Site Environmental Management Plan Turitea Wind Farm TWF-VES-PM-PLN-0015_05-SEMP 01
Turitea Wind Farm Site Environmental Management Plan – Civil Area 1 T90-VAWT-PM-PL-0020
Document Preparation and Control
Signature
Michelle Flawn – Environmental Advisor (Downer NZ) Mike McConnell – Environmental Consultant (McConnell Consultancy) Document Approval
Signature
Duncan Wallbank – Project Manager (Vestas) Marty Craill – Project Manager (Downer NZ)
Project Document Version
Date
05
09/09/2019
Page 1 of 27 Downer Internal Use Only © Downer 2017. All Rights Reserved
Version: 4.0 Warning: Printed documents are UNCONTROLLED
Commercial in Confidence