SOLAR DECATHLON INDIA 2020

Page 1

Table of contents 1. Team Summary 1 .1 1 .2 1 .3 1 .4 1 .5 1 .6 1 .7 1 .8

01

T ea m N a me I n stitu tion N am e Div ision A pp r oa ch Backg r ou n d F acu lty Lea d & f acul ty Advi sors T h e T eam I n du str y P a r tners

2. Project Summary

04

2 .1 I n tr odu ction 2 .2 P r oject P a r tners 2 .3 Descr iption of the proj ect 2 .4 E stimated total bui l t area 2 .5 T a r g et E n er g y Perf ormance Index 2 .6 P r elimin a r y E st i m ate of on- si t e renew abl e en er g y poten tia l 2 .7 P r elimin a r y constructi on bud get 2 .8 Sp ecial r equi rements of t he proj ect

3. Goals 4. Appendix A 5. Appendix B

06 07 12


List of tables & figures List of Tables

Tabl e Tabl e Tabl e Tabl e Tabl e Tabl e Tabl e Tabl e Tabl e Tabl e

1 : 2 : 3 : 4 : 5 : 6 : 7 : 8 : 9 : 10

Members of t h e t e a m Samarpan N e t - Z e r o G o a l s a n d St r a t e gi e s Wal l assembl i e s Roof assembl i e s Wi ndow ass e m bl i e s Case Stu di e s Maximum Plot Coverage, FAR and road widths Water consumption calculation Water consumption calculation : Water consumption calculation

01 07 08 08 08 11 12 13 13 13

List of Figures F igure 1 : Fac tors i n a Co st - Effe ct i v e De s i gn F igure 2 : E xpl oded I somet r i c v i e w o f wa l l a ss e m by o pt i o n s F igure 3 : E xpl oded I somet r i c v i e w o f r o o f a ss e m by o pt i o n s F igure 4 : I sometri c di agr a m s h o wi n g F A R, P l o t - co v e r a ge an d Road w i dth Opti on 1 F igure 5 : I sometri c di agr a m s h o wi n g F A R, P l o t - co v e r a ge an d Road w i dth Opti on 2 F igure 6 : I sometri c di agr a m s h o wi n g F A R, P l o t - co v e r a ge an d Road w i dth Opti on 3 F igure 7 : Graph showi ng wa t e r co n su m pt i o n F igure 8 : Graph showi ng H o u r l y Dr y Bu l b T e m pe r a t u r e F igure 9 : Graph showi ng H o u r l y W e t Bu l b T e m pe r a t u r e F igure 10 : Graph show i n g H o u r l y W e t Bu l b De pr e ss i o n F igure 11 : Graph show i n g Re l a t i v e H u m i di t y F igure 12 : Psy c hometri c C h a r t F igure 13 : Psy c hometri c C h a r t s t r a t e gi e s (4 0 1 5 h r s .) F igure 14 : Psy c hometri c C h a r t s t r a t e gi e s (8 7 6 0 h r s .) F igure 15 : Graph show i n g H o u r l y A v e r a ge Dr y Bu l b T em peratu re (Monthw i se ) F igure 16 : Ori entati on A n a l ysi s 1 :1 .3 F igure 17 : Ori entati on A n a l ysi s 1 :1 .5 F igure 18 : Ori entati on A n a l ysi s 1 :1 .2

07 08 08 12 12 12 13 16 16 16 16 17 17 17 18 18 18


1 .

