MORTAZA ABUZAR
BACHELOR
![]()
BACHELOR
TYPE
Institutional, Civic - Museum, memorial and therapy
SITE
Rond Terrace, Parkes Way, Acton ACT 2601
SOFTWARES USED
Rhino, Vray, Illustrator, Photoshop, Indesign, Autocad
PROJECT DESCRIPTION
Behind the motivation for an ANTI-WAR MUSEUM lies a perfect world, where global peace is optimised. However, the world is far from perfect, and unfortunately, violence is one of the many obstacles that stand in its way.
In essece, the role of ANTI-WAR MUSEUM is confronting these violence in pursuit of a better world. Its goal is to pay tribute and acknowledge the victims (often maimed), to heal their trauma and to provide therapy for them.
The project deeply investigates the transformations of the maimed body through violence; looking at them in a grotesque manner and studying them through physical models.
The ANTI-WAR MUSEUM emerge not for projections of artifacts and national wealth, but as a sanctuary of healing and consolation. The museum focuses on creating an emotional journey, rooting in profound empathy for the maimed.
Maimed bodies are grotesque. They are grotesque because they have been transformed through external forces, forces of violence. Therefore, during the making of these models, the materials have been disturbed in a way to explore these transformations.
Anti-War Museum, view from Rond Terrace
Maimed bodies are grotesque
They are grotesque because they have been transformed through external forces, forces of violence.Therefore, during the making of these models, the materials have been disturbed in a way to explore these transformations
MemorialConfrontations of the violence in an abstract way
Dealing with traumaActive place of therapy, to help with the notions of grief and loss and presence and absence. Presence is layed out on the upper floor while abcense takes place under.
Treatment/therapyHere the maimed bodies are treated through therapy. Spaces are Private and Public.
MuseumLearning about the tragic events of violence and its distaster on the humans Gallery about the maimed body. Exhibitions of the maimed forms. Observatory plateform.
1 Therapy rooms (Private)
2 General therapy (Public)
3 Lobby + Entrance
4 Viewing platform
5 Auditorium
6 7
8
9
10 General exhibition Gallery
Exhibition - Models Reflection space - meditations
Memorial and experiential spaces
Memorial_Bomb
Here, the bomb is positioned and held in the middle of the memorial, followed by stairs and platforms to experience and understand the calamaties of violence through man’s creation.
Ferrocement
Reinforced concrete shell
1 Memorial
2 Violence in display
3 Molonglo River
4 Reflection space - meditations
5 Underground hot pool therapy
6 Rond terrace
The victims of war not only experience physical loss but also long-term trauma of the war that comes with it. The emotional journey of the memorial begins at the ground floor and ends at the top. The lower spaces are dark, grotesque and enclosed, while the upper ones welcome light through the large openings on North and South facade.The central void brings light directly to the Nuclear Bomb in the form of a spotlight, to project one of man’s worst creation. This journey emphasize on capturing trauma and therapy in an abstract way.
1 Storage rooms
2 General exhibition
3 Maimed Gallery and exhibition
4 Displayed models and artifacts
5 Viewing platform
6 7 8 Hydraulics
Therapy rooms (Private) General therapy (Public) Acoustic
TYPE
Commercial - The Gateway
SITE
135-139 West Terrace, SA 5000
SOFTWARES USED
Rhino, Revit, Grasshopper, Indesign
PARTICIPANTS
Mortaza Abuzar, Thomas Doan, Miah Thorpe and Tze Weng Yip
PROJECT DESCRIPTION
The site along West Terrace is currently used as a car park and has been identified as an opportunity for a significant cultural building as a gateway to the city.
The focus goes towards the structural concept and detailing of the building envelope that can comprise of 4 flexible spaces, used for exhibitions, events, workshops and or as office spaces.
The project comes with restrictions of not exceeding above 5000m2 and being at least 5 storeys tall.
