I am Mehak Chhabra, and I have studied architecture from MBS School of Planning and Architecture a liated to Guru Gobin Singh Indraprastha University. During my time there, I have worked on multiple individual and group projects honing my artistic abilities.
Studying architecture has taught me to visulise spaces in 3D and understand the dimensional properties of the objects surrounding us.
-- Selected Works -Hello!
I am an imaginative, driven and hard working individual who is passionate about design and the impact it has on an individual.
Architect
PROFESSIONAL PROFILE
A meticulous and organised individual with a strong ability to handle complex projects. Innovative, creative, and willing to contribute ideas and learn new things. A curious mind with the capability to grasp new ideas with ease.
WORK EXPERIENCE ACHIEVEMENTS
Design Intern (July, 2022 - May, 2023)
Space Matrix
1. Day 2 works for Nestle and SHL.
2. Design for Julius Baer.
3. 3D Visuals, drawing, planning, design, pitch presentations.
Architecture Intern (July, 2021 - October, 2021)
1. Master Planning, project proposal and 3D visualisation.
Journalism Intern (October, 2019 - February, 2020)
1. Well researched content writing for websites.
EDUCATION CONTACT
Bachelor of Architecture (2018-2023)
Don Bosco Sr. Sec. School (2016-2018)
Ashok Hall Girls’ Residential School (2014-2016)
Call for Ideas
Liveable Leh: shortlisted amongst top 9 entries
DesignAddvance
Particpated in Liveable spaces for Nowhere People
IJRASET Journal
Published a research paper
SKILLS
Autocad
Photoshop
Illustrator
Sketchup
Vray
Enscape
Revit
Mehak Chhabra
+91 8630726638 mehakchhabra2506@gmail.com Rudrapur, Uttarakhand
01 Julius Baer
Interior Design/Design Thinking/Julius Baer (July 2022-January 2023)
Design Brief for Interior Design: The o ce of Julius Baer should be a space reminiscent of their legacy. Creation of two zones: Client Zone and Employee zone. The client zone is a formal space wheras employee zone subtly informal with a pop of color.
Carpet Area: 7500 sqft.
Axonometric View
Zoning
COPYRIGHT © SPACE M
01 Julius Baer Planning
Site Understanding
Zone
Zone 01 Julius Baer
Client
Employee
erns Tran sition Vi br a nt | B i ophi l i c | D yna mi c | N a t u r a l Tones Warmth Vibrant | Biophilic | Natural | Dynamic Warm Tones Transition Pattern Moodboard 01 Julius Baer
02 Now-Here People
Architecture/Competition/Nowhere People (June 2021)
Design Brief for Planning: Group Housig for Migrant workers. Due to Covid a lot of migrant workers were left homeless without any mode to return to their homes. The motive of the competition was to plan a space where these people can live and think of them as Now-Here instead of Nowhere People.
Zoning
Honeycomb Structure
VEHICULAR MOVEMEN T HOUSING HOUSING SCHOOL COMMUNITY HALL VENDOR’s PLAZA HOUSING HOUSING PEDESTRIAN MOVEMEN T
People
Movement Planning
Hierarchy of Spaces 02 Now-Here
02 Now-Here People
HOUSING UNITS
3 DWELLING UNITS
2BHK AND 3BHK TYPE ARE PROVIDED
Idea is to create a cluster by simple stacking of efficiently designed hexagonal blocks. The shape of the module helps in space optimization. Moreover, dwellings are designed according to the human comfort Spatial arrangement is from public to private spaces.
