N I D H I B A L I G A ORTFOLIO
P E R S O N A L I N F O R M A T I O N 0 9 / 0 4 / 2 0 0 1
+ 9 1 - 8 0 8 8 0 2 4 0 1 0 n i d h i . k . b a l i g a @ g m a i l . c o m
2 0 3 , D i v y a P a r a d i s e , B l o c k A , B e j a i - K a p i k a d M a n g a l u r u - 5 7 5 0 0 4
N I D H I B A L I G A
S t u d e n t
0 1
E D U C A T I O N
N I T T E I N S T I T U T E O F A R C H I T E C T U R E
M a n g a l u r u
B . A r c h ( 2 0 1 9 - )
T H E O X F O R D S R . S E C . S C H O O L
B e n g a l u r u
C l a s s V I - C l a s s X I I
L A D Y H I L L E N G . H R . P R Y . S C H O O L
M a n g a l u r u
C l a s s I - C l a s s V
S K I L L S E T
A u t o C A D
S k e t c h U p
0 2
C
O N T E N T S
Performing arts centre
Institution design
site location: Mangaluru, India
Water Sensitive Urban
Housing design
site location: Bunder, Mangaluru, India
0 3
S k e t c h i n g
C r e a t i v e W r i t i n g
L A N G U A G E S
E n g l i s h
K o n k a n i
K a n n a d a
Everyday Urbanism
Urban design
site location: Bengaluru India
H i n d i T u l u
G e r m a n
R h i n o c e r o s
G r a s s h o p p e r
A d o b e P h o t o s h o p
E n s c a p e
V r a y
A d o b e I n D e s i g n
M S O f f i c e
I N T E R E S T S
W r i t i n g
R e a d i n g
H i s t o r y
L a n g u a g e L e a r n i n g
T r a v e l l i n g
S i n g i n g
P u b l i c S p e a k i n g
L e a d e r s h i p Q u a l i t i e s
M o d e l M a k i n g
3 D V i s u a l i z a t i o n
A n a l y t i c a l T h i n k i n g
I l l u s t r a t i o n
P h o t o g r a p h y
E X P E R I E N C E A N D A C H I E V E M E N T S
0 4
T H E B R O W N C A N V A S , ( F e b 2 0 2 2 - J u l 2 0 2 2 ) : I n t e r n
B e n g a l u r u
0 5
S u s t a i n a b i
Internship Work
Semester VI
The Browncanvas, Bengaluru
Sustainability Studio
Semester III
site location: Bengaluru , India
2 0 1 6
L i t e r a r y a n d M a g a z i n e C o m m i t t e e H e a d ( 2 0 1 8 )
l i t y W o r k s h o p b y A r P e t e r R i c h A n s w e r s t h r o u g h A d o b e - w o r k s h o p b y A r . K r i t i D h i n g r a 1 s t R u n n e r U p - B l o g g i n g C o n t e s t , D e l h i P u b l i c S c h o o l (
)
01 Performing Arts Centre Institution Design Semester 5
First Floor Plan
Process Models
Site Location : BEM School Ground, Mangaluru, Karnataka, India
The primary aim of this design studio was to come up with the design of a performing arts school, specializing in vernacular dance and music forms. The given site has an existing school, which was cinstructed in 1880s, built by the German missionaries, in vernacular style of architecture.
