,16,'( &DQDO 3DUN 8SJUDGHV 6W (OL]DEHWK %RDUGPDQ +HDOWK &HQWHU &RQVWUXFWLRQ 7UDGHV
July 2014/$7.95
;OL >LZ[PU»Z >HYT >LSJVTL 9LUV]H[PVU KLSP]LYZ YLQ\]LUH[LK SVKNPUN TVKLYU TLL[PUN ZWHJLZ PU +V^U[V^U *SL]LSHUK
PAVING WITH PRIDE FOR 30+ YEARS Since 1982, we’ve been building our reputation job by job
LET’S MAKE YOUR JOB OUR NEXT STOP >L ^V\SK HWWYLJPH[L HU VWWVY[\UP[` [V Z\ITP[ V\Y YLJVTTLUKH[PVUZ HUK LZ[PTH[LZ MVY `V\Y!
5L^ 7HYRPUN 3V[ *VUZ[Y\J[PVU
.YHKPUN ,_JH]H[PVU
:P[L +L]LSVWTLU[
(ZWOHS[ 9LZ\YMHJPUN
*H[JO )HZPUZ +YHPU[PSL
:[VYT :L^LY >VYR
(ZWOHS[ 9LWHPYZ
*YHJR -PSSPUN :LHSJVH[PUN
4PSSPUN
Specialists from site development to chuckhole patching!
We're doing it better for less every day
Call us today at 216.421.1203 2417 Woodhill Rd., Cleveland, OH 44104 • Fax 216.421.1278
^^^ UVY[OJVHZ[WH]PUN JVT
ENVI RON M EN T A L C O N T R O L SER V ICES F O R H EALTH CAR E F ACIL IT IE S
You know that the health of your medical facility is also important to the well-being of the people inside. Hospitals and healthcare facilities are acutely aware of the infec-
For over 25 years, EA Group has worked with a variety of leading
tion risks posed by construction and renovation projects in and
healthcare facilities to help reduce the risk of infection from en-
around their facilities. EA Group has designed and managed the
vironmental contaminants. When renovation, construction or
safe removal of asbestos and hazardous materials from health-
water leak repairs require Infection Control Risk Assessment
care facilities for over two decades. We have developed expertise
procedures, EA Group provides critical site monitoring. Our
in Infection Control Risk Assessment (ICRA) and Infection
project managers inspect isolation barriers, conduct air monitor-
Control Implementation during construction, renovation and
ing and work with construction and facilities staff to implement
remediation projects. We work in conjunction with the hospital’s
and document ICRA controls. Put the expertise of EA Group to
construction, facility engineering and infection control staff to
work for your organization and start to breathe a little easier.
develop and implement plans to protect patients and hospital staff during these projects.
BREATHE EASIER • Infection Control Monitoring • Exposure Monitoring
• Pre-Construction Hazardous Materials Assessment & Management • Mold & Moisture Damage Response • Analytical Laboratory Support
800.875.3514 • 440.951.3514 • www.eagroupohio.com 7118 Industrial Park Boulevard • Mentor, OH 44060
www.per fectpower wash.com www.perfectpowerwash.com OVER 14 YEARS IN BUSINESS
July 2014, Volume LXVIII, Number 7
phone: 216.251.0035 toll free: 888.641.4241 fax: 216.251.0064 www.propertiesmag.com
FEATURES
CLEVELAND 3826 W. 158th St. Cleveland, Ohio 44111 AKRON P.O. Box 9 Munroe Falls, Ohio 44262
Photo by Jim Maguire
OWNER/PUBLISHER Kenneth C. Krych kkrych@propertiesmag.com MANAGING EDITOR/ART DIRECTOR Mark Watt mwatt@propertiesmag.com CONTRIBUTING WRITERS Doug Bardwell, Jeanne Bluffstone, Dennis Castiglione, John Elliott, Lou Kren, Alec Pacella, Molly Reeves, John Slagter, David Woodburn ACCOUNT EXECUTIVES Karen Cahill kcahill@propertiesmag.com 216.849.6753 Andrea Keener akeener@propertiesmag.com 216.849.4350 Larry Overbey loverbey@propertiesmag.com 216.251.6649
10 May Construction Retreats 5% 14 The Westin’s Warm Welcome Renovation delivers rejuvenated lodging, modern meeting spaces in Downtown Cleveland
25 Local Flavor ‘Agri-chic’ ambience matches farm-to-table culinary approach at Urban Farmer
29
Building Buzz at the Ballpark Renovation efforts boost fan experience at Akron RubberDucks’ Canal Park
47
Rising to the Challenge Catholic Health Partners meets growing healthcare needs in Boardman with new patient tower
57 Construction Trades: Committed to Craftsmanship 57 Rock Solid Training from IMI: International Masonry Institute lays solid foundation for lifelong craft development 60 Vantage Point – New Revenue Rules to Impact Contractors 65 McTech Corp Continues Building 66 Trading Up with Technology: Construction testing/inspection services get smarter, faster in the virtual world 71 Open to Options: Five things to consider when selecting dock doors for your facility 72 Product Profile: Krystol Internal Membrane
Walter Sisson wsisson@propertiesmag.com 216.251.2520 OFFICE MANAGER Lisa Larissey 216.251.8506 Cover photo: The Westin Cleveland Downtown, by Scott Pease
Properties (ISSN 033-1287) is published monthly for architects, engineers, building owners and managers, general contractors, home builders, mortgage bankers, savings and loans, real estate agents, appraisers, servicers and suppliers in Northern Ohio by Properties, Inc., 3826 W. 158th St., Cleveland, Ohio 44111. Copyright © 2014 by Properties, Inc. All rights reserved. Reproduction or use, without written permission, of editorial or pictorial content is strictly prohibited. Periodicals postage paid in Cleveland, Ohio and additional offices. Subscription rates: one year $24.95, single copy $7.95, back issues $10 when available. Postmaster: send change of address notices to Properties, P.O. Box 112127, Cleveland, Ohio 44111.
DEPARTMENTS 8 13 35 38 40 42 44 74
PROPERTIES PEOPLE BOMA BUSINESS BILLBOARD FINANCIAL STRATEGIES LEGAL PERSPECTIVES ACAR CORNER NAIOP NEWS CONSTRUCTION PROGRESS REPORT www.propertiesmag.com 5
PUBLISHER’S NOTE July 2014
Across the Region elcome to our July 2014 issue featuring some of the biggest and best projects recently completed in the region, from Cleveland to Akron to Youngstown.
W
For our cover story, we are proud to bring you the latest hotel on Cleveland’s skyline with the opening of The Westin Cleveland Downtown. This was much more than just a renovation/restoration of the old Crowne Plaza hotel. It’s actually an all-new structure, keeping only the existing concrete/steel frame. Beautifully done inside and out, the new hotel lights up the street at night with a limitless choice of LED lighting designs illuminated on an architectural mesh screen. Inside, you’ll find a two-story glass stairway has been added to open up the main ballroom area, plus an amazing collection of locally produced art.
KEN KRYCH
We also visit the new Urban Farmer restaurant, which is situated within the same structure as the Westin. The eatery is one-of-a-kind, from its farm-to-plate menu options to its agri-chic atmosphere with reclaimed wood and chicken wire cages used as design features. St. Elizabeth Boardman Health Center In Mahoning County, we tour the sixstory vertical addition at St. Elizabeth Boardman Health Center. Great thought was given to the color palette of each floor based upon use with soothing greens, blues and other muted tones along with unique flooring. Making the
Suntrol It!
™
G L A S S
SU UNTROL
E N H A N C I N G
F I L M S
Save Energy, g Save Money With Suntrol! Did you know that adding window film to existing windows could save you up to 33% on energy costs at about 1/5 the cost of replacement windows? That’s right. Window film isn’t just for commercial buildings, it’s a home improvement that actually pays for itself and helps protect the environment, too. Don’t just window film it, Suntrol it!™ • Pays for itself by saving you up to up to one third on energy costs. • Is virtually clear and makes your home more beautiful and more comfortable, year round. • Is covered by today’s most generous warranty.
G L A S S
SUNTROL
E N H A N C I N G
Why Suntrol? • A trusted area window film expert since 1975. • A multiple award winner, including Angie’s List Super Service Award. • A company that cares about Northeast Ohio.+ Schedule by Aug. 1 and mention promo code Summer14, and you could save up to 10% on whole house installation along with a FREE Suntrol window care kit*! +
Call today for your FREE in-home estimate! Save up to 10%*!
Suntrol supports the Case Comprehensive Cancer Center. http://cancer.case.edu/about/
F I L M S
COMMERCIAL | RESIDENTIAL
Suntrol.com • 800-466-TINT(8468) 6
3URSHUWLHV | July 2014
project especially complex, the tower was built atop an existing active surgical center that remained open throughout. Canal Park Additionally, we take a look at four major revisions to Canal Park, home of the Akron RubberDucks, with new seating areas, a restaurant, tiki bar and special event space, all of which enhance the experience for fans of the Double-A affiliate of the Cleveland Indians. Construction Trades Special Section New this year, we introduce our Construction Trades Special Section, which focuses on contracting and craftsmanship and examines the latest techniques, tools and evolving technology that goes into literally everything here that is three-dimensional. We want to thank the firms who have contributed with informative articles and insights into their craft. PSI Inc. writes about how technology is advancing testing and inspection in the lab and in the field. Meaden & Moore lets us in on the effects of new revenue rules on contractors. Price Builders & Developers informs us on high performance waterproofing products. Commercial Dock & Door provides information on choosing the right dock doors for facilities. Additionally, we have a special article on the International Masonry Institute, which assists craftsmen at all levels. And we bring you a special profile on Cleveland-based building company McTech Corp. Coming in August Looking ahead, August will include our annual Security & Fire Protection Special Section, so we welcome input and features from the top local, regional and national firms on the topic. We are also going to be focusing on the new Cuyahoga County Headquarters, The Residences at 1717 and the renovation of John Carroll University’s Murphy Hall. Until the, let’s enjoy the summer while we can.
> COMMERCIAL REAL ESTATE expertise. > PERSONALIZED COMMUNITY BANK service.
It’s all about collaboration, individualized service and fostering economic growth in our community. We’re committed to it. And nearly 80 years of community banking expertise supports it.
LET OUR TEA M HELP YOUR S THR I V E . Contact Rig Goss at (216) 239-5904.
ARE THERE TAX DEDUCTIONS HIDING IN YOUR BUILDING?
Many building owners have millions of dollars in income tax deductions they don’t know about. If you own commercial or industrial property and need more tax deductions, let our Cost Segregation professionals furnish you with an estimate. It won’t cost you anything to find out!
Positively,
Call Dennis Duffy or Craig Miller: Cleveland 440.892.3339 / Columbus 614.949.4185 Detroit 248.752.7433 or visit our website www.costsegexperts.com
Kenneth C. Krych Owner/Publisher
THE REGION’S LEADING INCOME TAX REDUCTION EXPERTS www.propertiesmag.com 7
PROPERTIES PEOPLE Highlighting notable industry events
1
2
7
2014 “Goodtime for Design” Over 400 members and guests of 24 industryrelated organizations boarded the Goodtime III for a 3½-hour boat tour along Lake Erie and the Cuyahoga River, which included food, drinks, dancing, prizes and a 50/50 raffle. A new twist including a photo competition for best “selfie” and architectural photo, which added to the fun experience under perfect skies. Spearheaded by Cleveland AIA, the event also included an aftercruise networking social party mixer. P
7
NAIOP Awards of Excellence The Northern Ohio chapter of NAIOP presented its annual Awards of Excellence recently at Windows on the River in Cleveland. Over 350 real estate professionals and guests attended the program, celebrating design, development and marketing successes in industrial, office, retail, mixed-use and multi-family developments. A cocktail reception followed to recognize the nominees and winners, and to network with industry representatives. P 8
8
5
9
10 0
1 Tom and Karen West, Annette Malkin and Alex Russo (Cushman Wakefield/CRESCO Real Estate) and Don Obermeier (PSI, Inc.) 2 Larry Overbey (Properties) and Miklos Peller, Jr. (Peller & Associates, Inc.) 3 Craig Miller and Dennis Duffy (Duffy & Duffy Cost Segregation) 4 Ledell Burks and Lori Haynes (IMAGINiT) 5 Robert Weeks (Cleveland Construction, Inc.) and Amanda Romeo (Herschman Architects) 6 Merrie Guinther and Denise Adomaites (Stoneworks) 7 Neil Dick (Dick Group Consultants) and Bonnie N. Dick (Career Transition Center) 8 Ross and Fran Augustino (Ohio Warehouse Equipment) 9 Bard Fulton (Fortney & Weygant Inc.), Mandy Phelan (TES Engineering) and Kari Walton (Britton Smith Peters & Kalial Co., LPA) 10 Jeff Gliebe (The Krill Co.), Stephanie Wilson (Music Box), Dan Audia and Kyle Konczos (The Krill Co.)
2
1
4
4
3
8
9
5
10 0
6
11 11
1 2 3 4 5 6
Claire Lichter (Industrial Realty Group) and Erin Ryan (Atwell LLC) Amy Whitacre (First American Title Insurance Company) and Mark Panzica (Panzica Construction Co.) Tracy Van Der Kuil (Weber Murphy Fox), Fred Geis (Geis Companies) and Sara Solberg (Weber Murphy Fox) Annette Malkin and Alex Russo (Cushman Wakefield/CRESCO Real Estate) Ken Krych and Jing Liu-Krych (Properties) David Fischback (The Krill Co.), Sophia Deseran (Walter & Haverfield, LLP) and Jeff Gliebe (The Krill Co.) 7 Marko Zlatic and Howard Moss (Omni Property Companies), and Joe Greulich (Crescendo Commercial Realty) 8 Tracy Green (Industrial Realty Group), Stuart Lichter (Industrial Realty Group) and Mark Panzica (Panzica Construction Co.) 9 Randy Ruttenberg (Fairmount Properties) and David Bowen (Richard L. Bowen + Associates, Inc.) 10 Ron DeGrandis (McGladrey) and Scott Maloney (K2M Design) 11 Greg Seifert (Geis Companies), Joe Perrow (Geis Companies), Matt Beesley (Cushman Wakefield/ CRESCO Real Estate) and Joseph Martanovic (Ostendorf-Morris)
3URSHUWLHV | July 2014
Photos courtesy of Poses a Studio Photography
6
3
1
2
4
NAIOP Charities Golf Classic Recently 150 golfers hit the courses at Weymouth/Fox Meadow Country Clubs in Medina for NAIOP Northern Ohio’s 21st Annual Charities Golf Classic. The eventful day was capped off by raffles, dinner and drinks. Over $15,000 was raised to donate to area charities, including Cleveland Neighborhood Progress, North Coast Community Homes, American Cancer Society, Our Lady of the Wayside, Transitional Housing, Inc. and more. P
3
5
1 Craig Miller (Duffy + Duffy Segregation), Mark Panzica (Panzica Construction), Scott McCready (Cardno ATC) and Dennis Duffy (Duffy + Duffy Cost Segregation) 2 Traci Mockbee Hunt (CAM Inc.) and Dave Robar (Vocon) 3 Maureen Leech (NAIOP Northern Ohio), Donna Haders (NAIOP Northern Ohio) and Jing LiuKrych (Properties) 4 Kate Herrera (Today’s Business Interiors), Marko Zlatic (Omni Property Companies), Gabe Adler (Zinner & Company), Evan Klotzman (Alpha Park, Inc.), Michael Hermes (Zinner & Company), Maureen Leech (NAIOP), Tara Merciao (K2M Design), Melissa Caples (American Interiors), and Donna Haders (NAIOP) 5 Dan Hamilton (Stemle Associates), Skip Schmeis (Gebauer Company), John Quinones (Today’s Business Products) and Bob Kubicki (Ctrac)
Kevin Schmotzer (City of Cleveland Small Business Development), Jennifer Valencic (Positively Cleveland), Richard Yost Pace (Cumberland Development), Fred Geis (Geis Companies/Hemingway Development), Michael Demer (Downtown Cleveland Alliance) and Deb Janik (Greater Cleveland Partnership)
SMPS ‘What’s Next Cleveland’ Panel Over 70 members of Society for Marketing Professional Services (SMPS) Northeast Ohio Chapter met at the City Club of Cleveland recently for a luncheon discussion, moderated by Kevin Schmotzer of the City of Cleveland. The panel of five real estate, building and design experts analyzed current and future growth in the region. P
BETWEEN THE WEATHER & YOU SINCE 1922
WARREN ROOFING WARREN ROOFING AND INSULATING COMPANY
Working directly with manufacturers to provide efficient, reliable service and installation of a complete selection of roof systems, from single-ply to solar & green roofing. ABOVE ALL... WE ARE THE ROOFING PROFESSIONALS
Commercial/Industrial Roofing + Architectural Sheet Metal
440.439.4404 Fax 440.439.7523
www.warrenroofing.com www.propertiesmag.com 9
May Construction Retreats 5% t a seasonally adjusted annual rate of $513.4 billion, new construction starts in May dropped 5% from the previous month, according to McGraw Hill Construction, a division of McGraw Hill Financial. The reduced pace for total construction starts reflected a moderate loss of momentum for nonresidential building and housing, while the nonbuilding construction sector eased back slightly.
A
The total construction decline followed two months of strengthening activity, although May’s level was still above the lackluster volume registered at the outset of 2014. For the first five months of 2014, total construction starts on an unadjusted basis were $201.5 billion, down 1% from the same period a year ago. The May statistics lowered the Dodge Index to 109 (2000=100), compared to a revised 114 for April. During the first two months of 2014, the Dodge Index was reported at 103. “After the slow beginning to 2014, construction activity during March and April regained upward momentum, and May’s retreat does not necessarily mean that renewed expansion is stalling,” says Robert A. Murray, chief economist for McGraw Hill Construction. “The downturn
for nonresidential building in May was the result of a sharp pullback by the often-volatile manufacturing plant category after its huge gain in April. Residential building has often reflected the monthly up-and-down pattern for
[Nationally,] hotel construction in May increased 101%, boosted by the start of two large projects, [including] the $260 million Cleveland Convention Center Hotel in Cleveland. multifamily housing, which despite a setback in May can still be viewed as trending upward. Of more concern for residential building is single-family housing, which has yet to move beyond its recent plateau and resume growth.
Are you satisfied with your current investment returns? Is your IRA growing at 11% - 15% per year? Do you have ANY investments worth DOUBLE what you paid for them? YOU CAN...
NOW YOU HAVE A CHOICE! TURNKEY INVESTOR PROPERTIES, A STARK COMPANY offers a unique and effortless way to earn 11%, 12%, 15% annually, starting with a very low minimum investment. Call Brian Stark directly today at 216-310-1470 to learn more! www.turnkeyinvestorproperties.com
“The Stark Group Live!” Talking Real Estate Thursdays at 7 pm on Newstalk 1490 AM WERE 10
Nonbuilding construction in May was pulled down by further weakness for electric utilities; at the same time, public works construction made a partial rebound in May after retreating during the previous two months.”
Nonresidential building Nonresidential building in May fell 5% to $192.2 billion (annual rate), sliding back following a 15% jump in April. Manufacturing plant construction in May plunged 87% after being lifted in April by the start of several large projects, including a $3.0 billion ethylene plant in Texas. In contrast, the largest manufacturing project reported as a May start was an $80 million manufacturer-owned research laboratory in New Jersey. If the manufacturing category is excluded, nonresidential building would have been essentially flat in April followed by a 20% gain in May. Commercial building showed particularly strong growth in May, climbing 31%, led by gains for offices and hotels. Office construction in May surged 94%, led by the start of the massive new headquarters for Apple Inc. in Cupertino, California, with $2.3 billion estimated for the office portion of the project’s $2.5 billion construction cost. Other large office projects that reached the construction start stage in May included a $130 million data center in Elk Grove, Illinois and a $56 million office building in San Diego, California. Through the first five months of 2014, the top five metropolitan areas ranked by the dollar volume of new office starts were – San Jose, California; New York, New York; Houston, Texas; Washington, D.C.; and Boston, Massachusetts. Hotel construction in May increased 101%, boosted by the start of two large projects – the $260 million Cleveland Convention Center Hotel in Cleveland and the $272 million Marriott Marquis Hotel in Houston, Texas. After showing improved activity in April, both stores 3URSHUWLHV | July 2014
and warehouses retreated in May, falling 23% and 21% respectively. The institutional side of nonresidential building increased 11% in May, helped by substantial gains for several smaller institutional structure types. The public buildings category jumped 144%, lifted by the start of the $396 million San Diego County Central Courthouse in San Diego, California and the $200 million Stockton Courthouse in Stockton, California. The transportation terminal category increased 81%, led by $208 million for work on the East 86th Street Station on the Second Avenue Subway Line in New York, New York. The amusement-related category advanced 17%, but church construction dropped 7%. The largest institutional category, educational buildings, edged up 1% in May, supported by groundbreaking for such projects as a $98 million high school in Manassas, Virginia and a $79 million high school in Leander, Texas. Healthcare facilities in May slipped 5%, although the latest month did include groundbreaking for several large hospital projects, located in Huntley, Illinois ($210 million); Barrington, Illinois ($150 million); and Mansfield, Texas ($118 million).
Residential building Residential building, at $205.6 billion (annual rate), fell 7% in May. Multifamily housing dropped 25% after a gain of similar size in April, pausing from this category’s lengthy upward trend. Even with the decline, May did see groundbreaking for five large multifamily projects valued each in excess of $100 million, located in San Francisco, California ($140 million); Los Angeles, California ($135 million); Arlington,
May Construction Starts for Greater Cleveland/Akron Areas McGraw-Hill Construction recently reported on May contracts for future construction in the metropolitan statistical area of Cleveland-Elyria-Mentor, consisting of Cuyahoga, Geauga, Lake, Lorain and Medina counties, and the Akron area, consisting of Portage and Summit counties. An authority on the construction market, the firm produces Dodge Reports and Sweets Catalog Files. According to the Dodge Analytics unit of McGraw-Hill Construction, construction activity included: Cleveland-Elyria-Mentor Area (Cuyahoga, Geauga, Lake, Lorain and Medina counties) 2014 2013 Percent Change Nonresidential $271,041,000 $30,961,000 +875 Residential $54,230,000 $60,647,000 -11 Total Building $325,271,000 $91,608,000 +355 Akron Area (Portage and Summit counties) Nonresidential Residential Total Building
2014 $18,394,000 $18,439,000 $36,833,000
2013 $8,509,000 $33,866,000 $42,375,000
Percent Change +216 -46 -13
• Nonresidential buildings include commercial, manufacturing, educational, religious, administrative, recreational, hotel, dormitory and other buildings. • Residential buildings include one- and two-family houses and apartments. Source: McGraw-Hill Construction
Virginia ($126 million); Brooklyn, New York ($111 million); and New York, New York ($105 million). Through the first five months of 2014, the top five metropolitan areas ranked by the dollar volume of new multifamily projects were – New York, New York; Washington, D.C.; Miami, Florida; Los Angeles, California; and Boston, Massachusetts “While the multifamily recovery has moved into a more mature stage, with smaller annual increases, such market fundamentals as occupancies and rents are still rising which should encourage more construction growth in the near term,” Murray says.
