Skip to main content

Architectural Portfolio-2022

Page 1

NANDISH K M Selected Works 2017-2022 CMR UNIVERSITY SCHOOL OF ARCHITECTURE , BENGALURU B.ARCH ARCHITECTURE PORTFOLIO


NANDISH #281/a Siddarameshwara nilaya, near Maranagere RLV gate , Tiptur, Tumkur (Dist ), Karnataka

K

M

nandishkm29@gmail.com nandish.17ar@cmr.edu.in +91 8748836309


EDUCATION 2017 - 2022

CMR University School of Architecture, [B.Arch], Bengaluru, 560037, Karnataka

2010 - 2017

Jawahar Navodaya Vidyalaya [6th grade to 12th grade] Gollahalli , Tumkur ( Dist ), 572102, Karnataka

EXPERIENCE 2021 - 2021

Inspira Builders, Lavelle Road, Bengaluru, Karnataka 560001 [6 month internship, Jan 2021 - June 2022]. + + + + + + + + + +

Concept designs Design development Schematic to Construction Drawings 3d Modelling, Walk through & Elevation designs Co-ordination with various Consultants Feasability report & BOQ preparations Client presentation & Brochure designing Co-ordination with sales department Site visits Vaastu based designs

SKILLS AutoCAD

Adobe Indesign

Sketchup

Adobe Illustrator

Autodesk Revit

Adobe Premiere pro

Lumion

Rhino - 3D

Photoshop

Model making

LANGUAGES English, Kannada, Hindi, Telugu

ACHIEVEMENTS Sports - Regional level hand ball - 2015 & 2014 NCC - RDC , IGC 2013 - 2014 , MYSORE


Selected Projects J N V - Ramanagara Tree House Kiosk The Vessel - A Tourist Attraction 3x3 Cube House 2nd innings Housing Montessori School MG Road Urban Design

0 04

16

22

Urban Entertainment center Office Interior Design

08

Villa Design Film Office [Futurism] THESIS

Veternary Institute, Hebbal Commercial Complex Vertical Sports Center The Papilio Pavillion

32

HSR Manjegouda Project

38

Totti Mane Koramangala Commercial


01 02 1 . JNV Ramanagara - A Residential School Year -

2022

Location -

Kanakpura, Ramanagara

Advisor -

Nidhi B

Site area -

25 Acres

BUA-

25000 Sqm


05 l RESEARCH

STUDENT USER GROUP

“Education is perhaps the one most important national activity it is the back one of any progress that the country has to make”

GOVERNMENT OF INDIA AGE GROUP

GOVERNING

SANCTION

11 YEARS

FUNDING

18 YEARS

STUDENT GENDER

STUDENT STRENGTH

BOY

300

GIRL

200

TOTAL

500

HUMAN RESOURCE DEVELOPMENT

“Every educational system needs regular upkeep and improvements .it has to adjust with times with new discoveries in technologies”

