Skip to main content

Mondo | Stadia #50 - Oct/Nov 2026

Page 1

SHELL ENERGY STADIUM

TURF MOOR

XENIA SOLUTIONS INTERVIEW

DAKTRONICS INTERVIEW

LD Systems install a new L-Acoustics system at the home of Houston Dynamo FC.

Adlb deliver a state-of-the-art, weatherproof CODA Audio system at one of England’s oldest football grounds.

We spoke to Alexandra Végh, CEO of Xenia Solutions, to discuss BeerChamp and solving the half-time queue.

We spoke to Jay Parker, VP of Live Events & Spectaculars at Daktronics, to discuss the future of LED in stadiums.

ISSUE 50 - OCTOBER | NOVEMBER 2026

THE INTERNATIONAL PUBLICATION FOR THE SPORTING VENUE ECOSYSTEM


SCALABLE NETWORKING SIMPLIFIED.

Whether deploying a redundant or primary-only network topology, the MS8.2 Milan network switch is perfectly suited to simplify mobile, installed systems and spatial audio applications.


WELCOME ifty issues. I remember the first one going to print, and the boxes of finished copies landing in the office. Seeing it in print for the first time is not something you forget. Since then, MONDO | STADIA has become the platform for everything else we do: STADIA | SESSIONS, and now stadia expo, all built for an industry we love. To everyone who has read, contributed, and supported us along the way, thank you. It is fitting that ISSUE 50 is also the issue being handed out at stadia expo. Across two days at the Business Design Centre in London, clubs, venue operators, architects, consultants and the suppliers who serve them will be in one room, having the conversations this magazine exists to start. Our cover story takes us to the Kia Center in Orlando. Evertz built the arena’s original control room in 2010, and has now rebuilt it around SMPTE ST 2110 IP in under eight months, ready for ten years of growth. CUE opens the issue with its World Cup story: 104 matches, 16 venues and more than 725,000 fan engagements. Jay Parker of Daktronics explains what European venues can take from the US model without losing their matchday traditions, and Alexandra Végh of Xenia Solutions tackles the half-time queue with BeerChamp. In audio, LD Systems brings L-Acoustics’ A Series to Houston’s Shell Energy Stadium, Adlib work with CODA Audio at Turf Moor, and Martin Audio rounds up projects in Leeds, Dover and Tokyo. Layrd Design looks back on a summer of club interiors, Grass Valley goes behind the scenes of La Liga production, and ADI goes beyond the brief. In Extra Time, George Vaughan of The Digital Line, Adder Technology and Sean Miller of Orion Creative Services look at engagement, the control room and the next move serious stadiums will make. Here’s to the next fifty. Enjoy.

F

Sam Hughes Chief Creative Officer & Editor-in-Chief


CLIENT: OPTUS STADIUM

Mondo Stadia Full Page_Light_PRINT_AUG.pdf 2 2/27/2025 4:12:29 PM

C

M

Y

CM

MY

CY

CMY

K

From Venue to Destination Our award-winning team provides solutions for the most complex, large-scale, and immersive installations. AV & Experiential Design

Broadcast Control Rooms

Digital Signage & IPTV

Large Venue Sound

onediversified.com


SHELL ENERGY STADIUM

TURF MOOR

XENIA SOLUTIONS INTERVIEW

DAKTRONICS INTERVIEW

LD Systems install a new L-Acoustics system at the home of Houston Dynamo FC.

Adlb deliver a state-of-the-art, weatherproof CODA Audio system at one of England’s oldest football grounds.

We spoke to Alexandra Végh, CEO of Xenia Solutions, to discuss BeerChamp and solving the half-time queue.

We spoke to Jay Parker, VP of Live Events & Spectaculars at Daktronics, to discuss the future of LED in stadiums.

ISSUE 50 - OCTOBER | NOVEMBER 2026

THE INTERNATIONAL PUBLICATION FOR THE SPORTING VENUE ECOSYSTEM

INSIDE…

Cover Image: KIA Center - Evertz Chief Creative Officer & Editor-in-Chief Sam Hughes s.hughes@mondiale.co.uk

Editorial Assistant Matt Johnson m.johnson@mondiale.co.uk

Chief Commercial Officer Jamie Dixon j.dixon@mondiale.co.uk

Sales Executive Ruby Bemowski r.bemowski@mondiale.co.uk

Design & Production Dan Seaton d.seaton@mondiale.co.uk

Mel Capper m.capper@mondiale.co.uk

Finance Director Amanda Giles a.giles@mondiale.co.uk

Credit Control ar@mondiale.co.uk

Group Chairman Damian Walsh

MONDO | STADIA is published by Mondiale Media Limited, Strawberry Studios, Watson Square, Stockport, SK1 3AZ, UK Tel: +44 161 476 8340

TEAM TALK

VENUE FOCUS

006 Years In The Making. A Summer To Remember | CUE

VIDEO 068 ADI: Beyond The Brief

INTERVIEW

012 Jay Parker | Daktronics 018 Alexandra Végh | Xenia Solutions

THE FULL PITCH 028 Kia Center | Orlando, United States

VENUE FOCUS AUDIO

Printed By Buxton Press

WWW.MONDOSTADIA.COM

036 Shell Energy Stadium | Houston, USA 042 Turf Moor | Burnley, England 048 Martin Audio Round-Up | Leeds, England | Dover, England | Tokyo, Japan INTERIOR DESIGN 054 Layrd Design: Six Clubs. One Summer. BROADCAST 062 Producing La Liga | Grass Valley

LIGHTING 076 Florence Center | Florence, USA

EXTRA TIME 086 The New Rules Of Engagement | George Vaughan, The Digital Line 090 Great Fan Experiences Start In The Control Room | Adder Technology 094 WORK PRO Audio | INTEGRA Series 096 The Next Move Serious Stadiums Will Make | Sean Miller, Orion Creative Services


TEAM TALK

YEARS IN THE MAKING. A SUMMER TO REMEMBER. E

very four years, the world turns its attention

“Working on a project as large as the World Cup requires

to football. Millions of fans, dozens of nations,

preparation, communication, and adaptability,” Blassage

and a shared passion that reaches far beyond

explained. “No matter how much planning goes into a

the stadiums.

project of this size, there’s always going to be unexpected

For CUE, a fan engagement technology company that helps

challenges that come up.”

sports teams and brands create interactive live experiences

Her role placed her at the center of the effort to ensure that

and measurable sponsorship value, the opportunity to

production partners and local operators were equipped to

be part of one of the world’s largest sporting events

deliver the experiences themselves. Rather than requiring

represented far more than another high-profile project.

CUE employees to be physically present at every venue for

It was the culmination of years of relationship-building,

every match, the company built an operating model that

product development, and preparation.

allowed local teams to run activations confidently, with

For Chris Saccoccia, CUE’s VP of Global Partnerships,

CUE providing training and remote support behind the

the journey began years before the first fans entered the

scenes.

stadiums. An early introduction to CUE’s fan engagement

Conversations with teams and clients reinforced

technology sparked a relationship that grew through

the significance of the opportunity for Jack Colton,

demonstrations, creative discussions, and a successful

CUE’s International Business Lead. Their excitement

deployment at the 2025 Club World Cup, setting the stage

demonstrated just how much the project meant, not only to

for an even more ambitious undertaking in 2026.

CUE but to the broader international sports industry.

CUE was preparing to support interactive fan experiences

“This is not just any other event. This is the big one and we

across 16 venues and 104 matches in the United States,

have to get it right,” Colton recalled thinking.

Mexico, and Canada. Eight different products (Light Show,

The audience would ultimately see the finished production:

PostUp, FanSee, Polling, Trivia, Noise Meter, Prize Drop and

fans scanning QR codes, appearing on stadium screens,

Shuffle), all operating through one platform, would give

competing with rival supporters, and becoming part of

production teams a range of ways to engage supporters,

the entertainment. What they wouldn’t see were the

from interactive games and live polling to fan-generated

months of preparation, hundreds of details, and countless

content and stadium-wide competitions. But the challenge

conversations required to make those moments feel

wasn’t simply the scale of the project. It was how the

effortless.

company would deliver consistently across multiple venues

006

while continuing to serve its existing clients around the

The Best Kind of Silence

world.

When the tournament began, months of preparation gave

Coordinating the extraordinary number of moving pieces

way to the excitement of seeing the technology in action.

fell to Jensen Blassage, CUE’s Director of Client Success.

Over six weeks, CUE’s experiences became part of the

From training and account setup to creative development,

matchday atmosphere for millions of fans in attendance,

testing, and ongoing support, the project required

with more than 725,000 direct fan engagements through

collaboration across nearly every department.

the platform.

WWW.MONDOSTADIA.COM


Above: Jensen and Chris on the field at MetLife Stadium during the 2026 FIFA World Cup Final

And back at CUE, the phones weren’t ringing.

what the team had accomplished together.

For a technology company supporting a live event of this

“I have a tremendous amount of pride for contributing to

magnitude, that silence was something to celebrate. Sean

this type of event and knowing that I played just a small

Hopkins, CUE’s VP of Product and Innovation, recalls the

part in such a meaningful experience that captivated the

pride of watching the platform perform reliably throughout

world,” Blassage reflected.

the tournament, with no major software issues disrupting

Some of Colton’s most memorable moments came from

the experience.

watching how naturally fans embraced the technology.

That reliability wasn’t an accident. CUE was built by people

While attending a game, he watched supporters around

who understand the demands of live production, where

him take out their phones and scan a QR code without

there are no second chances when the moment arrives.

needing instructions. They immediately understood how to

Years of experience working alongside game presentation

participate.

teams, producers, and venue operators have shaped a

The experiences also demonstrated how well the technology

platform designed to perform under pressure. From its

complements the traditions of international football.

underlying infrastructure to its operating tools and remote

During one match, supporters from Norway and England

support capabilities, resilience has been built into the

participated in a Noise Meter competition, turning

technology, allowing teams to deliver confidently whether

the passion of rival fan bases into another moment of

they’re engaging a few hundred fans or an entire stadium.

entertainment inside the stadium.

After months of planning and coordinating across venues,

For CUE cofounder and Chief Revenue Officer Ira Akers, the

Blassage finally got to watch everything come together in

project’s success represented more than a major milestone.

real time. Seeing content arrive from on-site operators

It was proof of how far the company had come. Years

meant the work was no longer happening behind the

earlier, an undertaking of this size might have required

scenes. Fans were experiencing it.

everyone to drop what they were doing and focus entirely

And when the tournament reached its final match, Blassage

on one event. This time, CUE delivered its most ambitious

had the opportunity to experience it firsthand, joining

deployment while continuing to support clients around the

Saccoccia at the championship. After spending months

world.

focused on the details required to make everything work,

“We prove that we can do the biggest and the best and

she was finally able to take in the atmosphere, energy, and

the most events in such a short amount of time without

magnitude of the event from inside the stadium. It was a

slowing down everything else, without losing the

once-in-a-lifetime experience and a fitting celebration of

momentum elsewhere,” Akers reflected.

WWW.MONDOSTADIA.COM

007


TEAM TALK

Above: Inside the control room at MetLife Stadium during the 2026 FIFA World Cup

Perhaps that’s what makes the story special. Behind those

Across professional sports, concerts, festivals, and other

hundreds of thousands of fan interactions wasn’t an

live events, interactive technology is creating new ways

enormous army of people. It was a relatively small team

for audiences to participate rather than simply watch. A

that had spent years building technology, earning trust, and

stadium-wide competition can bring thousands of fans

preparing for an opportunity like this. When the moment

into the action. A personalized moment on the big screen

finally arrived, they were ready.

can become something a fan takes home and shares. And sponsors can become part of the entertainment itself,

The Opportunity Beyond the Big Stage

creating meaningful connections with audiences while

The success of a project like this demonstrates more than

generating measurable engagement and new commercial

the ability to support a major international event. It shows

value.

what’s possible when interactive technology becomes a

For teams and venues, it’s an opportunity to enhance the

natural part of the live production environment, creating

atmosphere, create new sponsorship inventory, and make

opportunities that extend far beyond global tournaments.

attending in person even more rewarding, without losing

The World Cup also reinforced something particularly

the traditions and experiences that make each event unique.

important to Colton and the international football market: interactive fan experiences aren’t exclusively an American

Making the Experience Worth Remembering

approach to sports entertainment. They can also play

The technology may continue to evolve, but the opportunity

a meaningful role in football cultures where tradition,

remains remarkably simple. Create something fans

atmosphere, and passionate supporters are already central

remember. Give teams and venues new ways to connect

to the experience.

with their audiences. And help the brands investing in those

“The tradition and the passion that exists in European

experiences become part of the story.

football and the things that make football quite unique as a sport, they should always be celebrated,” Colton explained.

About CUE

Football clubs don’t need to replicate the American sports

CUE helps sports teams, venues, and brands create

experience to benefit from the technology that has helped

interactive fan experiences that drive engagement and

make those events more interactive. The opportunity is to

deliver measurable value.

take the best of what works elsewhere and adapt it to the culture, identity, and supporters of each club. And that opportunity extends well beyond football.

008

WWW.MONDOSTADIA.COM


TER339.047 – MONDO Adverts 245 x 318mm_AW.indd 2

24/04/2026 12:09


50 INTERVIEW

“We just want to be in the background to help continue those traditions, and make the traditions even better.”

“The problem is not demand... it’s delivery. Every fan who walks away from a queue is revenue the venue has already earned and then lost.”

Jay Parker VP of Live Events & Spectaculars Daktronics

Alexandra Végh CEO Xenia Solutions


012

WWW.MONDOSTADIA.COM


INTERVIEW

THE FUTURE OF LED DISPLAYS: TRANSFORMING LIVE EVENTS AND BRAND EXPERIENCES MONDO | STADIA spoke to Jay Parker, VP of Live Events & Spectaculars at Daktronics, to discuss how LED is winning fans back from the sofa, why the next gains will come from content and control systems, and what European venues can take from the US model while keeping their matchday traditions intact.

Every venue now competes with the living room.

“Today we’ve done a six millimetre at the Green Bay

Coverage is sharper, the fixture calendar is relentless,

Packers. Common today is eight to 10 millimetres.”

and every fan carries a second screen that never

Indoors, the numbers are tighter still: “Arenas are

switches off. The case for buying a ticket has to be

getting into the four-millimetre range, and some are

made on the day itself.

getting down to 2.5 millimetre.”

Jay Parker has spent 32 years at Daktronics, the

That clarity changes what a crowd does. Replays

manufacturer behind the main displays at Lambeau

are now sharp enough for 70,000 people to judge a

Field, Gillette Stadium, and the rebuilt Santiago

decision for themselves, in real time, and react to it

Bernabéu, to name just a few. He oversees the

together.

company’s Times Square and Las Vegas Strip

“You can’t get that at home, right? I’m not throwing

installations, as well as its AV integration team, and

stuff at my television at home on a call, because

his starting point is the sofa.

I’m just watching it. I don’t have any influence,” he

“You’re trying to create a stadium to get people off

says. “But if I’m in the stadium, I get to holler and

the couch to come to your facility for a home event,”

scream and voice my opinion, positive or negative, and

he says. “You’ve got a lot of distractions in this world

technology is in the background helping with all this.”

today. You’ve got social media, you’ve got broadcast

The other trend is scale. Halo boards that wrap the

rights.”

whole bowl now hang in Atlanta’s Mercedes-Benz

The answer, in his view, is to build an experience that

Stadium and a number of Los Angeles venues. Europe

can’t be reproduced at home. “So with the stadium,

has its own: Daktronics’ 360-degree halo at the iconic

you’re trying to create something that people can’t

Bernabéu made its debut at El Clásico in April 2024.

get at home, get them off their couch, get them to the

“You’re seeing things bigger than life,” Parker says.

facility, and then want to come back. And I think that’s

“You can’t get that in your living room.”

where LED technology really fits into this equation.” Europe’s turn to lead The resolution race

The NFL is spending more time on this side of the

In the US, a wave of new NFL construction is setting

Atlantic than ever. The 2026 season features a record

the pace. Owners tour the best venues, borrow

nine international games, six of them in Europe, across

what works and then try to stamp their own city’s

London, Paris, Madrid and Munich. Parker believes

identity on the result. Parker points to the Tennessee

that exposure is pushing European stadiums towards

Titans’ new stadium in Nashville as an example of a

American habits: big main boards, and LED fascia

club building around local character, with LED in a

ringing the tiers.

supporting role.

In one area, though, European football is already

The hardware has moved quickly. In 2023, Lambeau

ahead. Pitchside perimeter LED has been standard here

Field became the first NFL venue with 6mm main

for years, and the NFL has struggled to copy it because

video boards.

its sidelines are crowded with players and staff.

“I still remember in the 2000s, 34 millimetre was the

“The NFL hasn’t gone to the soccer pitch displays as

pixel spacing on the LED video displays,” says Parker.

much, just because you’ve got teams standing on the

WWW.MONDOSTADIA.COM

013


sidelines that cover the entire pitch perimeter displays,” he

look at every asset and say: is that generating revenue for

says. “But I guarantee you this: the NFL is looking at ways.

us?” Parker says. The request he hears most often from clubs

How do we get displays down to field side without people

is blunt: “We don’t have any open inventory, so we need to

standing in front of it? Because that television exposure is

add some more locations.” When existing positions don’t

extremely important.”

sell, the fix is better ones: “they’ve got to get better premium

That broadcast value sits behind most placement decisions.

locations for it.”

“When they get down into the lower bowl, you get an opportunity to get caught by a TV camera. That adds value to

Content beats hardware

a sponsor, that adds value to the team.”

Pixel pitch matters less to Parker than what runs on the screen.

014

The subtle sell

“The display technology is still important, but it’s what

Fans tune out when they are shouted at, and advertisers have

you put on the displays,” he says. “That’s the thing that I

noticed. The sponsorship model on venue screens has moved

think can separate facilities and can bring people back to the

away from full-screen interruptions and towards association

events.”

with content that fans actively want.

The benchmark fans now carry into the stadium is broadcast-

“We used to see just big advertisements coming at you, and

grade graphics, and the hard part is producing them live.

it made it kind of hard for the fan. They would tune out if it

“It’s one thing to produce something before the game and

was too much advertising,” Parker says. “But when you have

play it. It’s another thing to be able to do it real time with

it tied to stats and data that people want to see, and you have

current stats and data and activity that’s going on, and that’s

it sponsored by whatever … it’s subtle.”

what gets people’s attention.”

A sponsored replay gets watched because fans want the

The competition is the phone in every fan’s hand. “We don’t

replay. “I think the industry is getting really good at making

want people at a live sporting event looking at their cell

it more subtle, making it a theme instead of just hard

phone. We want them to be looking at our screens.”

advertising coming at you all the time.”

Parker expects AI to speed up the production of stats and

The commercial pressure has not eased, however. Every asset

real-time graphics, which puts more weight on the control

in a stadium is now judged on what it earns. “They have to

room. “Control is probably as important today as it’s ever

WWW.MONDOSTADIA.COM


INTERVIEW

been. The display becomes the medium of showing the

has. I think the US is learning a lot from what’s happening in

information that you’ve got.”

Europe with security.”

Beyond the bowl

Greener, finer, still LED

Space in the seating bowl is finite. The growth is outside

On sustainability, Parker’s case rests on LED’s efficiency

it, along what Daktronics calls the journey “from the street

compared with what came before. “LED from a green

to the seat”: roadside signs, wayfinding, gates, concourses

perspective has actually been a great move in technology. It

and the entertainment districts now springing up around US

uses less power and the lifetime is longer.”

stadiums.

The next step down in scale is microLED, which Daktronics

“How do we make it easy for people to get to the stadium?”

defines as anything below a one-millimetre pitch. It is lighter

Parker asks. The districts, he argues, change the nature of the

and more power-efficient again, though for now it lives

day. “It’s not just a game. It becomes this event.”

mainly in watches and phones. Parker sees no imminent

Concourses are the obvious home for interactive displays,

replacement for LED in venues. “There’s nothing out there

but crowd size is the problem. “The question is, what

that’s going to replace it at the present moment … and

interactivity can you do when you’ve got 50 to 80,000 of your

we’ll see what the next 10 years brings, because that could

closest fans coming by? Because interactivity is a one-on-one

change.”

kind of situation.” Whatever is built has to work for non-specialists. Parker

Trust on game day

describes touchscreens in NFL draft rooms, used by coaches

Buyers’ biggest worry is reliability: whether the system

and GMs who are not natural technologists: “It’s got to be

works when 70,000 people are watching, and whether a small

easy. It’s got to be simple, and it can’t be difficult to do.

operations team can repurpose it the next day.

Otherwise, you’re going to struggle.”

“The next day you’re renting your facility to a concert, or

Ideas travel both ways. Faster security lines have opened up

you’ve got a birthday party, or you’ve got a corporate event

entrance walkways as space for storytelling and wayfinding,

on your floor,” Parker says. “It needs to be simple so that

and here Parker credits Europe. “I think Europe probably

you can cater the building to that group of people in the

has even more sophisticated security lines than what the US

facility. There needs to be confidence that the technology

WWW.MONDOSTADIA.COM

015


is going to work as intended, because if it doesn’t, you can

the match. The less obvious lesson is about who is in the

embarrass yourself very, very quickly.”

building. Every crowd now includes fans who come for the

Operators want game day to be uneventful. “When game day

people rather than the play. At Coors Field, the Colorado

happens, they want to make sure that they have nothing to

Rockies stripped out unsellable upper-deck seats and built a

worry about. It’s just smooth sailing.”

rooftop bar in their place.

Less is more

“They turned it into a bar, and it’s one of the most popular

Parker accepts that the American model won’t transfer

places to go to today, because it’s social,” Parker says.

wholesale to European football. The sport offers few natural

European football has the same audience in its clubs, lounges

breaks, and matchday atmosphere is generated in the stands,

and least-loved seats. “You want to cater to the different

not by the production desk.

levels of diehard fans, because they all pay the same price to

“The European stadiums have always had a ‘less is more’

get in.”

type of situation,” he says. “The game doesn’t lend itself

For European venues, Parker’s US examples work as a menu

to a lot of stoppage in action. So that’s a unique thing.”

to pick from. The stands can stay as they are while the

The challenge, as he sees it, is “how can you find those

approach, concourses, hospitality spaces and control rooms

moments?” On perimeter boards that already run all match,

change around them. Some matchday frustrations are still

he urges restraint: “I think you’ve got to find the right

beyond any display, though. “If you could figure out how to

balance of how much advertising you’ve got coming at your

bring restrooms to the seats, now you’d have it figured out,”

fans.”

Parker says. “But that might be way off!”

His view of tradition underpins Daktronics’ renewed push

Everything short of that is already in play. As European clubs

into UK and European venues. “Technology doesn’t ever take

plan their next round of upgrades, Parker’s bet is that the

over. It just complements,” he says. “We just want to be in

gains will come as much from what runs on the screens,

the background to help continue those traditions, make the

and the control rooms behind them, as from the screens

traditions even better.” He expects European venues to judge

themselves.

each US idea on its own merits. The idea most likely to travel, he believes, is the concourse, where fans should be able to queue for food without losing

016

WWW.MONDOSTADIA.COM


018

WWW.MONDOSTADIA.COM


INTERVIEW

ALEXANDRA VÉGH Every football club knows the moment. The referee blows for half-time, thousands of supporters stand up at once, and within seconds the concourse is full. The demand is there. The atmosphere is there. The beer is there. And yet, fifteen minutes later, the second half kicks off and hundreds of people are still standing in line, or have given up and gone back to their seats empty-handed. For Alexandra Végh, CEO of Xenia Solutions, that moment is not a statistic. In 2020, working at a professional football club, she went looking for a way to solve the half-time queue and could not find one that was good enough. BeerChamp, the automated beverage system Xenia Solutions presented at its launch in April 2026, grew directly out of that search. “I did not discover the problem in a market report,” Alexandra says. “I lived with it. Match after match, one thing never changed. Beverage service was the bottleneck. Not because fans did not want to buy, but because they could not.” A Problem That Was Everywhere

slowed down, never over-poured, and delivered the

Her first reaction, she admits, was the obvious one:

same result from the first drink to the last,” she says.

find a machine that already existed. “I looked at

“Only after I had defined that did I begin looking at

several existing machines and alternative solutions,”

how technology and automation could support it in a

she says. “None of them truly solved the problem at

real operating environment. That was the moment I

scale. Queues still formed quickly, the peak passed too

decided to build it myself.”

fast, and the sales were lost.” Once she started paying attention, the pattern became

Three Years, Four Prototypes, a Thousand Late Nights

impossible to ignore. From the queues at ZTE Arena

Alexandra is candid that the road from idea to product

during a match against Ferencváros to the concourse at

was anything but straight. Three years after she first

Opus Arena during NK Osijek against Rijeka, the scene

started exploring the problem, the first prototype

was the same. “Different stadiums, different countries,

was built in 2023. Over nearly three more years, the

different sizes of crowd,” Alexandra says. “The same

system went through repeated highs and setbacks.

operational limits. Long queues, long waiting times,

“Some versions were too slow. Others were precise but

frustrated guests.”

not reliable under pressure,” she says. “Every time

The numbers back up what she saw from the stands.

something failed, we had to rethink it, rebuild it and

Industry research shows that 94% of fans buy food or

refine it.”

drink at live sporting events, that 58% would spend

The milestones tell the story: the first cup holder

more if they did not have to wait, and that three out

iterations in 2024, frame assembly at Indupro,

of four customers leave a queue once the wait passes

programming and system configuration, parts coming

ten minutes. “That is the part people underestimate,”

off 3D printers at the factory, and the custom rear

she says. “The problem is not demand. The problem

display fitted into Prototype 4 in 2025. “There were

is delivery. Every fan who walks away from a queue is

a thousand late-night development sessions, and

revenue the venue has already earned and then lost.”

I do not think that is an exaggeration,” Alexandra says. “Progress came from continuous testing, honest

Starting From First Principles, Not From a Machine

evaluation, and being willing to throw away what did

At some point, Alexandra says, the thinking had

not work, even when we had already invested a lot in

to shift. Adding more staff, extending shifts or

it.”

rearranging bars were incremental fixes to a systemic problem. “Once you accept that the problem is the

When Theory Met a Live Crowd

system, small improvements stop making sense,” she

The real test came when BeerChamp left the workshop.

says. “The real question was not how to serve faster

The machine was tested at live events, during peak

for a few minutes. It was how to design a system

periods and under conditions where speed and

that performs the same way during every single peak

reliability mattered immediately, including a live test

moment.”

at Puskás Arena, where students were briefed on the

So she did not start with hardware. She started with

system before the gates opened.

three principles: speed, precision and consistency. “I

“Live events have a way of exposing the truth,”

asked what beverage service would look like if it never

Alexandra says. “No workshop and no simulation can

WWW.MONDOSTADIA.COM

019


fully predict what happens when thousands of people arrive

a football stadium and an indoor arena place very different

at the same moment.”

demands on a system. “A festival crowd moves differently

Some things worked from the start. Consistency improved

from a matchday crowd, and an arena event is different

immediately, and pouring precision reduced waste more than

again,” she says. “If BeerChamp performs in all three, it

expected. Other things were a surprise. “User behaviour,

performs where it matters.”

cleaning routines and on-site workflows needed adjustments

The return to Opus Arena carries a particular meaning. “It is

that only became clear in real conditions,” she says. “And

one of the places where I saw the queues myself,” she says.

some components that worked perfectly in isolation failed

“Now the same concourse has a solution we built for exactly

under continuous peak use. We did not hide from that. Those

that moment.”

failures led directly to design changes, stronger materials

“An installation is where everything we learned in testing has

and simpler operating logic. The version we launched exists

to hold up week after week, not just for one event,” she adds.

because of what went wrong along the way.”

“It is one thing to perform on a test day with the whole team standing next to the machine. It is another to perform on an

Built for Peak Moments

ordinary matchday, when the machine is simply expected to

The result is a system capable of pouring more than 870

work. What pleased me most was seeing people come back to

half-litre beers per hour. Staff only need to refill the cups

their seats before the second half started, with a full cup in

and change the kegs and the CO2. “Your best bartender never

their hand.”

slows down,” Alexandra says. “That is not a slogan for us. It is the design brief.”

What Has Happened Since the Launch

BeerChamp is offered on a Hardware-as-a-Service model.

The launch, Alexandra stresses, was a starting point rather

The venue does not carry a large upfront investment; Xenia

than a finish line. In the months since, the work has shifted

Solutions installs, operates and maintains the system.

from building a machine to building everything around it that

“Venues should not have to become technology companies to

a professional operator needs.

solve a queue,” she says. “They should get the result, and we

A web dashboard now gives operators visibility over their

should carry the responsibility for the technology.”

machines, with role-based access for the different people involved in running an event. It is supported by a full

020

From Test Events to Real Installations

bilingual end-user guide and a separate bilingual service

Since the launch, BeerChamp has moved from test events to

and maintenance manual covering installation, connection

real operation at some of the region’s busiest venues: Sziget

of the keg, CO2 and flow-through cooler, commissioning and

Festival in Budapest, Opus Arena in Osijek, Croatia, and MET

daily routines. “If we want venues to trust the system, they

Arena in Székesfehérvár.

need clear standards, not just a phone number to call when

For Alexandra, the range is the point. A multi-day festival,

something happens,” she says.

WWW.MONDOSTADIA.COM


LIVE MODE

ACT ENTERTAINMENT / DIGITAL PLACEMAKING

FROM STAGE TO STADIUM. PLACES THAT PARTICIPATE. PLACES THAT PERFORM.

WAYFINDING

PUBLIC REALM

ARRIVAL

THE PRODUCTION VALUES OF LIVE ENTERTAINMENT NOW BELONG IN THE MASTER PLAN. ACT helps architects, consultants and designers bring programmable light, real-time media and control into the project while the place is still malleable – so guests can move from passive observers to participants, and the public realm can change across day parts and modes.

25-26 NOVEMBER 2026

Join Bob Bonniol, Chief Innovation Officer from ACT Entertainment, at Stadia Expo to discuss how technology, immersive design and storytelling can transform the way fans experience a stadium or event center.

