NANDISH K M Selected Works 2017-2022 CMR UNIVERSITY SCHOOL OF ARCHITECTURE , BENGALURU B.ARCH ARCHITECTURE PORTFOLIO
NANDISH #281/a Siddarameshwara nilaya, near Maranagere RLV gate , Tiptur, Tumkur (Dist ), Karnataka
K
M
nandishkm29@gmail.com nandish.17ar@cmr.edu.in +91 8748836309
EDUCATION 2017 - 2022
CMR University School of Architecture, [B.Arch], Bengaluru, 560037, Karnataka
2010 - 2017
Jawahar Navodaya Vidyalaya [6th grade to 12th grade] Gollahalli , Tumkur ( Dist ), 572102, Karnataka
EXPERIENCE 2021 - 2021
Inspira Builders, Lavelle Road, Bengaluru, Karnataka 560001 [6 month internship, Jan 2021 - June 2022]. + + + + + + + + + +
Concept designs Design development Schematic to Construction Drawings 3d Modelling, Walk through & Elevation designs Co-ordination with various Consultants Feasability report & BOQ preparations Client presentation & Brochure designing Co-ordination with sales department Site visits Vaastu based designs
SKILLS AutoCAD
Adobe Indesign
Sketchup
Adobe Illustrator
Autodesk Revit
Adobe Premiere pro
Lumion
Rhino - 3D
Photoshop
Model making
LANGUAGES English, Kannada, Hindi, Telugu
ACHIEVEMENTS Sports - Regional level hand ball - 2015 & 2014 NCC - RDC , IGC 2013 - 2014 , MYSORE
Selected Projects J N V - Ramanagara Tree House Kiosk The Vessel - A Tourist Attraction 3x3 Cube House 2nd innings Housing Montessori School MG Road Urban Design
0 04
16
22
Urban Entertainment center Office Interior Design
08
Villa Design Film Office [Futurism] THESIS
Veternary Institute, Hebbal Commercial Complex Vertical Sports Center The Papilio Pavillion
32
HSR Manjegouda Project
38
Totti Mane Koramangala Commercial
01 02 1 . JNV Ramanagara - A Residential School Year -
2022
Location -
Kanakpura, Ramanagara
Advisor -
Nidhi B
Site area -
25 Acres
BUA-
25000 Sqm
05 l RESEARCH
STUDENT USER GROUP
“Education is perhaps the one most important national activity it is the back one of any progress that the country has to make”
GOVERNMENT OF INDIA AGE GROUP
GOVERNING
SANCTION
11 YEARS
FUNDING
18 YEARS
STUDENT GENDER
STUDENT STRENGTH
BOY
300
GIRL
200
TOTAL
500
HUMAN RESOURCE DEVELOPMENT
“Every educational system needs regular upkeep and improvements .it has to adjust with times with new discoveries in technologies”
EDUCATIONAL PROGRAMS CCE PROGRAMS
ENTRANCE EXAM
USER GROUP - TEACHING STAFF
EDUCATION POLICY
STATE GOVERNMENT
24 YEARS - 60 YEARS CONTRACTORS
TEACHER DESIGNATION
SANCTION OF LAND
STRENGTH
PRINCIPAL
SECONDARY USERS
CHAIRMAN DC OF DISTRICT
FAMILIES
PRINCIPAL & VICE.P
STUDENTS
TEACHERS
ADMIN STAFF
GROUP D STAFFS
PRINCIPAL & VICE.P
STUDENTS
TEACHERS
ADMIN STAFF
GROUP D STAFFS
25 - 30
TOTAL
27 - 32
USER GROUP - NON TEACHING STAFF
SUPPLIERS
STAKEHOLDER MAPPING
USER GROUP
1
TEACHERS FAMILIES
PTC MEMBER
PRIMARY USERS
1
VICE. PRINCIPAL
ADMIN STAFF
DESIGNATION
STRENGTH
