Skip to main content

20261013_General Projects_Newspaper

Page 1

General Projects


WHO WE ARE

ABOUT US We were founded in 2005 and collaborate across two studios in Dublin and London. We strive to become one of the most trusted, original and responsible voices for architecture and urbanism. Stimulating to work for and engaging to work with. Our design comes from a close engagement with the client and the brief, through a process that seeks to harness the full spectrum of society’s talent. We collaborate with artists and carpenters to researchers and writers. We collaborate with local authorities, planners, community engagement practitioners, and housing developers, and most importantly, communities.

Our design is rooted in the meaning and story of place and is driven by our mission for social impact.

Our colleagues in Dublin


One of many shop-front installations for London Festival of Architecture


HOW WE WORK We listen to better understand, we share our knowledge collegially, we cherish and value genuine collaboration.

VALUES

More than two decades ago we set out to practice architecture differently. We wanted to make more useful, more beautiful, more inspiring buildings and places. We could see that there needed to be greater recognition of the power of collaboration and creative exchange in the design process and that this needed to change before architecture and urbanism could evolve.

Our values:

INCLUSIVE INNOVATIVE RIGOROUS GENEROUS

Our design comes from a close engagement with the client and the brief, which we often help develop. It also comes from a detailed understanding of the physical, cultural and economic context – the nature of place. This aids our clients in selecting ideas and contributing to the process, helping to generate the integrity of our masterplanning, architecture and interiors work.


HOW YOU WORK

General Projects and Metropolitan Workshop share a belief that great places emerge through creativity, collaboration and long-term stewardship. Both organisations are driven by a desire to unlock potential, to champion the creative reuse of under-used buildings, create positive change and deliver places that generate lasting social, environmental and economic value.

YOU COLLABORATE INSTINCTIVELY YOU LEARN CONSTANTLY YOU DESIGN FOR LONG TERM RESILIENCE YOU CREATE VALUE FOR COMMUNITY IMPACT


OUR PROCESS We create an open and iterative process using tested means of engaging clients – models, analysis drawings, sketches, workshops, optioneering – that is enjoyable, stimulating, and adds value.


INCLUSIVE Collaborating to unlock the full potential of every place. University of East London ceramic tiles Tod Hanson

We put Tod Hanson forward to be commissioned by Wandsworth Council and the Balham Partnership via (arts consultant Modus Operandi) to work with us to create locallydistinctive art works on three sites in Balham town centre. We also worked with Tod to develop the ceramic relief tiles at the building facade for University of East London New Academic Building.

Balham High Road


Loraine Rutt worked with us to produce glazed terracotta models of the cladding of the Mapleton Crescent housing scheme for Pocket. She also produced a tea set to celebrate the planning consent.

Mapleton Crescent samples

Loraine Rutt

Jonny Allams

As an Educator and maker, Jonny Allams has collaborated with us multiple times, producing wooden models for our public engagement from off-cuts. In Balham, he built a ‘balloon basket’ in which to hold our community consultation. With his educator hat on, he advised us on a new library concept for Berger Primary School in Hackney. Deptford Creekside model


INNOVATION (& EXPERIMENTS) Using new design approaches to create future-ready environments.


Engie/Living Design Manual A new approach to suburban development

Developed with French energy company ENGIE, the Homestead concept reimagines suburban living through modular housing, flexible masterplanning and integrated sustainable energy infrastructure. The approach enables adaptable, low-carbon communities that support changing lifestyles while delivering affordable, greener energy to residents.

Titan Modular Designs Ltd seeks to define a new approach to the design, manufacture and assembly of steel-framed modular homes on site. It is hoped that this system will mark a new and long overdue, environmentally, socially and economically sustainable approach to housing delivery in the UK.

Mapleton Crescent uses innovative modular construction (Vision Modular system) to deliver affordable, highquality homes quickly, efficiently and at scale.


RIGOROUS Combining strategic thinking and technical excellence to achieve the best outcomes. Farmstead Road demonstrates a rigorous approach to sustainable design, delivering 24 affordable homes to the Passivhaus Low Energy Building Standard.


