Skip to main content

Florida Home Project Glossary: 30 Terms to Know Before Hiring a Contractor

Page 1

Florida Home Project Glossary 30 terms to know before hiring a contractor

A plain-language reference from Nearbia, a directory of local businesses in the United States built from public records.

Nearbia


How to use this glossary Contracts, permits and lien paperwork come with their own vocabulary. If you know the words before a contractor uses them, you can ask better questions and spot gaps sooner. The terms are grouped by stage of a project: who can do the work, the paperwork before it starts, money while it runs, and closing it out. This glossary is general information, not legal advice. Laws and local rules change; for a specific situation, check the current statute, your local building department, or a Florida attorney.

Part 1: Who is allowed to do the work 1. Certified contractor. A contractor who passed the state exam and holds a license from the Florida Construction Industry Licensing Board. A certified license is valid anywhere in Florida. License numbers for certified contractors start with "C" (for example, CGC or CRC). 2. Registered contractor. A contractor registered with the state on the basis of a local competency license. A registered contractor may work only in the cities or counties where that local license is held. These numbers start with "R" (for example, RG or RR). 3. CGC (Certified General Contractor). The broadest general license class. A general contractor may contract for any type of building or structure, without a height limit. 4. CBC (Certified Building Contractor). A building contractor may work on commercial buildings up to three stories and on residential buildings, plus certain work on larger buildings that does not affect structural elements. 5. CRC (Certified Residential Contractor). Limited to one-, two- and three-family homes up to two stories, along with their accessory structures. For a typical home remodel, a CRC is often enough; for a large multi-story project, ask whether the license class fits. 6. Specialty and trade licenses. Many jobs need a trade license rather than a general one: plumbing (CFC), air conditioning (CAC), roofing (CCC), pool (CPC) and others. Electrical contractors are licensed by a separate board and carry EC or ER numbers. 7. DBPR license lookup. The Florida Department of Business and Professional Regulation (DBPR) runs a free public search at myfloridalicense.com. Search by

nearbia.com | 2


name or license number to see the license class, status (active, inactive, delinquent), expiration date and any public complaints or discipline. 8. Owner-builder. Florida law lets a property owner act as their own contractor on their own home under certain conditions, usually after signing a disclosure statement at the building department. The owner then takes on the legal duties a contractor would normally carry. Be cautious if a contractor asks you to pull an owner-builder permit for work they will perform. 9. Unlicensed contracting. Performing or offering contracting work that requires a state license without holding one. It is a crime in Florida, and homeowners who hire an unlicensed contractor lose some protections, including access to the Recovery Fund.

Part 2: Insurance and protection 10. General liability insurance. Coverage that pays for damage the contractor causes to your property or to other people during the job. Florida requires licensed contractors to carry it. Ask for a certificate of insurance naming the insurer, and confirm it is current. 11. Workers' compensation. Insurance that covers injuries to the contractor's workers. If a worker is hurt on your property and the employer has no coverage, questions about responsibility can follow. Most construction employers in Florida must carry it. 12. Workers' comp exemption. In construction, a limited number of corporate officers who own part of the business may elect to exempt themselves from workers' compensation coverage. The exemption covers those officers only, not employees. You can verify an exemption through the Florida Department of Financial Services, Division of Workers' Compensation. 13. Florida Homeowners' Construction Recovery Fund. A state fund that may pay homeowners who suffered financial loss because a licensed contractor violated certain laws, such as abandoning a job or mismanaging funds. Payments are capped and conditions apply. It does not cover work by unlicensed contractors. Florida contracts for residential work above a set amount must include a written notice about the fund.

Part 3: Paperwork before work starts 14. Building permit. Official approval from the city or county to do the work under the Florida Building Code. The licensed contractor usually applies for it. A permit

nearbia.com | 3


leads to inspections; unpermitted work can cause trouble with insurance, resale and future permits. 15. Florida Building Code. The statewide code that sets minimum standards for construction, including wind resistance. Local building departments enforce it through plan review and inspections. 16. HOA or ARC approval. Many homeowners' and condominium associations require approval from an architectural review committee before exterior or structural changes. This approval is separate from the building permit; having one does not replace the other. 17. Written contract. The agreement that sets scope, price, schedule and payment terms. For a Florida contractor, the license number should appear on the contract, bids and advertising. 18. Deposit rules. Under Florida law, a contractor who takes a deposit of more than 10 percent of the contract price on residential work generally must apply for the permits within 30 days and begin work within 90 days after the permit is issued, unless the contract says otherwise or there is a just cause for delay. 19. Notice of commencement. A form recorded with the county clerk, and posted at the job site, before work begins on projects above a dollar threshold set in Florida's lien law. It names the owner, contractor, property and others involved. An inspection is often not scheduled until it is filed. Payments made before it is recorded can be at risk.

Part 4: Money while the job runs 20. Construction Lien Law. Part I of Chapter 713 of the Florida Statutes. It lets contractors, subcontractors, workers and suppliers who are not paid place a lien on the improved property. This can happen even if you paid your contractor in full, which is why the paperwork below matters. 21. Notice to owner. A notice a subcontractor or supplier sends to the property owner to preserve its lien rights. It tells you that someone other than your contractor is furnishing labor or materials. Keep every one you receive. 22. Lien waiver (lien release). A signed document in which a contractor, subcontractor or supplier gives up lien rights for a payment. Collecting releases from everyone who sent you a notice to owner, before or as you pay, helps protect against paying twice. 23. Claim of lien. A document an unpaid party records against the property. Florida law sets deadlines for recording it after that party's last work or delivery on the job.

nearbia.com | 4


24. Draw schedule. A plan that ties payments to stages of completed work (for example, after rough-in inspection or after drywall). Payments that match progress, rather than running ahead of it, limit your exposure. 25. Retainage. A portion of each payment held back until the job is complete, so the owner still holds money while waiting for remaining work and corrections done. On private residential jobs, the amount is whatever the contract states. 26. Change order. A written, signed change to the scope, price or schedule after the contract is signed. Get every change in writing before the extra work is done.

Part 5: Closing out the job 27. Final inspection. The last inspection by the building department confirming the permitted work meets code. A permit is not closed until it passes. 28. Certificate of occupancy (or certificate of completion). The building department's document stating a structure may be occupied, usually issued for new construction or major changes. Smaller permits typically close with a passed final inspection or a certificate of completion. 29. Punch list. A written list of small items still to fix or finish before final payment. Walk the job with the contractor, write the list together, and pay the final draw once it is done. 30. Final payment affidavit and notice of termination. Before final payment, a Florida contractor is generally required to give the owner an affidavit stating whether everyone who worked on the job has been paid. A notice of termination is a recorded form that ends the period covered by the notice of commencement. Ask about both before you close out.

Before you sign: a short checklist • Look up the license on myfloridalicense.com and match the class to the job. • Ask for proof of general liability and workers' compensation coverage or exemption. • Confirm the permit, and any HOA approval, before work starts. • Pay by a draw schedule and collect lien releases as you go. • Close the permit with a final inspection before the last payment.

nearbia.com | 5


General information only, not legal advice. Find more guides at nearbia.com

nearbia.com | 6


Turn static files into dynamic content formats.

Create a flipbook
Florida Home Project Glossary: 30 Terms to Know Before Hiring a Contractor by Nearbia - Issuu