SHT. TITLE (ORDER FOLLOWS U.S. NATL. CAD STD.)
G001
CS2/ LIST OF SHEETS/ REQUIRED
A001
3D OVERLAY [SW]/ ENCLOSURE SYSTEMS*
A002
3D OVERLAY [NE]/ ENCLOSURE SYSTEMS*
A003
3D UNDERLAY [NE]/ MECH. & VERT. SYSTEMS*
A004
3D UNDERLAY [NE]/ STRUCTURAL SYSTEMS*
A100
PLAN LEVEL L0/ OVERALL/ BELOW GRADE LVL.
A110
PLAN LEVEL L1/ OVERALL/ GRADE LEVEL
P
A120
PLAN LEVEL L[3]/ OVERALL/ UPPER LEVEL*
P
A121
PLAN L[3]/ SECTOR S[1]/ CORE*
P
A122
PLAN L[3]/ SECTOR S[3]/ ENCLOSURE [N]*
A180
PLAN L[20]/ OVERALL/ ROOF LEVEL*
A201
ELEVATION [WEST]/ OVERALL*
A202
ELEVATION [SOUTH]/ OVERALL*
A213
ELEVATION [EAST] S[3]/ ENCLOS. [N]*
P
A301
BLDG. SECTION 1/ OVERALL
P
A302
BLDG. SECTIONS 2 & 3/ S[1] CORE*
P
A331
3D/ BLDG. SECTION/ L[3] BELOW CLG.*
P
A332
3D/ BLDG. SECTION/ L[3] ABOVE CLG. & CORE*
P
A352
WALL SECTION 1/ S[3] ENCLOS. [N]*
A381
3D WALL SCTN./ S[3] ENCLOS. [N]*
A382
3D WALL ELEV./ AT NON-TYP./DESIGN DTL.
P
A401
PLAN DTL. L[3] S[3]/ TYP. WALL AT COL.*
P
A402
PLAN DTL. L[3] S[3]/ TYP. WALL AT CORNER*
A503
PLAN DTL. L[X]/ AT NON-TYP./DESIGN DTL.*
A451
SCTN. DTL. L[3] S[3]/ TYP. WALL/FLOOR*
P
Student
A552
SCTN. DTL. L[X]/ AT NON-TYP./DESIGN DTL.*
Ensamble Studio
Moussa Aoun
A553
SCTN. DTL. L[20] S[3]/ AT ROOF*
dd mmm yyyy Unx
Architect
CS2/ List of Sheets/ Required
P
Sheet Issued
Santiago De Compostela, Spain
Sheet Title
Musical Studies Centre
Project Source
P
Student Name, Year & Semester
SHT. NO.
Construction Systems 2
PROGRESS (UNIT INFO. REQS. MET) FINAL (INDIV. DRAWING REQS. MET) RECAP (SET DRAWING REQS. MET)
LTU CoAD ARC 2323
p F r
Music Academy Spain Arch. Name (Sht., Designer)
NOTES: LEVEL OR LOCATION VARIES BY PROJECT
DATE:
DD MON YYYY UNIT 6: INDUSTRY PRACTICE
*
ISSUED FOR:
DD MON YYYY UNIT 5: ENCLOSURE DETAILS
UNIT 7: PROJ. RECAP. & COORD. DD MON YYYY
DD MON YYYY UNIT 4: ENCLOSURE COORD.
UNIT 3: HORIZ. LAYOUT COORD. DD MON YYYY
DD MON YYYY UNIT 2: VERT. CORE COORD.
UNIT 1: FRAMING & FND. COORD. DD MON YYYY
List of Sheets/ Required
Madrid, Spain 2002
A600-[4] SCHEDULES (QUANTITY ITEMIZATION)* I 2[3]0
INT. PLAN AREA & ELEV./ PUBLIC TOILET RM.
I 2[3]0
REFL. CLG. PLAN L[3]/ OVERALL*
zG001
Construction Systems 1
Music Academy Spain Ensamble Studio, Madrid
VERTICAL CIRCU-LATION: STAIRS & ELEVATORS IN CONT. VERTICAL SHAFTS
VERTICAL SUPPORT FRAMING: STEEL COLUMNS W12X87 SHAFT AREA CONTAINS ALL VERT. BLDG. SYSTEMS:
HORIZ. FLOOR & ROOF FRAMING: STEEL BEAMS; PRIMARY CLEAR SPAN, WITH SECONDARY INFILL
HVAC SYSTEMPRIMARY DISTRIBU-TION: SUPPLY AIR &RETURN AIR TRUNKDUCTS IN CONT.VERTICAL SHAFTS
EXTERIOR ENCLOSURE: 4" MASONRY, 6" CFMF (TYP.)
SUB-GRADE WALLS:C.I.P. REINF.CONCRETE
ROOF SYSTEM SAME AS LEVEL 5 (TO BE COORDINATED)
DRAWING LEGEND LINE OF "PLACEHOLDER" OBJECT (TO BE DEVELOPED). AREA TO COORD.; AREA/ITEM REVISED.
1
3D OVERLAY SW ENCL. SYSTEMS
05/07/2021
FOUNDATION SYSTEM: C.I.P. REINF. CONCRETE PIERS AT COLUMNS; C.I.P. REINF. CONCRETE FOOTINGS AT ADEQUATE SOILS
3D OVERLAY - SW - ENCLOSURE SYSTEMS
ELECT. & COMM. SYSTEMS PRIMARY DISTRIBUTION: CONDUCT RISERS VERTICALLY THROUGH SERVICE ROOMS.
Sheet Issued
TRANSPARENT ENCLOSURE: PRE-FINISHED ALUMINUM CURTAINWALL WITH 1" INSULATING GLAZING UNITS AND 2.5"X5" MULLIONS
Sheet Title
PLUMB. & FIRE PROT. SYSTEMS PRIMARY DISTRIBUTION: PIPERISERS IN CONT. VERTICAL SHAFTS
Moussa Aoun, Spring 2021
LTU CoAD ARC 2313
Project Source
FLR. & ROOF SLABS:C.I.P. CONCRETE ON METAL DECK
zA001
PLUMB. & FIRE PROT. SYSTEMS PRIMARY DISTRIBUTION: PIPERISERS IN CONT. VERTICAL SHAFTS
HORIZ. FLOOR & ROOF FRAMING: STEEL BEAMS; PRIMARY CLEAR SPAN, WITH SECONDARY INFILL
ELECT. & COMM. SYSTEMS PRIMARY DISTRIBUTION: CONDUCT RISERS VERTICALLY THROUGH SERVICE ROOMS.
EXTERIOR ENCLOSURE: 4" MASONRY, 6" CFMF (TYP.)
FOUNDATION SYSTEM: C.I.P. REINF. CONCRETE PIERS AT COLUMNS; C.I.P. REINF. CONCRETE FOOTINGS AT ADEQUATE SOILS
Moussa Aoun, Spring 2021
Construction Systems 1
VERTICAL SUPPORT FRAMING: STEEL COLUMNS W12X87
Music Academy Spain Ensamble Studio, Madrid
FLR. & ROOF SLABS:C.I.P. CONCRETE ON METAL DECK
HVAC SYSTEMPRIMARY DISTRIBU-TION: SUPPLY AIR &RETURN AIR TRUNKDUCTS IN CONT.VERTICAL SHAFTS
Project Source
SHAFT AREA CONTAINS ALL VERT. BLDG. SYSTEMS:
LTU CoAD ARC 2313
VERTICAL CIRCU-LATION: STAIRS & ELEVATORS IN CONT. VERTICAL SHAFTS
DRAWING LEGEND LINE OF "PLACEHOLDER" OBJECT (TO BE DEVELOPED).
1
3D OVERLAY NE ENCL. SYSTEMS
AREA TO COORD.; AREA/ITEM REVISED.