Featured in

Bellingham Estate

Developed in collaboration with specialist sustainability engineers Etude, the scheme adopts a fabric-first strategy, combining high levels of insulation, airtight construction, triple-glazed windows and low-carbon energy systems to reduce operational energy demand, lower carbon emissions and minimise residents’ energy bills. We apply the same rigour to embodied carbon, taking a retrofit-first approach that prioritises the reuse of existing structures and low-carbon materials.


GENEROUS Sharing research, ideas and expertise to support better places beyond the boundaries of individual projects.

Our office window, street frontage, should be active. Most of the year we display our work in it. We also use it to contribute to Clerkenwell Design Week and the London Festival of Architecture, as well as commission artists to create display pieces.


A New Kind of Suburbia: A collaborative research initiative examining how new forms of suburban layout can support sociability, liveability and long-term community wellbeing through higher densities.

Somerleyton Road: We coordinated the work of 5 practices to bring architectural variety to the project.


PROJECTS

University of East London


University of East London Stratford, London

We were appointed by the University of East London to design a scheme comprising student rooms and new academic space at the Stratford Campus, including a review of the existing Campus: its open spaces, connections to the wider area, permeability and accessibility, with the aim of developing a sitewide vision that will support the proposal of new student accommodation and teaching and learning space whilst better integrating the Campus with its neighbourhood. The scheme consists of 650 student

bedrooms and ancillary space, c.4000m2 of new teaching and learning space, a 300m2 gym, a 300m2 health and wellbeing centre and a 175m2 nursery. RIBA Stages 1-3 (planning) and a resolution to grant consent was achieved in February 2023. The teaching building is on site and due for completion in September 2027.

2026 on site £30m Construction Value (Academic Building) RIBA Stages 1-7


Lower ground floor shared facilities


Maggie’s Centre


Maggie’s Centre Cheltenham

We were commissioned to design a sensitive new extension to increase the capacity of Maggie’s Centre Cheltenham for Maggie’s Cancer Caring Centres Trust. The existing centre was opened in 2010, designed by Richard MacCormac and comprises a refurbished Grade II listed Victorian Lodge with

a substantial contemporary addition. The new building sits firmly alongside the Grade II listed Lodge. The connection to it is set back behind its building line, allowing the Lodge to maintain its prominence on the site. The new proposal is a single-storey building with a simple glazed connection to the existing building to

emphasise the separation from the listed Lodge. It provides an additional 75-85 sqm of floor space, enabling the centre to accommodate larger group activities.

2025 Completion £1.5m Construction Value RIBA Stages 0-7


Mapleton Crescent


Mapleton Crescent Wandsworth, London

Section:OBS 2R PaGe:40 Edition Date:180520 Edition:01 Zone: Sent at 17/5/2018 18:10

40

The scheme, for Pocket Living, provides 89 homes within a remarkable 27-storey tower on a 460 M2 site in Wandsworth. The resulting triangular geometries, striking ceramic cladding and tall modular structure provide a unique identity for this tall building. Built in 21 months using steelframed modular construction, the project set new benchmarks for offsite affordable housing

quality and, upon completion, was the tallest private residential modular structure in Europe. It was built on time and on budget.

The Observer 20.05.18

Critics

Architecture

BELOW ‘A sense of depth and Crescent in Wandsworth, wi faience cladding. Photograph

Absolutely prefabulous A stylish new residential tower in south London is an exemplar of innovative modular housing, each individual flat built in a factory off-site and craned into place, one storey a day…