EDUCATIONAL PROGRAMS CCE PROGRAMS

ENTRANCE EXAM

USER GROUP - TEACHING STAFF

EDUCATION POLICY

STATE GOVERNMENT

24 YEARS - 60 YEARS CONTRACTORS

TEACHER DESIGNATION

SANCTION OF LAND

STRENGTH

PRINCIPAL

SECONDARY USERS

CHAIRMAN DC OF DISTRICT

FAMILIES

PRINCIPAL & VICE.P

STUDENTS

TEACHERS

ADMIN STAFF

GROUP D STAFFS

PRINCIPAL & VICE.P

STUDENTS

TEACHERS

ADMIN STAFF

GROUP D STAFFS

25 - 30

TOTAL

27 - 32

USER GROUP - NON TEACHING STAFF

SUPPLIERS

STAKEHOLDER MAPPING

USER GROUP

1

TEACHERS FAMILIES

PTC MEMBER

PRIMARY USERS

1

VICE. PRINCIPAL

ADMIN STAFF

DESIGNATION

STRENGTH

ADMIN STAFF

ACADEMIC BLOCK CORE SUBJECTS

LANGUAGES

POTTERY

TOY MAKING

WEAVING

SPORTS

MUSIC & DANCE

9th - 10th

CORE SUBJECTS

LANGUAGES

POTTERY

TOY MAKING

WEAVING

SPORTS

MUSIC & DANCE

40 AGGREGATE STUDENTS

EXCHANGE BETWEEN JNV’S

PCMCs

COMMERCE

ARTS

HOTEL MANAGEMENT

FASHION DESIGN

11th - 12th

CORE SUBJECTS

PHYSICS

CHEMISTRY

MATHS

BIOLOGY

ENGLISH

LIBRARY & LABS

KITCHEN & STORES

2 0 0 0

S Q M

6th - 8th

PRAYER HALL / INDOOR SPORTS

40 NON AGGREGATE STUDENTS

5 0 0 0

13 - 15

INTAKE OF 80 STUDENTS

4 0 0 0

S Q M

8

TOTAL

PROGRAM & CURRICULUM

DESIGN PROGRAM

S Q M

5

GROUP - D

DINING HALL

INTERACTIVE SPACES

PRIVATE INSTITUTE

UG DEGREE

OUTDOOR PLAY AREA

TOY MAKING STAFF HOUSING

HOUSING STUDENT HOUSING

POTTERY

LANGUAGES

NEW PROPOSED CURRICULUM FOR 6th - 12th

SPORTS


SITE ANALYSIS l 06

LOCATION : Jawahar Navodaya Vidyalaya Ramanagara,Near battala Gundappa Devasthana, Kanakapura,Karnataka 562117 36 KM FROM RAMANAGARA 68 KM FROM BANGALORE 10 KM FROM KANAKAPURA

BATTLU GUNDAPPA TEMPLE

SITE

NH - 948 BANGALORE - COIMBATORE

WETLAND 1

INDIA

2

1 4

3

1 - SITE 2 - BATTALU GUNDAPPA TEMPLE

1

3 - UNKOWN HILL KARNATAKA

4

4 - POND SITE AREA : 25 Acres

SERVICE ROAD ACCESS TO BATTLU GUNDAPPA TEMPLE

HIGHEST AVERAGE TEMPERATURE IS 36 C

WETLAND 2

CONNECTING ROAD

PIPELINE ROAD

LOWEST AVERAGE TEMPERATURE IS 23.1 C BENGALURU

SITE

Throughout the year, there are 181.2 rainfall days, and 836mm (32.91") of precipitation is accumulated.

POSSIBLE ACCESS TO SITE

RAMANAGARA CHANNAPATNA

MADDUR SITE

KANAKPURA

MALVALLI

KANAKPURA Granites are a major geographical feature of this region and are from the lower proterozoic era..The total Geographical area of Ramanagara District is 3516 Sq. Km., of which 699.46 Sq. Km. is Forest Area, and having 823 villages.

BIDADI

10,82,739

in 2011 Its population growth rate was 5.06% in the decade 2001-2011, 976 females per 1000 males.

PIPELINE ROAD

Ramanagara District has an industrial area, housing well known and big Industries such has Toyota, Coca-Cola, Bosch etc. NH - 948 BANGALORE - COIMBATORE

1:0.9

RAMANAGARA SEX RATIO

69.8%

80%

LITERACY RATE

RURAL POPULATION

SERVICE ROAD

Ramanagara District is known for Mulberry, Silk Weaving. Ramanagara houses one of the biggest Silk Market in India, giving it the name as “Silk City’’.

CHANNAPATNA The Channapatna is known as `Toys City’ of Karnataka as it houses many Industries producing wooden toys which are very famous for their marvelous carvings and paintings .

BENGALURU

BIDADI

CHANNAPATNA

RAMANAGARA

B.G.TEMPLE

MADDUR SITE

KANAKPURA

MALVALLI

70%

SITE SECTION

SC/ST POPULATION

POND

SITE

ROADS


07 l MASTERPLAN

19

18

13

13

13

14

14

13 13

17

14

13

16

14

13 13

16

14

12

16

16

16 14

16

16

14 14

16

14

15

14

15

15

14

15

10 15 11

15

15 15

9

4

20

1

7

3

7

2

1 - ACADEMIC BLOCK 2 - PRAYER HALL / INDOOR GAMES 3 - AMPHITHEATRE 4 - PLAY GROUND 5 - ELECTRIC SUBSTATION 6 - MAIN ENTRANCE 7 - ACADEMIC BLOCK ENTRANCE 8 - PLAYGROUND 9 - PRINCIPAL RESIDENCE 10 - VICE . PRINCIPAL RESIDENCE 11 - GUEST HOUSE 12 - DINING AND KITCHEN 13 - GIRLS HOSTELS 14 - STAFF OUATERS 15 - BOYS HOSTEL 16 - ADMIN STAFF QUATERS 17 - STP 18 - PUMP HOUSE 19 - OVER HEAD TANK 20 - EXHIBIT AREA 21 - OVER HEAD TANK LIGHT & SHADOW ANALYSIS