05/07/2021
SUB-GRADE WALLS:C.I.P. REINF.CONCRETE
3D OVERLAY - NE - ENCLOSURE SYSTEMS
12" EARTH RETETION SYSTEM FROM BASEMENT TO LEVEL 2
Sheet Issued
TRANSPARENT ENCLOSURE: PRE-FINISHED ALUMINUM CURTAINWALL WITH 1" INSULATING GLAZING UNITS AND 2.5"X5" MULLIONS
Sheet Title
STEPS AT ENTRANCE TO BE COORDINATED
zA002
GUARDRAILS AT CENTER OF STAIR ONLY
BLDG. SYSTEMS SECONDARY DISTRIBUTION: HORIZONTAL RUNS THROUGH CEILING PLENUM & RAISED FLOOR ZONES
HVAC SYSTEM PRIMARY DISTRIBUTION: SUPPLY AIR & RETURN AIR TRUNK DUCTS IN CONT. VERT. SHAFTS
Moussa Aoun, Spring 2021
Construction Systems 1
Music Academy Spain Ensamble Studio, Madrid
VERTICAL CIRCULATION: STAIRS & ELEVATORS IN CONT. VERT. SHAFTS
LTU CoAD ARC 2313
STRUCTURE / HVAC COORD. STRATEGY: HVAC PRIMARY BRANCH RUNS PARALLEL TO & RECESSED WITHIN CLEARSPAN BEAMS; HVAC SECONDARY BRANCHES ARE WIDE/ SHALLOW & RUN UNDER-NEATH CLEARSPAN BEAMS
Project Source
HVAC SYSTEM PRIMARY EQUIPEMNET: EQUIP. AT TOP (AND BOTT.) FLOORS FEEDING TRUNK DUCTS IN VERT. SHAFTS
LINE OF "PLACEHOLDER" OBJECT (TO BE DEVELOPED).
1
3D UNDERLAY NE MECH. & VERT. SYSTEMS
AREA TO COORD.; AREA/ITEM REVISED.
03/06/2021
DRAWING LEGEND
3D UNDERLAY NE - MECHANICAL SYSTEMS
VERT. COORD. REQ'D AT SHAFTS: CONFLICTS OCCUR IN MANY LOCA-TIONS AT SHAFT PART'NS & PIERS, WHERE PIERS ARE LARGER THAN TYP. STRUCT. MEMBER SIZES
Sheet Issued
PLUMB. & FIRE PROT. SYSTEMS PRIMARY DISTRIBUTION: PIPE RISERS IN CONT. VERTICAL SHAFTS
Sheet Title
ELECT. & COMM. SYSTEMS PRIMARY DISTRIBUTION: CONDUIT RISERS VERTICALLY THROUGH SERVICE ROOMS.
zA003
VERTICAL SUPPORT FRAMING: STEEL COLUMNS W12X87 Project Source
HORIZ. FLOOR & ROOF FRAMING: STEEL BEAMS; PRIMARY CLEARSPAN, WITH SECONDARY INFILL
Moussa Aoun, Spring 2021
Construction Systems 2
LATERAL BRACING SYSTEM AT CORNER AREAS: STEEL BEAMS, COLUMNS & DIAGONALS (TO BE COORD.)
Music Academy Spain Ensamble Studio, Madrid
LTU CoAD ARC 2323
EXPOSED STRUCTURAL FRAMING VS. ENCLOSED STRUCTURAL FRAMING: EXPOSED STRUCTURAL FRAMING IS HANDLED DIFFERENTLY, TO SHED WATER AND ALLOW TIGHT JOINTS TO OTHER ENCLOSURE MATERIALS
FINISH GRADE
FLR. & ROOF SLABS: C.I.P. CONCRETE ON METAL DECK
1
3D UNDERLAY NE STRUCTURAL SYSTEMS
LINE OF "PLACEHOLDER" OBJECT (TO BE DEVELOPED). AREA TO COORD.; AREA/ITEM REVISED.
05/07/2021
DRAWING LEGEND
3D UNDERLAY NE STRUCTURAL SYSTEMS
EART RET. WALL FROM FNDN. TO LEVEL 2
Sheet Issued
WATERPROOFING ON C.I.P. CONC. SLAB AT AREAS OF INSET ENCLOSURE
Sheet Title
SUB-GRADE WALLS: C.I.P. REINF. CONCRETE
FOUNDATION SYSTEM AT ADEQUATE SOILS: C.I.P. REINF. CON-CRETE PIERS AT COLUMNS; C.I.P. REINF. CONCRETE FOOTINGS
zA004
1 Sheet Issued
02/05/21
Sheet Title
3D UNDERLAY SW STRUCTURAL SYSTEMS
z/e/ 3D Ext./ "NE" Abv./ Str. & Fnd.
zA004'
Music Academy Spain Designer
Project Source
Author
Construction Systems 1
LTU CoAD ARC 2313
z8
70' - 0" 11' - 8"
35' - 0"
SLAB HALF TONED TO SHOW FT'G LAYOUT BELOW
LTU CoAD ARC 2313
23' - 4"
REFER TO ENLARGED AREA PLANS FOR PARTITION & STRUCTURE COORD. NOTES
BASIC STAIR RISERTREAD LAYOUT SHOWN ONLY; REFER TO SECTIONS & ENLARGED PLANS FOR OTHER STAIR COMPONENTS
Project Source
23' - 4"
STAIR LAYOUTS IS THE SAME BASED ON FLR.-FLR. HEIGHT, THAT IS IDENTICAL FOR ALL LEVELS (TYP.)
23' - 4"
z1
70' - 0"
29' - 2"
29' - 2"
70' - 0"
z2
SUB-GRADE WALLS: C.I.P. REINF. CONCRETE
Moussa Aoun, Spring 2021
z7
Construction Systems 1
z6
Music Academy Spain Ensamble Studio
z5
VERTICAL CIRCULATION: STAIRS & ELEVATORS IN CONT. VERTICAL SHAFTS
1
Level 0 3/32" = 1'-0"
zA331
05/07/2021
z4 1
PLAN LEVEL 0 OVERALL - BLW. GRADE LVL.
17' - 6"
17' - 6"
z3
SUB-GRADE PIERS SUPPORTING COLUMNS ABOVE: C.I.P. REINF. CONCRETE 30 X 30
Sheet Issued
VERTICAL SUPPORT FRAMING: STEEL COLUMNS W12X87
Sheet Title
LOWEST LEVEL SLAB: C.I.P. CONCRETE SLAB ON GRADE
DRAWING LEGEND LINE OF "PLACEHOLDER" OBJECT (TO BE DEVELOPED). AREA TO COORD.; AREA/ITEM REVISED.
zA100
z8
DRAWING LEGEND LINE OF "PLACEHOLDER" OBJECT (TO BE DEVELOPED).
70' - 0" 23' - 4"
11' - 8"
35' - 0"
1 zA403
EARTH RET. WALL SYS. 12" (TYP.)
AREA TO COORD.; AREA/ITEM REVISED.
z1
23' - 4"
HORIZ. FLOOR FRAMING: STEEL BEAMS; PRIMARY FRAME W16X40, WITH SECONDARY INFILL W12X35
LTU CoAD ARC 2323
FLOOR SLAB: 3" LW CONCRETE ON 2" METAL DECK
TRANSPARENT ENCLOSURE: RECESSED PRE-FINISHED ALUM. CURTAIN WALL SYSTEM WITH 1" INSUL. GLAZING UNITS AND TOP AND BOTTOM MULLIONS ONLY
VERTICAL SUPPORT FRAMING: STEEL COLUMNS W12X87
"EXIT" IN FIRERESISTENCE RATED ENCLOSURE (TYP.)
Project Source
z3
17' - 6"
z/a Plan Level L1-Grade Level 1 1/8" = 1'-0"
05/07/2021
LATERAL BRACING SYSTEM AT CORNER AREAS: STEEL BEAMS, COLUMNS & DIAGONALS (TO BE COORD.)
PLAN LEVEL 1 OVERALL GRADE LEVEL
DOOR IN CURTAIN WALL SYSTEM (TYP.)