2018 Completion £23m Construction Value RIBA Stages 0-7

Rowan Moore It’s a beautiful chimera, now more than a century old, that a house might be built in the same way as a car. It has long seemed so practical, so sensible and at the same time inspiringly progressive that the benefits that Henry Ford discovered in the production line – speed, efficiency, cheapness, quality – might be applied to the places where

we live. Le Corbusier had a go in the 1920s. So did Buckminster Fuller, with the aluminium yurt he called the Dymaxion. Somehow, their machineage nirvana keeps on not quite happening. The world is not covered with Dymaxia, nor the many other variations on the theme. The nearest Britain came to living the dream was with the postwar prefab – quick and cheap, for sure, but rationed in their comfort and beauty, modern nostalgic revisionism notwithstanding. In the 1960s,

government promotion of factorybuilt housing tended to produce results that were not particularly cheap, or functional, or goodlooking, but were at least numerous. Still, nil desperandum. Since the 1980s, office buildings have been built with extensive prefabrication, or modularisation, to use the preferred contemporary name – facade panels and toilet blocks built under cover, away from the wind, rain, muck and hazards of a building site, and craned into place with the satisfying simplicity of a child’s toy. If Britain’s housing shortages are seriously to be addressed, they will require not only land and funding, but also an expansion of the construction industry’s capacity to build. Which, if it is not to entail limitless supplies of labour coming to Brexit Britain


5,%

Ribbed

,%

Micro Ribbed

7 5,%

Pleated

7

$7

Central staircase


Good Community Vessel


Good Community Vessel Royal Victoria Docks, London

A purpose-built floating hotel at Royal Victoria Dock, submitted to the London Borough of Newham in September 2025. The proposed development comprises a new purpose-built floating hotel to be moored within Royal Victoria Dock, positioned behind the existing Good Hotel.

The associated decking surrounding the vessel will provide enhanced public access to the water, including facilities to support waterbased activities. The proposals also facilitate access to the lagoon formed between the existing and proposed vessels, as well as new pontoons and associated facilities supporting Open Water Swimming. The project reflects our growing portfolio of experiential, projects and our long standing and close working knowledge of the Royal Docks.


Bay studies


Annesley Gardens


Annesley Gardens Ranelagh, Dublin

Transforming a constrained back lands site in Ranelagh amongst 58 protected structures required a rigorous approach to site planning moving away from standard layouts to deliver twenty modern family homes that truly respect their nineteenthcentury context. By utilising first-floor ‘cut-backs’ and ‘light chimneys’, we moved beyond

the ubiquitous twenty-two metre back-to-back rules to prioritise sunlight and privacy - all while achieving a sustainable density of 41.5 dph. From the sawtooth brickwork detailing to the A2 energy rating, every element was designed to balance the local Victorian vernacular with highperformance modern living.

2022 Completion £7.8m Construction Value RIBA Stages 0-Handover


Carriage Works Swindon

We were commissioned by Forward Swindon to convert these Brunel-designed, former Great Western Railway Carriage Works railway sheds into low cost managed workspace for creative small businesses and start-ups in the centre of Swindon. This is the first phase of a series of regeneration projects in the town’s historic quarter. The approach, minimal intervention, generous volume and affordable space for makers and start-ups, closely mirrors

the spirit of Expressway and Stratford Workshops. The original Grade II listed buildings have been sensitively repaired with minimal interventions. The main intervention is the construction of a free-standing, lightweight mezzanine structure to create two levels of new offices, meeting rooms and open-plan workspace. This greatly increases the space available, making the most of the considerable height of the former sheds.

2018 & 2019 Completion £9.5m & £1.2m Construction Value RIBA Stages 0-7

*shortlisted in workplace category, 2018


Snow Hill Birmingham

A new landmark 48-storey residential tower, Located next to Snow Hill station and within the former Gun Making Quarter, will celebrate the northern gateway into the city centre. Operating as Build to Rent with an extensive communal amenity offering, with a commercial and retail presence at ground floor, it will establish a greater variety in land use for the area as proposed within the Big City Plan (2015). We have been

commissioned by the Build to Rent specialists Hub to design a striking new 48-storey tower in Birmingham’s historic city centre. The scheme will boast 462 build-to-rent apartments, with extensive communal amenity spaces set over four separate levels. 2022 Completion £80m Construction Value RIBA Stages 0-3


