Skip to main content

Construction Document Set - Musical Studies Centre / ENSAMBLE STUDIO - Spain

Page 1

SHT. TITLE (ORDER FOLLOWS U.S. NATL. CAD STD.)

G001

CS2/ LIST OF SHEETS/ REQUIRED

A001

3D OVERLAY [SW]/ ENCLOSURE SYSTEMS*

A002

3D OVERLAY [NE]/ ENCLOSURE SYSTEMS*

A003

3D UNDERLAY [NE]/ MECH. & VERT. SYSTEMS*

A004

3D UNDERLAY [NE]/ STRUCTURAL SYSTEMS*

A100

PLAN LEVEL L0/ OVERALL/ BELOW GRADE LVL.

A110

PLAN LEVEL L1/ OVERALL/ GRADE LEVEL

P

A120

PLAN LEVEL L[3]/ OVERALL/ UPPER LEVEL*

P

A121

PLAN L[3]/ SECTOR S[1]/ CORE*

P

A122

PLAN L[3]/ SECTOR S[3]/ ENCLOSURE [N]*

A180

PLAN L[20]/ OVERALL/ ROOF LEVEL*

A201

ELEVATION [WEST]/ OVERALL*

A202

ELEVATION [SOUTH]/ OVERALL*

A213

ELEVATION [EAST] S[3]/ ENCLOS. [N]*

P

A301

BLDG. SECTION 1/ OVERALL

P

A302

BLDG. SECTIONS 2 & 3/ S[1] CORE*

P

A331

3D/ BLDG. SECTION/ L[3] BELOW CLG.*

P

A332

3D/ BLDG. SECTION/ L[3] ABOVE CLG. & CORE*

P

A352

WALL SECTION 1/ S[3] ENCLOS. [N]*

A381

3D WALL SCTN./ S[3] ENCLOS. [N]*

A382

3D WALL ELEV./ AT NON-TYP./DESIGN DTL.

P

A401

PLAN DTL. L[3] S[3]/ TYP. WALL AT COL.*

P

A402

PLAN DTL. L[3] S[3]/ TYP. WALL AT CORNER*

A503

PLAN DTL. L[X]/ AT NON-TYP./DESIGN DTL.*

A451

SCTN. DTL. L[3] S[3]/ TYP. WALL/FLOOR*

P

Student

A552

SCTN. DTL. L[X]/ AT NON-TYP./DESIGN DTL.*

Ensamble Studio

Moussa Aoun

A553

SCTN. DTL. L[20] S[3]/ AT ROOF*

dd mmm yyyy Unx

Architect

CS2/ List of Sheets/ Required

P

Sheet Issued

Santiago De Compostela, Spain

Sheet Title

Musical Studies Centre

Project Source

P

Student Name, Year & Semester

SHT. NO.

Construction Systems 2

PROGRESS (UNIT INFO. REQS. MET) FINAL (INDIV. DRAWING REQS. MET) RECAP (SET DRAWING REQS. MET)

LTU CoAD ARC 2323

p F r

Music Academy Spain Arch. Name (Sht., Designer)

NOTES: LEVEL OR LOCATION VARIES BY PROJECT

DATE:

DD MON YYYY UNIT 6: INDUSTRY PRACTICE

*

ISSUED FOR:

DD MON YYYY UNIT 5: ENCLOSURE DETAILS

UNIT 7: PROJ. RECAP. & COORD. DD MON YYYY

DD MON YYYY UNIT 4: ENCLOSURE COORD.

UNIT 3: HORIZ. LAYOUT COORD. DD MON YYYY

DD MON YYYY UNIT 2: VERT. CORE COORD.

UNIT 1: FRAMING & FND. COORD. DD MON YYYY

List of Sheets/ Required

Madrid, Spain 2002

A600-[4] SCHEDULES (QUANTITY ITEMIZATION)* I 2[3]0

INT. PLAN AREA & ELEV./ PUBLIC TOILET RM.

I 2[3]0

REFL. CLG. PLAN L[3]/ OVERALL*

zG001


Construction Systems 1

Music Academy Spain Ensamble Studio, Madrid

VERTICAL CIRCU-LATION: STAIRS & ELEVATORS IN CONT. VERTICAL SHAFTS

VERTICAL SUPPORT FRAMING: STEEL COLUMNS W12X87 SHAFT AREA CONTAINS ALL VERT. BLDG. SYSTEMS:

HORIZ. FLOOR & ROOF FRAMING: STEEL BEAMS; PRIMARY CLEAR SPAN, WITH SECONDARY INFILL

HVAC SYSTEMPRIMARY DISTRIBU-TION: SUPPLY AIR &RETURN AIR TRUNKDUCTS IN CONT.VERTICAL SHAFTS

EXTERIOR ENCLOSURE: 4" MASONRY, 6" CFMF (TYP.)

SUB-GRADE WALLS:C.I.P. REINF.CONCRETE

ROOF SYSTEM SAME AS LEVEL 5 (TO BE COORDINATED)

DRAWING LEGEND LINE OF "PLACEHOLDER" OBJECT (TO BE DEVELOPED). AREA TO COORD.; AREA/ITEM REVISED.

1

3D OVERLAY SW ENCL. SYSTEMS

05/07/2021

FOUNDATION SYSTEM: C.I.P. REINF. CONCRETE PIERS AT COLUMNS; C.I.P. REINF. CONCRETE FOOTINGS AT ADEQUATE SOILS

3D OVERLAY - SW - ENCLOSURE SYSTEMS

ELECT. & COMM. SYSTEMS PRIMARY DISTRIBUTION: CONDUCT RISERS VERTICALLY THROUGH SERVICE ROOMS.

Sheet Issued

TRANSPARENT ENCLOSURE: PRE-FINISHED ALUMINUM CURTAINWALL WITH 1" INSULATING GLAZING UNITS AND 2.5"X5" MULLIONS

Sheet Title

PLUMB. & FIRE PROT. SYSTEMS PRIMARY DISTRIBUTION: PIPERISERS IN CONT. VERTICAL SHAFTS

Moussa Aoun, Spring 2021

LTU CoAD ARC 2313

Project Source

FLR. & ROOF SLABS:C.I.P. CONCRETE ON METAL DECK

zA001


PLUMB. & FIRE PROT. SYSTEMS PRIMARY DISTRIBUTION: PIPERISERS IN CONT. VERTICAL SHAFTS

HORIZ. FLOOR & ROOF FRAMING: STEEL BEAMS; PRIMARY CLEAR SPAN, WITH SECONDARY INFILL

ELECT. & COMM. SYSTEMS PRIMARY DISTRIBUTION: CONDUCT RISERS VERTICALLY THROUGH SERVICE ROOMS.

EXTERIOR ENCLOSURE: 4" MASONRY, 6" CFMF (TYP.)

FOUNDATION SYSTEM: C.I.P. REINF. CONCRETE PIERS AT COLUMNS; C.I.P. REINF. CONCRETE FOOTINGS AT ADEQUATE SOILS

Moussa Aoun, Spring 2021

Construction Systems 1

VERTICAL SUPPORT FRAMING: STEEL COLUMNS W12X87

Music Academy Spain Ensamble Studio, Madrid

FLR. & ROOF SLABS:C.I.P. CONCRETE ON METAL DECK

HVAC SYSTEMPRIMARY DISTRIBU-TION: SUPPLY AIR &RETURN AIR TRUNKDUCTS IN CONT.VERTICAL SHAFTS

Project Source

SHAFT AREA CONTAINS ALL VERT. BLDG. SYSTEMS:

LTU CoAD ARC 2313

VERTICAL CIRCU-LATION: STAIRS & ELEVATORS IN CONT. VERTICAL SHAFTS

DRAWING LEGEND LINE OF "PLACEHOLDER" OBJECT (TO BE DEVELOPED).

1

3D OVERLAY NE ENCL. SYSTEMS

AREA TO COORD.; AREA/ITEM REVISED.