6: 00 AM - 3 : 30 PM

MICRO ANALYSIS

6

4

5

WATER BODY ANALYSIS

VEGETATION

ACCOMMODATION OCTOBER - JANUARY

+20 Mtrs Highest point

-4 Mtrs Lowest point

KITCHEN AND DINING

TOPOGRAPHY

3: 30 AM - 4 : 30 PM

FEBRAURY - MAY

INSTITUTIONAL ACADEMIC BLOCK

PRINCIPAL AND VICE.PRINCIPAL RESIDENCE

FACULTY HOUSING AND STUDENTS HOSTEL

ZONING PLAY GROUND MULTI PURPOSE HALL VIEWS

4: 30 AM - 6 : 00 PM

JUNE - SEPTEMBER


SITE SECTIONS l 08

SITE SECTIONS

SECTION BB STUDENT ENTRANCE

BOUNDARY WALL

PU BLOCK

PLAY GROUND

ADMIN BLOCK

POTTERY BLOCK

BOUNDARY WALL

SECTION BB STUDENT ENTRANCE

BOUNDARY WALL BOUNDARY WALL

PLAY GROUND

FACULTY HOUSING PU BLOCK

ADMIN BLOCK

SECTION AA

GIRLS HOSTEL POTTERY BLOCK

BOUNDARY WALL BOUNDARY WALL

ROAD

BOYS HOSTEL

SECTION BB STUDENT ENTRANCE

BOUNDARY WALL BOUNDARY WALL ENTRANCE

PLAY GROUND

PEDESTRIAN

BOYS HOSTEL

PLAY GROUND

FACULTY HOUSING PU BLOCK ROAD

ADMIN BLOCK

SECTION AA SECTION CC

GIRLS HOSTEL POTTERY BLOCK

BOUNDARY WALL BOUNDARY WALL

DINING HALL

SEATING

BOUNDARY WALL

SECTION BB SECTION AA

STUDENT ENTRANCE BOUNDARY WALL ENTRANCE

BOUNDARY WALL

ENTRANCE

PEDESTRIAN

BOYS HOSTEL

PLAY GROUND

PLAY GROUND

GIRLS HOSTEL

FACULTY HOUSING PU BLOCK ROAD

ADMIN BLOCK

SEATING

BOUNDARY WALL SEC-

POTTERY BLOCK

BOUNDARY WALL

DINING HALL

BOUNDARY WALL

SECTION DD

AMPHITHEATRE

MUSEUM CORNER

WATER CHANNEL

BOUNDARY WALL

POND

CC SECTION AA

ENTRANCE

GIRLS HOSTEL

FACULTY HOUSING

BOUNDARY WALL PEDESTRIAN

PLAY GROUND

ROAD

SEATING

BOUNDARY WALL

DINING HALL

BOUNDARY WALL

SECTION DD

BOYS HOSTEL ENTRANCE

AMPHITHEATRE

MUSEUM CORNER

WATER CHANNEL

BOUNDARY WALL

POND

UNDERGROUND WELL

SECTION CC

ENTRANCE ENTRANCE

PEDESTRIAN

PLAY GROUND

SEATING

DINING HALL

BOUNDARY WALL

SECTION DD

AMPHITHEATRE

MUSEUM CORNER

WATER CHANNEL

BOUNDARY WALL

POND

AMPHITHEATRE

MUSEUM CORNER

WATER CHANNEL

BOUNDARY WALL

POND

UNDERGROUND WELL

SECTION DD ENTRANCE UNDERGROUND WELL

UNDERGROUND WELL

TION


09 l ACADEMIC BLOCK CONCEPT

CONCEPT

POTTERY BLOCK WITH 6th &7th

ACTIVITY BASED LEARNING

TOY MAKING BLOCK WITH 8th

HOSKEREDODDI VILLAGE

ENTRANCE / LOBBY KARDI DODDI VILLAGE

LIBRARY & LABS

ADMINSTRATIVE BLOCK

9th & 10th

11th & 12th

SELF LEARNING

MANAMAANAHALLI VILLAGE

OPEN GROUND TEMPLE KITCHEN GARDEN FARM HOUSE INTERACTIVE NODES

TOY MAKING BLOCK WITH 8th

LIBRARY & LABS

EACH CLUSTERS HAS MORE THAN ACCESS PATH SIMILAR TO THE LAYOUT OF THE VILLAGE WHERE A HOUSE HAS MULTIPLE ACCESS ROADS.

EACH OF THESE CLUSTERS HAVE THEIR OWN ACTIVITY SPACE - ARRANGED ON BASIS OF FIBONACCI .

POTTERY BLOCK WITH 6th &7th

ENTRANCE / LOBBY

ADMINSTRATIVE BLOCK

9th & 10th

11th & 12th


3D EXPLODED VIEW l 10

3D EXPLODED VIEW CARVE + OFFSET INTERACTIVE SPACES WITHIN THE STRCTURE

TOY MAKING CLUSTER WASHROOMS

LABS POTTERY CLUSTER LIBRARY

9th & 10th CLUSTER

ADMIN BLOCK

PU CLUSTER

FRAMING UP

SET OF FRAMES OF VARYING IN VOLUME CREATE AN INTERACTIVE CORRIDOR


11 l ACADEMIC BLOCK PLAN

ACADEMIC BLOCK PLAN

j

j

j j

+8

p +5

p

j

l i

+6.5

+3.5

i

+4

+7 k

j

q q

l

+5 +7

+5

+4.5

h

p

o

m

+5

+3 b

+5 +4.5

+7

g

+5 m

+5

+5

c q

+4.5

+3 +3

q

a - Main Entrance

c

f

+7

+2.5

m

+3 +4

p

a

q +3.5

+4

+4 n

q q

+5

d

+3

e

p

b - Student Entrance c - Staff Rooms d - Admin & Reception

+3 n

+1

+1

n n

+1

n

+.5 p

+1.5

+1.5 o n

e - Principal Cabin f - Staff Toilet g - Medical Room h - Computer lab i - Equip Room / Staff Room j - Type A Classroom [ Semi-open ] k - Activity Area [ Semi-open ] l - Washroom m - Labs n - Type B Classroom [ Enclosed ] o - Libraries p - Courtyard with Activity space q - Corridors connecting Clusters


