MONTGOMERY PARK MASTER PLAN A VISION FOR NORTHWEST PORTLAND
MAY 2020
MONTGOMERY PARK MASTER PLAN A VISION FOR NORTHWEST PORTLAND TABLE OF CONTENTS The Big Picture 04 Site Discovery 12 Vision 28 District Framework 30 East Zone 44 American Can Warehouse 54 Central Zone 60 Montgomery Park Building 70 West Zone 76 Trailhead Lodge 86 92
Resiliency & Infrastructure
110
Master Plan Team 122
NW
NW 29 TH AVE
Streetscape / Mobility / Parking / Service
T AI S
OL NIC
NW
W AR
DW AY
2
NW
26 T
H
AV E
ILSON
NW W
NW TH
27
E AV
N ST
AUGH NW V
3
ST
THE BIG PICTURE
4
5
INTRODUCTION & OPPORTUNITY Montgomery Park is an icon of Portland industry and commercial activity. Its century old architecture is rich in character and steeped in stories that echo the City’s own economic and cultural lineage. Montgomery Park is also uniquely situated next to one of the region’s most renowned natural resources, Forest Park, that provides the site with a singular opportunity to renew itself as an iconic mixed-use district that celebrates Portland’s famed urban outdoor lifestyle and anchored by the same landmark building Portlanders have treasured for a century. With incredible vision that respects the past and looks to the future, Montgomery Park seeks to evolve a deeply rooted community and commercial core with direct connections to acres of forested parks and miles of trails in Northwest Portland.
A singular opportunity to renew itself as an iconic mixed-use district that celebrates Portland’s famed urban outdoor lifestyle
6
DISTRICT PARK MAIN SQUARE SHARED STREET / DISTRICT SPINE MONTGOMERY PARK BUILDING & ATRIUM RE-PURPOSED LANDSCAPE RAMPS & DECK AMERICAN CAN COMPLEX TRAILHEAD LODGE FUTURE STREETCAR POTENTIAL PEDESTRIAN BRIDGE
1 2 3 4 5 6 7 8 9
FUTURE VISION DARY
TY BOUN PROPER
I ST
NW
OLA NIC
2
RK BLVD
LEWIS & CLA
3
1
7
4
5
8
NW WILSON ST
NW 26TH AVE
9
NW 27TH AVE
6
NW WA
RDWAY
NW VAUGHN ST
0
OVERALL MASTER PLAN
100 N FT
7
A NEW LAUNCHING POINT TO FOREST PARK Portland is known for its access and cultural identity to the outdoors. Montgomery Park District has the opportunity to leverage its proximity to Forest Park and build an identity and purpose as an outdoor mecca and urban trailhead for the nearby 5,200 acre park. The district will become a threshold where city meets park with a future streetcar expansion and parking garage that increases public access and a new district park and Trailhead Lodge where the outdoor community can gather. This recreational lifestyle offers business and event opportunities for retailers, rental shops, and local parks office to cater and educate the public.
WEST
CENTRAL
5 MINUTE WALK
EAST
TO FOREST PARK FROM STREETCAR
N
80+ MILES
K R ACRES s PA elane5,200
ir F T & ES , Roads s Trail
e1
2 Firelan e
e3
l an Fir e
TH
n gh Va u
. St
rm
an
NW
SECTION A
Th u Lowe r McLe a y Tr
Cu mb erla nd
Rd
.
NW
Rd .
Bu r
NW
ckDr. Pitto
y T r. Mc L ea
W
p er
H
W
Pittock n Mansio
4
ne La man
ns
Cum
id e
T ra d
Wildw
d D o gwoo
pson Thom
t
nu est Ch ail Tr
Tunn el land e br
Up
12
6
7
5 3 rd
13
Tra i l
oo
N
. Rd
n
14
erry Tr d Ch Wil
er Ald
Tra il 10
NW 53rd Dr.
r
e
Rd.
ol
tur
Birch T
Na
8
15
Sa l tz ma
Fi
4
5
e lan re
so Er
dw o
Wireg
n 5 r e la e
17
od
W i l dwo
9
Trail
M apl e Trail
. Rd
Wil
SECTION B Leif E riks on D
Trail
e4
1 lan e ire Le if
l e Tra i l
M ap
ne Rd G a s Li
r
Wi
Rid g e Trail
Firela n
zman Salt
n
Leif
Tra il . R d esty d H ar
Spr ingville
ik
11
t.
orn ell
St. Joh .
Rd
S p ringv i
Wild wo d Tr o
Trail
own ant rm
Waterlin e
nR
BPA Rd .
To li
Firela n e 9
. Rd
d. od wo Wil d
Cannon Trail
10 Firel a n e
. y Rd
15
Ge
berr
to
New
nda T rail
Linn ton
Ne w ton Rd .
Tra il
Newto n R
d. BPA R
12 l a ne F ire 13 ne e ir
la
F
F i relan
18
n
n Aspe
0
Rd
8
on Drive Leif Eri ks
7
16
SECTION C TH
1
.
N ew
23
Tr i l l ium Trail
2 3
6
in e
O il L ne 7 ela r. Trail d Fi ate T oo 19 ldw
Leif E riks on Dri ve
n Drive kso Eri
Dr
21
NW Nicolai S
Fi
22
24
FOREST PARK / LOWER MACLEAY TRAILHEAD
d. R
Trail
e
e
25
Ye
ens Rd.
20
9
10
y 30
NW St. Hel 8
so Erik
lle
Hw
ve. on A
.
od
30
11
NW
ns Rd
Leif
28
Tr a
29
t. Hele
dg
ood dw 27
il
NW S
Tra il
Wil 26
Trail
.
y 30
Hw
1
s Rd
. Ave
Tr
d.
elen
ront
F NW
F
St. H
MONTGOMERY PARK DISTRICT
River
ns Brid
ge
Willame t te
Ri
NW
LE
R O F URBAN AXIAL ORDERED
GREEN FLEXIBLE DISCOVERED
OF PUBLIC FOREST LAND
NW
PARK CITY
TO DOWNTOWN PORTLAND
il
TO FOREST PARK
NW WILSON ST
NW C
NW 27TH AVE
OF ACCESSIBLE TRAILS
3
5
NW
Corn e ll
WILDWOOD TRIAL CONTINUES SOUTH TO HOYT ARBORETUM, JAPANESE GARDENS, ROSE GARDENS, ad arker OREGON ZOO, &TVIETNAM railhe MEMORIAL M e l i arker ood M M w e l d i l i M 14 W n Dr.
INDUSTRY
LEIF ERICKSON TRAIL AIL
R YT R R
HE
C ILD
1.2 MILES 25 MINUTE WALK 12 MINUTE BIKE RIDE
W
MONTGOMERY PARK DISTRICT
NW
LOWER MACLEAY TRAIL
0.7 MILES 13 MINUTE WALK 6 MINUTE BIKE RIDE
0.4 MILES 6 MINUTE WALK 3 MINUTE BIKE RIDE
ICK
SO
T NS
NT
MA
RA
IL
UR TH
ASPEN TRAIL
PARK
FUTURE STREETCAR LINE EN
TRA
IL
NW VAUGHN ST
LD WI
WO
ACCESS TO TRAILHEADS
HOLMAN LANE ENTRANCE
NW THURMAN ST
0.9 MILES 16 MINUTE WALK 10 MINUTE BIKE RIDE
FOREST PARK FEATURES • • • • • •
FUTURE DISTRICT PARK
IL
RA
T OD
FUTURE STREETCAR STATION
THE STONE HOUSE WITCH’S CASTLE BALCH CREEK PITTOCK BIRD SANCTUARY PORTLAND AUDUBON PITTOCK MANSION
AN HOLM
NW 27TH AVE
ASP
NW WILSON ST
NW 29TH AVE
EIF
ER
ST NW NICOLAI
CITY
LANE
ER
LOW
Y LEA C A M
IL
TRA
0
400 N FT
9
PRINCIPLES & IDENTITY
1
ESTABLISH THE MONTGOMERY PARK DISTRICT AS AN EPICENTER FOR PORTLAND’S URBAN OUTDOOR LIFESTYLE, ROOTED IN ITS PROXIMITY TO FOREST PARK AND CONNECTION TO THE CITY
2
5 3
DESIGN PEDESTRIAN-FRIENDLY BUILDINGS AND SPACES THAT ARE FLEXIBLY PROGRAMMED, VARIABLY SCALED, AND DYNAMIC
CELEBRATE THE 1905 LEWIS & CLARK CENTENNIAL EXPOSITION HISTORY AND FAMED FORESTRY BUILDING LEGACY
DEVELOP A DESTINATION DISTRICT ANCHORED BY THE ICONIC MONTGOMERY PARK BUILDING AND AMERICAN CAN COMPLEX
4
FOSTER COMMUNITY BY CREATING AN AUTHENTIC PLACE FOR NORTHWEST PORTLAND THAT IS WELCOMING, SAFE, AND INCLUSIVE
MONTGOMERY PARK DISTRICT URBAN TRAILHEAD FOR FOREST PARK
PARK FOREST PARK 10
TRAILHEAD LODGE
MONTGOMERY PARK BUILDING
AMERICAN CAN COMPLEX
7 6
EMBRACE PORTLAND’S LOCALLY ROOTED IDENTITY WHILE ESTABLISHING THE DISTRICT AS A REGIONAL DESTINATION FOR RETAIL, ARTS, INNOVATION, FOOD, AND CREATIVE CULTURE
DESIGN A COHERENT ARCHITECTURAL VOCABULARY THAT CELEBRATES THE HISTORIC BUILDINGS WHILE ARTFULLY INCORPORATING A CONTEMPORARY MIX OF USES
8
10
ELEVATE THE MONTGOMERY PARK BRAND THROUGH MEANINGFUL DEVELOPMENT PHASES THAT EXECUTE AN ECONOMICALLY SUCCESSFUL PLACE WHERE PEOPLE WANT TO WORK, LIVE, AND PLAY
EXEMPLIFY ENVIRONMENTAL STEWARDSHIP AS INTEGRAL PART OF PLACEMAKING
9
PROMOTE CONNECTIVITY BY BECOMING A MULTI-MODAL TRANSIT HUB FOR NORTHWEST PORTLAND
CITY DOWNTOWN PORTLAND
WILLAMETTE RIVER 11
SITE DISCOVERY
12
13
PROJECT POSITIONING MONTGOMERY PARK DISTRICT
Montgomery Park District is located on the northwest edge of what is known as the Northwest District of Portland surrounded by residential neighborhoods to the south, industrial park to the north, and Forest Park to the west. Due to local height restrictions in the area the Montgomery Park building and sign soar over adjacent buildings and act as an ionic beacon for the district and wayfinding monument in the city. With current growth and development pressures pushing towards the northwest the district has a unique opportunity to establish a destination as a melting pot where city, industry, and park combine to provide a place for living, outdoor culture, commerce, business, food and beverage, events, wellness, fitness and access to open space. This transformation of the district into a walkable and compact urban development for residents and visitors will distinguish itself from many other successful districts in Portland.
FOREST PARK
FOREST PARK
MONTGOMERY PARK DISTRICT
An ionic beacon for the district and wayfinding monument in the city.
FOREST PARK & LOWER MACLEAY TRAILHEAD
PARK
CITY 14
INDUSTRY
HW
Y
ST LE
I5
HE
FR BR EM ID ON GE T
NS ST
W
NW VAUGHN ST
MONTGOMERY PARK
SPORTS VENUE
ELIOT
20
SLABTOWN
IL
LA
M
ET
NE GRAND AVE / NE MLK JR BLVD
NW
GUILD’S LAKE INDUSTRIAL SANCTUARY
RI
VE
LLOYD
PEARL
BANFIELD EXW
NE
OLD TOWN
SA
YB ND
Y
D LV
E BURNSIDE ST
GOOSE HOLLOW
URBAN NEIGHBORHOOD
NORTHWEST DISTRICT WEALTHY
TRENDY
HISTORIC HOUSING
ARSTY / BOUTIQUE
RETAIL CORRIDORS
NOB HILL / 21ST & 23RD ST POST-INDUSTRIAL
VIBRANT / LIVELY
ART GALLERIES
UPSCALE NEIGHBORHOOD
SATURDAY MARKET
NIGHTLIFE
PEARL
BUCKMAN
DOWNTOWN
SE MORRISON ST
SE INDUSTRIAL
6
HW
CONVENTION CENTER
SHOPS / RESTAURANTS / NIGHTLIFE
R
KERNS
HILLSIDE
LLOYD
QUIET & GREEN
I 405
NORTHWEST DISTRICT
IRVINGTON
NE BROADWAY ST TE
FOREST PARK
NOB HILL
HOTELS
SHOPPING MALL
Y2
OLD TOWN
CHINATOWN
HISTORIC / PORTLAND SIGN
SE HAWTHORNE BLVD
PSU
MIXED-USE
I4
05
HOSFORD - ABERNETHY
HIGH-RISE TOWERS
DOWNTOWN
CENTRAL BUSINESS DISTRICT
PSU
SE DIVISION ST
RESTAURANTS SE M UGH LIN BLV
SOUTH WATERFRONT
CLO D
PORTLAND CONTEXT
I5
OHSU
SE P
INDUSTRIAL
SE INDUSTRIAL
OWE L
L BL VD
CREATIVE OFFICE
WATERFRONT PARK
OHSU CONNECTION
HEALTHCARE / RESEARCH
MAJORITY HIGH RISE HOUSING 15
SOUTH WATERFRONT
HISTORY
MONTGOMERY PARK BUILDING & AMERICAN CAN COMPLEX
LEWIS & CLARK EXPOSITION The origins of the site date back to the 1905 Lewis and Clark Centennial Exposition which was a worldwide exposition held in Northwest Portland to celebrate the centennial of the Lewis and Clark Expedition. This four-month exhibit with twenty-one represented countries and their relative buildings included events and large open spaces for gathering. The Forestry building by Oregon was constructed of heavy timber to promote the local construction history and the main street was called the Lewis & Clark Boulevard. The future transformation of Montgomery Park District cherishes this rich cultural history of the Exposition by reimagining the Forestry building into a contemporary Trailhead Lodge as well as incorporating modern day Lewis & Clark Boulevard.
FORESTY BUILDING
1920 POSTCARD
1920 CONSTRUCTION
HISTORICAL BUILDINGS In 1920-21 the two historical Montgomery Ward and American Can Complex buildings were built adjacent to the Exposition and provide a unique architectural character for the district. The Montgomery Ward Building was built as a mail order catalog warehouse and following the closing of the business in 1985 the building was converted to the second largest office building in Portland. Concurrently, the building name changed from ‘Montgomery Ward’ to ‘Montgomery Park.’ The American Can Complex was built for can packing production and closed after 38 years and in 1985 when the Montgomery Ward building was converted the American Can Complex was also converted into a garage to accommodate the Montgomery Park office tenants. 16
FORESTY BUILDING
1939
1980
1950
1905 LEWIS & CLARK CENTENNIAL EXPOSITION
FORESTRY BUILDING
FORESTRY BUILDING
LEWIS & CLARK BOULEVARD
EVENTS
PROJECT BOUNDARY FORESTRY BUILDING
FORESTRY BUILDING
OPEN SPACES 17
EXISTING CONDITIONS The district is currently comprised of six various buildings including Montgomery Park buildings, American Can Complex, and the north garage. The existing site can fit roughly twelve Portland blocks within its boundary and is only five-minute walking distance from end to end.
TYPICAL PORTLAND BLOCK
60’
200’
BLOCK
R.O.W.
BLOCK
200’
200’
SITE INFORMATION TOTAL SITE : 17.5 ACRES (765,416 FT2) EXISTING TOTAL GSF = 1,178,537 FT2 EXISTING F.A.R. = 1.5:1 •1 MONTGOMERY PARK: 748,663 FT2 •2 NORTH GARAGE: 101,877 FT2 • AMERICAN CAN COMPLEX: 327,997 FT2 •3 MAIN BUILDING: 257,534 FT2 •4 WAREHOUSE: 36,325 FT2 •5 TOOL SHED: 8,764 FT2 •6 ADMIN: 25,374 FT2 EXISTING PARKING SPACES: 2,071 SPACES EXISTING CONDITIONS SECTION
1
18
1,343’
53’
Parking Lot
Court NW 26th Ave
4
5
6
7
8
9
10
11
12
1/4 MILE - 5 MIN WALK
12
PORTLAND BLOCKS WITHIN PROPERTY BOUNDARY
884’
149’
Old Rail
3
SECTION CUT
AMERICAN CAN COMPLEX
65’ MAX Build
2
37’
Parking Garage
173’
MONTGOMERY PARK BUILDING 136’
65’ MAX Build
65’ MAX Build
Warehouse
Drive + Parking NW 27th Ave
Parking Lot NW Wardway
MONTGOMERY PARK 9 LVLS (136 FT)
NORTH GARAGE 4 LVLS (26 FT)
AMERICAN CAN TOOL SHED 2 LVLS (28 FT)
AMERICAN CAN WAREHOUSE 2 LVLS (48 FT)
NW NICOLAI ST
PROPE
RTY BO U
2
NDARY
5 26 TH AV E
WA R
DW AY
NW
NW
4
NW
27 T
H
AV E
1
3 6
NW NW
VAU G
HN
WIL
SON
ST
ST
AMEICAN CAN FACTORY 3 LVLS (60 FT)
AMERICAN CAN ADMIN 3 LVLS (50 FT) R ST SHU UP
BIRDSEYE OF EXISTING SITE 19
INITIAL IMPRESSIONS PUBLIC REALM • PROS • ARCHITECTURAL CHARACTER • SPACES FOR FUTURE OPEN SPACES & PEDESTRIAN CONNECTIONS • VIEWS TO FOREST PARK • CONS • NOT A COHESIVE DISTRICT • PARKING VISIBLE EVERYWHERE • LARGE BUILDING FOOTPRINTS / MASSING • LACK OF OPEN SPACES • DULL STREETS • INACTIVE EDGES
20
VIEW A
VIEW B
VIEW C
VIEW D
VIEW E
VIEW F
VIEW G
VIEW H
NW 28TH AVE
NW
NI
AI COL
DARY
N TY BOU R E P O R P
ST
G
B A
F H NW WILSON ST
NW 29TH AVE
E
C
D
NW WAR
DWAY
NW 26TH AVE
AERIAL OF EXISTING SITE
NW 27TH AVE
NW VAUGHN ST
N 0
200
FT
21
ARCHITECTURAL CHARACTER The existing architectural character has an eclectic turn of the century industrial vocabulary that gives it the district a memorable identity. This authentic gritty charm appears built over time like a true evolving district that celebrates its unique history. These existing buildings provide the bones to envision future development with a cohesive material palette that represents the industrial character with a looseness in formality and casual nature. The large existing footprints provide opportunities to carve open pedestrian connections, courtyards, and light wells to promote a walkable, porous, inviting, and connected district at the ground level while providing natural lights into the buildings.
