7 4 0
DECADES GENERATIONS COMPROMISES
Since 1947
Mike Hicks President For over seven decades we’ve earned the reputation of being more than just roofers. Our four generations carry the tradition of partnering with our customers, who trust us to provide the right product, at the right price, installed with integrity to last for decades. Contact Hicks Roofing to get the maximum life out of your top-level investment with zero compromises.
www.HicksRoofing.com • 800-750-4425
Call to setup your free consultation today!
Walmart
200,800 Sq Ft | 2014
Wooster City Schools Custom Color Membrane Simulate Metal 15,700 Sq Ft | 2017
Buehler’s Grocery Store 84,800 Sq Ft | 2016
THE BOYS & GIRLS CLUB OF HARLEM
Preserving the past, building the future. As Public School 186 in Harlem, New York, eclipsed 30 years of abandonment, its iconic architecture was in serious jeopardy. Dattner Architects and the Pella Architectural Solutions team worked together to bring new life to the building with custom solutions for complicated needs. Using old photos and architectural remnants found inside, Pella preserved the historical accuracy while adding modern innovations and durability. F R O M R E M N A N T S TO R E S TO R AT I O N . PELLA WINDOWS & DOORS 26150 Richmond Road Bedford Heights, OH 44146 Commercial Dept. 216.586.6959 • direct www.professional.pella.com
©2019 Pella Corporation
Powerful. Precise. Performance.
Powered Aire Air Curtains & Air Doors
Powered Aire offers the quietest, most aesthetically pleasing AIR CURTAINS for comfort, climate, insect control and new VESTIBULE EXCEPTION codes. Air Control Products is the exclusive Cleveland, Columbus, and Toledo representative for Powered Aire air curtains.
www.aircontrolproducts.com
Ăůů ĨŽƌ ŵŽƌĞ ŝŶĨŽƌŵĂƟŽŶ Žƌ Ă ƋƵŽƚĞ͊
440-526-3020
November 2019, Volume LXXIII, Number 11
FEATURES Phone: 216.251.0035 Fax: 216.251.0064 www.propertiesmag.com CLEVELAND 3826 W. 158th St. Cleveland, Ohio 44111
OWNER/PUBLISHER Kenneth C. Krych kkrych@propertiesmag.com 216.251.0035 MANAGING EDITOR/ART DIRECTOR Mark Watt mwatt@propertiesmag.com 216.251.2655
Photo by Gary Yasaki
AKRON P.O. Box 9 Munroe Falls, Ohio 44262
11 Creating ‘Cultural Change in Construction’ Contractors Assistance Association celebrates 10th anniversary
13 Honoring Top Designs AIA Akron celebrates achievements of area architects with biannual awards
15 Branching Out in Boston Heights CONTRIBUTING WRITERS Doug Bardwell, Eric Eakin, Scott Esterly, Ian Frank, Lou Kren, Matt Lehnert, Alec Pacella, Diane DiPiero Rodio, Carlo Wolff, David Woodburn MEDIA CONSULTANTS Matt Lehnert mlehnert@propertiesmag.com 216.251.6753
Akron Children’s Hospital continues regional growth with Cynthia Parker Matthews Building
23
Rocket Mortgage FieldHouse launches after $185 million makeover of 25-year-old arena
49 Reshaping History in Chagrin Falls $29.5 million renovation & addition upgrades intermediate school
58 Supporting Cast: Spotlighting the professional service providers behind successful construction projects 58 The State of Northeast Ohio’s Real Estate and Construction Industries: Skoda Minotti releases results of its 12th annual survey 62 Legal Perspectives: Strategies & Solutions for Labor Shortages 66 Construction in the Courts: A look at three recent cases that can change the way you do business 69 The Tricky Business of Classifying Income from Land Rents: A look at the challenges of reporting land rent income & losses on tax returns 72 Getting Hot When You Can’t Get Cool: When energy efficiency expectations aren’t met, litigation may ensue 74 NAIOP News: Office, Industrial Financing Remains Strong 77 Vantage Point: Finding Efficiencies Via Construction Technology
Larry Overbey loverbey@propertiesmag.com 216.251.6649 OFFICE MANAGER Lisa Larissey 216.251.8506 Cover photo: Rocket Mortgage FieldHouse, by Trepal Photography
Properties (ISSN 033-1287) is published monthly for architects, engineers, building owners and managers, general contractors, home builders, mortgage bankers, savings and loans, real estate agents, appraisers, servicers and suppliers in Northern Ohio by Properties, Inc., 3826 W. 158th St., Cleveland, Ohio 44111. Copyright © 2019 by Properties, Inc. All rights reserved. Reproduction or use, without written permission, of editorial or pictorial content is strictly prohibited. Periodicals postage paid in Cleveland, Ohio and additional offices. Subscription rates: one year $30, single copy $9, back issues $12 when available. Postmaster: send change of address notices to Properties, P.O. Box 112127, Cleveland, Ohio 44111.
Game Changer
DEPARTMENTS 8 38 44 46 62 74 77 80
PROPERTIES PEOPLE BILLBOARD FINANCIAL STRATEGIES ACAR CORNER LEGAL PERSPECTIVES NAIOP NEWS VANTAGE POINT CONSTRUCTION PROGRESS REPORT www.propertiesmag.com 5
PUBLISHER’S NOTE November 2019
Behind the Curtain elcome to our November issue, featuring our annual “Supporting Cast” Professional Services special section. In this issue, we pull back the curtain to highlight firms who often quietly work behind the scenes to help guide design, construction and development projects to successful completion.
W KEN KRYCH
We thank this year’s contributors who have provided articles on a range of relevant subjects and timely topics, including Cohen & Company; Frantz Ward LLP; Hahn Loeser; Meaden & Moore; Meyers, Roman, Friedberg & Lewis, LPA; Pinnacle Financial Group, Inc., a Marcus & Millichap Company; and Skoda Minotti.
Quicken Loans Arena into the spacious, modern Rocket Mortgage FieldHouse. The sports and entertainment venue has been expanded by 55,000 square feet and completely reimagined with new pedestrian-friendly entrances, member lounges and premium club suites, plus diverse dining options, over 100 pieces of art and dynamic, high-tech design features.
Rocket Mortgage FieldHouse We are pleased to present our cover story on the transformation of the former
Chagrin Falls Intermediate School We’re also proud to bring you a comprehensive feature on the expansion
zŽƵƌ ,ŝƐƚŽƌŝĐ tŝŶĚŽǁ ZĞƉůŝĐĂƟŽŶ WĂƌƚŶĞƌ ĨƌŽŵ ^ƚĂƌƚ ƚŽ &ŝŶŝƐŚ & H O H E U D W L Q J
<HDUV ³
ǁǁǁ͘ũĂŵŝĞƐŽŶƌŝĐĐĂ͘ĐŽŵ ͮ ϭϴϰϱ ĂƐƚ ϰϬƚŚ ^ƚ͘ ůĞǀĞůĂŶĚ K, ϰϰϭϬϯ ͮ ;ϮϭϲͿ ϲϮϭ ϰϮϳϳ 6
Properties | November 2019
and historic renovation of Chagrin Falls Intermediate School. Built as a new high school in 1914, then added to in the 1940s, some 35,000 square feet have now been reused with a third addition to create a new 88,000-square-foot, three-story school. The result combines the best of old and new. Akron Children’s Hospital – Cynthia Parker Matthews Building Additionally, we visit the new Akron Children’s Hospital Cynthia Parker Matthews Building in Boston Heights. Designed by Hasenstab Architects and built by Summit Construction, the regional health center is the latest facility to open as part of the hospital’s initiative to bring convenient, easily accessible pediatric care into communities where patients and their families live. Situated near the juncture of Route 8 and the Ohio Turnpike, the facility is highly visible to passersby, and incorporates memorable architectural details first introduced at Kay Jewelers Pavilion in downtown Akron in 2015.
STRUCTURAL STEEL FABRICATORS & ERECTORS SINCE 1958
0DVRQ 6WHHO Contact Mike Smith for a Proposal: (440) 439-1040 | (800) 686-1223 7500 Northfield Rd. | Walton Hills, OH 44146 www.masonsteel.com Other Fine Products Available: Stone | Pavers | Fireplaces | Windows | Doors
SALT • SALT • SALT Water Softener • Industrial • Food Ice Melt • Sea Salt
Call For Pricing!! Minimum Delivery: 1 Pallet
Coming in December Next month, we’re looking forward to touring and covering Merici Crossings, the new residence building for Ursuline Sisters of Cleveland in Pepper Pike, as well as the new Ohio Center for Oral, Facial & Implant Surgery in Mentor. We will also present our annual Building Products & Maintenance special section, and more. As ever, let us know what other projects you’d like to see featured in Properties! You can send information directly or we can email you an easyto-use link. Take advantage of the editorial coverage in our reader-favorite Construction Progress Reports. It’s another value-added way of keeping you in the forefront of the industry. Happy Thanksgiving from everyone at Properties! Positively,
Kenneth C. Krych Owner/Publisher
.G S n h o
J
. c n I , rimm MEDINA, OHIO
1-800-547-1538 Salt Distributors Since 1966
www.saltdistributormedinaoh.com www.propertiesmag.com 7
PROPERTIES PEOPLE Highlighting notable industry events
1
2
3
1
4
5
6
7
NEO/Cleveland Facilities Maintenance & Management Expo
2
Recently, 40 vendors connected with hundreds of building owners and facility managers at the 9th NEO/ Cleveland Facilities Maintenance & Management Expo, held at Holiday Inn Independence. Firms exhibited their products, equipment and services for building owners and managers at the daylong expo, which also included free industry-related seminars. P
3 1 Rick Mayer and Jake Wattenbarger (University Hospitals/Sodexo), Bakari Bollard (CMC) and Matt Ambrose (University Hospitals/Sodexo) 2 Chris Petrow and Anne Hartman (Moody Nolan), David Stanton, Mitch Gelofsack and Greg Klik (Industrial First) 3 Chris Petrow (Moody Nolan) and Steven D. Standley (University Hospitals)
ACE Mentor Luncheon Recently, Construction Employers Association hosted an ACE Mentor luncheon at the newly renovated Cuyahoga Community College Metro Campus Center in Cleveland. The keynote speaker was Steven D. Standley, chief administrative officer at University Hospitals (UH), who shared details of UH’s master plan and future initiatives. The ACE Board of Directors also accepted checks totaling $35,300 in donations raised by the Cleveland AIA and sponsors. P 8
1
4
AIA Akron Design Awards The Akron Chapter of American Institute of Architects recently hosted its biannual Design Awards at The Trailhead at Cascade Lofts in Akron. Approximately 125 association members and guests attended the celebratory event. Eight projects were recognized for exceptional design, while Eric Pros, of DS Architecture, was honored with the Emerging Talent Award. (See full story, pg. 13) P
1 Michael Fusco, Alexis Millerleile and Robin Bishop (Diamond Roofing Systems) 2 Justin A. Jivan and Nick Reinfeld (Power Graphics & Action Sports Apparel) 3 Todd Janda, Rebecca England, Amy Mitan and Dan Moore (S.A. Comunale) 4 Craig Wallace (CEJN) 5 Elijah Burnett, Derek Fess and Charles Adams (1st Choice Roofing) 6 Bill Beiter (Dunbar Mechanical Inc.) 7 Dale Verni (D3D SCAN)
2
3
5
6
1 Justin Gleason, Kriston Pleat (DS Architecture) and Robert Lucius (Allegion) 2 Julia Duhart (Braun & Steidl Architects) and Zachary Forney (Hasenstab Architects) 3 Peter Marks (DLR Group), Eric Pros (DS Architecture) and Bill Willoughby (Kent State University) 4 Ian Jones and Randall Parsons (Mann Parson Gray Architects Corp.) 5 Peter Marks (DLR Group), Emily SteinerLittle and Bill Willoughby (Kent State University) and Elizabeth Corbin Murphy (Perspectus Architecture/Chambers Murphy Burge) 6 Amber Duld and Dennis Check (Hasenstab Architects)
Properties | November 2019
1
2
3
4
ABC Fall Golf Scramble The Associated Builders and Contractors (ABC) Northern Ohio Chapter recently held its annual fall golf scramble at the Fowlers Mill Golf Club in Chesterland. The daylong event included a golf scramble competition for over 80 golfers and guests with on-course beverages, lunch, happy hour networking, cocktails, barbecue chicken/ribs buffet, awards presentations, raffles and prizes – including a RTV Hole-in-one Contest (sponsored by ADMAR Supply) P
5
1 Tim Porter (Skoda Minotti), Jack Rolf (Progressive), Joe Weber (Skoda Minotti) and Ashley DeCress (Skoda Minotti) 2 Charlie Filisko (Marsh & McLennan Agency LLC), Todd Kikol (Beneco), Shirley Wilburn (People Ready Skilled Trades) and Nicole Foster (People Ready Skilled Trades) 3 Evan Mullaney (North Bay Construction, Inc.), Jim Manns (North Bay Construction, Inc.), Matt Slife (Erie Industrial) and Kevin Komar (Ko-Advisors) 4 Nick Nykulak (Ross, Brittain & Schonberg Co., L.P.A.,) Frank Pillari (Ross, Brittain & Schonberg Co., L.P.A.), Tyler Woolace (Woolace Electrical), and Tom Short (Woolace Electrical) 5 Bryan Williams (ABC), John Friend (Assured Partners), Jim Anderson (Mars Electric) and Phil Harrell (Mars Electric)
2 1 Melanie Stock, Lisa Matuszak and Sharmaine Dixon (First Federal Savings of Lorain) 2 Liz Schneider (NCBIA) and Jenna Blanchfield (Fidelity National Title)
NCBIA 75th Anniversary The North Coast Building Industry Association (NCBIA) celebrated its 75th anniversary recently at Ahern’s Banquet Center in Avon Lake. More than 100 current and past members were in attendance. New members of the 2020 Board of Directors were voted in at the event as well. P
Serving Northeast Ohio For Over 60 Years! Residential Ŷ Commercial Ŷ Industrial Ŷ Institutional
ARCHITECTURE INFORMED AND INNOVATIVE EXPERIENCE IN
:ʝʁʘɿODȪɏ
+HɪOʃKFʋȾɏ
(ʏXFDʤLʝɚ
&ȵʑɃɰOʋQɍ
Expert Brick Matching and Complete Inventory of Brick, Block, Masonry, Cast & Natural Stone, Plaster Products & Tools
VISIT IKM ARCHITECTURE AT www.ikminc.com 2529 Detroit Avenue, Suite 132 Cleveland, OH 44113 t: 216-678-9456
Follow us on
16900 Rockside Rd., Maple Heights, OH 44137
216.791.9800 Ŷ www.bruderinc.com www.propertiesmag.com 9
Photos courtesy of NCBIA
Photos courtesy of ABC Northern Ohio
1
“Embracing Diversity, Enhancing Relationships: Celebrating Pioneers in Northeast Ohio’s Construction Industry” Event Co-Chairs: Adrian Maldonado, President Adrian Maldonado & Associates Ariane Kirkpatrick, President/CEO The AKA Team Don Dreier, Executive Vice President Donley’s Tari Rivera, President Regency Construction Services
CAA OFFICERS: Glen Shumate, Executive Director Margaret Hewitt, President Shakorie Davis, Vice President Chris Howse, Secretary Heather Baines, Treasurer
The AKA Team
Lorain County Community College
SCHOLARSHIP SUPPORTERS:
AM Higley
Next Generation Construction
Cleveland Building Trades Council
Calfee
Norris Brothers
Coleman Spohn
The Cleveland Marble Mosaic Co.
Panzica Construction
Fitzgibbos Arnold
Coleman Spohn Corporation
Precision Environmental Co.
NorthCoast Concrete
IKORCC Regional Council of Carpenters
Regency Construction Services
Ozanne Construction
Turner
Panzica Construction
Laborers’ International Union of North America
Whiting-Turner
Peterson King Construction
CELEBRATING SUCCESSES Among more than 200 attendees at the CAA anniversary gathering were (left) Greater Cleveland Regional Transit Authority’s Carl Kirkland, Jonathan Laule, India Birdsong, Steven Sims, Rajan Gautam and Diana Jones. Representing Norris Brothers Company (right) were Joe Michael, Kathleen Norris Michael, Ed McAdams, Maureen Norris McAdams, Evelyn DeMarco and Bruce DeMarco.
Creating ‘Cultural Change in Construction’ Contractors Assistance Association celebrates 10th anniversary By Lewis Rice | Photos by Ken Krych
he Contractors Assistance Association (CAA) celebrated its 10th anniversary in fine fashion last month at the Intercontinental Hotel on Cleveland Clinic’s main campus. More than 200 diverse construction professionals representing owners, public officials, contractors, organized labor and suppliers gathered to salute this significant marker in Greater Cleveland’s evolving construction industry.
T
Dominic Ozanne, CEO of Ozanne Construction – who, along with John Todd, of JWTA and Associates, was a founding CAA member – credited Cleveland Mayor Frank Jackson for his leadership role in encouraging the organization’s formation. Jackson was the primary force in initiating the process that led to the 2013 Memorandum of Understanding – signed by the area’s leading contractors, owners and labor organizations – that has changed the way the industry operates. “We have realized cultural change in construction,” Ozanne says. Jackson, Todd and Ozanne were among those honored during the 60-minute program, which was preceded by a networking social hour attended by the mayor. Glen Shumate, who as executive vice president of the Construction Employers Association (CEA) functions as CAA’s executive director (CAA is an affiliate of CEA), delivered brief but comprehensive remarks that reviewed how the indus-
try has changed since CAA’s inception, described CAA’s major program initiatives, and offered a series of open-ended questions that suggested where the organization’s future energy would be directed. Referring to CAA’s members, most of whom are MBEs, Shumate asked,
SAVE THE DATE
Cleveland Building Excellence & Craftsmanship Awards Thursday, March 26, 2020 FirstEnergy Stadium | Cleveland, OH Visit www.ClevelandCraftsmanship.com for info. “How do we make it easy to connect new workers and young employees to industry opportunities? How do we help small companies build capacity and get access to profitable opportunities? How do we work with owners?” The program highlighted CAA’s successes in providing resources to
increase contracting, education and employment opportunities in Ohio’s construction industry, especially among minorities and women. It also recognized local industry leaders in the ongoing effort to increase diversity, inclusion and equity. Alfonso Sanchez, a former executive with Turner Construction’s Cleveland office, and Terri Sandu, formerly of Hard Hatted Women, were saluted with Pioneer Awards, along with Ozanne and Todd, for their roles in launching CAA. University Hospitals was honored with a Diversity in Action Award for its Vision 2010 program, a fiveyear strategic growth plan that provided unprecedented opportunities for new and emerging minority contractors. Tony Panzica, CEO/president of Panzica Construction, received the Construction Diversity Leadership Award for his efforts in helping to create a more open and inclusive culture in the industry. www.propertiesmag.com 11
ϰϵϯϯ EĞŽ WĂƌŬǁĂLJ 'ĂƌĮĞůĚ ,ĞŝŐŚƚƐ͕ K, ϰϰϭϮϴ ;ϮϭϲͿ ϰϳϴͲϬϴϭϬ ǁǁǁ͘ƵƐĐĂŶĚĞ͘ĐŽŵ
zŽƵƌ ďĞƐƚ ĐŚŽŝĐĞ ĨŽƌ sŽŝĐĞ͕ ĂƚĂ ĂŶĚ sŝĚĞŽ͘͘͘ ͘͘͘ĂŶĚ ŶŽǁ ^ĞĐƵƌŝƚLJ͕ ƵĚŝŽͬsŝƐƵĂů ĂŶĚ /ŶͲ ƵŝůĚŝŶŐ tŝƌĞůĞƐƐ͊ www.uscande.com ;d]n]dYf\ k Kl]]d @]Y\imYjl]jk
Repair. Restore. Preserve. experts in exterior masonry
&ROXPELD %XLOGLQJ 3URGXFWV STEEL JOISTS STRUCTURAL IRON METAL ROOF DECK STEEL STAIRS & RAILS STEEL ERECTION
440-235-3363 *-1.) =de Kl&$ ;d]n]dYf\$ G@ ,,)+0
12
Vertical Masonry Surfaces Brick Façades Storefronts Concrete Balconies Garage Structures
M ASONRY RESTORATION M AINTENANCE, Inc. 216-883-1526
www.mrmrestoration.com
APPRECIATED EFFORTS CEA Chairman Jason Jones (Turner Construction) presented Tony Panzica (Panzica Construction Co.) with the Construction Diversity Leadership Award.
Labor officials John Horton Jr. (Laborers 310) and Dwayne Kee (Carpenters) were recognized as Business Agent Trailblazers. Honored as CAA Champions for their work in advancing diversity were Lenora Lockett (Cuyahoga County Procurement), Terry Bolden (Ohio Dept. of Transportation), Norman Edwards (American Center for Economic Equality), Marsha Mockabee (Urban League of Greater Cleveland), Steven Sims (Greater Cleveland Regional Transit Authority) and Jenice Contreras (Northeast Ohio Hispanic Center for Economic Development). Glen Shumate received the evening’s final award, presented by former CAA President Ariane Kirkpatrick (AKA Construction) with a rousing introduction that produced a standing ovation as the honoree came forward. The Nehemiah Award recognized Shumate for his leadership in guiding CAA from its initial two-member cohort to an association comprising 36 members, most of which are minority-owned. Major sponsors included CEA, Donley’s and Gilbane. Other supporters included The AKA Team, Calfee, the Cleveland Marble Mosaic Company, Coleman Spohn, A. M. Higley, the Indiana Kentucky Ohio Regional Council of Carpenters, Laborers’ Local 310, Lorain County Community College, Next Generation Construction, Norris Brothers, Panzica Construction, Precision Environmental, Regency Construction Services, Turner Construction and Whiting-Turner. P Properties | November 2019
Honoring Top Designs AIA Akron celebrates achievements of area architects with biannual awards he American Institute of Architects Akron Chapter (AIA Akron) recently held its biannual Design Awards at The Trailhead at Cascade Lofts in Akron. This biannual program honors the exceptional commitment of its member architects who continually serve, shape, discover and imagine contemporary solutions to the evolving needs of our living and working environments.