05/07/2021

SUB-GRADE WALLS:C.I.P. REINF.CONCRETE

3D OVERLAY - NE - ENCLOSURE SYSTEMS

12" EARTH RETETION SYSTEM FROM BASEMENT TO LEVEL 2

Sheet Issued

TRANSPARENT ENCLOSURE: PRE-FINISHED ALUMINUM CURTAINWALL WITH 1" INSULATING GLAZING UNITS AND 2.5"X5" MULLIONS

Sheet Title

STEPS AT ENTRANCE TO BE COORDINATED

zA002


GUARDRAILS AT CENTER OF STAIR ONLY

BLDG. SYSTEMS SECONDARY DISTRIBUTION: HORIZONTAL RUNS THROUGH CEILING PLENUM & RAISED FLOOR ZONES

HVAC SYSTEM PRIMARY DISTRIBUTION: SUPPLY AIR & RETURN AIR TRUNK DUCTS IN CONT. VERT. SHAFTS

Moussa Aoun, Spring 2021

Construction Systems 1

Music Academy Spain Ensamble Studio, Madrid

VERTICAL CIRCULATION: STAIRS & ELEVATORS IN CONT. VERT. SHAFTS

LTU CoAD ARC 2313

STRUCTURE / HVAC COORD. STRATEGY: HVAC PRIMARY BRANCH RUNS PARALLEL TO & RECESSED WITHIN CLEARSPAN BEAMS; HVAC SECONDARY BRANCHES ARE WIDE/ SHALLOW & RUN UNDER-NEATH CLEARSPAN BEAMS

Project Source

HVAC SYSTEM PRIMARY EQUIPEMNET: EQUIP. AT TOP (AND BOTT.) FLOORS FEEDING TRUNK DUCTS IN VERT. SHAFTS

LINE OF "PLACEHOLDER" OBJECT (TO BE DEVELOPED).

1

3D UNDERLAY NE MECH. & VERT. SYSTEMS

AREA TO COORD.; AREA/ITEM REVISED.

03/06/2021

DRAWING LEGEND

3D UNDERLAY NE - MECHANICAL SYSTEMS

VERT. COORD. REQ'D AT SHAFTS: CONFLICTS OCCUR IN MANY LOCA-TIONS AT SHAFT PART'NS & PIERS, WHERE PIERS ARE LARGER THAN TYP. STRUCT. MEMBER SIZES

Sheet Issued

PLUMB. & FIRE PROT. SYSTEMS PRIMARY DISTRIBUTION: PIPE RISERS IN CONT. VERTICAL SHAFTS

Sheet Title

ELECT. & COMM. SYSTEMS PRIMARY DISTRIBUTION: CONDUIT RISERS VERTICALLY THROUGH SERVICE ROOMS.

zA003


VERTICAL SUPPORT FRAMING: STEEL COLUMNS W12X87 Project Source

HORIZ. FLOOR & ROOF FRAMING: STEEL BEAMS; PRIMARY CLEARSPAN, WITH SECONDARY INFILL

Moussa Aoun, Spring 2021

Construction Systems 2

LATERAL BRACING SYSTEM AT CORNER AREAS: STEEL BEAMS, COLUMNS & DIAGONALS (TO BE COORD.)

Music Academy Spain Ensamble Studio, Madrid

LTU CoAD ARC 2323

EXPOSED STRUCTURAL FRAMING VS. ENCLOSED STRUCTURAL FRAMING: EXPOSED STRUCTURAL FRAMING IS HANDLED DIFFERENTLY, TO SHED WATER AND ALLOW TIGHT JOINTS TO OTHER ENCLOSURE MATERIALS

FINISH GRADE

FLR. & ROOF SLABS: C.I.P. CONCRETE ON METAL DECK

1

3D UNDERLAY NE STRUCTURAL SYSTEMS

LINE OF "PLACEHOLDER" OBJECT (TO BE DEVELOPED). AREA TO COORD.; AREA/ITEM REVISED.

05/07/2021

DRAWING LEGEND

3D UNDERLAY NE STRUCTURAL SYSTEMS

EART RET. WALL FROM FNDN. TO LEVEL 2

Sheet Issued

WATERPROOFING ON C.I.P. CONC. SLAB AT AREAS OF INSET ENCLOSURE

Sheet Title

SUB-GRADE WALLS: C.I.P. REINF. CONCRETE

FOUNDATION SYSTEM AT ADEQUATE SOILS: C.I.P. REINF. CON-CRETE PIERS AT COLUMNS; C.I.P. REINF. CONCRETE FOOTINGS

zA004


1 Sheet Issued

02/05/21

Sheet Title

3D UNDERLAY SW STRUCTURAL SYSTEMS

z/e/ 3D Ext./ "NE" Abv./ Str. & Fnd.

zA004'

Music Academy Spain Designer

Project Source

Author

Construction Systems 1

LTU CoAD ARC 2313


z8

70' - 0" 11' - 8"

35' - 0"

SLAB HALF TONED TO SHOW FT'G LAYOUT BELOW

LTU CoAD ARC 2313

23' - 4"

REFER TO ENLARGED AREA PLANS FOR PARTITION & STRUCTURE COORD. NOTES

BASIC STAIR RISERTREAD LAYOUT SHOWN ONLY; REFER TO SECTIONS & ENLARGED PLANS FOR OTHER STAIR COMPONENTS

Project Source

23' - 4"

STAIR LAYOUTS IS THE SAME BASED ON FLR.-FLR. HEIGHT, THAT IS IDENTICAL FOR ALL LEVELS (TYP.)

23' - 4"

z1

70' - 0"

29' - 2"

29' - 2"

70' - 0"

z2

SUB-GRADE WALLS: C.I.P. REINF. CONCRETE

Moussa Aoun, Spring 2021

z7

Construction Systems 1

z6

Music Academy Spain Ensamble Studio

z5

VERTICAL CIRCULATION: STAIRS & ELEVATORS IN CONT. VERTICAL SHAFTS

1

Level 0 3/32" = 1'-0"

zA331

05/07/2021

z4 1

PLAN LEVEL 0 OVERALL - BLW. GRADE LVL.

17' - 6"

17' - 6"

z3

SUB-GRADE PIERS SUPPORTING COLUMNS ABOVE: C.I.P. REINF. CONCRETE 30 X 30

Sheet Issued

VERTICAL SUPPORT FRAMING: STEEL COLUMNS W12X87

Sheet Title

LOWEST LEVEL SLAB: C.I.P. CONCRETE SLAB ON GRADE

DRAWING LEGEND LINE OF "PLACEHOLDER" OBJECT (TO BE DEVELOPED). AREA TO COORD.; AREA/ITEM REVISED.

zA100


z8

DRAWING LEGEND LINE OF "PLACEHOLDER" OBJECT (TO BE DEVELOPED).

70' - 0" 23' - 4"

11' - 8"

35' - 0"

1 zA403

EARTH RET. WALL SYS. 12" (TYP.)

AREA TO COORD.; AREA/ITEM REVISED.

z1

23' - 4"

HORIZ. FLOOR FRAMING: STEEL BEAMS; PRIMARY FRAME W16X40, WITH SECONDARY INFILL W12X35

LTU CoAD ARC 2323

FLOOR SLAB: 3" LW CONCRETE ON 2" METAL DECK

TRANSPARENT ENCLOSURE: RECESSED PRE-FINISHED ALUM. CURTAIN WALL SYSTEM WITH 1" INSUL. GLAZING UNITS AND TOP AND BOTTOM MULLIONS ONLY

VERTICAL SUPPORT FRAMING: STEEL COLUMNS W12X87

"EXIT" IN FIRERESISTENCE RATED ENCLOSURE (TYP.)

Project Source

z3

17' - 6"

z/a Plan Level L1-Grade Level 1 1/8" = 1'-0"

05/07/2021

LATERAL BRACING SYSTEM AT CORNER AREAS: STEEL BEAMS, COLUMNS & DIAGONALS (TO BE COORD.)

PLAN LEVEL 1 OVERALL GRADE LEVEL

DOOR IN CURTAIN WALL SYSTEM (TYP.)

Sheet Issued

BASIC STAIR RISER TREAD LAYOUT SHOWN ONLY; REFER TO SECTIONS & ENLARGED PLANS FOR OTHER STAIR COMPONENTS

OPAQUE ENCLO-SURE: PRE-FINISHED METAL PANEL CLADDING SYSTEM AT SPANDREL & COL. ENCLOSURE WITH A 4" RECESS

Sheet Title

29' - 2"

STAIR LAYOUTS IS THE SAME BASED ON FLR.-FLR. HEIGHT, THAT IS IDENTICAL FOR ALL LEVELS (TYP.)

70' - 0"

z2

Moussa Aoun, Spring 2021

z7

Construction Systems 2

z6

Music Academy Spain Ensamble Studio, Madrid

z5

2 zA332

z4

zA110


z8

70' - 0"

1' - 8"

1' - 8"

1 zA402

1' - 8"

1 zA331

HORIZ. FLOOR FRAMING: STEEL BEAMS; PRIMARY FRAME W16X40, WITH SECONDARY INFILL W12X35

z1

2 I501 TRANSPARENT ENCLOSURE: PRE-FINISHED ALUMINUM CURTAINWALL WITH 1" INSULATING GLAZING UNITS AND 2.5"X5" MULLIONS

1

VERTICAL SUPPORT FRAMING: STEEL COLUMNS W12X87

23' - 4"

I501

EXTERIOR ENCLOSURE: 4" MASONRY, 6" CFMF (TYP.)

"EXIT" IN FIRERESISTENCE RATED ENCLOSURE (TYP.)

1 zA401

Project Source

z2

STAIR LAYOUTS IS THE SAME BASED ON FLR.-FLR. HEIGHT, THAT IS IDENTICAL FOR ALL LEVELS (TYP.)

-

1

70' - 0"

BASIC STAIR RISERTREAD LAYOUT SHOWN ONLY; REFER TO SECTIONS & ENLARGED PLANS FOR OTHER STAIR COMPONENTS

29' - 2"

---

1 zA121

05/07/2021

1 zA701

1 zA123

PLAN LEVEL 2 OVERALL - LEVEL 2

FURNISHINGS LAYOUT: EXAMPLE LAYOUTS ILLUSTRATE USAGE & COORDINATE ELECT. & COMM. DISTRIBUTION

Sheet Issued

zA332

Sheet Title

1 zA122

35' - 0"

1' - 8"

FLOOR SLAB: 3" LW CONCRETE ON 2" METAL DECK

11' - 8"

LTU CoAD ARC 2313

23' - 4"

z3 DRAWING LEGEND 17' - 6"

LINE OF "PLACEHOLDER" OBJECT (TO BE DEVELOPED). AREA TO COORD.; AREA/ITEM REVISED.

2

Level 2 1/8" = 1'-0"

zA332 1' - 8"

1

Moussa Aoun, Spring 2021

z7

Construction Systems 1

z6

Music Academy Spain Ensamble Studio, Madrid

z5

z4

zA120


1

HORIZ. FLOOR FRAMING: STEEL BEAMS; PRIMARY FRAME W16X40, WITH SECONDARY INFILL W12X35

35' - 0"

zA331

VERTICAL SUPPORT FRAMING: STEEL COLUMNS W12X87

FIRE RESISTENCE RATED SHAFTWALL PARTITION SEPARATING MULTI-STORY SHAFTS FROM ADJACENT FLOOR AREAS (TYP.) ("TYPE 1")

1

23' - 4"

I501

"EXIT" IN FIRERESISTENCE RATED ENCLOSURE (TYP.)

STAIR LAYOUTS IS THE SAME BASED ON FLR.-FLR. HEIGHT, THAT IS IDENTICAL FOR ALL LEVELS (TYP.)

HVAC SYSTEM PRIMARY DISTRIBUTION: SUPPLY AIR & RETURN AIR TRUNK DUCTS IN CONT. VERTICAL SHAFTS

z2

LTU CoAD ARC 2313

z1

NON-RATED PARTITIONS UNLESS NOTED OTHERWISE (TYP.) ("TYPE 2")

---

BASIC STAIR RISERTREAD LAYOUT SHOWN ONLY; REFER TO SECTIONS & ENLARGED PLANS FOR OTHER STAIR COMPONENTS

29' - 2"

PLUMB. & FIRE PROT. SYSTEMS PRIMARY DISTRIBUTION: PIPE RISERS IN CONT. VERTICAL SHAFTS

FURRED PARTITION COVERING STEEL STRUCT. (TYP.)("TYPE 3")

1

VERTICAL CIRCULATION: STAIRS & ELEVATORS IN CONT. VERTICAL SHAFTS

Project Source

-

Sheet Issued

05/07/2021

PLAN L2 SECTOR 1 (S1) CORE (1 96)

17' - 6"

z3

ANNOTATION LINE DEPECTING ENCLOSURE WALLS THAT WILL BE COORDINATED IN FUTURE UNITS

Sheet Title

zA332

FNDN. WALL GOES UP TO LEVEL 2 AT SOME INSTANCES

DRAWING LEGEND

Level 2 - A121 1 1/8" = 1'-0"

Moussa Aoun, Spring 2021

z8

Construction Systems 1

z7

Music Academy Spain Ensamble Studio, Madrid

FLOOR SLAB: 3" LW CONCRETE ON 2" METAL DECK

2

LINE OF "PLACEHOLDER" OBJECT (TO BE DEVELOPED).

zA332

z4

AREA TO COORD.; AREA/ITEM REVISED.

zA121


1' - 8"

1' - 8"

1' - 8" 1' - 8"

HORIZ. FLOOR FRAMING: STEEL BEAMS; PRIMARY FRAME W16X40, WITH SECONDARY INFILL W12X35

11' - 8"

z1

23' - 4"

LTU CoAD ARC 2313

VERTICAL SUPPORT FRAMING: STEEL COLUMNS W12X87

FNDN. WALL GOES UP TO LEVEL 2 AT SOME INSTANCES

DOORS & FRAMES: HOLLOW MTL. OR ALUM. STOREFRONT FRAMES W. SIDELIGHTS; WD. SOLID CORE DOORS W. GLAZING

05/07/2021

DRAWING LEGEND

1

Level 2 - A122 1/8" = 1'-0"

1' - 8"

TRANSPARENT ENCLOSURE: PRE-FINISHED ALUMINUM CURTAINWALL WITH 1" INSULATING GLAZING UNITS AND 2.5"X5" MULLIONS

17' - 6"

EXTERIOR ENCLOSURE: 4" MASONRY, 6" CFMF (TYP.)

PLAN L2 SECTOR 3 (S3) ENVEL N (1 96)

z3

Sheet Issued

FURNISHINGS LAYOUT: EXAMPLE LAYOUTS ILLUSTRATE USAGE & COORDINATE ELECT. & COMM. DISTRIBUTION

Sheet Title

INT. FURRED PARTITIONS: GWB, NSMF 1.625", 2.25" thk, double sided, 1 hr

70' - 0"

29' - 2"

INT. PARTITIONS Ex, GWB, WS 3.5", GWB, 5.25" thk (TYPE 1)

Project Source

z2

1 zA331

z4

LINE OF "PLACEHOLDER" OBJECT (TO BE DEVELOPED). AREA TO COORD.; AREA/ITEM REVISED.

Moussa Aoun, Spring 2021

23' - 4"

z7

Construction Systems 1

z6

Music Academy Spain Ensamble Studio, Madrid

z5

FLOOR SLAB: 3" LW CONCRETE ON 2" METAL DECK

zA122


35' - 0"

FURRED PARTIOTION COVERING STEEL STRUCT. (TYP.)

VERTICAL CIRCULATION: STAIRS & ELEVATORS IN CONT. VERTICAL SHAFTS

z3 2

BASIC STAIR RISERTREAD LAYOUT SHOWN ONLY; REFER TO SECTIONS & ENLARGED PLANS FOR OTHER STAIR COMPONENTS

HVAC SYSTEM PRIMARY DISTRIBUTION: SUPPLY AIR & RETURN AIR TRUNK DUCTS IN CONT. VERTICAL SHAFTS

Project Source

zA701

Moussa Aoun, Spring 2021

z8

Construction Systems 1

z7

LTU CoAD ARC 2313

STAIR LAYOUTS IS THE SAME BASED ON FLR.-FLR. HEIGHT, THAT IS IDENTICAL FOR ALL LEVELS (TYP.)

NON RATED PARTITION UNLESS NOTED OTHERWISE

Music Academy Spain Ensamble Studio, Madrid

"EXIT" IN FIRERESISTENCE RATED ENCLOSURE (TYP.)

17' - 6"

ANNOTATION LINE DEPECTING ENCLOSURE WALLS THAT WILL BE COORDINATED IN FUTURE UNITS

z4

HORIZ. FLOOR FRAMING: STEEL BEAMS; PRIMARY FRAME W16X40, WITH SECONDARY INFILL W12X35 VERTICAL SUPPORT FRAMING: STEEL COLUMNS W12X87

1

05/07/2021

FLOOR SLAB: 3" LW CONCRETE ON 2" METAL DECK

PLAN AREA L2 STAIRS & TOILET

zA332

Sheet Issued

2

Sheet Title

FIRE RESISTENCE RATED SHAFTWALL PARTIOTION SEPARATING TWO SHAFTS (TYP.)

zA332

1

Plan Area L3 - Stairs & Bathroom1 1/4" = 1'-0"

zA123


1 Level 3 3/32" = 1'-0" 1

zA331

z2

z4

Author

Construction Systems 1

z8

Music Academy Spain Designer

35' - 0"

02/01/21

70' - 0" LTU CoAD ARC 2313

z1

PLAN LEVEL 3 (L3) - OVERALL UPPER LEVEL

11' - 8"

Project Source

z7

Sheet Issued

23' - 4"

23' - 4"

70' - 0"

29' - 2"

z6

Sheet Title

17' - 6"

z5

z3

zA130


1 Level 4 3/32" = 1'-0" zA331

z2

z3

z4

Author

Construction Systems 1

z8

Music Academy Spain Designer

LTU CoAD ARC 2313

z1

02/02/21

35' - 0"

PLAN LEVEL 4 OVERALL

11' - 8"

Project Source

70' - 0"

Sheet Issued

23' - 4"

23' - 4"

z7

70' - 0"

29' - 2"

z6

Sheet Title

17' - 6"

z5

1

zA140


z8

DRAWING LEGEND LINE OF "PLACEHOLDER" OBJECT (TO BE DEVELOPED).

70' - 0" 23' - 4"

11' - 8"

35' - 0"

AREA TO COORD.; AREA/ITEM REVISED.

FULLY ADHEREED MEMBRANE ROOFING

ROOF DRAINAGE SYSTEM: TAPERED INSULATION AND ROOF DRAINS AND OVERFLOW DRAINS 23' - 4"

TAPERED ROOF INSULATION (SLOPE 1/4" / 1' MIN.U.N.O.) RIGID BOARD ROOF INSULATION (MIN. THICKNESS AS REQ'D. PER ENERGY CODE CALCS.)

TAPERED INSUL. CRICKETS (SLOPE 1/8" / 1' MIN) (TYP.)

-

ROOFING DRAINAGE SYSTEM COORD.: ROOF DRAINS AND OVERFLOW DRAINS TO BE LOCATED ON OPPOSITE SIDES OF STEEL BM. BELOW, AS REQ'D TO PROVIDE PIPE CLEARANCES AROUND BM. INCL. FIREPROOFING

29' - 2"

ROOF DRAIN AND OVERFLOW DRAIN

70' - 0"

---

LAYOUT TO REMAIN TYP. AROUND EXTERIOR INDENTATION

Sheet Issued

05/07/2021

PLAN L4 OVERALL - ROOF LEVEL

ROOFING SYSTEM AT LEVEL 3, SAME AS ROOFING SYSTEM AT LEVEL 5

1/2" SLOPED GLAZING ENCLOSURE

z3 LOCATION OF MULTIPLE CONDENSING UNITS FOR LOCALIZED INTERIOR AIR CONDITIONING

17' - 6"

Roof 1/8" = 1'-0"

Project Source

z2

ROOFING DRAINAGE LAYOUT: CONSISTENT RECTANGULAR LAYOUT FOR COST AND CONSTRUCTION EFFICIENCY

1

LTU CoAD ARC 2313

z1

ROOFING SYSTEM

Sheet Title

2" METAL COPING SYSTEM (TYP.)

Moussa Aoun, Spring 2021

z7

Construction Systems 1

z6

Music Academy Spain Ensamble Studio, Madrid

z5

2 zA332

z4

zA150


z8

BLDG. SYSTEMS DISTRIB. TERMINA-TIONS (HVAC, FIRE PROT./ALARM, ELEC./ COMM.): DEVICES MOUNTED IN CEILING & RAISED FLOOR (NOT SHOWN FOR CLARITY)

70' - 0" 23' - 4"

11' - 8"

35' - 0"

ACOUS. CEILING TILE (ACT) CEILING SYS-TEM: 2X2 / 2X4 TILES IN SUSPENDED GRID GWB CEILING SYS.: GWB ON SUSPENSION SYS. OR MTL. STUD FRAMING

23' - 4"

RECESSED 2X2 / 2X4 TROFFERS AND DIREC-TIONAL DOWNLIGHT FIXTURES IN GWB & ACT CEILINGS

RECESSED CAN OR INDIRECT DOME DOWN-LIGHT FIXTURES IN GWB & ACT CEILINGS

SUSPENDED LINEAR INDIRECT / DIRECT LIGHT FIXTURES, COORDINATED WITH PARTITIONS AS AN OVERALL GENERAL LIGHTING APPROACH

Project Source

z2 -

17' - 6"

z3

DRAWING LEGEND LINE OF "PLACEHOLDER" OBJECT (TO BE DEVELOPED).

2 zA332

Level 2 1/8" = 1'-0"

05/07/2021

BLDG. SYSTEMS SECONDARY DISTRIBUTION (HVAC, FIRE PROT./ALARM, ELEC./COMM.): HORIZONTAL RUNS THROUGH CEILING PLENUM & RAISED FLOOR ZONES

REFL CLG PLAN L2 - OVERALL

ACT CEILING SYS. USAGES: SOUND CONTROL AT OPEN & PRIVATE OFFICE AREAS; FLEXIBLE ACCESS TO PLENUM

Sheet Issued

29' - 2"

70' - 0"

---

PARTITION FRAMING & CEILING: PARTNS. ARE EXTENDED UP TO UNDERSIDE OF SLAB FOR RIGIDITY

1

LTU CoAD ARC 2313

z1

ACT CEILING SYS. GRID LAYOUT: GRID ARRANGED FOR EACH SPACE TO MINIMIZE <6" TILES AT CLG. EDGES

Moussa Aoun, Spring 2021

z7

Construction Systems 1

z6

Music Academy Spain Ensamble Studio, Madrid

z5

Sheet Title

ACT CEILING SYS. GRID LAYOUT: GRID ARRANGED FOR EACH SPACE TO ALLOW CENTERING OF LIGHT FIXTURES & ALIGNMENT OF OTHER DEVICES.

1 zA331

z4

AREA TO COORD.; AREA/ITEM REVISED.

zA230


29' - 2"

z4

DRAWING LEGEND LINE OF "PLACEHOLDER" OBJECT (TO BE DEVELOPED).

17' - 6"

VERTICAL SUPPORT FRAMING & LATERAL BRACING SYSTEMS AT BLDG. BASE: CONT. DOWN TO FOUNDATIONS (TO BE COORD.) 11' - 8"

Roof 46' - 8"

LOCATION OF FLOOR SLAB: 3" LW CONCRETE ON 2" METAL DECK

LTU CoAD ARC 2313

AREA TO COORD.; AREA/ITEM REVISED.

Level 4 35' - 0"

TRANSPARENT ENCLOSURE: PRE-FINISHED ALUMINUM CURTAINWALL WITH 1" INSULATING GLAZING UNITS AND 2.5"X5" MULLIONS

58' - 4"

1

EXTERIOR ENCLOSURE: 4" MASONRY, 6" CFMF (TYP.)