WEST
CENTRAL
MONTGOMERY PARK BUILDING
MONTGOMERY PARK BLDG
OVERALL BIRDSEYE VIEW
EAST
A - VIEW OF WEST FACADE ENTRY & ATRIUM F
C AMERICAN CAN TOOL SHED
D B
A
E
AMERICAN CAN ADMIN AMERICAN CAN FACTORY AMERICAN CAN WAREHOUSE MONTGOMERY PARK BUILDING
B - VIEW OF EXISTING RAMPS & NE FACADE 22
INTERIOR VIEW OF ATRIUM
AMERICAN CAN WAREHOUSE & FACTORY
AMERICAN CAN ADMIN & TOOL SHED
FACTORY TOOL SHED WAREHOUSE ADMIN
OVERALL BIRDSEYE VIEW
OVERALL BIRDSEYE VIEW
C - NORTH FACADE OF WAREHOUSE
INTERIOR VIEW OF WAREHOUSE
E - VIEW OF ADMIN EAST FACADE
INTERIOR VIEW OF TOOL SHED LOWER LEVEL
D - WEST FACADE OF WAREHOUSE
INTERIOR VIEW OF FACTORY BLDG LVL 1
F - VIEW OF TOOL SHED EAST FACADE
INTERIOR VIEW OF TOOL SHED UPPER LEVEL 23
RM
Locations shown on the diagram are not exact boundaries. Detailed boundaries for centers, corridors, habitat areas, and all other items shown on the map will be defined in supporting plans or through future planning projects.
NEIGHBORHOOD DIRECTION
Urban Design Framework
own on the diagram are not exact boundaries. Detailed boundaries for centers, bitat areas, and all other items shown on the map will be defined in supporting ugh future planning projects. work
NEW CITYWIDE COMPREHENSIVE PLAN
LOCAL ZONING UPDATE
are not exact boundaries. Detailed boundaries for centers, URBAN FORM ther items shown on the map will adopted be defined inthe supporting Portland recently 2035 Comprehensive Plan which is committed to linking projects.
land use and transportation. It strives to improve Portland as a place that is walkable, Figure 3-1. Urban Design Framework bikeable and transit-friendly with active main streets. The plan is dedicated to compact Locations shown on the diagram are not exact boundaries. Detailed boundaries centers, development, with active employment centers, expanding housing choice,for and access corridors, habitat areas, and all other items shown on the map will be defined in supporting to parks and open space. As planned, Montgomery Park District is currently located in Detailed boundariesplans for centers, orcenter’ through future planning projects. an opportunity for the future district. a future ‘town area which provides
map will be defined in supporting
The recent 2035 Comprehensive Plan has outlined a future transformation of the local zoning categories and regulations and their specific locations within the city. This alteration has spurred the rewrite of local zoning which is currently underway. The possible future impact on Montgomery Park District will be to its immediate surroundings being transformed from industry only to a denser mixed use neighborhood. MONTGOMERY PARK DISTRICT
MONTGOMERY PARK DISTRICT LOCATED IN NORTHWEST DISTRICT
TE
ET
M
LA
IL
W
INDUSTRY
RI R
VE
INDUSTRIAL
CENTRAL EMPLOYMENT
RESIDENTIAL
INDUSTRIAL
GENERAL EMPLOYMENT
MIXED-USE OPEN SPACE
CITY
MIXED-USE
RESIDENTIAL
EXISTING ZONING
INDUSTRY PAGE GP3-30
2035 COMPREHENSIVE PLAN
DECEMBER 2018
INDUSTRIAL MIXED EMPLOYMENT CENTRAL EMPLOYMENT
MIXED-USE
2035 COMPREHENSIVE PLAN
2035 COMPREHENSIVE PLAN
24
OPEN SPACE
DECEMBER 2018
DECEMBER 2018
2035 PORTLAND COMPREHENSIVE PLAN
SINGLE DWELLING
MULTI-DWELLING
CITY COMPREHENSIVE PLAN ZONING
SINGLE DWELLING
MIXED-USE
GENERAL EMPLOYMENT
RESIDENTIAL
The Green Loop serves as the hub of the network, linking the city’s communities safely and directly to regional attractions and destinations. The system will provide safe and attractive pedestrian, jogging and bicycle connections between natural areas, parks, neighborhoods, schools, and commercial districts. Distinctive street design, landscaping, tree plantings,
FUTURE STREETCAR & ADJACENT REDEVELOPMENT
Citywide Trail Springwater Corridor
CONNECTION TO THE PROPOSED GREEN LOOP
and sequences of parks along the greenways extend the experience of open spaces and nature into the streets of neighborhoods.
Northwest Portland is positioned for major redevelopment opportunities due to the future streetcar expansion and recent comprehensive plan. The streetcar expansion is currently being planned that would connect Montgomery Park District to the existing streetcar network and neighborhoods across the city. Adjacent redevelopment property also plays a major role in the evolution of the district and its synergy and connection with Montgomery Park District.
The Green Loop is a recent concept of the Central City 2035 Plan that proposes a six-mile linear park that connects people through the heart of the city and improves access to regional attractions, cultural institutions, employment centers, and shopping districts. The plan overlaps with the comprehensive plan proposed greenways with a link to Forest Park and an opportunity for Montgomery Park District to be the future urban trail head gateway and connection between the Green Loop and Forest Park. Raised Cycle Track and Sidewalk NE Cully Avenue
Enhanced Greenway Corridors NE Klickitat Street
MONTGOMERY PARK DISTRICT LOCATED ALONG PROPOSED GREENWAY CONNECTION FROM FOREST PARK TO GREEN LOOP
U
O P E RT N IC O P R
LAI ST
NW NICO
Y BOUND
45 ACRES OF REDEVELOPMENT POTENTIAL
ARY
DEVELOPMENTS
CONNECT
UNICO SITE OWNER
NW YEON AVE
MONTGOMERY PARK DISTRICT
NW YORK ST
ESCO SITE OWNER CONNECTION TO DOWNTOWN & LARGER PORTLAND TRANSIT SYSTEM
NW WILSON ST
NW WARD
FUTURE STREETCAR WAY
CENTRAL CITY
NW VAUGHN ST NW 23 AVE
NW 24 AVE
NW 25 AVE
NW 26 AVE
NW 27 AVE
NW 29 ST
LEGEND
Legend EXISTING AND PROPOSED TRAILS
Existing and Proposed Trails PROPOSED CITY GREENWAYS Proposed City Greenways
SURROUNDING REDEVELOPMENT OPPORTUNITIES
2035 PORTLAND COMPREHENSIVE PLAN GREENWAYS & PROPOSED GREEN LOOP
7
25
IDENTITY
CURRENT
FUTURE
A SLEEPING GIANT.
A PO RTL A N D O R I G I N A L . L A R G ELY LO CA L , EN D LES S LY A MA ZI N G , A N D A LWAYS O PEN TO N EW I D EAS .
Montgomery Park is an underutilized urban campus of historic warehouse structures located between an industrial district and Portland’s most established and affluent neighborhoods. While currently occupied as an office building, its far from reaching its ultimate potential as the heart of this community.
We house infinite untapped potential in a neighborhood that’s on the move. We are urban and outdoorsy, eclectic and inclusive, unhurried and exuberant, casual and irreverent. We love a good hoodie. We support our local makers and crafters, amazing food and drink, and our endlessly creative community. We celebrate our historic, imperfect buildings and are unabashedly passionate about sustainability. We value local and don’t take ourselves too seriously. We’re all about the arts, and we live to celebrate our creatives. Every breath we take is a breath of fresh air. We are Montgomery Park, on the move.
Residing within Slabtown, a slice of the Northwest District once home to timber workers, the area is rapidly changing. It now stitches together the Pearl District, Nob Hill, and a vast industrial area. New buildings largely replace parking lot tundra creating a neighborhood with residential and industrial-chic buildings, local eateries, airy coffee shops, craft distilleries and breweries, indie boutiques, theaters and galleries. Already a historically significant landmark, Montgomery Park has the opportunity to become a significant retail and mixed-use destination as well. Montgomery Park will both anchor and catalyze the evolution of the entire Northwest District.
26
RETAINING HISTORIC CHARACTER A PLACE TO PLAY A COMMUNITY DESTINATION
27
VISION
28
29
DISTRICT FRAMEWORK
WEST
PEDESTRIAN CONNECTIONS
CITY TO PARK NW WILSON ST CORRIDOR
DISTRICT PARK MONTGOMERY PARK BUILDING 1/4 MILE - 5 MIN WALK
URBAN DESIGN CONCEPT
30
75
8
M
M
IL
IN
E
W
AL
NW VAUGHN ST
TRAILHEAD LODGE
1/
1.
K
2.
5M
IN
NW 26TH AVE
COURTYARDS
R
PARK RAMPS
CITY
ET E
STREET CAR
AM
NW WARDW AY
ATRIUM
DI
POTENTIAL PROPERTY ACQUISITION FOR CONNECTION TO FOREST PARK
PARK
POCKET PARKS
W
NW 29TH AVE
LODGE
MARKET
K
FOOD HALL
PARK 2 MIN WALK TO FOREST PARK / LOWER MACLEAY TRAILHEAD
E
DISTRICT SPIN
ENTRY COURTS
AL
T SHARED STREE
PRIVATE STREET
SQUARE
NW 27TH AVE
EAST
OUNDARY PROPERTY B
RESIDENTIAL COURTYARDS
LEWIS & CLARK BLVD
CENTRAL
OFFICE COURTYARDS
T LAI S
ICO WN
N
The Master Plan is a once-in-a-generation opportunity to holistically re-imagine Montgomery Park District’s future. The district will evolve beyond its current office identity by renovating its existing historical Montgomery Park and American Can Complex buildings and infusing vertical development, pedestrian connections, active open spaces, additional mix of uses. A diverse range of uses will help activate the district throughout the day anchored by a market, food hall, and Trailhead Lodge that will promote a culinary, cultural, and outdoor identity to the district. Integrating a district spine that is both a shared street and pedestrian alleyway, innovative wayfinding, access to transit, and connection to Forest Park into the 18-acre development will encourage connectivity and walkability.
EAST AMERICAN CAN COMPLEX
MONTGOMERY PARK DISTRICT
WEST
CENTRAL
POTENTIAL PEDESTRIAN BRIDGE TO CONNECT TO FOREST PARK / LOWER MACLEAY TRAILHEAD
RESIDENTIAL
NORTH GARAGE
RESIDENTIAL
AMERICAN CAN WAREHOUSE
AMERICAN CAN OFFICE ADDITION
NW
LEW
NW WI
CL A
AMERICAN CAN ADMIN
AV E
LSON S
T
NW
RK B
IC
IS &
NW N
ST OL AI
2 6 TH
AMERICAN CAN TOOL SHED
TH
27
LV D
AV E
N W 2 9 TH AV E
N W VA U
NW
WA
RD
WA
GHN ST
Y
NW U
PSHU
R ST
OVERALL VIEW OF DISTRICT FROM SOUTH TRAILHEAD LODGE
DISTRICT PARK
RESIDENTIAL
MONTGOMERY PARK BUILDING 31
WEST
BRINGING AN HISTORIC COMPLEX BACK TO LIFE
CENTRAL
EAST
FROM CITY TO PARK Porous Buildings
Landscape Ramps
promote pedestrian connectivity and wayfinding
Water Cistern
holds stormwater for reuse or slow discharge & acts as an iconic beacon for district
FOOD HALL / OFFICE / RETAIL / F&B / PENTHOUSE / GYM
transform existing vehicular ramps into a vibrant open space and front door to promote pedestrian movement to mezzanine deck and entrance
MONTGOMERY PARK BUILDING
OFFICE
RETAIL / F&B / MAKERSPACE
OFFICE / RETAIL / F&B
OFFICE
MARKET / OFFICE / RETAIL / F&B
AMERICAN CAN ADMIN
AMERICAN CAN TOOL SHED
AMERICAN CAN FACTORY
AMERICAN CAN OFFICE ADDITION
AMERICAN CAN WAREHOUSE
Solar Panels
provide a local renewable energy source to help reduce energy cost and fossil fuel consumption
Active Street Frontage
contributes to district vitality and pedestrian experience
C NEW BUS LAYOVER LOCATION
DISTRICT SPINE
DISTRICT SPINE
B
A
NORTH GARAGE WITH RETAIL FRONTAGE PARKING / RETAIL / F&B
A DIVERSE MIX OF OPEN SPACES A mix unique mix of parks, plazas, squares, and courtyards with various identities, program, and scale promote a vibrant public life
32
B PEDESTRIAN CONNECTIVITY Porous connections inside and outside of buildings through alleyways, paseos, courtyards, and atrium encourage a pedestrian friendly scale of development
C HISTORICAL BUILDING RE-USE Renovating existing historical buildings helps maintain the site history and reduce the carbon footprint.
OVERALL VIEW OF DISTRICT FROM EAST
MONTGOMERY PARK BUILDING
NW WILSON ST
FOREST PARK / LOWER MACLEAY TRAILHEAD
STREETCAR
RESIDENTIAL
FOREST PARK
RESIDENTIAL
NW 26TH AVE
POCKET PARK
AMERICAN CAN ADMIN
AMERICAN CAN OFFICE ADDITION
DISTRICT SPINE THROUGH ACC COMPLEX & ENTRY COURT
BUS LAYOVER
AMERICAN CAN TOOL SHED 33
WEST
ESTABLISHING A PARK DISTRICT & CONNECTION TO FOREST PARK
CENTRAL
EAST
FROM CITY TO PARK Shared Street
promote a safe experience for pedestrian and a mulimodal opportunity
Events & Markets
promote community, district identity, and cater towards local vendors
Green Roofs
help capture, hold, clean, and slowly discharge stormwater & reduce heat island effect
RESIDENTIAL / RETAIL / F&B
RESIDENTIAL / RETAIL / F&B
FOOD HALL / OFFICE / RETAIL / F&B / PENTHOUSE / GYM
MARKET / OFFICE / RETAIL / F&B / MAKERSPACE
RESIDENTIAL
RESIDENTIAL
MONTGOMERY PARK BUILDING
AMERICAN CAN COMPLEX WATER TOWER
Resi Amenity Decks
surround open spaces to promote community and views to the city & Forest Park
POTENTIAL PROPERTY ACQUISITION & PEDESTRIAN BRIDGE FOR CONNECTION TO FOREST PARK
RESIDENTIAL COURTYARDS
F
VIEWS TO FOREST PARK
I ST
NW NICOLA
E FUTURE STREETCAR
G
SERVICE CORRIDOR
TRAILHEAD LODGE 2 MIN WALK TO FOREST PARK / LOWER MACLEAY TRAILHEAD
34
SPA / WELLNESS CENTER / GREAT ROOM / CAFE / BAR / CATERING KITCHEN
RESIDENTIAL RESIDENTIAL / RETAIL / F&B
E DISTRICT PARK A flexible an active open space that is the heart of the district where people gather, eat, play, and shop surrounding by a mix of uses.
F MULTI-MODAL OPPORTUNITIES Provide several ways for users to access and encounter the district by streetcar, bus, or bike and reduces vehicular travel and congestion.
G BELOW GRADE PARKING Reduces heat island effect and promotes a more compact urban environment and active ground floor experience.
NORTH GARAGE
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
MONTGOMERY PARK BUILDING
NW
NIC O
LAI
ST
NW W ARDW AY
RESIDENTIAL
AMERICAN CAN COMPLEX
WEST ZONE DISTRICT PARK & CONNECTION FROM MONTGOMERY PARK BUILDING TO TRAILHEAD LODGE
POTENTIAL PROPERTY ACQUISITION FOR CONNECTION TO FOREST PARK
GARAGE ENTRY
PEDESTRIAN BRIDGE
DISTRICT PARK TRAILHEAD LODGE 35
NE EAST ZO
DISTRICT PROGRAM
ZONE ENTRAL
C
RETAIL BUILDINGS FRONTING GARAGE
ONE WEST Z
OVERALL DISTRICT PROGRAM (GSF)
H
8
6
13
4
10
7
LEW
1
T AI S
ICOL
N NW
STREETCAR
IS &
MARKET
RK CLA BLV
N ST
AUGH NW V
D
3 2
NW
*EXCLUDES SUB-LEVEL 1-6 + INCLUDES EXISTING NORTH GARAGE GSF ** AVAILABLE FAR USES BASE + AFFORDABLE HOUSING BONUS + EXISTING HISTORICAL OWNER TRANSFER. IT EXCLUDES ANY TRANSFER FROM IH ZONE (EXISTING SURFACE PARKING LOT ON 26TH AVE) & POTENTIAL ADDITIONAL FAR BOUGHT OFF THE OPEN MARKET
WA R
PENTHOUSE
DW AY
PEDESTRIAN BRIDGE
E AV
2,007,328 FT2 TOTAL PROGRAM (USED FOR FAR)* NEW PROGRAM 1,720,928 FT2 TOTAL EX(D)* 286,400 FT2 TOTAL EG1 2,007,328 FT2 TOTAL EG1+EX(D) FAR BY ZONE 3,399,763 FT2 FAR EX(D) 632,408 FT2 FAR EG1 4,032,171 FT2 FAR EG1+EX(D) AVAILABLE FAR (FAR BY ZONE - NEW PROGRAM)** 1,678,835 FT2 EX(D) 346,008 FT2 EG1 2,024,843 FT2 TOTAL AVAILABLE (W/0 FEE)** 2.62 FAR (NEW PROGRAM / SITE AREA)
NW
TH
27
126,680 FT2 734,136 FT2 ----860,816 FT2 2,789,192 FT2
OVERALL F.A.R
36
N ST
ILSO
NW W
PARKING PROVIDED ABOVE GRADE = 433 BELOW GRADE = 2,317 SURFACE = 173 STREET = 33 TOTAL = 2,956 DISTRICT TOTAL
12
AV E
11
9 878,031 FT2 116,347 FT2 761,727 FT2 < 871 UNITS > 21,225 FT2 32,810 FT2 5,521 FT2 23,508 FT2 19,081 FT2 13,557 FT2 11,250 FT2 45,319 FT2 1,928,376 FT2
26 T
5
PROGRAM * OFFICE RETAIL / F&B RESIDENTIAL MARKET TRAILHEAD LODGE MAKERSPACE MP BLDG FOOD HALL MP BLDG AMENITY MP BLDG ATRIUM MP BLDG PENTHOUSE MP BLDG BOH TOTAL
NW
TRAILHEAD LODGE
RESTAURANT & AMENITY ROOF
DISTRICT PARK
NW
WEST ZONE 11 PARCEL 1 PROGRAM RESIDENTIAL 363,330 FT2 < 418 UNITS > RETAIL / F&B 7,930 FT2 PARKING BELOW GRADE 504,814 FT2 < 1588 SPACES > TOTAL AREA 876,074 FT2
2 PARCEL 2 PROGRAM LODGE 32,810 FT2 TOTAL AREA 32,810 FT2
3 PARCEL 3 PROGRAM RESIDENTIAL 88,767 FT2 < 102 UNITS > RETAIL / F&B 9,577 FT2 TOTAL AREA 98,344 FT2
CENTRAL ZONE 4 PARCEL 4 PROGRAM RESIDENTIAL RETAIL / F&B PARKING BELOW GRADE TOTAL AREA
7 PARCEL 7 * 138,684 FT2 < 162 UNITS > 5,700 FT2 46,850 FT2 < 171 SPACES > 191,234 FT2
5 PARCEL 5 PARKING ABOVE GRADE TOTAL AREA
126,680 FT2 < 433 SPACES > 126,680 FT2
6 PARCEL 6 PROGRAM RETAIL / F&B TOTAL
5,648 FT2 5,648 FT2
PROGRAM OFFICE 578,408 FT2 RETAIL / F&B 63,599 FT2 MP FOOD HALL 23,508 FT2 MP AMENITY 19,081 FT2 MP ATRIUM 13,557 FT2 MP PENTHOUSE 11,250 FT2 MP BOH 45,319 FT2 TOTAL AREA 754,722 FT2 * NOTE - PARCEL 7 PROGRAM DATA MAY NOT REFLECT ENTIRE BUILDING GSF
HUR
UPS
ST
EAST ZONE 8 PARCEL 8 PROGRAM RESIDENTIAL RETAIL / F&B PARKING BELOW GRADE TOTAL AREA
11 PARCEL 11 170,946 FT2 < 189 UNITS > 5,156 FT2 182,472 FT2 < 558 SPACES > 358,574 FT2
9 PARCEL 9 PROGRAM MARKET RETAIL / F&B OFFICE TOTAL AREA
21,225 FT2 8,330 FT2 29,151 FT2 58,706 FT2
10 PARCEL 10 PROGRAM RETAIL / F&B OFFICE TOTAL
7,071 FT2 252,667 FT2 259,738 FT2
PROGRAM OFFICE TOTAL
17,805 FT2 17,805 FT2
12 PARCEL 12 PROGRAM RETAIL / F&B 3,336 FT2 MAKERSPACE 5,521 FT2 TOTAL 8,857 FT2
13 PARCEL 13 FUTURE REDEVELOPMENT PARCEL TO BE DETERMINED
ACTIVE GROUND FLOOR NW
LAI
O NIC
ST
8 12
5 4 6 10
K BLVD IS & CLAR
LEW
11
9
13
1
NW 27TH AVE
7
3 POTENTIAL PEDESTRIAN BRIDGE CONNECTION TO FOREST PARK
NW 26TH AVE
2
NW WILSON ST
STREETCAR FOOD HALL
MARKET
NW WAR
DWAY
TRAILHEAD LODGE DISTRICT PARK NW VAUGHN ST
LEGEND ANCHOR AMENITY RETAIL / F&B OFFICE RESIDENTIAL RESIDENTIAL LOBBY MP BOH
TOTAL - GROUND FLOOR (GSF) PROGRAM OFFICE RETAIL / F&B RESIDENTIAL MARKET TRAILHEAD LODGE MAKERSPACE MP FOOD HALL MP BLDG AMENITY MP ATRIUM MP BOH TOTAL
87,000 FT2 80,456 FT2 70,179 FT2 < 49 UNITS > 21,225 FT2 7,043 FT2 5,521 FT2 23,508 FT2 6,350 FT2 13,557 FT2 7,280 FT2 322,119 FT2
1 PARCEL 1
PROGRAM RESIDENTIAL 39,636 FT2 < 34 UNITS > RETAIL / F&B 7,930 FT2 TOTAL AREA 47,566 FT2
7 PARCEL 7 PROGRAM OFFICE RETAIL / F&B MP FOOD HALL MP BLDG AMENITY MP ATRIUM MP BOH TOTAL AREA
2 PARCEL 2
PROGRAM TRAILHED LODGE 7,043 FT2 TOTAL AREA 7,043 FT2
8 PARCEL 8 1,400 FT2 33,700 FT2 23,508 FT2 6,350 FT2 13,557 FT2 7,280 FT2 85,795 FT2
PROGRAM RESIDENTIAL 19,230 FT2 < 15 UNITS > RETAIL / F&B 5,156 FT2 TOTAL AREA 24,386 FT2
3 PARCEL 3
PROGRAM RESIDENTIAL 2,949 FT2 RETAIL / F&B 9,577 FT2 TOTAL AREA 12,526 FT2
9 PARCEL 9
PROGRAM MARKET RETAIL / F&B OFFICE TOTAL AREA
4 PARCEL 4
PROGRAM RESIDENTIAL RETAIL / F&B PARKING TOTAL AREA
8,364 FT2 5,700 FT2 27 SPACES 14,064 FT2
10 PARCEL 10 21,225 FT2 2,338 FT2 1,692 FT2 25,255 FT2
PROGRAM RETAIL / F&B 7,071 FT2 OFFICE 77,973 FT2 TOTAL AREA 85,044 FT2
5 PARCEL 5
6 PARCEL 6
11 PARCEL 11
12 PARCEL 12
PROGRAM OFFICE TOTAL AREA
PROGRAM RETAIL / F&B MAKERSPACE TOTAL AREA
PARKING ABOVE GRADE 144 SPACES
5,935 FT2 5,935 FT2
PROGRAM RETAIL / F&B 5,648 FT2 TOTAL AREA 5,648 FT2
0
100 N FT
13 PARCEL 13 3,336 FT2 5,521 FT2 8,857 FT2
FUTURE REDEVELOPMENT PARCEL TO BE DETERMINED
37
CITY POINT PLAZA, LONDON
PARK
SQUARE
The district park on the western portion of the site anchors the framework. On axis with the Montgomery Park Building atrium, and connected by a pedestrian promenade, the park is the main flexible gathering space.
Squares are welcoming entry points and significant open spaces. Multiple programs come together in these flexible paved areas, including outdoor seating, art installations, planting and circulation.
38
MINT PLAZA, SAN FRANCISCO
CROWN COMMONS, DUKE UNIVERSITY
Inspired by the history, character and context of the Montgomery Park site, the open space framework is envisioned as an integrated series of flexible landscapes, each providing a variety of amenities to the community. A 10-minute walk to the west, 23 square miles of Forest Park lend a green and recreational character. To the east and south, the urban street grid reaches the site before being affected by Montgomery Park’s industrial heritage of oversized buildings and uninterrupted parcels. Each node within the open space network is intended to reflect this combination of influences through its scale, materiality, and programming. Together, parks, gardens, squares and courts support daily life, recreation, special events, retail and food culture. A rich tapestry of connectors, including walkways, interior alleys, exterior paseos, and curbless streets, unify spaces of diverse scale and program to create a sense of exploration and discovery.
ONE COLEMAN STREET GARDENS, LONDON
OPEN SPACE FRAMEWORK
GARDEN
COURT
Distributed gardens and pocket parks reinforce the green character of the district. They provide opportunities for stormwater treatment and biofilia near residential and office entries.
Courts are smaller paved spaces that provide outdoor comfort and blur the line between interior and exterior. In these active entry spaces, programs spill out to various degrees throughout the year.
OUNDARY PROPERTY B I ST
NW 29TH AVE
NW
OLA NIC
ARK BLVD
LEWIS & CL
DWAY
NW 26TH AVE
NW WAR
NW 27TH AVE
NW WILSON ST
NW VAUGHN ST
OPEN SPACE NETWORK
0
100 N FT
39
TRANSFORMING THE DISTRICT CURRENT CONDITIONS
0%
EXISTING GREEN ROOFS
100% SITE 17.5 ac
3 UNIQUE PROGRAMS COMMERCIAL / RETAIL-F&B
PROPOSED CONDITIONS
36% BUILDINGS 6.0 ac
18%
PROPOSED GREEN ROOFS
100% SITE 17.5 ac
40
7 UNIQUE PROGRAMS
COMMERCIAL / RETAIL-F&B / RESIDENTIAL / TRAILHEAD LODGE / FOOD HALL / MARKET / MAKERSPACE
50% BUILDINGS 8.5 ac
1%
STREET
(PRIVATELY OWNED / PUBLICLY USED)
EXISTING
PUBLIC OPEN SPACE
+
PUBLIC OPEN SPACE
9% STREET / HARDSCAPE 43% SURFACE PARKING
12% PLANTING
1.5 ac
2.0 ac
0.4 ac
27%
1.1 ac
8.0 ac
STREET
(PRIVATELY OWNED / PUBLICLY USED)
PROPOSED PUBLIC OPEN SPACE
+
PUBLIC OPEN SPACE
14% PLANTING 2.5 ac
28% STREET / HARDSCAPE 5.0 ac
0.85 ac
4.15 ac
8% SURFACE PARKING 1.5 ac
41
I ST
NW
OLA NIC
433 SPACES 101 SPACES
YEAR 2 - 3
CHANGING THE DISTRICT PERCEPTION
PROGRAM
PHASE 2 & [ PHASE 1+2]
PARKING PROVIDED
OFFICE RETAIL / F&B RESIDENTIAL TRAILHEAD LODGE MAKERSPACE MARKET MP FOOD HALL MP AMENITY MP ATRIUM MP PENTHOUSE MP BOH TOTAL
270,472 FT [ 878,031 FT ] 33,562 FT2 [ 105,491 FT2 ] 452,097 FT2 < 520 UNITS > 32,810 FT2 5,521 FT2 [ 21,225 FT2 ] [ 23,508 FT2 ] [ 19,081 FT2 ] [ 13,557 FT2 ] [ 11,250 FT2 ] [ 45,319 FT2 ] 794,462 FT2 [ 1,607,890 FT2 ]
ABOVE GRADE = 433 BELOW GRADE = 1,588 SURFACE = 333 STREET = 24 TOTAL = 2,378
2
DWAY
36 SPACES
AMERICAN CAN WAREHOUSE MONTGOMERY PARK BUILDING NW VAUGHN ST
RETAIL
S
189 SPACE
I ST
LA ICO WN
N
INTERNAL ROAD
433 SPACES
RESIDENTIAL
PLAZA
108 SPACES
1,588 BELOW GRADE SPACES
ALLEY
75 SPACES
PHASE 2
ESTABLISHING A PURPOSE & PLACE
PROGRAM
PHASE 3 & [ PHASE 1+2+3 ]
PARKING PROVIDED
OFFICE RETAIL / F&B RESIDENTIAL TRAILHEAD LODGE MAKERSPACE MARKET MP FOOD HALL MP AMENITY MP ATRIUM MP PENTHOUSE MP BOH TOTAL
[ 878,031 FT2 ] 10,856 FT2 [ 116,347 FT2 ] 309,630 FT2 < 351 UNITS > [761,727 FT2] [ 32,810 FT2 ] [ 5,521 FT2 ] [ 21,225 FT2 ] [ 23,508 FT2 ] [ 19,081 FT2 ] [ 13,557 FT2 ] [ 11,250 FT2 ] [ 45,319 FT2 ] 320,486 FT2 [ 1,928,376 FT2 ]
ABOVE GRADE = 433 BELOW GRADE = 2,317 SURFACE = 173 STREET = 33 TOTAL = 2,956
NW WAR
DWAY
PED BRIDGE
NW WILSON ST
ATRIUM
PARK
YEAR 5 - 7
PHASE 3 & 4 INFILLING DENSITY
NW WILSON ST
NW 26TH AVE
PHASE 1
75 SPACES
ATRIUM
NW WAR
2
660 SPACES PLAZA
408 SPACES
YEAR 8 - 10
42
S
189 SPACE
NW 26TH AVE
ABOVE GRADE = 1,093 BELOW GRADE = 0 SURFACE = 809 STREET = 18 TOTAL = 1,920
NW 27TH AVE
607,559 FT 71,929 FT2 21,225 FT2 23,508 FT2 19,081 FT2 13,557 FT2 11,250 FT2 45,319 FT2 813,428 FT2
20 SPACES
TRAILHEAD LODGE
AMERICAN CAN OFFICE COMPLEX FUTURE STREETCAR NW VAUGHN ST
558 BELOW GRADE SPACES
RESIDENTIAL NW
I ST OLA NIC
49 SPACES
RESIDENTIAL
433 SPACES PLAZA
LEWIS & CL
PARK NW WAR
DWAY
NW 26TH AVE
Montgomery Park’s redevelopment revolves around the need to radically renew.
OFFICE RETAIL / F&B MARKET MP FOOD HALL MP AMENITY MP ATRIUM MP PENTHOUSE MP BOH TOTAL
NW 27TH AVE
Starting with the iconic Montgomery Park building, itself the economic and cultural anchor of the district, the site’s redevelopment will first reintroduce the landmark site as a catalyst for creative office, locally-rooted retail and destination dining. Building on this renewed perception, the site will then deliver on its core vision by delivering impactful new creative office and residential densities while creating vibrant new public spaces and strengthening its connection to Forest Park.
PARKING PROVIDED 2
ALLEY
ARK BLVD
75 SPACES
NW WILSON ST
ATRIUM
20 SPACES
NW 27TH AVE
The phasing of Montgomery Park’s redevelopment revolves around the need to radically renew the presence of century old architecture and its one-dimensional programming. The site’s renewal will take place over a series of phases that artfully adapt old buildings to house a new dynamic mix of uses, creatively deliver additional densities to animate the site in new ways and connect all through a network of pedestrianoriented public spaces that promote discovery and delight.
PHASE 1
29 SPACES
PHASING STRATEGY
PROGRAM
PHASE 4 REDEVELOPMENT PENDING FUTURE MARKET DEMAND NW VAUGHN ST
RESIDENTIAL
RESIDENTIAL
NORTH GARAGE
AMERICAN CAN OFFICE ADDITION
AMERICAN CAN TOOL SHED
AV E
AMERICAN CAN ADMIN
RESIDENTIAL NW
26 T
H
PHASE 4
PHASE 3
PHASE 2
T ON S
ILS NW W
AMERICAN CAN FACTORY
I ST
A ICOL WN
N
WIS
LE
FUTURE STREETCAR
LA
&C RK
N ST
VD BL
AUGH NW V
AMERICAN CAN WAREHOUSE NW TH
27
E AV
NW
WA R
DW AY
PHASE 1 PEDESTRIAN BRIDGE
TRAILHEAD LODGE
RESIDENTIAL
DISTRICT PARK
MONTGOMERY PARK BUILDING
NW
T UR S
H UPS
DISTRICT PHASING 43
EAST ZONE AMERICAN CAN COMPLEX
RESIDENTIAL
AMERICAN CAN OFFICE ADDITION
AMERICAN CAN TOOL SHED
NW
The East Zone is the first impression as you enter the district from the city. Its industrial gritty nature is mainly comprised of the historic American Can Complex that will be renovated to include a majority of new office with a mix of retail, F&B, and makerspace that is anchored by an urban market with a roof deck. There is possibility of additional office built on top of the existing historic building. The zone is split by the active district spine that runs through the ground floor of the complex and connects to various open spaces from NW 26th Ave to NW 27th Ave. The future streetcar station and line is planned for the south side of the district along NW Wilson St. Additional residential development is added to help diversify uses and provided below grade parking nearby.
