(1) LONSDALE LOOM Type: Architecture Competition - Big & Lit Canadian Design Award | 2nd Place Role: site analysis, concept design, model design, rendering Software: Rihno, D5 Render, Adobe Illustrator, Adobe Photoshop Description: The brief called for a bridge connecting Upper and Lower Lonsdale, two North Vancouver communities divided by Highway 1. Rather than a simple crossing, we designed a the bridge as an extension of the neighborhood itself.
(2) Sairen Type: Studio Final Project - Arch 406 UCalgary Role: All Software: Rihno, D5 Render, Adobe Illustrator, Adobe Photoshop Description: Tasked with reimagining a campus bus stop that was underused, exposed and too far from where buses actually arrived, Sairen is shaped by natural wind patters for shelter and calm. A center glass oculus lights the interior and doubles as a passive notification system, using air and sound to signal approaching buses.
Grass Road Movement Areas of Rest Line of Sight Tree Edges Wind Bus Traffic
(3) NOOR
Type: Product Design Competition - Kokuyo Design Award Role: All
Software: Rihno, Blender, Adobe Photoshop Description: Responding to the prototype theme, Noor is a fully customizable lamp built from a modular block system and electromagnets, letting designers, architects and everyday users alike shape their own lighting.
(4) Madrasa Type: Architecture Competition - Buildner Unbuilt Award 2024 Role: All Software: Rihno, Blender, Adobe Illustrator, Adobe Photoshop Description: Submitted to Buildner’s Unbuilt Award, which celebrates unrealized architectural visions, Madrasa is a sustainable school originally envisioned for a rural community in Sudan. Using mud brick walls and a cantilevered onduline roof, its U-shaped form passively cools and lights the space while doubling as a community hub and sanctuary.
(5) GRAPHIC DESIGN Type: Promotional Posters Role: Graphic Designer Software: Adobe Photoshop Description: As founder and president of a campus club, I picked up graphic design out of necessity to promote events and grow the organization over a three year term. What began as a practical skill turned into a genuine passion, one I’ve since carried into personal design work beyond the club.
(*) ENgineering
LEGEND
CATCHMENT POND 3 5 CRUSHER ELECTRIC SUBSTATION
After replacing pipe, additional protective and preventative measures at the catchment pond 1 will be put into place. Delaying the washout of water onto the crusher 5 electric substation.
PUMP HOUSE INLET PIPE
5 CRUSHER SUMP PUMP HOUSE
Type: Site work
CATCHMENT POND 1
CULVERT CLOGGED/BLOCKED REPLACE OR CLEAR BLOCKAGE GRADING DAYLIGHT LINE 1:1 SLOPE
-
0+00
0
A
0
END OF CULVERT BURRIED 0+02
CONNECTION TO CSP
Role: Civil Engineering Intern | Stantec & Teck Resources
0+02
8
CATCHMENT POND 2 48" CSP CULVERT
48" CSP CULVERT
INLET PIPE
Software: Adobe Photoshop
L1B CONVEYOR
Review
5 CRUSHER CSP PIPE ALIGNMENT
1182
EXISTING GROUND
EXISTING GROUND
1182
1180
1180
1178
1178
1176
1176
6.32%
1
1174
1174
1
PUMP HOUSE
1172
EXTENTS OF EXCAVATION
0+000
0+020
0+20.00 48" CSP CULVERT ATTEMPT TO REMOVE BLOCKAGE BY FLUSHING PIPE PRIOR TO REMOVAL/REPLACEMENT
1170 1178.20
EXCAVATE BELOW END OF CULVERT TO DETERMINE EXTENTS OF BLOCKAGE PRIOR TO STARTING LARGER BACKFILL
1178.66
1170 0+00.00
1177.91
1172
1174.15
Description: As a site engineering summer student at Stantec, I monitored and tracked progress across several community development projects in Calgary, compiling findings into daily reports. As a civil engineering intern on the Teck Resources site engineering team, I led my own project to clear and restore a clogged CSP pipe affecting site drainage, alongside AutoCAD drafting and project inspection work.
Currnet 48" CSP Pipe connected to the 5 crusher sump pump house is clogged and unfunctional. Before replacing, check to see if pipe is clogged on east end. If pipe is clogged and unable to be cleaned, continue to follow the excavation plan and replace with new 48" CSP.
0+040
0+058
0+40.00
0+57.55 REMOVE AND REPLACE 48" CSP CULVERT
A -