Landscape Plan Turitea Wind Farm TWF-VES-PM-PLN-0013_08-LP
Turitea Wind Farm Landscape Plan T90-VAWT-PM-PL-0015
Document Preparation and Control
Signature
Michelle Flawn – Environmental Advisor (Downer NZ) Document Approval
Signature
Marty Crail – Project Manager (Downer NZ) Duncan Wallbank – Project Manager (Vestas)
Project Document Version
Date
08
13/09/2019
Document Library Number: DI-PM-TP019
Page 1 of 22
Downer Internal Use Only © Downer 2017. All Rights Reserved
Version: 8.0 Warning: Printed documents are UNCONTROLLED
Commercial in Confidence