T
Photo by Brad Feinknopf; photo of KHIC Library courtesy of Sōl Harris/Day Architecture
A field of 23 professional and three student submissions were juried by a team of industry thought-leaders who evaluated design achievement, regardless of project category, type or budget. The 2019 AIA Akron Design Awards jury was led by William T. Willoughby, AIA, NCARB, associate dean and professor at the Kent State University’s College of Architecture and Environmental Design. Eight projects were recognized with awards, including:
CITATION AWARDS Akron Children’s Hospital Considine Professional Building Addition HASENSTAB ARCHITECTS Client/Owner: Akron Children’s Hospital
KSU Stark - Fine Arts Building Addition / Renovation
43 Town Square, Lima, Ohio PERSPECTUS ARCHITECTURE / CHAMBERS, MURPHY & BURGE STUDIO Client/Owner: Woda Cooper Companies
Photo by Todd Biss
HASENSTAB ARCHITECTS Client/Owner: Kent State University – Stark
PRIZED EFFORT AIA Akron recognized Hasenstab Architects for its work at Summa Health West Tower, as the project received both an Honor Award and the People’s Choice Award.
Photo courtesy of DS Architecture
Lake Elementary School
HONOR AWARD & PEOPLE’S CHOICE Summa Health West Tower LN Gross Company Building
KHIC Library
HASENSTAB ARCHITECTS Client/Owner: Summa Health
MERIT AWARDS
MERIT AWARDS FOR INTERIOR
EMERGING TALENT AWARD
LN Gross Company Building
KHIC Library Renovations
DS ARCHITECTURE Client/Owner: Renaissance 2000
SŌL - HARRIS/DAY ARCHITECTURE Client/Owner: University of Mount Union
Bounce Innovation Hub Renovation
Lake Elementary School
HASENSTAB ARCHITECTS Client/Owner: City of Akron
SŌL - HARRIS/DAY ARCHITECTURE Client/Owner: Lake Local Schools
Lastly, the Emerging Talent award was presented to Eric F. Pros, director of design at DS Architecture. The award recognizes one who, in the early stages of his/her career, has demonstrated an innovative approach to design, created a unique architectural voice and whom has shown exceptional leadership. P www.propertiesmag.com 13
Building Visions into Reality.
Serving Ohio’s commerical construction management needs. Echelon Independent Living
Middlebury Commons
Chillicothe Intermediate School
www.summitconstruction.com Follow us on Instagram / Connect with us on LinkedIn
14
(GXFDWLRQDO +HDOWKFDUH +RVSLWDOLW\ 0XOWL )DPLO\ +RUWLFXOWXUH *UHHQKRXVHV 5HWDLO 2ႈFH
Properties | November 2019
Branching Out in Boston Heights Akron Children’s Hospital continues regional growth with Cynthia Parker Matthews Building By Mark Watt | Photos by Gary Yasaki
his fall, the Cynthia Parker Matthews Building at Akron Children’s Health Center, Boston Heights, opened its doors near the junction of Route 8 and the Ohio Turnpike. The two-story, 43,000-square-foot facility at 328 E. Hines Hill Rd. brings together primary care, urgent care, rehabilitative facilities, laboratory and radiology services, plus more than a dozen specialty care providers, in one highly visible location.
T
Designed by Hasenstab Architects and built by the developer/contractor team of Testa Family Foundation and Summit Construction, the $14.9 million health center signals the hospital system’s continued commitment to provide accessible, comprehensive healthcare for patients ranging from newborn to 21 years old throughout Greater Akron.
Regional strategy moves forward The Cynthia Parker Matthews Building is the latest of several regional health centers to open throughout Northeast Ohio recently as part of the hospital’s initiative to provide patients and families with convenient access to care, says Lisa Aurilio, chief operating officer at Akron Children’s Hospital. “Part of our strategy is to consolidate services and create healthcare hubs that are easy to find and access,” Aurilio
says. “In Boston Heights, we’re bringing together services that were previously located in disparate locations in the area. We had an urgent care center and rehab services in Hudson about five miles away, and sub-specialty services like dermatology and cardiology in Twinsburg about eight miles from here, for instance. Now we’ve brought them all into this single building, which also includes a new primary care practice.” The Boston Heights facility – named in recognition of a $2 million gift from the Hudson-based Cynthia Parker Matthews Family Foundation – is the third new health center to open in 2019 alone, Aurilio notes. The first opened in Mansfield this March, while a second health center opened in North Canton in May. A fourth facility is currently under construction in Portage County along Route 59 between Kent and Ravenna,
and is scheduled to open in early 2020 (see ‘Regional Growth,’ pg. 17).
Developing the design Planning for the Cynthia Parker Matthews Building began in 2017, says Scott Radcliff, principal architect with Hasenstab Architects, which has served as a design partner on multiple Akron Children’s projects over the past 25 years. “There were several key pieces to the design process,” Radcliff says. “First, the health center would be bringing together a diversity of services previously located elsewhere, so we started by developing a ‘kit of parts’ approach to identify similar areas, such as exam rooms, waiting areas and specialty practice spaces, which we could then assemble together. Secondly, we went through a series of exercises to site the project early on, ultimately positioning the building to allow patient www.propertiesmag.com 15
ARTISTIC MOVEMENT Just inside the front doors of the new health center is a distinctive kinetic sculpture by artist George Rhoads, whose 20-foot by nine-foot “Incrediball Circus 2” sculpture has captivated children at the hospital’s main campus for more than 25 years.
parking on the north side of the building and staff parking to the south. Because of an elevation change on the long and fairly narrow site, we envisioned a twostory building that would provide plenty of visibility from the highway.” Hasenstab Architects has been establishing a design ‘brand’ for
Akron Children’s Hospital since 2012, Radcliff notes, starting with the development of Kay Jewelers Pavilion (see full story, Properties, June 2015 at www. propertiesmag.com) and the William H. Considine Professional Building addition (see full story, Properties, November 2018).
Proud to provide flooring at Akron Children’s Hospital – Cynthia Parker Matthews Building
Commercial, Institutional & Industrial Floor Covering Provider & Installer
Specializing in the healthcare marketplace with the highest quality & best service since 1989. We provide 24/7 service & installation. Call us today to take advantage of our trained in-house staff and extensive library of product information. Complete line of flooring including: Athletic Floors Resilient Flooring • Vinyl & Ceramic Tile • Carpeting
Call today for a FREE estimate! 4300 Brookpark Rd., Cleveland, OH 44134 • 216-595-0100 • www.messinaflooring.com
16
“So the other key aspect of the design here was translating the materials and general look and feel of the Akron Children’s branding to this new building,” Radcliff says. “That led to a design that included a tower at the entrance, green metal exterior panels, a light and airy waiting room and an abundance of natural light.” Brian Lapolla, executive director of facilities, construction and public safety at Akron Children’s Hospital, explains that the Village of Boston Heights has its own design guidelines, with an established palette of preferred building materials and Colonial-influenced Western Reserve architectural elements. “We worked closely with Mayor [Bill] Goncy of Boston Heights to ensure that the facility would meet our expectations, as well as fit the village design standards,” Lapolla says. “That led to compromises ensuring the landscape design, signage and stone all fit with the design aesthetics established by the village.”
Construction kicks off In early 2018, Akron Children’s Hospital contracted with Testa Family Foundation and Summit Construction to develop and construct the building. Through its agreement, Testa Family Properties | November 2019
COMING BACK AROUND Circular cutaway windows lend a whimsical touch, recalling similar design features incorporated at other Akron Children’s Hospital facilities.
Lean approach reduces waste Helping to optimize jobsite efficiency, the design and construction team incorporated Lean principles throughout the project, aiming to eliminate waste wherever possible. Instrumental to that approach were lessons learned by the
Regional Growth Akron Children’s Hospital expands with new health centers
T
he Cynthia Parker Matthews Building is the latest in a trio of new Akron Children’s Hospital regional health centers to open in 2019, delivering on a goal to provide easily accessible healthcare services within communities where patients’ families reside. Each health center aims to consolidate pediatrician offices, pediatric specialties and rehabilitative services in a centralized, convenient location.
Designed by Hasenstab Architects, all facilities feature familiar exterior design components and building materials first introduced at Kay Jewelers Pavilion and the Considine Professional Building addition at the hospital system’s main campus in downtown Akron: green metal panels and red brick, as well as glass and aluminum curtainwall. Inside, each incorporates similar design details, such as bold color palettes and plentiful natural light. A spacious welcome center in each building features a unique whimsical kinetic sculpture by contemporary artist George Rhoads, whose 20-foot by nine-foot “Incrediball Circus 2” sculpture has captivated children at the hospital’s main campus since 1993. Photographic wall murals and window film graphics are customized for each location, incorporating imagery of local landmarks and regional interests. The 32,400-square-foot Mansfield Health Center (1029 S. Trimble Rd., Mansfield) opened in March. Constructed by Adena Corporation, the one-story building includes pediatric primary care, urgent care, specialty care, maternal fetal medicine, radiology, laboratory medicine and rehabilitative services. Graphics nod to Richland County’s culture and iconic locales,
such as Richland Carrousel Park and Mid-Ohio Sports Car Course. In May, the hospital opened its North Canton health center: The Timken Foundation Building at Akron Children’s Hospital (6076 Whipple Ave. NW, Canton; Aultman North campus). The building is 38,000 square feet and combines pediatric primary care, specialty care and rehabilitative services. The three-story facility, built by A. Altman Company, pays homage to Stark County’s park system and the nearby Pro Football Hall of Fame with custom graphics and a distinctive outdoor rehab walking track that encircles a miniature football field. A fourth new regional health facility is currently under construction by A. Altman Company near the Kent/Ravenna border (2497 State Route 59, Kent). The 29,500-square-foot Portage County Health Center will include primary care offices, pediatric care, rehabilitation services, physical therapy and maternal fetal medicine. Interior design elements are inspired by Kent State University, Marvin Kent and the Atlantic and Great Western Railroad, as well as the Kent Bog and other area parks. The health center is scheduled to open in early 2020. –MW www.propertiesmag.com 17
Photo (top left) by Lauren Davis / Feinknopf; photo (top right) by Gary Yasaki; rendering (bottom) courtesy of Hasenstab Architects
Foundation owns the building, which will eventually be gifted to Akron Children’s at the end of a 30-year lease. Testa contracted with Summit Construction to build the shell of the health center, while Akron Children’s Hospital contracted directly with Summit for build-out of interior spaces, as well as all furniture and equipment. The construction team broke ground in early summer 2018, says Nathan Booth, project manager with Summit Construction, who notes that the building is a steel structure with metal stud balloon framing and a fully adhered Johns Manville White TPO roof system. “The biggest challenge for us was the timing and working through the winter,” Booth says. “We started laying foundations in late summer and started steel right at the end of fall. We worked steel through the winter which was a bit difficult. This area is right on the cusp of the snowbelt which meant we were hit with a lot of snow and sleet.” Construction continued through spring and summer of 2019, completing in time for a grand opening and dedication in late September.
PLANNED EXPANSION The hospital’s new regional facilities include Mansfield Health Center (top left) and The Timken Foundation Building in North Canton (top right). Portage County Health Center (bottom) is now under construction and scheduled to open in early 2020.
Congratulations Design & Construction Teams of
Akron Children’s Health Center - Boston Hts. From Your Structural Engineering Partner
330.659.6688
www.thorsonbaker.com
Suntrol It! SUNTROL
™
G L A S S
E N H A N C I N G
F I L M S
Suntrol.com 800-466-TINT(8468) ESTABLISHED 1975
Love Your Windows!
Select Pro Window Film Dealer: • Security • Privacy/Custom • Energy Savings • Glare Reduction • Sun Protection
design team from previous large projects for Akron Children’s Hospital. Multiple full-scale cardboard mock-ups of nearly all rooms were developed during the Kay Jewelers Pavilion and Considine addition projects, built offsite and tested by project partners and patient families before construction began. “As an organization, Akron Children’s Hospital is committed to Lean principles, which we’ve applied to the design and construction of this building, as well as many other projects over the past several years,” Lapolla says. “We build mock-ups to test spaces, such as an exam room, and evaluate the design before constructing 40 exam rooms onsite, for example. Our design and construction teams have truly adopted this philosophy to make sure we have the best outcome for the facility.” Mock-ups took place on two floors of shell space at the hospital’s main campus in downtown Akron, Radcliff adds. “The health centers alone have over 25 departments represented, so the
“Part of our strategy is to consolidate services and create healthcare hubs that are easy to find and access. In Boston Heights, we’re bringing together services that were previously located in disparate locations in the area.” Lisa Aurilio Akron Children’s Hospital mock-ups can have up to 100 people involved,” he says. “It’s an incredible investment from the hospital.” The payoff is worth the upfront investment, Aurilio notes. She should know, as she’s seen firsthand the danger of poor planning. “Earlier in my career, for a different hospital system, I was a nurse manager on a high risk OB floor and we were moving to a new unit that had been renovated,” she says. “We had a patient who was pregnant with quintuplets and she couldn’t get out of bed. The day of the move, we rolled her in a bed up to the door. It wasn’t until right then that we realized that the door was too narrow 18
Properties | November 2019
COMFORT + CONVENIENCE Waiting rooms are furnished with child-friendly graphics and a mix of comfortable seating for visitors of all ages. To enhance wayfinding, check-in desks and signage are color-coded for various healthcare specialties and destinations.
and the bed wouldn’t fit through. In this design, that would have never happened because we would have practiced rolling the bed through a cardboard mock-up and caught the error early on. So I really value this process.” The project also benefitted from best practices learned through previous building projects, Lapolla notes. “As we invest in each of these health centers, we’re pulling in many of the standards found in our other buildings, such as a full building automation system to ensure we can tailor our energy system needs based on peak times of the day and scale them back when they’re not needed,” he says. “These are principles that we incorporated in the Kay Jewelers Pavilion and have now applied to our regional health centers. High-efficiency mechanical and lighting systems ensure these buildings run more efficiently for us.”
Inside look Approaching the Cynthia Parker Matthew Building from the patient parking lot to the north, the health center is immediately recognizable as an Akron Children’s Hospital facility, wrapped in a familiar combination of
red Belden brick, large expanses of glass and a two-story lobby tower framed by green metal panels. Accommodating Boston Heights’ design standards, the exterior also includes rustic Krukowski Stone along portions of the building’s base, while wood and stone elements are incorporated into freestanding signage. “The wood and stone add a rustic look, which blends really well with the overall design,” says Bob Medziuch, principal with Hasenstab Architects. Inside, visitors are immediately met with an entry space bathed in natural daylight, featuring vibrant colors and a distinctive kinetic sculpture by Asphalt Paving Complete Site Construction
contemporary artist George Rhoads. Photographic wall murals and decorative window film designs here and throughout the building celebrate the surrounding community, depicting popular local sights such as the Cuyahoga Valley National Park, downtown Hudson’s historic clock tower and the Cuyahoga Valley Scenic Railroad. The building also features a substantial collection of art from students throughout the community. “We commission through art teachers at local schools, provide general themes and encourage children and young adults to submit artwork,” Aurilio says. “If their
Proud to have provided the asphalt paving for Akron Children’s Hospital – Cynthia Parker Matthews Building
Drainage Seal Coating Concrete
ASPHALT & CONCRETE
Line Striping
We Maintain Your Investment
Find us on
1324 Kenmore Blvd., Akron, OH 44314 330-745-9585 | 800-528-9078 www.propertiesmag.com 19
Move Forward with Certainty.
Glad to have partnered with Summit Construction in providing the composite metal panels and screen wall panels at Akron Children’s Hospital – Cynthia Parker Mat[hews Building
Quality Connections for Long-Term Relationships
Exclusive | Focused | Informative | Dependable | Connected
A DVANCED ROOFING S YSTEMS
BEST MOVE NOW! CALL 216.251.0035 www.Propertiesmag.com
7555 Bond St., Glenwillow, Ohio 44139 Phone: 440/439-9820 Fax: 440/439-9822
INDUSTRY LEADER SINCE 1946
The Belden Brick Company is proud to continue our relationship with Akron Children’s Hospital in their growth and development.
b e l d e n b r i c k . c o m
20
The Standard of Comparison Since 1885
Properties | November 2019
UNDER ONE ROOF The first floor includes an urgent care center (top), pediatric specialty care services and diagnostic facilities, while the second floor is comprised of primary care and rehabilitative services (bottom).
work is selected, they win a gift card and we put it on display. It’s been a very successful program.” Just beyond the entryway, a central welcome center enables patients and families to check in for appointments at self-serve kiosks or at the front desk. Contiguous waiting rooms span both floors along the north side of the building, furnished with child-friendly graphics and a mix of comfortable seating for visitors of all ages. To enhance wayfinding, check-in desks and signage are color-coded for various healthcare specialties and destinations. “The color coding is consistent throughout all Akron Children’s facilities, with orange used for rehabilitative services and green for primary care, as two examples,” Aurilio says. The first floor accommodates pediatric specialty care services with 15 private exam rooms, physician and staff work areas, charting stations and support areas. Exam rooms are flexibly designed, allowing various specialties to function in the same space as needed. Also on the ground level is an urgent care center with six exam rooms where pediatricians treat common illnesses and minor injuries. Both areas have convenient access to diagnostic tools such as echocardiology, EKG, cardiac ultrasound and x-ray, plus a blood draw/laboratory, a procedure room and a dedicated audio booth and hearing aid room. “The audiology facility is a fully contained, acoustically sealed space,” Lapolla says. “It’s highly specialized and required a lot of pre-planning. The lead time on these units can be up to a year, so it had to be ordered early on. The floor is recessed about eight inches below floor level and the unit is dropped into place.” Elsewhere, a staff lounge with kitchenette and dining tables opens to a patio space on the southwest corner of the building. Primary care and rehabilitative services are situated on the second floor. The primary care area incorporates 12 exam rooms and support spaces, while the rehabilitative department includes
a gym for exercise, sensory integration and gross motor skills; a sports therapy space with a throwing lane; five therapy rooms; and an indoor track. “The track idea came about after observing that physical therapists used hospital corridors with patients working on gross motor skills,” Aurilio says. “So this was a fun way to rethink a corridor.” Also on the second floor is a 525-squarefoot community meeting room which accommodates internal meetings for Akron Children’s Hospital, and can be utilized by community groups as well. Allowing for growth, the building includes 5,300 square feet of shell space and is designed to enable future expansion to the east.
Living up to promises Aurilio says that feedback from staff, patients and families alike has been over-
whelmingly positive in the weeks since the building opened. “We are thrilled,” she says. “This is a true example of how Akron Children’s Hospital continues to live up to its promises. The hospital was started by a group of women 130 years ago and they had three [vows]: treat every child as we would our own, treat others as they would like to be treated, and turn no child away for any reason. “We’ve created a place that is bright, colorful and open, where I feel any child would feel comfortable and welcome. By bringing services out into the families’ communities, we are helping to alleviate the stress of travelling longer distances. The convenience allows patients to get the services they need more efficiently so they can get back to being children.” P www.propertiesmag.com 21
Proud to be electrical contractor for
Rocket Mortgage FieldHouse
Photo by Trepal Photography LLC and Cleveland Cavaliers
EINHEIT
ELECTRIC CONSTRUCTION CO.
216.661.6000 240 Tuxedo Ave. Cleveland, OH 44131 info@einheitelectric.com www.einheitelectric.com
Since 1910
Game Changer Rocket Mortgage FieldHouse launches after $185 million makeover of 25-year-old arena By Doug Bardwell | Photos by Trepal Photography / Cleveland Cavaliers
ocket Mortgage FieldHouse is still located at the corner of Ontario Street and Huron Road – but the location is about all that stayed the same. The former Quicken Loans Arena (The Q) has grown from 95,000 square feet of concourse space to more than 150,000 square feet. Entrances have been replaced with more spacious, pedestrian-friendly areas. Dining options are extremely diverse with both standing and seating options. And most noticeable is the phenomenal artwork collection seen throughout the building.
R
Many fans may not realize it, but Rocket Mortgage FieldHouse (RMFH) is the 26th busiest venue in the world – and the 11th busiest in the United States (according to Pollstar Magazine). With the $185 million transformation, expect even greater popularity. The sports and entertainment venue, reopened for the fall 2019 season, offers a completely new experience – one
that will likely take guests more than a single visit to fully appreciate.