SECTIONS l 12

ACADEMIC BLOCK SECTIONS

SECTION AA [POTTERY CLUSTER]

SECTION BB [TOY MAKING CLUSTER]

SECTION CC

SECTION DD [ADMINSTRATIVE CLUTER]

SECTION EE [9th & 10th CLUSTER]

SECTION FF [11th & 12th CLUSTER]


13 l RENDERS


MODEL l 14


15 l ACCOMODATION PLANS

a - Entrance with Sit-out

a - Entrance with Sit-out

FACULTY HOUSING

b - Living Area c - Bedroom

b - Living Area

PRINCIPLE / VP RESIDENCE

c - M - Bedroom d - Washrooms

d - Washrooms

e - Bedroom

e - Kitchen f

d

GROUP D HOUSING

f - Kitchen & Dining g - Courtyard

e

g

GUEST HOUSE

b d e

a

a c

d

g

b

g

b d

c

b

a - Entrance with Sit-out

f

a a

b - Living Area

c

c - M - Bedroom d - Washrooms e - Bedroom

e

d

c

f - Kitchen & Dining g - Courtyard

KITCHEN & DINING HALL

f

DORMS / HOSTEL BLOCKS

a

a

a

c - Girls dining hall o

a - Entrance with Sit-out

d - Serving counters e - Service alley

b - Dorm Room

d

c - Locker & wash room

f - Plate washing area

c

n

g - Kitchen

d - Backyard / Courtyard

g

m

d

d

d

d

d

h - Catering assistant room i- Store

e

l c a

a - Entrance b - Boys dining hall

p

g

d

j - RO - Plant

k

k - Washing area l - Gas storage

g

m - Toilet b i

n - Loading & unloading bay

h

o - Store room

b

p - Cold storage j a

a

f

a

0


02 2 . The Vessel - A Tourist Attraction Year -

2018

Location -

Gudibande

Site area -

6000 Sqm

BUA-

2500 Sqm


17 l SITE LOCATION

Gudibande fort

Site

Byrasagara Lake

Users community

Gudibande fort

TOURISTS

TREKKERS

Site Byrasagara Lake Aerial view of the site with context

RESIDENTS


CONCEPT l 18

CONCEPT Gudibande is 100 km from Bengaluru (30 km from AP border). One can reach Gudibande by taking the Airport road. There are clear sign boards after Chikkaballapur towards both left and right side of the road. The roads to the place throughout are in good condition and can be accessed with minor difficulty. It is a less known place for trekkies out there and slowly becoming popular over the past few years. The place is connected to major tourists spots around it . As the town itself has an historical value, the design helps in attracting more tourists. The town is also well known for trekking , and there are no existing hotels or restuarant for the tourists for their refreshments, so the design could be a major pause point. The design brings the community of the town together.

Concept plan

Concept elevation

The form of the design is inspired by both Ship & the Fish. The main reason to design an intresting form is to attract the tourists from all over the place. The major elements of the building is also derived from different parts of the ship and fish.


19 l PLAN & SECTION

Boat house

Art gallery View deck

Ground floor plan

Art gallery

Connecting bridge

Lake view point

First floor plan

The front elevation and the entrance represents the forward / BOW of the ship.

Restuarant

Roof top restuarant

Head height for the stairs represents theFIN of the shark.

View deck

Support of the bridge represents the ribs of a fish.

Bridge

Boat house and view point represents a boat.

Boat house View deck

Section E-W


RENDERS l 20


21 l

0


02 03 3 . K.M. Cariappa Cycle Track - An Urban Design YEAR -

2020

LOCATION -

Mg Road, Bangalore


23 l CONCEPT

CONCEPT The area we chose is at MG Road, which is CBD (Central Business District) of Bengaluru. There is lack of open spaces, not much of greenery and breathing space in this area. Traffic congestion adds to the pedestrain crossing problems and hustle in this area. This junction connects the the residential, commercial and institutional zones. The major drawback is lack of interaction between people. The main aim was to resolve the major issues in and around MG Road Banglore. From the site studies we infered that there were two main residential zones which were lost each other even though it was just 400 mtr radius but there were hardly any connections between them , this was due to lack of open spaces which brings the whole community together. From the site study and history of MG Road we observed that the whole lane of Boulevard was destroyed for the purpose of metro construction in which most of the residents were unhappy as it was used for a good, morning walk ,through the boulevard. So the idea was to bring back the same ambience for the people by connecting two residential zones. According to the site study there is an existing cycle track named K.M. CARIAPPA CYCLE TRACK which randomly ends at the museum road and recidency road junction which is near the southerns residential zone .Thus we came with the statergy of a cycle and pedestrian path way connecting from richmond circle to the boulevard at the metro station through southern and northern residential zones.