6460 6460 TOILET 1235x1710 TOILET 1235x1710 TOILET 1235x1710 TOILET BEDROOM BEDROOM 2945 x3950 KITCHEN LIVING ROOM 5395 x4160 DINING AREA WASH AREA BEDROOM BEDROOM 2945 x3950 DINING AREA KITCHEN 2335 x4160 LIVING ROOM 5395 x4160 STEPS: 22 STEPS:22WIDTH:1500 TREAD:300 RISER:150 UP 3 8 18 20 2 3 5 6 9 10 12 11 13 14 16 17 18 19 20 21 22 15 ENTRYTOTHE GROUNDFLOOR LVL+600 ENTRY TO THE DWELLING UNIT
DINING AREA LIVING ROOM KITCHEN BEDROOM BEDROOM DINING AREA LIVING ROOM KITCHEN BEDROOM BEDROOM TOILET STAIRCASE FOR VERTICAL CIRCULATION WASH AREA ENTRY TO DWELLING ENTRY TO THE BLOCK VIEW A A A PLAN 2BHK UNIT 1 WASH AREA SCALE 1:125
02 Now-Here
7185 12115 14635 12115 DINING AREA KITCHEN LIVING ROOM BEDROOM BEDROOM TOILET 2335 x4160 ENTRY TO THE DWELLING UNIT ENTRY TO THE DWELLING UNIT DINING AREA KITCHEN BEDROOM x3960 2335TOILET x4160 4 5 13 14 15 16 20 STEPS: 22 ENTRY TO THE GROUND FLOOR LVL+600 LIVING ROOM BEDROOM x3960 TOILET 2335 x4160
B STAIRCASE FOR VERTICAL CIRCULATION B PLAN 2BHK UNIT 2 B LIVING ROOM ENTRY TO THE BLOCK ENTRY TO DWELLING DINING AREA BEDROOM BEDROOM TOILET TOILET COURTYARD KITCHEN
2BHK UNIT 1 TOILET TERRACE/ COURTYARD TERRACE/ COURTYARD SCALE 1:125
People
VIEW
MODEL
02 Now-Here
BEDROOM BEDROOM 3000 x3960 DINING AREA KITCHEN LIVING ROOM ENTRYTOTHE DWELLINGUNIT GROUNDENTRYTOTHE FLOOR LVL+600 VIEW C C STAIRCASE FOR VERTICAL PLAN 3 BHK UNIT 3 TERRACE/ COURTYARD TOILET SCALE 1:125 SPACE PERMISSIBLE WIDTH HEIGHT AREA (IN SQ M ) WIDTH HEIGH Habitable Room 2500 2750 9 3000-4000 3150 Kitchen 1500 2600 3 3SQ M 2335 3150 Toilet 1000 2200 1 8SQ M 1235-2335 2850 TYPE OF UNITS UNIT 1: 2 BHK UNIT 2: 2 BHK UNIT 3: 3 BHK TOTAL
People
ELEVATION A ELEVATION B ELEVATION C Vendor’s Plaza Walkway Pavillion Pavillion Pavillion Terrace Terrace Terrace Vendor’s Plaza Terrace Dwelling unit Dwelling unit Terrace Jaali for Jaali for staircase Jaali for staircase Jaali for staircase Jaali for staircase Jaali for staircase Jaali for staircase X Y Dwelling unit Dwelling unit 1 2’ 1’ 2 SECTION 1-1’ 02 Now-Here People Site Plan
People
Views
VIEW A: VENDOR’s PLAZA
Shopping arena provided as an opportunity for the vendors to set up their shops
W B: WALKWAY
Curved wooden walkway in the form of bands creates a sense of openness upon the entrance
W C: COURTYARD
The centrally placed courtyard acts as the focal point creating a pleasant view for the dwellers and encourages social and environmental interaction
The terraces on uper levels bridge the gap between built and unbuilt and form a connectivity loop.
VIEW E: TERRACE
3D
Visual 02 Now-Here
Interior Design/Planning/Nestlé (July 2022)
Design Brief for Planning: Nestle’s workplace moved towards the hybrid way of working. The zoning for di erent activities was uidic in nature. Created destinations with the principle of 4C's i.e Concentrate, Contemplate, Collaborate & Communicate to translate the brands in the various spaces.
Area: 1,07,482sqft.