01 / INTERVENTIONS DESIGN MOVES

VIDEO

BUSINESS DESIGN CENTRE / LONDON

ACTENTERTAINMENT.COM

02 / PUBLIC REALM SHARED GROUND

VIDEO

LIGHTING

03 / FLOW + WAYFINDING LIVE SERVICE

LIGHTING


Quality control has also been formalised. Xenia Solutions

of beverage service is not defined by speed alone,” she says.

built a structured foam diagnostic framework that monitors

“It is defined by information. Every pour creates data. Over

pour quality continuously, so that every glass meets the same

time, that data shows you your demand patterns, your peak

standard and, if anything ever needs adjusting, the cause

moments, how people consume and how efficient your

can be identified immediately. “Beer quality is not a detail,”

operation really is. What cannot be measured cannot be

Alexandra says. “A fast pour that is wrong is still a bad pour.

optimised.”

Precision has to include the glass the fan actually receives.”

The next step is integration: connecting BeerChamp with

On the supply side, the company has moved into series

access control to forecast demand from crowd flow, with

production. Commercially, it has opened conversations with

cashless payment systems to remove friction, and with

further arena and stadium operators through partners in the

loyalty and engagement platforms to turn a quick transaction

sports and events industry.

into a longer relationship with the fan. “When beverage service becomes predictable, the whole event becomes easier

Working Alongside People, Not Replacing Them

to run,” she says.

The question every automation company hears is whether the machine replaces staff. Alexandra rejects that framing.

What Success Will Look Like

“BeerChamp works alongside people,” she says. “It takes

Asked how she will know BeerChamp has succeeded,

over the repetitive part of the job at the most stressful

Alexandra’s answer is simple. “When nobody at a stadium

moment of the event, so staff can focus on what people do

thinks about the queue anymore,” she says. “When half-time

best: looking after guests, quality control and keeping the

becomes a valuable part of the guest experience, not fifteen

operation running smoothly.”

minutes of waiting and missing the start of the second half.

Hospitality, she points out, has some of the highest staff

When venue operators see the system not as an alternative,

turnover of any industry, with annual retention in some

but as the natural way to serve a large crowd.”

surveys as low as 21%. “Great events are still relying on a

She is also clear about who made it possible: family,

workforce model designed decades ago,” she says. “Airports

engineers, suppliers, advisors and the early operators who

automated check-in. Supermarkets introduced self-checkout.

were willing to test, question and refine the system in real

Warehouses run on automated systems. Hospitality is one of

environments. “This project was built together,” she says.

the last large industries still doing everything manually at its

“Some solutions are not invented. They are revealed, once

busiest moment. That is not a criticism of the people. It is a

you have lived with the problem long enough and once the

gap in the system.”

right people are willing to solve it with you.”

The Invisible Layer For Alexandra, speed is only the first chapter. “The future

022

WWW.MONDOSTADIA.COM


The room shaping the future of stadiums, arenas and sporting venues For the first time, the global sporting venue ecosystem is being brought together under one roof. stadia expo is the new home ground for the people designing, delivering and commercialising the next generation of stadiums, arenas and sporting destinations. From infrastructure and technology to fan experience, hospitality and operations, this is where the industry comes to explore what’s next.

Scan for your FREE ticket


25-26 November 2026 • Business Design Centre, London www.stadiaexpo.com

Here are some of MONDO | STADIA Media’s event partners


27-30 APRIL 2027 N E W LO CAT I O N - I B I Z A


50 THE FULL PITCH

028 Kia Center | Orlando, United States


THE FULL PITCH

KIA CENTER Orlando, United States Images: Evertz

028

WWW.MONDOSTADIA.COM


WWW.MONDOSTADIA.COM

029


THE FULL PITCH

S

ince opening in 2010, the Kia Center, home of

- Enable future expansion without major structural overhaul

the Orlando Magic, has continuously evolved to

- Transition from baseband SDI to SMPTE ST 2110 IP

meet the expectations of fans, production teams,

workflows

and league partners. With live event presentation

- Maintain operational familiarity for engineering staff

playing a central role in the in-arena experience, broadcast

The team evaluated remaining with baseband and adopting

infrastructure is critical to delivering high-impact visuals,

a hybrid approach before determining that a full transition

real-time replay, and seamless show execution.

to IP would provide the foundation needed for its future

After more than a decade operating on an SDI-based system,

production requirements.

leadership recognized the need to modernize the control

At the same time, the project timeline was aggressive.

room environment to support the next phase of growth.

Onsite work began on June 1, 2025, with the new control

Evertz provided the original SDI-based system when Kia

room required to be operational for a September 30 NHL

Center opened in 2010, giving the organization an established

preseason game. The project also coincided with upgrades to

technology relationship as it prepared to make the transition

the venue’s LED displays and audio system while Kia Center

to IP.

continued to host events. This was not simply a technology refresh. It required a full

030

The Challenge

architectural transition, executed within a tight off-season

The existing control room had served the organization

window.

reliably for over 15 years. However, key elements of the

“Our goal was to stabilize the environment, allow future

existing production environment were reaching capacity,

expansion, and be cutting edge but not bleeding edge. We

requiring a more flexible and scalable architecture that could

needed to support everything from small productions to full

support future growth.

17,000-seat multi-camera shows,” said David Storm, Senior

The Magic needed a solution that would:

Director of Broadcast Technology & Services, Orlando Magic.

- Stabilize the production environment

“We focused on router capacity so we’d never have to say,

- Support high-density, multi-camera NBA broadcasts

‘Sorry, we’re out of inputs.’ We built in redundancy and

WWW.MONDOSTADIA.COM


expansion for at least ten years … Fans don’t see the router,

supporting up to 192x192

but it’s the backbone. They see better replays, faster routing,

3G-SDI to ST 2110 paths, ensuring seamless integration

stronger reliability … Working with Evertz felt like the perfect

between legacy and IP workflows. This includes 32x32

balance between traditional baseband and IP flexibility. Our

3G-SDI I/O dedicated to the Truck Dock, with fiber transport

engineers could use familiar tools without needing a full-

connecting the Truck Dock to the central production

time IT staff just for routing,” Storm added.

infrastructure.

“We launched a new control room in less than eight months

Audio infrastructure was modernized through integrated IP

— from concept to first event — during supply chain

audio engines and gateway systems, supporting TDM, AES67,

challenges and ongoing events. Many peers were shocked we

MADI, and Dante workflows within a unified architecture.

pulled it off. It required total commitment from consultants

“The change to my role after the upgrade was night and

and vendors, but we did it.”

day,” said Jamie Lafayette, lead technical director for the Orlando Magic. “Everything is crisp and clear. The camera

The Solution

shots are dialed in. The video board representation is

Working with technology consultant Anthony James Partners

incredible.”

and systems integrators Alpha and Unity Systems Integration,

“The biggest efficiency gain was consistency,” Lafayette said.

the Orlando Magic implemented an Evertz IP-based broadcast

“Everything works as programmed. If something glitches, we

infrastructure centered on SMPTE ST 2110.

can trace it. We built from scratch, so we know exactly where

At the core of the deployment are three EXE 3.0 9RU

to look.”

switching platforms, providing high-capacity, 400G-capable

Multiviewing was expanded to support 32 mosaics with up

switching with integrated NAT functionality. Each platform

to 16 images per display, powered through ST 2110-based

includes redundant NCS, power supplies and crosspoint

processing and advanced monitoring capabilities. Dedicated

functionality, supporting the resiliency and expansion

ST 2110 processing provides up to 64 paths of up/down/cross

requirements of the new environment.

conversion and HDR processing.

The system includes comprehensive IP gateway conversion

Live production was enhanced through the DreamCatcher™

WWW.MONDOSTADIA.COM

031


THE FULL PITCH

system, supporting 24 ST 2110 1080p inputs, eight ST 2110

concept through first event, despite ongoing venue operations

1080p outputs, three replay operators and a dedicated

and supply chain challenges.

tagging operator. Metadata CoPilot supports metadata-

Today, the organization benefits from improved reliability,

driven clipping, content organization and export, while

increased production efficiency, and infrastructure designed

DreamCatcher Motion+ uses AI-assisted processing to

with a ten-year expansion horizon.

generate high-frame-rate content from standard-frame-rate

Rather than simply replacing aging equipment, the Magic

sources.

invested in a forward-looking broadcast architecture

“As a replay operator, what I love about DreamCatcher is that

that supports innovation while maintaining operational

everything is controlled from one box,” said Ronald Sayles,

confidence.

replay operator for the Orlando Magic. “You’re not bouncing around between controllers. It’s concise. You don’t really need the keyboard unless you’re labeling something.” “I love the accessibility, the flexibility, and the speed,” Sayles

Equipment List

said. “We’re able to streamline our process: clipping, putting

• 3 × EXE 3.0 9RU IP Switching Platforms (400G-capable)

together packages, showing replays to coaches and fans. It

• PREFEX ST 2110 IP Gateways

eliminates what used to be a full position. Now one person

• SCORPION IP Conversion Chassis

can work on better quality packages instead of scrambling.”

• SMPTE ST 2110 Multiviewers

“We don’t scrub back and auto-clip anymore. We never miss

• IP Audio Engines & Gateways (AES67, Dante, MADI

a shot, assist, or three-pointer. We embed what we want, and

support)

it spits it out immediately.”

• 5700MSC-IP Master Sync Generator • DreamCatcher™ ST 2110 Live Production System

The Conclusion

• DreamCatcher™ Motion+ AI Processing

By transitioning to a scalable ST 2110 architecture, the

• DreamCatcher™ Metadata CoPilot

Orlando Magic have positioned the Kia Center for long-term

• LM-CORE High Compute Processing Cores

operational stability and growth. The upgraded control room

• VUE Touch Control Panels

supports approximately 250 incoming sources, enhanced

• VUE-EDGE-PRO Visualization & Control Platform

multiviewer flexibility, expanded replay functionality, and

• MAGNUM-OS Orchestration & Analytics

improved routing performance across all event types. The system was delivered in under eight months from initial

032

WWW.MONDOSTADIA.COM


EXPERIENCE MAT TERS

Arena Macuiltépetl (aka/informally Arena Nido del Halcon) Xalapa, Veracruz, Mexico

Advanced LED systems designed for lasting performance, reliability, and show-stopping experiences, inside and out.

©2026 Musco Sports Lighting, LLC · ADINT26-14

SC AN HERE TO PUT OUR EXPERTISE TO W O R K F O R YO U


50 VENUE FOCUS

AUDIO

036 Shell Energy Stadium | Houston, USA 042 Turf Moor | Burnley, England 048 Martin Audio Round-Up | Leeds, England | Dover, England | Tokyo, Japan

INTERIOR DESIGN 054 Layrd Design: Six Clubs. One Summer.

BROADCAST 062 Producing La Liga | Grass Valley

VIDEO 068 ADI: Beyond The Brief

LIGHTING 076 Florence Center | Florence, USA


AUDIO

SHELL ENERGY STADIUM Houston, USA Images: L-Acoustics

036

WWW.MONDOSTADIA.COM


WWW.MONDOSTADIA.COM

037


AUDIO

I

n much of the world, soccer fandom is the

renewable electricity, and sub-metering that shows staff

permanent weather. In the United States it

where the 4.2 million kilowatt hours a year actually go.

arrives in waves, and the 2026 FIFA World

The club wants to halve its Scope 1 and Scope 2 emissions

Cup was the biggest wave yet: 48 teams, 104

by 2026 against a 2018 baseline. Scope 2 is purchased

matches, 39 days, and a final in July that Spain took from

electricity, which means the PA counts alongside the

Argentina with an extra-time winner. Houston was one of

floodlights.

the host cities and it spent the summer at full voice. But this

038

city’s soccer does not pack up when a tournament does. It

Higher Energy, Better Coverage, and a Good Neighbor

runs every week, in front of four different sets of supporters,

Downtown

at Shell Energy Stadium, where since earlier this year it

The system it replaced dated to the 2012 opening and

has been carried by a new L-Acoustics A Series loudspeaker

had been on the club’s list for years. The new system

system designed and installed by LD Systems, a Clair Global

arrived inside a wider investment round; in October 2025,

brand.

majority owner Ted Segal committed to a full overhaul of

Opened in 2012 and designed by Populous, the 20,656-

the stadium’s sound system, part of more than 30 million

seat ground was the first soccer-specific stadium in Major

dollars put into the building since 2021. “They’ve wanted

League Soccer built in a city’s downtown district. Four

to do a new PA for quite a while,” says Matt Rhodes, LD

teams now share it: Houston Dynamo FC, twice MLS Cup

Systems Sales Engineer. “There had been updates to dasher

champion and US Open Cup winner in 2018 and 2023; the

boards and video walls and things like that, but now audio

Houston Dash of the National Women’s Soccer League, who

was high on the list.”

took the 2020 NWSL Challenge Cup; the Texas Southern

The brief was ambitious from the first conversation. The

University Tigers college football team; and the Houston

general manager wanted higher energy and better coverage

Gamblers of the United Football League.

than the outgoing vocal-reinforcement system could give

The building has been improving since the day it opened,

him. “He basically told me, ‘I want to make sure that we

starting with LEED Silver certification and, in January 2023,

get a noise complaint from the police from my neighbors,’”

a decarbonization package bundled into the Shell Energy

Rhodes recalls. “He was joking, of course, but it underscored

naming-rights deal: venue-wide LED lighting, rooftop solar,

their desire to bring greater impact to the fan experience.”

WWW.MONDOSTADIA.COM


Behind the joke was a real design target. Shell Energy

the space an array would otherwise want.

Stadium sits in downtown Houston with East Downtown on

Using L-Acoustics Soundvision modeling software, LD

its doorstep, so the brief was never simply more level, it was

Systems mounted enclosures to the scoreboard structure

more level exactly where the fans are. That put intelligibility

itself and fired additional A Series arrays from the southeast

in the stands and control everywhere else on the same list—

and southwest corners back toward it, closing the gap

on the pitch, where the officials’ calls have to cut through,

without adding steel. “That was a specific request from

and past the walls, where the venue is a neighbor.

management, that we provide solid coverage there without

LD Systems had two more boxes to tick, and both worked in

adding any type of major structure modification,” Rhodes

the venue’s favor. The existing cabling infrastructure could

says. “And the A Series was exactly the right choice for that

carry the new system, which kept the budget down and kept

in terms of size, power, and coverage.”

new copper out of an occupied building. And management

Anthony DiDonato, LD Systems Project Engineer, notes

wanted the coverage without any major structural

that A Series propagates plenty of upper-frequency energy

modification, which is precisely the kind of problem A Series

while keeping it tightly directed. Each A15i uses Panflex

is shaped for.

for horizontal directivity control, while vertical coverage is fixed by the enclosure: 30 degrees for A15i Wide, 10 degrees

Two Ends of the Bowl That A15i Had to Reach

for A15i Focus. “The vertical directionality of A Series is

“The east and west bowl seats were fairly easy because

excellent, and Soundvision showed us exactly what was

they have these big overhangs, but getting good coverage

going to happen, and it just worked,” he says. “That let us

on the north and south sides from a design standpoint was

keep the sound highly intelligible for the fans, but also keep

definitely a challenge,” Rhodes says. Neither end offers an

it off the field where it can become a distraction for players

overhang to fly from, the corner throws are long, and one

and others on the sidelines. That’s crucial for hearing the

end holds a standing supporters’ and band section that is

officials’ calls in the PA system.”

loud in its own right and sits at an angle no single wellaimed array serves cleanly. “That’s always been a huge gap

Ninety-Six A15i and 16 KS21i on Twelve Amplified

for them,” he says. Above the north seats, the main video

Controllers

display, roughly 34 feet high by 73 feet wide, takes much of

L-Acoustics A Series won the job on the pairing that decides

WWW.MONDOSTADIA.COM

039


AUDIO

most of them, performance against price. “We could

reinforcement type of setup, and now it’s much more music-

achieve everything they wanted with A Series, getting the

friendly,” DiDonato says.

performance that we were looking for at a price they were

The clearest verdict came from people nobody had told.

happy with,” Rhodes says.

“We heard a ton of unsolicited comments about how much

Main bowl coverage on the east and west sides of the

better the sound is from people that had no idea that there

stadium comes from 16 hangs of four A15i Wide, interspersed

even was a new sound system in there. Fans, who are

with eight pairs of down-firing KS21i subwoofers. The north

not technical people, said to us, ‘Wow, it sounds so much

seating area adds four smaller arrays of one A15i Focus over

better this season,’” Rhodes relates. “To get that kind of

one A15i Wide above and around the video display, while the

feedback was really cool. It just makes us feel like, okay, this

south end sports three arrays of four A15i Wide flown from

system truly has made a great, positive impact on the fan

a canopy that extends out over the central seats. The four

experience.”

corner seating areas are covered by arrays of two A15i Focus over one A15i Wide. In total, the system comprises 84 A15i Wide, 12 A15i Focus, and 16 KS21i, collectively driven by ten LA12X and two LA4X amplified controllers. Using only a dozen amplified controllers to cover the entire bowl, added to the reused cabling and an untouched roof structure, gives the stadium a full-scale PA upgrade that sits lightly on the energy budget it is working to shrink. Fans Heard It Before They Knew About It The venue often runs DJs before, during, and after matches, and the flown KS21i give that material both low-end impact and tonality. “The previous system was more of a vocal-

040

WWW.MONDOSTADIA.COM


L-Acoustics_Sound Forward_MondoStadia_245x318mm.indd 1

16/12/2024 11:44:47


AUDIO

TURF MOOR Burnley, England Images: CODA

042

WWW.MONDOSTADIA.COM


WWW.MONDOSTADIA.COM

043


AUDIO

ne of the oldest football stadiums in England,

stadium’s infrastructure, Adlib was invited to demonstrate

Turf Moor has been in continuous use as the

the APS-Pro units. Ian continues:

home of Burnley Football Club since 1887. With

“We carried out the demo in absolutely appalling weather,

a capacity of more than 20,000 the ground is

which whilst unpleasant for those in attendance, superbly

widely renowned for the fantastic match-day atmosphere

demonstrated the system’s capabilities. As well as happily

generated by its loyal fanbase.

resisting the strong winds and horizontal rain, the system

As football clubs diversify the use of their stadia into

sounded breathtakingly good.”

multi-purpose entertainment settings, Burnley FC recently

Having witnessed demonstrations of different brands,

took the decision to upgrade its audio provision with a

the Club awarded Adlib the contract for what would be a

future proof solution that would meet a wide range of event

logistically demanding install. The stadium’s busy schedule

requirements, as well as ensuring longterm compliance with

allowed limited access during times when other contractors

the football authorities’ strict rules on safety.

would also be working on different upgrade elements. Once

Burnley required a durable, weatherproof, permanently

the APS-Pro system was confirmed as the Club’s choice,

installed system which would last decades rather than years.

Adlib continued work on the design and consulted with the

It needed to provide premium quality audio to every part of

CODA Audio team about potential modifications to the units.

the ground whilst reducing load on the infrastructure by

George comments: “Because the APS-Pro system was

being light in weight.

developed as a touring product it has very innovative rigging

Adlib, a specialist integrator in live technologies had

elements which enable quick and easy setup and removal

previously supported the Club at short notice with an

for live work. These added weight to the product and were

interim CODA Audio solution when it secured promotion to

unnecessary for a permanent install. A unit without these

the Premier League for the 2025/2026 season. This portable

elements would be lighter and have fewer fixing holes,

system had combined flown line array elements (ViRAY)

reducing any chance of water ingress. The removal of the

with point source units (HOPS), and whilst highly effective,

parts essential in a touring environment would give us a

was not a practical long-term solution.

marine-grade loudspeaker that still possessed all of CODA’s

Following a tender process, Adlib was invited to design a

proprietary technologies, which would slot perfectly into a

system working to the specification provided by the club.

long-term installation environment.”

Adlib’s Audio Technical Manager Ian Nelson and Systems

CODA responded swiftly to the request, delivering the

Technical Manager George Puttock designed a system based

modified units early for a team working under pressure. Ian

on CODA Audio APS-Pro (arrayable point source) to suit the

was impressed:

environment, as Ian explains:

“We were up against it on the ground, working within a lot

“Timings, as ever, were challenging on this job. Our design

of restrictions. We couldn’t go on the pitch, so only had a

process was aided by CODA’s System Optimiser simulation

very narrow footprint upon which to operate. This meant

tool, and we concluded that APS-Pro would meet every

that time was at a premium, so CODA really knocked it out

requirement of the project, providing an ultra-reliable

of the park by delivering all the modified loudspeakers in

system with no compromise on audio quality. Whilst APS-

pristine condition, a week ahead of schedule.”

Pro at the time had been developed by CODA essentially as a

This swift response to Adlib’s request for a modified unit

touring product, its suitability was never in doubt as far as

ultimately became the basis of a new addition to the CODA

we were concerned.”

Audio range. The APSi-Pro emerged directly from the project

Following in-depth discussions with the club’s consultant,

as a fully-developed, cost-effective installation product,

Olly Creedy, over what would be a life-critical element of the

available for stadiums, indoor sports arenas, and wide range

O

044

WWW.MONDOSTADIA.COM


046

of other similar applications.

amplifier in a compact 1U package, the LINUS6.4i delivers 4

In contrast to the original APS-Pro units, APSi-Pro is

x 1500W of clean power per unit, and more when driven in

supplied with a pair of universal fixing plates that form

BTL, as was the case at Burnley.

the core of the system’s modular installation concept.

For a system with a critical life-safety role, the amplifiers’

These plates allow any APSi product to be securely attached

monitoring capabilities were just as important as their

to another APSi element or directly to the flying frame,

output power. Loudspeaker impedance monitoring, pilot

enabling a wide range of configurations without additional

tone monitoring, fault reporting and watchdog security, are

bespoke hardware. Whether the requirement is a compact

fully integrated into the Club’s Q-SYS ecosystem, giving

two-box point-source cluster, a mixed-angle array, or a full

continuous real-time visibility of system health. The tight

system with an APSi-SUB, the same fixing plates provide a

Q-SYS integration with the LINUS platform makes it possible

consistent, streamlined mounting method.

for Adlib to monitor the system remotely, helping to ensure

In addition, CODA’s Array Keeper (AK) is a new APSi-Pro

it performs as it should, every match day and every day in

Series installation accessory derived from the custom

between.

metalwork Adlib designed for Burnley FC. Its purpose is

Doug Metcalfe, Director of Operations at Burnley Football

simple but extremely valuable, in that it allows any single

Club comments: “This is a long-term investment in the

loudspeaker element in an installed APSi array to be

club’s infrastructure, but also a long-term investment

removed for servicing without disturbing, disconnecting,

in our relationship with Adlib. It’s about developing

or re-rigging the rest of the array, overcoming one of

those relationships. Having a system you can rely on and

the biggest practical challenges in fixed installations -

have confidence in is crucial. We want to entertain, and

maintaining a flown array without requiring a full system

safety comes first, so knowing we’ve got a system that is

breakdown.

compliant and goes beyond those requirements is, for me,

At Turf Moor, Adlib installed more than 100 x APSi-Pro

the most important thing.”

units. The (largest) North Stand was covered by 8 hangs

David Webster, Global Sales and Marketing Director,

of 5 x APSi-Pro, with a single APSi-SUB per hang, with a

CODA Audio concludes: “Adlib’s work on this project was

further 5 hangs of 5 x APSi-Pro (with SUB) for the East

exceptional in every respect. Their team had a clear idea

Stand and 4 x APSi-Pro (without SUB) for the West Stand.

for an optimal outcome for the stadium, and we were really

The South Stand was covered by 8 hangs of 3 x APSi-Pro. For

happy to work closely with them and ensure they had

two corners of the ground which required audio coverage,

exactly the right CODA Audio tools to achieve their aims.

Adlib deployed CODA Audio HOPS Series (High Output Point

The installation at Turf Moor perfectly illustrates both

Source) loudspeakers supplemented by CODA Audio D5 Cube

Adlib’s expertise and vision as well as our ability to respond

(point source). These areas comprised 3 x HOPS10-Pro and

with agility to the needs of the market. The fact that the

2 x HOPS7-Pro in the South-East corner, with a further 3 x

APSi-Pro Series is now an established part of our portfolio

HOPS7-Pro and 8 x D5 Cube for the North-East corner.

speaks volumes about the impact of this project and the

The system is powered by 46 x CODA Audio LINUS6.4i

collaboration which delivered exceptional audio in the most

DSP amplifiers. A four-channel, networkable installation

efficient and cost-effective way for the club.”

WWW.MONDOSTADIA.COM


APSi Series I N S TA L L AT I O N E V O L U T I O N

APSi-Pro is a purpose built, high output progressive line source platform designed for installation projects that need predictable coverage, high SPL, and realworld cost efficiency. It is a system - a modular frame of engineered blocks - not a single loudspeaker. APSi-Pro brings the performance philosophy of large modular linesource architectures into an installation friendly, budget sensitive format. HEARING IS BELIEVING

APSi-SUB

APSi-Pro-S APSi-Pro-D Vertical Dispersion APSi-Pro D projects energy further with its narrower angle output resulting in higher SPL for the longer throw section of an array, when used with narrow angle couplers.

CODAAUDIO.COM

Horizontal Symmetrical Dispersion 120°/90°/60°

APSi-Pro S has wider coverage, so slightly less SPL, especially when wide angle couplers are used. An array is naturally level shaded without having to use multiple amplifier channels.

InstaFit Magnetic Couplers

10° 10° 30°

120°

90° 60°


AUDIO

MARTIN AUDIO ROUND-UP Leeds, England | Dover, England | Tokyo, Japan Images: Martin Audio

048

WWW.MONDOSTADIA.COM


WWW.MONDOSTADIA.COM

049


AUDIO

F

050

ew venues ask as much of a sound system as

in the outdoor zones and CDD6TX-WR for the premium

a stadium, where the PA has to carry safety

Excite seats, while Audiobrains handled acoustic simulation

messages, match presentation and music over a

and tuning. CDD’s dispersion widens close to the cabinet

capacity crowd, in a building that puts sightlines

and narrows with distance, which means fewer boxes cover

before acoustics and often sits open to the weather. Hard

each area evenly, whilst careful directivity control keeps spill

surfaces throw reflections back at the audience and open

beyond the stadium to a minimum. The 122m run from home

stands let sound drift towards the neighbours. The solution

base to centre field adds around 0.36 seconds of delay, so the

relies on placing acoustic energy precisely where the audience

team corrected timing to let sound arrive naturally at every

needs it and, just as importantly, keeping it away from

seat, in line with Denon’s aim of “providing the optimal

everywhere else, with the right tool depending on the space.

acoustic environment for each area and purpose”.

Not every part of a stadium needs an optimised line array,

The idea works just as well in smaller grounds, which need

and where throws are short or areas split into zones, a point-

the same clarity but have simpler structures and tighter

source loudspeaker can control coverage through its acoustic

budgets to work with. At Dover Athletic’s Crabble, Old Barn

design alone. At Giants Town Stadium, the 2,900-seat

Audio replaced a 100V horn system with 32 weather-resistant

ballpark in Inagi, Tokyo, Denon Engineering deployed Martin

CDD-WR loudspeakers in seven zones across all four stands

Audio’s CDD Series, with weather-resistant CDD10-WR mains

and the clubhouse, from the leading edge of the new Family

WWW.MONDOSTADIA.COM


Stand roof to a VIP box with its own volume control. “The

company’s Alan Inkster explained, “direct SPL is the key in a

weatherised CDD-WR was the perfect choice,” said the

loud stadium”.

company’s Phil Clark.

Optimisation comes into its own over longer throws and in

The bowl brings a different problem, because a roof-mounted

more complex spaces, where software works backwards from

line array close to a steeply raked stand has to bend into such

the audience, starting with a 3D model of the venue and the

a tight curve that it loses much of its long-throw advantage.

SPL and frequency response each area should receive. The

A constant curvature design avoids that compromise without

software then works out the splay angles and per-box DSP

any need for optimisation. At Leeds United’s Elland Road,

filtering that will deliver those targets, while keeping energy

Imperium Integration switched its PA/VA renewal to TORUS

out of the places where nobody sits. DISPLAY 3 applies that

T1230 as the range arrived, and short constant curvature

approach to Martin Audio’s Wavefront Precision line arrays

arrays now cover all four stands and the corners. The four

while also predicting the rest of the range, and its patent-

stands differ in age, structure and materials, yet keeping

protected algorithm has become a regular part of stadium and

the same model throughout held the timbre consistent, and

arena design.

the arrays’ low weight left room to fly SXCF118 cardioid

A prediction only counts if it matches what the audience

subs in the hangs. Imperium also modelled intelligibility in

hears on the day, and Martin Audio rates the software within

Martin Audio’s DISPLAY 3 prediction software because, as the

±1dB of real-world measurements. The designer can also

WWW.MONDOSTADIA.COM

051


AUDIO

mark areas where sound should fall away, such as behind

than a traditional in-the-round arrangement and held the

a hang or beyond the last row, and Martin Audio uniquely

seating within ±2dB across the octave around 50Hz, with the

applies its optimisation to that fall-away, through a function

court 6dB lower. The integrator also set Hard Avoid® values

it calls Hard Avoid®, which can reduce level there by up to

around the retractable seating, with a Q-SYS system recalling

30dB. Optimisation also tightens control of the low end, and

presets for game night, a graduation or a staged event. “We

the same model can store separate snapshots for a part-filled

needed precise coverage only where it was needed,” said

bowl, a sell-out or a change in conditions.

Spectrum’s Operations Manager Zach Mitchell.

Middle Tennessee State University’s Murphy Center

Every one of these projects, whether it relies on point source,

demonstrates what optimisation can do in a difficult

constant curvature or full optimisation, began with the same

space, because the 11,520-seat arena is reverberant and has

discipline of deciding where sound should and should not

reflective glass walls. Spectrum Sound hung six Wavefront

go long before the doors opened. That discipline delivers

Precision WPS arrays in the round, and LED walls at each end

coverage, consistency and control from a non-league ground

left the whole grid free for subwoofers. Martin Audio’s Joe

to an 11,520-seat arena, and it makes every seat count.

