Skip to main content

James Ndeda- Portfolio_2024

Page 1

2023

Portfolio Architecture

James Ndeda

ndedajames.10@gmail.com

SEPTEMBER 2022

1


WESTRIDGE STUDY CENTRE ALTERATIONS

Project 05

RECENT WORK PROJECTS WESTRIDGE STUDY CENTRE ALTERATIONS | 2022 JOHANNESBURG COTTAGE DESIGN | 2022 JOHANNESBURG MDESIGNSPACE ARCHITECTS | 2021 JOHANNESBURG

52

NEW ACACIA GALPINI

NEW ACACIA GALPINI

NEW

NEW ACACIA GALPINI

230m

CONCRETE ENTRANCE RAMP 1:15 GRADIENT

NEW ACACIA GALPINI

ENTRANCE LANDING

NEW ACACIA GALPINI

NEW FBO

NEW FBO

D

1785.00m

1785.00m

854

D

ERF 504

0 411 RY - 2 A D N BOU SITE WALL DARY N U O ICK B m BR

NEW ACACIA GALPINI

NEW ACACIA GALPINI

5125

D

m

230m

5125

NEW

C

NEW ACACIA GALPINI wall taining EX. Re

I INITTSER WITSW

ERF 504

411 Y - 20 R A D BOUN ALL SITE ARY W D N U BO BRICK

RY 18

EX

LINE DING IL U B 1M INE ING L D IL U 1M B

C

ll

ing wa . Retain

0m

1784.5

SEPTEMBER 2022

53


PORTE CORCHERE PROPOSAL

Project 07

Bongani house refurbishment

"/.'!.)ç(/53%ç2%&52")3(-%.4ç•• • ••• • • •• •• • ••• • •• •• • • •• •• • ••• • • • • • • • • • •• • ç

• • • •• • •• ••• • • • • • •• • •••• • •• • • • • • •• • •• • •• • •• • •• • •• • •• • •• •• • • •• • • • • •• • • • • • • •

• •• • • •• • • • • • ••

29 SEPTEMBER 2021

54

SEPTEMBER 2022

55


EMPOWERMENT THROUGH RECYCLING

SCHOOL PROJECTS UNIVERSITY OF THE WITWATERSRAND | UNDERGRAD, HONOURS & MASTERS | 2019-2023 STUDENT NUMBER- 2178165 JOMO KENYATTA UNIVERSITY OF AGRICULTURE AND TECHNOLOGY | DIPLOMA| 2015-2017 STUDENT NUMBER- AB141 -04 -0177/2014

4

SEPTEMBER 2022

5


EMPOWERMENT THROUGH RECYCLING

Project 01

AERIAL VIEW

6

SEPTEMBER 2022

7


8

SEPTEMBER 2022

9


ISSUE & THEORY

tation that illustrate oups from 16 to 64 and women but are on the information unemployment are

is an age bracket able of working fullconcern as this is a exhibit the highest 30-54 consists of a rage. Age group 16is bracket are still in

my source of labour etween ages 20 and eating a community ction and exchange he evident issue of

A CASE OF ALEXANDRA Demographics Alexandra typifies a majorly disenfranchised community in the context of South Africa, suffering the consequences of socio-economic marginalization of black urban neighborhoods during the apartheid era. Nearly 500 000 people live in approximately 100 000 households in formal and informal housing; unemployment is estimated to sit at 60%, and most household incomes fall below the extreme poverty line of less than 1 USD per person per day.

er-and-unemploy-

My intervention aims at mitigating these conditions of poor and inadequate housing and unemployment through an innovative approach of transforming waste materials into building materials that are accessible to the people in need for better housing.

ment

d for 1 0

The data visualisation charts below are a graphical representation that illustrate the different levels of unemployment according to age groups from 16 to 64 years old. The extent of the segments vary between men and women but are seen to have the same displacement approximately. Based on the information gathered, the age groups experiencing the highest rate of unemployment are 20-24, 25-29 and 55-59, 60-64, with 60-64 being the highest.

