Skip to main content

Architectural Portfolio

Page 1

ARCHITECTURE PORTFOLIO

NAVEEN CHOUDHARY


CONTENTS This portfolio contains selected compilation of my architectural ideas & works from 2015-2022, developed while pursuing Architecture degree and then during my architectural practice. The projects were chosen to highlight the diverse scale and approaches encompassed in my design education and career.


Facade design, Delhi

Sustainable Hostel Project, Himachal Pradesh

Skill Training and Community Centre for MinoritiesSadhbhavna Mandap, Alwar

Jaleb Chowk - Designing a Public Square, Jaipur

Sustainable Primary School, Pakyong

Recreational Garden, Gangtok

Dissertation - Permaculture

Photography


01

Facade Design Site - A-29, Mayapuri, New Delhi

SITE CONTEXT

DESIGN CONTEXT

The site is located at A-29, Mayapuri. The site can be accessed from 65 feet wide access road with a plot size of 8m x 24m.

Façade Upgradation for Existing structure with improved ventilation & natural daylight.

“FACADE to be conducive of the Inside Out feel of Architectural planning”

Extended Landscape Landscape as an extension to indoor spaces with juxtaposed spill over functions.

Form follows function The primary elements of the planning to drive the design while creating a point of interest to the visitor.

Passive Design Using Sustainability as a guiding principle to reduce the heat load and allow for thermal comfort.


A

B

C

A

300

1000

RAILING TO BE DEMOLISHED +910 MM

300 X960MM HPL BOXING FOR CONCEALING PLUMBING

LVL. +910

F 300 X960MM HPL BOXING FOR CONCEALING PLUMBING

+0 MM

RAILING TO BE DEMOLISHED

1000

1900

DUCT TO BE REMOVED

+910 MM

+910 MM

LVL. +910 +0 MM

WINDOWS TO BE BLOCKED IN BRICKWORK

WINDOWS TO BE BLOCKED IN BRICKWORK

F

RAILING TO BE DEMOLISHED

1000

1900

+0 MM

+910 MM

+910 MM

1900

LVL. +910

WINDOWS TO BE BLOCKED IN BRICKWORK +910 MM

WINDOWS TO BE DEMOLISHED AND REPLACED BY NEW FLOOR TO CEILING GLAZING SYSTEM

LVL

F

1000

RAILING TO BE DEMOLISHED +910 MM

1240

450

+910 MM

LVL 3350X1000MM OPENING TO BE CREATED IN BRICKWORK FOR VENTILATORS

3350X1000MM OPENING TO BE CREATED IN BRICKWORK FOR VENTILATORS

+0 MM +0 MM

SHUTTER DOOR

GF W-1

ENTRY DOOR

F2 SHUTTER DOOR TO BE BLOCKED IN BRICKWORK

METAL GATE TO BE REFURBISHED METAL STAIRCASE TO BE REFURBISHED

RAILING TO BE DEMOLISHED

960

as/site

900

300

as/site

8 PANELS

as/site

900

WINDOWS TO BE BLOCKED IN BRICKWORK

as/site

as/site

WINDOWS TO BE BLOCKED IN BRICKWORK

RAILING TO BE DEMOLISHED

as/site

WINDOWS TO BE BLOCKED IN BRICKWORK

as/site

900

as/site

750

300

WINDOWS TO BE DEMOLISHED AND REPLACED BY NEW FLOOR TO CEILING GLAZING SYSTEM WPC PANEL AND SIGNAGE AS PER DETAIL

as/site

2800

PRODUCED BY AN AUTODESK STUDENT VERSION

Working Drawing

as/site RAILING TO BE DEMOLISHED


B

C

A

B

C

1000

300

LVL. +910

LVL. +910

300 X960MM HPL BOXING FOR CONCEALING PLUMBING

LVL. ±00

F1

10x10mm MS RAILING 200mmC/C WITH A 25x50mm BALUSTRADE AS/ DETAIL

LVL. +960

1000

2100

TF D-1

LVL. +910

LVL. ±00

F1

10x10mm MS RAILING 200mmC/C WITH A 25x50mm BALUSTRADE AS/ DETAIL

LVL. +960

1000

2100

SF D-1

LVL. +910 50x50mm HOLLOW ALUMINUM FRAMEWORK MOUNTED ON MS STRUCTURAL FRAMEWORK AS/STRUCTURE

L. ±00

FF D-1

FF W-1

LVL. ±00

FF W-2

F1

PERFORATED METAL SHEETS AS/DETAIL

LVL. +960

1000

2100

LVL. +910

LVL. ±00

1000

L. ±00

GF W-2

GF W-1

GF W-2

LVL. ±00

REFURBISHED GATE AS/DETAIL

WPC PANEL AND SIGNAGE AS PER DETAIL

REFURBISHED GATE AS/DETAIL

2800

2

REFURBISHED METAL STAIRCASE AS/DETAIL

as/site 300 X960MM HPL BOXING FOR CONCEALING PLUMBING

960

900

REFURBISHED METAL STAIRCASE AS/DETAIL

300

300

40x40 MM MS FRAME

S - 400C/C

8 PANELS - 400C/C

12 PANELS - 400C/C

2 PANELS 400C/C PERFORATED METAL SHEETS MOUNTED ON 50x50mm HOLLOW ALUMINUM FRAMEWORK AS/DETAIL

as/site

300 X960MM HPL BOXING FOR CONCEALING PLUMBING

as/site 300

REFURBISHED GATE AS/DETAIL

960

10x10mm MS RAILING 200C/C WITH A 25x50mm BALUSTRADE AS/ DETAIL

300

300

40x40 MM MS FRAME

REFURBISHED METAL STAIRCASE AS/DETAIL PERFORATED METAL SHEETS MOUNTED ON 50x50mm HOLLOW ALUMINUM FRAMEWORK AS/DETAIL 10x10mm MS RAILING 200C/C WITH A 25x50mm BALUSTRADE AS/ DETAIL

12 PANELS - 400C/C

2 PANELS 400C/C


02

Sustainable Hostel Project Site - Bir Billing, Kangra, Himachal Pradesh


The site is located in Bir Khas, a popular touristy village and attraction in Kangra district of Himachal Pradesh. The site also has a considerable slope and low heighted contours, towards the Village Suja, that has been taken advantage of when designing.


Material Expression The expression of the materials is celebrated through the use of fair-faced concrete, rammed earth and local stone. The stabilised rammed earth walls strongly depict the natural hues of the earth and surrounding topography. The conversation continues in the internal courts with the use of local stone in the courtyards and ‘Jaali’ screens which filter the harsh summer sun.

Rammed Earth - The strength and solidity of EARTH

Rammed Earth construction is a process of compressing a damp mixture of earth that has suitable proportions of sand, gravel and clay into an external supported frame that holds the shape of a wall section creating a solid wall of earth.

Adobe Blocks - The affordability & timelessness of EARTH

The tradition of making sun dried raw earth bricks popularly known as adobes goes back to the beginning of human society. Adobe is versatile, viable and provides great flexibility in the construction of earth buildings. These bricks are fireproof, non toxic and has an excellent thermal performance. Adobe buildings can be found across continents where it has been spontaneously and continuously adapted by people of different cultures for housing as well as monumental structures.

CSEB - The engineered modern age EARTH

(CSEBs) are made in a manual press using a mixture of earth with 5% cement. Some of the advantages of using CSEBs for construction are that they can be made on site and their manufacture needs much less energy and reduces pollution.