Lima tested several layouts in DISPLAY 3 and settled on four clusters of four SXCF118 cardioid subs that point sideways and spiral slightly off centre. The layout delivered 2dB more

052

WWW.MONDOSTADIA.COM


Make Every Seat Count

From the concourse to hospitality to the main bowl, Martin Audio delivers control, coverage and consistency for a more successful match-day experience. See us at Stadia Expo, London or visit our website for case studies.

martin-audio.com/ applications/stadium-sound

Unite Your Audience

5343-Stadium Advert 245x318mm.indd 1

16/10/2026 15:56


INTERIOR DESIGN

LAYRD DESIGN: SIX CLUBS. ONE SUMMER. Images: Layrd Design

O

ver the summer, Layrd delivered projects for AFC Bournemouth, Cambridge United, Peterborough United and Birmingham City, increasing capacity, strengthening commercial offerings and creating

spaces that generate value for each club beyond matchday. The off-season provides a short window for work, and for any club investing in its venue, every week counts. This summer, Layrd delivered stadia projects across four clubs, from players’ tunnels and retail to premium hospitality. Peterborough United Football Club Layrd completely transformed Peterborough United’s executive hospitality suite, which had remained largely unchanged for 20 years. The club wanted a fresh, modern space that would engage long-standing supporters while providing a more compelling environment for sponsors and new customers. The design reimagines the existing layout to maximise space and create a more varied hospitality experience. Flexible seating zones, private booths, high-level perch bars and dining areas allow the space to adapt throughout matchday, while a refined bar, integrated screens and bespoke joinery create a stronger social environment. The scheme brings the club’s new 2026/27 brand identity into the interior through a palette of dark and light blues, textured fabrics, timber finishes and contrasting metallic details. Club heritage is woven throughout, including a striking triumph banner and a vinyl wall map highlighting the stadium’s

054

WWW.MONDOSTADIA.COM


WWW.MONDOSTADIA.COM

055


INTERIOR DESIGN

056

location at the heart of Peterborough.

Cambridge United Football Club

The original bar was retained and transformed through

Following Cambridge United’s promotion to League One,

recladding and softened detailing, while bespoke curved

Layrd looked to elevate two of the club’s hospitality spaces

banquettes with integrated planters, and bold circular wall

at the Cledara Abbey Stadium. Each lounge was given its

lamps create a warmer, more premium atmosphere.

own distinct character, but both share the same ambition: to

The transformation has increased capacity and revenue

create a more premium, considered matchday experience that

opportunities for Peterborough United, giving long-standing

reflects the club.

supporters a completely refreshed experience and providing a

The Regent Lounge

stronger proposition for potential sponsors.

The brief for the Regent Lounge centred on two priorities:

“Working with Layrd Design on the transformation of our

increasing capacity and creating a more exclusive

Alan Boswell Executive Suite has been a fantastic experience

environment for matchday guests. The existing bar took up

from start to finish. The finished space has exceeded

more of the room than the club needed, so Layrd reduced

our expectations and has genuinely raised the standard

its footprint and repositioned it as a genuine feature, visible

of hospitality we can offer at the stadium. Delivering a

from the entrance.

project of this scale within a working football stadium,

The club’s amber and black are brought in as considered

against a very tight summer schedule, was never going to

accents, through amber-framed doorways and amber-lined

be straightforward. Having Layrd overseeing the project

wall recesses framing the screens. Black mesh screens divide

gave us real confidence that the design vision wouldn’t

the room into more intimate zones, while softer upholstery,

be compromised.” - Alex Harris, Commercial Director,

warm wood-effect flooring and framed photography from the

Peterborough United Football Club

club’s history balance the harder materials.

WWW.MONDOSTADIA.COM


The space recovered from the bar has been given over to

The tangible return on investment has been outstanding,

guests, with bespoke banquettes and a mix of dining and

resulting in a dramatic rise in corporate bookings and

poseur-height tables giving the club greater flexibility for

increased seasonal package sales. Layrd Design remain

fixtures, corporate bookings and private hires.

a trusted partner as we continue driving the commercial

The Layrd Lounge

development of Cambridge United Football Club.”

The 77 sqm Layrd Lounge was transformed into a warmer,

Neil Rowe, Head of Commercial Cambridge United Football

more sophisticated space where guests and sponsors can

Club

relax and feel genuinely looked after. Bespoke banquettes, tailored tables and timber-finished TV units’ pair with a

Birmingham City Football Club

refined palette of amber, soft blue-grey, black and white.

Birmingham City Football Club were looking for a versatile

Amber acoustic panels with integrated Cambridge United

destination for fans, staff, visitors and the wider community.

signage form a statement feature wall, improving the

The 180 sqm space was reimagined to operate as a welcoming

acoustics while adding colour and depth. A gallery-style

café throughout the week, while retaining its role as a key

display also celebrates the club’s heritage, including the

matchday hub, in just six weeks.

original 1848 football rules. The existing timber flooring

Working within the existing footprint, the design increases

was retained and tables and panels repurposed, keeping the

natural light, expands seating capacity and opens up the

scheme sustainable without losing its warmth.

kitchen to create a larger, more engaging service area. Key

“Partnering with Layrd Design on the overhaul of the Regent

matchday features, including the self-service beer wall, were

Lounge and the Layrd Lounge at Cambridge United has been

retained.

a total gamechanger for our matchday hospitality product.

Warm neutrals and club-inspired blues were used, in

WWW.MONDOSTADIA.COM

057


INTERIOR DESIGN

combination with feature tiling, oak finishes, brown leather

I look forward to continuing our relationship with Layrd on

and copper accents, creating a contemporary yet welcoming

future projects at St. Andrews @ Knighthead Park .” - Rich

atmosphere. Commissioned graffiti artwork and a pitch-

Carpenter, Director of Operations, Birmingham City Football

inspired moss wall reinforce the club’s identity and provide a

Club

distinctive sense of place. Outside, new planting and copper

058

planters create additional capacity for weekday visitors and

AFC Bournemouth

matchday supporters.

At AFC Bournemouth, Layrd delivered the players’ tunnel,

During the week, The Homeground provides a welcoming

club store and East Stand hospitality. Cambridge United

space for staff, visitors, contractors, stadium tours,

gained two lounges fit for League One, Peterborough United

community groups and members of the public. On

a fully transformed executive suite in eight weeks, and

matchdays, it transforms into a vibrant fan destination with a

Birmingham City a seven-day café and fan hub. Beyond the

flexible layout capable of accommodating larger crowds.

stadium, Layrd’s work this year has extended into high-

“Working with Layrd was a very positive experience

performance environments, including Wrexham AFC’s

from start to finish. The management team at Layrd

training ground and Ipswich Town’s new state-of-the-art

were professional, knowledgeable, and easy to work with

training facility, where interior spaces included offices,

throughout the project. Despite the challenges of a busy

recovery areas, pools, Pilates studios, a canteen, café area and

football schedule, they worked efficiently and delivered the

more.

transformation within just five weeks. The Homeground

Each brief was distinct, but all shared the same commercial

has been significantly improved and is already having a

goal: make existing space work harder, generate more value

positive impact on how our staff, supporters, and wider

from every square metre and give supporters, sponsors

community use our new space. It’s encouraging to see the

and guests a stronger reason to spend time, and money, at

space being enjoyed beyond match days, helping us create a

the stadium. Layrd’s relationship with AFC Bournemouth

more welcoming and accessible environment for everyone.

began with the redesign of the home players’ dressing room

WWW.MONDOSTADIA.COM


01223 952992 | info@layrddesign.co.uk | layrddesign.co.uk

ALAN BOSWELL INSURANCE EXECUTIVE SUITE PETERBOROUGH UNITED FOOTBALL CLUB

CREATING IMMERSIVE EXPERIENCES


INTERIOR DESIGN

in 2025. That project laid the foundations for a growing

understanding what makes AFC Bournemouth unique. The

partnership, and this summer Layrd returned to deliver three

work they delivered on our first-team dressing room was

more projects across very different parts of the matchday

a significant project, and to see that relationship develop

experience: the players’ tunnel, the club retail store and a

further through their work across the East Stand, players’

series of hospitality spaces within the East Stand. Together,

tunnel and retail store has been fantastic.” - Rob Mitchell,

they shape every audience the club serves. That trust has

Commercial Director, AFC Bournemouth

since been recognised, with Layrd now a Club Regional

060

Partner of AFC Bournemouth.

Southend United Football Club

The Players’ Tunnel

Following the launch of its new brand identity, Southend

The tunnel continues the materials, tones and lighting of the

United asked Layrd to transform its 134 sqm club store into a

changing room, so the players’ momentum carries from the

destination that better reflects the club’s ambitions, heritage

dressing room onto the pitch. LED panels along the walls and

and connection to its supporters.

ceiling can be tailored to any occasion, from club branding on

Repositioning the till point improved circulation and opened

matchday to sponsors, visiting teams or other events. Wider

up merchandising opportunities across the shop floor,

pitch doors bring in natural light and open up views, while a

creating a clearer customer journey and greater operational

new glazed canopy extends the tunnel onto the pitch, keeping

efficiency. The club’s signature blue extends across walls,

the players visible as they enter and leave.

ceilings and structural elements, balanced by warm timber

The Club Shop

finishes and black mesh detailing. Supporter culture runs

Deeper reds and exposed ceilings carry the stadium’s new

throughout, including “We Are The Shrimpers” and “Blue

design direction from the tunnel through to retail. The

Army,” with fan photography built into bespoke decorative

layout has been reworked to draw supporters through the full

features.

store, with home shirts positioned at the rear and a bespoke

Flexible merchandising allows the store to adapt to seasonal

central till, crowned by a suspended lightbox, that can

campaigns, product launches and club events. Combined with

host other activities on non-matchdays. The print lab was

the careful reuse of existing elements, the result is a cost-

relocated, more points of sale were added and the entrance

effective, sustainable transformation and a stronger platform

was redesigned, while a dedicated retro zone in darker timber

for merchandise sales.

celebrates the club’s history.

“Through strategic space planning, bespoke joinery,

The East Stand

integrated branding and carefully considered finishes, the

The East Stand reimagines general admission and entry-level

new store celebrates Southend United’s rich history while

hospitality, transforming what would traditionally be an

embracing its future. The result is a vibrant retail experience

industrial sports bar into a playful, immersive space inspired

that strengthens fan engagement, improves customer flow

by Bournemouth’s piers and seaside arcades. Within it, the

and creates a more impactful platform for merchandise

2:21 Lounge, named after James Hayter’s record-breaking

sales.” - Sedona Black, Interior Designer, Layrd

hat-trick against Wrexham, reflects a growing Premier

Layrd’s summer projects demonstrate how thoughtful

League trend: hospitality that bridges the gap between

interior design can elevate the stadium experience at

general admission and premium dining. Turning a previously

every level, from the tunnel and the club store to premium

underused area into a substantial new offer, the project

hospitality. By working with what each club already had

increases hospitality capacity and makes better use of the

wherever possible, Layrd delivered each transformation

existing stadium space.

within the off-season, increasing capacity, strengthening

“Layrd have already become a familiar presence around the

club identity and creating new commercial opportunities.

Vitality Stadium, having played a key role in transforming

Each space is now ready to welcome supporters, sponsors and

a number of spaces across the stadium and, importantly,

guests throughout the 2026/27 season and beyond.

WWW.MONDOSTADIA.COM


Stand out from the crowd with intelligent lighting control Turn every game into an unforgettable experience with Pharos. deliver sound-synchronised shows that bring your stadium to life. When the game is over and the touring show rolls in, seamlessly hand control over to live event consoles.

Steaua Bucharest Romania

272 Gunnersbury Avenue

sales@pharoscontrols.com

London, W4 5QB United Kingdom

Scan to learn more

+44 (0)20 3696 4050

pharoscontrols.com @pharoscontrols


BROADCAST

PRODUCING LA LIGA Spain Images: Grass Valley

P

roducing live football at scale is an exercise in balancing production quality, resources and efficiency. With hundreds of matches to deliver across a season,

dedicating a complete production setup and team to every event is not always the most effective approach. NVP faced this challenge when it was awarded a five-year contract to provide production services for both LaLiga EA Sports and LaLiga Hypermotion. The two competitions have different production requirements, so NVP needed an operational model that could accommodate both while maintaining consistent production standards.

062

WWW.MONDOSTADIA.COM


WWW.MONDOSTADIA.COM

063


BROADCAST

Its answer was a hybrid approach. LaLiga Hypermotion

assigning them to individual matches.

matches are produced remotely from a new production center

Production capacity can be shared across events, expanded

in Madrid, while LaLiga EA Sports continues to be produced

when required and adapted as workflows evolve. For an

through NVP’s outside broadcast fleet. Both operations are

operation managing a large number of live events, this

connected through a common technology environment built

provides an alternative to building every production around

around Grass Valley’s AMPP platform.

fixed, dedicated resources. “For NVP, AMPP has established a software-defined

Centralizing where it makes sense

production environment that allows us to allocate production

The Madrid production center includes six production

resources according to the requirements of each competition

galleries capable of handling multiple LaLiga Hypermotion

while maintaining a consistent operational approach

matches simultaneously.

across the wider LaLiga production ecosystem,” says Ivan

AMPP OS provides the software-defined production

Pintabona, CTO, NVP.

environment, with Grass Valley Maverik X supporting

064

live production switching, Audio Mix providing live audio

Two production models, one environment

production and LiveTouch X handling instant replay. Grass

Centralizing production does not mean eliminating outside

Valley Orbit orchestration, Kaleido IP multiviewers and

broadcast operations.

IP gateway technology provide the wider infrastructure

LaLiga EA Sports continues to be produced using NVP’s OB

connecting the different production functions.

fleet, including eight compact REM-OB vans purpose-built by

The key benefit for NVP is the ability to allocate production

NVP and Video Progetti for the project.

resources according to the schedule rather than permanently

The two production models therefore remain distinct, but

WWW.MONDOSTADIA.COM


BROADCAST

they operate within the same wider technical environment.

center using Creative Grading. This allows specialist camera

Common engineering practices, technology and production

resources to be centralized while acquisition remains at the

standards allow NVP to choose the appropriate workflow

venue.

for each competition without maintaining two completely

For the production team, the result is a consistent camera

separate production infrastructures.

workflow regardless of where a match is being produced.

This is an important part of the approach. For organizations

“The LDX 135 and LDX 150 camera systems have delivered the

modernizing established sports production operations,

image quality, HDR performance and operational reliability

moving everything to a centralized or software-based model

we were looking for,” says Pintabona. “Having a common

may not be practical. Existing OB infrastructure can remain

camera platform across the fleet gives our production

valuable while software-defined production is introduced

teams a consistent operational experience regardless of how

where it delivers a clear operational benefit.

individual matches are produced.” The wider deployment also includes Grass Valley Karrera

Bringing the stadium into the production center

production switchers and Sirius routing infrastructure for

The model extends beyond the production galleries

production switching and signal management.

themselves. Grass Valley supplied 144 LDX 135 and LDX 150 camera

Designed to evolve

systems across NVP’s production fleet, providing a common

A further consideration for NVP was how the production

UHD HDR acquisition platform across both competitions.

environment could adapt as requirements changed.