03 Nestlé
Zoning
Ground Floor
First Floor
03 Nestle
Second Floor
Fourth Floor
Third Floor
03 Nestle
03
Nestlé Business Garden Concept Moodboard
Reception (Contours)
03 Nestlé Themed
Breakout Areas
03 Nestlé
Artwork
Branding
Reception Table
03 Nestle SCALE: 01 PLAN 1:10 SCALE: 03 FRON ELEVATION 1:10 FRONT ELEVATION WITH GRID MARKING SCALE: 04 SECTION 1:10 SCALE: 05 SECTION 1:10 SCALE: 02 GRID MARKING PLAN 1:10 200 200 04 05 2000 300 TABLE TOP FORMED OUT OF 20MM THK. PLY FINISHED WITH 4MM THK. VENEER AS/APPD. TABLE FRONT & SIDE FORMED OUT OF 12MM THK. FLEXIBLE PLY FINISHED WITH 4MM THK. VENEER AS/APPROVED 1050 3200 300 1200 350 1200 500 350 3200 750 1050 13 B1-I7006-D 350 50 15 AS/ GRID MARKING 750 1050 290 150 290 150 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 435 435 85 95 150 175 95 40 170 155 150 1050 155 170 200 200 40 95 175 150 95 90 60 60 60 85 150 150 85 60 300 300 260 350 50 15 750 1050 500 300 FABRIC CLADDING AS/APPD. TOP FORMED OUT OF 20MM THK. PLY FINISHED WITH 4MM THK. VENEER AS/APPD. COUNTER FINISHED WITH VENEER AS/APPD. TABLE TOP FORMED OUT OF 20MM THK. PLY FINISHED WITH 4MM THK. VENEER AS/APPROVED 20MM THK. PLY FINISHED WITH LAMINATE AS/APPD. SURFACE FORMED OUT OF 12MM THK. FLEXI PLY FINISHED WITH 4MM THK. VENEER AS/APPD. WOODEN SUPPORTS AS/REQUIRED WOODEN WITH POLISH MATCH TO VENEER WITH 4MM GROOVE AS/APPROVED 50X50MM WOODEN FRAMING AS/REQUIRED WOODEN WITH POLISH MATCH TO VENEER WITH 4MM GROOVE AS/APPROVED FINISH WITH LAMINATE AS/APPROVED CABLE MANAGER AS/APPD. 1600 1600 520 TABLE TOP FORMED OUT OF 20MM THK. PLY FINISHED WITH 4MM THK. VENEER AS/APPROVED 20MM THK. PLY FINISHED WITH LAMINATE AS/APPD. SURFACE FORMED OUT OF 12MM THK. FLEXI PLY FINISHED WITH 4MM THK. VENEER AS/APPD. WOODEN SUPPORTS AS/REQUIRED WOODEN WITH POLISH MATCH TO VENEER WITH 4MM GROOVE AS/APPROVED FINISH WITH LAMINATE AS/APPROVED AS/GRID MARKING TABLE TOP FORMED OUT OF 20MM THK. PLY FINISHED WITH 4MM THK. VENEER AS/APPROVED WOODEN WITH POLISH MATCH TO VENEER WITH 4MM GROOVE AS/APPROVED Transition Counter Top + 1050 Table Top + 750 R25 06 06 07 SKIRTING FINISHED WITH VENEER AS/APPROVED SKIRTING FINISHED WITH VENEER AS/APPROVED 500 550 200 300 620 R770 SCALE: 06 DETAIL 1:01 TOP EDGE 4 4 4 4 R25 25 35 4MM THK VENEER 12MM THK. FLEXIBLE PLY WOODEN SUPPORT 50 50 20 4 12 4 WOODEN WITH POLISH MATCH TO VENEER 4X4MM GROOVE WITH POLISH MATCH TO VENEER 4X4MM GROOVE WITH POLISH MATCH TO VENEER 4 MM THK VENEER 20MM THK PLY SCALE: 07 REAR ELEVATION 1:10 550 EQ EQ COUNTER FORMED OUT OF 20MM THK. PLY FINISHED WITH 4MM THK. VENEER AS/APPROVED FABRIC CLADDING AS APPD. IN SIDE FINISHED WITH LAMINATE AS/APPD. FABRIC CLADDING AS APPD. DATA & POWER POINT AS PER REQUIREMENT PEDESTAL UNIT FORMED OUT OF 20MM THK PLY FINISHED WITH LAMINATE & 2~3 MM THK MATCHING PVC EDGE BANDING OUT SIDE SURFACE FORMED OUT OF 12MM THK. FLEXI PLY FINISHED WITH 4MM THK. VENEER AS/APPD. TOP FINISHED WITH VENEER AS/APPD. TABLE TOP FORMED OUT OF 20MM THK. PLY FINISHED WITH 4MM THK. VENEER AS/APPROVED 750 300 1050 675 620 C DATE REV CLIENT : DRAWN BY: DATE: DRAWING PROJECT NO: PURPOSE : PLOT DATE: FILE: TITLE : Space SINGAPORE PLUMBING CONSULTANT HVAC CONSULTANT PM CONSULTANT RECEPTION GROUND B1-I-7041 19.09.2022 MEHAK R0 14.01.2022 R1 19.09.2022 Mehak Chhabra 17-01-2023 C:\Users\mehak.chhabra\Downloads\recption table_nestle_05012023.dwg PROPOSED Nestlé DLF Gurgaon GROUND FLOOR, 21-DL0003 NOTES: 01) ALL DIMENSIONS 02) PLEASE ONLY. 03) PLEASE 04) CONTRACTOR APPROVAL CONSTRUCTION 05) CONTRACTOR THIS DRAWING, SYMBOL CG-01 PT-01 PT-03 EP-01 WB-01 LM-01 WD-01 SK-01
04 SHL REVISION NOTE REV NO: CHECKED BY: SCALE: Design Consultants Pvt Ltd BANGALORE DELHI PUNE MUMBAI HYDERABAD KOLKATA CHENNAI www.spacematrix.com ENGINEERING SERVICES CLUB DRIVE ROAD, MG ROAD, GHITORNI, DELHI-100030, PHONE: 011-26503018; FAX-26503019 zsa.phe.services@gmail.com; zulfi_sb@yahoo.co.in ELECTRO CONSULTANTS A-222,SHIVALIK, MALVIYA NAGAR, DELHI. PHONE: +91 11 26684140 CUSHMAN & WAKEFIELD GURGAON FLOOR, BUILDING 8, TOWER C DLF CYBER GURGAON, HARYANA 122002. 124 4695555 THERMAL FACTOR NO-210 VIPUL BUSINESS PARK, SOHNA ROAD, GURGAON-122001(HARYANA) Tel : 0124 4521885 E Mail : thermal_factor@yahoo.com guptadc02@rediffmail.com DETAIL B1-I-7041 R1 AS SHOWN RB ISSUED FOR CONSTRUCTION REVIDED TABLE DETAIL OFFICE FOR Jacaranda Marg M Block II, National Highway 8 122002 BLOCK B, SECTOR-53 A, GOLF COURSE ROAD, HARYANA 122002, TEL:+91 12449 08230
of the new headquarters of the talent acquistion compay SHL. The oorplate is divided by a central core creating two di erent working zones.
Zoning Space Planning Interior Design/Design Thinking(November 2022) Design
04