Single-family housing in May was unchanged from its pace in April, and has now shown declining or flat activity in six out of the past seven months. By region, May showed greater single-family construction in the Midwest, the South Atlantic, and the West, but declines in the South Central and Northeast. “It’s become apparent that the recent loss of momentum for single-family housing is the result of more than just tough winter weather conditions,” Murray says. “While mortgage rates remain quite low, with the 30-year fixed mortgage rate settling back to 4.1% at the end of May, tight mortgage lending standards are
YOUR LOCAL MARKET EXPERTS We believe that you are only as good as the people you are in business with. That’s why we make it a priority to be in business with the best.
The Osborne Group
KW Commercial / The Osborne Group has expertise in all facets of commercial real estate. We are your local market experts with the resources of a national platform, cutting edge tools and international network at our disposal.
7400 Center Street | Mentor, Ohio 44060 | 440-299-5190 | www.KWCommercialOhio.com www.propertiesmag.com 11
DESIGN s INSTALL s MANAGE U Install to your specs or our design U Complete maintenance services U Quality...Value... Professional
Landscape Development Management s Garden Center
5157 Akron-Cleveland Rd. s www.SuncrestGardens.com s 330.650.4969
),5( 3527(&7,21 6(59,&(6 Fire Extinguishers, Alarms, Exit/Emergency Lighting, Kitchen Fire Suppression, Sprinklers, FM-200/Halon/CO2 Systems/Backflow Prevention Divison 10 fire extinguishers and cabinets to construction trades
888.528.0928 www.county-fire.com
Fire protection contracting services to property owners/managers
!KRON s #LEVELAND s #OLUMBUS s 4OLEDO
COMMERCIAL & RESIDENTIAL SPECIALISTS Full service for residential and commercial real estate transactions including: Title Insurance, For Sale By Owner Packages, Closing and Escrow and Home Builder Services, including:
1031 Exchange Services Limited Lien Searches
MENTOR 8500 Station St., Ste 285, Mentor, OH 44060 440.974.8242 CLEVELAND 2077 E. 4th St., Cleveland, Ohio 44115 216.325.0400
www.lakecountytitle.com 12
restraining the ability of potential firsttime homebuyers to purchase a home.”
Nonbuilding construction Nonbuilding construction in May slipped 1% to $115.7 billion (annual rate). A 31% decline for electric utilities slightly outweighed a 5% increase for public works overall, pulling down May’s nonbuilding total. The largest electric utility projects that were entered as May starts were a $335 million wind farm in Kansas, a $200 million expansion of a gas-fired power plant in Alaska, and a $112 million gas-fired power plant in Louisiana. For public works, substantial increases in May were reported for highways, up 23%; and bridges, up 34%; after particularly weak activity was reported for both project types during April. Large bridge projects that were entered as May starts included a $146 million bridge renovation in Albany, New York and a $132 million bridge replacement in Kentucky. The top five states for highway and bridge construction during the first five months of 2014 were – Texas, California, Pennsylvania, Illinois, and North Carolina. The environmental public works categories registered declines in May from the previous month, with water supply systems down 25%, and river/harbor development down 52%. The 1% drop for total construction starts on an unadjusted basis during the first five months of 2014 relative to last year reflected modest gains for nonresidential building and housing, combined with a double-digit slide for nonbuilding construction. Nonresidential building during the January-May period climbed 5%, resulting from increases for manufacturing buildings, up 52%; and commercial buildings, up 5%; while the institutional building segment slipped 2%. Residential building during the first five months of 2014 grew 2%, with multifamily housing up 10% while singlefamily housing was flat. Nonbuilding construction in the first five months of 2014 was down 13%, with public works falling 8% while electric utilities plunged 35%. By geography, total construction starts during the first five months of 2014 showed growth in the Northeast and South Central, each up 6%. The other three regions registered year-to-date total construction declines – the West, down 2%; the Midwest, down 4%; and the South Atlantic, down 8%. P 3URSHUWLHV | July 2014
BOMA BUSINESS Exploring timely topics with BOMA members
Using ESCOs to Reach Energy Efficiency Goals enovations in downtown Cleveland are beneficial to visiting professionals, tourists, building owners, consumers, our local economy and the environment. Owners and property managers are establishing energy efficiency goals to reduce their operating and utility costs, while maintaining the integrity of the building. The end result can increase the property value and attractiveness to a new tenant with renovated space that offers improved lighting and more efficient heating and cooling systems.
R
It is important to research any preliminary energy efficiency option. Whether your building requires updated mechanical systems or commissioning, employee engagement can make an immediate impact. Developing policies and procedures for employees to follow at the end of each day will reduce costs. Utilizing employees and a building automation system will make immediate improvements to the energy efficiency of the building. More complicated projects, such as building or renovating a boiler and chiller plant, require professional engineering and project management. These services are available through energy service companies (ESCOs) utilizing in-house resources to deliver a turnkey solution. From electrical engineers to construction experts to cost estimators, most ESCOs will provide you with a guaranteed maximum price and guaranteed results. As a result, ownership can budget precisely these improvements. If financing is an issue, there are very creative options available through Federal and State funding mechanisms, as well as operating leases with no money required. To initiate a plan, developing specific goals within your facility is a great start.
Then, you may want to commence an energy audit by an ESCO with expertise in auditing, design/engineering and implementing projects. Most ESCOs will provide a no-obligation energy audit that will give you a preliminary analysis to make needed improvements due to its life cycle and new technology. This information will provide you with quantifiable information to make a decision that may maintain the legacy and competitiveness in the market. Numerous key projects in Northeast Ohio such as PlayhouseSquare, The Galleria and Tower at Erieview, plus The Westin Cleveland Downtown (featured in this issue) as well as other historical landmarks have already undergone impressive renovations that continue to positively impact the environment and lower utility costs. P
BOMA Greater Cleveland is proud to provide this space to our associate members so they can inform, educate and share their knowledge with property management professionals. This article was written by Dan Mitchell, energy service sales consultant, of the Brewer Garrett Company. Mitchell can be reached at 440-971-0603 or dmitchell@brewer-garrett.com. The Brewer Garrett Company can be found on the web at Brewer-Garrett.com.
Please join us! Cleveland Engineering Society
ANNUAL GOLF OUTING *745&#;X 7)756 FLX FNEH 19.'4 5 +.. 1.( 1745' EGNMI 1%-*#8'0 &X *'56'4.#0&X HHNFJ 1+0 75 (14 # &#; 1( )1.(X (70X )#/'5 #0& 24+<'5 +0%.7&+0)U PIXNNN Fg 766 1/$1 106'56Y #06#56+% 1.'g+0g 0' 4+<'5Y INfIN #((.'Y -+05Y 114 4+<'5Y +.'06 7%6+10 #0& 14'^
')+564#6+10 +0%.7&'5U )1.(X $4'#-(#56X .70%*X &+00'4 #0& #0 126+10#. 24'g)1.( 5'/+0#4T ')+56'4 $; 7.; GE (14 &+5%1706'& 4#6'5T
14' &'6#+.5 10.+0' #6 999T%'50'6T14) 14 %#.. FEJgGJEgGENNT 2105145*+2 12214670+6+'5 #8#+.#$.'Y %106#%6 (14 /14' +0(14/#6+10T -!'!:).% ).#
+5 # 2417& /'&+# 5210514 1( 6*' .'8'.#0& 0)+0''4+0) 1%+'6; www.propertiesmag.com 13
The Westin’s Warm Welcome Renovation delivers rejuvenated lodging, modern meeting spaces in Downtown Cleveland By Doug Bardwell | Photos courtesy of The Westin Cleveland Downtown
ome on in. Sit down. Relax. Perhaps logon to the Wi-Fi and share some photos. It’s your living room after all… or so goes the invitation at the new 484-room Westin Cleveland Downtown. The expansive lobby at 777 Saint Clair Ave. has been designed with comfort in mind, not only for the hotel’s overnight guests, but also for anyone walking by who would like to stop in and enjoy the facility.
If you’ve been downtown recently, you couldn’t help but notice the complete transformation of the former 22-story, Crowne Plaza Hotel into Cleveland’s newest hotel – The Westin Cleveland Downtown. With its new cantilevered floating stairway above the sidewalk and a collection of Cleveland artists’ work that could make a museum envious, this $74 million, 500,000-square foot renovation is making a name for itself already.
The history Back during the troubled financial times of late 2010 and early 2011, Sage Hospitality was brought in by the 14
trustee for Lehmann Brothers to take over management of a select portfolio of hotels including the former Crowne Plaza Hotel on Saint Clair Avenue. At the time, it needed considerable façade restoration work following issues related to the Sarabond mortar admixture that had originally been used. Looking at the property as a potential joint venture with Optima Ventures, Sage brought Buric Global aboard as local owner’s rep for the development team. Excited to see a vintage landmark be maintained and revitalized, Joe Kapitan, AIA, NCARB, senior project consultant with Buric Global, recalls “our first con-
tribution was the selection of an excellent design/build contractor that could help quantify the scope of the project.” “Wanting to use a local firm, we brought in Marous Brothers Construction to help us in late 2011,” says Kevin McKinney, vice-president of construction and development for Sage Hospitality. “We signed a pre-construction due-diligence agreement with Marous and basically partnered with them from the beginning. That allowed us to get accurate pricing and detailed knowledge of the building. Within 60 days, we then had a good handle on the initial project costs.” 3URSHUWLHV | July 2014
Photo by Scott Pease
C
PROUD DESIGN/BUILDER FOR THE WESTIN CLEVELAND Marous Brothers Construction offers a powerful combination of experience, creativity and a depth of services that ensure the successful, on-time and on-budget completion of your construction project. We self-perform construction services, making us one of the few construction firms in the Midwest that can call themselves a true builder. This approach gives us greater control of design elements, schedules, budgets and most importantly, quality and workmanship. For more than 30 years, our award-winning staff has helped developers and owners realize the potential of their dreams.
IT’S TIME TO PUT MAROUS BROTHERS CONSTRUCTION, A REAL BUILDER, TO WORK FOR YOU.
1702 Joseph Lloyd Parkway • Willoughby, OH 44094 440.951.3904 • www.marousbrothers.com
LOADED WITH LIGHT The lobby design nods to Cleveland’s industrial roots with glass and chrome “shipping crate” fixtures, which are suspended from industrial canvas straps and filled with deconstructed chandeliers or thousands of unlit, clear recycled light bulbs. You can almost picture yourself being in the hold of a Great Lakes freighter, and looking up to see crates being lowered down into the lobby.
At the same time, Sage was finalizing an equity partnership and joined with Optima Ventures to purchase the property. Looking at multiple hotel franchises for the new venture, the partnership opted to go with Westin, a four-star brand that was just getting a start in Cleveland. When Westin indicated an interest in opening a hotel
adjacent to the convention center, the parties knew they had the makings of a good team. During early 2012, “six months of additional due diligence investigation helped define the actual scope of the project,” recalls Kapitan. “Keeping a constant riskmanagement focus also helped ensure this would be a successful project.”
By fall of 2012, the sale was completed. Marous Brothers Construction was given design/build responsibility and Christopher Auvil, AIA, LEED AP, director of design services for Marous, began working with Westin to finalize the design of the building. “With the design of this hotel, we wanted to show respect for the Westin
Proud to have provided & installed the elevators at The Westin Cleveland Downtown for Sage Hospitality & Optima Ventures with Marous Brothers Construction
ThyssenKrupp ELEVATOR CORPORATION CONTACT DAN BAYLOR FOR YOUR ELEVATOR NEEDS 9200 Market Place, Broadview Heights, OH 44147 16
www.thyssenkruppelevator.com 3URSHUWLHV | July 2014
Photo by Ken Krych
3URXG WR 6HUYH DV 2ZQHU¶V 5HSUHVHQWDWLYH IRU 6DJH +RVSLWDOLW\ DQG 2SWLPD 9HQWXUHV DW 7+( :(67,1 &/(9(/$1' '2:172:1 ARTISTIC EXPRESSION Adding character and drama at the new Westin are a variety of locally made art pieces, including Cellular, a six-foot-tall head covered with a mosaic of tree limb slices.
brand, but we didn’t want this to be at all ‘cookie-cutter,’” says Alan Feuerman, director of sales and marketing for The Westin Cleveland Downtown. “We are part of a division called Premier and Lifestyle, so we wanted to make sure that this hotel invokes that lifestyle feeling.” Colum McCartan, founder and principal of McCartan in New York City, was brought in to handle the complete interior design. Artwork for the project would be curated by LAND Studio, a non-profit formed by the 2011 merger of Cleveland Public Art and ParkWorks.
2ZQHU 5HSUHVHQWDWLRQ %,0 ,QWHJUDWLRQ &30 6FKHGXOLQJ &OHYHODQG ZZZ EXULFJOREDO FRP
SPECIALIZING IN EXTERIOR MASONRY REPAIR & RENOVATION SINCE 1972 • COMPLETE INSPECTION/ASSESSMENT OF FAÇADE CONDITIONS • TUCKPOINTING/CAULKING
• BRICK & STONE REPAIR/REPLACEMENT
• SEALING/WATERPROOFING
• CLEANING/PRESSURE WASHING
Ph 216.881.4142 | Fx 216.881.6557 | 4408 St. Clair Ave., Cleveland, OH 44103
The renovation Construction work began in January 2013. All new windows were installed throughout, replacing the old, singleglazed original windows from the Crowne Plaza Hotel. Each window needed to be measured individually since the original sheer walls were anything but evenly spaced or even plumb. Brian Linc, AIA, NCARB, and BECx team manager with Technical Assurance, performed quality control measures by observing the window and building joint seals to minimize the potential for condensation and to ensure proper water shedding at the new window building joints. “Providing an extra set of eyes, with years of experience is where a company like ours can provide value to a project,” Linc says. “Instead of just writing up reports and turning them over to the glazier, we actually worked together on the stage, saving valuable time.” The garage – which goes from floors two to five – needed a substantial amount of work and was enclosed
͙͙͔͔ ǡ ǡ ͕͕͗͘͘ Ǧ ͖͕͚Ǥ͚͖͘Ǥ͚͔͔͘ ͖͕͚Ǥ͚͖͘Ǥ͚͔͕͘
Ƭ Ƭ Ȁ Ǧ Ƭ
Ǥ Ǧ Ǥ
͖͘Ȁ͛Ȁ͚͙͗ www.propertiesmag.com 17
Ǥ
FOREST CITY ERECTORS, INC. 8200 Boyle Pkwy. Twinsburg, OH 44087 330-425-7185
3400 Independence Rd. Cleveland, OH 44105 216-363-1111
www.forestcityerectors.com “A Women’s Business Enterprise”
18
3URSHUWLHV | July 2014
with W.S. Taylor’s architectural grade woven wire mesh. Connected at the top, it was literally rolled down into place and fastened at the bottom. “In addition to being much lighter and quicker to install than the former masonry panels, it afforded ventilation, fall protection and decorative value,” explains Auvil. Exterior Phillips LED fixtures, specified by lighting designer Ron Friedman, allow the mesh to have multiple color variations at night. “There’s virtually no ROI in doing garage work,” lamented McKinney, “but it was necessary in this case.” With the LED lighting, now four floors of garage actually become part of the building decoration. Elsewhere, Versawall two3/4-inch insulated panels were GREEN SCREEN Literally adding life in the lobby is an indoor green wall system, comprised of two used on the east and west tower vegetative panels that flank a doorway leading to restrooms. elevations to add R-value and came with a textured surface for visual interest. Covering roughly improvement people will notice most. “I especially love the way the stairs one-third of the exterior, they added The walls outside the ballroom used to are skewed to the southwest for an amazinsulation – which will help obtain be full-height masonry with no windows. ing view of Public Square and Terminal LEED certification for the project. Now, there’s light and a view for every- Tower,” Kapitan says. Floors six and seven make up the one on the meeting room levels.” 24,000 of meeting space, including the Meant for business The glass protrusion is cantilevered large ballroom on floor six with its pre- over the marquee below and encloses a The Westin offers a full range function space facing south. Previously, structural steel-framed wooden staircase of meeting spaces, starting with its a large dark hole, the team decided with structural glass sidewalls and stain- 9,000-square-foot ballroom on floor that this area needed to be opened up. less steel hand railings. Radiant heaters six. LED bracelet-like lighting fixtures Cutting a stairway between the two were added at levels six and seven to pro- float over the space. Dark wood panel floors proved impractical with the post- vide additional heating in winter. walls blend well with the large pattensioned concrete construction. Standing on the stairs, one gets an terned carpet. “The biggest change was moving the aerial view straight down Saint Clair A host of other smaller meeting rooms wall out on floors six and seven, with Avenue, a sight never before available. – from 300 square feet to 1,980 square a cantilevered stairway and full height The glass walls lean out as they go up to feet – occur on both floors six and seven. glass windows in the center of the build- the seventh floor and extend further on The seventh floor, however, is the locaing,” relates McKinney. “That’s the the west side than the east side. tion of the Tangent Business Center, a
Let our PERFORMANCE help your bottom line Proud to be part of the team at THE WESTIN CLEVELAND DOWNTOWN
PERFORMANCE PAINTING )%( 6%( ('*( &HUWLÀHG FBE City of Cleveland
SBE Cuyahoga County
Commercial, Institutional & Industrial Painting Contractor Serving all of Northeast Ohio • Interior/Exterior Painting • LEED Projects • Female-Owned Enterprise
• Wallcovering • Historic Preservation • Epoxy Flooring
• High Performance Coatings • Rigid Wall Protection • White Boards
7603 First Place Suite 3B Oakwood Village, OH 44146 Q 440-735-3340 Q F: 440-735-3341 Q Performpaintllc@aol.com www.propertiesmag.com 19
TEXTURAL TREATMENT Leading to the reception desk in the lobby is an exquisitely detailed mosaic tile floor. This is complemented by a full, floor-to-ceiling wall of waves created from plaster and illuminated by a series of wall-washing fixtures above.
fully equipped workspace for a myriad of uses. Two glass-walled teleconferencing centers are located there, along with multiple computer stations and all the necessary business amenities. The 23rd floor houses the Boardroom. Equipped with microphones built into
the tabletop, the room is technologically ready for any high-level meeting. The terrific view of Cleveland might be a slight distraction at first, but the room is meant for business. If you want to stretch after a tough day of sitting in meetings, there’s a giant,
6&8/3785$/ '(6,*1 )25 <285 63$&( /$85(1 +(5=$. %$80$1 678',2 www.laurenhb.com | laurenhb@gmail.com | 216.245.2682 20
3,000-square-foot Life Fitness-equipped workout center. Literally dozens of people can use the room simultaneously; there’s that much equipment. A New Balance gear-lending program enables you to work out even if you didn’t bring your own shoes. On the first floor, a free guest Wi-Fi network serves anyone using the lobby area, which is arranged into three distinct work/relax areas. In each area, there are two four-foot by eight-foot raised tables with comfortable stools that offer work seating and a host of convenience outlets for laptops. Comfortable sofas and custom upholstered seating are located throughout. Ninety-percent of the pieces were custom designed by McCartan for this project. Off the lobby, a full-service, uniquely designed Starbucks provides the caffeine to get started or to keep going.
Local craftsmen and artisans
Drift
Sculptural Wall Commission for The Westin Cleveland Downtown
If the new Westin Cleveland Downtown is anything, it’s a showcase of Cleveland area talent. Locally designed and/or sourced art, decoration, furniture and fixtures reflect the talent pool represented in Cleveland. 3URSHUWLHV | July 2014
3URXG WR EH SDUW RI WKH SURMHFW WHDP IRU 7+( :(67,1 &/(9(/$1' '2:172:1
$5&+,7(&785$/ '(6,*1 0(6+
&RQWDFW :HQG\ 'H&DSLWH ZGHFDSLWH#ZVW\OHU FRP 7\OHU %OYG 0HQWRU 2KLR
H[W ZZZ W\OHUGHVLJQPHVK FRP
AIA Cleveland 1001 Huron Road Suite 101 Cleveland, Ohio 44115 (216) 575-1224/FAX (216) 575-1244 ©1990, AIA
Proud to provide & install interior stone, porcelain, glass & ceramic tile at THE WESTIN CLEVELAND DOWNTOWN with Marous Brothers Construction
4XDOLW\ 6HUYLFH ¥ &RQVLVWHQWO\ %UDGOH\ 6WRQH RIIHUV H[SHUW VHUYLFHV LQ D ZLGH UDQJH RI FRPPHUFLDO UHVLGHQWLDO DSSOLFDWLRQV
*UDQLWH 4XDUW] 0DUEOH /LPHVWRQH 6RDSVWRQH 2Q\[ 7UDYHUWLQH 3RUFHODLQ *ODVV 7LOH 6WRQH &DUH &DUWHU 6W _ 6RORQ 2KLR _ ZZZ EUDGOH\ VWRQH FRP www.propertiesmag.com 21
All Things Concrete – Your Commercial & Decorative Total Concrete Solution
J.V. Janitorial Services, Inc. • Commercial Buildings • Construction Sites • Special Event Clean-Up • Concrete Cleaning • Carpet Cleaning • Window Cleaning • Wall Washing An Equal Opportunity Employer
21ST CENTURY CONCRETE CONSTRUCTION INC. 13925 Enterprise Ave. Cleveland, OH 44135
• Acoustical Ceilings
1230 East Schaaf Road Brooklyn Heights, OH 44131
216.362.0900
216-749-1150
www.21stcenturyconcrete.com
www.jvjanitorial.com
Proud P roud t to o h have ave p provided rovided e electrical lectrical c contracting ontracting services s ervices a at t T The he W Westin estin C Cleveland leveland D Downtown owntown
New + Renovation Electrical Construction Communications High Voltage Instrumentation Wiring Energy Management Card Readers Sound CCTV + Security Fire Alarm Systems Gateway Electric, Inc. is dedicated to providing electrical contracting service of outstanding quality and value throughout Northern Ohio. We are committed to profitable partnerships with our employees, customers and suppliers. 4450 Johnston Parkway, Cleveland, Ohio 44128 www.gateway-electric.com | mail@gateway-electric.com
216.518.5500 22
3URSHUWLHV | July 2014
“At a four-star level, our customer is more sophisticated and they want a local feeling when they stay in a hotel,” Feuerman explains. With a commitment unusual in the hotel industry, especially from an out-of-town management team, Sage executives made the decision to obtain 1,500 pieces of local art for the hotel lobby, public spaces and guest rooms. LAND Studio, under the direction of Greg Peckham, recommended a wide variety of art for the Sage team to pick from. From photography to prints, and sculpture to murals, the art well represents Cleveland’s history of making things with our hands. John Zayac of The Project Group consulted with LAND Studio throughout the project. Walking into the building from LODGING IN LUXURY All guest rooms are furnished with ergonomic work spaces, Westin’s Saint Clair Avenue, you can’t help Heavenly® beds and sectional sofas. Many also offer invigorating views of the Cleveland Browns’ but notice the amazing piece called FirstEnergy Stadium, the Rock and Roll Hall of Fame and Museum, and Lake Erie. Cellular by local artist Olga Ziemska. The piece is a six-foot-tall head, Flanking the doors as you enter are the city with no overly faux theatrics. completely covered with a mosaic of half- large “rolling industrial doors,” which We wanted to create a living room inch-thick slices of various tree limbs don’t really roll, but were crafted by local that was very edgy, but with an honest from the Cleveland area. The variety of Amish carpenters and make a warm, connection to the industrious nature of diameters and wood species work mar- wood statement accentuating the entry- Cleveland and the history of the lake.” velously well together to detail two ears, way. Whimsical light fixtures accent the Above, for ceiling illumination, a closed mouth, gently sloped nose and a area with a splash of brass. series of glass and chrome “shipping pair of closed eyes… undoubtedly think“When we began looking to reju- crate” fixtures are suspended from ing about Westin’s Heavenly Beds. Expect venate the hotel, we wanted to industrial canvas straps and filled with the patina to evolve, as most people create something new and iconic for deconstructed chandeliers or thousands walking by feel the need to reach out and Cleveland,” recalls McCartan. “Sage of unlit, clear recycled light bulbs. You touch it. (The artist does not encourage was looking for something that spoke can almost picture yourself being in visitors to touch the sculpture however.) to the gutsy, raw, natural, real feel of the hold of a Great Lakes freighter, and
2TQWF VQ DG RCTV QH VJG VGCO CV 6JG 9GUVKP %NGXGNCPF &QYPVQYP YKVJ /CTQWU $TQVJGTU %QPUVTWEVKQP
CONTAINER SERVICE, INC.
¸;OL 3LHKLY PU *VU[HPULY :LY]PJL¹ -), *:) ,+., *,9;0-0,+
>>> 7,;,(5+7,;,05* *64
@6<9 *65:;9<*;065 :7,*0(30:;: .9,,5 3,,+ 7961,*;: @(9+ -965; 36(+ *65;(05,9: @(9+ 96336-- *65;(05,9: www.propertiesmag.com 23
Photo by Ken Krych
SPACIOUS SETTING The Westin offers a full range of meeting spaces, starting with its 9,000-square-foot ballroom on floor six. LED bracelet-like lighting fixtures float over the space, while dark wood panel walls blend well with the large patterned carpet.
looking up to see crates being lowered down into the lobby. A single strip of LED lights in the center of the crate then provides the illumination. “Working with a four-star brand like Westin does require a certain amount of luxury and polish, so we couldn’t go too industrial,” continues McCartan. “In the process of creating a hotel like this, we curate and sculpt, developing our design organically for each project. We try very hard to make sure that all pieces work well together in each area, so that it isn’t about just one signature piece. For each separate area, whether it’s sleeping, working or relaxing, all the pieces need to work – aesthetically, stylistically and functionally to accomplish the purpose of that space.” Approaching the reception desk, you may be surprised to notice that it is in fact a series of wooden desks – some with legs, some full height with drawer fronts, but all very warm-toned walnut wood with a residential feeling. All the desks were also made by local Amish craftsmen. When utilitarian needs demanded more storage on the working side of the reception desk, amber-toned mirrors go to the floor under the tall desks, reflecting the intricate rug-like mosaic tile floor of the reception area. It takes a second look to realize the floor isn’t really extending right through the legged-desk areas. Behind the reception desk, Lauren Herzak-Bauman created one of the many 24
commissioned art pieces called Drift. A full, floor-to-ceiling wall of waves was created from plaster and is illuminated by a series of wall-washing fixtures above. Where Westin has typical fullheight lightboxes located behind their reception areas, the ones in Cleveland have a graphic applied to repeat and highlight the repetitive wave action of the featured art walls. Most of the original pieces of framed art are on the premium 22nd and 23rd floors. To stretch the art budget, many of the pieces in lower rooms are reproductions of the originals. Throughout, the art reflects man’s connection with nature and the natural world.
The result Feuerman says he’s been asked by more than one person, “Are you going to build a Cleveland hotel?” But, since no one could define what a Cleveland hotel really is, Feuerman is quick to respond, “We have built a hotel in conjunction with a fabulous city and a fabulous convention center that is of the caliber necessary to host those people who come here looking for sophistication and excitement. It has the local feel customers expect from our four-star brand.” “The response has been amazing,” echoes McKinney. “People love the interior design and they are actually coming in just to hang out in the lobby.” It really is your living room, Cleveland. Come in and join the crowd. P 3URSHUWLHV | July 2014
Local Flavor ‘Agri-chic’ ambience matches farm-to-table culinary approach at Urban Farmer By Doug Bardwell | Photos by Ken Krych
alking down East Sixth Street, farming might be the furthest thing from your mind; but one look at the hand-painted farm mural and the rustic exterior at 1325 East Sixth will quickly change your outlook. Cleveland’s newest steakhouse, the Urban Farmer opened in May and is already changing the food landscape for the better. Blending an inspired menu with memorable drinks and a uniquely Cleveland interior, the Urban Farmer will surely appeal to residents and travelers alike.
W
Seating is available for 255 guests in this 5,950-square-foot, agri-chic interior. Choices include the main dining room, the pantry area, a private dining room, a charcuterie station, and the bar and lounge, as well as outdoor seating accessed through glass French doors during moderate weather. The Denver-based Sage Restaurant Group has one other Urban Farmer location in Portland, but each location is uniquely designed to appeal to its local market.
“I’ve worked with Peter Karpinsky from Sage for about six years now and this is our sixth restaurant together,” says David Ashen, president of dash design. “It was important for both of us to make this authentic to the region, and not a copy of the Portland location.” The original design inspiration for the new restaurant “came from the hypothetical meeting of a farmer, an art collector and a chef,” explains Troy Christian, general manager of Urban Farmer.
“I was approached about a year ago with this idea and we’ve been working up to this since then,” Christian says. “Before you even enter, people seem to be attracted to the reclaimed rustic woods blended in with this hip, cool building. When people walk in, they comment that this doesn’t feel like anything else in Cleveland.” Found rural art and artifacts line the walls of the bar/lounge area. “When I first saw the space, I was admittedly a little overwhelmed,” www.propertiesmag.com 25
CULTIVATING CULTURE A charcuterie station allows guests to see food preparation first-hand (top), while reclaimed wood, rural art and found artifacts create a fitting rustic/modern setting throughout (bottom).
recalls Ashen. “The 19-foot-tall ceilings required some special thought for acoustics and to avoid feeling cavernous. Suspended sheet rock ceilings provided a more intimate scale in the bar area and we floated Tectum panels above the dining areas for sound absorption as well.” Many of the other exposed surfaces like the concrete floor and masonry exterior walls were left as part of the decorative fabric, which works well in this design. Reclaimed wood slats and wood flooring give the space a warm feeling along with autumnal-colored fabrics and leathers for the seating. Whimsical lighting fixtures were designed by Wendy Umanoff, lighting designer, and range from farm pulleys
ranchers, brewers and distillers,” Christian says. Photos and blackboards above the opening to the theatrical kitchen list the local suppliers, including: The Chef’s Garden in Huron, Mackenzie Creamery from Hiram, Ohio City Farm and Green City Growers Cooperative from Cleveland, Lucky Penny Farm from Kent, Basket of Life Farm from Peninsula, Morningside Farm from Hinckley, Rittman Orchards from Doylestown, and Rainbow Farm from Madison. “An Ohio graphic designer, Melissa Wehrman, did an awesome job on the washed-out looking signage that wraps the exterior corner of the building, telling the story of the local purveyors,” Ashen says. “People like to know where their food comes from, and our message boards help tell that story.” The “pantry” seating area features shelves upon shelves of glass jars, containing vegetables and fruits prepared on site. Don’t be surprised to see jars turned upside down as the shelves are full of real stock that is rotated and used in meal preparations by the chef. Beautiful tall grasses frame the shelves creating this semi-private area, but don’t worry about allergies – they are extremely realistic looking artificial plants used for decoration. In addition to having a great to chicken wire cages. There’s even a happy hour crowd already, people are magical umbrella of feathers found for also finding the charcuterie station lighting in the private dining room. quite attractive. A wall of flat-panel LCD screens line “It brings some life to the room having one of the exterior sheer walls and feaa chef working out front preparing the meats for the charcuterie boards and portioning out the cheeses,” Christian says. “Those have become our two best-selling appetizers as well as desserts.” Troy Christian Weekends find a Saturday and Sunday brunch from 8:00 a.m. Urban Farmer to 3:00 p.m. featuring a Bloody Mary station where guests can tures a colorful but calming video show craft their own cocktails. by filmmaker Matt McCormick of the “Each week we are seeing an increase in four seasons on Cleveland’s lakefront. patrons not only from hotels in the area, “We are focused on sourcing the but locals as well,” Christian says. “The best possible product available, conword is definitely getting around.” P necting with the finest local farmers,
“[The original design inspiration] came from the hypothetical meeting of a farmer, an art collector and a chef.”
26
3URSHUWLHV | July 2014
We have them
7SLHZLK [V IL WHY[ VM [OL WYVQLJ[ [LHT H[ <9)(5 -(94,9 ¶ *3,=,3(5+»: :;,(2/6<:, PU ;/, >,:;05 *3,=,3(5+ +6>5;6>5
Covered.
New polished concrete flooring at the Urban Farmer Cleveland Steakhouse, located in the Westin Cleveland Downtown hotel, was professionally installed by SilverTec Flooring Solutions.
Epoxy Coatings | Decorative Broadcast Systems Polished Concrete | Concrete Rapair Materials www.silvertecflooringsolutions.com 330.814.6843
6>,5: -SVVYPUN *VTWHU`
:LOORXJKE\ 2+
:KDW GRHV %,0 PHDQ WR \RX" %,0 FDQ EH PDQ\ WKLQJV²JUHHQ LQWHJUDWHG D SURFHVV D WHFKQRORJ\ D WHFKQRORJ\ %XW DOO \RX FDUH DERXW LV \RXU %,0 \RXU WHDP DQG \RXU FOLHQWV FOLHQWV $OO ZH FDUH DERXW LV PDNLQJ %,0 ZRUN IRU \RX 5HYLW 1DYLVZRUNV DQG )DFLOLWLHV 0DQDJHPHQW H[SHUWV WV ,PSOHPHQWDWLRQ WUDLQLQJ WHFKQLFDO VXSSRUW²LQ SHUVRQ RU RQOLQH RQ RU RQOLQH WR %,0 DQG ,0$*,1L7 &ODULW\ IRU $XWRGHVN 5HYLW 6HUYHU 6FDQ WR %,0 DQG ,0$*,1L7 8WLOLWLHV IRU 5HYLW 3URGXFWLYLW\12: 3RUWDO SURYLGHV VXSSRUW H/HDUQLQJ IUHH IUHH 8WLOLWLHV DQG DQ DFWLYH FRPPXQLW\ 7KH 3URGXFWLYLW\12: 3RUWDO KDV 2: 3RUWDO KDV FRQWHQW IRU HYHU\RQH ZLWK DGYDQFHG IXQFWLRQDOLW\ DYDLODEOH RQO\ WR DLODEOH RQO\ WR ,0$*,1L7 FOLHQWV 7R JHW VWDUWHG RU DVN D TXHVWLRQ FDOO RXU &OHYHODQG RI¿FH ¿FH DW RXU &ROXPEXV RI¿FH DW RU RU YLVLW LPDJLQLW FRP
www.propertiesmag.com 27
WƌŽƵĚ ƚŽ ƉƌŽǀŝĚĞ 'ĞŶĞƌĂů dƌĂĚĞƐ ĨŽƌ dŝŬŝ dĞƌƌĂĐĞ͕ dŚĞ ƵĐŬ ůƵď Θ dŚĞ 'ĂŵĞ 'ƌŝůů н Ăƌ Ăƚ ĂŶĂů WĂƌŬ
Proud to be part of the team at Canal Park
TRI-STATE ELEVATORS • Lifting Liiff ting You You o to to New New H Heights eigh ei igh gh t s • Tri-State Elevators has been serving the industry for over 20 years and our employees have a combined experience of over 80 years. y We specialize in: Sales service & installation of elevators S for f homes and businesses Wheelchair W lifts for homes and business Stair lifts S Dumb waiters Extended service agreements available. ' E Z > KEdZ dKZ ͮ KE^dZh d/KE D E ' Z ^/'E h/> ͮ KtE Z͛^ Z WZ ^ Ed d/s WZKW Zdz s >KWD Ed ͮ /Ed Z/KZ^
ǁǁǁ͘dŽďĞƌ ƵŝůĚŝŶŐ͘ĐŽŵ ͮ ϯϯϬ͘ϰϮϭ͘Ϯϵϴϭ ϯϰϬϭ Z <^s/>> ZK ͕ ^h/d ϭϭϰ ͮ Z/ ,&/ > ͕ K,/K ϰϰϮϴϲ dŽ ůĞĂƌŶ ŵŽƌĞ͕ ĞŵĂŝů dŽĚĚ dŽďĞƌ͗ ƩŽďĞƌΛdŽďĞƌ ƵŝůĚŝŶŐ͘ĐŽŵ
24-HOUR CALL BACK SERVICE 610 Lawrence Road Canton, OH 44704 O: 330-489-3995 F: 330-489-6075
www.tristateelevators.com
Exceptional Architectural and Interior Photography Visit us at www.maguirephoto.com or give us a call at 330.630.9050.
28
3URSHUWLHV | July 2014
Building Buzz at the Ballpark Renovation efforts boost fan experience at Akron RubberDucks’ Canal Park By Mark Watt | Photos by Jim Maguire
ast October, the Akron Aeros organization turned heads when it announced a major branding overhaul. The minor-league baseball team – the Cleveland Indians’ Double-A affiliate – would now be known as the Akron RubberDucks, playing off of the city’s rich rubber industry ties. With the new name came a new logo and team colors, but the changes certainly didn’t stop there.
L
Under the leadership of owner Ken Babby, who purchased the team in October 2012, the organization has ventured to elevate the fan experience via a multi-pronged, phased $5.6 million facility upgrade, overseen by Akronbased G. Stephens, Inc. as construction manager. Completed by the start of the 2014 baseball season, that project includes Fowl Territory, a new left-field picnic area; Tiki Terrace, a right-field patio and outdoor bar; the Duck Club, a special event space; and The Game Grill + Bar, a new restaurant. This follows a major upgrade to the ballpark’s scoreboard system completed
early last year. The physical improvements are complemented with a refreshed marketing mantra to deliver “affordable family fun” for fans of all ages. “From the start, we knew we were going to spend quite a bit of money improving the facility,” Babby says. “Like any project, you want to make sure your resources are spent on the right thing, and our idea was to maximize the customer experience in the ballpark. Every dollar has been spent in a way that our fans would be able to reap the benefit.” So far, the efforts have paid off. In 2013, the franchise posted its highest single-season growth in attendance since
moving from Canton to then-new Canal Park in 1997. More than 295,000 fans visited the ballpark in 2013, a nearly 12% increase from the previous year. The current season has seen a continuation of that growth. “We were up 33% year over year and our first home stand in 2014 was 54% over 2013,” Babby says.
Stepping to the plate According to Pete Popovic, senior project manager with G. Stephens, Inc., basic ideas for a ballpark upgrade had been on the drawing board for several years within the baseball organization. HOK www.propertiesmag.com 29
Solar Innovations, Inc.
Photo by Mark Watt
Single Source Manufacturer of Custom Engineered and Designed Glazed Products for Commercial & Multi-Family Projects
Folding & Stacking Glass Walls t 0QFSBCMF 7FOUJOH Skylights t Sunrooms Greenhouses t Sliding Doors t Pool Enclosures t Windows t 'JYFE 4LZMJHIUT Terrace & French Doors t $MFBS (MBTT 8BMMT t 8PPE $VSUBJO 8BMMT 4PMBS *OOPWBUJPOT *OD BMTP QSPWJEFT 4JOHMF 'BNJMZ &EVDBUJPOBM BOE *OTUJUVUJPOBM QSPEVDU TPMVUJPOT
Made in Pine Grove, PA 1 t ' t TLZMJHIU!TPMBSJOOPWBUJPOT DPN
X X X T P M B S J O O P W B U J P O T D P N PA Home Improvement Contractor: PA051151
^ĂůĞƐ Ε >ĞĂƐŝŶŐ Ε ƵLJĞƌͬdĞŶĂŶƚ ZĞƉƌĞƐĞŶƚĂƟŽŶ Ε ŽŶƐƵůƟŶŐ
¤ ¬ ထ ¢ ªထ £ ¤ ထ ¡ ¨ £¤လ ¡ £¤ ¤ ¡© £ ª ¤
¡ ¨ ¦ ££
(DVW $YHQXH 0HQWRU 2+ ZZZ *OREDO&RPPHUFLDO5( FRP
30
SERVING PURPOSE In Fowl Territory, several seating sections have been replaced by four tiers of picnic tables with a new capacity of about 400. Supporting the space, a nearby pavilion functions as a buffet serving area.
Sport, a Kansas City-based architecture firm specializing in athletic facilities, was behind Canal Park’s original design. More recently, the firm – now known as Populous – had developed models for refreshed left-field and right-field seating areas. However, it wasn’t until Babby took over the team that those plans truly took shape, Popovic says. Babby, formerly chief revenue officer and general manager of digital operations at The Washington Post, purchased the team from original owner Mike Agganis at the close of the team’s 2012 season and immediately spearheaded the $1.65 million scoreboard upgrade. “From the beginning, we wanted to scream from the rooftops that, with my new ownership and this new management, we were here and wanted to make a very big impact,” Babby says. G. Stephens oversaw construction and installation of a high definition LED video board – the largest in all of Double-A, according to Babby – that was enlarged to the maximum size that the existing supporting steel structure could handle. The 26-foot-tall by 68-footwide screen now hangs in right-center field, supplemented by a six-foot-tall by 54-foot-long digital ribbon board in leftcenter field. Following the success of that effort, the organization pulled the trigger on the second phase of improvements last 3URSHUWLHV | July 2014
SCORING SUCCESS An enlarged and upgraded scoreboard was completed in time for opening day 2013. This spring brought a second round of improvements, which included Tiki Terrace, an outdoor bar and tiered patio space in right field.
fall, retaining G. Stephens to oversee the renovation. Added to the team was project architect Marty Caruso, of Caruso Architecture, Inc., who was involved in the ballpark’s original construction as architect of record for Canal Park’s initial onsite restaurant. Construction began in October and was completed in time for the home opener on March 10, 2014.
Improvements in the outfield As a refined version of the original Populous plans, Fowl Territory is a new seating section between third base and the left field corner. Here, several seating sections – comprising 1,400 individual
seats – have been replaced by four tiers of picnic tables with a new capacity of about 400, as well as 56 premium swivel seats along the left-field wall, now called Duck Row. To accomplish this portion of the project, existing documents from the original build-out were key, Popovic says. “Those documents and the precast layout determined the location of stairs and where the tiers could land,” he explains. “From there, Ebersole Engineering came up with reinforcement of the plates on the bottom of the steel below, which held up the precast.” While the construction team originally anticipated multiple concrete pours
to complete the section, Mother Nature had other ideas. The brutal winter and persistent cold weather forced the crew to complete the work using just two pours, which was achieved successfully through good planning, Popovic says. Nearby, a new 20-foot by 64-foot steel frame pavilion, with a standing seam roof, functions as a buffet serving area for picnics. The other upgrade initiated by Populous is Tiki Terrace, an outdoor bar and tiered patio space that has completely replaced a bleacher section in right field. The patio incorporates 87 swivel seats with drink rails, 191 picnic seats and 27 four-seat hightop tables.
Thanks to AKRON RUBBERDUCKS for the opportunity to serve as your architect.
&$5862 $5&+,7(&785( Commercial & Residential Design in Northeast Ohio Since 1996 3460 RIDGEWOOD ROAD • AKRON, OH 44333 • 330.665.3432 • WWW.CARUSOARCH.COM www.propertiesmag.com 31
Photos by Mark Watt
DOUBLING UP New signage, gooseneck lighting and awnings draw attention to The Game Grill + Bar (left). The restaurant is accessible from within the ballpark on game days, while a separate entrance (right) along Main Street provides guests entry year-round.
Hightop seating is customized with the RubberDucks logo cut out of chair backs. Attached to the terrace is the new Tiki bar, complete with a faux thatched roof. “It’s a full service bar that’s very popular during games,” Popovic says. Adding local flavor, baseball cards from each year in the team’s history were incorporated into the countertops and then covered and sealed with clear epoxy resin. The patio itself is constructed using a composite product line from TimberTech, including decking and a fascia riser system, plus steel cable railing. “The steel rail complements the deck perfectly and also helps to give fans a clear, unobstructed view of the field,” Popovic says. Installing the new system required removal of the existing bleachers, yet
32
much of the steel support system was reused. This process was easier said than done, Popovic adds. “The steel fabricator put together large frames which were boomed in with a crane from the street outside, placed on top of the existing rake beams and then welded into place,” he says. “Then the composite decking was attached to that frame. It was a tough build.” The project utilized 80,000 pounds of material, including steel substructure, pressure treated lumber and composite decking, notes Todd Tober, president of Tober Building Company, general trades contractor. “There were seven semis full of material and we used a 150-foot crane parked along State Street outside to boom it all into the ballpark,” Tober says. “It would
have taken weeks for guys to bring them in by hand. It worked out well.”
Calling for a change-up Complementing the remodeled outfield seating areas, the renovation also addressed a two-story section on the facility’s northeast corner that had struggled since the park opened. This included a small, enclosed indoor picnic space on the first floor that had essentially turned into a storage room. Directly above on the second floor was a vacant area that formerly housed multiple restaurants, unsuccessfully. “When I bought the team, the restaurant was sort of an anomaly,” Babby says, noting that a Menches Brothers family restaurant and more recently a Wing Warehouse had struggled within the
3URSHUWLHV | July 2014
COVERING THE BASES Akron RubberDucks branding and baseball-themed details are situated throughout the restaurant, from tiretread patterns painted onto oak ply slats beneath the bar (top) to brushed metalcoated baseball bat light fixtures that dangle from the ceiling (bottom).
The Game Grill + Bar Today, the new restaurant, The Game Grill + Bar, has become a cornerstone of the refreshed Canal Park, capitalizing on its location with large windows along Main Street, accordion-style glass walls that open to the right-field concourse and a combination of indoor and outdoor seating, plus a media-rich bar area. The 4,000-square-foot space nods to Akron’s history with a hand-painted mural by local artist Mike Ayers and a custom neon ‘Akron’ sign, while RubberDucks branding and baseballthemed details turn up everywhere. Chairs are etched with the team logo and brushed metal-coated baseball bat light fixtures dangle from the ceiling, while in key spaces a tire-tread pattern has been printed directly onto threequarter-inch oak ply slats.