Site Plan The two-storey dwelling sits on an irregularly shaped site that is surrounded by farmland. A primary goal for the design team was to create an "architecture that belongs to the place and merges with its surrounding farmlands.” The buildings were designed to respond to environmental factors such as wind direction and heavy rains, but also to reflect the local architecture of the community through the communal features and adaption of local construction techniques.


Hostel Block

1.1

1.1 2.1 W1

2.4

2.4

W1

WIDTH - 3'-6" TREAD - 1' RISER - 7"

UP

8.1

6.1

2.4

COMMON AREA

0.9

1.2

1.1

1.8

0.9

V1

A

1.2

V1

2.9 W1

2.4

2.9

TOILET

TOILET

9.0

1.8 1.2

D2

2.9

0.9

1.8

D2

1.3

0.9

V1

V1

PRODUCED BY AN AUTODESK STUDENT VERSION 1.7 5.8 W

1.1

W4

W

2.9

1.1

D1

D2

DORMITORY

1.7

TOILET

0.5 2.0 1.2

0.9

TOILET D2

A' W4

1.8

PORCH

W2

PRODUCED BY AN AUTODESK STUDENT VERSION DORMITORY

1.8

1.2

1.8

1.1

UP

W3

0.9

1.2

4.0

DORMITORY

W3

W3

W3

W3

W3

D1

0.6

18" THICK - 2' STONE WALL

4.6 1.7

DORMITORY

D1

1.5

0.6

0.6

1.1

D1

1.1 0.4

1.0

0.6

1.1

14.2

0.6 0.4

1.1

1.1

0.6

0.9 ROOF PROJECTION

1.7

GROUND FLOOR PLAN

2.1

1.1

3'-6" WIDE BALCONY

V2

TOILET 2.1

D2

4.6

W6

ROOM

WIDTH - 3'-6" TREAD - 1' RISER - 7"

DOWN

0.3

6.1

2.4

1.1

1.2

D1

1.8

0.9

0.9

V1

1.2

V1

A 0.6 0.9

D2

0.6 0.9

2.9

2.9

0.9

1.8

0.9

1.3

ROOM

3.2

W5

1.5

W4

5.8 0.9

1.1

V1

V1

D2

D2

D1

0.5

TOILET

TOILET

9.0

1.8 1.2

TOILET

V1

PRODUCED BY AN AUTODESK STUDENT VERSION 0.5 2.0 1.2

D1

D2

TOILET

0.9

TOILET D2

5.6

ROOM 1.8

A'

W4 W2

1.2

4.0

1.8 1.1

9.4

D1

ROOM

ROOM W3

W5

0.9

ROOM W3

W4

W4 D1

D1

3'-6" WIDE BALCONY

2.9

1.6

1.5

1.7

0.6

1.1

1.2

0.4

3' HIGH PARAPET WALL

1.1

0.6 0.4

1.1

1.2 0.5

0.9 ROOF PROJECTION

FIRST FLOOR PLAN

14.2

+24'-6" Roof Level +22' Ceiling Level

BALCONY

TOILET

ROOM

ROOM

ROOM

ROOM

ROOM

+13' First Floor Level

COMMON AREA

DORMITORY

DORMITORY

DORMITORY

DORMITORY

±0 Ground Level

HOSTEL BLOCK SECTION AA'

PRODUCED BY AN AUTODESK STUDENT VERSION

3'-6" WIDE BALCONY

PRODUCED BY AN AUTODESK STUDENT VERSION

8.1

SECTION

ELEVATION

PRODUCED BY AN AUTODESK STUDENT VERSION PRODUCED BY AN AUTODESK STUDENT VERSION

4.6


The building’s architecture explores the plastic abilities of mud in order to create a stronger identity. Mud is regarded as poor and old-fashioned material and inferior to brick for example. But to us, it doesn’t matter how old the material is, it is a matter of our creative ability to use it in a contemporary way. To show the beauty and capacity of mud, it is needed to bring out the best of it and not just to treat it as a cheaper version to brick.


Cafe Block

PRODUCED GROUND FLOOR PLAN

BY AN AUTODESK STUDENT VERSION FIRST FLOOR PLAN

FRONT ELEVATION

20'-6" Eaves Level

+9' Lintel Level +5' Sill Level 4' Counter Top Level

±0 Ground Level

SIDE ELEVATION

CAFE FRONT ELEVATION

PRODUCED BY AN AUTODESK STUDENT VERS

+27'6" Roof Level

COTTAGE- TYPE 1

COTTAGE- TYPE 2


The material palette used on the façade creates a dialogue between the building, the landscape in the context and the surrounding villages. The expression of the materials is celebrated through the use of adobe bricks, rammed earth and local stone. The stabilised rammed earth walls strongly depict the natural hues of the Kangra valley and soil belonging to this area. The conversation continues in the internal courts with the use of local stone and corridors which filter the summer sun.

STAFF ROOM & TOILET

SEPTIC TANK PLAN & SECTION

SPECIFICATIONS FOUNDATION - CLAY MIX, 15MM THICK RANDOM RUBBLE MASONRY LEVELLED WITH CLAY & LIME MORTAR DOORS & WINDOW - DEODAR WOOD FOR SHUTTERS AND CHOWKETS SUPER STRUCTURE - 18 INCH THICK MUD WALL IN MUD MORTAR DPC - 38MM THICK


03

Skill Training and Community Centre for Minorities Site - Bambora, Alwar, Rajasthan PARKING

SECONDARY ENTRY

PARKING

SEMI OPEN SITTING

ADMINISTRATION

SEMI OPEN SITTING SCULPTURE COURT

MAIN ENTRY

Central Vision axis Main Pathway Secondary connecting pathways

VIEWING DEC

GUARD ROOM

OUTDOOR EXHIBITION

ELECTRICITY SUB STATION

LIBRARY & COMPUTER CENTRE

OCCUPATIONAL DEVELOPMENT AREA

SEMI OPEN EXHIBITION SPACE

GRIEVANCE & COUNSELLING

SKILL TRA BLOCK 1


India lives in its villages, and while the cities have grown immensely over the last 20 years, rural areas have not seen that kind of development. Rural areas are still plagued by problems of malnourishment, illiteracy, unemployment and lack of basic infrastructure. An encompassing environment has the power to influence and sway over an individual moods, decision making capacities, personality, social behaviour and physical as well as mental health. The project aims to be a democratic and inclusive public space - the focus of activity of the community while also emphasising on the need for an architectural intervention in a rural setting that is slowly but surely heading down the path of disorganised growth that has crippled our cities, through Sustainable rural living & Income generation opportunities.

COMMUNITY SERVICES

CAFETARIA

PRAYER HALL

TOILETS WASTE WATER TREATMENT

CK

AINING

SKILL TRAINING BLOCK 2

OAT

SOLAR PANEL & PLANTATION AREA

GAZEBO


Act of Building

FOR THEM, WITH THEM EXPERIENCE THROUGH IMMERSION The project will have special construction organisation: there is no professional constructors/ contractors, around few local villagers leading the whole construction and also training the local youth. They won’t be only the builders of the centre but also the users.

LEARN THROUGH BUILDING Local villagers have natural recognition of cultural identity to the earth structures because they have been lived in the earth house for thousands of years. However, this recognition of cultural identity is weaker and weaker because of the modernisation as the time goes. Now, the main aim is to bring this recognition back.

DESIGN THROUGH COLLABORATION The centre will be constructed in collaboration with local builders and craftsmen, following the methods of local building tradition, training the local youth, while introducing a simple yet innovative typology in the region.

Aspects of

COMMUNITY DEVELOPMENT Skill Training

Disaster Management

Skill Training centre provides the opportunity to learn new skills, gaining access to stone, pottery, metal and wood workshops, computer labs and a range of other environments where they can learn hands-on, employable skills.