TH
26 E AV
ON ST
LS NW WI WEST
CENTRAL
EAST
FUTURE STREETCAR NW 27T VE HA
EAST ZONE AXON
44
AMERICAN CAN WAREHOUSE
AMERICAN CAN FACTORY
AMERICAN CAN ADMIN
RESIDENTIAL
OPEN SPACE PLAZA ALONG DISTRICT SPINE AT AMERICAN CAN COMPLEX
AMERICAN CAN OFFICE ADDITION
GROUND FLOOR RETAIL
WATER TOWER
SQUARE
OFFICE MEZZANINE
AMENITY ROOF TERRACE
DISTRICT SPINE THROUGH MARKET
45
INSPIRATION
WEST SIDE MARKET: HISTORIC MARKET WITH HIGH CEILING SPACE
ARMSTRONG OIL & GAS HEADQUARTERS: ADAPTED WAREHOUSE INTO OFFICES
THE SOURCE: OUTDOOR SPILL OUT SPACE IN FRONT RESTORED WAREHOUSE BUILDING 46
ARMSTRONG OIL & GAS HEADQUARTERS: OFFICE MEZZANINE INSIDE BUILDING
ST. ANN’S WAREHOUSE: ADAPTED WAREHOUSE BUILDING EXPRESSING HISTORIC ELEMENTS CHOPHOUSE ROW: MARKET ALLEY ADAPTED FROM AN INDUSTRIAL BUILDING
YETI STORE: ACTIVATED CORNER ON AN ADAPTED WAREHOUSE BUILDING
HEIGHTS MERCANTILE: EXPRESSED VOLUME PROJECTING ABOVE A PUBLIC PLAZA 47
PROGRAM MIX
EAST ZONE PROGRAM
GROUND FLOOR / LEVEL 1 RESIDENTIAL 15,130 FT2 15 UNITS
OFFICE MARKET RETAIL / F&B RESIDENTIAL MAKERSPACE PARKING TOTAL AREA
RESI AMENITY 2,600 FT2
PARKING 49 SPACES
PARKING ENTRY
8 PARCEL 8 - RESIDENTIAL
85,600 FT2 21,225 FT2 17,901 FT2 19,230 FT2 < 15 UNITS > 5,521 FT2 142 SPACES (INCL. PARCEL 13) 149,477 FT2
SERVICE
LEGEND ANCHOR AMENITY RETAIL / F&B OFFICE
12
PARKING 18 SPACES
RETAIL 5,156 FT2
OFFICE 35,007 FT2
B
RESI LOBBY 1,500 FT2
MAKER SPACE 5,521 FT2
136 FT
RETAIL 3,336 FT2
RETAIL 3,496 FT2 AMERICAN CAN ALLEY (covered) 4,410 FT2
K BLVD
LEWIS & CLAR
10
SERVICE
11
OFFICE 42,966 FT2
OFFICE 5,935 FT2
9 RETAIL 2,338 FT2
NW 27TH AVE
AMERICAN CAN ALLEY (covered) 2,324 FT2
A OFFICE 1,692 FT2
RETAIL 3,575 FT2
STREETCAR
0 48
170,946 FT2 < 189 UNITS > 5,156 FT2 182,472 FT2 < 558 SPACES > 358,574 FT2
9 PARCEL 9 - WAREHOUSE PROGRAM MARKET RETAIL / F&B OFFICE TOTAL AREA
21,225 FT2 8,330 FT2 29,151 FT2 58,706 FT2
10 PARCEL 10 - FACTORY PROGRAM RETAIL / F&B OFFICE TOTAL
7,071 FT2 252,667 FT2 259,738 FT2
PROGRAM OFFICE TOTAL
17,805 FT2 17,805 FT2
12 PARCEL 12 - SHED PROGRAM RETAIL / F&B 3,336 FT2 MAKERSPACE 5,521 FT2 TOTAL 8,857 FT2
EAST ZONE TOTAL PROGRAM OFFICE 299,623 FT2 MARKET 21,225 FT2 RETAIL / F&B 23,893 FT2 RESIDENTIAL 170,946 FT2 < 189 UNITS > MAKERSPACE 5,521 FT2 PARKING BELOW GRADE 182,472 FT2 < 558 SPACES > SURFACE 124 SPACES STREET 18 SPACES TOTAL 703,680 FT2
MONTGOMERY PARK BUILDING LANDSCAPE RAMPS
FOOD HALL
NW WILSON ST NW 26TH AVE
DROP OFF
MARKET 21,225 FT2
RESIDENTIAL RESIDENTIAL LOBBY MP BOH SERVICE
OFFICE
8
PROGRAM RESIDENTIAL RETAIL / F&B PARKING BELOW GRADE TOTAL AREA
11 PARCEL 11 - ADMIN
100 N FT
SECTION A
COURTYARD
NW 27TH AVE
RESIDENTIAL 29 UNITS 25,286 FT2 RESIDENTIAL UP TO LEVEL 7
ROOF DECK 1,655 FT2
PARKING 93 SPACES 30,412 FT2
2 LEVELS OF OFFICE ADDITION UP TO LEVEL 3
OFFICE ADDITION 23,457 FT2
OFFICE UP TO LEVEL 3
LE
OFFICE UP TO LEVEL 3 OFFICE 5,935 FT2
NW 26TH AVE
OFFICE 65,341 FT2
2NW 7TH AVE
OFFICE 27,459 FT2
LE
RETAIL / F&B 5,992 FT2 ROOF DECK 8,718 FT2
NW WILSON ST
SUB-LEVEL 1 (SUB-LEVEL 1-6 TOTALS BELOW)
LEVEL 2 (LEVEL 2-7 TOTALS BELOW)
ROOF LEVEL
BELOW GRADE PARKING (SUB-LEVEL 1-6) TOTAL AREA
OFFICE (LEVELS 2-3) RESIDENTIAL (LEVELS 2-7) TOTAL AREA
RETAIL / F&B (LEVEL 3) ROOF DECK TOTAL AREA
182,472 FT2 < 558 SPACES > 182,472 FT2
ROOF DECK 1,759 FT2
BLVD WIS & CLARK
NW 26TH AVE
BLVD WIS & CLARK
NW 27TH AVE
PARKING DOWN TO SUB-LEVEL 6
214,023 FT2 151,716 FT2 < 174 UNITS > 365,739 FT2
NW WILSON ST
5,992 FT2 8,718 FT2 14,710 FT2
ROOF DECK 2,394 FT2
0
100 N FT
AMERICAN CAN WAREHOSE
AMERICAN CAN FACTORY
AMERICAN CAN ADMIN 60 FT
ROOF DECK
48 FT
F&B
OFFICE MARKET
RETAIL / F&B
MARKET ALLEY
OFFICE
PROPERTY LINE
84 FT
50 FT
OFFICE
WATER TOWER ALLEY
NW 26TH AVE 49
WEST
BUILDING POROSITY & DISTRICT CONNECTION
AMERICAN CAN FACTORY
CENTRAL
EAST
AMERICAN CAN OFFICE ADDITION
60 FT
ROOF DECK 52 FT
OFFICE OFFICE
OFFICE
SECTION B 50
OFFICE ADDITION OFFICE ADDITION RETAIL / F&B
DISTRICT SPINE
OFFICE
STREETCAR
SOLAR PANELS
AMERICAN CAN OFFICE ADDITION & GREEN ROOF
RESIDENTIAL
NW 26TH AVE
NW WILSON ST
AMERICAN CAN COMPLEX
WATER TOWER
POCKET PARK
AMERICAN CAN ADMIN DISTRICT SPINE THROUGH = OFFICE AMERICAN COMPLEX & ENTRY COURT
F&B / ACTIVE FRONTAGE
BUS LAYOVER
AMERICAN CAN TOOL SHED = MAKERSPACE 51
AMERICAN CAN ALLEY American Can Alley is the pedestrian circulation spine for the eastern portion of the Master Plan. It provides an important connection through the large American Can Complex between NW 26th Avenue and NW 27th Avenue. The diverse series of spaces along the alley include a large Square at the corner of Lewis & Clark Boulevard and NW 27th Avenue, a Market Deck that extends from the Warehouse Building, an open-air covered walkway through the Factory Building and an Entry Court between the smaller Administration Buildings at NW 26th Avenue. Connections to explore along the way include the Office Courtyard, the interior Market Alley and two external alleys with catenary lighting maker spaces and opportunities for art installations. Together the American Can Alley and adjacent spaces support an active and dynamic public experience unlike anywhere else in Portland.
WEST
CENTRAL
INDEPENDENCE BEER GARDEN, PHILADELPHIA: OPEN-AIR FLEXIBLE SEATING & BEER GARDENS
EAST
DAIRY BLOCK, DENVER: ACTIVE ALLEYWAYS & ART INSTALLATIONS 52
ENTRY COURT
OFFICE COURTYARD
COVERED RETAIL ENTRY
POCKET PARK
COVERED RETAIL ENTRY
RETAIL FLEXIBLE SEATING
RETAIL MARKET MARKET DECK
OUTDOOR SEATING
OFFICE
RETAIL ENTRY
RESTAURANT SEATING
OFFICE MARKET SEATING
MARKET ALLEY
FUTURE CONNECTION TO ESCO SITE
WATER TOWER ALLEY
OFFICE
NW 27TH AVE
MAKER ALLEY
NW 26TH AVE
AMERICAN CAN ALLEY
RETAIL MAKERSPACE
SQUARE
0
N
30
FT
53
AMERICAN CAN WAREHOUSE American Can Warehouse is uniquely positioned to become a key anchor and activator for the Montgomery Park District. Poised to be redeveloped in phase one, it has the potential to become a mixed use building with a market and retail / F&B on the ground floor, office mezzanine, and roof top amenity restaurant / bar. The east ‘market alley’ and north ‘district spine’ help promote connectivity and provide light into the surrounding warehouse and factory office buildings. WEST
CENTRAL
EXISTING CONDITIONS 54
EAST
GOOD PEOPLE BREWING - REPURPOSED WAREHOUSE
KROG STREET MARKET - OUTDOOR SIDEWALK ENGAGEMENT
HOUSTON TRUCKYARD - ECLECTIC REPURPOSED DOCK
HEMINGWAY’S BREWERY - PORCHES TO BRIDGE INTERIOR AND EXTERIOR
KATY TRAIL ICEHOUSE - COME AS YOU ARE EXPERIENCE
LITTLE CREATURES - RAW INTERIOR EXPERIENCES
NS T WI LSO
TH
27 E AV
NW
NW CORNER OF 27TH AVE & WILSON ST
55
AMERICAN CAN WAREHOUSE - PROGRAM BREAKDOWN MARKET INDOOR GSF MARKET INDOOR PORCH & ALLEY GSF MARKET OUTDOOR GSF MARKET INDOOR TOTAL GSF
OFFICE TOTAL GSF RETAIL TOTAL GSF AMENITY ROOF F&B WAREHOUSE INDOOR TOTAL GSF
18,585 FT2 5,235 FT2 2,300 FT2 26,120 FT2
27,075 FT2 4,091 FT2 5,650 FT2 62,936 FT2
AMENITY ROOF TERRACE 5,650 FT2
14 FT
OFFICE 27,075 FT2
16 FT
INDOOR MARKET 18,585 FT2
19 FT
MARKET PORCH 2,450 FT2
ROOF DECK
ROOF DECK
RETAIL 2,340 FT2
AMENITY ROOF TERRACE 5,650 FT2
STREET CAR STATION
OFFICE 27,075 FT2
NW WILSON ST
INDOOR MARKET 18,585 FT2
NW 27TH AVE
SECTION SECTION A A-A
RETAIL 3,600 FT2 MARKET ALLEY
SECTION SECTIONB-B B
SERVICE ENTRY RESIDENTIAL
SERVICE ENTRY
COURTYARD 6,800 FT2
RETAIL 3,500 FT2
A
RETAIL 3,330 FT2
RESI LOBBY
NW 26TH AVE
OFFICE 35,000 FT2 RETAIL 5,200 FT2
OFFICE 23,450 FT2
A
A GREEN ROOF SKYLIGHT
MARKET PORCH PARTITION
B LINE OF EXISTING FACADE MARKET OUTDOOR SEATING 1,300 FT2 STREET CAR
60 FT
INDOOR MARKET 18,585 FT2
B RETAIL 3,600 FT2 RETAIL ALLEY 1,040 FT2
RETAIL 2,340 FT2 A
GROUND FLOOR PLAN 56
MARKET ALLEY 2,785 FT2
ROOF TERRACE
OFFICE 5,935 FT2
OFFICE 27,075 FT2
OFFICE 42,960 FT2
165 FT
OFFICE LOBBY 1400 FT2 NW WILSON ST
B
B LINE OF EXISTING FACADE
A
LEVEL 2 / MEZZANINE
LIGHT
SKYLIGHT
SKYLIGHT
SERVICE ENTRY MARKET OUTDOOR SEATING 1,000 FT2
HISTORIC OFFICE ADDITION
OFFICE 23,450 FT2
DISTRICT PEDESTRIAN SPINE
MARKET PORCH 2,450 FT2
RESIDENTIAL HISTORIC OFFICE ADDITION
MAKERSPACE STUDIOS 5,520 FT2
NW 27TH AVE
RESIDENTIAL
WELL
OFFICE 5,935 FT2
OFFICE 5,935 FT2
OFFICE 63,825 FT2 B
AMENITY ROOF TERRACE 5,650 FT2
ROOF DECK 8,650 FT2
B
OFFICE 63,825 FT2
A
LEVEL 3 / WAREHOUSE ROOF
0
100 N FT
NW WILSON ST VIEW FROM WILSON ST 57
AMERICAN CAN WAREHOUSE - DISTRICT SPINE & MARKET ALLEY American Can Warehouse is uniquely positioned to become a key anchor and activator for the Montgomery Park District. Poised to be redeveloped in phase one, it has the potential to become a mixed use building with a market and retail / F&B on the ground floor, office mezzanine, and roof top amenity restaurant / bar. The east ‘market alley’ and north ‘district spine’ help promote connectivity and provide light into the surrounding warehouse and factory office buildings. WEST
CENTRAL
EAST
DISTRICT SPINE PEDESTRIAN CONNECTION THROUGH MARKET
EXISTING CONDITIONS 58
MARKET ALLEY
NORTH FACADE ALONG DISTRICT SPINE 59
CENTRAL ZONE MONTGOMERY PARK BUILDING & LEWIS & CLARK BOULEVARD
RESIDENTIAL
The Central Zone is the iconic view of the district with the historic Montgomery Park Building and sign towering over the entire neighborhood and the front door centered along NW Wilson St. The zone is comprised mainly of this building that will be renovated to include a majority of new office with a mix of retail, F&B, penthouse amenity, and gym that is anchored by a food hall at the ground floor. The existing ramps are transformed into landscape areas with seating, roof decks, and courtyards beneath and the atrium and west entry will become an active indoor open space with a direct connection to the new district park and views towards Forest Park. A new shared street, Lewis & Clark Blvd, will surround the building on the north and west acting as the district spine connecting each zone. Additional residential and retail / F&B frontage along the existing north garage helps active the shared street and provide parking.