Photo by Elisha Cerino Photography
Photo by Mark Watt
space. “When we really took this piece of the project to pen and paper though, we knew there was an opportunity to do something really special.” The solution was to build a new restaurant on the first floor, with easy access from within the park as well as South Main Street to the east. This would allow it to be open to diners yearround, not just on game days. Babby’s vision for a new eatery was inspired by Dempsey’s Brew Pub & Restaurant, a restaurant similarly attached to the Baltimore Orioles’ Camden Yards. Babby has personal connections to the Baltimore, Maryland ballpark; his father Lon Babby, currently president of basketball operations with the Phoenix Suns, served as general counsel for the Orioles throughout the ‘80s and early ‘90s. “During our planning process, we took a day trip to Dempsey’s which had recently opened,” Babby says. “We loved the design and the finishes. In our restaurant, we would bring our own flavors and tastes, but if you walk into Dempsey’s you’d see a lot of familiar elements to what we hoped to bring to Akron.” “The environment is whimsical and fun, and the energy from the ballfield and the bar make it an exciting space,” says Christopher Nonno, principal of branding firm Louis + Partners Design, which led the interior design. “Ken [Babby] wanted a dynamic space that would complement the game experience for fans, but because it would be open year-round, it also had to have a broader appeal.” Along Main Street, new details create visual cues that the restaurant is its own entity independent from the rest of the ballpark, Nonno says. This includes new signage, gooseneck lighting and awnings, which provide a splash of color and pop against the ballpark’s distinctive brick exterior. Servicing the new restaurant is the original second-floor kitchen, which was gutted and rebuilt with a new cooking line. Newly installed spiral stairs and
a dumb waiter transport food to a new warming kitchen on the first floor. “Connecting kitchens on two floors presented some challenges, but that’s common when trying to get new ideas to work within existing buildings,” Caruso says. “The stairs and dumb waiter became a good solution.” An adjacent concession stand was converted into storage space. Outside, to the north of the restaurant, a new air handling system was installed, and a mechanical room below was upgraded with new plumbing.
The Duck Club Upstairs, the space last seen as a Wing Warehouse underwent a complete transformation, Popovic notes. “You can’t imagine what this place was like when we began,” he says. “The smell was atrocious, like stale beer and old fried food.” www.propertiesmag.com 33
Photo by Elisha Cerino Photography
Photo by Mark Watt
ELEVATED ANGLES Located directly above the new restaurant is a special event facility called The Duck Club (left), which can accommodate up to 150 guests. Here, flexible dining tables and hightop bar-style seating (right) overlook the ballfield for exceptional views during games.
Initially, it was earmarked for a basic remodeling into a club lounge but as the project progressed, Babby elected to pour more resources into the area to create The Duck Club, a one-of-a-kind, higher end special event facility for downtown Akron to accommodate 150 guests with flexible tables and seating overlooking the ballfield. “This space has undoubtedly the best views in the ballpark,” Babby says. “We said, what if this became a climatecontrolled space that’s open year-round for different events, from weddings and bar mitzvahs to business meetings?” Babby elected to open up the space by replacing existing windows with a sliding glass window product from Pennsylvania-based Solar Innovations. “It’s open to the ballpark literally and figuratively,” Babby says. “With the operable windows, you can feel the energy of the ballpark, get the smells, the sounds, all those senses that are brought to life when you’re at a ballpark, but also have private space that’s all yours with great food from The Game.”
Radiant panels and slot diffusers above the windows create a curtain of heated or cooled air, providing a comfortable environment despite the weather outside. Supplementing the natural light from the expanse of windows are three large, circular light-fixture ceiling elements, plus several smaller spoked light fixtures.“They help to create drama in the space,” Nonno says. Interior finishes include porcelain tile flooring with a linear plank wood pattern, durable carpeting and gray ceiling tiles. Adding visual interest is a 16-foot-long by eight-foot-tall oak paneled wall, with a pattern of baseball bat-shaped cutouts and a built-in flat screen TV. Nearby, another Mike Ayers mural depicts notable ballplayers from the team’s history. “The Duck Club is the premier area in the ballpark, no question about it,” Babby says.
Winning combination A third phase of the ballpark upgrade is under consideration now, Popovic
Proud to be part of the team at Canal Park
Phone 440.526.1200 | Fa x 440.526.1270 2917 Reser ve Avenue, Copley OH 44321
34
notes, and likely will include a new children’s Fun Zone area beyond center field. The space may include a speed pitch game, a slide and other play equipment, but logistics are still being worked out. In the meantime, Babby enjoys watching fans pass through the gates along Main Street and savor the new amenities. He credits the construction and design team for seeing the project through on time and within budget. “I’m a big believer of hiring great people, getting out of the way and letting them do their job,” Babby says. “I think Glen Stephens and Pete [Popovic] found some excellent partners to get this done as a team under a very tight timeframe.” Babby adds that local support was significant. “We’ve been very fortunate to do this in a community where we have everyone behind us, great civic leadership and great local partnerships, and I’m proud to say that all of the labor on this project is local as well,” he says. “Every facet of this project has been about creating opportunity in this area and specifically in Northeast Ohio. The results have been phenomenal.” Tober, of Tober Building Company, adds that the local connection meant a lot to the contractors involved in the project. “Canal Park is a landmark in Akron and has been for 16 years, so it’s great to be part of its revitalization,” he says. “Ken [Babby] has brought new life to downtown.” P 3URSHUWLHV | July 2014
BILLBOARD News about people, products, places & plans
Kent State Grads Earn High Honor in Int’l Design Competition ent State University graduate students Jeff Jasinski, of Wickliffe, and Matt Dureiko, of Stow, both enrolled in the architecture and urban design program, placed second in an international design competition recently. The DawnTown 2014 Alternative Mobilities design competition, sponsored by the Miami Downtown Development Authority, asked designers to create a central hub where routes people take to move around downtown could meet. The proposal would boost Miami’s trans“Mobile Miami” design competition submission portation network. Jasinski and Dureiko learned about the competition from their professor, David Jurca, associate director of Kent State’s Cleveland Urban Design Collaborative, who thought the complex multimodal issues raised in the DawnTown competition would constitute an exciting urban design challenge for his graduate studio students to explore. The students named their project after their team name, Mobile Miami. Their project stresses the importance of intermodal transportation as a growing urban trend in the city. The concept projects real-time digital information to communicate the availability of all modes of on-site transportation, which allows for absolute freedom of choice on how to better connect with the city.
Image courtesy of Kent State University – Cleveland Urban Design Collaborative
K
Builders Exchange Names Board of Directors The Builders Exchange, Inc., a construction trade association established in 1881, recently announced the election results for its Board of Directors.
Elected were Mark Doris (Mars Electric Co.), Mike Gallagher (The John F. Gallagher Co.), Randy Hamilton (T. Allen, Inc.) and Fred Innamorato (Foti Contracting). Other directors include: Tim Czyzak (iVideo Technologies, LLC),
Greg Freeh (Fortney & Weygandt, Inc.), Steve Jones (Zenith Systems), Kurt Knapp (The Great Lakes Construction Co.), Gregg Mazurek (Builders Exchange, Inc.), R. Russell O’Rourke (Meyers, Roman, Friedberg & Lewis), Kyp Ross (Dawson
Companies), Kevin Sorrell (Americut Coring & Sawing, Inc.) and Randy Spencer (Dunlop & Johnston, Inc.).
Howard Hanna Acquires Ostendorf-Morris Howard Hanna recently announced the acquisition of Ostendorf-Morris, a commercial real estate leader based in Ohio since 1939. More than 40 employees, agents and brokers will join the Hanna Commercial team, with the goal of consolidation within the next eight months. With the addition of these new commercial agents, the company will become the largest of its kind in Northeast Ohio. Work done by OstendorfMorris with corporate services, appraisal, development, consulting, investments and research will continue. Day-to-day operations will be led by Geoff Coyle, managing partner of Ostendorf-Morris, with Mac Biggar, president of Hanna Chartwell,
7,5(' 2) %(,1* 5,33(' 2))"
7KHQ VWRS KLULQJ À\ E\ QLJKW ³URR¿QJ FRQWUDFWRUV´ ZKRVH RQO\ RI¿FH DGGUHVV LV ZKHUHYHU WKHLU SLFN XS WUXFN KDSSHQV WR EH SDUNHG DW WKH WLPH 7KH QR LQVXUDQFH LUUHVSRQVLEOH RSHUDWRUV DUH GULYLQJ WKH IHZ UHPDLQLQJ KRQHVW URR¿QJ FRQWUDFWRUV RXW RI EXVLQHVV 8QOHVV WKH FRQVXPHU JHWV ZLVHU WKHUH ZLOO EH QR TXDOLW\ URRIHUV OHIW :H DUH ORRNLQJ IRU D IHZ ZLVH FRQVXPHUV ,I \RX ¿W WKH ELOO FDOO XV WRGD\
6,1&(
(DVW WK 6WUHHW &OHYHODQG 2+ ZZZ FDUH\URR¿QJ FRP )D[ www.propertiesmag.com 35
BILLBOARD News about people, products, places & plans
working with Coyle on the eventual integration of the two organizations. Howard Hanna is the fourth largest real estate company in the nation, with a closed sales volume of almost $10 billion in 2013 accounting for an increase of 37% over the previous year.
Arkinetics Announces Two New Additions Design firm Arkinetics recently announced the hiring of two additional professionals to its team of architects, urbanists and interior designers. Jennifer Veverka brings 12 years’ experience in hospitality and commercial design and will take on the role of job captain. As job captain, she will work closely with the internal project team and assist the project manager in producing construction drawings and project administration. Michael Couch has 17 years’ experience in office, retail, and institutional projects. As a licensed architect, Couch will
Jennifer Veverka
assist the design team in creating design and construction documents within the firm’s focus markets.
Cleveland Engineering Society Elects New Board of Directors and Officers The Cleveland Engineering Society (CES) inducted new board members and officers at its Annual Meeting and Celebration recently at the Western Reserve Historical Society – Crawford Auto Aviation Museum. The following individuals were elected to serve
a three-year term through June 2017: Linda Barita (MAGNET), Bill Filion (Hyland Software, Inc.), Kathy Gargasz (Lincoln Electric) and Michael Heil (Ohio Aerospace Institute). Additionally, the following directors were re-elected for the same three-year term: J. Brandon Davis (URS Corporation), Kurtis L. Knapp (The Great Lakes Construction Company), Aaron LeMieux (Tremont Electric), Don Majba (Middough Inc.) and Michael J. Schipper (Greater Cleveland Regional Transit Authority).
Gilbane Building Company Names New President, COO Gilbane Building Company recently announced Michael McKelvy has joined the company as president and chief operating officer. McKelvy assumed his new position in early July and is based in the company’s Providence, Rhode Island headquarters. Also this month, Bill Gilbane, Jr., the company’s
president and chief operating officer since 2004, assumed the role of vice chairman where he will devote more of his time to shepherding Gilbane’s business units toward long-term success and strategic growth in partnership with the company’s current leadership team while overseeing McKelvy’s transition. McKelvy has now assumed profit and loss responsibility companywide. With several Gilbane family members currently holding senior leadership positions throughout the organization, Gilbane stands committed to remaining a private, family-owned business and continuing its 141-year old tradition of family leadership within the company. McKelvy comes to Gilbane from an accomplished 26-year career with CH2M HILL, a global leader in consulting, design, design-build, operations, and program and construction management with 26,000 employees across six continents.
Where does your business fit? Call Propertiess now at 216.251.0035 today to book your add iin these th upcoming i SSpecial i l SSections. ti AUGUST
SEPTEMBER
OCTOBER
SECURITY & FIRE PROTECTION Detailing the latest sprinkler systems, surveillance technologies and other products and services that keep facilities safe and secure.
GREEN BUILDING A special focus on the latest initiatives & proven methods of sustainable design in the commercial, institutional & residential markets.
RENOVATION & RESTORATION With an eye toward the renewal of older properties, we highlight the latest trends & best techniques for freshening up interiors & exteriors of Northeast Ohio buildings.
AD CLOSE: Friday, July 25
AD CLOSE: Monday, August 25
AD CLOSE: Thursday, September 25
For info on advertising & editorial opportunities, opportunities call 216 216.251.0035 251 0035 or email kkrych@propertiesmag kkrych@propertiesmag.com. com View the 2014 Media Planner at www.propertiesmag.com www propertiesmag com. 36
3URSHUWLHV | July 2014
CUSTOM DESIGN & DEVELOPMENT OF COMMERCIAL CONSTRUCTION 0TCPSOF 3FBM &TUBUF 4FSWJDFT MFBE CZ 3JDL 0TCPSOF +S JT B GVMM TFSWJDF DPNNFSDJBM EFTJHO BOE EFWFMPQNFOU DPOTUSVDUJPO DPNQBOZ UIBU JT EFEJDBUFE UP BMM PG ZPVS DPNNFSDJBM SFBM FTUBUF OFFET 8F PGGFS B XJE JEF WB BSJ S FUZ PG PG TFS FSWJ WJDF DFT T UIBU XJMM FOTVSF UIB IBU U XI XIFO FO ZPV ZPVS S QB QBSU SUOF OFS XJ XJUI U VT BMM PG ZPVS DPNNFSDJBM SF SFBM B FTU BM T BUUF CVJMEJ EJOH EJ OH OFF OH FFETT BSF DPWFSFE 4QFDJBMJ[JO JOH H JO H JO
Custom Design & Development .XUW] %URV ,QF LV D SLRQHHU LQ FDULQJ IRU 2KLR¬V HQYLURQPHQW DQG QDWXUDO UHVRXUFHV :H RIIHU D YDULHW\ RI VXVWDLQDEOH &RPPHUFLDO 6HUYLFHV DQG SURGXFWV ,QGXVWULDO %HQH²FLDO 5HXVH &RQVWUXFWLRQ 'HEULV 'URS RII 5ROO RII &RQWDLQHU 6HUYLFHV
RU FXELF \DUG VL]HV
0RELOH :RRG *ULQGLQJ 6HUYLFHV (QYLURQPHQWDO &RQVXOWLQJ 6WRUPZDWHU 0DQDJHPHQW 7UDQVSRUWDWLRQ 6HUYLFHV
/((' &UHGLWV 2'27 6RLO 6RLO 5HPRYDO (URVLRQ &RQWURO &RPSDFWDEOH )LOO <DUG :DVWH 5HF\FOLQJ 5HF\FOHG $JJUHJDWHV [
Construction, Interior Build-Outs Renovations, Expansions Property Management
[
Osborne O sborne R Real eall E Estate sttate t Services Serviices s )JHI 4U 'BJSQPSU )BSCPS 0) ] XXX PSFTMMD OFU
!30(!,4 0!6).' !30(!,4 2%0!)2 3%!,#/!4).' #2!#+ &),,).' #/-0,%4% 3)4% #/.3425#4)/.
0!6 ) . ' ) . # s %XCELLENT QUALITY COMPETITIVE PRICING RELIABILITY
%8#!6!4)/. 4/ #/-0,%4)/.
s #UNNINGHAM 0AVING IS A FAMILY OWNED BUSINESS WITH OVER YEARS OF EXPERIENCE s ,ICENSED BONDED INSURED s /UR MOTTO h+EEPING OUR CUSTOMERS SATISFIED KEEPS THEM COMING BACK v
* iÊӣȰxn£°nÈää >ÝÊӣȰxn£°nÈnÎ !URORA 2OAD 7ARRENSVILLE (EIGHTS /( www.propertiesmag.com 37
FINANCIAL STRATEGIES Smart use of fiscal planning & action
Metrics at the Midpoint t’s hard to believe that just six months ago, we were suffering through one of the coldest winters in recent memory. Time certainly flies, especially when those of us in the commercial real estate industry are having fun.
I
ALEC J. PACELLA
This month, we are going to review the activity over the first half of the year and discuss how things have heated up, literally as well as figuratively, as we make our way toward 2015.
Keep on keeping on Last year was not only the fourth consecutive year of increasing sales activity but also saw the highest sales volume since the 2007. I’ve always said that a “normal” annual volume for Cleveland (if there is such an animal) is around $750 million, so the $790 million achieved in 2013 would certainly indicate that our investment market is back to normal. And this trend has continued into 2014. The aggregate sales volume over the first six months is just over $325 million, putting us well on our way to another solid year. As you will see, pricing has firmed and activity is robust across all types of product.
Shopping spree As we hit the halfway point, we have a surprise leader in sales volume – the retail sector. Although this was one of
the most battered of all the property types during the economic downturn, it has surged back and represents over one-third of the total sales volume. This sector included several high-profile transfers, including Pavilion Shopping Center ($34.3 million), Market Square of Montrose ($32.5 million) and Erie Commons ($18.35 million), among several others. Devonshire REIT, a private REIT out of Toledo, has been particularly active in the Northeast Ohio market, with two retail purchases totaling over $52 million during the last four months. The industrial (24%), apartment (19%) and single-tenant net leased (13%) sectors also check in with solid activity levels.
Strength in numbers While the Cleveland market has historically seen its fair share of highprofile sales over the last few decades, there has only been one such transaction of note during the first half of 2014. It was a big one – a $43 million, nine-property industrial portfolio sale by Harbor Group – but there were no other hallmark-type transactions.
ǡ Ǥ Ƭ ǡ Ƭ ǡ ǡ Ǥ
Ǥ Ȉ Ǥ Ȉ Ǥ Ȉ Ǥ Ǥ Ȉ Ǥ Ȉ
Leading The Future. Honoring the Past.
38
Ȉ Ȉ
Ǥ
3URSHUWLHV | July 2014
Rather, the vast majority of the sales volume was composed of smaller transactions. In fact, over 30% of the total sales volume came as the result of transactions less than $5 million. In the aggregate, 39 of the 56 investment sales year-to-date had a transfer price of $5 million or less.
and interest rates remain low, expect this segment to remain hot.
Daus, You Know? BULKING UP Cleveland-based DDR Corp. continues to make big news on a national scale. Last month, they announced a $2 billion acquisition with frequent joint-venture partner Blackstone Group. The transaction included 76 retail centers nationwide. –AP
So what’s behind door #3? It’s always easier to make predictions when you have a running head start – like six months. Back in January, I boldly predicted a total sales volume of $825 million for 2014. Halfway through the year and we are a little less than halfway there. But that’s all right, as there are several transactions in the works that give me a fighter’s chance. The office sector has been sleepy so far this year, accounting for just 6% of the total sales volume. But expect that to change over the second half of the year. I noted a lack of hallmark-type transactions so far this year but expect that to change. One more prediction – lured by attractive yields as compared to gateway markets, public REITs will make a splash with multiple purchases. P
MSRP One of the more pronounced trends over the last few years has been the continued increase in “market rate” investment sales. Just five years ago, the landscape was dominated by valueadded transactions, characterized by troubled assets with high vacancy and low sale price on a per square foot basis. However, as the market fundamentals began to improve and the debt market returned, the composition of investment deals has changed. Over the first half of this year, nearly 75% of the transactions were considered market rate deals, reflected by solid pricing and competitive CAP rates.
The long and winding road While market rate transactions have certainly returned, the distressed segment has not disappeared. In fact, the first half of 2014 actually saw an uptick in activity. Over the first half of the year, more than half a dozen properties have been the subject to either receivership or foreclosure actions and another half a dozen have sold to resolve a troubled situation. The good news is that very few properties are in the early stages of distress. But as we’ve discussed in this column in the
past, the time needed for properties to work through the process is measured in years, not months, and it will be another 18 to 24 months before the majority of these troubled assets are out of the soup.
Surging STNL The single-tenant net leased segment is back with a vengeance. There has been at least one sale from this segment in each month so far this year, with most months seeing multiple STNL transfers. CAP rates have fallen to the levels last seen almost a decade ago. CAP rates under 7% are commonplace for long-term leases with credit tenants, with ground leases dipping under 6%. So long as the 1031 exchange market continues to gain momentum
Alec Pacella, CCIM, senior vice president at NAI Daus, can be reached by phone at 216.455.0925 or by email at apacella@naidaus.com. You can follow him on twitter @dausyouknow or on his blog at http://blog.sbequitiesinc.com.
127( +2/'(5 2:1(5 ',5(&76 ,00(',$7( 6$/(
4XDOLW\ %XLOGLQJ WKURXJK 3DUWQHUVKLSV 2QH 3URMHFW DW D 7LPH &+$*5,1 1257+ %8,/',1*6 6 ( & 620 &(17(5 &+$5'21 52$'6 65 86 :,//28*+%< +,//6 2+,2 2:1(5 86(5 25 ,19(6725 23325781,7< %8< 620( 25 $//
7RWDO 6TXDUH )HHW RQ 7RWDO $FUHV 8S WR &RQWLJXRXV 6TXDUH )HHW )XOO )ORRU $YDLODEOH IRU 2ZQHU 8VHU 2FFXSDQF\ &RPPHUFLDO 'HQWDO 0HGLFDO 2IILFH 7HQDQWV 0DMRU 7HQDQW /DNH +RVSLWDO ā 5HVWDXUDQW %DU 2Q 6LWH ā 4XLFN $FFHVV WR , ,
&RQVWUXFWLRQ 0DQDJHPHQW *HQHUDO &RQWUDFWLQJ 'HVLJQ %XLOG
(+/( 0255,621 *5283 /7'
&UDQZRRG 3DUNZD\ Ɣ :DUUHQVYLOOH +HLJKWV 2KLR 3KRQH Ɣ )D[ ZZZ LQILQLW\FRQVWUXFWLRQ FRP
www.propertiesmag.com 39
LEGAL PERSPECTIVES Navigating property laws & regulations
Arbitration: Did You Get What You Bargained For? ost times, you don’t think about a contract’s arbitration provision until there is an actual dispute. Arbitration provisions in construction contracts can save time and money if both parties operate in good faith.
M MARC A. SANCHEZ
Unfortunately, if a party engages in misconduct, this process can be delayed, manipulated or corrupted. Moreover, the impact of state construction statutes, as well as the federal and state arbitration acts, must be considered when drafting any arbitration provision.
Opponent misconduct Let’s suppose your construction contract contains an agreement to arbitrate disputes under the American Arbitration Association (“AAA”) Construction Industry Rules. You submit your demand for arbitration and initiate your claim. Respondent answers and the AAA appoints three arbitrators from the Panel of Neutrals. Respondent becomes dissatisfied with one of the arbitrators (the Chairperson). Respondent offers to purchase a country club (in distress that needs a purchaser) where the arbitrator is a member. Respondent, however,
40
makes clear that it will not purchase the country club unless the arbitrator/ club member resigns as Chairperson of the AAA Panel. Arbitrator refuses and notifies the AAA. Respondent then claims that its attempt to purchase the club has created a conflict of interest and requires removal of the arbitrator pursuant to AAA Construction Industry Rule R-20. Yes, this stuff really happens, but the question is: what happens next?
Who decides? Objections to an arbitrator or motions to disqualify are decided by the Case Administrator in standard cases. In large, complex cases, the AAA Administrative Review Council (“ARC”) makes the decision. The ARC is an executive-level, administrative decision-making authority consisting of current and former high level AAA executives. The ARC was
3URSHUWLHV | July 2014
created to resolve certain administrative issues that arise in the AAA’s large, complex cases, including challenges to an arbitrator’s impartiality.
What is the standard? The ARC utilizes a four-part test in determining whether an arbitrator(s) “partiality or lack of independence” rises to the level of removing him or her from a case. The four-part test is whether the conflict is: (1) direct; (2) continuing; (3) substantial; and (4) recent. Weighing these factors together serves as a guide as to whether the conflict is disqualifying. Ultimately, the ARC’s administrative determination is based upon whether the disclosure creates, to a reasonable person, the appearance that an award would not be fairly rendered.
Did respondent’s conduct violate Ohio law? Does it even matter? Respondent’s conduct may violate Ohio Revised Code (“ORC”) ORC § 2921.02, which states: “No person, with purpose to corrupt . . . or improperly influence a public servant . . . shall promise, offer, or give any valuable thing or valuable benefit.” Respondent’s conduct may also violate ORC § 2921.03 prohibiting attempts to influence public servants involved in a civil action or proceeding. That statute states specifically that a person that violates this section is liable for reasonable attorney’s fees, court costs and other expenses incurred as a result of prosecuting a civil action commenced under this division. The alleged violations of these criminal statutes constitute a tort, but also arise out of and relate to the underlying contract. In addition, by actively impeding the arbitrator selection process set forth in the contract, these actions may constitute an additional breach of contract. Unfortunately, arbitrators simply do not have the powers of a court to forcibly deal with parties who disrespect the process. This should be a consideration when deciding whether your contract’s dispute resolution provision will call for arbitration or litigation.
provision and a forum selection clause requiring that arbitration be commenced in New York, even though the project is located in Ohio. Your construction contract also states that New York law shall govern any disputes. Are these provisions enforceable as written? Like many other states, Ohio has enacted a statute (ORC § 4113.62) that voids any contract provision that requires construction-related litigation to be conducted in a state other than where the project is located. The same statute also voids any contract provision that mandates that any state law other than Ohio law applies when a project is located in Ohio.
Does the FAA trump these state statutes? The Federal Arbitration Act (“FAA”) may preempt state arbitration statutes. In fact, under the FAA, a court is required to order the parties to arbitrate pursuant to the terms of their agreement, which includes the forum selection clause. A statute purporting to override that term is preempted by the FAA if the act applies to the agreement. Courts in Minnesota, Texas, Virginia, Rhode Island and Illinois have all found that the FAA preempted statutes voiding contract provisions requiring arbitrations in another state. Ohio has yet to squarely address this issue. Generally, courts which have
The takeaway Arbitration may not be the right dispute resolution process if your contracting partner is untrustworthy and will not respect the process. Unfortunately, this decision is always much easier in hindsight. Arbitration panels simply do not have the same power as courts when it comes to oversight and enforcement. Further, the impact of state construction statutes, as well as federal and state arbitration statutes should be considered when crafting any arbitration provision. A brief discussion with competent counsel can save a great deal of headache – and likely – cash. P
Marc A. Sanchez is a partner in Frantz Ward LLP’s Construction Law Group in Cleveland, Ohio. He has arbitrated many construction disputes and counsels clients regarding claim avoidance, claim prosecution, risk allocation as well as surety and insurance issues.
0DNLQJ \RX ORRN JRRG LV RXU EXVLQHVV 5HVLGHQWLDO FRPPHUFLDO ODQGVFDSH LQVWDOODWLRQ PDLQWHQDQFH 6LQFH
Venue and choice-of-law statutes Now assume that your construction contract contains an arbitration
addressed this issue have found that state laws, which attempt to “rewrite the parties’ agreements and compel arbitration of their dispute in a forum which is not one of those enumerated in an arbitration agreement’s forum-selection clause,” are presumably preempted by the FAA. This means that the bargained for venue and choice-of-law provisions in the construction contract might survive challenge under state law statutes.
LLQIR#UEVWRXWLQF FRP I # E W
ZZZ UEVWRXWLQF FRP www.propertiesmag.com 41
ACAR CORNER Issues in the real estate industry
NAR Provides Outlook for Remainder of 2014 ccording to the National Association of Realtors (NAR), the outlook for all of the major commercial real estate sectors is slightly improving despite disappointing economic growth during the first quarter of 2014.
A SETH TASK
42
Lawrence Yun, NAR chief economist, says the sluggish growth experienced in the first quarter is not indicative of the actual health of the economy. The improved lending for commercial loans and continuing job gains we’ve seen this spring bode well for modest progress in commercial real estate leases and purchases of properties. National vacancy rates in the office market are forecast to decline 0.2% over the coming year, while international trade gains continue to boost use for industrial space, which forecasts a decline of 0.3%. The outlook for personal income and consumer spending is favorable for the retail market, likely leading to a vacancy decline of 0.2%. “The multifamily sector continues to be the top performer in commercial real estate with the lowest vacancy rates,” Yun says. “However, tight availability – despite new construction – is causing rents to currently rise near 4% annually in many markets. Many renters who are getting squeezed may begin to view homeownership as a more favorable, long-term option.”
Recently, NAR reported in its annual Commercial Member Profile that despite subpar economic expansion, Realtors who practice commercial real estate saw an increase in sales transaction volume and medium gross annual income in 2013. NAR’s latest Commercial Real Estate Outlook offers overall projections for four major commercial sectors and analyzes quarterly data in the office, industrial, retail and multifamily markets. Office vacancy rates should decline from an expected 15.8% in the second quarter of this year to 15.6% in the second quarter of 2015. Office rents are projected to increase 2.5% in 2014 and 3.2% next year. Industrial vacancy rates are anticipated to fall from 9.0% in the second quarter to 8.7% in the second quarter of 2015. Annual industrial rents should rise 2.4% this year and 2.6% in 2015. Net absorption of industrial space nationally is seen at 107.8 million square feet in 2014 and 107.1 million next year. Net absorption of office space in the U.S., which includes the leasing of new space
3URSHUWLHV | July 2014
coming on the market as well as space in existing properties, is likely to total 39.7 million square feet this year and 49.8 million in 2015. Vacancy rates in the retail market are expected to decline from 10.0% to 9.8% in the second quarter of 2015. Average retail rents are forecast to rise 2.0% in 2014 and 2.3% next year. Net absorption of retail space is likely to total 11.5 million square feet this year and 19.6 million in 2015. The apartment rental market – multifamily housing – should see vacancy rates edge up from 4.0% in the second quarter to 4.1% in the second quarter of 2015. Average apartment rents are projected to rise 4.0 this year and in 2015. Multifamily net absorption is expected to total 221,400 units in 2014 and 173,100 next year. For more information, visit the Akron Cleveland Association of Realtors online at www.AkronClevelandRealtors.com, or contact either office and staff will be happy to help however they can. P
reliable & local CALL OUR COMMERCIAL SALES MANAGERS TODAY, TO DISCUSS YOUR ELECTRIC SERVICE NEEDS
Wes Tarver: 216.664.3922 ext.145 Kim Smith: 216.664.3922 ext. 253 VISIT US AT WWW.CPP.ORG
Sustainable practices. Superior results.
Seth Task is the president of the Akron Cleveland Association of Realtors (ACAR).
The Road to Cleanliness Starts Here Ê ",Ê Ê "Ê "-/Ê* , Ê , Ê -- --
UÊ-Üii« } UÊ*ÀiÃÃÕÀiÊ7>Ã } UÊ-VÀÕLL } UÊ*>Ûi i ÌÊ,i«> ÀÃ UÊ-ÌÀ « } UÊ-> Ì }
Only from Schill.
/
UÊ- ÜÊ* Ü } UÊ ÃÌÀÕVÌ Ê- Ìià UÊ*>À }Ê Ìà UÊ*>À }Ê iV à UÊ7>Ài ÕÃià UÊ-«iV > Ê Ûi ÌÃ
Schill Grounds Management has been a trusted provider of commercial landscaping and snow removal services to premier properties in Northern Ohio for 20 years.
- ViÊ£ ä
330-798-9200
ÜÜܰLÕV iÞiÃÜii« }°V
©Schill Grounds Management
Now, we’re pioneering the use of sustainable business practices and products. From propane-powered equipment to bio-nutritional fertilizers to reduced pesticide use, Schill delivers earth-friendly solutions that protect the planet and your property – without costing more. Find out how Schill can help you create healthy, green spaces for living, working, or shopping. Call us today.
5000 Mills Industrial Parkway • North Ridgeville, OH 44039 • (440) 327-3030 • schillgroundsmanagement.com
www.propertiesmag.com 43
NAIOP NEWS Commercial real estate happenings
Ohio General Assembly Legislation Impacting Real Estate s a powerful voice for commercial real estate, NAIOP advocates for effective legislation on behalf of its members. Currently, NAIOP Ohio is actively working on numerous issues impacting real estate in the State of Ohio.
A
The 2014 mid-year legislative update on pending legislation includes the following:
CRAIG MILLER
Proposal to allow property owners to opt out of TIF Incentive Districts H.B. 198 will provide property owners with a broad opportunity to opt out of tax-increment financing (“TIF”) incentive districts. If enacted, this legislation would allow property owners to opt out of TIF incentive districts if their parcels are not wholly within an overlay area of not more than 300 acres that is a square or rectangle. Sub. H.B. 198 does not impact “project/parcel” TIFs. NAIOP Ohio opposes any attempt to restrict the use of TIF by allowing property owners to opt out of TIFs. Taxincrement financing is one of the most important tools that local governments have for financing public infrastructure improvements. Property owners already have sufficient protections under current TIF law; and pay the same amount
when their parcels are subject to TIF as they would pay in property taxes if their parcels are not subject to TIF.
Ohio Historic Preservation Tax Credits Program The Ohio Historic Preservation Tax Credit Program provides a 25% tax credit to owners for the rehabilitation expense of historically designated buildings. This credit can also be combined with a 20% federal historic tax credit to provide additional leverage for rehabilitating historic buildings. Ohio’s 2013 budget provided a two-year extension which allows for $60 million in tax credits for fiscal year ended, June 30, 2014 and June 30, 2015. The budget bill retained the tax credit cap of $5 million per project. NAIOP Ohio supports the continuation and enhancement of the Ohio Historic Preservation Tax Credit Program. This program will benefit Ohio by keeping Ohio competitive, creating jobs, encour-
Sleggs, Danzinger & Gill, Co., LPA CONTESTING REAL PROPERTY TAX ASSESMENTS IN ALL OF OHIO’S 88 COUNTIES
We help taxpayers maximize property investments by reducing property taxes.
EXPERIENCED LEGAL COUNSEL IN PROPERTY TAX LAW 216.771.8990 | www.sdglegal.net | 820 West Superior Ave., Seventh Floor | Cleveland, OH 44113 44
3URSHUWLHV | July 2014
aging private investment and producing additional return on investment.
Expansion & enhancement of Ohio New Markets Tax Credit Program The New Markets Tax Credit Program (NMTC Program) was established by Congress in 2000 to spur new or increased investments into operating businesses and real estate projects located in low-income communities. The NMTC Program attracts investment capital through a tax credit against investors’ income tax in exchange for making equity investments. The Ohio NMTC program predominately mirrors the federal program. Ohio’s NMTC program is capped at total allocations of $10 million in tax credits per year with a $1 million cap per project. The Ohio NMTC can be twinned with the Federal NMTC to provide even more injection of private capital into low-income communities. NAIOP Ohio supports expansion and enhancement of the Ohio NMTC and the following changes:
• S.B. 309: To modify the qualifications for the New Markets Tax Credit to conform to the federal program and to modify the schedule for receiving the credit. The Ohio New Markets Tax Credit program restricts use of the credit to primarily owner occupied buildings.
Vacant Industrial Site Tax Credit Industrial sites often present challenges for rehabilitation of the building or conversion of the building to a different use. These properties are also often
environmentally challenged, which increases cost and risk associated with rehabilitating the site. NAIOP Ohio supports H.B. 135, the Vacant Industrial Site tax credit. Upcoming events Save the date for NAIOP Northern Ohio’s new Walking Tour of Downtown Developments on Thursday, August 7. P Craig Miller is NAIOP of Northern Ohio Public Affairs/Government Relations Chair and a member of the NAIOP of Ohio Board Directors. For more info, visit www.naiopnorthernohio.com.
When Quality Counts, Count on Delta.
• H.B. 478: To eliminate the requirement that taxpayers receive federal New Markets Tax Credits to qualify for the Ohio New Markets Tax Credit.
;d]n]dYf\ k Kl]]d @]Y\imYjl]jk
Providing Industrial Cleaning, Painting & Maintenance with Quality & Service that is Second to None. INDUSTRIAL CLEANING & MAINTENANCE
&ROXPELD %XLOGLQJ 3URGXFWV STEEL JOISTS STRUCTURAL IRON METAL ROOF DECK STEEL STAIRS & RAILS STEEL ERECTION
440-235-3363 *-1.) =de Kl&$ ;d]n]dYf\$ G@ ,,)+0
• Hot pressure / steam cleaning • Waterproofing and sealing • Parking deck cleaning, painting, and striping • Overhead cleaning / painting • Exterior and interior building cleaning • Industrial oven cleaning • Dust collector cleaning • Pigeon / bat excrement removal • Graffiti removal
• Roof fan and ventilator cleaning • Industrial exhaust system cooling and heating coil cleaning • Kitchen exhaust system and kitchen equipment cleaning • Machinery cleaning / painting • Welding exhaust cleaning • Construction clean-up or restoration of property for sale and leasing
INDOOR AIR QUALITY • HVAC system cleaning & sanitizing • Air duct cleaning • Mold remediation
Contact Delta Industrial today! 216-281-8700 5201 DENISON AVE., CLEVELAND OHIO 44102 www.propertiesmag.com 45
ͳ ͳͻʹǡ Ȅ
WƌŽƵĚ ƚŽ ŚĂǀĞ ƐĞƌǀĞĚ ĂƐ ƚŚĞ ĐŽŶƐƚƌƵĐƟŽŶ ŵĂŶĂŐĞƌ ŽŶ ƚŚĞ ^ƚ͘ ůŝnjĂďĞƚŚ ŽĂƌĚŵĂŶ ,ŽƐƉŝƚĂů WĂƟĞŶƚ dŽǁĞƌ ĚĚŝƟŽŶ͘
ǁǁǁ͘ƐŚŽŽŬĐŽŶƐƚƌƵĐƟŽŶ͘ĐŽŵ ͮ ϰϰϬ͘ϴϯϴ͘ϱϰϬϬ
Rising to the Challenge Catholic Health Partners meets growing healthcare needs in Boardman with new patient tower By Dennis Castiglione | Photos by Jim Maguire
emand continues to drive growth at St. Elizabeth Boardman Health Center with the opening of a $58 million, seven-story patient tower this April. Part of an overall $203 million upgrade underway at Humility of Mary Health Partners’ three hospitals in eastern Ohio – which also includes St. Elizabeth Health Center in Youngstown and St. Joseph Health Center in Warren – the project is a response to population growth in Boardman, Canfield and Poland.
D
The 184,000-square-foot tower was designed by architects Rodney Lamberson, of Strollo Architects in Youngstown, and Bill Miller, of Moody Nolan Architects in Columbus, and built by Shook Construction, of Dayton, as construction manager at risk, in a joint venture with KBJ Inc., of Cleveland. Located on the hospital’s existing campus along Market Street in Boardman, the facility includes six intensive care beds, 12 labor and delivery beds, 32 post-partum beds and a 24-bed neonatal intensive care unit within floors one through four. Build-out of remaining floors is ongoing and will provide 72
medical surgical/telemetry beds, 48 of which are due to open this September. The project aims to meet needs of a community that has embraced the hospital since it officially opened just seven years ago.
First to market, fast to market Humility of Mary Health Partners (HMHP) had long considered growing its coverage into the southern portion of Mahoning and Columbiana counties. A regional market of the Catholic Health Partners non-profit health system, HMHP has enjoyed a strong reputation system-wide and strategically it made sense to establish
a facility in the region. So 38 acres were purchased in Boardman and in 1999 a cancer center was erected on the property. The response was huge. “Although we do a lot of planning and forecasting and in-depth business plans, the success of that facility blew us away,” says Eugenia “Genie” Aubel, president of St. Elizabeth Boardman Health Center. “We looked at the incidence of cancer in the population and despite the healthcare options they might have closer to their homes, people wanted to be here whether they lived here or not. This is the part of town that was growing and people preferred to come here for treatment.” www.propertiesmag.com 47
BUILDING SUPPORT In all, 1,300 tons of structural steel, deck, shear studs and miscellaneous steel were utilized to build the six-story addition to the existing hospital, plus the separate two-story surgery wing expansion.
Not long after the cancer center opened, HMHP began plans to build a hospital there. Flexibility is a cornerstone trait of HMHP and its initial move was to build a modular emergency and diagnostic unit in 2001. “We didn’t want to lock up our property with something that
wouldn’t work for us in the long term so the modular unit became a feeder for the campus,” Aubel says. “We wanted to establish ourselves here and be certain that people were comfortable and accustomed to coming here. That bought us a few years to begin to design a hospital for the area.”
3URXG WR EH SDUW RI WKH WHDP DW 6W (OL]DEHWK %RDUGPDQ +HDOWK &HQWHU
BOCHERT BROS. PA I N T I N G & D E C O R AT I N G PAINTING CONTRACTORS Commercial, Industrial + Institutional Wallcovering Specialist Since 1964
(330) 758-8282 Fax (330-758-8377 bochertbros@att.net 590 E. Western Reserve Rd., Bldg. #2 Poland, Ohio 48
BONDED & INSURED
HMHP opened a permanent emergency department and diagnostic center in 2003, replacing the modular unit. “It was our strategic plan to develop this campus in phases,” she adds. The plan worked from the onset. Every unit built on the campus has met or exceeded HMHP’s forecasts, which has been a testimony to solid research and thoughtful, tactical planning. In 2004, a joint venture was opened with the YMCA, which was also quite strategic. “It has been great for visibility of our campus,” Aubel says. “The YMCA brings thousands of visitors here weekly.” Ten acres of the campus went to the YMCA on a 100-year land lease. St. Elizabeth Boardman Health Center leases part of the space in the YMCA building for therapy, too, further connecting the two organizations. (Today, not including the space leased from the Y, there are 500,000 square feet of healthcare facilities on the campus.)
Continuing growth Strollo Architects has enjoyed a long relationship with HMHP and, partnering with architectural firm Moody Nolan, began plans for a seven-story bed tower and surgery center on the campus. 3URSHUWLHV | July 2014
Proud to perform exterior wall framing, thermal insulation, air barrier, sheathing & demolition for Shook KBJ Construction & Team at ST. ELIZABETH BOARDMAN HEALTH CENTER PATIENT TOWER ADDITION
:H ZRUN WRJHWKHU WR EXLOG H[FHOOHQFH Metal Framing/Drywall Q Exterior Finishing Q Acoustical Painting Q Preconstruction Q Specialties Q Millwork
3URXG &RPPLVVLRQLQJ 3URYLGHU IRU 6W (OL]DEHWK %RDUGPDQ +HDOWK &HQWHU
%XLOGLQJ 3HUIRUPDQFH 6XVWDLQDEOH 5HVXOWV &200,66,21,1* (1(5*< $ $66(660(17 0($685(0(17 9 9(5,),&$7,21 )25(16,& & &2168/7,1*
ZZZ RFS FRQWUDFWRUV FRP
(XFOLG $YH 6WH &OHYHODQG 2+ ZZZ HFRFRPPLVVLRQV FRP
www.propertiesmag.com 49
Ƭ Ǥ Ǥ
FOREST CITY ERECTORS, INC. 8200 Boyle Pkwy. Twinsburg, OH 44087 330-425-7185
3400 Independence Rd. Cleveland, OH 44105 216-363-1111
Strollo would handle all the exterior, public spaces and all renovations while Moody took the lead on the surgery center and patient rooms – its specialty in the healthcare architecture world. This project would ultimately become St. Elizabeth Boardman Health Center, which officially opened its doors in 2007. “When the tower and surgery center was designed, it was planned to be another phase in the expansion of the campus and the infrastructure was put into place to ultimately erect a second tower,” says Bill Souders, Moody Nolan project manager. The first tower was a 128-bed facility and with the current completion of remaining floors in the second tower, St. Elizabeth is growing to 278 beds – more than twice its size. “The milestone of this latest phase was the movement of all of our maternity services from [St. Elizabeth Health Center] downtown to this facility, which happened on April 7 of this year,” Aubel says.
Vertically challenging Simply building a seven-story hospital tower in less than two years is no small task – constructing it verti-
www.forestcityerectors.com “A Women’s Business Enterprise”
Ohio Desk wishes to thank St. Elizabeth Hospital for allowing us to be a
part of your team. Furniture Solutions for Corporate, Professional Services, Healthcare, Higher Education and Government
800.326.0601 ohiodesk.com Akron Canton Cleveland Erie Warren Youngstown
50
3URSHUWLHV | July 2014
SOUND DECISION There is no overhead paging system at St Elizabeth Boardman Health Center like those typically found in healthcare facilities. Instead, nurses, doctors and staff members carry phones, reducing noise levels throughout.
cally over an operational surgery center made this an especially challenging assignment, especially considering the possible impact of sound and vibration within the existing facility. In all, Forest City Erectors, Inc. installed 1,300 tons of structural steel, deck, shear studs and miscellaneous steel for the six-story addition to the existing hospital, plus the separate two-story surgery wing expansion.
“Work was completed using two separate cranes and crews working at separate sides of the project to expedite the schedule,” says Bernie Nowak, project manager with Forest City Erectors, Inc. The roof was left in place during the vertical expansion. This provided both a natural insulation as well as a sound barrier, protecting the surgical area. “Strategically, we opened it up on nice days to make the structural tie-
ins and connections in order to go vertical,” says Chris Freitag, project manager with Shook Construction. As for scheduling around surgeries, the team worked off-hours once the roof was removed to keep pace and avoid conflicts with surgical procedures being done in the center. “Originally we were planning one floor above the surgical center but needs dictated a second floor so we went back
Proud to be part of the team with Shook Construction at St. Elizabeth Boardman Health Center
7E /FFER THE -OST #OMPLETE %LECTRICAL $ISTRIBUTION 3YSTEM 3ERVICE 5NDER /NE 2OOF &OR THE VERY BEST IN ALL TYPES OF ELECTRICAL SERVICES YOU CAN DEPEND ON h*OEv $ICKEY %LECTRIC )NC 7E HAVE BEEN IN BUSINESS FOR OVER YEARS /UR PROFESSIONAL EXPERIENCE INCLUDES #OMMERCIAL )NDUSTRIAL AND 2ESIDENTIAL SERVICES ´-RHµ 'LFNH\ (OHFWULF IRXQGHG E\ -RH 'LFNH\ -U 0DQDJHG E\ 'DYLG 'LFNH\ 3UHVLGHQW 5HVLGHQWLDO KHDGHG E\ -HII 6XJDU DQG -XVWLQ /HZLV 7(** 6HUYLFHV ZLWK ,QIUDUHG 7HFKQRORJ\ 3UHYHQWLYH 0DLQWHQDQFH KHDGHG E\ 5XVV %DUWRQ
(OUR %MERGENCY 3ERVICE
a %LECTRICAL $ESIGN "UILD
a
&REE %STIMATES
a
$ATA 6OICE 6IDEO
a
31<< EC 6?B B5C945>D91< 3?==5B391< ?B 9>4ECDB91< >554C
²>? :?2 D?? <1B75 ?B D?? C=1<<³
%NERGY -ANAGEMENT
#OMMERCIAL )NDUSTRIAL
a 2ESIDENTIAL
a
(IGH 6OLTAGE
a
"ACKUP 0OWER 3YSTEMS
a
!LTERNATIVE 0OWER 3UPPLIES
a
a
(IGH 6OLTAGE
3UB 3TATIONS
:PV )BWF 5SJFE 5IF 3FTU /PX 5SZ UIF #FTU
ÀÊ>`` Ì > Ê v À >Ì ÀÊ>Ê , Ê/ Á -iÀÛ ViÊ*Ài >ÀÞÊ-ÞÃÌi à Û> Õ>Ì ]ÊV> ÊÕÃÊÌ `>Þ°
Ag] Û;a[c]qÛ<d][lja[ Û@f[ 8 4PVUI 3BOHF 3PBE 1 0 #PY /PSUI -JNB 0)
PS
WWW DICKEYELECTRIC COM /( ,IC
www.propertiesmag.com 51
Landscaping Contracts – with Extraordinary Color Plans Planting, Design & Installation • Irrigation Installation & Repair Routine Ro outtine ti PProperty roperty ope pe y Ins Inspection sspec pecti pec tion o & Maint Mainte Maintenance a tenaa ce ce
T HHNTIFJTGFIK GGNTFGMTEMMI '48+0) .. 1( *+1
WKH ZRUNVKRS DUFK GHVLJQ OOF
W
RKLR RQH EXLOGLQJ HDVW ERDUGPDQ VWUHHW VXLWH \RXQJVWRZQ RKLR ZZZ WKHZRUNVKRS DG FRP VSHFLDOL]LQJ LQ KHDOWKFDUH FROOHJLDWH DQG FRUSRUDWH GHVLJQ
NATURAL CONNECTION A “Tree of Life” floor treatment weaves its way throughout the neonatal intensive care unit with branches reaching into each unit along the way.
into that space and reinforced the columns to adapt,” says Rod Lamberson, of Strollo Architects. “We would go in on a Friday to reinforce existing columns,” Freitag says. “We would weld stiffening angles and plates on Saturday, fireproof it and on Sunday we would replace the drywall and paint so by Monday morning they would never know we were in there.” Iron was set during the winter months and the only weather-related challenge was keeping holes dry at the tie-in points during times of high precipitation. A lot of new infrastructure was installed to manage the expansion. Space and connections were provided for a second major generator and additional boilers and chillers, while shafts were shelled out for future elevators. “Maybe the most significant impact of the expansion was the need for a new electric substation because the grid wasn’t big enough to handle the capacity,” Lamberson says.
Creating a restorative environment 6LQFH
)ORRULQJ 6SHFLDOLVWV 9L 9LFWWRULD 5 L 5RDG $ G $XVWLWLQWWRZQ 2+ 2+ 3KRQH 7ROO )UHH ZZZ U\DQFDUSHW FRP
:( $5( 3528' 72 +$9( 3529,'(' )/225,1* )25 7+( 5
67 (/,=$%(7+ %2$5'0$1 +($/7+ &(17(5
52
Trips to the hospital, whether you’re a patient or a visitor, can be stressful experiences. One of the primary goals with the design of the St. Elizabeth Boardman Health Center was to create a “healing environment,” Aubel says. “We considered everything from the color palette used to decorate to noise reduction,” she says. “We took advantage of natural light, built in gentle, trickling waterfalls and water features to create a calming ‘white noise’ and strived to minimize clutter.” For example, there is no overhead paging system at St. Elizabeth like those typically found in healthcare facilities. 3URSHUWLHV | July 2014
CREATING COMFORT A goal of the design was to create a soothing environment. “We started with labor and delivery,” says Becky Tennant, principal of interior design firm The Workshop. “We wanted to keep the colors soft and uplifting because parents are excited and stressed.”
“It’s very quiet here,” Aubel says. “Clinical staff carry phones and we can reach nurses, doctors and staff members on their phones rather than paging throughout the facility.” HMHP brought in The Workshop Arch+Design, LLC to develop and implement the plan in accord with their objectives. “We started with labor and delivery,” says Becky Tennant, principal of The Workshop. “We wanted to keep the colors soft and uplifting because parents are excited and stressed.” An integral design element, a “Tree of Life” floor treatment weaves its way throughout the neonatal intensive care unit with branches reaching into each unit along the way. “We were striving for a color palette that felt more like Mom was going to a spa rather than the hospital,” adds Tennant. “We also wanted to use
says Aubel. “What they came up with was nothing we expected – but something that was, indeed, very special and quite unique. It really works.” The Workshop went to the website Etsy.com and found items like a 1902 christening gown that is displayed in a shadow box in the maternity area, for example. “We truly appreciate the openness demonstrated by Genie Aubel and the Humility of Mary Health Genie Aubel Partners,” adds Tennant. “They were St. Elizabeth Boardman Health Center willing to allow us to explore and try something different and we’re very ing, textured carpets and unique wall pleased with the results.” True to the HMHP strategy, research treatments that are pleasing to the eye played a big part in the interior architecand comforting.” One of the most unique features ture and design. “We had extensive user group feedin the maternity ward is the use of vintage babies’ and women’s clothing back and interaction,” Aubel says. “We from the ‘50s and ‘60s. “We gave The even built a mock room downtown at Workshop room to really try some- significant expense to allow the staff to thing special, to step outside the box,” investigate our design concepts and offer materials that would stand the test of time; that people wouldn’t get tired of. We were able to incorporate cool [blues and greens], luxury vinyl floor-
“We took advantage of natural light, built in gentle, trickling waterfalls and water features to create a calming ‘white noise’ and strived to minimize clutter.”
www.propertiesmag.com 53
TEST RESULTS Research played a big part in the interior architecture and design. For instance, a mock patient room was built offsite at significant expense to allow the staff to investigate design concepts before construction of finished rooms (above) began.
suggestions to improve upon them before final construction was begun.” The feedback was vital, says Lamberson. “We wanted to know if there was anything we could tweak to make everyone’s experience better,” he says. “We wanted to be sure we designed this facility with input from every possible vantage point.” Energy-efficient lighting was a key factor. Strollo incorporated LED lighting, which has not only become more affordable but provides both energy
conservation and a softer, more controlled lighting environment.
Materials that make a difference Careful consideration was given to the materials selected for the build. For example, the red brick used was selected because it was readily available and could be found years from now to be incorporated into any future expansions. “We wanted materials that could stand the test of time,” explains Lamberson.
“We wanted them to be easily matched years from now.” There was also intent to blend the campus into the cityscape. In fact, the materials used and design emphasis reflect that of the Boardman Township building. Exterior surfaces are nearly equal parts of brick and aluminum in order to break down the scale of the structure, Lamberson says. “If it was an entirely brick building, it would be pretty over overwhelming,” he
3528' 72 %( 3$57 2) 7+( 7($0 $7 67 (/,=$%(7+ %2$5'0$1 +($/7+ &(17(5 SPECIALTY & DESIGN BUILD CONSTRUCTION SERVICES &RPSUHVVLRQ 3LOHV
7HQVLRQ 3LOHV 3UHVVXUH *URXWLQJ
5HVWULFWHG $FFHVV /RZ +HDGURRP &HPHQW %DVH *URXWLQJ ,QVWDOODWLRQV /LJKWZHLJKW &HPHQW *URXWV (DUWK 5HWHQWLRQ 6\VWHPV %DFNÀOO &HPHQW *URXWV + 3LOHV
THE FOUNDATION SPECIALISTS
/DJJLQJ
&KHPLFDO *URXWLQJ
&XW RII :DOO 3LOHV
)DEULF )RUPV IRU *URXWV
7% 6RLO 5RFN $QFKRUV 0LFUR 3LOHV
(URVLRQ &RQWURO 5HYHWPHQW 0DWWUHVV
6RLO 1DLOV
3UHSODFHG $JJUHJDWH &RQFUHWH
PH 330-336-8871 1 • P.O. BOX 557, WADSWORTH, OHIO 44282 AUGERCASTPILES@AOL.COM • WWW.AUGERCASTPILES.NET 54
3URSHUWLHV | July 2014
CALMING CONCEPT “We were striving for a color palette that felt more like Mom was going to a spa rather than the hospital,” says Becky Tennant, of The Workshop. Supporting the idea, cool blue and green color tones (top), luxury vinyl flooring (middle) and textured carpets (bottom) are intended to be pleasing to the eye and comforting.
explains. “We were trying to make the elements play off each other.” Tinted panes and low E panes were used in the windows to help reduce the costs to heat and cool. “I always believe that it is important to be able to see in and out and we don’t want it to get too dark, either,” Lamberson says. Fritting was added to some areas to better control the light as well. “[Fritting] was a late addition to our plans and is a good example of the tweaking we are doing to ever improve the facility.”
Close collaboration weathers tight construction schedule “To say we moved quickly is a major understatement,” Freitag says. “We started planning mid-2012 and opened in April. It was a 20-month construction schedule.” Successful completion of the project was aided by Shook’s partnership with Kyle Jones, of KBJ, Inc. Jones has worked on the Great Lakes Science Center, the East Bank of the Flats, The Eaton Building, Ahuja Medical Center, Progressive Field and the Rock and Roll Hall of Fame and Museum in Cleveland, so he’s no stranger to extensive projects with tight timelines. “It was an extremely aggressive schedule but I can’t say enough good things about Shook,” Jones says. “They were great to work with. I can tell you, nobody slept during construction. It was very demanding, time-wise, but in the end we had a very satisfied customer, which is what we hope for. Genie [Aubel] and her team were also wonderful. We hope to work on more HMHP projects up the road.” Lamberson, of Strollo Architects, says a collaborative spirit was key on the project. “This was a very aggressive schedule all the way through the process, which kept us all on our toes,” he says. “Communication was great from Genie [Aubel] and her team to the entire design and build crew.” P www.propertiesmag.com 55
ALWAYS on time
• Due Diligence • Retail, Commercial and Industrial • Value Engineering
• Development & Leasing • Historical/Industrial Renovations • Design/Build
330-659-2040 Charles Marshall – cmarshall@mccdesignbuild.com
Construction Company
216.662.5200 chassvecinc@brightdsl.net
a division of
P.O. Box 1092, Bath, OH 44210 • www.beaconmarshall.com
We Train “The Best Hands in the Business” Bricklaying
Blocklaying
Tuckpointing,, Caulking, Cleaning
Cement
TTile Setting
Terrazzo
FOR MORE INFORMATION ON OUR PROGRAMS, CALL: (330) 463-5504 Northern Ohio Regional Training Center (513) 732-6232 Southern Ohio-Kentucky Regional Training Center 56
3URSHUWLHV | July 2014
Construction Trades COMMITTED
TO
CRAFTSMANSHIP
Rock Solid Training from IMI International Masonry Institute lays solid foundation for lifelong craft development By Doug Bardwell | Photos courtesy of International Masonry Institute
or centuries, people have appreciated the strength, the beauty and the longevity of masonry construction. But what most people don’t see is the talent that crafted that wall, that arch or that stadium.
F
Largely responsible for that craftsmanship today is the International Masonry Institute (IMI). Headquartered in the James Brice House in historic Annapolis, Maryland, the institute also has regional offices around the country. Northeast Ohio is served by a 36,000-square-foot regional office in Hudson, Ohio. “We’ve also recently opened a 32,000-square-foot regional office in Cincinnati to serve the southern area of our district,” says Ken Kudela, director of the Ohio – Kentucky Administrative District Council. “We’ve just completed our second year of operation there.” The IMI is a well-conceived alliance between the International Union of Bricklayers and Allied Craftworkers (BAC) and the signatory contractors who want to RAISING OPPORTUNITY Not only do IMI students learn the art of masonry construction in a promote the highest quality stan- hands-on setting, but they can also cross-train to become foremen, superintendents, instructors dards of masonry construction. or even contractors. The institute offers training at also some of the newer systems the tion,” Kudela says. “This accomplishes all levels for craftspeople, specialized professional and continuing craftsman and contractor need to be two things. First, it gives them a chance to see if our trade is a good fit education for contractors, and free familiar with. Before IMI students even set foot on for them. Secondly, they get to learn technical assistance to architects, designers and anyone else desiring to a worksite, they have the opportunity the basic skills of the trade, as well to attend an extensive pre-apprentice as the lingo. When they show up for build with masonry. their first day of work, they Today, masonry crafts mean are prepared to be a knowlnot only brick and mortar, but LEED Building Blocks also include stone, marble, If a project is seeking LEED accreditation, masonry materials can be an edgeable, productive and safe block, tile, terrazzo, plaster and integral part of the point system. Up to 52 LEED points are obtainable by use member of the workforce. “This year we graduated cement, both for restoration of the IMI LEED checklist, available by emailing GreenMasonry@imiweb.org. and new construction. While Versions are available for both the US and for Canada. Masonry plays a role in 21 from the pre-apprenticethe typical masonry products multiple secondary LEED categories: Sustainable Sites, Energy & Atmosphere, ship program and within two weeks, 19 of them are already are important, the institute Materials & Resources, as well as Indoor Environmental Quality. –DB employed. We expect the other also focuses on rain screen wall systems, veneers, insulated con- program, which introduces them to the two to start work very soon as well. With our regular apprentice program, crete forms, air barriers, grouts and craft and to jobsite safety. “Our program gives these new we have 130 in Cleveland and 70 in hybrid masonry designs. Pre-fabricated and pre-stressed masonry systems are people eight 40-hour weeks of orienta- Cincinnati. We also offer specialty www.propertiesmag.com 57
)DEULFDWLRQ ,QVWDOODWLRQ 6HUYLFH LQ \HDUV U H Y R RU OL]LQJ I 6SHFLD WRS U HG URRI J D RW ZDWH N F K D 3 P GLQJ ¥ VWHD ZHO Q R L W D F %RLOHUV UL HWDO IDE HOGLQJ 6KHHWP ULFDWLRQ Z IDE W 3ODVWLF HHULQJ DUWPHQ Q S L H J G Q H H F 9DOXHG H PDLQWHQDQ UYLF )XOO VH
Complete Glass Experts Family-Owned & Operated for 60 years! Specializing in: • Commercial Glass and Glazing • Aluminum Doors & Storefronts • Custom Sandblasted “Etched” Glass with Clearshield • Bullet Resistant Glass & Polycarbonate • Custom Frameless Shower Doors, Mirrors & Glass Table Tops
Free Commercial Estimates 24 Hour-Board-Up Service
ZZZ OLVFRKYDF FRP 6WDWH 5G 1 5R\DOWRQ 2+
phone 216-621-1971 | fax 216-621-6602 www.sandgloglass.com 2316 St. Clair Avenue | Cleveland, Ohio 44114
:LWK RXU VWUHQJWK LQ WKH FRQVWUXFWLRQ LQGXVWU\ ZH DUH WKH RQHV WR WXUQ WR IRU \RXU FRQFUHWH QHHGV $ IDPLO\ RZQHG EXVLQHVV OHDGHU LQ WKH 5HDG\ 0L[ &RQFUHWH LQGXVWU\ VLQFH WKH V RIIHULQJ D FRPSOHWH OLQH RI PDVRQU\ EXLOGHUV VXSSOLHV :HVWYLHZ &RQFUHWH RSHUDWHV PDMRU IDFLOLWLHV WKURXJKRXW 1RUWKHUQ 2KLR :H KDYH WKH FDSDELOLW\ WR PHHW DQ\ MRE VLWH UHTXLUHPHQW RQ WLPH RQ WKH PRQH\ &DOO XV WRGD\ WR OHDUQ ZKDW ZH FDQ GR IRU \RX
BRICK • STONE • EROSION BLOCK RETAINING WALLS • BUILDER SUPPLIES
READY MIXED CONCRETE 440-235-1800 • 1-800-332-2738 • www.westviewconcrete.com 58
3URSHUWLHV | July 2014
Construction Trades COMMITTED
training at the John Flynn Training Center in Maryland.” As students continue their apprenticeship, IMI offers training in both traditional and state-of-the-art methods and materials. Not only do they learn the art of masonry construction, but they can also cross-train to become foremen, superintendents, instructors or even contractors. The institute provides life-long learning opportunities for students and graduates alike. Instructors themselves have all gone through a 200-hour certification program and continue to receive updates over time. Masonry contractors appreciate the opportunity to learn at the IMI Contractor College. With the opportunity to structure classes for all size firms, contractors’ personnel can receive training on a range of management topics as well as industry specific trends and techniques. Certification programs provide proof that the contractor’s staff is up the challenge of today’s cutting-edge projects. “Sometimes journeyman need training for a new specialty bond they’ve never done before, or maybe they want to learn to do arches or fireplaces,” Kudela says. “We can tailor a class especially for them, whether it’s a single day or multiple days.” Architects and designers also benefit from the work of the IMI with private consulting, educational series and technical assistance for anything on their
TO
CRAFTSMANSHIP
LEADING MINDS Maria Viteri, AIA, LEED AP, BD&C, director of Sustainability and Program Development for International Masonry Institute, presents the educational seminar “Green Tile, Marble & Terrazzo” at the training center in Hudson.
boards. From restoration techniques to the latest advances in materials or methods, the IMI helps the design community to get the project done right the first time. “We’ve even had architects come in just to try laying out a radiused masonry wall,” Kudela says. “They can add blocks or take them away until they get just the radius they envisioned.”
“My main responsibility as director is to make sure we consistently provide quality trained people to the contractors,” Kudela says. “The more we can train them, the better they are and the more productive they are, which translates to a better building or end product. We sincerely want them to be the best they can be.” P
7851 2)) <285 :$5(+286( /,*+76 $1' 7851 21 7+( 681 )LUHVWRQH 6XQ:DYH 'D\OLJKWLQJ 6\VWHP &RYHUHG LQ WKH 5RR¿QJ 6\VWHP :DUUDQW\
&DWFKHV PRUH ORZ DQJOH OLJKW ZLWK GLIIXVLRQ DV FRPSDUHG WR VWDQGDUG 7UDQVPLW PRUH OLJKW VN\OLJKWV WKDQ RUGLQDU\ VN\OLJKWV 26+$ $SSURYHG FRVW FRPSHWLWLYH
)LQG RXW PRUH WRGD\ $$GYDQFHG %XLOGLQJ 3URGXFWV //& ZZZ DDGYDQFHG FRP LQIR#DDGYDQFHG FRP www.propertiesmag.com 59
VANTAGE POINT Experts weigh in on industry issues
New Revenue Rules to Impact Contractors fter years of deliberations, new rules for accounting for revenue were finally released in May. The new guidance – issued by the Financial Accounting Standards Board, which sets rules for U.S. companies, and the International Accounting Standards Board – provides how to recognize revenue from contracts with customers. Many entities among numerous industries will be impacted and to varying degrees, including the construction industry.
A AARON COOK
The new provisions include five steps to determine how much revenue has been earned on a contract. In short, the revenue reported should represent the value of the performance obligations that have been satisfied. Sounds simple enough, right?
Step 1: Identify the contract Generally, a contractor will have an agreement in place before work on a project begins. Of course the deal might not be inked just yet, but that does not preclude revenue recognition under the new guidance. So let’s assume that an arrangement is in place and move on to Step 2.
Step 2: Identify the performance obligations Performance obligations are promises to provide goods and/or services in exchange for compensation. At contract
inception, all distinct performance obligations should be identified. An obligation is distinct if the customer can benefit from it separately. Each distinct performance obligation is a separate profit center for the purpose of recording revenue. In a construction project, there are many performance obligations that are being satisfied simultaneously; however, the customer generally can only benefit from the finished project. Accordingly, under such a situation, the new rules allow performance obligations to be bundled together into a single profit center. With so many different types of construction projects under different types of arrangements and project delivery methods, there are certainly possibilities that distinct performance can be identified in a contract. For example, a design-build contractor might separately perform project
/HW·V %XLOG 7RJHWKHU With almost 95 years of experience in the construction industry, we understand the business cycles, the special income tax issues, the reporting and bonding requirements, and the unique risks and opportunities contractors face each day. Meaden & Moore services, tailored to the needs of construction firms, include: Ƈ Accounting Expertise
Ƈ Succession Planning
Ƈ Cost Control
Ƈ Business Planning
Ƈ Profit Enhancement
Ƈ Litigation Support Services
Ƈ Tax Planning
Ƈ Bid Reviews
Ƈ Job-Cost Auditing
216.241.3272 60
meadenmoore.com 3URSHUWLHV | July 2014
Construction Trades COMMITTED
design and construction. From a practical standpoint, these arrangements are often package-deals that probably can be considered a single performance obligation. However, some design-build contracts provide that the contractor is compensated for the design if the customer decides to use a different contractor for the build. Because performance obligations are to be identified at contract inception, to me that would seem to indicate that there are two separate performance obligations that should be measured as separate profit centers. Also, to the extent that separate performance obligations are identified within a contract, they might be considered distinct and therefore measured separately. I believe industry-specific interpretation is warranted to assist contractors and their practitioners in this area. Otherwise there seems to be room for interpretation on whether performance obligations are distinct or not. This might impair comparability of financial information throughout the industry.
tion price for variable consideration, a contractor has two options. 1. Calculate the expected value by applying “probability-weighted” amounts, or 2. Estimate the “most likely amount” For example, let’s say a contractor has a delay claim against a customer for additional compensation. The claim is for
TO
CRAFTSMANSHIP
$100,000 and the contractor has determined the probability of these outcomes: • 90% chance $50,000 will be realized • 75% chance $70,000 will be realized • 50% chance $100,000 will be realized If my math is correct, that comes out to about $49,167, which should be
The company to trust with your window replacement needs.
Step 3: Determine the transaction price We have determined that an arrangement is in place (Step 1) and also have identified distinct performance obligations (Step 2). Next is to determine the transaction price. For a lump-sum contract, determining the transaction price would seem easy enough. Barring any change orders, the transaction price would equal the lump-sum contract value. Change orders, known as contracts modifications under the new guidance, are handled similar to current rules. That is, once there is an arrangement to provide additional compensation, that amount should be added to the transaction price. But what about cost-type projects with shared-savings arrangements, incentive compensation for early completion and/or liquidated damages for late completion? And of course, what about un-priced change orders and the dreaded contract claim? The amount that will ultimately be realized under these situations is known as ‘variable consideration’ under the new rules. When determining the transac-
Providing Lasting Value for Legacy Projects 2800 Euclid Avenue | Cleveland, OH 44115 (216) 621-4277 | Fax: (216) 621-7665 | www.jamiesonricca.com www.propertiesmag.com 61
'2(6 $ /,*+7,1* 5(752),7 0$.( 6(16( )25 <285 3523(57<" :H FDQ SURYLGH UHDO LQSXW LQYHVWPHQW VWUDWHJLHV WR KHOS \RX GHFLGH
2++ //LF ( LF LF ((/ /
9LVLW X XV R RQOLQH D DW ZZZ DFHOHFWULFRKLR FRP RU FDOO IRU D )5(( HVWLPDWH
6ROYLQJ \RXU /,*+7,1* (/(&75,&$/ QHHGV 72'$< IRU D EHWWHU 52, WRPRUURZ &/(9(/$1' _ $.521
included in the transaction price on the $100,000 claim. The second option is more straightforward and requires the contractor to determine the most likely amount. Using the above example, the contractor determines that the most likely outcome is to receive additional compensation of $50,000; therefore, that amount would be used in determining the transaction price for variable consideration.