“Probably one of the hardest climate extremes to deal with is drought, because it can come on quickly and get really bad in a hurry. Then it gets beyond just farms—it gets to communities and farms and mental health issues even, where people are really stressed and having a tough time,”

Rural Development

Community Centre

Rural development involves creation of the conducive atmosphere where there is growth of people’s self esteem through the establishment of good economic systems and social political institutions that are able to promote human dignity and respect. Rural development aims at finding the ways to improve the rural lives with participation of the rural people themselves so as to meet the required need of the rural area.

The community centre is posited as a peace offering to those members of the wider community who are skeptical about being a neighbourhood created for all the religious groups combined. Well-designed communities are places where people want to live and invest in the future. As the character of many rural communities is threatened by out-migration, loss of an economic base, and urbanisation, designing vibrant rural places is increasingly important.


Central Vision axis

Viewing Point

Viewing Angle

The design conceptualisation starts with providing the users a experience through the architecture and providing them the connection between social, cultural, environmental and economic matters and integrating diversity of interests within a community.


CONCEPT DEVELOPMENT

BLOCK LAYOUT All main functions and volumes have been kept separated along the central vision line and reconnected to enable programmatic and social interaction within the building as well as in the centre.

ORIENTATION The blocks have been kept in N-S orientation with larger walls facing the North & South to minimise the heat gain and also to fit into the topography of the site.


TRANSPARENCY & VIEWS Maximum views have been provided from the building blocks to provide transparency and an environment of openness and community interaction.

INTERMEDIATE GREEN Maximum integration between interior and exterior spaces have been kept to enhance user participation in the centre.


SITE The site for intervention of this thesis is located in Bambora Village, a small village with a multi ethnic population of 4000, in Alwar district of Rajasthan. Bambora Village is located on State Highway 25, connecting Alwar to Delhi. With a total site area of 14110 sq. m, the site has a uphill terrain with contour difference of 2m.

Project Proposal The project Sadbhavna Mandap is brought by Ministry of Minority Affairs & Ministry of Rural Development to come up with a central venue for congregation for dissemination/awareness activities of various schemes and programmes of MoMA, carrying out skill development courses, social functions, communal harmony functions, trainings for health and hygiene, disaster management etc.

Site Location

Work Profile

The Site is located in Bambora Vill., Alwar, Rajasthan, India. Bambora Village is a census town located in Kishangarh Bas Tehsil of Alwar District.

“In Bambora village out of total population, 1665 were engaged in work activities. 75.26 % of workers describe their work as Main Work (Employment or Earning more than 6 Months) while 24.74 % were involved in Marginal activity providing livelihood for less than 6 months.” - census2011.co.in

Site Approach road

Traffic Nodes

Residential

State Highway-25

Commercial

Road to Village

Institutional

Road Network The main road, SH-25 lies to the south of the side and also the main village, Bambora. The site is connected through the village by a 6m local road and 18m Wide SH-25.

Temporary Settlements

Land

Major Building types are reside followed by small commercia So local people can easily be c good footfall as well as in participation


Site Topography • The site is a under construction site for the Sadbhavna Mandap, proposed by the Govt. • The site is located on a uneven topography towards the leeward side of a hill, part of Aravalli ranges. • The site slopes towards its centre. • The site gains an elevation of 6m from the lowest point with contour elevation difference of 2m.

Site Approach The site for proposed Sadhbhavna Mandap is at a distance of 300m from the State Highway 25 connecting Kishangarh Bas, Tijara, Bhiwadi and Delhi to Alwar, approached by a 6m wide proposed road.

d Use

ential, of all the income groups, al shops over the main road. called at the site maintaining a ncreasing the community n at the site.

Single Storey Double Storey Above Double Storey

Building Height All the surrounding building to the site and of village are mostly single storey while some commercial spaces rising upto double storey and very few rising above it. Keeping in harmony with the rural life and vernacularity of the village, the new built up structure should be of a low height while blending with the topography.


SITE PLAN

+6000MM

SOLAR PANEL INSTALLATION AREA

+2000MM

0M M

00

+3

W

OR KS PA CE

LV

L

TO IL

ET

UP

SE M IO PE N

UP

+0.0MM

SK IL L TR AI L NI +5 N 95 0M G B LO M CK

LV

+0.0MM

2

UP

+0.0MM

UP

UP

+0.0MM

DO W

N

-2000MM

DO

W

N

GAZEBO

COMMUNITY SERVICES -2000MM

+0.0MM

LVL+6000MM STAGE -5000MM

DO

W

M

N

+3 45 0M

OAT

-2000MM

RA LO MP W ER TO LE VE L

+0.0MM

SK

VIEWING DECK

IL L LV TR A L +7 ININ 50 G 0M BL M O

CK

1

UP

RAINWATER HARVESTING TANK

DO

W

N

LV L

-3800MM

UP

LIBRARY & COMPUTER CENTRE

PARKING

+0.0MM

-2000MM

LVL +4000MM UP

SEMI OPEN EXHIBITION AREA

LL

DO W N

-2000MM

CE

+2000MM

UN

M

LV

L

CO

50 M

UP

-2000MM

+5 9

SE L

LI

NG

SEMI OPEN SITTING SEATING

SECONDARY/VILLAGER'S ENTRY

TO EN W DO TR AR W Y DS N BA CK

-2000MM

+0.0MM

SE EX MI HIB OP IT EN IO N AR EA

+2000MM

ADMINISTRATION LVL +4000MM

+0.0MM

SECURITY ROOM

DROP OFF ZONE

DROP OFF ZONE

PARKING

MAIN/ VISITORS ENTRY

WAY TO BACK ENTRY

ROAD TOWARDS MAIN HIGHWAY

M 00

+8

LV L

IO UP AT CC O +0.0MM

R U AM PP P ER TO LE VE L

PARKING

0M

SEATING

NA L

SCULPTURE COURT

DE

PARKING

VE LO

PM

EN T

AR

EA

UP

UP


OP

SH

3

O

SH

P

2

PARKING

OP

SH

5

UP

SCULPTURE COURT

PARKING

+0.0MM

+0.0MM

SECURITY ROOM

DROP OFF ZONE

PARKING

DROP OFF ZONE

MAIN/ VISITORS ENTRY

WAY TO BACK ENTRY

ROAD TOWARDS MAIN HIGHWAY

SEATING

OP

6

OP

SH

7

G

IN G

AIT

+2000MM N

N W O RK

ET AL

OM

W EL DIN G

E RO OM

Y

ER

M AC HIN

RE

N W

M

O

RO

OR K

16

14

UP

6

O

17

M

O

RO

S

NT

A CO UTO M PO NE

RE

O

DO W N

-2000MM

ST

SE AR MI EA OPE

D

AR

TY

UR

CO 2

M

O

RO

OR

RK

O

W

ST

W N

ST

N

SE AR MI EA OPE

VIL NE LA ST W GE UD SP IO APE R

O RA G E

M

RO O

K

M

RO

OR

W

E

SE AR MI EA OPE

ST OR

SE AR MI EA OPE

RC H

3

UP

1

ST

LV

RT Y AR D

IL ET

UP LIN G

RK

O

W

M

PO M

4

CO U

TO

N

+0.0MM SE AR MI EA OPE

FT S

RA

IC

HA ND

+3 00

EN TR L Y

LV

11

UP

T RO OOL OM

G

LIN

DO W N C RO OUN O SE M L

N

IO

PT

CE

RE

13

+0.0MM

C RO OUN O SE M L

G OF RIE FIC VA E NCE

RC H

15

EN

D

AR

UR TY

CO

SEMI OPEN SITTING SEATING GR CO IE DE MP VANC SK LA IN E T

M

PO M

Y

W N

DO

UP

17

EA

AR

KIT CH

K

OR

LV UR L -1 TY 20 A 0 R M D M

RE CE PT IO N

UP RC H

PO

50

+7

TR Y

RA R

WN

DO

L

CO OF UN FIC SE E LL IN

W

Y

-2000MM

H

SECONDARY/VILLAGER'S ENTRY RA LO MP W ER TO LE VE

RC

TR

L

LV

EN

LIB

1

SH

PO

EN

C CE OM NT PU RE TE R

OAT

4

TR Y

MA TO LE ILE T

VIEWING DECK

UP

EN

EA

SE EX MI HIB OP IT EN IO N AR

TO EN W DO TR AR W Y DS N BA CK

M

RO O

19

N

AT IO

+0.0MM

P

1

RC H

TIN G

EE

M

E

FE TO MAL IL ET

AR

EP

50

O

P

O

M

M

PO

M TO ALE IL ET

PR

L

SH

SH

50

Y

FE TO MA ILE LE T

-2000MM

+7

PW TO D ILE T

-2000MM

UP

PARKING W

R U AM PP P ER TO LE VE L

L

EN TR

LV

W N

10

Y

9

TR

CO

3

DO

OL

12

E

DO W

4

IC

E

11

FF

ST ON

JO B

5

UP

O

EN

M

GR E

10

15

PA N

+0.0MM

9

5

AL E TO IL ET

UP

8

3 14

R'S

-3800MM 7

13

2

BU CO ILD NS IN TR G UC TIO

SE AT IN G

FE

AL E

M

SP AC E

TO IL ET

IO PE N

15

SE M OR I O KS PE PA N CE

SE M

13

W

UP

4

O

PL AY

12

AD

DIS

11

-2000MM 10

6

9

7

HE

L

8

DIR OF E FIC CT E

AT E

M

RIA

UP 2

5

RAINWATER HARVESTING TANK

DO

UP

M HA ULT LL IP (2 UR 5x PO 18 S M E )

GROUND FLOOR PLAN

+6000MM

SOLAR PANEL INSTALLATION AREA

+2000MM

W OR KS PA CE

S RO TOR OM E

S

N

+0.0MM

S LO KILL UN M GE AN 'S

SE W MI OR O KS PE PA N CE

TO

TO RO OL OM

S RO TOR OM E

PO TT ER

+4 M

M

Y

UP W W OO OR DE K N

SE W MI OR O KS PE PA N CE

12

N

+0.0MM

GAZEBO

-2000MM

-5000MM

STAGE

1

-2000MM

+0.0MM

SEMI OPEN EXHIBITION AREA

+0.0MM

+2000MM

6

7

8

14

16

18 18

19


PRODUCED BY AN AUTODESK SITE SECTIONS

SOLAR SHADED CAR PARKING

ROUNDABOUT AT ENTRANCE

PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

SECTION AA’

PRODUCED BY AN AUTODESK STUDENT VERSION ENTRANCE GATE

WATER COOLER

SEMI OPEN SEATING

SEMI OPEN SEATING

PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

SECTION BB’

This longitudinal section cuts through what is envisioned to be the main central axis pathway, connecting the main entrance to sub arterial pathways of the site. This section gives a idea about the landscape and semi open spaces around the site.

ED BY AN AUTODESK STUDENT VERSION

RETAININ

SECTION CC’


K STUDENT VERSION PRODUCED BY AN AUTODESK STUDENT VERSION

This transverse section cutting primarily through the parking area and central axis pathway gives a sense of space and contour difference between the admin block and exhibition block.

Semi open seatings have been provided outside every blocks to create waiting or recreational spaces for visitors and also to connect with the surroundings as much as to inside.

ON

SKILL MAN’S LOUNGE

PRODUCED BY AN AUTODESK STUD

PRODU

NG WALL

This transverse section cutting through the library and counselling building gives a sense of volume between the buildings and shows level difference. It also highlights the retaining wall used with the planters to give a visual and aesthetic feel to the visitors.


COMMUNITY SERVICES/ MULTIPURPOSE HALL

KITCHEN

STORAGE

2

1

4

3

5

6

7

8

9

10

11

12

13

14

15

16

17

MULTIPURPOSE HALL (25x18M)

19

UP

18

PREPARATION AREA

UP MALE TOILET

FEMALE TOILET

PRODUCED BY AN AUTODESK STUDENT VERSION UP

GROUND FLOOR PLAN

KITCHEN CAFETARIA

DOWN

PRODUCED BY AN AUTODESK STUDENT VERSION BOOK SHELVES

FOOTWEAR KEEPING AREA

PRAYER HALL (110 Sq. M) ABLUTION AREA

FIRST FLOOR PLAN

ACTIVITY MAPPING OF MULTIPURPOSE HALL

PRODUCED BY AN AUTODESK STUDENT VERSION DURING RELIGIOUS GATHERINGS/DISASTER


SOLAR SHADING DEVICE

RECREATIONAL STAIRS

BRICK JAALI WALL AT PRAYER HALL

PRODUCED BY AN AUTODESK STUDENT VERSION

SOLAR PANELS

+6300mm Terrace Level

PRAYER HALL

+3300mm First Floor Level MULTIPURPOSE HALL

MALE TOILET

FEMALE TOILET

STAIRS

+300mm Plinth Level ±0 Ground Level

SECTION AA’