ADMIN STAFF
ACADEMIC BLOCK CORE SUBJECTS
LANGUAGES
POTTERY
TOY MAKING
WEAVING
SPORTS
MUSIC & DANCE
9th - 10th
CORE SUBJECTS
LANGUAGES
POTTERY
TOY MAKING
WEAVING
SPORTS
MUSIC & DANCE
40 AGGREGATE STUDENTS
EXCHANGE BETWEEN JNV’S
PCMCs
COMMERCE
ARTS
HOTEL MANAGEMENT
FASHION DESIGN
11th - 12th
CORE SUBJECTS
PHYSICS
CHEMISTRY
MATHS
BIOLOGY
ENGLISH
LIBRARY & LABS
KITCHEN & STORES
2 0 0 0
S Q M
6th - 8th
PRAYER HALL / INDOOR SPORTS
40 NON AGGREGATE STUDENTS
5 0 0 0
13 - 15
INTAKE OF 80 STUDENTS
4 0 0 0
S Q M
8
TOTAL
PROGRAM & CURRICULUM
DESIGN PROGRAM
S Q M
5
GROUP - D
DINING HALL
INTERACTIVE SPACES
PRIVATE INSTITUTE
UG DEGREE
OUTDOOR PLAY AREA
TOY MAKING STAFF HOUSING
HOUSING STUDENT HOUSING
POTTERY
LANGUAGES
NEW PROPOSED CURRICULUM FOR 6th - 12th
SPORTS
SITE ANALYSIS l 06
LOCATION : Jawahar Navodaya Vidyalaya Ramanagara,Near battala Gundappa Devasthana, Kanakapura,Karnataka 562117 36 KM FROM RAMANAGARA 68 KM FROM BANGALORE 10 KM FROM KANAKAPURA
BATTLU GUNDAPPA TEMPLE
SITE
NH - 948 BANGALORE - COIMBATORE
WETLAND 1
INDIA
2
1 4
3
1 - SITE 2 - BATTALU GUNDAPPA TEMPLE
1
3 - UNKOWN HILL KARNATAKA
4
4 - POND SITE AREA : 25 Acres
SERVICE ROAD ACCESS TO BATTLU GUNDAPPA TEMPLE
HIGHEST AVERAGE TEMPERATURE IS 36 C
WETLAND 2
CONNECTING ROAD
PIPELINE ROAD
LOWEST AVERAGE TEMPERATURE IS 23.1 C BENGALURU
SITE
Throughout the year, there are 181.2 rainfall days, and 836mm (32.91") of precipitation is accumulated.
POSSIBLE ACCESS TO SITE
RAMANAGARA CHANNAPATNA
MADDUR SITE
KANAKPURA
MALVALLI
KANAKPURA Granites are a major geographical feature of this region and are from the lower proterozoic era..The total Geographical area of Ramanagara District is 3516 Sq. Km., of which 699.46 Sq. Km. is Forest Area, and having 823 villages.
BIDADI
10,82,739
in 2011 Its population growth rate was 5.06% in the decade 2001-2011, 976 females per 1000 males.
PIPELINE ROAD
Ramanagara District has an industrial area, housing well known and big Industries such has Toyota, Coca-Cola, Bosch etc. NH - 948 BANGALORE - COIMBATORE
1:0.9
RAMANAGARA SEX RATIO
69.8%
80%
LITERACY RATE
RURAL POPULATION
SERVICE ROAD
Ramanagara District is known for Mulberry, Silk Weaving. Ramanagara houses one of the biggest Silk Market in India, giving it the name as “Silk City’’.
CHANNAPATNA The Channapatna is known as `Toys City’ of Karnataka as it houses many Industries producing wooden toys which are very famous for their marvelous carvings and paintings .
BENGALURU
BIDADI
CHANNAPATNA
RAMANAGARA
B.G.TEMPLE
MADDUR SITE
KANAKPURA
MALVALLI
70%
SITE SECTION
SC/ST POPULATION
POND
SITE
ROADS
07 l MASTERPLAN
19
18
13
13
13
14
14
13 13
17
14
13
16
14
13 13
16
14
12
16
16
16 14
16
16
14 14
16
14
15
14
15
15
14
15
10 15 11
15
15 15
9
4
20
1
7
3
7
2