Step 4: Allocate the transaction price
Celebrating our 30th year in setting the standard in commercial glass
Once the transaction price has been determined it needs to be allocated to the separate performance obligations (if any). The amount to allocate to each performance obligation should equal its standalone selling price. If separate performance obligations are separately priced at standalone value, this step will be a snap. Otherwise, the contractor needs to determine the standalone price had it been sold separately. Using the previous design-build example, assume that the contract separately identifies two separate performance obligations A) to design and B) to build an office building. The design fee is $100,000 and the construction fee is $900,000. The contractor will allocate $100,000 and $900,000 to the performance obligations to design and to build the project, respectively. As discussed in Step 5, revenue will be measured and recognized separately for each performance obligation.
Step 5: Recognize revenue as performance obligations are satisfied
,<*30+ .3(:: +669 *644,9*0(3 .3(:: +669: :05*,
Glazing contractor & service contractor specializing in storefronts, curtain wall, aluminum entrance doors, heavy glass walls & doors, glass replacement, door repairs, hardware installations, closers & parts. Caulking services, steel door replacement, security glass, reception-ticket-teller glass, glass table tops, mirrors & privacy glass
/6<9 ,4,9.,5*@ :,9=0*, -(*030;0,: 4(05;,5(5*, 440.269.1335 www.euclidglass.com Q 4560 Glenbrook Rd., Willoughby, OH 44094 62
Current practice is to recognize revenue on a construction contract using the percentage-of-completion method. Although one of three criteria must be met in order to continue to use this method, contracts that I see would definitely meet one or more criteria. For example, most construction contracts require that progress payments be made throughout the life of the project. Furthermore, if the customer terminates the contract, the contractor is to be compensated for work completed to date. In addition, most contractors use the cost method to measure percent 3URSHUWLHV | July 2014
Construction Trades COMMITTED
complete, which is the ratio of contract costs incurred to date to the total estimated contract cost. This method is still available for use, but I would encourage contractors to evaluate all options and choose the one that most accurately depicts the satisfaction of performance obligations. For instance, depending on the nature of the project, other methods to measure performance might be more meaningful. Examples include A) as contract milestones are achieved, B) as units are installed, or C) as labor is incurred. These alternatives would seem prudent where a large portion of the contract cost relates to materials and/or equipment that are engineered and produced by a third-party. If this is the case and the contractor chooses the cost method anyway, the new rules require that profit be deferred on these costs and recognized based on a different performance measure, such as ratably over the life of the contract. The new literature uses the example of an elevator contractor where the cost of the elevators comprises a significant portion of total contract cost. Furthermore, the equipment was purchased from a third-party and the contractor did not significantly participate in the design and production of the elevators. This example would seem to apply to other types of contracts. For instance, mechanical and HVAC contractors often times procure equipment from third-party suppliers and the cost of the equipment is significant to the total contract cost. Also, the new rules require that the cost of construction inefficiencies be separately recorded and charged to expense, rather than to be used in calculating percent complete. This includes wasted material, labor downtime, idle equipment and any other unforeseen cost not contemplated at contract inception. In this case, and in the elevator example, it would seem that job-cost systems would need to be modified to separately account for these costs. Another difference from current practice is accounting for pre-contract costs. Generally, if it is probable a
TO
CRAFTSMANSHIP
contract will be awarded, a contractor can defer pre-contract costs until the contract is awarded. New rules require that costs incurred before obtaining the contract be expensed. However, costs incurred had the contract not been obtained can be deferred and amortized over the
is a little ways out in 2018. However, private contractors can implement the new provisions to coincide with public company requirements in 2017. The reporting changes need to be applied retrospectively under one of two presentation choices.
“Industry-specific interpretation is warranted to assist contractors and their practitioners.... Otherwise there seems to be room for interpretation on whether performance obligations are distinct or not.”
1. To each reporting period presented, or
contract duration – mobilization costs, for example. Although these changes might seem subtle as they relate to the construction industry, the concepts of separate performance obligations, uninstalled materials, and costs for inefficiencies might prove significant to certain contractors. The good news is that the implementation date for privately held contractors
2. No change to prior periods with cumulative change applied to the year of implementation with certain required disclosures So if a private contractor chooses the first option with early adoption, the first year of change could be as early as 2016, which really is not that far out. I assume that industry-specific guidance will be provided prior to implementation, but in the meantime I would encourage you to seek advice from a certified construction CPA. P Aaron Cook is a senior manager in Meaden & Moore’s Construction Services Group and is a Certified Construction Industry Financial Professional (CCIFP). He can be reached at 216.928.5372 or acook@meadenmoore.com. For more info, visit www.meadenmoore.com.
Restoration Contractors American International Construction, Inc. is a company dedicated to the restoration and preservation of numerous types of buildings, including related services on new structures. Let our commitment to quality and client satisfaction work for you. UÊ >Õ }ÊEÊÃi> > ÌÃ UÊ/ÕV « Ì }
UÊ Õ ` }ÊV i> } UÊ >V>`iÊÀiÃÌ À>Ì
UÊ >à ÀÞÊEÊÃÌ iÊÀiÃÌ À>Ì UÊ-Ì ÀivÀ ÌÊÀi Û>Ì UÊ7>ÌiÀ«À v } UÊ ÃÌ À VÊ«ÀiÃiÀÛ>Ì
Michael Petrasek president
1073 WEST BAGLEY ROAD, BEREA, OHIO 44017 ph: 440.243.5535 f: 440.243.7745 www.aiconstruction.com
www.propertiesmag.com 63
Harpers Ferry, West Virginia (Rendering courtesy of Perspectus Architecture)
Harpers Ferry, West Virginia (Rendering courtesy of Perspectus Architecture)
RTA Little Italy/University Circle (Rendering courtesy of City Architecture)
MBE • General Contractor • Design/Builder • Construction Manager
8100 Grand Avenue • Cleveland, Ohio 44104 • 216.391.7700 • www.mctech360.com
Construction Trades COMMITTED
TO
CRAFTSMANSHIP
McTech Corp Continues Building ince 1997, McTech Corp has served federal, state, municipal, educational, industrial, commercial and health care clients in its three areas of expertise: construction management, design/ build and general contracting.
S
The Cleveland-based company (www. mctech360.com), with more than 40 employees, continues to grow, as these three new projects attest:
This SUNY Campus Center Expansion consists of three phases: east addition to campus center, to be completed by June 1, 2015; west addition, to be completed by September 2016; and renovation of the existing center, also to be completed by September 2016. The project also includes renovation of a central courtyard and fountains. The work is geared toward producing a LEED Silver facility. Coordination and planning is paramount on this project, according to Mark Perkins, McTech Corp president, as the renovation takes place – crews began working on May 27 – in a functioning campus setting, which has necessitated the construction of a temporary service road and rerouting of pedestrian traffic. Perkins credits McTech Corp’s performance in a comprehensive review process, where university officials interviewed architects and building owners, as a major factor in an Ohio company winning a job in Albany, New York.
Little Italy-University Circle Rapid Station (Cleveland) Another McTech Corp General Contractor project involves replacement of an obsolete RTA rapid station on Euclid Avenue and East 120th Street with a new station at Mayfield Road and East 119th Street, in the Little Italy neighborhood. Work is underway, with the goal of an April 2015 completion. That’s no easy task, as the project includes a 22-day shutdown where crews work 24/7 to remove existing track and install the shell for a lower rapid head-
Photo courtesy of Greater Cleveland RTA
University at Albany, SUNY Campus Center Expansion (Albany, NY)
DRIVING GROWTH In his remarks at the GCRTA Little Italy – University Circle Rapid Station, Vice President Joe Biden said, “We cannot fail to invest in infrastructure. If we invest – there’s faster growth; there’s better jobs.” McTech Corp President Mark Perkins agrees. McTech Corp serves as the general contractor on the project and has provided jobs to area Clevelanders.
house and upper berth. The project also entails moving an eastbound bridge nine feet to the east, raising another and removing a footbridge. Interestingly, this project was nearly a century in the making. Plans in the 1920s called for a station at this location, according to McTech Corp Senior Project Manager Anthony Ignazio, and a vault was constructed to house it. With the Great Depression, those plans were shelved. Today, the rapidtransit project is back on track and will include an ADA-compliant singleplatform headhouse and entrance plaza; heavy-duty elevator and stairway from street level to the platform and waiting areas; and new concrete sidewalks, landscaping and lighting as well as bridge-abutment repairs.
of this project. As General Contractor working closely with the Army Corps of Engineers and overseeing more than 60 subcontractors, McTech Corp is adding four new 250-room dormitories and one conference center to the 224-acre campus. The addition of living space is key to this project, as the 12,000-plus customs border control officers being trained there each year no longer must reside and travel from off-campus. Work began this past April with completion expected early in 2016, according to McTech Corp Superintendent Bob Waldhauser. The dormitories are slated for LEED certification, with the conference center aiming for LEED Gold. This project is the last of a five-phase building plan at the center.
U.S. Customs and Border Protection Advanced Training Center (Harpers Ferry, WV)
The diversity of work described above indicates the company’s range of capabilities and expertise, as Perkins explains. “Our current projects,” he says, “speak to the depth, sophistication and diversification of services that McTech Corp can provide.” P
The CBP Phase-II project is very complex and exciting for McTech Corp, since the company completed Phase-I
An expanded portfolio
www.propertiesmag.com 65
Photos courtesy of PSI
APP IN ACTION “PSI introduced its new smart phone application [left] to us in spring of 2014 on the Flats East Bank Phase II project [right],” says Panzica Construction Executive Vice President Mark Panzica. “We appreciated the reduced reporting time on our project.”
Trading Up with Technology Construction testing/inspection services get smarter, faster in the virtual world By Wess Mekhael & Don Obermeier PSI
hen was the last time that you heard a project manager on a high profile project say “just get me the information whenever you can?” For that matter, how many projects are not high profile and not constructed at a fast pace?
W
It is commonplace for tablet computers and smart phones to be used by construction project managers on most high profile projects. In a day and age where smart technology is showing up on more and more construction sites, it is a natural progression for testing and inspection firms to develop smarter and faster capabilities for providing testing reports and information.
Technological advances in the lab Most consulting engineering firms have evolved in the computer age and it is the standard of care for testing labs to utilize a Laboratory Information Management System (LIMS) to provide reporting of laboratory results. These systems help to manage laboratory resources (personnel, security, tester competencies, equipment, calibrations, etc.) and the 66
flow of samples in the laboratory. LIMs Systems are typically set up to calculate test results and produce the laboratory’s final test reports. One of the benefits of a LIMS program is the reduced chance of user error with calculations and data management. For example, in the past, the laboratory technician would break a concrete cylinder in the lab and write down the test results on a form. This would then be transcribed into a lab report at a desktop workstation. More recent technology allows concrete compression machines to be directly connected to a computer. At PSI, for instance, when concrete cylinders are scheduled to be broken, the cylinder number is entered into the system and the compression results are electronically transmitted from the concrete compression machine directly into the lab report. This set-up removes two opportunities for error and speeds
up the process from breaking the cylinder to delivery of the final results.
Technological advances in the field Construction management firms have benefited from the technological advances that consulting engineering firms have made with laboratory services. Therefore, as smart technology is becoming more commonplace in the field for construction management firms, they started making inquiries to testing and inspection firms about how construction material testing information could be reported faster. PSI welcomed the challenge of developing a smart technology application to meet the demands of the technologically savvy construction managers. In 2012, PSI developed and ran a pilot study with PSI-QESTField, which is a web-based real time data entry system for construction testing services. PSI3URSHUWLHV | July 2014
Serving Northeast Ohio For Over 60 Years! Residential Ŷ Commercial Ŷ Industrial Ŷ Institutional
Commercial Interiors Since 1978
Tri-C Emerging Technology & Energy Center (Cleveland)
Expert Brick Matching and Complete Inventory of Brick, Block, Masonry, Cast & Natural Stone, Plaster Products & Tools
Metal Studs | Drywall Acoustic Ceilings | Carpentry 9005 Woodland Ave., Cleveland, OH 44104 216.791.9800 Ŷ www.bruderinc.com
26100 Broadway Ave., Oakwood Village 440-232-2626 | www.centurycontractors.net
0HVVLQD )ORRU &RYHULQJ //&
Commercial, Institutional & Industrial Floor Covering Provider & Installer Specializing in the healthcare marketplace with the highest quality & best service since 1989. We provide 24/7 service, installation and flooring maintenance. Call us today to take advantage of our trained in-house staff and extensive library of product information. Complete line of flooring including: Carpeting • Resilient Flooring, Vinyl & Ceramic Tile • Athletic Floors
Call today for a FREE estimate! 4300 Brookpark Rd., Cleveland, OH 44134 • 216-595-0100 • Toll Free 888-271-8200 68
3URSHUWLHV | July 2014
Construction Trades COMMITTED
QESTField replaces the paper forms that our technicians typically use to record data in the field with smartphone technology. The smartphone technology allows for photographic documentation to be incorporated directly into the reports. The program also allows for GPS locating of sample points in the field. The program includes a Controlled Vocabulary List (CVL) embedded in the system, which assists the field personnel to accurately select and avoid the misinterpretation of test locations during manual data entry in a “non-web” based older system. Additional benefits of the new technology include: laboratory results (proctors, asphalt lab densities, etc.) being available to the technician in “real-time”; test results being automatically calculated as data is entered; field data being available in “real-time” to engineers in the office; improved quality of recorded data by guiding data entry; elimination of transcription errors; and a reduction in the number of administrative hours on projects. A system like this offers improved data quality, reduced administrative time, the ability for 24-hour report turnaround, and greatly increases the speed of providing information to the Construction Managers and other end users while reducing the amount of paper being used.
pleted electronically with “real- time” decisions made in the field. With the fast paced technological advances in our industry it is natural that smart technology makes it into the hands of your construction testers and inspectors. For PSI, this has revolutionized how we manage construction testing and inspection information and has resulted in significant time-savings
TO
CRAFTSMANSHIP
on projects and reduced project costs by cutting down on project delays and reducing administrative time. P Founded in 1881, PSI is an engineering, consulting and testing firm with 85 offices nationwide. Wess Mekhael, PE (wessam.mekhael@psiusa.com) is PSI’s Cleveland office Construction Services Manager and Don Obermeier, LEED AP (don.obermeier@psiusa.com) is PSI’s Northeast Ohio Business Development Manager.
Technological advances in the Cloud Another advancement in smart technology is hosting of project information, lab reports and documentation in the virtual world. With the fast pace of projects and the size of documents, it is natural for our industry to use virtual resources to share information. PSI uses Construction Hive which is a Web-based system that allows for electronic delivery of reports and opportunities for clients to have their project information securely hosted on PSI’s website. PSI’s PSIQEST system is comprised of three “advanced” systems working together (PSI-QESTLab, PSI-QESTField, and Construction Hive). The three systems allow PSI’s construction testing and inspection services to be comwww.propertiesmag.com 69
The Leader in Loading Dock Safety Systems Since 1957
TRUSTED • EXPERIENCED IN QUALITY & EQUIPMENT • RELIABLE • HIGHEST SERVICE LEVEL Timbers-Kovar Company is a recognized leader in the sale & service of high quality loading dock & industrial door safety products. With our own fully equipped, factory-trained service department, we have the capability to service & install all manufacturers of loading dock equipment & will contract Planned Maintenance ntenance Programs annually annually.
Inddustrial Doors Ergonomic Lifts Modular Offices Big Industrial Fans Loading Dock Seals Rolling Steel Doors
7653 St. Clair Ave., Mentor, OH 44060 800-222-DOCK K • 440-951-1210 • www.timberskovar.com
Overhead Doors Truck Restraints
*/ % 6 453: -& "%& 3 */ )*() 26"- * 5 : %0 $ , %0 0 3 4 & 37 * $ & ."* /5 & /" / $ &
Opening New Doors
COMMERCIAL / INDUSTRIAL / INSTITUTIONAL ONE-SOURCE FOR:
4"*/5 $-"*3 "7&/6& " .&/503 0)*0
www.commercialdockanddoor.com 70
Ì &/ /53" "/$& %003 34 Ì 3& &70-7 -7&34 Ì *$6 %0 0034 Ì 4. .0,& & 3"5&% %0 0034 Ì "% %" %0034
440.951.4541 3URSHUWLHV | July 2014
Construction Trades COMMITTED
TO
CRAFTSMANSHIP
Open to Options Five things to consider when selecting dock doors for your facility By Lou Kren
ith anything, a little attention upfront can save a lot of headaches down the road. This holds true when considering doors for your facilities, according to Ray Strumbly, vice president of sales and marketing for Commercial Dock & Door (www.commercialdockanddoor.com) and Timbers-Kovar (www.timberskovar.com) in Mentor.
W
Here are five things to consider when selected the right dock door for your facility’s needs.
It’s easy for people to say, “We just need a sectional door or a rolling steel door.” But they may not be evaluating how they will use the door. How many cycles per day will that door require? What’s going through it? People? Forklifts? Too often, the wrong door is specified. Eliminate that problem by involving an expert in the design/specification process. Consider the cost of buying a door, having it damaged due to misapplication, then having to replace it.
2. Choose the right door for the application. So many types of dock doors are available these days: traditional sectional doors, rolling steel doors, high-speed fabric doors, even impactable doors – you can hit them and knock them out, and just pop them back in and they are operational once again. Determining the function of the door and what or who will be using it is critical to proper door selection.
3. Mind environmental issues. Dock doors can provide energy savings by minimizing the loss or intake of hot and cold air. For example, high-speed doors are used for high-traffic-volume applications. Temperature-sensitive facilities such as cold-storage warehouses often use these types of doors.
4. The right manufacturers and installers make a difference. With so many types of doors and brands, a good distributor can provide
Photo courtesy of Timbers Kovar
1. Most dock doors are misapplied.
SMART SELECTION Many types of dock doors are available these days: traditional sectional doors, high-speed fabric doors, even impactable doors – you can hit them and knock them out, and just pop them back in and they are operational once again. Determining the function of the door and what or who will be using it is critical to proper door selection.
expertise on quality, performance, application, safety issues, value and price. But as much as the dealer, consider the installer. Just buying a good door from a dealer is not enough. Does the dealer contract out to installers? That happens a lot, and it could be a problem. Look for dealers that also install. They will know their products best, and how to install them quickly and correctly.
5. What happens after the sale? Who will support the product after the sale is over? Just as any of us do when we make a major purchase at home, determine what happens if repairs are needed or if there is a warranty option. Look for a dealer that also supports the doors after the sale.
About Commercial Dock & Door In business since 1957, Commercial Dock & Door focuses on industrial, commercial and institutional customers. It supplies a variety of doors, from standard sectional doors to rolling steel, impactable and fire-rated doors, as well as Rytec highspeed doors and Horton automatic doors.
In fact, Strumbly sees increased interest in automatic doors, especially for use in medical environments, such as hospital intensive care units. The company also carries the leading brands of dock equipment as well as truck restraints for loading-dock safety. Besides that, Commercial Dock & Door provides other industrial equipment, from mezzanine structures to modular inplant offices and industrial high-volume, low-speed (HVLS) fans. Timbers-Kovar carries industrial doors along with a full complement of aftermarket parts for all manufacturers of loading-dock equipment. Both companies employ experienced, factory-trained technicians and salespeople, and install and service what they sell. In addition, both companies work upfront with specifiers and architects, assisting them in the correct selection of doors and dock equipment and parts, and also conduct presentations to educate building owners, managers and designers. Engagement continues with contractors as jobs get underway, according to Strumbly. P www.propertiesmag.com 71
Product Profile: Krystol Internal Membrane By David W. Price Price Builders & Developers, Inc., LLC
rice Builders & Developers Inc., LLC, an exclusive distributor of Kryton’s line of concrete waterproofing products, uses a unique and proprietary blend of Krystol chemicals. Krystol is based on principles that are very similar to what occurs during the processes of hydration and hardening of concrete. When cement particles are mixed with water, a chemical reaction occurs where the calcium silicates in cement combine with water to form new compounds. The new compounds are calcium silicate hydrate (CSH) and calcium hydroxide.
The CSH forms as an amorphous microcrystalline structure, extending outward from the individual cement particles and eventually filling the space between them. The CSH crystal formation is the mechanism by which the concrete stiffens and gains strength. It is most dramatic in the first hours after the concrete is placed, but actually continues for weeks, months and even years into the life of the concrete. The reason that hydration can continue, seemingly indefinitely, is because only a portion of the cement has reacted during the initial hydration and hardening of the concrete. A significant portion of each cement particle remains un-reacted long after the concrete has reached its design strength. It is the unreacted particles that allow the Krystol chemicals to perform their function. Krystol acts as a catalyst to a larger reaction within the concrete mass. Krystol forms hydration crystals that form into a crystalline structure of long hexagonal prisms that extend through and fill the capillary voids and microcracks of the concrete. The crystals themselves are not made up solely of the Krystol material, but grow from the partially reacted cement particles. This is why the Krystol crystals can travel many inches through the concrete. Krystol treatments that have been applied to one side of a concrete wall have been observed to cause crystal growth to occur on the other side of several inches of “solid” concrete. The Krystol chemical is never used up during the crystallization process. As a catalyst, only a very small amount of Krystol is 72
Photo courtesy of Price Builders & Developers, Inc., LLC
P
BUILT TO LAST Kryton’s Krystol Internal Membrane (KIM) waterproofing products are designed to reduce longterm maintenance and repair costs of concrete structures.
required to grow a very large quantity of crystals. Within the tight confines of the concrete, crystals can easily grow to fill and block the microscopic capillary pores and micro-cracks without using more than a small fraction of the available Krystol chemical. The remaining chemical lies dormant within the concrete waiting for a crack to develop that will provide the necessary space and water source to allow the crystallization process to continue. When added or applied to concrete, crystalline chemicals create a reaction that causes long, narrow crystals to form, filling the pores, capillaries and hairline cracks of the concrete mass. As long as moisture remains present, crystals continue to grow throughout the concrete, reaching lengths of many inches over time. Once the concrete has cured, the crystalline chemicals sit dormant until another dose of water (such as through a
new crack) causes the chemical reaction to begin again. The ability to reactivate in the presence of water gives crystalline-treated concrete the ability to “self-seal”. When cracks form due to curing shrinkage, settling, seismic activity, etc., water entering through them causes new crystals to form and grow, blocking and filling the cracks. Its ability to self-seal cracks is one of crystalline technology’s most unique and useful features, and can help to dramatically reduce the longterm maintenance and repair costs of a concrete structure. P David W. Price is president and CEO of Price Builders & Developers Inc., LLC, a three dimensional business including a construction division, a supply division, and a consulting division. Price Builders & Developers Inc. is an environmentally friendly, green registered company based in Cleveland, Ohio. For more information, call 216-475-8112. 3URSHUWLHV | July 2014
\ 174 75 61/ 4%*+6'%674#. '6#. 2'%+#.+565[
1746#& 0%T *VTTLYJPHS 0UK\Z[YPHS 0UZ[P[\[PVUHS 9L[HPS :WLJPHSPaPUN PU LUNPULLYPUN MHIYPJH[PVU PUZ[HSSH[PVU VM! TL[HS YVVMPUN YVSSLK VU ZP[L MSHZOPUN [YPT J\Z[VT MHZJPHZ MYPLaL IVHYKZ LH]LZ JVWWLY Z[HPUSLZZ Z[LLS Z`Z[LTZ JVTWVZP[L TL[HS ^HSS Z`Z[LTZ J\Z[VT N\[[LYZ KV^UZWV\[Z JVTTLYJPHS N\[[LYZ YVSSLK VU ZP[L
GGNTFKHTGENN T T 1: LFKX #067#X HHFII 999T%1746#&+0%T%1/
:+26( 5(387$7,21 ,6 21 7+( /,1( :+(1 7+( :$7(53522),1* )$,/6"
21/< .5<721 3527(&76 &21&5(7( $1' <285 ,19(670(17 3(50$1(17/< 'LVWULEXWHG LQ 2KLR E\ 3ULFH %XLOGHUV DQG 'HYHORSHUV GDYLGSULFH#SULFHFRUSJURXS FRP
ZZZ NU\WRQ FRP www.propertiesmag.com 73
CONSTRUCTION PROGRESS REPORT Updated info on important projects in the region
Project Report #: 01284 MARINER’S WATCH APARTMENTS LOCATION: 3107 Detroit Ave. Cleveland, OH (Cuyahoga County) PROJECT TYPE: Renovation CATEGORY: Residential CONTRACTING METHOD: Bids by Invitation Only PROJECT STATUS: Work nearing completion - grand opening scheduled for October 2014. EST. VALUE: Over $6,000,000 OWNER: Ohio City Development Partners Brian Kotch info@marinerswatchapts.com Phone: (216) 346-3371 ARCHITECT: Dimit Architects Scott Dimit 14414 Detroit Ave., Ste. 306 Lakewood, OH 44107 Phone: (216) 221-9021 CONSTRUCTION MANAGER: Vintage Development Jim Donelan 38025 2nd St., Suite 102 Willoughby, OH 44094 Description: Over 1 acre, 1 bldg, 4 stories. The complex will feature several vehicle charging stations - VRF heating and cooling system top floor will be devoted to a fitness center - 33 one-bedroom and 29 two-bedroom
74
apartments - 64 indoor parking spaces majority of units will feature lake views.
multiple green open spaces - fountains - bike lanes and numerous public areas.