On their mind since 2006 “A year after Dan [Gilbert] acquired the team, we began looking at how we might reimagine the space,” says Len Komoroski, CEO of the Cleveland Cavaliers and Rocket Mortgage FieldHouse. “With a great location and a great fan viewing experience in the
bowl, we were limited structurally with very little public space. Within comparable markets in the league, we had among the least amount of public space.” With the massive stone façade of the former arena, they felt very disconnected from downtown. “The only way people knew there was an event going on was if they saw people going in or out,” recalls Komoroski. “Although we were facing downtown, we www.propertiesmag.com 23
MAIN ATTRACTION Rocket Mortgage FieldHouse is the 26th busiest venue in the world, and the 11th busiest in the United States, according to Pollstar Magazine.
felt disconnected from the city, and the and regionally. While all entertainers All-Star Weekends. It’s an incredibly façade wasn’t an iconic image that would will hit the primary markets like New competitive environment.” Within the NBA, the Q had become York, Chicago and Los Angeles, when show up on a postcard.” Limited areas to process tickethold- it comes to the secondary markets, we the oldest arena that had not yet undergone major structural renovations, ers for an event meant many guests was presently under construction or were stuck outside, sometimes in had been replaced completely. harsh winter weather. Once inside, the limited concourse areas often meant shoulder-to-shoulder experiEvaluating the options ences until fans reached their seats. Originally the site of Cleveland’s Despite its faults, the building has Central Market, by the late ‘80s the been averaging 200 ticketed events area was virtually unused. With voter Len Komoroski approval to build the arena and the each year and 1,400 private events. “We’ve been fortunate to become Cleveland Cavaliers/Rocket Mortgage FieldHouse baseball stadium (then Jacobs Field) one of the most popular venues in 1992, the area has since flourished in the country,” says Komoroski, “and compete with probably a dozen cities with nearly $2 billion of development although our fans learned to put up with in the Midwest, and the acts may just and more coming, explains Komoroski, the building’s inadequacies, we oper- select two or three of those for any including the largest residential district, ate in a very competitive environment given tour. That doesn’t even include nine hotels (including the largest concenfor entertainment acts, both nationally events like the NCAA tournaments or tration of historical hotels in the country), 80-plus restaurants, as well as countless other office and business enterprises. “[The Gateway District] is viewed as a model nationally, completely revitalizing the southern part of Cleveland,” he says. Owned by Cuyahoga County, the arena is a partnership between the City of Cleveland, Gateway Economic Development Corporation and the Cavaliers. While the building had been meticulously maintained, it was suffering in its operational functionality. Continuing without change could certainly lead to an erosion of the venue’s popularity.
“Although we were facing downtown, we felt disconnected from the city, and the façade [of The Q] wasn’t an iconic image that would show up on a postcard.”
24
Properties | November 2019
Restricted access and low headroom augercast piles in an urban center. And you need to stay open for business?
Yeah, we can do that. Design Build Services | Earth Retention Systems Ground Improvements | Pile Foundations Our company was proud to offer our Auger Cast Piling services at the the newly transformed Rocket Mortgage FieldHouse in Cleveland, Ohio. We completed our installation in restricted access and low headroom conditions all while maintaining pedestrian access for scheduled events. Go Cavs!
www.grout-systems.net | 330-336-8871 | 800-272-4928
Proud to be part of the team at Rocket Mortgage FieldHouse
PERFORMANCE PAINTING )%( 6%( /3( &HUWLÀHG FBE City of Cleveland
SBE Cuyahoga County
Commercial, Institutional & Industrial Painting Contractor Serving all of Northeast Ohio • Interior/Exterior Painting
• Wallcovering
• High Performance Coatings
• LEED Projects
• Historic Preservation
• Rigid Wall Protection
• Female-Owned Enterprise
• Epoxy Flooring
• Dry Erase Surfaces
Let our PERFORMANCE help your bottom line 26 | November 2019 7603 First Place Suite 3B Oakwood Village, OH 44146 Q 440-735-3340 Q F: 440-735-3341 Q Properties office@performpaint.com
GRAND ENTRANCE A 42,500-square-foot atrium soars above the northern entrances and features a 77,110-square-foot curtain wall made up of over 3,800 uniquely designed, tessellated metal panels illuminated with LED spotlights.
Remember the Richfield Coliseum? It primarily the admissions tax on tick- grapple with the cost of building new in lasted 20 years. Elsewhere, the average ets sold to events at the venue. The the increasingly dense urban cores.” With the arena’s renovation, the lifespan of an NBA arena is 22 years. Cavaliers contributed an additional $45 million to their original $70 million Cavs, whose previous lease was set to Cleveland’s is now nearly 26 years old. In most of the cities that recently commitment to privately finance $115 expire in 2027, extended their lease replaced their arena, the answer was to of the total project cost, covering all seven additional years, through 2034. build anew. Looking at the cost, how- non-public and technology upgrades, This commitment to play in the same facility for 40 years is among the ever, the most recent arena was just longest in professional sports. under $1 billion, with new baseball The venue is also home to and football stadiums going as high Cleveland’s professional hockey as $2 billion. team, the Lake Erie Monsters. City and county partners recognized that the arena has been one of the largest drivers of economic Multiple needs, multiple designers activity in the downtown area. Once the decision was made to Len Komoroski renovate instead of relocating and Politicians also recognized the impact of taxes and jobs created. Cleveland Cavaliers/Rocket Mortgage FieldHouse replacing, it was time to expand Through a $185 million public/ the initial visioning and concepts private partnership, the Rocket as well as a significant portion of the started in 2006 by Detroit-based archiMortgage FieldHouse transformation public space. tecture firm ROSSETTI. became a fiscally responsible way to “At $800 million, the cost to build a “We did a series of smaller renovations renovate the venue at a fraction of the new venue, even with a public/private and concepts and, in 2013, conducted cost of building anew. The public por- partnership, would have been a sub- a facility assessment on the conditions tion of funding from the city/county is stantial lift for a community of our size,” of the building at that time,” says Kelly $70 million and will be repaid almost Komoroski says. “In addition, these types Deines, principal and creative director entirely from direct, venue event- of renovations will become the norm for at ROSSETTI. “Shortly after, we worked related, self-generating revenue sources, communities of our size as they try to with the Cavs to master plan 150,000
“These types of renovations will become the norm for communities of our size as they try to grapple with the cost of building new in the increasingly dense urban cores.”
www.propertiesmag.com 27
BUILDING TOWARD THE FUTURE COMMITTED TO OUR CLIENTS, EMPLOYEES AND COMMUNITY FOR NEARLY FOUR DECADES
Proud Carpentry & Interior Finishes Subcontractor for the RocketMortgage Fieldhouse Renovations
CONSTRUCTION MANAGEMENT • DESIGN/BUILD • HISTORIC RESTORATION CARPENTRY & INTERIOR FINISHES • SITE • SPECIAL PROJECTS GROUP
WWW.MAROUSBROTHERS.COM
Proud to serve as general contractors for 19 new concession and retail areas at Rocket Mortgage Field House
&OHYHODQG 7ROHGR ZZZ LQÀQLW\FRQVWUXFWLRQ FRP
28
Properties | November 2019
IN THE SPOTLIGHT Just inside the Cleveland-Cliffs Entrance is a 20-foot high, cartoonish wooden sculpture by internationally renowned artist KAWS. Titled “Final Days,” it is one of many pieces of original art commissioned specifically for the project.
square feet of new premium spaces, and then did the subsequent concept design.” “SHoP Architects, from New York, was the one who took ROSSETTI’s original concept and created the glass curtainwall you see today,” explains Antony Bonavita, executive vicepresident, venue operation for Rocket Mortgage FieldHouse. “Not having original blueprints of the building, we had them come in and scan the entire building to create a computer model of the whole facility. Going forward, we don’t want that situation for those who follow us, so we enlisted the help of MultiVista to come in weekly and photographically document what’s inside of every wall.” Robert P. Madison International, Inc. (RPMI) joined the project in 2014. “SHoP Architects was the original designer for the project and brought us on board as the local architectural consultant that year,” says Robert Klann, partner and CFO of RPMI. In 2017, global architecture firm Gensler joined as executive architect. “We were brought into the project a little more than two years ago, midway through the design,” says Ryan Sickman, principal and director of sports for Gensler. In addition, Pophouse (formerly dPOP) joined in January 2018 to design
the corporate offices for the Cavaliers. Richardson Design provided initial design services for all the Aramark chefinspired dining areas, while Infinite Scale provided the extensive wayfinding graphics. “[RPMI] also had the role of associate architect with Gensler, assisting with Cleveland design review and permitting procedures,” adds Klann. “We partici-
pated in some aspects of construction documents and construction administration with Gensler. It was Gensler, late in 2017, that presented the project formally to the City of Cleveland Planning Commission and submitted documents for permitting.” “Additionally, Whiting Turner was our general contractor, who did a great job for us,” says Komoroski, “and then
Proud to Provide Carpet, Rubber & Bolon Flooring at Rocket Mortgage FieldHouse
Commercial, Institutional & Industrial Floor Covering Provider & Installer
Specializing in the healthcare marketplace with the highest quality & best service since 1989. We provide 24/7 service & installation. Call us today to take advantage of our trained in-house staff and extensive library of product information. Complete line of flooring including: Athletic Floors Resilient Flooring • Vinyl & Ceramic Tile • Carpeting
Call today for a FREE estimate! 4300 Brookpark Rd., Cleveland, OH 44134 • 216-595-0100 • www.messinaflooring.com www.propertiesmag.com 29
30
Properties | November 2019
MEMORABLE MOMENTS The new Power Portal (top) is a high-tech tunnel boasting immersive audio/video programming. Other unique features include a basketball molded into a wall of the office entrance (middle) and a display commemorating the Cavs’ 2016 NBA championship (bottom).
Bedrock worked with us as a development partner.”
Two summers to complete With the extensive amount of work planned throughout the facility, it was decided the building would close for the summers of 2018 and 2019. No entertainment events were booked, allowing construction to proceed unimpeded. Construction started in fall of 2017 with some preliminary work, but began in earnest in 2018, and was completed in 18 months. “In our world, where sporting and entertainment event schedules are
Photo by Jacob Koestler
“This project took a lot of communication between all of the different entities involved... Working through a full NBA season with a partially underconstruction building posed some interesting challenges.” Ryan Sickman Gensler planned far in advance, we are often up against these types of either expedited construction or multi-phased approaches to projects,” Sickman says. “There are always difficulties, but through careful planning and the development of a solid phasing plan, you’d be amazed at what is possible.” Deines agrees. “It’s typical for a project of this size and complexity to span two summers. ROSSETTI’s design process provides a very early glimpse of the design intent and details the goals and objectives. It’s the nature of the architecture industry to go through iterations of the design, however the vision is never compromised, and the goals are always clear.” “This project took a lot of communication between all of the difwww.propertiesmag.com 31
Congratulations RMFH on achieving the vision on the remodel. We are proud to be on the team providing interior/exterior signage and graphics.
CITY LIGHTS The Sherwin-Williams Entrance, the largest of the three entries, faces northwest at the corner of Ontario and Huron and offers views of the surrounding skyline.
4811 Van Epps Road, Cleveland, Ohio 44131
216.741.3800
www.brilliantsign.com
Our Congratulations to Gensler and Whiting-Turner on the Rocket Mortgage FieldHouse
Acoustical Ceilings, Specialty Wood and Metal Ceilings, GRG Column Enclosures, Column Painting, Architectural Millwork, Stone Countertops Defining THE Skyline®
32
ocpcoc.com
ferent entities involved,” recalls Sickman. “During the primary design phase, we were in Cleveland for weekly meetings, but in constant communication with the entire design team in order to pull off getting this project to the finish line on time. There weren’t any major out-of-the-norm challenges on this project per se, but working through a full NBA season with a partially under-construction building posed some interesting challenges to keep the ingress and egress for the building at max occupancy while also traversing an active construction site.” “RPMI also had a second role working for Whiting-Turner,” explains Klann. “They reached out to our firm for assistance in life safety logistics and egress planning during construction, since the building was occupied and holding events during the initial construction phases. Having been the architect of record for the original Gund Arena, we had keen insight into current exiting strategies and exiting capacities.” “Working around construction was obviously a challenge, especially during that first season with the NBA Finals going on,” Bonavita says. “Each day was a new challenge, but we had great cooperation from our partners like the Indians, Gateway, the Cleveland Police Department and others. We were always out in front of it as our primary responsibility was to keep people safe.” Properties | November 2019
MAKING SPACE To make the concourse feel roomier, old floors were replaced with white terrazzo flooring and ceilings were raised three feet.
Construction completed by the end of September 2019 with a free public open house held on September 28. The first regularly scheduled public event was the grand-opening concert by The Black Keys on September 30.
New entries, atriums + artwork Getting people out of the weather and through the ticketing process was a primary concern. Each of the three entrances were redone, adding more space for the public. “The new addition along Huron Road increases the amount of space for pre-function events by over 300%, while eliminating entirely the inconvenience of outdoor queuing,” explains Christopher Sharples, principal at SHoP. The Sherwin-Williams Entrance is the largest of the three entries and faces northwest at the corner of Ontario and Huron, while the Cleveland-Cliffs Entrance is located along Huron Road to the northeast. A 42,500-square-foot atrium soars above the contiguous entrances and features a 77,110-square-foot curtain wall made up of over 3,800 uniquely designed, tessellated metal panels illuminated with LED spotlights. 1,500 different color combinations can be shown on the panels, creating custom color themes based on
the entertainment event du jour. This is first-of-its-kind for any sports and entertainment venue in the country. “The patterning of the [curtain wall] evokes the traditional herringbone wood floors of historic basketball courts, while the individual panel shapes are sized to optimize views out of the building to the city and the Cuyahoga River beyond,” Sharples explains. “Obviously, the north atrium presents itself as the new front porch to the city of Cleveland, and what that space and area of the building is going to do for the sense of arrival and for hosting events will be amazing in the years to come,” Sickman says. Also located in the north atrium is the Cavaliers Wall of Honor, recognizing and memorializing the contributions of past players and others, like Wayne Embry, Bill Fitch, Nick Mileti and Joe Tait. Just inside the Cleveland-Cliffs Entrance is one of many pieces of original art commissioned specifically for the project: “Final Days,” a 20-foot high, wooden sculpture by internationally renowned artist KAWS. More than 100 other pieces of art are found throughout the facility, from conventionally framed art prints to fourstory-high, sprayed art surrounding the escalators, to an incredibly original bas-
ketball molded into the wall of the office entrance, created by Ohio-native Daniel Arsham. Nationally known artist Shepard Fairey, famous for the Obama HOPE poster, also created his only Cleveland piece in the large “High Fidelity” mural commemorating the area’s music influence. Curated by Library Street Collective, this extensive collection of artwork was privately funded by Cleveland Cavaliers Chairman Dan Gilbert and his wife, Jennifer. The third entrance, sponsored by Discount Drug Mart, faces Progressive Field and Gateway Plaza and adds yet another 6,000 square feet for customer convenience.
Premium clubs + suites 62 suites have been reimagined and redone. Seven membership spaces are now available throughout the facility, accommodating groups smaller than 150 up to areas that can handle 500 or more. There is also a Members Lounge exclusively for Wine & Gold United and Monsters Hockey Club members, each team’s season ticketholder base. “As associate architect, our role was for the premium clubs and suites,” says Deines, of ROSSETTI. “This is our area of expertise, and the Cavs have been www.propertiesmag.com 33
BREW WITH A VIEW The Budweiser Brewhouse provides fans with open viewing of the entire arena, while never being far from the closest tap.
a collaborative client partner. The fun of working on sports hospitality projects, and especially for Rocket Mortgage FieldHouse, is to choreograph a series of hospitality spaces, designing them on a parallel path yet with clear distinctions from one club space to another. We design to the parameters of each club from specific fan perspectives to ensure that their expectations of experience are fulfilled. There are six distinct experiences with clear stories and pathways.” One of the special club areas is the Huntington Legends Club, where guests can dine in large gathering areas and watch events from plush, private theatrical box seating, high above the central bowl. “One of our strengths is using materials in interesting ways to ensure a custom solution,” Deines says. “We worked with a specialty vendor to research the copper patina and design scribing on metal doors to achieve the perfect finish to meet the Cavs’ expectations.”
venues. Each neighborhood is anchored by food and beverage tenants. “We actually have the same number of points of sale we had before, but each has been reimagined,” ” Komoroski says. To make the space seem even roomier, old floors have been replaced with white terrazzo flooring. Ceilings have also been raised three feet in the corridors.
All food and beverage areas have been updated with LED lighting, tile surfaces, new equipment, new countertops and signage. Some of the establishments now offer self-ordering options and at the CLE/MKT, fans can dispense their own draft beer and use the Mashgin artificial intelligencepowered, multi-item express checkout.
“The fun of working on sports hospitality projects, and especially for Rocket Mortgage FieldHouse, is to choreograph a series of hospitality spaces... with clear distinctions from one club space to another.”
Hangin’ out in the neighborhood There are also eight destination “neighborhoods” throughout, where friends can meet up, hang out and enjoy their refreshments from 18 unique food 34
New player spaces
“Gensler also had the opportunity to reimagine and bring to life the vision of Cavaliers General Manager Koby Altman for the renovated players’ spaces in the building,” adds Sickman. The Cavs’ locker room incorporates a state-of-the-art sound system, Kelly Deines high-end lockers with no exposed ROSSETTI hinges and custom carpeting that includes the team logo, plus a verDespite reducing the plenum area, all satile LED board. The locker room is the high-tech cabling has been hidden three times larger than its predecessor. “This was one of the most rewarding and provisions have been made for more elements of the project for me personally, wiring in the future. The Overlook Bar presents guests growing up in the Cleveland area, being with great views of the Cleveland of Cleveland-rooted parents – Rocky Skyline, and the Budweiser Brewhouse River – and getting to design the Cavs’ provides fans with open viewing of the locker room,” Sickman says. “It was truly entire arena, while never being far from a dream come true. Coupled with the personal opinion that this is hands-down the closest tap. Properties | November 2019
Proud to provide countertops for ROCKET MORTGAGE FIELDHOUSE
Delivering Quality & Service – Consistently Bradley Stone offers expert services in a wide range of commercial & residential applications:
Granite • Quartz • Marble Limestone • Soapstone • Onyx Travertine • Porcelain Glass Tile • Stone Care 30801 Carter St. | Solon, Ohio 44139 440-519-3277 | www.bradley-stone.com
www.propertiesmag.com 35
ECLECTIC MENU Eight destination “neighborhoods” are located throughout, each anchored by unique food and beverage vendors, such as Saucy Brew Works (top), Banditos Cantina (middle) and Symon’s Burger Joint (bottom).
the best team space in the league, it’s something we are very proud of.”
Optimized operations offices Administration offices occupy the 5th and 6th floors of the facility. All design direction for this space was performed by Pophouse, of Detroit, Michigan. “We were fortunate in that the office spaces had interesting existing architectural elements that we were able to incorporate into the design,” says Anna Habig, design director at Pophouse. “Things like a spiral staircase and visible structural bracing became complementing features to the design narrative, and were further enhanced with specialty millwork.” “The offices at the Rocket Mortgage FieldHouse are shared by several sports brands, including the Cavaliers, the Cleveland Monsters hockey team and the Cavs Legion of the NBA 2K League,” explains Sophia Grdina, senior interior designer for Pophouse. “We wanted to create a space that celebrated the diversity of the teams working side-by-side. Through our workplace survey, we were able to find a common thread among all team members: an extreme sense of pride around the city of Cleveland and its industrial heritage in the steel industry. With this inspiration, we focused on an industrial athleticism concept, utilizing raw materials like steel and forms inspired by the bridge trusses prevalent throughout downtown Cleveland.” “With a limited footprint for the office space, our team needed to provide each person adequate workspace and office amenities, while still providing program for multiple work styles and collaboration,” adds Grdina. “Our final design was a combination of tech-free huddle spaces, hospitable gathering areas and the addition of many more digitally integrated conference and meeting spaces. By eliminating and repurposing private offices for team member space, we were able to maximize the usable space.”
Power portal + high tech Technology was a major component of the entire renovation. With 279 wireless 36
Properties | November 2019
REIMAGINED ARENA The $185 million transformation has expanded the sports and entertainment venue with 55,000 additional square feet of public space, new dining options and modernized fan amenities, plus upgraded offices, club areas, suites and player lockers.
“The fan experience areas of the access points, wireless coverage should be restrooms. Using a system called Kolo phenomenal. More than 730 connected Smart Janitorial Monitoring, mainte- building are always the most satisfy4K flat screens help with wayfinding, nance personnel will be alerted every ing for us,” Sickman says. “To see the show mouthwatering food images and time a towel or toilet dispenser gets looks on people’s faces when they see a renovated building is always very advertise upcoming entertainment acts. below a predetermined paper capacity. rewarding as a design firm. You can see But the signature piece is known as Multiple teams score a win the emotions, the memories and the joy the Power Portal. Composed of 2,200 Reflecting back on the successful in their faces as they remember what it borderless LED panels with 2.4 million pixels of illumination, this “tunnel” of completion of the project, each of the was and begin to realize what it is now. We’ve been honored to work with the light projects seamless, high-resolution design teams share in the success. Cleveland Cavaliers during the last video images above and to both sides several years to complete this beauof fans as they progress from the tifully designed project and deliver Sherwin-Williams Entrance into the it to the city of Cleveland.” concourse. Using an immersive audio Klann proudly adds, “having system known as Soundscape techbeen involved in the original arena nology, the sound follows fans as they that opened in 1994, we find it walk through the portal. truly satisfying to be part of the “RPMI was the lead architect for renovation that updates the arena the Power Portal, working under a for the next 25 years.” direct contract with the Cleveland Len Komoroski “We believe the Rocket Mortgage Cavaliers,” Klann says. “Our work Cleveland Cavaliers/Rocket Mortgage FieldHouse FieldHouse transformation is the on the portal was extremely satmost holistic renovation of a major isfying as it is a one-of-a-kind “SHoP is excited by the idea that professional arena ever executed and project. Working closely with the technology firm, ANC, we enjoyed you don’t need to tear a building down will set the standard going forward,” cooperatively solving issues related to to create something new and beauti- Komoroski says. “Both the interior and sound, lighting, mechanical systems ful,” says Sharples. “We feel that the exterior have been completely transRocket Mortgage FieldHouse is going formed. Unless you knew otherwise in and construction tolerances.” Technology is even playing a role in to be a great civic experience for the advance, you would think it’s a brandnew venue.” P keeping the towel containers full in the citizens of Cleveland.”