1 - ACADEMIC BLOCK 2 - PRAYER HALL / INDOOR GAMES 3 - AMPHITHEATRE 4 - PLAY GROUND 5 - ELECTRIC SUBSTATION 6 - MAIN ENTRANCE 7 - ACADEMIC BLOCK ENTRANCE 8 - PLAYGROUND 9 - PRINCIPAL RESIDENCE 10 - VICE . PRINCIPAL RESIDENCE 11 - GUEST HOUSE 12 - DINING AND KITCHEN 13 - GIRLS HOSTELS 14 - STAFF OUATERS 15 - BOYS HOSTEL 16 - ADMIN STAFF QUATERS 17 - STP 18 - PUMP HOUSE 19 - OVER HEAD TANK 20 - EXHIBIT AREA 21 - OVER HEAD TANK LIGHT & SHADOW ANALYSIS
6: 00 AM - 3 : 30 PM
MICRO ANALYSIS
6
4
5
WATER BODY ANALYSIS
VEGETATION
ACCOMMODATION OCTOBER - JANUARY
+20 Mtrs Highest point
-4 Mtrs Lowest point
KITCHEN AND DINING
TOPOGRAPHY
3: 30 AM - 4 : 30 PM
FEBRAURY - MAY
INSTITUTIONAL ACADEMIC BLOCK
PRINCIPAL AND VICE.PRINCIPAL RESIDENCE
FACULTY HOUSING AND STUDENTS HOSTEL
ZONING PLAY GROUND MULTI PURPOSE HALL VIEWS
4: 30 AM - 6 : 00 PM
JUNE - SEPTEMBER
SITE SECTIONS l 08
SITE SECTIONS
SECTION BB STUDENT ENTRANCE
BOUNDARY WALL
PU BLOCK
PLAY GROUND
ADMIN BLOCK
POTTERY BLOCK
BOUNDARY WALL
SECTION BB STUDENT ENTRANCE
BOUNDARY WALL BOUNDARY WALL
PLAY GROUND
FACULTY HOUSING PU BLOCK
ADMIN BLOCK
SECTION AA
GIRLS HOSTEL POTTERY BLOCK
BOUNDARY WALL BOUNDARY WALL
ROAD
BOYS HOSTEL
SECTION BB STUDENT ENTRANCE
BOUNDARY WALL BOUNDARY WALL ENTRANCE
PLAY GROUND
PEDESTRIAN
BOYS HOSTEL
PLAY GROUND
FACULTY HOUSING PU BLOCK ROAD
ADMIN BLOCK
SECTION AA SECTION CC
GIRLS HOSTEL POTTERY BLOCK
BOUNDARY WALL BOUNDARY WALL
DINING HALL
SEATING
BOUNDARY WALL
SECTION BB SECTION AA
STUDENT ENTRANCE BOUNDARY WALL ENTRANCE
BOUNDARY WALL
ENTRANCE
PEDESTRIAN
BOYS HOSTEL
PLAY GROUND
PLAY GROUND
GIRLS HOSTEL
FACULTY HOUSING PU BLOCK ROAD
ADMIN BLOCK
SEATING
BOUNDARY WALL SEC-
POTTERY BLOCK
BOUNDARY WALL
DINING HALL
BOUNDARY WALL
SECTION DD
AMPHITHEATRE
MUSEUM CORNER
WATER CHANNEL
BOUNDARY WALL
POND
CC SECTION AA
ENTRANCE
GIRLS HOSTEL
FACULTY HOUSING
BOUNDARY WALL PEDESTRIAN
PLAY GROUND
ROAD
SEATING
BOUNDARY WALL
DINING HALL
BOUNDARY WALL
SECTION DD
BOYS HOSTEL ENTRANCE
AMPHITHEATRE
MUSEUM CORNER
WATER CHANNEL
BOUNDARY WALL
POND
UNDERGROUND WELL
SECTION CC
ENTRANCE ENTRANCE
PEDESTRIAN
PLAY GROUND
SEATING
DINING HALL
BOUNDARY WALL
SECTION DD
AMPHITHEATRE
MUSEUM CORNER
WATER CHANNEL
BOUNDARY WALL
POND
AMPHITHEATRE
MUSEUM CORNER
WATER CHANNEL
BOUNDARY WALL
POND
UNDERGROUND WELL
SECTION DD ENTRANCE UNDERGROUND WELL
UNDERGROUND WELL
TION
09 l ACADEMIC BLOCK CONCEPT
CONCEPT
POTTERY BLOCK WITH 6th &7th
ACTIVITY BASED LEARNING
TOY MAKING BLOCK WITH 8th
HOSKEREDODDI VILLAGE
ENTRANCE / LOBBY KARDI DODDI VILLAGE
LIBRARY & LABS
ADMINSTRATIVE BLOCK
9th & 10th
11th & 12th
SELF LEARNING
MANAMAANAHALLI VILLAGE
OPEN GROUND TEMPLE KITCHEN GARDEN FARM HOUSE INTERACTIVE NODES
TOY MAKING BLOCK WITH 8th
LIBRARY & LABS
EACH CLUSTERS HAS MORE THAN ACCESS PATH SIMILAR TO THE LAYOUT OF THE VILLAGE WHERE A HOUSE HAS MULTIPLE ACCESS ROADS.
EACH OF THESE CLUSTERS HAVE THEIR OWN ACTIVITY SPACE - ARRANGED ON BASIS OF FIBONACCI .