PROJECTOR ROOM STAGE BACKSTAGE CHANGING CUBICLES ENTRY/EXIT CHANGING CUBICLES Lvl -0.60 M Lvl -0.60 M Lvl +0.45 M Lvl +0.45 M Lvl +0.0 M Lvl +1.05 M Lvl +0.0 M STAGE MULTIPURPOSE HALL STUDIO 1 STUDIO 2 STUDIO 3 CAFETERIA AMPHITHEATRE 25 22 20 19 Lvl -2.4 M A A' B' Lvl +0.0 M B C C' D D' 0 5 10 20M Ground Floor Plan Nidhi Baliga | NU19UAR022 | Semester 5 | Architectural Design Studio 3 0 5 10 20M Ground Floor Plan Nidhi Baliga | NU19UAR022 | Semester 5 | Architectural Design Studio 3 LIBRARY ART WORKSHOP 27 26 23 17 16 Lvl +4.02 M Lvl +0.0 M A B' B C' D D' C
Ground Floor Plan
A
A’
Section AA’
02 Water Sensitive Urban Housing Design Semester 8
This studio aimed at providing housing for the working community, living in the old port area, belonging to various communities such as fishermen, truck drivers, ice factory workers, etc. The design also caters to water efficient aspect by incorporating features such as rain garden, bioswales, rainwater harvesting and treatment.
Site Location: Bunder, Dakke, Mangaluru,
Typology 2
0 N SCALE 1:500 20 40 60
Lake
1.
2. Marketplace 3. Park
4. Playground
5. Public Square 6. Type 1 Cluster
7. Type
2 Cluster
8. Type 3 Cluster
9. Fish drying area
1 A 2 3 10 11 4 5 6 7 8 8 9 A’ 9 A A’ 0 25 50m
0 25 50m C C’
10. Parking
Typology 1
Section CC’
03 Everyday Urbanism Urban Design Semester 7
Yelachenahalli is a neighbourhood located in the south of Bangalore. The site is situated along the green line of Namma Metro and is in between Yelachenahalli and Jayaprakaash Nagar Metro stations. The area is well accessible by metro, has nearby bus stations and auo stands, necessary services such as post office, police station, primary healthcare centres, within 2km radius around the site.
Site Images
Residential Public/semi-public Commercial Mixed Formal seating Informal parking Informal seating Proposed green space Proposed lake Landmarks
Street Lights Sidewalk 1.5m wide Unsafe areas Draincover
The Kalyani is a contemporary interpretation of the typical temple pond and becomes a point of reference for all religious processions. This was located in the south-eastern corner due to easy access from the road as well as the village. The Kalyani’s drainage is linked to the city drainage so that it does not faul the lake water.
Parking Boating Deck
The primary focus of the design was to make it as inclusive as possible - a space that would aid citizens in experiencing the flora and fauna while engaging in the context of the region. In a time, when cities across the world are getting homogenised In terms of its planning and design, it is such engagement that help conserve and propagate the regional ethos of a place.
Design Intervention 1 2 3 4 5 6 7 9 11 A’ 10 Section AA’ Lvl +7.0M Lvl +2.5M Lvl +0.0M Lvl -5.0M Lvl -15.0M Scale 1:750 B Detail Section at B
Kalyani Tank
Entrance Plaza Seating Space Food Court Seating Space
LEGEND
1. Parking
2.Entrance Plaza
