5 minute read

Consequences

Consequences Rain check

By Mike Conroy and Bob Dooley

t can happen in any port: Fish-

Iing boats geared up end up sitting at the dock waiting for the start of the season, whether it’s been called or not.

In January, many vessels participating in the West Coast commercial Dungeness crab shery were tied to the dock while the eet negotiated a price. Many of these vessels had their gear onboard for an extended period of time, since the shery was slated to open in mid-December after a delay for whale migration. They then held back when domoic acid reared its ugly head along part of the coast and a price negotiation, further postponing the shery well into January in the northern part of Oregon and most of Washington. In other years, the eet has been called to stand down while crab meat ll achieves a market standard.

Unfortunately, even when a boat is sitting at the dock a valve can fail, a pump can quit operating, or the EPIRB may stop operating. We o er these checklists to jump start a thorough self-inspection of your vessel, your safety equipment and your crew’s readiness as you prepare to embark on upcoming trips, especially after any kind of extended delay.

Vessel

• Bilge pumps, pumps for sh holds and especially for those vessels with live wells; • All of your alarm systems; • Deck or engine room cameras; • PA/intercom/other communication systems between the deck and wheelhouse; and • Lights — running, deck, safety, etc. • Verify the date of your last Coast Guard safety inspection to ensure the sticker hasn’t expired. • If you can access below-deck compartments: - Make sure you haven’t accumulated water in any voids. - All shafts and bearings are greased. - Check hoses for abrasions or cracks, and ensure hose clamps are secure. • Con rm that all gear is properly secured. Even the slightest easing of tension in your stack can have dire consequences. • Check ttings, connectors, etc.

Safety equipment

• All lifesaving equipment is where it should be and isn’t expired. • Raft is installed properly, EPIRB tested. • All ashlights are working and have extra batteries.

DURAMAX MARINE® TECHNOLOGY

Engineered To Work As Hard As You Do.

DryMax® Maintenance Free Shaft Seal System The Original Johnson Cutless®® Sleeve and Flange Bearings

DuraBlue® Composite Rudder Bushings, Thrust Washers & Wear Plates Custom Engineered Heat Exchange Systems

Duramax Marine® is an ISO 9001:2015 Certified Company

Crew readiness

• Perform safety drills before you leave. • Make sure each crew member knows where the following are located and used: life ring(s), re extinguishers, escape routes, PFDs, survival suits, life slings or other devices used to pull people out of the water, ares, rst aid kit, knives, radios, GPS, and any other lifesaving and emergency equipment onboard. • Clearly communicate and walk through your abandon-vessel procedures. • Consider adequate head protection to protect each crew member from ying buoys, swinging hooks, falling pots from the top of the stack, and the unforeseeable items that could come into contact with your head. There are a number of options that would seem ideal for the commercial shing industry — FirstWatch Gear, based on California is one such option. • Ensure each crew member can quickly put on a survival suit; and if your vessel requires use of a PFD while on deck, as we hope it does, make sure that is clearly communicated and understood.

In November, Chris Woodley — former chair of the Commercial Fishing Vessel Safety Advisory Committee — wrote in this column about the virtues of PFDs to safeguard against fatalities associated with falls overboard. Citing NIOSH, Woodley indicated that, “220 commercial shermen died after falling overboard from 2000 to 2016.” He also indicated that 30 percent of industry fatalities come from falls overboard. If one of those shermen had been wearing a PFD, and was then rescued, their family would have avoided the unimaginable grief of losing a spouse, parent or child.

This list is not meant to be exhaustive. You know your vessel and crew far better than we do. We hope this will serve as a prompt, and also generate conversations that will prepare you to ensure a safe return for all of you and your crews. Above all else, please use good judgment. If a particular action seems risky, there is no shame in waiting for safer conditions. The Coast Guard has a web-based app that can generate a more thorough checklist to help you prepare for a dockside exam. It is located at www. shsafewest.info/ checklist/generator.html.

We are depending on you to provide all of us with a sustainable source of protein. We hope all of you will be with your families at season’s end.

Mike Conroy is a commercial fi sherman and the executive director of the Pacifi c Coast Federation of Fishermen’s Associations. Bob Dooley is a retired commercial fi sherman, a member of the Pacifi c Fishery Management Council and a founding member of Seafood Harvesters of America.

Helping you make your hauls for 40 years!

Port Townsend Shipwrights

WESTEC CAN SUPPLY YOU!

Manufacturer of: Bowthrusters ∙ Power Blocks Fish Pumps & Fish Pumping Systems Hydraulic Pump Drives and Pursing Winches

We can also custom design and manufacture a wide variety of machinery, including: Fishing Winches, Specialty Purpose Winches and other Net Handling Equipment and Deck Machinery all carefully tailored to meet your specific requirements.

1514 Bay St. North Vancouver ∙ British Columbia, Canada V7J 1A1 Tel: (604) 988-1130 ∙ Fax: (604) 988-1173 info@westecequipment.com ∙ www.westecequipment.com