MEGAN GIRVAN
MASTER’S CANDIDATE CLEMSON UNIVERSITY
YOU ARE HERE.
PERSONAL STATEMENT.
I SEEK OUT CHALLENGES. I THINK THE RICHNESS OF ARCHITECTURE STEMS FROM ITS COMPLEXITY. THE NEED FOR COLLABORATION AND CONSTANT PROBLEM SOLVING CREATES AN ENVIRONMENT IN WHICH I THRIVE. MY GREATEST PASSION IS DESIGN. THROUGH THE PRACTICE OF ARCHITECTURE I HAVE BEEN ABLE COMBINE MY INTERESTS OF SERVING OTHERS, ADVOCATING FOR THE ENVIRONMENT, AND ENGAGING IN RESEARCH. LET’S MAKE SOMETHING AMAZING. I WANT TO USE MY KNOWLEDGE OF HEALTH AND ARCHITECTURE TO ARTFULLY SHAPE SPACES IN A WAY THAT POSITIVELY IMPACTS ALL USERS.
GRADUATE
UNDERGRADUATE PRACTICE
RESUME
GRADUATE GIS WORK MCMURDO STATION, ANTARCTICA PROFESSOR: ANDREW KLEIN OUTSIDE OF ARCHITECTURE, I STUDIED GEOGRAPHY AND URBAN PLANNING, IN WHICH I LEARNED HOW TO USE GEOGRAPHIC INFORMATION SYSTEMS.WHILE MAPPING STARTED AS A HOBBY, I HAVE FOUND IT EXTREMELY APPLICABLE TO ARCHITECTURE. I NOW USE GIS IN SCHEMATIC DESIGN, TO HELP INFORM ACCESS, ORIENTATION, ETC.
THIS PARTICULAR MAP WAS AN EXERCISE IN MAPPING BOTH RASTER AND VECTOR DATA, AND ILLUSTRATES DIFFERENT POLLUTANT LEVELS SURROUNDING THE AMERICAN RESEARCH STATION IN ANTARCTICA.
COMMUNITY HEALTH BOONE, NORTH CAROLINA 2017 PARTNER- LAM NGUYEN PROFESSORS- DAVID ALLISON + BYRON EDWARDS THIS YEAR LONG PARTNERSHIP WITH THE TOWN OF BOONE BEGAN WITH AN EXPLORATION OF THE PROPOSED WELLNESS DISTRICT, AN AREA ADJACENT TO BOONE MEDICAL CENTER, AND CHANGES IN ZONING. AFTER THREE TOWN HALL MEETINGS, THERE WAS PRODUCTIVE DIALOGUE ABOUT GROWING PEDESTRIAN USE, MIXED USE SPACES, AND STRIVING FOR A COHESIVE IDENTITY.
THE FOLLOWING SEMESTER, WE FOCUSED ON A MASTER PLAN OF THE WATAUGA MEDICAL CENTER. THE ORIGINAL HILL-BURTON HOSPITAL HAD SEEN INCREMENTAL GROWTH. NOW, THE ORIGINAL BUILDING HAS REACHED IT’S USEFUL LIFE END, BUT IS COMPLETELY SURROUNDED BY ADDITIONS. THE PROPOSAL HERE INCLUDES PHASING TO ADDRESS DEMOLITION OF THE ORIGINAL HILL-BURTON HOSPITAL, WHILE MAINTAINING USE OF THE FACILITY, AND MOVING TOWARDS THE SAME GOALS ESTABLISHED IN THE WELLNESS DISTRICT NARRATIVE.
BOONE WELLNESS DISTRICT
HEALTHY COMMUNITY - 2 WEEK CHARETTE
TREE CANOPY
ACTIVE STOREFRONTS
DIVERSITY OF PLAZAS
PHASE 1
PHASE 2
CONNECTION TO APP STATE HEALTH SCIENCE CENTER
HOSPITAL CAMPUS MASTER PLAN
YEARAND 10 TREATMENT PLANS • DIAGNOSTIC THE WATAUGA MEDICAL CENTER HAS A HISTORY OF• INPATIENT BEDS TOWER • SUPPORT SPACE EXPANDING IN PLACE, BUT HAVE COMPLETELY ENCLOSED• DIAGNOSTIC AND TREATMENT • INPATIENT BEDS TOWER • THEIR ORIGINAL FACILITY, WHICH NOW HAS AGED SYSTEMSSUPPORT SPACE • DIAGNOSTIC AND TREATMENT • INPATIENT BEDS TOWER AND SUBSTANDARD PATIENT CARE SPACES. • DIAGNOSTIC AND TREATMENT • SUPPORT SPACEDEMOLISHED • INPATIENT BEDS TOWER 1967 • SUPPORT SPACEHILL-BURTON
1978
1993
LEVEL 1
D+T SPINE
• SECOND INPATIENT TOWER • PATIENT DROP-OFF • ADMINISTRATION ANDMAINTAINED SUPPORT SPACE • SECOND INPATIENT TOWER EMERGENCY • PATIENT DROP-OFF • ADMINISTRATION AND SUPPORT SPACE • SECOND INPATIENT TOWER • PATIENT DROP-OFF • SECOND INPATIENT TOWER • ADMINISTRATION AND SUPPORT SPACE • PATIENT DROP-OFF • ADMINISTRATION AND SUPPORT SPACE