11' - 8"

Level 3 23' - 4"

Project Source

11' - 8"

LOCATION OF VERTICAL SUPPORT FRAMING: STEEL COLUMNS W12X87

Moussa Aoun, Spring 2021

23' - 4"

RECESSED 2" MTL. COPING

70' - 0"

z3

Construction Systems 1

z2

Music Academy Spain Ensamble Studio, Madrid

z1

I501

05/07/2021

11' - 8"

Level 1 0' - 0"

ELEVATION WEST - OVERALL

FOUNDATION SYS. AT ADEQUATE SOILS: C.I.P. REINF. CON-CRETE PIERS AT COLUMNS; C.I.P. REINF. CONCRETE FOOTINGS

Sheet Issued

11' - 8"

SUB-GRADE WALLS: C.I.P. REINF. CONCRETE 12"

Sheet Title

Level 2 11' - 8"

Level 0 -11' - 8"

EART RET WALL SYS. 4"

1

z/d Elevation "West"/ Overall (A204 x192) 1/8" = 1'-0"

zA301


70' - 0" 23' - 4"

11' - 8"

35' - 0"

DRAWING LEGEND LINE OF "PLACEHOLDER" OBJECT (TO BE DEVELOPED). AREA TO COORD.; AREA/ITEM REVISED.

Roof 46' - 8"

FLOOR SLAB: 3" LW CONCRETE ON 2" METAL DECK HORIZ. FLOOR FRAMING: STEEL BEAMS; PRIMARY FRAME W16X40, WITH SECONDARY INFILL W12X35

Level 4 35' - 0"

TRANSPARENT ENCLOSURE: PRE-FINISHED ALUMINUM CURTAINWALL WITH 1" INSULATING GLAZING UNITS AND 2.5"X5" MULLIONS

Level 3 23' - 4"

EXTERIOR ENCLOSURE: 4" MASONRY, 6" CFMF (TYP.)

Project Source

VERTICAL SUPPORT FRAMING: STEEL COLUMNS W12X87

Moussa Aoun, Spring 2021

z8

Construction Systems 1

z7

LTU CoAD ARC 2313

VERTICAL SUPPORT FRAMING & LATERAL BRACING SYSTEMS AT BLDG. BASE: CONT. DOWN TO FOUNDATIONS (TO BE COORD.)

z6

Music Academy Spain Ensamble Studio, Madrid

z5

FOUNDATION SYS. AT ADEQUATE SOILS: C.I.P. REINF. CON-CRETE PIERS AT COLUMNS; C.I.P. REINF. CONCRETE FOOTINGS

Level 0 -11' - 8"

1

z/c/ Elevation "South"/ Overall (A203 x192) 1/8" = 1'-0"

05/07/2021

EART RET WALL SYS. 4"

ELEVATION SOUTH OVERALL

Level 1 0' - 0"

Sheet Issued

SUB-GRADE WALLS: C.I.P. REINF. CONCRETE 12"

Sheet Title

Level 2 11' - 8"

zA302


AREA TO COORD.; AREA/ITEM REVISED.

TRANSPARENT ENCLOSURE: PRE-FINISHED ALUMINUM CURTAINWALL WITH 1" INSULATING GLAZING UNITS AND 2.5"X5" MULLIONS

Level 3 23' - 4"

2' - 8 1/4"

OPAQUE ENCLOSURE: PREFINISHED METAL PANEL CLADDING SYSTEM AT SPANDREL & COL. ENCLOSURE WITH A 4" RECESS

Sheet Issued

05/07/2021

Sheet Title

ELEVATION EAST - S3 - ENVEL N

7' - 0"

11' - 8"

1' - 11 3/4"

TRANSPARENT ENCLOSURE: RECESSED PREFINISHED ALUM. CURTAIN WALL SYSTEM WITH 1" INSUL. GLAZING UNITS AND TOP AND BOTTOM MULLIONS ONLY

Level 2 11' - 8"

Project Source

11' - 8"

EXTERIOR ENCLOSURE: 4" MASONRY, 6" CFMF (TYP.)

Moussa Aoun, Spring 2021

23' - 4"

Construction Systems 1

z1

LTU CoAD ARC 2313

z2

LINE OF "PLACEHOLDER" OBJECT (TO BE DEVELOPED).

Music Academy Spain Ensamble Studio, Madrid

DRAWING LEGEND

Level 1 0' - 0" LINE OF GRADE

1

z/b/ Elevation "East"/ Sector 1/4" = 1'-0"

zA313


29' - 2"

z4

HVAC SYSTEM PRIMARY EQUIPMENT: EQUIP. AT TOP AND BOTT. FLOORS, FEEDING TRUNK DUCTS IN VERT. SHAFTS

17' - 6"

GUARDRAIL AT CENTER OF STAIRS ONLY

Level 4 35' - 0" 11' - 8"

VERTICAL SUPPORT FRAMING: STEEL COLUMNS W12X87

ENTRANCE TO BE COORDINATED

Level 3 23' - 4"

FOUNDATION SYS. AT ADEQUATE SOILS: C.I.P. REINF. CON-CRETE PIERS AT COLUMNS; C.I.P. REINF. CONCRETE FOOTINGS

z/a/ Bldg. Section 1/ "N-S, to E"/ Overall (A301 x192) 1 1/8" = 1'-0"

58' - 4"

11' - 8" 11' - 8"

7' - 2 1/2"

Level 2 11' - 8"

BLDG. SYSTEMS SECONDARY DISTRIBUTION: HORIZONTAL RUNS THROUGH CEILING PLENUM & RAISED FLOOR ZONES BLDG. SYSTEMS COORDINATION: HORIZONTAL RUNS COORDINATED WITH PARTITIONS TO MINIMIZE CONFLICT & PENETRATIONS

TRANSPARENT ENCLOSURE: PRE-FINISHED ALUMINUM CURTAINWALL WITH 1" INSULATING GLAZING UNITS AND 2.5"X5" MULLIONS

EXTERIOR ENCLOSURE: 4" MASONRY, 6" CFMF (TYP.)

Level 1 0' - 0" 11' - 8"

VERTICAL CIRCULATION: ELEVATOR MACHINERY AT TOP OR BOTT. OF SHAFTS, DEPENDING ON BLDG, HGT. & ELEVATOR TYPE

8' - 2"

SUB-GRADE WALLS: C.I.P. REINF. CONCRETE 12"

LOWEST LEVEL SLAB: C.I.P. CONCRETE SLAB ON GRADE 5" THK.

VERTICAL CIRCULATION: STAIRS & ELEVATORS IN CONT. VERTICAL SHAFTS

Level 0 -11' - 8"

HVAC SYSTEM PRIMARY DISTRIBUTION: SUPPLY AIR & RETURN AIR TRUNK DUCTS IN CONT. VERTICAL SHAFTS

DRAWING LEGEND LINE OF "PLACEHOLDER" OBJECT (TO BE DEVELOPED). AREA TO COORD.; AREA/ITEM REVISED.

05/07/2021

11' - 8"

HORIZ. FLOOR FRAMING: STEEL BEAMS; PRIMARY FRAME W16X40, WITH SECONDARY INFILL W12X35

BLDG SECTION OVERALL

Roof 46' - 8"

Project Source

FLOOR SLAB: 3" LW CONCRETE ON 2" METAL DECK

LTU CoAD ARC 2313

PLUMB. & FIRE PROT. SYSTEMS PRIMARY DISTRIBUTION: PIPE RISERS IN CONT. VERTICAL SHAFTS

Moussa Aoun, Spring 2021

23' - 4"

z3

Construction Systems 1

70' - 0"

Music Academy Spain Ensamble Studio, Madrid

z2

Sheet Issued

z1

Sheet Title

VERTICAL SUPPORT FRAMING & LATERAL BRACING SYSTEMS AT BLDG. BASE: CONT. DOWN TO FOUNDATIONS (TO BE COORD.)

zA331


Level 4 35' - 0" 11' - 8"

BLDG. SYSTEMS SECONDARY DISTRIBUTION: HORIZONTAL RUNS THROUGH CEILING PLENUM & RAISED FLOOR ZONES

Level 3 23' - 4"

FINISH GRADE LEVEL

Level 2 11' - 8" 11' - 8"

HORIZ. FLOOR FRAMING: STEEL BEAMS; PRIMARY FRAME WITH SECONDARY INFILL VERTICAL SUPPORT FRAMING: STEEL COLUMNS

Level 1 0' - 0"

Level 0 -11' - 8"

SUB-GRADE WALLS & FOOTING: C.I.P. REINF. CONCRETE

2

332-2 1/8" = 1'-0"

1

332-1 1/8" = 1'-0"

HANDRAIL AT CENTER OF STAIRS ONLY

STAIR LAYOUTS IS THE SAME BASED ON FLR.-FLR. HEIGHT, THAT IS IDENTICAL FOR ALL LEVELS (TYP.)