“We believe the Rocket Mortgage FieldHouse transformation is the most holistic renovation of a major professional arena ever executed and will set the standard going forward.”
www.propertiesmag.com 37
BILLBOARD News about people, products, places & plans
Hahn Loeser & Parks Names White as Partner-In-Charge
H
ahn Loeser & Parks LLP recently announced that Craig Owen White has been appointed by the firm’s board of directors as the new partner-in-charge of the Cleveland office. In his new role, White will play a leading role in the growth and direction of the firm in Northeast Ohio. Currently the firm’s Cleveland Office is home to more than 65 attorneys. White has been with Hahn Loeser since joining the firm in 1990. He was elected to the firm’s partnership in 1991 and served on the firm’s board of directors from 1997 to 2007. As a senior partner in the firm’s Business Practice Area, White guides established and growth-oriented companies through mergers, acquisitions, divestitures, enterprise governance, and financing and licensing issues Craig Owen White in the U.S. and abroad. He serves as a director of Great Lakes Cheese, Co., Inc., one of the largest privately owned food companies in the U.S. In addition, White was recently appointed for a second term by the United States Trade Representative (USTR) to the Trade Advisory Committee on Africa (TACA) and was appointed chair of the TACA earlier this year. White received his J.D. from the University of Virginia School of Law in 1983; was named as a Thomas J. Watson Jr. Foundation Fellow for Economic study in Kenya and Ghana from 1979-1980; and received his B.A. from Williams College in 1979.
Donley’s Announces Three Recent Promotions Donley’s Inc. recently announced the promotions of three employees – John Berkebile, Courtney Moore and Nate Heitner – from project manager to senior project manager. Berkebile, Moore and Heitner are a part of a construction team that is consistently ranked in the top SAFETY & SECURITY
three construction firms in Northeast Ohio and in the top 400 nationally. Since joining Donley’s in 2002, Berkebile has worked on numerous higher education and healthcare projects. Most recently, he served as the project manager on CSU’s Center for Innovation in Medical Professions (see full story, Properties, September 2015, available at www.properSUPERIOR INSULATING
tiesmag.com) and the Health Education Campus project (Properties, June 2019). Moore joined Donley’s in 2011. Her work portfolio includes the Health Education Campus, Tinkham Veale University Center (Properties, October 2014) and Tomsich PLMI Laboratory, along with cochairing cost reporting and software initiatives. Her ENERGY CONSERVATION
career began in 2004, after graduating from Syracuse University with a bachelor of architecture and the University of Southern California with a master’s in construction management. Heitner joined Donley’s as a project engineer in 2011 and became a project manager in 2014. His portfolio of Donley’s projects includes MOCA Cleveland (Properties, November 2012), CWRU Tinkham Veale, City of Akron Rack 14, Oatey’s headquarters, and the Summa Health West Tower (Properties, July 2019).
NAIOP Announces 2020 Awards of Excellence The Northern Ohio Chapter of NAIOP recently announced details regarding its upcoming Annual Awards of Excellence next spring. The event will take place at Windows on the River in Cleveland on May 13, 2020. The annual awards program recognizes outstanding achievements in commercial real estate in 11 categories, including Architectural Design, Interior Design, Exterior Renovation, Interior Renovation, Development, DECORATIVE
www.SunrayFilms.com nrayFilms.com
800.295.8468 295.8468
A Female & Minority Owned Company Company ority Owned “It’s Always a Sunny Day at Sunray!”
38
Authorized Dealer & & Applicator Applicator ed Dealer
Properties | November 2019
BILLBOARD News about people, products, places & plans
Transaction, Broker, Construction, Investment Transaction and Developer and – new this year – Innovation in Commercial Real Estate. NAIOP is now accepting ‘Intent to Enter’ applications at awards.naiopnorthernohio.com. The deadline for entries is Monday, December 16. For more information, visit www.naiopnorthernohio.com or call the NAIOP Chapter Office at 440.899.0010.
Marcus & Millichap Welcomes Senior Associate Marcus & Millichap, a commercial real estate investment services firm with offices throughout the U.S. and Canada, recently announced
commercial real estate firm. Marcelli specializes in office and industrial properties throughout Northeast Ohio.
Walter | Haverfield Acquires Two Regional Law Firms
Steven Marcelli
that Steven Marcelli, a 25-year veteran of the commercial real estate industry, has joined its Cleveland office as a senior associate. Prior to joining Marcus & Millichap, Marcelli was a top performer at a local Canton
Cleveland-based law firm Walter | Haverfield has acquired Hurtuk & Daroff Co., LLP, a Cleveland real estate and finance law firm with a nationwide practice and wide-ranging client base. Separately, it has acquired Nardone Limited, a tax planning and business services law firm headquartered in Columbus. The acquisitions are part of a strategic initiative by Walter | Haverfield to expand its presence in Ohio
and deepen the firm’s expertise in key practice areas. Hurtuk & Daroff, a leader in real estate law and finance, provides counsel to developers, real estate investors, retailers, financial institutions, contractors and other participants in real estate transactions and finance. The firm, which has seven attorneys, has developed a substantial presence in local and national real estate transactions. Ed Hurtuk will be partnerin-charge of the Mayfield Heights office and a member of the Walter | Haverfield executive committee. Nardone Limited, founded and led by Vince Nardone, is a business services law firm with a nationwide specialty
director@aiacleveland.com
216.662.5200 chassvecinc@brightdsl.net www.propertiesmag.com 39
Have occupied space? Need flooring solutions? Talk to the occupied space solutions providers.
BEFORE: Carpet & Workstations
BEFORE: Carpet
AFTER: New Carpet
Specialists in Corporate, Healthcare & Industrial Occupied Office Space for 35 Years Ź Single-source accountability Ź No downtime to end-user/client Ź Reduced timelines & costs/fees
AFOC is recognized as the experts in occupied space change-outs. With in-house labor for both floor covering & furniture relocation, we provide single-source expertise coupled with our moving division, Business-on-the-Move.
For further info on occupied spaces, visit www.afocfloors.com.
Architectural Floors of Cleveland
COMMERCIAL FLOORING SOLUTIONS PROVIDER 40
18200 Brookpark Road, Cleveland, Ohio 44135 216-898-1550 / www.afocfloors.com / afoc@afocfloors.com Properties | November 2019
BILLBOARD News about people, products, places & plans
Ed Hurtuk
in buying and selling dental practices. The firm also represents clients throughout Ohio and surrounding states in matters related to tax and succession planning, employment issues and professional practice transitions.
Nardone, who has a master’s in tax law, will be partnerin-charge of the Columbus office and a member of the firm’s executive committee. Walter | Haverfield has experienced significant growth over the past several years. Since 2017, the firm has increased its number of attorneys by 30% and gained more than 1,300 new clients. The acquisition of Hurtuk & Daroff and Nardone Limited brings the total number of attorneys at the firm to nearly 90.
Reich Appointed to the ABA Forum on Construction Law Frantz Ward recently announced that construction attorney Allison Taller
Reich has been appointed to the American Bar Association (ABA) Forum on Construction Law’s Technology Committee. The committee’s goal is to utilize technology to enhance the forum experience and make the forum’s benefits accessible to membership. She received a 2019 Diversity Fellowship from the ABA and is a member of the forum’s Division 13 Steering Committee. Members of the ABA Forum on Construction Law represent all segments of the construction industry: owners, design professionals, general contractors, construction managers, subcontractors, suppliers, insurers and sure-
Allison Taller Reich
ties. The forum’s mission is to serve the construction industry through education and leadership while “Building the Best Construction Lawyers.” Reich focuses on all aspects of construction law, includ-
christian phillips photography architectural interiors landscape info @ c-p-photo.com christianphillipsphoto.com 617.990.4587 OH/NY/MA will travel Associate AIA Member xhibition by dimit architects
...see the difference a trained architect can make looking through the lens!
www.propertiesmag.com 41
BILLBOARD News about people, products, places & plans
ing drafting, negotiating and revising contracts; assisting clients manage claims, projects and schedules in real time to keep projects moving; and resolving disputes between her clients. She earned her J.D. from Cleveland-Marshall College of Law and her B.S., in Architecture, from The Ohio State University.
Miller graduated with a degree in interior design from Kent State University. She serves as an advocacy coordinator for the IIDA (International Interior Design Association) for the Cleveland/Akron chapter.
Richardson Design Welcomes Senior Interior Designer
Dan Gilbert’s Bedrock LLC recently announced that Matt Cullen is joining the real estate company as chief executive officer and Mark Dunkeson will be joining as president and chief operating officer. Cullen and Dunkeson have led casino gaming and racino company JACK Entertainment, and will be
Richardson Design has expanded its design team by adding Kimberly Miller as senior interior designer, the firm announced recently. She joins Richardson Design from Louis & Partners where she worked as a senior interior designer.
Bedrock Announces New CEO, President/COO Matt Cullen
expanding their role as leaders within the Rock Family of Companies. Cullen will continue to serve as chairman of the board for JACK. Dunkeson will hold the position of chief executive officer of
JACK and remain a member of the board of directors. Detroit-based Bedrock is a full-service real estate firm specializing in acquiring, developing, leasing, financing and managing commercial and residential buildings. Since its founding in 2011, Bedrock and its affiliates have invested and committed more than $5.6 billion to acquiring and developing more than 100 properties, including new construction of ground-up developments in downtown Detroit and Cleveland totaling more than 18 million square feet. P WHAT’S NEW? For coverage within Billboard, send along company news, story ideas and project information to billboard@propertiesmag.com.
:ȝ &Ȫ8ȫ+ 2ȭ5 &ȧ0Ȩ(Ȭ,Ȭ,ȧ1 J.V. Janitorial Services, Inc. • Commercial Buildings • Construction Sites • Special Event Clean-Up • Concrete Cleaning • Carpet Cleaning • Window Cleaning
COMMERCIAL, RESIDENTIAL & INDUSTRIAL DEMOLITION ASBESTOS SURVEYS & ABATEMENT • WRECKING
CAREY DEMOLITION 216-881-0608 | www.careydemolition.com 2695 E. 55th St. | Cleveland, OH 44104
42
• Wall Washing • Acoustical Ceilings
1230 East Schaaf Road Brooklyn Heights, OH 44131
216-749-1150 www.jvjanitorial.com Properties | November 2019
Ignoring your environmental issues won’t make them go away.
EA Group has provided environmental consulting and laboratory services to a wide range of clients for over 25 years. We’ve helped
EATHE BRE E ASIER
hundreds of companies solve their most challenging environmental issues from assessments and analysis to project management and remediation. Stop hiding from the problem and put our team to work early to avoid environmental emergencies that can result in costly and unexpected delays. Our expert technicians are experienced in: • Asbestos and Hazardous Materials Management • Site Assessment and Remediation • Indoor Air Quality Assessment • Industrial Hygiene and Safety • Mold Remediation Management • Analytical Laboratory Support
800.875.3514 • 440.951.3514 • www.eagroupohio.com 7118 Industrial Park Boulevard • Mentor, OH 44060
FINANCIAL STRATEGIES Smart use of fiscal planning & action
Made in China ast month, I had a unique opportunity to visit China. I could spend hours talking about the food (if you’re thinking P.F. Chang’s, think again), the people (can you say 1.5 billion, with a ‘b’) and the flight (14 hours is a lot of seat time). But real estate plays a huge role in the Chinese economy and if someone invites me in the front door, I’ll make myself right at home.
L
ALEC J. PACELLA
This month, I’m going to discuss some primary observations from my trip.
Owning your castle The Chinese culture fosters an overwhelming desire to own versus rent. Although this is particularly true in the residential market, it also carries over to the commercial market. The majority of my time in China was spent in the coastal city of Shanghai, which, with a population of 24 million, is the second largest city in the country. While I was there, I saw literally miles of lowrise, multifamily buildings and the vast majority of these are condominiums and not apartments. The same is true for the scores of small to midsize manufacturing facilities that dominate the landscape between the central city and the China Sea. Most of these are owned rather than leased.
With a clarification In China, you really can’t own anything, at least not in the manner that
44
we think about owning a parcel of real estate. With rare (and I mean rare) exceptions, the Chinese government retains ownership of all of the underlying ground. When people in China refer to owning, they are really talking about controlling the leasehold interest. For example, a Shanghai resident says that they live in a condo. And while it’s true that they don’t pay monthly rent, they can only control the specific condo unit that they are living in for a maximum of 70 years. An owner can generally sell this long-term lease to another person but, again, it is really a leasehold interest as opposed to a fee-simple interest. It’s the same for all types of real estate, including retail, office and industrial.
Not so big data When it comes to technology, China is a huge paradox. On one hand, virtually all of the hardware that we are accustomed to working with, including brands such as Apple, Lenovo and Dell, are predominately manufactured in
Properties | November 2019
China. And they have is known as Jin Mao a massive software and Tower. It is also the programming sector. oldest, completed in TWO ON THE MOVE Last month, However, the data 1999, and the smallnot one but two 1980s-era office that is available to real est, at 88 floors and buildings traded hands on Rockside estate professionals is 3.1 million square Road. 6400 Rockside sold for $2.65 decades behind when feet. The middle child million. The 34,000-square-foot, three-story building is completely compared to what is is Shanghai World vacant. Right next door, 6500 available here. Not only Financial Center. Rockside sold for $5.4 million. This is there no comparable It was completed in 55,000-square-foot, multi-tenant counterpart to third2009, rises 101 floors building is 93% occupied. –AP party providers such and encompasses 4.1 as Co-Star, Landvision million square feet. and ESRI, but even But the granddaddy basic information is scarce. For example, is Shanghai Tower. It is the newest, we have access to data produced by completed in 2014 (six years after county auditors, the U.S. Census and construction started). At 128 floors, the Bureau of Labor Statistics. However, it is not only the tallest building in these types of agencies are non-existent Shanghai but also the second tallest in China, which leaves a huge void in building in the world. And it encombasic data. Even popular search engines passes a whopping 6.2 million square such as Google, Wikipedia and YouTube feet. Over the course of a morning, I don’t exist there. As a result, conduct- saw more office square footage in three ing real estate business in China today buildings than there is in Cleveland’s is much the same as it was in the U.S. entire suburban office market. two decades ago, dominated by “on the street” knowledge. Haves and have-nots Retail in Shanghai was particularly A three-hour tour perplexing. Primary arterials were domiIf you think crossing I-480 during nated by retailers and restaurants that rush hour is bad, think again. Shanghai are mainstays in China. Meanwhile, covers approximately 2,500 square marquee U.S. names such as McDonald’s miles, which is roughly the same as and Starbucks were relegated to offbeat the Cleveland-Akron Metropolitan locations. However, some of the mainStatistical Area. However, Shanghai stream U.S. brands are afforded superior has approximately seven times as many locations. The Apple Store in Shanghai people as we do, so it’s no surprise that has a “main and main” location in a pricongestion plays a significant part of mary shopping and tourist area known the daily grind. To help ease highway as The Bund, which is located on the gridlock, China has chosen to make western bank of the Haungpu River. driving a privilege that few can afford And I spotted none other than a Dairy to enjoy. The cost to maintain an Queen situated on a prime corner in the annual driver’s license and associated Chenghuang Temple, a walled city that vehicle registration costs the equivalent dates to the 1400s. of $15,000 a year. And if you are thinking Uber and Lift, think again – these Real estate aside, I found China to popular ridesharing services don’t exist be a fascinating country. There is a balin China. anced fusion of old and new. While the centuries of tradition is evident, you can also see many influences from the westBiggie-size I spent part of a morning in Shanghai ern world. I would certainly recommend touring some office towers in the cen- visiting should the opportunity present tral business district. I was only able itself – just make sure you have a good to see three office buildings – but not book or three for the flight! P because of distance. All three were actually adjacent to one another, at Alec Pacella, CCIM, senior vice president at the intersection of Huayuanshiquiao NAI Pleasant Valley, can be reached by phone at Road and Dongtai Road. What took 216.455.0925 or by email at apacella@naidaus. so long was the sheer size of these com. You can follow him on twitter @dausyouknow structures. The smallest of this trio or on his blog at http://blog.sbequitiesinc.com.
What I C @ PVC
1st CHOICE ROOFING COMPANY
We are a customer service company providing unmatched integrity and HGXFDWLRQ LQ WKH URRÀQJ DQG construction industry.
COPPER SLATE TILE HISTORICAL RESTORATION & PRESERVATION
1st CHOICE ROOFING COMPANY
10311 Berea Rd. Cleveland, OH 44102 ZZZ VWFKRLFHURRÀQJ FRP
216.227.7755 www.propertiesmag.com 45
ACAR CORNER Issues in the real estate industry
Young Adults Pick Small Towns ore millennials and younger Gen Xers are leaving the big cities behind and opting for smaller towns to call home. Since 2014, an average of about 30,000 residents between the ages of 25 and 39 have departed big cities annually, according to U.S. Census Bureau figures. Smaller cities have been seeing some of the largest influxes of the millennial generation.
M JUDY GORBETT DARWAL
Young adults who freelance or have telecommuting jobs are more likely to move out of urban job centers and move out to smaller towns. Towns like Boise, Idaho, and Charlotte, North Carolina, are seeing their populations grow at a faster rate than most big cities, Census Bureau data shows. Young adults are in search of more affordable housing, larger lots, quality schools and lower costs. “The fiercely independent nature of millennials has made indie enclaves in cities such as Portland, Oregon; Austin, Texas; and Charlotte attractive options for settling down,” a 2018 study by Rent.com notes. “The so-called ‘hipster’ culture has become somewhat of the poster child for 20-somethings, even if none of them would dare to admit it. The thriving art cultures of smaller
cities give young people the opportunity to live cheaply while still being able to express themselves.” Small towns near large cities are a popular choice. For example, Milwaukee, Wisconsin, is about a 30-minute car ride from Chicago and is drawing more young people there for its affordable rent and cultural offerings, the Rent.com report notes. Conversely, a Cleveland Foundationcommissioned study by The Center for Population Dynamics at Cleveland State University (published in 2016) revealed Cleveland is eighth in the nation in the growth rate of college-educated millennial residents aged 25 to 34. P Judy Gorbett Darwal, broker/owner at RE/MAX Trinity, is 2019 president of Akron Cleveland Association of Realtors. This article is reprinted with permission from Realtor Magazine.
<DUG 5ROO RII 'XPSVWHUV <DUG )URQW /RDG 'XPSVWHUV 7RSVRLO 0XOFK $JJUHJDWHV Boulders • Fill Sand • Clay :H $FFHSW &RQVWUXFWLRQ 'HEULV &OHDQ )LOO 'LUW &RQFUHWH DQG 2UJDQLF :DVWH
46
BOYAS RECYCLING
PETE & PETE
11311 Rockside Rd., Valley View, OH 44125 216-524-3620 www.boyasrecycling.com
4830 Warner Road *DUÀHOG +WV 2+ 216-441-4422 ZZZ SHWHDQGSHWHLQF FRP Properties | November 2019
BETWEEN THE WEATHER & YOU SINCE 1922
WARREN ROOFING WARREN ROOFING AND INSULATING COMPANY
With 94+ years in business, Warren Roofing knows what it means to provide top-notch customer service and quality workmanship. We work directly with manufacturers to provide a complete selection of roof systems from single ply to modified/built up, liquid applied coating, solar and green roofing, along with maintenance and repairs.
Commercial/Industrial Roofing + Architectural Sheet Metal 48
440.439.4404
Fax 440.439.7523
www.warrenroofing.com Properties | November 2019
Reshaping History in Chagrin Falls $29.5 million renovation & addition upgrades intermediate school By Doug Bardwell | Photos by Scott Pease
core one for saving another landmark building in Chagrin Falls. The Chagrin Falls Exempted Village School District dedicated this historic school building at 77 E. Washington St. on August 17 with a ribbon-cutting ceremony following its $29.5 million renovation. The 88,000-square-foot, three-story Chagrin Falls Intermediate School sits on three acres and serves approximately 400 students in the fourth, fifth and sixth grades.
S
Located just a short stroll from downtown Chagrin Falls, there’s been a school on this property since 1885. In 1914, the original high school was built here. As a WPA project in the 1940s, a gymnasium, auditorium and three-story classroom wing were added to the 1914 structure. Since then, the question was always – “What now?”
A community comes together Few items in Chagrin Falls ignited people’s opinions like the question of whether to keep the old building and remodel, or relocate the school to other property owned by the Chagrin Falls Board of Education. On the subject of historic preservation, proponents
stressed the idea of the school being ideally located in a walkable neighborhood, with access to the nearby historical society and proximity to a lively downtown business district. Opponents lobbied for relocating the Intermediate School to a more remote location where the Elementary School was located. They stressed the fact there were 32 acres available for a new facility and the two schools could share common functions like the gym and cafeteria. Prompting the discussion was a ruling by the Ohio School Facilities Commission in 2011, stating the building had outlasted its useful life. Accessibility issues with all the stairs in the build-
ing were foremost, and the heating and plumbing systems were severely outdated. “That started the discussion process in earnest, and we began a master plan of all the school buildings in the district,” recalls Robert Hunt, superintendent for the Chagrin Falls Exempted School District. Retaining Stantec Architecture Inc., the board looked at dozens of iterations, evaluating multiple designs on multiple campuses. Community meetings were held and debate was lively as citizens voiced their opinions on each design idea. “As divisive as the discussions were, it was something we had to go through,” says Hunt. “We thought the community would support us, but only www.propertiesmag.com 49
Register Now!
NEW USES Wood salvaged from the old high school hardwood flooring is repurposed in a few key areas, including a warm-toned, well-polished half-wall in the receptionist’s desk.
if we looked at all the options and heard all their opinions.”
