127 Paradise Pde Original Concept

Page 1

NOTE: TERMITE MANAGEMENT SYSTEM TO BE INSTALLED TO COMPLY WITH NCC PART 3.1.3 AND AS 3660.1 INCLUDING ALL PENETRATIONS AND COLD JOINTS AS APPLICABLE.

STORMWATER AND ON-SITE DRAINAGE DRAINAGE TO COMPLY WITH AS35OO AND THE NCC PARTS 3.1.2 & 3.5.2 9 PVC PIPES

TO SPACING BETWEEN DOWNPIPES MUST NOT BE MORE THAN 12 METRES, AS PER THE NCC VOLUME 2 PART 3.5.2

ROOF WATER TO BE CONTROLLED ON SITE & DIRECTED TO KERB & CHANNEL OR OTHER LAWFUL POINT OF DISCHARGE

MECHANICAL VENT TO BE PROVIDED WHERE REQUIRED TO COMPLY WITH N.C.C. CLASS 1 & 10 PART 2.4.5. & INSTALLED IN ACCORDANCE WITH A.S.1668.2

WC DOORS TO COMPLY WITH THE N.C.C., PART 3.8.3. DOOR TO SWING OUT FROM EDGE OF THE PAN, DISTANCE BETWEEN THE PAN & THE DOOR TO BE MIN 1200MM OR LIFT-OFF HINGES TO BE INSTALLED.

SMOKE ALARMS TO COMPLY WITH N.C.C. CLASS 1&10 PART 3.7.2 2016 & WITH A.S.3786-2014, AS1670.6. & SUBORDINATE LEGISLATION 2016 No.221 TO BE INTERCONNECTED WHERE THERE IS MORE THAN ONE ALARM

WATERPROOFING TO BE CARRIED OUT IN ACCORDANCE WITH THE N.C.C. VOL 2 PART 3.8.1 & INSTALLED BY A QUALIFIED PERSON

VENTILATION TO COMPLY WITH THE CURRENT NATIONAL CONSTRUCTION CODE VOLUME 2, PART 3.8.5. MECHANICAL VENTILATION, IF REQUIRED, MUST BE INSTALLED IN ACCORDANCE WITH AS1668.2.

NATURAL LIGHTING TO ALL HABITABLE ROOMS TO COMPLY WITH CURRENT NATIONAL CONSTRUCTION CODE COLUME 2, PART 3.8.4.