INTERMEDIATE STAIR LANDINGS (TYP.)

11' - 8"

SUB-GRADE PIERS SUPPORTING COLUMNS ABOVE: C.I.P. REINF. CONCRETE

STAIR RISER-TREAD LAYOUT SHOWN FOR DIMENSIONAL FIT (SECTION & PLAN); STRINGERS, HAND-RAILS, & GUARDRAILS SHOWN DIAGRAMATICALLY ONLY

STAIR STRINGERS & LANDINGS SUPPORTED FROM BLDG. STEEL FRAMING

58' - 4"

11' - 8"

FLOOR SLABS: 3" CONCRETE ON 2" MTL. DECK (TYP.)

FURRED PARTITION COVERING STEEL STRUCTURE & CONCRETE FOUNDATION WALL (TYP.)

Moussa Aoun, Spring 2021

11' - 8"

VERTICAL CIRCULATION: STAIRS & ELEVATORS IN CONT. VERTICAL SHAFTS

PLUMB. & FIRE PROT. SYSTEMS PRIMARY DISTRIBUTION: PIPE RISERS IN CONT. VERTICAL SHAFTS

Construction Systems 1

Roof 46' - 8"

05/07/2021

FIRE RESISTENCE RATED SHAFTWALL PARTITION SEPARATING TWO SHAFTS

BLDG SECTIONS S1

11' - 8"

Music Academy Spain Ensamble Studio, Madrid

FIRE RESISTENCE RATED SHAFTWALL PARTITION SEPARATING MULTI-STORY SHAFTS FROM ADJACENT FLOOR AREAS (TYP.)

17' - 6"

LTU CoAD ARC 2313

z7

Project Source

z6

Sheet Issued

FURRED PARTITION COVERING STEEL STRUCTURE (TYP.)

z4

Sheet Title

z3

zA332


BLDG. SYSTEMS COORDINATION: HORIZONTAL RUNS COORDINATED WITH PARTITIONS TO MINIMIZE CONFLICT & PENETRATIONS

Project Source

FLR. & ROOF SLABS: CONCRETE ON METAL DECK (NOT SHOWN FOR CLARITY) STRUCTURE / HVAC COORD. STRATEGY: HVAC PRIMARY BRANCH RUNS PARALLEL TO & RECESSED WITHIN CLEARSPAN BEAMS; HVAC SECONDARY BRANCHES ARE WIDE/SHALLOW & RUN UNDERNEATH CLEARSPAN BEAMS

Moussa Aoun, Spring 2021

BLDG. SYSTEMS SECONDARY DISTRIBUTION: HORIZONTAL RUNS THROUGH CEILING PLENUM & RAISED FLOOR ZONES

HVAC SYSTEM COORD. CHARACTERISTICS: SINGLE LARGETRUNK DUCT SYSTEM, THAT DISTRIBUTES FROM FLOORPLATE EDGE, HAS LARGE WIDE/DEEP DUCTS FOR VOLUME & LONG RUNS

Construction Systems 1

VERTICAL SUPPORT FRAMING: STEEL COLUMNS

LTU CoAD ARC 2313

HVAC SYSTEM PRIMARY DISTRIBU-TION: SUPPLY AIR & RETURN AIR TRUNK DUCTS IN CONT. VERTICAL SHAFTS

Music Academy Spain Ensamble Studio, Madrid

PARTITION FRAMING & CEILING: PARTNS. ARE EXTENDED UP TO UNDERSIDE OF SLAB FOR RIGIDITY

1

AREA TO COORD.; AREA/ITEM REVISED.

05/07/2021

3D Bldg Section SW - Plan L2 Below Clg

LINE OF "PLACEHOLDER" OBJECT (TO BE DEVELOPED).

3D BLDG SCTN L2 BELOW CLG & CORE

DRAWING LEGEND

Sheet Issued

FLOOR STRUCTURE COORD. CHARACTERISTICS: PRIMARY CLEARSPAN BEAMS ARE DEEP, SOLID, & DIRECTIONAL

Sheet Title

ACOUS. CEILING TILE (ACT) CEILING SYSTEM: 2X2 / 2X4 TILES IN SUSPENDED GRID

zA333


INDIRECT / DIRECT LIGHT FIXTURES, COORDINATED WITH PARTITIONS AS AN OVERALL GENERAL LIGHTING APPROACH

1

3D Bldg Section NE - Plan L2 Above Clg

AREA TO COORD.; AREA/ITEM REVISED.

05/07/2021

LINE OF "PLACEHOLDER" OBJECT (TO BE DEVELOPED).

3D BLDG SCTN L2 ABOVE CLG

DRAWING LEGEND

Sheet Issued

PLANNING GRID: SPACING OF EXTERIOR ENCLOSURE MULLIONS DEFINES PLANNING MODULE FOR INTERIOR WALL LAYOUT

Sheet Title

Project Source

SUSPENDED FIXTURES ALIGNED WITH ACT GRID & INT./EXT. PLANNING GRID FOR COORDINATED DESIGN CONCEPT

Moussa Aoun, Spring 2021

Construction Systems 1

DOORS & FRAMES: HOLLOW MTL. OR ALUM. STOREFRONT FRAMES W. SIDELIGHTS; WD. SOLID CORE DOORS W. GLAZING

Music Academy Spain Ensamble Studio, Madrid

LTU CoAD ARC 2313

PARTITION FRAMING & CEILING: PARTNS. ARE EXTENDED UP TO UNDERSIDE OF SLAB FOR RIGIDITY, OR EXTEND 6" ABV. THE CEILING WITH BRACING

zA334


SINGLE LARGE TRUNK DUCT SYSTM., THAT DISTRIBUTES FROM FLOORPLATE EDGE, HAS LARGE WIDE/DEEP DUCTS FOR VOLUME & LONG RUNS

ROOFING SYSTEM (REFER TO ROOF PLAN DRAWING)

Level 4 35' - 0"

STRUCTURE / HVAC COORD. STRATEGY: HVAC PRIMARY BRANCH RUNS PARALLEL TO & RECESSED WITHIN CLEARSPAN BEAMS; HVAC SECONDARY BRANCHES ARE WIDE/ SHALLOW & RUN UNDER-NEATH CLEARSPAN BEAMS

COORD. LIGHT FIXTURE TYPE & HGT. WITH CLG. HGT.

EXTERIOR ENCLOSURE: 4" MASONRY, 6" CFMF (TYP.)

PARTITION FRAMING & CEILING: PARTNS. ARE EXTENDED UP TO UNDER-SIDE OF SLAB FOR RIGIDITY, OR EXTEND 6" ABV. THE CEILING WITH BRACING

Level 3 23' - 4"

INT. PARTITIONS "TYPE 1": REFER SHT. A122

1 zA451

8' - 2"

FLOOR STRUCTURE COORD. CHARACTERISTICS: PRI-MARY CLEARSPAN BEAMS ARE DEEP, SOLID, & DIRECTIONAL

Level 2 11' - 8"

HORIZ. FLOOR & ROOF FRAMING: STEEL BEAMS; PRIMARY CLEARSPAN, WITH SECONDARY INFILL (TYP.)