Target group

Age group 50-65 has a high unemployment rate as this is an age bracket consisting of senior citizens, most of whom are not fully capable of working fulltime jobs in the 6 9 Age bracket 20-29 however, raises concern as this is a 2 0 industry. 22 group consisting of capable men and women and yet they exhibit the highest numbers of people not part of the labour force. Age group 30-54 consists of a majority of citizens who have jobs that are consistent on average. Age group 1619 is understandably low as most of the people falling in this bracket are still in school. 69 2022

The data visualisation charts below are a graphical representation that illustrate the different levels of unemployment according to age groups from 16 to 64 years old. The extent of the segments vary between men and women but are seen to have the same displacement approximately. Based on the information gathered, the age groups experiencing the highest rate of unemployment are 20-24, 25-29 and 55-59, 60-64, with 60-64 being the highest.

It is therefore in order, to target the age group 20-29 as my source of labour force. There will be a curation and incorporation of youth between ages 20 and 29 into the construction and operation of the project, creating a community hub that provides an opportunity for socio-economic interaction and exchange that would empower the youth of Alexandra, mitigating the evident issue of unemployment in Alexandra.

credible-map-shows-

h

Target group

(https://open.uct.ac.za/bitstream/handle/11427/27819/thesis_ebe_2018_mbanjwa_ phindile.pdf?sequence=1)

Age group 50-65 has a high unemployment rate as this is an age bracket consisting of senior citizens, most of whom are not fully capable of working full-

SEPTEMBER 2022

11


12

SEPTEMBER 2022

13


PETE plastic can be transformed into fabric for winter clothing, alternative sewing thread, shoes, bags and carpets. This is a great way to access and boost the local textile industry which at the moment is lagginng behind. The finished products shall be used by personel working in the facility and also sold to the public- revenue from this will then be fed back into the facility to add onto the pool of funds that are used to cover for operational costs.

Fig 27: Making of Textile from recycled plastic Graphic by Author with reference to PLASTIC BRICKS MADE FROM USED WATER BOTTLES Written by Expert Skip Hire on 02 July 2018.

52

2022

53


Roofing is a well known output for plastic recycling. Plastic waste is recycled and pressed into rolls and corrugated sheets which are then used for roofing. It is a sustainable way of recycling plastic wate. This is another material that will be used in the second phase for construction. PVC roofing has become a common roofing material that competes twith the other traditional materials such as clay tiles and gulvanised Iron sheets. They will also act as backdrops for solar panels that will be installed to harvest solar energy that would be converted into electricity to complement mainstream power from the municiplity.

Fig 28: Making of roofing sheets from recycled plastic Graphic by Author with reference to PLASTIC BRICKS MADE FROM USED WATER BOTTLES Written by Expert Skip Hire on 02 July 2018.

54

2022

55


CONTEXT CONTEXT

1FEFTUSJBO BDDFTT

CONTEXT

The Project is located in Alexandra, Johannesburg in Gauteng Province. Established in Province. 1912, Alexandra is one of Johannesburg’s oldest townships, located The Project is located in Alexandra, Johannesburg in Gauteng adjacent oldest to Sandton, Johannesburg’s economic hub. Established in 1912, Alexandra is one of Johannesburg’s townships, located adjacent to Sandton, Johannesburg’s economic hub.

1SFUPSJB .BJO 3E

*/%6453*"- ;0/&

8ZOCFSH

8ZOCFSH

-BSHFMZ DPOTJTUJOH PG XBSFIPVTFT BOE EJTUSJCVUJPO TUPSFT PG WBSJPVT QSPEVDUT

1SFUPSJB .BJO 3E

-BSHFMZ DPOTJTUJOH PG XBSFIPVTFT BOE EJTUSJCVUJPO TUPSFT PG WBSJPVT QSPEVDUT

'JSTU 4USFFU 'JSTU 4USFFU

CONTEXT

;POJOH "DDFTT */%6453*"- ;0/&

1FEFTUSJBO BDDFTT

The Project is located in Alexandra, Johannesburg in Gauteng Province. Established in 1912, Alexandra is one of Johannesburg’s oldest townships, located adjacent to Sandton, Johannesburg’s economic hub.

