Michael Woodruff
Architecture Design Art
Portfolio
Contents Resume / pg. 05
1
2
Gensler Culver Studios Bldg. Y / pg. 08
2
Culver Studios Garage / pg. 20
3
8777 Washington / pg. 26
4
Capital Group / pg. 46
5
Red Bull Media House / pg. 56
6
Woodruff
Contents da-Collective Inspire Resort Arena / pg. 64
7
Seed LA / pg. 84
8
La Veranda / pg. 100
9
Beacon Landing / pg. 106
10
Personal Projects Tiny House / pg. 114
11
Cabin / pg. 124
12
Sculptural Vessels / pg. 128
13
Art / pg. 134
14
3
Portfolio
About
Michael Woodruff
4
P.O. Box 1065, Driggs, ID 83422 mwoodruff21@gmail.com (310) 938-1806
MICHAEL WOODRUFF
OBJECTIVE
Seeking a position as a project architect
EDUCATION
Southern California Institute of Architecture, Los Angeles Master of Architecture
2010 - 2013
University of Arizona, Tucson Bachelor of Science, Regional Development, General Business
2006 - 2008
EXPERIENCE
ACHIEVEMENTS
da-Collective Job Captain / Project Architect in Training Collaborated with teams of consultants & designers to deliver building design and construction docs for casino arena in South Korea & affordable housing projects in LA. Led team of junior designers through SD-CD levels of construction documentation.
2017 - 2021
Yerba Buena Farm Co-Founder Worked in collaboration with investor and co-founder to build farm business to provide vegetables for local restaurants. Spearheaded installation of farm property utility & infrastructure improvements. Cultivated vegetable & fruit tree crops.
2016 - 2017
Gensler Architectural Designer Worked collaboratively with design team to deliver presentation drawings and construction drawings from concept design through construction documents on various ground up & T.I. projects for commercial office space.
2013 - 2016
Amorphis Intern Made paper model, drew elevations for schematic design of Mt. Washington Residence. Worked on presentation drawings for SCI-Arc Graduation Pavilion.
2012
Graduated from SCI-Arc with distinction Studio project selected for SCI-Arc Spring Exhibition Project selected for SCI-Arc exhibit at the Centre Pompidou
2013 2012 2012 2007
Dean’s List University of Arizona SKILLS
3d Modeling Rhino Grasshopper
Presentation Illustrator Photoshop InDesign
INTERESTS
Art, ceramics, screen printing, graphic design, baseball, skiing, hiking, camping, farming
BIM Revit
Woodruff
P.O. Box 1065, Driggs, ID 83422 mwoodruff21@gmail.com (310) 938-1806
Production Laser Cutting CNC Milling 3d Printing Vacuum Forming Slip Casting Mold making Screen Printing
5
Portfolio
Projects
2013-2017
6
Gensler
Woodruff
7
Portfolio
Category
Status
Core & Shell
Built
Country
City
USA
Los Angeles
Culver Studios Bldg. Y 2015-2016 Project Team Michael White, Kevin Kilmer, Peter Himmelstein, Yupil Chon, Xiao Liu, Michael Woodruff
8
Project Phases SD, DD
Project Responsibilties • • • • • •
Prepared city planning comprehesive plan documents Prepared plans, sections, elevations, and diagrams for city planning environmental impact report Prepared presentation drawings for client Built project BIM model from scratch Developed DD Documents Coordinated with rendering artist
Woodruff
Rendering by Kilograph
Project Description
9
The original Culver Studios had a rich place in Los Angeles history during the dawn of the film industry, so when the client came to Gensler with the desire redevelop the property as a modern office / studio space, the design team used the studio history as a design generator for the building form. The building base with a board formed concrete finish harkened to a feeling of the past studio using an older construction technique of casting concrete with board planks. A modern shed was placed on top of the base to represent the new in relationship with the past. The relationship is accentuated by the modern glass ribbon between the old and the new and the interplay of the roof form and concrete base.
Portfolio
CONCEPT DESIGN DIAGRAMS
TOP MIDDLE PROGRAM
PROGRAM
PROG
BASE
PROGRAM
CONTAINER BUILDING MASS - THREE ESSENTIAL COMPONENTS
PROGRAM SHROUD BASE + SHROUD OPEN UP CIRCULATION FLOWS INTO PROGRAM
PROGR WITHIN OPTIMI EXPERIE
INCE BLVD.
GATE 2
CARSON ST.
Proposed BUILDING O 90,000 GSF
HUBBARD ST.
Existing BUILDING J Facade Update
KRUEGER ST.
WASH IN
LINBLAD E ST.
GTON BLV
D.
BUILDING Y | DECEMBER 17, 2015
GATE 3
Proposed BUILDING Y 84,700 GSF
GATE 4
BLDG. E
BLDG. D
BLDG. J
STAGE 7, 8, & 9
BL . DG
CULVER BLVD.
STAGE 5 BLDG
GATE 1
BLDG
S
T
BLDG. P
4 STAGE 2, 3, &
BLDG V BLDG U
STAGE 11, 12, &
STAGE 6
AVE. LUCERNE
BLDG .C
H
PARCEL B
STAGE 15 & 16
14
BLDG. N BLDG. W
BLDG. I
TWO WAY
GATE VAN BUREN
VAN BUREN CULVER HOTEL
Relocated BUNGALOW LOT
Proposed BUILDING R 31,000 GSF
ONE WAY
PLACE
Proposed ABOVE GRADE PARKING 1,408 Spaces
1":150' @ 11"x17" 0'
10
PROPOSED PROJECT OVERVIEW
Comprehensive Plan Amendment #6 proposes the addition of 3 new production office buildings, a new above/below grade parking structure, the relocation of Bungalows S, T, U, and V, and a facade update to existing Building J. In addition, two landscape features will be added to the property; the proposed bungalow lawn that will complement the existing character of the mansion and associated landscaping, and the Van Buren linear setback which will provide visual and sound buffering, stormwater mitigation functions, and act as a neighborhood amenity.
PROJECT
SIZE (GSF OR SPACES)
BUILDING O*
90,000 GSF
BUILDING Y*
84,700 GSF
BUILDING R
31,000 GSF
RELOCATED BUNGALOW LOT BUILDING J FACADE UPDATE VAN BUREN PARKING STRUCTURE
N/A N/A 1,408 SPACES
* Basement level not included - intended as restricted access for utility infrastructural uses only (Building O: 21,400 GSF, Building Y: 27,300 GSF).
75'
150'
Woodruff
ITH 5’ MAINTENANCE PATH
BUILDING Y | DECEMBER 17, 2015
T
11
Portfolio
(E) SIDEWALK TO REMAIN NEW PAINTED FIRE LANE
NEW ASPHALT PAVING SEE CIVIL DWGS REMOVED CURB CUT
ACCESSIBLE ROUTE TO EXISTING PARKING GARAGE
7' - 0"
EQ
EQ
DN
ACCESSIBLE PATH ADA STALL 9' X 18'
GATE 4
8" CMU WALL
18' X 8' - 6" SPACES, TYP.
CARSON ST
NEW PAINTED STEEL MOTORIZED GATE
12' - 0"
0" 18' - 0"
NEW TRANSFORMER PAD
5' - 0"
VAN ACCESSIBLE STALL (9 X 18)
20' - 0"
IPE BENCH OVER CONC. IPE CLAD TYP.
9' - 0"
F IR E LAN E
GROUND LEVEL PLANTER (N) TREE TYPSEE L'SCAPE
36" RAISED PLANTER TYP.
TRELLIS ABOVE TYP.
INCE BLVD.
8' - 5"
12' - 0"
TRASH
STAINED CONCRETE / TEXTURED CONC. FLUSH W/ ASPHALT. TYP.
UP
5
ING PEDESTAL OVER S.O.G.
4
(E) TREE TO REMAIN TYP
BIKE RACK (N) BIKE RACKS
SEE DRAWING A1.201 FOR LEVEL 1 FLOOR PLAN
EXISTING STUCCO GARAGE
3
(E) SIDEWALK TO REMAIN 2
LINE OF SKYLIGHT ABOVE TYP.
98 .24 °
° .96 89
1 7"
EXISTING STUCCO GARAGE
H
EXISTING SINGLE STORY RESIDENCE G
F
EXISTING SINGLE STORY RESIDENCE E
D
12
199' - 0"
C
B
A 1' - 0"
10"
Woodruff
2ND FLOOR
BUILDING Y | DECEMBER 17, 2015
THE CULVER STUDIOS | 17
4TH FLOOR
BUILDING Y | DECEMBER 17, 2015
THE CULVER STUDIOS | 19
13
Portfolio
14 ________ ________ A2.202
8 ________ ________ A2.201
6 ________ ________ A2.202
GUNMETAL LACQUER FINISH GUARDRAILS & HANDRAILS TYP. 1/4" DIAM. BALLUSTERS TYP. A
__ _
B
C 37' - 6"
35' -
12' - 0"
6' - 0"
9' - 0"
4' - 6"
9' - 0"
4' - 6"
14' - 0"
5' - 1"
7' - 11"
19' - 0"
MOTORIZED STLFRAMED ROTATING DOOR W/ GS-3 APPLIED ALUM. GLAZING SYSTEM
1
GS-3 ALUMINUM FRAMED GLAZING ASSEMBLY WITH BACK-UP STEEL SUPPORT FRAME. TYP.
BUILDING ELEVATION - NORTH SCALE: 3/32" = 1'-0"
16 8 ________ ________ ________ ________ A2.202 A2.202
\\gensler.ad\Projects\05\05.9511.000\BIM\Building Model\_Central Model File\05.9511.000_Bldg_Y_Central_V2016.rvt
GS-1
ALUM. GUNMETAL GREY FLAT FASCIA PANEL TYP. MP-1, ALUM. GUNMETAL GREY CORRUGATED PANEL
MP-1, ALUM. GUNMETAL GREY CORRUGATED PANEL
G
24' - 0"
F 37' - 6"
14
3' - 0"
28' - 6"
PTD. ALUM. PANEL INFILL WALL
13' - 6"
3' - 6" 6' - 0" 4' - 6"
2
BUILDING ELEVATION - SOUTH SCALE: 3/32" = 1'-0"
8' - 0"
9' - 0 3/4" 3' - 11"
15' - 4"
01
TYP.
01
TYP.
M
8 ________ ________ A2.202
MP-1, ALUM. GUNMETAL GREY CORRUGATED PANEL
D
MP-3 GUNMETAL GREY FLAT ALUM. PANEL TYP.
E
199' - 0"
- 0"
GS-2 PTD. ALUM.-FRAMED PUNCHED WINDOW TYP.
GS-1 IGU W/ ALUMINUM HEAD & SILL SHOE TYP. & BUTT JOINTED JAMBS
F
35' - 0"
16 ________ ________ A2.202
Woodruff
16 ________ _______ A2.201
MP-2, 12"W ALUM. GUNMETAL GREY FLAT PANELS GUNMETAL GREY FLAT ALUM. FASCIA PANEL TYP.
G
G
G LO
15' - 4"
37' - 6"
M
G BA
G
35' - 0"
M
9' - 1"
8' - 0"
3' - 11"
T.O. MECH. PROJECTION 69' - 0"
TYP.
TYP.
G
1
TYP.
6' - 0"
01
LEVEL 2 15' - 0"
9' - 0"
TYP.
3' - 0"
01
2
LEVEL 3 28' - 6"
9' - 0"
4' - 6"
01
LEVEL 4 42' - 0"
9' - 0"
4' - 6"
01
14' - 0"
ROOF 56' - 0"
LEVEL 1 0' - 0"
EL. 89' - 00"
PAINTED STEEL FRAME GATE C.I.P. CONC. WALL W/ FORMLINER TEXTURE TYP.
PTD. STL. C-CHANNEL BEAM TYP.
NARROW-FRAMED PTD. ALUM.-FRAMED GLASS DOOR TYP.
FRAMELESS GLASS DOOR
S 01
MP-3 GUNMETAL GREY FLAT CANOPY ALUM. PANEL MP-3, GUNMETAL GREY FLAT ALUM. PANEL
MP-1, ALUM. GUNMETAL GREY CORRUGATED PANEL
E
199' - 0" 35' - 0"
D
GUNMETAL LACQUER FINISH GUARDRAILS & HANDRAILS TYP. 1/4" DIAM. BALLUSTERS TYP.
8 ________ ________ A2.201
C 35' - 0"
14 ________ ________ 6 ________ ________ A2.202 A2.202
B 37' - 6"
A 19' - 0"
T.O. MECH. PROJECTION 69' - 0"
ROOF 56' - 0"
LEVEL 4 42' - 0"
2' - 0"
11' - 6"
3' - 6"
10' - 6"
5' - 1"
7' - 11"
35' - 0"
16 ________ ________ A2.201
LEVEL 3 28' - 6"
OPEN SLOT
12' - 0"
19' - 6"
FOR LEVEL 2 ELEVATION BEHIND SHROUD WALL REFER TO SECTION 14/A2.201
LEVEL 2 15' - 0"
LEVEL 1 0' - 0"
EL. 89' - 00"
C.I.P. CONC. FORMLINER TEXTURED SITE PERIMETER WALL TYP.
C.I.P. CONC. FORMLINER TEXTURED WALL TYP.
PTD ALUMINUM NARROWFRAMED GLASS DOOR, TYP.
15
PTD. ALUM. ACCORDION GLASS FOLDING DOOR
L
Portfolio SKYLIGHT TYP.
36" RAISED PLANTER TYP. IPE BENCH OVER CONC. IPE CLAD TYP.
C.I.P. CONC. WALL TYP.
PTD. STL. C-CHANNEL BEAM TYP.
16
C.I.P. CONC. WALL TYP.
Woodruff
GUNMETAL GREY STANDING SEAM ROOFING
SKYLIGHT
GUNMETAL GREY CORRUGATED STEEL RAINSCREEN TYP. GUNMETAL GREY FLAT ALUM. PANEL RAINSCREEN TYP.
GLAZED PUNCHED OPENING W/ PTD. ALUM. FRAME TYP.
INSULATED GLAZING SYSTEM W/ BRUSED S.S. HEAD & SILL SHOE TYP. & BUTT JOINTED JAMBS GUNMETAL LACQUER FINISH GUARDRAILS & HANDRAILS TYP.
STAINED CONCRETE / TEXTURED CONC. FLUSH W/ ASPHALT. TYP. PTD. STL. C-CHANNEL BEAM TYP. MOTORIZED ROTATING DOOR W/ STL-FRAMED GLASS CLADDING TYP. C.I.P. CONC. WALL TYP.
STEEL & WOOD TRELLIS TYP.
PLANTER BED TYP.
8" CMU WALL TRASH ENCLOSURE
IPE CLAD 36" RAISED PLANTER TYP. IPE BENCH OVER CONC. TYP.
17
18 Portfolio
Woodruff
19
Portfolio
Category
Core & Shell
Status
Built
Country
City
USA
Los Angeles
COMPREHENSIVE PLAN AM
Project Team Michael White, Kevin Kilmer, Peter Himmelstein, Yupil Chon, Xiao Liu, Michael Woodruff
Project Phases 20
SD
Project Responsibilties • • •
Prepared city planning comprehesive plan documents Prepared plans, sections, elevations, and diagrams for city planning environmental impact report Prepared presentation drawings for client
Woodruff
Culver Studios Parking Garage 2015-2016 Rendering by Kilograph
MENDMENT 6 | JUNE 8, 2016
THE CULVER STUDIOS |
Project Description The Culver Studios garage is a six level parking facility designed to provide parking for the employees who work at the Culver Studios campus. The challenge for the garage was to not only provide parking for the studio employees, but also consider the buildings context in its residential neighborhood. The design employs a louvered facade & street landscaping to soften its presence on the site. Powder coated aluminum channel cladding provides a visual break between the cars and the neighboring residences, while also providing the ventilation required of a parking structure. Van Buren Street enjoys an abundance of existing trees lining the sidewalks, and the new landscaping along the sound facade compliments the existing greenery providing a pleasant sidewalk environment.
21
Portfolio
REVISED - VAN BUREN PARKING GARAGE VAN BUREN PLACE ELEVATION
2
1
Property Line
Property Line
14'-04" (@ Roof Level Only)
64’-00”
Top of Mechanical Overrun
59’-60”
Top of Parapet
56’-00”
Top of Roof - 6th
45’-10”
Top of Slab - 5th
35’-08”
Top of Slab - 4th
25’-06”
Top of Slab - 3rd
15’-04”
Top of Slab - 2nd
0’-00”
Grade Level
Landscape
2
Van Buren Parking Garage Van Buren Place Elevation 1/32”=1'-0” @ 11"x17" 0'
8'
16'
32'
64'
Materials
Property Line
22
COMPREHENSIVE PLAN AMENDMENT 6 | JUNE 8, 2016
1 Concrete
2 Aluminum Screen THE CULVER STUDIOS | 17
56'-00"
Top of Roof - 6th
Woodruff
45'-10"
Top of Slab - 5th
CPA 6 - VAN BUREN PARKING GARAGE FACADE SCREEN - 36" OFFSET & UPPER LEVEL BLUE COLOR
35'-08"
Top of Slab - 4th
25'-06"
Top of Slab - 3rd
COLOR 01 COLOR 02 Lower to mid canopy Upper canopy
COLOR 03 Trunk and branches
15'-04"
Top of Slab - 2nd
12'-00"
Top of Perimeter Fence
36" Offset
0’-00”
Grade Level
KING GARAGE ON - 36" OFFSET & UPPER LEVEL BLUE COLOR
E PLAN AMENDMENT 6 | JUNE 8, 2016
COMPREHENSIVE PLAN AMENDMENT 6 | JUNE 8, 2016
THE CULVER STUDIOS | 19
32' - 05" 18' - 01" 11' - 11" 59'-60"
Top of Parapet
56'-00"
Top of Roof - 6th
45'-10"
Top of Slab - 5th
35'-08"
Top of Slab - 4th
Property Line
25'-06"
Top of Slab - 3rd
EXISTING GARAGE 15'-04"
Top of Slab - 2nd
12'-00"
Top of Perimeter Fence
0’-00”
Grade Level
23
COMPREHENSIVE PLAN AMENDMENT 6 | JUNE 8, 2016
24 Portfolio
Woodruff
25
Portfolio
Category Core & Shell
Status Built
City
Country
Los Angeles
USA
8777 Washington 2017 Project Team Michael White, Kevin Kilmer, Ryan Ihly, Michael Woodruff
26
Project Phases SD, DD
Project Responsibilties • • • • • •
Prepared plans, sections, elevations, and diagrams for city planning environmental impact report Prepared presentation drawings for client Built project BIM model from scratch Developed DD Documents Coordinated with rendering artist Coordinated with model builder
Woodruff
Rendering by Kilograph
Project Description The prompt for this office building considered a variety of factors in the building design. The building was designed for a creative office space to include open floor plans plenty of light and easy access to communal spaces. The building location is also within the Culver City area of impact directly adjacent to the Expo Line. The solution was a design for mixed use retail on ground level, office levels above and parking below ground. Floor to ceiling windows and skylights above the stair provide ample natural light reaching well within the building.
27
28 Portfolio
Woodruff
29
Portfolio
30
P.L.
RENDERED WALL SECTION
gton | June 12, 2017
Woodruff
ARTICULATION RENDERED PARTIAL ELEVATION
31
Portfolio
INTER�CONNECTING STAIR 1 2 3 4
Key Notes Pantry Skylight 3-Story Feature Wall Feature Wall
ALL HANDS SPACE Typical Floorplan NTS
SPACE
Floorplan - Level 4
Floorplan - Level 3
Section
8777 Washingt
1 2 3 4 5 6 7 8
Key Notes Bleacher Stairs Conference Room Flexible Open Space Pantry Open to Below Patio Retractable Screen Skylight Section
32
Floorplan - Level 3
Perspective View
Woodruff
Typical Floorplan NTS
DS SPACE
Section 8777 Washington | June 12,
Floorplan - Level 3
Section
8777 Washington | June 12, 2017
33
Portfolio
Aerial view of Washington and National Blvd intersection
34
8777 WASHINGTON | COMPREHENSIVE PLAN
Woodruff
Site Plan
fo pr a4 loc lev to ap te re sit th bu an rig
35
LEVEL 02 15' - 6"
Portfolio
07
SHEET NOTES 01 02 03 04 06 07 08 09 10 11 12
ARCHITECTURAL CONCRETE TOPPING. ALUMINUM STOREFRONT DOOR, TYP. BUTT-GLAZED GLASS WALL. LOUVER CANOPY SYSTEM, TYP. CONT. RECESSED LOUVER VENT SYSTEM, TYP. CONT. EXTRUDED METAL PANEL FASCIA, TYP. ACM SOFFIT PANEL, TYP. WINDOW WALL SYSTEM, TYP. TRANSOM GLASS SYSTEM, TYP. SLOPED WALKWAY, REFER TO CIVIL. PLANTER BOX.
08
E
8777 WASHINGTON
06 10
09 LEVEL 02 15' - 6"
03 07 08 06
________ ________ 5 A5.602
10
12
500 South Figueroa Street Los Angeles, California 90071 United States
03
1' - 0"
Tel 213.327.3600 Fax 213.327.3601
LEVEL 01 0' - 0"
________ ________ 3 A5.601
________ ________ 5 A5.602
5
FACADE WALL SECTION AT PLANTER 12 SCALE: 3/8" = 1'-0"
3
R
3
R
2
R
2
R
1
R
SC
________ ________ 3 A5.601
1' - 0"
5
LEVEL 01 0' - 0"
E
FACADE WALL SECTION AT PLANTER SCALE: 3/8" = 1'-0"
SCA
09 LEVEL 02 15' - 6" 07 08 06
E
10 04
09
SC
LEVEL 02 15' - 6"
GENERAL NOTES A. REFER TO SHEET G0.200 FOR GRAPHIC SYMBOLS AND ABBREVIATIONS.
36
Date
1 2 3 4 5
\\gensler.ad\projects\RevitUserModels\16503\8777_WASHINGTON_(HBO)_R16_16503.rvt 6/10/2017 7:32:39 PM serModels\16503\8777_WASHINGTON_(HBO)_R16_16503.rvt
07
03/06/2017 03/31/2017 04/14/2017 05/05/2017 05/26/2017
08 03 06 10
________ ________ 3 04 A5.601
________ ________ 4 A5.601
LEVEL 01 0' - 0"
SCA
03
Description
50% SCHEMATIC DESIGN 75% SCHEMATIC DESIGN PROGRESS 100% SCHEMATIC DESIGN LEASE RECORD SET RETAIL FACADE WALL LEASE RECORD SET SCALE: 3/8" = 1'-0"
4
________ ________ 3 A5.601
________ ________ 4 A5.601
LEVEL 01 0' - 0"
SECTION
SC
07
06
10
04
07
06
10
Woodruff
04
12
02
11
01
03
11
02
12
12
02
11
01
03
11
02
12
L FACADE AXON
L FACADE AXON
5
5 ________ ________ A4.104
5
5 ________ ________ A4.104
4 ________ ________ A4.104
6
4 ________ ________ A4.104
10
06
07
LEVEL 02 15' - 6"
6
10
06
07
LEVEL 02 15' - 6"
LEVEL 01 0' - 0" 12
02
04
03
04
02
12
L FACADE ELEVATION
LEVEL 01 0' - 0"
-0"
12
02
5
L FACADE ELEVATION
-0"
5
04
5 ________ ________ A4.104
03
E
6
4 ________ ________ A4.104
RETAIL
02
12
6
4 ________ ________ A4.104
5 ________ ________ A4.104
04
RETAIL
RETAIL
RETAIL
2
E
A4.104 12
02
11
01
03
11
02
12
03
11
02
12
2 A4.104 12
02
11
01
L STOREFRONT ENLARGED PLAN
-0"
-0"
37
L STOREFRONT ENLARGED PLAN
Portfolio
Category
Tenant Improvement
Status Built
City
Country
Los Angeles
USA
CAPITAL GROUP 2015 Project Team Michael White, Kevin Kilmer, Ryan Ihly, Michael Woodruff
Project Phases 38
CD, CA
Project Responsibilties • • • •
Answered RFI’s Approved material samples Visited construction site CD Documentation, plans, interior elevations, details
Woodruff
Rendering by Kilograph
Project Description This office interior project started with a concept to provide a unifying element of warmth within existing floors of an office tower. This concept was acheived with and undulating wood slat wall which not only provided clear direction to program and circulation but also provided acoustic insulation to offset the existing stone tile flooring. Living green walls further accentuate the wall giving the space a vibrant character. The challenge of this project was concealing green wall system within the wood slats for a clean modern look.
39
40 Portfolio
11
OOFING BRANE
8 1/2"
METAL TRIM
Woodruff
1/2" REVEAL
SCHEDULED FINISH
DEMOUNTABL SEE PLAN FO
7 1/2"
NOTE: FINAL INSTALLATION DETAILS TO BE COORDINATED AND REVIEWED WITH GREEN WALL MANUFACTURER'S SHOP DRAWINGS.
R DRAIN MBING.
5
3/4" MARINE G
GREEN WALL SECTION END
S DOOR L WITHSCALE: 3" = 1'-0" LATCH DWARE
DEMOUNTABLE PARTITION SEE SCHEDULE FOR TYPE
HSS 3X3X1/4 SUPPORT FRAMING FOR GLAZING SYSTEM
LACQUERED MDF FASCIA BOARD FINISH TO MATCH EXISTING
9
GREEN WALL SERVICE CLOSET
SCALE: 3/4" = 1'-0"
6
NOTE: FINAL INSTALLATION DETAILS TO BE COORDINATED AND REVIEWED WITH GREEN WALL MANUFACTURER'S SHOP DRAWINGS. GWB OVER 3 5/8" MTL STUD FRAMING TYP
GWB OVER 6" W/ BATT INSU TYP
GREEN WALL SECTION END @ DOOR NOTE: FINAL INSTALLATION DETAILS TO BE COORDINATED AND REVIEWED SCALE: 3" =WITH 1'-0" GREEN WALL MANUFACTURER'S SHOP DRAWINGS.
6 3/8"
CUSTOM WOOD WALL PANELS BREAK METAL WALL 2" TRIM
1 1/2" ALIGN
GWB OVER 6" MTL STUD FRAMING TYP
1/4" MTL PLATE FIN AT BASE FOR DRAINAGE PIPE HOUSING
1 1/2"
3/4" MARINE GRADE PLYWOOD 1/4" MTL PLATE FIN MOLD AND MILDEW RESISTANT 1 1/2" Z CLIPGYPSUM SUBFRAMING BOARD (5/8") BEHIND FOR ATTACHMENT PLANTERS
8 1/2"
VEGETATION PLANTERS
WATER PROOF MEMBRANE
7 1/2"
1 1/2"
BREAK METAL WALL TRIM
3/4" MARINE GRADE PLYWOOD
SCHEDULED FINISH
BATT INSULATION WATERPROOFING MEMBRANE 8 1/2"
WATER SUPPLY CONNECTION FROM CONTROL TO WALL
TYP JAMB AT WAR ROOM GREEN WALL
FLUSH ACCESS PANEL WITH TOUCH LATCH HARDWARE. FINISH TO MATCH ADJACENT er.ad\projects\RevitUserModels\20976\06.9850.100_Capital Group NAD_2014_20976.rvt SURFACE. SCALE: 3" = 1'-0"
NOTE: FINAL INSTALLATION DETAILS TO BE COORDINATED AND REVIEWED WITH GREEN WALL MANUFACTURER'S SHOP DRAWINGS.
GREEN WALL IRRIGATION CONTROL PANEL BY GREEN WALL MANUFACTURER.
GREEN WALL SECTION W/ CONTROLLER ADJACENT
SCALE: 1 1/2" = 1'-0"
ALIGN 1 1/2"
BREAK METAL WALL TRIM CUSTOM WOOD WALL PANELS VEGETATION PLANTERS
8 1/4"
3/4" MARINE GRADE PLYWOOD
WATER PROOF MEMBRANE
7 1/2"
MOLD AND MILDEW RESISTANT GYPSUM BOARD (5/8") BEHIND PLANTERS
SCHEDULED FINISH
E: FINAL INSTALLATION DETAILS TO BE COORDINATED AND REVIEWED GREEN WALL MANUFACTURER'S SHOP DRAWINGS.
GREEN WALL SECTION END
SCALE: 3" = 1'-0"
41
DEMOUNTABLE PARTITION SEE SCHEDULE FOR TYPE
HSS 3X3X1/4 SUPPORT FRAMING
GWB OVER 3 5/8" MTL STUD FRAMING
Portfolio
4
FEATURE WALL SCALE: 1/2" = 1'-0"
6 ________ ________ A3.400
GREEN WALL
15 ________ ________ A3.400
7' - 6"
________ ________ 7 A5.402
EN FICE ALK P09
OPEN
9 ________ ________ A3.400
OPEN
OPEN
GREEN WALL
SY OP
7' - 6"
EN FICE ALK P09
15 ________ ________ A3.400
FIRE SHUTTER POCKET
8 ________ ________ A3.400
8 ________ ________ A3.400
3 ________ ________ A3.410
EN FICE ALK S08
GREEN WALL
OPEN
2 1/2"
2 1/2"
1 ________ ________ A3.410
SY OP
42
EN FICE ALK L10
7' - 6"
15 ________ ________ A5.402
REPEAT MODULE SERIE OPEN
CO
12' - 0"
4' - 0"
PANEL SERIES WIDTH REPEAT
A(I)
B(I)
4' - 0"
BEGIN WOOD PANEL SERIES @ END OF FEATURE WALL. REFER TO A3.102 FOR FEATURE WALL LAYOUT DIMENSIONS
4' - 0"
WD PANEL WIDTH
C(I)
A(I)
B(I)
C(I)
11 ________ ________ A3.410 REPEAT
REPEAT
REPEAT
B
C
A
B
C
A
A
B
C
A
B
C
C
A
B
C
A
B
INVERTED PANEL SERIES
OPEN
YM________ 16 ________ PP A3.400
Seal/Signature GREEN WALL
A(I)
B(I)
8 ________ ________ A5.402
B
C
C(I) 16 ________ ________ A3.400
A(I)
B(I)
OPEN
C(I)
INVERTED PANEL SERIES
11' - 2"
REPEAT
REPEAT
14 ________ ________ A3.400
A
B
C
A
A
TYP 6 ________ ________ B A3.400
C
A
B
OPEN TO ABOVE
C
ALIGN
27' - 1 1/2" REPEAT
Woodruff
L SAMPLE MODULE LAYOUT
FIRE SHUTTER POCKET
YM ________ 16 ________ PP A3.400 REPEAT
REPEAT
A(I) B
B(I) 13 ________ ________ A5.402
B
16 ________ ________ A3.400
C(I)
C
A
14 ________ ________ A3.400
A(I)
B(I)
C
A
B
C
C(I) A
ES PATTERN
GREEN WALL
A
CURVED WALL
B
C
________ ________ 2 A3.101
15 ________ ________ A3.400
9 ________ ________ A3.400
OLLABORATE 49R08
B
ALIGN
REPEAT
A
OPEN
A
B
C
7' - 6"
C
GREEN WALL
OPEN
INVERTED PANEL SERIES
Project Name Capital Group LA Project Number 06.9850.100
Description ATRIUM FEATUR Scale As indicated
PANEL MODULE A
PANEL MODULE C PANEL MODULE B
A3.1 43
8 ________ ________ A3.400
© 2013 Gensler
Portfolio
GENERAL
NOTE: 1. FINISH OF WOOD FEATU BASE SCOPE: SOLID OAK
ALTERNATES: A. SOLID CEDAR - PER MO B. OAK VENEER OVER FIR C. LACQUERED - FIRE RET
PANEL C
PANEL A
PANEL B
PANEL C
PANEL A
PANEL A
PANEL B
PANEL C
1 LEVEL FLOOR TO FLOOR
PANEL A(I)
PANEL B(I)
PANEL C(I)
PANEL B
12' - 0"
44
1 PANEL SERIES
4
FEATURE WALL SAMPLE MODULE LAYOUT SCALE: 1/2" = 1'-0"
12' - 0"
4' - 0"
4' - 0"
4' - 0"
Woodruff
3
FEATURE WALL PANEL KIT 1" 1"OF PARTS
2"
f
dd
1"
3" 3"
1"
ee
1"
1"
cc
2"
1"
1"
3"
3"
bb
e 3" 3"
1"
d
2"
2" 2"
aa
c
2"
b 3" 3"
2" 2"
1"
3"
2"
a
1" 1"
2" 2"
SCALE: 6" = 1'-0"
GREY HATCH INDICATES 1" GAP BETWEEN WD SLATS
1" 1"
2" 2"
1" 1"
FEATURE FEATUREWALL WALLPANEL PANELKIT KITOF OFPARTS PARTS SCALE: SCALE:6" 6" = 1'-0" = 1'-0"
a
e
c
d
a
PANEL PANELAA f
b
c
f
a
d
e
b
c
f
e
a
d
FEATURE WALL WD PANEL MODULES
REFER TO ELEVATION
PANEL B
4' - 0"
SUBSTRATE
2
REFER TO ELEVATION
PANEL A
REFER TO ELEVATION REFER TO ELEVATION
REFER TO ELEVATION REFER TO ELEVATION
REFER TO ELEVATION
GREY GREY HATCH HATCH INDICATES INDICATES 1" 1" GAP GAP BETWEEN BETWEEN WDWD SLATS SLATS
4' - 0"
c
f
a
e
d
b
f
a b
e
d
f
PANEL C
4' - 0"
c
b
f
a
d
e
PANEL PANELBB f
c
e
d
a
f
b
c
b
f
a
d
e
a b
c
e
f
SCALE: 1" = 1'-0"
6 ________ ________ A3.400
ELEVATOR LOBBY 52G10
OPEN
OPEN OFFICE WALK 52P09
15 ________ ________ A3.400
________ ________ 7 A5.402 ELEVATOR LOBBY 51G10
OPEN
a ae e c c d da a f f b bc c f f a ad d e eb bc c f f e ea ad d
ELEVATOR LOBBY 50G10
4' -4'0"- 0" OPEN 15 ________ ________ A3.400
c c f f a a e e d d b b f f a ab b e e d d f f c c b b f f a a d d e e
FEATURE FEATUREWALL WALLWD WDPANEL PANELMODULES MODULES OPEN
OPEN OFFICE WALK 50S08
1 ________ ________ A3.410 2 1/2"
= 1'-0" = 1'-0" SCALE: SCALE:1" 1"
OPEN OFFICE WALK 51P09
15 ________ ________ A5.402
OPEN
45
8 ________ ________ A5.401
2 1/2"
SUBSTRATE SUBSTRATE
4' -4'0"- 0"
Portfolio
1' - 0
WOOD SLAT W SEE A3.102 FO TYPES (BY MN 20% OPEN PER SUBSTRATE (B VARIES
2"
8"
BLACK ACOUS FABRIC (BY MN
1" RIGID INSUL (BY MNFR)
PLYWOOD BAC (BY MNFR)
Z CLIP ATTACH (BY MNFR) LIGHT FIXTURE AS SCHEDULED CEILING AS SCHEDULED
SEALANT 2X2 STL ANGLE FOR ATTACHMENT
1/4" STL PLATE SEE SCHEDUL FOR FINISH
PRE-WELDED TO STL PLATE BOLTED TO ST FRAMING
46
5
TYP FEATURE WALL PORTAL SCALE: 3" = 1'-0"
Woodruff
Ca LA
?
3
0"
WALL OR PANEL NFR) RF. WOOD BY MNFR)
1/2"
+/- 4" BY MNFR
333 CA.
GWB FASCIA 4X4 TUBE STL HANGAR FROM (E) STL BEAM ABOVE
STICAL NFR)
LATION 4X4 TUBE STL MEMBERS ATTACHED TO HANGAR FOR STL PLATE FIN SUPPORT
CKING
1/2"
HMENT
TO. FINISH VARIES SEE ELEVATION FOR HEIGHT
E FIN LE
SEE PLAN FOR DP TYPE
STL ANGLE E TO BE TL TUBE VARIES
6 1/2"
4"
Rev
@ HEAD
3
47
Portfolio
Category
Tenant Improvement
Status
Incomplete
City
Country
Los Angeles
USA
RED BULL MEDIA HOUSE 2016 Project Team Michael White, Kevin Kilmer, Ryan Ihly, Michael Woodruff
Project Phases 48
SD, DD
Project Responsibilties • •
Presentation drawings DD documentaion
Woodruff
Project Description Red Bull Media House came to Gensler to to add media production office space to revamp it’s current office in Santa Monica. This includes sound rooms, editing rooms and a newsroom control center. The newsroom, used as a media control room, is designed as a central figure within the space representing the control center of the media house. The team sculpted the newsroom with a substructure and tensile fabric to display the finished media on to the surface of the newsroom allowing the company to project it’s exciting work within the space.
49
Portfolio 12
C
13
C
A3.106
12
C
19
GENERAL NOTES
1740 STEWART ST. SANTA MONICA, CA 90404 NEC
A8A
1UN
- X55
NEC 1UN - X55
500 South Figueroa Street Los Angeles, California 90071 United States
Tel 213.327.3600 Fax 213.327.3601
NEC - X551 UN
X551UN NEC NEC - X551UN
DMC 1281
7
DMC 1281
NEC - X551UN
3
17 6
A3.105
A3.106
EL. 0"
EL. 7" A3.106
4 NEC X551UN
5
NEC - X551 UN
- X55 1UN
A8A
NEC
NEC - X55 1UN
A8A
SHEET NOTES 9
B
B
1
A3.106
ENLARGED PLAN - DMC SCALE: 1/4" = 1'-0"
13
6
SECTION - DMC SCALE: 1/4" = 1'-0"
B
3
12
Date
Description
3/4/2016
DESIGN DEVELOPMENT
SECTION - DMC SCALE: 1/4" = 1'-0"
12
13
Seal / Signature
? Project Name
1740 STEWART Project Number
05.9575.000 Description
ENLARGED PLANS & INTERIOR ELEVATIONS - DMC Scale
1/4" = 1'-0"
4
SECTION - DMC SCALE: 1/4" = 1'-0"
5
SECTION - DMC
A3.105
SCALE: 1/4" = 1'-0"
50
© 2015 Gensler
Woodruff
51
Portfolio
4
PRODUCTION ZONE
PRODUCTION ZONE
52
05.9575.000 | DESIGN DEVELOPMENT
Woodruff
53
Portfolio
Projects
2018-2021
54
da-Collective
Woodruff
55
Portfolio
Category Core & Shell
Status
In Construction
City
Country
Seoul
South Korea
INSPIRE RESORT ARENA 2018 - 2019 Project Team Yupil Chon, Soo Ahn, Markus Sohst, Graciela Hodgson, Xiangtai Sun, Charles Wang, Yan Leng, Harry Lyu, Michael Woodruff
Project Phases 56
SD, DD, CD
Project Responsibilties • • • •
Provided design direction for junior employees Provided structural, mechanical & facade design coordination materials BIM management Oversaw CD documentation
Woodruff
Project Description
57
IIR is a new type of resort in Korea, integrating Life style, entertainment and leisure activities in one large venue. The project consists of three different Hotels one Arena and Casino, combined with a large Retail section and a water dome with spa areas. da-Collective provided the architectural design and coordinated facade design options with the executive architect and consultants and the ownership. Bold contrasting colors of the metal facade panels dynamically placed at the exterior envelope, create an illusion of infinity. The slender glazing slots stretch horizontally around the envelope and further emphasize the linear infinity loop of the facade.
Portfolio
ROOF LOWER EVA EL +26750
LV 03 EVA EL +11500 LV 01 EVA EL +3500
58
ALL UNITS ARE IN MILLIMETERS UNLESS NOTED O
Woodruff
EL +3350
2
AXONOMETRIC - EVA SOU 엑소노메트릭(북서측)
-
SCALE(A1)
59
Portfolio
AR-17
AR-16
AR 2
7 9,
AR-EVA-3201
4,150
AR-26
11,000
70
7,650
GREEN RM 1 그린룸-1
11,000 GREEN RM 3 그린룸-3
EXEC OFFICE-2 임원사무실-2
EVA.ST-6A
GREEN RM 2 그린룸-2
AR-25
EL +2,800
3 9,
90 ,1 0 38 ,65 18
3 9,
70
임원사무실-1 OFFICE-11 사무실-11 OFFICE-10 사무실-10 OFFICE-9 사무실-9 OFFICE-8 사무실-8 OFFICE-7 사무실-7
25
STAFF ENTRY
MTG2 회의실
7, 5 48
EGRESS CORR.
0 63 6,
REHERSAL 리허설실
AR-C
5 31 MULTI PURPOSE 다목적실
2, 0 60
DRESSING 3 탈의실-3 DRESSING -2 탈의실-2
DOCTOR'S 의무실
EVA.ST-5
3,3
VEST. 4 전실
90
7,145
STO-4 창고-4
OFFICE-12 사무실-12
CORR. 복도
COPY 복사실 STO-OFF 창고-사무실
°
EDGE OF FIRST T @ EL:7480mm
22.50°
EDGE OF FIRST T EL:3800mm
0
TR(M) 화장실(남)
3000W X 3500H EQUIPMENT ENTRY
22.50°
EL +3,350
FLOOR MOUNT
22 .5 0
°
3 ,0 5
0
. 50 22
2 ,4 0
29,245
EGRESS CORR.
AR-D TR-06 (W=300) (PJW-9907)
TRAINING 연습실
CORR. 복도 FAV
11,100
AR-B
CHANGING-1 탈의실-1
BOH CORR. BOH복도 ADMIN OFFICE 관람장 사무실
OFFICE-3 사무실-3
850
AR-7 SLOPE 1 /147.2
41,500
AR-EVA-3102
8,550
8,550
3,100
3,800
7,200
15,300
11,000
2
15,100 TR(W) 화장실(여)
ELEC-EVA2 부전기실
EVA.ST-4A
RETRACTABLE SEATING
LIGHTING STO. 조명장비실
3 2
EVENT 공연
1
AR-9
PIT ACCESS
8,400
EL +3,500
CON'C PAD
EDGE OF FIRST T RETRACTABLE SE
EL +3,500
. 50 22 °
STO-1 창고-1
AHU 공조실
EGRESS CORR.
2 ,4 0
0 60 9,
CON'C PAD
22 . 50
.00° 0 25
00
9,
50
LIQUOR STO 주류보관실
VIP CORR. VIP 복도
0
CON'C PAD
EGRESS CORR.
TR-06 (PJW-9
3,
3 ,7
°
BUNKER SUITE VIP 접견실
39
2 ,0
29
FLOOR M
EDGE OF PRECAST
0
60 0
OA LOUVER
0
22.50°
135
9,845
3,800
22.50°
CON'C PAD
EA LOUVER
9,845
15,100
PRESS RM 기자실
18,050
19,400
AUDIO STOR. 음향 장비실 EVA.ST-4B
850
AR-EVA-3201
BOH CORR. BOH복도
11,000
AR-8
AR-A
EVA.ST-6B
3,
AR-24
25 EXCE OFFICE-1
18,050
7 9,
OFFICE-6 사무실-6 OFFICE-5 사무실-5 OFFICE-4 사무실-4
2,395
EGRESS CORR.
MDF
7, 0 20
AR-20
EVA.ST-3A
STO-3 창고-3
,6 13
6,700 TPS
00
MAIN KITCHEN 주방
0 9,8
STO-2 창고-2
EVA.ST-3B
0
AR-23
VEST. 전실
EPS
FAV EGRESS CORR.
00
EVA.EV-2
OFFICE-1 사무실-1
BRAI
,6 13
AR-22
,4 23
REFER TO RETAIL
EVA.EV-2
CORR-KIT 복도
00
MNG OFF 매니저사무실
PIT ACCESS EVA.ST-2A
AR-19 AR-21
4,300
13,
VI P E 11,000
60
AR-18 AR-17
11,000
AR-16
AR
AR-13
AR-31
AR-29
1 AR-EVA-3101
101,250 11,000
21,950
7,650
10,500
AR-4
4,150
11,600
인천국제공항 국제업무지역(IBC)-III
13,200
AR-5
RAMP
인스파이어 복합리조트 개발사업(1단계)
EL +3,350
3,850
EVA.ST-7B
MEDIA
TRASH 분리수거실
CON'C PAD
4,400
9,
EPS
2,600
3,600
2,200 LOADING DOCK 하역장
8,
0 63 00
3,
16 ,3
시공전 설비도면 참조하여 SHOP DWG 작성 EL +3,500 EVA.ST-8
6,215
2,
FIRE SHUTTER (PJW-9905)
AV CONTRL AV 조정실
°
11,000
EGRESS CORR. EL +3,350
5,500
. 50 22
18,050
5
이질 재료간의 접촉부(콘크리트와 벽돌, 블
4,000
UPS-EVA1 UPS
AR-7
850
22.50°
SMOKE CURTAIN ABOVE
15,100 11,000
1
9,720
3,630
AR-EVA-3102
EVA.ST-9A
AR-8
FIRE SHUTTER (PJW-9905)
EVA.ST-9B
4,550
15,100
할것 5. INTERIOR WALL AND FURNITURE ETC.
EPS
AR-9
850
5
배관후 콘크리트를 타설하여 층간방화구획
11,000
EL +3,500
TPS
HOLDING CELL 홀딩셀
EL +3,350
°
EGRESS CORR.
22 .5 0
F FIRST TREAD OF T SEATING @ EL:7480mm
. 50 22
FIRE SHUTTER (PJW-9905)
°
SMOKE CURTAIN ABOVE
22.50°
(W=300) 9907)
인테리어 벽체 및 가구 등. 6. REFER TO AV DWG FOR SHOW LIGHTING/ SPORTS LIGHTING / SPECTATOR LIGHTING 7. FIREPROOFING REQUIREMENT FOR ROOF S - STRUCTURE MEMBERS FOR RP--01-SS: INTU PAINT APPLIED (SEE SPECIFICATION) - STRUCTURE MEMBERS FOR RP-01-MO: SPR FIREPROOFING (SEE SPECIFICATION) - ALL OTHER VISIBLE STRUCTURE MEMBERS AS NOTED (SEE SPECIFICATION)
9,845
18,050
MOUNTED HYDRANT
8,400
22.50°
TREAD OF EATING @ EL:3800mm
등을 제시하여 감리자의 승인을 득할 것 4. PLACE CONCRETE AT SLAB OPENINGS OF ALL MEPF PIPING AFTER PIPING CONSTRUCTION FOR FIRE COMPARTMENT BETWEEN FLOORS
각종 설비배관의 슬라브 오픈 부위는 설비
BUS LOBBY
ELEC-EVA1 부전기실
6,450
T FLOOR 연장
3,800
보강블럭(W=200), 균열유도 줄눈 등을 설치
CONTROL JOINT 위치, 재료, 규격, 시공방법
4 1
기타)의 마감부위는 긴결철물을 설치, 메탈 연속된 미장바름 면적이 넓은 경우에는
3000W X 3500H EQUIPMENT ENTRY
FL : ± 0 SL : FL -150
11,000
3,800
감독관 및 감리자의 승인을 득한 후 시공 할 3. INSTALL CLADDING ANCHOR, METAL LATH REINFORCED BLOCK(W=200), CONTROL JOINT FOR INTERFACE FINISH OF DIFFERENT MATERIALS(CONCRETE AND BRICK, BLOCK ETC.). WHEN CONTINUOUS PLASTERING COVER IS LONG, SUGGEST CONTROL JOINT LOCATION, MATERIAL, STANDARD, CONSTRUCTION METHOD AND ETC. AND GET APPROVALS FROM SUPERVIS
BD CONTROL 방송실
°
TREAD OF RETRACTABLE SEATING @
설비관련 모든 벽체 및 슬라브의 OPEN은
0 65
75,650
0
SECURITY-1 경비실-1
7,245
12,500
55
45
7,
,2
22 . 50
AR-6
13,200
11
TED HYDRANT
6,700
MARSHALLING-NE 행사지원실
DRESSING -5 탈의실-5
22.50°
0 85
LAUNDRY 세탁실
FAV
STO 창고
TREAD OF PRECAST SEATING
7,
OFFICE-15 사무실-15
ARCHITECT OF RECORD 4/F Hyundai Building, 75, Yulgok-ro Jongno-gu, Seoul, Republic of Kore T +82 (2) 746-6500 F +82 (2) 513-5000
※NOTE 1. LEVEL - LV 00 EVA = EL 550 = FL ±0 - LV 01 EVA = EL 3,500 = FL ±0 - LV 03 EVA = EL 11,500 = FL ±0 - LV 04 EVA = EL 17,500 = FL ±0 - LV 05 EVA = EL 22,200 = FL ±0 - LV 06 EVA RIGGING = EL 26,700 = FL ±0 - ROOF LOWER EVA = EL 26,750 = FL ±0 - ROOF UPPER EVA = EL 39,710 = FL ±0 2. CONSTRUCT ALL MECHANICAL RELATED WALL AND SLABE OPENINGS AFTER GETTING APPROVALS FROM SUPERVISORS WITH SHOP DRAWINGS REFERING TO MECHANICAL DRAWINGS BEFORE CONSTRUCTIO
35
0
PIT ACCESS
STO-5 창고-5
DRESSING 4 탈의실-4
3,600
2,
85
0
0 12
.
DOWNSPOUT LOADING DOCK PLATFORM
14,950
11,605
STRIP DOOR
AHU 공조실
AR-30
7,450
EL +2,300
CON'C PAD
10,250
CON'C PAD
12,055
2,395
EA LOUVER
EVA.ST-7A
INSPIRE INTERGRATED RESORT
CANOPY ABOVE
OA LOUVER
GREEN RM 5 그린룸-5
7,500
GREEN RM-4 그린룸-4
OFFICE-14 사무실-14
AR-27
5,000
11,000
TPS
AR-28
Woodruff
AR-14
R-15
CON'C PAD OA LOUVER
5,100
TR-02 (W=200) (PJW-9907)
CYLINDER RM 소화가스실
3 ,7
CON'C PAD
STO 창고
8, CON'C PAD
EA LOUVER
50 AHU 공조실 VEST. 2 전실
65 0
VIP LOUNGE VIP라운지
BAG CHECK 가방체크실
EL +3,350
PANTRY 보조주방
FS PLANT 소방펌프실
EVA.EV-1
EL LOBBY 승강기 로비 EL +3,500
LV 01 FLOOR PLAN 1층 평면도
9,8 0
AR-11
TR(W) 화장실(여) TR(M) 화장실(남)
4,550
Date
DRAWING TITLE
EVA.ST-1A BRAILLE TILE
Rev.
7th CD PKG 1 (CD100) 6th CD PKG 1 5th CD PKG 1-1 4th CD PKG 1 (CD 50) 3rd CD PKG 1 For Sub structure & Foundation Description
AR-2
13 ,6
00
23 ,4
EGRESS CORR. PIT ACCESS
2019.12.31 2019.11.29 2019.11.01 2019.07.30 2019.07.01 2019.05.30
KEY PLAN:
AR-1
0 TO CONCOURSE
5 4 3 2 1 0
00
EVA.ST-10B
8,050 EVA.EV-1
,150
R-15
ARENA LOBBY
WATER TANK
ILLE TILE
ENTRY
AR-10
13 ,6
5,100 10,900
16,900
00
EVA.ST-10A
AR-3
2 AR-EVA-3101
Drawn: G.H.KIM Scale:
11,000
11,000
13,800
57,800
AR-14
AR-13
1
LV01 FLOOR PLAN 1층 평면도
-
SCALE(A1)1 : 300
AR-12
Checked: KRIS CHAE
Approved: I.K.KI NORTH
A1 = 1/300
ISSUE DATE
2019.12.31
SEQUENCE
HDA- DE-CD
DRAWING NUMBER
61
AR-EVA-3002
ALL UNITS ARE IN MILLIMETERS UNLESS NOTED OTHERWISE
HDA-DE-CD-AR-EVA-3002
Portfolio
AR-A
AR-A
AR-B
AR-B
AR-C
AR-C
AR-D
AR-17
AR-D
AR-17
11,837
AR-15
AR-16
11,000
AR-14
AR-15
AR-16
11,000
AR-14
11,000
AR-13
AR-13
11,000
AR-D
11,837
AR-D
AR-C
AR-C
AR-B
AR-B
AR-A
AR-A
AR-A
AR
AR-A
AR
ROOF UPPER EVA EL. +39710
11,837
TOP OF PARAPET EVA EL. +29185
11,000
11,000
11,000
11,000
11,837 260
260
ROOF UPPER EVA ROOF LOWER EVA EL. +39710 EL. +26750
+26.75M
LV 05 EVA EL. +22200EVA TOP OF PARAPET EL. +29185 LV 04 EVA EL. +17500 ROOF LOWER EVA EL. +26750 LV 03 EVA EL. +11500 LV 05 EVA EL. +22200
6.0 10
0°
.0 0
+11.5M
0° 1106.0 1 5 . 00 °
65 .0 0 °
LV 04 EVA LV 01 EVA EL. +17500 EL. +3500
°
.0 0
°
+3.5M
4,635
74
4,635
0°
+26.75M
74
4,635 01° 6 . 0 15 . 0 10 0
6. 0 10
260 4,635
°
260
LV 03 EVA EL. +11500
905
8,350
8,650
10,200
15,100
11,000
11,000
0°
11
850
.0 0
5.0
65
11
+11.5M
10,250 5.0
0°
°
LV 01 EVA EL. +3500
+3.5M
905
8,350
8,650
3 -
LONGITUDINAL GEOMETRY SECTION 횡단면도 10,200
15,100
11,000
11,000
10,250 850
SCALE(A1) 1 : 500
3
LONGITUDINAL GEOMETRY SECTION 횡단면도
-
SCALE(A1) 1 : 500
AL-##-PD INSULATED METAL PANEL
LV 03 EVA
R = 106,006 mm
EL +11500
AL-##-PD INSULATED METAL PANEL 74°
R = 103,510 mm R = 114,538 mm R = 135,628 mm
1 11, 12, 893
1 12, 893
1 1
12, 893
EQ
12, 893
EQ
11,
11,
12, 893
11,
EQ
EQ
83 11,
7
000
AL-##-PF PERFORATED ° METAL PANEL 65
837 11, 11,
000
LV 01 EVA EL +3500
00 1 ,0
AL-##-PF PERFORATED METAL PANEL
000 LV 01 EVA EL +3500
EXT FACADE PANELS
5° 11
N
12, 893
EL +11500
R = 135,628 mm
00 1 ,0
1
LV 03 EVA
R = 106,006 mm R = 114,538 mm
00 1 ,0
837
R = 103,510 mm
5° 11
12, 893
000
00 1 ,0
74°
12, 893
° 65
37 1 ,8
SECONDADY STRUCTURE
IN
N
EXT FACADE PANELS SECONDADY STRUCTURE
62
INS
1
ROOF GEOMETRY AXON 지붕 지오메트리 엑소노
-
SCALE(A1)
1
ROOF GEOMETRY AXON 지붕 지오메트리 엑소노
-
SCALE(A1)
AR-A
AR-A
AR-A
AR-B
AR-A
AR-B
AR-C
AR-C
AR-7
AR-D AR-7
AR-D
AR-8 AR-8
AR-9
AR-9
AR-D AR-C
AR-D
AR-C
AR-B
AR-B
AR-A
인천국제공항 국제업무지역(IBC)
INSPIRE INTER
인스파이어 복합리조트 개발사업(1단
AR-A
INSPIRE INTERGRATED RESORT
ARCHITEC 4/F Hyund Jongno-gu
ARCHITECT OF RECORD T +82 (2) 4/F Hyundai Building, 75, Yul F +82 (2) Jongno-gu, Seoul, Republic o T +82 (2) 746-6500 NOTE F +82※ (2) 513-5000
ROOF UPPER EVA EL. +39710
260 +26.75M
260 0°
LV 05 EVA EL. +22200
LV 04 EVA EL. +17500
.0 0 .0 0 74
3,785
5.0
LV 04 EVA EL. +17500 +11.5M
0°
55
+3.5M
°
°
.0 0
.0 0
65
65
LV 03 EVA EL. +11500
+11.5M 55
0°
°
°
5.0
LV 05 EVA EL. +22200
.0 0
.0 0
11
EL. +26750
65
65
11
+11.5M
EL. +29185
ROOF LOWER EVA EL. +26750
3,785
°
4,635
+3.5M
TOP OF PARAPET EVA EL. +29185
°
+26.75M
74
° .0 0 7 4 ° .0 0
+11.5M
6 10
6. 0 10 ° . 00
ROOF UPPER EVA EL. +39710
TOP OF PARAPET ROOF EVA LOWER EVA +26.75M
590
+29.755M
+26.75M
4,635
590
+29.755M
74
+3.5M
+3.5M
850
8,650 8,650
10,200 10,200
18,050 18,050
11,000
LV 01 EVA EL. +3500
LV 03 EVA EL. +11500
850
4 -
1. EXTERIOR PANEL 외 A. AL-##-PD : Alumin
※NOTE
1. EXTERIOR PANEL 외장패널 w/insulati A. AL-##-PD : Aluminum Solid Panel 2.5mm
B. AL-34-SH : Aluminu C. AL-##-PF : Alumin
w/insulation (알루미늄판넬)
B. AL-34-SH : Aluminum SHEET (알루미늄 (알루미늄 C. AL-##-PF : Aluminum PERFORATED
D. MT-02-PA : POLYM E. MT-03-PA : POLYM
(알루미늄 타공시트)
D. MT-02-PA : POLYMETAL PANEL (메탈 (메탈 E. MT-03-PA : POLYMETAL PANEL - ORA
판넬) F. RP-01-MO : MONO
(메탈
LV 01 EVA EL. +3500
11,000
R 10 351 0
10,250 10,250
R 10 351 0
R-B
Woodruff
R-B
인천국제공항 국
인스파이어 복합리
판넬) G. RP-01-SS : STAND F. RP-01-MO : MONO ROOF 2. GLASSSEAM 유리ROOF G. RP-01-SS : STANDING
A. GLI-02 : 37.52MM L 2. GLASS 유리 GR A. GLI-02 : 37.52MM Laminated(LIGHT Insulation
B. GL-02-IB : 28MM In (LIGHT GRAY) / (접합복층유 (LIGHTGlas GR B. GL-02-IB : 28MM Insulation Low-E
FOR ALL EXTERIOR (LIGHT3.GRAY) / 로이 복층유 REFER TO LIGHTING 3. FOR ALL EXTERIOR LIGHTING, 4. FOR ALLFOR EXTERIOR REFER TO LIGHTING DWG TYPE REFER TO 4000 SER 4. FOR ALL EXTERIOR STAIRS, REFER TO 4000 SERIES
CROSS GEOMETRY SECTION CROSS GEOMETRY SECTION 종단면도 4종단면도 SCALE(A1) 1 : 500 SCALE(A1) 1 : 500
AL-##-PD AL-##-PD INSULATED METAL INSULATED PANEL
METAL PANEL
LV 03 EVA EL +11500
106,006 mm R R= =114,538 mm
EL +11500
74°
LV 03 EVA
103,510 mm R R= =106,006 mm
74°
R = 103,510 mm
114,538 mm R R= =135,628 mm
° 65
R = 135,628 mm
° 65
AL-##-PF PERFORATED AL-##-PF METAL PANEL
Rev.
PERFORATED METAL PANEL
Date
KEY PLAN:
Date
KEY PLAN:
LV 01 EVA EL +3500
5° 11
LV 01 EVA
Description
Rev.
EL +3500
5° 11
DRAWING TITLE
EXT FACADE PANELS
DRAWING TITLE ENCLOSURE SYST DIAGRAM-3 ENCLOS DIA 외벽 시스템 다이어그
SECONDADY STRUCTURE
EXT FACADE PANELS
INSULATION SECONDADY STRUCTURE PERFORATED PANELS INSULATION WINDBEAM PERFORATED PANELS
RIB STRUCTURE WINDBEAM
Drawn: G.H.KIM Scale:
RIB STRUCTURE
2 -
FACADE DETAIL DIAGRAM 파사드 분해도DETAIL DIAGRAM FACADE SCALE(A1) 파사드 분해도 2 -
SCALE(A1)
ALL UNITS ARE IN MILLIMETERS UNLESS NOTED OTHERWISE
외벽 시스템
Checked: KRIS CHAE
Approve
A1 = 1/500 Drawn: G.H.KIM
NO
Check
ISSUE DATE
Scale: 2019.12.31
SEQUENCE
A1 = 1/5
ISSUE DATE
HDA- DE-CD
2019.12.
DRAWING NUMBER SEQUENCE
HDA- DE-CD AR-EVA-3504 DRAWING NUMBER
HDA-DE-CD-AR-EVA-3 AR-E
HDA-DE-CD
63
ALL UNITS ARE IN MILLIMETERS UNLESS NOTED OTHERWISE
Portfolio
AR-13
AR-14
AR-15
AR-16
AR-17
AR-25
ROOF UPPER EVA
B
A
A
B
B B
B
A A
A
B
B
B
B
B
B
B
B
A
A
B
A
A
A
B
B
A
A
A
B
A
A
A
A
A
A
B
A
A
B
B
A
A
A
B
B
B
A
B
B
B
B
B
B
B
A
A
B
B
A
B
A
B
B
A
A
A
B
A
B
A
A
A
A
A
A
A
A
B
B
A
B
A
B
A
B
B
B
A
A
B
B
A
B
A
A
A
A
A
B
A
A
A
A
B
A
A
A
B
A
A
A
B
B
A
A
B
A
A
A
A
A
B
A
B
B
B
A
A
B
B
B
B
A
B
A
A
A B
B
A
B
A
B
B
B
A B
A
B A B
A
B B
A
B
B
A
B
B
A
A
B
A
A
A
B
B
A
B
A
A
A
B A
A
B
B
A
A
B
B
A
B
A
A
B A
B
B B
B
B
B B
A B
A
B
B
B
A
B
B
B
A
B
A
B
A
A
A
B
A
A
A
B
A
B
B
A
A
B
B B
B
B
B
B
A
B
A
B
A
B
A
A
B
A
B
A
A
B
A
A
A
A
A
A
A
A
A
B
B
B
B
B
B
B
B
A
A
B
A
A
B
A
B
B
B
B
B
A
B
B
B
B
B
A
B
A
A
A
A
A
A
A
B
B
B
B
B
B
B
A
B
B
B
B
B
A
A
A
B
A
B
A
A
B
A
B
B
A
B
B
B
B
B
A
A
A
B
B A
A B
B A
B A
B
A
A
B
A
A
B
A
A
B
A
B
A
A
B
A
B
B
A
B
A
B
A
B
B
A
A
A
B
B
A
B
B
B
A
A
B
A
A B
A
A
A
A
A
B
A
A
B
B
B
B
B
A
A
C
C
D
A
A
B
A
B
B
A
A
B
A
B
A
A
B
A
A
C
C
C
D
D
C D
D
C
C
D
C
D
C
C
C
C
C
D
D
D
C
D
D
C
D
C
D
C
C
D
C
C
C
C
C
D
D
C
C
D
C
C
C
C
C
C
C
D
C
D
D
D
A
A
A
A
B
B
B
B
C
C
C
A
B
A
B
B
A
B
B
A
B
A
A
A
B
A
B
A
A
A
B
B
A
B
A
B
B
A
B
A
B
B
B
A
B
A
A
A
A
B
A
B
A
B
B
B
B
A
B
B
B
B
A
A
A
A
A
A
B
B
A
B
B
A
A
A
B
A
A
B
A
A
A
B
A
A
A
B
A
A
A
B
A
A
A B
AR-15
C
B
B
B
B B
B
C
A A
A
B
B
A
C
B
A
A
B
B
B A
A
A
D
D
B
B A
AR-14
C
D
C C D
B
A
AR-13
ROOF UPPER EVA
B
B
A
A A
LV 01 EVA
B
A A
A
LV 03 EVA
B
B A
D
C
D
C
A
B B
B
B
A
B
B
A
A
C
D
C
C
B
B
A
B
B
B
B
B
B
A
B
A
B
B
B
B
A
B
A
C
C
D
C
D
C
D
D
C
D
D
C
C
C
D
C
D
D
C
C
C
C
D
D
D
C
C
C
C
C
D
D
C
C
D
D
D
C
C
C
D
C
C
C
C
C
C
C
D
C
D
D
D
D
C
D
D
C
C
C
C
C
C
C
C
D
C
D
C
C
D
D
C
C
C
D
C
C
C
C
D
C
C
D C
A
B
B
A
A B A
C
C
C
D
D
C
D
C
C
D
C
C
D
C
C
D
C
C
C
C
D
C
C
C
C
D
C
D
C
D
D
C
D
C
C
D
C
C
D
D
C
C
D
D
C
C
C C
D D D
D
C
D
C
D
C
D
D
C
C
D
C
D
D
D
D
C
C
C
D
C
C
C
D
D
C
D
C C
D
D
C
D
D
C
C
C
D
C
C
D
C
C
D
C
C
C
D
C
C
D
D
C
D
C
D C C
D
D
D
C
C
C
D
C
D
C
D
D
C
C
D
D
C
C
D
C
C
C
C
D
C C
D D
C
C
C
C
C
D
C
D
C
C
C
C
C
C
C
C
D
D
C
C
D
C
C
C
C
C
C C
C
C
C
C
C
D
C
C
C
C
C
C
D
D
C
C
D
C
C
C
C
C
C
C
C
C
C
C
D
C
D
C
D
C
C
D
C
C
D
C
D
C
C
C
C C
C
C
D
D
C
D
D
C
C
D
C
D
C
C
D
D
C
D
C
C
C C
C
C
D
C
C
D
C
C
D
D
C
C
C
C
D
C
C
D
D
C C
D
D
C
C
D
C
C
C
D
C
C
D
C
C
D D
D
D
C
D
C
D
C
C
C
D
C
C
C
C C
D C C
C
C
D
C
C
D
C
C
C
D D
C
D
C
C
C
D
C
C
C C
D
D
D
C
C
C
C
C D D
D D
C C
C C
C C
C C
D
D
C
C
C
C
C
C C
D C
D
B B
AR-1 5
AR-1 4
B
C
C
D D
C C
C
C
C
C
D
C
D
C
D
C
C
C
C
C
D
C
D D
C
C
C
D
C
C
C
C
C
C
C
C
C
C
C
D
C
D
C
D
C
C
C
D
C
C
C
C
C
D
C
C
C
C
C
C
D
D
C
C
C
C
C
C
D
C
C
C
C
C
C
D
C
C
D
C
C
C
C
C
D
C
C
C
C
D
C
C
D
C
D
C
D
C
C
C
D
C
C
C
D
C
D
D
C
C
C
C
C
D
C
C
C
D D
A
B B
A
B
A
A B
B A
D C
C
C
C C
C
C
D
C C
C C D
D
C C D
C
D
C
C
C
C
D
D
D
C
C
C
D
C
C
D
D
D
D
D
D
C
C
C
D
D
C
D
C
C
D
C
C
C
C
C
D
C
C
C
C
D
C
C D
C
C
D D
D
C
C C
D
C
D D
C D
D
C
D
D
C C
D
D
C
C
C
C
D
C
C
D
C
D C
C
A
B
A B B
A
B
A
B
A
B
B
B
B
B
B
A
A
A
B
B
A
A
A
B
B
B
B
A
A
A
A
A
B
B
A
B
B
B
B
B
A
A
B
A
B
A
B
B
A
A
B
A
A
A
A
A
A
A
B
A
A
B
A
B
B
B
A
A
B
A
B
B
A
B
B
A B
A
B
B
A
A
A
A
B
B
B
B
B
B
A
A
B
B
B
B
B
B
A
B
B
B
A
A
A
A
A
B
B
A
B
A
A
A
A
A
B
A
B
B
B
B
B
B
B
A
A
A
A
B
B
A
A
B
B
B
A
A
A
A
B
B
B
B
A
A
A
B
A
B
A
B
B
B
A
A
C
C C
A
A
C
D D C
B
B
D C
C
B
A
C C
C
B
B
D
C
B
B
B
AR-1 1 B
B
A B
D D C
AR-1 3
B
A A A A
A
B
AR-1 6
A
C
D
AR-1 7
B
D
D
SCALE(A1)1 : 350
A A B
A
C
C
-
B
D
LV 01 EVA
2
A
A
D
C
C
C
UNFOLDED SKIN_WEST & NORTH 서, 북측 입면 전개도
B
A
C
C
C
C C
A
A
A
C
C
D
C
D D
A
A
A
A
C
C
C
D D
B
B
A A
B
C
C C
B
A
B
B
B
C
C C
A
A
A
B
B
B
A B B
B A
D
C
B
A
A
B B
B
A
C
C
B
A
B
A B
B
A
B A
D
LV 03 EVA
ROOF UPPER EVA
B
D
D C
C
B
A
AR-25
D
D
A
B
AR-17
D
D
A
A B
A
B A
C
D
B
A
A
B
B
AR-16
C
B
A
A
A
B B
B
B
B B
B
A
A
A A
A
B
B
A
A
A
A
B
A
A
A
A
B
B
A
B
B
A
B
B
B
B
B
B
A
A
B
B
B
A
A
A
A
A
B
B
A
A
B
A
A
A
B
A
B
A B A
B
B
B
A
B
A
A
A
B
A
B
B
B
A A
ROOF UPPER EVA
C
C
C C C
C C
D
C
C
C
C
D
D
C
C C
D C C C
C C C
C
C C C
C
AR-1 6 C
C
D
D
D
D
C
D
D
C
D
D
C C D
C
AR-1 5
C
C
C
D
C
D
C
C
AR-1 4
C
C
C
C
C
C
D
D
C
D
C
C
D
D
D
C D
C
C
C
C
D
C C
AR-1 3 C
D
C
C
C
C
D
C
C
C D
D
C
C
C
D
C
C C
C D D
D
LV 03 EVA
64
LV 01 EVA
1
UNFOLDED SKIN_EAST & SOUTH 동, 남측 입면 전개도
-
SCALE(A1)1 : 350
C
C
C
C C C
C
C
AR-1 1 C
C
D C
C
C C C
B
B
B
B
B
B
A
B
LV 01 EVA
B
A A
LV 03 EVA
B
B B
A
AR-1 7
A
B
A
A
B
B A
B
A
A
B
B
Woodruff
COLOR LEGEND
AR-7
B
A
A
A
A
B
B
A
B
B
B
A
B
B
B
A
B
A
A
B
B
B
A
B
B
A
B
A
A
B
A
A
A
B
A
B
A
A
B
B
A
A
B
A
B
B
A
A
A
A
A
A
B
A
A
A
B
B
A
B B
B
B
B B
A
B
A
A
B
B
B
A
B
A
A
B
A
B
B
B
B
A
A
A
B
A
B
A A
A
B
A
B
B
A
A
B
B
B
B
A
B
A
B
A
A
B
A
A
B
B
B
A
A
A
A
B
B
B
B
B
A
B
B
A
B
A
B
A
A
B
A
A
A
A
A
B B B
B
B
B
A
B
B
A
A
B
B
A
B
A
B
B
B
A
B
A B
A
B
A
A B
B
A
A
B
A
B
B
A A B
A
B
B
B
B B
A
B
A
A A
B
AR-8
A
B
B
B
A
B
A
B B
A
A
B
A
B
A
A
A
A
A
A
A
A B
A
B
B
A
B
A
A
A
B
B
A
B
A
A
A A
AR-9
B
B
A
A
B
A
B
A
A
A
A
A
B
A
A
A
B
B
A
B
A
B
A
A
B
B
B
A
A
B
B
B
B
A A
B
B
A
A
A
B
A
A
A
A
A
A
A
A
B
B
A
B
B
B
A
B
B
A
A
A
B
B
A
B
A A
B B
A
B
A
A
B
B
A
B
A
B
A
A
A
B
A
B
B
A
B
A
A
B
A
B
AR-7
C C C
C
D C C
C
D D C
C
C
C
C
D
C
D
C
C
D
C
D
C
D
C
C
D D
C C
D
D D C
D
C
C
D
D
C
C
C
C
C
C
D
C
D D
D C C
C C
D
D
C
D
C
D
C
C
C
C
C
C
D
C
D
D
C
D
D
C
C
C
D
D
C
C
C
C
D
D
D
C
C
C
C
C
C
C C
C
C
C
C
D
D
C
D
C
C C
C
C
C
D
C
D
C
D
C
C
C
C
D
C
C
C
C
D
D
C
D
C
D
C
D
D
C
C
D
D
C
C
C
D
D
C
C
D
C
D
D
C
C
C
D
C
C
D
C
C C C
D D
C C C
D
C
C
C
C C C
C
C
D
C
A
A
A
B
A
A
A
A
B
B
A
B
B
B
B
B
B
A
B
A
B
A
B
A
B
A
A
B
B
A
A
B
A
B
B
A
A
A
B
A
A
B
B
B
A
B
A
B
B
B
A
A
B
A
A
A
B
B
A
A
A
B
A
B
B
B
A
B
A
A
A
B
A
B
B
A
B
B
B
A
A
B
B
B
B
B
A
B
B
A
B
B
B
B
A
B
A
B
A
B
A
B
A
B
B
A
A
A
B
B
B
B
A
B
A
B
B
A
A
B
B
B
A
A
B
B
A
A
B
A
B
A
B
B
B
B
B
B
B
B
B
B
B
A
A
A
A
A
A
B
A
A
A
A
B
A
A
A
B
B
B
A
A
A
A
B
B
A
B
A
B
A
B
B
B
A
B
B
B
A
A
A
A
A
A
A
A
B
A
B
A
B
A
A
A
B
B
B
B
B
B
B
A
A
B
B
A
B
B
B
B
B
A
A
A
B
B
A
B
A
A
B
A
B
A
B
A
A
A
A
A
B
B
B
B
B
A
A
A
A
B
A
B
A
B
A
B
B
B
B
B
A
A
B
A
A
A
A
A
A
A
B
A
A
A
A
A
A
A
B
A
B
A
A
B
A
A
A
B
A
B
A
B
B
B
A
A
B
A
A
B
B
A
A
B A
B
A
B
B
A B
A
B
A
A
A
B
A
A
A
B B
B
A
B
A
B
A B
A
A
B
B
A
A
B
A
A
B
A
A
A
B
D
D
C
D D
C
C
AR7
A
B
C C
C
B A
A
A
B
A
B
B
A
B
B
B A
AR5
A
A B
B
B
B
A
B
A
A
A
B
B
A
A
B
A
A
B
B
B
B
B
A A
A
A
B
B A
B
A
B
B
B
A A
A
A
B
A
A
A
B
B
B
A
A
A
B
B
A
A
B
A
B
A
B
B
A
B
B
B
A
B
B
A
A
A
A
B
B
B
B
B
B
A
B
B
A
A
A
A
B
A
B
B
A
A
A
B A
B
A
A
A
A
B
B
A
B
B
A
B
B
A
A
B
B
A
B
A
B A
A
B
A
B
A
B
A
B
B
B
B
B
A
B
B
A
A
B
A
A
B
A
A
A
A
B
B
A
B
B
B
B
B
A
B
A
A
B
A
B
B
A
B
A B B
A
B
A A
B
B
B
A
B
B
A B
A A
B
A
B
C
D
AR8
A
A
B
C
D D
C
D D
C
B B
C
C C
C
C C
C
C
B
A
C C C
D
C
C
D
D
C
C
D D
B
B
D C D D
C C C
C
C
A
A
B
A B
C
A
B
B
A
B
A
B
A
C C
C
AR9
A
ARCHITECT OF RECORD 4/F Hyundai Building, 75, Yulgok-ro, Jongno-gu, Seoul, Republic of Korea T +82 (2) 746-6500 F +82 (2) 513-5000
A
C C
D
D
C D
D
D
A
B
B
B
C
C
C
C D
C
C
D C
C
C
C
C C C
C
C
D C
C
D
D C
C
C
C
C
C
D
D C
D
C
C
C
C
C
C D
C
C C
D
C
C
D
C D
C
C
D
D
C
C C
D
D
D C
D
C
C
C
C
C
C
D
C
C
C
C C
C
C
C
D
C C
C
C
C
C
C
D
D
C
C
C
C C
C
C
C
D
C
C C
C
D
D
D
C
D
C C C
C
D
C
C
C
C
D
D
C
C
C
C C
C
C
C
D
C
C
C
C C
C
C
D
C
C
D
D
D
D C
C
C
C
C
C
C C
C
C
C
C
C
C
D
D
C C
D
B B
C
C
C
C
C
D
D C
B
C
C
C
D
D
B
C
D
C
C
A A
C
C
C
C C
B
B B
D C C
C
C
C D D
A
B A
D
C
C
A B
B
A
D
D
C
C
D
B
B
B
D
C
C
A
A
A
C
D
D
B
C
C
D
A
B
D
C
D
A
A
C
C
C
A
B
C
C
C
B
B
C
C
C
B
A
A
D
C
C
B
B
B
C
C
C
B
A
A
B
D
D
D
B
A
A B
C
D
C
A
A A
B
C
D
C
B
B
C
C
D
A B
B A A
D
C
C
B
A
B B B
D
C
C
A
B
C
C
C
A
A B A A
C
D
C
A
C
C
C
A
C
C
D
A
C
C
C
B
C
D
C
A
C
D
C
A
C
C
C
D
C
C
C
C
C
B
D
C
D
A
D
D
C
D
D
C
A
C
C
D
A
B
D
C
C
C
C
C
C
C
C
C
C
C
C
C
D
C
D
A
A
A
A
AR-19 D D
C
D D
C
D
C
C
D
D
C
C
C
D
C
C
C
D
D
C
A
B
A
B
D
D
C
C
C
A
A
A
A
D
C C C C
C
B
B
B
A
B
C
C
A
B
B
B
A
B
A
A
B
A
B
B
B
A
A
A
A
B
A
A
A
A
A
A
B
A
B
B
A
B
A B
B
A
A
B
A A A
B
B
A
A
A
B
B
B
A
B
C C
C
B B B
INSPIRE INTERGRATED RESORT
B
B
A A
AR-9
C
C
A A
B
A
A
B
A
AR-8
A
A
B
A
B
B
B
A
A
B
B
A
B
A A
A
B
A
B
A
A
B
A
A
B
A
B
A
A
A
A A
A
A
B A
B
B
A B B
B
B
A
B
A B
B
B B
A
B
A
A
B
A
A
B
A
A A
B
A
B
B
A
B
A
A
B
B
A B
A
A
A
A A
B B
B
B
B
B
B B
A
B
A
B
B
A
B
B B
B
A
A
B
A
B
A B A
C C
B
B
A
B
A
A
A A
B
A
A
A A
A A
B
A
A A
A
인천국제공항 국제업무지역(IBC)-III 인스파이어 복합리조트 개발사업(1단계)
A
B
A
B
A
MATERIAL CODE FOR AL-##-PD / AL-##-PF AL-31-PD/AL-31-PF AL-32-PD/AL-32-PF AL-33-PD/AL-33-PF AL-34-PD/AL-34-PF (50% SHEEN)
AR-19
B
A B
RAL CODE 270 85 05 270 80 10 270 30 20 270 30 20
RGB COLOR 210,214,219 190,200,216 46,71,100 #1 46,71,100 #2
A B C D
B
Rev.
AR9
AR8
AR7 C
D
D
D
C
C
C
D
C
C
C
D
D
C
D
C
C
C
C
D
C
C
D
C
D
D D C C C D D D C C D C C C C C
C D D C D
D C
C
C
D D
D
C
C
C
C
D D
D
D C
C
D
D
C
C
C
C
C C
C
C D D
C
D
D
C
D
D
C
C
D
C
C
C
D
C
C
C
C
D
C
C
D
C
D
C
C
C
D
C
C
C
D
C
C
D
C
D
D
D
D
D
C
D
D
D
C
C
C
C
D
D
C
C
C
D
D
C
C
C
C
C
C
D
C
D
C
D
C
C
D
C
C
C
C
C
D
D
C
C
C
C
C
D
C
C
C
D
C
C
C
C
C
C
D
C
C
D
C
C
C
C
C
D
C
C
C
C
D
C
D
C
D
C
C
C
C
C
D
D
C
C
C
D
C
D
C
D
C
C
C
C
C
C
C
D
C
C
D
D
C
D
C
D
C
C
C
C
D
C
C
C
C
C
C
C
C
C
C
D
C
C
D
C
D
D
C
C
D
C
D
C
D
D
C
D
C
D
D
C
D
C
C
C
D
D
D
C
C
C
C
C
C
D
C
C
C
C
D
D
D
D
D
D
D
C
C
D
C
C
C
D
C
D
C
D
C
D
C
D
C
C
C
C
C
C
C
D
C
C
C
C
C
D
C
C
C
C
C
C
C
C
D
C
C
C
C
D
C
C
D
D
D
C
C
D
C
C
D
C
C
C
C
C
D
C
C
C
D
D
D
D
D
C
D
C
C
C
C
C
C
C
C
D
C
C
D
C
D
D
C
D
C
C
D
D
C
D
D
D
C
C
C
D
C
C
D
C
C
C
D
D
C
C
C
D
C
D
C
D
C
D
C
C
C
C
C
C
D
C
C
C
C
C
D
C
C
D
D
C
C
C
C
C
C
D
D
C
C
D
C
D
C
C
D
C
D
C
D
C
D
C
D
D
C C C
C
C
C
D
C
D
C
D
C
C
C
C
D
C
C
C
C
C
C
C
C
C
C
C
C
D
C
C
C
C
C
C
C
D D
C D
D
C
D
C C C
C
C
C
C
C
C
C D C C
C
C
C
D D
C
C
C C C
C
D D
C C
C C
D
C
C
C
C
C
C
C
D D
D D
C
C
C
D
C C C
D D
D
C D
C
DC
C C
C
C
D
C
D
C C
D
D
C
C
D
C
C
D
D C
C
D
D
C
D
C
D
D
C
C
C D
C C
C
C
C
C C
C
C
C
D C C
C C
C D
D
D
D C
C
C
C
D
DRAWING TITLE
UNFOLDED ENCLOSURE 외벽 시스템 전개도
C
C C
C
C
C
D
C D
C
C
C D
C
C
C
C
C D
D C
C
C
C
C C
C
C
D
D
C
C
C
D
D
C C
D
D
Description
D
C
C
C
D
C
D
D D
C
D
C
C
C
C
C
C
C
C
D
D
D
C
D
C
D
C
C
D
C
D
C
C
C
C
D
C
C
D
C
C
C
C
C
C
D
C
D
C
C
D
D
C
C
C
D
C
C
C
C
D
D
D
C
D
C
D
C
C
D
C
C
C
C
C
D
C
C
C C
D
D
D
C
C
C
D
D
C
C
D
C
C
C
D
C
C
C
C
C
C
C
D
C
C
C
C
C
C
C
D
D
C
D C
C
C
D
D
D
D
D
C
D
D
C
D
D
C
C
D
C
C
D
C
C
C
C
D
C
D
C
C
C
D
C
D
C
D
C
C
D
C
C
C
D
C
C
D
C
C
D
C
C
D
C
D
C
C
D
C
D
C
C
C
C
C
C
C
C
C
C
D
C
C
C
C
C
C
C
D
D
C
D
D
C
C
D
C
C
C
D
C
C D
D
C
C
D
C
D
D
C
C
C
C
D
D
C
C
C
C
C
C
C
C
C
C
C
D
D
C
C
C C
C
C
C
D
C
C
C
C
C
C
C
D
D
C
C
C
C
C
D
C
D
C
C
C
C
C
C
C
D
D
C
C
C
C
C
C
C
C
C
D
D
C
D
C
C
C
D
C
C
D
D
C
C
D
C
C
C
C
D
C
D
C
D
D
C
C
D
D
C
C
D
C
C
D
C
C
D
C
C
C
D D
D
C
D
C
C
D
C
D
C
C D
Date
KEY PLAN:
AR5
Drawn: G.H.KIM
C
D
Scale:
Checked: KRIS CHAE
Approved: I.K.KIM
A1 = 1/350
NORTH
ISSUE DATE
2019.12.31
SEQUENCE
HDA- DE-CD
DRAWING NUMBER
AR-EVA-3506
ALL UNITS ARE IN MILLIMETERS UNLESS NOTED OTHERWISE
65
HDA-DE-CD-AR-EVA-3506
Portfolio
AR-8 2,400
2,400
2,400
AR-8 240
2,400
2,400
2,400
2,160 2,400
240
LV 04 EVA EL. +17500
2,400
2,400
2,400
2,160
6,000
6,000
LV 04 EVA EL. +17500
AL-##-PD
AL-##-PD
LV 03 EVA EL. +11500 LIGHT REVEAL
LV 03 EVA EL. +11500
8,000
8,000
LIGHT REVEAL
AL-##-PF
AL-##-PF
LV 01 EVA EL. +3500 LV 01 EVA EL. +3500
2 2-
EXT. WALL ELEVATION 10 외벽 WALL 부분 입면도-10 EXT. ELEVATION 10 SCALE(A1)1 : 60 외벽 부분 입면도-10
-
SCALE(A1)1 : 60
AR-8 AR-8
DW6 DW6
ELEC-EVA2 부전기실
.
3,500 3,500
3,500 3,500
.
66
AUDIO STOR. 음향 장비실 AUDIO STOR. 음향 장비실
+3350 +3350
MT-03-PA AL-##-PF AL-##-PF CONCRETE SHEAR WALL
EVA.ST-4A 계단실-4A
EVA.ST-4B 계단실-4B
EVA.ST-4A 계단실-4A
EVA.ST-4B 계단실-4B
1,620 1,620
1,4201,420
200 200
CONCRETE SHEAR WALL
AR-A AR-A
REFER
ELEC-EVA2 부전기실
MT-03-PA
EL
EL ± 11
1 1-
LV 01 ENLARGED PLAN 10 LV ENLARGED PLAN 10 1층01부분 평면도-10 1층 부분 SCALE(A1)1 : 60 평면도-10
-
SCALE(A1)1 : 60
(1/FAC REFER TO (1/FAC-E REFER
(3/FAC REFER TO (3/FAC-E
Woodruff
AR-A
인천국제공항 국제업무지역(IBC)-III
인스파이어 복합리조트 개발사업(1단계)
+29184
INSPIRE INTERGRATED RESORT +29185
2,435
8 00
8 00
TOP OF PARAPET EVA EL. +29185
THK 225 INSUL.
8 00
REFER TO FACADE (1/FAC-EVA-8305)
ROOF LOWER EVA EL. +26750
RP-01-MO
8 00
1/50 SLOPE
LV 06 EVA RIGGING EL. +26700
50
+26200
※NOTE 1. CORKING AT DIFFERENT MATERIALS INTERFACE, AND REINFORCE INSULATION AT LEAKING AND DEFECT PARTS
8 00
이질재간 만나는 부분은 코킹처리하고, 단열이 결손되거나 취약한 부분은 단열
4,500
8 00
8 00
6,685
보강할 것. 2. GET APPROVALS FROM GAMRI FOR SECONDARY STEEL ACCESSORY AFTER SAMPLE SUBMISSION, USE GALVANIZED STEEL AND ANTI-RUST TREATMENT AT WELDED PARTS
SPRAY- APPLIED FIRE PROOFING
8 00
하지철물 악세사리는 샘플 제출후 감리자의 승인을 득하고, 철제부위는 아연도금 처리된
8 00
FIRE STOPPING
LV 05 EVA EL. +22200
8 00
REFER TO FACADE (3/FAC-EVA-8301)
ARCHITECT OF RECORD 4/F Hyundai Building, 75, Yulgok-ro, Jongno-gu, Seoul, Republic of Korea T +82 (2) 746-6500 F +82 (2) 513-5000
것을 사용하고 용접부위는 방청할것. 3. PLACE CONCRETE AT SLAB OPENINGS OF ALL MEPF PIPING AFTER PIPING CONSTRUCTION FOR FIRE COMPARTMENT BETWEEN FLOORS
8 00
설비 샤프트 바닥 및 외벽과 접하는 슬라브는
8 00
800
4,700
단열 및 방수는 PJW 계획도 참조 5. REFER TO INTERIOR FINISH TABLES 실내 마감은 재료마감표 참조 6. INSTALL APPLICABLE MATERIAL FOR WINDRESISTANCE AND SEISMIC PERFORMANCE ON EXTERIOR CEILING FRAME
800
REFER TO FACADE (2/FAC-EVA-8301)
층간방화로 층별 구획할 것. 4. REFER TO PJW PLAN REGARING TO INSULATION & WATERPROOF MATERIAL
AL-##-PD
외부 천장틀은 내풍 및 내진 성능에 적합한 8 00
자재를 설치할것 7. MATERIALS 외장재료 7.1. EXTERIOR PANEL 외장패널 A. AL-##-PD : Aluminum Solid Panel 2.5mm w/insulation (알루미늄판넬) B. AL-34-SH : Aluminum SHEET (알루미늄시트) C. AL-##-PF : Aluminum PERFORATED
25,685
8 00
11000.00
8 00
LV 04 EVA EL. +17500
8 00
THK 180 TERRACO EIFS PF SYSTEM
(알루미늄 타공시트) F. MT-02-PA : POLYMETAL PANEL (메탈판넬) MT-03-PA : POLYMETAL PANEL (메탈판넬)
6,000
7.2. GLASS 유리 B. GLI-02 : 37.52MM Laminated Insulation Glass
CONCOURSE-W 콩코스-서
(LIGHT GRAY) / (접합복층유리)
8 00
8 00
EVA.ST-4B 계단실-4B
6,000
8 00
TR-01-IA
8 00
THK 180 INSULATION
3,675
°
8 00
.01 74
REFER TO FACADE (1/FAC-EVA-8313)
4,634 3,986
LV 03 EVA EL. +11500
EL ± 11496
65
8 00
REFER TO FACADE (1/FAC-EVA-8336)
. 00
°
66
THK 180 INSUL.
8 00
5,000
8 00
REFER TO FACADE (3/FAC-EVA-8307)
8 00 8 00
Rev.
Date
Description
KEY PLAN:
8,000
MT-03-PA
AL-##-PF
8 00 8 00
EVA.ST-4B 계단실-4B
C6
8 00
AUDIO STOR. 음향 장비실
8 00 8 00
WP-02
LV 01 EVA EL. +3500
150
PAVEMENT; SEE LANDSCAPING
DRAWING TITLE
F13C
WP-02 THK10 PROTECTION BOARD
REFER TO FACADE (2/FAC-EVA-8304)
THK20 CEMENT MORTAL WP-02 THK60 PLAIN CONCRETE
REFER TO FACADE (3/FAC-EVA-8312)
3
EXT. WALL SECTION 10 외벽 부분 단면도-10
-
SCALE(A1)1 : 60
EXT. WALL SECTIONS @ WEST_2 외벽 입단면 상세도-8 Drawn: G.H.KIM Scale:
Checked: KRIS CHAE
Approved: I.K.KIM
A1 = 1/60
NORTH
ISSUE DATE
2019.12.31
SEQUENCE
HDA- DE-CD
DRAWING NUMBER
AR-EVA-3558
ALL UNITS ARE IN MILLIMETERS UNLESS NOTED OTHERWISE
HDA-DE-CD-AR-EVA-3558
67
Portfolio
2,
84
0
AR-A
7 1,
1,
8 54
67
3,
5
48 8 1, 00
0
0 40
G R 18, I D 745 AR -2 5
3,
08
1 AR-EVA-4010
00
TO
5 3,
7 1,
80
EL: +3350
STAIRS ABOVE
0 ) 64 80 3, Tx2 3 (1
PAINTED CONCRETE COLUMN
5 1,
0 92
0 35
0 1,
75
MT-03-PA
10 EGRESS CORR. 피난복도
2 AR-EVA-4010
STEEL RIB SEE STR DWG FOR SIZE
0 35
SEE LANDSCAPE FOR FINISH GRADE & PAVING TYPE
2, 0 15 1, 0 80
LV03 FLOOR ABOVE
1,
TR(W) 화장실(여)
0 35
AR-24
MT-03
AR-24 TR(M) 화장실(남)
ATM MA
MT-03 EL: +3350
SLO PE
1/20 MIN
EVA-MP02
FOR F FINISH INTERI PACAK
3,27
0
°
MT-03-PA
150
4,200 (15Tx280)
7,145
130
22.50° 22 .5 0
EVA.ST-5 계단실-5
MT-03-PA
TYPE H (PJW-9910)
TYPE H (PJW-9910)
AL-##-PD
1,057 11,100 TO GRID AR-7
** ST-8, OPPOSITE EL: +3350
350 350
68
ELEC-EVA2 부전기실
UP
1,800
1,350 3,630
1
ST-5 LV 01 PLAN ST-5 부분 평면도(1층)
-
SCALE(A1)1 : 60
Woodruff
인천국제공항 국
인스파이어 복합리
INSPIRE INTER
AR-A
0 15
2,
0 84 5 2,
60
1, 7
ARCHITEC 4/F Hyunda Jongno-gu, T +82 (2) 7 F +82 (2) 5
45
6 3, 95 00
AR-EVA-4010
10
AL-##-PD
0 20
0 40
1
0 ) 76 80 4, Tx2 7 (1
15 0
AR-A
5 25
,6
00
00
1, 8
TYPE H 11500 (PJW-9910)
5 3, 00
※NOTE 1. LEVEL - LV 00 EVA = EL 550 = - LV 01 EVA = EL 3,500 - LV 03 EVA = EL 11,50 - LV 04 EVA = EL 17,50 - LV 05 EVA = EL 22,20 - LV 06 EVA RIGGING = - ROOF LOWER EVA = - ROOF UPPER EVA = 2. CONSTRUCT ALL MEC AND SLAB OPENINGS FROM SUPERVISORS WITH SHOP DRAWING NICAL DRAWINGS BE
설비관련 모든 벽체 7 1,
75
설비도면 참조하여
감리자의 승인을 득한 3. USE FIRE-RESISTANC ALL ELEV. DOORS
DN
0 1,
75
ELEV도어는 방화성능
TYPE H (PJW-9910)
MT-03-PA
2
4.
: HOSE BOX. 방
: INDOOR HYD - REFER TO FIRE PRO DRAWING FOR LOCA INDOOR HYDRANT
AR-EVA-4010
옥내소화전 및 방수 TYPE H (PJW-9910)
소방도면 및 인테리 5. REFER TO PJW INSUL TION MATERIAL
STEEL RIB SEE STR DWG FOR SIZE
EVA.ST-5 계단실-5
FL -3000 SL -3300
8 1,
TR(W) 화장실(여)
05
FL +0 SL -100
0 15
AR-24
ATM MACHINE
FOR FOOR FINISH, SEE INTERIOR PACAKGE
STAIR BELOW
0 Rev.
2019.07.30 4th Date
KEY PLAN:
AL-##-PD
** ST-8, OPPOSITE
** ST-8, OPPOSITE
DRAWING TITLE
ST-5 & 8 EN ST-5 확 Drawn: G.H.KIM Scale:
2
ST-5 LV 03 PLAN ST-5 부분 평면도(3층)
-
SCALE(A1)1 : 60
Checke
A1 = 1/60
ISSUE DATE
2019.12.3
SEQUENCE
HDA- DE-CD
DRAWING NUMBER
AR-EV
HDA-DE-CD-
69
ALL UNITS ARE IN MILLIMETERS UNLESS NOTED OTHERWISE
Portfolio
PAINTED STL RIB FOR FACADE
TYPE H (PJW-9910)
TYPE H (PJW-9910)
AL-##-PD
PANEL DEMARCATION FOR AL-##-PD & AL-##-PF
AL-##-PD
AL-##-PF AL-##-PF
TYPE H (PJW-9910)
PAINTED STL WIND BEAM FOR FACADE
TYPE H (PJW-9910) PAINTED PERIMETER CONCRETE BEAM. SEE STR DWG FOR AL-##-PD SIZE STAIR 5
PANEL DEMARCATION FOR AL-##-PD & AL-##-PF
ENCLOSURE OPENING FOR EGRESS
TYPE H (PJW-9910)
AL-##-PF
PAINTED PERIMETER
4,660 TO GRID AR-25 BEAM. CONCRETE
10,600
3
ST-5 AXON VIEW ST-5 엑소노
-
SCALE(A1)
730
SEE STR DWG FOR SIZE
2
ENCLOSURE OPENING FOR EGRESS
AR-EVA-4010
LV 04 EVA EL. +17500
LV 04 EVA EL. +17500
3,800
THK 180 EFIS FINISH PAINTED STL RIB SEE STR FOR SIZE
TR-01-IA
10,600
EVA.ST-5 계단실-5
F55
SCALE(A1)
TYPE H (PJW-9910)
LV 04 E EL. +1
F55
LV 03 EVA EL. +11500
3,800
LV 03 EVA EL. +11500
TYPE H (PJW-9910)
THK 180 EFIS FINISH 3,000 (18RX166.7)
CONCOURSE-W 콩코스-서
3,000 (18RX166.7)
2,200
2 AR-EVA-4010
LV 04 EVA EL. +17500
ST-5 AXON VIEW ST-5 엑소노
730
ATM
CONCOURSE-W 콩코스-서
3
6,000
6,000
4,660 TO GRID AR-25
TR-01-IA
F55
LV 03 E EL. +1
TYPE H (PJW-9910) PAVEMENT; SEE LANDSCAPING
3,000 (18RX166.7)
2,747 (16RX171.7)
PAINTED CONCRETE COLUMN SEE STR DWG FOR SIZE
150
TYPE H (PJW-9910)
2,840
4,760 (17T X 280)
1,780
3,640 (13TX280)
LV 01 EVA EL. +3500
4,200 (15TX280)
VARIES
** ST-8, OPPOSITE
2,403 (14RX171.7)
8,000
5,000
EGRESS CORR. 피난복도
LV 03 EVA EL. +11500
LV 01 EVA EL. +3500
MT-03-PA
CONCOURSE-W 콩코스-서
150
F55
EVA.ST-5 계단실-5
150
2,200
TYPE H (PJW-9910)
CONCOURSE-W 콩코스-서
8,000
ATM
2,403 (14RX171.7)
8,000
6,000
TYPE H (PJW-9910)
1
ST-5 SECTION A ST-5 부분 단면도-A
-
SCALE(A1)1 : 60
TYPE H (PJW-9910)
MT-03-PA
EGRESS CORR. 피난복도
150
LV 01 EVA EL. +3500
150
2,747 (16RX171.7)
PAINTED CONCRETE COLUMN SEE STR DWG FOR SIZE
2,840
4,760 (17T X 280)
1,780
3,640 (13TX280)
VARIES
4,200 (15TX280)
70
** ST-8, OPPOSITE
1
ST-5 SECTION A ST-5 부분 단면도-A
-
SCALE(A1)1 : 60
LV 01 E EL. +35
INSULA
단열 및 3. REFER
Woodruff
실내 마 4. SYMBO
STAIR 5
4.1
TYPE H (PJW-9910)
AR-A
AXON VIEW 엑소노
1 AR-EVA-4010
LV 04 EVA EL. +17500
THK 180 EFIS FINISH
6,000
PAINTED STL RIB SEE STR FOR SIZE
TR-01-IA
TYPE H (PJW-9910)
EVA.ST-5 계단실-5
CONCOURSE-W 콩코스-서
3,000 (18RX166.7)
LV 03 EVA EL. +11500
THK 180 EFIS FINISH TYPE H (PJW-9910) BEAM (BEYOND)
THK 180 INSULATION
8,000
0 Rev.
5,000
KEY P
EVA.ST-5 계단실-5
WP-02
PAVEMENT; SEE LANDSCAPING
DRAW
S
150
LV 01 EVA EL. +3500
Drawn: G Scale:
E
** ST-8, OPPOSITE
-
SCALE(A1)1 : 60 ALL UNITS ARE IN MILLIMETERS UNLESS NOTED OTHERWISE
SEQUEN
HDA
DRAWIN
71
2
ST-5 SECTION B ST-5 부분 단면도-B
ISSUE D
HDA
Portfolio
UPPER SEATING BOWL
UPPER SEATING BOWL
D
UPPER SEATING BOWL
UPPER SEATING BOWL
D
D
D
VOM CEILING SEE SCHEDULE FOR TYPE
ADA VOM CEILING PLATFORM SEE SCHEDULE FOR TYPE
ADA PLATFORM
VOM CEILING SEE SCHEDULE FOR TYPE
ADA PLATFORM
B
1,80
0
3,000
MAIN CONCOURSE
0
VOM OPENING: 1800mm CEILING HEIGHT: 3000mm
MAIN CONCOURSE
4,3 00
2
3D_VOMITORY, TYPE B VTYPE OM OPENING: 1B 800mm VOM OPENING: 1800mm 3D_VOMITORY, CEILING HEIGHT: 3000mm CEILING HEIGHT: 3000mm 3D 객석출입구,TYPE B 2 3D 객석출입구,TYPE B 3D_VOMITORY, 3D_VOMITORY, TYPE B TYPE B SCALE(A1) SCALE(A1) 3D 객석출입구,TYPE 3D 객석출입구,TYPE B B 2
-
SCALE(A1)
-
VOM CEILING SEE SCHEDULE FOR TYPE
-
4 -
SCALE(A1)
REFER TO INTERIOR
-
-
D
SCALE(A1)
C
SUITE SEATING BOWL REFER TO INTERIOR
REFER TO INTERIOR
I
D D E E 3D_VOMITORY, TYPE D V3D_VOMITORY, OM OPENING: 4300mm VOTYPE M OPENING: 43D 00mm CEILING HEIGHT: 4000mm CEILING HEIGHT: 4000mm D 3D 객석출입구,TYPE D D 4 3D 객석출입구,TYPE D 3D_VOMITORY, 3D_VOMITORY, TYPE D TYPE D SCALE(A1) SCALE(A1) D 3D 객석출입구,TYPE 3D 객석출입구,TYPE D D 4
4
SCALE(A1)
인천
인스파
SUITE SEATING BOWL
SUITE SEATING BOWL
ADA PLATFORM
B
VOM OPENING: 4300mm CEILING HEIGHT: 4000mm
4
VOM ,3O0P0 ENING: 4300mm CEILING HEIGHT: 4000mm
UPPER SEATING BOWL
2
B
4,3 00
4,3 00
VOM OPENING: 1800mm CEILING HEIGHT: 3000mm
4,000
MAIN CONCOURSE
MAIN CONCOURSE
MAIN CONCOURSE
4,000
1,80
3,000
0
MAIN CONCOURSE
VOMITORY
B
3,000
1,80
0
3,000
1,80
C
VOMITORY
MAIN CONCOURSE
MAIN CONCOURSE
LOWER SEATING BOWL
VOMITORY
VOMITORY
LOWER SEATING BOWL
C
C
LOWER SEATING BOWL
VOMITORY VOMITORY
LOWER SEATING BOWL
LOWER SEATING BOWL
LOWER SEATING BOWL
LOWER SEATING BOWL
VOMITORY
VOMITORY
C
ADA PLATFORM
LOWER SEATING BOWL
C
C
VOM CEILING SEE SCHEDULE FOR TYPE
4,000
VOM CEILING SEE SCHEDULE FOR TYPE
4,000
VOM CEILING SEE SCHEDULE FOR TYPE
VOM CEILING SEE SCHEDULE FOR TYPE
VOM CEILING SEE SCHEDULE FOR TYPE
SUITE SEATING BOWL
C UPPER SEATING BOWL
UPPER SEATING BOWL LOWER SEATING BOWL
UPPER SEATING BOWL
REFER TO INTERIOR
LOWER SEATING BOWL
UPPER SEATING BOWL
C
C
LOWER SEATING BOWL
LOWER SEATING BOWL
VOMITORY
3,000
A
5 MAIN CONCOURSE
TYPE B YPE B
3,62
4 -
VOM CEILING SEE SCHEDULE FOR TYPE
3D_VOMITORY, TYPE D 3D 객석출입구,TYPE D 3,62
5
VOM CEILING VOMITORY SEE SCHEDULE FOR TYPE
MAIN CONCOURSE
VOM CEILING SEE SCHEDULE FOR TYPE
3,6
VOMITORY
00
3,6
00
MAIN CONCOURSE
LOWER SEATING BOWL
B
LOWER SEATING BOWL
SCALE(A1)
SCALE(A1)
4,000
VOMITORY
MAIN CONCOURSE
3,6
VOM OPENING: 3600mm CEILING HEIGHT: 4000mm
6
VOMITORY KEY PLAN 객석출입구 KEYPLAN
-
SCALE(A1)1 : 600
VOM CEILING SEE SCHEDULE FOR TYPE
3
3D_VOMITORY, TYPE C VOM OPENING: 3600mm VOTYPE M OPENING: 36C 00 m m 3D_VOMITORY, CEILING HEIGHT: 4000mm CEILING HEIGHT: 4000mm 3D 객석출입구,TYPE C 3 3D 객석출입구,TYPE C 3D_VOMITORY, 3D_VOMITORY, TYPE C TYPE C SCALE(A1) SCALE(A1) 3D 객석출입구,TYPE 3D 객석출입구,TYPE C C 3
-
SCALE(A1)
3 -
-
VOMITORY
VOM CEILING SEE SCHEDULE FOR TYPE
VOM CEILING SEE SCHEDULE FOR TYPE VOM CEILING SEE SCHEDULE FOR TYPE
00
UPPER SEATING BOWL
3,60
3,60
0
0
MAIN CONCOURSE
VOMITORY
4,000
VOMITORY
V
4,000
VOM CEILING SEE SCHEDULE FOR TYPE
00
0
KEY P
DRAW
VOMITORY MAIN CONCOURSE
3,60
VOM CEILING SEE SCHEDULE FOR TYPE
MAIN CONCOURSE
객석
VOM OPENING: 3600mm CEILING HEIGHT: 4000mm
VOM OPENING: 3600mm CEILING HEIGHT: 4000mm
3
3D_VOMITORY, TYPE C 3D 객석출입구,TYPE C
5
3D_VOMITORY, TYPE E 3D 객석출입구,TYPE E
-
SCALE(A1)
-
SCALE(A1)
Drawn: G Scale:
ISSUE D
SEQUEN
HDA
DRAWIN
ALL UNITS ARE IN MILLIMETERS UNLESS NOTED OTHERWISE
72
3
Rev.
LOWER SEATING BOWL
3,6
0
SCALE(A1)
LOWER SEATING BOWL
VOM CEILING SEE SCHEDULE FOR TYPE
3,60
MAIN CONCOURSE
LOWER SEATING BOWL
LOWER SEATING BOWL
TYPE A YPE A
VOMITORY
VOM OPENING: 3600mm CEILING HEIGHT: 4000mm
-
-
MAIN CONCOURSE
00
VOM OPENING: 3625mm CEILING HEIGHT: 3000mm
1
-
MAIN CONCOURSE
3,6
3D_VOMITORY, TYPE A VOM OPENING: 3625mm VTYPE OM OPENING: 3A 625mm 3D_VOMITORY, CEILING HEIGHT: 3000mm CEILING HEIGHT: 3000mm 3D 객석출입구,TYPE A 1 3D 객석출입구,TYPE A 3D_VOMITORY, 3D_VOMITORY, TYPE A TYPE A SCALE(A1) SCALE(A1) 3D 객석출입구,TYPE 3D 객석출입구,TYPE A A 1
1
VOMITORY
VOM CEILING SEE SCHEDULE FOR TYPE
5
SCALE(A1) VOM OPENING: 3625mm CEILING HEIGHT: 3000mm
A
4,000
3,62
MAIN CONCOURSE
VOMITORY
VOM OPENING3,:6245 300mm CEILING HEIGHT: 4000mm
4,000
4,3 00 MAIN CONCOURSE
LOWER SEATING BOWL
B
LOWER SEATING BOWL
4,000
VOMITORY
VOMITORY
C
LOWER SEATING BOWL
4,000
LOWER SEATING BOWL
MAIN CONCOURSE
B
LOWER SEATING BOWL
LOWER SEATING BOWL
HDA
Woodruff
인천
인스파
I
D
E
E
D
D
D
D
D
LOWER SEATING BOWL
C
C
C
C
B
C
B
B A
A
6
VOMITORY KEY PLAN 객석출입구 KEYPLAN
-
SCALE(A1)1 : 600
LOWER SEATING BOWL
LOWER SEATING BOWL
Rev.
KEY P
73
LOWER SEATING BOWL
Portfolio
Category
New Construction
Status
In Construction
City
Country
Los Angeles
USA
SEED LA 2019 - 2020 Project Team Yupil Chon, Soo Ahn, Markus Sohst, Charles Wang, Yan Leng, Robert Nalbandyan, Michael Woodruff
74
Project Phases SD, DD, CD
Project Responsibilties • • • •
Led team responsible for constrution documentation. Led team of junior employees to provide presentation drawings and construction documents Coordinated with waterproofing, structural, landscaping consultants Participated in project meetings
Woodruff
Rendering by other
Project Description
75
SEED LA is a 4.2-acre vocational and 100% college-preparatory charter boarding school for resilient youth in south Los Angeles. This 113,000 square foot campus and boarding school will include 200 dormitories, 21 administrator units, 24 classrooms, social services space, cafeteria, gymnasium, offices and a reading room. The SEED LA site integrates and enhances the current context of the neighborhood’s buildings with an architectural design that responds to the bustling corridor along Vermont Avenue, while respecting the small scale residential building to the east. The campus features various building elements such as balconies, building offsets and terraces, resulting in a modern expression that is wellsuited for the vibrant, communal, and interactive educational experience.
Portfolio
2 A6.102
A
A.1
A2 LOAD BEARING WALL, S.S.D. 0991.PT01 0924.ES01
C
0991.PT01 0924.ES01
C2
A5.002
D
E
J
1014.01
4' - 0"
TOP OF STAIR 219.89
MAX ALLOWABLE BUILDING HEIGHT 216.50
0991.PT07 0924.ES01
1
C.9
5' - 0"
TOP OF PARAPET 215.89 ROOF 210.89
10' - 0"
C41
1' - 0 3/4"
10' - 0"
6TH FLOOR 200.89
SE67
1' - 0 3/4"
71' - 0"
4TH FLOOR 180.89
10' - 0"
74' - 0"
10' - 0"
5TH FLOOR 190.89
1' - 0 3/4"
3 A6.103
10' - 0"
3RD FLOOR 170.89
2ND FLOOR 160.89
SE67 LV-J
LV-J LV-H
16' - 0" GRADE PLANE 144.41 LOWEST GRADE POINT 142.50
LV-J
S2.1
LV-H LV-H
LV
SE18
SE19
SE18
1ST FLOOR 144.89
0924.ES01 0991.PT07
0622.ES02 A.1 A
0924.ES01 0552.RA05 0552.RA01 0991.PT01 B.1 C
0552.RA01 0552.RA02
E
F
G
G.7
H
K 1
76
A5.002
Woodruff
77
F
C2
Portfolio
6' - 7 1/8"
5"
5' - 8 1/8"
5' - 0"
TOP OF PARAPET 215.89
3 A10.103
TRANSIT PLAZA
WALL SECTION NOTES
0924.ES01
ROOF 210.89
10' - 0"
EXTERIOR CORRIDOR 600D
1
2 A10.103
0622.ES04
2 3 10 A10.601
0924.ES01
EXTERIOR CORRIDOR 600C
1' - 0 3/4" 3' - 6" MIN.
8 A10.101
6TH FLOOR 200.89
9 A10.601
0853.01 518A
0622.ES03 BEYOND TO BE PAINTED WITH ACCENT COLOR
RAIL TYPES
0924.ES01 0622.ES02
0552.RA01 0552.RA02 0552.RA03 0552.RA04 0552.RA05 0552.RA06
LOUNGE 507G
0622.ES04 0622.ES05
1' - 0"
0841.01
8' - 11"
10' - 0"
DORM 407B
0853.01
7 A10.303
1' - 1 5/8"
4TH FLOOR 180.89
0891.LV01 0891.VT01
0622.ES03 BEYOND TO BE PAINTED WITH ACCENT COLOR
8' - 11"
10' - 0"
318A
5 A10.303
LOUNGE 307G
6"
1' - 0"
3RD FLOOR 170.89 0924.ES01
10' - 0"
0552.RA01 LOUNGE 218G 4 A10.104
4 A10.104
DORM 207B
5 A10.104
2ND FLOOR 160.89 CONCRETE PODIUM FASCIA TO BE CLASS 2 FINISH
16' - 0"
0841.01
HALLWAY
HALLWAY
H2
H3 9 A10.301
78
1ST FLOOR 144.89
EXTERIOR STOREFRONT GLAZING SYSTEM (REFER TO STOREFRONT SCHEDULE SHEET A0.602-A0.604 FOR TYPE) VINYL WINDOW SYSTEM (REFER TO WINDOW SCHEDULE SHEET A0.501 FOR TYPE)
LOUVER TYPES
0853.01 DORM
EXTERIOR STUCCO FIBER CEMENT BOARD LAP SIDING FIBER CEMENT BOARD FIN FIBER CEMENT BOARD CANOPY FIBER CEMENT BOARD GATE SIDING
GLASS SYSTEM TYPES
0924.ES01 418G
EXTERIOR SYSTEM TYPES
6"
5TH FLOOR 190.89
LOUNGE
EXTERIOR FINISH LEGEND
0622.ES03
8' - 11"
10' - 0"
DORM
STRUCTURE SHOWN IS DIAGRAMMATIC, REFER TO ST JOIST / BEAM DIRECTION AND SIZING ALL PARAPETS TO BE MIN. 30" IN HEIGHT FROM ROOF ALL CONCRETE COLUMN CORNERS TO BE SQUARE, N
SCIENCE CLASSROOM
115
STOREFRONT LOUVER MECH. VENT
SPECIAL FLOORING 0996.SF01 0963.SF02 0964.SF03 0965.SF04
ELASTOMERIC COATING SPORT COURT FLOORING GYM WOOD FLOORING GYM RUBBER FLOORING
MT MT MT MT MT SP
SURROUND 7/8" EXT STUCCO OVER METAL LATH
Woodruff
FLUID WRB. GRADE D BUILDING PAPER
0' - 2"
LIQUID FLASHING, PROVIDE CONTINUOUS BEAD OF SEALANT BEHIND WINDOW FLANGE STEEL ANGLE
0' - 3 1/4"
0' - 2"
EXTERIOR
6" = 1'-0" SCALE:
VINYL WINDOW - HEAD @ FIBER CEMENT SURROUND
11
6" = 1'-0" SCALE:
FIBER CEMENT BOARD SURROUND INTERIOR
INTERIOR
EQ
EQ
7/8" EXT STUCCO OVER METAL LATH FLUID WRB. GRADE D 0' - 2" BUILDING PAPER
EXTERIOR
LIQUID FLASHING, PROVIDE CONTINUOUS BEAD OF SEALANT BEHIND WINDOW FLANGE
LIQUID FLASHING, PROVIDE CONTINUOUS BEAD OF SEALANT BEHIND WINDOW FLANGE STEEL ANGLE
EQ
BACKER ROD, CAULK AND SEAL AT JOINT (PAINTED TO MATCH WINDOW)
EQ
6" = 1'-0" SCALE:
INTERIOR FLUID WRB. GRADE D BUILDING VINYL WINDOW - HEAD @ FIBER CEMENT SURROUND
11
PAPER
0' - 2"
LAP SIDING TRIM
6" = 1'-0" SCALE:
0' - 2"
VINYL WINDOW JAMB - FIBER CEMENT SURROUND LIQUID FLASHING, PROVIDE
BACKER ROD, CAULK AND SEAL AT JOINT (PAINTED TO MATCH WINDOW)
6" = 1'-0" SCALE: CONTINUOUS BEAD OF SEALANT BEHIND WINDOW FLANGE
EQ
0' - 3 1/4" EQ
SHEET METAL SILL PAN WITH VERTICAL BACK DAM SET IN FULL BED OF SEALANT STEEL ANGLE FIBER CEMENT BOARD SURROUND
0' - 2"
FLUID WRB. GRADE D DIVORCING LAYER OVER WRB WHERE SCRATCH COAT INSTALLED
0' - 2"
7
BACKER ROD, CAULK AND SEAL AT JOINT (PAINTED TO MATCH WINDOW)
0' - 3 1/4"
12
INTERIOR
6" = 1'-0" SCALE:
7/8" EXT STUCCO OVER METAL LATH EXTERIOR
INTERIOR
INTERIOR
FLUID WRB. GRADE D BUILDING PAPER
FIBER CEMENT BOARD SURROUND 0' - 2" STUCCO END CHANNEL
0' - 3 1/4"
EQ
EQ
2% SLOPE MIN.
SHEET METAL SILL PAN 0' - 2" LIQUID FLASHING INSIDE R.O.
STEEL ANGLE
EXTERIOR
DORM RESTROOM
7
BACKER ROD, CAULK AND SEAL AT JOINT (PAINTED TO MATCH WINDOW)
0' - 3 1/4"
INTERIOR
6
0' - 2" STEEL ANGLE
INTERIOR FIBER CEMENT BOARD SURROUND STUCCO END CHANNEL GWB BASEBOARD, SEE FINISH SHCEDULE FLUID WRB. GRADE D BUILDING PAPER
7/8" EXT STUCCO OVER METAL LATH
INTERIOR
0' - 3" MIN.
DORM RESTROOM
INTERIOR
7/8" EXT STUCCO OVER METAL LATH
SHEET METAL SILL PAN
LIQUID FLASHING INSIDE R.O. SEALANT OVER BACKER FLUID WRB. GRADE D ROD BUILDING PAPER LIQUID FLASHING INSIDE R.O.
SHEET METAL SILL PAN, PAINTED TO MATCH WINDOW FRAME
0' - 3" MIN.
BACKER ROD, CAULK AND SEAL AT JOINT (PAINTED TO MATCH WINDOW)
7/8" EXT STUCCO OVER METAL LATH
FLUID WRB GRADE D BUILDING PAPER 7/8" EXT8%STUCCO OVER SLOPE MIN. METAL LATH
STUCCO END CHANNEL
LAP SIDING TRIM
6" = 1'-0" SCALE:
VINYL WINDOW JAMB - FIBER CEMENT SURROUND
12
6" = 1'-0" SCALE:
BACKER ROD, CAULK AND SEAL AT BLOCKING JOINTAS(PAINTED TO MATCH REQ'D WINDOW)
INTERIOR
BER 0' - 2"CEMENT FIN
6" = 1'-0" SCALE:
0' - 3 1/4"
STEEL ANGLE
8
FIBER CEMENT BOARD SURROUND
INTERIOR GWB
EQ VINYL WINDOW -EQSILL - FIBER CEMENT 2% SLOPE MIN.
BASEBOARD, SEE FINISH SHCEDULE SURROUND 6" = 1'-0" SCALE:
5
SHEET METAL SILL PAN, PAINTED TO MATCH WINDOW FRAME
7/8" EXT STUCCO OVER METAL LATH
79
FLUID WRB. GRADE D DIVORCING LAYER OVER WRB WHERE SCRATCH COAT INSTALLED
SEALANT OVER BACKERBLOCK ROD REQ'D LIQUID FLASHING INSIDE PLYWO R.O.
0' - 2" 1 1/4" MAXON GYPSUM UNDERLAYMENT, (SEE FLOOR ASSEMBLY)
7/8" EXTERIOR SHEET METAL SILL PAN WITH STUCCO VERTICAL BACK DAM SET IN FULL BED OF SEALANT
6
FLUID WRB GRADE D BUILDING PAPER 8% SLOPE MIN.
2' - 5"
2' - 5"
2' - 5"
PAT. 1
PAT. 1
PAT. 1
[B-B-B-A-A]
2' - 2" PAT. 1
[A-B-B-A-A]
[B-B-B-A-A]
G3
3' - 3 1/2"
3' - 3"
HSS
G2
3' - 3"
32' - 1" 6' - 3"
3' - 3"
DOOR CLOSER SEE SPEC
6' - 3"
3' - 1 1/2"
3' - 3"
5
DOOR CLOSER SEE SPEC
2' - 10"
HSS STEEL FRAME
1 1/2"
1 1/2"
8' - 0"
8' - 0"
4" TYP.
4" TYP.
TYP.
VERMONT ELEVATION PAINTED LETTERS
0570.MT02
3' - 3"
3' - 1 1/2"
6' - 3"
32' - 1" 6' - 3"
3' - 3"
3' - 3"
3' - 3"
3' - 3 1/2"
4" TYP.
1 1/2"
8' - 0"
1 1/2"
4" TYP.
4" TYP.
PANIC HARDWARE
COURTYARD ELEVATION G1
80
4" TYP.
G1
8' - 0"
4" TYP.
10"
10"
Portfolio
2' - 5" PAT. 1
2' - 4" PAT. 2
PERF. SHEET MTL.
14NOTE: SEE SHEET A0.301 FOR GATE ELEVATIONS AND INFORMATION
14 14
NOTE: SEE SHEET A0.301 FOR GATE ELEVATIONS AND INFORMATION
NOTE: SEE SHEET A0.301 FOR GATE ELEVATIONS AND INFORMATION
STEEL CLIPS
METAL INTERMEDIATE STRUCTURE - SECTION
6" = 1'-0" SCALE:
NOTE: SEE SHEET A0.301 FOR GATE ELEVATIONS AND INFORMATION
LI C C GIU
U
LI
10
10 METAL GATE JAMB HINGE 6" = 1'-0" SCALE: 10
PROTECTION BOARD
METAL GATE BASE - SECTION
3" = 1'-0" SCALE:
METAL GATE BASE - SECTION
1
3" = 1'-0" SCALE:
1 1
RN
IA
RN
04/18/2019
100% SD PACKAGE
05/16/2019
DD PRICING SET
SLOPE
3" = 1'-0" SCALE:
DATE
ENTITLEMENTS
REV #
100% SD VE PACKAGE 09/19/2019
STEEL ANGLE WELDED TO STRUCTURE TUBE STEEL POST, S.S.D. BASE PLATE ANCHORED TO CLIP, CONCRETE SLAB STEEL WELDED TO TUBE STEEL POST, S.S.D. PERF. PAINT FINISH TO MATCH PERF. SHEET MTL. SHEET MTL. STEEL ANGLE STEEL CLIP, WELDED TO STRUCTURE PERF. SHEET MTL. SLOPE BASE PLATE ANCHORED STEEL ANGLE WELDED TO TOSTRUCTURE CONCRETE SLAB PAINT FINISH TO MATCH PERF. BASE PLATE ANCHORED SHEET MTL. TO CONCRETE SLAB PAINT FINISH TO MATCH PERF. SLOPEMTL. SHEET
METAL GATE BASE - SECTION
ISSUE
11/15/2019
PLAN CHECK SET 12/20/2019 ISSUE DATE REV # CLA PUBLIC HEALTH 03/13/2020 ENTITLEMENTS 04/18/2019 PLAN CHECK RESP 1 04/24/2020 1 100% SD PACKAGE 05/16/2019 ISSUE REV # CLAPH RESPONSE 1DATE 05/08/2020 2 100% SD VE PACKAGE 09/19/2019 ENTITLEMENTS 04/18/2019 PLAN CHECK RESP 2 07/09/2020 3 DD PRICING SET 11/15/2019 100% SD PACKAGE 05/16/2019 BULLETIN 003 08/14/2020 4 PLAN CHECK SET 12/20/2019 100% SD VE PACKAGE 09/19/2019 PLAN CHECK RESP 3 10/01/2020 5 CLA PUBLIC HEALTH 03/13/2020 DD PRICING SET 11/15/2019 PLAN CHECK RESP 1 04/24/2020 PLAN CHECK SET 12/20/2019 1 CLAPH RESPONSE 1 05/08/2020 CLA PUBLIC HEALTH 03/13/2020 2 PLAN CHECK RESP 2 07/09/2020 PLAN CHECK RESP 1 04/24/2020 3 1 BULLETIN 003 08/14/2020 CLAPH RESPONSE 1 05/08/2020 4 2 PLAN CHECK RESP 3 10/01/2020 PLAN CHECK RESP 2 07/09/2020 5 3 BULLETIN 003 PRINT DATE: PLAN CHECK RESP 3
08/14/2020 4 PM 9/30/2020 7:30:33 10/01/2020 5
SITE DETAILS 9/30/2020 7:30:33 PM
PRINT DATE:
SITE DETAILS 9/30/2020 7:30:33 PM
PRINT DATE:
A10.000
SITE DETAILS
A10.000 A10.000
81
TUBE STEEL 1/4" TUBE THK. STEEL POST S.S.D., STRUCTURE, S.S.D. PAINT TO MATCH PERFORATED SHEET SHEET METAL METAL, PAINTED, SEE 1/4" THK. ELEVATION FOR TYPE PERFORATED SHEET AND FINISH PAINTED, SEE GATEMETAL, JAMB HINGE ELEVATION FOR TYPE TUBE STEEL POST S.S.D., 6" = 1'-0" SCALE: AND TO FINISH PAINT MATCH SHEET METAL TUBE STEEL POST S.S.D., PAINT TO MATCH SHEET METAL
PROTECTION BOARD 1/2" CONCRETE ONFRAME, GRADE S.S.D. TUBE STEEL SEE CIVIL FOR 1/2" ELEVATION CONCRETE ON GRADE SEE CIVIL FOR ELEVATION PROTECTION BOARD
4 4
STEEL CLIP, WELDED TO PERF. SHEET MTL.
1/4" THK. PERFORATED SHEET TUBE STEEL FRAME, METAL, PAINTED, SEE S.S.D. 1/4" THK. ELEVATION FOR TYPE AND 1/2" PERFORATED SHEET CONCRETE ON GRADE FINISH METAL, PAINTED, SEE CIVIL FOR SEE ELEVATION FOR TYPE AND ELEVATION FINISH TUBE STEEL FRAME, S.S.D.
IA
GI
CONSULTANTS
4
TUBE STEEL POST, S.S.D.
METAL, PAINTED, SEE ELEVATION FOR TYPE AND FINISH
1/4" THK. PERFORATED SHEET METAL, PAINTED, SEE TUBE STEEL FOR TYPE ELEVATION STRUCTURE, S.S.D. AND FINISH
6" = 1'-0" SCALE:
6" = 1'-0" SCALE:
1/4" THK.
TUBE STEEL STRUCTURE, S.S.D.
METAL GATE JAMB HINGE
3303 N. San Fernando Blvd. Suite 100 Burbank, CA 91504 T: 818.841.8388
ISSUE
METAL INTERMEDIATE STRUCTURE - SECTION
NOTE: SEE SHEET A0.301 FOR GATE PERFORATED SHEET ELEVATIONS AND INFORMATION
STEEL CLIPS
METAL
1530 S. Lewis Street SOILS ENGINEER Anaheim, CA 92805 Inc. T:Geocon, 714.508.18802 3303 N. San Fernando Blvd. Suite 100 Burbank, 91504 SOILSCA ENGINEER T: 818.841.8388 Geocon, Inc.
ISSUE
13 METAL GATE JAMB - 2 DOORS 6" = 1'-0" SCALE: 13
NOTE: SEE SHEET A0.301 FOR FOR GATEGATE NOTE: SEE SHEET A0.301 ELEVATIONS AND AND INFORMATION ELEVATIONS INFORMATION
6" = 1'-0" SCALE:
0' - 0 1/2"
6" =POST, 1'-0" SCALE: TUBE STEEL S.S.D.
Geocon, 526 Commercial StreetInc. FOOD SERVICE 3303 N. San Fernando Blvd. Glendale, CA Suite 91203100 Webb Foodservice Design Burbank, CA 91504 T: 818.396.8002 1530 S. Lewis Street T: 818.841.8388 Anaheim, CASERVICE 92805 FOOD T: 714.508.18802 Webb Foodservice Design
ELEVATIONS AND INFORMATION
METAL GATE JAMB - 2 DOORS
0' - 0 1/2"
STAMP
METAL INTERMEDIATE STRUCTURE - SECTION
13 NOTE: SEE SHEET A0.301 FOR GATE
STEEL CLIPS
0' - 0 1/2"
Webb Foodservice Design 755 N. Central Avenue PLUMBING ENGINEER S. Lewis Street Upland,1530 California 91786 Moe Plumbing Anaheim, CA 92805 T: 909.981.5051 526 Commercial Street T: 714.508.18802 Glendale, CA 91203 PLUMBING ENGINEER T: 818.396.8002 SOILS ENGINEER Moe Plumbing
ISSUE
GATE ON
TUBE STEEL POST, S.S.D. 1/4" THK.STEEL FRAME, S.S.D. TUBE PERFORATED SHEET METAL, SEE ELEVATION 1/4" THK. FOR TYPE AND FINISH PERFORATED SHEET METAL, SEE ELEVATION TUBE POST, S.S.D. FORSTEEL TYPE AND FINISH
1 1/2"
METAL
ATE
1140 N. RedMoe GumPlumbing Street ELECTRICAL ENGINEER 526 Commercial Street Anaheim, CA 92806 Walton Electric Glendale, CA 91203 T: 714.630.3200 755 N. Central Avenue T: 818.396.8002 Upland, California 91786 ELECTRICAL ENGINEER T: 909.981.5051 FOODElectric SERVICE Walton
TUBE STEEL FRAME, S.S.D. STEEL ANGLE WELDED TO STRUCTURE 1/4" THK. PERFORATED SHEET STEEL ANGLE WELDED SEE ELEVATION TOMETAL, STRUCTURE FOR TYPE AND FINISH TUBE STEEL FRAME, S.S.D.
1 1/2"
OR GATE TION 0' - 0 1/2"
1/4" TUBE THK. STEEL PERFORATED SHEET STRUCTURE, S.S.D., METAL, PAINTED, SEE PAINT 1/4" THK.TO MATCH ELEVATION FOR TYPE PERFORATED SHEET AND FINISH METAL, PAINTED, SEE ELEVATION FOR TYPE TUBE ANDSTEEL FINISH STRUCTURE, S.S.D., TO MATCH GATE PAINT JAMB - 2 DOORS TUBE STEEL 6" = 1'-0" SCALE: STRUCTURE, S.S.D., PAINT TO MATCH
Walton Electric 707 Wilshire Blvd., Suite 5100 MECHANICAL ENGINEER N. Central Avenue Los 755 Angeles, CA 90015 Upland, California 91786 T:Thermalair 213.362.7778 1140 N. Red Gum Street T: 909.981.5051 Anaheim, CA 92806 MECHANICAL ENGINEER T: 714.630.3200 PLUMBING ENGINEER Thermalair
STEEL CLIP, WELDED TO STEEL ANGLE PERF. SHEET MTL.WELDED TO STRUCTURE STEEL CLIP, WELDED TO PERF. SHEET MTL.
1 1/2"
- 0 1/2"
I
1800 S. Brand Blvd., Studio 212 Thermalair STRUCTURAL 1140 N.ENGINEER RedCA Gum Street Los Angeles, 91204 Miyamoto International, Inc.92806 Anaheim, CA T: 323.691.6647 707 Wilshire Blvd., Suite 5100 T: 714.630.3200 Los Angeles, CA 90015 STRUCTURAL ENGINEER T: 213.362.7778 ELECTRICAL ENGINEER Miyamoto International, Inc.
PERF. SHEET MTL.
1/4" THK. PERFORATED SHEET METAL, PAINTED, SEE ELEVATION FOR TYPE AND FINISH
0' - 0 1/2"
SE
12-31-21 CIVIL ENGINEER RENEWAL Fuscoe Engineering C-26571 16795 Von Karman, Suite 100 DATE F OIrvine, CA 92606 O F12-31-21 CA L I T: 949.474.1960 RENEWAL DATE E LANDSCAPE F O ARCHITECT O FTina CheeL Landscape Studio CA I 1800 S.CIVIL BrandENGINEER Blvd., Studio 212 Fuscoe Engineering Los Angeles, CA 91204 16795 Von Karman,T:Suite 100 323.691.6647 Irvine, 92606 CIVILCA ENGINEER T: 949.474.1960 STRUCTURAL ENGINEER Fuscoe Engineering
Miyamoto International, 16795 Von Karman, Suite 100Inc. LANDSCAPE ARCHITECT 707 Wilshire Blvd., 5100 Irvine, CASuite 92606 Tina Chee Landscape Studio Los T: Angeles, CA 90015 949.474.1960 1800 S. Brand Blvd., Studio 212 T: 213.362.7778 Los Angeles, CA 91204 LANDSCAPE ARCHITECT T: 323.691.6647 MECHANICAL ENGINEER Tina Chee Landscape Studio
SHEET NAME
0' - 0 1/2"
3
3 METAL GATE POST - PLAN = 1'-0" SCALE:TO 3 STEEL6"CLIP, WELDED
METAL HINGE, TUBE STEEL PAINT TO MATCH STRUCTURE, S.S.D., PAINT TO MATCH TUBE STEEL STRUCTURE, S.S.D., PAINT TO MATCH
- 0 1/2"
C
STAMP
0' - 0 1/2"
E
CONSULTANTS CONSULTANTS
EQ
TUBE STEEL 1/4" TUBE THK. STEEL POST S.S.D., STRUCTURE, S.S.D. PAINT TO MATCH PERFORATED SHEET SHEET METAL METAL, PAINTED, SEE 1/4" THK. ELEVATION FOR TYPE PERFORATED SHEET AND FINISH METAL GATE - PLAN METAL,POST PAINTED, SEE ELEVATION FOR TYPE = 1'-0" SCALE: TUBE STEEL6"POST S.S.D., AND TO FINISH PAINT MATCH SHEET METAL TUBE STEEL POST S.S.D., PAINT TO MATCH SHEET METAL GATEMETAL POST - PLAN 6" = 1'-0" SCALE:
A
METAL
6" = 1'-0" SCALE: TUBE STEEL GATE END JAMB STRUCTURE, S.S.D., STEEL CLIPS PAINT MATCH 6" =TO 1'-0" SCALE: METAL HINGE, STEEL PAINT TOCLIPS MATCH
0' - 0 1/2"
HI SE T EN C-26571 PPE AL
AT
MATCH METAL GATEPAINT ENDTOJAMB
0' - 0 1/2"
NOTE: SEE SHEET A0.301 FOR GATE ELEVATIONS AND INFORMATION
EQ EQ
A T ST
EQ
1/4" THK. PERFORATED SHEET METAL, PAINTED, SEE TUBE STEEL FOR TYPE ELEVATION STRUCTURE, S.S.D. AND FINISH
O P L SE O F CI A L I F D ARC
T EC O T EC O AN N
0' - 0 1/2"
ST
01 FOR GATE RMATION
C-26571 12-31-21 D ARCH SE RENEWAL IT DATE EN E PE A
AT
FOR GATE MATION
TUBE STEEL STRUCTURE, S.S.D.
EQ
1/4" TUBE THK. STEEL PERFORATED SHEET STRUCTURE, S.S.D., METAL, PAINTED, SEE PAINT 1/4" THK.TO MATCH ELEVATION FOR TYPE PERFORATED SHEET AND FINISH METAL, PAINTED, SEE ELEVATION FOR TYPE TUBE METAL GATE END JAMB ANDSTEEL FINISH STRUCTURE, S.S.D., 6" = 1'-0" SCALE: PAINT TO MATCH TUBE STEEL STEEL CLIPS STRUCTURE, S.S.D., PAINT TO MATCH METAL HINGE,
0' - 0 1/2"
I T: 213.629.2702 S E: galiano@abodecommunities.org
ST
EQ
1/4" THK. PERFORATED SHEET METAL, PAINTED, SEE ELEVATION FOR TYPE AND FINISH
0' - 0 1/2"
S IT EN PLos PEAngeles, AL CA 90015 E
GI
EQ
T EC
0' - 0 1/2"
0' - 0 1/2"
EQ
STEEL CLIP, WELDED TO BASE PLATE BEYOND, PERF. SHEET MTL. PAINT TO MATCH SHEET METAL BASE PLATE BEYOND, PAINT TO MATCH SHEET METAL
O AN
METAL HINGE, TUBE STEEL PAINT TO MATCH STRUCTURE, S.S.D., PAINT TO MATCH TUBE STEEL STRUCTURE, S.S.D., PAINT TO MATCH
0' - 0 1/2"
EQ
LI
EQ
ARCHITECT ARCHITECT STAMP
0' - 0 1/2"
IA
TUBE STEEL 3" = 1'-0" SCALE: STRUCTURE, S.S.D., STEEL CLIPS PAINT TO MATCH METAL HINGE, STEEL PAINT TOCLIPS MATCH
12 12 METAL 6" =WELDED 1'-0" SCALE: STEEL CLIP, TO 6" PLATE = 1'-0" SCALE: BASE BEYOND,
EQ PAINT -TO MATCH SHEET METAL GATE TOP SECTION
EQ
SHEET NAME SHEET NAME SHEET NUMBER
0' - 0 1/2"
2 2
3" = 1'-0" SCALE:
PAINT TO MATCH METAL GATE JAMB - PLAN
SHEET NUMBER SHEET NUMBER
METAL HINGE,
STEEL CLIP, WELDED TO PERF. SHEET MTL.
GATE TOP - SECTION 0' - 0 METAL 1/2"
T: Temple 424.208.6016 500 W. St. E: alandecker@exed.net Los Angeles, CA T: 213.974.4256 SEED LA Facilities, LLC Lara Regus C/O ExED T: 213.225.2812 Anita Landecker E: lregus@abodecommunities.org 11858 La Grange Ave, Fl. LLC 2 SEED LA Facilities, Los Angeles, CAC/O 90025 ExED T: 424.208.6016 Anita Landecker E: alandecker@exed.net 11858 La Grange Ave, Fl. 2 Abode Communities Los Angeles, Architecture CA 90025 1149 S. Hill Street, Suite 700 Regus T:Lara 424.208.6016 Los Angeles, CA 90015 T: 213.225.2812 E: alandecker@exed.net T: 213.629.2702 E: lregus@abodecommunities.org E: galiano@abodecommunities.org Lara Regus T: 213.225.2812 E: lregus@abodecommunities.org Abode Communities Architecture 1149 S. Hill Street, Suite 700 Los Angeles, CA 90015 T: 213.629.2702 Abode Communities ARCHArchitecture E: galiano@abodecommunities.org EDS. Hill 1149 Street, Suite 700
Woodruff
METAL GATE JAMB - PLAN
0.3010'FOR - 0GATE 1/2" FORMATION
E
NOTE: SEE SHEET A0.301 FOR GATE ELEVATIONS AND INFORMATION
STEEL CLIPS
12
6" = 1'-0" SCALE:
RN
ATE
METAL GATE TOP - SECTION
NOTE: SEE SHEET A0.301 FOR GATE ELEVATIONS AND INFORMATION
U
2
3" = 1'-0" SCALE:
DEVELOPER DEVELOPER ARCHITECT
METAL GATE JAMB - PLAN S.S.D.
E
Irvine, CA 92606 T: 949.474.1960
CON
#24
LANDSCAPE ARCHITECT Tina Chee Landscape Studio 1800 S. Brand Blvd., Studio 212 Los Angeles, CA 91204 T: 323.691.6647
#25
STRUCTURAL ENGINEER Miyamoto International, Inc. 707 Wilshire Blvd., Suite 5100 Los Angeles, CA 90015 T: 213.362.7778
#27
FELT UNROLL
1/4" = 1'-0" SCALE:
Q
ELECTRICAL ENGINEER Walton Electric 755 N. Central Avenue Upland, California 91786 T: 909.981.5051
S2
PLUMBING ENGINEER Moe Plumbing 526 Commercial Street Glendale, CA 91203 T: 818.396.8002
3' - 6 1/2" 6' - 8 1/2"
13' - 6 5/8"
11 3/4"
2' - 0" TYP.
TYP.
6
15
14
13 12
11 10
4
1
2
3
95
8° .9
7
8
9
5
1' - 4 1/2"
3° .6 85
15.17°
2' - 0"
14.5
20' - 6 5/8"
4.37°
5' - 3 1/4"
SOILS ENGINEER Geocon, Inc. 3303 N. San Fernando Blvd. Suite 100 Burbank, CA 91504 T: 818.841.8388
7' - 10 1/4"
16
FOOD SERVICE Webb Foodservice Design 1530 S. Lewis Street Anaheim, CA 92805 T: 714.508.18802
6' - 2 3/4"
14
R
MECHANICAL ENGINEER Thermalair 1140 N. Red Gum Street Anaheim, CA 92806 T: 714.630.3200
3
4' - 0 1/4"
Portfolio
#26
15 FEET
2° .0
20' - 0 3/8"
#2
17
43.5 2°
23
21
20
25
11' - 7 3/8"
19
22
26
#6
05/16/2019
REV #
DD PRICING SET
11/15/2019
PLAN CHECK SET
12/20/2019
CLA PUBLIC HEALTH
03/13/2020
PLAN CHECK RESP 1
04/24/2020
1
CLAPH RESPONSE 1
05/08/2020
2
PLAN CHECK RESP 2
07/09/2020
3
BULLETIN 003
08/14/2020
4
PLAN CHECK RESP 3
10/01/2020
5
87 .94 °
11' - 3 1/2"
4' - 6 1/4"
92 .0 6°
15' - 6 3/4"
#9 #10 #11
10/2/2020 10:10:09 AM
PRINT DATE:
#12 #13 #14
HUB CEILING SYSTEM
#15 #16
NOTE: PROVIDE A MOCKUP SAMPLE OF A FELT #17 ATTACHMENT TO THE FRAME FOR #18 ARCHITECTS APPROVAL #19 HUB CEILING
1/4" = 1'-0" #20 SCALE:
A8.104.4
SHEET NUMBER
1" INDUSTRIAL FELT - 18" HIGH DROPPED CEILING ADHERED TO PROFILED PLYWOOD SUSPENDED FROM METAL FRAMING INSTALLED ON STRUCTURAL CEILING ABOVE
04/18/2019
100% SD PACKAGE
SHEET NAME
.83 ° 74
16
DATE
ENTITLEMENTS
#8
8° 46.4
13' - 6 3/8"
2X2 STL TUBE #4 GRID FRAMING HUNG FROM SLAB ABOVE#5
#7
27
ISSUE
100% SD VE PACKAGE 09/19/2019
#3
18
24
3' - 11 5/8"
ISSUE
84 #1
1
#21 #22 #23 #24 #25 #26 RODS CONNECTED TO SLAB ABOVE
#27
2'X2' GRID METAL FRAME
1/4" THK 18" HT INDUSTRIAL FELT
14
3' - 6 1/2"
Q
TYP.
6' - 8 1/2"
15.17°
2' - 0"
14.5
2
4.37°
5' - 3 1/4"
15
14
13
20' - 0 3/8"
16
13' - 6 3/8"
16
82
1" INDUSTRIAL FELT - 18" HIGH DROPPED CEILING ADHERED TO PROFILED PLYWOOD SUSPENDED FROM METAL FRAMING INSTALLED ON STRUCTURAL CEILING ABOVE
92 .0
3' - 11 5/8"
74
.83 °
27
FRAMING AS REQ'D GWB GWB HOSPITAL GRADE HOSPITAL GRADE CURTAIN TRACK. TRACK. RECESS TOCURTAIN ALIGN WITH RECESS TO ALIGN WITH CEILING FINISH CEILING FINISH SHOWER CURTAIN SHOWER CURTAIN
Woodruff
1/4" THICK STEEL PLATE. FIT 1/4" THICK STEEL FIT BETWEEN CEILING TILEPLATE. PANELS BETWEEN CEILING TILE PANELS
RECESSED SHOWER CURTAIN TRACK RECESSED SHOWER CURTAIN TRACK 3" = 1'-0" SCALE: 11
CEIL CE
11
CEILING SUSPENSION RODCEILING SUSPENSION ROD T-BAR SUSPENSION T-BAR SUSPENSION GRID, PAINTED BLACK GRID, PAINTED BLACK
UNDERSIDE OF UNDERSIDE ROOF OF ROOF
0' - 0 1/4"
DINING HALL T.O.S. DINING HALL T.O.S. 178.64 178.64
0' - 0 1/4"
3" = 1'-0" SCALE:
METAL STUD METAL STUD WALL WALL SEE PLAN FOR TYPE SEE PLAN FOR TYPE
INDUSTRIAL FELT, FELT, 1/4" INDUSTRIAL THICK, SEE SPEC 1/4" THICK, SEE SPEC
HUB CEILING CLIP CONNECTION HUB CEILING CLIP CONNECTION 10 6" = 1'-0" SCALE: 6" = 1'-0" SCALE:
0' - 0 1/4"
ACOUSTIC PANEL ACOUSTIC PANEL SEE INT. ELEV. FOR TYPE SEE INT. ELEV. FOR TYPE GYP WALL BOARD GYP WALL BOARD CORNER BEAD CORNER BEAD
METAL CLAMP, SUSPENDED METAL FROM CLIP CLAMP, PER SUSPENDED FROM CLIP PER MANUFACTURER, MANUFACTURER, REFER TO TO RCPREFER FOR POINT RCP FOR POINT CONNECTIONS TO CONNECTIONS TO CEILING GRID CEILING GRID
0' - 0 1/4"
T-BAR CLIP T-BAR CLIP
0' - 4 1/4" 0' - 4 1/4"
DINING HAL DINING H
10
FOR CEILING ASSEMBLY, FORTO CEILING REFER SHEETASSEMBLY, A0.105 REFER TO SHEET A0.105
CEILING SUSPENSION RODCEILING SUSPENSION ROD
10 A10.700 10 A10.700
T-BAR SUSPENSION T-BAR SUSPENSION GRID, PAINTED BLACK GRID, PAINTED BLACK
PER PLAN
DISTANCE VARIES. VARIES. SEEDISTANCE REFLECTED CEILING SEE CEILING PLAN ORREFLECTED FLOOR PLANS OR FLOOR FORPLAN CEILING HEIGHT.PLANS FOR CEILING HEIGHT. (7'-6" MIN. AT (7'-6" LOCATIONS) MIN. AT DUCTED DUCTED LOCATIONS)
PER PLAN
CONCRETE SLAB, CONCRETE SLAB, S.S.D. S.S.D. CEILING SUSPENSION RODCEILING SUSPENSION ROD
T-BAR CLIP T-BAR CLIP
1' - 6"
FOR CEILING ASSEMBLY, FORTO CEILING REFER SHEETASSEMBLY, A0.105 REFER TO SHEET A0.105
1' - 6"
METAL CLAMP, METALFROM CLAMP, SUSPEND CLIP FROM CLIP PERSUSPEND MANUFACTURER, PER MANUFACTURER, REFER TO RCP FOR REFER TO RCP FOR POINT CONNECTIONS POINT CONNECTIONS TO CEILING GRID TO CEILING GRID
CEILI CE
INDUSTRIAL FELT, 1/4" INDUSTRIAL THICK, SEE FELT, 1/4" THICK, SEE SPEC SPEC
BOTTOM OF BOTTOM FELT, OF INDUSTRIAL INDUSTRIAL FELT, BEYOND BEYOND
DISTANCE VARIES. VARIES. SEEDISTANCE REFLECTED CEILING SEE CEILING PLAN ORREFLECTED FLOOR PLANS PLAN OR FLOOR FOR CEILING HEIGHT.PLANS FOR CEILING HEIGHT. (7'-6" MIN. AT (7'-6" LOCATIONS) MIN. AT DUCTED DUCTED LOCATIONS)
STOREFRONT STOREFRONT GLAZING GLAZING
83
STOREFRONT STOREFRONT MULLION MULLION
0' - 8" 0' - 8"
Portfolio
Category Core & Shell Modular
Status
In Progress
City
Country
Los Angeles
USA
BEACON LANDING 2021 Project Team Yupil Chon, Soo Ahn, Charles Wang, Yan Leng, Robert Nalbandyan, Michael Woodruff
84
Project Phases SD, DD, CD
Project Responsibilties • • •
Led team through construction documentation Led team of junior employees to provide presentation drawings and construction documents Coordinated with factory prefab, waterproofing, landscaping consultants
Woodruff
Rendering by other
Project Description
85
Beacon Landing is an 89-unit supportive housing development in San Pedro. The project is one of five developments to be produced as part of the City of Los Angeles HHH Innovation Challenge to streamline site selection, design, construction, and financing of prefabricated modular housing. da-Collective coordinated the building design with manufacturer FactoryOS to design factory built modular housing units to be transported and stacked on site. The design challenge centered on how to wrap the stacked modular units in such a way to create interest and break the monotony of boxes stacked upon themselves. The rotation of exterior furring walls provides a variegated design to establish unit part to whole relationship, while also coming together a cohesive pattern long the facade.
SETBACK LINE
2
3
4
6
7
5
8
9
5
8
9
CJ-02 VINYL WINDOW, BLACK EXTERIOR FRAME FINISH
CJ-01 CS-03
CS-02
5'-7 1/2" SETBACK
1
2
SETBACK LINE
PROPERTY LINE PROPERTY LINE
Portfolio
1
3
4
6
7
CJ-02 VINYL WINDOW, BLACK EXTERIOR FRAME FINISH
CJ-01 CS-03
CS-02
5'-7 1/2" SETBACK
17'-6 1/8" 6" FURR OUT
17'-6 1/8"
BV-01
2'-6" 3'-6" 6'-0"
CS-04
CS-02
CS-03
CS-02
CS-03
4'-0"
6'-0"
2'-6" 3'-6" 6'-0"
4'-0"
6" FURR OUT
CS-04
CS-02
6'-0"
?
BV-01
CS-02
SETBACK LINE
12'-10" SETBACK
A
SETBACK LINE
PROPERTY LINE
PROPERTY LINE
?
A
B
B
C
D
VINYL WINDOW, BLACK EXTERIOR C FRAME FINISH D
E
F
E
F
CJ-01
G
H
J
K
R
G
H
J
K
R
L
L
CJ-02
CJ-02
CJ-02
CJ-02
CS-03
12'-10" SETBACK
VINYL WINDOW, BLACK EXTERIOR FRAME FINISH
3'-4"
CJ-01 CS-03
3'-6"
5'-0" 8'-6" TYP.
3'-4"
FURR OUT VARIES (2"~12")
FURR OUT VARIES (2"~12")
3'-6"
5'-0" 8'-6" TYP.
FURR OUT VARIES (2"~12")
6' H PERFORATED METAL BACK YARD FENCE AND GATE
6' H PERFORATED METAL GARAGE FENCE
10'-0"
6' H PERFORATED METAL GARAGE GATE
BV-01
6' H PERFORATED METAL GARAGE GATE
BV-01
10'-0"
6' H PERFORATED METAL BACK YARD FENCE AND GATE
10'-0"
6'-0" RET. WALL
4/30/2021 12:20:48 4/30/2021 12:20:48
PRINT DATE:
86
PRINT DATE:
2'-0"
10'-0"
6'-0" RET. WALL
2'-0"
FURR OUT VARIES (2"~12")
ALUMINUM-FRAMED STOREFRONT
6' H PERFORATED METAL GARAGE FENCE PAD-MOUNTED TRANSFORMER
ALUMINUM-FRAMED ENTRANCE DIMENSIONAL METAL BUILDING NUMBER SIGNAGE
PAD-MOUNTED TRANSFORMER
ALUMINUM-FRAMED STOREFRONT
ALUMINUM-FRAMED ENTRANCE DIMENSIONAL METAL BUILDING NUMBER SIGNAGE
PAINT COLOR 1 / WHITE
6'-0" 10'-10 3/4" 10'-10 3/4" 5'-0"
8'
16' P
HEIGHT TO COMPLY WITH T LAMC U 12.21.1.B.3 N
Q
32'
3'-0" STREET DEDICATION P
Q
CJ-01
CS-01
CS-02
CEMENT STUCCO, SAND FLOAT 20/30, PAINT COLOR 4 / GREY CEMENT STUCCO, SAND FLOAT 20/30,
BV-01
BRICK VENEER, COLOR 1 / GREY
CS-03 CJ-01
CEMENT STUCCO, SAND FLOAT 20/30, PAINT COLORSTUCCO 3 / LIGHTGREY 1/4" PAINTED CONTROL JOINT
CJ-02 CS-04
1/2" PAINTED STUCCO CONTROL JOINT CEMENT STUCCO, SAND FLOAT 20/30, PAINT COLOR 4 / GREY
BV-01
BRICK VENEER, COLOR 1 / GREY
CJ-01
1/4" PAINTED STUCCO CONTROL JOINT
CJ-02
1/2" PAINTED STUCCO CONTROL JOINT
PAINT COLOR 2 / CHARTREUSE
GRADE PLANE, SEE 1/G1-301 (+30.00') LEVEL 1 0" (+27.50') LOWEST POINT (+27.30')
2
SOUTH ELEVATION
2
SCALE: 1/8" = 1'-0"
STAMP: herein and in this drawing, all prepared
STAMP: T.O.PARAPET 53'LEVEL - 11 1/4"4 38' - 0 1/2" ROOF 48' - 11 1/4"
LEVEL 3 27' - 1 3/4" LEVEL 4 38' - 0 1/2"
LEVEL 2 16' - 3" LEVEL 3 27' - 1 3/4"
57'-5 1/4" 57'-5 1/4" PROPOSED BUILDING HEIGHT PROPOSED BUILDING HEIGHT
5'-0" 10'-10 6'-0" 3/4" 10'-10 3/4" 10'-10 3/4" 5'-0"
ROOF 48' - 11 1/4"
10'-10 16'-3" 3/4"
10'-10 3/4" 10'-10 3/4"
by Abode Communities | Architecture, are for the use solely with respect to this project, and Abode Communities | Architecture shall retain all common law, statutory, and other reserved rights including copyright, and shall not be used by others for any other purpose without written permission of Abode Communities | Architecture.
T.O.PARAPET 53' - 11 1/4"
GRADE PLANE, SEE 1/G1-301 LEVEL 2 (+30.00') 16' - 3"1 LEVEL 0" (+27.50') LOWEST POINT (+27.30')
CS-01
0'
4'
8'
CS-02
0'
4'
16'
32'
1
NOTES: 1. PER LAMC SECTION 14.00 A.13(G)10 LIGHTING: SECURITY NIGHT LIGHTING SHALL BE SHIELDED SO THAT THE LIGHT SOURCE CANNOT BE SEEN FROM ADJACENT RESIDENTIAL PROPERTIES EAST ELEVATION COMPLIES WITH LAMC SECTION 14.00 A.13 (G)4: (I) FOR ANY BUILDING LOCATED IN A COMMERCIAL ZONE, A MINIMUM OF 25 PERCENT OF NOTES: THAT PORTION OF THE EXTERIOR STREET-FACING WALLS WHICH ARE BETWEEN 2 FT TO 8 FT ABOVE THE SIDEWALK GRADE SHALL BE COMPRISED OF TRANSPARENT (UNTINTED, 1. PER LAMC SECTION 14.00 A.13(G)10 LIGHTING: UNFROSTED, NON-REFLECTIVE) WINDOWS OR OPENINGS, EXCLUSIVE OF AREAS FOR SECURITY NIGHT LIGHTINGPASEOS SHALL BE SHIELDED WALKWAYS, DRIVEWAYS, AND PLAZAS. SO THAT THE LIGHT SOURCE CANNOT BE SEEN FROM ADJACENT RESIDENTIAL (II) A MINIMUM OF 10 PERCENT OF THEPROPERTIES UPPER STORY PORTIONS OF THE EXTERIOR STREETFACING BUILDING FACADE AS MEASURED FROM THE TOP OF THE FINISHED GROUND FLOOR TO THE TOP OF THE BUILDING FACADE SHALL BE COMPRISED OF TRANSPARENT (UNTINTED, EAST ELEVATION COMPLIES WITH LAMC SECTION 14.00 A.13 (G)4: UNFROSTED, NON-REFLECTIVE) WINDOWS OR OPENINGS. (I) ANYISBUILDING LOCATED IN A COMMERCIAL OF 25 PERCENT (III)FOR GLASS CONSIDERED TRANSPARENT WHERE ZONE, IT HAS AA MINIMUM TRANSPARENCY HIGHER OF THAN THAT PORTION OFEXTERNAL THE EXTERIOR STREET-FACING WALLS ARE BETWEEN 2 FT TO 8 FT 80 PERCENT AND REFLECTANCE OF LESS THANWHICH 15 PERCENT. ABOVE THE SIDEWALK GRADE SHALL BE COMPRISED OF TRANSPARENT (UNTINTED, UNFROSTED, NON-REFLECTIVE) WINDOWS OR OPENINGS, EXCLUSIVE OF AREAS FOR WALKWAYS, DRIVEWAYS, PASEOS AND PLAZAS. (II) A MINIMUM OF 10 PERCENT OF THE UPPER STORY PORTIONS OF THE EXTERIOR STREETFACING BUILDING FACADE AS MEASURED FROM THE TOP OF THE FINISHED GROUND FLOOR TO THE TOP OF THE BUILDING FACADE SHALL BE COMPRISED OF TRANSPARENT (UNTINTED, UNFROSTED, NON-REFLECTIVE) WINDOWS OR OPENINGS. (III) GLASS IS CONSIDERED TRANSPARENT WHERE IT HAS A TRANSPARENCY HIGHER THAN 80 PERCENT AND EXTERNAL REFLECTANCE OF LESS THAN 15 PERCENT.
REV
ISSUE
REV
ISSUE
50% SD 100% SD PLAN CHECK [HSAP-2]
50% SD 100% SD PLAN CHECK [HSAP-2]
SHEET NAME:
SHEET NUMBER: SHEET NAME:
BUILDING A5.01 ELEVATIONS
Original drawing is 30x42. Half size is 15x21.
8'
16'
32'
SCALE: 1/8" = 1'-0"
SHEET NUMBER:
1
DATE
01/29/21 03/01/21 05/03/21
BUILDING ELEVATIONS
CS-01
EAST ELEVATION
DATE
01/29/21 03/01/21 05/03/21
A5.01
87
GRADE PLANE, SEE 1/G1-301 (+30.00') LEVEL 1 0" EAST ELEVATION (+27.50') SCALE:POINT 1/8" = 1'-0" LOWEST (+27.30')
2'-6"
CS-02
10'-0"
16'-3"
2'-6"
5'-0" 2'-0" 5'-0" 2'-0"
4'-0" 2'-3"
10'-0"
4'-0" 2'-3"
3'-6" 5'-0" 3'-6"
7" FURR OUT
311-345 N. Beacon St. ARCHITECT: Los Angeles, CA 90731 Abode Communities CLIENT: 1149 S. Hill Street, Suite 700 Los Angeles, CA 90015LP Beacon Landing, T: 213.629.2702 1149 S. Hill Street, Suite 700 Los Angeles, CA 90015 CONSULTANTS: T: 213.629.2702 CIVIL KPFF ARCHITECT: 700 SouthCommunities Flower Street, Suite 2100 Abode Los Angeles, CA 90017 1149 S. Hill Street, Suite 700 T: 213.418.0201 Los Angeles, CA 90015
The ideas and designs represented
CS-03
7" FURR OUT
Beacon Landing, LP 1149 S. Hill Street, Suite 700 Los Angeles, CA 90015 T: 213.629.2702
The ideas and designs represented herein and in this drawing, all prepared by Abode Communities | Architecture, are for the use solely with respect to this project, and Abode Communities | Architecture shall retain all common law, statutory, and other reserved rights including copyright, and shall not be used by others for any other purpose without written permission of Abode Communities | Architecture. PROJECT NO: 202006
CJ-01
5'-0"
CS-01
BEACON LANDING
PROJECT NO: 202006
6'-0"
3'-0" STREET DEDICATION
311-345 N. Beacon St. Los Angeles, CA 90731 PROJECT: CLIENT:
MECHANICAL / ELECTRICAL / PLUMBING / FIRE PROTECTION / LOW VOLTAGE Budlong & Associates 315 Arden Avenue #23 Glendale, CA 91203 T: 818.638.8780
CS-03 HEIGHT TO COMPLY WITH LAMC 12.21.1.B.3
BEACON LANDING
MECHANICAL / ELECTRICAL 1800 S. Brand Boulevard, Studio 212/ PLUMBING / FIRE PROTECTION Glendale, CA 91204 /T:LOW VOLTAGE 323.691.6647 Budlong & Associates STRUCTURAL 315 Arden Avenue #23 DCI Engineers Glendale, CA 91203 818 W. 7th Street, Suite T: 818.638.8780 Los Angeles, CA 90017 T: 213.298.3700
SOUTH ELEVATION
SCALE: 1/8" = 1'-0"
PROJECT:
LANDSCAPE T: 213.629.2702 Tina Chee Landscape Studio 1800 S. Brand Boulevard, Studio 212 CONSULTANTS: Glendale, CA 91204 CIVIL T: 323.691.6647 KPFF STRUCTURAL 700 South Flower Street, Suite 2100 DCI Engineers Los Angeles, CA 90017 818 W. 7th Street, Suite T: 213.418.0201 Los Angeles, CA 90017 LANDSCAPE T: 213.298.3700 Tina Chee Landscape Studio
GRADE PLANE, SEE 1/G1-301 LEVEL 2 (+30.00') 16' - 3"1 LEVEL 0" (+27.50') LOWEST POINT (+27.30')
PROPERTY LINE
4'
PAINT COLOR 1 / WHITE
PROPERTY LINE
N
DEDICATION
0' U
LEVEL 2 16' - 3" LEVEL 3 27' - 1 3/4"
PAD-MOUNTED TRANSFORMER 16' 32' BV-01
DEDICATION
S
T
LEVEL 3 27' - 1 3/4" LEVEL 4 38' - 0 1/2"
10'-10 3/4" 10'-10 3/4" 2'-6" 2'-6"
BV-01
ALUMINUM-FRAMED STOREFRONT 4' 8'
CEMENT STUCCO, SAND FLOAT 20/30, PAINT COLOR 3 / LIGHTGREY CEMENT STUCCO, SAND FLOAT 20/30,
16'-3"
PAD-MOUNTED TRANSFORMER
10'-0"
0'
M
T.O.PARAPET 53'LEVEL - 11 1/4"4 38' - 0 1/2" ROOF 48' - 11 1/4"
10'-10 16'-3" 3/4"
4'-0" 2'-3" 10'-0" 4'-0" 2'-3" ALUMINUM-FRAMED STOREFRONT
S
ROOF 48' - 11 1/4"
57'-5 1/4" 57'-5 1/4" PROPOSED BUILDING HEIGHT PROPOSED BUILDING HEIGHT
5'-0"
5'-0" 8'-6" TYP. 3'-6" 5'-0" 8'-6" TYP. 3'-6"
9" FURR OUT
M
T.O.PARAPET HEIGHT TO COMPLY WITH 53' - 11 1/4" LAMC 12.21.1.B.3
10'-10 6'-0" 3/4"
VINYL WINDOW, WHITE EXTERIOR FRAME FINISH
9" FURR OUT
CS-03
CS-04
5'-7 1/2" SETBACK
CS-03
CEMENT STUCCO, SAND FLOAT 20/30,
CS-01
PROPERTY LINE
SETBACK LINE
10 11 VINYL WINDOW, WHITE EXTERIOR FRAME FINISH
HEIGHT TO COMPLY WITH LAMC 12.21.1.B.3
5'-7 1/2" SETBACK
CS-03
CS-02
PAINT COLOR 2 / CHARTREUSE EXTERIOR FINISH LEGEND
Woodruff
PROPERTY LINE
11 SETBACK LINE
10
Portfolio
GRID
GRID
SEE PLAN
VARIES FACTORY BUILT WALL ASSEMBLY SITE INSTALLED EXTERIOR PLASTER, SEE ELEVATIONS FOR TYPE
FACTORY BUILT WALL ASSEMBLY SITE INSTALLED W.R.B.
SITE INSTALLED W.R.B. SITE INSTALLED LIQUID APPLIED SILICONE W.R.B., LAP 4" MIN. O/ SHEATING JOINT
SITE INSTALLED LIQUID APPLIED SILICONE W.R.B., LAP 4" MIN. O/SHEATING JOINT
CONTROL JOINT
CONTROL JOINT
LEVEL 2
LEVEL 2
FRT PLYWOOD SHEATING, LAP 2" OVER RIM JOIST, S.S.D.
FACTORY SUPPLIED & SITE INSTALLED PLYWOOD CLOSURE
FACTORY SUPPLIED & SITE INSTALLED PLYWOOD CLOSURE
FACTORY BUILT FLOOR ASSEMBLY
FACTORY INSTALLED (2) 2X12 OR LVL RIM JOIST, S.S.D.
FACTORY INSTALLED (2) 2X12 OR LVL RIM JOIST, S.S.D.
SITE SUPPLIED & INSTALLED FRT 2X BEARING PLATES, S.S.D.
SITE INSTALLED 2X FRAMING
1'-0"
SITE INSTALLED CONCRETE PODIUM, S.S.D. SITE INSTALLED WRB
SITE INSTALLED EXTERIOR PLASTER, SEE ELEVATIONS FOR TYPE
SITE INSTALLED EXTERIOR PLASTER, SEE ELEVATIONS FOR TYPE
SITE INSTALLED DRIP EDGE SET IN FULL BED OF SEALANT
SITE INSTALLED DRIP EDGE
1/4" SITE INSTALLED SELF ADHERED MEMBRANE SITE BUILT CONCRETE PODIUM, S.S.D.
1/4"
SITE INSTALLED SELF ADHERED MEMBRANE STUCCO CORNER MOLD
SITE BUILT FIRESTOP SEALANT OVER POLYETHYLENE BACKER ROD
SITE BUILT FIRESTOP SEALANT OVER POLYETHYLENE BACKER ROD SITE INSTALLED EXTERIOR PLASTER
SITE BUILT EXTERIOR WALL PER PLAN
SITE INSTALLED EXTERIOR WALL PER PLAN
2HR EXT. WALL @ PODIUM - STUCCO FURROUT SCALE:
3" = 1'-0"
5 A9.11
SITE SUPPLIED & INSTALLED FRT 2X BEARING PLATES, S.S.D.
FACTORY SUPPLIED, SITE INSTALLED 2X FRAMING, SSD FACTORY SUPPLIED, SITE INSTALLED PLYWOOD SHEATHING
INTERIOR CORRIDOR
1'-0"
FACTORY BUILT FLOOR ASSEMBLY
FACTORY SUPPLIED & SITE INSTALLED GYPSUM BOARD CLOSURE
1'-3 1/4"
FACTORY SUPPLIED & SITE INSTALLED GYPSUM BOARD CLOSURE
1'-3 1/4"
FRT PLYWOOD SHEATING, LAP 2" OVER RIM JOIST, S.S.D.
19
2HR EXT. ANGLED WALL @ PODIUM - STUCCO SCALE:
3" = 1'-0"
15
88
AT A ATTACHM PREDRILL HOLE FILL WITH SE
H UG RO O NT LIG
ING EN OP
SITE INST WATERP MEMB
SITE INST EXTERIOR PLA OVER METAL
PODIUM SLAB EDGE, WHERE OCCURS
SEE PLAN
FIELD SUPPLIED & INSTALLED PLYWOOD SHEATING & EXT. GYP. BD. SHEATING
GRID
Woodruff
SITE INSTALLED LIQUID APPLIED SILICONE W.R.B.
SITE INSTALLED EXTERIOR PLASTER, SEE ELEVATIONS AND WALL ASSEMBLY SCHEDULES
EXT. WALL @ MODULE MATELINE - PLAN
CORRIDOR FURROU
8
3" = 1'-0"
SCALE:
SLOPE
WEATHER RESISTIVE BARRIER
FACTORY INSTALLED 5/8" GWB
SELF ADHERED MEMBRANE
UNIT INTERIOR
0' - 0 3/4"
LOUVERS
S.A.
FAC FUR
SITE BAC
SITE
FACTORY INSTALLED 7/16" PLYWOOD
SITE THE (TPO
FACTORY INSTALLED 5/8" GYPSUM SHEATHING
0' - 0 3/4"
METAL CLIP SUPPORT; TACK WELD TO GALV. MTL. SLEEVE
0' - 4"
SEALANT AND BACKER ROD
1 A9.13
FACTORY INSTALLED FRAMING & INSULATION
GALV. DRIP HEAD; EXTEND 2" BEYOND JAMB NAILING FLANGE
HEAD NAILING FLANGE, EXTEND 2" BEYOND JAMB NAILING FLANGE
24 G MTL
GRID
EXTERIOR PLASTER
FAC DEN
SITE INSTALLED 7/8" EXTERIOR PLASTER
POINT OF WALL ROTATION
FAC FRA
SITE INSTALLED W.R.B.
BIRD SCREEN
SITE
SITE
SITE INSTALLED SELF ADHERED MEMBRANE
UVER AT STUCCO - HEAD SCALE:
3" = 1'-0"
11
SITE
ROOF PARAPE
GRID SITE INSTALLED STUCCO CORNER MOLD
1'-0"
NOTE: MINIMUM HEIGHT OF PARAPET TO BE MEASURED FROM THE HIGHEST POINT OF ROOF SHEATHING OVER TAPERED INSULATION
FACTORY INSTALLED MODULAR UNIT FLOOR ASSEMBLY
FACTORY INSTALLED 5/8" GWB
SITE INSTALLED BEARING PLATE
FACTORY INSTALLED FRAMING & INSULATION
SLOPE 1/2" PER FT. MIN.
FACTORY INSTALLED 7/16" PLYWOOD
SITE INSTALLED PLYWOOD CLOSURE SITE INSTALLED GYP. SHEATHING CLOSURE
7/8" EXT. PLASTER OVER PAPER BACKED MTL. LATH
FACTORY INSTALLED 5/8" GYPSUM SHEATHING
PROVIDE GALV. MTL. DAM W/ 2% OVERLAPPING GALV. MTL. SLEEVE; ASSUME 45 DEGREES ANGLE MIN. TO DETERMINE THE LENGTH OF THE DAM; SEAL DAM IN ALL SIDES AND AGAINST DAMPER
4" MIN. OVERLAP
FACTORY INSTALLED MODULAR UNIT CEILING ASSEMBLY
W.R.B.
SITE INSTALLED 7/8" EXTERIOR PLASTER SITE INSTALLED WATERPROOF MEMBRANE
SITE INSTALLED S.A.M. SITE INSTALLED EXTERIOR PLASTER SCALE:
FACTORY INSTALLED BRACKETS TO SUPPORT VERT. MULLION & BIRD SCREEN; TACK WELD AND PROVIDED SEALANT AT ALL SEAMS AS REQ'D
6
9
SITE INSTALLED SEALANT & BACKER ROD
5
UNIT
UNIT
89
SITE INSTALLED GALV. DRIP HEAD; EXTEND 2" BEYOND JAMB NAILING FLANGE FACTORY INSTALLED BIRD SCREEN, LEAVE A 1/4" GAP BELOW FOR WATER DRAINAGE
3" = 1'-0"
1/4" PER FT. SLOPE MIN. REFER TO ROOF PLAN FOR DIRECTION OF SLOPE
TO ELEVATION ARAPET HEIGHT
SITE INSTALLED WRB
MODULE ANGLED EXT. WALL CORNER & MATELINE - PLAN
SITE INSTALLED DRIP EDGE SET IN FULL BED OF SEALANT
SITE INSTALLED DRIP EDGE
1/4" 1/4"
Portfolio
SITE INSTALLED SELF ADHERED MEMBRANE
SITE INSTALLED SELF ADHERED MEMBRANE STUCCO CORNER MOLD
SITE BUILT CONCRETE PODIUM, S.S.D. SITE BUILT FIRESTOP SEALANT OVER POLYETHYLENE BACKER ROD
SITE BUILT FIRESTOP SEALANT OVER POLYETHYLENE BACKER ROD SITE INSTALLED EXTERIOR PLASTER
SITE BUILT EXTERIOR WALL PER PLAN
SITE INSTALLED EXTERIOR WALL PER PLAN
2HR EXT. WALL @ PODIUM - STUCCO FURROUT SCALE:
3" = 1'-0"
2HR EXT. ANGLED WALL @ PODIUM - STUCCO
19
SCALE:
3" = 1'-0"
15
PRED FIL
EXT OV
3" EQ
8 1/ 2"
SITE INSTALLED ALUMINUM ANGLE, TYP.
EQ 3"
SITE INSTALLED PREFINISHED FOLDED ALUMINUM SUNSHADE, POWDER COAT FINISH
7 1/2" EQ
FACTORY INSTALLED VINYL WINDOW 11
/2"
SITE INSTALLED 7/8" EXTERIOR PLASTER
EQ
SEE PLAN
3"
1/2"
6"
WINDOW DETAIL AXON VIEW SCALE:
90
SITE BUILT /
1'-
SITE INSTALLED VENT / LOUVER ALIGN TO ROUGH OPENING
1/2"
SITE BUILT /
TO IGN AL
G NIN PE O H UG RO
13
ROD SITE INSTALLED EXTERIOR PLASTER
FACTORY EXTERIOR WALL
UNIT
SITE INSTALLED EXTERIOR WALL PER PLAN
SCALE:
3" = 1'-0"
CORRIDOR ANGLED WINDOW JAMB
15
SCALE: 1 1/2" = 1'-0"
SITE INSTALLED PREFINISHED FOLDED ALUMINUM SUNSHADE, POWDER COAT FINISH SITE INSTALLED ALUMINUM ANGLE
VARIES
SITE INSTALLED WATERPROOF MEMBRANE
SITE INSTALLED FASTENER, EQUALLY SPACED ALONG SUNSHADE EDGE
SITE INSTALLED EXTERIOR PLASTER OVER METAL LATH
SITE INSTALLED SEALANT OVER BACKER ROD
1/2"
1/2"
FACTORY BUILT
SITE BUILT / INSTALL
11
FACTORY BUILT
AT ANGLE ATTACHMENT PREDRILL HOLES AND FILL WITH SEALANT
STALLED ALUMINUM ANGLE,
Woodruff
PODIUM - STUCCO
FACTORY INSTALLED VINY
SEE PLAN
FACTORY INSTALLED VINYL WINDOW FACTORY INSTALLED LIQUID FLASHING
INTERIOR
FACTORY BUILT EXTERIOR WALL, PER PLAN INTERIOR
SCALE:
VARIES
SITE INSTALLED 7/8" EXTERIOR PLASTER FACTORY BUILT, SITE INSTALLED FRAMING & PLYWOOD
ETAIL AXON VIEW SCALE:
13
SITE INSTALLED PREFINISHED FOLDED ALUMINUM SUNSHADE, POWDER COAT FINISH FACTORY INSTALLED VINYL SITE INSTALLED ALUMINUM ANGLE WINDOW
FACTORY FACTORY INSTALLEDBUILT VINYLEXTERIOR WINDOW WALL, PER PLAN
SCALE: SCALE:
1'-0" 3"3"==1'-0"
INTERIOR
INTE
INTERIOR
WINDOW HEADFURROUT - STUCCOW/ W/SUNSHADE SUNSHADE WINDOW JAMB - STUCCO
FACTORY BUILT SITE INSTALL
SITE INSTALLED WATERPROOF SITE INSTALLED W.R.B. MEMBRANE SITE INSTALLED ANGLE FASTENER SITE INSTALLED SEALANT OVER VARIES BACKER ROD
US ED
FACTORY BUILT SITE INSTALL
AT ANGLESITE ATTACHMENT INSTALLED- PREDRILL ALUMINUM HOLES AND FILL WITH SEALANT ANGLE
FACTORY INSTALLED LIQUID FACTORY FLASHING INSTALLED METAL FLASHING
SITE INSTALLED W.R.B. SITE INSTALLED SEALANT OVER BACKER ROD
FACTORY INSTALLED EXTERIOR WALL PER PLAN SITE INSTALLED SITE INSTALLED EXTERIORPREFINISHED PLASTER FOLDED OVER METAL LATHALUMINUM SUNSHADE, POWDER COAT FINISH FACTORY INSTALLED GYPSUM SHEATHING
FACTORY BUILT
SITE INSTALLED 7/8" EXTERIOR PLASTER OVER METAL LATH
INTERIOR
1/2"
NO T
FACTORY INSTALLED EXTERIOR WALL PER PLAN
FACTORY BUILT
FACTORY SUPPLIED, SITE INSTALLED 2X FRAMING & PLYWOOD SHEATHING
SEE PLAN
SITE INSTALLED W.R.B. OVER SELF ADHERED MEMBRANE AT CORNER
WINDOW HEA
10
FACTORY INSTALLED LIQUID FLASHING
1/2"
SITE BUILT / INSTALL
E PLAN STALLED 7/8" OR PLASTER
3" = 1'-0"
SITE BUILT / INSTALL
WINDOW JAMB - STUCCO W/ SUNSHADE
RY INSTALLED VINYL W
SEE PLAN
STALLED PREFINISHED D ALUMINUM SUNSHADE, R COAT FINISH
98 91
FACTORY INSTALLED VINYL WINDOW
FACTORY INSTALLED LIQUID FLASHING SITE INSTALLED WATERPROOF
Portfolio
S& E
PROJECT:
PROJECT:
BEACON BEACO LANDING LANDIN
311-345 N. Beacon St. 311-345 N. Beacon St. Los Angeles, CA 90731 Los Angeles, CA 90731PRO
CLIENT:
BE LA
CLIENT:
EQ
Beacon Landing, Beacon LP Landing, LP 1149 S. Hill Street, Suite 1149700 S. Hill Street, Suite 700 Los Angeles, CA 90015 Los Angeles, CA 90015311-3 T: 213.629.2702 T: 213.629.2702 Los A ARCHITECT:
CLIE
ARCHITECT:
2' - 0".
Bea Abode Communities Abode Communities 1149 1149 S. Hill Street, Suite 1149700 S. Hill Street, Suite 700 Los A Los Angeles, CA 90015 Los Angeles, CA 90015T: 21 T: 213.629.2702 T: 213.629.2702
ARC
CONSULTANTS: CONSULTANTS:
Abo
EQ
1149 CIVIL CIVIL Los A KPFF KPFF T: 21 700 South Flower Street, 700 South Suite 2100 Flower Street, Su Los Angeles, CA 90017 Los Angeles, CA 90017CON T: 213.418.0201 T: 213.418.0201
CIV
LANDSCAPE LANDSCAPE KPFF Tina Chee Landscape Tina Chee Studio Landscape 700 S LosSA 1800 S. Brand Boulevard, 1800 S. Studio Brand 212 Boulevard, Glendale, CA 91204 Glendale, CA 91204 T: 21 LAN T: 323.691.6647 T: 323.691.6647
Tina
STRUCTURAL STRUCTURAL 1800 DCI Engineers DCI Engineers Glen 818 W. 7th Street, Suite 818 W. 7th Street, SuiteT: 32 Los Angeles, CA 90017 Los Angeles, CA 90017STRU T: 213.298.3700 T: 213.298.3700 DCI
818 W MECHANICAL / MECHANICAL ELECTRICAL / / ELECT Los A PLUMBING / FIREPLUMBING PROTECTION / FIRE PROT T: 21 / LOW VOLTAGE/ LOW VOLTAGE MEC Budlong & Associates Budlong & Associates 315 Arden Avenue #23 315 Arden Avenue #23 PLUM / LO Glendale, CA 91203 Glendale, CA 91203 Bud T: 818.638.8780 T: 818.638.8780 315 A
15
&
Glend T: 81
ENTRANCE CANOPY ENTRANCE AXON CANOPY AXON
3
FLUSH PANEL
SLOPE
METAL PANEL FASCIA TO SOFFIT FLASHING
METAL PANEL SOFFIT PANEL
CANOPY OPENING SECTION SCALE:
SCALE:
10
3" = 1'-0"SCALE:
3" = 1'-0"
10
3" = 1'-0"
SLOPE
MTL CANOPY ENCLOSURE
10
CONC COLUMN
10 A9.51
LOBBY 101
MTL CANOPY ENCLOSURE
CONC COLUMN
J
J
STL TUBE FRAMINGSTL TUBE FRAMING SUPPORT FOR CANOPY SUPPORT FOR CANOPY SEE STR DWG FORSEE STR DWG FOR 10 SIZE SIZE A9.51 XF XF 10 A9.51 1 A6.11
J
XF
1
CONFERENCE ROOM A6.11 103
X3
5
ENTRANCE CANOPY - PLAN TOP VIEW 1'-5 5/8"
9
XE
G
G
1'-52'-0" 5/8"
SCALE: 1/4" = 1'-0"
2'-0"
SIGNAGE DETAIL
92
GNAGE DETAIL SIGNAGE DETAIL
9
SCALE: 1/4" = 1'-0"SCALE: 1/4" = 1'-0"
9
5
X3
SCALE: 1/4" = 1'-0"
X3
5
ENTRANCE CANOPY ENTRANCE - PLAN CANOPY TOP VIEW - PLAN TOP VIEW
5
SCALE: 1/4" = 1'-0"SCALE: 1/4" = 1'-0"
5
0D 0P 0[
L
0F D 0
0 0
5
XE
CONT MTL CANOPY VERTICAL ENCLOSURE
SHEET NAME:
5
SHEE
G
SHEET NAME:
CA SU DE
SHEE
CANOPY AND CANOPY AND ENTRANCE CANOPYG PLAN - LV-01 1 SUNSHADE SUNSHADE SCALE: 1/4" = 1'-0" Origina DETAILS DETAILS CONT MTL CANOPYCONT MTL CANOPY
5
3'-4 5/8" X3
5 1 P
D [
XE
3'-4 5/8" X3
ISSUE DATE
I
CANOPY OPENING CANOPY ABOVE OPENING ABOVE
2'-0"
XE
REV
REV
50% 01/29/21 SD 100% 03/01/21 SD PLAN CHECK PLAN 05/03/21 CHECK [HSAP-2] [HSAP-2] H DD 100% DD05/31/21 100% PLAN CHECK PLAN 07/19/21 CHECK [HSAP-3] [HSAP-3] LAHD-LACDA LAHD-LACDA 09/01/21 H CANOPY OPENING ABOVE FIRE 2ND, GREEN, FIRE 09/07/21 2ND, GREEN, DAS BACKCHECK DAS BACKCHECK
1 A6.11
1'-0" G
150% SD A6.11 100% SD
H
19'-0" XE
1'-0"
REV XF ISSUE
XF
1'-0"
LEVEL 1 0" (+27.50')
J
CONFERENCE ROOM CONFERENCE ROOM XE 103 103
CANOPY OPENING CANOPY OPENING
J
XF
H
CANOPY OPENING
STAMP:
ENTRANCE CANOPY ABOVE
ENTRANCE CANOPY ENTRANCE ABOVE CANOPY ABOVE
H
H
STAMP:
2 A6.11
1 A6.11
1 A6.11
19'-0"
LOBBY J 101
STL TUBE FRAMING SUPPORT FOR CANOPY SEE STR DWG FOR SIZE
herein
K
The ideas and designs represented The ideas and designs represented by Abo K and in this drawing, allherein herein prepared and in this drawing, all prepare are for by Abode Communities | Architecture, by Abode Communities | Architecture project are for the use solely with respect are for to thethis use solely with respect to Archite statuto project, and Abode Communities project, | and Abode Communities | includil Architecture shall retain all common Architecture law,shall retain all common used statutory, and other reserved statutory, rights and other reserved rights b including copyright, and shall including not be copyright, and shall notwithou be Comm used by others for any otherused purpose by others for any other purpose without written permission ofwithout Abodewritten permission of Abode STAM Communities | Architecture.Communities | Architecture. 2
A6.11
2 LOBBY A6.11 101
MTL CANOPY ENCLOSURE
PRO
K
PROJECT NO: 202006 PROJECT NO: 202006 R The id
SIGNAGE ABOVE SEE SIGNAGE DWG
2 A6.11
R
R
2 A6.11
2 A6.11
XG
XG
2'-0"
METAL PANEL SOFFIT PANEL
PREFINISHED MTL GRATE W/ DRAIN
40'-7 3/4"
METAL PANEL SOFFIT PANEL
K
SLOPE ABOVE SIGNAGE ABOVE SIGNAGE SEE SIGNAGE DWGSEE SIGNAGE DWG
HIGH TEMP. WEATHERPROOF MEMBRANE
HIGH HIGH TEMP. WEATHERPROOF SHINGTEMP. WEATHERPROOF MEMBRANE MEMBRANE
R
1 KA9.52
PRINT & COPY 123
XG
1'-5 5/8"
HSS FRAMING, S.S.D.
CONC K R XG ENING CANOPY SECTION OPENING SECTION COLUMN
R
K 1 A9.52 PREFINISHED MTL PREFINISHED MTL GRATE W/ DRAIN GRATE W/ DRAIN
1 A9.52
HSS FRAMING, S.S.D. HSS FRAMING, S.S.D.
14
R
PRINT & COPY 123
XG
19'-0"
EQ.
FLUSH PANEL
METAL PANEL FASCIA METAL TO PANEL FASCIA TO SOFFIT FLASHING SOFFIT FLASHING
XG
40'-7 3/4"
HIGH TEMP. WEATHERPROOF HIGH TEMP. WEATHERPROOF MEMBRANE MEMBRANE
FLUSH PANEL
XG
HIGH TEMP. WEATHERPROOF MEMBRANE
3
G
A
1'-5 5/8"
GYPSUM SHEATHING
SEE STR DWG FOR DETAIL
SCALE:
8
PRINT & COPY PRINT & COPY 123124
1'-5 5/8"
GYPSUM SHEATHING GYPSUM SHEATHING
CONC&TO STL TUBEPRINT & COPY PRINT COPY CONNECTION 124 124
2'-0"
METAL FRAMING AS REQUIRED
2' - 0".
METAL FRAMING AS METAL FRAMING AS REQUIRED REQUIRED
CONCCONC TO STL TUBECONC TO STL TUBE COLUMN CONNECTION CONNECTION SEE STR DWG FORSEE DETAIL STR DWG FOR DETAIL
8
1'-5 5/8"
METAL PANEL CORNER
CONC TRIM COLUMN
8
8
40'-7 3/4"
METAL PANEL CORNER METAL PANEL CORNER TRIM TRIM CONC COLUMN
8
2'-0"
EQ.
8
3
SCALE: ENTRANCE CANOPY AXON
SCALE:
3'-4 5/8" ENCLOSURE VERTICAL VERTICAL ENCLOSURE X3
5
ENTRANCE CANOPY ENTRANCE PLAN CANOPY - LV-01PLAN - LV-01
1
SCALE: 1/4" = 1'-0"SCALE: 1/4" = 1'-0"
SHEET NUMBER: SHEET NUMBER:
1 A9.51 A9.51
Original drawing is 30x42. HalfOriginal size is 15x21. drawing is 30x42. Half size is 15
Woodruff
EXTERIOR WALL PER PLAN WEATHERPROOF MEMBRANE SELF ADHERED MEMBRANE
EXTERIOR BUILDING SIGNAGE
STUCCO WEEP SCREED 24 GA. STAINLESS STEEL METAL FLASHING PAINT TO MATCH STUCCO PREFINISHED MTL GRATE W/ DRAIN DRAIN, SEE PLUMBING
2".
FRAMING AS REQ'D
4".
METAL PANEL J TRIM
SLOPE 2%
PREDRILL BOLT HOLES & FILL WITH COMPATIBLE SEALANT
EQ
METAL FRAMING AS REQUIRED GYPSUM SHEATHING
2' - 0".
HIGH TEMP. WEATHERPROOF MEMBRANE
FLUSH SEAM METAL PANEL HSS FRAMING, S.S.D.
CEILING, SEE RCP FOR TYPE & HT.
SOFFIT METAL PANEL HIGH TEMP. WEATHERPROOF MEMBRANE
FASCIA TO SOFFIT FLASHING
SELF ADHERED MEMBRANE
SOFFIT METAL PANEL
ALUMINUM FRAMED STOREFRONT MULLION
CANOPY SECTION 2 SCALE:
EXTERIOR WALL PER PLAN WEATHERPROOF MEMBRANE EXTERIOR PLASTER SEE ELEV FOR TYPE METAL PANEL BEYOND PREFINISHED MTL GRATE W/ DRAIN BEYOND
15
3" = 1'-0"
EXTERIOR BUILDING SIGNAGE PREDRILL BOLT HOLES & FILL WITH COMPATIBLE SEALANT METAL PANEL CORNER TRIM
METAL FRAMING AS REQUIRED EQ.
9 A9.17
EQ
STOREFRONT HEADER, S.S.D.
GYPSUM SHEATHING
93
HIGH TEMP. WEATHERPROOF MEMBRANE 2' - 0".
1' - 0"
SEALANT OVER BACKER ROD
Portfolio
TINY HOUSE 2021 Project Team Michael Woodruff
94
Project Description Using the constraints imposed by building on a 32’x10’ trailer chassis, the house design favors design solutions that prioritize the maximization of space and finding moments where the building elements can be articulated. A typical tiny house builds a box the full size of the chassis, whereas this tiny house design emphasizes the custom front entry & natural light clerestory by shifting wall planes and framing building elements with material contrast. The interior design favors maximum storage by lifting the living room floor off the main floor level, providing storage above and below while also creating another frame to emphasize the living space and provide contrast between the functions of space between the living room and kitchen. The main floor bedroom also contains a full size wardrobe closet and full size bathroom.
Woodruff
95
96 Portfolio
Woodruff
97
98 Portfolio
Woodruff
99
100 Portfolio
Woodruff
101
102 Portfolio
Woodruff
103
Portfolio
LATE BLOOMER CABIN 2022 Project Team Michael Woodruff
Project Description
104
The cabin maximizes interior space by utilizing storage and space underneath the bed frame. The design concept unifies the space and program areas with a minimal material palette and clean details. The 10’x16’ tiny house includes an ample kitchen with storage, shower, toilet, queen bed, and desk working area with shelving. The polycarbonate partition separates the bed from shower, while allowing light between spaces, while providing a sleek surface to contrast the warm plywood interior.
Woodruff
105
106 Portfolio
Woodruff
107
Portfolio
108
SCULPTURAL PLANTERS 2016-2021
Woodruff
Project Description
109
110 Portfolio
Woodruff
111
112 Portfolio
Woodruff
113
114
BOOLEAN LAMP
Portfolio
Woodruff
115
Portfolio
116
BED FRAME & DRAWERS
Woodruff
117
118 Portfolio
Woodruff
119
Portfolio
120
ART & ILLUSTRATION
Woodruff
121
122 Portfolio
Woodruff
123
124 Portfolio
Woodruff
125
126 Portfolio
Woodruff
127
128 Portfolio
Woodruff
129
mwoodruff21.myportfolio.com