1' - 8" 1' - 4"

7' - 0"

FLR. & ROOF SLABS: CON-CRETE ON MTL. DECK (TYP.)

VERTICAL SUPPORT FRAMING: STEEL COLUMNS

TRANSPARENT ENCLOSURE: PRE-FINISHED ALUMINUM CURTAINWALL WITH 1" INSULATING GLAZING UNITS AND 2.5"X5" MULLIONS

OPAQUE ENCLOSURE: PREFINISHED METAL PANEL CLADDING SYSTEM AT SPANDREL & COL. ENCLOSURE WITH A 4" RECESS

TRANSPARENT ENCLOSURE: RECESSED PREFINISHED ALUM. CURTAIN WALL SYSTEM WITH 1" INSUL. GLAZING UNITS AND TOP AND BOTTOM MULLIONS ONLY

SUB-GRADE WALLS: C.I.P. REINF. CONCRETE

Level 1 0' - 0"

FOUNDATION SYSTEM: C.I.P. REINF. CONCRETE PIERS AT COLUMNS


PRE-FINISHED ALUMINUM CURTAINWALL WITH 1" INSULATING GLAZING UNITS AND 2.5"X5" MULLIONS

TRANSPARENT ENCLOSURE: RECESSED PREFINISHED ALUM. CURTAIN WALL SYSTEM WITH 1" INSUL. GLAZING UNITS AND TOP AND BOTTOM MULLIONS ONLY

OPAQUE ENCLOSURE: PRE-FINISHED METAL PANEL CLADDING SYSTEM AT SPANDREL & COL. ENCLOSURE WITH A 4" RECESS

FOUNDATION SYSTEM: C.I.P. REINF. CONCRETE PIERS AT COLUMNS; C.I.P. REINF. CONCRETE FOOTINGS AT ADEQUATE SOILS

SUB-GRADE WALLS: 12" C.I.P. REINF.CONCRETE

GWB CEILING SYS.: GWB ON SUSPENSION SYS. OR MTL. STUD FRAMING


PRE-FINISHED ALUMINUM CURTAINWALL WITH 1" INSULATING GLAZING UNITS AND 2.5"X5" MULLIONS

MASONRY CUT LINE AT 5' 10" VERTICAL INCREMENTS

OPAQUE ENCLOSURE: PRE-FINISHED METAL PANEL CLADDING SYSTEM AT SPANDREL & COL. ENCLOSURE WITH A 4" RECESS

TRANSPARENT ENCLOSURE: RECESSED PREFINISHED ALUM. CURTAIN WALL SYSTEM WITH 1" INSUL. GLAZING UNITS AND TOP AND BOTTOM MULLIONS ONLY

SUB-GRADE WALLS: 12" C.I.P. REINF.CONCRETE

A453

FOUNDATION SYSTEM: C.I.P. REINF. CONCRETE PIERS AT COLUMNS; C.I.P. REINF. CONCRETE FOOTINGS AT ADEQUATE SOILS

A4 03


W12X87 COLUMN WITH FIREPROOFING, 1" MIN (TYP.)

CFMF STUDS SUBSTRATE WALL, 16" O.C. AT VARIOUS SIZES: 6", 4", 2.5" BASED ON CONDITIONS

6" CFMF, ALONG WALL LENGTH, BUT 4" NEAR COLUMN TO ALLOW SPACE TO UNIFORM SPACING

Project Source

GYPSUM LAYER ON INTERIOR WALLS, BUT NOT IN PLACES THAT ARE HIDDEN

z2

Moussa Aoun, Spring 2021

LTU CoAD ARC 2313

CONTINUOUS 2" AIR GAP BETWEEN RIGID BOARD INSULATION AND THE INSIDE FACE OF MASONRY VENEER

Construction Systems 1

4" MASONRY VENEER ON OUTERMOST ELEMENT OF WALL.

Music Academy Spain Ensamble Studio,Madrid

z8

SPRAY FOAM INSULATION INSIDE SUBSTRATE WALL.

RIGID BOARD INSULATION RUNS CONTINUOUS AROUND ENTIRE WALL.

Sheet Issued

05/07/2021

PLAN DTL L3 - S3 TYP WALL/COL (1 08)

VAPOR BARRIER PLACED JUST INSIDE OF SPRAYED ON INSULATION

Sheet Title

2' - 0"

CONTINUOUS LAYER OF SEATHING RUNS BEHIND INSULATION

WATER BARRIER PLACED ON RIGID INSULATION

DRAWING LEGEND

1

Level 2 - A401 1 1/2" = 1'-0"

LINE OF "PLACEHOLDER" OBJECT (TO BE DEVELOPED). AREA TO COORD.; AREA/ITEM REVISED.

zA401


LTU CoAD ARC 2313

CONTINUOUS 2" AIR GAP BETWEEN RIGID BOARD INSULATION AND THE INSIDE FACE OF MASONRY VENEER 6" CFMF STUD-FRAMEDBACKUP WITH EXT. GYP BD SHEATHING (TYP)

W12X87 COLUMN WITH FIREPROOFING, 1" MIN (TYP.) COLUMNS INTERIOR PARTITIONS "TYPE 3" (FURRING PART'N): REFER TO SHT A120

Project Source

0' - 11"

6" CFMF, ALONG WALL LENGTH, BUT 4" NEAR COLUMN TO ALLOW SPACE TO UNIFORM SPACING

z1

SPRAY FOAM INSULATION INSIDE SUBSTRATE WALL. RIGID BOARD INSULATION RUNS CONTINUOUS AROUND ENTIRE WALL.

Moussa Aoun, Spring 2021

0' - 11"

Construction Systems 1

4" MASONRY VENEER ON OUTERMOST ELEMENT OF WALL.

Music Academy Spain Ensamble Studio,Madrid

z8

CONT. SEALANT &BACKER RODAROUND PERIMETEROF CURTAINWALLSYSTEM ATEXTERIOR & ATINTERIOR

02/01/21

PLAN DTL L3 - S3 TYP WALL/CORNER (1 08)

CURTAIN WALL OPENING WITH 2.5"x5" MULLIONS

Sheet Issued

VAPOR BARRIER PLACED JUST INSIDE OF SPRAYED ON INSULATION

Sheet Title

CONTINUOUS LAYER OF SEATHING RUNS BEHIND INSULATION

WATER BARRIER PLACED ON RIGID INSULATION

1

Level 2 - A402 1 1/2" = 1'-0"

zA402


1' - 4" 1' - 2"

LINE OF SLAB AND FOUNDATION WALL BELOW: WATERPROOF PORTION OF SLAB BEYOND GLASS LINE

1' - 8"

Project Source

2 1/2" X 5" PREFINISHED ALUM. MULLION (TYP.)

z1

PRE-FINISHED METAL PANEL CLADDING SYSTEM (TYP.)

4" CFMF STUD SUBSTRATE WALL W/ RIGID INSULATION AND 2" AIR GAP FROM LIMESTONE METAL PANEL CLADDING CONTINUOUS AROUND COLUMN BETWEEN INTERIOR AND EXTERIOR

0' - 1"

1' - 2 1/4"

0' - 4"

A453

z/a Plan Level L1-Grade Level - Atypical Callout 1 1 1 1/2" = 1'-0"

05/07/2021

SUPPORT FOR METAL PANEL NOT SHOWN FOR CLARITY

PLAN DTL LX - AT NON-TYP/DSGN DTL (1 08)

1' - 4"

3 1/8" PARTITION FOR FASTENING INTERIOR METAL PANEL

Sheet Issued

1' - 2"

PRE-FINISHED ALUM. CURTAINWALL SYSTEM, WITH 1" INSUL. GLAZING UNITS (TYP.)

1' - 4"

SEALENT AND BACKER ROD AT LOCATION OF MULLION AND METAL PANEL

Sheet Title

1' - 4"

LTU CoAD ARC 2313

1' - 8"

LINE OF METAL PANEL ABOVE

Moussa Aoun, Spring 2021

AREA TO COORD.; AREA/ITEM REVISED.