;POJOH "DDFTT

;POJOH "DDFTT

1FEFTUSJBO BDDFTT

"NFOJUJFT

"NFOJUJFT

1SFUPSJB .BJO 3E

8ZOCFSH -BSHFMZ DPOTJTUJOH PG XBSFIPVTFT BOE EJTUSJCVUJPO TUPSFT PG WBSJPVT QSPEVDUT

'JSTU 4USFFU

'JSTU "WFOVF

"NFOJUJFT

*/%6453*"- ;0/&

'JSTU "WFOVF

'JSTU "WFOVF 8ZOCFSH 3E

8ZOCFSH 3E

3&4*%&/5*"- ;0/&

8ZOCFSH 3E

3&4*%&/5*"- ;0/&

"SLXSJHIU "WFOVF

$POTJTUJOH PG MPX JODPNF IPVTFT TQB[B TIPQT TDIPPMT BOE TNBMM QVCMJD TQBDFT

"DDFTT UP TJUF "DDFTT UP TJUF

$POTJTUJOH PG MPX JODPNF IPVTFT TQB[B TIPQT TDIPPMT BOE TNBMM QVCMJD TQBDFT

"DDFTT UP TJUF

5P / &BTUFSO #ZQBTT

5P / &BTUFSO #ZQBTT

5P 1SFUPSJB .BJO 3E 'SFFXBZ

5P 1SFUPSJB .BJO 3E 'SFFXBZ

5P / &BTUFSO #ZQBTT

5P 1SFUPSJB .BJO 3E 'SFFXBZ

14

"MFYBOESB

"SLXSJHIU "WFOVF $POTJTUJOH PG MPX JODPNF IPVTFT TQB[B TIPQT TDIPPMT BOE TNBMM QVCMJD TQBDFT

"MFYBOESB

"SLXSJHIU "WFOVF

3&4*%&/5*"- ;0/&

"MFYBOESB

SEPTEMBER 2022

15


SITE 4USFFU "DUJWJUJFT 4

SITE

4USFFU "DUJWJUJFT 4

SITE

4USFFU "DUJWJUJFT 4

4USFFU "DUJWJUJFT 4

4USFFU "DUJWJUJFT 4

16

SEPTEMBER 2022

17


the recycling of the various types of plastic waste. Once these products have been manufactured, they are to be subjected to various Once these products have been manufactured, they are to be subjected to various testing procedures to ensure that they comply with the national stipulated testing procedures to ensure that they comply with the national stipulated standards- e.g the plastic brick has to comply with SANS regulations regarding standards- e.g the plastic brick has to comply with SANS regulations regarding TROLLEY MAKING building matreials. This phase shall be managed by material engineers and people Section dealing with transformation of building matreials. This phase shall be managed by material engineers and people with expertise in dealing wiht non-conventional building materials.plastic waste into trolleys with expertise in dealing wiht non-conventional building materials.

DESIGN RESPONSE CORE PROGRAM

Section dealing with transformation of plastic waste into trolleys

LUMBER MAKING

LUMBER MAKING

The following are the 6 main products that my facility shall focus on producing from the recycling of the various types of plastic waste. Once these products have been manufactured, they are to be subjected to various testing procedures to ensure that they comply with the national stipulated standards- e.g the plastic brick has to comply with SANS regulations regarding building matreials. This phase shall be managed by material engineers and people with expertise in dealing wiht non-conventional building materials.

TROLLEY MAKING

BRICK MAKING Section dealing with transformation of plastic waste into brick TROLLEY MAKING

STORAGE & SUPPLY

Section dealing with transformation of plastic waste into trolleys

Section dealing with packaging, testing & distribution of finished products LUMBER MAKING

Section dealing with transformation of plastic waste into brick

STORAGE & SUPPLY 5

Section dealing with transformation of plastic waste into flooring material

4

TEXTILE MAKING

3

5

Section dealing with transformation of 7 plastic waste into flooring material

4

TEXTILE MAKING

3

Section dealing with transformation of plastic waste into textie

2

FLOORING

6

FLOORING

FLOORING

6 7

5

7

Section dealing with transformation of plastic waste into roofing material

Section dealing with packaging, testing & distribution of finished products

Section dealing with transformation of plastic waste into roofing material

Section dealing with transformation of & Section dealing with packaging, testing plastic waste into roofing material distribution of finished products

6

ROOFING

ROOFING

ROOFING STORAGE & SUPPLY

Section dealing with transformation of plastic waste into lumber

BRICK MAKING

Section dealing with transformation of plastic waste into lumber

BRICK MAKING Section dealing with transformation of Section dealing with transformation of plastic waste into lumber plastic waste into brick

1

Section dealing with transformation of plastic waste into flooring material

4

TEXTILE MAKING

3

Section dealing with transformation of plastic waste into textie

2 1

Section dealing with transformation of plastic waste into textie

2 1

COLLECTION POINT Offloading of plastic waste for sorting & dispatch to respective zones- based recyclate types