ADVANCED CONSTRUCTION : Assessment 3
ENVELOPE DETAILS + PROTOTYPE
Assessment 3: Envelope Details + Prototype
ARCH 7033 Advanced Construction (M)
Student: Abuzar, Mortaza (A1761191); Doan, Thomas (A1770016); Thorpe, Miah (A1768506); Yip, Tze Weng (A1743589)
Section
PRODUCED
150PFC
310UB
150UB
CYLINDRICAL NODE
530 DEPTH CURVED TRUSS WELDED TO
CUSTOM
150PFC SECONDARY MEMBER FIXED TO PRIMARY MEMBER VIA PLATE & BOLT
310UB CONNECTED TO SHEAR WALL VIA PLATE & BOLT CONNECTION
CONCRETE FILLED 120 ABOVE THE BOTTOM OF THE 0.75 BMT BONDEK® STRUCTURAL
BY PRIMARY 310UB
530
ARGON
STEEL
300
530
Doan,
150X80MM CONTINUOUS
STRUCTURAL MEMBER
10MM SCREED
150X80MM CONTINUOUS STRUCTURAL MEMBER
150X80MM RECTANGULAR HOLLOW SECTION
SPONGE GASKET
SILICON SEALANT
150X80MM RECTANGULAR HOLLOW SECTION
200X80MM CUSTOM MADE
STEEL FITTING PROFILE
ALUMINUM FLASHING
200X80MM CUSTOM MADE
1 11
1:5
250X250X10 STEEL BASE PLATE GROUT
10MM SCREED
HSL-3-G M12-100
HEAVY-DUTY WEDGE ANCHOR
250X250X10 STEEL BASE PLATE GROUT
HSL-3-G M12-100
HEAVY-DUTY WEDGE ANCHOR
SLAB FOUNDATION WITH PILE FOUNDATIONS AT EACH FLOOR TO FACADE INTERSECTION (TO ENGINEERS SPECIFICATIONS)
SLAB FOUNDATION WITH PILE FOUNDATIONS AT EACH FLOOR TO FACADE INTERSECTION (TO ENGINEERS SPECIFICATIONS)
FACADE TO FLOOR CONNECTION
RIGID INSULATION PANELS
RIGID INSULATION PANELS
ALUCOBOND RUBBER GASKET
ALUCOBOND RUBBER GASKET
SikaSeal®-305 GLASS AND WEATHER SEAL SILICONE
SikaSeal®-305 GLASS AND WEATHER SEAL SILICONE
200MM x 80MM CUSTOM-MADE
STEEL FITTING PROFILE
200MM x 80MM CUSTOM-MADE
STEEL FITTING PROFILE
3MM CUSTOM-MADE ANGLE BRACKET WELDED TO THE PROFILE
3MM CUSTOM-MADE ANGLE
BRACKET WELDED TO THE PROFILE
3MM THICK ALUCOBOND PROFILED
SHEET PINNED TO ANGLE BRACKET
3MM THICK ALUCOBOND PROFILED
3MM THICK ALUCOBOND SHEET
SHEET PINNED TO ANGLE BRACKET
INSERTED IN THE PROFILE, HELD AND SUPPORTED BY GASKET AND SILICONE
CLADDING CONNECTION DETAIL
3MM THICK ALUCOBOND SHEET
INSERTED IN THE PROFILE, HELD AND SUPPORTED BY GASKET AND SILICONE
150X80MM CONTINUOUS STRUCTURAL MEMBER
150X80MM CONTINUOUS
STRUCTURAL MEMBER
10MM SCREED
150X80MM CONTINUOUS STRUCTURAL MEMBER
10MM SCREED
150X80MM CONTINUOUS
STRUCTURAL MEMBER
Mortaza (A1761191); Doan, Thomas (A1770016);
STEEL FITTING PROFILE
ALUMINUM FLASHING
80MM CONCRETE PAVERS
20MM BEDDING SAND
COMPACT AGGREGATE BASE
80MM CONCRETE PAVERS
EXTERNAL DPM DPM
20MM BEDDING SAND
COMPACT AGGREGATE BASE
EXTERNAL DPM DPM
4MM GLASS
ARGON GAS
4MM GLASS
ARGON GAS 4MM GLASS
4MM GLASS
4MM GLASS
ARGON GAS
EPDM RUBBER GASKET
4MM GLASS
PRESSURE PLATE
COVER CAP
SILICON SEALANT SETTING BLOCK
EPDM RUBBER GASKET
4MM GLASS ARGON GAS
PRESSURE PLATE
SPONGE GASKET
COVER CAP
EPDM RUBBER GASKET
PRESSURE PLATE
COVER CAP
SILICON SEALANT SETTING BLOCK
150X80MM RECTANGULAR HOLLOW SECTION
SPONGE GASKET
SPONGE GASKET
SILICON SEALANT SETTING BLOCK
150X80MM RECTANGULAR HOLLOW SECTION
4MM GLASS SPONGE GASKET
SILICON SEALANT SETTING BLOCK
COVER CAP PRESSURE EPDM RUBBER
150X80MM RECTANGULAR HOLLOW SECTION
150X80MM RECTANGULAR HOLLOW SECTION
200X80MM CUSTOM MADE
STEEL FITTING PROFILE
200X80MM CUSTOM STEEL FITTING
ALUMINUM FLASHING GROUT
200X80MM CUSTOM MADE
EXTERNAL DPM
STEEL FITTING PROFILE
ALUMINUM FLASHING GROUT
ALUMINUM FLASHING
EXTERNAL DPM
80MM CONCRETE PAVERS
200X80MM CUSTOM STEEL FITTING
ALUMINUM FLASHING
20MM BEDDING SAND
80MM
PROTOTYPE PROJECTION FROM THE BUILDING MODEL
CONCRETE
COMPACT AGGREGATE BASE
80MM CONCRETE PAVERS
20MM BEDDING SAND
20MM BEDDING
COMPACT AGGREGATE
80MM CONCRETE
COMPACT AGGREGATE BASE
EXTERNAL DPM DPM
20MM BEDDING
COMPACT AGGREGATE
EXTERNAL DPM DPM
SCALE
022 1 : 5
FITTING PROFILE CLIPS WHICH FIT INTO CUSTOM STEEL MEMBERS
DOUBLE GLAZED WINDOW PANEL (ARGON FILLED)
SikaSeal-305 GLASS AND WEATHER SEAL SILICONE
FITTING PROFILE CONSISTING OF CYLINDRICAL NODE CONNECTORS AND CUSTOM STEEL MEMBERS
FITTING PROFILE CLIPS WHICH FIT INTO CUSTOM STEEL MEMBERS
3mm ALUCOBOND SHEET INSERTED IN PROFILE. HELD AND SUPPORTED BY GASKET AND SILICONE.
SILICONE APPLIED TO FITTING PROFILE.
CUSTOM ANGLE BRACKET WELDED TO PROFILE.
COMPOSITE PANEL INSULATION HELD BETWEEN ANGLE BRACKETS.
3mm PROFILED ALUCOBOND SHEET PINNED TO CUSTOM ANGLE BRACKET.
CUSTOM ANGLE BRACKET WELDED TO PROFILE.
FITTING PROFILE CONSISTING OF CYLINDRICAL NODE CONNECTORS AND CUSTOM STEEL MEMBERS
FITTING PROFILE CLIPS WHICH FIT INTO CUSTOM STEEL MEMBERS
DOUBLE GLAZED WINDOW PANEL (ARGON FILLED)
SikaSeal-305 GLASS AND WEATHER SEAL SILICONE
FITTING PROFILE CONSISTING OF CYLINDRICAL NODE CONNECTORS AND CUSTOM STEEL MEMBERS
DOUBLE GLAZED WINDOW PANEL (ARGON FILLED)
SikaSeal-305 GLASS AND WEATHER SEAL SILICONE
FITTING PROFILE CONSISTING OF
TYPE
Commercial - Upcycling
SITE
293 St Vincent St, Port Adelaide, SA 5015
Rhino, Vray, Illustrator, Revit, Photoshop, Indesign
PROJECT DESCRIPTION
Approximately 8 million tons of plastic enters the Earth’s oceans every year, causing damage to the aquatic ecosystems, forming large ocean garbage patches. As for Port Adelaide, the ecosystem of the river has been disrubted and al-ready has cost the lives of 5 young dolphines and other sea-species.The Marine and Harbors Building (MHB), which once served as an office building is now proposing an upcycling program that aims to respond this issue.
Due to the wonderful location, the MHB can engage closely with Port Adelaide River by sending its clearbots and fetch waste plastics and any other waste that is polluting the river. These plastics wastes will be re-organised to their different categories and upcycled to their full potential. Some of the upcycled items will be displayed on the platform at the East end of the MHB for general awareness. The Marine and Harbors Building thus acts as a means to rescue and save the ecosystem as well as creating new jobs.
GENESIS
Being the tallest building within the Port, MHB is visible from different areas of the site. These visibilities are then photographed, outlined and later used to generate form.
LEGEND
Marine and Harbors Building (MHB)
Outline of MHB seen from different points
Different points looking towards MHB Roaming path
Communal -
Private
Communal -
Communal -
-
The upcycling of plastic waste not only cleans the existing river conditions but also create local jobs. Designers have already implemented upcycled materials in everyday clothing and built environment.
Being the tallest building in the heart of Port Adelaide, the upcyling program give MHB a chance to compete for creating a better and sustainable environment. Section
TYPE
Residential - Student Accomodation
SITE
139-141 Archer St, North Adelaide, SA 5006
SOFTWARES USED
Rhino, Enscape, Illustrator, Revit, Photoshop,
PROJECT DESCRIPTION
Since North Adelaide is within the walking distance of Adelaide CBD, the site proposal is to design a multi-storey student accomodation. It is evident that students need a balance between indoor and outdoor environment, to promote their productivity, as well as maintaining a healthy life. With most conventional student accomodation apartments, student’s mental health is affected due to the absence of close-range outdoor spaces within the building and a sense of connection with nature.
The aim of the proposal is to focus more on the open spaces, implementing courtyard, backyard, terraces and open bridges within student’s close proximity.
Plan Detail | Not to scale
PLAN DETAIL
SCALE 1:10 1 A1.1
PLAN DETAIL
SCALE 1:10 1 A1.1
SECTION DETAIL
SCALE 1:10 1 A3.1
Section Detail | Not to scale
SECTION DETAIL
TILE TYPE 1 FINISH
TILE TYPE 1 FINISH
TILE TYPE 1 FINISH
5MM THICK COLUMN TYPE 1, 150MM x 100MM STEEL HOLLOW COLUMN 150MM x 100MM C CHANNEL
5MM THICK COLUMN TYPE 1, 150MM x 100MM STEEL HOLLOW COLUMN 150MM x 100MM C CHANNEL
16MM FIRE RATED PLASTERBOARD
16MM FIRE RATED PLASTERBOARD
5MM THICK COLUMN TYPE 1, 150MM x 100MM STEEL HOLLOW COLUMN 150MM x 100MM C CHANNEL
2 LAYERS OF R2.7 INSULATION
2 LAYERS OF R2.7 INSULATION
TIMBER FINISH
16MM FIRE RATED PLASTERBOARD
TIMBER FINISH
2 LAYERS OF R2.7 INSULATION
TIMBER FINISH
30MM CAVITY
92MM WIDE STEEL STUD
R2.7 WALL INSULATION
30MM CAVITY
30MM CAVITY
1 x 16MM FIRE RATED PLASTERBOARD ON BOTH SIDES
92MM WIDE STEEL STUD
92MM WIDE STEEL STUD
200MM THICK CONCRETE SLAB TO ENG. SPECS.
R2.7 WALL INSULATION
R2.7 WALL INSULATION
1 x 16MM FIRE RATED PLASTERBOARD ON BOTH SIDES
1 x 16MM FIRE RATED PLASTERBOARD ON BOTH SIDES
SUSPENSION RODS
200MM THICK CONCRETE SLAB TO ENG. SPECS.
200MM THICK CONCRETE SLAB TO ENG. SPECS.
13MM THICK PLATERBOARD LINING
R3.1 CEILING INSULATION
SUSPENSION RODS
SUSPENSION RODS
RESILIENT FURRING CHANNEL WITH MOUNTING BRACKETS
13MM THICK PLATERBOARD LINING
13MM THICK PLATERBOARD LINING
R3.1 CEILING INSULATION
R3.1 CEILING INSULATION
110MM THICK CAST IN-SITU CONCRETE
RESILIENT FURRING CHANNEL WITH MOUNTING BRACKETS
RESILIENT FURRING CHANNEL WITH MOUNTING BRACKETS
110MM THICK CAST IN-SITU CONCRETE
110MM THICK CAST IN-SITU CONCRETE
Plan Detail | Not to scale
2 A1.2
SCALE 1:10
STEEL FRAMING BELOW
STEEL FRAMING BELOW
200MM THICK REINFORCED CONCRETE SLAB
200MM THICK REINFORCED CONCRETE SLAB
ALUMINIUM PANEL TO ENG. DETAIIL, OPERABLE PANELS
ALUMINIUM PANEL TO ENG. DETAIIL, PANELS ARE OPERABLE
125MM x 65MM C CHANNEL ATTACHED TO SLAB VIA SCREWS
125MM x 65MM C CHANNEL ATTACHED TO SLAB VIA SCREWS
STEEL FLASHING TO SLAB
STEEL FLASHING TO SLAB
RONDO M6 x 43MM FASTENER WITH HEX HEAD
RONDO M6 x 43MM FASTENER WITH HEX HEAD
STEEL FRAMING
STEEL FRAMING
RONDO 74MM x 74MM ‘L’ BRACKET
RONDO 74MM x 74MM 'L' BRACKET
M6 x 80MM FASTENER WITH HEX HEAD
M6 x 80MM FASTENER WITH HEX HEAD
200MM THICK REINFORCED CONCRETE SLAB
200MM THICK REINFORCED CONCRETE SLAB
ALUMINIUM PANELS BEYOND
ALUMINIUM PANELS BEYOND
STEEL FLASHING TO SLAB
STEEL FLASHING TO SLAB
ALUMINIUM PANEL TO ENG. DETAIIL, PANELS ARE OPERABLE
ALUMINIUM PANEL TO ENG. DETAIIL, PANELS ARE OPERABLE
RONDO M6 x 43MM FASTENER WITH HEX HEAD
RONDO M6 x 43MM FASTENER WITH HEX HEAD PANEL TIGHTENER
PANEL TIGHTENER
STEEL FRAMING
STEEL FRAMING
RONDO M6 x 40MM FASTENER WITH 6MM MALE THREAD
RONDO M6 x 40MM FASTENER WITH 6MM MALE THREAD
RONDO 74MM x 74MM ‘L’ BRACKET
RONDO 74MM x 74MM 'L' BRACKET
TITLE DETAILS
100MM x 50MM C CHANNEL ATTACHED TO STEEL FRAMING VIA SCREWS
100MM x 50MM C CHANNEL ATTACHED TO STEEL FRAMING VIA SCREWS
125MM x 65MM C CHANNEL ATTACHED TO SLAB VIA SCREWS
125MM x 65MM C CHANNEL ATTACHED TO SLAB VIA SCREWS
PROJECT ARCHER'S VILLAGE
SCALE
1:10 @A1 OR 1:20 @A3
M6 x 80MM FASTENER WITH HEX HEAD
M6 x 80MM FASTENER WITH HEX HEAD
DRAWN
DATE
LOCATION
MORTAZA ABUZAR
18.06.2023
139-141 ARCHER ST NORTH ADELAIDE SA 5006
DWG NO A4.1 A1 SHEET
F-SHAPED FLASHING RECEIVER
F-SHAPED FLASHING RECIEVER
FORMED ALUMINIUM CLOSURE
FORMED ALUMINIUM CLOSURE
DOUBLE BACKER ROD AND SEALANT TERRACOTTA PANEL ALUMINIUM CLIP
GLAZING
GLAZING
ALUMINIUM WINDOW PROFILE
DOUBLE BACKER ROD AND SEALANT BLOCKING
TERRACOTTA PANEL ALUMINIUM CLIP
STEEL STUD TO ENG. DETAILS
STEEL STUD TO ENG. DETAILS
TERRACOTTA CLADDING
TERRACOTTA CLADDING
ALUMINIUM HORIZONTAL Z-GIRTS
ALUMINIUM HORIZONTAL Z-GIRTS
MOISTURE BARRIER
MOISTURE BARRIER
Plan Detail | Not to scale
R3.1
SARKING
COLOURBOND FLASHING
ALUMINIUM WINDOW PROFILE BLOCKING
TIMBER FLOORING
92MM STEEL STUD WITH R2.7 INSULATION
2 LAYERS OF 16MM FIRE RATED PLASTERBOARD
51MM STEEL STUDS 600CTS WITH INSULATION
RUBBER FLOORING
200MM THICK CAST IN-SITU CONCRETE
MINERAL WOOL INSULATION
TERRACOTTA CLADDING
PANEL CLIP
PARAPET BEYOND FALL
PARAPET BEYOND
STEEL PARAPET CAPPING
STEEL PARAPET CAPPING
STEEL RHS TO STRUCTURAL ENG. DETAIL
STEEL RHS TO STRUCTURAL ENG. DETAIL
STEEL UB COLUMN TO STRUCTURAL ENG. DETAIL
STEEL UB COLUMN TO STRUCTURAL ENG. DETAIL
METAL WALL SHEET FIXED TO STEEL STUD
METAL WALL SHEET FIXED TO STEEL STUD
GUTTER SUPPORT BEAM TO STRUCTURAL ENG. DETAIL
GUTTER SUPPORT BEAM TO STRUCTURAL ENG. DETAIL
500 X200 BOX GUTTER
500 X200 BOX GUTTER
METAL ROOF SHEET ON ROOF RAZORS
METAL ROOF SHEET ON ROOF RAZORS SARKING MEMBRANE
SARKING MEMBRANE
PURLIN TO STRUCTURAL ENG. DETAIL
PURLIN TO STRUCTURAL ENG. DETAIL
RIGID BOARD UNDER PURLIN
RIGID BOARD UNDER PURLIN
DOWNPIPE
DOWNPIPE
PFC RAFTER TO STRUCTURAL ENG. DETAIL
PFC RAFTER TO STRUCTURAL ENG. DETAIL
SUSPENSION RODS
SUSPENSION RODS
13MM PLASTERBOARD
13MM PLASTERBOARD
16MM FIRE RATED PLASTERBOARD
16MM FIRE RATED PLASTERBOARD
51MM
51MM WIDE STEEL STUD
R2.7 INSULATION
R2.7
The proposed site in North Adelaide, being conveniently close to Adelaide CBD, presents an opportunity for the development of a multi-storey student accommodation facility. It is widely recognized that students require a harmonious blend of indoor and outdoor environments to enhance their productivity and maintain a healthy lifestyle. Unfortunately, many traditional student accommodation buildings lack the provision of nearby outdoor spaces, impeding students' mental well-being and their connection with nature.