POTTERY BLOCK WITH 6th &7th
ENTRANCE / LOBBY
ADMINSTRATIVE BLOCK
9th & 10th
11th & 12th
3D EXPLODED VIEW l 10
3D EXPLODED VIEW CARVE + OFFSET INTERACTIVE SPACES WITHIN THE STRCTURE
TOY MAKING CLUSTER WASHROOMS
LABS POTTERY CLUSTER LIBRARY
9th & 10th CLUSTER
ADMIN BLOCK
PU CLUSTER
FRAMING UP
SET OF FRAMES OF VARYING IN VOLUME CREATE AN INTERACTIVE CORRIDOR
11 l ACADEMIC BLOCK PLAN
ACADEMIC BLOCK PLAN
j
j
j j
+8
p +5
p
j
l i
+6.5
+3.5
i
+4
+7 k
j
q q
l
+5 +7
+5
+4.5
h
p
o
m
+5
+3 b
+5 +4.5
+7
g
+5 m
+5
+5
c q
+4.5
+3 +3
q
a - Main Entrance
c
f
+7
+2.5
m
+3 +4
p
a
q +3.5
+4
+4 n
q q
+5
d
+3
e
p
b - Student Entrance c - Staff Rooms d - Admin & Reception
+3 n
+1
+1
n n
+1
n
+.5 p
+1.5
+1.5 o n
e - Principal Cabin f - Staff Toilet g - Medical Room h - Computer lab i - Equip Room / Staff Room j - Type A Classroom [ Semi-open ] k - Activity Area [ Semi-open ] l - Washroom m - Labs n - Type B Classroom [ Enclosed ] o - Libraries p - Courtyard with Activity space q - Corridors connecting Clusters
SECTIONS l 12
ACADEMIC BLOCK SECTIONS
SECTION AA [POTTERY CLUSTER]
SECTION BB [TOY MAKING CLUSTER]
SECTION CC
SECTION DD [ADMINSTRATIVE CLUTER]
SECTION EE [9th & 10th CLUSTER]
SECTION FF [11th & 12th CLUSTER]
13 l RENDERS
MODEL l 14
15 l ACCOMODATION PLANS
a - Entrance with Sit-out
a - Entrance with Sit-out
FACULTY HOUSING
b - Living Area c - Bedroom
b - Living Area
PRINCIPLE / VP RESIDENCE
c - M - Bedroom d - Washrooms
d - Washrooms
e - Bedroom
e - Kitchen f
d
GROUP D HOUSING
f - Kitchen & Dining g - Courtyard
e
g
GUEST HOUSE
b d e
a
a c
d
g
b
g
b d
c
b
a - Entrance with Sit-out
f
a a
b - Living Area
c
c - M - Bedroom d - Washrooms e - Bedroom
e
d
c
f - Kitchen & Dining g - Courtyard
KITCHEN & DINING HALL
f
DORMS / HOSTEL BLOCKS
a
a
a
c - Girls dining hall o
a - Entrance with Sit-out
d - Serving counters e - Service alley
b - Dorm Room
d
c - Locker & wash room
f - Plate washing area
c
n
g - Kitchen
d - Backyard / Courtyard
g
m
d
d
d
d
d
h - Catering assistant room i- Store
e
l c a
a - Entrance b - Boys dining hall
p
g
d
j - RO - Plant
k
k - Washing area l - Gas storage
g
m - Toilet b i
n - Loading & unloading bay
h
o - Store room
b
p - Cold storage j a
a
f
a
0
02 2 . The Vessel - A Tourist Attraction Year -
2018
Location -
Gudibande
Site area -
6000 Sqm
BUA-
2500 Sqm
17 l SITE LOCATION
Gudibande fort
Site
Byrasagara Lake
Users community
Gudibande fort
TOURISTS
TREKKERS
Site Byrasagara Lake Aerial view of the site with context
RESIDENTS
CONCEPT l 18
CONCEPT Gudibande is 100 km from Bengaluru (30 km from AP border). One can reach Gudibande by taking the Airport road. There are clear sign boards after Chikkaballapur towards both left and right side of the road. The roads to the place throughout are in good condition and can be accessed with minor difficulty. It is a less known place for trekkies out there and slowly becoming popular over the past few years. The place is connected to major tourists spots around it . As the town itself has an historical value, the design helps in attracting more tourists. The town is also well known for trekking , and there are no existing hotels or restuarant for the tourists for their refreshments, so the design could be a major pause point. The design brings the community of the town together.
Concept plan
Concept elevation
The form of the design is inspired by both Ship & the Fish. The main reason to design an intresting form is to attract the tourists from all over the place. The major elements of the building is also derived from different parts of the ship and fish.
19 l PLAN & SECTION
Boat house
Art gallery View deck
Ground floor plan
Art gallery
Connecting bridge
Lake view point
First floor plan
The front elevation and the entrance represents the forward / BOW of the ship.
Restuarant
Roof top restuarant
Head height for the stairs represents theFIN of the shark.
View deck
Support of the bridge represents the ribs of a fish.
Bridge
Boat house and view point represents a boat.
Boat house View deck
Section E-W
RENDERS l 20
21 l
0
02 03 3 . K.M. Cariappa Cycle Track - An Urban Design YEAR -
2020
LOCATION -
Mg Road, Bangalore
23 l CONCEPT
CONCEPT The area we chose is at MG Road, which is CBD (Central Business District) of Bengaluru. There is lack of open spaces, not much of greenery and breathing space in this area. Traffic congestion adds to the pedestrain crossing problems and hustle in this area. This junction connects the the residential, commercial and institutional zones. The major drawback is lack of interaction between people. The main aim was to resolve the major issues in and around MG Road Banglore. From the site studies we infered that there were two main residential zones which were lost each other even though it was just 400 mtr radius but there were hardly any connections between them , this was due to lack of open spaces which brings the whole community together. From the site study and history of MG Road we observed that the whole lane of Boulevard was destroyed for the purpose of metro construction in which most of the residents were unhappy as it was used for a good, morning walk ,through the boulevard. So the idea was to bring back the same ambience for the people by connecting two residential zones. According to the site study there is an existing cycle track named K.M. CARIAPPA CYCLE TRACK which randomly ends at the museum road and recidency road junction which is near the southerns residential zone .Thus we came with the statergy of a cycle and pedestrian path way connecting from richmond circle to the boulevard at the metro station through southern and northern residential zones.
Users community
STUDENTS
RESIDENTS
CYCLISTS
HAWKERS
SHOPPERS
STRUCTURE PLAN l 24
INTERVENTION 3 Plaza Cycle parking Public seatings
INTERVENTION 2 Pedestrian Cycle track
INTERVENTION 1 Pedestrian Cycle track Public seatings
PROPOSED STRUCTURE PLAN
25 l ACADEMIC BLOCK PLAN
I N T E R V E N T I O N
1 Pedestrian Cycle track Public seatings
SECTIONS l 26
I N T E R V E N T I O N
2 Pedestrian Cycle track
27 l ACADEMIC BLOCK PLAN
I N T E R V E N T I O N
3 Plaza Cycle parking Public seatings
0
02 04 4 . The Office - Interior Design Year -
2020
Location -
-
29 l MOOD BOARDS
Materials Used
Walnut Wood
Teak Wood
Concrete
Glass
Colors used
Wall elevations
RENDERS l 30
31 l
0
02 05 5 . Casa Papilio - A Concept Butterfly Pavillion Year -
2021
Location -
Cubbon Park, Bangalore
33 l RENDER
RENDER l 36
37 l RENDER
0
02 06 6 . HSR Manjegouda Project - Commercial Year -
2021
Location -
HSR Layout
Site area -
5500 Sqft
BUA-
10000 Sqft
GENE
39 l INTERNSHIP WORKS
1. ALL DIM 2. DO NOT 3. READ TH OTHER S
PLANS & SECTIONS
KEY P
WS1 PS2 A
PS2 A
S2
B
S2
PS3
WS1 B
C
PS3
C
D
S1
D
S1
WS1 WS1 B
A FFL-0.27M LVL
FFL-0.26M LVL FFL-0.27M LVL
FFL-0.26M LVL
A
D2
Staff Toi.
W1
W1
D1
S2
W1
D1
D1 W2 WB
HF
W2 WC
W1
S3 S3
5
S1
W2 D2
1
S3
W2
FFL+2.75M LVL1 WB
D2
LIFT
UP
LD
GROUND FLOOR FFL GROUND FLOOR +1.2m +1.2m 4 FFL LVL UP +1.2m UP LVL
2
UP +1.2m
4
3
FFL+0.17M LVL
S1
5
W2 WB
4
LIFT
2
D7
D7
2
3
3
UP
LD W1
2
WS2 WS2
UP
LD
2
D7
PRO
D7
FFL +0.17m LVL
1
1 1
1
1 1
1
CLIE
DWN
UP
1
DWN
UP
FFL+0.15M LVL
S2
A
ROAD LVL IS ±0.00
B
B
S1
C
S1
C
D
PURP
D
FLOOR PLAN -1ST FLR FLOOR PLAN -1ST FLR S2
S2
S2
A
FFL+0.15M LVL
A
5
4
3
7
A
S3 5
W1
7
ELECTRICAL TRANSFORMER
ROAD LVL IS ±0.00
D2
FFL+1.2M LVL
D6
ELECTRICAL TRANSFORMER
S3
W2 WB PH
3
UP
D6
17
PH
LIFT
1
FFL+1.2M LVL S1
3
2
3.8M WIDE UP RAMP OF SLOPE 1:8(19.2M 3.8M WIDE RAMP OF LENGTH) FFL SLOPE 1:8(19.2M +0.17m LENGTH) LVL
17
FFL+0.17M LVL
WC
D2
1
1
N
W2
WB
WC
4
6
2
UP
1
S3
HF UR
W2
WB
UR
5
WS2
6
UP
UR
PH
HF UR
W1
4
D7
1
1
PH
W2
3
D7
D7
4
W2
HF
S3 PS5
3
4
6
HF
WC
PS5
WS2
D3
D3
6
D1
WB
4
D7
UP UP
D1
D1
WB
4
W1
D1
W1
FFL +1.05m LVL
FFL +1.05m LVL
D4
WC
LIFT LD
D4
WB
D4
D4
WB
FFL-0.24 M LVL
W1
S3
D4
D4
W2 D4
6
6
14
D4
6
5
5
FFL+2.75M LVL
FFL-0.24 M LVL 14 3
2
PS4
PH
W2
6
PS4
W2
WC
WB
PS1
FFL -1.95m
PH
HF WB
UR
W2
WB
UR
PH
3
FFL -1.95m
WC
WC
4 4
FFL +0.15m
PH
HF UR
5
PS1
UR
WB
S1
W1
BBMP PAR
+0.15m
HF
WB
S1 S1
6FFL
WB
W1
D
S2
6
D1
W2
6
D
C
D2
Staff Toi.