18

COLLECTION POINT Offloading of plastic waste for sorting & dispatch to respective zones- based recyclate types

COLLECTION POINT Offloading of plastic waste for sorting & dispatch to respective zones- based recyclate types SEPTEMBER 2022

19


PHASE 2 PHASE 2

CONSTRUCTION TECHNOLOGY CONSTRUCTION TECHNOLOGY

20

SEPTEMBER 2022

21


SOLAR & HVAC The teethed roof on the manufacturing phase of the facility slants facing the North for ample exposure to the sun for most of the day. This ensures that the panels on the grooves receive solar energy that is then converted into electric energy to be used in the facility. Mechanical ventilation is used to compement passive ventilation systems that have been incorporated in the design. The same applies to solar energy- it acts as a complimentary source of power to the municipality power.

Slanted PVC sheeting rain water runs down the sheeting onto a channel that flows into downpipes for harvesting

WATER HARVESTING

Pluvia roof drainage system FBOs cast into columns draining storm water away into reservoir

Different roofs have different methods of water harvesting. The main methods are the pluvia system which uses FBOs and use of gutters and downpipes to chanel storm water into reservoirs for treatment and reuse. Appropriate roof angles have been implemented to facilitate water run off.

FBO roof drainage system on R.C roof FBOs cast into columns draining storm water away into reservoir

Gulvanised steel downpipes

Storm water storage for treatment and circulation into facility 26

Storm water to municipality

SEPTEMBER 2022

27


28

SEPTEMBER 2022

29


30

SEPTEMBER 2022

31


External spaces invite and ephemerally accomodate waste collectors in the site for nourishment and rest. Kitchen space gives the women who cook for the waste collectors an opportunity to take part and contribute to the intervention

COLLECTOR’S SPACE External spaces invite and ephemerally accomodate waste collectors in the site for nourishment and rest. Kitchen space gives the women who cook for the waste collectors an opportunity to take part and contribute to the intervention This enhances an over-all socio-economic growth amongst the people of Alexandra

WORKER’S LOUNGE

This enhances an over-all socio-economic growth amongst the people of Alexandra

MAMA’S KITCHEN ABLUTIONS

WORKER’S LOUNGE

WORKER’S LOUNGE

COLLECTION POINT/DROP OFF

MAMA’S KITCHEN

PUBLIC SPACE FOR COLLECTORS & WORKERS ABLUTIONS

COLLECTION POINT/DROP OFF MAMA’S KITCHEN ABLUTIONS

PUBLIC SPACE FOR COLLECTORS & WORKERS COLLECTION POINT/DROP OFF

MAMA’S KITCHEN

PUBLIC SPACE FOR COLLECTORS & WORKERS

ABLUTIONS

COLLECTION POINT/DROP OFF

PUBLIC SPACE FOR COLLECTORS & WORKERS

32

SEPTEMBER 2022

33


34

SEPTEMBER 2022

35


EAST ELEVATION

36

SEPTEMBER 2022

37


38

SEPTEMBER 2022

39


Project 02

ORANGE GROVE PLACE FINAL PROJECT- BAS HONOURS

Negotiating difference, adaptability and dual use through mixed strategies around home, work and leisure.

40

SEPTEMBER 2022

41


42

SEPTEMBER 2022

43


NEW FBO

TERRACE WITH PLANTERS E FA LL SCREED TO FALL WITH ING TO LATER WATERPROOF DR AI N SPECIFICATIO N LL

AI NA

OF LL IRECTION D F FA

DR

LL

3

LL FA

ENGINEER

XXXXX

FAL

GE FAL

GE

INA DRA

00

53 3

20 DA RY BO UN TE SI

FWM

53

3

LI NE

20 Y AR

DI NG IL

BO UN D SI TE

NE LI DI NG

S

IL

IT W

S IT

W

ERF 506 ARCHITECT LOGO

SW MH 0,5m deep

PHONE CONTACT PERSON

PROJECT

ARPL2002 2018 PROJECT 3

CLIENT

WITS UNIVERSITY

DWG

SITE PLAN

ISSUED FOR

COUNCIL APPROVAL

ERF 506 DATE

PROJECT SCALE

ARCHITECT LOGO

CLIENT PAGE SIZE

YYYY-MM-DD DRAWN XX ARPL2002 2018CHECKED PROJECT XX3 1:XXXX WITS UNIVERSITY REVISION A3

DWG DWG NO ISSUED FOR

SIGNATURES

00

IN IN TE TE RN RN AL AL RO RO AD AD 2 2

00 25

35 00

BU 1M

BU

VITU SER

2M

NEW

NEW ACACIA GALPINI

NEW

m 230 By.

