Skip to main content

Architecture portfolio, 2022

Page 1

VKP(en)2022


Professional work Contents

1

2

3

4

5

6

7

8

Shigeru Ban Architects

QING ZHEN WETLAND MUSEUM

Shigeru Ban Architects

ZEN WELLNESS SEINEI

Shigeru Ban Architects

WATERGARDEN RESTAURANT

Shigeru Ban Architects

HAKONE ONSEN HOTEL

Shigeru Ban Architects

ASSEMBLE TENT

Sou Fujimoto Architects

SHIROYA HOTEL

Atelier Tsuyoshi Tane Architects

HORIZONTAL TIME IN BASELWORLD

Shanghai Zhongke Architectural Design Institute

RR DONNELLEY SHANGHAI OFFICE

01

03

05

07

09

11

13

15


Academic work Contents

9

Evaluating Land Waste Within Central Manchester

PROLIFERATING DROSSCAPE

Shape of sound in urban area

10 SOUND MUSEUM

11

Sustainable Mixed-use commercial office building

GINZA GREEN TOWER

Rejuvenate and bring back the bustling Jinling Rd

12 FLOATING HIGH STREET

Design on limited space in Central Tokyo

13 SPIRAL STAIRS SHAREDHOMES

Educational building

14 THREE FANS KINDERGARTEN

Capture of projects

15 APPENDIX

17

19

21

23

25

27

29


PROJECT INDEX About me My name is Vicky Meng. An Asian architect from Xinjiang, China. With professional experience in different countries for more than 6 years. And I am always looking for opportunities to learn with challenges. My experiences in different countries have always involved both professional and academic aspects. Since I completed my study and 2 more years of working in Shanghai. I have mostly lived, studied, and worked in Japan. During my early years of stay in Japan, I spent the most time doing the internship. I also had the opportunity to do work in Paris during that period. After the pandemic, I decided to do advanced study in the UK. Currently, I am studying for my Master’s Degree in Architecture and Urbanism course in Manchester. I will be graduating in the autumn of 2022. Selected work Academic work -->A Professional work -->P

Tokyo

Tokyo

JAPAN OCT 2014 ~ MAY 2021 Tokyo Designer Gakuin College Shigeru Ban Architects Siu Fujimoto Architects Nikken Sekkei Co.,Ltd SANAA Architects

A

Stacking boxes home

A

Helix Gallery

A

Bamboo Gallery

A

Nishikanda Library

A

Three Generation Community

A

Sound museum

A

Ginza Green Tower

P

Osaka University Teaching Building

P

ARAI Shoten Kichijoji office building

P

Shiroya Hotel

P

Roppongi Hill Mall

P

Stacks Aluminum Boxes Pavilion

P

Haesley Hamlet Private Golf Centre

P

Merco YIR Casino

P

Tainan Art Museum

P

Kakone Onsen Hotel

P

Muji Hut

P

Mifune Housing T

P

Zen Wellness Seinei

P

Awaji Watergarden Resort

P

Assemble Tent

P

OPAM Exhibition

P

Guiyang Qingzhen Wetland Culture Museum

P

Oita Airport Marine Access Passenger Terminal Competition


Shanghai

Shanghai

CHINA SEP 2009 ~ OCT 2014

Shanghai Art & Design Academy Shanghai Normal University (Training) Shanghai Vanessa Art Decoration & Design Co.,Ltd Shanghai Zhongke Architectural Design Institute Co.,Ltd

A

House of mine

A

White house re-design

A

Bike shop + Housing

A

Floating High Road

P

RR Donnelley Shanghai Office Interior Design

P

China Taiping Life Insurance Sichuan Headquarter Office

P

YS Housing Interior Design

P

Mussee China Waxing Store Interior Design

P

WenBo Tea House

P

Shanghai Purplemagna Machinery Office Interior Design

P

Baselworld 2019 Citizen Watch Exhibition

P

Chiso Foundation | Office Building

P

Furoshiki Exhibition in Paris | Temporary Exhibition Installation

A

Live With Landscape

A

Ascendant City : Rethinking of Rebel Cities

A

Shared Community : Rejuvenating and developing the

Paris

Paris

FRANCE JUL 2017 ~ OCT 2017 Atelier Tsuyoshi Tane Architects

Manchester

Manchester

UNITED KINGDOM SEP 2021 ~ NOW Manchester School of Architecture

neighbourhood in Lower Kersal A

Proliferating Drosscape: Evaluating Land Waste Within Central Manchester

A

Final Thesis: Re-generating the urban life along Littleton Road


PROFESSIONAL

1. QINGZHEN WETLAND MUSEUM The first large scale timber structured public building in China

Project Description: Qingzhen Wetland Museum is a place to exhibit the local wetland academic, and this building itself, is also a place to introduce Guiyang culture and ethnic characteristics. Guiyang is home to the most diverse ethnic groups in China. The people there maintain traditional and sustainable lifestyles and are very valuable in the world. It can be said that the city itself is a museum. In such traditional life, the ethnic groups retain superb architectural techniques, especially the large timber structure technique is very prominent. Therefore, the main design concept of this museum is to use traditional timber structure technique, and to transform it into modern architecture. Responsibility in Project: The project team consists of 5 architects. I joined this project in the SD phase. I was mainly responsible for the plan, roof structure study and partial visualization work, as well as the presentation booklet. In the roof design, it needs to be done in cooperation with the structural engineer. I was also in charge of communicating with lighting design company. Project type: Location: Year of work: Total area: Professional field:

Museum Qingzhen, Guiyang, Guizhou, China 2020 8321 sqm Architecture

MEANING AND SIGNIFICANCE OF TIMBER STRUCTURE

VIEW FROM THE TOWER

New Town Lao Ma River

ORIGINAL LANDSCAPE

01

LANDSCAPE WITH NEW BUILDING


PROFESSIONAL

PUBLIC CULRUAL PROJECT PERSPECTIVES

PROGRAM

ROOF DESIGN

CIRCULATION

• • •

The roof structure is made up of traditional wooden nuki system. No metal hardware appears at the joint. The upper and lower chords are double beams.

02


PROFESSIONAL

2. ZEN WELLNESS SEINEI Meditation doji capsule hotel in the air

Project Description: Zen Wellness Seinei a Zen-themed capsule hotel. Zen refers to the Japanese forms of Zen Buddhism, the meditative training of awareness and equanimity. This practice, according to Zen proponents, gives insight into one’s true nature, or the emptiness of inherent existence, which opens the way to a liberated way of living. This hotel is mainly to attract foreign tourists to understand and experience Japanese culture. This project is located in the jungle on the outskirts of Awaji. The second floor of meditation platform overlooks the surrounding woods, which is more conducive to spiritual purification. Responsibility in Project: I participate separately in the schematic design and construction design phases in this project. I was mainly responsible for the 3D modelling and visualization work in SD. Detail drawings and communicate with landscape company in CD. Project type: Location: Year of work: Total area: Professional field:

Hotel, Hot spring Awaji city, Tokyo 2019-2021 1361 sqm Architecture

1F & 2F PLANS

Large sectional detail

STRUCTURE DIAGRAM

03

SECTIONAL DETAIL

Sectional detail


PROFESSIONAL

COMMERCIAL PROJECT HOTEL ROOM DIAGRAM

VISUALIZATION & COMPLETED PHOTO

2F meditation deck

Bird eye view

Hot spring

LARGE SECTIONAL DETAIL

LONG SECTION

04


PROFESSIONAL

3. WATERGARDEN RESORT Awaji water garden restaurant hotel

Project Description: The watergarden resort contains restaurant, bar and hotel. The site is sitting on a hill where face Pacific Ocean, and far from the city centre and needs to be reached by car or bus. The roof is a 500mm deep artificial pool which has the view connected to the sea in the distance. The S-shaped gentle slope enters the garden under the pool supported by the timber column, where you can enjoy different kinds of flowers. At the back of the garden is the dining area of the restaurant. On the basement floor, there is a wine bar with designed cave room. Responsibility in Project: I joined this project from schematic design and worked till construction design phase. I was in charge of the presentation booklet, 3D modelling, analysis diagramming, and visualization in this stage. From design development phase, the team was minimized to 2 architects. My responsibility was design the detail and communicate with construction company and manufacturers. Also, making the detail drawing document for estimation. Project type: Location: Year of work: Total area: Professional field:

Restaurant, Wine Bar and Hotel Awaji city, Tokyo 2019-2021 2225 sqm(total), 2762 sqm(water pond) Architecture

SITE PLAN

A

B

Entrance path A

Entrance path B

ARCH COLUMN DIAGRAMS

Exterior view

Restaurant view

05


PROFESSIONAL

COMMERCIAL PROJECT PERSPECTIVE

1F entrance garden

Hotel room

Basement cave

HOTEL ROOM STRUCTURE

Green Roof

CLT: Floor+wall Foundation: RC+V shape steel

CLT

3 layers of CLT panel in different direction

compress

Staggered bending directions make the panels stronger

FLOOR PLANS

GF plan

BF plan

06


PROFESSIONAL

4. HAKONE ONSEN HOTEL Private Hot Spring Hotel in the Mountain

Project Description: The site is located in the middle of the Gora District and in the direction of the slope, looks down the Hayakawa Valley across to the Myojogatake mountain where every year the Daimonji bonfire ritual takes place during the Obon festival. In the neighborhood is the Hakone Museum of Art famous for its Autumn leaves, and the Gora Park popular for it seasonal flora. The hotel will also be the attraction for visitor to experience the Japanese style of housing and Onsen culture. Responsibility in Project: The project contains 7 buildings. I was in charge of the whole site plan and section drawings, as well as some visualization and 3D modelling. I was also act as the coordinator with teammates who in charge of different buildings due to my position. Project type: Location: Year of work: Area: Professional field:

Hotel 2018 6471.89 sqm Architecture

PERSPECTIVE

Main entrance

07

1F Foyer


PROFESSIONAL

WHOLE PLAN

GF swimming pool

Hotel room interior

Physical model

08


PROFESSIONAL

5. ASSEMBLE TENT Multipurpose tent made by carbon pipes

Project Description: The tent project is a multi-purpose architectural product. The design of tent project consists of 3 parts: frame, joints, and cover. Tent is counted by unit. Due to the flexibility of the module, tents of different sizes can be built in different situations. Quickly detachable and installation friendly of the structure allows it can be used in vast occations. Target situation such as, refuge shelter, commerial usage, farmer’s markets, emergency medial assistance, festive events, etc. Responsibility in Project: This project was in charge my own, and my main job is to optimize the design of the joint. The process involed 3D modelling study of the dimention, 3D printing to test the model. As well as, communicating with the manufacturer. Tent 1:1 mock-up was displayed at OPAM architecture exhibition in Oita, Japan, in 2020. Project type: Location: Year of work: Area: Professional field:

Installation 2020 5 sqm per unit Product design

6UNITS ELEVATION S=1/100

Feasible Material(depanding on the bugget) FRAME a. Papaer tubes b. Aluminium tubes c. Carbon pipes

JOINTS a. Wood b. Aluminium c. 3D printing materials

COVER a. Plastic(water proof ,but airtight) b. Any kind of fabric *Vertical section can be taken away, then it becomes a wall-less pavillon.

SUN LIGHT

09

ROOF PLAN S=1/100

FLOOR PLAN S=1/100

ELEVATION S=1/100

SECTION S=1/100


PROFESSIONAL

STRUCTURE ELEMENTS DATA

ISOMETRIC VIEW

INSTALLATION PROJECT B1 JOINT SECTION S=1/3

JOINTS 3D MODEL

DETAIL PHOTOS

1:1 MOCK-UP MODEL

10


PROFESSIONAL

6. SHIROYA HOTEL Renovation of Heritage tower from 70’s

Project Description: This is the project to renovate an old hotel building from the 70’s and create an atrium, he removed the floor and exposed the rough concrete surface, his stairs interact with Leandro Erlich’s “Lighting Pipes” reminiscent of water pipes Run traces past the old mansion. This part of the site where the hotel business has continued for over 300 years in the past is known as the “Heritage Tower”. Responsibility in Project: During my 6 months internship, Shriya hotel was my most participated project. This project was in schematic design to design development phase. I have worked on volume studies of entrance design, 3D modelling, visualization and drawings of plan and elevations for the document. This project was completed in 2020. Project type: Location: Year of work: Total area: Professional field:

Hotel 2-2-15 Honmachi, Maebashi City, Gunma Prefecture, Japan 2016 2562 sqm Architecture, Interior design. $ $

እᵓᅗ

᪂タቨ㸸ࣞࣥ࢞ࢱ࢖ࣝ

ࣞࣥ࢞ࢱ࢖ࣝ

ࣞࣥ࢞ࢱ࢖ࣝࠉ

ࣞࣥ࢞ࢱ࢖ࣝࠉ

ࣞࣥ࢞ࢱ࢖ࣝࠉ $ $

ࣞࣥ࢞ࢱ࢖ࣝࠉ

እ㒊㝵ẁ❧㠃ᅗ

MAIN ENTRANCE RENDER & PLAN

ͤእ㒊㝵ẁ࡟࠾ࡅࡿࢥ࣮ࣝࢸࣥ㗰W ࡢ⟠ᡤཬࡧᩘ㔞ࡣୗグࡢ⏬ീࡢ㏻ࡾ࡜ࡍࡿ s

մ

յ

ࣞࣥ࢞ࢱ࢖ࣝࠉ

s

ࣞࣥ࢞ࢱ࢖ࣝࠉ

ճ ղ

ࣞࣥ࢞ࢱ࢖ࣝࠉ

ࣞࣥ࢞ࢱ࢖ࣝࠉ

᪤Ꮡ᧦ቨ㸸 ࣞࣥ࢞ࢱ࢖ࣝ

᪤Ꮡ᧦ቨ㸸 ࣞࣥ࢞ࢱ࢖ࣝ

ձ

እ㒊㝵ẁ࢖࣓࣮ࢪ⏬ീ

ഛ⪃

Ⓨὀ⪅

ᰴᘧ఍♫ࠉ⸨ᮏኊ௓ᘓ⠏タィ஦ົᡤ

࣮࢜ࢡᮦ ࢘ࣞࢱࣥሬ⿦ ࢡࣜ࢔ ྜྠ఍♫ࠉ࣐࣮ࢬ ᳜᱂ᖏ

‫) ۂ‬/ */

‫) ۂ‬/ */

‫*ۂ‬/

‫*ۂ‬/

‫*ۂ‬/

‫*ۂ‬/

‫*ۂ‬/

‫*ۂ‬/

‫ۂ‬% )/ */

‫ۂ‬% )/ */

Ⓨὀ⪅

ᴗົ␒ྕ

㸦௬⛠㸧࣍ࢸࣝⓑ஭ᒇᨵಟᕤ஦ィ⏬ࠉ᪂⠏Ჷ ᅗ㠃ྡ⛠

⸨ᮏኊ௓㸦Ⓩ㘓➨ ྕ㸧

11

ᴗົྡ⛠

3'

஦ົᡤⓏ㘓ࠉᮾி㒔▱஦Ⓩ㘓ࠉ➨ ྕ ௦⾲タィ⪅

⦰ᑻ

እ㒊㝵ẁ❧㠃ᅗ

$ $

ᐇ᪋タィᅗ ᅗ㠃␒ྕ

$

ᴗົ␒ྕ

㸦௬⛠㸧࣍ࢸࣝⓑ஭ᒇᨵಟᕤ஦ィ⏬ࠉ᪂⠏Ჷ ᅗ㠃ྡ⛠

⸨ᮏኊ௓㸦Ⓩ㘓➨ ྕ㸧

ᰴᘧ఍♫ࠉ⸨ᮏኊ௓ᘓ⠏タィ஦ົᡤ ྜྠ఍♫ࠉ࣐࣮ࢬ

ᴗົྡ⛠

3'

஦ົᡤⓏ㘓ࠉᮾி㒔▱஦Ⓩ㘓ࠉ➨ ྕ ௦⾲タィ⪅

ᐇ᪋タィᅗ ᅗ㠃␒ྕ

⦰ᑻ

እ㒊㝵ẁᖹ㠃ᅗ

$ $

$


PROFESSIONAL PROFESSIONAL HOTEL PROJECT

COMMERCIAL PROJECT VISUALIZATION & COMPLETED PHOTO

Back entrance Main entrance

Reception hall

Staircase

1F PLAN

3F PLAN

A'

A

SECTION A-A’

B

SECTION B-B’ B'

X00

X01

X02

X03

X04

X05

X06

Y00

Y01

Y02

Y03

12


PROFESSIONAL

7. HORIZONTAL TIME IN BASELWORLD Baselworld 2019 Citizen Watch Exibition

Project Description: Citizen watch hold exhibition in Basel each a few years. The previous show was in 2016. The concept of the exhibition is ‘the gears of time have been turning ever since humanity first became conscious of the concept, and there is no doubt that we will continue to contemplate time in the future. Accordingly, we have time to thank for the present, and when we cast our gaze to an uncharted future, time too casts its reach.’ Responsibility in Project: This project was one of the dominate project I was working on during my 4 months internship in Paris. I was working on proposing the watch display holder and testing the idea in schematic design phase. At the construction design phase, the team was consists 4 people in total (2 staffs and 2 interns). I have participated the making design documents, step and stair detail drawings, as well as the construction design of the entrance tunnel. 1F PLAN AX1

AX2

AX3

AX4

1

2

AX7

32500

3250

3250

4500

3250

3250

A R-109 OFFICE 006 COA M-4 17.7 sqm C

A R-110 OFFICE 007 VIP 14.6 sqm C

3250

3250 BY4

3250

AX6

AR2-002

W-7

3250

AX5

2

AR3-001

AR3-001

AX0

BY4

8 AR5-004

B

D

W-1

F-3

W-1

D

B

A R-107 OFFICE 004 COA M-3 14.6 sqm C

W-1

F-3

B

A R-108 OFFICE 005 COA M-3 17.7 sqm C

D

B D

W-1

W-1

F-3

D110-1 D108-1

A R-112 OFFICE 009 SHARE 14.6 sqm C

D111-1

D112-1

D

A R-113 BAR SERVICE CITIZEN 4.5 sqm C

B

STORAGE / TECHNICAL (LOW CEILING)

STORAGE / TECHNICAL (LOW CEILING)

W-1 F-6

4406

F-2

1 AR-XXX

S-102

F-6

D102-1

F-2

W-6

BY2

19000

AR5-003

W-1 F-2

5963

F-1

DISP.

AR5-002

4

19000

3

F-1

W-2

A R-114 BAR/LOUNGE B CITIZEN 32.2 sqm C

D

RAMP

1:20

F-2

6

1:20

F-1

SLOPE

F-1

SLOPE

5963

RAMP

A R-103 BAR / LOUNGE B CITIZEN 32.2 sqm C

2500

W-5

D

S-101

19000

W-2

F-2

W-1

W-5

BY2

B

F-3

W-1

D113-1

D104-1

D

B

F-3

W-1

F-3

D107-1

D106-1 W-1

D

B

F-3

W-1

D109-1

D105-1

F-2

A R-104 BAR SERVICE B CITIZEN 4.5 sqm C

D

W-1 W-1

D

B

F-3

A R-111 OFFICE 008 VIP 14.6 sqm C

BY3

W-2

A R-106 OFFICE 003 COA M-2 14.6 sqm C

5730

D

A R-105 OFFICE 002 COA M-1 14.6 sqm C

4487

5 AR5-004

4487

Installation Basel, Switzerland 2017 1296.5 sqm Interior & Exhibition

BY3

Project type: Location: Year of work: Total area: Professional field:

3

W-2

AR3-003

D116-1

AR5-004

W-1 W-2

W-7

W-7

3618

F-3

D

A R-102 OFFICE 001 COA S-1 17.0 sqm C

F-3

W-1

W-6

W-1

W-6

W-1

W-1

D

B

D

A R-101 GALLERY CITIZEN 41.2 sqm C

B

D

A R-115 GALLERY CITIZEN 41.2 sqm C

A R-116 OFFICE 010 COA S-5 17.0 sqm C

3618

W-6

W-2

2 AR5-002

B

B

2

F-2

BY1

BY1

AR3-003

F-2

F-2

W-1

6364

W-1

4132

11

A R-100 RECEPTION CITIZEN 18.0 sqm C

D

RAMP SLOPE 1:20

D

B

A R-117 RECEPTION 18.0 sqm C

B

4132

RAMP SLOPE 1:20

1 AR5-002

AR5-004

F-1

F-1

1

12

AR3-002

AR5-004

6830

2475

4500

2475

4295

6830

3

8000

46000

1

3

1

AR2-001

AR2-003

2

AY4

28500 6830

4295

2475

4500

2475

4295

2500

AY4

1

AR2-003

BY0

32500

BY0

COMPLETED PHOTO, 2019

4295

530

2

F-1

F-1

B

DISP. RAMP SLOPE 1:20

F-2

F-2

AY3

W-1

AY3

F-2

RAMP SLOPE 1:20

7310

DISP.