The primary aim of the project is to design and construct a net zero energy building for the proposed multi-storey student accommodation in North Adelaide. The goal is to achieve a building that generates as much energy as it consumes over the course of a year, resulting in a net zero energy footprint. Through a combination of energy-efficient design, renewable energy generation, and smart energy management systems, the project strives to minimize energy consumption and maximize on-site renewable energy production. The objective is to create a sustainable and environmentally friendly building that reduces greenhouse gas emissions, promotes energy conservation, and sets a positive example for future developments.
In this context, the primary objective of this building project is to prioritize open spaces such as courtyards, backyards, terraces, and interconnected bridges located in close proximity. By emphasizing the integration of these open areas, the aim is to foster a sense of connection with nature and provide students with ample opportunities for relaxation, social interaction, and rejuvenation.
Additionally, the presence of the Immanuel Lutheran Church adjacent to the site adds an element of security and comfort, further contributing to the overall appeal and benefits of the proposed student accommodation facility.
The primary aim of the project is to design and construct a net zero energy building for the proposed multi-storey student accommodation in North Adelaide. The goal is to achieve a building that generates as much energy as it consumes over the course of a year, resulting in a net zero energy footprint. Through a combination of energy-efficient design, renewable energy generation, and smart energy management systems, the project strives to minimize energy consumption and maximize on-site renewable energy production. The objective is to create a sustainable and environmentally friendly building that reduces greenhouse gas emissions, promotes energy conservation, and sets a positive example for future developments.
Simulation Floor
Four design strategies, in terms of materials have been implemented to improve the overall design: External wall, Internal wall, Ceiling and Roof
The proposed site in North Adelaide, being conveniently close to Adelaide CBD, presents an opportunity for the development of a multi-storey student accommodation facility. It is widely recognized that students require a harmonious blend of indoor and outdoor environments to enhance their productivity and maintain a healthy lifestyle. Unfortunately, many traditional student accommodation buildings lack the provision of nearby outdoor spaces, impeding students' mental well-being and their connection with nature.
Four design strategies, in terms of materials have been implemented to improve the overall design: External wall, Internal wall, Ceiling and Roof
In this context, the primary objective of this building project is to prioritize open spaces such as courtyards, backyards, terraces, and interconnected bridges located in close proximity. By emphasizing the integration of these open areas, the aim is to foster a sense of connection with nature and provide students with ample opportunities for relaxation, social interaction, and rejuvenation.
Additionally, the presence of the Immanuel Lutheran Church adjacent to the site adds an element of security and comfort, further contributing to the overall appeal
The primary aim of the project is to design and construct a net zero energy building for the proposed multi-storey student accommodation in North Adelaide. The goal is to achieve a building that generates as much energy as it consumes over the course of a year, resulting in a net zero energy footprint. Through a combination of energy-efficient design, renewable energy generation, and smart energy management systems, the project strives to minimize energy consumption and maximize on-site renewable energy production. The objective is to create a sustainable and environmentally friendly building that reduces greenhouse gas emissions, promotes energy conservation, and sets a positive example for future developments.
Four design strategies, in terms of materials have been implemented to improve the overall design: External wall, Internal wall, Ceiling and Roof
The proposed site in North Adelaide, presents an opportunity for the development dation facility. It is widely recognized of indoor and outdoor environments healthy lifestyle. Unfortunately, many lack the provision of nearby outdoor and their connection with nature.
