taining
C
wall
1 - 20 41 DARY BOUN L Y WAL UNDAR
23 NEW
0mm
NEW ACACIA GALPINI
BO BRICK
NEW ACACIA GALPINI
1785.00m
NEW ACACIA GALPINI
CONCRETE ENTRANCE RAMP 1:15 GRADIENT
854
ENTRANCE LANDING
NEW ACACIA GALPINI
RY 18 UNDA
NEW FBO
NEW FBO
AIN
FA
AG E
1000
DR A
NEW CONCRETE ROOF TERRACE WITH PLANTERS SCREED TO FALL WITH WATERPROOFING TO LATER SPECIFICATION
AG
NEW DOVE GREY KLIPLOK SHEETED ROOF LAID ON TIMBER RAFTER @ 5 DEGREE PITCH WITH THERMAL AND ACOUSTIC INSULATION TO LATER SPECIFICATION
IN RA
DRAI NAG
E FA LL
NEW FBO
NEW 300mm DIA PVC STORMWATER PIPE TO 1784.00m 2500L SLIMLINE JOJO STORAGE TANK
ALL
EF
D
NEW FBO
LL
FA NAGE
C
ALL
E
NEW FBO
NEW CONCRETE ROOF TERRACE WITH PLANTERS SCREED TO FALL WITH WATERPROOFING TO LATER SPECIFICATION
MAI WATER
D
AD
FALL
N TO
DR
D
DRAINAGE
N
L
FIRE MAI
FA AG E
NEW FBO
IT
U
D
N O
S
AIN
M
F A IC GE TRA CIN RA LE
AIN
NO
PV ARRAY NOTE
TIO IREC
1920
& PCV
F FA
NEW ACACIA GALPINI
LL
LL
DRAI
CK STOPCO
2 NEW
NEW FBO E FA LL
IN
GE FALL
LL
DRAINA
DIRECT
FA
OAD 1
K BO RIC mB 30m
DRAI NAG
FA LL
E
ION O
ARY UND
F FALL
L WAL
LL
DR AIN AG
m
1784.50
NAL R
AG E
SITE BO
DR
NEW FBO
NEW ACACIA GALPINI
INTER
5125
NEW ACACIA GALPINI
D
1M BU
SITE
WITS
ERF 504
ILDING
LINE
EX. Re
FALL
SOLAR GEYSER NOTE
NEW FBO
GE
B
INA DRA
ENTRANCE LANDING
10 0
00
0
25
BLE
AL TRIC
22 30 7
1783.00m
BOU
25 00
RY
ERF 501
SMH MWM
00
2
P2
NEW CONTROLLED PEDESTRIAN ACCESS
53
3
N SITE PLAN
UN D
00
TE
BO
25
E
RN
IN IL D 1M
BU
VITU
DE
00
P5
NEW ACACIA GALPINI
NE 1 2 3 4 5 6
All work to comply with National Building Regulations SABS 0400 and Local Authority by-laws.
Work to figured dimensions only. Do not scale drawings. Any discrepancies, errors or omissions are to be reported to the architects immediately and before the work is put in hand. The contractor is to verify all levels, heights and dimensions on site and to check these against the drawings, and is to locate and protect any existing services for the duration of the contract. Unless otherwise noted all levels are shown as Finished Floor Levels (FFLs). This drawing is to be read in conjunction with other architect's and engineer's drawings, specifically bathroom and kitchen layouts. XXXXXXXXXXXXXXXXXXXXXX
W SW MH 0,5m deep
ERF 506
PROJECT
DRAWING REVISIONS No. Date. Note. XXXXX
XXXXX
XXXXX
IN
1782.00m
IT S
K BO RIC
UND
ARY
2M
TE
SER
L WAL
G
25 00
50
mB 30m W2
# GENERAL NOTES
AL
SI
1782.50m
LI N
LINE
P4
A
RO
AR
Y
20
P3
SCALE 1:100
COPYRIGHT AND RIGHT OF REPRODUCTION OF THIS DRAWING OR ANY PORTION THEREOF IS RESERVED BY THE ARCHITECTS.
AD
35
SITE
FWM
CONCRETE ENTRANCE RAMP 1:15 GRADIENT
ELEC
NDA
EMH
S CA MAIN
ARCHITECT LOGO
By. XXXXX
ARPL2002 2018 PROJECT 3
CLIENT
WITS UNIVERSITY
DWG
SITE PLAN
ISSUED FOR
COUNCIL APPROVAL
SIGNATURES
DATE
CLIENT
ADDRESS
SCALE
YYYY-MM-DD 1:XXXX
ARCHITECT
PHONE
PAGE SIZE
ENGINEER
CONTACT PERSON
DWG NO
DRAWN CHECKED
A3 XXX-XXX-XX-XXXX-X
XX XX REVISION
A