Sheet Issued
BASIC STAIR RISER TREAD LAYOUT SHOWN ONLY; REFER TO SECTIONS & ENLARGED PLANS FOR OTHER STAIR COMPONENTS
OPAQUE ENCLO-SURE: PRE-FINISHED METAL PANEL CLADDING SYSTEM AT SPANDREL & COL. ENCLOSURE WITH A 4" RECESS
Sheet Title
29' - 2"
STAIR LAYOUTS IS THE SAME BASED ON FLR.-FLR. HEIGHT, THAT IS IDENTICAL FOR ALL LEVELS (TYP.)
70' - 0"
z2
Moussa Aoun, Spring 2021
z7
Construction Systems 2
z6
Music Academy Spain Ensamble Studio, Madrid
z5
2 zA332
z4
zA110
z8
70' - 0"
1' - 8"
1' - 8"
1 zA402
1' - 8"
1 zA331
HORIZ. FLOOR FRAMING: STEEL BEAMS; PRIMARY FRAME W16X40, WITH SECONDARY INFILL W12X35
z1
2 I501 TRANSPARENT ENCLOSURE: PRE-FINISHED ALUMINUM CURTAINWALL WITH 1" INSULATING GLAZING UNITS AND 2.5"X5" MULLIONS
1
VERTICAL SUPPORT FRAMING: STEEL COLUMNS W12X87
23' - 4"
I501
EXTERIOR ENCLOSURE: 4" MASONRY, 6" CFMF (TYP.)
"EXIT" IN FIRERESISTENCE RATED ENCLOSURE (TYP.)
1 zA401
Project Source
z2
STAIR LAYOUTS IS THE SAME BASED ON FLR.-FLR. HEIGHT, THAT IS IDENTICAL FOR ALL LEVELS (TYP.)
-
1
70' - 0"
BASIC STAIR RISERTREAD LAYOUT SHOWN ONLY; REFER TO SECTIONS & ENLARGED PLANS FOR OTHER STAIR COMPONENTS
29' - 2"
---
1 zA121
05/07/2021
1 zA701
1 zA123
PLAN LEVEL 2 OVERALL - LEVEL 2
FURNISHINGS LAYOUT: EXAMPLE LAYOUTS ILLUSTRATE USAGE & COORDINATE ELECT. & COMM. DISTRIBUTION
Sheet Issued
zA332
Sheet Title
1 zA122
35' - 0"
1' - 8"
FLOOR SLAB: 3" LW CONCRETE ON 2" METAL DECK
11' - 8"
LTU CoAD ARC 2313
23' - 4"
z3 DRAWING LEGEND 17' - 6"
LINE OF "PLACEHOLDER" OBJECT (TO BE DEVELOPED). AREA TO COORD.; AREA/ITEM REVISED.
2
Level 2 1/8" = 1'-0"
zA332 1' - 8"
1
Moussa Aoun, Spring 2021
z7
Construction Systems 1
z6
Music Academy Spain Ensamble Studio, Madrid
z5
z4
zA120
1
HORIZ. FLOOR FRAMING: STEEL BEAMS; PRIMARY FRAME W16X40, WITH SECONDARY INFILL W12X35
35' - 0"
zA331
VERTICAL SUPPORT FRAMING: STEEL COLUMNS W12X87
FIRE RESISTENCE RATED SHAFTWALL PARTITION SEPARATING MULTI-STORY SHAFTS FROM ADJACENT FLOOR AREAS (TYP.) ("TYPE 1")
1
23' - 4"
I501
"EXIT" IN FIRERESISTENCE RATED ENCLOSURE (TYP.)
STAIR LAYOUTS IS THE SAME BASED ON FLR.-FLR. HEIGHT, THAT IS IDENTICAL FOR ALL LEVELS (TYP.)
HVAC SYSTEM PRIMARY DISTRIBUTION: SUPPLY AIR & RETURN AIR TRUNK DUCTS IN CONT. VERTICAL SHAFTS
z2
LTU CoAD ARC 2313
z1
NON-RATED PARTITIONS UNLESS NOTED OTHERWISE (TYP.) ("TYPE 2")
---
BASIC STAIR RISERTREAD LAYOUT SHOWN ONLY; REFER TO SECTIONS & ENLARGED PLANS FOR OTHER STAIR COMPONENTS
29' - 2"
PLUMB. & FIRE PROT. SYSTEMS PRIMARY DISTRIBUTION: PIPE RISERS IN CONT. VERTICAL SHAFTS
FURRED PARTITION COVERING STEEL STRUCT. (TYP.)("TYPE 3")
1
VERTICAL CIRCULATION: STAIRS & ELEVATORS IN CONT. VERTICAL SHAFTS
Project Source
-
Sheet Issued
05/07/2021
PLAN L2 SECTOR 1 (S1) CORE (1 96)
17' - 6"
z3
ANNOTATION LINE DEPECTING ENCLOSURE WALLS THAT WILL BE COORDINATED IN FUTURE UNITS
Sheet Title
zA332
FNDN. WALL GOES UP TO LEVEL 2 AT SOME INSTANCES
DRAWING LEGEND
Level 2 - A121 1 1/8" = 1'-0"
Moussa Aoun, Spring 2021
z8
Construction Systems 1
z7
Music Academy Spain Ensamble Studio, Madrid
FLOOR SLAB: 3" LW CONCRETE ON 2" METAL DECK
2
LINE OF "PLACEHOLDER" OBJECT (TO BE DEVELOPED).
zA332
z4
AREA TO COORD.; AREA/ITEM REVISED.
zA121
1' - 8"
1' - 8"
1' - 8" 1' - 8"
HORIZ. FLOOR FRAMING: STEEL BEAMS; PRIMARY FRAME W16X40, WITH SECONDARY INFILL W12X35
11' - 8"
z1
23' - 4"
LTU CoAD ARC 2313
VERTICAL SUPPORT FRAMING: STEEL COLUMNS W12X87
FNDN. WALL GOES UP TO LEVEL 2 AT SOME INSTANCES
DOORS & FRAMES: HOLLOW MTL. OR ALUM. STOREFRONT FRAMES W. SIDELIGHTS; WD. SOLID CORE DOORS W. GLAZING
05/07/2021
DRAWING LEGEND
1
Level 2 - A122 1/8" = 1'-0"
1' - 8"
TRANSPARENT ENCLOSURE: PRE-FINISHED ALUMINUM CURTAINWALL WITH 1" INSULATING GLAZING UNITS AND 2.5"X5" MULLIONS
17' - 6"
EXTERIOR ENCLOSURE: 4" MASONRY, 6" CFMF (TYP.)
PLAN L2 SECTOR 3 (S3) ENVEL N (1 96)
z3
Sheet Issued
FURNISHINGS LAYOUT: EXAMPLE LAYOUTS ILLUSTRATE USAGE & COORDINATE ELECT. & COMM. DISTRIBUTION
Sheet Title
INT. FURRED PARTITIONS: GWB, NSMF 1.625", 2.25" thk, double sided, 1 hr
70' - 0"
29' - 2"
INT. PARTITIONS Ex, GWB, WS 3.5", GWB, 5.25" thk (TYPE 1)
Project Source
z2
1 zA331
z4
LINE OF "PLACEHOLDER" OBJECT (TO BE DEVELOPED). AREA TO COORD.; AREA/ITEM REVISED.
Moussa Aoun, Spring 2021
23' - 4"
z7
Construction Systems 1
z6
Music Academy Spain Ensamble Studio, Madrid
z5
FLOOR SLAB: 3" LW CONCRETE ON 2" METAL DECK
zA122
35' - 0"
FURRED PARTIOTION COVERING STEEL STRUCT. (TYP.)
VERTICAL CIRCULATION: STAIRS & ELEVATORS IN CONT. VERTICAL SHAFTS
z3 2
BASIC STAIR RISERTREAD LAYOUT SHOWN ONLY; REFER TO SECTIONS & ENLARGED PLANS FOR OTHER STAIR COMPONENTS
HVAC SYSTEM PRIMARY DISTRIBUTION: SUPPLY AIR & RETURN AIR TRUNK DUCTS IN CONT. VERTICAL SHAFTS
Project Source
zA701
Moussa Aoun, Spring 2021
z8
Construction Systems 1
z7
LTU CoAD ARC 2313
STAIR LAYOUTS IS THE SAME BASED ON FLR.-FLR. HEIGHT, THAT IS IDENTICAL FOR ALL LEVELS (TYP.)