6364

4132

AR3-002

D

A R-132 RECEPTION BULOVA 18.0 sqm C

3618

W-1

D

A R-131 OFFICE 016 VIP S-1 17.0 sqm C

F-5

B

D

A R-130 GALLERY BULOVA 41.2 sqm C

B

D

W-7

W-6

W-2

A R-122 GALLERY B MULTIBRAND 41.2 sqm C

W-7

W-6

W-1

F-4

F-6

S-103

W-6

STORAGE / TECHNICAL (LOW CEILING)

W-1

AY2

W-1

19000

W-6

19000

4406

STORAGE / TECHNICAL (LOW CEILING)

W-1

19000

AY2

D131-1

W-1

1500

W-4

F-4

W-2

F-6

AR3-003

F-4

D123-1

D128-1

F-5

W-4

D

B

A R-126 OFFICE 014 BULOVA M-2 18.7 sqm C

F-2

W-4

A R-125 OFFICE 013 D B CITIZEN STAFF 27.1 sqm C

W-1

W-1

A R-124 OFFICE 012 D B BULOVA STAFF 30.0 sqm C

W-1

D F-4

W-4

W-5

AY1

A R-123 OFFICE 011 BOH 27.2 sqm C

B F-6

B

W-2

5490

F-5

A R-127 OFFICE 015 BULOVA M-1 21.0 sqm C

D126-1

5730

4487

1

W-4

D124-1

D127-1

D

F-1

W-4

D125-1

AY1

B

F-4

W-2

F-1

2500

RAMP

F-1

E 1:20

A R-129 BAR/LOUNGE BULOVA 27.0 sqm C

4500

SLOP

F-1

D

SLOP

E 1:20

F-4

RAMP

5963

S-104

W-5

A R-128 BAR SERVICE B D BULOVA 4.5 sqm C

D123-2 W-3

3592

4908

4500

5625

1000

AY0

AY0

W-3

4700

2775

28500 W-7

4

AR2-002

AX0

AX1

AX2

AX3

AX4

AX5

AX6

AX7

GROUND F

13


ATELIER TSUYOSHI TANE ARCHITECTS

ATELIER TSUYOS TANE ARCHIT PROFESSIONAL

INTERIOR PROJECT

CLIENT: CITIZEN WATCH CO. BULOVA

ARCHITECTS: ATELIER TSUYOSHI TANE ARCHITECTS

BOX CHANEL METAL CHANEL

200

CONSTRUCTION: SECONDARY STRUCTURE SUSPENDED CEILINGEXPOMOBILIA AG Florian Faber BOX CHANELffaber@expomobilia.com METAL CHANEL

SECONDARY STRUCTURE SUSPENDED CEILING BOX CHANEL METAL CHANEL

590

SUSPENDED CEILING SECONDARY STRUCTURE BOX CHANEL

STEEL BEAMS BOX CHANNEL

STEEL BEAMS BOX CHANNEL

SECONDARY STRUCTURE SUSPENDED CEILING

SECONDARY STRUCTURE SUSPENDED CEILING

BOX CHANEL METAL CHANEL

BOX CHANEL METAL CHANEL

6 Cité Griset 75011 Paris France www.at-ta.fr contact@at-ta.fr

600

SUSPENDED CEILING

BOX CHANEL METAL CHANEL

ARCHITECTS: ATELIER TSUYOSHI

400

BOX CHANNEL SECONDARY STRUCTURE

SUSPENDED CEILING

200

PERFORATED STEEL PANEL FLANGE

BOX CHANNEL SECONDARY STRUCTURE

200

PERFORATED STEEL PANEL FLANGE

400

PERFORATED STEEL PANEL

108 77 185 108 77 185 6 Cité Griset 75011 Paris France PANEL ANCHOR PANEL ANCHOR www.at-ta.fr PERFORATED STEEL PANEL PERFORATED STEEL PANEL PERFORATED STEEL PANEL FLANGE PERFORATED STEEL PANEL FLANGEcontact@at-ta.fr BOX CHANNEL BOX CHANNEL

ROOF EL 7000 MM

185

400

PERFORATED STEEL PANEL

STEEL BEAMS BOX CHANNEL

77

10

108

PANEL ANCHOR

FACADE LED LIGHTING

400

185

200

77

400

108

PANEL ANCHOR

FACADE LED LIGHTING

600

SECTIONAL DETIALS

CLIENT: CITIZEN WATCH CO. BULOVA

CONSTRUCTION: EXPOMOBILIA AG

Florian Faber ffaber@expomobilia.com

217

CONSTRUCTION MANAGEMENT: IXI CO., LTD / IXI S.R.L.

CONSTRUCTION MANA IXI CO., LTD / IXI S.R.L

Rieko Ito ito-r@ixi-jp.com

Rieko Ito ito-r@ixi-jp.com

2193

EXTERIOR

INTERIOR OFFICE

EXTERIOR

Yutaka Endo yu@luftzug.net

3000

3000

3000

INTERIOR OFFICE

INTERIOR OFFICE EXHIBITOR: CITIZEN WATCH CO., LTD.

INTERIOR OFFICE

INTERIOR OFFICE

INTERIOR OFFICE

3400

INTERIOR EXTERIOR OFFICE

EXTERIOR

PRODUCTION MANAGE LUFTZUG CO., LTD. / L

3400

EXTERIOR STADIUM

3000

3000

PRODUCTION MANAGEMENT: LUFTZUG CO., LTD. / LUFTZUG EU

Yutaka Endo yu@luftzug.net

EXTERIOR STADIUM

EXTERIOR STADIUM

EXHIBITOR: CITIZEN WATCH CO., L

Tomoaki Imazeki imazekit@citizen.co.jp

SUSPENDED CEILING

285 72

285 72

02/08/17

SECONDARY STRUCTUREUPDATED PRICING PACKAGE SUSPENDED CEILINGUPDATED PRICING PACKAGE

METAL CHANNEL

METAL CHANNEL

GLAZING METAL CHANNEL

GLAZING METAL CHANNEL

Description:

INITIAL DESIGN SET

INITIAL DESIGN SET

INITIAL DESIGN SET

PRICING PACKAGE

10/08/17

UPDATED PRICING

14/09/17

UPDATED PRICING FACADE MATERIAL ABOVE TUNNEL ENTRANCE

500

264

All ideas, designs, and plans ind are created and owned by Atelie These drawings are created and of ATTA. All ideas, designs and p drawings were created and deve None of such ideas, designs or p whatsoever without written perm

Seal/Signature:

CITIZEN GROUP BASELWORLD Project Number

CH07

Scale

ARCHITECTURAL DETAILS

590

CONSTRUCTION: EXPOMOBILIA AG

93 57

500

Florian Faber ffaber@expomobilia.com

DISPLAY CASE TO BE DEFINED BY AR

ARCHIT DE

500

CONSTRUCTION MANAGEMENT: IXI CO., LTD / IXI S.R.L.

500

DIMENSIONS AND DES DEVELOPED BY ARCH

2 2 1:20 FACADE SECTION DETAIL 1:20 PRODUCTION MANAGEMENT: LUFTZUG CO., LTD. / LUFTZUG EU

FACADE SECTION DETAIL

DETAIL D

4

DISPLAY CASE TO BE DEFINED BY ARCHITECT

Yutaka Endo yu@luftzug.net

DIMENSIONS AND DESIGN TO BE DEVELOPED BY ARCHITECT

Tomoaki Imazeki imazekit@citizen.co.jp

BRIDGE SECTION DETAIL

3 1:20 BRIDGE SECTION DETAIL

1:20

AR

500

1000

1:20

200

AR5-003

1

1:20

20

0

Scale

ORIGINAL SHEET SIZ AXONOMETRIC VIE

Rieko Ito ito-r@ixi-jp.com

707

1 1:20 FACADE SECTION DETAIL

FACADE SECTION DETAIL

CIT Project Number

306

A1

Reviewed Project Name

500

0

PLAN VIEW

707

6 Cité Griset 75011 Paris France www.at-ta.fr contact@at-ta.fr

AS INDICATED

ORIGINAL SHEET SIZE

AXONOMETRIC VIEW OVERALL

Drawn

ARCHITECTS: ATELIER TSUYOSHI TANE ARCHITECTS

211

PT / MN / MB

264

BE

20

57 93

EL 00 MM

93 57

57

15mm GAP

93

BOX CHANEL

PANEL ANCHOR

93 57

GLAZING METAL CHANEL

FACADE LED LIGHTING

15mm GAP

EXTERIOR ENTRANCE TO TUNNEL

CLIENT: CITIZEN WATCH CO. BULOVA

CARPET FLOOR FINISH MATERIALS

200

BOX CHANNEL

GLAZING

BOX CHANEL

DISPLAY CASE TO BE DEFINED BY ARCHITECT

CARPET FLOOR FINISH MATERIALS

EXTERIOR ENTRANCE TO TUNNEL

INTERIOR OFFICE

FACADE MATERIAL ABOVE TUNNEL ENTRANCE

211

METAL CHANNEL

LED STRIP

BOX CHANNEL

METAL CHANEL

PANEL ANCHOR

500

PERFORATED STEEL PANEL FLANGE PERFORATED STEEL PANEL FLANGE METAL CHANNEL METAL CHANNEL 500 BOX CHANNEL BOX CHANNEL GLAZING GLAZING DIMENSIONS ANDDrawn DESIGN TO METAL CHANEL METAL CHANEL BOX CHANEL BOX CHANEL DEVELOPED BY ARCHITECT Reviewed ELEVATED GROUND FLOOR PANEL ANCHOR PANEL ANCHOR EL 15 MM 15mm GAP 15mm GAPProject Name GROUND FLOOR

ATELIER TSUYOSHI TANE ARCHITECTS

143

2800

306 METAL CHANNEL

FACADE LED LIGHTING

All ideas, designs, and plans indicated or represented by these drawings are created and owned by Atelier Tsuyoshi Tane Architects (ATTA). These drawings are created and developed by ATTA and are the property of ATTA. All ideas, designs and plans indicated or represented by these drawings were created and developed for use with the specificed project. INTERIOR None of such ideas, designs or plans shall be used for any purpose OFFICE whatsoever without written permission from ATTA.

Seal/Signature:

0

CARPET FLOOR FINISH MATERIALS

PERFORATED STEEL PANEL FLANGE

EXTERIOR

500

20

CARPET FLOOR FINISH MATERIALS

PERFORATED STEEL PANEL FLANGE

EXTERIOR

INTERIOR RECEPTION

2800

INTERIOR RECEPTION

2800

2650

EXTERIOR

2800

LED

LED STRIP

00/07/17

2800

SECONDARY STRUCTURE

DISPLAY

SD

STEEL BEAMS

PERFORATED STEEL PANEL PANEL ANCHORPRICING PACKAGE

CARPET FLOOR FINISH MATERIALS

SUSPENDED CEILING SECONDARY STRUCTURE

SUSPENDED CEILING

EXTERIOR TUNNEL AT ENTRANCE TO BAR LOUNGE

00/05/17

93

PERFORATED STEEL PANEL PANEL ANCHOR STADIUM LANDING EL 3000 MM SECONDARY STRUCTURE SUSPENDED CEILING

INITIAL DESIGN SET

CARPET FLOOR FINISH MATERIALS

00/04/17

SD

143

SECONDARY STRUCTURE

SUSPENDED CEILING

STEEL BEAMS

Date:

SD

93 57

SECONDARY STRUCTURE

Issue:

93

PANEL ANCHOR

72

PERFORATED STEEL PANEL

PANEL ANCHOR

STEEL BEAMS

285

PERFORATED STEEL PANEL

285 72

PERFORATED STEEL PANEL FLANGE STEEL BEAMS

93

PERFORATED STEEL PANEL FLANGE

CARPET FLOOR FINISH MATERIALS Description:

GLAZING GLAZINGINITIAL DESIGN SET METAL CHANNEL METAL CHANNEL BOX CHANNEL BOX CHANNELINITIAL DESIGN SET PERFORATED STEEL PANEL FLANGE PERFORATED STEEL PANEL FLANGE

FIRST FLOOR EL 3400 MM

93

BOX CHANNEL

285

GLAZING METAL CHANNEL

72

FLOOR FINISH MATERIALS

FLOOR FINISH MATERIALS

BOX CHANNEL

METAL CHANNEL

CARPET FLOOR FINISH MATERIALS

CARPET

CARPET

GLAZING METAL CHANNEL

93

CARPET FLOOR FINISH MATERIALS

Tomoaki Imazeki imazekit@citizen.co.jp

EXHIBITOR: CITIZEN WATCH CO., LTD.

200

356

707

707

2

20

1:100

211

3

707

RECEPTION CITIZEN 18.0 sqm

707

R-227 OFFICE 121 BULOVA 15.9 sqm

R-228 OFFICE 122 BULOVA 22.3 sqm

Project Number

R-226 OFFICE 120 BULOVA 14.5 sqm

Scale

PLAN VIEW

AY0

1:50

356

500

200 200

1:100

DETAIL

1:100

3

2 AY3

50 0

SD

00/05/17

INITIAL DESIGN SET

SD

00/07/17

PRICING Date: Issue:PACKAGE

02/08/17

SD PRICING 00/04/17 UPDATED PACKAGE

10/08/17

SD PRICING 00/05/17 UPDATED PACKAGE

14/09/17

AY4

SD

00/07/17

PRICING PACKAGE

02/08/17

UPDATED PRICING PACKAGE

10/08/17

UPDATED PRICING PACKAGE

14/09/17

EL 770 MM

EL 360 MM

LONGITUDINAL SECTION

BY1

BY0

8000

BY4

BY3

BY2

1

1:100

19000

EL 7000 MM

R-206 OFFICE 106 CHK 17.5 sqm

50 0

R-207 CIRCULATION 102.8 sqm

FIRST FLOOR EL 3400 MM

PLAN VIEW

3

1:50

STADIUM LANDING

DETAILEL PLAN VIEW 3050 MM R-108 OFFICE 005 COA 17.7 sqm

R-101 GALLERY CITIZEN 41.2 sqm

PT / MN / MB

Reviewed

1

Project Name

ELEVATED GROUND FLOOR EL 15 MM

CITIZEN GROUP BASELWORLD

50 0 EL 770 MM

INITIAL DESIGN SET

Drawn

0 50

EL 1314 MM

00/04/17

INITIAL DESIGN SET

EL 360 MM

EL 200 MM

EL 555 MM

EL 200 MM

EL 555 MM

Date:

SD

INITIAL DESIGN SET

50 0

2800

R-130 GALLERY BULOVA 41.2 sqm

EL 770 MM

1

EL 1045 MM

EL 381 MM

0 50

OFFICE 013 CITIZEN STAFF 27.1 sqm

EL 1314 MM

50 0

3000 7000

EL 803 R-125 MM

BY4

EL 1045 MM

EL 1314 MM Issue:

INITIAL DESIGN SET

1

EL 1352 MM

EL 1635 MM

EL 00 MM

EL 381 MM

Seal/Signature:

EL 200 MM

EL 555 MM

EL 803 MM

BY3

BY2

Seal/Signature:

EL 381 MM

EL 200 MM

EL 1045 MM

4

1:100

All ideas, designs, and plans indicated or represented by these drawings are created and owned by Atelier Tsuyoshi Tane Architects (ATTA). These drawings are created and developed by ATTA and are the property of ATTA. All ideas, designs and plans indicated or represented by these drawings were created and developed for use with the specificed project. None of such ideas, designs or plans shall be used for any purpose whatsoever without written permission from ATTA.

0 50

EL 592 MM

EL 1635 MM

EL 15 MM

ROOF

EL 200 MM

0 50

EL 1090 MM

EL 803 MM

IN5-012

EL 1352 MM

All ideas, designs, and plans indicated or represented by these drawings are created and owned by Atelier Tsuyoshi Tane Architects (ATTA). These drawings are created and developed by ATTA and are the property of ATTA. All ideas, designs and plans indicated or represented by these drawings were created and developed for use with the specificed project. None of such ideas, designs or plans shall be used for any purpose whatsoever without written permission from ATTA.