3. Food Court with Seating 4.Shops
7.Boating
8.Lake 9.Floating
10.Walking
11.Kalyani
5.Weekly Market 6.Viewing Deck
Deck
Island
Track
Tank Lake Kalyani Island Market Plaza
04 Internship Works The Browncanvas Feb 2022 - Jul 2022 Semester 6
Internship Work
The scope of work during my internship ranged from developing detailed sectional elevations for interior projects, 3D modelling, both interior and exterior projects, developing floor plan and facade renders. I have also gained experience in site visits and supervision of the projects
TV AC AC S 2 S G Inv Ges WP w CB CS DVP WALL MOUNT POINT 15 AMPS SOCKET AMPS SOCKET TELPHONE POINT T.V. POINT DISTRIBUTION BOARD CIELING MOUNT POINT LEGEND: AIR CONDITIONER SWITCH AIR CONDITIONER AMP SOCKET FAN REGULATOR EXHAUST FAN @ 2500mm FFL TWO WAY SWITCHES SWITCHES GEYSER SWITCH GEYSER 15 AMP SOCKET CEILING MOUNT FAN POINT UPS 15 AMP POINT FOR WATER PURIFIER CONTROL SWITCH TO WATER PURIFIER CALLING BELL POINT CALLING BELL SWITCH DOOR VIDEO PHONE WM & Dr DW KITCHEN UTILITY SON'S BEDROOM MASTER BEDROOM STORE FOYER BALCONY BALCONY WALK-IN WARDROBE F PUJA MW &O DINING TOILET ENTERTAINMENT ROOM Any discrepancy between architectural and consultants dwg have to be brought the Architect notice for approval not, contractors responsibility. All dimensions are given in millimeter. Do not scale drawings, follow only dimensions mentioned. All dimensions to be checked site. Do not use the drawing for any other purpose other than mentioned for. SITE: YELAHANKA CITY: BANGALORE VER 1.0 R0 SCALE: 1:50/ A3 DWG NO.: PI/ED/P-01 ELECTRICAL DRAWING DATE 08 03 2022 CONSULTANTS ELECTRICAL STRUCTURAL CLIENT MR.PRASANTH PROJECT APT INTERIOR N PHE LINEN STORAGE BREAKFAST COUNTER CROCKERY UNIT CUM TV UNIT FOR ENTERTAINMENT ROOM TOILET LIVING 150 TV S S 1910 AC S AC 450 S AC AC S 150 900 AC TV S S 350 S 1425 S 1200 375 1400 AC 300 AC AC S AC AC S 350 S 350 S AC S S S 225 S S 300 S 150 S 1375 S S S S S S 650 Ges 450 775 w S S 500 1425 300 S 300 1475 450 200 450 725 S 150 1150 150 150 310 310 310 S 1140 S 550 1075 900 1425 445 S 850 350 1375 650 1300 EQ/575 EQ/575 600 900 100 500 EQ/1925 EQ/1925 2075 1045 150 C 1675 1925 CS DVP 900 1815 1435 1440 1440 15 AMP POINT FOR CURTAIN MOTOR NOTES: 1.POSITION OF ELECTRICAL POINTS ON THE CARPENTERY ARE INDICATIVE, THE ACTUAL POSITION WILL CARY ACCORDING TO FURNITURE DETAIL. 2.ELECTRICAL POINTS IN THE KITCHEN MAY VARY SLIGHTLY AS PER CARPENTRY DETAIL. THE SWITCHES NEXT TO THE BED ARE +650MM C.O.P FROM FINISH FLOOR LVL. KITCHEN AND BATHROOM SWITCHES AND SOCKETS ARE AT 1375MM C.O.P FROM FINISH FLOOR LVL (ALSO REF ELEVATIONS). IN KITCHEN AMPS- @ 650MM FROM FFL FOR HOB AND @1875MM FROM FFL FOR THE CHIMNEY. ALL THE OTHER SWITCHES AND REGULATORS ARE+ 975MM C.O.P FROM FINISH FLOOR LVL. ALL THE WALL MOUNT POINTS ARE AT+1950 MM C.O.P FROM FINISH FLOOR LVL (ALSO REFER THE ELEVATIONS) TV POINT AND TEL. OUTLETS SHALL BE FIXED AT 450MM FROM FFL (ALSO REFER THE ELEVATIONS). ALL THE SWITCH PLATES SHOULD BE RECTANGULAR MODEL, OF 2,4,6, AND MODEL, NO SQUARE PLATE TO BE USED. 10. IN CASE OF TWO INDIVIDUAL RECTANGULAR PLATES ARE USED, SHOULD BE ALIGNED TO ONE SIDE OR TO THE CENTER. 