Making a decision to move forward
68th Annual Design & Construction Conference & Tradeshow "Sustaining the Region Through Design, Engineering and Construction" FRI., MARCH 27, 2020 8:00 A.M. – 4:00 P.M. LaCentre Conference & Banquet Center Westlake, OH
Engineers Earn Up to 5 CPD hours! Register by January 31 for early bird discounts. www.cesnet.org/events -!'!:).% ).#
is a proud media sponsor of the Cleveland Engineering Society 50
By 2014, signs were pointing to retaining the original 1914 building along with the 1940s gym and auditorium, while slicing out the old three-story, L-shaped center section which joined them together. Western Reserve Developers, of North Ridgeville, worked as owner’s representative from very early on in the project, even before it was funded. “It was a very difficult project, considering we were working with the two older buildings built at different times,” says Terry Keenan, owner/president of Western Reserve Developers. Keeping the auditorium and adding a cafeteria in front would allow community functions to use the building after school hours, providing a valuable asset to the neighborhood. John Bourisseau, board president of Chagrin Falls Historical Society, relates that “Chagrin Falls is a community that fully engages people in the arts, so six community arts organizations came together to write a grant application for the State legislature to obtain a $600,000 Ohio Cultural Facilities Grant to renovate the auditorium for community events.” Involved in the grant application were Chagrin Arts, Chagrin Documentary Film Fest, Chagrin Falls Historical Society & Museum, Valley Arts Center, Chagrin Studio Orchestra and Chagrin Valley Little Theatre. “There’s no other place in the community where you can have a performance
for over 300 people,” says School Board President Kathryn Garvey. In addition, the new designs featured an entire special education suite and substantially improved arts education space. Prior to this, the special education areas were randomly located in whatever spaces could be commandeered. “Having a full suite of facilities for our special ed faculty, even including dedicated de-escalation rooms, is probably the most significant improvement in my opinion,” states Hunt. “Throughout the process, the board’s main concern was putting the students, faculty and community first, assuring that they provided quality in every piece of the project for the best value,” explains Keenan. “Our final design concept plan reflected three distinct exteriors, showing the archeological history of the building, which I feel is one of the successes of the project,” explains Beth Ahren, project architect with Stantec. On the new central section, gray and buff larger stones contrast with the dark brick finishes on the two historic portions. “We wanted the new addition to be reflective of the year 2019, yet we knew it needed to integrate with the two historic structures it was sitting between and wrapping around. We did this by studying proportions and detailing from both of the historic structures and incorporating those into the design.” “The stone rustication is inspired by the 1940 gym’s pilaster rustication,” continues Ahren. “The cornices on the additions are modern interpretations of the 1914 cornice, and the new classProperties | November 2019
HONORING HISTORY Embracing the past, the cafeteria incorporates original, elegant white arched openings and a 1940s limestone wall.
room wing brickwork detailing takes cues from the 1914 brickwork.” Each section is distinct, but together they form a cohesive whole. Inside the building, finishes flow through from one section to the next. The color palette is generally neutral, allowing student projects to produce pops of color throughout. The exception is the accent color coding per floor. Fourth grade classrooms on the first floor use orange as their accent color. Fifth graders on the second floor see blue in their common areas, while sixth graders enjoy a green color scheme on the third floor. On the east side of the building, fullheight, glass curtainwall allows vision
through and across the new cafeteria, highlighting the historic 1940s limestone wall and elegant white arched openings of the entrance to the auditorium. “From our meetings, we knew that keeping and celebrating those arches was something that was really important to the community,” says Ahren. “Going through the design review process, it was obvious they would have never accepted anything other than maintaining the historic look of the buildings, which was always our intent as well,” adds Ahren. With a win-win proposition for the community, the decision was made to put a combined bond and operating levy
of 8.9 mills on the ballot in May 2017. With 67% of the electorate voting for the issue, the school district was able to issue $31.5 million in bonds for repair and renovation of the schools. Demolition couldn’t begin with students in the building, so all three grades were transitioned to mobile trailers situated around the middle and high school campus in August of 2017. Intermediate students then shared cafeteria and gymnasium time with the middle school for two years.
Design documents begin “Preliminary design started early in 2017,” Ahren says. “In all, the project
We design with community in mind Stantec is a proud supporter of the Chagrin Falls Exempted Village Schools community.
stantec.com/education
www.propertiesmag.com 51
STAGING EVENTS The auditorium seats more than 400 in fixed seating on a sloped floor, and includes a large stage area enabling music and drama productions of all types. Recessed rope lights in the floor provide illumination when the room-darkening shades are drawn.
measures 88,000 gross square feet, with 35,000 reused from the original buildings.” “We were working on a [program of requirements] in May 2017,” says Keri Ash, project manager with Gilbane Company, selected as CM at Risk. A ceremonial groundbreaking occurred on October 14, 2017 with “farewell tours” conducted through the old building. In November 2017, abatement began with the start of demolition scheduled for December. “It wasn’t just a simple expansion,” explains Ash. “We ended up building
a sandwich, putting the new section between the two historic structures.” “We worked on four phased GMPs,” explains Ash. “First phase was abatement and demolition. Second was structural concrete, steel, site work and exterior underground utilities. The third was all building enclosure bid packages and the final consisted of general trades, flooring, kitchen equipment, casework, final cleaning and landscaping.” Exterior masonry walls, concrete floors and the steel framing were retained from
the 1914 high school building, but everything else was removed. The old concrete deck in the 1914 building was too brittle to support fasteners for hanging mechanical infrastructure. To solve the issue, an engineered grid system was used to provide hanger locations and distribute the load. New windows were installed throughout, matching the old profiles, but now operable. Fortunately, the exterior masonry was in better-than-expected condition and required less tuckpointing than anticipated.
AT GILBANE, WE HELP BUILD BRIGHTER FUTURES.
Chagrin Falls Exempted Village Schools Intermediate School
#
1
K-12 Builder
by Building Design & Construction 2019
www.gilbaneco.com 52
Properties | November 2019
The new center section added new steel framing, metal decks and concrete floors, as well as a gray-colored TPO single-ply roofing membrane. From a heating and cooling standpoint, rooftop units handle most of the HVAC load throughout the new and existing portions of the building while fin tube provides supplemental heating throughout the 1914 building. “Keeping the old classrooms comfortable was always a challenge,” recalls School Principal Sarah Read. “The old heating system was hard to control, which required windows to be opened sometimes in the winter, and some of the windows wouldn’t even open.” The new heating and cooling system should represent a substantial efficiency improvement. While not applying for LEED certification, Ahren suggests the project
“We benefitted from having many subcontractors who were part of the school district, and who genuinely cared about the outcome of this project. It was like an unspoken partnership that enabled us to work through some adverse weather and ultimately deliver the project early and under budget.”
Our Congratulations to Stantec Architecture and Gilbane on the Chagrin Falls Intermediate Elementary School
Exterior Structural Cold-Formed Metal Framing, Interior Metal Framing, Insulation, Drywall, Millwork, Casework, Finish Carpentry, Acoustical and Specialty Ceilings, Acoustical Wall Panels, Door Frames and Hardware, Specialty Wall Covering, Painting, Bathroom Accessories, Auditorium Features, Gymnasium Equipment, GFRC Columns, GFRG Fiberglass, Exterior Trim, EIFS, Overhead Coiling Doors ocpcoc.com
Defining THE Skyline®
Commercial & Industrial 24/7/365, Since 1987
Keri Ash Gilbane Company would probably achieve Silver status. Some of the sustainable features include the use of natural lighting to reduce lighting load, occupancy sensors and low-VOC products used throughout. On a normal day, natural illumination makes auxiliary lighting minimally necessary, so the lights only come on automatically to 50% levels. If more illumination is necessary, they must be manually switched on. “We’ve also gained green space, to the southwest corner, that we didn’t have before,” Hunt says. There is an access lane around the back of the school that is actually a permeable grass paver system. “The paver system allows grass to grow through, yet
5500 Old Brecksville Road Independence, Ohio 44131 216-642-6040 p | 216-642-6041 f www.precision-env.com www.propertiesmag.com 53
SINCE 1972
Façade Inspection | Tuckpointing/Caulking Pressure Washing | Brick & Stone Repair/Replacement 216.881.4142 | 4408 St. Clair Avenue | Cleveland, Ohio 44103 www.hmhrestoration.com
2008-201
can support the load of a truck should one need to drive around that part of the building,” Ash says. As construction progressed, the community was constantly informed about the progress with online updates, a webcam and photos of the project in various stages of completion. Hard hat tours were also given to students with introductions to the various employment opportunities available in the construction industry. During September 2018, a beam-signing event was held for the community. “The Gilbane team were very creative considering some surprises that came up during demolition and construction,” says Keenan. “Working with the owner in the same manner, they focused on quality and value, so that the project came in on time and under budget. With additional funds saved, they were able to use those for other important projects that will benefit the community at large. The core leadership of the school district were incredible to work with.” “We benefitted from having many subcontractors who were part of the school district, and who genuinely cared about the outcome of this project,” says Ash. “It was like an unspoken partnership that enabled us to work through some adverse weather and ultimately deliver the project early and under budget.”
First floor Entry to the school is now through the new center addition, facing south. The school office provides offices for principal and assistant principal, along with office staff areas, clinic, conference room and special guidance areas. A handsome, well-polished, warmtoned, wooden slat half wall creates the front of the receptionist’s desk – made of wood salvaged from the old high school hardwood flooring. A special badge is inlaid into the top of the wall, signifying it is made from authentic original construction materials. Two other installations around the building use more reclaimed wood. Pointing out some dark spots in the wood slats, Read says, “You can actually see some of the marks left by the old chairs in one of the former classrooms from the 1914 building. These wooden features have embedded a sense of warmth and history into our learning spaces.”
54
Properties | November 2019
COMMON COMFORTS Classrooms are clustered around a ‘learning commons’ on each floor. Each of these multipurpose areas acts as an extended learning space with bookshelves, lockers and flexible seating, providing space for presentations, group study and more.
Outside the office, in the entry corridor, a floor-to-ceiling mural shows a historical photo of the original high school building. Two more historical photos of other education buildings that have been on the site (including the demolished 1885 building) have been created into wall murals for other areas on the first floor. Immediately north of the offices is the classroom wing, with six classrooms ringing the exterior walls of the addition. The redesigned standard classroom areas feature saw-tooth staggered walls with half-height windows looking out into a common collaboration space on each floor. Each ‘learning commons’ serves several functions. It replaces the traditional library – with each floor stocked with its own age-appropriate extensive book collection. But, it also provides a variety of seating to create flexible academic spaces. “These ‘extended learning areas’ serve as expansion classrooms, giving students a space for cooperative learning, group presentations, projects and opportunities for a varied learning environment,” Read says. Lockers line the classroom and collaboration areas. Each has a color coordinated tiger paw label for the student’s name. (Chagrin Falls schools each use the tiger for their mascot.)
Each classroom level also has areas designated for small group instruction, which enable tutoring or intervention. “Small group instruction and cooperative learning have a significant impact on student achievement,” explains Read. “Each Grade House includes several Small Group Instruction (SGI) rooms, enabling teachers to meet with students to reinforce or reteach specific skills and concepts. Small groups typically range in size from six to 10 students. This allows teachers to personalize instruction and
a comfortable window seating area, the bench conceals fintube below. Linoleum sheet flooring is used throughout the cafeteria, while quarry tiles are used for flooring throughout the adjacent kitchen. All tables and attached seating fold up and can be whisked away both for cleaning after lunch as well as to clear the area to act as a large prefunction space outside the auditorium. Proceeding through the renovated white arches, you first enter the restored 1940s ticket lobby with refurbished ticket booth, and then enter the auditorium. The auditorium seats more than 400 in fixed seating on a sloped floor. Recessed rope lights in the floor provide illumination when the Sarah Read room-darkening shades are drawn. A large stage area enables music Chagrin Falls Intermediate School and drama productions of all types. Banks of stage lighting flank the intervention, provide individualized stage on either side and are controlled feedback, pre-teach and reteach topics, from a remote projection booth above and build student confidence.” the back of the auditorium. To the north is a cafeteria/event space, At the southeast corner of the buildwhich is built in front of the historic ing is the large, redone gymnasium. arches that lead to the original audito- Orange and black panels line the walls rium. The addition can hold up to 300 commemorating their mascot’s striped people for community events. coat. Highly polished wood floors, origiThis large space is awash with daylight nal from the 1940 construction, were as the almost floor-to-ceiling glass store- retained and refinished. front rises from a window seat made of To provide better circulation and sound more historic floorboards. Crafted into attenuation, a corridor was cut out of the
“Small group instruction and cooperative learning have a significant impact on student achievement.”
www.propertiesmag.com 55
EYE OF THE TIGER In the large, redone gymnasium, orange and black panels line the walls, commemorating the school mascot’s striped coat. Highly polished wood floors, original from the 1940 construction, were retained and refinished.
northern wall of the gym, eliminating the old bleacher seating. The corridor now separates the gym and the auditorium, preventing sound transfer between the two when events occur simultaneously. Wrapping around the gym on two sides are new exterior play areas, surfaced with cushy, soft, rubber matting. A host of climbing, swinging and spinning devices are mounted on mini, soft plastic boulders. The large parking area, not used during the day, provides more than adequate additional hardscape play area, separated from the street with new decorative, steel fencing.
Second floor On the second floor, directly above the school offices, are the special education classrooms. The sensory room is equipped with all types of mats, balls, wiggle chairs and other adaptive devices. Small, portable screens can create protected, focus areas throughout the space. Through personalized exercises and sensory-related therapy, students can use this space to calm and focus themselves so that they can be better prepared for learning and interacting with others. The other classroom is equipped with full-sized home appliances and a bath with full ADA-compliant shower for 56
teaching daily living skills. Two other smaller rooms are available for reading and speech tutors. The southwest corner of the former 1914 high school building is now called the Encore area, where large classrooms are available for STEM, world languages and art. The art room has generous storage for art materials and a separate room
“I’ve been pleasantly surprised how quickly our teachers have adapted to the new space.” Robert Hunt Chagrin Falls Exempted School District for a kiln. Easy-clean, rubber flooring is used in all art areas. A multi-collaboration room rounds out the area and can be used by either faculty or students as needs arise. The northwest corner has six more classrooms and a large learning commons area outside, with blue acoustical “clouds” hanging from the ceiling, blue columns and blue-themed carpet tiles. Each classroom throughout the building is equipped with large digital ViewSonic display screens, capable of
wirelessly casting content from laptops, digital cameras or phones. All students are entrusted with their own Chromebooks and carrying cases so they can prepare projects and have them displayed on the screens. Teachers also have access to voice amplification systems, which have proven to help students concentrate on their lessons. All classrooms benefit from moveable and height-adjustable desks, which can accommodate some students sitting while others might prefer to stand or sit on bar-height chairs. Chairs also come in a variety of styles including some which intentionally rock or wobble. Each classroom has window seating which can also be used for storage.
Third floor The third floor is home to the sixth graders, and a green theme again predominates in the learning commons area and around all door entries to the classrooms. In the southwest corner, music finds its home. The two largest rooms are devoted to band and to general music. End walls are used for instrument storage, including an entire wall of colorful African drums (in appropriately schoolthemed orange and black). Properties | November 2019
Clever plastic risers for choral groups can be unfolded to set various heights or can be flipped backwards and rolled out of the way when not needed. Noisy old metal music stands have given way to new, quieter plastic models. The major band room has three small practice rooms off to its east side, enabling areas for individual practice or lessons. The third room is devoted to orchestra with a large rack for the larger string instruments. A separate music storage room separates this area from the general music room. One more multi-collaboration room is located near the stairs. In the central area, above the main entrance are two large classrooms. The one for STEM education will be home to the school’s 3-D printer for maker projects. “This is one of the areas I’m most excited about,” says Read. “Our academic teachers will be able to bring students to this space and tie in with design and problem-based learning. It will also provide for extra-curricular opportunities like our Lego League Competition and community service projects. Thirdly, we have all types of tinkering opportunities with erector sets, PVC pipe, and even a wide-format printer. Our makerspace will provide hands-on, creative ways for students to collaborate, experiment, build and invent as they deeply engage in science, engineering and design. Students will have occasion to use the makerspace both during and after school.” The other large classroom is dedicated for all science subjects, with its own separate prep area complete with large stainless sink and storage shelving. Both rooms have doors leading to a sizeable outdoor roof terrace overlooking the main entrance to the school. Read calls it the ‘outdoor classroom’ and expects to be able to offer season-appropriate science projects like energy, biology or ecology as well as art projects, gardening and maybe some seating.
The two-year wait was worth it At the dedication ceremony, parents, students and community members got a chance to tour the facility, and comments were positive. “We were extremely pleased with collaboration of all the team, and
COLOR-CODED Spaces for each grade are themed with a different primary color. For instance, sixth grade academic areas on the third floor – such as a maker space (top) and a pair of music rooms (bottom) – are predominantly green.
the transparency which characterized our interactions,” Ahren says. “We’re proud to have solved the accessibility issues, so now everyone can enjoy the entire building.” “At the completion of many school projects, we prepare ourselves for the inevitable list of ‘I want’, ‘I need’ or ‘I have to have’ requests from building users,” rues Ash. “But this project was different. Every person who walked through the doors came through with sincere gratitude, thankfulness and appreciation. Credit has to go to the architect and the board, as every possible dollar went into programming.”
“I’ve been pleasantly surprised how quickly our teachers have adapted to the new space,” posits Hunt. “We thought it might take some time, but they’ve quickly begun leveraging all the space available. We want to teach children to be problem solvers, so we’ve been very thoughtful about incorporating an educational system to really prepare students for the next step. As I talk with my colleagues in other districts, I’m always amazed at all we offer our students here in Chagrin Falls, but I realize it is only possible because of the commitment to education displayed by our community.” P www.propertiesmag.com 57
Suppor rting Spotlighting the professional service providers successful construction projects Cast behind successf The State of Northeast Ohio’s Real Estate and Construction Industries Skoda Minotti releases results of its 12th annual survey By Roger Gingerich Skoda Minotti
hat is the health of Northeast Ohio’s real estate and construction industries? What are the greatest challenges and growth opportunities? These questions and more were the focus of Skoda Minotti’s 12th annual Real Estate and Construction Survey. The firm surveyed Northeast Ohio’s real estate and construction industry professionals to assess their views of the current and future state of their industries. While the industries remain healthy, respondents are increasingly cautious with their optimism.
W
It appears that some respondents are bracing for an eventual market correction. The lack of available skilled labor continues as a major challenge, and material cost volatility remains a top political issue. Still, the lending environment for both industries remains sound, and bonding requirements are the same or better than one year ago. Many respondents are waiting to measure the full impact of the Tax Cuts and Jobs Act, but real estate respondents are feeling positive about new tax incentives included in the legislation, including Opportunity Zones.
State of the construction industry Construction survey respondents report that their industry is strong; however, the optimism that prevailed in 2015 has steadily become more cautious. Since first reporting it as a challenge in 2014, the skilled labor shortage shows no sign of abating – respondents chose it as the greatest threat to their industry for the sixth consecutive year. Material cost volatility, likely affected by tariff turbulence, continues as a top political concern. Despite these challenges, respondents report improved job size, good competition for bids and a healthy project backlog. Positive lending environment • 94% of respondents report their ability to receive financing has increased or remained the same 58
• Almost three-quarters (71%) of respondents expect their ability to obtain bonding to remain unchanged • 39% report that 20% or fewer of their projects required bonding this year Expenditures • While 61% of 2018 respondents predicted they would increase their overhead expenditures in the coming year, only 51% of 2019 respondents increased spending • 42% of respondents held the line on expenses, a signal of uncertainty about the economy and concern about the industry Labor shortage looms large • 55% of respondents view their ability to secure skilled labor as their greatest threat • 62% of respondents cite solutions to the labor shortage as their top priority
Top political issues • Healthcare reform was selected by respondents as the top political issue that will impact their business • Material price volatility remains a top political issue for the ninth consecutive year Growth opportunities • 90% of respondents are seeing the same or more opportunities in Northeast Ohio; 92% report the same or more opportunities outside the area • 45% of 2019 respondents are predicting more opportunities in Northeast Ohio, an 11% drop from 2018 responses
State of the real estate industry According to real estate survey respondents, the industry remains healthy, with a positive lending environment and Properties | November 2019
Charting Your Next Destination?
INDUSTRY LEADER SINCE 1946 Exclusive | Focused | Informative | Dependable | Connected
www.Propertiesmag.com
www.propertiesmag.com 59
Graphics courtesy of Skoda Minotti
Suppor rting Spotlighting the professional service providers successful construction projects Cast behind successf
plenty of growth opportunities. Yet, there is growing skepticism about continued growth, with concern about construction costs and the labor shortage. For the second year, lending is viewed by respondents as one of the least significant barriers to growth. Lending from national banks has declined for the past three years, with the greatest decline in 2019. Tax-increment financing (TIF) has tripled as a funding source from 20% in 2017 to 60% in 2019. Rents outperformed predictions by 2018 survey respondents across the residential, commercial and industrial sectors. What’s more, 2019 respondents predict stable or increased rents in the year ahead. The following highlights summarize the 2019 real estate survey.