DIMENSIONS AND DESIGN TO BE DEVELOPED BY ARCHITECT

EL 592 MM

EL 420 MM

DETAIL PLAN VIEW BY1

BY0

Description:

INITIAL DESIGN SET

ELEVATED GROUND FLOOR

EL 200 MM

7000

50 0 0 50

EL 1090 MM

EL 855 MM EL 1352 MM

EL 1684 MM

R-222 OFFICE 117 BULOVA 17.5 sqm

R-220 CIRCULATION EL 1684 MM 102.8 sqm

EL 1412 MM

2

DIMENSIONS AND DESIGN TO BE DEVELOPED BY ARCHITECT

EL 420 MM

EL 592 MM

GROUND FLOOR

Tomoaki Imazeki imazekit@citizen.co.jp

19000

EL 855 MM

EL 1090 MM

1

DETAIL AY2

AY1

EL 1412 MM

EL 1684 MM

DIMENSIONS AND STADIUM LANDING 3050 MM DESIGN TOEL BE DEVELOPED BY ARCHITECT

EL 420 MM

R-127 OFFICE 015 BULOVA 21.0 sqm

0 50

356

CONSTRUCTION MANAGEMENT: IXI CO., LTD / IXI S.R.L. PRODUCTION MANAGEMENT: Rieko Ito LUFTZUG CO., LTD. / LUFTZUG EU ito-r@ixi-jp.com Yutaka Endo yu@luftzug.net

Description:

LONGITUDINAL SECTION AY0

R-129 BAR/LOUNGE BULOVA 27.0 sqm

ENLARGED EL 855 MM EL 1412 MM CENTRAL SEATING

EXHIBITOR: CITIZEN WATCH CO., LTD.

DIMENSIONS AND DESIGN TO BE DEVELOPED BY ARCHITECT

FIRST FLOOR EL 3400 MM

R-131 OFFICE 016 BULOVA 17.0 sqm

R-132 RECEPTION BULOVA 18.0 sqm

PRODUCTION MANAGEMENT: 3 LUFTZUG CO., LTD. / LUFTZUG EU EXHIBITOR: 707 Yutaka Endo DISPLAY CASE CITIZEN AY2 AY3 AY4 WATCH CO., LTD. yu@luftzug.net TO BE DEFINED BY ARCHITECT DIMENSIONS AND DESIGN TO BE Tomoaki Imazeki imazekit@citizen.co.jp DEVELOPED BY ARCHITECT

707

A1

1

1000

AY1

CH07

sqm AS 20.4 INDICATED

ORIGINAL SHEET SIZE

CONSTRUCTION MANAGEMENT: IXI CO., LTD / IXI S.R.L.

Rieko Ito ito-r@ixi-jp.com

R-224 OFFICE 118 BULOVA

R-220 CIRCULATION 102.8 sqm

0 50

500

590

1000

DISPLAY CASE TO BE DEFINED BY ARCHITECT

ROOF EL 7000 MM

50 0

590

707

R-102 OFFICE 001 COA 17.0 sqm

PT / MN / MB

7000

7000

2800

20

0

707

R-103 BAR / LOUNGE CITIZEN 32.2 sqm

EL 360 MM 1

0 50

Drawn

PT / MN / MB Project Number

Reviewed

Scale

Project Name

CH07

GROUND FLOOR EL 00 MM

AS INDICATED

ORIGINAL SHEET SIZE

A1

CITIZEN GROUP BASELWORLD Project Number

AY0

AY1

AY2

AY3

Scale

CH07

AY4 AS INDICATED

ENLARGED A1 CENTRAL SEATING ENLARGED

BY0

BY1

BY2

BY3

ORIGINAL SHEET SIZE

STAIR PROFILE NOT ACURATE

1:

Project Name

0 50

R-106 OFFICE 003 COA 14.6 sqm

Florian Faber ffaber@expomobilia.com R-100

200

356 Drawn Reviewed

COMPLETED PHOTO, 2019

CONSTRUCTION: EXPOMOBILIA AG

EL 1635 MM

DETAIL

CITIZEN GROUP BASELWORLD

ARCHITECTS: R-200 ATELIER TSUYOSHI TANE ARCHITECTS OFFICE 101 VIP CONSTRUCTION: 22.3 sqm 6 Cité Griset EXPOMOBILIA AG 75011 Paris France Florian Faber www.at-ta.fr ffaber@expomobilia.com contact@at-ta.fr

COA 15.8 sqm

BY4

19000

50 0

200

COA 14.5 sqm

3

50 0

200 DIMENSIONS AND DESIGN TO BE R-202 R-201 DEVELOPED BY ARCHITECT OFFICE 102 OFFICE 103

R-207 CIRCULATION 102.8 sqm

BY3

BY2

BY1

EL 360 MM

6 Cité Griset 75011 Paris France www.at-ta.fr contact@at-ta.fr

DIMENSIONS AND DES DEVELOPED BY ARCH

3000

264

20 3000

R-204 OFFICE 105 COJ 20.4 sqm

ELARCHITECTS: 1314 MM EL 770 MM ATELIER TSUYOSHI TANE ARCHITECTS

DISPLAY CASE TO BE DEFINED BY AR

1

EL 200 MM

1

500

NTS

EL 555 MM

8000

0 50

500

EL 1045 MM

14/09/17

2800

211

306

500 CLIENT: DISPLAY CASE DIMENSIONS AND DESIGN TO BE CITIZEN WATCH CO. TO BE DEFINED BY ARCHITECT BULOVA DEVELOPED BY ARCHITECT

0

500

BY0 EL 381 MM

EL 803 MM

CLIENT: CITIZEN WATCH CO. BULOVA

10/08/17

UPDATED PRICING PACKAGE

Seal/Signature:

EL 200 MM

1

264

0

20

EL 1352 MM

EL 1635 MM

19000

00/07/17

UPDATED PRICING PACKAGE

3000

AY3

DISPLAY CASE TO BE DEFINED BY ARCHITECT

500

00/05/17 02/08/17

2800

AY2

500

EL 592 MM

0 50

500

SD

PRICING PACKAGE

All ideas, designs, and plans indicated or represented by these drawings are created and owned by Atelier Tsuyoshi Tane Architects (ATTA). These drawings are created and developed by ATTA and are the property of ATTA. All ideas, designs and plans indicated or represented by these drawings were created and developed for use with the specificed project. None of such ideas, designs or plans shall be used for any purpose whatsoever without written permission from ATTA.