NW TH
27 E AV
IS & CLA RK B LVD
CENTRAL
N ST
LSO NW WI
LEW
WEST
EXISTING PARKING GARAGE
EAST
NW WARDWAY
CENTRAL ZONE AXON
60
MONTGOMERY PARK BUILDING
FOREST PARK
MONTGOMERY PARK BUILDING RENOVATION AND DISTRICT SPINE SHARED STREET
MONTGOMERY PARK BUILDING LOADING ZONE
AMERICAN CAN WAREHOUSE ROOF DECK
FOOD HALL
LANDSCAPED RAMP & OUTDOOR TERRACE
RESIDENTIAL
DISTRICT SPINE SHARED STREET
RESIDENTIAL
RETAIL FRONTING GARAGE 61
INSPIRATION
PEARL DISTRICT: URBAN GRIT AND ACTIVE USES ON DOCKS
AVANTI: DENVER COLORADO - ROOFTOP EXPERIENCES
CITY MARKET SOCIAL HOUSE: ACTIVE DOCK EXPERIENCE
ITHACA COMMONS: CURBLESS PEDESTRIAN ORIENTED EXPERIENCE
62
BREWDOG FRANKLINTON: ACTIVE ROOFTOP STREET ACTIVATION
AGUEDA PORTUGAL: ICONIC IMMERSIVE ART EXPERIENCE
PEARL BREWERY: CURBLESS PEDESTRIAN ACTIVE EXPERIENCE
PINK BALLS STREET: MONTREAL, CANADA - ICONIC IMMERSIVE ART EXPERIENCE 63
PROGRAM MIX CENTRAL ZONE PROGRAM 138,684 FT2 < 162 UNITS > 5,700 FT2 9,396 FT2 < 27 SPACES > 37,454 FT2 < 144 SPACES > 191,234 FT2
5 PARCEL 5 PARKING ABOVE GRADE TOTAL AREA
126,680 FT2 < 433 SPACES > 126,680 FT2
6 PARCEL 6 PROGRAM RETAIL / F&B TOTAL
PROGRAM OFFICE 578,408 FT2 RETAIL / F&B 63,599 FT2 MP FOOD HALL 23,508 FT2 MP AMENITY 19,081 FT2 MP ATRIUM 13,557 FT2 MP PENTHOUSE 11,250 FT2 MP BOH 45,319 FT2 TOTAL AREA 754,722 FT2 * NOTE - PARCEL 7 PROGRAM DATA MAY NOT REFLECT ENTIRE BUILDING GSF
7
LEGEND ANCHOR AMENITY RETAIL / F&B OFFICE RESIDENTIAL RESIDENTIAL LOBBY MP BOH SERVICE
PROGRAM 578,408 FT2 OFFICE RETAIL / F&B 74,947 FT2 RESIDENTIAL 138,684 FT2 < 162 UNITS > MP FOOD HALL 23,508 FT2 MP AMENITY 19,081 FT2 MP ATRIUM 13,557 FT2 MP PENTHOUSE 11,250 FT2 45,319 FT2 MP BOH PARKING ABOVE GRADE 136,076 FT2 < 460 SPACES > BELOW GRADE 37,454 FT2 < 144 SPACES > 49 SPACES SURFACE 9 SPACES STREET TOTAL AREA 1,078,284 FT2
GROUND FLOOR / LEVEL 1 OFFICE RETAIL / F&B RESIDENTIAL MP FOOD HALL MP AMENITY MP ATRIUM MP BOH PARKING TOTAL AREA
1,400 FT2 45,048 FT2 8,364 FT2 23,508 FT2 6,350 FT2 13,557 FT2 7,280 FT2 41,066 FT2 < 193 SPACES > 146,573 FT2
5 PARKING 108 SPACES 31,670 FT2
PARKING ENTRY
RESI AMENITY 3,414 FT2
4
PARKING 27 SPACES 9,396 FT2
RESI LOBBY 3,960 FT2
CENTRAL ZONE TOTAL 5,648 FT2 5,648 FT2
PARKING 29 SPACES
PARKING ENTRY
C
RETAIL 5,700 FT2
PARKING 9 SPACES
RETAIL 3,100 FT2
6
K BLVD
LEWIS & CLAR SERVICE
RETAIL 11,600 FT2
AMENITY 600 FT2
RETAIL 1,850 FT2
BOH 7,280 FT2
FOOD HALL 23,508 FT2
AMENITY 900 FT2 ATRIUM 13,557 FT2
7 RETAIL 800 FT2
RETAIL 10,800 FT2
OFFICE 1,400 FT2 AMENITY 2,000 FT2
NW WILSON ST AMENITY 2,850 FT2
RETAIL 1,400 FT2
FOOD HALL 23,508 FT2
STREETCAR
RETAIL 7,250 FT2
PARKING 20 SPACES
NW WARDWAY
64
RETAIL 2,548 FT2
DROP OFF
PROGRAM RESIDENTIAL RETAIL / F&B PARKING ABOVE GRADE BELOW GRADE TOTAL AREA
7 PARCEL 7 *
NW 27TH AVE
4 PARCEL 4
0
100 N FT
PARKING UP TO LEVEL 4 RESIDENTIAL 21,720 FT2 27 UNITS
PARKING DOWN TO SUB LEVEL 2
RESIDENTIAL UP TO LEVEL 7
ROOF DECK 2,700 FT2 PARKING 31,670 FT2 108 SPACES
PARKING 56 SPACES 14,029 FT2
ROOF DECK 2,548 FT2
K BLVD
K BLVD
LEWIS & CLAR
LEWIS & CLAR
GYM 12,731 FT2 BOH 13,462 FT2
F&B 3,409 FT2 ROOF DECK 5,080 FT2
NW 27TH AVE
OFFICE PROGRAM OCCUPIES ENTIRE FLOOR PLATE ON LEVELS 3-9 EXCEPT RETAIL @ LEVEL 2
MP PENTHOUSE 11,250 FT2
OFFICE 47,400 FT2
NW 27TH AVE
RETAIL 22,250 FT2
NW WARDWAY
ROOF DECK 6,400 FT2
SUB-LEVEL 1 (SUB-LEVEL 1-2 TOTALS BELOW)
LEVEL 2 (LEVELS 2-9 TOTALS BELOW)*
ROOF LEVEL
AMENITY (SUB-LEVEL 1) MP BOH (SUB-LEVEL 1) BELOW GRAD PARKING (SUB-LEVEL 1-2) TOTAL AREA
OFFICE (LEVELS 2-9) RETAIL / F&B (LEVELS 2-9) RESIDENTIAL (LEVELS 2-7) PARKING (LEVELS 2-4) MP BOH (LEVELS 2-9) TOTAL AREA
MP PENTHOUSE MP BOH ROOF DECK TOTAL AREA
12,731 FT2 13,462 FT2 37,454 FT2 < 144 SPACES > 63,647 FT2
577,008 FT2 29,899 FT2 130,320 FT2 < 162 UNITS > 95,010 FT2 < 325 SPACES > 21,697 FT2 853,934 FT2
NW WARDWAY
0 11,250 FT2 2,880 FT2 6,400 FT2 20,530 FT2
100 N FT
*TOTALS INCLUDE MP BLDG MEZZANINE
65
SHARED STREET & DISTRICT SPINE CENTRAL
EAST
84 FT
NORTH GARAGE WITH RETAIL FRONTAGE
MONTGOMERY PARK BUILDING
ROOF DECK
38 FT
LANDSCAPE RAMPS
NW 27TH AVE
33 FT
24 FT
PARKING 66
RETAIL / F&B
FOOD HALL
LEWIS & CLARK BLVD
SHARED STREET / DISTRICT SPINE
OFFICE
WEST
136 FT
HISTORIC LOADING DOCK
RESIDENTIAL AMENITY ROOF TERRACE
LEWIS & CLARK BOULEVARD & SHARED STREET / DISTRICT SPINE
RETAIL COURT
RESIDENTIAL
ACTIVE RETAIL / F&B FRONTAGE
RETAIL FRONTING GARAGE
DISTRICT SPINE SHARED STREET
WATER TOWER
OUTDOOR SEATING AREA
MONTGOMERY PARK BUILDING
EXISTING DOCK / NEW PEDESTRIAN SIDEWALK
ACTIVE RETAIL / F&B
67
LEWIS & CLARK BOULEVARD Lewis & Clark Boulevard is a proposed street through the existing parking and loading areas west and north of the Montgomery Park Building. The alignment of the street embraces two important historic site elements - the north ramp and the loading dock. North of the street the angled alignment creates opportunities for creative infill development including retail wrapping the existing parking structure. South of the street, outdoor seating, flexible paved areas and planting commingle with new active uses along the historic dock. Lewis & Clark Boulevard is envisioned as an important part of the open space network - a curbless street shared by pedestrians, cyclists and vehicles that can be closed to through traffic during events.
WEST
CENTRAL
KEEN GARAGE, PORTLAND: HISTORIC LOADING DOCKS REPURPOSED AS RETAIL ENTRIES AND SEATING
EAST
FIRST THURSDAY ART WALK, NW 13TH AVE, PORTLAND: STREET CLOSED TO VEHICLES DURING EVENTS 68
RESIDENTIAL STAIR TO NW NICOLAI
HISTORIC LOADING DOCK
RAMP GARDEN
GARAGE ENTRY COURT
AMENITY DECK
ENTRY COURT
FOOD HALL PLAZA
RETAIL COURT
COVERED RETAIL ENTRY
RETAIL RETAIL
RETAIL
RESIDENTIAL
LOBBY
K BLVD
OUTDOOR SEATING
RETAIL LOADING AREA
FOOD HALL
NW 27TH AVE
RETAIL
RESIDENTIAL ENTRY
RETAIL
RETAIL
LOBBY
RESIDENTIAL
LAR LEWIS & C
RETAIL ENTRY
FOOD HALL COURTYARD
GARDEN SEATING 0
N
30
FT
69
900 SF 900 SF
F+B KIOSK WITHSEATING SEATING F+B KIOSK WITH
SEATING SEATING 950 SF 950 SF
MONTGOMERY PARK BUILDING
L AIL F SF RETAIL F + B F + B ETAIL 800 SF WC WC 00 SF 1,500 1,500 SF SF
LOADING & LOADING & COMPACTOR COMPACTOR
OUTDOOR OUTDOOR SEATING FIRE FIRE SEATING 2,200 SFROOM ROOM 2,200 SF
RESTAURANT RESTAURANT CO-WORKING CO-WORKING 2,400 SF 2,400 SF LOUNGE LOUNGE 3,3503,350 SF SF
RETAIL RETAIL 1,4001,400 SF SF
RESTAURANT WITH GRAB & GO RESTAURANT WITH GRAB & GO
OPEN TO BELOW
OPEN TO BELOW MEP M MEP CE ANCE F SF BUILDING MAIL MAIL ROOMROOM ILDING 800 SF OFFICE 800 SF FFICE 600 SF 00 SF
Montgomery Park Building is the iconic 500F+BSFF+B 500 SF RESTAURANT beacon for the districtRESTAURANT as tallest building 2,400 the SF 2,400 SF in the neighborhood. The renovation of this EXISTING EXISTING building in phase one will set the tone and MEP MEP NG F+B OFFICE OFFICE F+B F+B ETING F + B F + F + B R (2026) BOHidentity for1000 (2026) 800 the future evolution. By SF B SF district’s 800 SF 1000 SF FTER 1,700BOH SF 9,0009,000 SF SF SF 1,700 SF transforming the existing ramps, atrium, BIKE VALET/ BIKE VALET/ LOCKER LOCKER F+B F+B ground floor, basement,Fand roof into ROOMS ROOMS F + B 600 SF F+B F+B +B 600 SF 2,050 SF F + B 2,050 SF 600 SF 600 SF 450 SF 300 FSF+ B landscape parks, interior gardens, food hall 450 SF 300 SF SEATING SEATING and retail/F&B spaces, 650 gym, and a penthouse SF 650 SF F+B amenity, the future identity will breathe life F+B 300 SF SEATING 300 SF and energy inside900SEATING and out of the building. SF
F+B F+B WC 1,500WC SF 1,500 SF
AIL SF
WEST
SEATING SEATING 950 SF 950 SF
CO-WORKING CO-WORKING LOUNGE LOUNGE 3,350 SF 3,350 SF
FIRE FIRE ROOM ROOM
CENTRAL
G MAIL ROOM ROOM 800 SF EING MAIL 800 SF CE SF MEP MEP
80'-0" 0'-0"
900 SF
160'-0" 160'-0"
E VALET/ OCKER IKE VALET/ ROOMS LOCKER ,050 SF ROOMS 2,050 SF
F+B 1,400 FSF+ B 1,400 SF
CO-WORKINGLOUNGE LOUNGE/ CHECK-IN / CHECK-INFOR FORFLOOR FLOOR0202CO-WORKING CO-WORKINGSPACE SPACE CO-WORKING F+B KIOSK WITH SEATING
F+B KIOSK WITH SEATING F+B KIOSK WITH SEATING
RETAIL 1,400RETAIL SF 1,400 SF
EAST
COFFEE SHOP RETAIL WITH FLEX SEATING COFFEE SHOP/RETAIL RETAIL WITHFLEX FLEXSEATING SEATING COFFEE SHOP/ WITH
EXISTING EXISTING OFFICE (2026) OFFICE 9,000(2026) SF 9,000 SF
CO-WORKING LOUNGE / CHECK-IN FOR FLOOR 02 CO-WORKING SPACE CO-WORKING LOUNGE / CHECK-IN FOR FLOOR2502 CO-WORKING SPACE 50 100 ft 25
280'-0" 280'-0"
RESTAURANT RESTAURANT 2,400 2,400 SFSF
160'-0" 160'-0"
F
LOADING LOADING && COMPACTOR COMPACTOR OPEN BELOW OPEN TOTO BELOW
CE E
MEP MEP
ETAIL TAIL SF 050SF
NG G F F+ +B B R BOH BOH OPEN TO BELOW OPENSF TO 1,700 1,700 SFBELOW GYM YM RANCE ANCE 0SF SF
MEP MEP
RESTAURANT RESTAURANT 2,400 2,400 SFSF RESTAURANT RESTAURANT 2,400 SF 2,400 SF
LOADING && LOADING COMPACTOR COMPACTOR F +F B+ B 1000 1000 SFSF
RESTAURANT RESTAURANT 2,400 F +F2,400 B+ B SF SF 300300 SFSF F+B F+B 1000 SF 1000 SF
EXISTING CONDITIONS SEATING 70
F+B
ELEVATED LOADING DOCK CIRCULATION AND LOADING ZONE
F+BF+B 500500 SF SF OUTDOOR OUTDOOR SEATING SEATING 2,200 2,200SF SF
SEATING SEATING 650650 SFSF F+B F+B 800 SF 800 SF
SEATING 900900 SFSF F+B
F+B F+B 500 500SF SF F +FB+ B F +FB+ B SF SF 600600 SF SF 600600
OPTION0303GROUND GROUNDFLOOR FLOORDAY DAY0101 OPTION 01.30.2020| P. | P.1111 01.30.2020
ELEVATED LOADING DOCK CIRCULATION AND LOADING ZONE FOOD FOODHALL HALL ELEVATED LOADING DOCK CIRCULATION AND LOADING ZONE
F + FB + B 1,400 SF SF 1,400
COFFEE SHOP/ RETAIL WITH FLEX SEATING COFFEE RETAIL WITH FLEX SEATING CO-WORKING SHOP/ ATRIUM SPACE
F +FB+ B 300300 SF SF
SEATING F+B F + B SEATING F+B F+B SF 600SF SF 600 SF 950950
100 ft
ELEVATED LOADING DOCK CIRCULATION AND LOADING ZONE ELEVATED LOADING DOCK CIRCULATION AND LOADING ZONE FOOD HALL FOOD HALL
F +FB+ B 800800 SFSF
F +F B +B 450 SFSF 450
KETING F+B ETING F+B ENTER BOH NTER BOH 00 SF 1,700 SF 0 SF 1,700 SF
OUTDOOR OUTDOOR SEATING SEATING 2,200 2,200 SF SF
50
F+B F+B 1,400 SF
CO-WORKING ATRIUM SPACE CO-WORKING ATRIUM SPACE
EAST FACADE ENTRY ALONG 27TH AVE & WILSON ST 71
MONTGOMERY PARK BUILDING - PROGRAM BREAKDOWN
TOTAL PROGRAM AREA * OFFICE RETAIL / F&B MP FOOD HALL MP AMENITY MP ATRIUM MP PENTHOUSE MP BOH TOTAL AREA
GROUND FLOOR / LEVEL 1
578,408 FT2 63,599 FT2 23,508 FT2 19,081 FT2 13,557 FT2 11,250 FT2 45,319 FT2 754,722 FT2
OFFICE RETAIL / F&B MP FOOD HALL MP AMENITY MP ATRIUM MP BOH L1 TOTAL AREA
1,400 FT2 45,048 FT2 23,508 FT2 6,350 FT2 13,557 FT2 7,280 FT2 146,573 FT2
EXISTING CONDITIONS - ATRIUM EXTERIOR
* NOTE - PARCEL 7 PROGRAM DATA MAY NOT REFLECT ENTIRE BUILDING GSF
LANDSCAPED RAMPS TO L2
K BLVD
LEWIS & CLAR RETAIL 800 FT2
RETAIL RETAIL 2,000 FT2 1,600 FT2
SERVICE RETAIL 1,850 FT2
RETAIL 6,000 FT2
BUILDING OFFICE / MAIL ROOM 1,400 FT2
COURTYARD SEATING
MARKETING CENTER 900 FT2
ATRIUM PEDESTRIAN 13,557 FT2 CIRCULATION RETAIL 2,000 FT2 RETAIL 2 2,800 FT
BOH 7,280 FT2 FOOD HALL 23,508 FT2
WILSON ST RETAIL 800 FT2
CO-WORKING LOUNGE 2,850 FT2
RETAIL 1,400 FT2
RETAIL 7,250 FT2 BIKE VALET / LOCKER ROOMS 2,000 FT2
COURTYARD SEATING BUS STOP
PARKING 20 SPACES
NW 27TH AVE
RETAIL 7,200 FT2 GYM ENTRANCE 600 FT2
EXISTING CONDITIONS - ATRIUM INTERIOR
NW WARDWAY
PHASE 2 -OPTION 02B
VAUGHN ST
EXISTING LOADING DOCK
GROUND FLOOR PLAN
0
100 N FT
ATRIUM EXTERIOR
RESTAURANT 3,906 SF
RETAIL 1,826 SF
RESTAURANT/ EVENT SPACE 2,165 SF
OUTDOOR SEATING 2,235 SF
WINE BAR/ MARKET 5,400 SF
F+B 525 SF
SERVICE SERVICE F+B 831 SF TENANT LOUNGE/ MARKETING CENTER 2,534 SF
F+B 1,990 SF RETAIL 2,408 SF
72
RETAIL 2,408 SF
LOBBY 1,127 SF
F+B 439 SF
WINE BAR OVERFLOW 408 SF
F+B 444 SF F+B 448 SF
F+B 510 SF
SEATING 934 SF
F+B 768 SF
F+B 825 SF
F+B 326 SF
FOOD HALL 24,835 SF
F+B 459 SF
F+B 510 SF SEATING 589 SF
F+B 485 SF RETAIL 2,413 SF F+B
RETAIL 806 SF
LOBBY 1,276 SF
F+B 446 SF F+B
SEATING 284 SF
F+B 535 SF F+B
F+B 847 SF
ATRIUM INTERIOR 73
MONTGOMERY PARK BUILDING - ANCHOR ACTIVATION
CORNER OF 27TH AVE AND LEWIS & CLARK BLVD
LANDSCAPING INTEGRATED WITH RAMPS TO L2 74
WEST
STEPS FUNCTION AS GATHERING AND MEETING SPACE
INTIMATE COURTYARD SPACES SET BACK FROM STREET
POP-UP KIOSKS TO ACTIVATE CORNER
SHARED STREET INTERSECTION
CENTRAL
EAST
VIEW INSIDE FOOD HALL 75
WEST ZONE TRAILHEAD LODGE & PARK DISTRICT
RESIDENTIAL
The West Zone is the park like setting of the district with a visible and physical connection to Forest Park. The zone is comprised of a district park for the residents and neighboring community that will be surrounded mainly by residential (& possible hotel) with a mix of retail and F&B that is anchored by The Trailhead Lodge. The district park is the heart of the district with various residential courtyards and pocket parks connecting to it. The Lodge plays a major role in the outdoor purpose and identity of the new district and its visible, emotional, and possible physical connection to Forest Park. This zone acts as the major parking hub of the district with a large below grade parking structure that serves the residents and workers as well as the local community of shoppers and park visitors. The entire zone is serviced below grade to promote an active ground floor and reduce servicing at grade.