W2
6
B
C
B
B C ROAD
S1
C
S1
D
DRA
D
ROAD
DR
GROUND FLOOR PLAN GROUND FLOOR PLAN
CHEC 5
4
3
2
GENERAL NOTES 6
5
4
3
2
1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED. 2. DO NOT SCALE ANY DRAWING, REFER TO DIMENTIONS AS INDICATED. TERRACE FLOOR SSL 3. READ THIS DRAWING IN CONJUNCTION WITH RELEVANT STRUC. AND +13.4m OTHER SERVICE DRAWINGS
1 TERRACE FLOOR FFL +13.55m
L1
88
STAIRCASE HEAD ROOM LVL LIFT HEAD ROOM- MACHINE ROOM LESS LIFT
TERRACE FLOOR SSL +13.4m
MID LANDING TERRACE FLOOR SSL +11.9m
W2
TERRACE LEVEL
THIRD FLOOR FFL +10.35m
KEY PLAN
THIRD FLOOR FFL +10.35m
THIRD FLOOR LEVEL
L1 77
MID LANDING 3rd FLOOR FFL +8.85m
66
L1
W2 55
SITE
SECOND FLOOR FFL +7.3m
SECOND FLOOR LEVEL
FFL +0.15
FIRST FLOOR FFL +4.25m
FIRST FLOOR LEVEL
AGRA LAKE
44
MID LANDING 2nd FLOOR FFL +5.8m
SECOND FLOOR FFL +7.3m
L1
W2 33
BBMP PARK KORAMANGALA
AGRA LAKE PARK
FIRST FLOOR FFL +4.25m
22
MID LANDING 1st FLOOR FFL +2.75m
GROUND FLOOR FFL +1.2m
(NGL 101.50) ROAD LVL +0.00
L1
W2
D2
11
GROUND FLOOR LEVEL
FFL +0.15mLVL
BASEMENT FLOOR -2.4m
ROAD (LVL=±0.00LVL)
GROUND FLOOR FFL +1.2m
N 1
ROAD LVL +0.00m
(NGL 100.00)
BASEMENT FLOOR LEVEL
RAFT
BASEMENT FLOOR LEVEL
SECTION 2 (S2) BEFORE OC
PROJECT: 6
5
4
3
2
ST1
1
STAIRCASE SECTION 1:40 (Scale)
STAIRCASE HEAD ROOM LVL LIFT HEAD ROOM- MACHINE ROOM LESS LIFT
TERRACE LEVEL
TERRACE FLOOR SSL +13.4m
CLIENT:
BASEMENT FLOOR FFL -2.4m
NERAL NOTES NOTES DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED.
INTERNSHIP WORKS l 40
ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED. OT SCALE ANY DRAWING, REFER TO DIMENTIONS AS INDICATED. NYTHIS DRAWING, REFER TO DIMENTIONS ASRELEVANT INDICATED.STRUC. AND DRAWING IN CONJUNCTION WITH IN CONJUNCTION RNGSERVICE DRAWINGSWITH RELEVANT STRUC. AND RAWINGS
ELEVATION
Y PLAN SITE
GENERAL NOTES
GENERAL NOTES
PARK KORAMANGALA
AGRA LAKE PARK
NGALA
1. ALL DIMENSIONS ARE IN MILLIMETE 2. DO NOT SCALE ANY DRAWING, REF 3. READ THIS DRAWING IN CONJUNCT OTHER SERVICE DRAWINGS
1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED. 2. DO NOT SCALE ANY DRAWING, REFER TO DIMENTIONS AS INDICATED. 3. READ THIS DRAWING IN CONJUNCTION WITH RELEVANT STRUC. AND OTHER SERVICE DRAWINGS
AGRA LAKE AGRA LAKE
KEY PLAN
KEY PLAN
AGRA LAKE PARK
SITE
SITE AGRA LAKE
BBMP PARK KORAMANGALA BBMP PARK KORAMANGALA
AGRA LAKE PARK
N
N
PROJECT:
PROJECT:
OJECT:
CLIENT:
CLIENT:
PURPOSE:
PURPOSE:
DRAWING TITLE:
DRAWING TITLE:
ENT:
DRAWN:
DRAWN:
RPOSE:
CHECKED:
G-V1
G-V5
RIGHT HAND SIDE ELEVATION
ARCHITECTS:
FRONT ELEVATION
CHECKED:
AR
AF
AFIFA SHAIS
AWING TITLE: TITLE:
RAWN:
GENERAL NOTES ECKED: 1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED. 2. DO NOT SCALE ANY DRAWING, REFER TO DIMENTIONS AS INDICATED. 3. READ THIS DRAWING IN CONJUNCTION WITH RELEVANT STRUC. AND OTHER SERVICE DRAWINGS
KEY PLAN
GENERAL NOTES
GENERAL NOTES