11. ALL ELECTRICAL FIXTURES TO BE APPROVED BY THE ARCHITECT. 12. REFER THE TYPICAL ELECTRICAL ELEVATIONS FOR ALL ROOMS FOR HEIGHTS. 1520 200 850 3990/ CENTER OF WALL 525 S 300 380 S 300 650 Any discrepancy between architectural and consultants dwg have brought the Architect notice approval not, contractors responsibility. dimensions are given millimeter. not scale drawings, follow only dimensions mentioned. dimensions be checked site. not use the drawing for any other purpose other than mentioned for. SITE: YELAHANKA CITY: DETAIL DRAWING DATE :11 03 2022 VER 1.0 R0 SCALE: 1:30 A3 DWG NO.: PI/DD/FCD02 CLIENT MR PRASHANTH PROJECT APT INTERIOR CONSULTANTS ELECTRICAL STRUCTURAL PHE N DT A WALK-IN WARDROBE 150 32 200 300 32 1195 1195 1185 32 300 300 600 300 300 DT B 100 670 300 200 100 300 150 32 200 200 300 100 25 DT C SPRINKLER DUCT COVE LIGHTING AROUND FALSE CEILING - 19 MM THK PLYWOOD WITH VENEER CEILING FAN POINT CHANDELIER LIGHT POINT PROFILE LIGHT POINT 2370 COVE LIGHT FALSE CEILING 19 MM THK PLYWOOD WITH VENEER PROFILE LIGHT WALL PANEL COVE LIGHT PROFILE LIGHT SPRINKLER DUCT 20 MM THK MARINE GRADE PLY FINISHED WITH PAINT AS PER SELECTION TRACK FOR CURTAIN 50 FALSE CEILING 19 MM THK PLYWOOD WITH VENEER COVE LIGHT DETAIL AT A DETAIL AT B DETAIL AT C PLAN WALL PANEL UPTO SLAB BOTTOM PELMET FOR CURTAIN 200 S 300 S 2 S 1425 Any discrepancy between architectural and consultants dwg have to be brought the Architect notice for approval not, contractors responsibility. All dimensions are given millimeter. Do not scale drawings, follow only dimensions mentioned. All dimensions to be checked site. Do not use the drawing for any other purpose other than mentioned for. SITE: YELAHANKA CITY: DETAIL DRAWING DATE :11 03 2022 VER 1.0 R0 SCALE: 1:30 A3 DWG NO.: PI/DD/FCD02 CLIENT MR PRASHANTH PROJECT APT INTERIOR CONSULTANTS ELECTRICAL STRUCTURAL PHE DT A 150 32 200 300 32 1195 1195 1185 32 300 300 600 300 300 DT B 100 670 300 200 100 300 150 32 200 200 300 100 25 DT C SPRINKLER DUCT COVE LIGHTING AROUND FALSE CEILING - 19 MM THK PLYWOOD WITH VENEER CEILING FAN POINT CHANDELIER LIGHT POINT PROFILE LIGHT POINT 2370 COVE LIGHT FALSE CEILING 19 MM THK PLYWOOD WITH VENEER PROFILE LIGHT WALL PANEL COVE LIGHT PROFILE LIGHT SPRINKLER DUCT 20 MM THK MARINE GRADE PLY FINISHED WITH PAINT AS PER SELECTION TRACK FOR CURTAIN 50 FALSE CEILING - 19 MM THK PLYWOOD WITH VENEER COVE LIGHT DETAIL AT A DETAIL AT B DETAIL AT C PLAN WALL PANEL UPTO SLAB BOTTOM PELMET FOR CURTAIN 200 S 300 S 2 S 2 1425 SITE: YELAHANKA CLIENT :MR PRASHANTH DWG NO PR/TD/01/ DATE 01.04.2022 BANGALORE TOILET DETAIL DRAWING PROJECT :APARTMENT INTERIOR ARCHITECTS Q.S PHE ELECTRICAL STRUCTURAL