• EMERGENCY DEPARTMENT • INTENSIVE CARE UNIT (ICU) • BIRTHING CENTER • EMERGENCY DEPARTMENT • INTENSIVE CARE UNIT (ICU) • BIRTHING CENTER • EMERGENCY DEPARTMENT • INTENSIVE CARE UNIT (ICU) • EMERGENCY DEPARTMENT • BIRTHING CENTER • INTENSIVE CARE UNIT (ICU) • BIRTHING CENTER
WINDBREAK/ MOUNTAIN OVERLOOK
COMMERCIAL PARTNER OFFICE BUILDING
2003 PUBLIC PLAZA + EXTENDED GREENWAY
EXPANSION DIAGRAMS BY LANSING DODD, WENZ TUTTLE
• NORTHWEST AREA HEALTH EDUCATION CENTER (AHEC) • MECHANICAL PENTHOUSES • NORTHWEST AREA HEALTH EDUCATION CENTER (AHEC) • MECHANICAL PENTHOUSES • NORTHWEST AREA HEALTH EDUCATION CENTER (AHEC) • NORTHWEST AREA HEALTH EDUCATION • MECHANICAL PENTHOUSES CENTER (AHEC) • MECHANICAL PENTHOUSES
GEOTHERMAL
LEVEL 2
LEVEL 3
INTERSTITIAL FLOOR
MAINTIANED MATERNITY
INPATIENT TOWER
MAINTIANED INTESNIVE CARE
LEVEL 4
FUNCTION: PUBLIC ENTRY AND VERTICAL CIRCULATION
PLANS, DIAGRAMS BY MYSELF, RENDERINGS BY LAM NGUYEN, POST PROCESSED BY TEAM
FORM: PUBLIC ATRIUM AND PANEL ADDITION TO EXISTING, SUN SHADING ON NEW INPATIENT TOWER
PHASING: MOVING EXISTING SERVICES OUT OF HILL-BURTON FACILITY AND EXPANDING TOWARDS MOUNTAIN VIEW
1
2A
2B
3
NEW OUTPATIENT FACILITY + POWER PLANT
NEW D+T SPINE + INPATIENT TOWER
DEMO EXISTING MINUS BIRTHING, ED + EMERGENCY ENTRY
EMERGENCY + OBSTETRICS
COASTAL CARE CHARLESTON, SOUTH CAROLINA FALL 2016 INDIVIDUAL PROJECT PROFESSOR- BYRON EDWARDS THIS ORTHOPEDIC CENTER PROTOTYPE FOR THE MEDICAL UNIVERSITY OF SOUTH CAROLINA (MUSC) WILL SERVE AS THEIR FIRST AMBULATORY SURGERY CENTER. WHILE AN INDIVIDUAL PROJECT FOR THE OVERALL FACILITY, THIS DESIGN INTEGRATES CURRENT RESEARCH LED BY A TEAM FROM BOTH CLEMSON UNIVERSITY AND MUSC FOR OPTIMIZING THE OPERATING SUITE.
THE MAIN CONCEPTS FOR THIS FACILITY WERE AN
OR/ PRE-OP/ POST-OP 9,875 NSF
OPTIMIZED ENVIRONMENT FOR THE STAFF, WITH EVIDENCE
IMAGING/ PT 8,297 NSF
BASED DESIGN IN BACK OF HOUSE AREAS, AND A COMFORTABLE ENVIRONMENT FOR THE FAMILY, USING THE
ADMIN/ REGISTRATION 16,088 NSF
MAIN STREET CONCEPT, WITH ACCESS TO GREEN ROOFS
CLINIC/ CLINIC SUPPORT &5266 6(&7,21
ON UPPER LEVELS.
11,406 NSF
6&$/(
MECHANICAL 3,215 NSF
0(*$1 *,59$1
83
086& $0%8/$725< 685*(5< &(17(5
PROGRAM
)281'$7,21 )/225 6/$%6 $1' 522)
&5266 6(&7,21 6&$/(
%($06 &2/8016 )$&$'( 6758&785$/ :$//6
)
CT EQUIP PHYSICIAN WORK
SHARED WORKROOM
STAFF LOUNGE
COLLABORATION
CT
UP
MRI CONTROL
MRI
DOCK
FUTURE MRI
CT CONTROL
)281'$7,21
EXAM
EXAM
EXAM
EXAM
%($06 &2/8016 6758&785$/ :$//6
EXAM
P2 RAD
XRAY
STORAGE EXAM
EXAM
EXAM
EXAM
EXAM
EXAM
EXAM
EXAM
EXAM
XRAY
EXAM
PATIENT TLT
STAFF TLT
EXAM
PREP/ RECOV P4
DRESSING
STORAGE
TLT
EXAM
WEIGHTS, MEASURES
CAFE / SMOOTHIE BAR
HSK SOILED HOLDING
P3
UTILITY RAD
HSK
EXAM
BIOHAZARD
CONTROL
NURSE WORK
EXAM
P1
)$&$'(
READING TLT
EXAM
PT GYM
)/225 6/$%6 $1' 522)
P6
P5
DME STOREFRONT
UP
UP OFFICE
WORK/ SCHEDULING
VESTIBULE OFFICE
OFFICE
OFFICE
RETAIL LAB BLOOD DRAW
MED RECORDS
OFFICE
OFFICE
RETAIL PHARMACY
CONFERENCE
SPECIMEN TLT
LEVEL 01
COLLABORATION
MEETING ROOM
DN
EXAM
STORAGE
TLT
EXAM
CLASSROOM
STORAGE
CAST ROOM
CAST ROOM
CAST ROOM
CAST ROOM
TLT
EXAM
EXAM NURSE'S STATION
EXAM
WEIGHTS/ MEASURES
WEIGHTS/ MEASURES
UTILITY
EXAM
EXAM
STORAGE
WEIGHTS/ MEASURES
EXAM
WEIGHTS/ MEASURES
EXAM
REGISTRATION
STORAGE
TLT
EXAM
TLT
EXAM
WEIGHTS/ MEASURES
WEIGHTS/ MEASURES
EXAM
EXAM
EXAM
EXAM
EXAM
EXAM
EXAM
EXAM
EXAM
EXAM
MECHANICAL
TLT
EXAM
EXAM
EXAM
EXAM
EXAM
TLT
COLLABORATION
EXAM
EXAM
EXAM
TLT
EXAM
PHYSICIAN'S
EXAM
EXAM
EXAM
LOUNGE
WEIGHTS/ MEASURES
WEIGHTS/ MEASURES
EXAM
EXAM
EXAM
DN
LEVEL 03
CLEAN CORE
STAFF LOUNGE
PROCESSING
UP
STERILIZER OR
WOMEN'S LOCKERS
OR
MEN'S LOCKERS
OR
EQUIP
EQUIP
OR
EQUIP
OR
OR
EQUIP
EQUIP
STERILIZATION
CORRIDOR
PRE-OP
PRE-OP
TLT
INDUCTION
INDUCTION
PRE-OP
PRE-OP
TLT
PRE-OP
PRE-OP
TLT
TLT
PRE-OP
PRE-OP
TLT
PRE-OP
NOURISHMENT
PRE-OP
TLT
PRE-OP
STORAGE
PRE-OP
NOURISHMENT
TLT
PRE-OP
PROCEDURE
POST-OP
TLT
POST-OP
POST-OP
TLT
POST-OP
POST-OP
CLEANUP TLT
POST-OP
PRE-OP
MEDS
MEDS
NURSE STATION
POST-OP PROCEDURE
NURSE STATION
PRE-OP
TLT
ENDO EQUIP
PRE-OP
REGISTRATION
ANES WORKROOM
POST-OP
STORAGE
POST-OP
POST-OP
TLT
POST-OP
TLT
POST-OP
POST-OP
TLT
POST-OP
UP
UP
LEVEL 02
PLAN | FLOWS FLOOR PLAN | FLOWS
ent
1/4” = 1’-0” 0’
1
4’
2
28' - 0" 1 23' - 0"
28' - 0" 23' - 0"
A
20' - 0"
20' - 0"
A
B B Above Equipment Sterile Zone Movable Furniture or Equipment Patient Circulating Nurse Scrub Nurse Surgeon Anesthesiologist
DESIGN OF THE OR IS PART OF A CONTINUING FOUR-YEAR RESEARCH PROJECT LED BY DR. ANJALI JOSEPH AND DR. KEN CATCHPOLE.. PLAN BY RACHEL MATTHEWS AND INTERIOR OR RENDERINGS BY INGE HUANG. CORRIDOR RENDERING BY MYSELF
INTRAOPERATIVE | SCRUB SINK
INTEROPERATIVE FROM SCRUB SINK
PATIENT ENTRY
DAYLIT STAFF CORRIDOR WITH WINDOWS TO OR
UNDERGRADUATE MEDIA-LAB HTX HOUSTON,TX FALL 2014 PARTNER PROJECT WITH ALYSSA GAINER PROFESSOR- MARCEL ERMINY THIS INTEGRATED STUDIO PROJECT INVOLVED DEVELOPING THE ARCHITECTURE, STRUCTURE AND SYSTEMS OF A MEDIA LAB LOCATED IN DOWNTOWN HOUSTON.
LOOKING AT THE RELATIONSHIPS BETWEEN MEDIA AND THE URBAN LANDSCAPE, WE CHOSE TO INVESTIGATE MULTIPOLARITY. THIS CONCEPT ALLOWED US TO EXPRESS VARIOUS OPPOSING AND RELATED FORCES WITHIN THE URBAN FABRIC BY ALLOWING THEM INFORM DESIGN DECISIONS SUCH AS FORM AND THE BALANCE OF POSITIVE AND NEGATIVE SPACE.
IN THIS WAY, MEDIA-LAB HTX IS BOTH REACTIVE, BY RESPONDING TO THE METRO LINE AND SURROUNDING HISTORICAL BUILDINGS, WHILE ALSO BEING A CATALYST FOR CREATION, BY ENCOURAGING NEW MEDIA AND TECHNOLOGY AS WELL AS POSITIVE ARCHITECTURAL INTERVENTION WITHIN HOUSTONâ&#x20AC;&#x2122;S INNER LOOP.
THROUGHOUT PRODUCTION, ALYSSA GAINER AND I COLLABORATED BY COMPLETING SEPARATE PLANS THEN SWITCHING FOR EDITS AND POST-PROCESSING. WORK DRAWN AND POST-PROCESSED BY MYSELF INCLUDES ALL RENDERINGS, SECTIONS, AND DETAIL DRAWINGS. CONCEPTUAL DIAGRAMS WERE ALSO WORKED ON BY BOTH ALYSSA AND MYSELF.
PLACELESS SPACE MARKETING SATURATION ENTREPRENEURIAL ALIENATION SPIRIT ORGANIZATION NONENGAGEMENT AROUND CARS SENSE OF BEING SMALL ACCESSIBILITY GENERIC, GLOBAL CITY
MESSY MULTIPLICITY OF STREET-LEVEL
DOWNTOWN
VIBRANCY WALKABILITY
LARGE POPULATION CONSTANT ACTIVITY
ENVIRONMENTAL CONNECTION
CULTURE
BELONGING
INTERACTION IDENTITY
PLACELESS SPACE MOBILIZING
MARKETING SATURATION
INFORMATION POLLUTION
INNOVATION
ENTREPRENEURIAL ALIENATION SPIRIT ORGANIZATION NONENGAGEMENT AROUND CARS SENSE OF BEING SMALL ACCESSIBILITY GENERIC, GLOBAL CITY
MEDIA AS MANIPULATOR
PUSHED
ISOLATION THROUGH DEPENDENCE
POLITICAL AND COMMERCIAL USE
ADDICTION MESSY MULTIPLICITY OF STREET-LEVEL
DOWNTOWN
VIBRANCY WALKABILITY
LARGE POPULATION CONSTANT ACTIVITY
ENVIRONMENTAL CONNECTION
CULTURE
BELONGING
INTERACTION IDENTITY
MEDIA GLOBALLY CONNECTS
SOCIAL USE PULLED
PROCRASTINATION SMART MEDIA DESENSITIZING HUMAN MANIPULATION OF MEDIA
SECTION AT MIDPOINT
houston house
SECTION AT THIRD QUARTER OF SEMESTER
30 30 1 3
B3
8
7
F
B3
6 4
B3
9 G1
G1
B4
B4
G1 B5
B5
G6
B4
G1 B5 15 B5
4
B1
4 27 28
B
B6
29
3
B5
B5
B5
B5
4
B5
5
6
7
9
8
1
G1 B5
2
B3
G
F
F
29
G3 B5
B5 B5
B4
3
B3
4
B3
B4
5
B3
B4
6
B3
B1 B
B7
5
6
8
B3
B3
G6 B5
B5
B5
B5
G6
B1 B1
B5
3
B1
G5 G1
G4
B2
B2
B2
B2
G4
B3
B4
4
28
24 1 1 29 The dual post-ten 1 Media Lab Housto
*The typical unbrac of the concret **The tallest unbra column length
B8
B8
B3
B4
B1
B1
G1
B1
B1
G3
B1
B1
B1
B1
G5
G3
B2
B2
G4
B2
B2
B2
6
8
14
B13
B10
9
G3
B13
15 13
G7
B
B8
B10
G9
B9
B9
B10 B10
14 15 16 17 B9
B9
G1
9
B13
G8
B13
B13
G8
B13
Bottom chord of T1
G10
For this reason, a on the uppermost enant entrance. O floors. Steel: Pros: Long sp Cons: Additio allow space fo
13
8” CMU Structural 14inspirat STEEL REINFORCING New Public Librar 15SLABThe bones model SITECAST CONCRETE metal decking in u BEARING PAD now integrated m 18” CONCRETE16 BEAM WITHslabs in the two th STEEL REINFORCING
G9
B9
B9
B8
B8
G7
B8
G7
Bottom chord of T2
B10
B10
B10
B10
B1 B1
5
6
8
B13 B13B13
B13
G4
5
9
B13
B13
B13
B13
B13
B13
B13
Middle chord of T1 G8
B11
B8
= 2’ Concrete Col = 8” Steel Transfer = Steel Tension Ro
10 4“ RIGID INSULATION 11 1.5” AIR SPACE 13 12 4” CONCRETE
5 B13
B13
B10 B10
B12
G8
G10 G7
G7
B11
B8 B8
G9
B9
B9
B9 B9
B12 G9
B8 B11
B11
G7
B10 B10
B10
B10
B10
B10
B10
B10
B8
B8
Middle chord of T2
B10
B8
B8
G9
B9
B8
B8
B8
B8
B8 B B8
B8
B8 Top chord of T3
18 19 20 21 22 23 24 B9
B9
2’ CONCRETE COLUMN 4” AIR SPACE 17 2’ SLUREE WALL CARTON FORMS 40’ CONCRETE PIER CMU WITH PARGING STEEL SECTION; W 24X
6
B13
B8
B8
B8
Top chord of T4
G7
B14 G7
G7
B15
B16
G12
B8 B17
B13
B13
B13
17
B13
Top chord of T1
G11
G9
B9
B9
B8
G7
B8
B22
G7
G14
B8 Top chord of T2
Top chord of T1
Middle chord of T1
B23
25 STEEL BOLTS 26 STEEL EMBEDMENT PLATE, LEVELING MORTAR 27 DOUBLE PANE GLASS 28 MULLION 29 RIGID INSULATION 30 STEEL W24X SECTIONS, WELDED CONNECTIONS B19
G7
G7
B8
Bottom chord of T4
B1
D
D
G7
B1
G5
G7
B8
Bottom chord of T3
B2
B5
B8
B
B2
G1
G1
G
B8
G1
B7
12 4” CONCRETE 8” CMU STEEL REINFORCING 13 8” CMU20 18 19 SITECAST CONCRETE SLAB 23 14 STEEL REINFORCING BEARING PAD 15 SITECAST CONCRETE SLAB 18” CONCRETE BEAM WITH 16 BEARING PAD 21 STEEL REINFORCING 17 18” CONCRETE BEAM WITH 17 STEEL REINFORCING 22 2’ CONCRETE COLUMN 4” AIR SPACE 18 2’ CONCRETE COLUMN 2’ SLUREE WALL 19 4” AIR SPACE CARTON FORMS B8
G4
F
G4
G7
B5
G1
3
G1
G7
B1
8
G
B1
F
B5
G1
9
G3
G1 B5 B5
B13
B1
B13
B1
B1
B1
G5 G1
G1
B1
B3
G1
B
B1
G1
B1
G1
B7
G1
B1
B1
A
B3
B1
B1 C
B
3
B1
G1
G1
S
FLINTEDGE METAL COPINGqualities related to braced floor span ASPHALT25 FELT module. This mod and servant space PLASTERED FINISH 25 lation and system STEEL 26 ANGLE more, concrete do ments of the stru VAPOR INSULATOR 26 terial. CANT STRIP Concrete: Pros: bounces FIELD MEMBRANE Cons: limits c “Z” BAR FLASHING METAL DECKING One of concretes
7
G1
G2
B1
G1 D
C
B3
27
Name G1 G2 G3 G4 G5 G6 G7 G8 G9 G10 G11 G12 G13 G14
concrete provides
1 2 3 4 5 6 7 8 9
B3
B3
B4
G1
G1
E
D
F
4
B5
B1
10 11 12
D
18 19 20 21
G1
B1
FLINTEDGE METAL COPING ASPHALT FELT 1 FLINTEDGE METAL COPING PLASTERED FINISH 25 2 ASPHALT FELT 26 STEEL ANGLE 3 PLASTERED FINISH VAPOR INSULATOR 4 STEEL ANGLE CANT STRIP 5 VAPOR INSULATOR 13 FIELD MEMBRANE 6 CANT STRIP 14 “Z” BAR FLASHING 15 7 FIELD MEMBRANE METAL DECKING 8 “Z” BAR FLASHING 16 9 METAL DECKING 10 4“ RIGID INSULATION 17 11 1.5” AIR SPACE 10 4“ RIGID INSULATION 12 4” CONCRETE 11 1.5” AIR SPACE 13 14 15 16 17
B1
24
24
1 2 3 4 5 6 7 8 9
G1
B5
G4
G
E
G6 B5
B1 B1
4
B1
2
B5
B3
24
G1
1
B5
B3
G3
15
G5
28
B3
B1
24
27
9
B1
B1 D
9
G3
B1
4
8
B3
B1
4
6
G1
2 3 5
9
B3
5
B8
B8
G7
B20
B21
G13
Bottom chord o
Top chord of T2
B18
Middle chord of T2
Bottom chord o
FANNIN STREET
MAIN STREET
METRO LINE
CLAY STREET
LEVEL 01
LEVEL -01
LEVEL 00
LEVEL 02
LEVEL 03
LEVEL 04
LEVEL 05
THE INTERFACE TEXAS A&M CAMPUS FALL 2013 PARTNER PROJECT WITH ETHAN MILLER PROFESSOR- CRAIG BABE THE INTERFACE SERVES AS A LINK BETWEEN THE THREE DISCONJOINED BUILDINGS WITHIN THE LANGFORD ARCHITECTURE COMPLEX. THIS ADDITION AIMS TO CONNECT NOT ONLY THESE STRUCTURE BUT ALLOW FOR MORE SOCIAL INTERATION. BY INCREASING CHANCE ENCOUNTERS THROUGH A COMMUNICATIVE STAIR AND LAYERING OF PUBLIC AND PRIVATE SPACE, THE SPACE TAKES AN ENVIRONMENT OF SLEEPY STUDENTS AND MAKES IT ENERGETIC.
DIAGRAMS AND SECTIONS WERE PRODUCED BY BOTH ETHAN AND MYSELF. EACH PARTNER COMPLETED TWO RENDERINGS. FINAL PLANS WERE COMPLETED WERE COMPLETED BY MYSELF, AND MODEL PHOTOGRAPHY WAS DONE BY ETHAN MILLER.
CONCEPTUAL VIGNETTES FROM EARLY IN THE DESIGN PROCESS INFORMED KEY MOMENTS IN THE PROJECT.
PRACTICE ANDREW’S INSTITUTE PLANO,TX SPRING 2015 PAGE SOUTHERLAND PAGE, INC.
THIS COORDINATED EFFORT BETWEEN ANDREW’S INSTITUTE AND TEXAS CHILDREN’S WAS MY LAST MAJOR PROJECT AS A DESIGNER AT PAGE/. MY ROLE IN THE PROJECT BEGAN AT THE END OF SCHEMATIC DESIGN AND WENT THROUGH THE BIDDING PROCESS. I WORKED CLOSELY WITH THE CLIENT IN DEVELOPING THE MODALITIES AS WELL AS COORDINATING WEEKLY WITH THE ENGINEERING TEAMS.
ALL WORK SHOWN WAS DONE AS COORDINATED EFFORTS BETWEEN ALL THOSE INVOLVED THE PAGE DESIGN. KEY PARTICIPANTS INCLUDE: PROJECT MANAGER: ROBERT DOANE PRINCIPAL AND MEDICAL PLANNER: BETH CARROLL ARCHITECTURE: LISA BRADELY, KATERINA GATES INTERIOR DESIGN: AIMEE BURMASTER, KATHERINE CARTER RENDERING BY KATERINA GATES
1
2
3
4
5
6
7
8
FLOOR
1. ALL UNMARKED PARTITIO UNLESS NOTED OTHERWISE
2. ALL WINDOW & DOOR PLA
A
3. FOR FIRE AND LIFE SAFE
4. ROOF PLAN SHOWN FOR DIMENSIONS.
5. REFER TO A2 SERIES DR
6. REFER TO A6 SERIES FO
7. INSTALL APPROPRIATE M EXPANSION JOINTS. TOP O TOP OF FINISHED FLOOR.
8. ALL PLAN DIMENSIONS AR SURFACE OF THE WALL (INC NOTED OTHERWISE.
9. INSTALL BLOCKING AS R
10. AT ALL SPANDREL GLAS ADJACENT WALL.
11. REFER TO A-551 FOR INT
12. GENERAL DIMENSIONS P ROUGH OPENING DIMENSIO CONTRACTOR IS TO PROVID ENLARGED ARCHITECTURA SCHEDULE/DETAILS (A6 SER DIMENSIONS NOT GIVEN IN
B C1 M-A-202
300 TON CHILLERS
2' - 0"
1" E.J.
300 TON CHILLERS
L DOCK LEVELER
LOADING DOCK T1621
SCALE
C
SUPPLY CHAIN VESTIBULE T1612
MANIFOLD ROOM T1623
STAFF TOILET HAZARDOUS CHEM WASTE WASTE HOLD T1618 T1616 T1617
SUPPLY CHAIN STORAGE T1611
E2
UTILITY YARD T1624
CART WASH T1620
DIRTY DOCK T1619
MAILBOXES T1600.01
M-A-201
GENERATOR
1 1/2" E.J.
CENTRAL EVS T1608
K
TRASH HOLDING T1615
SOILED LINEN HOLD T1614
MAIN ELECTRICAL T1610
.
D
EMERGENCY ELECTRICAL T1609
H1
1
H3
M-A-313
M-A-313
TR T1605
M-A-202 H6
H8
M-A-313
M-A-313
J
WATER SERVICE FIRE PUMP T1604
30' - 6"
ENGINEER OFFICE T1606
CLEAN LINEN T1603 BIOMED WORKROOM T1602
H3
2' - 6"
1% .
M-A-312
STAIR 03 T1-503.01
CLINICAL COORD T1111
A
MANAGER'S OFFICE T1112
HYDROTHERAPY T1104
RESPITE T1105
FEMALE LOCKER TLT SHWR T1102
MALE LOCKER TLT SHWR T1103
F
TREATMENT SPLINT ROOM T1117
RESPITE T1114
EXAM T1348
EXAM T1349
ALCOVE T1344.02
EXAM T1347
HSKPSTAFF TOILET T1016 T1017
CAFE T1003
EQUIP ALCOVE T1301.01 CHILD LIFE STORAGE T1345
LOBBY T1001
FEMALE RESTROOM T1008
ELEVATOR LOBBY T1006
PUBLIC ELEVATORS T1-E1
CONSULT T1358
WORKROOM T1201 RECEPTION T1201.01
REG T1201.02
REG T1201.04
REG T1201.03
PATIENT TOILET T1320
CAST ROOM T1352
B EXAM T1325
CAST ROOM T1353
EXAM T1322
EXAM T1317
GENERAL RADIOLOGY T1310
PATIENT TOILET T1311
WEIGHTS MEASURES T1304
REGISTRATION WAITING T1200
WEIGHTS MEASURES T1305
STAFF TOILET T1410
HALL T1412
1
CORRIDOR T1401
GENERAL RADIOLOGY T1308
32' - 6"
CONTROL T1409
0.5
RADIOLOGY FLUOROSCOPY T1408
CORRIDOR T1403
H5
2/29/2016 10:54:00 AM DATE STAMP:
H
1' - 4 1/2"
12
22' - 0"
31' - 6"
11
D
SCHEDULING T1404
SUB WAIT T1405
UP
1002a
STAIR 02 T1-502
NEW DOOR WITH DOOR TAG REF DOOR SCH
H3
C
M-A-201
B 3 1/2" 31' - 6"
9
31' - 6"
8
31' - 6"
7
31' - 6"
6
2
3
4
31' - 6"
5
H5 1
KEY PLAN
C.2
M-A-311
31' - 6"
10
A-431
ROOM NAME 101
PATIENT TOILET T1406
M-A-301 2" E.J.
5
31' - 6"
4
3.4
31' - 6"
3
31' - 6"
2
1.2
1
ARCHITECTURAL - OVERALL - LEVEL 01
SCALE: 1/16" = 1'-0"
6
A-211
D.2
GENERAL RADIOLOGY T1407
SOILED WORKROOM T1402
CLINIC WAITING T1300
H4
A6
CONTROL T1309
WEIGHTS MEASURES T1306
E
TECH WORK T1413
PATIENT TOILET T1411
H2
M-A-311
A6
EOS T1414
CONTROL T1414.01
M-A-311
H6
A6 A-301
ALCOVE T1416.01
EXAM T1315
IMAGING WAITING T1400
A
F CONTROL T1420 ZONE 3 VESTIBULE T1419
HALL T1416
G VESTIBULE T1000
M-A-202
A1 X
DRESSING DRESSING SCREENING SCREENING T1417 T1418
CORRIDOR T1302 WEIGHTS MEASURES T1303
MATCHLINE SEE XX / A101
A-201
SUBWAIT T1354
CHECK OUT T1201.09
SYMBOL
14
CLEAN WORKROOM T1422
ALCOVE T1312.01
EXAM T1314
CHECK OUT T1201.10
REG CHECK OUT T1201.06 REG REG T1201.08 T1201.05 T1201.07
F1
MRI SUITE T1421
READING ROOM T1423
ALCOVE T1312.02
EQUIPMENT STORAGE T1313
PATIENT TOILET T1356
FLO
G EQUIP COMPUTER ROOM T1424
EXAM T1323
EXAM T1316
HALL T1312
M-A-312 PHYS OFFICE T1508
EXAM T1324
ALCOVE T1321.01
CORRIDOR T1307
EQUIP ALCOVE T1307.01
H7
ADMIN CUBICLES T1500
ALCOVE T1321.02
HALL T1321
VIRTUAL CHARTING T1318
CALL CENTER T1319
CAST ROOM T1351
CORRIDOR T1301 CHECK OUT T1201.11
MANAGER OFFICE T1359
SOILED WORKROOM T1331
PHYS OFFICE T1507 HOTEL PHYS OFFICE T1501
ALCOVE T1350.01
SUBWAIT T1357.01
MANAGER OFFICE T1203
ALCOVE T1307.02
CORRIDOR T1330 CLEAN SUPPLY T1332
EXAM T1326
CORRIDOR T1350
DME STORAGE T1355
REG T1201.00
EXAM T1327
STORAGE T1328
TEAM WORK AREA T1343
EXAM T1346
CORRIDOR T1357
FINANCIAL COUNSELING T1202
HALL T1007
GREETER T1002
GUEST TRANSLATION OFFICE T1018
HSKP T1029
OFFICE T1329
HALL T1333
PATIENT TOILET T1342
VIRTUAL CHARTING T1341
HALL T1344
ALCOVE T1344.01
CORRIDOR T1015
PB
C:\Users\megang\Documents\315054b1A-Childrens_ARCH-R16-CENTRAL_megang.rvt
EXAM T1340
CHILD LIFE / VOLUNTEERS WORKROOM T1020
EXAM T1334
ALCOVE T1301.02
VENDING T1010.02
DISHWASHING T1004.03
WORK ROOM T1004
SOILED HOLDING T1122
EXAM T1339
STAIR 01 T1-501
USER NAME:
FILE NAME:
STAFF TOILET T1005
CLEAN SUPPLY T1121
NURSE PRACTIONER WORK T1019
TR / MDF T1014
MALE RESTROOM T1009
HSKP T1004.02
FITTING STORAGE T1120
CORRIDOR T1010
ENTRY HALL T1100
F3
DRY STORAGE T1004.04
TREATMENT T1119
EXAM T1336
HALL T1335
ALCOVE T1335.01
CORRIDOR T1021 ALCOVE T1010.01
TRASH HOLDING T1004.01
M-A-301
HALL T1011
FAMILY TOILET T1012
EXAM T1337
ALCOVE T1335.02
ELEC T1013
HAND THERAPY T1116
RECEPTION T1101
SHAKE BAR T1107
TREATMENT T1118
EXAM T1338
M-A-312
MEDICAL DIRECTOR T1506
COPY ALCOVE T1500.05
HOTEL PHYS OFFICE T1502
STAFF TOILET STAFF TOILET T1027 T1028
CORRIDOR T1022
H
H5
DIRECTOR OF OPERATIONS T1505
31' - 6"
SPORTS OFFICE T1110
H8
T1-503
PHYSICAL THERAPY T1115
PHYS OFFICE T1504
PHYS OFFICE T1503
TBD T1601
UP STAIR 03
M-A-314
EQUIPMENT STORAGE T1108
STAFF LOUNGE LOCKERS T1026
WORKROOM CONFERENCE T1109
APT GYM T1106
CORRIDOR T1600
SERVICE ELEVATOR T2-E2
CONFERENCE ROOM T1025
31' - 6"
E
CONFERENCE ROOM T1023
31' - 6"
BIOMECHANICS TESTING T1113
D
CORRIDOR T1613
1%
MECHANICAL ROOM T1607
NUMBER
31' - 6"
MED GAS STOR T1622
31' - 6"
C
7
8
LEVEL 01
(NOT TO S
1
2
3
4
5
6
7
8
FLOOR
1. ALL UNMARKED PARTITIO UNLESS NOTED OTHERWISE
2. ALL WINDOW & DOOR PLA
3. FOR FIRE AND LIFE SAFE
A
4. ROOF PLAN SHOWN FOR DIMENSIONS.
5. REFER TO A2 SERIES DR
6. REFER TO A6 SERIES FO
7. INSTALL APPROPRIATE M EXPANSION JOINTS. TOP O TOP OF FINISHED FLOOR.
8. ALL PLAN DIMENSIONS AR SURFACE OF THE WALL (INC NOTED OTHERWISE.
G21
9. INSTALL BLOCKING AS R
G18
10. AT ALL SPANDREL GLAS ADJACENT WALL.
G18
11. REFER TO A-551 FOR INT
12. GENERAL DIMENSIONS P ROUGH OPENING DIMENSIO CONTRACTOR IS TO PROVID ENLARGED ARCHITECTURA SCHEDULE/DETAILS (A6 SER DIMENSIONS NOT GIVEN IN
B C1 M-A-202
L
NUMBER
D
RIDGE
C
ROOF
K
C
E2
D
1
H3
M-A-313
M-A-313
J
RIDGE
M-A-201
H1 M-A-202 H6
H8
M-A-313
M-A-313 H3 M-A-312
ALCOVE T2327.02
CORRIDOR T2328
PREP / RECV PREP / RECV PREP / RECV T2314.03 T2314.01 T2314.02
PASSAGE T2327
PREP / RECV T2319
PATIENT TOILET T2325
H8
NOUR T2326
CLEAN SUPPLY T2324
NOUR T2338
PREP / RECV T2316
NURSE STATION T2321
NCM
PREP / RECV T2301
PREP / RECV T2302
MEDICATION T2329
NC
PATIENT TOILET T2330
PASSAGE T2300
STAFF TOILET T2331
REG / MEDICAL RECORDS T2101.03
PACU BAY T2401.07
PASSAGE T2402
HALL T2542
SERVICE ELEVATOR T2-E2
PACU BAY T2401.08
EQUIPMENT STORAGE T2336
PASSAGE T2335
PATIENT TOILET T2332
NURSE STATION T2334
PACU BAY T2401.01
PREP / RECV T2311
NC
PASSAGE T2401
SOILED UTILITY T2341
PASSAGE T2340
PACU BAY T2401.02
ELEC T2008
FAMILY TOILET T2007 HALL T2505
PREP / RECV T2304
CHILD LIFE STORAGE T2013 HALL T2006
ALCOVE T2005.01
INDUCTION T2306
PREP / RECV T2305
PACU BAY T2401.09
STERILIZER ROOM T2604
HALL T2544
HSKP T2502
PREP / RECV T2308
CONTROL STATION T2501
PREP / RECV T2309
CORRIDOR T2504 SUB-STERILE T2519.01
TR T2009
OPERATING ROOM T2512
OPERATING ROOM T2513
CORRIDOR T2505
HALL T2005
EQUIPMENT STORAGE T2519
ALCOVE T2506.01
REG T2101.02
SCRUB ALCOVE T2515
MALE RESTROOM T2004
REG T2101.01
RECEPTION T2100 PB
FEMALE RESTROOM T2003
STERILE STORAGE T2516
STERILE STORAGE T2517
OBSERVATION LOUNGE T2510
ALCOVE T2505.01
OPERATING ROOM T2511
H7 M-A-312
MALE SURGERY LOCKERS T2537
B SOILED UTILITY T2553
SYMBOL
HSKP T2601
MATCHLINE SEE XX / A101
F1
DECONTAMINATION T2600
ANESTHESIA WORKROOM T2552
FLO
G
TOILET SHOWER T2539
HALL T2605
14
M-A-202
STAFF LOUNGE T2536
A1 X
HSKP T2554
F
A6 A-301
ALCOVE T2508.02
A6 A-201 CORRIDOR T2508
SCRUB ALCOVE T2518
CORRIDOR T2506
ELEVATOR LOBBY T2001
TOILET SHOWER T2538
CORRIDOR T2507
PUBLIC ELEVATORS T2-E1
HALL T2002
F3
R/O WATER ROOM T2608
STERILE SUPPLY STORAGE T2606
TRASH HOLDING T2551
LABORATORY T2550
FEMALE SURGERY LOCKERS T2540
CART WASH T2602
HALL T2547
HALL T2549
CORRIDOR T2500
INDUCTION T2307
RECEIVING BREAKDOWN T2607
PHARMACY T2548
MED T2400.01 STAFF TOILET T2503
M-A-312
HALL T2541
CLEAN ASSEMBLY PREP/PACK T2603
HALL T2545
NURSE STATION T2400
ALCOVE T2401.00
PREP / RECV T2310
PACU BAY T2401.10
H
H5
CONFERENCE T2543 ALCOVE T2542.01
OFFICE ASC MANGER T2546
DN UP STAIR 03
VENDING T2005.02
WORKROOM T2101
M-A-301
A
PREP / RECV T2303
CORRIDOR T2011
F
PACU BAY T2401.04
PACU BAY T2401.03
PREP / RECV T2312
PASSAGE T2333
FINANCIAL COUNSELING T2102
HSKP T2012
PATIENT TOILET T2337
PREP / RECV T2315
PASSAGE T2320
SHELL 8,407 SF
C:\Users\brettw\Documents\315054b1A-Childrens_ARCH-R16-CENTRAL_brettw.rvt
PREP / RECV PREP / RECV PREP / RECV T2314.06 T2314.05 T2314.04
PASSAGE T2323
PREP / RECV T2317
M-A-314
PACU BAY T2401.06
T2-503
PASSAGE T2322
PREP / RECV T2318
ALCOVE T2401.11
PACU BAY T2401.05
PREP / RECV T2313
CHARTING T2339.01
NCM
E
E
H4
A-211
SHELL SPACE T2521
A6
STERILE STORAGE T2520
A-431
ALCOVE T2508.01
0.5
ALCOVE T2507.01
OPERATING ROOM T2514
ROOM NAME 101
D UP DN
STAIR 01 T2-501
CORRIDOR T2530
LOBBY T2000
SURGERY WAITING T2010
SURGERY WAITING T2535
G
CONSULT T2534
H3
A
CORRIDOR T2509
CONSULT T2533
BED STORAGE T2509.01
SURGERY WAITING T2531
CONSULT T2532
DN
D.2
UP
1002a
STAIR 02 T2-502
NEW DOOR WITH DOOR TAG REF DOOR SCH
M-A-311
C.2 H4
2/29/2016 3:03:07 PM
H5
DATE STAMP:
M-A-201
5
H6
12 G21
11
M-A-301
10
M-A-311
9
8
KEY PLAN
C
H2
M-A-311
B
USER NAME:
FILE NAME:
ALCOVE T2339.02
PASSAGE T2339
CHARTING T2327.01
7
4
3.4
3
2
1.2
1
6
H
H5 1
2
3
4
5
ARCHITECTURAL - OVERALL FLOOR PLAN - LEVEL 02 SCALE: 1/16" = 1'-0"
6
7
8
LEVEL 02
(NOT TO S
MG EDUCATION
EDUCATION
MEGAN GIRVAN MEGAN GIRVAN 832.334.3969 832.334.3969 megan.girvan@gmail.com megan.girvan@gmail.com issuu.com/mgirvan issuu.com/mgirvan
CLEMSON UNIVERSTIY May 2018 Master of Architecture Architecture and Health Concentration Clemson, South Carolina CLEMSON UNIVERSITY May 2018 Master of Architecture Clemson, SouthA&M Carolina TEXAS UNIVERSTIY
May 2015 Bachelor of Science in May Environmental Design, TEXAS A&M UNIVERSTIY 2015 MinorofinScience Urban Planning Design, Bachelor in Environmental College Station, Texas Texas College Station, University Honors
Overall GPA: 4.0
BARCELONA ARCHITECTURE CENTER BARCELONA ARCHITECTURE CENTER Spring 2014 Barcelona, Barcelona, Spain Spain JOB EXPERIENCE WORK EXPERIENCE
Spring 2014
CLEMSON UNIVERSITY August 2016 - present Graduate Assistant, HKS, INC. Summer 2017 Clemson, SC Summer Team Member, Chicago, Illinois of presentations Assist in research, production Commercial and Healthcare fitouts and renovations
PAGE/
June 2015 - May 2016
CLEMSON UNIVERSITY August 2016- present Designer, Dallas, TX Graduate Assisstant, Clemson, South Carolina
Develop and produce drawings and rendered materials for healthcare PAGE/ June 2015- July 2016 architecture Designer
Dallas, Texas
TODD MCILHANEY ARCHITECTURE September 2014 - May 2015
TODD MCILHANEY ARCHITECTURE September 2014- May 2015 Architectural Intern, College Station, TX Architectural Intern College Station, Texas
Develop and produce drawings for residential architecture
SIXTHRIVER ARCHITECTS June 2014- August 2014 Interiors Intern Austin, Texas SIXTHRIVER ARCHITECTS June 2014 -
August 2014
Intern, Corporate Interiors, Austin, TX Research materials and produce finish boards and interior renderings
ACTIVITIES
GRADUATE ARCHITECTURE STUDENT PARTNERSHIP Organize social and professional development events for graduate students of the School of Architecture (SoA), assist SoA in organization of the Career Expo President (2017) TAMU CANCER SOCIETY Fall 2011-2014 Raise on-campus awareness and fundraise for cancer research President (Fall 2013) Treasurer (Fall 2012-Spring 2013)
AWARDS
THOMAS S. GATHRIGHT SCHOLAR AWARD Junior recipient, awarded to student withthe highest overall grade point ratio within his or her year classification for each college ARTHUR W. LICHT MEMORIAL SCHOLARSHIP Junior recipient, awarded to an Environmental Design student with at least one year of college remaining HOUSTON A&M UNIVERSITY MOTHERS’ CLUB SCHOLARSHIP Sophmore recipient of the Houston A&M Univsersity Mother’s Scholarship for academic standing and service activities
SKILLS
Adobe Creative Suite, ArcGIS, AutoCad, Grasshopper, Microsoft Office, Lumion, Python scripting, Revit, Rhino, 3DSMax