VD K BL
CLAR
EAST
IS &
CENTRAL
NW
LEW
WEST
I ST
NW
WA R
DW AY
WEST ZONE AXON
76
LA NICO
TRAILHEAD LODGE
DISTRICT PARK
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL AMENITY ROOF DECK
DISTRICT PARK SURROUNDED BY RESIDENTIAL, RETAIL / F&B AND TRAILHEAD LODGE
FOREST PARK
PLAZA WITH WATER JETS DISTRICT SPINE / SHARED STREET
OUTDOOR MARKET
DISTRICT PARK
TRAILHEAD LODGE
RESIDENTIAL
BOARDWALK FROM MP BLDG ATRIUM TO TRAILHEAD LODGE / FUTURE PEDESTRIAN BRIDGE 77
INSPIRATION
SLABTOWN, PORTLAND: NATURAL FACADE MATERIAL PALETTE
MAVEN HOTEL, DENVER: CLEAN MATERIAL PALETTE AND MODERN FACADE 78
PEARL BREWERY: TIMELESS MASONRY MATERIALS
PEARL BREWERY: ACTIVE OPEN SPACES WITH PLANNED EVENTS (FARMERS MARKET)
AIX-EN-PROVENCE: OUTDOOR SEATING
SLABTOWN, PORTLAND: CLEAN MASONRY MATERIAL PALETTE
INDUSTRY CITY, NEW YORK: ACTIVE COURTYARDS
DISTRICT WHARF: ACTIVE GROUND FLOOR FACADES
PEARL DISTRICT, PORTLAND: ACTIVE STREET FRONTAGE
ANTWERP: AUTHENTIC MATERIAL PALETTE AND ACTIVE OPEN SPACE 79
PROGRAM MIX WEST ZONE PROGRAM 1 PARCEL 1 PROGRAM RESIDENTIAL 363,330 FT2 < 418 UNITS > RETAIL / F&B 7,930 FT2 PARKING BELOW GRADE 504,814 FT2 < 1588 SPACES > TOTAL AREA 876,074 FT2
3 PARCEL 3 PROGRAM RESIDENTIAL 88,767 FT2 < 102 UNITS > RETAIL / F&B 9,577 FT2 TOTAL AREA 98,344 FT2
2 PARCEL 2
B
PROGRAM TRAIL HEAD LODGE 32,810 FT2 TOTAL AREA 32,810 FT2 RESIDENTIAL 34 UNITS 30,122 FT2
WEST ZONE TOTAL PROGRAM RESIDENTIAL
PARKING ENTRY
452,097 FT2 < 520 UNITS > 17,507 FT2 32,810 FT2
RESI AMENITY 2,534 FT2
RETAIL / F&B LODGE PARKING BELOW GRADE 504,814 FT2 < 1588 SPACES > 6 SPACES SURFACE TOTAL AREA 1,007,228 FT2
SPEED RAMP TO PARKING BELOW APT LOBBY 2,434 FT2
1 APT LOBBY 2,379 FT2 RETAIL / F&B 3,120 FT2
RESI AMENITY 2,167 FT2
2 MIN WALK TO FOREST PARK / LOWER MACLEAY TRAIL HEAD
PARKING 6 SPACES RETAIL / F&B 3,120 FT2
A
RETAIL 1,690 FT2
LEGEND 2 TRAILHEAD LODGE 7,043 FT2
POTENTIAL PROPERTY ACQUISITION FOR CONNECTION TO FOREST PARK
GROUND FLOOR / LEVEL 1 RESIDENTIAL RETAIL / F&B LODGE PARKING TOTAL AREA 80
42,585 FT2 < 34 UNITS > 17,507 FT2 7,043 FT2 6 SPACES 67,135 FT2
RETAIL / F&B 4,233 FT2
POTENTIAL PEDESTRIAN BRIDGE CONNECTION TO FOREST PARK **DISTRICT PARK SQ.FT IS FROM BUILDING FACE TO BUILDING FACE
RETAIL / F&B 5,344 FT2
2
3
NW WARD
LEWIS & CLARK BLVD
29TH AVE
ANCHOR AMENITY RETAIL / F&B OFFICE RESIDENTIAL RESIDENTIAL LOBBY MP BOH
WAY
TRAILHEAD LODGE DISTRICT PARK 17,500 FT2 / 0.4 ACRES
0
100 N FT
PARKING DOWN TO SUB-LEVEL 4
RESIDENTIAL 53,949 FT2 64 UNITS
PARKING 317 SPACES 107,578 FT2
LEWIS & CLARK BLVD
LEWIS & CLARK BLVD
RESIDENTIAL UP TO LEVEL 7
ROOF DECK 1,122 FT2
TRAILHEAD LODGE 4,232 FT2
TRAILHEAD LODGE 21,535 FT2
ROOF DECK 1,490 FT2
NW WARDW
NW WARDW
AY
SUB-LEVEL 1 (SUB-LEVEL 1-4 TOTALS BELOW)
LEVEL 2 (LEVEL 2-7 TOTALS BELOW)
PARKING (SUB-LEVEL 1-4) TRAILHEAD LODGE (SUB-LEVEL 1) TOTAL AREA
RESIDENTIAL (LEVELS 2-7) 409,512 FT2 < 486 UNITS > TRAILHEAD LODGE (LEVEL 2) 4,232 FT2 TOTAL AREA 413,744 FT2
504,814 FT2 < 1500 SPACES> 21,535 FT2 526,349 FT2
RESIDENTIAL RESIDENTIAL 14,303 FT2 UP TO LEVEL 7 17 UNITS
ROOF LEVEL ROOF DECK TOTAL AREA
4,966 FT2 4,966 FT2
AY ROOF DECK 1,155 FT2
ROOF DECK 1,199 FT2
0
100 N FT
PROPERTY LINE
136 FT
RESIDENTIAL
ROOF DECK
MONTGOMERY PARK BUILDING
OFFICE
84 FT
AMENITY
RESI
RESI
RESI
RESI
LOBBY
RETAIL / F&B
RETAIL / F&B
GARAGE ENTRY
FIRELANE ACCESS TO BLDGS
OND D RAMP BEY
ACCESS SPEE
SERVICE CORRIDOR
NW WARDWAY
RESIDENTIAL COURTYARD
RESIDENTIAL COURTYARD
RESIDENTIAL COURTYARD
LEWIS & CLARK BLVD
DISTRICT SPINE / SHARED STREET
RETAIL / F&B GYM / FITNESS
FOOD HALL B.O.H
SECTION A 81
TRAILHEAD LODGE AND DISTRICT PARK CENTRAL
EAST
PROPERTY LINE
RESIDENTIAL
TRAILHEAD LODGE
RESIDENTIAL
PROPERTY LINE
WEST
PEDESTRIAN BRIDGE TO FOREST PARK 84 FT
FOREST PARK
84 FT
AMENITY
RESI
36 FT
RETAIL / F&B FIRELANE ACCESS TO BLDGS
GARAGE ENTRY
NW WARDWAY
AMENITY
SECTION B 82
DISTRICT PARK
RESIDENTIAL COURTYARD
SPEED RAMP
RESI
SPEED RAMP CONNECTS LEWIS & CLARK BLVD WITH NW WARDWAY
RESIDENTIAL
DISTRICT PARK ON AXIS WITH MONTGOMERY PARK BUILDING ATRIUM
BALCONIES OVERLOOKING PARK
OUTDOOR FIREPIT
ACTIVE RETAIL / F&B FRONTAGE ALONG BOARDWALK
MONTGOMERY PARK BUILDING & ATRIUM
BOARDWALK FROM ATRIUM TO POTENTIAL PEDESTRIAN BRIDGE
DISTRICT PARK
RESIDENTIAL AMENITY TERRACE
ACTIVE RETAIL / F&B FRONTAGE
RESIDENTIAL
RESIDENTIAL LOBBY
83
DISTRICT PARK SEQUENCE Conceptually, the Open Space Framework is a transition from city to park with the Montgomery Park Building at its center. West of the building, the Park Sequence will extend from the renovated Atrium toward Forest Park. In the Portland tradition of open space sequences each space, Atrium, shared street, entry square, District Park and Trailhead Lodge will express the transition from city to park through changes in materiality and character. Together the sequence will provide flexible space for a variety of programs and events as well as the everyday experience of residents and employees.
BELO CENTER FOR NEW MEDIA, AUSTIN: FLEXIBLE OPEN LAWN
WEST
CENTRAL
EAST
ELIZABETH CARUTHERS PARK, PORTLAND: PAVED AREAS WITH MOVABLE FURNITURE 84
TRAILHEAD LODGE
PARK
RESIDENTIAL
AMENITY
RETAIL ENTRY
RESIDENTIAL COURTYARD
PROMENADE
RESTAURANT SEATING
CAFE SEATING
RETAIL
RETAIL
ATRIUM
RETAIL
RESIDENTIAL COURTYARD
BRIDGE TO FOREST PARK
SQUARE & SHARED STREET
RETAIL
RETAIL ENTRY
RETAIL
FIRE LANE
NW WA
STORMWATER GARDEN
RDWAY
FLEXIBLE LAWN
SPLASH PAD
RETAIL RETAIL ENTRY
RETAIL
POCKET PARK
RETAIL
COVERED SEATING
LEWIS & CLARK BLVD
VIEW DECK
RETAIL
LOBBY
RESIDEN TIAL
TRAILHEAD LODGE
RETAIL ENTRY
0
N
30
FT
85
THE TRAILHEAD LODGE Trailhead Lodge is the future soul of the district as a physical symbol and connection to the outdoor lifestyle and Forest Park. The design is inspired by the history of the site and the local craftsmanship of the Forestry Building from the 1905 Lewis & Clark Centennial Exposition as well as other local icons such as the Timberline Lodge and Japanese Gardens. Located on the far west side of the property it is immediately flanked by the new district park and a visual connection to Forest Park with a possible pedestrian bridge across NW Wardway to help promote access to the Lower MacCleay / Forest Park trailhead. Located in the sublevel is the spa/wellness center, locker rooms, and fitness center that could be open to members or public. The ground level consists mainly of the Great Room and porch anchored by a fireplace that could be used as a lounge, restaurant, or community gathering place with views towards Forest Park. A coffee shop, catering kitchen, and retail or park office space help activate the east façade along the district park. The mezzanine level consists of seating, inside/outside bar, screened in porch, and outdoor deck all with stunning views to Forest Park. WEST
86
CENTRAL
FORESTRY BUILDING
SITE HISTORY - FORESTRY BUILDING IN 1905 LEWIS & CLARK EXPOSITION
SITE HISTORY - OREGON’S FORESTRY BUILDING - INTERIOR
APPLE STORE - LARGE ROOF OVERHANG WITH MINIMAL ROOF FASCIA
THERME VALS - ELEMENTAL SPA SPACE
TIMBERLINE LODGE - MOUNT HOOD - LOUNGE SPACE ORGANIZED AROUND SCULPTURAL STONE FIREPLACE
JACK DANIELS DISTILLERY: PARTITIONED INTERIOR SPACE WITH OPEN FEEL
EAST
WEST FACADE AND PORCH FACING FOREST PARK 87
TRAILHEAD LODGE - PROGRAM BREAKDOWN TRAILHEAD LODGE TOTAL AREA 32,810 FT2 INDOOR GSF 4,091 FT2 OUTDOOR GSF 30,940 FT2 TOTAL RSF 36,901 FT2 TOTAL GSF SUB-LEVEL 1 PROGRAM SPA / WELLNESS
LEVEL 1 PROGRAM LODGE GREAT ROOM
6,074 FT2
3,172 FT2 < 211 OCCUPANTS >
LEVEL 2 PROGRAM LODGE OVERLOOK
3,468 FT2 < 231 OCCUPANTS >
LOCKERS / RESTROOMS / STORAGE
3,742 FT2
LODGE GREAT ROOM PATIO
1,538 FT2 < 102 OCCUPANTS >
LODGE OVERLOOK BALCONY
310 FT2 < 20 OCCUPANTS >
FITNESS
6,765 FT2
RETAIL / PARK SPACE
650 FT2
BAR
238 FT2
L2 F&B B.O.H.TOTAL GSF
1,086 FT2
COFFEE SHOP
832 FT2
ROOF DECK (SCREENED)
711 FT2 < 47 OCCUPANTS >
B.O.H. / MECH / CIRC
3,868 FT2
COFFEE SHOP OUTDOOR SEATING
537 FT2
ROOF DECK (UNSCREENED)
779 FT2 < 51 OCCUPANTS >
CATERING KITCHEN
1,038 FT2
MECH / CIRC
634 FT2
RR / MECH / CIRC
1,459 FT2
SUB-LEVEL 1 AREA INDOOR GSF OUTDOOR GSF TOTAL RSF TOTAL GSF
LEVEL 1 AREA INDOOR GSF OUTDOOR GSF TOTAL RSF TOTAL GSF
21,535 FT2 --17,667 FT2 21,535 FT2
LEVEL 2 AREA INDOOR GSF OUTDOOR GSF TOTAL RSF TOTAL GSF
7,043 FT2 2,183 FT2 7,767 FT2 9,226 FT2
4,232 FT2 1,908 FT2 5,506 FT2 6,140 FT2
GARAGE
L2 F&B BOH
B.O.H. / MECH GREAT ROOM PATIO
SPA / WELLNESS 6,074
STORAGE / WASHROOM
MECH
COFFEE SHOP
LODGE GREAT ROOM
LOCKERS / RESTROOMS / STORAGE
COFFEE SHOP SEATING ROOF ABOVE
NOOK
MECH
ROOF ABOVE LODGE OVERLOOK BALCONY
LODGE OVERLOOK
BALCONY ABOVE
FIREPLACE
OPEN TO BELOW
FIREPLACE OPEN TO BELOW
RETAIL / PARK SPACE BAR MECH
FITNESS
NW
NW
WA R
DW AY
SUB-LEVEL 1 / SPA & WELLNESS 88
RR
ROOF DECK (SCREENED)
CATERING KITCHEN
ROOF DECK (UNSCREENED)
NW
WA R
DW AY
LEVEL 1 / GREAT ROOM - COFFEE SHOP - RETAIL / PARK SPACE
WA R
DW AY
LEVEL 2 / LODGE OVERLOOK - BAR - ROOF DECK
0
25
FT
N
BIRD’S EYE VIEW TOWARDS NORTHEAST 89
TRAILHEAD LODGE - DISTRICT PARK ACTIVATION
EAST FACADE FACING DISTRICT PARK WEST
LUSH VEGETATION INTEGRATES BUILDING WITH LANDSCAPE RAINWATER CISTERN TO INCREASE RESILIENCY AND PROVIDE MURAL & SIGNAGE OPPORTUNITIES
90
CONTEMPORARY GLASS FACADE
EXTERIOR BALCONIES TO CONNECT LODGE MEZZANINE WITH PARK ACTIVITY ICONIC ROOF FORM & LARGE OVERHANGS COVER EXTERIOR PATIOS & INTEGRATE DISTRICT PARK
COFFEE SHOP AND PATIO SEATING TO ACTIVATE WEST DISTRICT PARK EDGE LARGE TILT-UP DOORS TO CONNECT INTERIOR & EXTERIOR
CENTRAL
EAST
DISTRICT PARK VIEW FROM TRAILHEAD LODGE 91
STREETSCAPE MOBILITY PARKING SERVICE 92
93
STREET FRAMEWORK Montgomery Park is a former industrial site consisting of historic warehouses and factory buildings with irregular blocks much larger than those of Portland’s well known 200 x 200 foot grid. A drop in elevation and NW Nicolai Street, an industrial corridor, create a northern border to the site’s two super blocks. On axis with the Montgomery Park Building’s east entry, NW Wilson Street is the planned terminus of a future Portland Streetcar line. Named in honor of the 1905 Centennial Exposition, Lewis & Clark Boulevard, is a proposed shared street that will divide the western block and provide circulation for pedestrians, cyclists, cars and service vehicles. Where existing large buildings prevent additional street alignments, interior and exterior pedestrian alleys are proposed. Together these elements establish a humanscale street framework specifically suited its site and future programs.