50 0

AY1

306

AY0

500

EL 420 MM

0 50

STEP DETAIL

DIMENSIONS AND DESIGN TO BE DEVELOPED BY ARCHITECT

50 0

EL 855 MM

EL 1090 MM

SD

INITIAL DESIGN SET

707

50 0

ATELIER TSUYOSHI TANE ATELIER ARCHITECTS TSUYOSHIAY4 TANE AXONOMETRIC VIEW OVERALL ARCHITECTS EL 1412 MM

INITIAL DESIGN SET

Date: 00/04/17

500

DETAIL PLAN VIEW

EL 1684 MM

SD

1000

DETAIL

INITIAL DESIGN SET

590

1

NTS

0

AXONOMETRIC VIEW OVERALL

707

Issue:

Description:

STAIR PROFILE NOT ACURATE

BY4

14

1:


PROFESSIONAL

8. RR DONNELLEY SHANGHAI OFFICE Interior design of young and creative working place

Project Description: RR DONNELLEY is the headquarters of an American printing company in China. This project is a competation. The employees of the company are mostly young people. So the clients hope that the working space is young, active and modern environment. Clients request the working space fits 258 people, the proposal provide 278 seats base on different positions. Responsibility in Project: The team for this project consists of 3 interior designers. I was very involved in this project from the competation to final completion of the construction. I was in charge of creating common area in working space, including case study, partal visualization, construction drawings. I have followed this project till the construction completed. During the construction, I need to directly speak with the construction workers to solve urgent problems at the construction site at any time. Project type: Location: Year of work: Total area: Professional field:

Office Interior Design 222 Hubin Rd, Lu Wan Qu, Shanghai, China 2013 841.3 sqm Interior Design

Lift stop

No stop

No stop

Lift stop

PERSPECTIVES

31F Open meeting space

15

32F Meeting room

31F Reception area


PROFESSIONAL

PRINTING SPACE

INTERIOR PROJECT

TEA LEISURE AREA

34 F PLAN

The printing area needs good ventilation requirements, because the ink smell and heat of the machine.

• •

The setting of tea leisure area needs to be considered to facilitate the concentrated use of the crowd. Cleaning and drinking systems need to be considered in the area.

PUBLIC GREEN • •

•

LOCKER ROOM

If green plants are installed on the wall, nutrient supply equipment can be considered. Green plants are placed in the vacant area near the window in the large office area, which is convenient for maintenance and management. The personal office area and the open display area are interspersed with small potted plants.

MEETING ROOM

•

• Locker rooms on each floor near the entrance.

FURNITURE SELECTION

33 F PLAN

The meeting room is an important area of the office space. It is relatively scattered in each building, which is beneficial to the use of each department. Small chatting room with meeting and negotiation functions at the same time.

32 F PLAN

31F Bookcase Elevation

31 F PLAN

Office Desk YRJO KUKKAPURO‘s design, 1960-1988

Meeting table set

PERSPECTIVE

34F Manager A room

EV ONLY STOPS AT 31F

34F Manager B room

Spiral staircase from 31F to 34F

16


ACADEMIC

9. PROLIFERATING DROSSCAPE Evaluating Land Waste Within Central Manchester

This study is to propose the existence of wastelands to the masses. Wasteland may sound negative, but they also have values. I cannot say if the wasteland is right or wrong, because it has a reason for existence. Moreover, everyone understands wasteland differently: residents might say, I do not feel these abandoned landscapes have any impact on my life. Tourists might say, I like these abandoned landscapes, they have character, and they represent the city. Architects and planners might say, these vacant lots need to be remodelled to be more aesthetically pleasing. Geographers might say, these abandoned landscapes should be returned to nature. This research provides a profile for these diverse role populations and also lays the groundwork for future research. Project type: Location: Year of work: Professional field:

Dissertation research Manchester, United Kingdom 2021 Urbanism Research

Mapping GM

Applying Berger’s methodology to the wasteland in Great Manchester by using Google Earth to locate the site of wasteland (See Map above). What kind of land is selected in Map? The selection of locations is a large area of vacant parking lots, brownfields, landfills, trash dumping grounds, circular plan sewage plants or chemical plants (abandoned factory will not show company name on Google map), concrete vacant lots, etc.

Mapping GM is a useful resource site that is provided by the authority. This site provides an approximate map of the landfill.

17

This List contains 31 books which include the previous paragraphs of six key literatures. The rest of literatures are not additional literatures, but must-read literature before starting the research.


ACADEMIC

OUTCOMES The conclusion answers the questions below: • Does Berger’s methodology applicable for Manchester? • What is the attitude when facing the proliferating Drosscapes? • How should we deal with the ‘Degree of Intervention’? • What is the value of wasteland?

RESEARCH PROJECT If you would like to know the conclusion, and interested in the whole paper, please visit this link: https://issuu.com/mengyichen0504/docs/proliferating_drosscape_yichenmeng

FIELDWORK PHOTOGRAPH

18


ACADEMIC

10. SOUND MUSEUM Exploring the local culture through daily urban music

The highlight of this project is the transformation of the invisible into the tangible. The concept of the project is to show the cultural background of Japan being brought to life by collecting the urban music of the Taito district of Tokyo. This culture is not about the worldly wellknown part of Japan, it is about the true natural condition of how human and non-human life in this megacity. This project is emphasising the flexibility of using natural lights in space. The Sound Art Museum needs to consider the overall visual and auditory experience of the visitors, so according to the needs of the exhibits, the atmosphere created by the soundproof walls and light will have an important impact on the space. Project type: Location: Year of work: Area: Professional field:

Special-purpose, cultural building 1-3-4 Yanaka, Taito City, Tokyo 110-0001, Japan 2018 2332 sqm Architecture

SOUND GEOMETRY FORMATION

CIRCULATION DIAGRAM

PEOPLE

19

NATURE

TRAFFIC

TRANSPORTATION COLLECTIVES

CONSTRUCTION

VOLUMN STUDY


ACADEMIC

ARCHITECTURE DESIGN PROJECT GF PLAN

1F PLAN

SITE PLAN

4F PLAN

5F PLAN

SECTIONAL DETAIL Stainless AC outlet t=9

L angle steel 100×100 t=9

Channel Steel 150×75 t=12 Auto-Roll Screen Box h=200

1,000

FLOOR FINISH: Beige Carpet t=15 Flat Bar t=16

CH=4,000 5,000

Channel Steel 100×75 t=12

B-600×400

FACADE FINISH: Black Steel H5000×W2000 t=16

Channel Steel 100×75 t=12

Steel cover white SOP t=2.3

CEILING FINISH: PB borad 12.5+12.5

SECTION PERSPECTIVE

Channel Steel 150×75 t=12

Special exhibit rm: CH=20m

Black Steel H5000×W2000

Carpet Insulated Window Glass Pair H5000×W2000

Concrete slab

Foyer/corridor/ waiting area: CH=10m

AC outlet Wood floor

Lecture rm: Storage: CH=4.5m CH=3m

Staff locker/ resting rm: CH=2.8m

Smocking rm: CH=2.8m

Exhibit rm: CH=2.8m

L angle steel 250×250 t=12

Corridor: CH=3.5m Hall/central stairs: CH=20m

Terrace: CH=2.5m Terrace: CH=2.5m Exhibit rm: CH=4m

Exhibit rm: CH=3.5m

Archive exhibit rm: CH=6.5m

Exhibit rm: CH=5m Exhibit rm: CH=4m

PB board

Tickets/admin

Store/library: CH=3m

PATTERN STUDY

Take a mount of sand placed on the vibrator, different wave bands make the sand shows in different pattern. 4 different patterns as on the left figure.