INA

00 25 00 25

00

35

XXXXX

B

1783.00m 10

1782.50m

1782.00m

SW MH 0,5m deep

ADDRESS

XXXXX

FWM

NEW FBO

MWM

1782.00m

NEW ACACIA GALPINI

EMAIL

This drawing is to be read in conjunction with

Work to figured dimensions only. Do not scale drawings. Any discrepancies, errors or omissions are to be reported to the architects immediately and before the work is put in hand. The contractor is to verify all levels, heights and dimensions on site and to check these against the drawings, and is to locate

A

P5

SIGNATURES

architect's and engineer's drawings, specifically bathroom ARCHITECT GENERAL NOTES 5 # other No. Date. Note. and kitchen layouts.

2

1M

00

D

00

DRAWING REVISIONS CLIENT XXXXX

25

D

00

SER

25

25

2M E E LIN

00

K BRIC

25

XXXXX

0

NEW CONCRETE ROOF TERRACE WITH PLANTERS SCREED TO FALL WITH WATERPROOFING TO LATER SPECIFICATION

1782.50m

P3

P4 50

mm 230

U K BO

By.

FALL

B

1783.00m

25

LINE

00

00

RIC mB

XXXXX

NEW FBO 10 0

MWM

P3

50

DE VITU

L WAL ARY ND BOU L WAL

RY NDA XXXXX

MAIN

AI

DR

GE NA AI DR

ION

B SITE N No. Date. Note.

NEW FBO

SMH

BOU SITE

DRAWING REVISIONS

2

6

P2

NEW CONCRETE ROOF TERRACE WITH PLANTERS SCREED TO FALL WITH WATERPROOFING TO LATER SPECIFICATION

CONCRETE ENTRANCE RAMP 1:15 GRADIENT

NEW CONTROLLED PEDESTRIAN ACCESS

A

All work to comply with National Building Regulations SABS

DE

SMH

ABLE

P4

XXXXX

RA

T CIN RA LE

ENTRANCE LANDING

P2

P5

NEW FBO

IT

U

D

N

O

C

S GEYSER SOLAR N AI M LL FA AL NOTE IC GE

SOLAR GEYSER NOTE

SC

AIN

LM

ERF 501

SCALE 1:100

NEW FBO

NEW FBO FALL DRAINAGE

CONCRETE ENTRANCE RAMP 1:15 GRADIENT

NEW CONTROLLED PEDESTRIAN ACCESS

N SITE PLAN

0400 and Local Authority by-laws. 1 XXXXXXXXXXXXXXXXXXXXXX

ABLE

C INS

ICA

CTR

ELE

T ACIN DRELE

DRAINAGE

A

LM

ICA

NEW 300mm DIA PVC STORMWATER PIPE TO 1784.00m 2500L SLIMLINE JOJO STORAGE TANK

NEW FBO

& PCV

GE NA

O

ION

ECT

DIR

ALL OF F

PV ARRAY NOTE

ENTRANCE LANDING

C

M LL FA AL IC E RAG

ALL

FALL

AGE

DRAIN

S

NEW 300mm DIA PVC STORMWATER PIPE TO 1784.00m 2500L SLIMLINE JOJO STORAGE TANK

N

AI

0m

1784.5

NEW FBO

IT

U

D

N

O

EF

AG

AIN

DR

T IREC

30 7 RY DA OUN 22 30 7

SCALE 1:100

Work to figured dimensions only. Do not scale drawings. Any discrepancies, errors or omissions are to be reported to the architects immediately and before the work is put in hand. The contractor is to verify all levels, heights and dimensions on 3 site and to check these against the drawings, and is to locate and protect any existing services for the duration COPYRIGHT AND RIGHT OF REPRODUCTION OF as THIS DRAWING of the contract. Unless otherwise noted all levels are shown Finished FloorOR ANY PORTION THEREOF IS RESERVED BY THE ARCHITECTS. (FFLs). 4 Levels

L

FA

PV ARRAY NOTE

ERF 501

Y DAR

N EMH SITE PLAN

All work to comply with National Building Regulations SABS 0400 and Local Authority by-laws.