Users community

STUDENTS

RESIDENTS

CYCLISTS

HAWKERS

SHOPPERS


STRUCTURE PLAN l 24

INTERVENTION 3 Plaza Cycle parking Public seatings

INTERVENTION 2 Pedestrian Cycle track

INTERVENTION 1 Pedestrian Cycle track Public seatings

PROPOSED STRUCTURE PLAN


25 l ACADEMIC BLOCK PLAN

I N T E R V E N T I O N

1 Pedestrian Cycle track Public seatings


SECTIONS l 26

I N T E R V E N T I O N

2 Pedestrian Cycle track


27 l ACADEMIC BLOCK PLAN

I N T E R V E N T I O N

3 Plaza Cycle parking Public seatings

0


02 04 4 . The Office - Interior Design Year -

2020

Location -

-


29 l MOOD BOARDS

Materials Used

Walnut Wood

Teak Wood

Concrete

Glass

Colors used

Wall elevations


RENDERS l 30


31 l

0


02 05 5 . Casa Papilio - A Concept Butterfly Pavillion Year -

2021

Location -

Cubbon Park, Bangalore


33 l RENDER


RENDER l 36


37 l RENDER

0


02 06 6 . HSR Manjegouda Project - Commercial Year -

2021

Location -

HSR Layout

Site area -

5500 Sqft

BUA-

10000 Sqft


GENE

39 l INTERNSHIP WORKS

1. ALL DIM 2. DO NOT 3. READ TH OTHER S

PLANS & SECTIONS

KEY P

WS1 PS2 A

PS2 A

S2

B

S2

PS3

WS1 B

C

PS3

C

D

S1

D

S1

WS1 WS1 B

A FFL-0.27M LVL

FFL-0.26M LVL FFL-0.27M LVL

FFL-0.26M LVL

A

D2

Staff Toi.

W1

W1

D1

S2

W1

D1

D1 W2 WB

HF

W2 WC

W1

S3 S3

5

S1

W2 D2

1

S3

W2

FFL+2.75M LVL1 WB

D2

LIFT

UP

LD

GROUND FLOOR FFL GROUND FLOOR +1.2m +1.2m 4 FFL LVL UP +1.2m UP LVL

2

UP +1.2m

4

3

FFL+0.17M LVL

S1

5

W2 WB

4

LIFT

2

D7

D7

2

3

3

UP

LD W1

2

WS2 WS2

UP

LD

2

D7

PRO

D7

FFL +0.17m LVL

1

1 1

1

1 1

1

CLIE

DWN

UP

1

DWN

UP

FFL+0.15M LVL

S2

A

ROAD LVL IS ±0.00

B

B

S1

C

S1

C

D

PURP

D

FLOOR PLAN -1ST FLR FLOOR PLAN -1ST FLR S2

S2

S2

A

FFL+0.15M LVL

A

5

4

3

7

A

S3 5

W1

7

ELECTRICAL TRANSFORMER

ROAD LVL IS ±0.00

D2

FFL+1.2M LVL

D6

ELECTRICAL TRANSFORMER

S3

W2 WB PH

3

UP

D6

17

PH

LIFT

1

FFL+1.2M LVL S1

3

2

3.8M WIDE UP RAMP OF SLOPE 1:8(19.2M 3.8M WIDE RAMP OF LENGTH) FFL SLOPE 1:8(19.2M +0.17m LENGTH) LVL

17

FFL+0.17M LVL

WC

D2

1

1

N

W2

WB

WC

4

6

2

UP

1

S3

HF UR

W2

WB

UR

5

WS2

6

UP

UR

PH

HF UR

W1

4

D7

1

1

PH

W2

3

D7

D7

4

W2

HF

S3 PS5

3

4

6

HF

WC

PS5

WS2

D3

D3

6

D1

WB

4

D7

UP UP

D1

D1

WB

4

W1

D1

W1

FFL +1.05m LVL

FFL +1.05m LVL

D4

WC

LIFT LD

D4

WB

D4

D4

WB

FFL-0.24 M LVL

W1

S3

D4

D4

W2 D4

6

6

14

D4

6

5

5

FFL+2.75M LVL

FFL-0.24 M LVL 14 3

2

PS4

PH

W2

6

PS4

W2

WC

WB

PS1

FFL -1.95m

PH

HF WB

UR

W2

WB

UR

PH

3

FFL -1.95m

WC

WC

4 4

FFL +0.15m

PH

HF UR

5

PS1

UR

WB

S1

W1

BBMP PAR

+0.15m

HF

WB

S1 S1

6FFL

WB

W1

D

S2

6

D1

W2

6

D

C

D2

Staff Toi.