For LaLiga Hypermotion, 64 cameras are deployed at

A traditional facility is generally built around a defined

stadiums and shaded remotely from the Madrid control

number of production resources. Increasing capacity can

WWW.MONDOSTADIA.COM

065


BROADCAST

require additional physical infrastructure, while changing

A model for large-scale sports production

workflows can involve significant technical modifications.

The significance of the project goes beyond the number

A software-defined environment offers a different approach.

of matches it supports. NVP’s approach demonstrates

Production resources can be allocated and configured

how sports production organizations can modernize their

according to demand, allowing the operation to adapt without

operations without having to choose between established

having to duplicate every capability for every production.

broadcast infrastructure and newer software-based

This is particularly relevant to sports, where schedules, event

workflows.

requirements and production expectations can change over

For organizations facing similar challenges around

time.

production capacity, remote operations and resource

For NVP, the approach also means that newer software-

utilization, the model offers a practical approach: centralize

based workflows can coexist with established broadcast

the resources that benefit from being shared, retain local

infrastructure. The Madrid production center can evolve while

production capabilities where they remain valuable, and

the OB fleet continues to play a central role in LaLiga EA

connect both through a common operational environment.

Sports production.

“Innovation is in NVP’s DNA. With AMPP we are investing in the future of live production and raising the bar for LaLiga

From design to live production

broadcasts,” says Pintabona. “We now have a hybrid system

Video Progetti led the system integration, with installation,

that combines outstanding image quality with the scalability

commissioning and testing completed within two months

and reliability required for top-tier football production.”

ahead of the opening of the 2025–26 season.

For LaLiga, the result is a production operation designed

NVP, Video Progetti and Grass Valley worked together to

around the demands of a very large live sports schedule. For

deliver the production center, IP infrastructure and software-

other sports organizations considering their own next step, it

defined workflows as a single operational environment.

demonstrates that modernization does not necessarily mean

Testing covered the complete production chain, including

starting again. It can mean connecting what already works

AMPP OS-based applications, routing, switching, replay,

with new production capabilities, and introducing greater

orchestration, multiviewing and camera acquisition, before

flexibility where it can make a difference.

the facility entered live production. The resulting operation now supports more than 800 live matches each season across LaLiga EA Sports and LaLiga Hypermotion.

066

WWW.MONDOSTADIA.COM


Simple, No-fuss, Robust, Fast and Precise IP65 Wash Light Series RGBLime LEDs for outstanding output and improved CRI of 86. Same DMX mode across all models for fast and easy programming.

Discover More


VIDEO

ADI: BEYOND THE BRIEF Images: ADI

A

s stadiums evolve into more connected, commercially ambitious destinations, the decisions that shape their success are increasingly being made long before the first screen is installed or the first event takes place.

The conversation around modern stadium development has moved on. It is no longer simply about how to improve the matchday experience, or even how to extend a venue’s use beyond the sporting calendar. It is about how every part of a stadium can work together to create greater value for its owners, commercial partners and visitors. The shift towards year-round venues is changing the way projects are conceived. Hospitality, entertainment, retail and public spaces are increasingly considered alongside the sporting offer, while technology is becoming more deeply integrated into the fabric of the venue. With UEFA EURO 2028 approaching, these questions are particularly relevant for UK football. A number of clubs are investing in their stadiums and digital infrastructure, whether through wider redevelopment programmes or upgrades to existing facilities. The challenge is to ensure that investment meets the demands of major fixtures while continuing to deliver value long after the tournament has finished. But there is an important distinction between investing in these elements and making them work together.

068

WWW.MONDOSTADIA.COM


WWW.MONDOSTADIA.COM

069


VIDEO

A stadium can have impressive facilities, extensive digital

consultants and specialist suppliers.

infrastructure and ambitious commercial plans, yet still

Bringing those perspectives together early can help identify

fall short of its potential if those elements are developed in

opportunities that might otherwise be missed, test different

isolation. The opportunity lies in connecting them from the

approaches and reduce the risk of costly changes later in the

outset, with a clear understanding of what the venue needs to

process.

achieve and how each investment will contribute.

It also creates an opportunity to challenge the brief itself.

For ADI, that means looking beyond individual products

Rather than simply replacing existing equipment or

or installations to consider the wider brief: how a stadium

specifying a larger screen, clubs can consider what they

operates, how it engages its audiences, and how its physical

actually need their stadium to deliver, and whether a

and digital assets can support its commercial ambitions over

different configuration could achieve more.

time.

At ADI, this often begins with a consultancy process that combines site surveys, stakeholder discussions, visualisation

Determining Value Before Delivery

and technical design. In-house structural engineering and

Some of the most consequential decisions in a stadium

visualisation capabilities help translate an initial ambition

transformation are made well before installation begins.

into a solution that can be assessed from both a practical and

Where should digital displays be positioned? What can

commercial perspective.

the existing structure accommodate? How will technology

Working alongside consultants, architects and construction

integrate with the building’s power, data and operational

teams, this expertise helps connect the creative vision for a

requirements? How will the proposed infrastructure support

venue with the realities of delivering it.

the club’s commercial plans, and what will it enable the team

The objective is not to introduce complexity. It is to make

to deliver on matchday?

decisions with a clearer understanding of their implications,

These questions are closely connected, yet they can involve

before those decisions become difficult or expensive to

different stakeholders, from club leadership and commercial

change.

teams to architects, construction firms, technology

070

WWW.MONDOSTADIA.COM


VIDEO

Making The Commercial Case Tangible

valuable in its own right. At Crystal Palace, the visualisation

A vision for a transformed stadium is one thing. Giving

and commercial planning process helped the club and

decision-makers the confidence to invest is another.

its investors assess the proposed transformation before

Commercial modelling and visualisation can play an

committing to delivery.

important role in bridging that gap, helping clubs understand

It is an example of why the commercial conversation should

not only how a proposed development will look, but what it

happen alongside the design process, rather than after the

could make possible.

technical solution has already been decided.

At Crystal Palace, ADI worked with the club to explore the commercial potential of a new digital platform at Selhurst

Connecting The Physical And Digital Venue

Park. Three-dimensional visualisations helped stakeholders

The challenge becomes more pronounced as venues introduce

understand how the proposed installation would change the

more digital touchpoints and increasingly sophisticated

stadium, while commercial modelling supported discussions

visitor experiences.

about the advertising opportunities it could create.

A stadium screen, perimeter system, hospitality display and

The resulting transformation introduced nearly 1,000 square

external sign may each serve a different purpose. But when

metres of digital screens and signage across three stands and

they are designed to work together, they can become part

around the pitch.

of a wider platform for communication, engagement and

The significance of the project extends beyond the scale of

commercial activation.

the installation. The platform was designed to operate as an

That requires more than connecting the technology. It means

integrated system, enabling content to be coordinated across

considering how the different elements will be controlled,

different displays and creating opportunities for stadium-

how content will be created and delivered, and how the club

wide brand activations alongside the club’s matchday

will use the platform to communicate with supporters and

presentation.

partners.

For commercial teams, being able to demonstrate the

ADI’s work at Turf Moor illustrates this approach. Working

potential of an investment before it is installed can be

with Burnley FC, ADI has helped develop the stadium’s

WWW.MONDOSTADIA.COM

071


VIDEO

digital infrastructure over several years, with further

alongside matchday content production and maintenance and

enhancements introduced in 2026. The programme reflects

a new UEFA-compliant digiBOARD perimeter system.

a wider consideration of how technology can support the

Beyond the stadium bowl, ADI has delivered a 90.3-square-

fan experience while providing a more flexible commercial

metre ultrawide LED screen at The Warehouse, Villa Park’s

platform.

indoor fan zone. The screen supports live entertainment

The important point is that the infrastructure is considered

and matchday activity, while also providing a focal point for

as part of the wider stadium experience, rather than as a

presentations, screenings, exhibitions and conferences.

collection of individual screens.

Its ultrawide format gives the club flexibility to adapt

Technical requirements also matter, particularly when

content to different events and audiences, including sponsor

venues prepare for high-profile domestic and international

messaging and branded activations. The space can therefore

competitions. ADI’s UEFA-certified digiBOARD perimeter

serve supporters on matchdays while accommodating a wider

solution reflects the specialist requirements of elite football

programme of activity throughout the year.

and broadcast environments, where visibility, presentation

Together, these developments illustrate how digital

and reliable operation are essential.

infrastructure can support a broader venue strategy. The

This joined-up approach is equally important when working

same investment can serve the demands of live sport while

within existing buildings. Every stadium presents different

helping create more flexible spaces for activity beyond the

structural, spatial and operational constraints. A solution that

fixture list.

works in a new development may be impractical in a historic ground, making early collaboration between the relevant disciplines particularly important.

Making The Technology Work Harder

The right solution comes from understanding the venue and

Technology only creates value if the venue can use it

its objectives before deciding what to install.

effectively. Digital infrastructure creates possibilities, but it is the

072

From Infrastructure To Experience

content, programming and operation that determine how

A stadium’s digital infrastructure can do more than support

those possibilities translate into the visitor experience and

the matchday experience. When it is designed as a connected

commercial activity.

platform, it can support different events, audiences and

A coordinated pre-match show, a well-timed sponsor

commercial opportunities across the wider venue.

activation or consistent presentation across multiple displays

Aston Villa provides a particularly relevant example. ADI’s

requires creative planning and operational delivery as well

relationship with the club dates back to 1997, when it

as reliable technology. It also requires an understanding of

installed the first LED screens in a UK sports stadium at Villa

football: its rhythms, its audiences and the moments that

Park. Nearly three decades later, that partnership continues

matter to supporters.

to evolve as the stadium and its surrounding facilities

ADI’s in-house Studios team and Live Venue network bring

develop.

these elements into the same delivery model. Content can be

Recent investment has brought together stadium screens,

created, edited and delivered remotely from ADI’s production

digital perimeter, mid-tier ribbons and digital signage

galleries in Lancashire, working collaboratively with club

into a connected platform. More than 750 square metres

media and matchday teams.

of new LED screens and signage were installed during the

At Aston Villa, the ability to coordinate content across

2024/25 season as part of the wider stadium transformation,

the stadium’s digital platforms creates opportunities to

WWW.MONDOSTADIA.COM


STOP BUYING TECHNOLOGY. START BUYING OUTCOMES. THE BEST STADIUM TECHNOLOGY STARTS WITH KNOWING WHAT YOU WANT IT TO ACHIEVE. More valuable sponsorship. Better fan experiences. Greater flexibility. New revenue opportunities. ADI helps venues turn ambition into connected digital experiences designed to create lasting value.

0800 592 346 | info@adi.tv | www.adi.tv/sport


VIDEO XXX

bring different assets together for key moments, sponsor

The example demonstrates how the commercial impact of a

activations and matchday presentation.

stadium investment can depend on the work surrounding it

This is where the connection between infrastructure and

as much as the physical installation itself. The technology

experience becomes tangible. The value lies not simply in

provides the platform; planning, packaging and activation

having more digital space, but in having the capability to use

help turn that platform into a commercial asset.

it coherently. It also gives clubs greater flexibility in how they resource

A More Connected Approach To Stadium Development

matchday delivery. Through Live Venue, production and

As stadiums become more ambitious in their design and

content delivery can be centralised, reducing the need for

commercial objectives, collaboration is becoming a practical

every stadium to maintain the same level of permanent

necessity.

production infrastructure on site.

No single discipline can determine the success of a modern

For venues seeking to balance investment, operational

venue. The physical environment, digital infrastructure,

requirements and commercial ambition, these considerations

commercial strategy, content and operation all influence

are part of the original business case, not an afterthought.

one another. Treating them as separate workstreams risks limiting what the finished venue can achieve.

Building Value Beyond The Installation

For clubs, that means involving the right expertise early,

The move towards year-round, multi-purpose venues makes

establishing a shared understanding of the brief and

these decisions even more significant.

evaluating investment against clear operational and

Digital infrastructure may support matchday advertising, fan

commercial objectives.

engagement and stadium presentation, but it can also provide

For specialist partners such as ADI, it means contributing

a flexible platform for communicating with visitors across

more than a product or a technical installation. It means

hospitality areas, public spaces and other venue activities.

helping clubs define what they need, working alongside

The precise opportunities will depend on the venue, its

the wider project team to develop a deliverable solution,

operating model and the audiences it serves.

and supporting the venue as that investment moves into

Realising that potential requires ongoing attention. Content

operation.

needs to remain relevant, systems need to be maintained, and

The stadiums that create the greatest value will not

commercial teams need to understand how best to package

necessarily be those with the most technology or the most

and activate the opportunities available to them.

ambitious architectural statements. They will be those where

At Stockport County, ADI worked with the club to develop a

the individual elements have been considered together, with a

digital platform aligned with its wider ambitions for Edgeley

clear purpose and a practical understanding of how they will

Park. The project combined consultancy, visual design studies

be used.

and commercial modelling with a new stadium screen,

The shift from matchday venue to year-round destination is

four-sided digital perimeter, hospitality signage and ongoing

ultimately about more than filling the calendar. It is about

content and matchday support.

making the asset work harder, creating better experiences

Crucially, the work extended into how the club would sell

for the people who use it and building a stronger commercial

its new digital inventory. A tiered Business Club model was

proposition around it.

developed to give local and regional businesses access to

That process starts long before the gates open. It starts with

different sponsorship opportunities, with visual concepts

asking the right questions, bringing the right people together

helping the club present those opportunities before

and designing not just for what a stadium needs to be, but for

installation was complete.

what it needs to deliver.

Stockport County subsequently reported a 25% year-on-year increase in revenue following the introduction of the new digital platform.

074

WWW.MONDOSTADIA.COM


LIGHTING

FLORENCE CENTER Florence, USA Images: AEON

076

WWW.MONDOSTADIA.COM


WWW.MONDOSTADIA.COM

077


LIGHTING

T

he Florence Center in Florence, South Carolina, is

atmosphere for entertainment. They called on AEON LED

the premier hub for entertainment and athletics

after the old LED lights that were installed did not live

in the state’s northeast region. As the proud

up to the hype. AEON came in and provided the solution

home of the Pee Dee IceCats and a focal point for

the facility needed. The solution features a powerful

State Wrestling meets and State Basketball tournaments, the

combination of AEON’s signature technologies: 40 AEON PRO

venue is a cornerstone of South Carolina sports.