Double Glazing
- U-Value: 0.56
- SHGC: 0.76
- Glazing: 3mm
- Air: 6mm
Internal Wall
- 13mm Gypsum Board
- 17mm R1.5 Insulation
- 140mm Concrete
- 17mm R1.5 Insulation
- 13mm Gypsum Board
Concrete Flat Roof
- Roof Membrane
- Roof Insulation R5
- 200mm Heavyweight Concrete (Varies)
- F05 Ceiling Air Space
Resistance - F16 Acoustic Tile
Interior Floor Slab
- 250mm Concrete
- 400mm Air Gap
- F16 Acoustic Tile
External Wall
- 30mm Terracotta Cladding
- R2.5 Insulation
- 200mm Concrete - 19mm Gypsum Board
Double Glazing
- U-Value: 0.56
- SHGC: 0.76
- Glazing: 3mm
In this context, the primary objective spaces such as courtyards, backyards, located in close proximity. By emphasizing aim is to foster a sense of connection opportunities for relaxation, social interaction,
- Air: 6mm
Additionally, the presence of the Immanuel adds an element of security and comfort, and benefits of the proposed student
Internal Wall
- 13mm Gypsum Board
- 17mm R1.5 Insulation
- 140mm Concrete
- 17mm R1.5 Insulation
- 13mm Gypsum Board
The primary aim of the project is to building for the proposed multi-storey
Concrete Flat Roof
- Roof Membrane
- Roof Insulation R5
- 200mm Heavyweight
Concrete (Varies)
The goal is to achieve a building that over the course of a year, resulting combination of energy-efficient design, energy management systems, the project and maximize on-site renewable energy sustainable and environmentally friendly emissions, promotes energy conservation, developments.
- F05 Ceiling Air Space
Resistance - F16 Acoustic Tile
Four design strategies, in terms of materials the overall design: External wall, Internal
Interior Floor Slab
- 250mm Concrete
- 400mm Air Gap
- F16 Acoustic Tile
External Wall
- 30mm Terracotta Cladding - R2.5 Insulation
- 200mm Concrete
- 19mm Gypsum Board
Aluminium Facade and Shading Device 18m
Aluminium Facade and Shading Device
All Year Simulation - Cooling Loads
Base Model vs. Final Model (Hottest Week)
All Year Simulation - Heating Loads
139-151 Archer Street,
The graphs presented depict operable windows and no HVAC summer. The implemented modifications improvements in the design, having the most significant impact. concrete flat roof resulted in In the base model, temperatures 39 degrees Celsius. However, maximum of 29.6 degrees Celsius, was achieved.
Total energy use of the building (general consumption)
Total Energy (heating+cooling)
Total Energy (Lighting)
Total Energy (Appliances) Fridge
Zone - East
The
SUMMARY
In the
In the base model, temperatures during the hottest week soared as high as 39 degrees Celsius. However, in the final model, the temperature reached a maximum of 29.6 degrees Celsius, thus a difference of 9.4 degrees Celsius was achieved.
creating a temperature difference of 6.7 degrees Celsius. This achievement establishes a comfortable and desirable temperature range within the building.
In the initial model, temperatures during the coldest week dropped as low as 14 degrees Celsius. However, in the final model, the temperature reached a minimum of 20.7 degrees Celsius, creating a temperature difference of 6.7 degrees Celsius. This achievement establishes a comfortable and desirable temperature range within the building.
Total
Simulation Zone - West Facing Room (Hottest Week)
be
cooling, the low, allowing made for lighting will not only energy to
= 19.7 x building footprint
= 19.7 x 901
= 17750 kWh
= Wattage x Hours of use x 365
10 x 7 x 365 = 25550 watt-hours (25.55kWh) x 150
3832.5 kWh
= Annual usage x 20
110 kWh x 20
2200 kWh
= Annual usage x 50
146 kWh x 50
7300 kWh
= Annual usage x 20
156 kWh x 20
3120 kWh
= Annual usage x 20
312 kWh x 20
6240 kWh = Annual usage x 20
48.5 kWh x 50
139-151 Archer Street, Adelaide 3
= 17750 + 382.5 + 2200 + 7300 + 3120
6240 + 2425
39417.5 kWh/year
Roof Area = 384m²
PV System: 4kW
Dimension: 1650mm x 992mm
Stars NABERS?
= 39417.5/901 = 43.75 kWh/m²
Energy Production Per year = 4kW x 0.15 x 8760 hours = 5256 kWh per panel
achieved a NABERS rating of 6 stars based on the calculations. consumption of the building per square meter is calculated to Despite the higher energy consumption during heating and well-implemented design strategies have kept this number relatively building to meet the 6-Star NABERS rating with the assumptions appliances. Additionally, the installation of 66 solar panels enough energy for the building but also allow for excess into the grid.
All 66 panels = 5256 x 66 = 346896 kWh
Total Cooling Loads
Total Heating Loads
Total Loads
= 7.6 kWh/m² x 3.6 = 27.36 MJ/m²
= 12.10 kWh/m² x 3.6 = 43.56 MJ/m²
= 27.36 + 43.57 = 71.16 MJ/m²
The building has the potential to achieve a 7-Star NatHERS rating, which is a significant accomplishment considering that NatHERS is a mandatory rating for new residential buildings in Australia. In addition to this, the building has already achieved a 6-Star NABERS rating. Meeting both the NABERS 6 stars and NatHERS 7 stars ratings demonstrates the building's commitment to energy efficiency and sustainability.
Has the building achieved 6 Stars NABERS?
Total energy of building per m² = 39417.5/901 = 43.75 kWh/m²
The building has achieved a NABERS rating of 6 stars based on the calculations. The total energy consumption of the building per square meter is calculated to be 43.75 kWh/m². Despite the higher energy consumption during heating and cooling, the well-implemented design strategies have kept this number relatively low, allowing the building to meet the 6-Star NABERS rating with the assumptions made for lighting and appliances. Additionally, the installation of 66 solar panels will not only provide enough energy for the building but also allow for excess energy to be fed back into the grid.
What NatHERS rathing can the building achieve?
Can the building achieve 5 Stars or above?
The building has the potential to achieve a 7-Star NatHERS rating, which is a significant accomplishment considering that NatHERS is a mandatory rating for new residential buildings in Australia. In addition to this, the building has already achieved a 6-Star NABERS rating. Meeting both the NABERS 6 stars and NatHERS 7 stars ratings demonstrates the building’s commitment to energy efficiency and sustainability.
Summary
During the design phase, a key focus was achieving a balanced heating and cooling system for the building. This was accomplished by incorporating open corridors and a central lobby to facilitate natural cross ventilation. The lobby acts as the core of the building, ensuring that if the rooms are colder, the interior space remains warmer due to the presence of insulated interior walls. Conversely, if the rooms are warmer, the lobby helps to cool them down. Consequently, the lobby and corridors were intentionally designed to receive less daylight, while the rooms were designed to maximize daylight penetration, allowing for up to 100% natural lighting in each room.
During the design phase, a key focus was achieving a balanced heating and cooling system for the building. This was accomplished by incorporating open corridors and a central lobby to facilitate natural cross ventilation.
Summary Summary
During the design phase, a key focus was achieving a balanced heating and cooling system for the building. This was accomplished by incorporating open corridors and a central lobby to facilitate natural cross ventilation. The lobby acts as the core of the building, ensuring that if the rooms are colder, the interior space remains warmer due to the presence of insulated interior walls. Conversely, if the rooms are warmer, the lobby helps to cool them down. Consequently, the lobby and corridors were intentionally designed to receive less daylight, while the rooms were designed to maximize daylight penetration, allowing for up to 100% natural lighting in each room.
Illuminance Simulation Minimising
Summary
The graph above indicate that the building recieve indirect light, due to the balconies spaces above each floor. This approach was one key principle to maximise daylight and minimise solar heat gain, thus, most part of the building receive average of 300 LUX, except the gymnasium.
Comparing the last phase of assignment II, the building was comprising of bigger windows, that even with shading devices would not help to reduce the temperature down. The graph above indicate that the building recieve indirect light, due to the balconies spaces above each floor. This approach was one key principle to maximise daylight and minimise solar heat gain, thus, most part of the building receive average of 300 LUX, except the gymnasium.
Comparing windows, down. the balconies maximise receive
1. Natural abundant at high that make
2.Longevity: durability
3. Energy it can This buildings.
4. Recyclable: life
5.
1.
2.
3.
TYPE
Public Urbanism
SITE
Helen Mayo Park, Adelaide SA 5000
SOFTWARES USED
Rhino, Enscape, Vray, Illustrator, Photoshop, Indesign, Grasshopper
Reconnect, amphitheater
PROJECT DESCRIPTION
Due to the multitude of reasons, Helen Mayo Park is underused. Main factors that contribute to these reasons are diconnection and disengagement.
Helen Mayo requires alternative paths to the existing Montifiore road, which can get busy and loud. The site also lacks recreational, relaxation zones to make people want to stay, thus the site is disengaged.
Therefore, solutions are to bring new paths that can connect between CBD and the park, and features to restore and revitalise the site.
Reconnect, aerial view
SUMMER WIND-ROSE ANALYSIS
Key Issue: Wind Exposure
Brooklyn Hassold
Exposure to wind is evident, particularly in the winter. The direction of the prominent winter winds is not inhabited by any buildings, with vegetation and some topography the only wind barrier from this direction.
Higher flood level
Higher flood level
Medium flood level
Medium flood level
Persuasive 1
Lower flood level
Lower flood level
Anita Uprety
Key Issue 3: Wind Exposure
INTERACTION NOLLI MAP
SCALE 1:10 000 @ A3
SUMMER WIND-ROSE ANALYSIS
INTERACTION NOLLI MAP
“Concise Townscape”
lack of interaction and buildings comparison of sketches
WINTER WIND-ROSE ANALYSIS
Exposure to wind is evident, particularly in the winter. The direction of the prominent winter winds is not inhabited by any buildings, with vegetation and some topography the only wind barrier from this direction.
WINTER WIND-ROSE ANALYSIS
Gordon Cullen’s “Concise Townscape” technique was utilised to inform site exploration, sequences and sketches.
Mortaza Abuzar
9 AM
Issue 3: Exposure
SUMMER WIND-ROSE ANALYSIS
WINTER WIND-ROSE ANALYSIS
ANNUAL
URBAN STORM-WATER WEB
ANNUAL WIND-ROSE AND SPEED (km/h)
Issue 3: Exposure
SUMMER SUN-PATH
9 AM
Emphasis 1
3 PM
2
Quincy Trang Nguyen
Hovering 1
Whitney Fei Yang Huang
WINTER WIND-ROSE ANALYSIS
Stormwater Drains
Drains
Erosion Protection
Erosion Protection
ANNUAL SUNPATH
Stormwater main catchment boundaries
Stormwater main catchment boundaries
Pinpointing 1
Enfolding 2 Separation 2 Netting 2
9 AM
SUMMER SUN-PATH WINTER SUN-PATH
x2 3
SUMMER WIND-ROSE ANALYSIS
Key Issue 3: Sun Exposure
WINTER SUN-PATH SUMMER SUN-PATH
WINTER SUN-PATH
Suspenseful 3 Sighting 3 Enclosure 3
From the higher level at the university buildings, users are not shielded from the North facing sun. This contrasts the wind exposure to contribute to an uncomfortable, fluctuating space.
3 PM 3 PM
9 AM
ENVI-ANALYSIS
Bike and wheelchair access
Paspalum grass
Seating deck across River Torrens
Hard mable timber
Evergreen Redgum tree
Pampas grass Water
Traingular irregular network
Bridged path
Upper Mount
Pedestrian
High-dense concrete River Torrens
Stair access
Fresado concrete
Deciduous red Maple tree
Amphiteater
Wheelchair and bike access
Deciduous Ash tree
Lower bridging mounts
Crossing bridge connecting Memorial Dr. to Helen Mayo Park
Concrete seating
Bermuda grass
Semi-private seating area
TYPE
Commercial - Festival SITE
North Adelaide, Adelaide SA 5006
SOFTWARES USED
Rhino, Enscape, Illustrator, Maxwell, Photoshop, Indesign, Grasshopper
PROJECT DESCRIPTION
A mixed-use proposal of office space with additional spaces for the fulfilment of public spaces for the Adelaide Fringe. GroundLvl
Ticketing + Digital (212 m )
Ticketing + Digital (212 m²)
Ticketing + Digital (212 m )
Program Operations (199 m )
Program Operations (199 m²)
Meeting room (40 m )
Program Operations (199 m )
Finance (35 m )
Meeting room (40 m )
Meeting room (40 m²)
Finance (35 m )
Finance (35 m²)
People + Culture (102 m )
People + Culture (102 m²)
People + Culture (102 m )
Marketing (102 m )
Marketing (102 m²)
Marketing (102 m )
Productions (64 m )
Productions (64 m²)
Admin (50 m )
Productions (64 m )
Admin (50 m²)
Admin (50 m )
Kitchen (35 m )
Toilets (20 m )
Kitchen (35 m )
Kitchen (35 m²)
Toilets (20 m )
Toilets (20 m²)
Reception (10 m )
Reception (10 m )
Reception (10 m²)
Admin
Shade Light
Privacy Views
Finance
Shade Light Privacy Views
Fabrication
Shade Light
Privacy Views
Kitchen
Shade Light Privacy Views
Program X
Shade Light
Privacy Views
Meeting Room
Shade Light
Privacy Views
Production
Shade Light
Privacy Views
Spatial division
Southern elevation
Attractor grid mapping
Points
Frame Grid
ApertureSelection
SkinPerforated&Opening
ExtrusionForOpenings
ExtrusionForShadingElements
Aperture For Perforation
Aperture For Openings
500 mm Long Extrusion
1000 mm Long Extrusion
Hand Model Making, Lasercutting, 3D Printing
DESCRIPTION
Although most of today’s architectural work is carried out digitally, I believe it is useful for the creativity of the human brain to jump back and forth between digital and physical work, as it creates a sense of scale.
I take pride in being able to make models, whether they are quick hand-sketches or finished products. I don’t necessarily claim to be the best at it, but I definitely enjoy the process of thinking about multiple ways to create them. From a different perspective, model making has been a childhood hobby of mine.
I used to enjoy opening up broken old TV boxes, monitors, mobile phones, toys, furniture, and anything that was openable. I suppose I wanted to figure out how everything was thought through and arranged the way they were. I found it clever, and perhaps one day, I thought, I would be able to create something myself.
External and internal walls
Upper level
Villa Savoye aerial view
Boundary and site
TYPE
Residential, commercial, private LOCATIONS
SA, VIC, NSW, WA
JOB TYPES
New construction painting, repaint, renovation, bricklaying, gyprock flashing
JOB DESCRIPTION
Most construction work help with practical understanding of how designs are implemented. This knowledge can enhance the ability to create designs that are aesthetically pleasing but also feasible and practical to build.
With most of my expertise lying in painting over other trades, this is attributed to two main reasons:
1. In large-scale projects, painters often can witness both the project’s commencement and its final outcome. This allows me to continually interact with other trade specialists.
2. Typically, painting jobs are not classified as heavy physical work but are seen as more mobile. For me, while independently living during my architectural education, painting provided the cash flow I needed, as well as enabled me to visit various sites during my studying at the University of Adelaide..
When painting for larger projects, the frameworks will still be exposed to look at.
Stairway varnish
Private residence
Private residence
Residential job
Commercial, Aldi
Commercial,
Residential job, lounge room
Residential job
Commercial job, warehouse
Commerical job, cafe
Residential job
Residential job
PORTFOLIO
MORTAZA