Construction Systems 1

LINE OF "PLACEHOLDER" OBJECT (TO BE DEVELOPED).

z8

LINE OF MAS. VENEER ABOVE AND FOUNDATION WALL BELOW (AT 1' 8")

Music Academy Spain Ensamble Studio, Madrid

DRAWING LEGEND

MULLION INSET TO METAL PANEL CLADDING SYSTEM FOR CLEAN TRANSITION FROM GLAZING TO METAL PANELS

zA403


RIGID BOARD INSULATION RUNS CONTINUOUS AROUND ENTIRE WALL.

FLOOR SLABS: EXTERIOR EDGE OFCONCRETE ON METAL DECK 11" FROM CENTER OF BEAM (TYP) SEE NARRATIVE FOR DETAILS

6" CFMF STUDFRAMED BACKUP WITH EXT. GYP BD SHEATHING (TYP)

FLOOR SLAB: 3"CONCRETE SLAB 2" METAL DECK BASE FOR CONCRETE SLAB

CONTINUOUS LAYER OF SEATHING RUNS BEHIND INSULATION

1" SLIP CONNECTIONAT HEAD OF STUDWALL FOR MVMT.

VAPOR BARRIER PLACED JUST INSIDE OF SPRAYED ON INSULATION

Z-FURRING AT 24" SPACING INTERVALS

WATER BARRIER PLACED ON RIGID INSULATION

4" MASONRY VENEER ON OUTERMOST ELEMENT OF WALL. FLASHING AT MASONRY VENEER JOINTS

ACOUSTIC CEILING TILE IN SUSPENDEDGRID SYSTEM

5' - 9"

CONT. SEALANT &BACKER RODAROUND PERIMETEROF CURTAINWALLSYSTE M ATEXTERIOR & ATINTERIOR

CEILING-WALL CONNECTION TO BE COORDINATED

CURTAIN WALL OPENING WITH 2.5"x5" MULLIONS FLASHING AT TOP OF WINDOW SILL


HORIZ. FLOOR FRAMING: STEEL BEAMS, PRIMARY FRAME, WITH SECONDARY INFILL

Level 2 11' - 8"

1" MINIMUM OF FIREPROOFING SPRAY FOR FIRE RATING AT SUPPORTING STEEL

6" CFMF STUD SUBSTRATE WALL W/ RIGID INSULATION AND 2" AIR GAP FROM LIMESTONE

2' - 8 1/4"

3 1/8" PARTITION FOR FASTENING INTERIOR METAL PANEL, CONNECTED TO UNDERSIDE OF FLOOR SLAB ABOVE FOR RIGIDITY

4" STONE CLADDING OVERHANG AT TRANSITION BETWEEN STONE AND METAL TO HIGHLIGHT TRANSITION

PRE-FINISHED METAL PANEL CLADDING SYSTEM (TYP.) SUPPORT FOR METAL PANEL NOT SHOWN FOR CLARITY

METAL CLADDING USED AS TRANSITION BETWEEN STONE CLADDING AND GLAZING

0' - 5 1/2"

1' - 8"

0' - 3 1/8"

1' - 4"

1' - 4"

1' - 11 3/4"

1' - 2"

STEEL ANGLE SUPPORTS EACH EXTERIOR CLADDING STONE FROM BENEATH METAL PANEL CLADDING CONT. AROUND COLUMN BETWEEN INTERIOR AND EXTERIOR

SHIMS AND BLOCK FOR MULLION ATTACHMENT AND RIGIDITY

PRE-FINISHED ALUM. CURTAINWALL SYS., WITH 1" INSUL. GLAZING UNITS (TYP.) WITHOUT VERTICAL MULLIONS

2 1/2" X 5" PREFINISHED ALUM. MULLION (TYP.)

MULLION INSET TO METAL PANEL CLADDING FOR CLEAN FINISHED LOOK

SUPPORTING STEEL ATTACHED TO STEEL ANGLE NOT SHOWN FOR CLARITY

A403

LINE OF METAL PANEL BELOW


ROOF

WITH 2" HORIZ. METAL Z-FURRINGS (TYP.)

FULLY ADHERED MEMBRANE ROOFING

CONT. AIR AND WATER PENETRATION BARRIER (AWPB) (TYP.)

RIGID BOARD INSUL. (MIN. THICKNESS AS REQ'D PER ENERGY CODE CALCS.)

2' - 11"

TAPERED ROOF INSUL. (SLOPE 1/4" MIN.)

6" CFMF STUDFRAMED BACKUP WITH EXT. GYP. BD. SHEATHING (TYP.)

CONT. VAPOR BARRIER (IF SPECIFIC ROOS ASS'Y IS "BREATHABLE")

6" CFMF STUDFRAMED BACKUP EXTENDED PAST STEEL FRAME AND SLAB TO FORM PARAPET WALL

Roof 46' - 8"

FLOOR SLAB: 3" CONCRETE ON 2" METAL DECK

AT LINE OF ROOF, FILL ENTIRE STUD CAVITY WITH SPRAY FOAM INSUL. AND VAPOR BARRIER LAYER

HORIZ. FLOOR FRAMING: STEEL BEAMS, PRIMARY FRAME, WITH SECONDARY INFILL

CONT. 3" SPRAY FOAM INSUL. WITH VAPOR BARRIER LAYER AT INTERIOR STUD CAVITY (TYP.)

LINE OF FIREPROOFING ON STEEL FRAME (1" MIN. TYP.)

2" RIGID BOARD CONTINUOUS INSULATION AT EXT. CLADDING CAVITY

GYPSUM BOARD(GWB) CEILING SYSTEM

GWB SOFFIT USAGES: TRANSITION BETW. AREAS OF INTERIOR CEILING (LOWER, DUE TO PLENUM) AND HIGHER CEILING AREAS (AT FLOOR OPENING OR AT EXTERIOR GLAZING) (TYP.)


SURFACES, EXTENDING 4" UP WALLS

PARTITIONS TO COVER LATERAL PLUMBING RUNS TO VERT. CHASE AMBULATORY ACCESSIBLE TOILET COMPARMENT (60"d x 36"w)

z3 2 zA701

WHEELCHAIR ACCESSIBLE TOILET COMPARTMENT (60"d x 54"w)

17' - 6"

FINISH MATERIALS: COUNTERTOPS SHOULD HAVE WATER-RESISTENT SURFACES & SUBSTRATES, WITH SIDE & BACKSPLASHES, & WITH MINIMAL JOINTS ADJACENT TO FIX-TURES, TOWEL DISP. ETC,

TOILET RM. ACCESSORIES (SOAP, TOWEL & WASTE DISP., DRYERS, BABY-CHANGING STATIONS, ETC.) TO HAVE ACCESSIBLE FLOOR SPACE & REACH RANGES

WALL MOUNTED ITEMS (GRAB BARS, PAPER DISPENSERS ETC.) NOT SHOWN FOR CLARITY

2 zA332 TOILET PARTITIONS: 1" PANELS, FLR. MTD., WALL ATTACHED, HEADRAIL BRACED (TYP.)

TOILET & SINK FIXTURES LOCATED HORIZ. & VERT. PER ACCESSIBILITY REQS.)

z4 TOILET RM. SEPARATION: PERIMETER PARTNS. EXTEND UP TO SLAB ABOVE, WITH SEPARATE EXHAUST DUCTWORK (NOT SHOWN FOR CLARITY)

1

Plan Area L2 - Bathroom 1/4" = 1'-0"

z8

GWB CEILING SYS.: GWB ON SUSPENSION SYS. OR MTL. STUD FRAMING

11' - 8"

TOILET ACCESSORIES (PAPER DISP., GRAB BARS, ETC.) TO HAVE ACCESSIBLE CONFIG-URATIONS & MOUN-TING HGTS. WHERE REQ'D. (NOT SHOWN FOR CLARITY)

Level 3 23' - 4"

CLEAR FLOOR SPACE AT SINKS TO INCLUDE ACCESSIBLE KNEE AND TOE CLEARANCES, & KNEE PROTECTION AT PLUMBING CONNECTIONS

Level 2 11' - 8"


Turn static files into dynamic content formats.