Skip to main content

Towpath Talk November issue - Preview

Page 1

1 Issue 205, November 2022

www.towpathtalk.co.uk November 2022

The UK’s Number ONE read for all waterways users

TOWPATH

1

72 PAGES

REFLECTIONS FLOTILLA LIGHTS UP THE RIVER

P4

TALK

www.towpathtalk.co.uk October 2022

For all your Training, Safety, Rescue, Access and Specialist needs. For all your Equipment Training, Safety, Rescue, Access and Specialist Equipment needs.

LEISURELEISURE MIDWEEK ANDAND WEEKEND MIDWEEK WEEKEND COURSES NOW AVAILABLE! COURSES NOW AVAILABLE! 01902 544329

01902 544329 www.midlandmarine.co.uk www.midlandmarine.co.uk

Window of opportunity

CLEANING CREW KEEPS BIRDSWOOD SHIPSHAPE

P5

ELECTRIC WHEELYBOAT LAUNCHED ON AVON

P11

FEELING THE HEAT ON A FUEL BOAT

P14

BOATS FOR SALE Starts on

P19

Two narrowboats are worked through Henhurst Lock near the bottom of the Wigan flight of locks on Monday, October 17 on their way up the 21 locks to Aspull on the Leeds & Liverpool Canal. It was the first day of a two-week reopening to enable boaters to pass up and down the flight to return to their home or preferred mooring for winter, with the plan being for the window of opportunity to be open for two weeks. The navigation will then be closed again to enable the reservoirs to hopefully refill over the coming winter. PHOTO: COLIN WAREING

Waterways winter work programme for 2022-23 THE Canal & River Trust has announced its winter works programme 2022-23, providing details of the major repairs and canal improvements the charity will be carrying out between November and March. Forty-eight waterways will benefit from 172 large-scale works to repair masonry and brickwork, fix leaks, update and install hydraulics and electrics at mechanised structures, as well as replacing seals, stop plank grooves, lock ladders and lock gates.

The trust’s specialist workshops are handcrafting 120 lock leaves for the works, to be installed at 52 locks across the network. Chief executive Richard Parry said: “As boaters know, we work year-round to maintain navigations but the work we carry out over the winter is at the heart of it. While there are some familiar names on this year’s list of work locations, the majority of the winter works are the ongoing repairs we need to undertake every year to keep the waterways

navigable and safe: replacing older lock gates, repairing bridges, locks and aqueducts, and fixing defects.” As usual, the trust is carrying out the works in winter to minimise disruption to boaters over the busier summer cruising months and will be aiming to avoid the Christmas period when more boats take to the water. Seventy-two stoppages are due to take place before Christmas, with 93 scheduled for the new year, and a small number spanning the festive season.

Works aimed at improving navigation for boaters will be taking place across the network. On the Kennet & Avon Canal, there is a suite of lock gate replacements between locks 52 and 65, including works at Crofton Pumping Station. The Queen Elizabeth Lock at Caen Hill will also be re-grouted to reduce leakage. Lock 3 at Hillmorton will see its gates replaced and a number of lift bridges on the Oxford Canal will have their hydraulics renovated. Continued on page 2

SELL YOUR Land auction BOAT TODAY BROKERAGE

Swarkestone towpath

Wendover works

THE Canal & River Trust, working in partnership with Sustrans, is improving a 2.5km stretch of the Trent & Mersey Canal towpath starting at Swarkestone and connecting to the Cloud Trail which runs south to Worthington. The section is part of Route 6 of the National Cycle Network which connects London to the Peak District. The £800,000 project started in October and is expected to last 12 weeks.

THE towpath on the Wendover Arm of the Grand A BASIN and land near a newly restored stretch of the Union Canal will be made more accessible through Montgomery Canal at Crickheath Wharf is set to go a £367,000 partnership project led by Wendover under the hammer in an online auction on Thursday, Canal Trust and the Canal & River Trust. Thanks to November 24. With a guide price of £90,000, site From NO OBLIGATION 4% the Vatthe (Minimum charg +and funding awards from five organisations, plansccoare of about one acreTODAY includes hardstanding unt in VALUATION CALL V Y e applies) a k n r ba basin, consisting of a winding hole to the north and place to upgrade the towpath throughout to you the parish of Wendover. Work should start in January and be mooring area to the south. Selling agent is BidX1 and CHESHIRE NORTHAMPTONSHIRE NOR RTHAMPTONSHIRE completed by March. the site can be viewed at www.rightmove.co.uk

hrs

01327 842577

www.whiltonmarina.co.uk

01270 528251

www.venetianmarina.co.uk

SELL YOUR BOAT TODAY BROKERAGE

hrs

t accoun r bank to you

NORTHAMPTONSHIRE NOR RTHAMPTONSHIRE

01327 842577

www.whiltonmarina.co.uk

NO OBLIGATION V Y VALUATION CALL TODAY

From 4% + V at (Minimum char ge ap plies)

CHESHIRE

01270 528251

www.venetianmarina.co.uk


Turn static files into dynamic content formats.

Create a flipbook