Royal Academy Summer Exhibition 2023: Elevation sketch by Nick Coupland


Crown

2 Fold

Tower

1 Fold

Plinth

Gable

Street

Crown

2 Fold

Tower 1 Fold

Plinth

Gable

Elevation diagrams

Street


Carpenters Estate Regeneration Stratford, London


We have been appointed by LB Newham as joint Masterplanners with Proctor and Matthew Architects to develop proposals for the restoration and redevelopment of the Carpenters Estate in Stratford. We have also been appointed as architects on the first phase of the development, which will include 3 tall buildings that share a connected commercial plinth. 2024 Resolution to Grant £1bn+ Construction Value RIBA Stages 0-2


STATION QUARTER - Crafting Community at Carpenters

MAKING A HOME

8%

36%

75%

50%

100%

total homes

BTR Must Haves:

1B1P

NIA:GIA

Spacious, modern homes Unit mix variety Ample storage (in-unit +

1B2P

dual aspect

W:F

All homes have the opportunity to be dual aspect, and there are no north-facing dwellings. The interchangeability of the apartment plans means that views and orientation can be easily optimised during the design process to improve value and viability without costly design changes.

19%

30%

70%

2B4P

3B5P

affordable

BTR

1B

*

external) Durable & built to last Amenity-rich lifestyle Flexible future-proof spaces

37%

Views to Park

*2

B

Community connection Efficient floorplates Prime location Energy-efficient design Safe & secure Well-planned back-of-house Tech-ready living

*

3B

*1B

Homes will be thoughtfully designed, generous and built to last, with long views to the park and across East London, and strong connections to the existing homes and spaces on the estate. The mix of tenure and apartment types will foster a diverse, intergenerational community. Every home will have access to external amenity regardless of tenure, and shared spaces will be designed to support mental and physical well-being by offering comfort, dignity, and delight.

534

B

1B

2B 2B

es Zo n 1B

A

18

m

2B

3B

1B

The shape of these buildings is not just a whim. The (almost 45o) geometry of the site lends itself to this form, which minimises overlooking, optimises views out, maximises daylight access and …. most impressively, contains 20% more floor space. This shape will also deliver a form factor of <1.

1B 2B 1B

The octagon’s perimeter is 10% less than the square, so less external wall to build.

F se lex gm ibl en e t

Typical Upper Level

• Residential FFLs reduced to development within the par • Wall-to-floor ratio and form • Standardised types (4 used helps buildability, managem • 8 homes per floor - Each qu designed to allow for chang • The lower-levels are design family/accessible homes. • Each floor plate can be rota orientation views, daylight a

3B

Happily, this shape is found in traditional oak framing pegs so is a nod to the Carpentry heritage of the site as well.

Residential Accommodation

1B

W:F = 50%

3B

W:F = 55%

Views to Park

2B

EQm2

1B

EQm2

2B

Octagon

1B

Square

3 Ba B th ro 1B om

3B

The usefulness of an Octagon

) (L

Views to Park

N

d ce du

Units can be rotated as desired

Re

Typical Lower Level

Engineered Facades The building plans are highly regular and repetitive, meaning that the facade panels can be heavily standardised, bringing huge benefits to buildability, cost, and programme. The envelope can be built in many ways, whether in hand-laid brick or prefabricated precast panels. Our early conversations with Thorp Precast indicate that this building would lend itself well to MMC if desired, speeding up delivery and therefore the revenue stream. Wall-to-window ratios are pre-tested and compliant for daylight access and solar gain. Wall thickness can accommodate the requirements for Net Zero.

Typical 1-Bed *

Typical 2-Bed *

Typical 3-Bed *

* Unit sizes can be tweaked to accommodate either NDSS or Residents Charter space standards.

The three buildings are conceived as a family – related in form and components, but can be distinguished by colour and material. A gradient from light to dark creates visual rhythm, anchored by a harmonising plinth. A material hierarchy could enhance this relationship, allowing the Landmark Building* to be more refined and expressive than the Neighbourhood Marker and intermediate tower. * Landmark

Massing Colour Variations

* Landmark

Facade Study Option 01 - Brick

Facade Study Option 02 - Concrete


LIVIN GW EL

Amenity

Brief Objectives

L

1%

Green spaces will be located between the buildings and at street level, with permeable surfaces and rain gardens utilised to manage stormwater and reduce heat island effects. We will use Passive Design principles in the positioning of trees and shade structures that will reduce energy consumption and improve comfort. Community gardens and an orchard will promote health and social engagement at podium level, while ribbons of native planting and wildlife corridors will support biodiversity. Internal amenity spaces such as yoga, play and fitness studios will be provided to work in concert with the external amenity spaces.