W2

6

B

C

B

B C ROAD

S1

C

S1

D

DRA

D

ROAD

DR

GROUND FLOOR PLAN GROUND FLOOR PLAN

CHEC 5

4

3

2

GENERAL NOTES 6

5

4

3

2

1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED. 2. DO NOT SCALE ANY DRAWING, REFER TO DIMENTIONS AS INDICATED. TERRACE FLOOR SSL 3. READ THIS DRAWING IN CONJUNCTION WITH RELEVANT STRUC. AND +13.4m OTHER SERVICE DRAWINGS

1 TERRACE FLOOR FFL +13.55m

L1

88

STAIRCASE HEAD ROOM LVL LIFT HEAD ROOM- MACHINE ROOM LESS LIFT

TERRACE FLOOR SSL +13.4m

MID LANDING TERRACE FLOOR SSL +11.9m

W2

TERRACE LEVEL

THIRD FLOOR FFL +10.35m

KEY PLAN

THIRD FLOOR FFL +10.35m

THIRD FLOOR LEVEL

L1 77

MID LANDING 3rd FLOOR FFL +8.85m

66

L1

W2 55

SITE

SECOND FLOOR FFL +7.3m

SECOND FLOOR LEVEL

FFL +0.15

FIRST FLOOR FFL +4.25m

FIRST FLOOR LEVEL

AGRA LAKE

44

MID LANDING 2nd FLOOR FFL +5.8m

SECOND FLOOR FFL +7.3m

L1

W2 33

BBMP PARK KORAMANGALA

AGRA LAKE PARK

FIRST FLOOR FFL +4.25m

22

MID LANDING 1st FLOOR FFL +2.75m

GROUND FLOOR FFL +1.2m

(NGL 101.50) ROAD LVL +0.00

L1

W2

D2

11

GROUND FLOOR LEVEL

FFL +0.15mLVL

BASEMENT FLOOR -2.4m

ROAD (LVL=±0.00LVL)

GROUND FLOOR FFL +1.2m

N 1

ROAD LVL +0.00m

(NGL 100.00)

BASEMENT FLOOR LEVEL

RAFT

BASEMENT FLOOR LEVEL

SECTION 2 (S2) BEFORE OC

PROJECT: 6

5

4

3

2

ST1

1

STAIRCASE SECTION 1:40 (Scale)

STAIRCASE HEAD ROOM LVL LIFT HEAD ROOM- MACHINE ROOM LESS LIFT

TERRACE LEVEL

TERRACE FLOOR SSL +13.4m

CLIENT:

BASEMENT FLOOR FFL -2.4m


NERAL NOTES NOTES DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED.

INTERNSHIP WORKS l 40

ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED. OT SCALE ANY DRAWING, REFER TO DIMENTIONS AS INDICATED. NYTHIS DRAWING, REFER TO DIMENTIONS ASRELEVANT INDICATED.STRUC. AND DRAWING IN CONJUNCTION WITH IN CONJUNCTION RNGSERVICE DRAWINGSWITH RELEVANT STRUC. AND RAWINGS

ELEVATION

Y PLAN SITE

GENERAL NOTES

GENERAL NOTES

PARK KORAMANGALA

AGRA LAKE PARK

NGALA

1. ALL DIMENSIONS ARE IN MILLIMETE 2. DO NOT SCALE ANY DRAWING, REF 3. READ THIS DRAWING IN CONJUNCT OTHER SERVICE DRAWINGS

1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED. 2. DO NOT SCALE ANY DRAWING, REFER TO DIMENTIONS AS INDICATED. 3. READ THIS DRAWING IN CONJUNCTION WITH RELEVANT STRUC. AND OTHER SERVICE DRAWINGS

AGRA LAKE AGRA LAKE

KEY PLAN

KEY PLAN

AGRA LAKE PARK

SITE

SITE AGRA LAKE

BBMP PARK KORAMANGALA BBMP PARK KORAMANGALA

AGRA LAKE PARK

N

N

PROJECT:

PROJECT:

OJECT:

CLIENT:

CLIENT:

PURPOSE:

PURPOSE:

DRAWING TITLE:

DRAWING TITLE:

ENT:

DRAWN:

DRAWN:

RPOSE:

CHECKED:

G-V1

G-V5

RIGHT HAND SIDE ELEVATION

ARCHITECTS:

FRONT ELEVATION

CHECKED:

AR

AF

AFIFA SHAIS

AWING TITLE: TITLE:

RAWN:

GENERAL NOTES ECKED: 1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED. 2. DO NOT SCALE ANY DRAWING, REFER TO DIMENTIONS AS INDICATED. 3. READ THIS DRAWING IN CONJUNCTION WITH RELEVANT STRUC. AND OTHER SERVICE DRAWINGS

KEY PLAN

GENERAL NOTES

GENERAL NOTES

1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED. 2. DO NOT SCALE ANY DRAWING, REFER TO DIMENTIONS AS INDICATED. 3. READ THIS DRAWING IN CONJUNCTION WITH RELEVANT STRUC. AND OTHER SERVICE DRAWINGS