Expenditures
Lending environment
• Commercial – 67% of respondents report that rents increased, the greatest number of respondents seeing an increase since we began asking this question in 2015. Over half (54%) of respondents predict commercial rents will further increase
• 67% of survey respondents say lenders are asking for 30% or less in equity requirements • Only 14% of respondents report lenders accepting 20% or less in equity, a 15% drop from 2018 respondents • More than one-third (36%) of respondents are utilizing the new Opportunity Zone funds for redevelopment projects 60
• 71% of respondents report payroll increases over the past year, an increase of 13% over 2018 responses • More than half (53%) of respondents report increased spending for professional services, 14% more than in 2018 Rents • Residential – Only 48% of 2018 respondents predicted there would be increased rents, but 67% of 2019 respondents report an increase. Conversely, only 39% of 2019 respondents predict that rents will increase, the most cautious respondents have been since we began asking this question
• Industrial – 69% of respondents report that rents have increased, and 16% of those respondents are seeing a significant increase. 59% of respon-
dents see continued rent increases in the year ahead Barriers to growth • Cost of construction remains the number-one barrier • Availability of inventory jumped from sixth place in 2018 to become the number-two barrier in 2019 • Property valuations, the second top political issue in 2018, was selected by respondents as the least important barrier in 2019 Growth opportunities • More than three-quarters (76%) predict the same or more opportunities in Northeast Ohio, with nearly half (48%) predicting more opportunities, a 15% increase from 2018 • More than two-thirds (68%) of respondents predict more opportunities outside of Northeast Ohio To view the complete 2019 Real Estate and Construction Survey Report, visit skodaminotti.com/survey. P For questions about the survey or industry matters, please contact Roger Gingerich, CPA/ABV, CVA, CCA, at 440-449-6800. Properties | November 2019
When your fair share of taxes is neither fair... nor your share
Fostering Fairness for All Taxpayers The attorneys at Siegel Jennings bring experience as accountants, appraisers and real estate developers to the practice of law. Our property tax services include: Ŷ Representation at the administrative level through the State Supreme Court Ŷ Local expertise in every state through the American Property Tax Counsel Ŷ Tax management – acquisition/disposition strategies Ŷ Cutting edge approaches to property tax reductions
Siegel Jennings Call J. Kieran Jennings, Esq at 216.763.1004 23425 Commerce Park Drive, Suite 103, Beachwood OH 44122
www.siegeltax.com
Cleveland Ŷ Pittsburgh Ŷ Columbus Founding member, American Property Tax Counsel (APTC) • www.aptc.com
Suppor rting Spotlighting the professional service providers successful construction projects Cast behind successf
LEGAL PERSPECTIVES Navigating property laws & regulations
Strategies & Solutions for Labor Shortages sk anyone involved in construction and they will tell you – the industry is booming. Everyone is busy it seems. But even in a time where most contractors are thriving, there remain significant challenges to sustained performance and growth. And the most significant challenge that continues to plague the industry is the lack of skilled labor. Read any trade publication, attend any industry conference, and you will hear the same refrain – both locally and at the national level.
A IAN FRANK
While some market segments and areas of the country fare better than others, none are immune. In an October 2019 article published by Engineering NewsRecord (ENR), entitled “Labor Shortage Continues, Most Companies Report,” the CEO of the Associated General Contractors of America (AGC) said that “workforce shortages remain one of the single most significant threats to the construction industry.” This viewpoint was reinforced by Skoda Minotti’s recently released Survey of Northeast Ohio’s Real
Trusted by Business Owners & Commercial Property Managers Since 1944 www.wadsworthsolutions.com
Estate and Construction Industries (see full story, pg. 58). Contractors that participated in the survey reported that the single greatest threat to their business, by far, is their ability to secure skilled labor. In fact, Skoda Minotti characterized the data they collected from industry members as “a tidal wave of concern about finding solutions to the skilled labor shortage.”
Causes + consequences The lack of skilled labor in the construction industry certainly is not a new Contact Bart Barry for Information:
( 216 ) 391-7263 bbarry@wadsworthsolutions.com
Founded in 1944, Wadsworth Solutions is committed to providing our customers with a secure, energy efficient environment for their facilities. Whether it is for new construction or a retrofit of an existing facility, Wadsworth’s expert design team has a solution that can save your business time and money by removing the burdens of facility maintenance.
Providing Secure, Energy-Efficient Environments BUILDING AUTOMATION
SECURITY & INTEGRATION
• 24 Hour Service • Highly Trained & Experienced Building Automation & Service Technicians
HVAC EQUIPMENT & SERVICE
62
DATA CENTERS
• Provide Custom Designed Building System Solutions • Trusted Long-Range Planning Resource
• Proven Track Record with Private, Corporate & Governmental Agencies
Properties | November 2019
Call our commercial sales managers today, to discuss your electric service needs. phenomenon. Economists and industry experts have been discussing this dilemma for many years, and the causes are varied. The origins of this problem relate back to the last recession, which caused an exodus of craft laborers and other professionals to seek employment in other industries. But many other factors have influenced and exacerbated the issue, from smaller numbers entering the workforce to pursue careers in construction, to changing immigration policies, among other circumstances. While some disagree about whether the worst is behind us or yet to come, the inescapable truth is that the inability to maintain a sufficient, skilled labor force continues to have a direct impact on the bottom line for many companies, as well as a broader effect on the industry as a whole. Just a few of the consequences include higher prices, reduced competition, increased performance claims related to manpower-caused delays, and impacts to projects getting off the ground.
Show me the money Money talks, so they say. That is certainly true when it comes to recruiting and retaining talent. Locally, nearly 60% of the contractors participating in Skoda Minotti’s annual survey reported that they are increasing salaries as the primary means of addressing the lack of skilled labor. However, according to ENR’s October 2019 analysis, “few employers” are using significant salary increases to address the labor shortage. Instead, companies have turned to other financial incentives, including signing/stay bonuses, as a means to combat the problem. Higher compensation and other direct financial incentives are not a panacea. When compensation is the only goal, laborers are easily convinced to leave for greener pastures to the next highest bidder. So employers must address demands for other non-monetary benefits and incentives, including flexible work schedules, technological advancements that improve efficiency and safety, training and opportunities for advancement. Forward-thinking contractors are evaluating these ben-
reliable & Mark Herron local 216.563.7331
Visit us at www.cpp.org
Kim Woodford 216.563.7240
COMMERCIAL REAL ESTATE FINANCING
Let us help you finance:
• Construction
• Fixed and variable rates
• Multi-family, industrial, retail, office, residential lot development • Construction, refinancing and purchase financing
expertise • Market knowledge
and experience
LET’S TALK. John Funderburg Vice President/Division Manager jfunderburg243@dollarbank.com
216.736.8955 Ron Adair Vice President radair230@dollarbank.com
216.736.8957 Brandon Bucknell Assistant Vice President bbucknell003@dollarbank.com
216.736.8962 Equal Housing Lender. Member FDIC. Copyright © 2019, Dollar Bank, Federal Savings Bank
BUS793_19
www.propertiesmag.com 63
Suppor rting Spotlighting the professional service providers successful construction projects Cast behind successf efits already. Those that are not will be left even further behind.
Fill the pipeline In addition to addressing immediate needs for craft workers for ongoing projects and short-term growth, contractors need to develop a long-term strategy for developing a renewed pipeline of skilled laborers. Some commentators believe that one of the unintended consequences of a broader shift to nonunion/ merit shop employment in the construction industry has been a decline in the talent pool. Whether you subscribe to that theory or not, most agree that the industry needs a renewed and sus-
tained focus on workforce development programs, mentorship and vocational training to foster the growth of a skilled labor pool. In order to be successful, these initiatives are going to require substantial resource investment, partnerships and collaboration. The ACE Mentor Program of Cleveland and the Construction Employers Association’s (CEA) construction trade initiative partnership with the Urban League of Greater Cleveland are just two examples of the vision and leadership that will be required throughout the industry to overcome labor shortages. As one component of training, apprenticeship programs also play a
We’re Out to Clean Up This Town SWEEPING PRESSURE WASHING CONSTRUCTION SITES PARKING LOTS & DECKS WAREHOUSES SPECIAL EVENTS FLUSHING
Creative solutions
330.798.9200 | WWW.BUCKEYESWEEPING.COM
Restoration Contractors
440.243.5535 BEREA, OHIO FACADE RESTORATION BALCONY RESTORATION BUILDING CLEANING CAULKING & SEALANTS COATING SYSTEMS GARAGE RESTORATION HISTORIC PRESERVATION MASONRY RESTORATION STONE RESTORATION WATERPROOFING
www.aiconstruction.com 64
critical role in expanding a skilled labor force. This topic has become extremely controversial recently, following the Department of Labor’s proposed rule to revamp such programs by allowing companies to take part in new IndustryRecognized Apprenticeship Programs (IRAPs). The construction industry is exempt from the IRAP rule, but a debate over whether that exemption is good for the long-term health of the industry as a whole has caused division. Some believe that more apprenticeships would be a positive development, even if the criteria for those programs has greater flexibility and less regulatory oversight. Others contend that the exemption should be permanent and that IRAPs will only harm the development of a skilled workforce because more is not always more.
Contending with labor shortages is also going to require a little creativity and awareness of the unique aspects of your market. For example, many companies are evaluating methods for more modular construction and prefabrication to reduce labor demands where those approaches are available. New York City unions, on the other hand, faced with the need to keep an enormous union labor force occupied, have worked with their employer members to introduce new laborer classifications, thereby allowing the adjustment of crew ratios, wage rates and overall union labor costs. Solutions for the continual shortage of labor are not, and never will be, “one size fits all.” Nor can these solutions be effectively implemented by contractors in isolation. This is an industry challenge that requires collaborative answers created by participation from the entire industry, including organized labor, trade associations, governmental/regulatory agencies and educational institutions. P
Ian Frank (ifrank@frantzward.com) is a partner in and chair of the Construction Group at Frantz Ward LLP in Cleveland. For more information, visit FrantzWard.com. Properties | November 2019
)DEULFDWLRQ ,QVWDOODWLRQ 6HUYLFH
LQ \HDUV U H Y R RU OL]LQJ I 6SHFLD WRS U HG URRI J D RW ZDWH N F K D 3 P GLQJ ¥ VWHD ZHO Q R L W D F %RLOHUV UL HWDO IDE HOGLQJ 6KHHWP ULFDWLRQ Z IDE W 3ODVWLF HHULQJ DUWPHQ Q S L H J G Q H H F 9DOXHG H PDLQWHQDQ UYLF )XOO VH
Southside High
Public Square Cleveland
Tulane University Freeman Business School
Wooster Community Hospital
Integrated Project Solutions BIM Coordination Services • Site Logistics • 3D Content Creation Revit® • Navisworks® • 3D Studio Max • Residential Design
ZZZ OLVFRKYDF FRP 6WDWH 5G 1 5R\DOWRQ 2+
MIKE FURLONG, CM-BIM Managing Principal 330.414.9970 | mike@iprojsolutions.com | www.iprojsolutions.com
ASPHALT PAVING ASPHALT REPAIR SEALCOATING
UNNINGHAM
CRACK FILLING
PAVING CO
SEWER REPAIRS
• Excellent quality, competitive pricing & reliability
DRAINAGE
• Cunningham Paving is a family-owned business, with over 30 years of experience
LAYOUT & DESIGN COMPLETE SITE CONSTRUCTION EXCAVATION TO COMPLETION
• Licensed, bonded & insured • Our motto: “Keeping our customers satisfied, keeps them coming back.”
216.581.8600 www.cunninghampaving.com 20814 Aurora Rd., Warrensville Hts., OH 44146-1006 www.propertiesmag.com 65
Suppor rting Spotlighting the professional service providers successful construction projects Cast behind successf Construction in the Courts A look at three recent cases that can change the way you do business R. Russell O’Rourke, Esq. Meyers, Roman, Friedberg & Lewis, LPA
he past two years have given us several court decisions that can change the way you do business, particularly if you are a construction company or doing business with one. Here’s a look at three of the more interesting cases.
T
The Case of the Disappearing Insurance Coverage In 2012 the Ohio Supreme Court drew Ohio into the minority of states with the case Westfield Insurance Company v. Custom Agri Systems, Inc. when it held, “Claims of defective construction or workmanship brought by a property owner are not claims for ‘property damage’ caused by an ‘occurrence’ under a commercial general liability policy,” for work performed by the policy holder. While disappointing, at least everyone understood the occurrence issue and was comfortable with standard CGL language that excluded subcontractors’ work as the CGL policy contained the affirmative coverage for that work, outside of the “your work” exception — that was until the Ohio Supreme Court decided the case Ohio Northern University v. Charles Construction Services, Inc. in which the defective construction was performed by a subcontractor causing damage to the building. The Charles Court followed its Westfield decision in determining that, “property damage caused by a subcontractor’s faulty work is not fortuitous and does not meet the definition of an ‘occurrence’ under a CGL policy.” This means that the affirmative Subcontractor Exception written into the policy form was meaningless for defective work, leaving both Charles Construction and Ohio Northern University without coverage for the damage.
The Surprising Case of a Notice of Furnishing That Wasn’t, But Now Is Next, the Ninth District Court of Appeals heard the case Pursuit Commercial Door Solutions, Inc. v. ROCE Group, LLC, effectively reversing the 66
damage caused by the 2010 case Halsey Inc. v. Isbel. Pursuit and all other subcontractors and suppliers were victimized by Halsey which had misconstrued Ohio’s Notice of Furnishing (“NOF”) statute, and misapplied a 1991 case, Buy-Rite Lumber v. Bank One. Both Halsey and Buy-Rite were attempting to use a preliminary notice to place liability on a residential lender for gross negligence in paying loan proceeds to the contractor without requiring lien waivers from the subcontractor. Halsey mailed its NOF one day before it began work; the owner received it two days later. Because Halsey attempted to make a claim against the lender using the NOF form, the court improperly extended the right to notify the lender at the time that it was to distribute the loan funds to the completely different right to file a mechanic’s lien. The NOF statute ORC §1311.05 provides that a subcontractor or supplier
may preserve its mechanic’s lien rights by serving a notice of furnishing, “… any time after the recording of the notice of commencement [“NOC”]…but within twenty-one days after performing the first labor or work.” The Halsey Court quoted the statute, but omitted the first 10 words of the sentence, changing its meaning. The omitted words were “any time after the recording of the notice of commencement,” leaving only, “within twenty-one days after performing the first labor or work,” changing the intent of the legislature, narrowing the time period to serve an NOF until after the first work or material was supplied. Pursuit served its NOF after the NOC, but before it began working on the project. The Court recognized that the Halsey Court improperly omitted those 10 words allowing subcontractor and suppliers to serve their NOFs prior to their first day of work on Properties | November 2019
the project, as long as the NOC was already filed. Subcontractors and suppliers now have some comfort, at least in the Ninth District (Summit and Medina Counties).
The Case of the Missing Attorneys’ Fees Lastly, the 11th District Court of Appeals reviewed Ohio’s Prompt Pay Act. The act requires contractors, subcontractors and suppliers to pay their subcontractors and suppliers within 10 days of receipt of funds associated with the subcontractor’s work. If the upper tier party that received payment fails to pay the lower tier, without just cause, within 10 days from the date it received the payment, the unpaid party can recover 18% interest for all improperly retained funds from the non-paying upper-tier. If the party still is not paid within 30 days from the date funds were received, again without just cause, in a lawsuit the prevailing party can, in the Court’s discretion, recover its reasonable attorneys’ fees incurred in collecting the due, yet unpaid amount. The 11th District Court of Appeals in the case Xtreme Elements v. Foti Construction followed the 2004 Ohio Supreme Court case Masiongale ElectricalMechanical v. Construction One, allowing the trial court to determine whether the payment of the subcontractor’s attorneys’ fees would be inequitable. The Masiongale Court dismissed Masiongale’s appeal on the legal fees issue, leaving the Judge’s order requiring Construction One to pay Masiongale its $31,624.64 attorneys’ fees on its $37,000 case. Conversely, in Xtreme, the trial court found that even though prompt pay interest was appropriate, the payment of attorneys’ fees would be inequitable. Xtreme was not awarded its $150,000 claim for attorneys’ fees on its $87,650 contract claim. Understand that the recovery of attorneys’ fees is not a given. P Russell O’Rourke is the chair of the Construction Law Practice at Meyers, Roman, Friedberg & Lewis, LPA. He focuses his practice on the representation of subcontractors and suppliers in the construction industry.
S ce 192 Since Sin 1922, 1922 922 92 2, Sno 2 S w Bros Snow B ros ros.. A Appl pplian ppl iance ce has of offer f fered f ed exc except eption ional al ser servic vice e and ex extra traord ordina inary ry sav saving ings. s. Wit With h an a n unma u nmatch tched ed sel select ection ion,, featur fea turing ing al alll of o f your your fa favor vorite ite ki kitch tchen en and la laund undry ry bra brands nds,, the po possibilities possi ssibil biliti ities es are endless! endle en dless! ss!
5528 Mayfield Rd. | (440) 449-2650 | www.snowappliance.com
Offering a Full Spectrum of Legal Services to Individuals and Business Clients of All Sizes )\ZPULZZ *VYWVYH[L )SVJRJOHPU *Y`W[VJ\YYLUJ` *VUZ[Y\J[PVU *YLKP[VYZ» 9PNO[Z )HURY\W[J` +VTLZ[PJ 9LSH[PVUZ ,Z[H[L 7SHUUPUN 3HIVY ,TWSV`TLU[ 3P[PNH[PVU 9LHS ,Z[H[L ;H_
28601 Chagrin Blvd., Suite 600 • Cleveland, OH 44122
^^^ TL`LYZYVTHU JVT www.propertiesmag.com 67
Buying, Building and Managing, We Are Your Team
Construction
Facility Management
Property Management
FAMILY OWNED. SUSTAINABLE GROWTH. SINCE 1976. At the foundation of every Pleasant Valley client relationship and every project is our focus on meeting your needs for buying, building and managing facilities within a full circle of integrated services. 1093 Medina Rd., Medina, OH 44256 | 330.239.0176 | www.pleasantvalleycorporation.com
The Tricky Business of Classifying Income from Land Rents A look at the challenges of reporting land rent income & losses on tax returns By Dave Charles, CPA, MT Cohen & Company
lassifying and reporting income and losses related to a land rent, such as a flat-surface parking lot, can be more difficult than you might think. Many complexities of the tax law come into play and will depend on your specific situation, namely whether you operate the parking lot as a business or if you lease the land to an operator.
C
Both have different considerations and taxable outcomes that are important to record appropriately on your federal tax returns.
Operating parking lots as businesses If you are in the business of operating a parking lot, the first question to answer is “should income be reported as ordinary income or rental income?” A supplemental question to help answer that is, “Is this income subject to self-employment tax?” The tax code excludes “rentals from real estate” from self-employment income; however, the IRS does not consider business activity from a parking lot as a rental from real estate situation. The income is treated as ordinary, so it is in fact subject to self-employment tax and must be reported as such.
(2), agrees, stating that “the term ‘passive activity’ includes any rental activity.” Accordingly, rental activities are passive and should be reported on the Form 8825 Rental Real Estate Income and Expenses, along with other rental real estate activities, i.e. rental of a parking lot, right? Not necessarily. While net losses from land rents are reported as passive, it’s a little more complicated in years with net taxable income. Regulation 1.469-2T(f) (1) creates rules regarding the recharacterization of passive income from “certain
passive activities to be treated as income that is not from a passive activity.” Section (f)(3) of that regulation applies to a taxpayer leasing land to an operator: “If less than 30% of the unadjusted basis of the property… in a rental activity is subject to the allowance for depreciation… the taxpayer’s net passive income from the activity shall be treated as not from a passive activity.” For a land lease, where the only asset (or majority of the property) is the land, the taxpayer obviously does not have
Leasing the land to an operator On the other hand, if you lease the land to an outside party, who then operates the business of a parking lot, income classification becomes much more difficult to determine. In this scenario, the operating company is paying you, the lessor, for the right to run their business on this property. First question: “Should this be reported as self-employment income as in the scenario above?” The answer is no, as you are not rendering services to your occupants, like an operator. You are simply leasing the land to a tenant, who then is using that land to operate their business. The next logical question to ask is: “Is this passive income?” — since all you are doing is leasing land to a tenant for them to operate their business. At first glance the tax code, specifically Section 469(c)
Advisors to the
Real Estate & Construction Industries Tax planning and structuring Accounting and auditing Financial modeling Like-kind exchanges
Tax credits and incentives Strategic planning Deal analysis Capital structure consulting
Learn more at cohencpa.com/real-estate Adam Hill, CPA, Partner Dave Sobochan, CPA, Partner
cohencpa.com www.propertiesmag.com 69
NOW HOME TO ONE OF THE LARGEST REAL ESTATE PRACTICES IN OHIO PROUDLY WELCOMES THE LEGAL TEAM OF
Hurtuk
Charles Daroff Partner
Daroff Co., LLP
Edward A. Hurtuk Partner
Mark B. Radefeld Partner
Business Services | Hospitality & Liquor Control | Education | Litigation | Real Estate Intellectual Property | Labor & Employment | Public Law | Tax & Wealth Management COLUMBUS 614.246.2150 | CLEVELAND 216.781.1212 | walterhav.com |
COMMERCIAL & INDUSTRIAL RIAL ELECTRICAL CONTRACTORS OH LIC #21927
SERVICE Upfront Pricing • Trouble-Shoot & Repair
depreciable assets that make up more than 30% of the unadjusted basis of the property. So, the income from a passive activity is going to be recharacterized as non-passive income. No longer thought of as passive, should the income be reported as portfolio income? Not according to Regulation 1.469-2T(c)(3), which defines portfolio income as income attributable to items such as interest, annuities, royalties, dividends on C Corporation and S Corporation stock, income from real estate investment trust, disposition of property held for investment, among others. A land lease does not fit into any of these categories either.