LIFT LIFT S. LIFT S. LIFT SHAFT LIFT SHAFT L.V. SHAFT ELEC. SHAFT F.H.C. FOR FUTURE SPARE SHAFT FOR FUTURE SPARE SHAFT LIFT LIFT LIFT LIFT LIFT LIFT SERVER REPRO REPRO ACD UP FIRE CURTAIN UP FFL ± 0000 RFL +300MM FFL ± 0000 FFL ± 0000 RFL +300MM UPS-02 Tier servers Column Rack Network Rack ISP-02 UPS-01 DASHBOARD 1 ACD GREEN WALL DASHBOARD 3 DASHBOARD 2 VIDEO WALL DB DB DB STORAGE F02-REC-01 F02-4MT-01 4 PAX MEETING RM F02-4MT-02 4 PAX MEETING RM F02-3MT-01 3 PAX MEETING RM F02-6MT-01 F02-6MT-02 F02-6MT-03 F02-6MT-04 6 PAX MEETING RM F02-6MT-05 F02-10MT-01 F02-2PB-01 PHONE BOOTH F02-2PB-02 PHONE BOOTH F02-1PB-01 F02-1PB-02 PHONE BOOTH F02-1PB-03 PHONE BOOTH F02-1PB-05 PHONE BOOTH F02-1PB-04 PHONE BOOTH F02-STO-01 STORE F02-MAIL-01 MAIL + SECURITY F02-MED-01 PRAYER ROOM/ MEDITATION F02-1PB-10 F02-1PB-09 PHONE BOOTH F02-1PB-08 F02-1PB-07 F02-1PB-06 PHONE BOOTH F02-1PB-11 PHONE BOOTH F02-CAF-01 CAFETERIA F02-TUC-01 TUCK SHOP F02-PAN-01 PANTRY F02-VIR-01 F02-SER-01 F02-DIS-01 DISHWASHING F02-WEL-01 WELLNESS ROOM F02-REP-01 F02-REP-02 REPRO F02-REP-03 F02-BRE-01 BREAK OUT SPACE F02-FAC-01 FACILITY STORE F02-LT-01 F02-LT-02 LADIES TOILET F02-LT-03 LADIES TOILET F02-GT-01 GENTS TOILET F02-GT-02 GENTS TOILET F02-GT-03 GENTS TOILET F02-HT-01 HANDICAP TOILET F02-WCAF-01 WORK CAFE JC JC UP TV F02-LOU-01 JOINT FIXED SCREEN 6 F02-2MT-01 2 PAX MTG RM F02-BOA-01 JOINT FIXED SCREEN 1 JOINT FIXED SCREEN 2 FIXED SINGLE SCREEN FIXED SINGLE SCREEN JOINT FIXED SCREEN JOINT FIXED SCREEN 3 JOINT FIXED SCREEN FIXED SINGLE SCREEN FIXED SINGLE SCREEN FIXED SINGLE SCREEN FIXED SINGLE SCREEN F02-6MT-06 F02-6MT-07 6 PAX MEETING RM F02-10TR-01 F02-INN-01 F02-10TR-02 10 PAX TRAINING RM F02-IT-01 F02-FIN-01 F02-1PB-13 PHONE BOOTH PLOT DATE: FILE: Mehak Chhabra 17-01-2023 Z:\Shared\Space Matrix\SMDC India\SMDC GGN\Workplace\Jobs\22-DL0008_SHL, Gurugram\Studio\Interiors\50 Construction\B1 Blockna me\10 Sheet Files\2 Plans\New folder\Drawings\01-plans\as build\b1-i-21f02_second floor layout wellness room update.dwg
SHL Layout Plan
04 SHL Partition Marking Plan REVISION NOTE REV NO: CHECKED BY: SCALE: Matrix Design Consultants Pvt Ltd SYDNEY BANGKOK BANGALORE DELHI PUNE MUMBAI HYDERABAD KOLKATA CHENNAI ..\shl_logo.jpg INTERIOR LAYOUT PLAN FLOOR B1-I-21F02 R3 05.10.2022 1:100 FLOOR, PEGASUS ONE, BLOCK B, SECTOR-53 A, GOLF COURSE ROAD, GURUGRAM HARYANA 122002, TEL:+91 12449 08230 18-DL0006 CONSULTANT ZSA ENGINEERING SERVICES 8, CLUB DRIVE ROAD, MG ROAD, GHITORNI, NEW DELHI-100030, PHONE: 011-26503018; FAX-26503019 Email: zsa.phe.services@gmail.com; zulfi_sb@yahoo.co.in ELECTRO CONSULTANTS A-222,SHIVALIK, MALVIYA NAGAR, NEW DELHI. PHONE: +91 11 26684140 FAX: CONSULTANT THERMAL FACTOR UNIT NO-210 VIPUL BUSINESS PARK, SOHNA ROAD, SECTOR-48 GURUGRAM - 122004 (HARYANA) Tel : 0124 4521885 E MAIL