PRODUCED BY AN AUTODESK STUDENT VERSION DURING SOCIAL EVENTS

DURING SKILL TRAINING/ WORKSHOPS

PRODUCED BY AN AUTODESK STUDENT VERSION

SIDE ELEVATION


SKILL TRAINING BLOCK

VILLAGE NEWSPAPER STUDIO

AUTO COMPONENTS SEMI OPEN WORK AREA

UP 6

5

4

7

3

2

1

8 9 10

COURTYARD

11 13

14

15

16

17

18

19

12

ENTRY PORCH LVL +300 MM

UP LVL +00 MM

LVL +00 MM SEMI OPEN WORK AREA

SEMI OPEN WORK AREA

SEMI OPEN WORK AREA

STORE ROOM

STORE ROOM

STORE ROOM

HANDICRAFTS

SEMI OPEN WORK AREA

PRODUCED BY AN AUTODESK STUDENT VERSION WELDING ROOM

MACHINERY

METAL

PRODUCED BY AN AUTODESK STUDENT VERSION

STORE ROOM

SEMI OPEN WORK AREA

SEMI OPEN WORK AREA

BLOCK 1 - GROUND FLOOR PLAN

PRODUCED BY AN AUTODESK STUDENT VERSION OPEN TERRACE LVL +3150 MM

MEETING ROOM

LVL +3150 MM

DOWN

CHIEF TRAINING INSPECTOR DOCUMENTATION ROOM

PRODUCED BY AN AUTODESK STUDENT VERSION

TRAINER'S STAFF ROOM

BALCONY

BLOCK 1 - FIRST FLOOR PLAN

GEM & JEWELLERY

PRODUCED BY AN AUTODESK STUDENT VERSION

STORE ROOM

BOX WINDOW DETAIL 600mm Thick Rammed earth wall

RCC SLAB BOX OUT

100mm Stone Bond Beam IN 1500mm High Window

725mm High Sill Level


SEMI OPEN WORKSPACE

GREEN JOBS

STORE ROOM

SEMI OPEN WORKSPACE

TOOL ROOM

PRODUCED BY AN AUTODESK STUDENT VERSION MATERIAL DISPLAY

BUILDING CONSTRUCTION

COURTYARD

SKILL MAN'S LOUNGE

TOOL ROOM

STORE ROOM

COURTYARD SEMI OPEN WORKSPACE

POTTERY

SEMI OPEN WORKSPACE

STONE WORK WOODEN WORK TOOL ROOM

ENTRY PORCH LVL +450 MM

UP

BLOCK 2 - GROUND FLOOR PLAN

LVL +00 MM

PRODUCED BY AN AUTODESK STUDENT VERSION PRODUCED BY AN AUTODESK STUDENT VERSION

+7500mm Vault Roof Level

+5700mm First Floor Vault Beam Bottom Level MEETING ROOM

CHIEF TRAINING INSPECTOR OFFICE

GEM & JEWELLERY SKILL AREA

STORAGE

±3300mm Ground Floor Roof Level HANDICRAFTS SKILL AREA

STORAGE

VILLAGE NEWSPAPER STUDIO

+300mm Plinth Level 00mm Ground Level

SECTION AA’’

+7500mm Vault Roof Level

+5700mm First Floor Vault Beam Bottom Level OPEN TERRACE AREA

+4690mm Parapet Level

DOCUMENTATION ROOM

GEM & JEWELLERY SKILL AREA

+3300mm Ground Floor Roof Level VILLAGE NEWSPAPER STUDIO

100mm Stone Bond Beam STORAGE

+300mm Plinth Level 00mm Ground Level

PRODUCED BY AN AUTODESK STUDENT VERSION

SECTION BB’’

MACHINERY SKILL AREA

PRODUCED BY AN AUTODESK STUDENT VERSION

SEMI OPEN WORKSPACE


PRODUCED BY AN AUTODESK STUDENT VERSION PRODUCED BY AN AUTODESK STUDENT VERSION

7

6

5

4

8 9 11 12 13 14 15

8 9 10 11 12 13 14 15

OPEN CLASSROOM

3

LVL +00 MM

2

DOWN

1

PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

7

6

5

4

3

2

1

LVL +00 MM

UP

10

LIBRARY & COMPUTER BLOCK

LVL +00 MM

COMMON GATHERING SPACE

PRODUCED BY AN AUTODESK STUDENT VERSION LIBRARY

COMPUTER CENTRE

RECEPTION

MEDICAL ROOM

ENTRY PORCH LVL +750 MM

LOWER FLOOR PLAN

PRODUCED BY AN AUTODESK STUDENT VERSION

UPPER FLOOR PLAN

LVL +00 MM

UP

+8250mm Mumty Level

PRODUCED BY AN AUTODESK STUDENT VERSION +7390mm Parapet Level

PRODUCED BY AN AUTODESK STUDENT VERSION LIBRARY

LIBRARY

CORE i7

CORE i7

CORE i7

CORE i7

COMPUTER CENTRE

CORE i7

+6050mm Terrace Level

+2850mm First floor Level

COMMON GATHERING SPACE

OPEN CLASSROOM

+00mm Ground Level

SECTION AA’

+8250mm Mumty Level +7390mm Parapet Level

+6050mm Terrace Level

COMPUTER CENTRE

LIBRARY

+2850mm First floor Level

PRODUCED BY AN AUTODESK STUDENT VERSION OPEN CLASSROOM

+00mm Ground Level

SECTION BB’

COMMON GATHERING SPACE


SKILL TRAINING BLOCK 2 - FRONT ELEVATION

SKILL TRAINING BLOCK 1 - SIDE ELEVATION

LIBRARY & COMPUTER CENTRE- SIDE ELEVATION


04

Jaleb Chowk - Designing a Public Square Site - Jaleb Chowk, Jaipur, Rajasthan


Humans have a natural instinct to look for environment that safeguard them and provide them with a sense of security, safety psychological and physiological comfort This project was aimed to provide a space in this congested urban fabric that aids in stress relieving, by providing the people - a 3rd place' a place between home and work in the middle of Walled City of Jaipur, where people can come and relax and take a pause, and BREATHE. Jaleb Chowk marks the entrance to the City Palace, Jantar Mantar and Govind Dev Ji Temple and was historically used as a parade ground. Jaleb chowk offers varied type of activities in and around the site making it an important Transitional space.


What makes a successful URBAN SQUARE ? Diversity

Adaptability

A place with variety Mixed use space

A place that can change easily.

• • • •

• • • • •

A mix of compatible uses Variety of layout and building form Diverse communities and cultures Variety of architectural styles

Legibility A place that has a clear image and is easy to understand.

Flexible uses Possibilities for gradual change Buildings and areas adaptable to a variety of present and future uses Reuse of important historic buildings

• • • • •

Landmarks and focal points Clear and easily navigable routes Gateways to particular areas Lighting Signage and way finding

Ease of movement

Quality of Public Realm

A place that is easy to get to A place that is easy to move through

A place with public spaces and routes that are lively and pleasant to use.

• Spaces connected into well-used routes • Easy accessibility • Direct routes that lead to where people want to go

• A choice of safe, high quality routes

• • • • •

A feeling of safety and security Carefully detailed Suited to the needs of everyone Well-designed lighting and street furniture Attractive and robust planting

ACTIVITY MAPPING

Site Dimensions : 187M X 196M Area of site : 36652 Sq. M Existing Ground coverage : 26 % Ground Coverage Area : 9557 Sq.M Existing Open Area : 27095 Sq.M


How Public Squares should be like ? Urban Square is the acculturation and humanisation of its inhabitants and for these purposes public spaces are the essential tools in the city.

Public squares provide citizens with places for various leisure outdoor activities.

People of the city can relax, sit, read a book, play games, meet with friends etc. in these public areas.

Well-designed public squares increase the visual landscape value and contribute to environmental aesthetics.

Opportunities at Jaleb Chowk as a Public Square Opportunities to Walk Organising vehicular traffic and spaces for various activities would contribute towards better

Opportunities to See

Opportunities to Stand/Stay To establish a clear relation between private shops and public spaces by clear definition of spaces for pedestrians to

Opportunities to Talk & Listen

Noise levels in the Chowk need to be Project heritage quality of the place by reduced in order to create a place that enhancing view of historic axis and unhindered visibility of the monuments. meets permissible noise-level standards.

Opportunities to Sit/Shade To provide provisions for seating at appropriate locations by better organisation of space.

Opportunities to Enjoy the scale The human scale of public spaces needs to be preserved and presence of

Opportunities for Variety of activities

To provide space for every age group and community with various cultural and

Enjoyment of Positive Sensory Experiences Provisions for better management of waste is essential elevate positive senses


SITE PLAN Seating Irregular seatings are provided in food zone interpreting with existing trees on the site creating shade for the sitting and giving people an opportunity to sit in group and interact.

Ramp Circular ramps with exits on the ground floor from drop-off zone in parking is going towards the upward direction with a tree in the middle acting as a shading device & allowing partial natural light to enlighten basement.

Kiosk Multi Utility kiosks are provided at the periphery of central pathway keeping them separated from the public space and also keeping them close to all the other amenities.