4B7P

10%

accessible

Vibrant diverse neighbourhood

HO

2B*

Facade Design for MMC

w s

* 1B

*

2B

*

1B

ME

Landscape-led approach

Vi e

Best in class sustainability

Residents’ Garden Vibrant public realm / high st

Views to Olympic Park

Y T NI

n

U M

o 3075mm, to optimise rameters. m factor facilitate net-zero. d in 85% of the building) ment and maintenance. uarter segment is ges in unit mix as needed. ned to support larger,

M O C

ated to optimise and privacy.

Privacy & Comfort

Exemplary tall buildings

n

the To Arcade

e

an

sL ter en

Lobby / Entrance

HOOD R U

rp Ca South-facing Pub

Play Space

s

bin

Gib Residential Core & Ancillary

Lobby / Entrance

Ro

ts ven oE t ute

N

ard lev

O B H

u Bo

G I E

Lobby / Entrance Convenience Store

tio sta

Public Realm

The public realm and landscape will compliment the architecture to promote distinctive and vibrant placemaking, and support the environmental ethos and the health & wellbeing of the community. There will be a clear hierarchy of uses – putting people first (and cars in their place) - supported by purposeful landscape design for Gibbins Road and Carpenters Lane. Meeting servicing requirements while delivering community and people friendly spaces will require a strong focus on priorities. Matchday crowds should be thoughtfully managed and integrated with careful attention to access and service needs, ensuring they do not overwhelm or dominate the streetscape.


GSK House Brentford, London

We have collaborated with dRMM, Studio Egret West on the 980 Great West Road masterplan led by Haworth Tompkins, that reimagines the former GSK site as a vibrant, sustainable new neighbourhood in Brentford. The scheme delivers around 2,300 new homes—including co-living, student accommodation, and Build to Rent—alongside 330,000 sq ft of commercial, retail, and community space.

We have developed proposals for Plot I, a 21-storey coliving tower comprising 296 studios, designed to respond to the unique and challenging conditions of the M4 flyover. Its architectural language is robust and utilitarian yet expressive, clearly distinguishing between the heavy plinth and slender tower. Beneath the flyover, a textured concrete plinth houses residential amenities, co-working spaces, and commercial uses that activate

the space below, with materiality carefully chosen to withstand harsh conditions. Above, the tower rises with studios oriented away from the motorway to maximise daylight, solar access, and privacy. The lighter, modular upper levels reflect the rhythm of the co-living typology, while the façade facing the motorway doubles as a concrete mural, 2025 Planning Consent £42m Construction Value RIBA Stages 1-3


Masterplan site plan Key: Commercial Entrance Lobby Internal Amenity External Amenity Ancillary space/ Plant Cycle Store Cleaners Store Units: Standard Standard + Accessible

Typical floor plan


Walworth Estate Southwark, London

We were commissioned by Dorrington to produce The Walworth Guide. This suite of documents establishes the design principles for all works to the estate for the next 50 years. Anticipated projects include simple home refurbishments, extensions, and loft conversions, through to common-part renovations, and concept designs for the communal gardens, streets, and wider public realm. As part of this commission, we are also undertaking an estatewide mapping exercise to help Dorrington understand the development potential of the

entire estate. By recording the different typologies across the estate, when we design a new refurbishment or extension, we can identify how many other homes might be the same, helping our client understand the future uplift in floorspace and commensurate rental yield.

Ongoing Construction Value - Confidential RIBA Stages 1-6


Turn static files into dynamic content formats.

Create a flipbook
20261013_General Projects_Newspaper by Metwork - Issuu