NON RATED PARTITION UNLESS NOTED OTHERWISE
Music Academy Spain Ensamble Studio, Madrid
"EXIT" IN FIRERESISTENCE RATED ENCLOSURE (TYP.)
17' - 6"
ANNOTATION LINE DEPECTING ENCLOSURE WALLS THAT WILL BE COORDINATED IN FUTURE UNITS
z4
HORIZ. FLOOR FRAMING: STEEL BEAMS; PRIMARY FRAME W16X40, WITH SECONDARY INFILL W12X35 VERTICAL SUPPORT FRAMING: STEEL COLUMNS W12X87
1
05/07/2021
FLOOR SLAB: 3" LW CONCRETE ON 2" METAL DECK
PLAN AREA L2 STAIRS & TOILET
zA332
Sheet Issued
2
Sheet Title
FIRE RESISTENCE RATED SHAFTWALL PARTIOTION SEPARATING TWO SHAFTS (TYP.)
zA332
1
Plan Area L3 - Stairs & Bathroom1 1/4" = 1'-0"
zA123
1 Level 3 3/32" = 1'-0" 1
zA331
z2
z4
Author
Construction Systems 1
z8
Music Academy Spain Designer
35' - 0"
02/01/21
70' - 0" LTU CoAD ARC 2313
z1
PLAN LEVEL 3 (L3) - OVERALL UPPER LEVEL
11' - 8"
Project Source
z7
Sheet Issued
23' - 4"
23' - 4"
70' - 0"
29' - 2"
z6
Sheet Title
17' - 6"
z5
z3
zA130
1 Level 4 3/32" = 1'-0" zA331
z2
z3
z4
Author
Construction Systems 1
z8
Music Academy Spain Designer
LTU CoAD ARC 2313
z1
02/02/21
35' - 0"
PLAN LEVEL 4 OVERALL
11' - 8"
Project Source
70' - 0"
Sheet Issued
23' - 4"
23' - 4"
z7
70' - 0"
29' - 2"
z6
Sheet Title
17' - 6"
z5
1
zA140
z8
DRAWING LEGEND LINE OF "PLACEHOLDER" OBJECT (TO BE DEVELOPED).
70' - 0" 23' - 4"
11' - 8"
35' - 0"
AREA TO COORD.; AREA/ITEM REVISED.
FULLY ADHEREED MEMBRANE ROOFING
ROOF DRAINAGE SYSTEM: TAPERED INSULATION AND ROOF DRAINS AND OVERFLOW DRAINS 23' - 4"
TAPERED ROOF INSULATION (SLOPE 1/4" / 1' MIN.U.N.O.) RIGID BOARD ROOF INSULATION (MIN. THICKNESS AS REQ'D. PER ENERGY CODE CALCS.)
TAPERED INSUL. CRICKETS (SLOPE 1/8" / 1' MIN) (TYP.)
-
ROOFING DRAINAGE SYSTEM COORD.: ROOF DRAINS AND OVERFLOW DRAINS TO BE LOCATED ON OPPOSITE SIDES OF STEEL BM. BELOW, AS REQ'D TO PROVIDE PIPE CLEARANCES AROUND BM. INCL. FIREPROOFING
29' - 2"
ROOF DRAIN AND OVERFLOW DRAIN
70' - 0"
---
LAYOUT TO REMAIN TYP. AROUND EXTERIOR INDENTATION
Sheet Issued
05/07/2021
PLAN L4 OVERALL - ROOF LEVEL
ROOFING SYSTEM AT LEVEL 3, SAME AS ROOFING SYSTEM AT LEVEL 5
1/2" SLOPED GLAZING ENCLOSURE
z3 LOCATION OF MULTIPLE CONDENSING UNITS FOR LOCALIZED INTERIOR AIR CONDITIONING
17' - 6"
Roof 1/8" = 1'-0"
Project Source
z2
ROOFING DRAINAGE LAYOUT: CONSISTENT RECTANGULAR LAYOUT FOR COST AND CONSTRUCTION EFFICIENCY
1
LTU CoAD ARC 2313
z1
ROOFING SYSTEM
Sheet Title
2" METAL COPING SYSTEM (TYP.)
Moussa Aoun, Spring 2021
z7
Construction Systems 1
z6
Music Academy Spain Ensamble Studio, Madrid
z5
2 zA332
z4
zA150
z8
BLDG. SYSTEMS DISTRIB. TERMINA-TIONS (HVAC, FIRE PROT./ALARM, ELEC./ COMM.): DEVICES MOUNTED IN CEILING & RAISED FLOOR (NOT SHOWN FOR CLARITY)
70' - 0" 23' - 4"
11' - 8"
35' - 0"
ACOUS. CEILING TILE (ACT) CEILING SYS-TEM: 2X2 / 2X4 TILES IN SUSPENDED GRID GWB CEILING SYS.: GWB ON SUSPENSION SYS. OR MTL. STUD FRAMING
23' - 4"
RECESSED 2X2 / 2X4 TROFFERS AND DIREC-TIONAL DOWNLIGHT FIXTURES IN GWB & ACT CEILINGS
RECESSED CAN OR INDIRECT DOME DOWN-LIGHT FIXTURES IN GWB & ACT CEILINGS
SUSPENDED LINEAR INDIRECT / DIRECT LIGHT FIXTURES, COORDINATED WITH PARTITIONS AS AN OVERALL GENERAL LIGHTING APPROACH
Project Source
z2 -
17' - 6"
z3
DRAWING LEGEND LINE OF "PLACEHOLDER" OBJECT (TO BE DEVELOPED).
2 zA332
Level 2 1/8" = 1'-0"
05/07/2021
BLDG. SYSTEMS SECONDARY DISTRIBUTION (HVAC, FIRE PROT./ALARM, ELEC./COMM.): HORIZONTAL RUNS THROUGH CEILING PLENUM & RAISED FLOOR ZONES
REFL CLG PLAN L2 - OVERALL
ACT CEILING SYS. USAGES: SOUND CONTROL AT OPEN & PRIVATE OFFICE AREAS; FLEXIBLE ACCESS TO PLENUM
Sheet Issued
29' - 2"
70' - 0"
---
PARTITION FRAMING & CEILING: PARTNS. ARE EXTENDED UP TO UNDERSIDE OF SLAB FOR RIGIDITY
1
LTU CoAD ARC 2313
z1
ACT CEILING SYS. GRID LAYOUT: GRID ARRANGED FOR EACH SPACE TO MINIMIZE <6" TILES AT CLG. EDGES
Moussa Aoun, Spring 2021
z7
Construction Systems 1
z6
Music Academy Spain Ensamble Studio, Madrid
z5
Sheet Title
ACT CEILING SYS. GRID LAYOUT: GRID ARRANGED FOR EACH SPACE TO ALLOW CENTERING OF LIGHT FIXTURES & ALIGNMENT OF OTHER DEVICES.
1 zA331
z4
AREA TO COORD.; AREA/ITEM REVISED.
zA230
29' - 2"
z4
DRAWING LEGEND LINE OF "PLACEHOLDER" OBJECT (TO BE DEVELOPED).
17' - 6"
VERTICAL SUPPORT FRAMING & LATERAL BRACING SYSTEMS AT BLDG. BASE: CONT. DOWN TO FOUNDATIONS (TO BE COORD.) 11' - 8"
Roof 46' - 8"
LOCATION OF FLOOR SLAB: 3" LW CONCRETE ON 2" METAL DECK
LTU CoAD ARC 2313
AREA TO COORD.; AREA/ITEM REVISED.
Level 4 35' - 0"
TRANSPARENT ENCLOSURE: PRE-FINISHED ALUMINUM CURTAINWALL WITH 1" INSULATING GLAZING UNITS AND 2.5"X5" MULLIONS
58' - 4"
1
EXTERIOR ENCLOSURE: 4" MASONRY, 6" CFMF (TYP.)
