²
F= 25,91m² U= 25,11m
H
5,40
1,35
Serverraum F= 12,17m²
2,13
1,01
2.05 TRH Vorbereich
1,01
2,13
F= 308,57m² U= 92,90m
Büro - 1 AP F= 12,17m²
Schacht F= 2,47m²
2,13
WC D F= 4,16m²
2.07 MIETEINHEIT 15
10 9 8 7 6 5 4 3 2 1
Büro - 2 AP F= 21,10m²
F= 24,33m² U= 19,75m
PuMi F= 3,12m²
PuMi F= 3,12m²
Schacht F= 2,47m²
Kabineninnenmaß 1,10mx2,10m
2,13
Büro - 2 AP F= 24,93m²
F= 15,11m² U= 19,60m
11 12 13 14 15 16 17 18 19 20
1,01
Serverraum F= 12,17m²
Flur F= 48,15m²
10 Stg. 17,5/28
BR
5 1,3 5 2,3 0 17,5
:0 ,3
4m
2,35
BR
H:
0,3
4m
1,35
2,35
1,35
BRH: 0,34m
BRH: 0,34m 1,35
2,35 1,35 5912
5
5,40
1,35
BRH: 0,34m 1,35
2,35 5,27
5
1,35 2,35
BRH: 0,34m 1,35 5 12
5,40
1,35
BRH: 0,34m 1,35
2,35 5,21
5
1,35
BRH: 0,34m 1,35
2,35 25
5,40
1,35
BRH: 0,34m
BRH: 0,34m 1,35
2,35 3,10
1,35 2,35 2,05
1,35 25
5,40
1,35
BRH: 0,34m 1,35
2,35 2,85
1,35 2,35 25
BRH: 0,34m 1,35 5 4,81
5,40
1,35 2,35
BRH: 0,34m 1,35 5 12
1,35
BRH: 0,34m 1,35
2,35 5,27
5
5,40
2,35
BRH: 0,34m 1,35 5 12
1,35 2,35
BRH: 0,34m 1,35 5 5,27
5,40
17,715
G3
1,35
1,35
BRH: 0,34m 1,35
2,35 12
5
1,35
BRH: 0,34m 1,35
2,35
BRH: 0,34m
1,35
1,35
2,35 4,81
5,40
1,35 2,35 2,85
25
BRH: 0,34m 1,35 25
A1
A2
1,35
BRH: 0,34m 1,35
2,35 2,05
5,40
1,35 2,35 3,10
BRH: 0,34m 1,35
1,35 2,35
25
5,40
BRH: 0,34m 1,35 5 5,21
BRH: 0,34m
1,35
1,35
2,35 12
5
5,40
A4
A5
A6
BRH: 0,34m 1,35
2,35 5,27
1,35
BRH: 0,34m 1,35
1,35
5
2,35 5 3,11
2,35
5
12
5,40
BRH: 0,34m 1,35
1,35 5 120
1,3
2,35
5,40 28,955
26,20
A3
1,35
A7
A8
F
1,35
D
G2
2.11 MIETEINHEIT 16
WC H F= 4,16m²
10 Stg. 17,5/28
1,01
1,35
Kabineninnenmaß 1,10mx2,10m
2,35
1,35
BRH: 0,34m
Aufzugsschacht F= 4,08m²
2.09 TRH Vorbereich
2,13
1,01
WC D F= 4,16m²
Schacht F= 2,35m²
BR
Teeküche F= 12,17m² Schacht F= 2,47m²
10 Stg. 17,5/28
BR
1,35 m
1,35
BRH: 0,34
2,35
PuMi F= 3,12m²
Serverraum F= 10,51m²
Besprechungsraum F= 54,24m²
WC D F= 11,53m²
F= 24,33m² U= 19,75m
F= 15,11m² U= 19,60m
m 0,34
2.10 MF-G1/2
Schacht F= 2,47m²
1,35
5,40
A
WC H F= 11,53m²
10 Stg. 17,5/28
WC D F= 11,53m²
Bü ro F= 31,9 4 AP 8m ²
H:
1,35 2,35
G1
1,35
5,70
BR H:
3,30
1,35 2,35
5,40
2,35
BRH:
F
6
12 5
1,35
1,35 m 0,34
1,35 2,35
H:
2.1 MIE 9 T
Pu M F= i 3,12 m²
Bü ro F= 34,8 4 AP 2m ²
1,01 2,13
F1
1,35
BRH:
F= E U= 636, INH 143, 41m EIT 70 ² 18 m
Au F= fzugss 4,08 ch m² acht Ka 1,10 binen mx2 innen ,10m maß
hau
,9 25,1 0m 0m
Bü ro F= 31,7 4 AP 6m ²
0,34
1,35
2,37 H: 0,3 4m
4m
Tee F= küch 12,1 e 7m ²
Bü ro F= 22,2 2 AP 6m ²
10
OK cke +8.0 RF B = d=30 7 m +8 cm OK d=15 .35 FF cm m B= +8 .50 m
F=
5,30
H: 0,3
Bü ro F= 34,5 4 AP 0m ²
0,34
2,35
4m
BR
BR
5,21 5
5,40
F5 F6 5,40 25
F7 5,40 12 5
F8 26,2 0 5,40 12 5 1,35
F9 5,40 12 5 1,35
5,45
1,35
0,3
BR
Bü ro F= 34,9 4 AP 1m ²
Bü ro F= 34,8 4 AP 6m ²
UK RF De B = ck +8 RF e d= .07 B = 30 m d= +8 cm OK 15 .35 FF cm m B= +8 .50 m
2.1 Tre 6 F= pp 25 en
10
4,81
12 5
1,35
2,35
BR
OK
U=
0
1,35
0,34
BR
5,27 5
F3 30,8 0 5,40
5,27 5
F4 E
F1
5
7
H:
E8
5,30
1,3 2,3 BR
H:
1,35 2,35
m
C
E9
D
G
A9
A10
A11
A12
A1
E7
E6
1,35
5,45
25
1,35 1,35
0,34m BRH:
5,24
1,35
2,37
us 6
5,425
2,37
1,35
BRH: 0,34m
1,30 WÄNDE
125
2,37
1,35
5,85
70
2,37
1,35
1,35
BRH: 0,34m
1,35
2,37
1,35
1,35
BRH: 0,34m
ROHBAU / ÖFFNUNGEN 1,30
70
30
BRH: 0,34m
95 1,35 2,35
1,35 1,35
8,145
D7
BRH: 0,34m
2,35 125
1,35
5,40
2,97
1,35
BRH: 0,34m
2,35
125
1,35 1,35
1,675
2,35
Büro - 2 AP F= 13,00m²
Büro - 2 AP F= 15,48m²
5,40
E
D6
1,35 1,35
2,35
BRH: 0,34m
2,35
BRH: 0,34m
3,865 1,35 125
1,35 1,35
2,515
Büro - 4 AP F= 32,50m²
2,35
Büro - 2 AP F= 20,00m²
4,90
E
125
3,00
2,35
125
5,275
1,35 2,30
1,35
125
0
BRH: 0,34m
1,35
3,45
BRH: 0,34m
BRH: 0,34m 1,675
2,35
1,35
0,34m
1,35
25
1,60
1,675
2,35 2,515
PuMi F= 2,42m² BRH:
1,35
Büro - 2 AP F= 18,29m² Flur F= 51,43m²
BRH: 0,34m
Serverraum F= 9,17m² WC H F= 8,26m²
2,35
Schacht F= 1,47m²
Büro - 2 AP F= 22,82m²
Teeküche F= 11,29m²
WC H F= 4,24m²
0,34m
2,35
Besprechungsraum F= 49,78m²
1,35
1,35
D8
BRH: 0,34m
5,40
BRH: 0,34m
G
2,35
Büro - 4 AP F= 34,37m²
Büro - 4 AP F= 34,01m² 2,13
1,01
Schach F= 2,35 t m²
WC D F= 8,57m² BRH:
1,675
2,35
5,80
1,01
2,35
2,35
BRH: 0,34m
BRH: 0,34m
Büro - 4 AP F= 32,18m²
WC F= 4,31m²
10 Stg. 17,5/28
2.01 Treppenhaus 1
1,35
Serverraum F= 20,69m² Büro - 2 AP F= 17,52m²
OKRFB = +8.35 m Decke d=30 cm UKRFB = +8.07 m
25
5,40
D5
45,55 7,85
2,35
D4
2,35
1,35 2,35
1,35
BRH: 0,34m
D1 1,40
5,215
125
BRH: 0,34m 1,35 125
5,40
1,35 2,35
BRH: 0,34m 1,35
1,35 2,35
5,275
BRH: 0,34m 1,35 125
5,40
1,35
BRH: 0,34m 1,35
2,35
2,35 5,04
BRH: 0,34m
1,35
1,35 125
5,40
1,35 2,35
6,175
1,35
1,30
70
ROHBAU / ÖFFNUNGEN
70
WÄNDE
2,35
5,40
1,30
C6
UHD
TROCKENBAU BEST.
TROCKENBAU
WÄRMEDÄMMUNG
ABBRUCH
MK4 - NEUBAU BÜROGEBÄUDE "ANNENHÖFE" BAUHERR
TLG IMMOBILIEN AG BUDAPESTER STRAßE 3, 01069 DRESDEN
GESAMTMASS
C5
HOLZ
LAGEPLAN / GEBÄUDEÜBERSICHT
B4
C4
WERKSTEIN
ACHSEN GESAMTMASS
ACHSEN
2,81
C3
BRANDWAND
WERKSTEIN BEST.
BRH: 0,34m 1,35
5,40
125
2,35
125
1,35 1,35 1,35
2,35
BT-FERTIGTEIL
5,40
5,275 2,35
1,35
24,60
125 4,79
5,40
B2
125 6,625
PLANINHALT
MASSSTAB
GRUNDRISS 2.OG
1:400
B1
1,35
A01
2,35
BRH: 0,34m
1,35 1,35
2,35
BRH: 0,34m
1,35
A04
A02
2,35
1,35
B02
B03
5,40
1,35
BRH: 0,34m
5,275
1,35
C2
BRH: 0,34m
BRH: 0,34m 1,35
1,35
2,25
ROHBAU / ÖFFNUNGEN
2,35
5 8,35
70
WÄNDE
5 1,55
5,40
ACHSEN
GESAMTMASS
A14
ACHSEN
GESAMTMASS
WÄNDE
2,35
ROHBAU / ÖFFNUNGEN
1,35
70
70
1,50
1,45
BRH: 0,34m
Besprechungsraum F= 55,23m²
BRH: 0,34m 1,35
FEUERBESTÄNDIG (F90)
PUTZ
A03
1,35
Büro - 4 AP F= 30,75m²
2,35
MW
PUTZ BEST.