E X E C U T I V E

S U M M A R Y

Team Shunyam from NITTE school of Architecture dedicated towards Net Zero Energy Water Design has been working on an Educational Insititute to metamorphosize it into a environmentally consious space. Our goal is to maintain thermal and visual comfort of the students The new campus is proposed to be developed on 125 acres, to be phased over about 15 years in roughly 5 phases of development. The project site is located at Belma village, Deralakatte, Mangalore, Karnataka, India. When fully built, it is envisaged that about 25,000 students will occupy the facilities of this campus with a rough built-up area of about 65,000 m2 of academic space for higher education. The location falls under the warm-humid climate zone (As per ECBC 2017). This envisaged institute is an architecture college with a projected capacity of 400 students, 40 teaching staff and 20 supporting staff. The estimated built-up area is 4,650 m2. . The project will consist of design studios, faculty area, a conference room, an administrative section, a workshop, a library, a computer lab and an exhibition area. Also, ancillary faciliities like a recreational area, a food court and a stationery store will be provid¬ed. Further, in light of recent pandemic, a sanitizing station will be provided. The project will incorporate xeriscaping, water harvesting, solar panels, solar water heaters, underground cabling, centralized airconditioning and passive cooling systems. The campus is being planned keeping the environment in mind, giving utmost importance to water and energy conservation. We aim to build our structure where all materials in the built environment are regenerative and have no negative impact on human and ecosystem health. It should also be easily constructable, and be economical. Locally sourced materials are being put into use to reduce operational expenses.

01 1. Executive Summary


2 .

T E A M

I N T R O D U C T I O N

1.1 Team Name: Shunyam. 1.2 Institution Name: Nitte Institute of Architecture, Deralakatte 1.3 Division: Educational building 1.4 Background NITTE (Deemed to be University) is an institute of higher education established in 2008 with the motto of quality education-an abiding commitment. The NITTE education trust has established 31 institutions spread in three different campuses of NITTE in Mangalore and Bangalore. The institution has been accredited with ‘A’ grade by the National Assessment & Accreditation Council (NAAC). 1.5 Faculty Lead and Faculty Advisors Name: Naga Venkata Sai Kumar Manapragada (Assistant Professor, NIA) Bio: Naga holds Bachelor’s in Architecture and M.S by Research in IT in Building Science. He possesses expertise in building energy efficiency and climate change domains 1.6 The Team Shunyam is a group of 13 interdisciplinary team members from the NITTE University Mangalore. These students from architecture, engineering, management, and microbiology domains have teamed up to design a high-performance building. The roles of our team members have been outlined in Table 1. Table 1 : Members of the team Name

Qualification

Role

Namratha Gopan

Under graduation in Architecture

Team Leader

Hala Khaleel

Under graduation in Architecture

Interior Design

Harikiran V Alva

Under graduation in Architecture

Energy Analysis

Lakshit S Salian

Under graduation in Architecture

Indoor Air Quality & Ventilation

Partha R Rai

Under graduation in Architecture

Electric & Daylight simulation

Pritish Nazareth

Under graduation in Architecture

Water & Carbon management

Sinchana Shetty

Under graduation in Architecture

Constructability

Shruthadev B

Under graduation in Architecture

Architectural Design

Post graduation in Microbiology

Environmental Analysis

Tejaswi Kumar

Post graduation in Business Administration

Financial Analyst

Gouri Keshav Balse

Post graduation in Business Administration

Industry Partnership

Post graduation in Energy Systems Engineering

MEP Design

Under graduation in Computer Engineering

Innovation

Sreya Saikrishnan MP

Ashwini Udupi Sanath R Pai

1.7 Industry Partners

02 2. Team Introduction


3 .