Section through Kiosk

1) ENTRANCE FROM HAWA MAHAL ROAD 2) PERMEABLE PEDESTRIAN PATHWAY 3) CYCLE TRACK 4) PEDESTRIAN PATHWAY 5) RAMP TOWARDS PARKING 6) CYCLE STAND 7) RAMP UPWARDS 8) KIOSK 9) DRINKING WATER 10) RAMP COMING UPWARDS 11) ENTRANCE FROM HAWA MAHAL ROAD 12) GREEN LAWN 13) SHADED SITTING 14) RAMP FROM BASEMENT TO JANTAR MANTAR

15) FOUNTAIN 16) COVERED WORKSH 17) SKYLIGHT TO BASE 18) OPEN WORKSHOP 19) STAGE 20) STAIRS COMING DO 21) LANDING 22) KIDS PLAY AREA 23) SITTING WITH PER 24) OUTDOOR SITTING 25) INDOOR FOOD ZON 26) EXIT TO GOVIND D 27) EXIT TO CITY PALA 28) EXIT TO JANTAR M


Cycle Stand Creating awareness about eco friendly transportation, cycling stands are kept at the entrance of the site encouraging people to use cycle for travelling in and around old city of Jaipur.

Section through Cycle stand

Movement across site An additional Pedestrian pathway of width 3m has been provided along the existing built structure and on both the sides of the cycle track to provide easy and free movement across the site.

HOP AREA EMENT WITH SITTING P AREA

OWN

RGOLA G NE SEATING EV JI TEMPLE ACE MANTAR

Section through pathway OFFICIAL & EDUCATIONAL SHOPPING FOOD RECREATIONAL


05

Sustainable Primary School Site - Pakyong, Sikkim


The educational project was an on-going project in the studio. Client being a story teller & Journalist was very clear with his vision, he wanted a Sustainable Kindergarten & Primary School for the neighbouring kids. The client was reluctant to use any commercial building materials and therefore the aim was to use only sustainable materials and construction techniques. The School consists of a Administration block, Kindergarten block, Classrooms, Library, Computer Room, Staff Room and an Amphitheatre.


PRODUCED BY AN AU

TODESK STUDENT V ERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

Kindergarten Block The Kindergarten block was the first one to be made at the site with all the locally sourced earth for rammed earth walls and bamboo for roofing. 3 4 2 5

1

F.F - RUBBERIZED FLOO RING

R DOO ING SLID

SLID ING D OOR

ELEVATION

TUDENT VERSION

FLOOR PLAN


Purlin GSI Sheet

PRODUCED BY AN AUTODESK STUDENT VERSION

Bamboo Rafter

6228

B 103

858

550

1417

D

223

887

A

RCC Beam

220 PRODUCED BY AN AUTODESK 280 STUDENT VERSION 230 150 60

3272

139°

300

6mm Metal Base Plate

RCC Drain

380 450

600

337

287

PRODUCED BY AN AUTODESK STUDENT VERSION

Metal Strip

720

100

PRODUCED BY AN AUTODESK STUDENT VERSION

Bamboo Rafter

PRODUCED BY AN AUTODESK STUDENT VERSION

Purlin

PRODUCED BY AN AUTODESK STUDENT VERSION

BAMBOO ROOF SECTION

50

75

456

220

6mm MS Gusset Plate

300 50

220

60

80 150

182 436

CED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

50

220

BY AN AUTODESK STUDENT VERSION c PRODUCED Rammed Earth

GCI Sheet

UCED BY AN AUTODESK STUDENT VERSION

Roof Details

6mm MS Gusset Plate

6mm Metal Base Plate

PRODUCED BY AN AUTODESK STUDENT VERSION PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

DUCED BY AN AUTODESK STUDENT VERSION


PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION F

D

E

F

G

H

A

C

F.F - VETRIFIED TILES W.F - RAMMED EARTH

F.F - VETRIFIED TILES W.F - RAMMED EARTH

CLASS ROOM

PRODUCED BY AN AUTODESK STUDENT VERSION

CLASS ROOM

I

PRODUCED BY AN AUTODESK STUDENT VERSION PRODUCED BY AN AUTODESK STUDENT VERSION

J

K

Staff Room & Classroom Block

K

50 MM BAMBOO STRUTS

75 MM WOODEN FRAMED WINDOW

RAMMED EARTH WALL

BAMBOO REINFORCEMENT COLUMN

ELEVATION OF CLASS ROOM BLOCK

B

A

A

2

1

PRODUCED BY AN AUTODESK STUDENT VERSION F

K

CLASSROOM GROUND FLOOR PLAN K

PRODUCED BY AN AUTODESK STUDENT VERSION 75 MM WOODEN FRAMED WINDOW

RAMMED EARTH WALL

RAILING FOR PATHWAY

PATHWAY

1 BAMBOO RAFTER PURLIN

2

GSI Sheet 600 MM WIDE DRAINAGE

75 MM WOODEN FRAMED WINDOW

CLASSROOM

10 MM THICK GLASS

900 MM HIGH RAILING

50 MM FLOORING 100 MM X 150 MM HOLLOW MS SECTION

CLASSROOM CUPBOARD

900 MM HIGH RAILING

RETAINING WALL STAIRS FOR UPPER CLASS

CLASSROOM FIRST FLOOR PLAN

PRODUCED BY AN AUTODESK STUDENT VERSION

2

1

A

PRODUCED BY AN AUTODESK STUDENT VERSION

F

TRANSVERSE SECTION THROUGH CLASS ROOM BLOCK

F.F - VETRIFIED TILES W.F - RAMMED EARTH

F.F - VETRIFIED TILES W.F - RAMMED EARTH

CLASS ROOM

CLASSROOM

PRODUCED BY AN AUTODESK STUDENT VERSION

CLASS ROOM

PRODUCED BY AN AUTODESK STUDENT VERSION CLASSROOM

PRODUCED BY AN AUTODESK STUDENT VERSION

50 MM FLOORING 100 MM X 150 MM HOLLOW MS SECTION

SECTION THROUGH CLASS ROOM BLOCK


STAFF ROOM F.F - VETRIFIED TILES W.F - RAMMED EARTH WALL

PRODUCED BY AN AUTODESK STUDENT VERSION

1

A

B

C

D

E

PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

2

PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

2

CLASS ROOM F.F - VETRIFIED TILES W.F - RAMMED EARTH WALL

PRODUCED BY AN AUTODESK STUDENT VERSION

1

A

F

BAMBOO RAFTER PURLIN GSI Sheet 600 MM WIDE DRAINAGE

75 MM WOODEN FRAMED WINDOW 10 MM THICK GLASS

CLASSROOM 50 MM FLOORING 100 MM X 150 MM HOLLOW MS SECTION 4" thk. PCC 1:2:4 4" thk. Stone soling

PATHWAY

SLOPED BERM

STAFF ROOM

Rammed earth 4" thk. PCC 1:2:4

RAMMED EARTH WALL

PRODUCED BY AN AUTODESK STUDENT VERSION 4" thk. PCC 1:2:4 4" thk. Stone soling

PATHWAY Rammed earth

Rammed earth

4" thk. PCC 1:2:4

SECTION THROUGH STAFF ROOM BLOCK

2

CLASSROOM FLOOR PLAN

1

50 MM BAMBOO STRUTS

75 MM WOODEN FRAMED WINDOW

PRODUCED BY AN AUTODESK STUDENT VERSION

1

PRODUCED BY AN AUTODESK STUDENT VERSION

2

PRODUCED BY AN AUTODESK STUDENT VERSION

STAFF ROOM FLOOR PLAN

F

RAMMED EARTH WALL 100 MM STEEL SECTION BAMBOO REINFORCEMENT COLUMN

ELEVATION OF STAFF ROOM BLOCK


Pergola Details

571 571 571

3547

External Support 2455 2769

300mm High Concrete Pedestal

300

25mm Thick DPC

PATHWAY 1800 wide 300

Drain with Grating

300 300

1800

300

500

100 100

100

100 500

100mm thk P.C.C base

SECTION X-X'