B01
1,35
Büro - 4 AP F= 33,85m²
125
1,35
28,70
2,35 2,575
BRH: 0,34m BRH: 0,34m
1,35
1,35
C1
BRH: 0,34m
Büro - 2 AP F= 16,52m²
BRH: 0,34m 1,35
MW BESTAND
2,35
1,35
5,40
2,35
FEUERHEMMEND (F30)
BETON UNBEW. / ESTRICH
2,35
BRH: 0,34m
40
Teeküche F= 17,95m²
1,35
WÄNDE
25
BRH: 0,34m 1,35
2,35
2,20
725
1,35
WU-BETON
FREIBERGER STRAßE/ SCHWERINER STRAßE, 01067 DRESDEN
70 BRH: 0,34m 1,10
STB
PROJEKT
ROHBAU / ÖFFNUNGEN
PuMi F= 3,57m²
B5
WC H F= 5,29m²
UK RD
B3
WC D F= 4,73m²
OK RD
UK FD
2,35
Büro - 4 AP F= 32,88m²
1,35
Büro - 4 AP F= 34,43m²
Büro - 4 AP F= 34,43m²
BRH: 0,34m
Büro - 4 AP F= 34,02m²
WC H F= 6,95m²
2,05
WC D F= 8,99m²
OK FFB
WANDSCHLITZ (WS)
8,45 1,35
Schacht F= 1,05m²
Schacht F= 2,59m²
WANDDURCHBRUCH (WD)
DECKENDURCHBRUCH (DD)
5,40
F= 16,91m² U= 16,58m WC F= 4,90m²
A
D2
Besprechungsraum F= 52,19m²
2,35
Flur F= 53,10m²
F= 409,97m² U= 94,95m
2.02 TRH Vorbereich
1,35
2,13
1,01
2,13
1,01
BRH: 0,34m
2.27 MIETEINHEIT 20
2,13
BODENDURCHBRUCH (BD)
STB BESTAND
125
1,01
= 112,66 m NHN
SCHRAFFUREN
1,35
Aufzugsschacht F= 4,08m²
1,35
Büro - 2 AP F= 25,90m²
BRH: 0,34m
11 12 13 14 15 16 17 18 19 20
Büro - 2 AP F= 25,62m²
OKFFB = +8.50 m d=15 cm
Kabineninnenmaß 1,10mx2,10m Schacht F= 3,18m²
Teeküche F= 15,78m²
F= 13,13m² U= 15,58m
10 Stg. 17,5/28
1,35
BRH: 0,34m
2,13
WC F= 7,47m²
D3
2,35 BRH: 0,34m
5,40
2,35 BRH: 0,34m
1,35
2,35 BRH: 0,34m
10 9 8 7 6 5 4 3 2 1
2,35 BRH: 0,34m
PuMi F= 3,28m²
335 90
5,215
2,875
1,35
2,35
1,35
1,35
125 1,35
BRH: 0,34m
1,35
125
5,275 1,35
2,35
1,35
2,86
125 1,35
HÖHENBEZUG ± 0.00:
SYMBOLE
5,40
1,35
25
25 1,35
LEGENDE
1,01
Schacht F= 3,16m²
1,10 1,35
3,60
5,215
25 1,35
25
28,70 7,28 6,75
2,35
1,35 BRH: 0,34m
OKRFB = +8.35 m Decke d=30 cm UKRFB = +8.07 m
1,35
2,13
OKFFB = +8.50 m d=15 cm
2,35
F= 9,99m² U= 12,70m
1,01
2,35
J5
BRH: 0,34m
J4
1,35
J3
1,35
2.24 Treppenhaus 7
1,35
BRH: 0,34m
F= 48,34m² U= 28,90m
F= 31,21m² U= 23,65m
5,40
2.26 MF-G1/2
2.25 TRH Vorbereich
C
1,35
10 Stg. 17,5/28
20 19 18 17 16 15 14 13 12 11
10 Stg. 17,5/28
1 2 3 4 5 6 7 8 9 10
7,85
6,75
17,40
0
1,35
BRH: 0,34m
25
1,35
2,13
EIT 14
13
1,35
F= 393,19m² U= 101,32m
WC D F= 4,10m²
Schach F= 2,64 t m²
2.22 MF-G1/2
F= 24,7 3m² U= 21,4 1m
0,34m
1,35 25
1,35 2,37
OKFFB d=15 cm= +8.50 m OKRFB = +8.35 Decke d=30 cm m UKRFB = +8.07 m
2.20 Treppe nha
Kabineninn 1,10mx2,10 enmaß m Aufzugs F= 4,08 schacht m²
2.21 TRH Vor
bereich F= 16,3 2m² U= 20,0 8m
1,01
2,13
Schach F= 2,47 t m²
WC H F= 13, 93m²
BRH:
1,675
ACHSEN
5,45
1,35
2.23 MIETEINHEIT 19
0,34m
1,35
5,45
125
1,35 2,37
1,01
2
35
1,35
BRH: 0,34m
4m
2,35
GESAMTMASS 5,30
1,35 2,37
0,34m
BRH: 0,34m
F= 24,0 6m² U= 24,8 8m
17,5/28
10 Stg.
10 Stg.
17,5/28
Büro - 4 AP F= 32 ,02m²
WC F= 5,1 3m²
1,35
2,37
BRH: 0,34m
20 19 18 17 16 15 14 13 12 11
2,13
WC H F= 4,4 8m²
125
1,35
0,34m
BRH:
BRH:
5,45
D9
2,37
46
0,34m
BRH:
1,67 5
E1
5,30
1,35
Büro - 4 AP F= 35,11m²
BRH:
1 2 3 4 5 6 7 8 9 10
E2
5,45
25
1,35 2,37
1,35
1,35
0,34m
WÄNDE
2,95
2,37 BRH:
6,12 5
E3
25
1,35
BRH: 0,34m
1,35
0,34m
ACHSEN
E4
1,35 2,37 BRH:
ROHBAU / ÖFFNUNGEN
8,15
4,85
GESAMTMASS
E5
65,55
12 5
1,35
TYPICAL FLOOR PLAN
E12
F
1,69
E11
5,40 5
F At tika
3,41
F1
G
+23. 00
OK
E10 5,4 5 0
F2
5,40
D
E9
5,40 5
E8 5,40 5
F4
5,40
30,6 95
F3
5,40
5,40 5
LT05
- Bür
o/G
ewer
be
E 7.50
0 kg
F
F6
5,40
F5
+23. 00
5,40
OK
F At
tika
ca.
H6
C
5,40
+22. +22. 60 40 OKF OK Sc RD hach
tko
pf
F7
44,61 5
E
H5
F8
5,40
43,94
C
TG
J2
sve
tore
n
ROHBAU / ÖFFNUNGEN
500
kg
ca.
n tore
500 ca.
ntila
J1
ung
ntila
0k
g
sve
63,0 25
55 64,2
tra
ca.
uch
5.5 0
ung
tra En
GESAMTMASS 7,095
WÄNDE
6,63
46
ROHBAU / ÖFFNUNGEN
5
46
46
+23.00 OKF Attika
/N
ebe
nrä
H3
um
e
LT1
2-
ng
En
uchu
WÄNDE
kg
ca.
n tore ntila
sve ung uch tra
uch
En tra
LT1
2-
LT1
2-
5,40
F11
En
GESAMTMASS
500
kg
F1
0
LT0
5,40
4-
Bü
ro
/G
H4
ew
erb
e
F9
26,7 15
5,40
88,6 55
ca.
7.5 0
0k
g
C
5,40
F1
2
LT0
9-
5,40
WC
+25.31 OKF Attika
F1
3
+22. +22. 60 40 OKF OK Sc RD hach
tko
5,40
24,14
F1
6
F
LT0 3
-B üro
/G
ew
erb
e
F1
5
H1
5,40
ca.
7.5 0
0k
g
24,60
24,60
g 0k
5.5 0
Kü LT1 5-
31,2 45
ca .
che
nan
lag
F1
e
4
5,40
H2
pf
A5`
A6`
A7`
A8`
A9`
D
A4`
A10`
A11`
47,025
46
5,39
tika
G1
+23.00 OKF Attika
46
+23.00 OKF Attika
ca.
5
5.0 0
0k
g
46,21
+23.
00
OK F At
6.1 Dachfläche F= 3726,24m² U= 590,13m
ca. 5.500 kg
KT00 - Puffer
ca. 2.000 kg ca. 2.000 kg KT00 - Verteiler
erk 1 ühlw ück k -R
KT00 - Puffer
LT02 - Büro / Gewerbe
+22.60 OKF Schachtkopf +22.40 OKRD
ca. 7.500 kg
LT01 - Büro / Gewerbe
+22.60 OKF Schachtkopf +22.40 OKRD
ca. 7.500 kg
1.25 2.25
KT
00
ca. 2.500 kg KT00 - Kältemaschine
ca. 2.500 kg KT00 - Kältemaschine
LT08 - WC / Nebenräume
A
17,715 5 1,11
5,40
26,20
5,40
5,40
5,40
5,40
28,84
5,40
5,40
5,40
5,40
5,40
5,40
5,40
72,755
0
A1
A2
A3
A4
A5
A6
A7
A8
F
G3
D
1 16,2
1 16,2
1 16,2
G2
KT00 - Kältezentrale 1
A9
A10
A11
A12
A1
E7
E6 65,25 5
WÄNDE
E1
ACHSEN
E2
5,405
5,405
GESAMTMASS ACHSEN
5,405
5,41
1,185
WÄNDE ROHBAU / ÖFFNUNGEN
D9
Kältezent
rale 1
D7
ca. 5.500 kg
5,40
12,65
KT00 -
46 96
rale 2
D8
KT00 -
Kältezent
1.25 2.25
KT00 -
G
5,40
Verteile KT00 -
+22.60 OKF Scha +22.40 chtkopf OKRD
ca. 5.000 kg
kg ca. 2.000 kg
+23.00 OKF Attika
Kältem ca. 2.500 aschine kg
Puffer
r
ca. 2.000
KT00 -
Kältem ca. 2.500 aschine kg
Puffer
KT00 -
KT00 -
E
5,40
C
J4
J5
5,40
LEGENDE D4
J3
LT06 - Büro / Gewerbe
45,495
D5
18,25
17,38
17,38
17,38
ca. 7.500 kg
D6
E
5,40
LT13 - Küchenanlage
KT00 - Rückkühlwerk 2
+23.00 OKF Attika
2
HÖHENBEZUG ± 0.00:
13,405 13,405
46
1,35
ca. 5.500 kg
+23.00 OKF Attika
15Stg. 0,20 / 0,28
OK FFB
OK RD
WANDSCHLITZ (WS)
UK FD
UK RD
1,01 2,13
ca. 7.500 kg
A
WU-BETON
FEUERHEMMEND (F30)
MW BESTAND
MW
BETON UNBEW. / ESTRICH
FEUERBESTÄNDIG (F90)
PUTZ BEST.
PUTZ
BT-FERTIGTEIL
BRANDWAND
WERKSTEIN BEST.
WERKSTEIN
HOLZ
UHD
TROCKENBAU BEST.