11' - 8"
Level 3 23' - 4"
Project Source
11' - 8"
LOCATION OF VERTICAL SUPPORT FRAMING: STEEL COLUMNS W12X87
Moussa Aoun, Spring 2021
23' - 4"
RECESSED 2" MTL. COPING
70' - 0"
z3
Construction Systems 1
z2
Music Academy Spain Ensamble Studio, Madrid
z1
I501
05/07/2021
11' - 8"
Level 1 0' - 0"
ELEVATION WEST - OVERALL
FOUNDATION SYS. AT ADEQUATE SOILS: C.I.P. REINF. CON-CRETE PIERS AT COLUMNS; C.I.P. REINF. CONCRETE FOOTINGS
Sheet Issued
11' - 8"
SUB-GRADE WALLS: C.I.P. REINF. CONCRETE 12"
Sheet Title
Level 2 11' - 8"
Level 0 -11' - 8"
EART RET WALL SYS. 4"
1
z/d Elevation "West"/ Overall (A204 x192) 1/8" = 1'-0"
zA301
70' - 0" 23' - 4"
11' - 8"
35' - 0"
DRAWING LEGEND LINE OF "PLACEHOLDER" OBJECT (TO BE DEVELOPED). AREA TO COORD.; AREA/ITEM REVISED.
Roof 46' - 8"
FLOOR SLAB: 3" LW CONCRETE ON 2" METAL DECK HORIZ. FLOOR FRAMING: STEEL BEAMS; PRIMARY FRAME W16X40, WITH SECONDARY INFILL W12X35
Level 4 35' - 0"
TRANSPARENT ENCLOSURE: PRE-FINISHED ALUMINUM CURTAINWALL WITH 1" INSULATING GLAZING UNITS AND 2.5"X5" MULLIONS
Level 3 23' - 4"
EXTERIOR ENCLOSURE: 4" MASONRY, 6" CFMF (TYP.)
Project Source
VERTICAL SUPPORT FRAMING: STEEL COLUMNS W12X87
Moussa Aoun, Spring 2021
z8
Construction Systems 1
z7
LTU CoAD ARC 2313
VERTICAL SUPPORT FRAMING & LATERAL BRACING SYSTEMS AT BLDG. BASE: CONT. DOWN TO FOUNDATIONS (TO BE COORD.)
z6
Music Academy Spain Ensamble Studio, Madrid
z5
FOUNDATION SYS. AT ADEQUATE SOILS: C.I.P. REINF. CON-CRETE PIERS AT COLUMNS; C.I.P. REINF. CONCRETE FOOTINGS
Level 0 -11' - 8"
1
z/c/ Elevation "South"/ Overall (A203 x192) 1/8" = 1'-0"
05/07/2021
EART RET WALL SYS. 4"
ELEVATION SOUTH OVERALL
Level 1 0' - 0"
Sheet Issued
SUB-GRADE WALLS: C.I.P. REINF. CONCRETE 12"
Sheet Title
Level 2 11' - 8"
zA302
AREA TO COORD.; AREA/ITEM REVISED.
TRANSPARENT ENCLOSURE: PRE-FINISHED ALUMINUM CURTAINWALL WITH 1" INSULATING GLAZING UNITS AND 2.5"X5" MULLIONS
Level 3 23' - 4"
2' - 8 1/4"
OPAQUE ENCLOSURE: PREFINISHED METAL PANEL CLADDING SYSTEM AT SPANDREL & COL. ENCLOSURE WITH A 4" RECESS
Sheet Issued
05/07/2021
Sheet Title
ELEVATION EAST - S3 - ENVEL N
7' - 0"
11' - 8"
1' - 11 3/4"
TRANSPARENT ENCLOSURE: RECESSED PREFINISHED ALUM. CURTAIN WALL SYSTEM WITH 1" INSUL. GLAZING UNITS AND TOP AND BOTTOM MULLIONS ONLY
Level 2 11' - 8"
Project Source
11' - 8"
EXTERIOR ENCLOSURE: 4" MASONRY, 6" CFMF (TYP.)
Moussa Aoun, Spring 2021
23' - 4"
Construction Systems 1
z1
LTU CoAD ARC 2313
z2
LINE OF "PLACEHOLDER" OBJECT (TO BE DEVELOPED).
Music Academy Spain Ensamble Studio, Madrid
DRAWING LEGEND
Level 1 0' - 0" LINE OF GRADE
1
z/b/ Elevation "East"/ Sector 1/4" = 1'-0"
zA313
29' - 2"
z4
HVAC SYSTEM PRIMARY EQUIPMENT: EQUIP. AT TOP AND BOTT. FLOORS, FEEDING TRUNK DUCTS IN VERT. SHAFTS
17' - 6"
GUARDRAIL AT CENTER OF STAIRS ONLY
Level 4 35' - 0" 11' - 8"
VERTICAL SUPPORT FRAMING: STEEL COLUMNS W12X87
ENTRANCE TO BE COORDINATED
Level 3 23' - 4"
FOUNDATION SYS. AT ADEQUATE SOILS: C.I.P. REINF. CON-CRETE PIERS AT COLUMNS; C.I.P. REINF. CONCRETE FOOTINGS
z/a/ Bldg. Section 1/ "N-S, to E"/ Overall (A301 x192) 1 1/8" = 1'-0"
58' - 4"
11' - 8" 11' - 8"
7' - 2 1/2"
Level 2 11' - 8"
BLDG. SYSTEMS SECONDARY DISTRIBUTION: HORIZONTAL RUNS THROUGH CEILING PLENUM & RAISED FLOOR ZONES BLDG. SYSTEMS COORDINATION: HORIZONTAL RUNS COORDINATED WITH PARTITIONS TO MINIMIZE CONFLICT & PENETRATIONS
TRANSPARENT ENCLOSURE: PRE-FINISHED ALUMINUM CURTAINWALL WITH 1" INSULATING GLAZING UNITS AND 2.5"X5" MULLIONS
EXTERIOR ENCLOSURE: 4" MASONRY, 6" CFMF (TYP.)
Level 1 0' - 0" 11' - 8"
VERTICAL CIRCULATION: ELEVATOR MACHINERY AT TOP OR BOTT. OF SHAFTS, DEPENDING ON BLDG, HGT. & ELEVATOR TYPE
8' - 2"
SUB-GRADE WALLS: C.I.P. REINF. CONCRETE 12"
LOWEST LEVEL SLAB: C.I.P. CONCRETE SLAB ON GRADE 5" THK.
VERTICAL CIRCULATION: STAIRS & ELEVATORS IN CONT. VERTICAL SHAFTS
Level 0 -11' - 8"
HVAC SYSTEM PRIMARY DISTRIBUTION: SUPPLY AIR & RETURN AIR TRUNK DUCTS IN CONT. VERTICAL SHAFTS
DRAWING LEGEND LINE OF "PLACEHOLDER" OBJECT (TO BE DEVELOPED). AREA TO COORD.; AREA/ITEM REVISED.
05/07/2021
11' - 8"
HORIZ. FLOOR FRAMING: STEEL BEAMS; PRIMARY FRAME W16X40, WITH SECONDARY INFILL W12X35
BLDG SECTION OVERALL
Roof 46' - 8"
Project Source
FLOOR SLAB: 3" LW CONCRETE ON 2" METAL DECK
LTU CoAD ARC 2313
PLUMB. & FIRE PROT. SYSTEMS PRIMARY DISTRIBUTION: PIPE RISERS IN CONT. VERTICAL SHAFTS
Moussa Aoun, Spring 2021
23' - 4"
z3
Construction Systems 1
70' - 0"
Music Academy Spain Ensamble Studio, Madrid
z2
Sheet Issued
z1
Sheet Title
VERTICAL SUPPORT FRAMING & LATERAL BRACING SYSTEMS AT BLDG. BASE: CONT. DOWN TO FOUNDATIONS (TO BE COORD.)
zA331
Level 4 35' - 0" 11' - 8"
BLDG. SYSTEMS SECONDARY DISTRIBUTION: HORIZONTAL RUNS THROUGH CEILING PLENUM & RAISED FLOOR ZONES
Level 3 23' - 4"
FINISH GRADE LEVEL
Level 2 11' - 8" 11' - 8"
HORIZ. FLOOR FRAMING: STEEL BEAMS; PRIMARY FRAME WITH SECONDARY INFILL VERTICAL SUPPORT FRAMING: STEEL COLUMNS
Level 1 0' - 0"
Level 0 -11' - 8"
SUB-GRADE WALLS & FOOTING: C.I.P. REINF. CONCRETE
2
332-2 1/8" = 1'-0"
1
332-1 1/8" = 1'-0"
HANDRAIL AT CENTER OF STAIRS ONLY
STAIR LAYOUTS IS THE SAME BASED ON FLR.-FLR. HEIGHT, THAT IS IDENTICAL FOR ALL LEVELS (TYP.)