1000

DR

CTR

ELE

22

D EMH

1

LL

FA

INAG E FA NEW FBO DR LL NEW FBO AINA GE F ALL

FA

E

DRA

GE

GE DRAINA

AG

AG

0m

1784.5

1000

DR NEWNEW FBO CONCRETE ROOF AIN

NEW DOVE GREY KLIPLOK SHEETED ROOF LAID ON TIMBER RAFTER @ 5 DEGREE PITCH WITH THERMAL AND ACOUSTIC INSULATION TO LATER SPECIFICATION

1920

1920

# GENERAL NOTES

DRANEW FBO INAG NEW FBO E FA LL

LL LL

FA

FA

DR AI NA GE

GE

FALL

BRIC mm 230 NEW

RIC mB

NEW

LL

L NEW CONCRETE ROOF AGE FA NEW DOVE GREY KLIPLOK SHEETED ROOF AIN TERRACE WITH PLANTERS DR LAID ON TIMBER RAFTER @ 5 DEGREE PITCH SCREED TO FALL WITH NEW WITH THERMAL AND ACOUSTIC DRFBO AINA WATERPROOFING TO LATER GE F INSULATION TO LATER SPECIFICATION LL ALL SPECIFICATIONAINAGE FA

NEW ACACIA GALPINI

COPYRIGHT AND RIGHT OF REPRODUCTION OF THIS DRAWING OR ANY PORTION THEREOF IS RESERVED BY THE ARCHITECTS.

