1 minute read

YO UR CLO UD

Next Article
SAYT HE IR NAM ES

SAYT HE IR NAM ES

Leader, Qavam Al-din Contest,

Apr. 2018 - May. 2018

Advertisement

Leaders:

Students: - usual consequence of construction projects usual consequence of construction projects our approach in the construction project our approach the construction project

The subject of the contest was Environment and Destruction of Shiraz River. So what mattered to us was to build a space and structure without a trace of destruction. But we were aware of it that building is the same as destruction. No constructor can claim that what he/she has built does not harm nature in any way. So, we decided not to produce any materials for our structure.

“WAS TEPROD UC TIO N” TO B UIL D TO BUILD

“ WA STE PR OD UC TI ON ” TO B UI LD T O B UI LD

“W AS TE COL L EC T IO N”

“W AS T E C OL LE CT ION ”

In general, the project consists of three main sections: pilot, cloud, lighting. Three sections that mark the changes and destruction of humans to the surrounding environment; the Earth, sea, and the sky. The goal was to point out our everyday mistakes rather than slandering and condemning the government as well as showing a scale of this destruction, because it is more effective to see it by marking its amount, than explaining it with numbers; a destruction which is posed on nature for the sake of the main human need, drinking water. Causing a 300-year-old destruction for just 1 liter of water.

This article is from: