Dominion Energy 2 Page

Page 1


ENERGY DOMINION

Fairwinds Landing

The Dominion Energy project covers 7.5 acres and consists of two buildings: a 31,000 square foot Offshore Wind Monitoring and Coordination Center (MCC) and a 17,000 square foot Warehouse. Additionally, the project includes pier enhancements and site development.

MCC Facts

31,000 square feet

Structure: Podium slab with mass timber beams, columns, and roof deck

Enclosure: Curtainwall, storefront, and MCM metal panels

Interior: Operations room, SCADA room, offices, fitness room, conference rooms, break room, and restrooms

Interesting features: LEED Silver certification, solar array, EV charging stations, redundant power sources, exposed timber ceilings and columns

Warehouse Facts

17,000 square feet

Structure: Pre-engineered metal building

Enclosure: IMP panels with membrane roof, storefront, and overhead doors

Interior: Conference rooms, offices, locker room, mechanic shop, and storage space

Pier Improvements

750 feet of pier structural, electrical, mechanical, and plumbing improvements to existing pier

Demolition of abandoned mooring dolphins and collapsed transfer dock

Installation of a new 280-foot floating dock and gangway

External Renderings

Internal Renderings

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Dominion Energy 2 Page by millergrpva - Issuu