Skip to main content

2025 Noblesville West Gateway Plan

Page 1

WEST GATEWAY MASTER PLAN

NOBLESVILLE, IN 2025


TABLE OF CONTENTS

1 2 3 4 5

About this Document This Master Plan is a tool to illustrate, inspire, and guide the Noblesville community towards a vibrant, walkable and unique future for the area defined as the West Gateway. Navigation The plan is organized into five chapters. The tabs, shown at right, can be found across the top of the page throughout this document. These are hyperlinked for easy and convenient navigation through the document. At any time, click the home icon in the top left to return to the first page. Acknowledgments This plan is a result of the vision and leadership of Noblesville Mayor Chris Jensen and the dedicated City of Noblesville Staff, including: • Sarah Reed, Community Development Director • Caleb Gutshall, Planning & Development Department Director • Andrew Murray, Economic Development Director • Denise Aschleman, Assistant Director Planning & Development • Chuck Haberman, Assistant Director Economic Development • Jim Hellman, Assistant City Engineer • Alison Krupski, City Engineer At the direction of City leadership, and informed by numerous local stakeholders and community members, this plan was prepared by:

West Gateway Master Plan

2

INTRODUCTION

VISION

IMPLEMENTATION

COMMUNITY INPUT

ANALYSIS FINDINGS

2025


INTRODUCTION

VISION

11

West Gateway Master Plan

IMPLEMENTATION

COMMUNITY INPUT

About the Study

4

Collecting Input

6

Building on Opportunity

7

3

ANALYSIS FINDINGS

2025


INTRODUCTION

IMPLEMENTATION

VISION

COMMUNITY INPUT

ANALYSIS FINDINGS

About the Study Noblesville’s West Gateway District borders the historic downtown square, separated by the White River. The plan area is 420 acres, stretching about one mile west from the White River. It encompasses a transition from the low density suburban-rural edge into the traditional courthouse square, iconic of Indiana cities.

Roa d

St

ud y

38

Are

aB ou n r da

y

19

WEST GATEWAY

38

DOWNTOWN 32

The plan’s intent is to serve as a master plan for this area, which will be adopted into future citywide Comprehensive Plan updates guiding land use, infrastructure, and development.

West Gateway Master Plan

an

River Road

This master plan envisions a unique identity for a vibrant, walkable district in complement to the historic downtown. The plan projects changes possible in the next 15 – 20 years.

rid

Hague Road

A master plan is a collective vision imagining the future of a specific area and a list of action items to bring about the vision over time. The plan provides an aspirational guide, while providing flexibility to evolve or manifest in a way that aligns to, but varies from the plan.

She

W

HI

TE

RI

VE

R

N 4

2025


INTRODUCTION

IMPLEMENTATION

VISION

COMMUNITY INPUT

ANALYSIS FINDINGS

About the West Gateway Master Plan Objectives

Process

Concurrent Planning

This master plan set out to accomplish the objectives listed below. The results are compiled in the following sections of this plan.

The West Gateway Master Plan started in early 2024 with a 9-month-long schedule to conclude in late fall. The planning process included several events and opportunities to collect input from the community, as well as touch points with an advisory committee, comprised of Noblesville City Staff.

Several other planning and design efforts were underway concurrent with the West Gateway Master Plan. This includes:

• Envision a vibrant, walkable, and unique district shaping a gateway to Downtown Noblesville. • Identify potential future redevelopment sites and compatible land uses. • Identify opportunities to activate and connect with the White River and the Riverwalk. • Recommend improvements to roadways and trails to support movement to and through the district.

MKSK led the planning team, which included City staff and subconsultants, including Policy Analytics, JQOL, and Canopy 5 (formerly Pure Development). In addition, AveNew provided transportation policy advice under a separate contract with the City.

• Design an iconic gateway feature. • Identify infrastructure improvements necessary to support potential future redevelopment.

• East Gateway Master Plan (a sister project being completed along with this process by MKSK) • Downtown Parking Study • Alternative Transportation (NAT) Plan • Police Station Conceptual Design • Nickel Plate Trail Master Plan While this plan strives to be coordinated with other on-going efforts, those concurrent and succeeding plans should be reviewed for alignment during the implementation of the ideas herein.

• Draft design and development policies to implement the envisioned district. • Review economic impacts and fiscal projections related to potential development.

West Gateway Master Plan

5

2025


INTRODUCTION

VISION

IMPLEMENTATION

COMMUNITY INPUT

ANALYSIS FINDINGS

Collecting Input Each phase of the planning process has built upon the previous to result in the West Gateway Master Plan. The work completed in the last nine months translates into the analysis, vision, and implementation chapters, all supported by and rooted in community input, that organize this document in the tabs at the top of each page.

Summer 2024

Summer/Fall 2024

Fall 2024

Fall 2025 2025

West Gateway Master Plan

6

2025


INTRODUCTION

VISION

IMPLEMENTATION

COMMUNITY INPUT

ANALYSIS FINDINGS

Building on Opportunity Recent Change

W

hi

i te R

Rd

Lakeview Dr

Logan St

Westfield Rd

38

Cre

ek

River Rd

ero

19 ro Cice

32

W

Cic

Gr e en wa y

Rd

38

hi

te

Ri

ve

r

DOWNTOWN

N

West Gateway Plan Area West Gateway Master Plan

dan

ve r

Midland Trace Trail

There is an existing disconnect between the vibrant, walkable district Noblesville residents desire and the existing physical character of the West Gateway. This plan identifies the challenges, such as a lack of sidewalk connections and disconnected destinations, in order to recommend informed actions for change.

eri

River Rd

Existing Challenges

Sh

Hague Rd

The West Gateway has momentum for change. Recent redevelopment projects—Nexus Apartments, Federal Hill Commons, and nearby East Bank—and public investment in streets and sidewalks and trails ready the district for a boost of investment to shape an energized extension of downtown.

7

2025


INTRODUCTION

West Gateway Master Plan

VISION

21

IMPLEMENTATION

COMMUNITY INPUT

ANALYSIS FINDINGS

A Vision for the Future

12

Big Ideas that Achieve the Vision

14

Actions to Connect to the White River

16

Actions to Develop a Walkable Urban Grid

22

Actions to Assemble a Balance of Land Uses and Scales

30

Actions to Integrate a Network of Trails and Open Spaces

44

11

2025


INTRODUCTION

VISION

IMPLEMENTATION

COMMUNITY INPUT

ANALYSIS FINDINGS

A Vision for the Future Rooted in Wellness The West Gateway vision is centered on the concept of wellness. This focus is driven by the presence of Riverview Hospital as a major anchor and the many healthcare providers operating in the district in the hospital’s orbit. This vision also leverages the private and public sector’s recent catalytic investments in Federal Hill Commons. For this district, the concept of wellness extends beyond acute treatment of physical ailments. It includes preventative care of physical, mental and emotional wellbeing at the scale of the individual, the community, and their environs. The concept is broken down into seven sub-topics called the Dimensions of Wellness. The Dimensions of Wellness consider holistic wellness, from having stable and secure housing and jobs to connecting with community and nature. The Dimensions of Wellness are explored further on the following page and throughout this chapter, connected to the recommendations for physical changes in the West Gateway.

West Gateway Master Plan

12

2025


INTRODUCTION

VISION

IMPLEMENTATION

COMMUNITY INPUT

ANALYSIS FINDINGS

Dimensions of Wellness From the overall vision stem seven unique Dimensions of Wellness encompassed by this plan. Each dimension relates to a different aspect of holistic community or individual well-being. Throughout this chapter, each recommended action is related to its Dimensions of Wellness, indicated by the icons seen below. Read more about how these Dimensions of Wellness contribute to the physical elements of the master plan.

MOVEMENT

NATURE

HOUSING + JOBS

COMMUNITY

Walkable blocks, sidewalks, and bike paths support low-intensity activities to integrate movement into everyday activities and fuel physical and mental well-being.

Connecting with nature has proven benefits for physical and mental wellness. Access to the river or walking a nature path are simple ways to connect with nature daily.

The security of a safe home and well-paying job underpin mental and physical health. A diverse mix of housing types and business types supports community members in the baseline need.

Connecting with others is vital to mental health, which in turn impacts physical health. Places to gather, inside or out, provide space to build community and connect with one another.

HEALTHCARE

NOURISHMENT

ECOSYSTEMS

Neighborhood pharmacies, therapists, family doctors, and hospitals all shape an ecosystem of preventative, diagnostic, and acute care for our bodies and minds.

Access to healthy foods is essential for well-being. This comes in the forms of grocery stores, community gardens, farmers markets, and restaurants.

Healthy ecosystems offer clean air to breathe, water systems capable of diverting rainfall, and reduced pollutants in water and soils.

West Gateway Master Plan

13

2025


INTRODUCTION

VISION

IMPLEMENTATION

COMMUNITY INPUT

ANALYSIS FINDINGS

Big Ideas that Achieve the Vision

CONNECT TO THE WHITE RIVER.

DEVELOP A WALKABLE URBAN GRID.

ASSEMBLE A BALANCE OF LAND USES AND SCALES.

INTEGRATE A NETWORK OF TRAILS AND OPEN SPACES.

Making an Idea into a Reality How does a master plan transform an idea—like a vision of cultivating wellness—into physical changes? The four big ideas introduced here are the vehicles that translate an idea into a type of place. These four big ideas each contain a selection of recommended actions through which the West Gateway District can come to embody the vision as a center of wellness for residents and visitors. The rest of this chapter moves through each of the four big ideas to articulate their specific recommendations, including design and development guidelines, regulating plans for future redevelopment, and inspirational images to imagine the future West Gateway District. Click on any of the icons above to jump directly to that section.

West Gateway Master Plan

14

2025


INTRODUCTION

VISION

COMMUNITY INPUT

IMPLEMENTATION

ANALYSIS FINDINGS

A Guide to the Vision Recommended Action Page

The following pages outline the specific recommended actions to realize the big ideas and achieve the vision. These are presented in a combination of two page types.

ACTION PAGES Each recommendation is first introduced as an action. The Action Page includes a brief overview of the strategy and design considerations. It may include a map or regulating plan to guide implementation of the action, or it may include inspiration imagery. Each recommended action is tagged with icons for the related Dimensions of Wellness.

TYPOLOGY PAGES Typology pages expand on a new idea nested within the recommended actions. For example, an action may reference a new street type or land use type. These new types are explained in more detail with design guidelines on the subsequent pages. The typology pages can serve as a spec sheet for implementing the actions.

West Gateway Master Plan

GLOSSARY Some action items will present new street and land use types, defined on pages following the action item. Here’s a short list of what new terms you’ll come across, all of which have a Typology Page to reference in this section: Street Types: • Local Streets • High Streets • Green Avenues A • Green Avenues B Typology Page

Land Use Types: • Residential Village • Residential Transition • Mixed Use Residential • Mixed Use Commercial • Hospitality • Institutional • Indoor Recreational • Urban Open Space

15

2025


VISION

INTRODUCTION

COMMUNITY INPUT

IMPLEMENTATION

ANALYSIS FINDINGS

Actions to Connect to the White River The White River is a fantastic, yet untapped, asset defining Noblesville. Today, the river separates Downtown Noblesville from the West Gateway and is experienced in limited ways: either walking alongside the east bank on the Riverwalk or crossing over it in car, on bike, or by foot. The presence of the White River in downtown differentiates Noblesville from its peer communities, offering connections to nature in the center of the urban experience. The West Gateway vision builds upon many concepts within the White River Master Plan and proposes bold new ideas to connect to the White River and to develop responsibly with this element of nature. By turning towards the White River, the West Gateway can provide new connections with nature and recreational opportunities for residents, employees, and visitors. Capital improvement projects connecting to the river can catalyze private investment in future redevelopment on neighboring sites. By connecting to the White River’s west bank, this vision can transform the river from a barrier separating downtown and the West Gateway into a feature unifying the two sides as one whole.

REMOVE SR-19 AS A BARRIER TO THE RIVERFRONT

CONSTRUCT A NATURE BOARDWALK AND TRAIL

CAPTURE STORMWATER ON-SITE

N

Riverview Health

CONSTRUCT TERRACED RIVER BANKS

REDEVELOP RESPONSIBLY IN FLOOD HAZARD AREAS

Forest Park

Federal Hill Commons

CONSTRUCT A NEW PLEASANT STREET BOAT LAUNCH

Whit

e Riv er

ORIENT NEW DEVELOPMENT TOWARD THE RIVER

et

tre

nS

ga

t ee Str

16

Lo

er

nn

Co

West Gateway Master Plan

IMPROVE BOAT LAUNCH

2025


INTRODUCTION

VISION

IMPLEMENTATION

COMMUNITY INPUT

ANALYSIS FINDINGS

Connect to the White River 1. CONSTRUCT A NATURE BOARDWALK AND TRAIL ALONG THE RIVER. Downtown Noblesville has the Riverwalk, an urban, reinforced pathway along the water’s edge. The West Gateway proposes a counterpoint: a boardwalk weaving through the natural river’s edge. This envisions an upper canopy walk to explore treetops and capture photo-worthy vistas, and a lower boardwalk to meander wetlands along the river edge. These meandering walkways connect to a multi-use trail paralleling the river and connecting the district to points beyond. Design Considerations • Provide a loop or turn-around points and overlooks. • Provide a high canopy walk and a low boardwalk path. • Encourage adjacent properties and future development to incorporate trailheads. • Protect existing wetlands and clear invasive plants. • Design low path for periodic river flooding.

Dimensions of Wellness:

West Gateway Master Plan

17

2025


INTRODUCTION

VISION

IMPLEMENTATION

COMMUNITY INPUT

ANALYSIS FINDINGS

Connect to the White River 2. CONSTRUCT TERRACED RIVER BANKS. The White River experiences periodic flooding and erosion. Existing slopes and dense foliage, including invasive plants, obscure the river from human connections. Drawing from the recommendations of the White River Vision Plan between Logan Street and Conner Street, create a new river’s edge using terracing to stabilize from erosion, account for periodic floodwaters, and provide a new landing wherein locals and visitors can appreciate and experience the River. Design Considerations • Terrace for riverbank stabilization and create a venue for riverfront events and performances. • Provide universal access to the riverfront. • Incorporate lighting for increased safety and aesthetics. • Select materials and design features to withstand periodic river flooding for efficient clean up and minimal repairs after flood events. • Explore a terrace landing and pavilion for outdoor performances and covered events. • Provide access points for paddle craft pull-outs from a blue trail along the White River. Dimensions of Wellness:

West Gateway Master Plan

18

2025


INTRODUCTION

VISION

IMPLEMENTATION

COMMUNITY INPUT

ANALYSIS FINDINGS

Connect to the White River 3. IMPROVE THE BOAT LAUNCH AT FOREST PARK.

4. CREATE A NEW PLEASANT STREET BOAT LAUNCH.

Located just north of the White River Greenway viaduct, Forest Park’s boat launch is a popular put-in for paddle craft. The boat launch is site-constrained and offers limited parking and water access. This boat launch should be improved, in complement to a new, larger public boat launch at Pleasant Street (Action #4).

City-owned property on the White River’s east bank, adjacent to Pleasant Street, is an optimal location for a new public boat launch, complementary to Forest Park. This public boat launch can: include ample parking for vehicles and trailers; engage a vendor for paddle craft rentals; accommodate accessible water entry points; offer lockers for safely storing paddle craft while paddlers visit Noblesville landside, and connect to a riverside park with restrooms and expanded amenities.

Design Considerations • Construct public restroom facilities.

Design Considerations

• Configure spaces, install clear signage, and enforce parking to reduce vehicle parking on wellhead areas.

• Right-size parking to serve demands, including trailer parking.

• Expand the launch to accommodate inflatable rafts.

• Consider paddle craft rentals.

• Establish a larger river trail network branding/marketing and wayfinding.

• Establish a larger river trail network branding/marketing and wayfinding.

• Include features to enable accessible entry for all users.

• Include features to enable accessible entry for all users.

Dimensions of Wellness:

West Gateway Master Plan

Dimensions of Wellness:

19

2025


INTRODUCTION

VISION

IMPLEMENTATION

COMMUNITY INPUT

ANALYSIS FINDINGS

Connect to the White River 5. ORIENT NEW DEVELOPMENT TOWARDS THE RIVER.

6. TRANSFORM CICERO ROAD.

The White River is a terrific asset for Noblesville, and new development should embrace the river with visual and physical connections. This can take the form of view from terraces and roof decks and entrances facing trails or paths to connect physically, in addition to traditional streetfronting activity to successfully generate activity year-round.

Cicero Road (SR-19) separates Federal Hill Commons and its surrounding redevelopment from the White River. Explore transferring authority over Cicero Road to the City of Noblesville from the White River Greenway viaduct to Westfield Road (SR-32). Under City control, reshape the right-of-way into a flexible street from Logan to Westfield. During special events, the flexible street can become plaza; otherwise, the street functions as a typical segment of the connected grid.

Design Considerations • Incorporate decks, patios, rooftops to provide views towards the river.

Design Considerations

• Incorporate access to the river from existing and future development using a network of paths and trails.

• Take jurisdiction over from INDOT of Cicero Road from Forest Park Drive to Westfield Road (SR-32).

• Promote health and wellness through placemaking, gathering spaces for activities, and a blend of active and passive recreational zones.

• Transform Logan Street to Westfield Road into a flexible street. • Address known flooding issues north of Logan Street.

• Encourage 360 degree architecture to avoid buildings “turning their back” on the river.

Dimensions of Wellness:

West Gateway Master Plan

Dimensions of Wellness:

20

2025


INTRODUCTION

VISION

IMPLEMENTATION

COMMUNITY INPUT

ANALYSIS FINDINGS

Connect to the White River 7. REDEVELOP RESPONSIBLY IN FLOOD HAZARD AREAS.

8. CAPTURE STORMWATER ON-SITE.

Significant areas of the West Gateway are within flood hazard zones from the White River and Cicero Creek. Future redevelopment should follow best practices to mitigate flood damage to existing or new property. New development within a 100-year floodplain must comply with all current building protection requirements.

Best practices and regulations require new development to consider stormwater runoff and provide a degree of quality and quantity controls on-site. This can be accomplished through a combination of green infrastructure techniques. Design Considerations

Design Considerations

• Install green roofs or cisterns to hold stormwater or reuse it for building services.

• Retreat from any existing development in the floodway.

• Incorporate permeable pavers and underground vaults can hold and release water at slower rates.

• Construct new structures a minimum one for above the 100-year Base Flood Elevation and in accordance with Flood Hazard zoning requirements, which may include dry flood-proofing practices, floodgates or walls, or unoccupied lower levels that are designed to flood, such as an open parking deck.

• Use performance landscaping, including tree vaults, bioswales, and rain gardens with specialized plants can capture run off and naturally absorb water.

• Undertake new floodplain mapping to reflect actual existing conditions.

• Establish requirements for on-site new development, such as detaining the first 1” of rainfall over a specified storm event.

• Ensure future development has a cumulative “no-rise” impact to 100-year flood elevations.

• Explore the potential to fulfill requirements using adjacent streets.

Dimensions of Wellness:

West Gateway Master Plan

Dimensions of Wellness:

21

2025


VISION

INTRODUCTION

COMMUNITY INPUT

IMPLEMENTATION

ANALYSIS FINDINGS

Actions to Develop a Walkable Urban Grid Noblesville, and peer communities across Indiana and beyond, can draw a connection between vibrant, successful districts and their formatting on a compact, walkable city grid. Short blocks make walking a comfortable and easy experience. A compact network of streets facilitates on-street parking and provides redundancy for traffic flows. And strategically sized city grids shape attractive lots for potential future redevelopment. From empty-nesters to burgeoning young professionals, preferences for residing, thriving, and recreating continue a steady shift toward walkable centers. Today, much of the West Gateway District is primarily dependent on vehicles to get around. Wide, high-volume state roads get people into Noblesville, and provide access to West Gateway destinations. By mirroring the compact, walkable urban grid found downtown, investment in the West Gateway can build on the success of the traditional downtown, create a network hierarchy to cater to different modes and experiences, and shape or inform parcels for future redevelopment.

N

CREATE NEW LOCAL AND HIGH STREETS IMPROVE SAFETY AND EASE FOR ALL MODES OF MOBILITY

es W d

el

tfi

Riverview Health

BUILD PERFORMANCE LANDSCAPES INTO STREETS

n

ga

Lo

d

a Ro

t

e re

St

Forest Park

Whi

Federal Hill Commons te R

West Gateway Master Plan

iver

REPOSITION EXISTING CORRIDORS AS GREEN AVENUES

22

2025


INTRODUCTION

VISION

COMMUNITY INPUT

IMPLEMENTATION

ANALYSIS FINDINGS

Develop a Walkable Urban Grid 9. CREATE NEW LOCAL AND HIGH STREETS.

eri

dan

Ro ad

38

Lakeview Drive

Nexus Apartments

Lo gan

Stree

t 19

Westfield Road

Riverview Health

32

yT ree

Ro a

d

Mustard Seed

Federal Hill Commons

38

oa ro R Cice

d

River’s Edge Apartments

r

ive

R ite

err

Wh

Ch

• Prioritize active building fronts and entrances along High Streets.

Forest Park

Sh

River Road

• Provide most access to developments from Local Streets, limiting curb cuts on higher volume roads or High Streets.

Proposed High Street Existing Street Extension of Existing Street

ad

• Limit block sizes to no more than 400 ft; 350 ft preferred.

N

Proposed Local Street

Hague Road

Design Considerations

Streets

River Ro

For this action item, street types were developed for proposed new streets that will shape blocks for potential future redevelopment, diversify the hierarchy of streets in the district, and create redundancy for special events and traffic snarls. These street types are “Local Streets” and “High Streets” (see pages 24-25). These streets support people-oriented activity by creating walkable block sizes like those found in downtown.

• Where appropriate, Local Streets may function as nonvehicular connections.

Pleasant Street

Dimensions of Wellness: 350’ 350’

Proposed New Streets Plan West Gateway Master Plan

23

2025


INTRODUCTION

VISION

COMMUNITY INPUT

IMPLEMENTATION

ANALYSIS FINDINGS

Develop a Walkable Urban Grid 10. REPOSITION EXISTING CORRIDORS AS GREEN AVENUES.

eri

dan

Ro ad

38

Lakeview Drive

Nexus Apartments

Lo gan

Stree

t 19

Westfield Road

Riverview Health

32

yT ree

Ro a

d

Mustard Seed

Federal Hill Commons

38

oa ro R Cice

d

River’s Edge Apartments

r

ive

R ite

err

Wh

Ch

• Integrate infrastructure into curbside landscaping to detain and treat runoff stormwater.

Forest Park

Sh

Hague Road Nature Haven

ad

• Elevate ped and bike crossings at signaled intersections and roundabouts.

High Streets Green Avenue A Green Avenue B Right In - Right Out Intersections Roundabouts

River Road

• Explore local jurisdiction over state routes through the district.

N

Local Streets

River Ro

Design Considerations

Street Network

Hague Road

Existing corridors are predominantly designed for moving vehicles to and through the West Gateway. These corridors are re-imagined as a multi-modal street type, “Green Avenue” (see pages 26-27). Robust landscaping and coordinated street finishings elevate the look and feel of these corridors into an iconic West Gateway experience. Green Avenues build upon recent City and County road maintenance investments and focus on improvements behind the curb or added medians.

• Employ stormwater green infrastructure in public Dimensions of Wellness:

Street Classification Regulating Plan West Gateway Master Plan

24

2025


VISION

INTRODUCTION

COMMUNITY INPUT

IMPLEMENTATION

ANALYSIS FINDINGS BUILDING ZONE

Street Type: High Street LOW EDGED LANDSCAPE BEDS

The High Street is the center of activity for the West Gateway. These streets are the most active and people-oriented, with wide sidewalks and places to linger. Storefronts generate foot traffic and vibrant street life. Parallel parking supports storefronts and separates patrons strolling the sidewalk from vehicles passing by. Low planter beds showcase landscaping and serve as stormwater infrastructure. Curb bumpouts at intersections help people cross safely. Slow vehicle speeds allow people to bike comfortably in the travel lanes to reach their destinations. Coordinated street furnishings, from lighting to benches to bike racks and trash receptacles, convey intentional design and an inviting atmosphere for residents, businesses, and visitors.

CURB BUMP OUTS

1 TRAVEL LANE EACH DIRECTION

LEFT TURN LANE*

PLANTED MEDIAN*

TREE BOX DETENTION

RO W8

RO AD 4’

38’

BUILDING ZONE COORDINATED FURNISHINGS

An optional median can elevate the importance of the High Street as a slow, center of life within the West Gateway District. HIGH STREET Element

Width

Description

Sidewalk

8’ min

Pavers

Curb Landscaping

8’ min

Low edged planter beds

Parallel Parking

8’ min

Asphalt or pavers

Travel Lanes

11’ max

New streets

Landscaped Median*

11’ max

Left turn lane, as needed

*optional element

West Gateway Master Plan

25

2025


INTRODUCTION

VISION

COMMUNITY INPUT

IMPLEMENTATION

ANALYSIS FINDINGS

BUILDING ZONE

Street Type: Local Street PARALLEL PARKING

Local Streets support everyday life in the West Gateway District. A mix of storefronts and residences open onto Local Streets. These streets primarily serve local traffic, but also provide a networked redundancy that is critical during special events or traffic incidents.

1 TRAVEL LANE EACH DIRECTION

IN-GROUND LANDSCAPE BED

Sidewalks with safe crossings at intersections connect residents to businesses along High Streets or multi-use paths/ trails along Green Avenues. Parallel on-street parking supports businesses and residents. Continuous curb landscaping is ground cover or lawn with trees to shade the streets. The curb landscaping can also manage stormwater with rain gardens, bioswales, or tree pits.

COORDINATED FURNISHINGS

RO AD RO W6

Coordinated street furnishing support daily life: benches for neighbors to connect, bike racks, lighting that welcomes residents and guests, and trash receptacles for daily dog walking.

6’

BIOSWALES

BUILDING ZONE

38’ CURB BUMPOUTS

LOCAL STREET Element

Width

Description

Sidewalk

8’ min

Concrete or pavers

Curb Landscaping

8’ min

Lawn or in-ground planter beds

Parallel Parking

8’ min

Asphalt or pavers

Travel Lanes

11’ max

New streets

West Gateway Master Plan

26

2025


VISION

INTRODUCTION

COMMUNITY INPUT

IMPLEMENTATION

ANALYSIS FINDINGS

Street Type: Green Avenue A

2 TRAVEL LANES EACH DIRECTION

The Green Avenue A embraces the function and recent investments of the state routes which move large volumes of people and goods to and through Noblesville.

RAISED PLANTER BEDS

In the West Gateway, these routes are enhanced to support a walkable, active district. Most changes are to the public realm outside of the roadway, maintaining curbs and travel lanes.

BUILDING ZONE

Within the roadway, planted medians shade the streets, calm and beautify the travel experience, and accommodate left turn lanes. Large raised planters along the curb support robust landscaping and shade trees, can incorporate stormwater infrastructure, and buffer people on the sidewalk from vehicles in the street. In instances with a multi-use path or trail, a planted buffer separates the path from the storefront activity at the adjacent sidewalk.

STORMWATER TREE BOX

RO W1

RO AD 02’

’

58’

BUILDING ZONE MULTI-USE PATH/ TRAIL

GREEN AVENUE A Element

Width

Description

Sidewalk

8’ min

Concrete or pavers

Curb Landscaping

10’ min

24” high planter boxes

Travel Lanes

11’ max

Maintain existing

Landscaped Median

12’ max

Left turn lane, as needed

Multi-Use Path

10’ min

Asphalt, two directions

Multi-Use Path Buffer

4’ min

Planted

West Gateway Master Plan

27

2025


VISION

INTRODUCTION

COMMUNITY INPUT

IMPLEMENTATION

ANALYSIS FINDINGS

Street Type: Green Avenue B

BUILDING ZONE

Green Avenue B re-imagines existing thoroughfares as multi-modal connectors. Roadways are rebuilt with consistent lanes and widths, connecting the street grid and providing some access to destinations.

IN-GROUND LANDSCAPE BED

1 TRAVEL LANE EACH DIRECTION

RAISED PLANTER MEDIAN

A raised center median enhances the performance and experience of traveling the street. In-ground planter beds line the curb, planted with shade trees, ornamentals, and native grasses. Swales or basins in the planter beds can hold and treat stormwater runoff. Median and curb landscaping shelter people on the street from passing vehicles, encourage slower speeds, and create an iconic feel for the West Gateway.

LEFT TURN LANE

LANDSCAPED BIOSWALES

RO W7

RO AD 8’

Where multi-use paths or trails parallel the street, a planted buffer separates the path from the storefront activity at the adjacent sidewalk.

BUILDING ZONE

34’ MULTI-USE PATH/ TRAIL

GREEN AVENUE B Element

Width

Description

Sidewalk

8’ min

Concrete or pavers

Curb Landscaping

8’ min

In-ground planting beds

Travel Lanes

11’ max

Reconstructed

Landscaped Median

12’ max

24” high planter bed Left turn lane, as needed

Multi-Use Path

10’ min

Asphalt, two directions

Multi-Use Path Buffer

4’ min

Planted

West Gateway Master Plan

28

2025


INTRODUCTION

VISION

IMPLEMENTATION

COMMUNITY INPUT

ANALYSIS FINDINGS

Develop a Walkable Urban Grid 11. IMPROVE SAFETY AND EASE FOR ALL MODES OF MOBILITY.

12. BUILD PERFORMANCE LANDSCAPES INTO STREETS.

Safety and convenience for people walking and biking are a critical component of shaping a vibrant, walkable district. Streets and intersections should prioritize pedestrian and bicyclist safety.

Street landscaping can do more than simply beautify the district. Plants and infrastructure in the right-of-way can bolster natural habitats, improve air quality, reduce heat islands, and control stormwater runoff.

Design Considerations

Design Considerations

• Use on-street parking and curbside landscaping to buffer between sidewalks and roadways.

• Consider landscape guidelines to create a unified Gateway appearance.

• Create aligned perpendicular intersections where possible.

• Integrate native and adapted plants for a mix of beauty and function.

• Provide highly-visible ped and bike crossings, including curb bump outs at all local and high streets.

• Incorporate stormwater infrastructure into medians, curbside landscaping, parking areas, and sidewalks.

• Provide accessible sidewalks along all new and existing roadways.

• Install a variety of tree boxes, bioswales or rain gardens, permeable paving, and underground chambers to hold and treat stormwater.

• Provide bicycle racks at regular intervals and near front doors.

• Explore policies for developments to install, use, and maintain stormwater green infrastructure in the adjacent public way.

• Provide wayfinding and easy access to parking structures.

Dimensions of Wellness:

West Gateway Master Plan

Dimensions of Wellness:

29

2025


INTRODUCTION

VISION

COMMUNITY INPUT

IMPLEMENTATION

ANALYSIS FINDINGS

Actions to Assemble a Balance of Land Uses and Scales Mixing land uses—like ground floor retail, cafés, restaurants, and services—with upper floor housing or offices, brings and sustains people and activity to the district across different times of days, weekdays and weekends. Locating convenient retail, dining, and services adjacent to housing and places of work enables residents, employees, and visitors to park once and walk between destinations, whether that is stepping out of the office to pick up a healthy lunch nearby, or easily crossing off errands en route to the Farmers Market on a Saturday morning. Buildings with larger footprints and more stories, supported by structured parking, can centralize nodes of activity while adjacent areas of smaller, shorter buildings can transition to surrounding neighborhoods. A balance of development types provide for the needs and desires of different community members, providing options of housing types, sizes, and price points and shaping a variety of different lifestyle experiences, all within one connected Noblesville West Gateway District. ATTRACT KNOWLEDGEBASED WORK PLACES INCLUDE A DIVERSITY OF HOUSING OPTIONS

N

ATTRACT A MIX OF VENUES FOR RESIDE, THRIVE & RECREATE PROVIDE ACCESS TO FRESH AND HEALTHY FOODS

d

el

tfi

Riverview Health

es W

TRANSITION FROM EXISTING TO NEW DEVELOPMENT

Lo

d

a Ro

n

ga

RIGHT-SIZE PARKING TO SUPPORT DEVELOPMENT

t

e re

St

Whi

Federal Hill Commons

te R

iver

EMBRACE RIVERVIEW HOSPITAL AS AN ANCHOR ATTRACT A NEW HOSPITALITY PARTNER

West Gateway Master Plan

30

EMBRACE GATHERING AROUND RECREATION

INCORPORATE RETAIL INTO GROUND FLOOR SPACES 2025

Forest Park


INTRODUCTION

VISION

COMMUNITY INPUT

IMPLEMENTATION

ANALYSIS FINDINGS

Assemble a Balance of Land Uses and Scales 13. INCLUDE A DIVERSITY OF HOUSING OPTIONS.

dan

Ro ad

38

Lakeview Drive

Nexus Apartments

Lo gan

Stree

t 19

Westfield Road

Riverview Health

32

38

oa ro R Cice

d

River’s Edge Apartments

err

yT ree

Ro a

d

Mustard Seed

Federal Hill Commons

Ch

• Encourage a mix of two- and three-bedroom units in attached residential formats.

eri

River Road

• Adopt a forward-thinking policy on inclusionary zoning that requires developers to include affordable housing units in new developments.

Forest Park

Sh

ad

• Encourage a mix of for-sale and for-rent ownership options.

N

Residential Village Residential Transition Mixed Use Residential Mixed Use Commercial Hospitality Institutional Indoor Recreational Urban Open Space

Hague Road

Design Considerations

Land Use Categories

River Ro

The West Gateway combines spaces for residing, thriving, and recreating to shape a vibrant and unique district. Future land use is anchored by residential uses, as an independent land use and as mixed-use with active ground floors. Land uses are mixed vertically and horizontally throughout the district. The uses detach from existing zoning constraints to shape the envisioned active, wellness-centered district.

Dimensions of Wellness:

Land Use Regulating Plan West Gateway Master Plan

31

2025


INTRODUCTION

VISION

COMMUNITY INPUT

IMPLEMENTATION

ANALYSIS FINDINGS

Assemble a Balance of Land Uses and Scales 14. TRANSITION FROM EXISTING TO NEW DEVELOPMENT. The district hosts a diverse scale of potential future redevelopment, concentrating the largest buildings nearest to the White River and downtown and tapering towards existing neighborhoods.

Building Heights Min 1 2 3 4

N

Max 4 4 5 8

Forest Park

Sh

eri

dan

Ro ad

Aspirational building heights up to eight stories nearest the White River encourage developers to leverage the value of the Gateway’s natural and historic assets.

Lakeview Drive

ad

Stree

t 19

Riverview Health

32

38

oa ro R Cice

d

River’s Edge Apartments

err

yT ree

Ro a

d

Mustard Seed

Federal Hill Commons

Ch

• Employ natural features as buffers and transitions between scales of development.

Lo gan

Westfield Road

River Road

• Taper the intensity of development to transition to surrounding urban fabric.

River Ro

• Foster development of Residential Transition land uses between new and existing development.

Nexus Apartments

Hague Road

Design Considerations

38

Dimensions of Wellness:

Building Heights Regulating Plan West Gateway Master Plan

32

2025


INTRODUCTION

VISION

IMPLEMENTATION

COMMUNITY INPUT

ANALYSIS FINDINGS

Assemble a Balance of Land Uses and Scales 15. EMBRACE RIVERVIEW HOSPITAL AS AN ANCHOR.