1. ALL DIMENSIONS ARE IN MILLIMETERS 2. DO NOT SCALE ANY DRAWING, REFER T 3. READ THIS DRAWING IN CONJUNCTION OTHER SERVICE DRAWINGS

KEY PLAN

KEY PLAN

WS1 PS3

PS2 A

B

S2

C

FFL-0.27M LVL

FFL-0.26M LVL

SITE

D

S1

6

ARCHITECTS: ARCHITECTS: W1

W1

D1

SITE AGRA LAKE

D2

Staff Toi. W2

6

D1

WB

FFL +0.15m

HF

W2

WC

WB

PH

HF

W1

S3

UR

UR

PS4

W2

WB

WC

PH

S1

W2

WB

1

D2

5

BBMP PARK KORAMANGALA

S3 5

FFL+2.75M LVL

BBMP PARK KORAMANGALA

AGRA LAKE PARK

6

4

PS1

4

PS5

FFL-0.24 M LVL

14

FFL -1.95m

FFL +1.05m LVL

WS2

AFIFA SHAIS AFIFA SHAIS LIFT

3

UP

LD

W1

2

GROUND FLOOR FFL +1.2m LVL

4

UP UP

4

3

D3

+1.2m

2

D7

D7

6

3

1

UP

1

UP

3.8M WIDE RAMP OF SLOPE 1:8(19.2M LENGTH)

FFL +0.17m LVL

1

N

N

1

D6

FFL+0.17M LVL

17

FFL+1.2M LVL 7

S1

ELECTRICAL TRANSFORMER

1

DWN

UP

FFL+0.15M LVL

N

ROAD LVL IS ±0.00

A

S2

B

C

S1

D

ROAD

PROJECT:

PROJECT:

PROJECT:

CLIENT:

CLIENT:

PURPOSE:

PURPOSE:

DRAWING TITLE:

DRAWING TITLE:

CLIENT:

PURPOSE: DRAWN:

G-V4

DRAWING TITLE:

DRAWN:

CHECKED:

ARCHITECTS:

AFIFA SHAIS

REAR ELEVATION

CHECKED:

G-V3

G-V2

LEFT HAND SIDE ELEVATION

DRAWN: CHECKED:

ARCHITECTS:

ARCH

AFIFA SHAIS

AFIFA


41 l INTERNSHIP WORKS

RWISE SPECIFIED. S AS INDICATED. NT STRUC. AND

AKE

RK

:

E SPECIFIED. INDICATED. TRUC. AND


LS1

INTERNSHIP WORKS l 42 DETAILS

B

C

SS2

SS1 D

LS2 B

C

6 TERRACE FLOOR SSL +13.4m

TERRACE FLOOR SSL +13.4m

4

4

LS1 RAFT

THIRD FLOOR FFL +10.35m

THIRD FLOOR FFL +10.35m

5

LS1 3

SECTION SS1

4

SECOND FLOOR FFL +7.3m

3

B LS2 LP

SECOND FLOOR FFL +7.3m

3

2 FIRST FLOOR FFL +4.25m

FIRST FLOOR FFL +4.25m

GROUND FLOOR LVL FFL +1.2m

ROAD LVL

3.8M WIDE RAMP OF SLOPE 1:8 (19.2M LENGTH)

GROUND FLOOR FFL +1.2m

+0.00m

GROUND FLOOR FFL +1.2m

1

BASEMENT FLOOR FFL -2.4m

RAFT

SECTION SS2

BASEMENT FLOOR FFL -2.4m

BASEMENT FLOOR FFL -2.4m

LIFT WELL

LIFT WELL

LIFT SECTION - 1 1:50 (Scale)

LS2

B

C

SS2 SS1

RAMP PLAN

D

LIFT SECTION - 2 1:50 (Scale)

C LIFT PLAN 1:50 (Scale)


43 l INTERNSHIP WORKS

GENERAL NOTES

B

D

C SUMP PIT

B

1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED. 2. DO NOT SCALE ANY DRAWING, REFER TO DIMENTIONS AS INDICATED. 3. READ THIS DRAWING IN CONJUNCTION WITH RELEVANT STRUC. AND OTHER SERVICE DRAWINGS

D

C

DETAILS

SUMP PIT ENTRANCE TO SUMP

A

KEY PLAN

S2

WS2

B

C

D

S1

ENTRANCE TO SUMP 6

DRAIN

6

ENTRANCE TO SUMP

ENTRANCE TO SUMP S3

S3 5

5

4

4 DWN LIFT

3

GENERAL NOTES

SILT PIT

3 3.8M WIDE RAMP OF SLOPE 1:8(19.2M LENGTH)

2

2

UP

SILT PIT

1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED. 2. DO NOT SCALE ANY DRAWING, REFER TO DIMENTIONS AS INDICATED. ERAL NOTES 3. READ THIS DRAWING IN CONJUNCTION WITH RELEVANT STRUC. AND S1 SERVICE DRAWINGS MENSIONS ARE IN OTHER MILLIMETERS UNLESS OTHERWISE SPECIFIED.