CONSULTANTS SCALE 1:20 VER 1.0 R0 consultants dwg have be contractors responsibility. mentioned. than mentioned for. 800 MIRROR WITH LIGHTING OVERCOUNTER WASH BASIN MOUNTED MIXER 100 MM TILE SKIRTING VARYING AS PER SLOPE 800 12MM THK CORIAN AS PER SELECTION 1 2 4 1 375 FALSE CEILING AT EXISTING FALSE CEILING LEVEL 1200MM X 600MM ARBESCATO WHITE TILE 100 850 300 3 2 1 OVERHEAD SHOWER 1200MM X 600MM ARBESCATO WHITE TILE WALL MOUNTED WC WITH CONCEALED FLUSH TANK FALSE CEILING AT EXISTING FALSE CEILING LEVEL 100 MM THK LEDGE WALL WITH 12MM THK CORIAN ON TOP 1 2 GEYSER NICHE FINISHED WITH 12 MM THK CORIAN AS PER SELECTION 1 4 3 2 700 300 1000 EQ EQ EQ EQ 450 410 280 280 280 280 325 100 300 150 1650 280 100 2000 650 SHUTTER :19MM THK PLY FINISHED WITH 210UNIMR+ FROSTY WHITE LAMINATE ADJUSTABLE SHELVES FOR SHOE STORAGE WOODEN GROOVES WITH MARBLE AND COPPER TINTED MIRROR WITH BRASS INLAY AS PER DETAIL SHOE SEATER WITH 75MM THK CUSHION SHOE STORAGE: 19MM THK PLY FINISHED WITH 210UNIMR+ FROSTY WHITE SHUTTER: WOODEN GROOVES WITH MARBLE AND COPPER TINTED MIRROR WITH BRASS INLAY AS PER DETAIL SHOE SEATER WITH 75MM THK CUSHI0N 650 FOYER 7'0"x 5'6" 230 350 340 290 460 SHELF SHOE SEATER WITH 75MM THK CUSHION SHUTTER: 19MM THK PLY FINISHED WITH 210UNIMR+ FROSTY WHITE LAMINATE WOODEN GROOVES WITH MARBLE AND COPPER TINTED MIRROR WITH BRASS INLAY AS PER DETAIL VER 1.0 R0 SCALE 1:30/ A4 CONSULTANTS STRUCTURAL ELECTRICAL Q.S PHE PROJECT INTERIOR ARCHITECTS CLIENT PRASHANTH SITE: YELAHANKA CITY: BANGALORE DATE 25.04.2022 DETAIL DRAWING DWG NO PR/DD/FD/01 FOYER DETAIL FOYER 7'0"x 5'6" 230 300 350 SHELF SHOE SEATER WITH 75MM THK CUSHION ABOVE SHUTTER: 19MM THK PLY FINISHED WITH 210UNIMR+ FROSTY WHITE LAMINATE PLAN AT 600MM FROM FFL PLAN AT 450MM FROM FFL S 01 S 02 SECTION 01 SECTION 02 300 290 DUMMY 300 DUMMY 280 280 280 290 DUMMY Any discrepancy between architectural and consultants dwg have to be brought to the Architect notice for approval if not, is contractors responsibility. All dimensions are given in millimeter. Do not scale drawings, follow only dimensions mentioned. All dimensions to be checked at site. Do not use the drawing for any other purpose other than mentioned for. 700 340 DUMMY 300 150 455 DRAWER DUMMY DUMMY 455 455 440 475 475 475 460 DRAWER WITH KNOB AS PER SELECTION SON'S BEDROOM WARDROBE SECTION VER 1.0 R0 CONSULTANTS PROJECT INTERIOR SITE: CITY: BANGALORE DATE 06.01.2022 DESIGN DRAWING DWG SECTION LEDGE WALL PANEL WITH PROVISION FOR PROFILE LIGHT 415 2730 750 25 200 25 1100 DRAWER DRAWER 725 SHELF 690 19MM PLYWOOD SHELF WITH PROFILE LIGHT FINISHED WITH 14554RH HOOKED HOLZ ACACIA LAMINATE 180 300 300 SHELF 1625 FRAME MADE OF 25X75MM MS BOX SECTION INSIDE 75 930 75 75 450 120 DRAWER HANDLE FINISHED WITH UPHOLSTERY STUDY TABLE FINSIHED WITH LAMINATE AS PER SELECTION DRAWER DRAWER 180 75 DETAIL AT A MATTRESS UPHOLSTERY DRAWER HANDLE OF 19MM THK PLY 450 150