16. ATTRACT A NEW HOSPITALITY PARTNER.

Riverview Hospital anchors the West Gateway as a center of skilled employment and healthcare services for Hamilton County. Improvements in the district support the hospital’s on-going operations and potential future expansion. As an anchor institution, the hospital attracts private healthcare providers to the West Gateway.

A new hotel situated between the White River, downtown, and Riverview Hospital provides lodging to business travelers, hospital patients and families, and tourists exploring Noblesville. Guest rooms and a roof deck offer fantastic views of the Courthouse Clock Tower and the White River. Design Considerations

Design Considerations

• Locate an upscale hotel close to the White River and downtown to support local tourism, businesses, and healthcare patients.

• Consider current and future needs of Riverview Hospital. • Consolidate private care providers into purpose-built medical office buildings (MOB’s), supported by shared parking.

• Include ground floor uses to activate the street.

• Include active ground floor uses in MOB’s. • Maintain sight-lines and incorporate clear wayfinding to the hospital.

Dimensions of Wellness:

West Gateway Master Plan

Dimensions of Wellness:

33

2025


INTRODUCTION

VISION

IMPLEMENTATION

COMMUNITY INPUT

ANALYSIS FINDINGS

Assemble a Balance of Land Uses and Scales 17. PROVIDE ACCESS TO FRESH AND HEALTHY FOODS.

18. ATTRACT A MIX OF VENUES FOR DINING AND GATHERING.

Access to fresh and healthy foods starts with access to markets with reliable goods and reasonable prices. This can be at the local supermarket, specialty store, food co-op, or farmers market. Dining establishments can also provide nutritious options, in contrast to unhealthy fast foods.

Places for dining and gathering nourish people in body and spirit. A diversity of venues can offer options for time of day, dining duration, dietary and cultural preferences. A mix of restaurants and other venues attract employees, residents, and visitors while bolstering local businesses and creating jobs.

Design Considerations

Design Considerations

• Attract re-investment in a new urban format supermarket.

• Welcome dining and gathering establishments reflecting a diversity of cultures and palettes.

• Attract an additional, new smaller format market or specialty foods store.

• Prioritize new establishments that provide dine-in experiences.

• Partner with a co-op/ non-profit to expand access for low income families through groceries, gardens, or a combination.

• Consider incentives to support local, small businesses establishments.

• Continue expanding the Farmer’s Market at Federal Hill. • Attract restaurant concepts offering healthy options.

Dimensions of Wellness:

West Gateway Master Plan

Dimensions of Wellness:

34

2025


INTRODUCTION

VISION

IMPLEMENTATION

COMMUNITY INPUT

ANALYSIS FINDINGS

Assemble a Balance of Land Uses and Scales 19. INCORPORATE RETAIL INTO GROUND FLOOR SPACES.

20. ATTRACT KNOWLEDGE-BASED WORKPLACES.

Potential future redevelopment of the Gateway welcomes existing retailers into new spaces, activating the ground floor of multi-story buildings. This transforms the district from disconnected shopping centers fronts by parking to vibrant, walkable streets. The proximity and increase quantity of employees and residents supports the ground floor businesses.

The knowledge-based economy is one of the largest growing sectors in central Indiana, and drawn to unique locations that attract their talent pool. The West Gateway is a prime opportunity for a modest expansion of commercial office space in a vibrant district, walkable to riverfront amenities and downtown. Design Considerations

Design Considerations • Relocate existing retail tenants into new mixed use buildings.

• Attract local and regional office users with build-to-suit anchors to finance new office buildings.

• Encourage existing businesses to expand into the district.

• Include active ground floor uses in new office buildings.

• Consider incentives to support local businesses.

Dimensions of Wellness:

West Gateway Master Plan

Dimensions of Wellness:

35

2025


INTRODUCTION

VISION

IMPLEMENTATION

COMMUNITY INPUT

ANALYSIS FINDINGS

Assemble a Balance of Land Uses and Scales 21. EMBRACE GATHERING PLACES AROUND RECREATION.

22. RIGHT-SIZE PARKING TO SUPPORT DEVELOPMENT.

Indoor recreation, public spaces, and parks provide “third places” for people to gather and build community. For example, Bowl 32 and Federal Hill Commons are existing community hubs in the West Gateway. New indoor recreation, such as golf simulators, pickle ball, or climbing gyms can be active ground floor tenants. Parks provide outdoor recreation opportunities where community members find belonging.

Parking is necessary to support development, even in walkable environments. Convenient, centralized parking encourages visitors to park once and move between destinations on foot. Where practical, parking facilities can be shared between public and private entities or users with complementary needs. To maximize efficiency, parking is structured in the most active nodes of the Gateway.

Design Considerations

Design Considerations

• Support existing recreational destinations, such as Bowl 32 and Federal Hill Commons.

• Adopt zoning with shared parking provisions to minimize the cost of development and allow for a more intentional use of parking.

• Consider new recreational users as ground floor tenants in mixed-use developments.

• Employ parking maximums to reduce over-building parking spaces.

• Plan for on-going programming of open spaces.

• Adopt zoning for bicycle parking.

• Consider City-operated garages to support adjacent destinations.

• Create connectivity to river through adjacency or access through walkable/ bike-able street corridors.

Dimensions of Wellness:

West Gateway Master Plan

Dimensions of Wellness:

36

2025


VISION

INTRODUCTION

IMPLEMENTATION

COMMUNITY INPUT

ANALYSIS FINDINGS

Land Use: Residential Village The Residential Village is a small, compact residential land use. This form supports small, detached units on small lots bringing neighbors closer together and minimizing individual exterior spaces. Private parcels can be organized around communal open space. These smaller homes present opportunities for new homeowners entering the market, long-time residents downsizing, or residents preferring the scale and price point of a smaller home.

RESIDENTIAL VILLAGE Regulation Lot Size 7,500 sf min. Units per Lot 2 max. Stories 2 max. Parking 1.0 per unit Front Setback 10’ - 25’

For the West Gateway in particular, this land use is envisioned for the hilly property currently supporting smaller living options in mobile homes. The compact lots and buildings can accommodate terrain changes and transition from larger new development to the existing surrounding neighborhoods.

West Gateway Master Plan

37

2025


INTRODUCTION

VISION

IMPLEMENTATION

COMMUNITY INPUT

ANALYSIS FINDINGS

Land Use: Residential Transition The Residential Transition land use introduces an under-supplied housing form for Noblesville. This transitional scale and form can include townhouses, walk-up flats, duplexes, and similar types of compact units.

RESIDENTIAL TRANSITION Regulation Stories 2-4 Parking 1.5 per unit Front Setback 5’ - 15’

The Residential Transition land use is characterized by residential units that are attached with direct entry to units from the street, or common entrances serving fewer than ten units, such as in a walk-up flat. Townhouses are the most prolific form of Residential Transition. In the West Gateway, this can include fee simple units sharing only side partywalls, as well as duplexed units such as a one- or two-story unit below a three- or two-story unit, respectively. Private outdoor space is provided in balconies, roofdecks, and small yards and supplemented with public open space. Buildings with attached parking should be accessed from the rear, via a private alley. Guest parking (accounted for in the per-unit ratio) can be provided on-street or in discrete, dispersed lots.

West Gateway Master Plan

38

2025


INTRODUCTION

VISION

IMPLEMENTATION

COMMUNITY INPUT

ANALYSIS FINDINGS

Land Use: Mixed Use Residential Mixed Use Residential combines housing units above a ground floor activated with retail, food and beverage, and service establishments. The co-location of businesses and residences stokes street life and a vibrant district.

MIXED USE RESIDENTIAL Regulation Stories 3-5 Parking 1.1 per unit Front Setback 0’ - 15’

Residential units are accessed through common entries serving most or all units via internal corridors. Unit sizes range from efficiencies to three-bedroom units to provide options to different families and lifestyles. Units can be rented or owned, although current market conditions strongly lean towards rental units for securing financing. Private outdoor space is primarily provided through balconies. Rooftop or ground level amenity spaces may provide public common spaces. Parking to support the needs of residents and businesses can most efficiently be provided through structured parking. Parking structures may be fully dedicated for private use or in conjunction with public needs. Structures may be directly attached, adjacent, or connected via walkways. West Gateway Master Plan

39

2025


INTRODUCTION

VISION

IMPLEMENTATION

COMMUNITY INPUT

ANALYSIS FINDINGS

Land Use: Mixed Use Office Mixed Use Office combines an activated ground floor with upper floors of commercial office space. The co-location of retail, food and beverage, and service establishments will benefit from mutual support, and ground floor businesses will energize the street.

MIXED USE OFFICE Regulation Stories 3-5 Parking 1 per 300 sf Front Setback 0’ - 10’

Responding to constricted demands for new suburban commercial office space, this land use envisions small- to medium-sized buildings, averaging 40,000 - 80,000 square feet. Locking in an anchor tenant will be key to securing financing. Mixed Use Office buildings should employ a balance of transparent glazing and high-quality building materials. In particular, ground floor facades should demonstrate high degrees of transparency.

West Gateway Master Plan

40

2025


INTRODUCTION

VISION

IMPLEMENTATION

COMMUNITY INPUT

ANALYSIS FINDINGS

Land Use: Hospitality The Hospitality Land Use establishes the opportunity for new boutique hotel or national hotel brand. This can include conferencing, amenities, and food and beverage offerings. Hospitality development provides an enticing and activated ground floor. This can be through hotel-serving uses–such as a lobby, fitness center, or dining space—or through typical publicly accessible retail, food and beverage, or service establishments.

HOSPITALITY Regulation Stories 4-6 1 per key + 1 per 400 sf Parking conference space Front Setback 0’ - 10’

Design should reflect the local character and quality of design; out-of-the-box corporate architecture will not fit in the West Gateway. Outdoor amenities may be provided alongside the street, on terraces, or a roofdeck. In particular, Hospitality is a prime opportunity for development oriented towards the White River and downtown. Parking to serve the hotel is best provided through structured parking. This can be attached or adjacent to the hotel and associated spaces. For more remote parking, an operator might consider providing valet service.

West Gateway Master Plan

41

2025


INTRODUCTION

VISION

IMPLEMENTATION

COMMUNITY INPUT

ANALYSIS FINDINGS

Land Use: Institutional Medical The Institutional Medical Land Use accommodates two distinct users: expansion of the Riverview Hospital and a consolidation of low density private care providers into purpose-built facilities in a walkable urban form. With a taller and deeper floorplate than other uses, medical office buildings are purpose-built for healthcare and life science demands. In the West Gateway, Institutional Medical uses front the street with a primary shared entrance and ground floor uses visible to passers-by. Ground floor tenants may be healthcare-oriented uses, such as a physical therapy providers or a pharmacy; or general retail, food and beverage, or service providers supporting employees, patrons, and nearby residents. Blank walls are beautified with plants, lighting, or artwork.

Residential Skilled Nursing The West Gateway also considers a new development for a modern skilled nursing facility. This would fall within the Institutional Medical land use, but with unique regulations and considerations to support the needs of residential care.

INSTITUTIONAL MEDICAL Regulation Stories 3-5 Parking 1 per 250 sf Front Setback 0’ - 10’

Most efficiently, parking is provided in structures. These may be shared by multiple users, such as the hospital and private care providers.

West Gateway Master Plan

42

2025


VISION

INTRODUCTION

IMPLEMENTATION

COMMUNITY INPUT

ANALYSIS FINDINGS

Land Use: Urban Open Space Urban Open Space is critical to the success of all other land use components. Urban Open Space provides communal places to gather and relief from the vertical built environment. Urban Open Spaces can take many forms, from functional stormwater park to public green to formal plaza to pocket park or community garden.

URBAN OPEN SPACE Regulation Stories Parking 0 or determined by the Director Front Setback 0’

New Urban Open Space should be designed with input from the community to serve specific needs or preferences. Small scale open spaces may be intended to serve local neighbors, arriving on foot while destination civic spaces may need to accommodate crowded special events and supply parking to support visitors.

West Gateway Master Plan

43

2025


VISION

INTRODUCTION

COMMUNITY INPUT

IMPLEMENTATION

ANALYSIS FINDINGS

Actions to Integrate a Network of Trails and Open Spaces Open spaces and trails are the connective tissue of the West Gateway vision, connecting the other big ideas. Just as vibrant, walkable districts attract residents, businesses, and visitors, access to nature and recreation opportunities play a significant role in where people chose to reside, thrive, and recreate. Planned and proposed trails will safely and directly connect the West Gateway to downtown, greater Noblesville, and neighboring and regional destinations. The White River, Federal Hill Commons, and Bridge of Flowers are existing anchors defining the West Gateway District’s east end. To the north is Forest Park. The district’s west end is anchored by Cicero Creek and Hague Road Nature Preserve. By re-imagining gateway corridors as green connectors with non-motorized trails and integrating new open spaces into future redevelopment, the West Gateway can provide opportunities to reside, thrive, and recreate with nature and open space just outside one’s front door.

CONNECT MULTI-USE PATHS AND LOW-STRESS LOCAL STREETS

N

CREATE NEW NATURE TRAILS ALONG CICERO CREEK

CREATE A CONNECTED CONSTELLATION OF OPEN SPACES APPLY PRINCIPLES OF TRAIL ORIENTED DEVELOPMENT es W d

el

tfi

Riverview Health

n

ga

Lo

d

a Ro

t

e re

St

Forest Park

Whi

Federal Hill Commons

te R

iver

CONSTRUCT A PED-BIKE BRIDGE OVER THE WHITE RIVER

West Gateway Master Plan

44

2025


INTRODUCTION

VISION

COMMUNITY INPUT

IMPLEMENTATION

ANALYSIS FINDINGS

Integrate a Network of Trails and Open Spaces 23. CONNECT MULTI-USE PATHS AND LOW-STRESS LOCAL STREETS.

Forest Park

Sh

eri

dan

Ro ad

38

Lakeview Drive

Nexus Apartments

ad

• Continue existing, planned investments for side paths along major east-west corridors.

N

Low-Stress Streets Multi-Use Paths & Trails Path/Trail Junction

Hague Road

Design Considerations

Non-Motorized Paths

River Ro

Multi-use paths connect regional trails to the West Gateway and Downtown Noblesville. Continuous paths, grade separated from vehicular traffic makes it easy for serious cyclists or casual riders to access Noblesville’s destinations. Low speed local streets create a low-stress network connecting from trails to multi-use paths to destinations.

Lo gan

Stree

t 19

Westfield Road

Riverview Health

Federal Hill Commons

38

ro Cice

a Ro

d

• Add north-south connections between east-west corridors. d Ro a yT ree err

River’s Edge Apartments

Ch

• Sign routes through low-stress local streets to further connect trails.

32 Mustard Seed

River Road

• Continue local practice of grade-separated side paths.

Dimensions of Wellness:

Non-Motorized Paths Regulating Plan West Gateway Master Plan

45

2025


INTRODUCTION

VISION

IMPLEMENTATION

COMMUNITY INPUT

ANALYSIS FINDINGS

Integrate a Network of Trails and Open Spaces 24. CONSTRUCT A PED-BIKE BRIDGE OVER THE WHITE RIVER. High vehicular volume and speeds along the narrow Westfield Road (SR-32) bridge restricts the comfort, safety, and ease of crossing the White River. A new bridge from Maple Avenue to a potential future redevelopment of the former Kahlo car lot provides a safe, convenient, and inspiring connection for people walking and rolling. Design Considerations • Connect from redevelopment at the Kahlo lot on the West bank to Maple Avenue and the East Bank development. • Shape future redevelopment around the bridge end points to facilitate safe, easy, convenient access. • Consider an iconic design, complementary to the Courthouse Clock Tower. • Limit obstructions in the river.

Dimensions of Wellness:

West Gateway Master Plan

46

2025


INTRODUCTION

VISION

IMPLEMENTATION

COMMUNITY INPUT

ANALYSIS FINDINGS

Integrate a Network of Trails and Open Spaces 25. CREATE A CONNECTED CONSTELLATION OF OPEN SPACES. Public open spaces are a melting pot, bringing together individuals from all walks of life. From small privately-owned public plazas to grand civic squares to intimate community gardens, open spaces nourish the body and soul with connections to the natural world and social ties. Design Considerations • Integrate public open spaces into each redevelopment area. • Provide a balance of civic greens, pocket parks, gardens, and plazas. • Explore ownership and maintenance options from the spectrum of private to public. • Design performance landscapes and stormwater infrastructure into open spaces.

Dimensions of Wellness:

West Gateway Master Plan

47

2025


INTRODUCTION

VISION

IMPLEMENTATION

COMMUNITY INPUT

ANALYSIS FINDINGS

Integrate a Network of Trails and Open Spaces 26. APPLY PRINCIPLES OF TRAIL-ORIENTED DEVELOPMENT.

27. CREATE NEW NATURE TRAILS ALONG CICERO CREEK.

Trail-Oriented Development (TrOD) offers a front door not only to streets but also to trails, connecting residents and patrons with trail-side destinations. Throughout most of the West Gateway, proposed non-motorized connections are multi-use paths or trails paralleling streets. However, in instances where trails or paths chart their own course, TrOD welcomes trail users.

Cicero Creek is an untapped asset in the West Gateway. While the White River is the star of the show, Cicero Creek is the understudy. The Creek and its wide, undeveloped floodplain offer an opportunity for nature trails balancing a vibrant downtown lifestyle and access to the respite of nature. Design Considerations

Design Considerations • Consider a node at Pleasant Street and the Midland Trace Trail.

• Explore connectivity from Pleasant Street to Sheridan Road, Hague Road Nature Haven.

• Look for opportunities to front a new Nixon Street trail connection to the White River Greenway.

• Integrate paths and educational signage, designed to accommodate flood events.

• Riverview neighborhood (Kahlo lot, Riverwalk Village). • Implement requirements for bike racks and other parking facilities.