TROCKENBAU
WÄRMEDÄMMUNG
ABBRUCH
5,40
D2
13,55
LT07 - Büro / Gewerbe
STB
STB BESTAND
5,40
LT10 - WC / Nebenräume
OKRFB = +22.35 m Decke d=28 cm OKRFB = +22.17 m
PROJEKT
D1
ca. 5.500 kg
MK4 - NEUBAU BÜROGEBÄUDE "ANNENHÖFE" FREIBERGER STRAßE/ SCHWERINER STRAßE, 01067 DRESDEN
79
ca. 5.500 kg
585
+23.00 OKF Attika
585
+23.00 OKF Attika
66
675
LT11 - WC / Nebenräume
515
5,40
B5
ROHBAU / ÖFFNUNGEN 28,70 5,40
WÄNDE
5,40
5,40
1,185
5,40
28,70
0
GESAMTMASS
C6
BUDAPESTER STRAßE 3, 01069 DRESDEN GESAMTMASS
C5
ACHSEN
C4
WÄNDE
C3
LAGEPLAN / GEBÄUDEÜBERSICHT
B4
C2
ROHBAU / ÖFFNUNGEN
6,075
C1
BAUHERR
ACHSEN
TLG IMMOBILIEN AG
10,465
LT14 - Küchenanlage
5,40
B01
B3
24,45
B02
B03
A03
A01
5,40
A04
B2
13,40
A02
PLANINHALT
MASSSTAB
DACHAUFSICHT
1:400
B1
5,40 80 585
585
+23.00 OKF Attika
ROHBAU / ÖFFNUNGEN WÄNDE 5,40
1,44
ACHSEN
GESAMTMASS
A14
ACHSEN
GESAMTMASS
WÄNDE
Schacht F= 3,18m²
Kabineninnenmaß 1,10mx2,10m Aufzugsschacht F= 4,08m²
OKFFB = +22.50 m d=15 cm 4,33
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
WANDDURCHBRUCH (WD)
DECKENDURCHBRUCH (DD) SCHRAFFUREN
D3
+25.31 OKF Attika
BODENDURCHBRUCH (BD) 46 5,40
7,28
= 112,66 m NHN
SYMBOLE
28,70 8,20
ROHBAU / ÖFFNUNGEN
13
E3
5,405
GESAMTMASS
E4
64,13 5
ROHBAU / ÖFFNUNGEN
E5
8,11
ROOF PLAN
A1
A3
A2
A4
A5
A6
A7
A8
A9
A10
A11
50 3,03
2,71
32 47
50 32 47 2,71
3,35
32 47 3,50 2,71
3,65
3,50 2,71
32 47 2,71
3,50
3,50
32 47
32 47 3,50 2,71
47 53 2,50
2,50
3,35
3,50
47 53 3,50 2,50
32 47 2,71
3,50
32 47 2,71
3,50
32 47
+5,00
Abhangdecke 53 cm (wie im Grundriss 2.O
+8,50
3,50
1.OBERGESCHOSS
+12,00
2,71
+8,50
Abhangdecke max. 32 cm in Bereiche mit Fenster
47
±0,00
-0,90 60
-1,40
E4
E5
E6
E7
E8
E9
4,40
E11
E12
3.OBERGESCHOSS
+12,00
2.OBERGESCHOSS
+8,50
1.OBERGESCHOSS
+5,00
30
34 30
3,55
3,20
2,71
30
34 30
+19,00
30
34 30
3,50
3,20
2,71
30
34 30
3,50
3,20
2,71
15
+15,50
3,20
3,55
4.OBERGESCHOSS
2,71
20
+23,00
15
+19,00
3,80 35
3,60
E10
+23,00
5.OBERGESCHOSS
3,25
35 3,60
3,25
3,60
E3
-8,60
20
-8,60
-5,00
3,25
UNTERGESCHOSS -2
3,50
3,60 -5,00
35
UNTERGESCHOSS -1
3,00
NORD SCHWERINER STRAßE
4,10
60
60
- 1,40 = 111,26 NHN
E2
5,60
±0,00
ERDGESCHOSS
E1
5,13
5,90 4,73
5,93
6,40
70
47
+5,00 47
2.OBERGESCHOSS
32 47
+12,00
2,71
3.OBERGESCHOSS
+15,50
2,71
+15,50
47
4.OBERGESCHOSS
+19,00
53
+19,00 32 47
5.OBERGESCHOSS
2,71
3,03
32 47
50
+23,00
15 30
34 30
3,50
3,20
2,71
30
34 30
3,50
3,20
2,71
15
+15,50
15 30
34 30
3,50
3,20
2,71
30
34 30
3,50
3,20
2,71
15
+12,00
15 30
34 30
3,50
3,20
2,71
30
34 30
3,50
3,20
2,71
15
+8,50
30
15 30
4.OBERGESCHOSS
3.OBERGESCHOSS
2.OBERGESCHOSS
1.OBERGESCHOSS
6,40
18 5,95
30
5,77
30 6,40
18 5,95
5,77
15
+5,00
5.OBERGESCHOSS
ERDGESCHOSS ± 0,00 = 112,66 NHN SÜD FREIBERGER STRAßE
ERDGESCHOSS
-1,40 32
32
- 1,40 = 111,26 NHN
-8,60
3,60
3,28
UNTERGESCHOSS -1
3,60
3,28
3,60
32
UNTERGESCHOSS -2
-5,00
3,28
-5,00 32
UNTERGESCHOSS -1
3,28
3,60
NORD SCHWERINER STRAßE
-8,60
UNTERGESCHOSS -2
A12
A13
A14
C1
C2
C3
C4
C5
C6 LEGENDE
HÖHENBEZUG ± 0.00:
= 112,66 m NHN
SYMBOLE
32 47
50
+23,00
BODENDURCHBRUCH (BD)
WANDDURCHBRUCH (WD)
OK FFB
DECKENDURCHBRUCH (DD)
WANDSCHLITZ (WS)
UK FD
UK RD
STB
WU-BETON
FEUERHEMMEND (F30)
MW BESTAND
MW
BETON UNBEW. / ESTRICH
FEUERBESTÄNDIG (F90)
PUTZ BEST.
PUTZ
BT-FERTIGTEIL
BRANDWAND
WERKSTEIN BEST.
WERKSTEIN
HOLZ
UHD
TROCKENBAU BEST.
TROCKENBAU
WÄRMEDÄMMUNG
2,86
STB BESTAND 3,07
OK RD
SCHRAFFUREN
+19,00
5.OBERGESCHOSS
ABBRUCH
2,71
3,50
30 49
+19,00
PROJEKT +15,50
4.OBERGESCHOSS
30 34
+15,50
.
MK4 - NEUBAU BÜROGEBÄUDE "ANNENHÖFE" FREIBERGER STRAßE/ SCHWERINER STRAßE, 01067 DRESDEN
3,50
BAUHERR 2,71
TLG IMMOBILIEN AG
+12,00
+12,00
3.OBERGESCHOSS
BUDAPESTER STRAßE 3, 01069 DRESDEN
30 15
LAGEPLAN / GEBÄUDEÜBERSICHT
MAL
ERG
Abhangdecke max. 32 cm in Bereiche mit Fenster
FREIBERGER STRASSE
RA SS E ST ER
SSE
B02
TRA
2.OBERGESCHOSS
NS
SC
30 15
HW ER
+8,50
B03
NE AN
+8,50
A03
IN
3,50
ÄSS CHE N
B01 3,05
m nur im beidseitig begrenzten Flurbereich möglich OG)
A
A04
A01
A
E
ASS
-STR
3,05
3,50
A02
NER
-LIND
THA
HER
HERTHA-LINDNER-STRASSE
+5,00
1.OBERGESCHOSS
PLANINHALT
MASSSTAB
SCHNITT AA
1:100
45
+5,00
5,00
4,55
:Planverfasser
ERDGESCHOSS ±0,00
±0,00
± 0,00 = 112,66 NHN
SECTION AA
60
-0,60
5,00
4,40
SÜD FREIBERGER STRAßE
-5,00
UNTERGESCHOSS -1
-8,60
UNTERGESCHOSS -2
3,60 -8,60
J5
LEGENDE
HÖHENBEZUG ± 0.00:
= 112,66 m NHN
SYMBOLE BODENDURCHBRUCH (BD)
WANDDURCHBRUCH (WD)
OK FFB
DECKENDURCHBRUCH (DD)
WANDSCHLITZ (WS)
UK FD
OK RD UK RD
SCHRAFFUREN STB
WU-BETON
FEUERHEMMEND (F30)
MW BESTAND
MW
BETON UNBEW. / ESTRICH
FEUERBESTÄNDIG (F90)
PUTZ BEST.
PUTZ
BT-FERTIGTEIL
BRANDWAND
WERKSTEIN BEST.
WERKSTEIN
HOLZ
UHD
TROCKENBAU BEST.
TROCKENBAU
WÄRMEDÄMMUNG
ABBRUCH
STB BESTAND
PROJEKT
MK4 - NEUBAU BÜROGEBÄUDE "ANNENHÖFE" FREIBERGER STRAßE/ SCHWERINER STRAßE, 01067 DRESDEN BAUHERR
TLG IMMOBILIEN AG BUDAPESTER STRAßE 3, 01069 DRESDEN LAGEPLAN / GEBÄUDEÜBERSICHT
B
MAL
ERG
ÄSS
CHE
SS RA
SSE
TRA
NS
NE
ST
AN
E
B
B02
FREIBERGER STRASSE
N
B01
B03
A03
ER
J4
IN
J3
ER
J2
SC HW
J1
3,25
35
-5,00
A04 A01 A02 E
ASS
-STR
NER
-LIND
HERTHA-LINDNER-STRASSE
THA
HER
PLANINHALT
MASSSTAB
SCHNITT BB
1:400
SECTION BB
C6
C5
C4
C3
C2
C1
A14
A13
A12
A10
A11
A9
+15,50
3.OBERGESCHOSS
+12,00
2.OBERGESCHOSS
+8,50
1.OBERGESCHOSS
+5,00
3,07
3,22
28
4.OBERGESCHOSS
2,71
3,53 +19,00
28
36 28
15
5.OBERGESCHOSS
36 28
18
+23,00
3,05
3,50
3,22 28
36 28
15
2,71
+17,25
3,50 2,71
3,50
28
36 28
15
3,22
+13,75
3,50 2,71
3,50
28
36 28
15
3,22
+10,25
3,50
3,50 2,71 38
38
15
3,22
+6,75
5,00
4,47
5,60
4,75
+2,50
ERDGESCHOSS ±0,00
± 0,00 = 112,66 NHN
UNTERGESCHOSS -2
-8,60
1,20 3,80
4,40
5,00
4,40 -5,00
- 0,60 = 112,06 NHN
3,60
3,60
3,28
32
UNTERGESCHOSS -1
4,40
32
±0,00
3,43
±0,00
± 0,00 = 112,66 NHN SÜD FREIBERGER STRAßE
J5
F16
J4
J3
F15
F14
3,03
+23,00
5.OBERGESCHOSS
+19,00
4.OBERGESCHOSS
+15,50
3.OBERGESCHOSS
+12,00
2.OBERGESCHOSS
+8,50
1.OBERGESCHOSS
+5,00
3,50
+17,25
3,50
+13,75
3,50
+10,25
3,50
+6,75
5,90
+3,03
+1,06
±0,00
±0,00 ±0,00
ERDGESCHOSS -0,90
- 0,90 = 111,76 NHN
- 0,90 = 111,76 NHN 1,15
WEST HERTHA-LINDNER STRAßE
2,95
4,10
-3,05
UNTERGESCHOSS -1
-5,00
3,60
-6,81
UNTERGESCHOSS -2
-8,60
J2
F13
J1
F12
F11
F10
F9
F8
LEGENDE
A8
A7
A5
A6
A4
A3
A2
A1
HÖHENBEZUG ± 0.00:
= 112,66 m NHN
SYMBOLE BODENDURCHBRUCH (BD)
WANDDURCHBRUCH (WD)
OK FFB
DECKENDURCHBRUCH (DD)
WANDSCHLITZ (WS)
UK FD
OK RD UK RD
SCHRAFFUREN
28
5.OBERGESCHOSS
36 28
3,53
3,22 28
3,50
SICHTBETON
MW
BETON UNBEW. / ESTRICH
FEUERBESTÄNDIG (F90)
PUTZ
PUTZ
BT-FERTIGTEIL
BRANDWAND
WERKSTEIN
HOLZ
UHD
TROCKENBAU
WÄRMEDÄMMUNG
ABBRUCH
BAUHERR
2,71
3,22
FEUERHEMMEND (F30)
FREIBERGER STRAßE/ SCHWERINER STRAßE, 01067 DRESDEN
TLG IMMOBILIEN AG
4.OBERGESCHOSS
15
+15,50
BUDAPESTER STRAßE 3, 01069 DRESDEN
36 28
28
WU-BETON
MK4 - NEUBAU BÜROGEBÄUDE "ANNENHÖFE" +17,25
3,50
STB
PROJEKT
15
+19,00
3,07
KLINKER
2,71
3,07
3,35
36
28
18
+23,00
LAGEPLAN / GEBÄUDEÜBERSICHT
ERG ÄSS
CHE
N
B01
RA
SS
E
15
ST ER IN SC
HW
ER
28
SSE
36 28
TRA
C
NS
B02
B03
NE
A03
AN
C
3.OBERGESCHOSS
+12,00
FREIBERGER STRASSE
3,50
3,22
MAL
2,71
3,07
3,50
+13,75
3,50
3,22
A04
A01
A02
2,71
3,07
3,50
+10,25
E
ASS
-STR
NER
2.OBERGESCHOSS
-LIND
THA
HER
HERTHA-LINDNER-STRASSE
28
36 28
15
+8,50
3,50
3,22
2,71
3,07
3,50
+6,75
1.OBERGESCHOSS
28
28 6,40
1:100
5,97
6,25
6,40
+2,87
5,97
MASSSTAB
SCHNITT CC
SECTION CC
15
+5,00
PLANINHALT
+0,73 ±0,00 ±0,00
±0,00
ERDGESCHOSS
- 0,90 = 111,76 NHN
-1,40
- 1,40 = 111,26 NHN
- 1,40 = 111,26 NHN
32
NORD SCHWERINER STRAßE
3,60
3,00
3,56
2,95
3,60
-3,20
UNTERGESCHOSS -1
32
-5,00
3,60
3,28
3,60
3,60
-6,81
UNTERGESCHOSS -2
-8,60
LEGENDE
HÖHENBEZUG ± 0.00:
= 112,66 m NHN
SYMBOLE
F3
F2
F1
WANDDURCHBRUCH (WD)
OK FFB
DECKENDURCHBRUCH (DD)
WANDSCHLITZ (WS)
UK FD
OK RD UK RD
KLINKER
STB
WU-BETON
FEUERHEMMEND (F30)
SICHTBETON
MW
BETON UNBEW. / ESTRICH
FEUERBESTÄNDIG (F90)
PUTZ
PUTZ
BT-FERTIGTEIL
BRANDWAND
18
WERKSTEIN
HOLZ
UHD
36 28
SCHRAFFUREN
TROCKENBAU
WÄRMEDÄMMUNG
ABBRUCH
PROJEKT
3,03
3,22
2,71
3,53
28
+23,00
5.OBERGESCHOSS
FREIBERGER STRAßE/ SCHWERINER STRAßE, 01067 DRESDEN
TLG IMMOBILIEN AG
3,50
28 3,22
MK4 - NEUBAU BÜROGEBÄUDE "ANNENHÖFE" BAUHERR
BUDAPESTER STRAßE 3, 01069 DRESDEN
2,71
3,50
36 28
15
+19,00
4.OBERGESCHOSS
LAGEPLAN / GEBÄUDEÜBERSICHT
ER IN ER
ST
RA
SS E
3,50
SC HW
3,50
15
A04 A01
36 28
28
B02
A02
3,50
3,22