P R O J E C T

I N T R O D U C T I O N

2.1 Justification for the name and project - Samarpan 2.2 Project Partners Nitte Institute of Architecture (NIA) is part of Nitte (Deemed to be University), Deralakatte. It was established in 2015. The institution firmly believes in hands-on learning. Sustainability has been one of the main tenets in architectural education. The curriculum is framed to teach and encourage sustainable practices. The institution also shows it’s dedication towards sustainable designs through a LEED lab program. This facilitates the students to gain a deeper understanding of sustainability through a practical and immersive approach. One of the major mode to ascertain in NIA is through experiential learning. By following a sustainable lifestyle, the students get to witness it firsthand. Key Individuals - Prof.Vinod Aranha - Director, Nitte Institute of Architecture Dr.Ken Yeang - Chief Architect 2.3 Project Description The new campus is proposed to be developed on 125 acres, to be phased over about 15 years in roughly 5 phases of development. The project site is located at Belma village, Deralakatte, Mangalore, Karnataka, India. When fully built, it is envisaged that about 25,000 students will occupy the facilities of this campus with a rough built-up area of about 65,000 m 2 of academic space for higher education. For this competition, we are considering the architecture college building as a part of Phase-1 of the project. Phase-1 is expected to start by December 2021. The location falls under the warm-humid climate zone (As per ECBC 2017). This envisaged institute is an architecture college with a projected capacity of 400 students, 40 teaching staff and 20 supporting staff. The estimated built-up area is 4,650 m 2 . The users primarily comprise of undergraduate students, faculty and researchers. The typical working hours of the program will be 8 am - 4:30 pm on weekdays and 8 am - 1pm on Saturdays. The project will consist of design studios, faculty area, a conference room, an administrative section, a workshop, a library, a computer lab and an exhibition area. Also, ancillary facilities like a recreational area, a food court and a stationery store will be provided. Further, in light of recent pandemic, a sanitizing station will be provided. The project will incorporate xeriscaping, water harvesting, solar panels, solar water heaters, underground cabling, centralized airconditioning and passive cooling systems. 2.8 Market Research Highlights 1. Total number of Engineering colleges in India – 4000 (across specialization) 2. Total Number of B. Arch Colleges in India – 860 (NATA and Private) 504 – Private 356 – NATA 3. Average B.Arch. intake for Indian Architecture Colleges Through NATA – 58 (21000/356) Target Intake – 60(Gross) 350 via JEE Mains and JEE paper 2 (15 institutes for 945 seats) 4. 21000 seats for NATA 5. 45 in Karnataka & 3 institutes in Mangalore 2.9 Special Requirements of the project • • •

Achieving net-zero, and if possible be net positive in terms of energy. Maintaining and preserving various flora and fauna keeping the existing biodiversity intact as much as possible. The campus should be planned keeping the environment in mind and importance should be given for water and energy conservation.

03 3. Project Introduction


3 .

G O A L S EPI target is set at 50 kWh/m 2/annum whilst maintaining thermal and visual comfort of the occupants.

EPI Target

Thermal Comfort

ROI of at least 50% higher as compared to the prevailing banking interest rates. Cost

Water

• Universally accessible design • Climate responsive • Climate change resilient Design Goals

Indoor Air Quality

St ru c t u re

To meet the WHO (World Health Organization) standards related to PM 2.5 and PM10. To meet ventilation requirements as per ASHRAE 62.1

To maintain unmet hours less than 150 per annum for all the zones. To maintain the indoor air temperature range as prescribed by NBC

To meet zero waste water discharge by grey and black water treatment on site.

All materials in the built environment are regenerative with no negative impact on human and ecosystem health. Easily constructable, and economical. To reduce tCO2e values by reducing on operational and embodied energy by 2/3rd.

Carbon

Table 2 : Samarpan Net-zero goals and strategies Goal

Strategies

EPI Target

• Optimising the building envelope to reduce the heat gain and loss. • Using the outdoor comfort temperature and passive strategies to reduce the reliance on active cooling.

Thermal Comfort

• Using the comfortable outdoor air as and when possible, provide passive strategies and then air conditioning to meet the adaptive comfort setpoints as suggested by IMAC.

Cost

• Locally sourced materials • Reducing operational expenses even though the first cost increases by 10-15% • Using renewable energy to its full potential

Water

• • • •

Design goals

• To achieve thermally comfortable building by designing appropriate wall and roof assemblies and shading. • To provide a interactive spaces which promotes learning by introducing various design components like gazebo or sitout space.

Structure

• To use pre-fabricated structures for quick installation and replication.

Indoor Air quality

• To provide the spaces with MERV8 filters. • Providing trees like neem and indian redwood to improve the air quality on site.