NEW CONSTRUCTION Design/Build • Spec/Build ENERGY-SAVING UPGRADES BUILDING & PROCESS AUTOMATION Engineering • Installation ON-TIME PERFORMANCE GUARANTEED
service@jltaylorcompany.com www.jltaylorcompany.com
440.834.1223
Ultimately, net income from a land lease does not have a classification into which income fits nicely. While the IRS
Ultimately, net income from a land lease does not have a classification into which income fits nicely. While the IRS has issued plenty of guidance on what this income is not, there is little support on what it is and how it should be reported. has issued plenty of guidance on what this income is not, there is little support on what it is and how it should be reported. Without a definitive line or form specifically for this sort of income, reporting it as “Other Income” on Schedule K, with a footnote that this income is from a land lease, may be the best option currently available. While this seems like a catch-all spot to record this income, the main objective is to not characterize this as passive income, which can be offset with passive losses, or self-employment income, which will subject you to additional taxation. P Dave Charles, CPA, MT, is a tax manager in the Real Estate & Construction Industry Group of Cohen & Company. Contact him at 330.315.4163 or dcharles@cohencpa.com.
WINTER IS COMING ARE YOU PREPARED? For 26 years, Schill Grounds Management has provided custom snow and ice removal solutions for commercial properties across northern Ohio. Let’s talk about customizing a full service program for your property.
440 327 3030 | WWW.SCHILLLANDSCAPING.COM www.propertiesmag.com 71
Suppor rting Spotlighting the professional service providers successful construction projects Cast behind successf Getting Hot When You Can’t Get Cool When energy efficiency expectations aren’t met, litigation may ensue By Aaron S. Evenchik, Christopher R. Mykytiak, and Sonja C. Rice Hahn Loeser
ith LEED and Energy Star efficiency standards being more frequently mandated in construction projects, building owners expect to achieve reduced energy costs for their completed projects. When this does not occur, claims ensue.
W
Energy efficiency initiatives often focus on reducing energy consumption through the use of high-efficiency or phased heating and cooling systems, or through the use of geothermal, solar, or other alternative sources of power. These systems require significantly more initial design and coordination, and it is imperative that they be precisely detailed so that the various trades installing the systems know exactly what is required. Less experienced owners choosing these more complicated systems, especially those doing a single building project (who may be less familiar with the quirks of the particular system) may engage additional engineering or other assistance to ensure designers and
contractors achieve the intended design and performance. Unfortunately, expected efficiencies are not always achieved. Several local projects are experiencing problems
LEADERS IN MULTI-FAMILY CONSTRUCTION HARBOR VERANDAS GENERAL CONTRACTORS CONSTRUCTION MANAGERS DESIGN/BUILDERS
WWW.JOHNGJOHNSON.COM
72
BID PACKAGE SPECIALISTS
whereby the heating and cooling systems are not performing as expected, utility charges are higher than expected, or, in some instances, the systems simply fail. These failures can stem from several causes, such as improper design or selection of equipment, improper installation or connections, lack of maintenance, lack of training, or failure to understand how to operate the system. Additionally, the more technologically savvy systems installed within the last decade, or those operated by computers or CPUs that have the ability to communicate with each other, create issues when they try to interact but cannot speak the same “language.” In some cases, the system is so complicated that only the original designer (who may no longer be reachable) understands how it was intended to operate. For example, a religious institution hired a contractor to install a very hightech and energy-efficient HVAC system. Unfortunately, no one knows how to operate it properly. Eventually, one of the computer terminals “burned out,” leaving this high-tech (and expensive) system inoperable. Repair contractors suggested it would be easiest (and cheaper) to pull out the complicated system and install a simpler but less efficient single or fewer zone system in its place. But this solution leaves the owner without the energy efficiencies it had hoped for and paid to have installed. On another project, part of the heat exchange is occurring via a geothermal underground system. Litigation continues to ensue over the interaction between the HVAC system and geoProperties | November 2019
thermal system. The owner is seeking reimbursement of its increased energy costs as part of its damages. When these claims go forward, the owner will name as many parties as possible in its lawsuit – the designer/ architect, any direct separate mechanical engineer and the general contractor. Those parties will further tender the claims to their subcontractors and consultants until all parties are named who may have potential liability or who otherwise participated in the construction or design of the failing or inadequate system. Each of those parties will likely then tender the issue to their insurance companies for defense. Insurance coverage often exists for design-related claims but may not always exist for a defective construction claim. Additionally,
Energy efficiency initiatives often focus on reducing energy consumption through the use of high-efficiency or phased heating and cooling systems, or through the use of geothermal, solar, or other alternative sources of power.... Unfortunately, expected efficiencies are not always achieved. depending on the particular dispute resolution procedure specified in the construction contract (i.e. the arbitration or litigation clause), it may be challenging to bring all parties into one venue unless everyone is aligned. Finally, it is important to confirm whether the applicable construction contracts contain waivers for consequential damages, which may prevent the owner from collecting certain damages. In summary, owners choosing to install new or complicated energy efficient heating and cooling systems will need to ensure they obtain warranties from those designing and installing the systems, including on the intended final performance and costs, as well as
thorough training on how to operate the system. Contractors and designers, in turn, will want to clarify the owner’s expectations to ensure everyone agrees on the scope of work, including what is required for a particular project and the expected performance of the final product. A final consideration in order to mitigate possible claims and damages is to avoid new and/or unproven technol-
ogy and instead choose something that is proven and time-tested. P Aaron S. Evenchik, Christopher R. Mykytiak and Sonja C. Rice are construction and real estate attorneys at Hahn Loeser. Evenchik can be reached at aevenchik@hahnlaw.com or 216.274.2450; Mykytiak can be reached at cmykytiak@hahnlaw. com, or 216.274.2242; and Rice can be reached at srice@hahnlaw.com, or 216.274.2211.
Experts In Exterior Masonry Repair & Restoration
McMahon Masonry Restoration Brick + Stone Repair & Replacement Caulking | Tuckpointing | Sealing Pressure Washing | Building Cleaning 9449 Brookpark Rd. Unit A, Parma, OH 44129 216-778-9666 | Fax 216-661-4520 | mcmahonrest1@att.net
Call for Your Free Building Inspection & Assessment
YOUR INDUSTRY IS OUR BUSINESS. At Hahn Loeser, our Construction Team members are recognized as industry leaders by ChambersUSA ®, Best Lawyers® and SuperLawyers®. We offer our clients exceptional strength, leadership and industry knowledge. Our responsive team of hardworking professionals is committed to seeking outstanding results for our clients around the corner and across the country. For the latest legal developments impacting your business, subscribe to our blog at constructionlawinsights.com.
ROB REMINGTON, ESQ. | Construction Group Chair | rrr@hahnlaw.com ANDY NATALE, ESQ. | anatale@hahnlaw.com JEFF BRAUER, ESQ. | jabrauer@hahnlaw.com A ARON EVENCHIK, ESQ. | aevenchik@hahnlaw.com JEFF ROUSH | Director of Construction Services | jroush@hahnlaw.com
Hahn Loeser & Parks LLP | hahnlaw.com 200 Public Square | Suite 2800 Cleveland, OH 44114 | 216.621.0150 CLEVELAND | COLUMBUS | NAPLES | FORT MYERS | SAN DIEGO | CHICAGO CLEVELAND | COLUMBUS | NAPLES | FORT MYERS | SAN DIEGO | CHICAGO
www.propertiesmag.com 73
Suppor rting Spotlighting the professional service providers successful construction projects Cast behind successf
NAIOP NEWS Commercial real estate happenings
Office, Industrial Financing Remains Strong inancing for industrial properties continues to be exceptionally strong as 2019 approaches its closure. Permanent lenders, specifically life insurance companies, have increased their industrial portfolio allocation as the market continues to strengthen. Life companies are financing quality industrial assets up to 75% loan-to-value with rates in the 3.50-4.00% range (depending on leverage) for fixed terms of 10, 15, 20 and 25 years.
F LINDEE FLATER
74
Financing for a variety of industrial properties has never been this robust; whether properties are single-tenant, multi-tenant or owner-occupied, interest rates are at an all-time historic low watermark. As the industrial market is seeing record high demand, it has created an increase in construction and construction financing. Lenders have become creative and adaptive to current market conditions, entering the industrial property construction financing space more than they ever have before. 2018 was the cyclical high in Cleveland with 1.9 million
square feet of industrial development, and 2019 has an estimated 1.1 million square feet of industrial space planned. Construction has continued to see positive absorption, even with the historically high development. The Cleveland industrial market saw positive net absorption of approximately 2.0 million square feet. With continued strong absorption, rental rate increase and positive economic indicators, institutional permanent lenders will continue to compete and win construction financing when compared to banks.
Properties | November 2019
CELEBRATING The office market throughout downtown Cleveland and the surrounding suburbs remains consistent. Life companies have continued to offer competitive pricing for 60% to 65% loan-to-value office properties. Stable multi-tenant, highly divisible properties are seeing the best financing proposals for terms ranging from 10 to 25 years. While life companies tend to be more conservative on office properties, CMBS (commercial mortgagebacked security) lenders have benefited. Ranging from 70% to 75% loan-tovalue, office owners continue to benefit from higher leverage, 10-year fixed-rate
Financing for a variety of industrial properties has never been this robust; whether properties are single-tenant, multi-tenant or owner-occupied, interest rates are at an all-time historic low watermark.
17
OF COST SEGREGATION 2002-2019
YEARS
ACCELERATE DEPRECIATION AND SHIELD INCOME TAXES NOW • Cost Segregation • Energy Efficiency Certifications (179D) • New IRS Repair v. Capitalization
Call Craig Miller
Cleveland 440.892.3339 / Columbus 614.949.4185 Detroit 248.752.7433 / www.costsegexperts.com
THE REGION’S LEADING INCOME TAX REDUCTION EXPERTS
Over a Century of Service
financing opportunities with longer amortizations, ranging from 25 to 30 years. If you are considering acquiring a property or refinancing an asset, now is a good time to inquire about obtaining long-term fixed-rate financing.
FOUNDED IN 1918
•
Mark your calendar! • On Wednesday, December 4 at 5 p.m., Van Aukin Akins Architects LLC is hosting NAIOP Northern Ohio’s members-only Annual Meeting and Holiday Party. Details TBA. • The Northern Ohio Chapter is offering a Core Law 3 Hour Continuing Education Course on Wednesday, December 11 at 8 a.m. at Crowne Plaza Independence (5005 Rockside Rd., Independence). Send inquiries to naiop@wherryassoc.com. P Lindee Flater is director of Lender Relations at Pinnacle Financial Group, Inc., a Marcus & Millichap Company. For more information, visit www.pinnaclefinancialgroup.com.
THE OLDEST AND MOST EXPERIENCED WATERPROOFING, CONCRETE & MASONRY RESTORATION CONTRACTOR Concrete Repair Masonry Restoration Stone Repair Epoxy Injection Post Tensioning Repairs
Caulking/Sealants Expansion Joints 7UDIƓF &RDWLQJV Epoxy Flooring Masonry Sealers/Coatings
Exterior Cleaning :DWHUSURRƓQJ Spray Foam Insulation Air Barrier Systems Fire-Stopping
440.740.0100 | WWW.RAMSERVICES.COM 100 CORPORATION CENTER, BLDG 4 | BROADVIEW HEIGHTS, OHIO www.propertiesmag.com 75
You Already Take Enough Risks You work with industry experts to reduce risks to you and your employees. Shouldn’t the same be true for your accounting firm?
ACCOUNTING EXPERTISE ◆ BUSINESS PLANNING ◆ TAX PLANNING SUCCESSION PLANNING ◆ PROFIT ENHANCEMENT ◆ BID REVIEWS COST CONTROL ◆ LITIGATION SUPPORT SERVICES ◆ JOB-COST AUDITING
MEADENMOORE.COM | 216.241.3272 AKRON | BEACHWOOD | CLEVELAND | WOOSTER
VANTAGE POINT Experts weigh in on industry issues
Finding Efficiencies Via Construction Technology ecently, I attended a construction conference and one of the sessions featured a speaker from Dodge Data and Analytics, who do a lot of research related to the construction industry.
R
Part of the presentation focused on industry technology and the impact it’s having on construction firms. Here are some of the takeaways. CARLIN CULBERTSON
BIM Building Information Modeling (BIM) has become increasingly popular over the past decade and is commonly used on projects throughout Northeast Ohio. BIM software allows a contractor to create a digital model/plan of a building, highway, etc., which has significant advantages over a traditional blueprint or paper-based plan. It provides a great visualization tool to job owners during the bid and planning phases, during the construction process to provide updates/ check progress, and when the project is finished provides a complete digital map of the final project to the job owner. It can be adjusted easily if a change is needed to the design. It can be used for projections and what-if scenarios (like where should I position a large crane,
what’s the most efficient placement for materials staging, etc.), among other uses that help with planning and in turn reduce inefficiencies. It can also be used to track progress compared to the plan, catch potential issues earlier, and reduce rework. Although it is known as BIM, it applies to construction projects other than just buildings, such as civil projects. To show how BIM can reduce time and costs, the presentation mentioned that Turner Construction reported efficiency increases of 143% for mechanical, 67% for plumbing and 36% for fire protection from using BIM and related resources. Some of the other technologies available today integrate with BIM, making it even more powerful.
Laser scanning One of the technologies that integrates with and enhances BIM is laser scanning technology. It uses LIDAR (which is the basis for various self-driving car designs and allows the car to
Subscribe Now & Save Over 80% Stay informed BCPVU the very best in construction and development in Northeast Ohio. Subscribe online or by phone at 216.251.8506. INSIDE : Cleveland
Clinic Rehabilitation
Hospital • AkzoNobel
lding uilding • Roofing/Buil
l pe Envelope Envel
INSIDE : SpringHill Suites Independence
• l • Hyatt Place at Legacy Village
Building een Building Green G INSIDE : MetroHealth Brecksville
Sepptember 2016/$7.95 September
7.95 2016/$7.95 April 2016/$7
INSIDE : Larry Health & Surgery Center
Sears and Sally
• Renova Renovation ation & Restoration
October ober 2016/$7.95
Zlotnick Sears think[box] at CWRU
• Phoenix Buildin
g
January 2016/$7.95
INDUSTRY LEADER SINCE 1946 Celebrating 70 Years Since 1946
Exclusive | Focused | Informative | Dependable | Connected
www.Propertiesmag.com
ld The Schofield ing ake Reshap awaakens Building Reaw historic historic Renovation revives o new to structure as home n Hotel apartments, Kimpton
q Public Square $50 million public-private project brings renewed energy to ti
Encore Resurgence on Performan nce cee the
Restoration specialists re-create e-createe Ohio Theatre’s original lobby bby design at Playhouse Square are
Waterfront
Flats Ea Eastt Bank Phase Ph e II sprou spr ts new residential, t entertainment dining & ex i
www.propertiesmag.com 77
Suppor rting Spotlighting the professional service providers successful construction projects Cast behind successf map its surroundings) to map the months but was trimmed down to area and take accurate measurethree weeks using that methodology. ments. Typically, a special camera is used to do this, and the information Augmented reality can be used in a variety of ways. For Another technology that can proexample, the superintendent on a job vide some significant time savings is can use laser scanning to scan a locaaugmented reality. Using something tion, say a room in a building, and like a HoloLens from Microsoft, the then that data is fed into the BIM personnel wearing it can see an oversoftware, which then creates a hislay of the final design (or a phase torical picture of where that job was in the design from the BIM design) at a point in time if you need to refer for the area they are looking at. For back to it (possibly for claims disexample, if the superintendent wants putes). It also allows for the current to check that the plumbing for a sink state of the project to be compared TECHNOLOGICAL TOOLS Laser scanning systems, in a hospital room is in the correct to the plan, identifying any areas such as Trimble’s X7 3D laser scanner, allow users to place, he can see where the sink is that appear to be behind schedule. capture precise 3D scanning data for surveying and going to be over top of what is actuIn some cases, there are small robots construction applications. ally there and can see if it lines up that autonomously move around the correctly or is off. It can then be fixed project is going to be built in. It is much jobsite after-hours, scanning the variquickly as opposed to waiting until ous locations and uploading that data faster than traditional methods. the sink is being installed and only then automatically, so that jobsite personnel realizing it is six inches off plan. This Prefabrication can continue to focus on their other technology can also be used to allow BIM also allows for prefabrication, owners to visualize what sections of tasks. Another use for this technology is attaching it to drones and scanning which is increasingly common. This the project will look like as they walk the area where a capital project (maybe could include pre-cutting holes in dry- through the jobsite, and possibly ask for a new highway) is going to be built (or wall for HVAC, outlets, etc. or cutting changes sooner resulting in cost savings. widened). Once that’s done, there’s an drywall to fit corners, doorways, etc. accurate map of the surrounding area, ahead of time so installation is quicker, Safety technology including measurements that allow for cleaner, safer and more efficient. An Lastly, there’s safety technology, such planning/design in the BIM software example from the presentation was a as vests or shoe attachments that vibrate using accurate data about the area the job that would historically take three and light up as warnings when personnel enter a restricted area. Additional newer tech developments include artifiGENERAL CONTRACTOR cial intelligence and cameras that scan Keeping architects, engineers, the jobsite and flag anything that may subcontractors, and construction be unsafe, such as a ladder that isn’t business owners on the same anchored properly or a laborer that isn’t page is VITAL. properly secured on a roof, and generate a warning to jobsite personnel immediately to correct the issue.
P Precision Laser & Instrument, Inc. is Now Your Local BuildingPoint We are dedicated to continually improving productivity for the construction industry through advanced and intuitive technologies. Our portfolio of solutions streamlines communication and collaboration, helping realize greater efficiency and profitability.