HERTHA-LINDNER-STRASSE
2.OBERGESCHOSS
3,50
28
15
6,40
28
1:400
SECTION DD
28 5,97
6,25
MASSSTAB
SCHNITT DD
1.OBERGESCHOSS
+5,00
±0,00
±0,00
ERDGESCHOSS -1,40
3,60
37
- 1,40 = 111,26 NHN
2,95
PLANINHALT
2,71
3,22
36 28 15
+8,50
UNTERGESCHOSS -1
3,60
32
-5,00
3,28
E
ASS
-STR
NER
-LIND
THA
HER
2,71
3,50
D
-8,60
SSE
3.OBERGESCHOSS
+12,00
FREIBERGER STRASSE
N
TRA
28
CHE
NS
36 28
ÄSS
B01
B03
NE
3,22
DMALERG
A03
AN
2,71
15
+15,50
3,50
F4
6,40
F5
3,60
F6
3,60
F7
BODENDURCHBRUCH (BD)
UNTERGESCHOSS -2
Scale - 1:200
XXX
**The exact planning of the offices cannot be disclosed. For this purpose, the plans have been cropped/ distorted and jumbled.
Img - 1.8
**The exact planning of the offices cannot be disclosed. For this purpose, the plans have been cropped/ distorted and jumbled.
Informal Meeting Area Folding walls
Scale - 1:200
XXX
**The exact planning of the offices cannot be disclosed. For this purpose, the plans have been cropped/ distorted and jumbled.
Img - 1.9
**The exact planning of the offices cannot be disclosed. For this purpose, the plans have been cropped/ distorted and jumbled.
Scale - 1:200
XXX
**The exact planning of the offices cannot be disclosed. For this purpose, the plans have been cropped/ distorted and jumbled.
What I learned? Internal planning guidelines, German laws and things which are generally expected. The standards for arranging offices, planning the placement of workstations, projectors, and its implications on the wiring conduits. The general strategies followed during preliminary stage, and during construction. Possibilities of Planning of Toilets, Kitchens and Server rooms. The most feasible way depending on the placement of ducts. The stages of planning of a large scale building project, and how all the firmsconstruction, landlord, client, planning, architecture - collaborate. I spent a majority of the time at the part-time training, doing this project. The plans could easily undergo 3 revisions in a day. I learned how to communicate fast, through drawings. Of course, Lars and Ruairi were guiding me through this. I had a chance to apply the principles of acoustics. I learned about the standard drywalls available in the market. I had a chance to be fully involved during the internal planning phase. I learned and used Archicad for our plans and model, which was a vital tool for our spacial study.
Img - 1.10
The external building envelope, and structure were already designed by TLG Immobilien, when I joined the firm, in which, I was involved in making minor corrections, changes in ducts for toilets and teekuche, fire partitions, etc. References: Annenhoefe Building Images, Plans and External Visualizations- TLG Immobilien. Photos, Fig-1.1, 1.5, 1.6, 1.7, 1.10 by TLG . Copyright by TLG Immobilien, Source: www.annenhoefe.de Room program office space: Ruairà O’Brien.
HOHENECK PRISON MUSEUM A Museum, Depicting the Atrocities to political prisoners in the Hoheneck Castle
Client: City of Stollberg Location: Inside Hoheneck Castle, Stollberg, Saxony Architect: Ruairi O’Brien.Archecture.Light.Spacial Design. (Museum Planning Concept inside Hoheneck). The Hoheneck Castle was first mentioned in history in 1244 AD. It was rebuilt in 1815. Status: Proposal Stage.
Img - 1.1
Brief: To plan a museum inside the hoheneck castle, and its campus, which depicts the atrocities to the political prisoners in it throughout history.
History:
Site: The Site is located in Areal Stalburc/Hoheneck castle, in Stollberg, Germany. It is surrounded by field lands, and thus can be easily distinguished. The interiors of the castle speak for themselves about its grim past.
1244 The castle is mentioned for the first time in connection with Hugo von Straleburc. Until 18th Century Castle used by Medieval Kings. It was rebuilt in 1815, and served as a rent and justice office. 1862 The Castle is converted into Prison 1933 - 1945 Prison used by the Nazi government, for political prisoners. 1950 - 1990 Prison used by the Soviet Union. It became most notable as a detention facility for female political prisoners in East Germany. The prison was designed to hold up to 600 inmates, however, as many as 1,600 were detained there. 1990 - 2001 The detention centre is being partially modernized and is used to detain criminal men. It was closed in April 2001. The short film Broken: The Women’s Prison at Hoheneck examines forced labour in Hoheneck prison: https://www.nytimes.com/2017/01/27/opinion/broken-the-womens-prison-at-hoheneck.html
My contribution: I contributed to the design of the panel elements of the museum ( conceptual), their internal plan ,modelling and rendering. Interior Design
Concept
Visualization
Img - 1.4
Concept: The prison cells are 2m*4m in size. Prisoners sometimes spent as long as 10 days without any human contact in these dark cells. Some of these cells were modified into cold water punishment areas for disciplining the prisoners.
The concept is to “make the walls of the cell unfold and speak the story�. The walls were first taken and unfolded, preserving the dimensions, and its configurations were studied.
The West wing consists of Administrative blocks for employees, with larger rooms, This is where the museum is hosted.
The Prison Cells are located in the South Wing of the Castle. Cell Dimensions are 2m*4m.
Pre-concept of the memorial information Centre, by beyer+wellach Projekte, taken from competition basic materials of Gedenkstätte Frauenzuchthaus Hoheneck.
1.270
1.101
0.903
1.101
0.875
1.129
0.875
1.129
1.129
0.875
1.129
0.875
1.101
0.931
25.595
1.129 0.762 1.129
0.903
1.129
1.101
8.579
0.875
0.903
13.771
1.129
0.875
1.129
0.875
1.101
0.903
1.129
0.875
1.129
0.818
1.129
0.903
1.129
0.875
16.085
1.129
0.875
1.129
0.903
1.101
0.903
1.101
1.242
1.665 0.705 1.693 15.661 0.705 1.693 0.762 1.580
15.831
15.972
0.875
45.601
3.612 3.245
4.261
4.317 4.402
Preliminary room programme of the west wing.
Scale - 1:200
PRESENT SPACIAL CONCEPT (SITE)
My Learnings: I learnt about the strategies on designing the elements of museum, surrounding a single concept. I learnt some details of the medieval castle architecture.
References: Pre-concept of the memorial information Centre, by beyer+wellach Projekte, taken from competition basic materials of Gedenkstätte Frauenzuchthaus Hoheneck. Design Study of Hoheneck Museum - Ruairi O’ Brien. Images of Hoheneck, and its history, Retrieved from : https://www.areal-hoheneck.de/kulturstaetten_aktuelles_gedenkstaette.php
VOLKSSOLIDARITÄT TRACHENBERGE Task on drawing plans of the building.
3
Client: Volkssolidarität Trachenberge (People’s solidarity association building in Trachenberge) Organization(s): Kistner and Partner Architekten, Wissensarchitektur Laboratory of Knowledge Architecture. Location: Trachenberge, Dresden, Saxony. Team members/ Collaborators: Markus Kistner(Kistener and Partner), Konstantin Doll (KA Lab, Kistner and Partner), Niraj Kamal (KA Lab) Status: -
Brief: To make Renovation and Fire Planning for the People’s Solidarity Association building in Trachenberge. I was involved in the stage of making the architectural drawings from the old building data. My colleague Konstantin Doll was so kind to give me the opportunity, so that I could get to know about the architectural details of the buildings in Saxony better. This was one of the warmup tasks in the lab. People's Solidarity is an organisation for elderly people in the new states of Germany, founded 1945. It was one of many important non-parliamentary mass organisations in the former socialist country, East Germany.
My contribution: I was involved in making the building drawings especially the section in AutoCAD. Only the renovated building plans and sections are shown in this report. I was not involved during the fire planning stage, so those plans are not shown in this report. Architectural Drawings
My Learnings I learnt the architectural details of Saxon houses, and their roof design.
The site: The house was opened in 1998 and is centrally located in the Trachenberge district. In addition to the North Outpatient Services, they also offer day care and senior living on site.