Dimensions of Wellness:

West Gateway Master Plan

Dimensions of Wellness:

48

2025


INTRODUCTION

VISION

IMPLEMENTATION

COMMUNITY INPUT

ANALYSIS FINDINGS

Summary of Recommendations In total, the West Gateway vision takes shape through 27 recommended actions. Each action, covered on the previous pages, is listed below. Click on any action recommendation to jump back to its detail page. Read on to Chapter 3 to learn more about implementation strategies and potential outcomes. Connect to the White River.

Assemble a balance of land uses and scales. 13. Include a diversity of housing options.

1. Construct a nature boardwalk and trail along the river.

14. Transition from existing to new development.

2. Construct terraced river banks.

15. Embrace Riverview Hospital as an anchor.

3. Improve the boat launch at Forest Park.

16. Attract a new hospitality partner.

4. Create a new Pleasant Street boat launch.

17. Provide access to fresh and healthy foods.

5. Orient new development towards the river.

18. Attract a mix of venues for dining and gathering.

6. Transform Cicero Road.

19. Incorporate retail into ground floor spaces.

7. Redevelop responsibly in flood hazard areas.

20. Attract knowledge-based workplaces.

8. Capture stormwater on-site.

21. Embrace gathering places around recreation. 22. Right-size parking to support development.

Develop a walkable urban grid. 9. Create new Local and High Streets.

Integrate a network of trails and open spaces.

10. Reposition existing corridors as Green Avenues.

23. Connect multi-use paths and low-stress local streets.

11. Improve safety and ease for all modes of mobility.

24. Construct a ped-bike bridge over the White River.

12. Build performance landscapes into streets.

25. Create a connected constellation of open spaces. 26. Apply principles of Trail-Oriented Development. 27. Create new nature trails along Cicero Creek.

West Gateway Master Plan

49

2025


INTRODUCTION

West Gateway Master Plan

VISION

IMPLEMENTATION

COMMUNITY INPUT

3 49

ANALYSIS FINDINGS

Capital Improvement Projects

50

Private and P3 Redevelopment

53

Redevelopment Framework

54

Catalytic Sites

57

TIF Policy Considerations

67

Strategies for Inclusive Housing

69

2025


INTRODUCTION

IMPLEMENTATION

VISION

COMMUNITY INPUT

ANALYSIS FINDINGS

Recommended Projects

These projects reflect the recommended actions outlined in Chapter 2 of the plan. West Gateway Master Plan

38

Median, Striping, Pedestrian Improvements Pedestrian Bridge Public Improvements

N Forest Park

Road

Full ROW Construction

Lakeview Drive

Cicero

Sheridan Road Nixon Street

Reach 3 Stabilization

Logan Street John Street

Westfield Road Riverview Health

River Road

32

d

River’s Edge Apartments

Reach 1 Boardwalks

Reach 2 Terraces

Bike-Ped Bridge

err

yT ree

Ro a

Federal Hill Commons

Ch

The plan organizes potential improvements into two categories: publicly funded Capital Improvement Projects and those funded privately or through partnerships. Infrastructure such as streets, trails, and open spaces located within the redevelopment areas are generally categorized as private or P3-funded and are included in the redevelopment implementation tabulations.

Legend

Hague Road

This information is provided as a summary of projects that may qualify for inclusion in City or County Capital Improvement Plans. The West Gateway Master Plan outlines a bold vision for transformation that depends on a combination of public investment, private investment, and public-private partnerships (P3s). While most vertical real estate development is expected to be privately funded, the plan identifies public spaces and connecting infrastructure that may be integrated into municipal capital improvement programs or implemented through private or P3-led redevelopment efforts.

Recommended Projects 50

2025


INTRODUCTION

IMPLEMENTATION

VISION

COMMUNITY INPUT

ANALYSIS FINDINGS

Public and P3 Improvements PUBLIC IMPROVEMENTS White River Connections The plan’s vision of new connections to the White River describe new public amenities: the boardwalk, terraces, bike-ped bridge, and others. These projects will require large monetary commitments from the City and other stakeholders. Grant funding, from federal or state agencies can supplement local dollar commitments. Already, the City has pursued a U.S. Department of Transportation grant funding opportunity to take the first steps in design of the bike-ped bridge and boardwalks. Existing Streets + Multi-Use Paths/ Trails The plan envisions existing streets improved to best support multi-modal travel. This ranges from streets primarily improved behind the curb- retaining recent roadway investmentsand streets to be rebuilt for a consistent and complete right-of-way. These projects, on existing streets, can be completed by the City or County independent of vertical redevelopment.

West Gateway Master Plan

Most of the multi-use paths or trails included in this plan reflect improvements already planned or proposed by the City and County and referred to as “on-the-board” project. This means funding for some projects is already being considered or committed. Multi-use paths or trails that are within the right-of-way can be constructed as a public capital improvement project.

Multi-Use Paths or Trails Any new or improved multi-use paths or trails that are not accounted for as capital improvements can be constructed in conjunction with a future private redevelopment project as a developer contribution to the public good or through public funds contributed to the redevelopment costs. Open Spaces

P3 IMPROVEMENTS New Streets The plan calls for entirely new streets as well as a range of improvements to existing streets. The plan categorizes improvements to existing streets as capital improvements, and new streets to shape and serve future private redevelopment as private improvements. Public incentive contributions may help offset the design and construction costs for the new street and utility infrastructure, but these costs will be found grouped with the redevelopment site studies.

51

Similarly, the envisioned open spaces span a variety of scale, locations, and characteristics. Small parklets or plazas may be shaped as part of potential future private redevelopment, with the resulting area serving as a publiclyaccessible private property. Such open spaces can elevate the desirability and leasing value of the private development. Other open spaces, particularly larger properties or flood hazard areas, may be property acquired by the City or County and improved for public use.

2025


VISION

INTRODUCTION

IMPLEMENTATION

COMMUNITY INPUT

ANALYSIS FINDINGS

Capital Improvement Expenditures Cost estimates can assist in budgeting for capital improvements. The numbers presented below take a high level look at the costs of design and construction of the proposed capital improvement projects. These numbers, in 2024 dollars, include rough estimates for construction time and labor, demolition, earthwork, and utilities, soft costs, and contingency. These estimates should not supplant obtaining more detailed probable opinions of cost to budget and complete specific projects over time. Many unknown factors and economic conditions can vary the construction costs. The costs shown below represent a median estimate for planning and comparison purposes. Actual construction costs may vary up to 30%.

PUBLIC IMPROVEMENT

DESCRIPTION

White River Connections Reach 1 - Boardwalks Reach 2 - Terraces Reach 3 - Stabilization Bike-Ped Bridge Subtotal

Canopy walk with overlooks, boardwalk, multi-use path, stabilization, restrooms, and furnishings Terracing, pavilion, multi-use path, stabilization, restrooms, and furnishings Stabilization, multi-use paths, furnishings Bridge structure, landing plazas, and furnishings

Existing Street Improvements Westfield Street (SR-32) Logan Street Cicero Street (SR-19) Cicero Street (SR-19) Sheridan Road (SR-38) River Road Lakeview Street John Street Subtotal

Green Avenue A Green Avenue B + Multi-Use Path Local Street Flexible Street Green Avenue B Green Avenue B + Multi-Use Path Local Street Local Street

COST

Median, Striping, and Pedestrian Improvements Median, Striping, and Pedestrian Improvements Full ROW Reconstruction Full ROW Reconstruction Full ROW Reconstruction Full ROW Reconstruction Full ROW Reconstruction Full ROW Reconstruction

Cost (Millions) $13.6 $8.3 $1.7 $21.3 $44.9

Extents Mensa to Cicero River to Cicero Viaduct to Logan Logan to Conner River to Westfield Sheridan to Pleasant Logan to Westfield Logan to Westfield

Cost (Millions) $10.8 $9.5 $7.8 $11.6 $16.6 $3.6 $1.0 $61.0 $106.0

Public Improvement Total

West Gateway Master Plan

Linear Feet 3,500 3,400 1,200 500 3,300 4,000 1,400 400

Extents Riverview to Conner Conner to Logan Logan to Viaduct

52

2025


VISION

INTRODUCTION

IMPLEMENTATION

COMMUNITY INPUT

ANALYSIS FINDINGS

Private and P3 Redevelopment From Plan Making to Ground Breaking Documenting the collective vision in a master plan is only the first step to affecting change. This plan can guide investment as interest arises, but there are also actions the City and other stakeholders can take to spur private activity and bring to life the envisioned West Gateway. Below are several strategies for catalyzing private investment for future redevelopment. Land Acquisition

Infrastructure Investments

TIF Policy

Other

Noblesville would reduce total costs of potential future redevelopment by beginning to implement purchase options on properties in primary redevelopment areas/sites before announcing a development Request for Proposals (RFP) process. This could be conducted by a third-party entity.

Private developers evaluate feasibility by weighing lease/rental rates against costs of construction. If road and utility infrastructure is currently unavailable for a given site, the costs to make them available typically exceed what can be recovered with market-rate rent values.

Tax Increment Financing (TIF) allows the City of Noblesville to leverage new investment within the West Gateway to fund the infrastructure and amenities necessary to implement the development plan.

Private development can take time as developers carefully balance risk with new construction. Consider master-leasing building projects to guarantee rental revenue that would launch a project sooner than waiting for tenants to pre-lease a project.

Land acquired could then easily be sold or leased to developers for projects without complications arising from cost or timing negotiations.

Private investment in the West Gateway will be phased. The City of Noblesville will need to prioritize infrastructure and amenity investments that will induce additional capital investments from the private sector. City leaders must allocate resources among multiple priorities, including land acquisition, public infrastructure, amenities and developer incentives.

Noblesville could accelerate development activities by making strategic public infrastructure improvements to activate sites of interest. Infrastructure costs tend to scale by distance, so in a phased approach, sites closest to existing infrastructure would be the most cost effective to spur development at lowest cost of investment.

Specific attention will need to be directed to the technical details of implementing TIF value capture in order to maximize the ability to invest public funds into the site.

Parking garages may need to be publicly funded to accommodate density requirements.

West Gateway Master Plan

There is risk inherent in masterleasing, especially for product types that might be oversaturated. One approach might be to establish master-lease provisions with expirations that encourage or even reward developers for finding tenants quickly.

53

2025


INTRODUCTION

IMPLEMENTATION

VISION

COMMUNITY INPUT

ANALYSIS FINDINGS

Redevelopment Framework

West Gateway Master Plan

dan

Lakeview Drive

Related public improvements listed for each catalytic site include on-the-board projects, which are already being considered or planned by the City, and gateway plan projects, which are new ideas proposed in this plan.

eri

N

Ro ad

Forest Park

Site D 10.8 ac

38

Site F 8.9 ac

Site H

Site J

17.5 ac

8.9 ac

Lo gan

Site G

Site A 22.8 ac

Stree

t 19

8.4 ac

Westfield Road

Site C 18.2 ac

32

38

ro Cice

a Ro

d

Site B 9.0 ac

d Ch

err

yT ree

Ro a

Site E 15.4 ac

Federal Hill Commons

River Road

Sites A, B, and C are examined in closer detail as the primary catalytic sites. These sites are visualized with conceptual massings and development tabulations. Sites D through J use high-level calculations to generate similar tabulations for redevelopment potential. Redevelopment tabulations provide the basis for assessing building and infrastructure costs and revenue potential.

Sh

Hague Road

This Redevelopment Framework analyzes the future redevelopment potential of nine different sites in the West Gateway District and provides considerations on phasing, capital expenditures, and revenue. Over time, as opportunity and land owner interest arises, these sites are conceptualized for planning purposes to assure that the district is developed in a way that honors this plan, stakeholder input, and community values.

Redevelopment Framework Plan 54

2025

N


VISION

INTRODUCTION

IMPLEMENTATION

COMMUNITY INPUT

ANALYSIS FINDINGS

Redevelopment Framework The tabulations associated with all potential redevelopment sites reflect the big ideas of a walkable urban grid, interconnected open spaces, and balance of land use and scales; they also reflect the guidelines of the regulating plans found in Chapter 2 The potential future redevelopment imagined and visualized in Chapter 3 present one possible articulation of the vision set forth in Chapter 2. Future opportunities may manifest in a different form that still acheives the plan’s vision. These conceptual visualizations and tabulations are a tool for anticipating the potential future redevelopment and inspiring public and private investment.

West Gateway Master Plan

DEVELOPMENT Development Block

SITE A

SITE B

SITE C

SITES D - J

TOTAL

Gross Site Area (sf) Gross Floor Area (sf)

598,600

392,000

792,800

2,279,400

4,062,800

Residential Storefront Commercial

1,031,000 177,000

116,000 54,600

371,800 42,270

1,546,000 95,400

3,064,800

Commercial Office

-

-

-

464,000

464,000

Institutional - Medical Office

-

19,000

258,630

-

277,630

Institutional - Residential Care

-

-

-

99,000

99,000

Hotel Structured Parking

644,000

135,200 231,600

438,000

-

135,200

Subtotal Open Space New Residential Units

2,450,600 218,800

948,400 16,000

1,903,500 304,000

4,483,800 97,000

Multi-family + Flats (rented) Townhouse/ Condo (owned)

110 720

0 100

200 0

325 515

1,335

Total

830

100

200

840

1,970

55

369,270

1,313,600 9,786,300 635,800 635

2025


IMPLEMENTATION

VISION

INTRODUCTION

COMMUNITY INPUT

ANALYSIS FINDINGS

Qualifications Redevelopment Concepts Three catalytic sites are visualized with conceptual massings and development tabulations. The remaining potential future redevelopment sites use high-level calculations to generate similar tabulations for redevelopment potential. Redevelopment tabulations provide the basis for assessing building and infrastructure costs and revenue potential. These concepts illustrate one potential manifestation of redevelopment, aligned with the vision, action items, and regulating plans set forth in Chapter 2. Tabulations are constructed to represent a realistic development concept and generate comparable quantifications of future redevelopment potential, costs, and impacts. Redevelopment costs represent a median estimate for planning and comparison purposes. Actual construction costs may vary up to 30%. Property Tax Analysis Methodology Gross Assessed Value (GAV) was estimated using data from comparable properties within Hamilton County’s downtown municipal areas. Assessed value per square foot from the comparable properties was utilized to estimate the value of potential development within the West Gateway. Property tax liability was then calculated on the estimated assessed values. This process is visualized in the flow chart below. For residential properties, the same approach was applied on a per-unit basis for both multi-family and single-family developments.

Estimated Development SF*

x

*or per unit

Assessed Value (AV) Per SF *or per unit

=

Gross Assessed Value Less: Deductions

Net Assessed Value

x Tax Rate =

Gross Tax Liability

Less: Credits Less: Circuit Breaker

Compared Properties’ Improvement AV

÷

West Gateway Master Plan

Improvement Square Footage

=

Assessed Value (AV) Per SF

Net Property Tax Liability

56

2025


VISION

INTRODUCTION

IMPLEMENTATION

COMMUNITY INPUT

ANALYSIS FINDINGS

Catalytic Sites SITE A OVERVIEW Site A harnesses existing momentum at the neighboring Federal Hill Commons and leverages riverfront proximity for future redevelopment. Located closest to downtown, this site most closely replicates the energy and building forms of the traditional downtown.

A new urban format grocery store to replace the existing Kroger opens up much of the existing property for future redevelopment potential as a walkable activity center. The existing stormwater pond is reconfigured as a stormwater park, providing amenity space with functional performance. Townhouses/ condos edging the north and northeastern sides of the site transition to surrounding neighborhoods. West Gateway Master Plan

Federal Hill Commons

Lo

ga

Residential: Multi-family + Flats Residential: Townhouses/ Condos

sf

ac

DEVELOPMENT COST Vertical Development

Gross Site Area

598,600

22.8

Net Development Area

793,400

18.2

DEVELOPMENT TABULATIONS Site

nS

tre

et

Storefront Commercial Structured Parking

N

Several parking structures are necessary to support the new residents, employees, and visitors patronizing businesses and enjoying the White River. Where possible, shared parking garages optimize the cost and land area required.

The redevelopment concept removes development from the floodway, between Cicero Road and the river. The easternmost properties in the site have the greatest potential for high yields due to the proximity and views of the river and downtown. Connections to the river envisioned in the plan will drive the desirability for those properties.

TIF REVENUE USD (Millions)

TIF Capture Potential

USD (Millions)

Residential

$195.9

General Commercial

$0.5

Commercial Storefronts

$62.0

Medical Office

-

Structured Parking

$48.4

Multi-Family Residential

$2.3

Subtotal

$306.2

Parking

$0.7

Annual TIF Revenue

$3.5

Net Present Value (NPV)*

$49.9

Gross Floor Area

GFA (sf)

Residential

1,031,000

Storefront Commercial

177,000

Horizontal Development

Structured Parking

644,000

Streets + Utility Infrastructure

$18.7

Subtotal

1,852,000

Open Space

$13.1

Housing TIF Capture Potential

Open Space

218,800

Total Costs

$321.2

Single-Family Residential

$0.5

TIF Applicable Expenditures

$31.8

Housing TIF NPV*

$6.8

New Residential Units

Count

Townhouse/ Condo (owned)

110

Multi-family + Flats (rented)

720

Total

830

All numbers are conceptual and estimated. *Net Present Value of TIF capture over 25 years at 5% discount, at full buildout. 57

2025


INTRODUCTION

IMPLEMENTATION

VISION

COMMUNITY INPUT

ANALYSIS FINDINGS

Catalytic Sites NIXON STREET TRAIL

SITE A CONSIDERATIONS The Kroger parcel is the largest contiguous property in Site A. It is privately owned and leased to the grocery chain. The adjacent furniture store is the secondlargest parcel and contains most of the stormwater pond that serves the contiguous development. The properties flanking Cicero Road are largely held in common ownership, despite being separate parcels. Property control will be a key to unlocking redevelopment here.