The Experts in Design-Build-Operate Solutions WWW.BUILDINGPOINTOHIOVALLEY.COM Ben Little | 330-607-6622 | BJL@bpohiovalley.com
78
Hopefully, this provided some insight on how contractors are utilizing technology to cut their costs – allowing them to win more work with lower bids, while also increasing their profits. Plus, I think it’s all pretty cool stuff. And fortunately, none of the robots mentioned in the presentation seemed like they could easily kill all of us... yet. P Carlin Culbertson is a vice president in Meaden & Moore’s Assurance Services Group. For more info, visit www.meadenmoore.com. Properties | November 2019
Photo courtesy of Trimble
Trust Building Point Ohio Valley
CONSTRUCTION PROGRESS REPORT Updated info on important projects in the region
Project Report #: 02054 OHIO CENTER FOR ORAL, FACIAL & IMPLANT SURGERY LOCATION: 7207 Hopkins Rd. Mentor, OH (Lake County) www.ohsurgery.com PROJECT TYPE: New Construction CATEGORY: Commercial CONTRACTING METHOD: Bids by Invitation Only PROJECT STATUS: Opened EST. VALUE: $2 million OWNER: KC Surgical Properties LLC Contact: Dr. Keith Schneider 7207 Hopkins Rd. Mentor, OH 44060 Phone: 440-255-3700 ARCHITECT: Design-Build Evolutions Contact: Michael Turner 611 E. 4th St. Tulsa, OK 74120 GC: Kline Rostocil Construction Contact: Larry Kline 9385 Hamilton Dr. Mentor, OH 44060 Phone: 440-357-4500 www.klineconstruction.com
CIVIL ENG: Land Design Consultants DESCRIPTION: 2 bldgs, 1 story. New 3,619 sf dental clinic and surgical center - renovations of an existing 3,374 sf dental clinic into a conference/lecture center and dental clinic. Project Report #: 01992 FOUNDRY SOCIAL CLUB LOCATION: 333 Foundry St. Medina, OH (Medina County) www.thefoundrysocial.com PROJECT TYPE: Renovation CATEGORY: Commercial PROJECT STATUS: Construction Underway Completion Within 30-60 Days OWNER: Joint Venture of High Voltage Karting and Franklin Brewing High Voltage Karting Contact: Greg Cordray, Steve Madden 333 Foundry St. Medina, OH 44256 Phone: 330-333-9000 Franklin Brewing Contact: Howard Ross 333 Foundry St. Medina, OH 44256
Phone: 216-262-5110 BUILDER: Coastal Quality Construction Contact: Dave Gutfranski 4705 Brookpark Rd. Cleveland, OH 44134 Phone: 440-746-9900 www.cqcohio.com DESCRIPTION: 1 bldg, 30,000 sf. Entertainment center featuring - duckpin bowling billiards - bocce - pinball - ping pong - wall of vintage video games alongside modern games - full kitchen - full-service bar - both large and small event rooms. Project Report #: 02005 ANTHONY J. CELEBREZZE FEDERAL BUILDING (RENOVATION) LOCATION: 1240 E. 9th St. Cleveland, OH (Cuyahoga County) www.gsa.gov PROJECT TYPE: Renovation CATEGORY: Institutional CONTRACTING METHOD: Competitive Bids PROJECT STATUS: Preliminary Plans in Progress OWNER: Anthony J. Celebrezze Federal Building Contact: Maureen K. Michael
Space Comfort co. )$0,/< 2:1(' 23(5$7(' :,7+ +$1'6 21 (;3(5,(1&( ,1 0(&+$1,&$/ &2175$&7,1* 6$/(6 6(59,&( 6,1&( ([SHUWV LQ Q 7XUQNH\ VROXWLRQV GHVLJQ EXLOG YDOXH HQJLQHHULQJ Q 6HUYLFH LQVWDOODWLRQ PDLQWHQDQFH RI DOO PDNHV PRGHOV RI + 9$& HTXLSPHQW ERLOHUV Q 1HZ UHQRYDWLRQ UHPRGHOLQJ UHVWRUDWLRQ Q 3XEOLF SULYDWH 3URYLGLQJ UHOLDEOH SHUVRQDO VHUYLFH WR RZQHUV RI UHWDLO FHQWHUV PDOOV DSDUWPHQW FRPSOH[HV UHWLUHPHQW KRXVLQJ LQ 2KLR QHLJKERULQJ VWDWHV
5201 CLARK AVENUE, CLEVELAND OHIO 44102 Q PH. 216-281-2000 Q FAX. 216-281-8420 Q 800-203-9645 80
Properties | November 2019
1240 E. 9th St. Cleveland, OH 44199 216-522-4220 www.gsa.gov/ajcfb ARCHITECT: AECOM Contact: Todd Griffith 1300 E. 9th St., Ste. 500 Cleveland, OH 44114 216-622-2400 www.aecom.com DESCRIPTION: Renovation to five floors of Federal Building offices. Phase One - project to proceed in phases for interior renovation and remodeling of government offices conference rooms. Project Report #: 02051 KIRTLAND VETERINARY HOSPITAL LOCATION: 9222 Chillicothe Rd. Kirtland, OH (Lake County) PROJECT TYPE: New Construction CATEGORY: Institutional CONTRACTING METHOD: Bids by Invitation Only PROJECT STATUS: Project Completed EST. VALUE: $2.1 million OWNER: Kirtland Veterinary Hospital Land Holding, LLC Contact: Sherry Costello, manager 7930 Euclid-Chardon Rd. Kirtland, OH 44094 Phone: 440-256-3319 www.kirtlandvet.com ARCHITECT: c/o GC GC: Kline Rostocil Construction Contact: Laurence Kline 9385 Hamilton Dr. Mentor, OH 44060 Phone: 440-357-4500 www.krccontractors.com DESCRIPTION: 1 bldg, 1.5 stories. Ground-up new construction of a 6,158 sf veterinary hospital designed with a country look and feel. Project Report #: 01661 CSU SCIENCE & RESEARCH BUILDING RENOVATIONS PHASE 2 LOCATION: 2351 Euclid Ave. Cleveland, OH (Cuyahoga County) www.csuohio.edu PROJECT TYPE: Renovation CATEGORY: Institutional CONTRACTING METHOD: Competitive Bids PROJECT STATUS: Plans in Progress OWNER: Cleveland State University Contact: Bruce Ferguson 2121 Euclid Ave., PS 218 Cleveland, OH 44115-2214 Phone: 216-687-5008 www.csuohio.edu ARCHITECT: AECOM Contact: Dwayne Wilson 1300 E. 9th St., Ste. 500 Cleveland, OH 44114 Phone: 216-622-2400 www.aecom.com
CM:
Turner Construction 1422 Euclid Ave., #200 Cleveland, OH 44115 Phone: 216-522-1180 www.tcco.com DESCRIPTION: Phase 2 - renovation of teaching labs including all interior remodeling trades - electrical - HVAC - controls - flooring drywall - painting - ductwork. Project Report #: 01892 BRUNSWICK MIDDLE SCHOOL - AUDITORIUM & STADIUM LOCATION: Pearl Rd. Brunswick, OH (Medina County) PROJECT TYPE: New Construction CATEGORY: Institutional CONTRACTING METHOD: Bids by Invitation Only PROJECT STATUS: Working Drawings In Progress - Construction Underway - School Completion Set For 3rd Quarter 2020 Auditorium 4th Quarter 2020 - Stadium 2nd Quarter 2021 EST. VALUE: $63 million OWNER: Brunswick City Schools Contact: Michael Mayell, Superintendent 3643 Center Rd. Brunswick, OH 44212 Phone: 330-225-7731 www.bcsoh.org ARCHITECT: ThenDesign Architecture (TDA) Contact: Ed Shearson 4135 Erie St. Willoughby, OH 44094 Phone: 440-269-2266 www.thendesign.com CM AT RISK: Hammond Construction Contact: Ryan Weller 1278 Park Ave. S.W. Canton, OH 44706 Phone: 330-455-7039 www.hammondcontruction.com CIVIL ENG: Greenland Engineering STRUCTURAL ENG: Sixmo Inc. MECH & ELEC ENG: Verostko DESCRIPTION: 1 bldg, 3 stories, 243,000 sf. Multiphased construction - middle school with a capacity for nearly 1,700 students grades 6-8 - increased security - 700-seat auditorium - 449 parking spaces - new stadium with a synthetic turf field, an eight-lane track and bleachers. Project Report #: 02009 STREETSBORO 43 & FROST LOCATION: Ohio 43 & Frost Rd. Streetsboro, OH (Portage County) PROJECT TYPE: New Construction CATEGORY: Industrial CONTRACTING METHOD: Bids by Invitation Only PROJECT STATUS: Project Proposed Pending Leasing DEVELOPER: Geis Companies Contact: Conrad Geis 10020 Aurora-Hudson Rd.
Specializing in all aspects of Metal Framing, Drywall, Acoustical Ceilings and Flooring
DESIGN/BUILD TENANT & CAPITAL IMPROVEMENTS ARCHITECTURAL TRADES SUBCONTRACTOR At ICON INTERIORS, our goals and values are consistent with all clients: deliver quality work, on time and on budget. We strive to exceed every client’s expectations and form a lasting partnership. Our standards will ensure a flawless project every time. 2150 St. Clair Ave. Cleveland, OH 44114 glenn@iconwcf.com www.iconwcf.com
SERVING ALL OF NORTHEAST OHIO
216.713.2383 www.propertiesmag.com 81
Streetsboro, OH 44241 Phone: 330-528-3500 www.geis-companies.com DELIVERY METHOD: Design/Build DESCRIPTION: 150-acre business park development. Project Report #: 01603 LORRAINE AND BILL DODERO CENTER FOR PERFORMING ARTS LOCATION: 34001 Cedar Rd. Gates Mills, OH (Cuyahoga County) www.gilmour.org PROJECT TYPE: New Construction CATEGORY: Institutional CONTRACTING METHOD: Competitive Bids PROJECT STATUS: Work Underway - Set for Completion November 2019 EST. VALUE: $8.5 million OWNER: Gilmour Academy Contact: Ms. Kathryn J. Popp, CFO 34001 Cedar Rd. Gates Mills, OH 44040 Phone: 440-473-8000 www.gilmour.org ARCHITECT: ThenDesign Architecture (TDA) Contact: Ryan Schmidt & Robert Orovets 4135 Erie St. Willoughby, OH 44094 Phone: 440-269-2266 www.hbaarchitects.com CM AT RISK: Panzica Construction Contact: Bill Davis, proj mgr 739 Beta Dr.
Cleveland, OH 44143 Phone: 440-442-4300 www.panzica.com CIVIL ENG: GPD Group STRUCTURAL & MECH ENG: Thorson Baker & Associates DESCRIPTION: 1 bldg, 1 story, 19,106 sf. 300-seat main theater - 86-seat black box theater - debate practice rooms - presentation rooms - music ensemble enclave - art gallery exhibition hall. Phase 2: Preliminary plans - renovation to athletic field - wayfinding - ice arena renovations. Project Report #: 02052 TREMONT ANIMAL CLINIC LOCATION: 2320 Seymour Ave. Cleveland, OH (Cuyahoga County) PROJECT TYPE: New Construction CATEGORY: Institutional PROJECT STATUS: Work Underway - December Completion Set EST. VALUE: $2.6 Million OWNER: TAC Holding Company Contact: Dr. Katie McCoy 3148 W. 14th St. Cleveland, OH 44109 Phone: 216-298-5011 www.trmontanimalclinic.com ARCHITECT: c/o GC GC: Kline Rostocil Construction Contact: Dustin Morgan 9385 Hamilton Dr.
HOW BAD IS THAT LEAK?
Keep your assets safe by taking the time to ensure that problems at the top of your building are not damaging your bottom line.
Carey Roofing Corp. has eliminated asset damage due to a leaking roof with practical solutions since 1946. 216 • 881 • 1999 CAREY www.careyroofing.com
Roofing Corp. 82
founded in 1946
MEMBER: National Roofing Contractors Association
Mentor, OH 44060 Phone: 440-357-4500 www.krccontractors.com DESCRIPTION: 1 bldg, 2 stories, 9,430 sf. Ground-up new construction of a 9,430 sf modern contemporary style veterinary clinic in Cleveland’s Tremont neighborhood. Project Report #: 01525 TERMINAL TOWER CONVERSION MIXED-USE LOCATION: 50 Public Square Cleveland, OH (Cuyahoga County) www.kanddgroup.com PROJECT TYPE: Renovation CATEGORY: Residential/Commercial CONTRACTING METHOD: Bids by Invitation Only PROJECT STATUS: Work Underway - Project to Proceed in Phases - Phase One Completed Fall 2019 - Full completion April 2020 EST. VALUE: $100 million DEVELOPER: K & D Group Inc. Contact: Doug Price 4420 Sherwin Rd. Willoughby, OH 44094 Phone: 440-946-3600 www.thekdgroup.com OWNER’S AGENT: Evolution Construction LLC Contact: Jim Hounshell 1717 E. 9th St., Ste. 101 Cleveland, OH 44114 Phone: 440-918-1628 www.evolution-construction.com ARCHITECT: DLR Group/ Westlake Reed Leskosky Ltd. Contact: Michael Fant 1422 Euclid Ave., Ste. 300 Cleveland, OH 44115 Phone: 216-522-1350 www.wrldesign.com CM: Cleveland Construction Inc. Contact: Mike Swally, Project Mgr. 8620 Tyler Blvd. Mentor, OH 44060 Phone: 440-255-8000 www.clevelandconstruction.com DESCRIPTION: 1 bldg, 52 stories, 500,000 sf. Conversion includes 301 total residential units over 11 floors (floors 4-14) with additional amenity floor on 15. Floors above 15 remain commercial. Project Report #: 01960 BROOK PARK ELEMENTARY SCHOOL LOCATION: Brookpark, OH (Cuyahoga County) PROJECT TYPE: New Construction CATEGORY: Institutional PROJECT STATUS: Under Construction - Completion Set For November 2019 OWNER: Berea City School District Contact: Michael Sheppard, Superintendent 390 Fair St. Berea, OH 44017 Phone: 216-898-8300 Properties | November 2019
www.berea.k12.oh.us ARCHITECT: GPD Group 520 S. Main St. #2531 Akron, State: OH Zip: 44311 Phone: 330-572-2100 www.gpdgroup.com CM AT RISK: C.T. Taylor Construction 5802 Akron-Cleveland Rd. Hudson, OH 44236 Phone: 330-656-9353 www.cttaylor.com DESCRIPTION: New elementary school. Project Report #: 01899 NORTH ROYALTON ELEMENTARY SCHOOL LOCATION: 16400 State Rd. North Royalton, OH (Cuyahoga County) PROJECT TYPE: New Construction CATEGORY: Institutional CONTRACTING METHOD: Competitive Bids PROJECT STATUS: Construction Underway Completion Set Fall 2020 EST. VALUE: $26 million OWNER: North Royalton City Schools Contact: Greg Gurka, Superintendent 6579 Royalton Rd. North Royalton, OH 44133 Phone: 440-237-8800 www.northroyaltonsd.org ARCHITECT: ThenDesign Architecture (TDA) Contact: Claire Bank, project architect 4135 Erie St. Willoughby, OH 44094 Phone: 440-269-2266 www.thendesign.com CM: Hammond Construction Contact: Kim Adams, marketing 1278 Park Ave. SW Canton, OH 44706 www.hammondconstruction.com DESCRIPTION: 1 bldg, 90,000 sf. New elementary school - includes renovation - classrooms - collaborative areas - science labs media space - an auxiliary gym. Project Report #: 01983 EUCLID CITY SCHOOLS EARLY LEARNING VILLAGE LOCATION: 22800 Fox Ave. Euclid, OH (Cuyahoga County) PROJECT TYPE: Renovation/Addition CATEGORY: Institutional CONTRACTING METHOD: Competitive Bids PROJECT STATUS: Completed EST. VALUE: $14 million OWNER: Euclid City Schools Contact: Patrick Higley 651 E. 222nd St. Euclid, OH 44132 Phone: 216-861-2050 ARCHITECT: ThenDesign Architecture (TDA) Contact: Brad Gellert 4135 Erie St. Willoughby, OH 44094 Phone: 440-269-2266
440.234.0700 | WWW.RMRIGGLE.COM 879 W. BAGLEY RD. | BEREA, OH 44017
Downtown Cleveland’s Premier Building Solutions Provider • Sustainable Heating and Cooling Solutions • Energy Auditing and Retro-Commissioning • Building Performance Optimization • Maintenance and Service Contracting
To learn more visit www.clevelandthermal.com 216.241.3636 | www.clevelandthermal.com www.propertiesmag.com 83
www.thendesign.com CM AT RISK: Hammond Construction Contact: Derrick Semilia 1278 Park Ave. S.W. Canton, OH 44706 Phone: 330-455-7039 www.hammondconstruction.com CIVIL ENG: Greenland Engineering STRUCTURAL ENG: Barber & Hoffman, Inc. MECH ENG: Verostko Engineering, Inc. ELEC ENG: CL Firestone Engineering, Inc. DESCRIPTION: 1 bldg, 3 stories, 139,000 sf. Twostory addition to a vacant middle school to hold 16 kindergarten classrooms and 16 pre-K classrooms - renovate existing
administrative offices - special classrooms - two gyms - technology/fab lab - music - cafeteria. Project Report #: 01873 WEST SIDE HIGH SCHOOL LOCATION: W. 49th St. & Detroit Ave. Cleveland, OH (Cuyahoga County) www.clevelandmetroschools.org PROJECT TYPE: New Construction CATEGORY: Institutional CONTRACTING METHOD: Competitive Bids PROJECT STATUS: Work Underway - Possible Completion August 2020 OWNER: Cleveland Metropolitan School District
Contact: Eric Gordon 1111 Superior Ave., Ste. 1800 Cleveland, OH 44114 Phone: 216-838-0000 www.clevelandmetroschools.org ARCHITECT: TDA Archictecture Contact: Ed Shearson 4135 Erie St. Willoughby, OH 44094 Phone: 440-269-2266 www.thendesign.com CM AT RISK: ICON 26650 Renaissance Pkwy., Ste. 1 A Warrensville Hts., OH 44128-5776 Phone: 440-753-5200 www.iconohio.com DESCRIPTION: 1 bldg, 2 stories, 133,000 sf. New high school. Replacement of Max Hayes High School - 800-student capacity with two major sections, music, athletics and student driving section - two-story classroom section with connecting bridge-way passage between the buildings - two-story flexible media center with amphitheater. Project Report #: 01971 T J MAXX DISTRIBUTION CENTER LOCATION: 3293 Ellsworth-Bailey Rd. S.W. Warren, OH (Trumbull County) www.tjmaxx.tjx.com PROJECT TYPE: New Construction CATEGORY: Industrial CONTRACTING METHOD: Bids by Invitation Only PROJECT STATUS: Work Underway EST. VALUE: $160 million OWNER: The TJX Companies Inc/ Homes Goods Division Contact: Ernie Herrman, CEO 7700 Cochituate Rd. Framingham, MA 01701 Phone: 508-390-1000 www.tjmaxx.tjx.com ARCHITECT: c/o Builder GC: Catamount Constructors Inc. Contact: Brian Mulnix, Business Development 1527 Cole Blvd., Ste. 100 Lakewood, CO 80401 Phone: 330-679-0087 www.catamountinc.com DESCRIPTION: 290 acres, 1 bldgs, 1.2 million sf. Warehouse & distribution center administrative offices.
Brennan 84
Information included in Construction Progress Report has been produced, processed and/or verified through sources believed to be reliable. Properties Magazine makes no warranty of any kind for this information, express or implied, and is not responsible for any omissions or inaccuracies. To contribute project data or to notify Properties of any reporting errors, we encourage you to email cpr@propertiesmag.com. Properties | November 2019
www.northcoastpaving.com
2417 Woodhill Rd., Cleveland, OH 44104
(216) 421-1203
• Pavement Milling • Asphalt Paving & Maintenance • Site & Sewer Work • Line Striping & Sealcoating
Coming in December Ursuline Sisters Merici Crossings Residence MRI Software LLC Offices Ohio Center for Oral, Facial & Implant Surgery Building Products & Maintenance …and more Interested in advertising? Call Properties today and an account
www.propertiesmag.com representative can help you
Visit us online for archived feaaddress your advertising needs: ture articles, advertising rates, 216.251.0035 / 888.641.4241 specs and subscription information.
ADVERTISER INDEX 1st Choice Roofing, Co. ...............................................45 Abraxus Snow Removal..............................................54 Advanced Roofing Systems......................................20 AIA Cleveland...................................................................39 Air Control Products, Inc. ..............................................4 American International Construction..................64 Architectural Floors of Cleveland ..........................40 Belden Brick ......................................................................20 Bradley Stone Industries, Ltd. ..................................35 Brennan & Associates ..................................................84 Brilliant Electric Sign Co. .............................................32 Bruder Building Materials, Inc. ...................................9 Buckeye Sweeping, Inc. ..............................................64 Carey Demolition...........................................................42 Carey Roofing ..................................................................82 Chagrin Valley Steel Erectors ...................................44 Charles Schulz Building Company ........................12 Charles Svec Inc. .............................................................39 Christian Phillips Photography................................41 Cleveland Cavaliers.......................................................88 Cleveland Engineering Society...............................50 Cleveland Public Power ..............................................63 Cleveland Thermal ........................................................83 Cohen & Company ........................................................69 Columbia Building Products ....................................12 Commercial Roofing & Coating Systems, Inc..................................................................87 Contractors Assistance Association/CEA ...........10 Cunningham Paving Inc. ............................................65 Diamond Roofing Systems .......................................79 Dollar Bank ........................................................................63 Duffy & Duffy Cost Segregation Services..........75 EA Group ............................................................................43 Einheit Electric.................................................................22 Gilbane Company..........................................................52 Grout Systems, Inc.........................................................25 Hahn Loeser & Parks, LLP...........................................73 Harlan & Assocs ..............................................................59 Hasenstab Architects Inc. ..........................................14 Hicks Roofing......................................................................2 HMH Restoration Ltd. ..................................................54 Icon Interiors ....................................................................81 IKM Architecture, Inc.......................................................9 Infinity Construction ....................................................28 Integrated Project Solutions ....................................65
J.V. Janitorial Services, Inc. .........................................42 Jamieson Ricca Fenestration.......................................6 JL Taylor, Co. Inc. .............................................................71 John G. Johnson Construction Co.........................72 John S. Grimm, Inc............................................................7 Lisco Heating & Cooling, Inc. ...................................65 Marous Brothers Construction................................28 Mason Structural Steel, Inc. .........................................7 Masonry Restoration Maintenance ......................12 McMahon Masonry Restoration.............................73 Meaden & Moore, Ltd ..................................................76 Messina Floor Covering, Inc...............................16, 29 Meyers, Roman, Friedberg & Lewis.......................67 North Coast Paving.......................................................85 OCP Contractors......................................................32, 53 Pease Photography.......................................................48 Pella Window & Door Company/Gunton Corp. ...................................................................................3 Performance Painting..................................................26 Pete & Pete Container Service .................................46 Pleasant Valley Corporation .....................................68 Precision Environmental Co. ....................................53 Precision Laser & Instrument, Inc...........................78 R P Madison International .........................................24 RAM Construction Services of Cleveland ..........75 Reliable Snow Plowing Specialists ........................30 RM Riggle Enterprises, Inc. ........................................83 S.A. Comunale Company ...........................................18 Sable Asphalt Maintenance......................................19 Same Day Salt ..................................................................47 Schill Grounds Management ...................................71 Siegel Jennings ..............................................................61 Skoda Minotti Co. ..........................................................59 Snow Brothers Appliance, Inc. ................................67 Space Comfort Co..........................................................80 Stantec ................................................................................51 Summit Construction Co. ..........................................14 Sunray Window Films LLC .........................................38 Suntrol Co. .........................................................................18 Thorson Baker & Associates, Inc. ............................18 US Communications & Electric Company ......... 12 Wadsworth Solutions ..................................................62 Walter | Haverfield LLP ................................................70 Warren Roofing & Insulating Co. ............................48 Zinner & Company ........................................................74
Contact an Advertiser www.propertiesmag.com
And Tell Them You Saw It In...
Visit us online today to view archived issues in an interactive digital format.
86
Properties | November 2019
Cover Your Investments With Confidence
Count on Commercial Roofing and Coating Systems, Inc. to get on top of your roofing project – no matter the size. We specialize in roofing repairs, replacements and maintenance for Commercial, Industrial and Residential clients throughout Northeast Ohio. Our main focus? Providing efficient and cost-effective service. Our full line of services includes: Roofing Maintenance | Inspections & Reporting Infrared Leak Detection & Reporting | Low Slope Roofing Single-Ply Membrane Roof Systems | TPO, PVC, EPDM, Modified Asphalt Sheet Metal & Custom Flashings | ACM Composite Panels | Coatings Insulation | Tapered Insulation, Tapered Roofing | Metal-Retrofit Systems Daylighting | Solar Roof Systems | New Construction & Roof Replacement
Contact us today at 330-207-3879 to handle all of your roofing needs! Mailing Address: P.O. Box 73, Garrettsville, OH 44231 | Physical Address: 10025 SR-82, Windham, OH 44288 brandon@ohiocommercialroofing.com | www.ohiocommercialroofing.com
THANK YOU... 2,700 + construction crew members clocked more than 605,000 hours on the Transformation Project. Minority and Female Workforce Cuyahoga County Workforce Participation City of Cleveland Workforce Participation Minority Business Enterprise Female Business Enterprise Small Business Enterprise
We are proud that the project has met and exceeded every diversity and inclusion project goal established as part of the Community Benefits Agreement in partnership with the City of Cleveland, Cuyahoga County and Gateway Economic Development Corporation.