300

25mm Thick DPC

300 300

1800

ain Dr 555 5048 555

100

PRODUCED BY AN AUTODESK STUDENT VERSION 100

500

100mm thk P.C.C base

555 555

555

555

2843

Bamboo struts

555

623

5600

2843

300

500

100 100

KINDERGARTEN LAWN

PATHWAY 1800 wide 300

Drain with Grating

Playground Slope

555

PRODUCED BY AN AUTODESK STUDENT VERSION

300mm High Concrete Pedestal

Drain with Grating

555

Dr ain

Bamboo Column

Purlin

555

555 5736 555

PLAYGROUND X'

2293

External Support

555

Drain

50mm Bamboo Rafter

Metal Strip(130 x 180)mm

ain

PRODUCED BY AN AUTODESK STUDENT VERSION

555 2222

Dr

183

Drain

Bolt

150

PRODUCED BY AN AUTODESK STUDENT VERSION

Bamboo Purlin

Drain

600 600

4444

555

623

Drain

50 50

571

Drain

600

X

25

2700

Drain

PRODUCED BY AN AUTODESK STUDENT VERSION

150 600

2222

555

553

PERGOLA PATHWAY PLAN

RODUCED BY AN AUTODESK STUDENT VERSION PRODUCED BY AN AUTODESK STUDENT VERSION


06

Recreational Garden Site - Gangtok, Sikkim


The Recreational project was aimed at designing a recreational space for the tourists and people of city, Gangtok, to have a rejuvenating time in the lapse of nature. Site location being in the middle of forest and green mountains gave inspiration to provide a environmental friendly and homely experience to the visitors. The project consisted of a Restaurant, Bar, Duck Pond, Viewing Deck, Chicken House, Greenhouse, Kids Playing Area.


Restaurant & Bar A

B

C

13'-11"

13'-11"

W4 8'

3'-1"

11'-6"

10 4'

19'-11"

F.F - W.P.C FLOORING W.F - 3' HIGH WOODEN RAILING

6'

13'-11" W2

13'-2" BAR

8'-2"

KITCHEN

5'

14'-8"BAR COUNTER

8' 15'-5"

5'-6" D3 3' 1'

12'-11"

UP

D2 2' 2'-6" 5'-2"

1'-6"

1

D4 13'-8"

43'-6"

4'

W5

5'-10"

2

X

X' 57'-4"14'-8"

44'

PRODUCED BY AN AUTODESK STUDENT VERSION F.F - VETRIFIED TILES W.F - CEMENT PUTTY WITH 2 COATS OF PRIMER & WASABLE DISTEMPER

1' W1 26'-8"

DINING AREA

D4

14'-8" 13'-8" 27'-4" W4

5mm TOUGHENED GLASS

4'-8" 1'

W4

D1

8'-11"

F.F - W.P.C FLOORING W.F - 3' HIGH WOODEN RAILING

8'-11"

9'

35'-8"

14'-8" 1' DRAINAGE

4

27'-10"

D3

3'

6'-8" 6'-4"

3' HIGH WALL

2'

3'-10"

1 6'

13'-11"

F.F - WOODEN FLOORING W.F - CEMENT PUTTY WITH 2 COATS OF PRIMER & WASABLE DISTEMPER

14'-8"

14'-8"

18'-11"

2

19'-11" X' 57'-4"14'-8" WATER LEVEL - 2'

3

PRODUCED BY AN A 14'-8"

4

6'

9'

14'-11"

1'

3

10 9 8 7 6 5 4 3 2 1 1' 1' 1' 1' 1' 1' 1' 1' 1' 1' UP

4'-6" 1'

21'-8"

14'-8"

11 4'

LANDING

1'

2" D2 2'-6"

V1

10" 5'-4"

6'

TOILET F.F - ANTI SKID FLOOR TILES W.F - WHITE CERAMIC TILES

4'-2"

TREAD = 1' RISER = 6" No of R's = 20

UP

10'-5"

4'-6"

19'-11"

W3

8' SERVICE COUNTER

6'-11"

20 19 18 17 16 15 14 13 12 1' 1' 1' 1' 1' 1' 1' 1' 1'

5'-6"

W4

X

WIDTH OF STAIRCASE

4' 20'-3"

3'-3"

F.F - VETRIFIED TILES W.F - CEMENT PUTTY WITH 2 COATS OF PRIMER & WASABLE DISTEMPER

1'-8" 1'-1" 1'-6" V1

11 12 13 14 15 16 17 18 19 20 1' 1' 1' 1' 1' 1' 1' 1' 1' 1'

PRODUCED BY AN AUTODESK STUDENT VERSION

6'-6"

13'-11"

M.S RAILING 900 MM HIGH

LANDING

13'-5"

C

13'-11"

PRODUCED BY AN AUTODESK STUDENT VERSION

1 2 3 4 5 6 7 8 9 1' 1' 1' 1' 1' 1' 1' 1' 1' DOWN 1'-6"

B

M.S RAILING 900 MM HIGH

TREAD = 1' RISER = 6" No of R's = 20

1' 3' D3 5'

A

24'

1' 1'

16'-3"

40'-2"

40'-2"

RESTAURANT LOWER FLOOR PLAN

PRODUCED BY AN AUTODESK STUDENT VERSION 16'-7"

D4

D4

W3

6'-4" 3'

6'-5"

13'-8"

6' 12'-8" 11"

RESTAURANT SIDE ELEVATION

4'

12'-8"

12'-8"

A

B

RODUCED BY AN AUTODESK STUDENT VERSION

6'-1"

8'-5"

PRODUCED BY AN AUTODESK STUDENT VERSION

30'-8"

8"

PRODUCED BY AN AUTODESK STUDENT VERSION

RESTAURANT UPPER FLOOR PLAN

6"

1'

4'-10"

SINGLE ROOFING- DECAR

6" WOODEN FRAME FOR GLASS TOILET DOOR GLASS PANELS 3' HIGH BAMBOO RAILING

10'-1"

12'-10" 15'-9"

2'-6" D2 6'-4"

6" 3'-8" W4

3'-8"

6'-10" D1

23'-11"

12

RESTAURANT FRONT ELEVATION


PRODUCED BY AN AUTODESK STUDENT VERS

1'-6"

Entrance Gate 1'-3"

2'-11" 2'

Guard room STUDENT VERSION PRODUCED BY AN AUTODESK

2'

Ticket counter Raised Planter

urn planter

Ridge line

Purlins

1'-8" 2"

2'-321"

1'

12'-9"

6'-4" 3'

8'-11" 9'

9'-11"

PRODUCED BY AN AUTODESK STUDENT VERSION

25'-6"

3'-8"

B

4'-3"

6'-5" 4'-11" 1" 4'-10"

6" 1'-7"

2'-2"

PRECOATED SINGLE ROOFING PURLIN 2" X 2"

STRUT 4" X 4" RAFTER 6" X 4"

3'

RESTRO LOUNGE

BAR COUNTER

TOILET

7' 3'-8"

LOUNGE FACING WATER BODY

PRODUCED BY AN AUTODESK STUDENT VERSION 25'-2"

C

PRODUCED BY AN AUTODESK STUDENT VERSION

3'-8" W4

Recessed light fixture urn with plants

A

8'-5"

PRODUCED BY AN AUTODESK STUDENT VERSION

1'-2"

Stone cladding

PRODUCED BY AN AUTODESK STUDENT VERSION

0"

Raised Planter

2'-10"

Granite coping

1'