SHARED PARKING GARAGE

Design + Phasing

We st

• The first phase will need to reconstruct the existing pond into a stormwater park serving future redevelopment.

• Ground floor uses should be located or designed to co-exist in the floodplain. • Phase in a new urban format grocery store before decommissioning the existing grocery store.

URBAN FORMAT GROCERY Federal Hill Commons

dR oad

STABILIZED RIVER BANK

TERRACED RIVER LANDING

fiel

(SR -32

Lo

ga

R-19) Road (S Cicero

)

Residential: Multi-family + Flats Residential: Townhouses/ Condos

nS

tre

et

Storefront Commercial Structured Parking

N

• Regulations may be more restrictive in the eastern portion of the site that is located within the floodway.

Forest Park

STORMWATER PARK

RELATED PUBLIC IMPROVEMENTS On-the-Boards Projects:

Gateway Plan Projects:

• Construct multi-use path or trail along Logan Street. • Construct multi-use path or trail connection along Nixon Street to White River Greenway. • Construct roundabouts on Logan Street.

• Reposition Logan Street as Green Avenue B. • Re-imagine SR-19 (Cicero Road) to connect to the White River. • Stabilize river banks and construct terraced landing.

• Future redevelopment blocks can provide interim surface parking. West Gateway Master Plan

58

2025


VISION

INTRODUCTION

IMPLEMENTATION

COMMUNITY INPUT

ANALYSIS FINDINGS

Catalytic Sites Riverside Cemetery

SITE B OVERVIEW

e hit

er Riv

Riverview Hospital

W

West Gateway Master Plan

DEVELOPMENT TABULATIONS Site

sf

ac

Gross Site Area

392,000

9.0

Net Development Area

298,600

6.9

Residential: Multi-family + Flats Storefront Commercial Hotel

DEVELOPMENT COST Vertical Development

N

New residential buildings embrace the presence of the river and activate the landings of the boardwalk and bike-ped bridge.

t

Adjacent to the hospital, property is retained for medical offices or hospital expansion, nearest to the existing surgery pavilion. A shared parking garage would support the varied uses.

Westfield Road (SR-32)

nS

This site aggregates several unique uses activate the riverfront and Westfield Road. A boutique hotel overlooking the river can serve local tourism, traveling professionals, and hospital patrons. The base of the building can provide a new home to the Riverview Health Rehab + Fitness in a healthcare and community-based model. A community co-op grocery can offer fresh, healthy foods to new and existing residents.

Public space improvements activating the riverfront at this site should be designed and constructed sensitively to the existing landscape and use plantings, materials, and infrastructure techniques that preserve and protect the riverbank and the existing tree canopy as a natural asset.

xo Ni

The proximity of Site B to the White River, Federal Hill Commons, and Riverview Hospital positions it for impactful future redevelopment potential. Riverview Hospital (Hamilton County) ownership further enables short-term redevelopment.

Medical Office Structured Parking

TIF REVENUE USD (Millions)

TIF Capture Potential

USD (Millions)

Gross Floor Area

GFA (sf)

Residential

$22.0

General Commercial

$0.1

Residential

116,000

Commercial Storefronts

$21.2

Medical Office

$0.1

Storefront Commercial

54,600

Medical Office

$8.6

Hotel

$0.3

Medical Office

19,000

Hotel

$56.3

Multi-Family Residential

$0.4

Hotel

135,200

Structured Parking

$17.8

Parking

$0.2

Structured Parking

231,600

Subtotal

$125.9

Annual TIF Revenue

$1.1

Subtotal

556,400

Net Present Value (NPV)*

$15.5

Open Space

16,000

Horizontal Development Streets + Utility Infrastructure

$5.2

Housing TIF Capture Potential

New Residential Units

Count

Open Space

$1.0

Single-Family Residential

-

Townhouse/ Condo (owned)

0

Total Costs

$132.1

Housing TIF NPV*

-

Multi-family + Flats (rented)

100

TIF Applicable Expenditures

$6.2

Total

100

All numbers are conceptual and estimated. *Net Present Value of TIF capture over 25 years at 5% discount, at full buildout. 59

2025


INTRODUCTION

IMPLEMENTATION

VISION

COMMUNITY INPUT

ANALYSIS FINDINGS

Catalytic Sites The two properties that comprise the former Kahlo Car Lot are owned by Riverview Hospital (Hamilton County). The envisioned potential future redevelopment includes medical office and a boutique hotel on an activated ground floor base housing the Riverview Health Rehab + Fitness and a community co-op grocery.

Riverside Cemetery

i

eR

BIKE-PED BRIDGE LANDING

it Wh

RIVERVIEW HEALTH REHAB + FITNESS Residential: Multi-family + Flats Storefront Commercial

COMMUNITY GROCERY CO-OP

St

West Gateway Master Plan

SHARED PARKING

Westfield Road (SR-32) n xo

• Future redevelopment should include inviting connections to boardwalk and bike-ped bridge landings and through the site from the boardwalks and footbridges to Federal Hill

PARKING AND AMENITY DECK

Ni

• Ground floor uses should be located or designed to co-exist in the floodplain.

Riverview Hospital

FUTURE HOSPITAL EXPANSION

The existing Riverwalk Village nursing home is privately owned and operated, since 1965. As it reaches the end of its functional life and the function is modernized and relocated elsewhere in the West Gateway District, the property can redevelop. Design + Phasing

BOARDWALK TRAILHEAD

ver

Hotel Medical Office

Structured Parking

N

SITE B CONSIDERATIONS

Commons.

RELATED PUBLIC IMPROVEMENTS

Gateway Plan Projects: • Re-imagine Cicero Road (SR-19) to connect to the White River.

On-the-Boards Projects: • Construct intersection improvements at Cicero Road (SR-19) and Westfield Road (SR-32), prioritizing pedestrian crossings and enhancements.

60

• Construct a nature boardwalk along the White River. • Construct a bike-ped over the White River to downtown. • Reposition existing Westfield Road (SR-32) corridor as Green Avenue A. 2025


VISION

INTRODUCTION

IMPLEMENTATION

COMMUNITY INPUT

ANALYSIS FINDINGS

Catalytic Sites SITE C OVERVIEW d oa rR

Riverview Hospital

DEVELOPMENT TABULATIONS Site

sf

ac

Gross Site Area

792,800

18.2

Net Development Area

566,300

13.0

Westfield Road (SR-32)

Residential: Multi-family + Flats Residential: Townhouses/ Condos Storefront Commercial

Gross Floor Area

GFA (sf)

Residential

371,800

Storefront Commercial

42,270

DEVELOPMENT COST Vertical Development

Medical Office

258,630

Structured Parking

N

Leveraging the adjacency to Riverview Hospital, the potential redevelopment concept supports future hospital needs with medical offices and parking structures, and looks to consolidate disparate healthcare providers from the within the West Gateway District into purpose-built medical office buildings.

A central park can house new community amenities in support of medical staff and patients, business patrons, and residents.

ve Ri

Noblesville Square Shopping Center is predominantly publicly owned and under-utilized as a retail center, making it an optimum future redevelopment site. A new east-west street provides a connection from River Road and the new Pleasant Street corridor as a additional route to the hospital.

General Commercial Medical Office Structured Parking

TIF REVENUE USD (Millions)

TIF Capture Potential

USD (Millions)

Residential

$70.6

General Commercial

$0.1

438,000

Commercial Storefronts

$14.8

Medical Office

$1.3

Subtotal

1,110,700

Medical Office

$116.4

Multi-Family Residential

-

Active uses in the ground floors of the medical office buildings can support street life and connectivity and offer convenience retail or dining options for employees, visitors, and neighboring residents.

Open Space

304,000

Structured Parking

$32.9

Parking

$0.5

Subtotal

$234.7

Annual TIF Revenue

$1.8

Net Present Value (NPV)*

$26.0

By providing consolidated, compact medical offices, the remainder of the site can be developed into transitional housing - a mix of walk-up style apartments and townhouses/ condos.

West Gateway Master Plan

New Residential Units

Count

Townhouse/ Condo (owned)

200

Horizontal Development

Multi-family + Flats (rented)

0

Streets + Utility Infrastructure

$13.4

Housing TIF Capture Potential

Total

200

Open Space

$7.3

Single-Family Residential

$0.8

Total Costs

$255.4

Housing TIF NPV*

$11.7

TIF Applicable Expenditures

$20.7

All numbers are conceptual and estimated. *Net Present Value of TIF capture over 25 years at 5% discount, at full buildout. 61

2025


INTRODUCTION

IMPLEMENTATION

VISION

COMMUNITY INPUT

ANALYSIS FINDINGS

Catalytic Sites SITE C CONSIDERATIONS SHARED PARKING

The majority of Site C is publicly owned by Riverview Hospital (Hamilton County). Only the four outlots fronting Westfield Road are privately owned.

• Blank walls should be activated with living walls, lighting installations, and/or artwork. • Ground floor uses should activate the streets with mutual visibility, building articulation, and operable storefronts. • Building massings should create sight-lines to the existing hospital and emphasize wayfinding for patients.

West Gateway Master Plan

Riverview Hospital

FUTURE HOSPITAL EXPANSION

Westfield Road (SR-32)

Residential: Multi-family + Flats Residential: Townhouses/ Condos

Storefront Commercial General Commercial

Medical Office Structured Parking

N

• Structured parking is necessary to support the high intensity of medical offices.

WALK-UP FLATS

d oa rR

• Existing Noblesville Square shopping center might be demolished in phases as existing tenants are relocated to new spaces in the site or West Gateway District.

TOWNHOUSES/ CONDOS

ve Ri

Design + Phasing

STORMWATER INFRASTRUCTURE

NOBLESVILLE SQUARE PARK

RELATED PUBLIC IMPROVEMENTS On-the-Boards Projects:

Gateway Plan Projects:

• Construct multi-use path or trail along Westfield Road (SR-32).

• Reposition existing Westfield Road (SR-32) corridor as Green Avenue A. • Reconstruct River Road as Green Avenue B with multi-use path or trail.

62

2025


VISION

INTRODUCTION

IMPLEMENTATION

COMMUNITY INPUT

ANALYSIS FINDINGS

Redevelopment Potential SITES D-J OVERVIEW Site

Site F 8.9 ac

sf

ac

Gross Site Area

2,279,400

69.9

Net Development Area

2,279,400

52.3

Site D 10.8 ac

Site H

Site J

17.5 ac

8.9 ac

Westfield Road

Site G 8.4 ac

32

GFA (sf)

Residential

1,546,000

Storefront Commercial

95,400

Site G and H are envisioned to host a concentrated few commercial office buildings and medical office buildings. Additionally, Site H is identified as the location for a potential compact, urban form of residential skilled care to modernize and replace the aging privately run Riverwalk Nursing Home in Site B.

Commercial Office

464,000

Residential Skilled Care

99,000

Sites E and J transition from the vibrant intensity of the Gateway’s eastern end towards more subdued surroundings. Site E has opportunities for a Trail-Oriented Development node.

Structured Parking

Federal Hill Commons o Ro r

e

Cic

38

River Road

Gross Floor Area

19

ad

DEVELOPMENT TABULATIONS Hague Road

Sites D-J further the vision for the West Gateway through a mix of housing, office space, and medical offices. Currently host to many one-story, auto-oriented businesses, the redevelopment potential of these sites harnesses multi-story, street-fronting development to shape a walkable and vibrant district.

N

Forest Park

38

Site E 15.4 ac

Pleasant Street

-

Subtotal

3,063,000

Open Space

97,000

New Residential Units

Count

Townhouse/ Condo (owned)

DEVELOPMENT COST Vertical Development

TIF REVENUE USD (Millions)

TIF Capture Potential

USD (Millions)

Residential

$293.7

General Commercial

$0.5

Commercial Storefronts

$33.4

Medical Office

$0.4

325

Commercial Office

$208.8

Multi-Family Residential

$2.3

Multi-family + Flats (rented)

515

Residential Skilled Care

$44.5

Parking

-

Total

840

Structured Parking

-

Annual TIF Revenue

$3.2

Net Present Value (NPV)*

$44.5

Subtotal

$580.4

Housing TIF Capture Potential

Horizontal Development Streets + Utility Infrastructure

$42.2

Single-Family Residential

$1.4

Open Space

$5.8

Housing TIF NPV*

$23.0

Total Costs

$628.4

TIF Applicable Expenditures

48.0 All numbers are conceptual and estimated. *Net Present Value of TIF capture over 25 years at 5% discount, at full buildout.

West Gateway Master Plan

63

2025


IMPLEMENTATION

VISION

INTRODUCTION

COMMUNITY INPUT

ANALYSIS FINDINGS

Potential Revenue + Expenditures In total, projected TIF revenue—as a Net Present Value over 25 years at 5% discount, at full buildout—exceeds the estimated conceptual infrastructure (streets and utilities) and open space costs when compared site by site. However, when Capital Improvement Projects are added to the equation the total potential revenue falls short of covering all public TIF-eligible improvements.

TIF Applicable Expenditures - by Site TIF Applicable Costs - By Site Infrastructure Costs Open Space Costs Site A Site A

TIF Revenue - by Site

Sites DD-J -J Sites

$0

10.0

$20

20.0

$30 30.0 Millions

Infrastructure Costs

$40

40.0

$50

$60

50.0

$37.7

Sites DD-J -J Sites

$48.0 $10

$15.5

Site C Site C

$20.7

0.0

$56.7

Site B Site

$6.2

Site CC Site

Housing TIF Revenue

Site A Site A

$31.8

Site BB Site

TIF Revenue - By Site

TIF Revenue

$67.5

$0 0.0

60.0

$10 10.0

$20 20.0

$30 30.0

$40 40.0 Millions

TIF Revenue

Open Space Costs

$50 50.0

$60 60.0

$70 70.0

80.0

Housing TIF Revenue

Total Expenditures vs Revenue

Total Costs vs Revenue Potential

Redevelopment Total - $106.7 Expenditures Total Expenditures

Street Improvements - $49.7

Riverfront - $44.9

Revenue Total Revenues

Millions

$0 0

Site B

TIF Revenue - $135.9

$20

$40

50

$60

Site C

Sites D-J

Housing TIF Revenue - $41.5

$80 Riverfront Connections

West Gateway Master Plan

Site A

$100 100

$120

Street Improvements

Site A

64

Site B

$140

150

$160

Site C

Sites D-J

TIF

$180

$200 200

Housing TIF

2025


IMPLEMENTATION

VISION

INTRODUCTION

COMMUNITY INPUT

ANALYSIS FINDINGS

Gross Assessed Value at Full Buildout The full buildout of the West Gateway is estimated to generate approximately $580 million in new assessed value. Development will occur in phases as sites become available and developers show interest in investing in the West Gateway. The charts below illustrate a projection of the assessed value expected from this investment. While the timing of buildout will vary, the timeline of assessed value accumulation is a critical factor in implementing TIF value capture to maximize revenue.

ILLUSTRATIVE GROSS ASSESSED VALUE ACROSS 20 YEARS

ESTIMATED TOTAL GROSS ASSESSED VALUE

$578.6 M

$225.2 M

Millions

$177.7 M

$188.0 M

$400 $400

$150.7 M

$84.7 M

$200 $200

$27.1 M $41.8 M

$108.4 M

Total Gross Assessed Value [GAV] at Full Buildout

West Gateway Master Plan

Full

Full Buildout Buidout

Year20 20 Year

Year19 19 Year

Year Year18 18

Year17 17 Year

Year16 16 Year

Year15 15 Year

Year99 Year

Year77 Year

Year66 Year

Sites D-J Site D-J

Year55 Year

Site C Site C

$177.6 M

$148.7 M

$119.7 M

$88.9 M

$58.0 M

$29.0 M

Year44 Year

Site B Site B

$0 $0

Year33 Year

$32.1 M

$28.9 M

Year22 Year

Site A Site A

$68.3 M

Year11 Year

$12.9 M $44.7 M

$20.9 M

$100 $100

$41.8 M

Year88 Year

$38.3 M $50 $50

$41.8 M

Year14 14 Year

$65.7 M

$134.0 M

$110.5 M

$87.1 M

$43.6 M

Year13 13 Year

$100 $100

$54.2 M

Year12 12 Year

$94.7 M

$102.5 M

$300 $300

Year Year11 11

$134.0 M

Year10 10 Year

$150 $150

Millions

Millions

Site D-J

$500 $500 $225.2 M

$0 $0

Site C

Site B

$600 $600

$250 $250

$200 $200

Site A

$700 $700

Millions

General Commercial Owner-Occupied Single-Family Commercial Multi Family

Development Phased Over 20 years

65

2025


IMPLEMENTATION

VISION

INTRODUCTION

COMMUNITY INPUT

ANALYSIS FINDINGS

Annual Property Tax Liability At full buildout, the West Gateway is projected to generate $12.3 million in annual property tax liability. Property tax revenue captured within a TIF district will accrue gradually as development progresses. Since the buildout will occur in phases, careful consideration of TIF implementation timing is essential to maximize property tax revenue capture.