INTERMEDIATE STAIR LANDINGS (TYP.)
11' - 8"
SUB-GRADE PIERS SUPPORTING COLUMNS ABOVE: C.I.P. REINF. CONCRETE
STAIR RISER-TREAD LAYOUT SHOWN FOR DIMENSIONAL FIT (SECTION & PLAN); STRINGERS, HAND-RAILS, & GUARDRAILS SHOWN DIAGRAMATICALLY ONLY
STAIR STRINGERS & LANDINGS SUPPORTED FROM BLDG. STEEL FRAMING
58' - 4"
11' - 8"
FLOOR SLABS: 3" CONCRETE ON 2" MTL. DECK (TYP.)
FURRED PARTITION COVERING STEEL STRUCTURE & CONCRETE FOUNDATION WALL (TYP.)
Moussa Aoun, Spring 2021
11' - 8"
VERTICAL CIRCULATION: STAIRS & ELEVATORS IN CONT. VERTICAL SHAFTS
PLUMB. & FIRE PROT. SYSTEMS PRIMARY DISTRIBUTION: PIPE RISERS IN CONT. VERTICAL SHAFTS
Construction Systems 1
Roof 46' - 8"
05/07/2021
FIRE RESISTENCE RATED SHAFTWALL PARTITION SEPARATING TWO SHAFTS
BLDG SECTIONS S1
11' - 8"
Music Academy Spain Ensamble Studio, Madrid
FIRE RESISTENCE RATED SHAFTWALL PARTITION SEPARATING MULTI-STORY SHAFTS FROM ADJACENT FLOOR AREAS (TYP.)
17' - 6"
LTU CoAD ARC 2313
z7
Project Source
z6
Sheet Issued
FURRED PARTITION COVERING STEEL STRUCTURE (TYP.)
z4
Sheet Title
z3
zA332
BLDG. SYSTEMS COORDINATION: HORIZONTAL RUNS COORDINATED WITH PARTITIONS TO MINIMIZE CONFLICT & PENETRATIONS
Project Source
FLR. & ROOF SLABS: CONCRETE ON METAL DECK (NOT SHOWN FOR CLARITY) STRUCTURE / HVAC COORD. STRATEGY: HVAC PRIMARY BRANCH RUNS PARALLEL TO & RECESSED WITHIN CLEARSPAN BEAMS; HVAC SECONDARY BRANCHES ARE WIDE/SHALLOW & RUN UNDERNEATH CLEARSPAN BEAMS
Moussa Aoun, Spring 2021
BLDG. SYSTEMS SECONDARY DISTRIBUTION: HORIZONTAL RUNS THROUGH CEILING PLENUM & RAISED FLOOR ZONES
HVAC SYSTEM COORD. CHARACTERISTICS: SINGLE LARGETRUNK DUCT SYSTEM, THAT DISTRIBUTES FROM FLOORPLATE EDGE, HAS LARGE WIDE/DEEP DUCTS FOR VOLUME & LONG RUNS
Construction Systems 1
VERTICAL SUPPORT FRAMING: STEEL COLUMNS
LTU CoAD ARC 2313
HVAC SYSTEM PRIMARY DISTRIBU-TION: SUPPLY AIR & RETURN AIR TRUNK DUCTS IN CONT. VERTICAL SHAFTS
Music Academy Spain Ensamble Studio, Madrid
PARTITION FRAMING & CEILING: PARTNS. ARE EXTENDED UP TO UNDERSIDE OF SLAB FOR RIGIDITY
1
AREA TO COORD.; AREA/ITEM REVISED.
05/07/2021
3D Bldg Section SW - Plan L2 Below Clg
LINE OF "PLACEHOLDER" OBJECT (TO BE DEVELOPED).
3D BLDG SCTN L2 BELOW CLG & CORE
DRAWING LEGEND
Sheet Issued
FLOOR STRUCTURE COORD. CHARACTERISTICS: PRIMARY CLEARSPAN BEAMS ARE DEEP, SOLID, & DIRECTIONAL
Sheet Title
ACOUS. CEILING TILE (ACT) CEILING SYSTEM: 2X2 / 2X4 TILES IN SUSPENDED GRID
zA333
INDIRECT / DIRECT LIGHT FIXTURES, COORDINATED WITH PARTITIONS AS AN OVERALL GENERAL LIGHTING APPROACH
1
3D Bldg Section NE - Plan L2 Above Clg
AREA TO COORD.; AREA/ITEM REVISED.
05/07/2021
LINE OF "PLACEHOLDER" OBJECT (TO BE DEVELOPED).
3D BLDG SCTN L2 ABOVE CLG
DRAWING LEGEND
Sheet Issued
PLANNING GRID: SPACING OF EXTERIOR ENCLOSURE MULLIONS DEFINES PLANNING MODULE FOR INTERIOR WALL LAYOUT
Sheet Title
Project Source
SUSPENDED FIXTURES ALIGNED WITH ACT GRID & INT./EXT. PLANNING GRID FOR COORDINATED DESIGN CONCEPT
Moussa Aoun, Spring 2021
Construction Systems 1
DOORS & FRAMES: HOLLOW MTL. OR ALUM. STOREFRONT FRAMES W. SIDELIGHTS; WD. SOLID CORE DOORS W. GLAZING
Music Academy Spain Ensamble Studio, Madrid
LTU CoAD ARC 2313
PARTITION FRAMING & CEILING: PARTNS. ARE EXTENDED UP TO UNDERSIDE OF SLAB FOR RIGIDITY, OR EXTEND 6" ABV. THE CEILING WITH BRACING
zA334
SINGLE LARGE TRUNK DUCT SYSTM., THAT DISTRIBUTES FROM FLOORPLATE EDGE, HAS LARGE WIDE/DEEP DUCTS FOR VOLUME & LONG RUNS
ROOFING SYSTEM (REFER TO ROOF PLAN DRAWING)
Level 4 35' - 0"
STRUCTURE / HVAC COORD. STRATEGY: HVAC PRIMARY BRANCH RUNS PARALLEL TO & RECESSED WITHIN CLEARSPAN BEAMS; HVAC SECONDARY BRANCHES ARE WIDE/ SHALLOW & RUN UNDER-NEATH CLEARSPAN BEAMS
COORD. LIGHT FIXTURE TYPE & HGT. WITH CLG. HGT.
EXTERIOR ENCLOSURE: 4" MASONRY, 6" CFMF (TYP.)
PARTITION FRAMING & CEILING: PARTNS. ARE EXTENDED UP TO UNDER-SIDE OF SLAB FOR RIGIDITY, OR EXTEND 6" ABV. THE CEILING WITH BRACING
Level 3 23' - 4"
INT. PARTITIONS "TYPE 1": REFER SHT. A122
1 zA451
8' - 2"
FLOOR STRUCTURE COORD. CHARACTERISTICS: PRI-MARY CLEARSPAN BEAMS ARE DEEP, SOLID, & DIRECTIONAL
Level 2 11' - 8"
HORIZ. FLOOR & ROOF FRAMING: STEEL BEAMS; PRIMARY CLEARSPAN, WITH SECONDARY INFILL (TYP.)
