Skip to main content

Spring 2023 OCC to Cal Poly

Page 1

Natasha Lam Orange Coast College EMPL ID: 026920081

STUDIO PROJECTS First Year ARCH A115 ARCH A205 ARCH A215

Architectural Design & Theory 1 Arch. Drawing & Design Visualization 2 Architectural Design & Theory 2

S22 S22 F21

p. 8-10 p. 11-12 p. 15-18

Environmental Design Systems Architectural Design & Theory 3

F21 F22

p. 1-7 p. 13-14

S22 W23 F22 S23 F22 Su22

p. 20 p. 21 p. 22 p. 23 p. 24 p. 25

Second Year ARCH A185 ARCH A230

AUXILIRARY PROJECTS 4 Pocket Knot Bag 3D Fabric Manipulation Site Plan Drawings Detail Drawings Furniture Solace


STUDIO PROJECTS


E. GLENDALE ST.

FIRELANE

Site and Systems Plan

Fall 2021


­ ­ ­ ­ ­ ­ ­ ­ ­ ­ ­ ­ ­ ­ ­ ­ ­ ­ ­

­ ­

­ ­ ­ ­ ­ ­ ­ ­

­ ­ ­ ­ ­

­ ­ ­ ­ ­ ­ ­ ­ ­ ­ ­ ­ ­ ­ ­

­ ­ ­ ­ ­ ­ ­ ­ ­ ­ ­ ­ ­ ­ ­ ­

Apartment Permaculture Courtyard Diagram

­ ­ ­ ­ ­ ­ ­ ­ ­ ­ ­ ­ ­ ­ ­ ­ ­ ­ ­

­ ­ ­ ­ ­ ­ ­ ­ ­ ­

­ ­ ­ ­ ­ ­ ­ ­


South Elevation

35’ - 0”

47’ - 0”

21’ - 0”

21’ - 0”

3 Bedroom Unit

24’ - 0”

21’ - 0”

2 Bedroom Unit

1 Bedroom Unit


Perspective Render


0 250’ 500’

1000’

2000’

Site Plan

Fall 2021

­ ­


¡

West Elevation

North Elevation


¢

­ ­ ­ ­ ­

Occulus Perspective Render

Perspective Render


PACIFIC COAST HIGHWAY

11TH STREET

Site Plan

­ ­


£

ROOM

ROOFTOP SPACE

LOBBY

BATHROOM

GENERAL STORE

GARAGE

Exploded Axonometric View


Perspective Render

¤


¥

Enlarged Program Plan

Batiquitos Lagoon, Carlsbad Site Plan

¤ Spring 2022


Coral Collage

North View Render

Collage Linework

Perspective Render

Collected Shapes


¤ Fall 2022


Section Cut

¥ ¥ ¦ ¥

Photo Voltaics in Roof Plan

Bike Rack and Charging Stations


­

Fall 2021


­ ¡

ADMINISTRATION OFFICE INDOOR AUDITORIUM

TICKETBOOTH ADMINISTRATION OFFICE

OUTDOOR AMPITHEATER OUTDOOR STAGE

RESTROOM CAFE

First Floor

CLASSROOM PODS

LIBRARY

Second Floor

Rooftop

Exploded Axonometric View


­ ¢

East Elevation

West Elevation

South Elevation

North Elevation


Perspective Render

­


AUXILIRARY PROJECTS


¤

0’ - 3”

2’ - 2”

1’ - 3”

0’ - 3”

(2) BASE

(2) STRAP 0 ’ - 6”

1’ - 0”

0’ - 9”

1’ - 0”

1’ - 0”

(2) POCKET

Project on Body at Design Village

(1) INTERIOR LINING

Pattern

­ Spring 2022


Materials

Boiled for 30 mins.

Tying up pattern

Preparation Compete

Dry and release

Final Sample

­ Winter 2023


Orange Coast College, Costa Mesa

College of the Desert, Palm Desert

¤

76 Gas Station, Riverside


­

Corrugated Metal Deck at Plaster, NTS

Gutter Detail at Masonry Veneer, NTS

Sill at Slab on Grade, NTS

Handrail at (E) Stair, NTS

­ ­ Spring 2023

­

Window Head/Transom Detail, NTS


5’ - 0”

¤ Fall 2022

5’ - 0”


§

¡ Summer 2022

Mesh Fabric

Foldable Structure


Turn static files into dynamic content formats.

Create a flipbook
Spring 2023 OCC to Cal Poly by Natasha Lam - Issuu