Carbon

• To use the material available from 500 Km radius of the site.

Providing greywater and blackwater treatment plants. Collection and storage of rainwater. Using low flow fixtures in building. Use of xeriscaping.

04 3. Goals


5 4

3

3

Table 3 : Wall Assemblies

4

2

2

Option A

U-value achieved (w/m 2-k)

A.

1. 2. 3. 4. 5.

Cement plaster - 10mm Fly-ash brick - 100mm Extruded Polystyrene XPS - 10mm Fly-ash brick - 100mm Cement Plaster - 10mm

0.85

B.

1. 2. 3. 4.

Cement plaster - 10mm Aerated Autoclaved Concrete - 150mm Cellular Concrete - 30mm POP board - 10mm

0.85

1

1

Material with thickness (mm) outside to inside

Option

Option B

Figure 2: Exploded Isometric vew of wall assembly options

1

Table 4 : Roof Assemblies

1

Material with thickness (mm) outside to inside

Option 2

A.

1. 2. 3. 4. 5.

Fibre Reinforced Plastic - 15mm Cellular Concrete - 50mm Reinforced Cement Concrete - 150mm Mineral Wool - 60mm Cement Plaster - 10mm

0.85

B.

1. 2. 3. 4. 5.

Cement plaster - 15mm Reinforced Cement Concrete - 150mm Expanded Polystyrene Sheets - 40mm Cellular Concrete - 100mm Gypsum Board

0.85

2

3

3

4

4

U-value achieved (w/m 2-k)

5

5

Option A

Option B

Figure 3: Exploded Isometric vew of roof assembly options Table 5 : Window Assemblies - Sisecam Isicam Window systems

Option

Daylight (EN410)

Configuration

4+12+4

A.

4+16+4 4+12+4

B.

4+16+4 4+12+4

C.

4+16+4

Solar Energy (EN 410)

Transmittance %

Reflectance Outdoor %

Solar Factor %

Shading Co-efficient

80

14

75

0.86

79

12

56

0.64

71

10

44

0.51

Building Standards to be followed are as follows • • • • •

ASHRAE 62.1 ASHRAE 55 NBC - IMAC Model BEE 2017 Living Building Challenge

05 3. Goals

• • • • •

Well Standard GRIHA Council of Architecture CGWB Authority Mangaluru Zonal Regulations

Thermal Conductivity (U) W/m 2K (EN 673 Dry Air

Argon

2.9

2.7

2.7

2.6

1.6

1.3

1.3

1.1

1.6

1.3

1.3

1.1


Photographs of the site visit

Screenshot of the team meeting using Google Meet

06 3. Goals


5.2 Evolution of the design Developing the form with Informed design decisions

The ideal orientation is analysed to minimize radiation on the surfaces. The tool used here is Ladybug.

07 3. Goals


The form is then generated to minimize the radiation falling on the surface. The following generated below minimizes radiation by self shading

08 3. Goals


5.2 Conceptual drawings

Entrance and lecture podium

Desks

Figure showing Ideal configuration of a studio

The base shape is circular starting with the studio with the following shape. The studios arranged side by side forms a circular shape. Thus , the form of the building is influenced by the function of the studio

Ref: Time saver standards for building types - Joseph Chiara

09 3. Goals


5.2 Conceptual drawings

10 3. Goals


5.2 Conceptual drawings

11 3. Goals


5.2 Conceptual drawings

12 3. Goals


5.4 Analysis - Facade & Fenestration Systems

STUDIO

CLASSROOM

(12M X10M)

(10M X 6M)

12m

10m

60sqm

120sqm

19.2sqm

4m

6m

10m

16sqm

4m

16sqm

4m

12m

10m

Total Area= 12m X 10m = 120sqm Aspect Ratio = 6:5 Wall Area = 48sqm 40% of WWR = 19.2sqm