1' - 8" 1' - 4"
7' - 0"
FLR. & ROOF SLABS: CON-CRETE ON MTL. DECK (TYP.)
VERTICAL SUPPORT FRAMING: STEEL COLUMNS
TRANSPARENT ENCLOSURE: PRE-FINISHED ALUMINUM CURTAINWALL WITH 1" INSULATING GLAZING UNITS AND 2.5"X5" MULLIONS
OPAQUE ENCLOSURE: PREFINISHED METAL PANEL CLADDING SYSTEM AT SPANDREL & COL. ENCLOSURE WITH A 4" RECESS
TRANSPARENT ENCLOSURE: RECESSED PREFINISHED ALUM. CURTAIN WALL SYSTEM WITH 1" INSUL. GLAZING UNITS AND TOP AND BOTTOM MULLIONS ONLY
SUB-GRADE WALLS: C.I.P. REINF. CONCRETE
Level 1 0' - 0"
FOUNDATION SYSTEM: C.I.P. REINF. CONCRETE PIERS AT COLUMNS
PRE-FINISHED ALUMINUM CURTAINWALL WITH 1" INSULATING GLAZING UNITS AND 2.5"X5" MULLIONS
TRANSPARENT ENCLOSURE: RECESSED PREFINISHED ALUM. CURTAIN WALL SYSTEM WITH 1" INSUL. GLAZING UNITS AND TOP AND BOTTOM MULLIONS ONLY
OPAQUE ENCLOSURE: PRE-FINISHED METAL PANEL CLADDING SYSTEM AT SPANDREL & COL. ENCLOSURE WITH A 4" RECESS
FOUNDATION SYSTEM: C.I.P. REINF. CONCRETE PIERS AT COLUMNS; C.I.P. REINF. CONCRETE FOOTINGS AT ADEQUATE SOILS
SUB-GRADE WALLS: 12" C.I.P. REINF.CONCRETE
GWB CEILING SYS.: GWB ON SUSPENSION SYS. OR MTL. STUD FRAMING
PRE-FINISHED ALUMINUM CURTAINWALL WITH 1" INSULATING GLAZING UNITS AND 2.5"X5" MULLIONS
MASONRY CUT LINE AT 5' 10" VERTICAL INCREMENTS
OPAQUE ENCLOSURE: PRE-FINISHED METAL PANEL CLADDING SYSTEM AT SPANDREL & COL. ENCLOSURE WITH A 4" RECESS
TRANSPARENT ENCLOSURE: RECESSED PREFINISHED ALUM. CURTAIN WALL SYSTEM WITH 1" INSUL. GLAZING UNITS AND TOP AND BOTTOM MULLIONS ONLY
SUB-GRADE WALLS: 12" C.I.P. REINF.CONCRETE
A453
FOUNDATION SYSTEM: C.I.P. REINF. CONCRETE PIERS AT COLUMNS; C.I.P. REINF. CONCRETE FOOTINGS AT ADEQUATE SOILS
A4 03
W12X87 COLUMN WITH FIREPROOFING, 1" MIN (TYP.)
CFMF STUDS SUBSTRATE WALL, 16" O.C. AT VARIOUS SIZES: 6", 4", 2.5" BASED ON CONDITIONS
6" CFMF, ALONG WALL LENGTH, BUT 4" NEAR COLUMN TO ALLOW SPACE TO UNIFORM SPACING
Project Source
GYPSUM LAYER ON INTERIOR WALLS, BUT NOT IN PLACES THAT ARE HIDDEN
z2
Moussa Aoun, Spring 2021
LTU CoAD ARC 2313
CONTINUOUS 2" AIR GAP BETWEEN RIGID BOARD INSULATION AND THE INSIDE FACE OF MASONRY VENEER
Construction Systems 1
4" MASONRY VENEER ON OUTERMOST ELEMENT OF WALL.
Music Academy Spain Ensamble Studio,Madrid
z8
SPRAY FOAM INSULATION INSIDE SUBSTRATE WALL.
RIGID BOARD INSULATION RUNS CONTINUOUS AROUND ENTIRE WALL.
Sheet Issued
05/07/2021
PLAN DTL L3 - S3 TYP WALL/COL (1 08)
VAPOR BARRIER PLACED JUST INSIDE OF SPRAYED ON INSULATION
Sheet Title
2' - 0"
CONTINUOUS LAYER OF SEATHING RUNS BEHIND INSULATION
WATER BARRIER PLACED ON RIGID INSULATION
DRAWING LEGEND
1
Level 2 - A401 1 1/2" = 1'-0"
LINE OF "PLACEHOLDER" OBJECT (TO BE DEVELOPED). AREA TO COORD.; AREA/ITEM REVISED.
zA401
LTU CoAD ARC 2313
CONTINUOUS 2" AIR GAP BETWEEN RIGID BOARD INSULATION AND THE INSIDE FACE OF MASONRY VENEER 6" CFMF STUD-FRAMEDBACKUP WITH EXT. GYP BD SHEATHING (TYP)
W12X87 COLUMN WITH FIREPROOFING, 1" MIN (TYP.) COLUMNS INTERIOR PARTITIONS "TYPE 3" (FURRING PART'N): REFER TO SHT A120
Project Source
0' - 11"
6" CFMF, ALONG WALL LENGTH, BUT 4" NEAR COLUMN TO ALLOW SPACE TO UNIFORM SPACING
z1
SPRAY FOAM INSULATION INSIDE SUBSTRATE WALL. RIGID BOARD INSULATION RUNS CONTINUOUS AROUND ENTIRE WALL.
Moussa Aoun, Spring 2021
0' - 11"
Construction Systems 1
4" MASONRY VENEER ON OUTERMOST ELEMENT OF WALL.
Music Academy Spain Ensamble Studio,Madrid
z8
CONT. SEALANT &BACKER RODAROUND PERIMETEROF CURTAINWALLSYSTEM ATEXTERIOR & ATINTERIOR
02/01/21
PLAN DTL L3 - S3 TYP WALL/CORNER (1 08)
CURTAIN WALL OPENING WITH 2.5"x5" MULLIONS
Sheet Issued
VAPOR BARRIER PLACED JUST INSIDE OF SPRAYED ON INSULATION
Sheet Title
CONTINUOUS LAYER OF SEATHING RUNS BEHIND INSULATION
WATER BARRIER PLACED ON RIGID INSULATION
1
Level 2 - A402 1 1/2" = 1'-0"
zA402
1' - 4" 1' - 2"
LINE OF SLAB AND FOUNDATION WALL BELOW: WATERPROOF PORTION OF SLAB BEYOND GLASS LINE
1' - 8"
Project Source
2 1/2" X 5" PREFINISHED ALUM. MULLION (TYP.)
z1
PRE-FINISHED METAL PANEL CLADDING SYSTEM (TYP.)
4" CFMF STUD SUBSTRATE WALL W/ RIGID INSULATION AND 2" AIR GAP FROM LIMESTONE METAL PANEL CLADDING CONTINUOUS AROUND COLUMN BETWEEN INTERIOR AND EXTERIOR
0' - 1"
1' - 2 1/4"
0' - 4"
A453
z/a Plan Level L1-Grade Level - Atypical Callout 1 1 1 1/2" = 1'-0"
05/07/2021
SUPPORT FOR METAL PANEL NOT SHOWN FOR CLARITY
PLAN DTL LX - AT NON-TYP/DSGN DTL (1 08)
1' - 4"
3 1/8" PARTITION FOR FASTENING INTERIOR METAL PANEL
Sheet Issued
1' - 2"
PRE-FINISHED ALUM. CURTAINWALL SYSTEM, WITH 1" INSUL. GLAZING UNITS (TYP.)
1' - 4"
SEALENT AND BACKER ROD AT LOCATION OF MULLION AND METAL PANEL
Sheet Title
1' - 4"
LTU CoAD ARC 2313
1' - 8"
LINE OF METAL PANEL ABOVE
Moussa Aoun, Spring 2021
AREA TO COORD.; AREA/ITEM REVISED.