2,25 1,00 2,25
Parken P2 P3
4,36 1
35,60
1,10
15
6,34 2
P1
2,25
21,10
20,25 8
+- 0,0 = OFF Eingang
4,36 1 4,10 1
3,78 4,35 1
21,04
Fu Feuerwehrzufahrt
0,420 x 0,297 = 0,12 m²
Kistner & Partner Architekten PartGmbB Weißbachstraße 6 Weißbachstraße 6, 01069 Dresden 0351 30 9000 82 mail@kister-partner.de http://www.kistner-partner.de
BAUHERR Volkssolidarität Dresden Altgorbitzer Ring 58 01169 Dresden 0000-00000-1
7, 00 ca. 3
7,67 5 4,50
ußweg
PLAN Lageplan
PROJEKT Volkssolidarität Trachenberge
Maßstab: Datum: Gezeichnet:
Trachenberger Str. 6 01129 Dresden
1 : 200 26.03.2020 KD
64
6, 37 1,18 3
88 5 2,00 5
1,90 3
80 60
1,62
64
2,12 8
1,91
12
3, 8 0 3
25
1,32
Chemie/ Getränkelager
88 5 2,00 5
14,48 m²
4,32
2,74
1,01
25
22 9 257 4
16 5
88 5
1,18 60
2,96
1,29 5
7, 12
2,00 2
Aufzugsraum/ Technik
3,83 m²
Aufzug
53
53
1,50
1
2,96 m²
1,84 42 5 28 5
86 80 60 1,46 8
88 5
Waschraum
25 16
6,32 m²
1,27 2,05
2,36
2,65
2710 2
2
54 3 17 5
17 5
1,31
88 5 2,00 5
5 8 46 17 13
1,31
Umkleide Damen/ Herren
5 2,36 7,70 m²
1,38
52
1,25
5
36 12
76 5
63 5 2,00 5
42
1,18 60 1, 49
44 5
1,18 3
61
1,08
1,62
12 3 63 5 2,00 5
2,24 5
12
1,08
8
5,48
42
76
63 5 2,00 5
1,42 42 5
5, 48
5
28 8 54
80 60 71 3
64
88 5 2,00 5
1,62 54
1,74
5
4, 64
56
64 1,33 42 5
20,25
88 5
3,01
3,01
3, 01
9x17/29
1,54 64
0,420 x 0,297 = 0,12 m²
Kistner & Partner Architekten PartGmbB Weißbachstraße 6 Weißbachstraße 6, 01069 Dresden 0351 30 9000 82 mail@kister-partner.de http://www.kistner-partner.de
1,18 60 2, 20
1,00 12
1,18 60 1, 94
BAUHERR Volkssolidarität Dresden Altgorbitzer Ring 58 01169 Dresden 0000-00000-1
15
58 27
15,76 42
2, 47
42
2, 13
4,605
42 60
80 60
64 2,05
7
64
80 60
2, 25
80 10 8 2,20
1,34 3
3, 62
25 3 42
2,98
80 2,20
1,07 8
3,62
80 14 5 42 2,20
1, 65
1,36 2,78 3 , 7 35
1,98
25
54
10 54 75 2, 0 7
5, 8 3
24 81 5
61
75
2,22
1,58
1,56 5
1,18 60 2,19
1,02 27
1,18 60 1, 51
45 14
1,18 60
1,00 3, 43
1,18 60
50 25
1,18 60
50
1,18 60
97 5, 83
1,18 60
1,28 63
21,06
PLAN Kellergeschoss
PROJEKT Volkssolidarität Trachenberge
Maßstab: Datum: Gezeichnet:
Trachenberger Str. 6 01129 Dresden
1 : 100 26.03.2020 KD
6, 10
4, 95
1,90 60
1,32
Archiv
46,30 m²
56
88 5 2,00 5
1,01
2,00 5
1,07
26
81
54 27
5
1, 0 1 2,00 5
5
49
20,25
96 1,90 60 55 5 80 60
1,62
42 8 88 5 10 54 2,00 5
54
Archiv
3,52 m² 1,78 1,31
60 8 15 57
12
76 2,00 5
36 5
8, 88
1,01 2,00 5 1,10 1,01 2,00 5
88 5 2,00 5 1,07 8 88 5 2,00 5
25
4,13 m²
1,74
WC
5
86
42 5 5
1,60
2,00 5
3,81 m²
13,66 m²
36 5 44 3
1,84
2,00 5
57
1,90 60
Lager Tagespflege
WC
12
1,27
5
1210 1,32
8
85 5 2,05
6,85 5
31 5 25
80 60
Hausmeister
12,93 m²
27
62 7 59 22 2 80 60
1,66 1,13 1,01 2,00 5
1,42 6
85 5 2,05
5
11 5 48 9
2,00 5
60 5
40
28
1,50
84 2,05
35 5 36 5
2,28 5
3,93 3
90
2,00 5
12
11 5
1,52 5
1,99
4,45 m²
22
5
1,80
Mieterkeller
56
4,42 2,62 8
1,18 1,89
80 1,89
2,39
1Sa/DD 20x50 1Sa/DD Ø 160
1,62
56
Sa/DD 20x20
3,04
He/DD 20x10
Beratung
16,13 m²
12
22 56
5,53 3
56
11 x 17/30 25 1,55
68 8
25
10Sa/DD 20x50
He/DD 20/10
1,41 6
WC WC
2,91 5
1,62 m²
1,80 1,65
2,91 5
2
7,19 3
66
20,25
T
1,21
9 x 17/29
8 x 16/28
WC Vorraum
2,36 3
2,33 m²
5,19 m²
12 2,00 5
1,34 4
WC
98 5
12
80 1,89 78 3
66 8
98 5 12 42 5
1,01 2,00 5
5,30 m²
4, 71
PRELIMINARY IDEAS
1,28 5
25 20 1
63
1,01 2,00 5
1,01 2,00 5
12Sa/DD Ø 160
1,63 5 2,13 5
3,01
2,11
Flur
13,91 m²
+-0,00
3, 01
12
1,20 3
Aufzug
68 8
56
3,20 5
2,96 m²
56 8
1,96 3
12
62 6
25
2,18 2
7, 12
4,81 4
1,18 1,89
3,91 7
2,11
10 8
2, 1 5
1, 0 1 2,00 5
5,19 8
Ve Be
1,18 1,89
5,11 5
5, 41
2,11 5
34
56
2,11 5
101
1,54 56
0,420 x 0,297 = 0,12 m²
Kistner & Partner Architekten PartGmbB Weißbachstraße 6 Weißbachstraße 6, 01069 Dresden 0351 30 9000 82 mail@kister-partner.de http://www.kistner-partner.de
1,18 1,89
1,00
1,18 1,89
BAUHERR Volkssolidarität Dresden Altgorbitzer Ring 58 01169 Dresden 0000-00000-1
50
1,18 1,89
50
20,69 5
1,80 1,65
63
80 1,89
6
4,01 7
37 3
80 1,89
52
56
80 1,89
2,19
87
56 45 56
1,43
7
1,93
1,01
56
5
2,49
5
56
83 6
25 79 3 12
2
He/DD 20x10
2Sa/DD 20x50
D 0
2,55 m²
12,76 m²
Kreativ Raum
42 2 25
19 80 1,89
1,01 2,00 5
1,35 5
Flur
9,31 m²
5, 0 6 5
42 8 12
3,89
12,49 m²
2,07 8
Treppenhaus
21,07 m²
+1 , 2 8
+1 , 0 3
5, 1 6 5 He/DD 20/10
12
25
78 3
3,46 7
1218 5
25
1,42 3
4Sa/DD 20x50
Terrasse
8,1 6
2,30 1,65
5,11 5
eranstaltungsraum/ egegnungsstätte
42 5
3,85 5
1, 0 1 2,00 5
19 , 6 0
1,84
4, 2 2 2
5, 1 6 5
5,11 5
25
10 80 35 5 1,89
7, 1 5 7
Küche
19,88 m²
42 5 1,42 3
1,01 2,00 5
Flur
37,75 m²
2,30 1,65
Lü/DD Ø 150
56
1,96
1,71 m²
1,18 1,89
1,00
1,18 1,89
50 19,94
1,15 1,89
1,00
1,18 1,89
50
1,18 1,89
50
1,15 1,89
1,00
1,15 1,89
1,31 56
21,06
PLAN Hochparterre
PROJEKT Volkssolidarität Trachenberge
Maßstab: Datum: Gezeichnet:
Trachenberger Str. 6 01129 Dresden
1 : 100 26.03.2020 KD
20,25
88 5 2,00 5
2,55 6
16,68 m²
3,16 9
Kantine/Café
+1,28
56
2,62 5
1,09
25
56
1,00 8
12 1,05 6
9 13 3 257 9 63 5 712 2,00 5
7
62 7
1,03
59 22 2 80 1,89
1,01 2,00 5
5
1,01 2,00 5
25 52
49 5 25
98 5
12,38 m²
Büro
1,18 1,89
3,21 6
WC
Büro
3,06
2,57
1,45 5
25
42 5
6, 76 1,18 1,89
2,39
80 1,89
7
42 5
1Sa/DD 20x50 1Sa/DD Ø 160 He/DD 20x10
1,22
42
5
2,64 8
Sa/DD 20x20
1,18 1,89
Personal
20,90 m²
25 76 2,00 5
29 5
84 2,00 5
4, 0 9 5
6
Asr
1,20 m² 1.5
1.3
Server
Aufzug
6,23 m²
1,18 1,89
2,86
88 5 2,00 5
1.4
1,12
25
3,16
1.6
1.2
Flur
3,32 m²
6,82 m²
42 5 56
7,31 8
1,06 3
14, 84
42 5
12Sa/DD Ø 160
88 5 2,00 5
10Sa/DD 20x50
1.23 1,15 6
WC
1,02
28 18 5
2,36 m²
1.21
WC
2,35 m² 2,43
1,01 2,00 5
1.20
Flur
10,12 m² 12
2, 1 4
12
42 5
3
12 17 63 5 16 15 9 5 2,00
1,01 2,00 5
5,33 m²
96 4
1,74 4
WC
42 58 3 80 20 344 5 1,89
2,18 9 96 5 12
Trepp
22,49 m
He/DD 20/10
1.22
36 5
2,55 3
12
1,97
12
1,21
1,59
1.18
WC
1,01 2,00 5
2,89 m²
79
1216 5 63 5 2,00 5
1,69 1,18 1,89
15,07 m²
76 5
1,01 2,00 5
1,52
8,86 m²
1,44 5
1,69
Bad
42 5
42 5
5
1.17
2,74
1,01 2,00 5
5, 25
5, 41
1.19
Pflegebad
1,73 42 5
Kistner & Partner Architekten PartGmbB 0,297 x 0,420 = 0,12 m²
25 14
99 5
69
425
1.1
+3,26
74 6
74 6
20,25
10 x 17/38
11 x 17/30
1,06 3
3,01
11 x 17/30
Weißbachstraße 6 Weißbachstraße 6, 01069 Dresden 0351 30 9000 82 mail@kister-partner.de http://www.kistner-partner.de
1,18 1,89 2,91 8
1,00
1,15 1,89
12
BAUHERR Volkssolidarität Dresden Altgorbitzer Ring 58 01169 Dresden 0000-00000-1
50 3, 30
1,18 1,89
50 25
4, 93 5
1,18 1,89
1,36
2Sa/DD 20x50
1,00 5
42 5 68 5 42 5
1,43
5
1,97
1,11
2,39
42 5 5
He/DD 20x10
D 0
1.8
1.11
Behandlung
Büro
8,63 m²
3,26
11,27 m²
31 27
98
12,46 m²
93 1,89
88 5 2,00 5
3,88
31
93 1,89
1,01 2,00 5
1,34
1,01 2,00 5
3012 72
62 6
31
3Sa/DD 20x50
4,32
penhaus
93 1,89
3,48
3,04 6
+5,10
93 1,89
3,65 2
He/DD 20/10
81 6
4Sa/DD 20x50
1,04 5
7,19 6
m²
1.13
Lü/DD Ø 150
88 5 23 80 2,00 5 1,89
1.10
Flur/ Eingangsbereich
Aufenthaltsbereich
34,28 m²
1,06
12
5
2,49 2
1,01 2,00 5
12
1,75
1, 0 1 2,00 5
3, 3 4 5
1.15
1,56
2,12
2,03
1,01 2,00 5
Schlafraum
1.14
1,18 1,89 5, 25
Ruheraum
1,01 2,00 5
7Sa/DD 20x50
Gemeinschaftsraum
32,03 m²
42 5
2,12
2,03 5
11,54 m²
1,18 1,89 2, 22
1,00
1,18 1,89
50
12
1,18 1,89
80
5, 062
1,18 1,89
50 12
1,18 1,89
50
1,18 1,89
1,00
1,18 1,89
6, 10
83 5
42 5
1.16
6, 10
26,58 m²
5,25
5
4, 9 9 42 5
25 42 5
7, 3 9 7
42 510 80 1,89 425
1,54 5
54 5
2,90
1,01 2,00 5
39,21 m²
20,25
2,01 6
12 48 6
3,24 8
12
22 8
6,54 m²
1,34
Flur
7,54 7
12
88 5 2,00 5
1.9
7, 30
39 5
1,72 4
1,15
12
88 5 2,00 5
22 8
65 5
12
1,65 9
1,43 9
1.12
Empfangs-/ Warteraum
3, 32
25
25
64 5
25
1,10
4,94 9
13,04 m²
3,26
1.7
Behandlung
88 5 2,00 5 3,26
Notleiter mit Rückenschutz
3, 53
2,05
42 5
3,22
1,66 5
2, 48
5
12
12
80 8 5 88 5 1,89 2,00 5
70 5
9
2,36
6,87 5
25
42 5
2, 69
1,27 5
25
42
15, 76
42 5 425
21,06
PLAN 1. Obergeschoss
PROJEKT Volkssolidarität Trachenberge
Maßstab: Datum: Gezeichnet:
Trachenberger Str. 6 01129 Dresden
1 : 100 26.03.2020 KD
42 5
3,46 3
25
2,64 8
1,18 1,89
3,04 7
6
2,35
425
1Sa/DD 20x50 1Sa/DD Ø 160
1,64
5
He/DD 20x10
Sa/DD 20x20
1,80
WC
5,01 m²
25
1,71
88 5 2,00 5
7