94
EXISTING
NW NICOLAI ST
NW VAUGHN ST & WARDWAY
NW 26TH AVE
CIVIC CORRIDOR 60’ R.O.W. - PUBLIC TRUCK TRAFFIC INDUSTRIAL
CIVIC CORRIDOR 60’ R.O.W. - PUBLIC FAST TRAFFIC BIKE LANES
LOCAL STREET 60’ R.O.W. - PUBLIC LOW TRAFFIC LIMITED ACTIVATION
LEWIS & CLARK BLVD
NW WILSON ST
NW 27TH AVE
SHARED STREET 60’ R.O.W. - PRIVATE CURBLESS RETAIL & OUTDOOR SEATING
LOCAL STREET 60’ R.O.W. - PUBLIC STREETCAR PLANNED POTENTIAL MAIN STREET
LOCAL STREET 60’ R.O.W. - PRIVATE N. OF WILSON BUS ROUTE GARDENS & OUTDOOR SEATING
PROPOSED
NW 29TH AVE
PRIVATE STREET CLOSURE LOCATIONS FOR EVENTS
CIVIC CORRIDOR CIVIC CORRIDOR WITH BIKE LANES LOCAL STREET LOCAL STREET WITH PLANNED STREETCAR CURBLESS SHARED STREET PEDESTRIAN PATH
PRIVATE STREET CLOSURE LOCATIONS FOR EVENTS 0
100 N FT
95
LOBBY
96
RETAIL RETAIL
LOBBY
FOOD HALL
RETAIL
RETAIL
RETAIL
RETAIL RETAIL
EAST
RETAIL
CENTRAL
A
RETAIL
B
LEWIS & CLARK BLVD
WEST
RETAIL
RETAIL
As a shared street with curbless continuous paving, NW Lewis & Clark Blvd is both a street and an important open space for the district. During events portions of the street will be closed to vehicles to create a pedestrian and bicycle only environment. The historic Montgomery Park Building Loading Dock and Atrium abut the street and impart an industrial character. Retail and residential entries and outdoor seating activate the sidewalks and adjacent courts.
RESIDENTIAL
LEWIS & CLARK BLVD
RETAIL RETAIL
RETAIL
RESIDENTIAL
NW 27TH AVE
STREET DESIGN
RETAIL
RETAIL ENTRY
STORMWATER PLANTER
SIDEWALK
TREE WELL
PARKING
TRAVEL LANE
TRAVEL LANE
TREE WELL
SIDEWALK
GATHERING
DOCK
7’
18’
7’-6”
4’-6”
8’
11’
11’
5’
7’-6”
15’ (VARIES)
12’
106’-6” (VARIES)
RETAIL
RETAIL
SECTION A
SIDEWALK
TREE WELL
PARKING
TRAVEL LANE
TRAVEL LANE
PARKING
TREE WELL
SIDEWALK/SEATING
10’-6”
4’-6”
8’
11’
11’
8’
4’-6”
17’-6”
75’
SECTION B 97
STREET DESIGN
OFFICE
On axis with the iconic Montgomery Park Building, NW Wilson St is envisioned as a future main street in the district. A planned Portland Streetcar line and American Can Complex renovations, including active uses and gardens in the 20’ setback fronting the buildings, ensure that Wilson will be an arrival point for many visitors, residents and employees.
RETAIL
NW WILSON ST
SIDEWALK
TREE WELL
PARKING
TRAVEL LANE
TRAVEL LANE
STREET CAR STOP
SIDEWALK
ENTRY COURT
8’
4’
8’
10’
10’
12’
8’
20’
80’
RETAIL
SECTION A
WEST
CENTRAL
A
RETAIL
OFFICE
EAST
98
OFFICE
OFFICE
NW 26TH AVE
NW 27TH AVE
NW WILSON ST
RETAIL
FOOD HALL
D
D/L
DOCK
FOOD HALL COURTYARD
RAMP GARDEN
PLANTING/UTILITIES
SIDEWALK
TREE WELL
DROP OFF
TRAVEL LANE
TRAVEL LANE
10’
29’
31’
19’
8’
4’
8’
10’
10’
DROP OFF / TREE WELL SIDEWALK LOADING 8’ 4’ 8’
SEATING 12’
160’
RETAIL
EAST
NW 27TH AVE
NW WILSON ST
CENTRAL
LARK
WEST
LEWIS & C
FOOD HALL
NW 27th Ave is a local street with unique setback conditions on either side. Outdoor seating, public gardens and a raised crossing at NW Lewis & Clark Blvd will help to activate the street and unify the district.
A
MARKET
RETAIL
SECTION A
NW 27TH AVE
RETAIL N 99
EXISTING EMPLOYEE COMMUTING Where people are traveling from informs opportunities for multimodal access. As a starting point, data on employee commuting patterns sheds light on where workers are coming from. Today, the vast majority of employees drive to work. But a priority for the region is reducing driving trips and creating infrastructure, policies, and programs that get more people on bicycles, buses, or trains.
3,200
Jobs at Montgomery Park
76%
of workers live in the tricounty Portland metro area
18%
of employees live within 4 miles of Montgomery Park, a typical Portland bike commute length
Studying employee home locations reveals that a significant percentage live within biking distance of Montgomery Park. What amenities at the site could encourage some of those employees to hop on a bicycle? More than one-third of all employees live in the city of Portland. How can targeted outreach or incentives encourage those workers, or people to take the bus?
8%
of employees have a 30-minute bus ride or shorter
VANCOUVER
TOP HOME LOCATIONS 37.2% 6.1% 3.6% 3.6% 3.0% 2.3% 2.0% 1.6% 1.3% 1.2% 38.1%
PORTLAND, OR BEAVERTOWN, OR GRESHAM, OR VANCOUVER, WA HILLSBORO, OR TIGARD, OR LAKE OSWEGO, OR ALOHA CDP, OR MILWAUKIE, OR TUALATIN, OR ALL OTHER LOCATIONS
SOURCE: LEHD 2017 100
HILLSBORO
PORTLAND GRESHAM BEAVERTOWN
TIGARD LAKE OSWEGO
EXISTING MULTIMODAL ACCESS OPTIONS WALKING In general, sidewalks are present on both sides of the street. The sidewalk becomes very skinny west of the Montgomery Park entrance on NW Wardway. An existing staircase at the end of NW 28th Place and a planned bicycle diverter project along NW 29th Avenue open up opportunities for a connection into Forest Park.
Bicyclists have a continuous connection from NW 27th Avenue and NW Vaughn Street east to other neighborhoods and downtown. The westbound bike lane stops at NW 27th Avenue, requiring bicyclists to use the vehicle lane on the steep hill down to NW Nicolai Street, which connects to the St. Helens bike route. Eastbound bicyclists have a continuous connection up the hill.
WARDWAY NARROW SIDEWALK
EXISTING STAIRCASE
BUS ROUTE 15 BUS ROUTE 77 BIKE LANE SIDEWALK NARROWS DIFFICULT BIKE
TRANSIT STOP ON NW 27TH AVE
MARKED CROSSWALK TRAFIC SIGNAL STOP SIGN BUS STOP
NW 29TH AVE
BIKING
LEGEND
I ST
LA ICO WN
N
TRANSIT
NW 28TH PL
Today, cars access the site primarily via NW Vaughn Street, turning onto NW 27th Avenue to access parking facilities. The site is easily accessible from I-405. Traffic counts from 2016 show 241 westbound vehicles turning right onto NW 27th Avenue during morning rush hour, compared to 366 vehicles going straight.
NW 29TH AVE
DRIVING NW WAR
DWAY
NW 27TH AVE
NW WILSON ST
NW 26TH AVE
Transit users can take Line 77 (Troutdale to Montgomery Park) or Line 15 (Gateway Transit Center to Nob Hill) to the site. Line 15 runs every 15 minutes and is part of TriMet's frequent service network. Every day, 376 people get on or off a bus at the Montgomery Park stop at the northwest corner of NW Vaughn Street and NW 27th Avenue.
NW VAUGHN ST
101
MOBILITY OPPORTUNITIES The transformation of Montgomery Park will generate a large number of new trips. Getting people to the site by walking, bicycling, transit, carpool, or ride share is a high priority and achieves multiple benefits. Less driving means less impacts to the surrounding neighborhoods from traffic and people looking for parking. Walking and bicycling are zero carbon ways of getting around and dovetail with the goals of creating a linkage to Forest Park and promoting a space for green, healthy, and active living. More trips that do not require a vehicle parking space means reducing the amount of costly parking spaces that must be constructed and maintained. There are also opportunities to improve circulation to and through the site, as well as exciting new projects such as a potential extension of streetcar that can both serve as a centerpiece to the look and feel of the development but also bring more people by transit. The six opportunities shown here support the goal of multimodal access. Some require support from external partners while others can be integrated into the next phase of the master plan.
1 PROMOTE MULTIPLE ACCESS POINTS Promote access via NW Nicolai Street to reduce traffic pressure on NW Vaughn Street.
NW
L N I CO
A I ST
NW VAUGHN ST
CURRENT SIGNAGE AFTER EXITING I-405
2 MOVE BUS LAYOVER Today, buses lay over along NW 27th Avenue. As an alternative, buses could lay over on NW 26th Avenue. This reduces traffic pressure on NW 27th Avenue.
1
I ST
OLA NIC
2
4 VD CLARK BL
5
NW 26TH AVE
NW WARD WAY
6
102
NW WILSON ST
NW 27TH AVE
3
NW VAUGHN ST
NW 26TH AVE
LEWIS &
NW 27TH AVE
NW
3 INTEGRATE POTENTIAL STREETCAR
5 INSTALL AMPLE BIKE PARKING
The City of Portland is analyzing an extension of Portland Streetcar to Montgomery Park. A station may be located on NW Wilson Street. This is an exciting opportunity to integrate rail transit at the site.
N
The Portland Zoning Code requires new development and major redevelopment to provide adequate, secure, and convenient short- and long-term bicycle parking. Dedicated bike rooms, off-street racks, and a variety of bicycle parking facilities should be installed throughout the site. Programs such as bike valet parking make parking easy and quick, and can be especially effective during special events.
S
NW WILSON ST
POTENTIAL STREET LAYOUT
ENHANCE TRAFFIC OPERATIONS 6 AND WALKABILTY ON VAUGHN/WARDWAY
4 CREATE SLOW STREETS
As redevelopment occurs, there may be opportunities to work with the City of Portland to make changes to NW Vaughn Street and NW Wardway. Pedestrian refuge islands can be added along NW Wardway to facilitate street crossings. Longer left turn pockets at the NW Wardway entrance to Montgomery Park and at NW 27th Avenue improve eastbound through traffic flow. A westbound right turn lane instead of a left turn lane improves westbound traffic flow.
NW 26TH AVE
Today, NW Wilson Street, NW 26th Avenue, and NW 27th Avenue all have a low-speed environment that makes walking feel comfortable. Maintain that environment and prioritize it on the new internal roadway connections so people on bikes, walking, or using mobility devices feel safe using the streets.
NW 27TH AVE
LEWIS & CLARK BLVD
NW WILSON ST
103
A SHARED PARKING DISTRICT Montgomery Park will be a complete neighborhood, anchored by its unique history and a diverse mix of new supportive uses. How parking is supplied and managed is crucial to achieving this vision. A shared parking system will support a walkable and transit-oriented district. Ready for a hike in Forest Park? Want to bike to Sauvie Island? Parking will be flexible and available on site to meet recreational demand.
USER-FRIENDLY Ensuring convenient access for all.
RIGHT-SIZED Recognizing that too little or too much parking will have negative impacts.
SHARED Knowing that a parking space can serve employees, residents, and visitors during the day.
COST-EFFECTIVE Recognizing the high cost of building parking and maximizing this investment.
FLEXIBLE Prioritizing proactive management that offers choice for tenants and users.
PARKING MUST BE…
PARKING DEMAND BY DAY AND TIME
SITE SUPPLY: 2,956 SPACES
A
B
WEEKDAY
B C
SITE SUPPLY: 2,956 SPACES
C
D
WEEKEND LEGEND
A WEEKDAYS AT 1 PM
250 SPACES AVAILABLE FOR RECREATIONAL DEMAND 104
B WEEKDAYS AT 6 PM
950 SPACES AVAILABLE FOR RECREATIONAL DEMAND
C WEEKENDS AT 11 AM
850 SPACES AVAILABLE FOR RECREATIONAL DEMAND
OFFICE (BOH) GYM RETAIL
RETAIL (F&B) OFFICE RESIDENTIAL
E NW 29TH AVE
H I ST
NW
OLA NIC
C
E
A
D C
A
B
LEWIS &
F
VD CLARK BL
G
NW 29TH AVE
DWAY
H
E NW 26TH AVE
NW WAR
NW WILSON ST
NW 27TH AVE
A
E
NW VAUGHN ST
A
B
C
D
E
F
G
H
Prioritize on-street parking for short-term visitors, passenger dropoff and pickup, and limited commercial loading. Coordinate management with adjacent public streets.
Ensure consistent residential parking access. Promote strategic sharing with lodge and retail uses.
Ensure consistent residential parking access yet prioritize sharing of spaces with office and retail employees. Utilize permits, pricing, and technology systems to manage demand.
Manage as an unreserved, shared facility for office and retail uses. Utilize permits, pricing, and technology systems to manage demand. Offer priority carpool parking.
Communicate parking options at site entrances. Provide realtime availability and information by facility.
Manage as an unreserved, shared facility for office and retail uses. Explore tiered pricing based on site proximity.
Prioritize for flex/ discount parking and supportive services.
Allocate surface lots for short-term visitors and retail users.
105
PARKING & SERVICE OVERALL DISTRICT PARKING SPEED RAMP
PARKING BELOW GRADE AVG. AREA P/SPACE* SURFACE STREET TOTAL*
CENTRAL ZONE
DISTRICT TOTAL
504,814 FT2 < 1,588 > 318 FT2 -6 504,814 FT2 < 1,594 SPACES >
PARKING 317 SPACES 107,578 FT2
W RD
AY
AY
ANCHOR AMENITY RESIDENTIAL SERVICE
TRAILHEAD LODGE
WA
W RD
LEGEND
* PARKING LAYOUT DESIGN EXCLUDES STRUCTURAL BUILDING SYSTEMS SO PARKING RATIO % MAY SHOULD SLIGHTLY INCREASE AND TOTAL SPACES SHOULD SLIGHTLY DECREASE
WEST ZONE / SUB-LEVEL 1
WEST ZONE / SUB LEVEL 2
PARKING AVG. AREA PER SPACE TOTAL AREA
107,578 FT2 < 317 SPACES> 340 FT2 107,578 FT2
PARKING AVG. AREA PER SPACE TOTAL AREA
PARKING 93 SPACES 30,412 FT2
POTENTIAL SUB-LEVEL 3 PARKING ENTRY
PARKING 422 SPACES 132,457 FT2
NW 27TH AVE
PARKING DOWN TO SUB-LEVEL 2
PARKING 434 SPACES 135,457 FT2
NW
NW
W RD
WA
W RD
WA AY
AY
K BLVD
CENTRAL ZONE + EAST ZONE / SUB-LEVEL 1 (SUB-LEVEL 1-6 TOTALS BELOW)
WEST ZONE / SUB-LEVEL 3
WEST ZONE / SUB-LEVEL 4
PARKING (SUB-LEVEL 1-6) AVG. AREA PER SPACE TOTAL AREA
PARKING AVG. AREA PER SPACE TOTAL AREA
LEWIS & CLAR
106
229,322 FT2 < 729 SPACES > 314 FT2 229,322 FT2
129,322 FT2 < 415 SPACES> 380 FT2 129,322 FT2
PARKING ENTRY
PARKING DOWN TO SUB-LEVEL 6
PARKING 56 SPACES 14,029 FT2
PARKING 415 SPACES 129,322 FT2
SERVICE TURNAROUND
WA
PARKING PARKING ABOVE GRADE 126,680 FT2 < 433 > ABOVE GRADE 126,680 FT2 < 433 > BELOW GRADE 46,850 FT2 < 171 > BELOW GRADE 734,136 FT2 < 2,317 > AVG. AREA PER SPACE* 287 FT2 AVG. AREA PER SPACE* 313 FT2 SURFACE 49 SURFACE 173 STREET 9 STREET 33 TOTAL* 173,330 FT2 < 662 SPACES > TOTAL* 860,816 FT2 < 2,956 SPACES >
SERVICE CORRIDOR
PARKING BELOW GRADE 182,472 FT2 < 558 > AVG. AREA PER SPACE* 327 FT2 SURFACE 124 STREET 18 TOTAL* 182,472 FT2 < 700 SPACES >
SPEED RAMP
NW
WEST ZONE
NW
EAST ZONE
132,457 FT2 < 422 SPACES> 313 FT2 132,457 FT2
PARKING AVG. AREA PER SPACE TOTAL AREA
135,457 FT2 < 434 SPACES> 312 FT2 135,457 FT2
SURFACE PARKING 49 SPACES
SURFACE PARKING 29 SPACES
PARKING ENTRY
T OLAI S W NIC
SERVICE
SERVICE
SERVICE
N
BELOW GRADE PARKING
PARKING ENTRY
STREET PARKING 9 SPACES
SERVICE
STREET PARKING 18 SPACES
ABOVE GRADE PARKING PARKING 108 SPACES ENTRY 31,670 FT2
PARKING ENTRY
PARKING ENTRY
SERVICE SERVICE
VD LEWIS & CLARK BL
SERVICE
SURFACE PARKING 75 SPACES
SERVICE
SERVICE
DROP OFF ZONE
STREET PARKING 6 SPACES
DROP OFF ZONE
SURFACE PARKING 20 SPACES
NW WARD
GROUND FLOOR TOTAL
WAY
GROUND FLOOR PARKING & SERVICE
NW 27TH AVE
NW VAUGHN ST
PARKING ABOVE GRADE AVG. AREA PER SPACE* SURFACE STREET TOTAL*
NW 26TH AVE
NW WILSON ST
LEGEND PRIMARY CIRCULATION
31,670 FT2 < 108 > 313 FT2 173 33 31,670 FT2 < 314 SPACES >
SECONDARY CIRCULATION STREET PARKING DROP OFF ZONE PRIMARY SERVICE SECONDARY SERVICE
0
100 N FT
107
TRANSPORTATION DEMAND MANAGEMENT (TDM) DEVELOPING A PROGRAM
TDM includes policies, programs, or projects that reduce vehicle trips and promote biking, walking, shared rides, and transit.