Series 750W Luminaires: The white light luminaires serve as

To further elevate its profile and attract high-tier national

the backbone of the arena’s sports lighting, providing crisp,

events, the Florence Center recently underwent a massive

glare-free uniform illumination across the floor no matter

lighting transformation. After previous LED installations

what the event. They transform the venue into a world-class

failed to meet the facility’s rigorous demands, the center

stage, creating an immersive, high-energy atmosphere for

turned to AEON LED Sports Lighting for a definitive

athletes and fans alike.

solution. We provided a high-performance system

20 AEON 500W RGBW Luminaires: These full spectrum

engineered to handle everything from professional hockey

colored Luminaires add a vibrant “Entertainment Package,”

and rodeos to Monster Jam and world-class concerts.

allowing the venue to wash the arena in full-spectrum color

Together, these systems provide the Florence Center with far

for player introductions, the National Anthem, halftime

more flexibility than a traditional, one-mode arena lighting

shows, and special events. Set the scene you need with an

setup. The venue can now host elite athletic competitions,

easy push of a button.

public entertainment, and special productions without

Together, these systems give the venue far more

compromising the lighting experience.

flexibility than a traditional one-mode arena lighting setup. The Florence Center can host athletic competition,

The Project Scope

public entertainment, and special productions without

The upgrade focused on two distinct needs: elite-level

compromising the lighting experience.

visibility for high-speed sports and a dynamic, immersive

078

WWW.MONDOSTADIA.COM


THINK INSIDE THE BOX A FULLY REDESIGNED ACOUSTIC PLATFORM

JOIN THE NEXT GENERATION OF THE EVF & EVH SERIES

Redesigned from the ground up, the EVF and EVH Series feature newly developed Electro-Voice transducers at their core. These transducers deliver smoother coverage and greater consistency across all models, along with increased full-range output and more low-frequency headroom.

Trusted in thousands of venues across the globe, the front-loaded EVF Series and the horn-loaded EVH Series have become two of the most widely installed Electro-Voice point-source solutions for indoor and outdoor applications. Now the next generation, featuring four models, sets a new benchmark in premium performance and pattern control at a lower system cost.

EVF-12

EVF-15

EVH-15

EVF-215S

Learn more at electrovoice.com Product imagery renders are artistic digital representations for technical illustration purposes. ©2026 Electro-Voice Dynacord LLC

EV_EVFG2_EVHG2_PrintAd_245x335_March2026_v2.indd 1

05/08/2026 14:28:04


LIGHTING

Pro Series: Built for the Big Game

Full-Spectrum Color Flood Lighting that can create any

At the Florence Center, lighting is more than a utility, it is

environment you can imagine.

a performance standard. To meet the demands of elite-

The HyLink Wireless Control system allows the venue to

level competition, we implemented the AEON PRO Series,

manage the lights via Synapse DALI controls. This setup

delivering industry-leading efficiency of 170+ LPW. Unlike

empowers the Florence Center to transition instantly from

off-the-shelf LEDs, AEON is engineered with premium

a bright sports setting to a dramatic, color-saturated

components designed for superior longevity and sustained

environment. You can change the color of the lights with an

output.

easy top of the finger with your phone, tablet or computer.

By integrating proprietary Glare-Free technology and maintaining a UGR < 19, the PRO Series ensures that

Entertainment Package

athletes never lose sight of the ball, while fans enjoy a

The AEON LED RGBW Entertainment Package transforms

high-definition viewing experience. The result is a playing

any facility into a high-energy venue with full-spectrum

surface defined by Uniform Illumination—completely free

color lighting and instant-on/off capabilities. This system

of dark spots and a high CRI >85+ that mimics natural

offers total environmental control, shifting seamlessly from

daylight, allowing the game itself to remain the sole focus.

crisp white light to vibrant color displays. By eliminating warm-up times, it enables dramatic blackout introductions

080

RGBW: Setting the Stage

and synchronized light shows that captivate audiences and

While the PRO Series handles the action, the 20 RGBW

elevate the energy of every performance. AEON LED RGBW

Luminaires provide the “Wow” factor. These aren’t standard

Luminaires deliver high-efficiency, superior illumination,

arena lights; they are a fully integrated entertainment

and immersive entertainment, giving your facility the power

solution. Delivering Simple, Smart and easy-to-use

to have it all.

WWW.MONDOSTADIA.COM


From matchday to global touring productions and everything in between, we help you create unforgettable experiences with incredible sound for every listener. Accurately planned. Efficient. Reliable. Intelligible messaging one moment. Euphoric celebration the next. We understand the role sound plays.


ISE 2027 | 2 - 5 Feb 2027 Fira de Barcelona, Gran Via

THE STAGE IS SET. Get your free ticket Register with the code mondostadia at www.iseurope.org


20,840 live events pros and cutting-edge industry tech unites at ISE 2027.

Live Events is changing fast. Technology? Even faster. Falling behind today means quickly becoming irrelevant tomorrow. That’s exactly what ISE is here to address - from showcasing next-gen solutions for now-urgent problems, to delivering showstopping content that inspires the start of something big. So if technology in the entertainment industry impacts you, then come and make an impact with us.

A joint venture partnership


Y O U R PA S S T O

ESSMA Summit 2026

YOUR SEAT AT EUROPE’S STADIUM TABLE. D AT E

VENUE

CITY

9 & 10 November 2026

Allianz Riviera

Nice, France

PROGRAMME

AT T E N D E E S

HIGHLIGHTS

Keynotes, panels & networking moments

250+ stadium professionals

Tours & ESSMA Awards

MORE THAN A SUMMIT.

350+ members · 60+ partners · 20+ nations · since 1996

C L U B S · S TA D I U M S · L E A G U E S · F E D E R AT I O N S

S U P P L I E R S · S O L U T I O N P R OV I D E R S

BECOME A MEMBER

BECOME A PARTNER

Knowledge platform with 100+ reports & benchmarks

Direct reach to Europe’s largest stadium network

Ask ESSMA: tailored answers from our experts

Personal introductions, online & onsite

Workshops, stadium tours & matchdays

Access to reports & insights

Contact yari@essma.eu

Visibility through ESSMA channels & events

Contact thibault@essma.eu

S U M M I T · M E M B E R S H I P · PA R T N E R S H I P

CLAIM YOUR SEAT IN NICE. Scan to register for the Summit. More about the network: essma.eu

S CA N TO R E G I S T E R


50 EXTRA TIME

EXTRA TIME 086 The New Rules Of Engagement | George Vaughan, The Digital Line 090 Great Fan Experiences Start In The Control Room | Adder Technology 094 WORK PRO Audio | INTEGRA Series 096 The Next Move Serious Stadiums Will Make | Sean Miller, Orion Creative Services


THE NEW RULES OF ENGAGEMENT How immersive technology, real-time content and flexible production infrastructure are transforming stadiums into year-round entertainment destinations as part of a cultural evolution.

George Vaughan, The Digital Line

A

nyone who regularly reads my articles will know that, whilst

immersive, interactive and digitally connected experiences that rival,

I am a great enthusiast of technology, I remain an equally

and ultimately surpass, what they can enjoy at home. Simultaneously,

passionate advocate of human-centric experiences. For me,

venues are under increasing pressure to maximise their infrastructure

technology should always serve the experience, rather than

investments, attract new audiences and create additional revenue

become the experience itself.

streams.

That said, there is no doubt that the modern stadium is undergoing

Sitting at the heart of this evolution is a new approach to visual

a fundamental transformation. Once designed primarily as a place to

technology. Real-time graphics, interactive installations, projection

watch live sport and music, today’s venues are increasingly evolving

mapping and flexible media server infrastructure are opening up

into sophisticated entertainment destinations, where technology plays a

possibilities far beyond traditional scoreboards and perimeter LED

central role in shaping the visitor experience, creating new commercial

advertising.

opportunities and extending the life of the venue well beyond the event

Digital companies such as Disguise are helping make these possibilities

itself.

a reality, providing the technology and production workflows needed to

The real opportunity, however, lies not simply in introducing more

bring complex visual experiences together across multiple surfaces and

technology, larger screens or increasingly elaborate visual effects, but

environments.

in using these tools to create more meaningful connections between

086

people, performers and the spaces they inhabit. It is this balance

Bringing live data to life

between technological innovation and human engagement that will

Disguise is a creative technology company specialising in the software,

ultimately determine the success of the next generation of stadium

hardware and production workflows used to deliver complex visual

experiences.

experiences across live entertainment, sports, broadcast and immersive

For stadium operators, the challenge is no longer simply about

environments. Their technology enables creative and technical teams

delivering an outstanding entertainment spectacle. Audiences expect

to design, previsualise, manage and deliver content across large-

WWW.MONDOSTADIA.COM


COLUMN

scale LED displays, projection mapping installations and hybrid visual

have access to vast amounts of information. The challenge is

environments.

transforming that data into engaging content that brings fans closer to

For stadiums and arenas, Disguise provides the technology infrastructure

the action.

needed to deliver increasingly ambitious visual productions, from immersive player introductions and opening ceremonies to interactive

From spectators to participants

fan experiences and venue-wide brand activations. Their combination of

Another significant development in stadium entertainment is the shift

creative capability and operational flexibility allows operators to make

towards greater audience participation.

more effective use of their venues while delivering richer, more engaging

Today’s fans increasingly want to be involved in the experience rather

experiences for audiences.

than simply observe it. Interactive technology enables venues to

Sport has always been driven by data. From scores and statistics to

introduce new forms of engagement across the entire stadium.

player performance and match analysis, information is fundamental to

Interactive LED floors and surfaces can respond to movement, while

the viewing experience. However, much of this data has traditionally

mobile devices can connect audiences to in-venue content, enabling

been confined to television broadcasts, mobile applications or

games, voting, challenges and coordinated activations.

conventional stadium displays.

These experiences are particularly valuable during breaks in sporting

Real-time content technology is changing that.

action, providing opportunities to maintain energy and engagement.

By integrating live data feeds with rendering engines such as Unreal

For sponsors, this creates a different type of relationship with audiences.

Engine, Notch and Unity, venues can transform raw information into

Rather than simply displaying advertising messages, brands can become

dynamic visual experiences that respond to the action as it happens.

part of interactive experiences that encourage participation.

Player introductions can feature live statistics and animated graphics.

The result is a more participatory model of entertainment, where the

Score updates and leaderboard changes can trigger synchronised visual

audience becomes part of the show.

moments across multiple displays, while tracking information and audience inputs can influence content throughout an event.

Beyond the boundaries of the screen

Disguise supports these applications through production workflows

While LED technology continues to define much of the modern

capable of integrating real-time rendering engines, live inputs and

stadium’s visual landscape, immersive experiences are no longer

dynamic content. Its media server technology provides a means of

restricted to conventional display surfaces.

managing and delivering visuals across complex display environments,

Projection mapping allows venues to transform architecture, playing

helping production teams create more connected and responsive

surfaces and other previously underutilised areas into expansive creative

presentations.

canvases.

The opportunity is particularly compelling because stadiums already

A playing surface can become the backdrop for an opening sequence.

WWW.MONDOSTADIA.COM

087


COLUMN

Architectural features can be incorporated into coordinated visuals, while

Rethinking sponsorship opportunities

floors and physical structures can become part of a larger immersive

As visual infrastructure becomes more sophisticated, the commercial

environment. Beyond sport, the same infrastructure can support

opportunities available to stadium operators are evolving alongside it.

concerts, brand activations and corporate events.

Traditional sponsorship models have centred on static signage,

This ability to plan and manage an entire visual environment is

perimeter advertising and defined screen placements. Digital production

becoming increasingly valuable as stadium productions grow in scale

technology offers the potential to develop more integrated brand

and sophistication.

experiences. Synchronised screen takeovers can transform multiple displays into

A venue for every season

coordinated visual environments, giving sponsors a more prominent role

One of the strongest arguments for investment in flexible technology is

within an event.

the opportunity to increase venue utilisation.

Interactive activations can combine branded content with audience

Major stadiums represent substantial capital investments, yet their

participation, while real-time graphics allow messaging to respond to

primary sporting tenants may occupy them for a relatively limited

specific moments during the action.

number of dates each year.

The flexibility to adapt visual content according to the event, audience or

Creating a commercially sustainable venue increasingly means looking

sponsor also creates opportunities to develop new premium inventory.

beyond the traditional sporting calendar.

For operators, the aim is not simply to sell more advertising space, but

Concerts and touring productions are an established part of this strategy,

to make commercial partnerships a more engaging part of the overall

but esports competitions, conferences, product launches and branded

experience.

entertainment experiences offer further possibilities. The challenge is ensuring that a venue’s technology can accommodate

The next chapter

different formats without extensive reconfiguration.

Ultimately, the transformation of the stadium is not simply about

Flexible video production systems can help by supporting different

bigger screens, brighter visuals or more elaborate entertainment. It

combinations of LED displays, projection, live camera feeds and real-

reflects a broader change in how live venues are designed, operated and

time content.

commercialised.

This is an area where companies like Disguise can offer particular value.

Technology is enabling these spaces to connect audiences more closely

By enabling technical teams to manage different display configurations

to the action, turn spectators into participants and make greater creative

and content requirements within a unified environment, the technology

use of their physical environments.

can support transitions between sporting fixtures and other live

And as immersive technology continues to develop, the opportunity is

productions.

to make the entire venue more engaging, adaptable and commercially

Rather than developing entirely separate systems for each event,

valuable, long after the final whistle.

venues can make greater use of their existing infrastructure, potentially

But amidst all this innovation, we must never lose sight of one

reducing production complexity while expanding the range of

fundamental truth: technology may help shape the experience, but it is

experiences they can accommodate.

people who give it meaning. That is what makes live events so special,

It encourages operators to think of the stadium not simply as a sporting

and what must always remain at the heart of everything we create.

facility, but as a versatile entertainment platform operating throughout the year.

088

WWW.MONDOSTADIA.COM


LIFE OPERATOR FOR LIVE SIMPLYLIVE

SIMPLYLIVE PRODUCTION SUITE

HARDWARE, CLOUD, OR HYBRID. YOUR PRODUCTION, YOUR WAY. The Simplylive Production Suite Flex is a software-driven live production platform that lets you choose from a range of application layers, tuned to the tasks you need to do – from live production to instant replay, ingest recording, streaming or video review.

CREATE

ViBox All-In-One

Photo by Stefan Klinge

REPLAY

ViBox SloMo

REVIEW RefBox

• Intuitive smart UI design • New Flex licensing: freedom to scale, flexibility to save • Adaptive to all of today’s video formats including ST 2110 • Running on rock-solid commodity hardware

RECORD BMR

riedel.net


GREAT FAN EXPERIENCES START IN THE CONTROL ROOM Stavros Theodoridis, Business Development Manager, Control Systems, Adder Technology Images: Borhax/Shutterstock.com, Stock Image/Shutterstock.com

he defining moments of live sport

displays or working around equipment

connect individual production tasks to the

can unfold in seconds. From a

arrangements designed for an earlier

wider project. The objective is to give each

winning touchdown or a deciding

production setup.

team the access and visibility needed for its

penalty to a game-defining

Each investment should therefore prompt a

role, while supporting coordination where

replay, sports broadcasting brings fans closer

wider question: how will this help the teams

responsibilities overlap. For fans, the value

to the action, whether they are watching from

responsible for delivering the live broadcast?

is in the result: relevant information, well-

the stands or from a screen. Delivering these

Understanding this key relationship is

timed content and a presentation that keeps

moments depends on the production teams

essential to ensuring that greater technical

them engaged with the action.

working behind the scenes. It’s these very

capability translates into a better experience

Media transport and computer access

teams who meticulously select camera shots,

for fans.

have distinct roles in the control room

coordinate graphics and bring replays to

A single sporting moment can reach fans

environment. Moving video signals over

screens while the action unfolds.

through several different channels. Those

IP addresses how content travels; IP KVM

In the control room, operators need

inside the stadium can see a replay on the

addresses how people interact with the

immediate access to graphics computers,

main screen, follow statistics on a supporting

computers behind production. Planning both

playback systems and other production

display or watch the game in a hospitality

together helps venues connect infrastructure

tools to respond to pivotal moments as

area. Viewers elsewhere can experience the

decisions to everyday working requirements.

they happen. Fragmented access, cluttered

same moment through a public broadcast

workspaces and complicated workflows can

where replays, statistics and other game data

Designing Around The Operator

make that task harder, adding unnecessary

appear on a single screen. These outputs can

A useful starting point is to understand how

steps when timing matters most. The ability

involve different teams, systems and editorial

the control room functions during a live

to deliver a compelling fan experience

requirements, but each contributes to how the

event.

therefore depends in part on the effectiveness

event is experienced.