Project Report #: 01295 PUBLIC SQUARE RENOVATIONS LOCATION: Public Square Cleveland, OH (Cuyahoga County) PROJECT TYPE: Renovation/Addition CATEGORY: Commercial CONTRACTING METHOD: Competitive Bids PROJECT STATUS: Construction documents 50% complete - architect to select construction manager in early third quarter - project scheduled for completion early second quarter 2016. EST. VALUE: $30,000,000 OWNER: City of Cleveland c/o Land Studios Ann Zoller 1939 W. 25th St., Ste. 200 Cleveland, OH 44113 Phone: (216) 621-5413 ARCHITECT: James Corner Field Operations Veronica Rivera 475 10th Ave. New York, NY 10018 Phone: (212) 433-1450 X 235 DESCRIPTION: Plans call for closing Ontario St. narrowing Superior Ave. - incorporating
Project Report #: 01294 KENT STATE UNIVERSITY COLLEGE OF ARCHITECTURE AND ENVIRONMENTAL DESIGN LOCATION: Along the Esplanade between S. Lincoln & Haymaker Kent State University, Kent, OH (Portage County) PROJECT TYPE: New CONSTRUCTION CATEGORY: Institutional CONTRACTING METHOD: Competitive Bids PROJECT STATUS: Design development in progress - tentative release for bids on site work third quarter - project will be bid in various phases over several months EST. VALUE: Over $10,000,000 OWNER: Kent State University 615 Loop Rd. Kent, OH 44242 Phone: (330) 672-9627 ARCHITECT: Richard L. Bowen + Associates Inc. Alan Krupman 13000 Shaker Blvd. Cleveland, OH 44120 CONSTRUCTION MANAGER: Gilbane Building Company
3URSHUWLHV | July 2014
Jeff Hutchison 950 Main Ave., Ste. 1410 Cleveland, OH 44113 Phone: (216) 491-9300 DESCRIPTION: 1 bldg, 4 stories, 120,000 sf project to include studios, classrooms, administrative, and shop and research spaces - new sidewalks, parking and landscaping. Project Report #: 01286 CHESAPEAKE ENERGY UTICA SHALE HEADQUARTERS 2123 Energy Dr. Lewisville, OH (Stark County) PROJECT TYPE: New Construction CATEGORY: Industrial CONTRACTING METHOD: Bids by Invitation Only PROJECT STATUS: Work completed on headquarters - future plans may include a new receiving and maintenance/repair shop and railway access EST. VALUE: $11,000,000 OWNER: Chesapeake Energy Utica Shale HQ Gordon Pennoyer P.O. Box 18496 Oklahoma City, OK Phone: (405) 848-8000 ARCHITECT: Shilling Architects 405 Capital St. Charleston, WV 25301 Phone: (304) 346-0565 CONSTRUCTIONMANAGER:Hammond Construction 1278 Park Ave SW Canton, OH 44706 Phone: (330) 455-7039 DESCRIPTION: 1 bldg, 5 stories, 85,000 sf. Project Report #: 01287 RICHARD E. JACOBS INPATIENT HOSPITAL PATIENT ROOMS LOCATION: Located off Nagel Rd. at I 90 Avon, OH (Lorain County) PROJECT TYPE: New Construction CATEGORY: Institutional CONTRACTING METHOD: Bids by Invitation Only PROJECT STATUS: Schematics in progress - construction documents to begin in fourth quarter - construction tentatively scheduled to begin late fourth quarter 2014 EST. VALUE: $85,000,000 OWNER: Cleveland Clinic Foundation 9500 Euclid Ave., Ste. 300 Cleveland, OH 44195 Phone: (216) 444-2460 ARCHITECT: Westlake Reed Leskosky Ltd Paul Siemborski 1422 Euclid Ave. Cleveland, OH 44195 Phone: (216) 522-1350 CONSTRUCTION MANAGER: The Ruhlin Company/ Shook Construction The Ruhlin Company 6931 Ridge Rd. Sharon Center, OH 44274 (330) 239-2800
([SHULHQFHG 'HSHQGDEOH
6WUXFWXUDO 6WHHO )DEULFDWRUV DQG (UHFWRUV VLQFH &RQWDFW 0LNH 6PLWK IRU D SURSRVDO ZZZ PDVRQVWHHO FRP 1RUWKILHOG 5RDG :DOWRQ +LOOV 2KLR 2WKHU )LQH 3URGXFWV $YDLODEOH 6WRQH 3DYHUV )LUHSODFHV :LQGRZV 'RRUV
An EMCOR Company A
Mechanical
Fire Protection
Plumbing
Sprinklers Heating Extinguishers Air Conditioning Kitchen Suppression Process Piping Special Hazards Alarm & Detection Offices In: Ohio - Akron, Cincinnati, Cleveland, Columbus, Fremont, Marion, Youngstown Pennsylvania - Philadelphia, Pittsburgh, Reading New Jersey - Atlantic City, Phillipsburg Michigan - Detroit • Washington DC
www.sacomunale.com
Large Enough To Meet Your Needs, Small Enough To Care
www.propertiesmag.com 75
7KH 1XPEHUV 'RQ·W /LH *LDPEURQH &RQVWUXFWLRQ )XOO 6HUYLFH :%( )%( *HQHUDO &RQWUDFWRU
<RXU $YHUDJH +HDWLQJ &RROLQJ 6DYLQJV ZLWK 6SUD\ 3RO\XUHWKDQH )RDP 63) ,QVXODWLRQ 6RXUFH 6SUD\ 3RO\XUHWKDQH )RDP $OOLDQFH 5HVXOWV PD\ YDU\ EDVHG RQ LQGLYLGXDO +9$& XVDJH
*LDPEURQH 0DVRQU\
5
8QLYHUVDO 6FDIIROGLQJ
3HU ,QFK
63) KDV 1HDUO\ 7ZLFH WKH ,QVXODWLQJ 9DOXH RI 7UDGLWLRQDO )LEHUJODVV· 5 SHU LQFK
5HQWDO /HDVH 6DOH RI 4XDOLW\ 6FDIIROGLQJ
$XURUD +XGVRQ 5G +XGVRQ 2+
OF
OHIO
0DVRQ 6WRQH ,QVWDOODWLRQ 5HSDLU
ZZZ *LDPEURQH FRP $NURQ &OHYHODQG
SPRAY FOAM TECHNOLOGIES
&DOO &OLFN WR XWLOL]H 63) ,QVXODWLRQ RQ \RXU QH[W SURMHFW
6SUD\)RDP7HFK2KLR FRP $%$$ 1&), 26+$ &(57,),(' $XURUD +XGVRQ 5G +XGVRQ 2+
Space Comfort co. )$0,/< 2:1(' 23(5$7(' :,7+ +$1'6 21 (;3(5,(1&( ,1 0(&+$1,&$/ &2175$&7,1* 6$/(6 6(59,&( 6,1&( ([SHUWV LQ Q 7XUQNH\ VROXWLRQV GHVLJQ EXLOG YDOXH HQJLQHHULQJ Q 6HUYLFH LQVWDOODWLRQ PDLQWHQDQFH RI DOO PDNHV PRGHOV RI +9$& HTXLSPHQW ERLOHUV Q 1HZ UHQRYDWLRQ UHPRGHOLQJ UHVWRUDWLRQ Q 3XEOLF SULYDWH 3URYLGLQJ UHOLDEOH SHUVRQDO VHUYLFH WR RZQHUV RI UHWDLO FHQWHUV PDOOV DSDUWPHQW FRPSOH[HV UHWLUHPHQW KRXVLQJ LQ 2KLR QHLJKERULQJ VWDWHV
5201 CLARK AVENUE, CLEVELAND OHIO 44102 Q PH. 216-281-2000 Q FAX. 216-281-8420 Q 800-203-9645 76
3URSHUWLHV | July 2014
Shook Construction 10245 Brecksville Rd. Brecksville, OH 44141 DESCRIPTION: 6 stories, 180,000 sf. Project Report #: 01273 EAST 6TH ST. APARTMENTS RENOVATION OF THE GARFIELD BLDG LOCATION: Corner of Euclid and E. 6th St. Cleveland, OH (Cuyahoga County) PROJECT TYPE: New Construction CATEGORY: Residential CONTRACTING METHOD: Bids by Invitation Only PROJECT STATUS: Project proposed - further progress pending owner’s decision to proceed EST. VALUE: Over $1,000,000 OWNER: The Millennia Company Allan Pintner 8111 Rockside Rd. Independence, OH 44125 Phone: (216) 520-1250 ARCHITECT: Not selected DESCRIPTION: Renovation of the Garfield Building which was constructed in 1800 by two of President Garfield’s sons - 172 Apartments above ground floor - restaurants or stores to occupy first floor - 150 one-bedroom and 22 two-bedroom apartments - penthouses - this is a historic tax credit project. Project Report #: 01272 CONVENTION CENTER HOTEL - HILTON WORLDWIDE LOCATION: Corner of Lakeside and Ontario site of fomer Administration Cleveland, OH (Cuyahoga County) PROJECT TYPE: New Construction CATEGORY: Commercial CONTRACTING METHOD: Bids by Invitation Only PROJECT STATUS: On excavation - caisson work to begin soon - completion possible 2015 EST. VALUE: $272,000,000 OWNER: Hilton World Wide/Cuyahoga County Department Ginger Cox 2100 Superior Viaduct Rd. Cleveland State, OH 44113 Phone: (216) 443-7669 ARCHITECT: Cooper Carry Architects and Planners 191 Peachstreet NE, Ste. 2400 Atlanta, GA 30303 Phone: (404) 237-2000 CONSTRUCTION MANAGER: Turner Construction Marty Burgwinkle 1422 Euclid Ave. Cleveland, OH 44115 Phone: (216) 522-0540 DESCRIPTION: 1.93 acres, 1 bldg, 32 stories, 632,520 sf. 600-room hotel.
CONTRACTING METHOD: Bids by Invitation Only PROJECT STATUS: Work underway and tentatively scheduled for completion fourth quarter EST. VALUE: $500,000 OWNER: University of Mt. Union 1972 Clark St. Alliance, OH 44601 Phone: (800) 992-6682 ARCHITECT: Harris Day 6677 Frank Ave. NW North Canton, OH 44720 Phone: (330) 493-3722 GENERAL CONTRACTOR: Hammond Construction Steve McDonald 1278 Park Ave. SW Canton, OH 44706 Phone: (330) 455-7039 DESCRIPTION: 1 bldg, 1 story, 4,000 sf. Work includes updating the library complex. Project Report #: 01285 SOUTHWORTH BUILDING RENOVATION INTO APARTMENTS LOCATION: Near Cleveland’s Public Square Across from the Horeshoe Casino Cleveland, OH (Cuyahoga County) PROJECT TYPE: Renovation CATEGORY: Residential CONTRACTING METHOD: Bids by Invitation Only PROJECT STATUS: Construction documents complete and have been submitted for city approval - GC is negotiating sub trades - construction scheduled to begin
December 15 and work is scheduled to be completed within one year EST. VALUE: $4,000,000 OWNER: The Cicerchi Development Company LLC Rich Cicerchi 9900 Lorain Ave. Cleveland, OH 44102 Phone: (216) 281-1500 ARCHITECT: Sandvick Architects 1265 West 6th St. Cleveland, OH 44113 Phone: (216) 621-8055 CONSTRUCTION MANAGER: Pat Cicerchi Development Pat Cicerchi 9900 Lorain Rd. Cleveland, OH 44113 Phone: (216) 281-1500 DESCRIPTION: 1.5 acres, 1 bldg, 4 stories, 28,000 sf. Renovation of a building originally constructed in 1850s - work will include cutting an atrium inside the four-story building. Information included in Construction Progress Report has been produced, processed and/or verified through sources believed to be reliable. Properties Magazine makes no warranty of any kind for this information, express or implied, and is not responsible for any omissions or inaccuracies. To contribute project data or to notify Properties of any reporting errors, we encourage you to email cpr@propertiesmag.com.
Project Report #: 01290 IT CAFÉ AND LEARNING CENTER Library building on campus Alliance, OH (Stark County) PROJECT TYPE: Renovation CATEGORY: Institutional www.propertiesmag.com 77
&RPLQJ LQ $XJXVW &X\DKRJD &RXQW\ +HDGTXDUWHUV -RKQ &DUUROO 8QLYHUVLW\ 0XUSK\ +DOO 5HQRYDWLRQ 7KH 5HVLGHQFHV DW 6HFXULW\ )LUH 3UHYHQWLRQ ,VVXH DQG PRUH ,QWHUHVWHG LQ DGYHUWLVLQJ" &DOO 3URSHUWLHV WRGD\ DQG DQ DFFRXQW UHSUHVHQWDWLYH FDQ KHOS \RX DGGUHVV \RXU DGYHUWLVLQJ QHHGV ZZZ SURSHUWLHVPDJ FRP
9LVLW XV RQOLQH IRU DUFKLYHG IHD
WXUH DUWLFOHV DGYHUWLVLQJ UDWHV VSHFV DQG VXEVFULSWLRQ LQIRUPD WLRQ WWLL R RQ Q
ADVERTISER INDEX 21st Century Concrete Construction, Inc. ...........................22 AAdvanced Building Products, LLC ....................................... 59 Absolute Roofing Inc..................................................................... 79 AC Electric & General Contracting, LTD ............................... 62 AIA ........................................................................................................... 21 American International Construction...................................63 Asphalt Maintenance Applications........................................ 78 Bochert Brothers Painting ..........................................................48 Bradley Stone Industries, Ltd..................................................... 21 Brennan & Associates ....................................................................69 Bruder Building Materials, Inc...................................................68 Buckeye Sweeping, Inc................................................................. 43 Buckingham Doolittle & Burroughs ......................................38 Carey Roofing.................................................................................... 35 Caruso Architecture, Inc. ............................................................. 31 Century Contractors, Inc..............................................................68 Chagrin Valley Steel Erectors..................................................... 32 Charles Schulz Building Company.......................................... 62 Charles Svec Inc................................................................................56 Cleveland Engineering Society ................................................ 13 Cleveland Public Power................................................................ 43 Columbia Building Products ..................................................... 45 Commercial Dock & Door ........................................................... 70 County Fire Protection Inc...........................................................12 Courtad Inc. .......................................................................................73 Cunningham Paving Inc. ............................................................. 37 Delta Industrial Services, Inc...................................................... 45 Duffy & Duffy Cost Segregation Services ..............................7 EA Group.................................................................................................3 Ebersole Structural Engineers Ltd. .........................................34 Eco Commissions............................................................................. 49 Ehle Morrison Group, LTD ........................................................... 39 EM Construction Co./Beacon Marshall Companies .................................................................56 Euclid Glass & Door Inc. ................................................................ 62 First Federal Of Lakewood.............................................................7 Forest City Erectors .................................................................18, 50 Gateway Electric, Inc......................................................................22 Giambrone Masonry, Inc. ............................................................ 76 Global Real Estate Advisors, Inc. ..............................................30 Grout Systems, Inc. .........................................................................54 HMH Restoration Ltd. .....................................................................17 IMAGINiT Technologies................................................................ 27 Infinity Construction...................................................................... 39 International Masonry Institute ...............................................56 J.V. Janitorial Services, Inc. ..........................................................22 Jamieson Ricca Co........................................................................... 61 Joe Dickey Electric, Inc.................................................................. 51 Kurtz Bros. ........................................................................................... 37 KW Commercial Osborne Group..............................................11 Lake County Title..............................................................................12 Lauren Herzak-Bauman Studio ................................................20
Leff Electric .........................................................................................77 Lisco Heating & Cooling, Inc. .....................................................58 Maguire Photographics ...............................................................28 Marous Brothers Construction ................................................. 15 Mason Structural Steel, Inc......................................................... 75 McTech Corp. .....................................................................................64 Meaden & Moore, Ltd....................................................................60 Messina Floor Covering, Inc. ......................................................68 Moody Nolan Inc. ............................................................................50 National Construction Rentals.................................................. 42 Nelson Contracting ........................................................................ 52 North Coast Paving ...........................................................................2 OCP Contractors .............................................................................. 49 Ohio Desk/Integrated Interiors Group.................................50 Osborne Real Estate Services, LLC.......................................... 37 Owens Flooring Company.......................................................... 27 Pease Photography ........................................................................ 18 Perfect Power Wash ..........................................................................4 Performance Painting ................................................................... 19 Pete & Pete Container Service ..................................................23 Precision Environmental Co........................................................17 Price Builders & Developers Inc., LLC. ...................................73 PSI Inc. Professional Service Industries ................................ 67 RB Stout, Inc. ...................................................................................... 41 Ronyak Paving...................................................................................80 Ryan Carpet Sales & Service, Inc.............................................. 52 S.A. Comunale Company ............................................................ 75 Sandglo Glass & Mirror Co. .........................................................58 Schill Grounds Management..................................................... 43 Shook Construction .......................................................................46 Shooting Star Photography ....................................................... 74 Siegel Jennings ................................................................................ 79 Signature Sign Company............................................................. 24 SilverTec Flooring Solutions, LLC............................................. 27 Sleggs Danzinger & Gill ................................................................44 Solar Innovations, Inc. ...................................................................30 Space Comfort Co. .......................................................................... 76 Spray Foam Technologies........................................................... 76 Star Design-Build Contractors ..................................................40 Stark Group, The .............................................................................. 10 Strollo Architects ............................................................................. 49 Suncrest Gardens .............................................................................12 Suntrol Co...............................................................................................6 Thyssen Krupp Elevators ............................................................. 16 Timbers-Kovar................................................................................... 70 Tober Building, Co...........................................................................28 Tri-State Elevators, Inc. ..................................................................28 W. S. Tyler Architectural Group................................................. 21 Warren Roofing & Insulating Co. ................................................9 Westview Concrete Corp.............................................................58 workshop arch+design, llc, the................................................ 52 Zollinger Buric, Inc. ..........................................................................17
3URIHVVLRQDO 0DLQWHQDQFH E\ $VSKDOW (QJLQHHUV
ZZZ SURSHUWLHVPDJ FRP
9LVLW XV RQOLQH WRGD\ WR GRZQORDG DUFKLYHG LVVXHV IHDWXULQJ OLYH K\SHUWH[W OLQNV WR DGYHUWLVHUV· ZHEVLWHV 7KH 0HGLD 3ODQQHU LV QRZ DYDLODEOH DV D 3') GRZQORDG 78
Asphalt h l M Maintenance i A Applications li li i Asphalt Repair & Preventative Maintenance Seal Coating Ì Line Striping Ì Crack Filling Ì Patchwork
CALL 216-408-6566 216 408 6566 FOR FREE F ESTIMATES THROUGHOUT N E NE E OHIO O 20814 Aurora Road, Cleveland, Ohio 44146 Ì Fax 216-581-8683 3URSHUWLHV | July 2014
New w Roofs Ì TearT Offs Ì Repairs Ì Flat Roofs Ì Coatings Flashings Ì Custom Copper Work Ì Factories Ì Warehouses Churches/Steeples Ì Additions Ì Apartments Ì Condos
FAMILY OWNED & OPERATED
APPROVED APPLICATORS A FOR RPI, FIRESTONE, POLYGLASS, CTD & GAF
Ph 216.898.1563 Ì Fax 216.898.1853 Ì www.absoluteroofing.com 2013 NARI Contractor of the Year Award Winner – Commercial Specialty
When your fair share of taxes is neither fair... nor your share Billions in assessment reductions The attorneys at Siegel Jennings bring experience as accountants, appraisers and real estate developers to the practice of law. Our property tax services include: Ŷ Representation at the administrative level through the State Supreme Court Ŷ Local expertise in every state through the American Property Tax Counsel Ŷ Tax management – acquisition/disposition strategies Ŷ Cutting edge approaches to property tax reductions
Siegel Jennings Call J. Kieran Jennings, Esq at 216.763.1004
Cleveland Ŷ Pittsburgh Ŷ Columbus
23425 Commerce Park Drive, Suite 103, Beachwood OH 44122 www.siegeltax.com
Founding member, American Property Tax Counsel (APTC) • www.aptc.com
After 75 years, we’ve got the experience needed for your next paving project. Since the early days of ashpalt paving back in the 1930’s, Ronyak Paving has been a leader in the industry for advancements in machinery, materials and worker safety. Now, after 75 years of paving all sorts of surfaces from streets to highways to parking lots large and small, Ronyak Paving is the obvious choice for your next commercial, industrial or Ronyak Paving owns and operates our own asphalt plant to ensure quality and maintain project schedule.
municipal paving project. Put the experience of 75 years in the industry to work for you. We know how to get it done.
Quality and Excellence in Asphalt Paving Since 1939
800.PAVE.NOW www.RonyakPaving.com