4,00
Aufzug
Aufzugsflur
2,34
2,86
2,13 1,18 1,89
Flur
6,52 m²
25 17 8
16,42 m²
1,89
88 5 2,00 5
Büro
6, 27
82
3
29 8
1,18 1,89
2,64
7,12
80 1,89
7
2,99 m²
5,31 m²
98 5
1,21 3
10 x 17/30
29
88 5 2,00 5 59 5
+6,83
21,98 m
10Sa/DD 20x50
He/DD 20/10
88 5 21 5 80 1,89 2,00 5
42 5
Bad
4,84 m²
Büro
2,43 3
1,42
11,52 m²
1224 5
88 5 2,00 5
1,13 5
25
62 5
3,59 5
4,71
Trepp
1,36
10 x 17/30
1,06 3
3,01
3,01
10 x 17/28
20,25
1,36
4,18 5
1,06 3
42 5
12Sa/DD Ø 160
79
425
80 1,89
Flur
5,40 m²
88 5 2,00 5
32 8 12
75
5 88 5 1212 2,00 5
25
1,18 1,89
Büro
Büro
16,61 m²
15,57 m²
42 5
2,11 5
5, 25
5,41
2,11
5
2,88
1,35 3 42 5
0,420 x 0,297 = 0,12 m²
Kistner & Partner Architekten PartGmbB Weißbachstraße 6 Weißbachstraße 6, 01069 Dresden 0351 30 9000 82 mail@kister-partner.de http://www.kistner-partner.de
1,18 1,89 2,71 8
1,12 12
1,15 1,89
BAUHERR Volkssolidarität Dresden Altgorbitzer Ring 58 01169 Dresden 0000-00000-1
52 3,50
1,18 1,89
64 12
20,69 5 2, 59
72 5
25
80 12 5 88 5 1,89 2,00 5
9
73 5
5, 06 80 1,89
425
1,98
1,18 1,89
1,48
2Sa/DD 20x50
1,00 5
42 5 68 5 42 5
1,43
5
1,97
1,11
2,39
42 5 5
42 5
25
He/DD 20x10
Büro
88 5 14 5 2,00 5
2,67 6
Bad
3Sa/DD 20x50
5,02 m²
3,53
2,10 5
penhaus
2,30 1,65
+8,47
12
84 5 1,01 2,00 5
1,82
42 5
79 5 20
1,70 3
88 5 2,00 5
39 5
37
17 5 33 1
1,59 6
88 5 2,00 5
13,18 m²
3,32
Büro
6,37 m²
2,30 1,65
Flur
20 512
64 5
88 5 2,00 5
1,62 4
1,16 4
16,44 m²
42 5
1,12
Büro
12,00 m²
88 5 2,00 5
3,34 5
3,10 5
88 5 2,00 5
2,89 5
83
88 5 2,00 5
49 25
3,28
2,10
4,72 9
44 5 25
34 5 38 8 25
2,68
1,70
D 0
1,50 3
63 5 2,00 5 3
1224 5
88 5 2,00 5
Flur
Flur
6,11 m²
4,19 m²
3,69
3,69
Bad
Bad
6,10
30,26 m²
5, 25
Büro
Büro
12,81 m²
8,97 m²
42 5
2,46
6,00 m²
1,18 1,89 1,93
80 5 5
25
1,18 1,89
49 2 3,07 2
1,18 1,89
1,08 25
1,18 1,89 2, 01
44 12
1,18 1,89
52
1,18 1,89
1,13 6, 11 5
5
1,18 1,89
76
42 5 42 5
21,06
PLAN 2. Obergeschoss
PROJEKT Volkssolidarität Trachenberge
Maßstab: Datum: Gezeichnet:
Trachenberger Str. 6 01129 Dresden
1 : 100 26.03.2020 KD
20,25
7,30
80 1,89 10 4, 9 3 5
1,18 1,89
2,00 5
12 2,00 5
88 5 2,00 5
7Sa/DD 80 20x50
88 5
3,11
2,46
2,15 2
53
5 88 5 1412 2,00 5
88 5 14 5 2,00 5
88 5 14 5 42 5 31 5 2,00 5
1,51 6
88 5 2,00 5 14 5 1,03 5
6,87 5
54 5
2,12 5 88 5 2,00 5
3,47 2
425
1,50
12 41
1,97
34,52 m²
Lü/DD Ø 150
69 3
2,74
25,54 m²
5
He/DD 20/10
Büro
4,50 m²
2,25 4
Flur
WC
83
4Sa/DD 20x50
88 5 24 5 80 1,89 2,00 5
1,30 7
5,55 5
25
m²
42 5
3,71 3
25 1,18 1,89
2,59 8
2,38
80 1,89
7
42 5
1Sa/DD 20x50 1Sa/DD Ø 160 He/DD 20x10
1,20
42 5
2,79 7
Sa/DD 20x20
2,50
2,50
Bad
26
1,18 1,89
6,18 m²
88 5 2,00 5
Zimmer
1,51
24,86 m² 2,24 2
75
88 5 2,00 5
88 5 2,00 5
Aufzug
2,43 5
1,18 1,89
2,35 8
79 5
36 5
2,07
6 , 4 45
7,12
6,76
2,79 m²
25
25
75 5
1,06 5
12Sa/DD Ø 160
1,36
1,06 3
7,21 8
29
88 5 2,00 5
10Sa/DD 20x50
97
1,37
10,51 m²
85 5
12
1,66
88 5 2,00 5
Flur
1,49
5
62
8,38 m²
2,25 3
12
2,37
88 5 14 525 2,00 5
Zimmer
18,85 m²
42 5
1,06 5
2,11 5
2,80
1,93
1,18 1,89
5,41
Zimmer
11,67 m²
25
5,42 5
88 5 2,00 5
2,11 5
2,37 5
1,54 5
34
25
25
1,54
25
2,45 8
1,91 5
2,00
Bad
4,40 m²
5 88 5 1412 2,00 5
Zimmer
1,80 1,65
3, 77
4,71
21,72 m²
25
25
20,25
+10,18 He/DD 20/10
Trepp
1,36
10x 17/30
1,06 3
3, 01
3,01
10x 17/30
1,39 8 42 5
0,420 x 0,297 = 0,12 m²
Kistner & Partner Architekten PartGmbB Weißbachstraße 6 Weißbachstraße 6, 01069 Dresden 0351 30 9000 82 mail@kister-partner.de http://www.kistner-partner.de
24
80 20 1,89
1,42 6,11 3
80 1,89
BAUHERR Volkssolidarität Dresden Altgorbitzer Ring 58 01169 Dresden 0000-00000-1
78
80 1,89
55 25
8
20,69 5 2,59
67
25
1,80 1,65
1,98
25
5
84 0 80
1,99
2,82 5
42 5
1,18 1,89
5
1,00 5
1,51
2Sa/DD 20x50
1,43
42 5 68 5 42 5
1,97
1,11
2,39
42 5 5
42 5
25
Zimmer
7,55 m²
3, 53
9,30 m²
5
9,87 m²
1,18 1,89
Bad
3,81
Zimmer
3,28
2,76
Notleiter mit Rückenschutz
3,10 5
1,47
5
He/DD 20x10
D 0
61 5
2,45
Zimmer
78
1,95
75 5
14,86 m²
1,66
42 5
4,07
88 5 2,00 5
1,61 2
12
5
1212 5
88 5 2,00 5
1,11
2,39
5
88 5 2,00 5
Bad
3,10 5
5
1,04 5
2,38
54 5 12
2,85 3,77
10 80 1,89
25 88 5 2,00 5
5,35 m²
425
2,91
74 5
87
Zimmer
3,79 5
22,42 m²
42 5
2,53 5
1,40
80 1,89
1,28 7
50
80 1,89 5, 96 2
50
80 1,89
40
1,39 5 12
80 1,89
60 5 3,10 5
80 1,89
82 12
80 1,89
18 80 18 1,89 4,51 5
1,13 5
1,44 5 42 5
21,03 5
PLAN Mansardgeschoss
PROJEKT Volkssolidarität Trachenberge
Maßstab: Datum: Gezeichnet:
Trachenberger Str. 6 01129 Dresden
1 : 100 26.03.2020 KD
6, 10
Zimmer
16,84 m²
1,18 1,89
Zimmer
23,68 m²
5, 25
7Sa/DD 20x50
20,25
25
1,18 1,89
Zimmer
19,49 m²
1,51 6
2,52 2
1,18 1,89
4,21
Lü/DD Ø 150
3,77
Flur
He/DD 20/10
88 5 2,00 5
3,77
5,36 m²
86
91
Bad
8,62 m²
2,67 5
7, 30
85
4Sa/DD 20x50
13,47 m²
1,64 5
Küche
1,47
25
88 5 2,00 5
84 5
24 5
1,17 5
88 5 2,00 5
88 5 2,00 5
1,18
25 24 5
65 3
1,17 5
25
88 5 4 5 2,00 5 39 88 5 2,00 5
Flur
11,91 m²
80 5
²
1,00 5
3, 32
25
1,18 1,89
80
9,19 m²
+11,85
penhaus
1,36
25 78 5 88 5 2,00 5
88 5 2,00 5
87 5
3,32 5
Flur
88 5 2,00 5
52 5 25
Ausstiegspodest
2,82 5
42 5
25
5
2,89 5
1,98
87
25
88 5 2,00 5
2,59
1216 5
25 2,00 5
26 2,06
+14,85
+11,85
2,35 +8,47
41
10x17/30
2,36
+5,10
42
2,25
3,21
11x17/28
Kellergeschoss
-1,57
1,54 2,68 1,76
2,00 6
9x17/19
-1,57
Kistner & Partner Architekten PartGmbB 0,420 x 0,297 = 0,12 m²
+1,28
8x16/28
70 17
+0,00
2,45
2,87
Erdgeschoss
2,33
11x17/30
Weißbachstraße 6 Weißbachstraße 6, 01069 Dresden 0351 30 9000 82 mail@kister-partner.de http://www.kistner-partner.de
BAUHERR Volkssolidarität Dresden Altgorbitzer Ring 58 01169 Dresden 0000-00000-1
3,40
3,44
3,40
39
+3,26
85
82
1,33
85
3,07
10x17/28
2,96
2,33
36
+6,83
1. Obergeschoss
28
82
2,99
2. Obergeschoss
1,47
10x17/30
3,01
99
82
36
+10,20
37
10x17/30
2,13
+11,85
90
Mansardgeschoss
2,82
2,13
3,17
17
+15,02
Dachaufbau Bieberschwanz-Kronendeckung 15,5/36,5 Dachlatten Konterlatten Unterspannbahn Sparren Dämmung - 14cm Mineralwollefilz Dampfsperre sd > 100mm
1,65 8
2,82 93
2,13
Deckenaufbau 1 Fußboden im Dachgeschoss 50mm Estrich (Anhydritestrich oder Zementestrich mit Randdämmstreifen Trennschicht PE-Folie 90mm Wärmedämmung 30mm Trittschalldämmung
+11,85
OFF
1,80
94
3,12
1,90
26
Deckenaufbau 2 45mm Zementestrich und 5mm Belag 30mm Trittschalldämmelement 180mm Stahlbeton
+8,51
1,82
1,90
3,05
OFF
93
90
2,13
1,23
2x10mm Promatec
2,00 Terrasse
+1,32
50 70 30 40 17
1,37
2,60
70
2,00 5
+1,28
16 48
46
15 38
OFF
90
2,13
3,38
2,10
+5,14
Kellerfußboden Raum 0.30 u. 0.13 Ungedämmter einschichtiger Fußboden Imprägnierung nach DIN 19353 auf Epoxidharzbasis 100mm Geton B25 Tragschicht PE Folie vorh. Sandboden als kapillar Schicht Raum 0.1 u. 0.6 Ungedämmter zweischichtiger Fußboden 3,5mm homogener Kautschukbelag 45mm Zement- o. Anhydritestrich 0,5mm Abdichtung n. DIN 18195 T.4 100mm Beton B25 PE Folie vorh. Sandboden
PLAN Schnitt Treppenhaus
PROJEKT Volkssolidarität Trachenberge
Maßstab: Datum: Gezeichnet:
Trachenberger Str. 6 01129 Dresden
1 : 100 26.03.2020 KD
4 Client: National Aviation University, Kyiv, Ukraine. Organization: TU Dresden - Wissensarchitektur Laboratory of Knowledge Architecture. Location: Kiev, Ukraine. Team members/ Collaborators: Niraj Kamal Karunanidhi, Joerg Rainer Noennig, Olga Kyeslova, David Hick, Adam Urban, Nikhil Duggal. Status: Proposal Stage
KEIV NAUPROSTIR Science and Art space inside a university in KIEV
Brief: To design a space which will act as a focal point for creative projects and enterprises at the university. The wind tunnel has a very good heritage which needs to be preserved, and it is suited very well as a gallery/ exhibition space. Additionally, in later stages of the project, a vertical wind tunnel will be built to facilitate indoor sky diving. A new block should be planned to host the incubator spaces for start-ups and student groups. The old building (green) is more suited for machine workshops and labs. There is an existing aerospace faculty building(blue) which is the only building currently in use in the site.