Construction Systems 1
LINE OF "PLACEHOLDER" OBJECT (TO BE DEVELOPED).
z8
LINE OF MAS. VENEER ABOVE AND FOUNDATION WALL BELOW (AT 1' 8")
Music Academy Spain Ensamble Studio, Madrid
DRAWING LEGEND
MULLION INSET TO METAL PANEL CLADDING SYSTEM FOR CLEAN TRANSITION FROM GLAZING TO METAL PANELS
zA403
RIGID BOARD INSULATION RUNS CONTINUOUS AROUND ENTIRE WALL.
FLOOR SLABS: EXTERIOR EDGE OFCONCRETE ON METAL DECK 11" FROM CENTER OF BEAM (TYP) SEE NARRATIVE FOR DETAILS
6" CFMF STUDFRAMED BACKUP WITH EXT. GYP BD SHEATHING (TYP)
FLOOR SLAB: 3"CONCRETE SLAB 2" METAL DECK BASE FOR CONCRETE SLAB
CONTINUOUS LAYER OF SEATHING RUNS BEHIND INSULATION
1" SLIP CONNECTIONAT HEAD OF STUDWALL FOR MVMT.
VAPOR BARRIER PLACED JUST INSIDE OF SPRAYED ON INSULATION
Z-FURRING AT 24" SPACING INTERVALS
WATER BARRIER PLACED ON RIGID INSULATION
4" MASONRY VENEER ON OUTERMOST ELEMENT OF WALL. FLASHING AT MASONRY VENEER JOINTS
ACOUSTIC CEILING TILE IN SUSPENDEDGRID SYSTEM
5' - 9"
CONT. SEALANT &BACKER RODAROUND PERIMETEROF CURTAINWALLSYSTE M ATEXTERIOR & ATINTERIOR
CEILING-WALL CONNECTION TO BE COORDINATED
CURTAIN WALL OPENING WITH 2.5"x5" MULLIONS FLASHING AT TOP OF WINDOW SILL
HORIZ. FLOOR FRAMING: STEEL BEAMS, PRIMARY FRAME, WITH SECONDARY INFILL
Level 2 11' - 8"
1" MINIMUM OF FIREPROOFING SPRAY FOR FIRE RATING AT SUPPORTING STEEL
6" CFMF STUD SUBSTRATE WALL W/ RIGID INSULATION AND 2" AIR GAP FROM LIMESTONE
2' - 8 1/4"
3 1/8" PARTITION FOR FASTENING INTERIOR METAL PANEL, CONNECTED TO UNDERSIDE OF FLOOR SLAB ABOVE FOR RIGIDITY
4" STONE CLADDING OVERHANG AT TRANSITION BETWEEN STONE AND METAL TO HIGHLIGHT TRANSITION
PRE-FINISHED METAL PANEL CLADDING SYSTEM (TYP.) SUPPORT FOR METAL PANEL NOT SHOWN FOR CLARITY
METAL CLADDING USED AS TRANSITION BETWEEN STONE CLADDING AND GLAZING
0' - 5 1/2"
1' - 8"
0' - 3 1/8"
1' - 4"
1' - 4"
1' - 11 3/4"
1' - 2"
STEEL ANGLE SUPPORTS EACH EXTERIOR CLADDING STONE FROM BENEATH METAL PANEL CLADDING CONT. AROUND COLUMN BETWEEN INTERIOR AND EXTERIOR
SHIMS AND BLOCK FOR MULLION ATTACHMENT AND RIGIDITY
PRE-FINISHED ALUM. CURTAINWALL SYS., WITH 1" INSUL. GLAZING UNITS (TYP.) WITHOUT VERTICAL MULLIONS
2 1/2" X 5" PREFINISHED ALUM. MULLION (TYP.)
MULLION INSET TO METAL PANEL CLADDING FOR CLEAN FINISHED LOOK
SUPPORTING STEEL ATTACHED TO STEEL ANGLE NOT SHOWN FOR CLARITY
A403
LINE OF METAL PANEL BELOW
ROOF
WITH 2" HORIZ. METAL Z-FURRINGS (TYP.)
FULLY ADHERED MEMBRANE ROOFING
CONT. AIR AND WATER PENETRATION BARRIER (AWPB) (TYP.)
RIGID BOARD INSUL. (MIN. THICKNESS AS REQ'D PER ENERGY CODE CALCS.)
2' - 11"
TAPERED ROOF INSUL. (SLOPE 1/4" MIN.)
6" CFMF STUDFRAMED BACKUP WITH EXT. GYP. BD. SHEATHING (TYP.)
CONT. VAPOR BARRIER (IF SPECIFIC ROOS ASS'Y IS "BREATHABLE")
6" CFMF STUDFRAMED BACKUP EXTENDED PAST STEEL FRAME AND SLAB TO FORM PARAPET WALL
Roof 46' - 8"
FLOOR SLAB: 3" CONCRETE ON 2" METAL DECK
AT LINE OF ROOF, FILL ENTIRE STUD CAVITY WITH SPRAY FOAM INSUL. AND VAPOR BARRIER LAYER
HORIZ. FLOOR FRAMING: STEEL BEAMS, PRIMARY FRAME, WITH SECONDARY INFILL
CONT. 3" SPRAY FOAM INSUL. WITH VAPOR BARRIER LAYER AT INTERIOR STUD CAVITY (TYP.)
LINE OF FIREPROOFING ON STEEL FRAME (1" MIN. TYP.)
2" RIGID BOARD CONTINUOUS INSULATION AT EXT. CLADDING CAVITY
GYPSUM BOARD(GWB) CEILING SYSTEM
GWB SOFFIT USAGES: TRANSITION BETW. AREAS OF INTERIOR CEILING (LOWER, DUE TO PLENUM) AND HIGHER CEILING AREAS (AT FLOOR OPENING OR AT EXTERIOR GLAZING) (TYP.)
SURFACES, EXTENDING 4" UP WALLS
PARTITIONS TO COVER LATERAL PLUMBING RUNS TO VERT. CHASE AMBULATORY ACCESSIBLE TOILET COMPARMENT (60"d x 36"w)
z3 2 zA701
WHEELCHAIR ACCESSIBLE TOILET COMPARTMENT (60"d x 54"w)
17' - 6"
FINISH MATERIALS: COUNTERTOPS SHOULD HAVE WATER-RESISTENT SURFACES & SUBSTRATES, WITH SIDE & BACKSPLASHES, & WITH MINIMAL JOINTS ADJACENT TO FIX-TURES, TOWEL DISP. ETC,
TOILET RM. ACCESSORIES (SOAP, TOWEL & WASTE DISP., DRYERS, BABY-CHANGING STATIONS, ETC.) TO HAVE ACCESSIBLE FLOOR SPACE & REACH RANGES
WALL MOUNTED ITEMS (GRAB BARS, PAPER DISPENSERS ETC.) NOT SHOWN FOR CLARITY
2 zA332 TOILET PARTITIONS: 1" PANELS, FLR. MTD., WALL ATTACHED, HEADRAIL BRACED (TYP.)
TOILET & SINK FIXTURES LOCATED HORIZ. & VERT. PER ACCESSIBILITY REQS.)
z4 TOILET RM. SEPARATION: PERIMETER PARTNS. EXTEND UP TO SLAB ABOVE, WITH SEPARATE EXHAUST DUCTWORK (NOT SHOWN FOR CLARITY)
1
Plan Area L2 - Bathroom 1/4" = 1'-0"
z8
GWB CEILING SYS.: GWB ON SUSPENSION SYS. OR MTL. STUD FRAMING
11' - 8"
TOILET ACCESSORIES (PAPER DISP., GRAB BARS, ETC.) TO HAVE ACCESSIBLE CONFIG-URATIONS & MOUN-TING HGTS. WHERE REQ'D. (NOT SHOWN FOR CLARITY)
Level 3 23' - 4"
CLEAR FLOOR SPACE AT SINKS TO INCLUDE ACCESSIBLE KNEE AND TOE CLEARANCES, & KNEE PROTECTION AT PLUMBING CONNECTIONS
Level 2 11' - 8"