THEATRE AUDITORIA 1. 1.5m thick in-situ concrete roof plate 2. 1m deep auditoria beams 3. Auditoria seating 4. Stage 5. Curtain facade system
THE [detail B]
6. Pre-cast structural concrete slab 7. Ribbed pre-cast composite flooring panels 8. Curtain facade system 9. Suspended lighting system 10. Concrete Core 11. Pre-cast Insulated beam wall panels
6
8
DEMOCRATIC WALLS
7
Laura Moldovan 11
10
year 5 The Glamour Unit
[detail A]
9 Lobby: Research Level
[re]PUBLIC
BUREAUCRATIC BAR
12
13
12. Pre-cast concrete downstand 13. Pre-cast concrete panel
14
15
16
SUBSTRUCTURE (SET INTO RIVER BANK) 14. Reinforced concrete beam 15. Pile and cap foundation 16. Retaining wall
Structural Dissection scale 1:200 The [re]Public’s bureaucratic bar forms an inhabited foundation that doubles as promenade. The circulation cores, which are the main structural support system for the democratic walls, sit within this, providing a direct connection to both the promenade and theatre. Cantilevered 5m above the new promenade, the democratic walls are constructed as a hollow box: first floor and roof are formed of 1.5m thick insulated reinforced concrete, while the lateral 25m tall walls acts as gigantic beams, spanning up to 35m on either side of the strucutral cores. Nested in between these are the auditoria, where the stage and seating are formed of long cantilevered rectangular concrete profiles.
Auditorium: Pre-debate
. . . . . Duncan of Jordanstone College of Art & Design University of Dundee 2021/22
Research Thesis
Staging Dramaturgical Politics on London’s South Bank Lobby: Research Level