My contribution: I had a chance to be involved in this project in the early stages of analysis. The plan was to visit Kyiv and conduct a design workshop with the students before preliminary design phase, but due to the pandemic, we had to improvise. Thus, I got a chance to be in charge of the current phase of the project. I learnt how client meetings, their expectations, things to do/not to do during proposal stage, and how building registration stages work by interacting with the stakeholders. I also learnt importance of Student Activity Centres and the various stakeholders involved. Project Incharge/ Representative Preliminary Design Analysis Meetings with Client/ Stakeholders
The site: The site is inside the National Aviation University of Kyiv. It is an Air tube, used by the soviets but later decommissioned after the fall of the soviet union.
The wind tunnel is the centrepiece of the site. It is for a long time in unworkable state and from both technical and economic points of view to restore it makes no sense. The main part of the structure, which is not used at all, is a huge metal pipe with a total length of 170m and a cross section of 10 by 4 m. There is also an empty machinery building of 3 floors, each of 450 sq. m, with high ceilings, around - open space. The open space around the wind tunnel is abandoned and partially cluttered with building materials.
References: Photos of the site - NAUPROSTIR Collaboration dashboard- NAU, Kiev. Source: https://protw.github.io/nauprostir/ (This is the project’s official collaboration handle. Please visit for more information.)
REQUIREMENTS - ANALYSIS
Plans: The plans are quite old (around the early 1960s) and of very poor quality.
Reference: Plan photos - NAUPROSTIR Collaboration dashboard- NAU, Kiev. Source: https://protw.github.io/nauprostir/
PRELIMINARY IDEAS
PRELIMINARY IDEAS
URBAN DESIGN PROJECTS
5
6
7
NEUSTADT GUIDANCE SYSTEM
URBAN MOBILITY STUDY IN CHEMNITZ
“THE CLOUD” URBAN INSTALLATION
NEUSTADT GUIDANCE SYSTEM Urban City Elements (Guidance for Destinations/ Paths/ Routes)
Client: City of Neustadt in Saxony. Location: City of Neustadt, Saxony Architect: Ruairí O’Brien. Architecture. Light. Spatial Design., City Area: 83.05 Sq. Km Status: Design and Urban Planning Stage.
Brief: To design urban city elements (e.g. Posts, parking Signs, Notice boards, Way Signs, etc.) as a guidance system for Destinations, paths and routes, for the city of Neustadt in Saxony.
The City: Neustadt in Saxony lies between the ridges of the Hohwald and Ungerberg mountains, embedded in the Neustädter valley, on the border between the Lusatian highlands and the Elbe Sandstone Mountains. It is situated near the border with the Czech Republic, 35 km east of Dresden, and 23 km southwest of Bautzen.
Previous Works The Office has previously worked on city elements for guidance systems in Dresden, Freiberg, Dresden University hospital etc. My contribution: I contributed in the preliminary, design of the elements, and their details.
Model Preliminary design
References: About Neustadt City, Photos of Neustadt, Retrieved from: https://www.entdecke-sachsen.de/ziel/neustadt-in-sachsen.html Photo of Dresden Guidance System https://www.entdecke-sachsen.de
0.080 1.600
0.800
2.340
2.340
1.250 2.100
GSEducationalVersion
0.950
0.080
1.250
1.600
0.080
2.100
1.250
0.800
GSEducationalVersion
URBAN MOBILITY STUDY IN CHEMNITZ Urban mobility study on bicycle paths in Chemnitz
6
Topic: Urban Study of Chemnitz for new urban mobility awareness. Location: Chemnitz, Saxony. Organization: WISSENSARCHITEKTUR Laboratory of Knowledge Architecture, NUMIC Team mates: Sebastian Wisenhuetter Anja Jannak Jรถrg Rainer Noennig City Area: 220.8 Sq.Km Status: Urban Analysis Stage.
Brief: Data-driven analysis of the urban mobility, topology and morphology of the city of Chemnitz for the study of new possible modes of mobility, especially bike routes. Although initially data-driven, this project follows a participatory approach, involving academicians, citizens for voting the suggested routes, and city planners.
My contribution: I contributed in the initial stages of the study, to the workflow for urban analysis in grasshopper, especially bike(bicycle) scores for detecting the most feasible bike(bicycle) routes. Analysis
Workflow
The City: Chemnitz was first mentioned in 1143 and was founded between 1171 and 1174 as an imperial city. With the time of the Industrial Revolution around 1800 a great upswing and associated growth of the city began. Population growth rapidly from 1000 around 1800 to 360,000 in 1930 (previously the largest population) With the bombing on March 5, 1945, the centre was almost completely destroyed. The town hall and the Red Tower are among the few architectural monuments that could be saved
Chemnitz has a good 246,000 inhabitants as of July 2016. It is encouraging that the migration balance has been slightly positive for some years, so that the population decline has been stopped. Although, due to very less population, most of the activities are confined towards the city centre
FIGURE-GROUND PLAN
STREET NETWORK
BIKE PATHS
GREEN PATHS AND AGRICULTURE
Bike Score (normalized) Culture & Entertainment
Bike Score (normalized) Social & Government Service
Bike Score (normalized) Grocery
Bike Score (normalized) Errands
Bike Score (normalized) Shopping
Bike Score (normalized) Public
Bike Score (normalized) Mobility
Bike Score (normalized) Industries
Bike Score (normalized) Dining
Bike Score (normalized) Drinking
Bike Score (normalized) Average all Categories
ROUTE A SHORT LISTED BIKE ROUTES FOR VOTING
ROUTE B
References: The short-listing and analysis of individual routes were done by Sebastian Wisenhuetter at a later stage. Retrieved from: NUMIC Analysis by Sebastian Wisenhuetter, Wissensarchitektur Laboratory of Knowledge Architecture.
City Data retrieved from : https://m.chemnitz.de/chemnitz/de/unsere-stadt/stadtportrait/index.html https://m.chemnitz.de/chemnitz/de/unsere-stadt/stadtportrait/zahlen-und-fakten/bevoelkerung.ht ml
ROUTE C
Bike Score (normalized) Average all Categories
“THE CLOUD” URBAN INSTALLATION An Urban Installation in the City of Potsdam (for Potsdam Unterwegs im Licht 2021)
Client: City of Potsdam, Saxony. Location: City of Neustadt, Saxony Architect: Ruairí O’Brien. Architecture. Light. Spatial Design. Status: Proposal Stage
Brief: To design urban city element which could be used for spontaneous stage arts especially during a festival in Potsdam.
My contribution: I contributed in the preliminary, design of the elements, and their details.
The Concept: To make a stage, in the market square, in which artists can perform spontaneously. The stage has a primary urban installation - The cloud, which is suspended acts as a main focal point, and it reflects the light at night. One of the design proposals was to paint the cloud with invisible radiative UV paints and illuminate it with UV light at night
Model Preliminary design
Potsdam Unterwegs im Licht is a festival which is conducted every year. The photos of the festival in 2020 are on the left, designed by Ruairi O’ Brien. This is a proposal for an installation for this festival next year.
References: Photos of Potsdam Unterwegs, Retrieved from Ruairi O ’Brien LIGHT ART: http://www.ruairiobrien-lightart.com/ablauf/
10.8 7.042
10.8
12.767
Scale - 1:100
RESEARCH PROJECTS
8
9
PROJECT ADAM
SCORE - RESILIENCE FOR CORONAVIRUS.
10
11
AI AND ARCHITECTURE WORKSHOP
STUDY ON GERMAN OFFICE DESIGN STANDARDS
Research
Workshops / Studies
8 Research topic: Insitu Programmable surfaces with auxetic materials, for Architecture. Organization: TU Dresden - Wissensarchitektur Laboratory of Knowledge Architecture. Team members/ Collaborators: Niraj Kamal Karunanidhi, Joerg Rainer Noennig, Thomas Wallmersperger, Martin Sobcyk, Sebastian Wisenheutter, Konstantin Doll, Adam Urban. Status: Completion stage, research publication.
PROJECT ADAM Adaptive and Programmable Architecture and Material Structures: Insitu Programmable materials for Architecture.