1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED. 2. DO NOT SCALE ANY DRAWING, REFER TO DIMENTIONS AS INDICATED. 3. READ THIS DRAWING IN CONJUNCTION WITH RELEVANT STRUC. AND OTHER SERVICE DRAWINGS
1. ALL DIMENSIONS ARE IN MILLIMETERS 2. DO NOT SCALE ANY DRAWING, REFER T 3. READ THIS DRAWING IN CONJUNCTION OTHER SERVICE DRAWINGS
KEY PLAN
KEY PLAN
WS1 PS3
PS2 A
B
S2
C
FFL-0.27M LVL
FFL-0.26M LVL
SITE
D
S1
6
ARCHITECTS: ARCHITECTS: W1
W1
D1
SITE AGRA LAKE
D2
Staff Toi. W2
6
D1
WB
FFL +0.15m
HF
W2
WC
WB
PH
HF
W1
S3
UR
UR
PS4
W2
WB
WC
PH
S1
W2
WB
1
D2
5
BBMP PARK KORAMANGALA
S3 5
FFL+2.75M LVL
BBMP PARK KORAMANGALA
AGRA LAKE PARK
6
4
PS1
4
PS5
FFL-0.24 M LVL
14
FFL -1.95m
FFL +1.05m LVL
WS2
AFIFA SHAIS AFIFA SHAIS LIFT
3
UP
LD
W1
2
GROUND FLOOR FFL +1.2m LVL
4
UP UP
4
3
D3
+1.2m
2
D7
D7
6
3
1
UP
1
UP
3.8M WIDE RAMP OF SLOPE 1:8(19.2M LENGTH)
FFL +0.17m LVL
1
N
N
1
D6
FFL+0.17M LVL
17
FFL+1.2M LVL 7
S1
ELECTRICAL TRANSFORMER
1
DWN
UP
FFL+0.15M LVL
N
ROAD LVL IS ±0.00
A
S2
B
C
S1
D
ROAD
PROJECT:
PROJECT:
PROJECT:
CLIENT:
CLIENT:
PURPOSE:
PURPOSE:
DRAWING TITLE:
DRAWING TITLE:
CLIENT:
PURPOSE: DRAWN:
G-V4
DRAWING TITLE:
DRAWN:
CHECKED:
ARCHITECTS:
AFIFA SHAIS
REAR ELEVATION
CHECKED:
G-V3
G-V2
LEFT HAND SIDE ELEVATION
DRAWN: CHECKED:
ARCHITECTS:
ARCH
AFIFA SHAIS
AFIFA
41 l INTERNSHIP WORKS
RWISE SPECIFIED. S AS INDICATED. NT STRUC. AND
AKE
RK
:
E SPECIFIED. INDICATED. TRUC. AND
LS1
INTERNSHIP WORKS l 42 DETAILS
B
C
SS2
SS1 D
LS2 B
C
6 TERRACE FLOOR SSL +13.4m
TERRACE FLOOR SSL +13.4m
4
4
LS1 RAFT
THIRD FLOOR FFL +10.35m
THIRD FLOOR FFL +10.35m
5
LS1 3
SECTION SS1
4
SECOND FLOOR FFL +7.3m
3
B LS2 LP
SECOND FLOOR FFL +7.3m
3
2 FIRST FLOOR FFL +4.25m
FIRST FLOOR FFL +4.25m
GROUND FLOOR LVL FFL +1.2m
ROAD LVL
3.8M WIDE RAMP OF SLOPE 1:8 (19.2M LENGTH)
GROUND FLOOR FFL +1.2m
+0.00m
GROUND FLOOR FFL +1.2m
1
BASEMENT FLOOR FFL -2.4m
RAFT
SECTION SS2
BASEMENT FLOOR FFL -2.4m
BASEMENT FLOOR FFL -2.4m
LIFT WELL
LIFT WELL
LIFT SECTION - 1 1:50 (Scale)
LS2
B
C
SS2 SS1
RAMP PLAN
D
LIFT SECTION - 2 1:50 (Scale)
C LIFT PLAN 1:50 (Scale)
43 l INTERNSHIP WORKS
GENERAL NOTES
B
D
C SUMP PIT
B
1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED. 2. DO NOT SCALE ANY DRAWING, REFER TO DIMENTIONS AS INDICATED. 3. READ THIS DRAWING IN CONJUNCTION WITH RELEVANT STRUC. AND OTHER SERVICE DRAWINGS
D
C
DETAILS
SUMP PIT ENTRANCE TO SUMP
A
KEY PLAN
S2
WS2
B
C
D
S1
ENTRANCE TO SUMP 6
DRAIN
6
ENTRANCE TO SUMP
ENTRANCE TO SUMP S3
S3 5
5
4
4 DWN LIFT
3
GENERAL NOTES
SILT PIT
3 3.8M WIDE RAMP OF SLOPE 1:8(19.2M LENGTH)
2
2
UP
SILT PIT
1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED. 2. DO NOT SCALE ANY DRAWING, REFER TO DIMENTIONS AS INDICATED. ERAL NOTES 3. READ THIS DRAWING IN CONJUNCTION WITH RELEVANT STRUC. AND S1 SERVICE DRAWINGS MENSIONS ARE IN OTHER MILLIMETERS UNLESS OTHERWISE SPECIFIED.