ESTIMATED ANNUAL PROPERTY TAX LIABILITY

$4.6 M

$1.6 M

Property Tax Liability at Full Buildout

West Gateway Master Plan

Full

Property Tax Liability Resulting from Phased Development

66

Full Buildout Buildout

Year20 20 Year

Year19 19 Year

Year18 18 Year

Year17 17 Year

Year16 16 Year

Year15 15 Year

Year14 14 Year

Sites D-J Site D-J

Year13 13 Year

Site C Site C

$1.5 M

$0.7 M

$0

Year99 Year

Site B Site B

$0

Year77 Year

$0.9 M

$0.8 M

$4.0 M

$3.4 M

$2.7 M

$2.1 M

Year66 Year

$1.8 M

Year55 Year

Site A Site A

$2 $2

Year44 Year

$0.3 M $1.2 M

$0.5 M

$1.4 M

$1.1 M

$1.1 M

$1.1 M

Year33 Year

$0.5 M

$4 $4

Year12 12 Year

$0.8 M

$2.7 M

$2.4 M

$2.1 M

$1.0 M

$0.7 M $0.3 M

Year11 11 Year

$2.6 M

Year88 Year

$2.3 M

$6 $6

Year10 10 Year

$2.3 M

Year22 Year

$0.0

$2.5 M

$8 $8

$4.0 M

$1.0

$0.0

$4.5 M $3.5 M

$1.0

$0.5 $0.5

$12.3 M

Year11 Year

$1.5 $1.5

Site D-J

$12 $12

Millions

Millions

$3.0 $3.0 $2.5 $2.5 $2.0 $2.0

Site C

Site B

$10 $10

Millions

$5.0 $5.0 $4.5 $4.5 $4.0 $4.0 $3.5 $3.5

Site A

$14 $14

Millions

General Commercial Owner-Occupied Single-Family Commercial Multi Family

ILLUSTRATIVE PROPERTY TAX TIME SERIES

2025


VISION

INTRODUCTION

IMPLEMENTATION

COMMUNITY INPUT

ANALYSIS FINDINGS

TIF Policy Considerations The West Gateway directly overlaps with three existing TIF districts: the Noblesville Downtown, Village at Federal Hill, and Nexus TIF districts. Existing TIF districts within the site can complicate the implementation process but does not preclude new TIF capture.

New development will happen in phases so the full amount of revenue capture will not be immediately available. Matching various TIF expenditures with each phase of development will be important to maximize the investment of public funds and catalyze further development.

TIF districts expire 25 years after the first bond payment is made, limiting the capture duration of any new investment. Amending an existing TIF to create a new TIF district establishes a new expiration timeline for the new area. This also resets the base assessed value of the new TIF area to the net AV at the time it is created. Due diligence is required to identify and mitigate any complications or interactions with existing TIF backed bonds.

West Gateway Master Plan

N

Noblesville TIF Village at Federal Hill East Bank Levinson Nexus

38

Forest Park

19

Westfield Road

32

Ro ro

e Cic

38

TIF Expenditures River Road

Special attention should be given to creating a strategic TIF implementation plan that maximizes TIF capture while maintaining any bond backing or debt service requirements of existing TIFs.

Legend

ad

TIF Phasing

Hague Road

Existing TIFs and Modifications

Revenue collected from TIF districts can be spent in a number of different ways but can ultimately only be spent once. Potential TIF expenditures include land acquisition, road infrastructure, utility infrastructure, amenities, and developer incentives. A value maximizing implementation process will require strategic prioritization of TIF spending to induce further capital investment.

Pleasant Street

Existing TIF Districts

67

2025


INTRODUCTION

VISION

IMPLEMENTATION

COMMUNITY INPUT

ANALYSIS FINDINGS

TIF Policy Considerations Standard vs. Residential TIF

POTENTIAL TIF REVENUE BY TYPE

Conventional TIF districts capture the increment assessed value of commercial and industrial classed properties under the 3% circuit breaker cap.

Standard TIF Revenue Additional Revenue from Residential TIF

Recent regulatory changes allow for ‘Residential TIFs’ that can capture the increment assessed value of residential properties under the 1% circuit breaker.

Millions

$5.0 $5.0

$4.0 $4.0

Alternate Funding Sources

$4.0 M $1.4 M

$0.5 M

$3.5 $3.5 $3.0 $3.0

Millions

The TIF revenue generated from development within the West Gateway is not expected to cover all the infrastructure and capital investment costs. Additional funding sources could include State and Federal grants, road impact fees, Economic Improvement Districts (EID), and the municipal capital budget. Noblesville already has precedent for impact fees, generating $8.1 million in road impact fees between 2020 and 2023.

$4.6 M

$4.5 $4.5

$2.6 M

$2.5 $2.5 $0.8 M $2.0 $2.0

$3.5 M

$3.2 M

$1.5 $1.5

$1.1 M

$1.0 $1.0

$1.8 M $1.1 M

$0.5 $0.5 $0.0 $0.0

Site AA Site

Site BB Site

SiteCC Site

SitesD-J D-J Site

Annual Revenue at Full Buildout

West Gateway Master Plan

68

2025


INTRODUCTION

IMPLEMENTATION

VISION

COMMUNITY INPUT

ANALYSIS FINDINGS

Strategies for Inclusive Housing HOUSING COSTS AND STRATEGIES Accounting for below market rate housing is integral to implementing the vision of the West Gateway. Housing and Jobs is one of the dimensions of the concept of a district that will cultivate wellness for residents and visitors. Access to safe, stable, and cost-attainable housing is a foundation to physical, mental, and emotional wellness. The dimension of Community also calls for housing of varied sizes, types, and price points. It is through this variety that the Gateway District, and Noblesville as a whole, can foster a sense of belonging for all. Beyond the direct connections to housing in the vision, the desire for retailer and restaurant establishments throughout the district requires this mix of housing price points in order to sustain the retail and service industry workforce. As the 2016 Noblesville Housing Study and the 2022 Hamilton Housing Needs Assessment identified, workers in some of Noblesville’s fastest growing industries are lower wage earners, potentially categorizing them below the area median income. Just as workers in the knowledge-based industry seek to live in relative proximity to their jobs and interests, so too are service workers driven by such preferences. Housing at an attainable price point for service workers is necessary to support a robust and thriving district with vibrant ground floor storefronts.

West Gateway Master Plan

Conventional home economics determines that housing costs in the modern economy should be no more than one third of household gross monthly income. Households paying greater than one third of their gross monthly income are considered housing burdened. For Noblesville, the median area median income (AMI) is $46,600 for individuals, $99,400 for households. Therefore, in the Noblesville market, attainable housing- that is, housing which is within the one-third of income margin- is roughly $1,300 – $2,700 per month. This is the amount an individual or household can reasonably pay for rent and utilities or a mortgage, plus utilities and associated costs such as HOA fees. By definition, AMI is the median income; 50% of area residents earn above and 50% earn below that. Therefore, Noblesville needs to consider housing at price points below the median income, while market rates typically target residents with spending power above the median income.

The next tier, 50% AMI earners, includes workers in retail and service industries who earn above minimum wage. (For context, an individual making minimum wage and working a full work week would earn $15,000 annually, respectively 30% Noblesville AMI.) These two brackets will be used in exploring and recommendations to consider incorporating attainable housing in the West Gateway District. For the West Gateway District, several strategies are best provided for incorporating housing attainable to those earning at or below AMI. These can be used independently or in combination to maximize opportunities. The menu of strategies are described on the following pages.

When considering brackets of earners making below the median income, two typical categories are 80% AMI and 50% AMI. In discussion of housing, 80% AMI earners of often referred to as “workforce.” Most often this description targets civil servants, teachers, and first responders who play a critical role in the success of the community through their chosen vocation.

69

2025


INTRODUCTION

VISION

IMPLEMENTATION

COMMUNITY INPUT

ANALYSIS FINDINGS

Strategies for Inclusive Housing Land Banks

Community Land Trusts

Downpayment Assistance Programs

Land banks are a tool used by cities, non-profits, and private developers to hold, prepare, and position property for redevelopment and economic development. There are many success stories of land banks being used in Indiana to revitalize underutilized or vacant properties in cities in the state. Cities often set up land banks in collaboration with local redevelopment commissions, county assessors, and other entities to legally acquire properties for redevelopment. Land banks may be used in combination with complementary strategies, such as redevelopment strategies as in this plan and Community Land Trusts, Downpayment Assistance Programs, and workforce and attainable housing provisions within Tax Increment Financing (TIF) projects, explored within this summary.

Community land trusts are typically non-profit organizations that work with cities to position and hold properties to maintain real estate for the workforce and attainable housing, especially in real estate markets such as Hamilton County, where housing costs are at a premium. While the State of Indiana has not passed specific legislation allowing for tax benefits for community land trusts, there is growing support for these entities within Central Indiana and the Indiana State Legislature. While no benefits exist other than those assigned to a non-profit, several successful community land trusts operate in the state.

Downpayment assistance programs are used to encourage and increase the percentage of home ownership in communities. Cities work with entities such as the Indiana Community Development Authority (IHCDA) to provide financial aid through grants or no-interest loans to first-time homebuyers for downpayment and closing costs. Some cities allow this program to be used for home rehabilitation, such as roofing, HVAC, and/or ADA accessibility adaptation.

For example, Goshen, Indiana, has a successful example of a project that utilized land banking to support the Hawks Development, led by LaCasa, a local attainable housing developer. The Hawks Development provided affordable homes for artists and entrepreneurs and incorporated green spaces and mixed-use elements, helping revitalize the neighborhood and attract new residents. LaCasa’s project demonstrates how land banking can create long-term, sustainable development while fostering community stability. https://lacasainc.net/project/thehawks/ West Gateway Master Plan

Typically, community land trusts operate in the following way: the community land trust purchases land, which remains in the trust in perpetuity, while a prospective developer or homebuyer finances only for the structure of the land. The property remains affordable because the developer or homebuyer agrees to sell the property only to another income-qualifying household.

State and local dollars are often paired with Community Development Block Grant (CDBG) dollars and matches from the philanthropic community for these efforts. For example, East Chicago, Indiana has paired state and local dollars with gaming tax revenues to support its downpayment assistance programs with a maximum of $25,000 for new homes and $10,000 for rehabilitation. https://www.eastchicago.com/244/ Home-Ownership-Program

For example, the Summit Hill Community Land Trust in Bloomington, Indiana, is managed by a non-profit in collaboration with the Bloomington Housing Authority. This program provides attainable housing while maintaining long-term community ownership and stability. https://bhaindiana.net/shcdc/land-trust/

70

2025


INTRODUCTION

IMPLEMENTATION

VISION

COMMUNITY INPUT

ANALYSIS FINDINGS

Strategies for Inclusive Housing Inclusive Housing Opportunities The West Gateway Master Plan conceptualizes approximately 1,970 new housing units; 635 in combined units buildings (walk-up flats and corridor building) and 1,335 in townhouses. In context of the scale of each identified redevelopment site, this plan proceeds with the assumption that all the new housing would be developed in projects with a minimum of 10 units. This is a recommended threshold for requiring the incorporation of housing below market rate: any new development- or expansions of existing developments- which propose to construct 10 housing units or more, encompassing all formats of housing units (townhouses, duplex townhouses, flats, corridor buildings; for rent or for sale). To preserve existing naturally occurring affordability or variety on the market, Noblesville might also consider requiring the incorporation of below market rate units in existing developments repositioning existing assets through extensive renovation (defined as costs totaling equal to or greater than 50% of real estate value – align to other applicable definitions existing in zoning or building ordinances) or transition from a rental to for-sale model or vice versa.

West Gateway Master Plan

Using a measured approach, the plan recommends a requirement that new residential developments, meeting the requirements stated above, provide: • a minimum of 8% of the total unit count priced for households earning 80% AMI; and

A more tenacious approach might require that new residential developments, meeting the requirements stated above, provide: • a minimum of 15% of the total unit count priced for households earning 80% AMI; and • a minimum of 5% of the total unit count priced for households earning 50% AMI.

• a minimum of 2% of the total unit count priced for households earning 50% AMI.

As an example, Site B conceptualizes 100 new units in a corridor building (multi-family). The table below demonstrates the two approaches side by side for Site B and for the entire conceptual redevelopment of the West Gateway.

AFFORDABLE UNIT REQUIREMENTS Site B Example Measured Approach Tenacious Approach Total Gateway Concept Measured Approach Tenacious Approach ASSOCIATED HOUSEHOLD EARNINGS Individual Annual Gross Income Monthly Housing Costs Household Annual Gross Income Monthly Housing Costs

71

Total Count

Market Rate

80% AMI

50% AMI

100 100

90 70

8 15

2 5

1,970 1,970

1,772 1,575

158 296

40 99

$46,600 $1,300

$37,280 $1,000

$23,300 $650

$99,400 $2,700

$79,520 $2,200

$49,700 $1,350

2025


INTRODUCTION

VISION

IMPLEMENTATION

COMMUNITY INPUT

ANALYSIS FINDINGS

The West Gateway District will cultivate wellness for residents and visitors through the dimensions of:

COMMUNITY

HEALTHCARE

Fostering social networks and a sense of belonging

Ensuring stability and quality of life for all residents

Optimizing personal health and vitality

NATURE

NOURISHMENT

Anchoring urban life with natural surroundings

Providing access to fresh and healthy foods

ECOSYSTEMS

MOVEMENT

Stewarding balance in our natural environment

Incorporating movement into daily life and recreation

West Gateway Master Plan

HOUSING + JOBS

72

2025


INTRODUCTION

West Gateway Master Plan

VISION

COMMUNITY INPUT

IMPLEMENTATION

Engagement Overview

70

Identifying Existing Anchors

72

Visioning A Unique, Vibrant District

74

Identifying Movement Patterns

76

Visioning Connections to the River

78

69

4

ANALYSIS FINDINGS

2025


INTRODUCTION

VISION

IMPLEMENTATION

COMMUNITY INPUT

ANALYSIS FINDINGS

Engagement Overview The West Gateway Master Plan was shaped by input from the Noblesville community. Community members contributed by setting a vision for the future, mapping challenges and opportunities, and weighing in on their priorities. Planning team members met with the community at pop-up events—First Friday and Farmers Markets—and extended their reach through online survey tools. Throughout the planning process, representatives of stakeholder organizations met in groups to share their insights, and an Advisory Committee of City Staff representing various City departments steered the team towards achievable action items. This chapter reports in-depth on the findings from community members.

West Gateway Master Plan

70

2025


INTRODUCTION

VISION

IMPLEMENTATION

COMMUNITY INPUT

ANALYSIS FINDINGS

Engagement Overview “Add businesses & restaurants that are family focused. River boardwalk area that would be enjoyable for all ages and abilities.”

The planning process included several ways to engage with the local community:

“Would love to see entire Kroger area redeveloped in a more urban model.”

• The planning team conducted a series of stakeholder roundtable meetings, hearing from representatives with a vested interest in the plan area and have the potential— through land ownership and/ or capital investment—to affect changes recommended in the plan. • An online survey asked open-ended questions and used maps to collect information from participants about current habits and a vision for the future.

“Please bring more walking paths, a park with lots of trees and plants, and more sit-down restaurants with outside seating & healthy options.” “Walkable areas, better grocery option, more park/green space.”

• The planning team connected with community members during a pop-up event at the April First Friday in the Courthouse Square. Participants answered similar questions about current habits and a vision for the future, and were directed to the online survey.

West Gateway Master Plan

“I would love to see more green space, trees, and new development that is closer to the historic downtown in aesthetic.”

71

“Make it walkable. Connecting it to other areas in a way that cars are not required to get there. We need more connectivity in Noblesville.” 2025


COMMUNITY INPUT

IMPLEMENTATION

VISION

INTRODUCTION

ANALYSIS FINDINGS

Identifying Existing Anchors WHAT BRINGS YOU TO THE DISTRICT TODAY? “Work at Noblesville Schools”

“Kroger — grabbing a few items Chase — for banking Great clips — haircut!” “I come here for food, gas, and shopping occasionally.”

I WORK HERE 22 mentions

“Ice skating/play at park.”

RECREATION 22 mentions

SHOPPING + ERRANDS

ENTERTAINMENT + SPECIAL EVENTS

63 mentions

SOMETHING ELSE

I LIVE HERE! 48 mentions

17 mentions

13 mentions

“Farmers Market and concerts at Federal Hill Commons.”

“We love Bru Burger.”

RESTAURANTS, BARS, COFFEE, ETC.

51% Daily

39% Weekly

HEALTHCARE

29 mentions

HOW OFTEN DO YOU VISIT THE DISTRICT?

16 mentions

‘Doctor’s Office”

5%

5%

Monthly

Yearly

“Pharmacy”

out of 202 responses

out of 140 responses

West Gateway Master Plan

72

2025


COMMUNITY INPUT

IMPLEMENTATION

VISION

INTRODUCTION

ANALYSIS FINDINGS

Identifying Existing Anchors Envision a vibrant, walkable + unique district shaping a gateway to Downtown Noblesville.

N Forest Park Golf Course

W ive r

R

RESTAURANTS, SHOPS & ERRANDS

Gr ee

RUNNING, WALKING OR BIKING

nw ay

Kroger

INDOOR ENTERTAINMENT

Lo gan

Stree

Bowl 32

32

19

yT ree Ro ad ERO CRE EK

Federal Hill Commons

38

Riverview Health

RESTAURANTS, SHOPS & ERRANDS

oa ro R Cice

d

APPOINTMENTS & SERVICES

River’s Edge Apartments

DOWNTOWN ER

IV

CIC

err Ch

Noblesville Square

FARMERS MARKET & CONCERTS

t

Westfield Road

Mustard Seed

RUNNING, WALKING OR BIKING

Western Plaza

Lakeview Drive

Nexus Apartments

ad

River Ro

I LIVE HERE

RESTAURANTS, SHOPS & ERRANDS

Ro ad

River Road

SHOPPING/ERRANDS

dan

38

Midland Trace Trail

Key themes:

eri

APPOINTMENTS & SERVICES

Hague Road

Many people visit the district to go to eating establishments like restaurants or coffee shops or for medical appointments and services. Shopping centers also seem to be a major draw bringing people into the district for shopping, running errands, and dining or take-out.

Sh

Hague Road Nature Haven

h it e

Participants were asked to identify places that draw them to district today. This identified land use anchors and activities serving as existing assets.

R TE

HI

W Pleasant Street (Future Alignment)

RESTAURANTS, BARS, COFFEE, ETC. I WORK HERE

West Gateway Master Plan

73

2025


IMPLEMENTATION

VISION

INTRODUCTION

COMMUNITY INPUT

ANALYSIS FINDINGS

Visioning A Unique, Vibrant District IN THE FUTURE, WHAT DEVELOPMENT AND CHARACTERISTICS WOULD YOU LIKE IN THE WEST GATEWAY DISTRICT? “Walkability and biking is key to bringing the community together. It matters when a space is beautiful, vibrant, and clean.”

“More evening life (variety in sit-down restaurants, bars, winery) - especially outside. We love sitting outside socializing/ eating/drinking.”

“A place where one can walk, get ice cream, pastry, a yummy drink and eat it in the park, maybe check out some stores.”

“Family friendly places - museums, parks, arcades, etc.” “I am hoping we will have more ways to access the trail. Places to park to access trail.”

“Unique, non-chain/franchise places to eat. Foods from everywhere. Keep it local!!”

SAFE + WALKABLE PUBLIC REALM

RECREATION, CULTURAL + LEISURE ACTIVITIES 29 mentions

74 mentions

MORE GROCERY OPTIONS 23 mentions

MORE DINING + DRINKING OPTIONS

SPEND TIME IN PUBLIC SPACES, PLAZAS OR PARKS

113 mentions

37 mentions

“We are looking for options for sitdown restaurants/bars, fresh food options - specifically for lunches”

GO SHOPPING + RUN OTHER ERRANDS 52 mentions

“Entertainment, live music, independent businesses/unique shopping.”

“We need more greenspace for people to get out and do things. parks, play, [...] etc. Places to interact, not to just buy.” TRAFFIC + PARKING 13 mentions

SPEND TIME ON OR BY THE RIVER 14 mentions

West Gateway Master Plan

74

2025


INTRODUCTION

COMMUNITY INPUT

IMPLEMENTATION

VISION

ANALYSIS FINDINGS

Visioning A Unique, Vibrant District Identify potential redevelopment sites + compatible land uses.

R

ive r

Western Plaza

Lakeview Drive

Nexus Apartments

ad

River Ro

Potential to add complementary entertainment uses and recreation facilities around this area

Lo gan

Stree

Gr ee

nw ay

t 19

Westfield Road

Bowl 32

32

Noblesville Square

yT ree Ro CCIC EERR ad OO CC RREEE KE K

Riverview Health

River’s Edge Apartments

38

oa ro R Cice

d

DOWNTOWN ER

IV

R TE

HI

CI

Ch

Federal Hill Commons

Opportunity to activate unused space that is prime property along the river

err

Mustard Seed

W

Pleasant Street (Future Alignment)

Potential to revitalize Noblesville Square Shopping Center and rethink excess parking areas

“Softball fields behind Bowl 32”

West Gateway Master Plan

Forest Park Golf Course

W

Ro ad

River Road

“The whole [Kroger] shopping center looks very outdated compared to the new apartments and farmers market area.”

dan

Kroger

Midland Trace Trail

“Noblesville Square... would be nice if restaurants and shops/boutiques were added.”

eri

38

Hague Road

Some comments we heard from the community:

Sh

Hague Road Nature Haven

h it e

Community members called out some areas or sites within the West Gateway District where they see potential for improvements or future redevelopment. Overall, the community placed emphasis on revitalizing aging and dated strip mall shopping centers and reutilizing large, underused parking areas.

N

Potential to refresh and update the look of the shopping enter & expand/add more stores around it

75

2025


VISION

INTRODUCTION

IMPLEMENTATION

COMMUNITY INPUT

ANALYSIS FINDINGS

Identifying Movement Patterns HOW DO YOU USUALLY GET TO/FROM THE DISTRICT?

HOW DO YOU USUALLY GET AROUND WITHIN THE DISTRICT?

“Too much traffic and drivers that do not yield right of way to pedestrians add crosswalks with signals.”

“19th and Logan should be a roundabout or something. Restricted turns make it hard to navigate, it's narrow, and I wouldn't want to walk or bike it.” “More and more people that live in old town are trying to walk and bike as opposed to drive everywhere. It should be easy to do so. The West Gateway needs to be comfortable for walking and biking.”

“Lack of crosswalks makes this a dangerous area.” “Walking anywhere beyond the park is challenging. The crosswalks do not feel safe and the sidewalks are narrow and right up against the road.”

DRIVING 50%

DRIVING 85%

WALKING 28%

WALKING 8%

I ONLY GO TO ONE PLACE 19%

CARPOOL/RIDESHARE 4%

BIKING “There's no real sidewalks and ability to walk from one area to the other. All of these roads are jam packed.”

BIKING 3%

“I live here but can't safely get to downtown by bike - I have to use the Hague Road trail over to Lakeview, which has a very old and dilapidated sidewalk, and then ride along Logan, which isn't optimized for biking/walking either. “

3%

“I think widening of 32 will fix this, but biking here is sketchy. I drive now but would love to be able to bike or even walk it.”

out of 72 responses

West Gateway Master Plan

76

2025


INTRODUCTION

COMMUNITY INPUT

IMPLEMENTATION

VISION

ANALYSIS FINDINGS

Identifying Movement Patterns Recommend improvements to roadways and trails to support movement to and through the district.

Golf Course

W

Ro ad

Difficult to cross Logan and Sheridan

h it e

dan

R

ive r

Gr ee

nw ay

Kroger

Noblesville Square

yT ree Ro ad ERO CRE EK

River Road

Stree

t 19 Federal Hill Commons

38

Riverview Health

d

DOWNTOWN ER

IV

R TE

HI

W Pleasant Street (Future Alignment)

SAFER PEDESTRIAN CROSSINGS

oa ro R Cice

River’s Edge Apartments

CIC

Midland Trace Trail

Bowl 32

32

err

Lo gan

Westfield Road

Connect this area to the district + downtown through bike facilities or trail extensions

Ch

Western Plaza

Lakeview Drive

Nexus Apartments

ad

River Ro

Hague Road

WALKABILITY: SIDEWALKS & TRAILS

eri

Potential to connect this part of town to more trails Forest Park

38

Mustard Seed

Key Themes:

Sh

Hague Road Nature Haven

Participants were asked to identify areas that are challenging or barriers to movement through the district. This identified primary points of conflict and opportunities for improvements. Areas of the greatest concern include pedestrian safety Sheridan Road, Logan Street, Westfield Road and SR 19, particularly as they intersection and lead into downtown. Safer crossings and more pedestrian/bike facilities could enhance connectivity through the district.

Dangerous and unpleasant to walk around the shopping center + vicinity

Walkability is lacking in this entire area + there are many dangerous intersections

Lacking bike / pedestrian facilities along River Road

Dangerous pedestrian conditions at the Westfield Road and SR 19 intersection

Hazardous to walk: fast traffic and sidewalks against roadways

OPPORTUNITIES TO BIKE

West Gateway Master Plan

77

2025

N


COMMUNITY INPUT

IMPLEMENTATION

VISION

INTRODUCTION

ANALYSIS FINDINGS

Visioning Connections to the River WHAT ARE YOUR IDEAS FOR THE FUTURE OF THE WHITE RIVER?

“The riverfront development should be a focal point because of its economic benefits, and should be a combination of parks and entertainment.”

“Maybe a winery, an ice cream shop, a restaurant, with seating all along the river so people can relax, visit, have dates. A vibrant scene.”

“Love to see a board walk with small restaurants and boutique shops along the river”

SUSTAINABILITY + FLOODING/RIVER CONDITIONS 4 mentions

NEW RIVERFRONT DEVELOPMENT EATING & DRINKING ALONG THE RIVER “Riverfront businesses should compliment the river - random businesses like an auto repair shop should not be on the river.”

NATURE, HABITATS + WILDLIFE

18 mentions

3 mentions

20 mentions

“Kayak/paddle board launch.”

“Restaurants near/on river with outdoor space to overlook it.”

PADDLING OR FISHING ON THE RIVER 9 mentions

WALKING OR BIKING ALONG THE RIVER 16 mentions

“More/better walking and biking trails along the river.” “More access and usable space along the river. The trail along it is cool but it ends randomly and takes people too close to the treatment plant.” West Gateway Master Plan

78

SPECIAL EVENTS

2 mentions

2025


INTRODUCTION

West Gateway Master Plan

VISION

IMPLEMENTATION

ANALYSIS FINDINGS

COMMUNITY INPUT

5

Previous Plan Alignment

80

Spatial Analysis

83

Demographics Analysis

88

Why Noblesville? Living Here.

90

Why Noblesville? Working Here.

95

79

2025


VISION

INTRODUCTION

IMPLEMENTATION

COMMUNITY INPUT

ANALYSIS FINDINGS

Previous Plan Alignment The planning team reviewed a number of existing plans for goals and objectives that can be furthered in conjunction with this planning effort. Below are a synopsis of the relevant planning objectives from these plans.

City of Noblesville Comprehensive Plan (2020) The Noblesville Comprehensive Plan was developed as a needed update to the 2013 Noblesville Comprehensive Plan due to the increased development interest within Noblesville. The comprehensive plan focuses on these key elements: Placemaking, Downtown Streetscape, Context Sensitive Design, Economic Development and Redevelopment. • Accommodate a mix of land uses and development to sustain and grow the city’s tax base while protecting natural features and environmentally sensitive areas. • Accommodate a range of housing and neighborhood options while maintaining design compatibility with the surrounding character and connecting to nature. • Expand, attract, and retain a mix of businesses and industries that offer career opportunities that generate wealth and allow opportunities for increased standards of living. • Provide a safe, efficient, and multi-modal transportation system that connects neighborhoods, employers, entertainment and attractions. • Create a vibrant community hub by capitalizing on the historic qualities of downtown. • Strengthen the city’s identity by combining elements of the built environment, historic features, and intangible community characteristics. • Enhance, embrace, and celebrate Noblesville’s character and charm.

Noblesville Downtown Streetscape Master Plan (2018) The Noblesville Downtown Streetscape Master Plan was developed to create a plan that honors downtown’s vibrant past and develops a vision for the future that sets Noblesville apart as a destination. • Embrace existing historical significance of downtown. • Strengthen economic viability and diversity of businesses downtown to better serve residents and visitors. • Unify physical elements of the streetscape to establish a strong identity.

West Gateway Master Plan

80

2025


INTRODUCTION

VISION

IMPLEMENTATION

COMMUNITY INPUT

ANALYSIS FINDINGS

Previous Plan Alignment Noblesville Alternative Transportation Plan (2020) The Noblesville Alternative Transportation Plan was developed to update and expand upon the on-going efforts to provide bicycle and pedestrian facilities that are convenient, comfortable, and safe. • Connect all areas with bicycle and pedestrian routes. • Connect and complete the Non-Motorized Transportation (NAT) in and around the city. • Expand and improve bicycle and pedestrian facilities for all users, ages, and abilities. • Prioritize safety at intersections and crossings. • Improve wayfinding and signage for bicycle and pedestrian routes.

White River Master Plan (2019) The White River Master Plan was developed to create a collective vision for the White River corridor that is coordinated, comprehensive, and sustainable and that addresses the various contexts of the White River. • Enhance community stewardship through connections and experiences. • Draw people to the river with vibrant, accessible spaces. • Build economic strength and identity that supports businesses and inclusivity. • Preserve diversity and places for everyone.

West Gateway Master Plan

81

2025


INTRODUCTION

VISION

IMPLEMENTATION

COMMUNITY INPUT

ANALYSIS FINDINGS

Previous Plan Alignment City of Noblesville Housing Study (2016) The City of Noblesville Housing Study was conducted in 2016 to review the existing housing stock and develop implementation strategies to help diversify housing and develop community amenities that support residents. • Determine what housing options exist in the city and what may be missing. • Diversify neighborhoods with a variety of housing types. • Create mixed-use nodes near residential areas. • Develop transportation patterns that support a variety mobility options. • Connect to trail systems. • Develop unique public gathering spaces. • Create housing developments that enhance and complement the existing community.

Hamilton County Housing Study (2022) The Hamilton County Housing Study was conducted in 2022 to review the existing housing stock and develop implementation strategies to help diversify housing stock, develop more housing, increase affordability, and modify regulations to allow streamlined development. • Affordability is a concern as home values increase and incomes become less competitive. • Housing inventory within the county lacks diversity and cannot support the needs of the workforce. • Current housing demand is high and will take years to meet the current needs. • Cost of land and development regulations pose a challenge for developers as they develop housing variety and stock.

West Gateway Master Plan

82

2025


INTRODUCTION

IMPLEMENTATION

VISION

ANALYSIS FINDINGS

COMMUNITY INPUT

Spatial Analysis Identify potential redevelopment sites and compatible land uses.

Legacy use: Don-Mar Mobile Home Park

dan

Forest Park Golf Course

W

Ro ad

N

R

ive r

Gr ee

Riverfront legacy land uses nw ay

Kroger

Bowl 32

32

Noblesville Square

Stree

t 19

yT ree Ro ad ERO CRE EK

Riverview Health

River’s Edge Apartments

Federal Hill Commons

38

oa ro R Cice

d

Anchor: Federal Hill Commons DOWNTOWN ER

IV

1980’s housing

CIC

err Ch

Lo gan

Westfield Road

River Road

Midland Trace Trail

Rural development west of Cicero Creek

Western Plaza

Lakeview Drive

Nexus Apartments

ad

River Ro

Recent development: walkable residential

Mustard Seed

Legend

eri

38

Hague Road

A mix of low-, medium-, and high-density residential development is clustered around the edges of the district with more high-density residential occurring at the center in desirable walkable formats.

Sh

Hague Road Nature Haven

h it e

The district has a variety of land uses. Commercial and healthcare/ institutional uses are most visible. Undeveloped land areas are reflective of floodplains.

Recent development: walkable mixed-use

HI

R TE

W

Anchor: Riverview Health, supporting nearby medical offices

Pleasant Street (Future Alignment)

Low Density Residential High Density Residential Commercial Healthcare/Institution Parks/Recreation Agriculture/Undeveloped

West Gateway Master Plan

83

2025


INTRODUCTION

IMPLEMENTATION

VISION

ANALYSIS FINDINGS

COMMUNITY INPUT

Existing Non-Motorized Connectivity Recommend improvements to roadways and trails to support movement to and through the district.

N Forest Park Golf Course

W

Ro ad

h it e

dan

R

ive r

Gr ee

nw ay

Kroger

Western Plaza

Lakeview Drive

Nexus Apartments

ad

River Ro

Existing and planned regional trails reach the boundaries of the district but do not connect within

Lo gan

Stree

t 19

Westfield Road

Bowl 32

Noblesville Square

Riverview Health

Federal Hill Commons

38

oa ro R Cice

d

New roundabouts provide minimal comfort and safety for non-vehicular circulation 32

River’s Edge Apartments

DOWNTOWN ER

IV

CIC

Ch

err

yT ree Ro ad ERO CRE EK

River Road

Midland Trace Trail

Existing Sidewalk Planned Sidewalk Existing Trail Planned Trail

eri

Gaps in the sidewalk networks limit the ability to walk between destinations

38

Mustard Seed

Legend

Sh

Hague Road Nature Haven

Hague Road

The existing district is primarily auto-oriented. Recreational trails skirt the edges but do not connect into the district. Where sidewalks exist, they are inconsistent and directly against the roadway and make people feel unsafe or uncomfortable when they chose to walk. New roundabouts prioritize vehicle movements and offer minimal protection for people walking or biking to traverse the intersections.

Auto-oriented destinations lack sidewalks or walkways across parking lots

R TE

HI

W Pleasant Street (Future Alignment)

Existing Roundabout Planned Roundabout

West Gateway Master Plan

84

2025


INTRODUCTION

IMPLEMENTATION

VISION

ANALYSIS FINDINGS

COMMUNITY INPUT

Existing Roadways Recommend improvements to roadways and trails to support movement to and through the district.

eri

Forest Park Golf Course

W

Ro ad

N

h it e

dan

Few local streets to break up large developed areas

R

ive r

38

Gr ee

nw ay

Kroger

Western Plaza

Lakeview Drive

Planned INDOT improvements

ad

Nexus Apartments

Lo gan

Stree

t 19

Westfield Road

Bowl 32

32

yT ree Ro ad ERO CRE EK

Riverview Health

River’s Edge Apartments

Federal Hill Commons

38

oa ro R Cice

d

Two river crossings are very close together, creating congestionDOWNTOWN and pinch points ER

IV

CIC

err Ch

Noblesville Square

River Road

Midland Trace Trail

Legend

River Ro

New traffic circles facilitate flow of vehicles

Mustard Seed

State Route Collector Primary Arterial Local Street Planned Pleasant Street Alignment

Sh

Hague Road Nature Haven

Hague Road

The existing roadway network is imbalanced with three state routes converging in the study area. A lack of arterials or local streets connecting developments add to congestion with no relief valves. The new Pleasant Street extension should provide some of the needed relief for east-west movement.

State routes converging: high volume of vehicles, but limited local control of roadway

R TE

HI

W Pleasant Street (Future Alignment)

Pleasant Street Phase 3

Pleasant Street Phase 1

New Pleasant Street extension adds another east/west connection

Existing Roundabout Planned Roundabout

West Gateway Master Plan

85

2025


INTRODUCTION

IMPLEMENTATION

VISION

ANALYSIS FINDINGS

COMMUNITY INPUT

Existing Topography + Hydrology Identify infrastructure improvements necessary to support potential redevelopment.

N

Park designed to hold stormwater during flood events Sh

Hague Road Nature Haven

eri

dan

Forest Park Golf Course

W

Ro ad

h it e

The West Gateway District is uniquely defined by the two waterways—the White River and Cicero Creek—their floodplains, and their associated topography. These natural resources present a mix of opportunities and challenges to shape a unique district identity.