Goal: The overall goal of project ADAM(alias for graduate school) is to set up a graduate school focussed on programmable architecture and geometry, generative design, programmable use cases etc. My project focusses on the programmable materials, to generate programmable geometries, which are either preprogrammed (predetermined during fabrication) or in-situ programmable (programmed in real-time to any desired geometry). The main challenge was to find a way to change the 3-dimensional curvatures of surfaces (Gaussian Curvature). To achieve this, the material has to expand and contract, and/or shear. Thus auxetic tessellation systems were used for this purpose. My contribution: I am currently authoring the paper, under the guidance of Prof. Joerg, and with the collaboration of the team mates/ co-authors. The topic of the paper is “Insitu Programmable surfaces with Auxetic tessellation Systems, for Architecture�, under the umbrella of ADAM. All the content shown in the report relates to the themes/content of the research paper. Research Project In-charge Authoring Conception Experimentation Reviewing papers Drawings/ Modelling Simulation/ Calculations
Previous works by the lab: Sebastian Wisenheutter and Adam Urban from the lab have already experimented with Ron-Resch's patterns and had made prototypes of moving building envelopes, using algorithms and research of Tachi.
Motivation: The lab has worked on projects related to spacial robotics, parametric architecture, and Intelligent Architecture. The models of a previous origami project caught my attention, and we decided to take this up as a warmup project to be finished by March. This was my very first research project - I had the chance to take up an initiative and work on the ideas from ‘phase-0’. However, later the project got extended due to the lockdown, as it remained dormant for a few months. The project again gained momentum, and now is in the final stage as a publication.
Origami: The Ron-Resch's Origami patterns were constrained in curvature due to the behaviour of their base hinges. These patterns were extensively studied by Ron Resch, and other researchers. The bases were studied and its crease patterns were modified to induce flexibility. .
Normal Base
Normal Ron-Resch Tessellation
Surface plate Mountain fold Valley fold
Normal Rigid Tessellation (Not flexible, forces do not spread during deformation, breaks easily when deformed)
Flexible Structure (Flexible, forces are spread across the surface, acts like a fabric)
Structural System: Preliminary prototypes of structural system for programmable surfaces.
Auxetic Structures: Auxetic Tessellations can theoretically assume any shape within a specific scaling factor [Konakovic 2018]. This proved to be a promising solution for programmable structures.
Structural System: In order to have multiple degrees of freedom, the actuators in the surface is gridded in different patterns, Also, multiple layers of surfaces and actuators were added to control the scaling factor(expansion/contraction) and Gaussian curvature separately.
Multi-layered surface
Preprogrammed surface
Prototypes @ Home - office
Insitu Programmable geometries using Auxetic Kirigami:
Img - Possible Rapid Actuation:
Retrieved from: Zheng Yan, Fan Zhang, Jiehen Wang, Fei Liu, Xuelin Guo, Kewang Nan, Qing Lin, Mingye Gao, Dongquing Xiao, Yan Shi, Yitao Qiu, Haiwen Luan, Jung Hwan Kim, Yiqi Wang, Hongying Luo, Mengdi Han, Yonggang Huang, Yihui Zhang, John A Rogers: Controlled Mechanical buckling for Origami Inspired Construction of 3D Microstructures in Advanced Materials. Advanced Functional Materials. Volume 26, Issue 16 (2016)
GLOSSARY:
SCORE
Smart Co-Creating Resilience in Public Health Emergency Horizon 2020 Call: H2020-SC1-PHE-CORONAVIRUS-2020 (Advancing knowledge for the Clinical and public health response to the 2019-nCoV epidemic)
Topic: SC1-PHE-CORONAVIRUS-2020 Organization: WISSENSARCHITEKTUR Laboratory of Knowledge Architecture, Horizon 2020. Headed by: Xiaoping Xie
Context and Short Brief: It was early February, and Wuhan was the worst hit hotspot of 2019 nCoV (Later named as CoVID-19) The disease was still an epidemic, and many terms and strategies were not clear as they are now. Countries were still assessing the risks. This proposal lays down important and key strategies to handle the situation, and to increase the level of preparedness. The team collaborated with hospitals and organizations in Europe and China. Important principles of Knowledge Architecture like citizen participation were applied to make the process as agile as possible. (The proposal is of 130 pages)
Image by CDC
My Contribution: I participated in the proposal, in brainstorming, and created a lot of conceptual diagrams for the proposal. Conceptual Diagrams Brainstorming
What I learned: - I had a chance to revise and learn epidemiology while brainstorming and doing background work. - I got an insight on how proposals are made and submitted in research laboratories, and about funding organizations. - I got an insight on various agile strategies which could be used in an architectural and city perspective during an outbreak. - I learnt to represent key concepts and work-flows through conceptual diagrams.
AI AND ARCHITECTURE A workshop implementing basic present computer vision techniques on architectural applications
Topic: Workshop on AI and Architecture Organization: WISSENSARCHITEKTUR Laboratory of Knowledge Architecture, NUMIC Team mates: Niraj Kamal Karunanidhi, Adam Urban, David Hick.
What we did: Implemented basic image processing algorithms in urban spaces using python. We visualised the data using QGIS. We brainstormed about emerging technologies related to AI and Architecture,
Implementation on sample models Brainstorming
Analysis of movements of people in an Urban Square in Copenhagen
3-model Generation GAN network stack (Source:Nvidia)
STUDY ON GERMAN OFFICE DESIGN STANDARDS Analysis and study on German Standards especially in the context of the pandemic.
Topic: Analysis of German Standards for office design. Organization: Ruairi O’Brien. Architecture. Light. Spatial Design.
What we did: Made a model office as a demonstrator for current German standards, analysed the details and measurements. Made toilet details later for Annenhoefe office space. Studied the standards in the context of Coronavirus.
Analysis Brainstorming Detailing
FLOOR SPACE FOR WORKING AREAS: At-least 8m^2 for one workspace Plus at-least 6m^2 for each additional workspace Standard Values: Cellular Offices (1-6 people) – 8-10m^2 per workstation Group Offices (up-to 25 people) – 10-12m^2 per workstation Open-Plan Offices (from 400m^2) – 12-15m^2 per workstation
Toilet Details of Annenhoefe Space
GUIDELINES DURING PANDEMIC FOR OFFICE SPACES (MAY 2020)
Lunch After U-CODE Press Conference (KA lab)
Colleagues at Ruairi O’Brien
Home Office
Colleagues(KA Lab) trying to eat the food I cooked :P
KA Lab during April
Getty Images - iStockphoto
Dresden Castle
TU Dresden
Slub Library
TU Dresden
Conclusion I had a very good time in Dresden. I was exposed to a sea of various fields and domains in Architecture. Looking back, this journey has been beyond my expectations, full of turning points. I had a perfect time reflecting upon my interests during the lockdown and while slowly walking from my office back to my room via Elbe and Dresden Castle. I am grateful for this beautiful journey. I had the chance to meet a lot of people, share ideas, knowledge and know their perspective of the world. That helped me see things differently with an open mind and to understand myself better. I learnt a tiny bit of German through conversations, and I have already given the exam for elementary German. I have envisioned myself to be involved in work related to smart systems and knowledge architecture. I have currently extended my stay to complete the research publication. I had the time to mature my vision for my future ambitions. This journey has definitely broadened my horizons, and I hope I could take this learning forward with my future endeavours.
Bibliography Grima, J.N., Manicaro, E., Attard, D.: Auxetic behaviour from connected different-sized squares and rectangles. Proc. R. Soc. A. 467(2121), 439–458 (2011) Gómez Lizcano D. E. (2013): An expandable pendentive dome and polyhedral mechanisms using angulated scissors with sliding elements. New Proposals for Transformable Architecture, Engineering and Design in the Honor of E. P. P. Escuela Técnica Superior de Arquitectura, Sevilla 53-58 Gu and Yau [2008] – conformal mapping Hoberman, C.: Reversibly expandable structures having polygon links. U.S. Patent number 6,082,056 (2000) Konaković, M., Crane, K., Deng, B., Bouaziz, S., Piker, D., Pauly, M. (2016) Beyond developable: computational design and fabrication with auxetic materials. SIGGRAPH Technical Paper, July 24–28 (2016) Friedrich, J., Pfeiffer, S., Gengnagel, C.: Locally Varied Auxetic Structures for Doubly-Curved Shapes (2018) Jungwook Kim1, James A. Hanna2, Myunghwan Byun1, Christian D. Santangelo2,*, Ryan C. Hayward1,*: Designing Responsive Buckled Surfaces by Halftone Gel Lithography. Science. Vol 335, Issue 6073 .09 March 2012. Konaković, M., Konaković, P., Pauly, M. : Computational Design of Deployable Auxetic Shells. Advances in Architec-tural Geometry (2018). Konaković, M., Panetta, J., Crane, K., Pauly, M.: Rapid Design of Curved Surfaces via Programmable Auxetics. ACM Trans. Graph., Vol. 37, No. 4, Article 106. Publication date: August 2018. Roberto Naboni, Stefano Sartori Pezzi, Embedding auxetic properties in designing active-bending gridshells, XX Con-greso de la Sociedad Iberoamericana de Gráfica Digital, Blucher Design Proceedings, Volume 3, 2016, Pages 720-726, ISSN 2318-6968, Raviv, D., Zhao, W., McKnelly, C. et al. Active Printed Materials for Complex Self-Evolving Deformations. Sci Rep 4, 7422 (2015). https://doi.org/10.1038/srep07422 Resch, R.D. (1973) The topological design of sculptural and architectural systems. In: Proceedings of the June 4–8, 1973, National Computer Conference and Exposition, AFIPS’73, pp. 643–650 (1973) * [Resch1973] - resch patterns Russel W Mailen, Catherine H Wagner, Rachel S Bang, Mohammed Zikry, Michael D Dickery, Jan, G.: Thermo-mechanical transformation of shape memory polymers from initially flat discs to bowls and saddles. Smart Materials and Structures, Volume 28, N0. 4. IOP Publishing ltd (March 2019). Saxena, K., Das, R., Emilio, P.: Three decades of Auxetics Research - Materials with Negative Poisson’s Ratio: A Review. Advanced Engineering Materials (2016), 18, No. 11. Springborn, B., Schröder, P., Pinkall, U.: Conformal equivalence of triangle (2008)
meshes. ACM Trans. Graph. 27(3)
Sawhney and Crane [2017] Tachi[2010] Tachi, T. (2007) “Origamizing 3d surface by symmetry constraints, Tachi T. (2011): Rigid-Foldable Thick Origami. Fifth international Meeting of Origami Science, Mathematics, and Educa-tion. 253-263 Tachi T. (2013): Freeform Origami Tessellations by Generalizing Resch’s Patterns. ASME International Design Engineer-ing Technical Conferences and Computers and Information in Engineering Conference. [Tachi 2013b] Teunisvan Manen, Shahram Janbaz Amir, A.Zadpoor. Programming the shape-shifting of flat soft matter. Materials Today. Volume 21, Issue 2, (March 2018). *Review paper*. Zheng Yan, Fan Zhang, Jiehen Wang, Fei Liu, Xuelin Guo, Kewang Nan, Qing Lin, Mingye Gao, Dongquing Xiao, Yan Shi, Yitao Qiu, Haiwen Luan, Jung Hwan Kim, Yiqi Wang, Hongying Luo, Mengdi Han, Yonggang Huang, Yihui Zhang, John A Rogers: Controlled Mechanical buckling for Origami Inspired Construction of 3D Microstructures in Advanced Materials. Advanced Functional Materials. Volume 26, Issue 16 (2016) Yigil Cho, Joong-Ho Shin, Avelino Costa, Tae Ann Kim, Valentin Kunin, Ju Li, Su Yeon Lee, Shu Yang, Heung Nam Han, In-Suk Choi, and David J. Srolovitz. Engineering the shape and structure of materials by fractal cut (2014). Amanda Ghassaei - Origami Simulator - http://apps.amandaghassaei.com/OrigamiSimulator/ Bergermeyer Research, Gentsler Research - Strategies to be followed during a pandemic in office spaces.