Total Area= 12m X 10m = 120sqm Aspect Ratio = 6:5 Wall Area = 40sqm 40% of WWR = 16sqm

4m

9.6sqm 6m

10m Total Area= 10m X 6m = 60sqm Aspect Ratio = 5:3 Wall Area = 40sqm 40% of WWR = 16sqm

Total Area= 10m X 6m = 60sqm Aspect Ratio = 5:3 Wall Area = 24sqm 40% of WWR = 9.6sqm

LAB/WORKSHOP/COMPUTER LAB

ART COURT

(10M X 4M) AND (12M X 5M)

(10M X10M)

12m

15m 60sqm

60sqm

4m

24sqm

4m

4m

10m

5m 100sqm

6.4sqm

19.2sqm

4m

15m

12m

Total Area= 15m X 4m = 60sqm Aspect Ratio =15:4 Wall Area = 60sqm 40% of WWR = 24sqm

Total Area= 15m X 4m = 60sqm Aspect Ratio =15:4 Wall Area = 16sqm 40% of WWR = 6.4sqm

4m

8sqm

4m

AUDITORIUM

16sqm 10m

5m

Total Area= 15m X 4m = 60sqm Aspect Ratio =12:5 Wall Area = 48sqm 40% of WWR = 19.2sqm

Total Area= 15m X 4m = 60sqm Aspect Ratio =12:5 Wall Area = 20sqm 40% of WWR = 8sqm

Total Area= 10m X 10m = 100sqm Aspect Ratio =1:1 Wall Area = 40sqm 40% of WWR = 16sqm

LIBRARY

(20M X20M)

(15M X10M)

20m

15m

10m 20m

4m

16sqm 10m

4m

Total Area= 20m X 20m = 400sqm Aspect Ratio =1:1 Wall Area = 80sqm 40% of WWR = 32sqm

3. Goals

16sqm 15m

32sqm

20m

13

4m

Total Area= 10m X 15m = 150sqm Aspect Ratio =1.5:1 Wall Area = 40sqm 40% of WWR = 16sqm

10m

Total Area= 10m X 10m = 150sqm Aspect Ratio =1.5:1 Wall Area = 60sqm 40% of WWR = 24sqm


5.4 Analysis - Facade & Fenestration Systems

14 3. Goals


5.5 HVAC, Plumbing and Electrical

15 3. Goals


1800 CFM Workshop (double height Ceiling)

1800 CFM

700 CFM

Do wn

1800 CFM

Up

Down

PRODUCED BY AN AUTODESK STUDENT VERSION

1900 CFM

1900 CFM

1900 CFM

Material Library CFM-1400 Multipurpose hall

Visitors waiting/Gallery space CFM-1400 Front office

CFM-700

PA Cabin/ Waiting

Do wn

PRODUCED BY AN AUTODESK STUDENT VERSION Up

Workshop (double height Ceiling)