UP
FFL -2.4M LVL
1
S1
S1
T SCALE ANY DRAWING, REFER TO DIMENTIONS AS INDICATED. HIS DRAWING IN CONJUNCTION WITH RELEVANT STRUC. AND SERVICE DRAWINGS
1
BORE WELL WITH BORE PIT
ENTRANCE TO SUMP
S1
ROAD LVL IS ±0.00
N A
S2
B
S1
C
D
BASEMENT FLOOR PLAN
KEY PLAN
B
LOOR LVL
PLAN
m
D
C
SITE
L
0m
B
D
C
PROJECT:
AGRA LAKE
SITE
B
FLOOR
m
D
C
AGRA LAKE
BBMP PARK KORAMANGALA
RK KORAMANGALA
AGRA LAKE PARK
B
D
C
CLIENT:
AGRA LAKE PARK
FRONT PODIUM LVL SSL -0.29m
FRONT PODIUM LVL SSL -0.29m
N
PURPOSE:
GEN BASEMENT FLOOR LVL FFL -2.4m
BASEMENT FLOOR LVL FFL -2.4m
DRAWN:
KEY
CHECKED:
PROJECT:
OJECT:
ENT:
1. ALL 2. DO 3. REA OTH
DRAWING TITLE:
ARCHITECTS:
AFIFA SHAIS
5
FFL-0.24M LVL 4
POSE:
1
50mm FINISH
4
PURPOSE:
2
5
3
CLIENT:
4
S1
GROUND FLOOR FFL +1.2m PAVER FINISH
14
3
DRAWING TITLE:
PODIUM FFL +0.15m
PODIUM FFL -0.24m
3
SSL -0.29m
2
BASEMENT FLOOR FFL -2.4m
ROAD LVL 0.00m
AWING TITLE:
RAWN:
2
DRAWN:4
UP CHECKED: UP
CKED:
PR
4
FFL -1.95m
1
UP
CL
ARCHITECTS: ARCHITECTS: 1
AFIFA SHAIS
1
AFIFA SHAIS
PU
17
HEIGHT S1
RISER
150mm
TREAD
300mm
DR
D
CH
l 44 GENERAL NOTES 1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED. 2. DO NOT SCALE ANY DRAWING, REFER TO DIMENTIONS AS INDICATED. 3. READ THIS DRAWING IN CONJUNCTION WITH RELEVANT STRUC. AND OTHER SERVICE DRAWINGS A
KEY PLAN
S2
WS2
C
S1
D
6
DRAIN
6
B
S3
S3 5
5
4
4 DWN LIFT
3
3 3.8M WIDE RAMP OF SLOPE 1:8(19.2M LENGTH)
2
2
UP
UP
FFL -2.4M LVL
1
1
BORE WELL WITH BORE PIT
ENTRANCE TO SUMP
ROAD LVL IS ±0.00
N
S2
A
B
C
S1
D
BASEMENT FLOOR PLAN
PROJECT:
CLIENT:
PURPOSE:
L NOTES
NS ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED. E ANY DRAWING, REFER TO DIMENTIONS AS INDICATED. AWING IN CONJUNCTION WITH RELEVANT DRAWING TITLE: STRUC. AND CE DRAWINGS WS1
DRAWN: S2 PS2
A
PS3
B
C
D
S1
CHECKED:
FFL-0.27M LVL
FFL-0.26M LVL
W2
6
W1
W1
D1
D2
Staff Toi.
6
D1
WB
FFL +0.15m
HF
W2 WC
WB
PH
HF
W1
S3
UR
UR
PS4
W2
WB
WC
PH
S1
W2 WB
1
D2
5
S3 5
FFL+2.75M LVL 6
ARCHITECTS:
4 PS1
4
PS5
FFL-0.24 M LVL 14
FFL -1.95m
UP
LD
W1
2
FFL +1.05m LVL
LIFT
3
GROUND FLOOR FFL +1.2m LVL
4
UP UP 4
WS2 3
D3
AFIFA SHAIS
+1.2m
2
D7
D7
6
3
1
UP
1
UP
3.8M WIDE RAMP OF SLOPE 1:8(19.2M LENGTH)
FFL +0.17m LVL
1
1
D6
FFL+0.17M LVL
17
FFL+1.2M LVL 7
S1
ELECTRICAL TRANSFORMER
1
DWN
UP
FFL+0.15M LVL
Scan for more internship experience related works.
ROAD LVL IS ±0.00
A
S2
B
C
S1
D
ROAD
CT:
SE:
NG TITLE:
N:
D:
THANK YOU
I hereby declare that this document contains only original academic works. All drawings, photographs and texts are my own.
NANDISH K M nandishkm29@gmail.com 8748836309