4'

urn planter

C

Grill gate

Ticket counter

1'-4"

9'

Niche for sculpture

11"

6'-4"

3"

2"

3"

Beam with wooden cladding

1'-2"

2'-5"

3'-4"

6"

1'-8" Niche

7"

waterproofing plywood

6"

Wooden Brackets Guard room

3"

1'-3"

plywood soffit

Glass

1'-3"

king post Sloping roof with shingles

6"

8" 3"

1'

3" 1'-5"

6"

wooden rafter 8" Thick wooden rafter

1'

8"

wood Stone cladding

X

6"

1'-9"

8"

4"

1'

7"

6"

1'

2"

5'-11"

4"

3"

column

Ridgeline

4" x 2.5" Waterproofing PRODUCED BY AN AUTODESK STUDENT VERSION wooden rafters sheet Decorative eaves

3"

8"

3'-5" 17'

6'

PRODUCED BY AN AUTODESK STUDENT VERSION

6"

Sloping roof with shingles

4'-4"

PRODUCED BY AN AUTODESK STUDENT VERSION

2'-6"

Recessed light fixture

X

3"

Niche

2' 1'-6"

5'

2'

PLANTER BED

1'

3'-10"

D1

5'

AUTODESK STUDENT VERSION

2'-6"

12'-10" 2'-6"

1'-7"

D1

6'-9"

Niche

3'-10"

R.C.C. wall with stone cladding Niche

SECTION XX’

3'

SERVICE STAIRS 3' HIGH STONE WALL 3' HIGH GLASS RAILING

4'-10"

DRESS STONE WALL


Landscape Sections

1" thk. stone flooring laid 4" thk. PCC 1:2:4 drain with grating slope

4"

1"

4" thk. Stone soling +98 LVL

Sloped berm

11"

1'

Rammed earth 1.5" thk granite coping Brick masonry Seatings 1" thk. stone flooring +98 LVL

9"

D.P.C/Base course Half Brick wall 4" thk. PCC 1:2:4

drain with grating

Gazebo

1" thk. stone coping

PRODUCED BY AN AUTODESK STUDENT VERSION SECTION THROUGH PATHWAY 1" thk. stone flooring

10"

4"

drain with grating

Planting soil

4" thk. PCC 1:2:4 Rammed earth

5"

10"

9"

4"

4"

4"

4"

4" thk. PCC 1:2:4 Rammed earth

9"

4"

Lawn Planting soil Rammed earth

RESTAURANT BLOCK

FLOWING WATER FROM UPPER POND

Restaurant Decorative railing with climbers

6"

4" thk. PCC 1:2:4 4" thk. Stone soling

2' 4"

1'-5"

6"

9"

4"

4"

Brick masonry 4" thk. PCC bed

1'

gap

Rammed earth

FFL

Water level

Planting soil Rammed earth

Traps

Traps

DUCK POND

DUCK POND

Slope

Slope

Slope

Rammed earth

R.C.C pond as per str. 4" thk. PCC bed Rammed earth

Drain with grating 1.5" thk granite coping Brick masonry

1" thk. stone flooring 4" thk. PCC 1:2:4 8" thk. Stone soling

Stone masonry toe wall

consolidated earth

polished granite Seatings Brick masonry

6"

6'-0"

Planting soil

9"

9"

Seatings

Brick masonry

Lawn

2" thick. D.P.C/Base course

PRODUCED BY AN AUTODESK STUDENT VERSION 4"

4"

4" Planting soil

4"

4" thk. PCC 1:2:4 4" thk. Stone soling

4" thk. PCC 1:2:4 4" thk. Stone soling consolidated earth

AMPHITHEATRE SECTION

4"

4"

4"

4"

4"

4"

4"

Water level

Slope

R.C.C pond as per str. 4" thk. PCC bed

SECTION THROUGH DUCK POND

1'

Rip Rap embankment

Rip Rap embankment

3'-10"

Sloped berm

River washed stone

Lower deck

4" high kerbstone

1'-6"

1" thk. stone flooring Patio

2'

stepping stone with grass joints

4"

Gazebo refer detail

consolidated earth

4" thk. PCC 1:2:4 4" thk. Stone soling

Brick masonry 4" thk. PCC bed Rammed earth


07

DISSERTATION

Permaculture - Regenerative Architecture AIM The goal of any design is to provide a solution to a problem. The problem permaculture addresses is the maximisation of human welfare achieved in a sustainable way. “The aim is to get information on systems that are Ecologically sound and Economically Viable”. Its purpose is to create living environments that are harmonious, sustainable and productive; while greatly reducing the work and energy required to maintain them. To ensure long-term survival in a way that does not make us all miserable.

OBJECTIVES •To foster a basic understanding that natural regeneration processes can be understood and worked with. •To explain that land is dynamic not static. •To clearly understand the principle "work with nature not against it”. •To identify the three main factors in sustainable systems (water, soil, diversity). •To know about set of techniques and principles for designing sustainable human settlements. •To develop observation skills, learn how nature responds to challenges and apply these ideas to human needs. •To determine to what extent permaculture resonates with the sustainable development concept.


Permaculture is a system of design that provides all the needs of humanity in a way that benefits the environment. Permaculture is the conscious design and maintenance of architecturally productive ecosystems which have the diversity, stability, and flexibility of natural ecosystems. It is the harmonious integration of landscape and people — providing them food, energy, shelter, and other material and non-material needs in a sustainable way.

Permaculture integrates land, resources, people and the environment through mutually beneficial synergies – imitating the no waste, closed loop systems seen in diverse natural systems. Permaculture studies and applies holistic solutions that are applicable in rural and urban contexts at any scale. It is a multidisciplinary toolbox including architecture, water harvesting and hydrology, energy, natural building, forestry, waste management, animal systems, agriculture, appropriate technology, economics and community development. The philosophy behind permaculture is one of working with, rather than against nature; of continued and thoughtful observation rather than extensive and thoughtless action; of looking at systems in all their functions, rather than asking only one yield of them; and allowing systems to demonstrate their own evolutions. As the basis of permaculture is beneficial design, it can be added to all other ethical training and skills, and has the potential of taking a place in all human endeavours. With its system of applied education, research and citizen-led design permaculture can be a popular web of global networks and developed into a global social movement. Permaculture uses observation of nature to create regenerative systems, and the place where this has been most visible has been on the landscape. There has been a growing awareness though that firstly, there is the need to pay more attention to the people’s ethic, as it is often the dynamics of people that can interfere with projects, and secondly that the principles of permaculture can be used as effectively to create vibrant, healthy and productive people and communities as they have been in landscapes.


08

PHOTOGRAPHY

Your Imagination through Visual Perspective

Gangtok, Sikkim

Auroville

Auroville

Paro, Bhutan

Kinnaur Valley, HP


Photography and Writing, for me is one of the best ways to capture the beauty around us and is a process of constantly examining. It breaks routines, makes ordinary things extraordinary by creating a different perspective of looking at things. A picture can be a beginning of a story or a dream and it helps in expressing things in a different language. Also being a travelling enthusiast and a writer by heart, I’ve been exploring different places, cultures, typologies and expressing my views about them through the photography. This section have collection of visuals from different corners of our vast country, India through my architectural student life.

Kalpa, Himachal Pradesh

Ahmedabad

Pushkar, Rajasthan

Pelling, Sikkim


THANK YOU

NAVEEN CHOUDHARY Ph. No. - 08130716149 Email Id : nc_naveen14@yahoo.com


Turn static files into dynamic content formats.

Create a flipbook
Architectural Portfolio by Naveen Choudhary - Issuu