Director cabin/ Meeting

Down

Stationary

Cafetaria

PRODUCED BY AN AUTODESK STUDENT VERSION

CFM-980 CFM-1400

Up

PRODUCED BY AN AUTODESK STUDENT VERSION

1800 CFM

HOD cabin 700 CFM

1800 CFM

PRODUCED BY AN AUTODESK STUDENT VERSION

1800 CFM

Up

PRODUCED BY AN AUTODESK STUDENT VERSION

5.5 HVAC, Plumbing and Electrical

16 3. Goals


PRODUCED BY AN AUTODESK STUDENT VERSION

CFM-3100

Studio 02

ClassRoom 01 Auditorium

CFM-7000

PRODUCED BY AN AUTODESK STUDENT VERSION

Open Lecture area

CFM-3500

CFM-3200

Studio 05

CFM-3500 CFM-3100

Studio 06

ClassRoom 02

17 3. Goals

Studio 03

PRODUCED BY AN AUTODESK STUDENT VERSION

CFM-3200

Open Lecture area 02

PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

Studio 01

CFM-3300

PRODUCED BY AN AUTODESK STUDENT VERSION

CFM-3300


Studio 07

CFM-3500 CFM-3100

Studio 08

Computer Lab & Materials Lab

ClassRoom 03

Do wn

CFM-4100

Up

Up

Down

Open Lecture area 02

PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

Computer Lab & Materials Lab

PRODUCED BY AN AUTODESK STUDENT VERSION

CFM-3500

CFM-1500

18 3. Goals


19 3. Goals


PRODUCED BY AN AUTODESK STUDENT VERSION

5.4 Materials Analysis

PRODUCED BY AN AUTODESK STUDENT VERSION

10

Column size= 300 x 300 mm Beam size= 200 x 400 mm Slab thickness= 130mm Height= 3m Foundation= 1500 x 1500 x 300

PRODUCED BY AN AUTODESK STUDENT VERSION

Considering a room of size 10 x 10 m

10

A comparative study of affordability between RCC construction and FRP+GFRG

Quantity of concrete

Quantity of steel

Quantity of Fibre Reinforced Plastic (FRP)

Quantity of Glass Fibre Reinforced Gypsum (GFRG)

1. Foundation 9 numbers Total Quantity= 9(1.5 x 1.5 x 0.3)= 6.075 m3 Rate/ m3 = Rs 900 Total cost= 900 x 6.075= Rs 54,675

1. Foundation Quantity/ m3 = 80 kg/ m3 Total Quantity= 80 x 6.075= 486kg Rate/ kg= Rs 70 Total cost= 70 x 486= Rs 34,020

I section Beam- 10kg/m For 10meters-5+5=10 numbers are used For 3meters-9 numbers

Dimensions Length= 12.02m Height= 3.05m Thickness= 0.124m Room size= 10 x 10 x 3 Area= 100sqm

2. Column 9 numbers Total Quantity= 9(0.3 x 0.3 x 3)= 2.43 m3 Rate/ m3 = Rs 1200 Total cost= 2.43 x 1200= Rs. 29,160

2. Column Quantity/ m3 = 200 kg/ m3 Total Quantity= 200 x 2.43= 486kg Rate/ kg= Rs 70 Total cost= 70 x 486= Rs. 34,020

Horizontal beams (10 numbers) 1meter= 10kg 10meters=10 x 10= 100kg Total Quantity= 100 x 10= 1000kg

Rate/ m2= Rs1000 Total cost= 220 x 1000= Rs. 2,20,000

3. Beam 12 numbers Total Quantity= 24(0.2 x 0.4 x 5)= 9.6m3 Rate/ m3 = Rs 11,000 Total cost= 9.6 x 11000= Rs. 1,05,600

3. Beam Quantity/ m3 = 150 kg/ m3 Total Quantity= 150 x 9.6= 1440kg Rate/ kg= Rs 70 Total cost= 70 x 1440= Rs. 1,00,800

Vertical column bars (9 numbers) 1meter= 10kg 3meters=10 x 3= 30kg Total Quantity= 30 x 9= 270kg

4. Slab 4 numbers Total Quantity= 4(5 x 5 x 0.13)= 13m3 Rate/ m3 = Rs 12,000 Total cost= 13 x 1200= Rs.1,56,000

4. Slab Quantity/ m3 = 100 kg/ m3 Total Quantity= 100 x 13= 1300kg Rate/ kg= Rs 70 Total cost= 70 x 1300= Rs. 91,000

Total Quantity= (10 x 3)4 + (10 x 10)= 120+100= 220 sqm

Total Quantity=1000 + 270= 1270kg Rate/kg= Rs135 Total cost= 135 x 1270= Rs. 1,71,450