EXPLORE
DEFINE
TDM at Montgomery Park should be comprehensive, yet flexible, recognizing that strategies need to be tailored for residents, employees, and visitors.
• Best Practices • Existing + Future Needs
• Draft Package • Evaluation • Secure Partners
BENEFITS OF TDM
IMPACTS AT MONTGOMERY PARK
Incentivize multimodal trips and reduce congestion
OPERATE • Final Package • Engage + Communicate • Implement + Monitor
RESIDENTS
NON-RESIDENTS
PARKING POLICY + MANAGEMENT Right-size parking supply, demand, and costs
INCENTIVES + PROGRAMS Attract and retain tenants
SERVICES + INFRASTRUCTURE Reinforce the Montgomery Park lifestyle
Be a good neighbor and minimize local impacts
108
EDUCATION + AWARENESS TEST + MONITOR
10-13% reduction in parking demand
PARKING POLICY + MANAGEMENT Policies and tools that right-size parking supply and maximize efficiency. • Shared parking, ensuring reasonable guaranteed access • Priced parking, using price to balance demand and access across the district • Unbundled parking, offering flexibility to tenants on leasing options • Carpool parking, providing preferential pricing and access for shared trips • Wayfinding and technology, prioritizing convenience and user-friendliness
INCENTIVES + PROGRAMS Mobility services that catalyze new travel behaviors. • Passes and subsidies, making it simple and affordable to not drive • Commuter platforms, creating community through carpool matching and challenges
SERVICES + INFRASTRUCTURE Investments that strengthen and leverage site design and neighborhood amenities. • Streetcar and bus service, connecting to local and regional destinations • Rider amenities, providing safe bike lanes, secure parking, and showers/lockers • Shared mobility systems, formalizing bike/scooter/car share and ride hail
EDUCATION + AWARENESS Systems that make it easy to find, understand, and use the right mode of travel. • Tenant outreach, tailoring materials to new residents and employees • Transportation coordinator, supporting tenants through on-site engagement • Website, social media, and technology, connecting travelers to information
TEST + MONITOR Ongoing efforts to update policies, programs, and tools to meet tenant needs. • Pilot programs, testing ideas with small-scale interventions • Travel surveys, collecting periodic data on travel behavior and preferences 109
RESILIENCY INFRASTRUCTURE
110
111
HISTORIC PAST TO RESILIENT FUTURE Our vision is for a low-carbon, restorative district that infuses nature in its sense of place, creating a vibrant and healthy place to live, work, and play. Montgomery Park aims to be a global model for sustainable, urban infill and will advance carbon neutral design and effective resource management. To validate and communicate achievement of the sustainability vision, the neighborhood aims to pursue LEED for Neighborhood Development (LEED-ND) certification.
SUSTAINABILITY PRIORITIES • Commitment to 2030 Challenge • Embracing nature and biodiversity with ample open space, native plants, interactive rainwater management, and urban gardens • Water conservation through high-efficiency fixtures and rainwater reuse • Promoting low-carbon, multimodal transportation options • Maximizing building operational efficiency and renewable energy, and minimizing use of fossil fuels and refrigerants • Reducing embodied carbon through building reuse and low-carbon materials • Creating healthy indoor environments with natural daylight, connections to nature, and high indoor air quality • Pursue LEED Neighborhood Development and LEED Building Design & Construction Certifications 112
GREEN ROOFS TO MANAGE STORMWATER, REDUCE URBAN HEAT ISLANDS, AND IMPROVE BUILDING PERFORMANCE
BRING NATURE INTO BUIILDINGS WITH DAYLIGHT AND NATURAL VENTILATION THROUGH ATRIUM
HEAT RECOVERY FROM WASTEWATER IN RESIDENTIAL BUILDINGS
NW
LAI
O NIC
URBAN GARDENS PROMOTE LOCAL FOOD USE IN MARKETS
BUILDING REUSE AND PRESERVATION REDUCES EMBODIED CARBON
SOLAR PANELS FOR ENERGY GENERATION
WATER CISTERN FOR STORAGE
ST
NW
26
TH
AV E
ROUTE R A C T E STRE SUNRISE EAST STREETCAR STATION
T LSON S
NW WI NW
VE HA
27T
WA Y ST
BUS STOP
IS &
WA RD
LEW
NW
BU TE
RED
OU SR
SHA
VD K BL
CLAR
UGHN NW VA
ET
E STR
TIAL
POTEN
DEDIC
E
E LAN
D US SHARE
IKE L ATED B
ANE
N
SUNSET WEST DISTRICT ENERGY FROM SEWER WASTE ACROSS DISTRICT
E OPEN SPACE AND PARKS WITH NATIVE PLANTS
SHARED STREET PRIORITIZES PEDESTRIANS OVER CARS
W MAXIMIZE SOUTHERN EXPOSURE
STORMWATER RETENTION AND REUSE
S 113
ST
EMBRACING NATURE
NATIVE PLANTS & BIODIVERSITY
URBAN HEAT ISLANDS
RESTORATIVE DESIGN
Open space and vegetation are extremely important in urban environments as they encourage physical activity and social interaction and reduce stress. Montgomery Park will transform a paved hardscape into a lush, green and vibrant setting. The landscape design will prioritize the use of native plants with low-water needs. Additionally, the design will foster opportunities to enhance biodiversity – ideas include bird feeders in parks, green roofs, beehives, urban gardens, and trees and shrubs that bear fruit and berries.
Ample vegetation and greenery also help mitigate against the risks of urban heat islands. Heat islands are localized areas where the temperature is significantly warmer due to unshaded, dark surfaces that absorb and radiate heat from the sun. Vegetation and green roofs, an extensive tree canopy and light-colored, reflective paving are proven techniques for counteracting urban heat islands and will create a more comfortable environment for people.
Montgomery Park aims to restore and reveal a cleaner campus that aligns with the pre-development conditions. Outdoor spaces, for example, will be well-lit, inviting and safe while avoiding light pollution. Stormwater, which is one of the largest sources of water pollution in the U.S. will be slowed to pre-development rates and cleaned through bioretention and green roofs.
114
STORMWATER AS A RESOURCE T AI S
NW 26TH AVE
NW 27TH AVE
LEWIS & CLARK BLVD
NW
OL NIC
NW WILSON ST
NW WA
RDWAY
The Stormwater concept for the Montgomery Park Master Plan prioritizes on site infiltration and detention to reduce run-off to pre 1905 Lewis and Clark levels. This is achieved through a combination of stormwater planters, ecoroofs, underground detention, collection and reuse. Where soil conditions allow, infiltration will further reduce flows into the city’s combined sewer system. Existing buildings present opportunities for rainwater catchment, storage in the historic water tank, and reuse in greywater, irrigation, or mechanical systems.
LEGEND ECOROOF STORMWATER PLANTER UNDERGROUND DETENTION SITE BOUNDARY STORMWATER ZONE BOUNDARY
SITE AREA (ACRES)
STORMWATER DETENTION BY TYPE
PROPOSED BUILDINGS
LEWIS & CLARK BLVD
TOTAL SITE AREA 16.93 AC EXISTING BUILDINGS 5.95 AC PROPOSED BUILDINGS 2.86 AC NW 27TH AVE (PRIVATE) 0.73 AC LEWIS & CLARK BLVD 1.06 AC REMAINING SITE 6.33 AC
ECOROOF VEGETATED PLANTER UNDERGROUND DETENTION
TOTAL AREA 30% IMPERVIOUS 70% ECOROOF
TOTAL AREA 90% IMPERVIOUS 10% PERVIOUS
14% 55% 31%
2.86 AC 0.86 AC 2.86 AC
NW 27TH AVE TOTAL AREA 90% IMPERVIOUS 10% PERVIOUS
1.06 AC 0.95 AC 0.11 AC
REMAINING SITE 0.73 AC 0.66 AC 0.07 AC
TOTAL AREA 62% IMPERVIOUS 38% PERVIOUS
6.33 AC 3.95 AC 2.38 AC
115
SUSTAINABLE INFRASTRUCTURE SYSTEMS & LOW CARBON BUILDINGS
WEST
CENTRAL
EAST
MONTGOMERY PARK BUILDING
HISTORIC
HISTORIC PRESERVATION Preserving and reusing existing buildings is one of the most effective steps we can take in reducing the impact of the built environment on global carbon emissions. The emissions associated with the manufacturing, transportation, construction and demolition of buildings are referred to as embodied carbon, and they contribute almost 11% of all global carbon emissions. Montgomery Park will prioritize rehabilitation and reuse, making preservation part of the unique fabric of the community.
TRANSPORTATION Portland is an active city and ranks among the top cities in the U.S. when it comes to pedestrian, bicycle and public transit users. Montgomery Park will support multimodal, low-carbon transportation by incorporating streets that are walkable, shaded, and scaled for the pedestrian. Protected bike lanes and ample bike parking and amenities will make traveling to and through the site on bike a joyful experience. EV chargers will be available for electric vehicles. And for those using bus or streetcar, all transit stops will incorporate seating and weather protection. POROUS PAVERS
HISTORIC RAMP ADAPTIVE REUSE
BUS ROUTE
AMERICAN CAN WAREHOUSE
BIKE PARKING
HISTORIC BUILDING NW 27TH AVE CISTERN
116
GREEN ROOFS
CISTERN
STORMWATER & GREY WATER CAPTURE / REUSE
SKYLIGHT
WATER EFFICIENT BUILDINGS All buildings will also minimize water consumption and maximize use of alternative sources of water. For example, rainwater could be collected in existing water towers and reused in buildings for flushing toilets. LEED Certification for individual buildings will demonstrate this commitment to sustainability and resiliency.
REDUCED EMBODIED CARBON Another important strategy for reducing embodied carbon is to utilize low-carbon materials – paying attention to the structure, foundation and enclosure materials. Mass timber offers an exciting option for reducing the carbon footprint of a building. Additionally, the smart use of steel and concrete, such as prioritizing North American recycled steel and low-carbon concrete, can go a long way in making a significant impact.
NET ZERO ENERGY BUILDINGS Every building at Montgomery Park will prioritize efficient resource management. New construction and major renovation projects will strive meet the 2030 Challenge and achieve net-zero energy operations. Renewable energy and centralized systems that take advantage of waste energy and district energy are prioritized, while reliance on fossil fuels and refrigerants are discouraged.
WATER TOWER
DISTRICT ENERGY Large scale developments like Montgomery Park are also great opportunities to explore district energy. District energy is where heating, cooling, and/or hot water are distributed to multiple buildings through a network of buried, insulated pipes. There are many possibilities for non-fossil fuel energy sources, including energy sharing between buildings, geothermal energy, and sewer heat recovery.
CLEARSTORY WINDOWS AMERICAN CAN FACTORY
AMERICAN CAN ADMIN SOLAR PANELS
HISTORIC BUILDING
HISTORIC BUILDING CISTERN
EXISTING COMBINED SEWER PROPERTY LINE
RAIN GARDEN
NW 26TH AVE
DISTRICT ENERGY HEAT EXCHANGE 117
INFRASTRUCTURE Utility infrastructure is available to support the redevelopment of the Montgomery Park Master Plan with on-site improvements and public utility extensions. Much of the surrounding public sewer system is aged and combined storm and sanitary sewer with capacity issues. Best management practices, with regard to stormwater management, will be key to mitigating the impacts to the combined sewer system. Generally the development to the east of 27th is served from the existing facilities in 27th. The development west of 27th is served from proposed utility extensions in Lewis and Clark Boulevard with connections to public facilities in Wardway and 27th.
WEST
CENTRAL
EAST
EXISTING UTILITES SHARED ZONES
WEST ZONE
• 8-inch public water main is located in 26th, Wilson, 27th (south of Wilson) and a short segment in Wardway.
• 8-inch combined sewer (1949) Wardway
• Existing electrical (PGE) infrastructure is available in Wardway, 27th, Wilson and 26th Avenue.
• Various private stormwater inlets and lines existing within the Montgomery Park building and parking lots with connections to the surrounding combined public sewer system.
• Existing gas service (NWNG) is available in Wardway, Wilson, 26th and the northern portion of 27th Avenue.
CENTRAL ZONE
EAST ZONE
• 10-inch combined sewer (1924) Wardway at 27th
• 21-inch combined sewer (2017) Wilson.
• 12-inch combined sewer (2017) 27th Ave. between Wardway and Wilson.
• 24-inch combined sewer (1921) 26th Ave to Nicolai.
• 8-inch lateral to Montgomery Park building at 27th and Wilson.
• Various existing sewer laterals from American Can Complex to surrounding public sewer system.
• Various private stormwater inlets and lines existing within the Montgomery Park building and parking lots with connections to the surrounding combined public sewer system. • Private fire line from 27th and Wilson extends north on Wilson and west to Montgomery Park Building site.
118
• 12-inch combined sewer (1990) Wardway
STORMWATER / WASTEWATER
PROPOSED SANITARY & STORM CONNECTION COMBINED PUBLIC SEWER WITH CAPACITY ISSUES
I ST
NW
OLA NIC
LEWIS &
D
CLARK BLV
NW 27TH AVE
The majority of the site storm will follow the existing drainage and discharge locations. New storm and sanitary sewer piped infrastructure will be required for the redevelopment of the west portion of the site with connections to the combined sewer in Wardway. American Can Complex will have connections to the combined sewer in 26th Avenue and 27th Avenue. The redevelopment will be required to meet the Water Quality and Quantity requirements of the City of Portland’s Bureau of Environmental Services limiting stormwater runoff from the development to undeveloped (historical) condition for the 10-year, 24 hour storm event. Stormwater management will be mitigated as required to the maximum extent practicable utilizing vegetated stormwater facilities and eco-roofs. Further required flow control requirements will be met with below grade detention systems.
PROPOSED STORM CONNECTION PROPOSED SANITARY AND STORM CONNECTION
NW WAR
DWAY
NW 26TH AVE
NW WILSON ST
NW VAUGHN ST
LEGEND EXISTING COMBINED SEWER EXISTING STORM SEWER PROPOSED SANITARY SEWER PROPOSED STORM SEWER PROPOSED UNDERGROUND DETENTION ZONES
PROPOSED STORM CONNECTION
0
200 N FT
119
INFRASTRUCTURE DOMESTIC WATER
NW 27TH AVE WA RDW AY
PROPOSED DOMESTIC & FIRE CONNECTION
NW VAUGHN ST
PUBLIC WATER MAIN LOOP IN LEWIS & CLARK AND NW 27TH AVENUE IF DESIGNATED PUBLIC RIGHT-OF-WAY
I ST
NW
OLA NIC
EXISTING FIRE WATER LINE TO BE EXTENDED
LEWIS &
D
CLARK BLV
Public Watermain Loop Option A If Lewis and Clark Boulevard is constructed as a public roadway a public watermain loop could be constructed within the development to provide both fire and domestic service to each separately metered building.
PROTECT EXISTING FIRE WATER LINE PROPOSED DOMESTIC WATER CONNECTION WITH MASTER METER
LEGEND EXISTING FIRE WATER EXISTING WATER LINE PROPOSED PUBLIC WATER PROPOSED DOMESTIC WATER PROPOSED FIRE WATER 120
NW WILSON ST
NW WAR
DWAY
NW 26TH AVE
NW
NW 27TH AVE
An existing public watermain is located in 26th, Wilson, 27th (south of Wilson) and a short segment in Wardway. The development would require the extension of the public watermain in Wardway to the proposed Lewis and Clark Boulevard intersection. A proposed domestic water master meter would be installed at the proposed connection to the public watermain. The private domestic water main would follow Lewis and Clark Boulevard to 27th. There is an existing private fire line that connects to the public system at Wilson and 27th. This private fire line would be extended within Lewis and Clark Boulevard to the west and south to serve the new development and connect to the existing public watermain at Wardway. The east development area would have a proposed domestic and fire service connections to the public watermain in 26th.
A
NW VAUGHN ST
PROPOSED FIRE WATER CONNECTION WITH BACKFLOW
PROPOSED PUBLIC WATERMAIN EXTENSION
0
200 N FT
DRY UTILITIES - GAS & ELECTRICAL The existing site is currently served by gas service from NW Natural from the north side of the development. It is anticipated that a new gas main would be extended from Wilson and 27th and follow the Lewis and Clark Boulevard alignment. A joint trench with electrical and telecom is anticipated in Wardway to serve the site and the joint trench would follow the Lewis and Clark Boulevard alignment and the joint trench would be constructed in 27th. There would be new gas, electric and telecom services for the east development from the existing facilities in 26th.
I ST
NW
OLA NIC
LEWIS &
D
CLARK BLV
DWAY
NW 26TH AVE
NW WAR
NW 27TH AVE
NW WILSON ST
NW VAUGHN ST
LEGEND EXISTING GAS LINE EXISTING PGE LINE PROPOSED GAS LINE PROPOSED JOINT TRENCH
0
200 N FT
121
A ONCE IN-A-GENERATION-OPPORTUNITY MONTGOMERY PARK MASTER PLAN MASTER PLAN TEAM Property Owner Unico Properties & Partners Group Planning / Urban Design / Architecture Lake | Flato Architects Landscape Architecture PLACE Civil Engineering HHPR Mobility Nelson \ Nygaard Executive Architect GBD Architects
Y WA D R
NW
WA
NW 27TH AVE
Sustainability Advisors Unico Sustainability Placemaking / Design-Developer / Retail Activation / UX Design Jean-Pierre Veillet , NWSP Montgomery Park Building Design Architect S9 Architects
122
NW WILSON ST
Market Analysis / Strategy CRAVE
NW 26TH AVE 123
MONTGOMERY PARK MASTER PLAN