FA

NA

FALL

FALL OF FALL TION DIREC

YW D AR K BO

GE

CONCRETE ENTRANCE RAMP 1:15 GRADIENT

CK OPCO TO ST IN FIRE MA

AI

NEW ACACIA GALPINI

m 230

NA

WATER

DR

UN K BO ALL

AD OA E ROLE R YAL YA

YW

AI

ENTRANCE LANDING

NEW ACACIA GALPINI

AR UND

DR

NEW FBO

& COCK STOP IN TO IN FIRE MA

NEW ACACIA GALPINI

ALL

NEW ACACIA GALPINI NEW ACACIA GALPINI

NEW FBO

5125

D

1785.00m

NEW ACACIA GALPINI NEW FBO

NEW ACACIA GALPINI

MA WATER

2

CONCRETE ENTRANCE RAMP 1:15 GRADIENT

ENTRANCE LANDING

854

NEW

30mm

L

NEW ACACIA GALPINI

44

NEW ACACIA GALPINI

SITE

8 ARY 1 854 RY 18 ITE BOUND UNDA S O B E SIT

11 - 20 4 DARY BOUN LL A W DARY BOUN BRICK

5125

ERF 504 NEW ACACIA GALPINI

1785.00m

PCV

NEW ACACIA GALPINI

GE DRAINA

D

NEW ACACIA GALPINI

DRA

N

ll

ining wa

ta EX. Re

L

m

30m EW 2

C

NEW ACACIA GALPINI

SITE

1 D1 LDROA AA AL RNO ER INNTER INTS WITSWIT

ERF 504

11 - 20 4 DARY BOUN LL A W DARY BOUN BRICK

wall E G LIN LINE M BUILDIN 1 ILDING U B M 1

taining

EX. Re

EMAIL

DATE

SITE PLAN XXX-XXX-XX-XXXX-X COUNCIL APPROVAL DRAWN

A

SEPTEMBER 2022

45


11 - 20 4 DARY BOUN ALL W Y R DA BOUN BRICK

NEW ACACIA GALPINI

SITE

NEW

m

230m

NEW ACACIA GALPINI

NEW ACACIA GALPINI

CONCRETE ENTRANCE RAMP 1:15 GRADIENT

NEW ACACIA GALPINI

8 854

ENTRANCE LANDING

ARY 1 OUND

NEW FBO

NEW FBO DR

AI

NEW FBO

GE

FA

LL GE

LL

AI

NA

1000

NEW CONCRETE ROOF TERRACE WITH PLANTERS SCREED TO FALL WITH WATERPROOFING TO LATER SPECIFICATION

DRA

INAG

NEW 300mm DIA PVC STORMWATER PIPE TO 1784.00m 2500L SLIMLINE JOJO STORAGE TANK

ALL

NEW FBO FALL

FA GE

C

NEW FBO

IT

U

D

N

O

S

AIN

M

PCV

LL

F FA

ALL

F AL IC E RAG

NA

O TION

PV ARRAY NOTE

EC

DR

AI

T ACIN DRELE

NEW FBO

INAGE FALL

NEW CONCRETE ROOF TERRACE WITH PLANTERS SCREED TO FALL WITH WATERPROOFING TO LATER SPECIFICATION

WATE

R MAIN

DRA

DIR

AD

CK & OPCO TO ST IN FIRE MA

AGE

DRAIN

LL

E RO

1920

NEW FBO

LL

EF

AG

AIN

DR

E FA

NEW FBO

B

INA

GE

FAL

SOLAR GEYSER NOTE

L

230 NEW

NEW DOVE GREY KLIPLOK SHEETED ROOF LAID ON TIMBER RAFTER @ 5 DEGREE PITCH WITH THERMAL AND ACOUSTIC INSULATION TO LATER SPECIFICATION

NEW ACACIA GALPINI

NEW FBO E FA LL

INAG

FA

FA

DR

E FALL DRAINAG

LL OF FA

GE

mm

TION DIREC

DRA

NA

OAD 1

YAL

L WAL ARY UND O B K BRIC

AI

SITE B

LL

DR

0m

1784.5

NAL R

NEW ACACIA GALPINI

NA

INTER

D

1785.00m

5125

NEW ACACIA GALPINI

WITS

ERF 504

LINE ILDING 1M BU

C

all

aining w

EX. Ret

DRA

ENTRANCE LANDING

10

22 30 7

25

00

00

00

SMH MWM

NEW CONTROLLED PEDESTRIAN ACCESS

2

P2

53

3

N SITE PLAN

DA UN

0

TE

BO

25 0

RN A

LI

E

IN G 1M

BU I

LD

00

IT S

1782.00m

NE 1 2 3 4 5 6

46

All work to comply with National Building Regulations SABS 0400 and Local Authority by-laws.

Work to figured dimensions only. Do not scale drawings. Any discrepancies, errors or omissions are to be reported to the architects immediately and before the work is put in hand. The contractor is to verify all levels, heights and dimensions on site and to check these against the drawings, and is to locate and protect any existing services for the duration of the contract. Unless otherwise noted all levels are shown as Finished Floor Levels (FFLs). This drawing is to be read in conjunction with other architect's and engineer's drawings, specifically bathroom and kitchen layouts. XXXXXXXXXXXXXXXXXXXXXX

W

NEW ACACIA GALPINI

A

SW MH 0,5m deep

ERF 506

DRAWING REVISIONS No. Date. Note. XXXXX

XXXXX

XXXXX

IN

2

TE

E MS

P5

R mB 30m W2

RY NDA BOU ICK

L WAL

25 00

LIN UDE RVIT

50

L

SI

1782.50m

NE

P4

# GENERAL NOTES

RO

RY

20

P3

SCALE 1:100

COPYRIGHT AND RIGHT OF REPRODUCTION OF THIS DRAWING OR ANY PORTION THEREOF IS RESERVED BY THE ARCHITECTS.

AD

35 00

SIT

1783.00m

25

RY U E BO

FWM

CONCRETE ENTRANCE RAMP 1:15 GRADIENT

ERF 501

NDA

EMH

S

AIN

LM

ICA

CTR

ELE

LE CAB

ARCHITECT LOGO

By. XXXXX

PROJECT

ARPL2002 2018 PROJECT 3

CLIENT

WITS UNIVERSITY

DWG

SITE PLAN

ISSUED FOR

COUNCIL APPROVAL YYYY-MM-DD 1:XXXX

SIGNATURES

EMAIL

DATE

CLIENT

ADDRESS

SCALE

ARCHITECT

PHONE

PAGE SIZE

ENGINEER

CONTACT PERSON

DWG NO

DRAWN CHECKED

A3 XXX-XXX-XX-XXXX-X

XX XX REVISION

A SEPTEMBER 2022

47


48

SEPTEMBER 2022

49


50

SEPTEMBER 2022

51


BEWARE OF OVERCONFIDENCE ESPECIALLY IN MATTERS OF STRUCTURE Cass Gilbert

56


Turn static files into dynamic content formats.

Create a flipbook
James Ndeda- Portfolio_2024 by ndeda_james - Issuu