Which systems do operators need to access

of how the working environment supports the

For venue operators, this makes coordination

most frequently?

people producing it.

an important part of control room design.

What information must remain visible?

For established venues, these challenges can

The team producing content for stadium

Where do operators encounter delays,

develop gradually. A new graphics system,

screens needs to understand what is available,

unnecessary steps or difficulties coordinating

additional replay capability or expanded

access the appropriate tools and communicate

with colleagues?

screen network may each serve a clear

effectively with colleagues. A technically

These questions can reveal opportunities

purpose. Successive additions however,

capable installation can still create difficulties

that equipment specifications alone will not

can create a working environment that is

if those connections depend on awkward

identify. An operator may have access to a

increasingly complicated and difficult to

handoffs or workstations that isolate people

powerful production system, but its value

navigate. Operators may find themselves

from each other.

is limited if reaching it requires moving to

moving between interfaces, managing more

Designing around these relationships helps

another workstation at a critical moment.

T

090

WWW.MONDOSTADIA.COM


EXTRA TIME

Similarly, adding another display may

applications need to remain visible, but only

is straightforward: view production content

increase the information available while

one requires keyboard and mouse interaction

with color accuracy and interact with the

making it harder to identify what needs

at a given moment. If switching between

required systems over IP with ultra-low

attention.

systems involves another set of peripherals,

latency.

The physical environment matters too. Screen

an inefficient workspace adds unnecessary

positioning, sightlines, lighting, acoustics

steps to an already demanding task.

Modernization That Builds On Existing

and desk layout all influence how comfortably

A carefully designed arrangement can make

Investment

people can work and communicate.

those interactions more straightforward.

Improving this environment does not require

Computers located at workstations can

View options should reflect the information

every venue to undertake a complete rebuild.

contribute to heat, noise and clutter whilst

operators need to follow, while access

A progressive approach can begin with

creating space constraints for the operators

methods should make it clear which computer

the areas causing the greatest operational

delivering the broadcast.

they are interacting with. Where appropriate,

difficulty, while retaining equipment that

Considering technology and the surrounding

API integration can allow operators to select

continues to serve its purpose.

environment together helps venues make

a graphics or playback computer directly

One venue might prioritize access to

more informed decisions. Relocating

from a production control panel. This brings

production computers from additional

computers to a dedicated server room

computer access alongside production

workstations. Another might address crowded

optimizes workspace ergonomics, while

commands, reducing the need to move

desks or simplify switching between systems.

allowing operators to access those systems

between separate control interfaces during a

These improvements can form part of a

from their desks through IP KVM technology.

live production.

longer-term plan, with each stage supporting

The benefit extends beyond a tidier console:

These decisions need to be evaluated together.

the next.

it creates more freedom to arrange the

Adding more visible sources is useful only if

This is where the flexibility associated

workspace around the task.

operators can distinguish them clearly and

with IP infrastructure becomes particularly

interact with the intended system confidently.

valuable. As venues develop their production

Greater Visibility, Manageable Complexity

Involving users in trials helps establish

capabilities, they can consider how new

Operators also need information presented in

whether a proposed layout supports the pace

systems will be accessed, operators’ working

a way that supports timely decisions. During

of production, including during the busiest or

environments and how resources may be used

a live production, graphics, playback and

most striking game moments.

across different events.

other applications may need to remain visible

The same principle applies to system access.

A phased approach also creates opportunities

simultaneously. The challenge is to provide

IP KVM allows operators to access connected

to involve operators throughout the process.

that visibility without overwhelming the

systems across a network, creating flexibility

Testing proposed changes against realistic

workspace.

regarding where equipment and workstations

event scenarios can reveal whether a new

Consider an operator preparing a replay

are located.

arrangement makes essential tasks easier

while monitoring the next graphics cue. Both

For the operator at the console, the objective

before it comes part of live delivery.

WWW.MONDOSTADIA.COM

091


EXTRA TIME

Adapting As A Multi-Purpose Venue

for the delivery team. This is particularly

on which live production depends. Fans may

The requirements of a control room changes

valuable where preparation time is limited and

never see the infrastructure or procedures

between events. Whether it’s supporting

several teams share facilities.

involved, but they experience the consequences

regular sports fixtures, world-class

092

when production is interrupted.

tournaments or packed-out concerts, control

Protecting The Performance Behind The

A venue’s next investment may be a larger

rooms need to support different elements

Spectacle

display, a new production platform or an

such as content formats and staffing levels.

Flexibility needs to be supported by resilience

expanded events program. Each creates an

Infrastructure decisions should therefore

and appropriate security. A more adaptable

opportunity to reconsider how the control

account for how the venue prepares for those

control room must still provide dependable

room supports the people delivering it. By

changes, alongside how it performs during the

access when the event is underway.

improving workflows progressively, protecting

event itself.

Planning should account for what happens

operational continuity and designing around

Separating computer locations from operators

when a computer, connection or workstation

the operator, venues can build the capability to

can create greater freedom to assign

becomes unavailable. Alternative access

deliver memorable experiences long after the

workstations according to production. Rather

arrangements, suitable redundancy and clear

next upgrade is complete.

than treating every desk as the permanent

recovery procedures need to be considered and

home of a particular computer, venues can

tested across the wider production system.

plan access around the responsibilities of the

Access permissions deserve similar attention,

people using it.

particularly where venues accommodate

That flexibility still needs a clear operational

visiting production teams or changing

framework. Teams should know which

personnel. Operators need access to the

systems are available, how access is assigned

systems relevant to their responsibilities, with

and what must be checked before production

permissions reviewed as requirements change.

begins. Documented configurations and

Housing computers in secure server rooms

rehearsed setup procedures can help make

can help protect physical access, alongside

changes more predictable. This gives venues

appropriate network security and system

a practical basis for accommodating different

management.

events without adding unnecessary complexity

These considerations support the continuity

WWW.MONDOSTADIA.COM


EXTRA TIME

WORK PRO AUDIO One System – Endless Possibilities. The INTEGRA Series by WORK PRO

W

ORK PRO has expanded its acclaimed Integra

With the Integra 4SA and Integra 8SA, Equipson takes a step

series of digital matrixes with three new models:

forward in developing integrated solutions, significantly

Integra 16S, Integra 4SA, and Integra 8SA. These

expanding the Integra product range. These versions with

additions offer advanced and versatile solutions

integrated amplification are designed to adapt to various

for audio management in professional installations, such as

applications, from commercial spaces to auditoriums and sports

sports venues and arenas, reaffirming Equipson’s commitment

and entertainment venues, providing unprecedented versatility

to innovation and continuous improvement in audiovisual

and performance.

technology.

“Our goal with these new Integra series models is to offer

The new Integra 16S is a DSP matrix that retains all the features

integrators and end users the greatest possible flexibility in

of the well-known Integra 8S but with double the channels:

audio management,” says Juan José Vila, CEO of Equipson. “The

16 inputs and 16 outputs. This model offers greater audio

inclusion of matrix DSP with integrated amplification responds

management capacity, ideal for more complex installations that

to the need for compact, efficient solutions that simplify the

require simultaneous control of multiple zones or areas. With

installation process without compromising sound quality. These

its per-channel configurable DSP, the Integra 16S allows precise

new additions complete our Integra range, offering options for

sound optimization, ensuring exceptional quality in medium to

all types of needs, from small projects to large installations.”

large installation environments.

Furthermore Equipson has worked intensively on a completely

The most notable innovations in the Integra series come with

renewed software for the Integra series, developed based on

the introduction of the Integra 4SA and Integra 8SA models,

feedback from integrators who use the products daily. This new

which integrate DSP matrix functionality and amplification into

software has been totally redesigned with the user in mind,

a single product, providing a compact all-in-one solution for

providing a more intuitive, efficient experience tailored to the

audio management and amplification.

real needs of the industry. The new interface offers clearer

The Integra 4SA is a matrix with 4 inputs and 4 outputs,

visual control and simplified navigation, making DSP parameter

featuring a 4-channel amplifier with 150W per channel. This

configuration and adjustment more agile and straightforward.

combination is perfect for applications where a simplified

With the new Integra 16S, Integra 4SA, and Integra 8SA models,

installation and reduced size are required without sacrificing

WORK PRO continues to lead innovation in professional audio,

performance and flexibility. In addition the Integra 8SA offers

providing solutions that stand out not only for their advanced

an 8-input and 8-output matrix along with an 8-channel

technology but also for their focus on usability and efficiency.

amplifier, each with 150W of power. These models not only

The Integra series promises to transform the way professionals

manage audio but also provide amplification, significantly

approach audio installations, offering products designed to

reducing complexity and installation time—something highly

meet the most demanding needs of the audiovisual market.

valued by integrators and sound technicians.

094

WWW.MONDOSTADIA.COM


by

One System. Endless Possibilities.

Advanced Digital Matrix Series App Control and fully programmable DSP architecture per channel

Discover the full range at

workpro.es


THE NEXT MOVE SERIOUS STADIUMS WILL MAKE Europe’s next major stadium investment might not be technology. It might be talent.

Sean Miller, Founder - Orion Creative Services SE is where we go to see what stadiums can do next; bigger screens, smarter systems, and increasingly more ways to turn a building into an experience. But lately I’ve been thinking about something that doesn’t get nearly as much attention. Who are the people actually responsible for making it all happen? Not just on match-day, but on a Wednesday morning when the commercial team has an idea, the creative department has a campaign, and the stadium has several million pounds’ worth of technology sitting idle, waiting to be used. I think the next major shift in European stadiums will be bringing more of that responsibility in-house, and we’ve seen this happen before. Ten years ago, clubs regularly turned to agencies for design, photography and filmmaking. Today, many have their own designers, videographers, editors and content teams. Marketing and commercial departments have grown alongside them. As the work became an everyday requirement, so the jobs followed. But inside the stadium, things haven’t always moved at the same pace. Live presentation is still frequently organised around the next fixture. Production teams arrive, deliver the show and move on to the next event. That model has served clubs well for years. But it’s increasingly at odds with what we’re asking modern stadiums to become. We talk endlessly about 365-day venues. But too many venues are still operating with 30-day production models, planning around the next “major matchday”. We promise year-round entertainment. Hospitality, conferences, concerts, retail, sponsor activations. Yet we still organise much of our in-venue production around the next fixture. The crew arrives, delivers the show and moves on. Who’s responsible for the experience on the other 335 days?

I

096

WWW.MONDOSTADIA.COM

I’ve spent a lot of time working inside sports clubs, and I’ll give recent two experiences have shaped my thinking. At one club, the in-house producer was talented and ambitious, but unreliable equipment had left them spending far too much time worrying about whether the show would work. It’s difficult to think about entertaining 17,250 people when you’re concerned about whether the next cue will fire. As their understanding of the wider production system improved, their confidence grew. They started looking beyond the equipment. Content delivery accelerated, and there was room to develop the show. The ambition was always there. The producer just needed the confidence and technical understanding to act on it. At another club, the problem was different. An outsourced production team delivered a consistent, reliable show. It did what was asked of it. But here’s the thing. If a production company is delivering exactly what the club has commissioned, yet the show isn’t developing, whose responsibility is that? I’d argue it’s the clubs. When that club brought show production in-house, the run order began to expand. New features appeared. The team started exploring opportunities that hadn’t previously been part of the show. They hadn’t suddenly bought better equipment. They’d changed who was responsible for developing the experience. And I think that points to a bigger organisational problem. Inside many clubs, commercial teams own the revenue, creative teams own the content, and operations teams own the technology. But who’s bringing those things together? That question needs a solid answer, particularly as stadiums become more increasingly sophisticated businesses. I’m not arguing that clubs should replace specialist production companies, freelancers or broadcast partners. Television production and in-venue presentation


COLUMN

WWW.MONDOSTADIA.COM

097


COLUMN

are different disciplines, and major events will always need external expertise. The point is that there’s a difference between outsourcing delivery and outsourcing ownership. And that means suppliers will have to evolve too. Manufacturers, integrators, production companies and independent specialists aren’t going anywhere. But the next generation of stadium customers will expect something different from them. Not just equipment, installation and event-day crews. They’ll want training, knowledge transfer, smarter workflows and partners who can help their own teams become better at what they do. The best suppliers already understand this. Others will need to catch up. The companies that thrive won’t be the ones that make clubs dependent on them. They’ll be the ones that make clubs more capable. Not every club needs a permanent production department. Some might start with one person who understands the equipment, works with the creative and commercial teams, develops the show and makes sure that knowledge stays within the organisation. Someone whose job isn’t simply to get through the next fixture, but to ask what the stadium could be doing better. And I suspect this is just the beginning. Within the next decade, I expect more of Europe’s major stadiums to appoint creative directors specifically responsible for the live venue experience. Not the brand guidelines. Not the social media strategy. The actual experience of being 098

WWW.MONDOSTADIA.COM

there. What supporters see, hear and feel. How the stadium comes alive before kick-off. How commercial partners become part of the entertainment rather than an interruption to it. How the building tells the club’s story, even when there’s no match. Some clubs already have people doing parts of this job. I think we’ll increasingly see it become a distinct leadership responsibility. We already have sporting directors and commercial directors. Why shouldn’t someone have comparable creative accountability for the experience inside the stadium? Perhaps that sounds extravagant, but a decade ago, so did the idea of a football club employing its own film crew. There will be extraordinary technology at ISE. I’ll be as excited about it as anyone. But I suspect the clubs that get the greatest value from their stadiums won’t necessarily be the ones spending the most on equipment. They’ll be the ones that finally put someone in charge of what happens with it. Clubs have spent millions building the stage, now they need to decide who’s directing the performance.


ORI ON ORI ONCREATI VESERVI CES. CO. UK


ELEVATING EXPERIENCES. HONORING HERITAGE. SCAN HERE to learn more about the state-of-the-art

Have questions about a product or how Daktronics

halo screen at Santiago Bernabéu Stadium as well as our

solutions can enhance your venue? Visit us at

numerous innovative solutions for arenas and stadiums.

Daktronics.com/ProfessionalSports


Turn static files into dynamic content formats.

Create a flipbook
Mondo | Stadia #50 - Oct/Nov 2026 by Mondiale Media - Issuu