Detailed sectional elevation with material specifictions for an interior project
modelling works REFRIGERATOR BUILT-IN OVEN MICROWAVE 850 LONG TERM STORAGE LONG TERM STORAGE DRAWER DRAWER DRAWER 100 530 640 PUJA 525 525 600 600 210 210 210 650 600 320 350 ADJ SHELF 1030 600 650 600 SECTION 02 GREY ACRYLIC SHUTTER WITH PROFILE HANDLE QUARTZ COUNTERTOP AS PER SELECTION PUJA AS PER DETAIL FALSE CEILING AS PER DETAIL FALSE CEILING AS PER DETAIL 550 400 400 400 400 LONG TERM STORAGE LONG TERM STORAGE 2100 400 400 400 595 X 595 X 575 595 X 388 X 467.5 600 1825 X 912 X 861 LOFT WITH SHUTTER: 19MM THK PLY AND 25MM X 25MM TEAKWOOD BEADING GREY ACRYLIC SHUTTER WITH DUSTBIN ATTACHED QUARTZ DADDO AS PER SELECTION PLATE RACK AS PER SELECTION 580 400
Floor plan render for a marketing drawing 3D
05 Sustainability Studio Institution Design Semester 3
Sustainability Studio
Institution Project
Semester 3
Site is located off NH44 adjacent to Bettahalasuru Quarry which is not active at present. The site is well connected to major destinations in and around the city of Bengaluru.
Project Brief :
To design an architecture college on the above mentioned site, keeping in mind sustainability and passive design strategies so that the users of the building are thermally comfortable.
Inferences drawn
1. Orientation:
The longer facades of the blocks face North-South direction, so as to cut down surface radiation from East and West.
2. Wind Barrier
From the wind rose diagram it is observed that prevailing winds from south-west direction is at a high velocity, hence trees have to be planted which act as a wind barrier.
3. Cross Ventilation
Windows have to be provid ed on the opposite walls to ensure cross ventilation and quality air circulation through out the space.
4. Stack Effect
The units have to be stacked on top of each other so that hot air which is less dense can rise up and escape. Open courtyards are an optimum medium through which air can escape. Passive Design Strategies
05
Inlet of Tower Mist Sprayer Cool air exiting PDEC Water collecting Green Roof PDEC Tower Combination of Green Roof and PDEC Tower 1. Site Entry / Exit 2. Parking 3. Lobby 4. Classrooms 5. Computer Lab and AV Room 6. Spill Over Space 7. Model Making Space 8. Dean’s Office 9. Admin Office 10. Toilets 11. Faculty Block 12. Studio Classrooms 13. Cafeteria 14. Auditorium C’ A’ D’ Evolution of Form
Classrooms Computer Labs and AV Room Admin Office and Library Studio Classrooms Cafeteria Faculty
Toilets Auditorium
Circulation Space
Block
Lvl + 0.45m Plinth Lvl + 4.45m GroundFloor Ceiling Lvl + 8.45m First Floor Ceiling Lvl + 12.45m Second floor Ceiling Lvl + 15m PDEC Tower Outlet Lvl + 18m PDEC Tower Inlet Inlet Detail Section BB’ Wall Louvered Window Mist Sprayer Lintel Louvered Window Flooring RCC Slab Room Inlet Detail South Elevation East Elevation
THANK YOU N I D H I B A L I G A n i d h i . k , b a l i g a @ g m a i l . c o m