Cost of RCC Construction for 10mx10m room

Cost of FRP+GFRG Construction for 10mx10m room

Total cost of concrete= 29160+105600+ 156000+ 54675= Rs. 3,45,375

Total cost= 135 x 1270 = Rs. 1,71,450

Total cost of steel= 34020+ 100500+ 91000+ 34020 = Rs. 2,59,840

Total cost= 220 x 1000= Rs. 2,20,000

Total Project cost= 345375 + 259840 = Rs. 6,05215

Total Project cost= 171450+ 220000 = Rs. 4,00,000

20 3. Goals


5.4 Materials Analysis A quantitative comparision between concrete and FRP

Character

Units

FRP

Concrete

Resources

g/cm3

2

2.4

https://global.ctbuh.org/resources/papers/download/2519-fiber-reinforced-polymer-frp-a-new-materialused-in-facades-of-tall-buildings.pdf

Tensile strength

MPa

340

250

Thermal Transmittance

W/m²K

0.07

1.63

Young’s Modulus

GPa

37–784

30- 50

Shear strength

GPa

21

1.3 to 5.1

MJ/m2

183-286

Density

Embodied energy

3,180

https://global.ctbuh.org/resources/papers/download/2519-fiber-reinforced-polymer-frp-a-new-materialused-in-facades-of-tall-buildings.pdf

https://doi.org/10.1016/j.jclepro.2014.06.023 https://www.wgtn.ac.nz/architecture/centres/cbpr/ resources/pdfs/ee-coefficients.pdf

Comparision between concrete and FRP summarized

Quality Strength Resistant Flexibility Ability to carry loads Cost Installation rate Weight Durabilty

21 3. Goals

FRP

Concrete

High

Low

High

Low

High

Low

High

Low

Low

High

Low

Min. 28days

Lightweight 75years

heavier 15-20years


Design Methodology Informed Design Decision

Site Analysis To p o g r a p h y

Cl i m a t e A n a l y s i s W a t e r S h e d d i n g An aly s is Ecology Market Potential

Pre-Design

Asp ect Ratio

Form

Orientation

Bas e d O n

Radiation parameter

Architecture Design

Perfomance achieved

Z o n in g A c ti ve Se m i - A cti ve Pas s i ve Ci rc ul a ti on

SAMARPAN

Da yligh t E l e c t r i c L igh t in g T h e rm al E n e rgy

Perfomance not achieved

B u ilt F o r m

D e ta i l i ng B a s ed o n

C l i mat e & re qu ir emen t

Structur a l D es i gn

Simul ati on

Desi gn Sol ut i ons

B as e d o n

Pa s s i ve, Hy b r i d M ode A cti ve St rat e gie s

Figure 4: Flow chart showing the design methodology of the team

22 6. Project Completion Plan


A .

A P P E N D I X

-

A

A.1 Detailed Building Area Program

Sl. No. Room 1 Workshop 2 Faculty Room 3 H.O.D Cabin 4 5 6 7

Guest and visiting faculty lounge Amphitheatre Material Library Multipurpose Hall

8 9

Visitors Lounge/ Gallery space Front Office

Area (in m2)

Directors Cabin/ 10 Meeting Room 11 Stationary 12 Cafeteria P.A. Cabin/ Waiting Room Studio 1 Studio 2 Classrooms Open Lecture Area Auditorium Computer Lab Roof Top Dining Kitchen Washroom 1 Washroom 2 Corridor Ground 24 Floor 25 Corridor First Floor Corridor 26 2nd/3rd/4th Floor 13 14 15 16 17 18 19 20 21 22 23

Total Area

23 Appendix - A

Number of Total Area rooms (in m2) 202 1 202 19 9 171 38 1 38 26 173 54 45

1 1 1 1

26 173 54 45

50 45

1 1

50 45

38 23 61

1 1 1

38 23 61

26 106 131 97 109 225 189 643 111 82 74

1 6 2 3 3 1 1 1 1 6 6

26 636 262 291 327 225 189 643 111 492 444

268 485

1 1

268 485

312

3

936 6261


D .

A P P E N D I X

-

D

D.1 Confirmation letter of Industry Partner

24 Appendix - D


NITTE INSTITUTE OF ARCHITECTURE