UP

FFL -2.4M LVL

1

S1

S1

T SCALE ANY DRAWING, REFER TO DIMENTIONS AS INDICATED. HIS DRAWING IN CONJUNCTION WITH RELEVANT STRUC. AND SERVICE DRAWINGS

1

BORE WELL WITH BORE PIT

ENTRANCE TO SUMP

S1

ROAD LVL IS ±0.00

N A

S2

B

S1

C

D

BASEMENT FLOOR PLAN

KEY PLAN

B

LOOR LVL

PLAN

m

D

C

SITE

L

0m

B

D

C

PROJECT:

AGRA LAKE

SITE

B

FLOOR

m

D

C

AGRA LAKE

BBMP PARK KORAMANGALA

RK KORAMANGALA

AGRA LAKE PARK

B

D

C

CLIENT:

AGRA LAKE PARK

FRONT PODIUM LVL SSL -0.29m

FRONT PODIUM LVL SSL -0.29m

N

PURPOSE:

GEN BASEMENT FLOOR LVL FFL -2.4m

BASEMENT FLOOR LVL FFL -2.4m

DRAWN:

KEY

CHECKED:

PROJECT:

OJECT:

ENT:

1. ALL 2. DO 3. REA OTH

DRAWING TITLE:

ARCHITECTS:

AFIFA SHAIS

5

FFL-0.24M LVL 4

POSE:

1

50mm FINISH

4

PURPOSE:

2

5

3

CLIENT:

4

S1

GROUND FLOOR FFL +1.2m PAVER FINISH

14

3

DRAWING TITLE:

PODIUM FFL +0.15m

PODIUM FFL -0.24m

3

SSL -0.29m

2

BASEMENT FLOOR FFL -2.4m

ROAD LVL 0.00m

AWING TITLE:

RAWN:

2

DRAWN:4

UP CHECKED: UP

CKED:

PR

4

FFL -1.95m

1

UP

CL

ARCHITECTS: ARCHITECTS: 1

AFIFA SHAIS

1

AFIFA SHAIS

PU

17

HEIGHT S1

RISER

150mm

TREAD

300mm

DR

D

CH


l 44 GENERAL NOTES 1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED. 2. DO NOT SCALE ANY DRAWING, REFER TO DIMENTIONS AS INDICATED. 3. READ THIS DRAWING IN CONJUNCTION WITH RELEVANT STRUC. AND OTHER SERVICE DRAWINGS A

KEY PLAN

S2

WS2

C

S1

D

6

DRAIN

6

B

S3

S3 5

5

4

4 DWN LIFT

3

3 3.8M WIDE RAMP OF SLOPE 1:8(19.2M LENGTH)

2

2

UP

UP

FFL -2.4M LVL

1

1

BORE WELL WITH BORE PIT

ENTRANCE TO SUMP

ROAD LVL IS ±0.00

N

S2

A

B

C

S1

D

BASEMENT FLOOR PLAN

PROJECT:

CLIENT:

PURPOSE:

L NOTES

NS ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED. E ANY DRAWING, REFER TO DIMENTIONS AS INDICATED. AWING IN CONJUNCTION WITH RELEVANT DRAWING TITLE: STRUC. AND CE DRAWINGS WS1

DRAWN: S2 PS2

A

PS3

B

C

D

S1

CHECKED:

FFL-0.27M LVL

FFL-0.26M LVL

W2

6

W1

W1

D1

D2

Staff Toi.

6

D1

WB

FFL +0.15m

HF

W2 WC

WB

PH

HF

W1

S3

UR

UR

PS4

W2

WB

WC

PH

S1

W2 WB

1

D2

5

S3 5

FFL+2.75M LVL 6

ARCHITECTS:

4 PS1

4

PS5

FFL-0.24 M LVL 14

FFL -1.95m

UP

LD

W1

2

FFL +1.05m LVL

LIFT

3

GROUND FLOOR FFL +1.2m LVL

4

UP UP 4

WS2 3

D3

AFIFA SHAIS

+1.2m

2

D7

D7

6

3

1

UP

1

UP

3.8M WIDE RAMP OF SLOPE 1:8(19.2M LENGTH)

FFL +0.17m LVL

1

1

D6

FFL+0.17M LVL

17

FFL+1.2M LVL 7

S1

ELECTRICAL TRANSFORMER

1

DWN

UP

FFL+0.15M LVL

Scan for more internship experience related works.

ROAD LVL IS ±0.00

A

S2

B

C

S1

D

ROAD

CT:

SE:

NG TITLE:

N:

D:


THANK YOU

I hereby declare that this document contains only original academic works. All drawings, photographs and texts are my own.

NANDISH K M nandishkm29@gmail.com 8748836309


Turn static files into dynamic content formats.

Create a flipbook
Architectural Portfolio-2022 by Nandish-29 - Issuu