P P O O O O O O O O O O O O O O O O N PARADISEPARADE CANAL 39 5225 26273 141 122042355 298 08 55 36941 255° 25 30 7 4 7 232 5005 4458 PROPOSED RESIDENCE N Architecture, Development, Research www.slamoffice.com Scale Checked by Drawn by Date Project number Revision E. jordan@slamoffice.com M. +61 438 019 369 1 : 500 4/01/2022 11:56:06 AM LOCATION AND PROJECT DETAILS 21002 323 PARADISE PARADE, CALYPSO BAY DALTON GRIFFIN & BROOKE HAYWARD 04.01.2022 JM JM A000 No.Descriptionxx Sheet List Sheet NumberSheet NameCurrent RevisionCurrent Revision Date A000LOCATION AND PROJECT DETAILS A010SITE PLAN A099BASEMENT FLOOR PLAN A0100GROUND FLOOR PLAN A101LEVEL 01 PLAN A102ROOF PLAN A300NORTH & EAST ELEVATIONS A301SOUTH & WEST ELEVATIONS A400SECTION AA A401SECTION BB A1000FINISHES SCHEDULE LOT NUMBER: 323 REGISTERED PLAN NUMBER: SP287575 LOCALITY: JACOBS WELL LOCAL GOV: GCCC SITE AREA: 721 m2 PROPOSED SITE COVER: 32% SITE PARTICULARS
O O O O O O O PROPOSED RESIDENCE PARADISE PARADE CANAL 39 ° 52 ' 25 " 26 273 4141°12'20" 2355 298° 08' 55" 36 941 255°25'30 " 7497 232 ° 50 '05 " 4 458 POOL PLANTER PLANTER 2622 2549 2270 5116 6180 2000 12950 8359 6305 7480 FRONT YARD BACKYARD OUTDOOR DINING OUTDOOR ENTERTANING RAMP VISITOR PARKING Architecture, Development, Research www.slamoffice.com Scale Checked by Drawn by Date Project number Revision E. jordan@slamoffice.com M. +61 438 019 369 1 : 100 4/01/2022 11:56:56 AM SITE PLAN 21002 323 PARADISE PARADE, CALYPSO BAY DALTON GRIFFIN & BROOKE HAYWARD 04.01.2022 JM JM A010 No.Descriptionxx
UP A301 2 CAR 01CAR 02CAR 03 A300 1 A300 2 A301 1 1 A400 1 A401 39 ° 52 ' 25 " 26 273 4141°12'20" 2355 298° 08' 55" 36 941 CAR 04 CAR 05CAR 06 CAR 07CAR 08 10400 5600 5200 4400 15000 10200 200 200 200 200 BASEMENT GARAGE -150 AIRLOCK 1250 RAMP 1:81:4 -150 STRIP DRAIN SPOON DRAIN 300 300 300 300 2400 2400 400 2400 2400 5400 5400 5400 2400 2400 3000 2000 4200 ROLLER DOOR Architecture, Development, Research www.slamoffice.com Scale Checked by Drawn by Date Project number Revision E. jordan@slamoffice.com M. +61 438 019 369 1 : 50 4/01/2022 11:56:59 AM BASEMENT FLOOR PLAN 21002 323 PARADISE PARADE, CALYPSO BAY DALTON GRIFFIN & BROOKE HAYWARD 04.01.2022 JM JM A099 No.Descriptionxx
A301 2 GUEST BEDROOM ENSUITE ROBE VOID ENTRY HALL OFFICE COURTYARD A300 1 A300 2 A301 1 1 A400 1 A401 LAUNDRY PANTRY KITCHEN WC DESK 39 ° 52 ' 25 " 26 273 141°12'20" 298° 08' 55" VOID DESK LIVING ROOM DINING ENSUITE 1800 STAIR 4200 BED 3000 LIVING 5400 E N S U I T E 2387 ROB E 2173 5000 5000 DINING 3017 KITCHEN 3300 PANTRY 2930 LAUNDRY 3100 OFFICE 3400 LAU NDRY 2640 WC 1000 2612 1200 ENTRY 3162 3070 3070 3070 3070 3070 3070 MEDIA ROOM 4900 4700 3070 POOL 42355 36 941 1:8 1:4 RAMP FRONT YARD BACKYARD OUTDOOR DINING 3070 3070 OUTDOOR ENTERTANING 1500 PLANTER PLANTER CANAL Architecture, Development, Research www.slamoffice.com Scale Checked by Drawn by Date Project number Revision E. jordan@slamoffice.com M. +61 438 019 369 1 : 50 4/01/2022 11:57:08 AM GROUND FLOOR PLAN 21002 323 PARADISE PARADE, CALYPSO BAY DALTON GRIFFIN & BROOKE HAYWARD 04.01.2022 JM JM A0100 No.Descriptionxx
A301 2 A300 1 A300 2 A301 1 1 A400 1 A401 39 ° 52 ' 25 " 26 273 4141°12'20" 2355 298° 08' 55" 36 941 BEDROOM 02 ENSUITE ROBE DESK 6070 6070 ENSUITE ROBE DESK BEDROOM 01 6070 6070 VOID VOID VOID 6070 6070 ENSUITE 6070 ROBE MASTER BEDROOM VOID SEAT 6070 FAMILY ROOM 4200 3000 929 717 4700 5180 1400 3750 4400 4700 1800 2960 4200 2960 1800 Architecture, Development, Research www.slamoffice.com Scale Checked by Drawn by Date Project number Revision E. jordan@slamoffice.com M. +61 438 019 369 1 : 50 4/01/2022 11:57:12 AM LEVEL 01 PLAN 21002 323 PARADISE PARADE, CALYPSO BAY DALTON GRIFFIN & BROOKE HAYWARD 04.01.2022 JM JM A101 No.Descriptionxx
A301 2 A300 1 A300 2 A301 1 1 A400 1 A401 39 ° 52 ' 25 " 26 273 4141°12'20" 2355 298° 08' 55" 36 941 FALL 3.5 DEGREES FALL 3.5 DEGREES FALL 3.5 DEGREES FALL 3.5 DEGREES Architecture, Development, Research www.slamoffice.com Scale Checked by Drawn by Date Project number Revision E. jordan@slamoffice.com M. +61 438 019 369 1 : 50 4/01/2022 11:57:27 AM ROOF PLAN 21002 323 PARADISE PARADE, CALYPSO BAY DALTON GRIFFIN & BROOKE HAYWARD 04.01.2022 JM JM A102 No.Descriptionxx
GROUND FLOOR 3050 LEVEL 01 6050 ROOF 9050 A401 GROUND FLOOR 3050 LEVEL 01 6050 ROOF 9050 1 A400 PROPERTY BOUNDARY Architecture, Development, Research www.slamoffice.com Scale Checked by Drawn by Date Project number Revision E. jordan@slamoffice.com M. +61 438 019 369 1 : 50 4/01/2022 11:57:43 AM NORTH & EAST ELEVATIONS 21002 323 PARADISE PARADE, CALYPSO BAY DALTON GRIFFIN & BROOKE HAYWARD 04.01.2022 JM JM A300 No.Descriptionxx 1 : 50 NORTH ELEVATION 1 1 : 50 EAST ELEVATION 2
GROUND FLOOR 3050 LEVEL 01 6050 ROOF 9050 BASEMENT 150 A401 GROUND FLOOR 3050 LEVEL 01 6050 ROOF 9050 1 A400 PROPERTY BOUNDARY Architecture, Development, Research www.slamoffice.com Scale Checked by Drawn by Date Project number Revision E. jordan@slamoffice.com M. +61 438 019 369 1 : 50 4/01/2022 11:57:52 AM SOUTH & WEST ELEVATIONS 21002 323 PARADISE PARADE, CALYPSO BAY DALTON GRIFFIN & BROOKE HAYWARD 04.01.2022 JM JM A301 No.Descriptionxx 1 : 50 SOUTH ELEVATION 1 1 : 50 WEST ELEVATION 2
GROUND FLOOR 3050 LEVEL 01 6050 ROOF 9050 BASEMENT 150 A401 VOID ROBE MASTER BEDROOM LIVING HALL BASEMENT 600 2600 300 2700 400 2800 Architecture, Development, Research www.slamoffice.com Scale Checked by Drawn by Date Project number Revision E. jordan@slamoffice.com M. +61 438 019 369 1 : 50 4/01/2022 11:58:00 AM SECTION AA 21002 323 PARADISE PARADE, CALYPSO BAY DALTON GRIFFIN & BROOKE HAYWARD 04.01.2022 JM JM A400 No.Descriptionxx 1 : 50 SECTION AA 1
GROUND FLOOR 3050 LEVEL 01 6050 ROOF 9050 BASEMENT 150 1 A400 PROPERTY BOUNDARY BASEMENT OFFICE HALL FAMILY ROOM 600 2600 300 2700 400 2800 Architecture, Development, Research www.slamoffice.com Scale Checked by Drawn by Date Project number Revision E. jordan@slamoffice.com M. +61 438 019 369 1 : 50 4/01/2022 11:58:11 AM SECTION BB 21002 323 PARADISE PARADE, CALYPSO BAY DALTON GRIFFIN & BROOKE HAYWARD 04.01.2022 JM JM A401 No.Descriptionxx 1 : 50 SECTION BB 1