R

ive r

38

Extensive floodways and floodplains

Western Plaza

Lakeview Drive

ad

River Ro

32

yT ree Ro ad ERO CRE EK

err

Noblesville Square

River Road

Midland Trace Trail

Bowl 32

Lo gan

Stree

t 19

Riverview Health

Federal Hill Commons

38

oa ro R Cice

d

River’s Edge Apartments

DOWNTOWN ER

IV

CIC

Hague Road

Nexus Apartments

Westfield Road

Ch

nw ay

Kroger

Grey infrastructure conveys stormwater to outfalls at natural waterways

Mustard Seed

Gr ee

R TE

HI

W Pleasant Street (Future Alignment)

Legend Waterways and topography uniquely define the district

Outfall to Waterways Regulatory Floodway 100 Year Floodplain 500 Year Floodplain Forested Wetland

West Gateway Master Plan

86

2025


INTRODUCTION

IMPLEMENTATION

VISION

ANALYSIS FINDINGS

COMMUNITY INPUT

Existing Zoning Classifications Draft design and development policies to implement the envisioned district.

h it e

R

ive r

Western Plaza

Lakeview Drive

Nexus Apartments

ad

High density residential reflects different eras of development – from the River’s Edge Apartments (1980s) to Nexus Apartments (2023)

Lo gan

Stree

Gr ee

nw ay

t 19

Westfield Road

Bowl 32

32

yT ree Ro ad ERO CRE EK

err Ch

Noblesville Square

Riverview Health

Federal Hill Commons

38

oa ro R Cice

d

River’s Edge Apartments

DOWNTOWN ER

IV

CIC

Mustard Seed

R2 - Low-to-Moderate Density Single Family Residential

HI

R TE

W

Flood Hazard District follows FIRM delineation

Pleasant Street (Future Alignment)

R4 - Moderate-to-High Density Single/Two-Family Residential I1 - Light Industrial FH - Flood Hazard

Forest Park Golf Course

W

Ro ad

N

Kroger

R1 - Low Density Single Family Residential

R5 - Multi-Family Residential

dan

River Ro

FeHiPD - Federal Hill PD

eri

River Road

LB - Local Business PB - Planned Business

Sh

Layers of zoning reflect a patchwork of changes over time

38

Midland Trace Trail

Legend

Mix of zoning for mobile home park

Hague Road Nature Haven

Hague Road

The planning team documented the existing zoning classifications to understand the policies governing the study area. Unique aspects include the use of planned development districts and overlays, and classifying flood hazard areas as a zoning district. The implementation phase of this plan will make recommendations to policies to facilitate bringing the vision to life.

Zoning is primarily Business District with numerous overlays and PDs

Lower density west of Cicero Creek

Overlays PD - Planned Development

West Gateway Master Plan

87

2025


IMPLEMENTATION

VISION

INTRODUCTION

ANALYSIS FINDINGS

COMMUNITY INPUT

Demographics Analysis STATEWIDE POPULATION TRENDS

REGIONAL POPULATION TRENDS Cumulative Change in Population 2003 to 2023; Population in thousands

NorthwestIndiana Region: 0.3% Fort Wayne, IN Region: Rest of Indiana Region: 0.1%

Central Indiana Region: 1.1%

1.1%

Urban areas are attracting more residents.

Hamilton County

Personal Income per Capita 2022

+156.5k

Marion County

+99.9K

Cities and suburbs near major cites have grown faster than the rest of the state since 2023.

Hendricks County

Urban Areas house 57% of Indiana residents, as of 2023.

Morgan County

+5.5K

Shelby County

+1.8K

Madison County

+0.8K

Boone: $91,419

+67.0K

Hamilton: $95,757

Madison: $46,466

+45.6K

Johnson County Boone County

+27.1K

Hancock County

+26.6K

-

50K

Hendricks: $60,249

Morgan: $53,657

Marion: $66,500

Johnson: $59,315

Hancock: $61,585

Shelby: $52,401

100K 150K 200K

Louisville,KY Region: 0.9% Evansville, IN Region: 0.4%

31%

Hamilton County is attracting residents, investment, and wealth.

Indiana population living in Central Region

Source: U.S. Census Bureau

West Gateway Master Plan

5.4%

Indiana population living in Hamilton County

Hamilton County has the highest personal income per capita of the central Indiana region. Personal income per capita has grown at a rate of 3.8%, annually, over the last 20 years. Hamilton County has added over 156,500 residents since 2003. This is 36% of the total population growth of the region.

Source: U.S. Census Bureau; U.S. Bureau of Economic Analysis

88

2025


INTRODUCTION

IMPLEMENTATION

VISION

ANALYSIS FINDINGS

COMMUNITY INPUT

Hamilton County Population Trends Hamilton County has become more diverse since 2012 as minority populations continue to grow within the County. Hamilton County has a high concentration of highly educated people, with 62% holding a bachelor’s degree or higher. Noblesville is currently in a growth phase, growing rapidly since 2000 and continuing. Peer communities like Carmel and Fishers, which have seen impressive growth in recent years, are beginning to see their growth slow down as space becomes limited. Compared to peer communities, Noblesville has had the longest steady population and measured growth, anchored by its role as the county seat and historic urban fabric.

COUNTY-LEVEL TRENDS Population Growth in Central Indiana Communities Total Population; 1950 to 2022 120,000

Legend

100,000 Zionsville 80,000 Westfield 60,000 Carmel

40,000

Fishers

20,000

Noblesville

0 1950

1960

1970

1980

1990

2000

2010

HAMILTON COUNTY TRENDS Shifts in Race and Ethnic Origin Hamilton County; 2012 to 2022

Educational Attainment in Hamilton Cumulative Share of Population 25+ (2022)

100%

Two or more races

90% 70%

Native Hawaiian and Other Pacific Islander

60%

Asian

50% 40%

Graduate or Professional Degree

22.5%

At least a Bachelor’s Degree

61.6%

At least a Associate’s Degree

66.9%

Some other race

80%

88%

80%

30%

American Indian and Alaska Native

20%

Black or African American

10% White

0% 2019 West Gateway Master Plan

2020

2022

At least a High School Graduate (Includes Equivalency)

96.9% 0%

50%

100%

Source: U.S. Census Bureau 89

2025


INTRODUCTION

VISION

IMPLEMENTATION

COMMUNITY INPUT

ANALYSIS FINDINGS

Why Noblesville? Living Here. Commuting time if one of the largest factors in selecting a location to reside. Several peer communities and northeast Indianapolis fall within a 30-minute driveshed from Noblesville.

Noblesville offers three key characteristics that others do not: • A vibrant, historic downtown center • The White River

Carmel, Fishers, and Westfield are closer to Downtown Indianapolis, better positioning them to downtown commuters.

• Walkable, historic urban neighborhoods

Noblesville competes with Hamilton County peers to attract residents.

NOBLESVILLE REGIONAL ACCESS

KEY HOUSING DECISION FACTORS

30-Minute Drivetime from Noblesville Accelerate Indy (Indianapolis Regional Economic Development Strategy) found that economic success wasn’t dictated by the most generous tax breaks, but instead prosperous regions focused on the bigger picture.

Source: ESRI; Policy Analytics, LLC West Gateway Master Plan

Credit: 2016 Noblesville Housing Study, Greenstreet Ltd 90

2025


INTRODUCTION

VISION

IMPLEMENTATION

ANALYSIS FINDINGS

COMMUNITY INPUT

Local Population Trends Single-family residential occupancy in Noblesville has shifted differently than trends in Hamilton County as a whole. Since 2012, Noblesville has seen a slight increase in younger households and a decrease in older households. Noblesville has also seen a decrease in single-occupant households while Hamilton County has seen an increase. This trend may reflect the lack of smaller for-sale units available in Noblesville compared to other communities.

NOBLESVILLE + HAMILTON COUNTY HOUSING OCCUPANCY TRENDS Hamilton County Noblesville

60% 40% 20% 0%

60% 40% Families are no longer the largest housing segment in the U.S. Household demographics are changing (nationally and locally), but the current housing stock doesn’t reflect that change.

Legend

Shifts in Single Family Residential Occupancy 2012 to 2022

Young Households (1+ under 18) 2012

2013

2014

2015

2016

2017

2018

2019

2020

2021

2022

2015

2016

2017

2018

2019

2020

2021

2022

2015

2016

2017

2018

2019

2020

2021

2022

Old Households (1+ over 60)

20% 0% 60% 40%

2012

2013

2014

Single Occupant Households

20% 0% 2012

2013

2014

Source: U.S. Census Bureau

Credit: 2016 Noblesville Housing Study, Greenstreet Ltd

West Gateway Master Plan

91

2025


IMPLEMENTATION

VISION

INTRODUCTION

COMMUNITY INPUT

ANALYSIS FINDINGS

Local Housing Development Trends Hamilton County has also seen the highest level of investment in singlefamily residential units since 2012. This includes the fast-paced growth communities of Fishers and Carmel. Noblesville has added 9,392 units of detached, attached, two-family, and multi-family units since 2013. Another 3,000 units are pending construction.

RESIDENTIAL CONSTRUCTION TRENDS Noblesville New Residential Construction 2013 to 2023

Single-Family Building Permits 2012 to 2022 total change

1,200 1,091

1,079 1,000

1,105 Madison: 1.7K

942

915

882

825

786

800

Boone: 5.3K

Hamilton: 24.6K

717 615

600

Hendricks: 9.6K

435 400

Marion: 10.1K

200 Morgan: 2K

2013

2014

Single Family Detached

2015

2016

Multi-Family

2017

2018

2019

2020

2021

Single Family Attached (Townhouses)

2022

Johnson: 7.8K

Hancock: 5.9K

Shelby: 0.7K

2023 Two Family

Source: U.S. Department of Housing and Urban Development (HUD), State of the Cities System (SOCDS); City of Noblesville

West Gateway Master Plan

92

2025


INTRODUCTION

VISION

IMPLEMENTATION

COMMUNITY INPUT

ANALYSIS FINDINGS

Local Housing Market Potential Noted trends indicate a potential for continued measured growth, particularly in middle housing types aligned to the needs and wants of the population trends. Middle housing can include duplex/attached units, townhouses, and small multi-family buildings. New multi-family development in Noblesville is all rental, leaving the potential for apartment-style for sale product.

Noblesville’s homogeneous housing development primarily serves middle-aged households - not the two largest generations. Housing diversity attracts and retains people at all life stages.

Of the 26,539 housing units in Noblesville, two predominant hosuing types exist. Single-family detached (77 percent) and multi-family (17 percent).

Credit: 2016 Noblesville Housing Study, Greenstreet Ltd

West Gateway Master Plan

93

2025


INTRODUCTION

VISION

IMPLEMENTATION

ANALYSIS FINDINGS

COMMUNITY INPUT

Local Housing Attainability Noblesville offers the most affordable single-family housing compared to neighboring communities in Hamilton County. The recently completed Hamilton County Housing Needs Assessment identifies the challenging gap between high- and low-wage earners and housing potential.

HAMILTON COUNTY HOUSING SUPPLY

COMMUNITY HOUSING AFFORDABILITY Single-Family Residential Affordability 2024 Gross AV 75th Percentile

25th Percentile

Median

$700K $594.8K

$600K $500K

$461.2K $412.5K

$400K A family earning 120% of the area median income has an annual household income of $97,920. This is comparable to the median household income.

An attainable home value for this family is $293,760.

For families earning below 80% AMI, homeownership A family at this options are income level could relatively out of afford 28% of new reach. Only 2% of construction, just 12% current listings of current listings, and 0% of new and 100% multiconstruction family rentals. are considered attainable.

NEW CONSTRUCTION STARTS 3,434 units (total) ACTIVE LISTINGS 287 listings (total) MULTI-FAMILY RENTALS 22,587 units (total) occupancy: 97.6%

Credit: MIBOR REALTORS ®Association. BLC ®Listing Service; Zonda 2021; Greenstreet Ltd. current listings reflect MLS active listings on November 5, 2021

West Gateway Master Plan

94

$300K $200K

$498.4K

$445.0K $367.1K

$391.1K $334.8K $253.7K

$387.3K

$291.1K

$302.9K

Fishers

Westfield

$100K $0K Noblesville

Carmel

Source: Policy Analytics, LLC

2025


INTRODUCTION

VISION

IMPLEMENTATION

COMMUNITY INPUT

ANALYSIS FINDINGS

Why Noblesville? Working Here. WHY NOBLESVILLE?

Development Potential

The White River

Riverview Health is an existing anchor, bolstering an ecosystem of health services concentrated in the West Gateway District. Current trends in Hamilton County are development by competing major healthcare providers entering or expanding their presence in the market. Development is focused on the storefront-oriented service model in one- to two-story ambulatory care centers, such as medical office buildings and urgent care. Consolidating existing users, such as the proliferation of medical offices, into build-to-lease space will be challenging in the current economy, unless strongly supported by City policies. Current financial pressures are limiting the development of speculative office buildings. Build-to-suit spaces are more readily funded. This pressure may diminish with anticipated economic stabilization in upcoming years. Commercial offices in smaller markets are seeing less pressures than in over-saturated downtown markets. Businesses are highly motivated to locate in places attractive to the talent they hope to employ. Local amenities and a location convenient to the workforce can be determining factors.

Historic Downtown Center

Restaurants and Places to Eat are the second highest growth industry in Hamilton County. The 2018 Noblesville Downtown Streetscape Master Plan identified leakage from Noblesville to bars and taverns. New housing units will add to the existing demand for restaurants in walkable context.

West Gateway Master Plan

Historic Urban Fabric

95

2025


IMPLEMENTATION

VISION

INTRODUCTION

ANALYSIS FINDINGS

COMMUNITY INPUT

Regional Commuting + Employment Mobility COMMUTING PATTERNS

EMPLOYMENT MOBILITY

The majority of Hamilton County’s labor force commutes outside the County for work, with 45% commuting to Marion County.

Inflow and Outflow of Jobs in Noblesville 2021; workers in thousands Inflow

21%

HAMILTON

Commute elsewhere outside of Hamilton County

Live + work in Hamilton County

36%

18.5K

36% 9.5K

Commute into Hamilton County from other counties

2.3K

High Wage (more than 3,333 per mo.)

Hamilton County residents commuting to Marion County

45%

26%

Internal Outflow

Marion County residents commuting to Hamilton County

7.2K

6.4K 1.7K

Middle Wage (1,251-3,333 per mo.)

4.8K

1.2K

5.2K

Low Wage (1,250 or less per mo.)

The U.S. Census Bureau delineates commuting data by three wage categories: less than $1,250, $1,250 to $3,333, and more than $3,333 per month. Over half (57.6%) of Noblesville workers earn a wage greater than $3,333 per month. Of high wage workers in Noblesville, 88.9% are working outside of Noblesville. Inflow is the number of people contributing to Noblesville’s workforce (total number of people employed in the city, regardless of residency). Outflow is the number of residents who are a part of Noblesville’s labor force (number of residents in the job market) but are a part of another city/county’s workforce.

MARION

Internal is the number of residents who work in Noblesville. Workers are part of both the labor force and the workforce. Source: U.S. Census Bureau

Source: U.S. Census Bureau; U.S. Bureau of Labor Statistics; U.S. Bureau of Economic Analysis West Gateway Master Plan

96

2025


INTRODUCTION

IMPLEMENTATION

VISION

ANALYSIS FINDINGS

COMMUNITY INPUT

Regional Employment Elementary and secondary schools are the highest growing employment industry in Hamilton County.

For everyone one high-paying, high-tech job, five other jobs are created in various sectors of the economy.

Restaurants and eating places also saw significant growth between 2012 and 2022.

An economic development strategy focused on highpaying jobs still requires a diverse housing strategy to support its workforce.

$85,240 Research and Development in Nanotechnology

Hamilton County’s top growing industries represent a range of high- and low-paying jobs.

$31,330 Security Guard

$125,650 Lawyer

$23,320 Childcare Worker

$60,870 HR Specialist

Credit: 2022 Hamilton County Housing Needs Assessment, Greenstreet Ltd

HAMILTON COUNTY EMPLOYMENT INDUSTRIES Top 10 Industries by Total Employment Growth, Hamilton County NAICS 4-Digit Industries, 2012 to 2022

Average Annual Wage

Elementary and Secondary Schools

8,534

Restaurants and Other Eating Places

4,895

Executive, Legislative and Other General Gov. Support

$48.5K $22.6K $88.5K

3,087

Warehouse Clubs, Supercenters and Other Similar

2,731

$28.7K

Other Amusement and Recreation Industries

2,471

$23.9K

Management, Scientific, and Technical Consulting Services

$26,110 Waiter/ Waitress

$88.1K

2,113

General Medical and Surgical Hospitals

1,874

$67.6K

Computer Systems Design and Related Services

1,764

$60.6K

Insurance Carriers

1,585

Employment Services

1,526

$97.1K $79.6K

1,000 2,000 3,000 4,000 5,000 6,000 7,000 8,000 9,000 Source: U.S. Census Bureau; U.S. Bureau of Labor Statistics; U.S. Bureau of Economic Analysis West Gateway Master Plan

97

2025


INTRODUCTION

VISION

IMPLEMENTATION

ANALYSIS FINDINGS

COMMUNITY INPUT

Regional Employment Noblesville’s top employer is Noblesville schools. Three of Noblesville’s top five largest employers are local government entities. While school, city, and county employees can be synonymous with daytime population, employers like Riverview Health and Wal-Mart may represent differing workforce peaks or spreads.

HAMILTON COUNTY EMPLOYERS Top Employers in Noblesville by Employment 2020; Reported Employment

1,595

Noblesville Schools 1,291

Riverview Hospital Hamilton County

902

SMC Corporation of America

895

City of Noblesville

499

Wal-Mart

400

Ambu, Inc. (formerly King Systems)

391

Helmer Scientific

256

Ryan Fireprotection. Inc.

200

BorgWarner Indiana Technical Center

168 0

400

Local Government Healthcare Retail 800

1,200

1,600

Manufacturing, R&D Source: ESRI; Policy Analytics, LLC

West Gateway Master Plan

98

2025


WEST GATEWAY MASTER PLAN


Turn static files into dynamic content formats.

Create a flipbook