440Hz

2400Hz

880Hz

4000Hz

20


ACADEMIC

11. GINZA GREEN TOWER Sustainable Mixed-use commercial office building

This project aims to respond the environmental and finacial concern in Ginza district. Ginza district is famours for shopping high-end brand and designer products. Many leading fashion houses’ flagship stores are located here, in the area with the highest concentration of Western shops in Tokyo. The financial strategy is aimed at the fact that the retail operating income is still on a downward trend from 2016 to 2018 while accounting for 48.1% of the total number of tourists. Environmental strategy is where commercial buildings are concentrated, the greening rate is relatively low, but it is possible that green space is being developed using the roof of the facility in Ginza. Project type: Location: Year of work: Area: Professional field:

Commercial office building 5-3-1 Ginza, Chuo City, Tokyo 2017 36,857.56 sqm Architecture

EXSITING BUILDING IN SERVICE FROM 9TH AUG 2018 This park was built after demolishing the above-ground floors of the old Sony Building which long served as a landmark of Ginza Sukiyabashi intersection. Connecting to the subway concourse and Nishi-Ginza parking lot underground. The Olympics coming up, Tokyo is going through a major redevelopment stage, this Park will be temporarily in use for a few years. CIRCULATION

Cafe

Library

Bar

Theater

Traditional mall

OFFICE

SHOPS

21

Developed mall

OFFICE

SHOP

SHOP

Retail BAR

CAFE


ACADEMIC

ARCHITECTURE DESIGN PROJECT DIAGRAM OF EXPLAINING THE INCREASE AREA OF FACADE Advantages: By increases the exposing area can helps shop to appear more at [the front zone].Shops can be easily seen from streets. Disadvantages: Building shape coefficient the higher, the bigger heating/ cooling load. It can cost more energy.

Building shape coefficient(S) =

x2

x2.5x

3

Building exterior area Built Volume

*Under constant volume

S=1

SITE PLAN

S=1.25

S=1.5

S=1.75

ISOMETRIC PERSPECTIVE

ISOMETRIC PLAN

10F PLAN

11F -15FPLAN

5F PLAN

6F-9F PLAN

GF PLAN

1F-3F PLAN

Benifits of upper park • Plants act as rainwater buffers. • Plants reduce roof temperature, reducing energy usage. • Plants add value to the facility.

PERSPECTIVE

22


ACADEMIC

12. FLOATING HIGH ROAD Rejuvenate and bring back the bustling Jinling Road

Jinlin East Road covers an area of 0.75 square kilometers. There are more than 29,300 households with a population of 82,200 people. The most of the roads in the territory were built in the middle and late 19th century. Since then, the French Concession filled Zhoujing and built Minti Niyin Road (now Tibet South Road) in the twenty-sixth year of Guangxu in the Qing Dynasty (1900). Culture, education, health and other undertakings in the territory developed rapidly. The residents living on Jinling East Road are mostly old-schoolpeople in Shanghai. Because of the development of the Nanjing economic circle in the north, the south has gradually lost its former vitality. The purpose of this project is to establish rejuvenate the economic development. A smart mobile applets is designed to make more convenient for local residents. Project type: Location: Year of work: Area: Professional field:

Re-design the Junlin Road area Jinling east road, Huangpu district, Shanghai, China 2012, 2020 Masterplaning

THE BOND, SHANGHAI, 1933

Early 1856

Mr. HEMA APPLICATION

23

2013

21st January, 1908

24th November, 1974

CONVEYOR SYSTEM

May 1998

2015 Untill now

SECTION


ACADEMIC

PLANNING PROJECT 2ND LEVEL PERSPECTIVES

GRROUND LEVEL PERSPECTIVES

The second level is a landscape Skylight is a natural lighting system for the 1st floor

Bus is the central transportation in this project. It conects Ground level and 1st level. It is also act as a sightseeing transportation and restaurant.

The first level is a pedestrian street, in addition to the shops on both sides, there are also food stalls on the street

Conveyor is an auto-delivery system for transporting the product that customer odders.

24


ACADEMIC

13. SPIRAL STAIRS SHAREDHOMES Design on limited space in Central Tokyo

This is a residential housing project near Hongo-sanchome metro ststion. This neighbourhood is fairly expensive due to its predominant location. This zone is more of mixed-use of conmmercial and residential area. The concept of the SPIRAL STAIRS SHAREDHOMES is to break the traditional room relations fuzz the space of ‘in’ and ‘out’. Recording the local building code law, ‘one half or more of the circumference effectively open to the outside air can be treated as an outdoor staircase.’ Combining the indoor area and outdoor area by using staircase, also adding more greeness at thevertical vision. Using the limited space smartly creating a high qulitly housing complex. Project type: Location: Year of work: Total area: Professional field:

Six stories residentail housing 2-27-6 Hongo, Bunkto City, Tokyo 2016 285 sqm Architecture

SELECTED FLOOR PLAN

GF Plan

1F Plan

2F Plan

ELEVATIONS S=1:300

SOUTH ELEVATION

25

EAST ELEVATION

NORTH ELEVATION

WEST ELEVATION


ACADEMIC

RESIDENTIAL PROJECT CIRCULATION

STRUCTURE

VOLUME

Guest room

EV Stairs

Public space Reception

ELEMENTS DIAGRAM

NORTH SECTION

Corridor

PHYSICAL MODEL S=1:50

Entrance

Building body

2nd FLOOR INTERIOR ISOMETRIC Opening

A’

B’

D

D’

C

Vegetation

C’ A

B

Floor Plan

A-A’ section

C-C’ section

B-B’ section

D-D’ section

26


ACADEMIC

14. THREE FANS KINDERGARTEN Educational building

The entire kindergarden builds with three pieces. Each section is a fan shape , and gathers created a central garden in the middle. The connect point of three curves (fan) which are the openning spots in this building. These opennings helps the air floats, also are the entrance for teachers and children. The venue is located in a more prosperous area of Chuo District in Tokyo. There are many vehicles and pedestrians around. Three fans wrap inward to form a central garden, where children are mainly active inside, isolated from the outside noise.

Project type: Location: Year of work: Total area: Professional field:

SITE PLAN

Education 2-3-11 Nishikanda, Chiyoda City, Tokyo, Japan 2017 1456.8 sqm Architecture

GF PLAN

1F PLAN

Entrance

27

ROOF PLAN


PERSPECTIVE

VOLUMN STUDY

ACADEMIC

PROGRAMME DIAGRAM

A: Play room, Reading room B: Class room, Reception, Resting room C: Kitchen, office North and west sides opens to streets. give some rooms between the building and streets.

CH: 6170 CH: 5420

CH: 3930 Empty the middle space, create three volumaes which separate the open streets.

Structure

Corridor Garden

Makes three openning, create air-circulation.

Entrance view

Staff entry Red volume is the tallest which blocks the street behind.blue and yellow are gradually lower, because the south gets more sun light into the buildings.

Reasting room interior view

Main entrance (students)

SECTIONS

Corridor

GF: Play room

Corridor

GF: Class room | 1F: Reasting room

Corridor

GF: Resting room

GF: Reception

Corridor

GF: Locker room

Corridor

Street

Corridor

GF: Kitchen | 1F: Office

Street

Corridor

GF: Kitchen | 1F: Foyer

Corridor

GF: Class room | 1F: Reasting room

Street

Corridor

GF: Clinic | 1F: Flexible room

28


PROFESSIONAL

15. APPENDIX Capture of projects

Hamlet Golf Centre / Professional

Kiqijoji office / Professional

Roppongi Mall / Professional

Oita Airport / Professional

Mifune housing / Professional Muji Hut / Professional

Fukushiki installation / Professional


ACADEMIC

Wenbo Tea house / Professional

Taiping office / Professional

Hawaii housing / Professional

3 Generation community / Academic

Bamboo Gallery / Academic

Helix Gallery / Academic

Bike shop + housing / Academic


+44(0)7926559916 mengyichen54@gmail.com vk_meng vk.meng https://www.linkedin.com/in/vicky-meng-322aa1a5/ https://issuu.com/mengyichen0504/docs


Turn static files into dynamic content formats.

Create a flipbook
Architecture portfolio, 2022 by Vicky M - Issuu