thermal_factor@yahoo.com CONSULTANT SHL INFINITY TOWER-TOWER C, 2ND FLOOR, CITY, DLF PHASE 2, SECTOR 24, GURUGRAM, HARYANA 122002 DIMENSIONS ARE IN MM UNLESS SPECIFIED. REFER THIS DRAWING FOR INTERIOR LAYOUT ONLY. REFER ALL DRAWINGS MENTIONED IN THIS CONTRACTOR TO CONSTRUCT SUPPLY MOCKUP / SAMPLE & APPROVAL FROM THE CLIENTS & ARCHITECTS GYPSUM PARTITION GLASS PARTITION BLOCK MASONARY WALL BUILD 07.04.2022 ISSUED FOR CONSTRUCTION 20.04.2022 REVISED SEE CLOUDED AREA 17.05.2022 REVISED SEE CLOUDED AREA LIFT LIFT S. LIFT S. LIFT SHAFT LIFT SHAFT LIFT L.V. SHAFT ELEC. SHAFT F.H.C. FOR FUTURE SPARE SHAFT PLUM. FOR FUTURE SPARE SHAFT SHAFT PLUM. LIFT LIFT LIFT LIFT LIFT LIFT FIRE CURTAIN P1 P1A P3B P3A P3B P3A P3A P3B P1 P1 P3A P1 P1A P1A BW1 P1B P1B P1A P3A P3B P1A P1B P1A P1 P3A P1A P1B P3A P3A P3A P1 P3A P3A P3A P3A P3A P3A P3A P3A P4A P1 P1 P3A P3A P3A P3A P1 P3B P3A P3B P3A P3A P3A P1 P1 P1 P1A P1 P3A P3A P1 P1A P1 P1A P1A P1 BW1 P1A P1A P1A P1A P3A P3A P3A P1 P1 P3A P3A P3A P3A P3A P3A P3A P3A P3A P3A P3A P3A P3A P3A P3A P1A P1 P1B P1A P1A P1B P1 P1 P1B P1B P3A P3A P3A P3A P2A P2 P1A P2 P2 P2 P2 P1 P1 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P1 BW1 BW1 BW1 BW1 BW2 BW2 BW2 BW1 BW1 BW1 BW1 BW1 P1A BW1 BW1 BW1 BW1 BW1 BW1 BW1 BW1 BW1 BW1 BW1 BW1 BW1 P1 1865 150 BW1 2090 5135 5150 ALIGN 2860 3180 2860 3260 2345 ALIGN ALIGN 3180 150 1690 2715 1655 1335 1285 300 1900 1550 710 200 330 2235 2775 1600 2655 2685 3185 2725 R450 850 6915 1610 1455 1000 900 900 3280 3010 7940 1815 2460 2835 2900 1510 P3B 300 840 9360 690 4875 510 150 300 2000 150 300 300 3350 150 250 300 4685 260 600 300 4575 840 840 3770 450 150 4025 5240 3950 5240 600 450 150 2220 100 300 4000 300 100 760 4115 4580 1560 1965 150 3000 4355 3185 150 P2 300 3000 100 1000 245 800 5650 2375 5550 3900 3065 800 800 450 4055 750 3795 3080 1365 475 P3A 900 100 1000 1000 3860 1000 1800 1000 1200 1000 1200 1000 1000 1000 P1A D4 D4 D4 D4 D5 D4 800 800 D2A D4A D4 D4 D4 D4 2180 P1A P1A D4 D4 D4 D2A D3 D3 D4 D4 D4 D4 D4 D4 D2 D1 D1 140 140 140 140 BW1 BW1 D4 P1A 450 450 P1A D4 D4 3570 550 BW1 3580 1500 830 650 700 550 BW1 BW1 BW1 BW1 BW1 700 550 1850 650 BW2 BW2 BW2 BW2 BW2 BW2 EX EX EX EX EX EX EX EX EX EX EX EX EX P3A P3A P3A P3A P1 P1 P1A 4495 D4 150 300 P2 450 1300 P3A 300 100 P1A 1685 ALIGN 1200 1000 850 7240 1335 1335 1285 1500 P1B P1A P1B 3000 2450 4300 3170 100 2070 P1A P1 D4 D4 1500 150 1400 P3A P3A D6 D6 D6 P1A 1970 100 ALIGN 3900 P5A 2590 1565 1665 1665 1675 1665 1500 1500 D6 D6 D6 D6 D6 D8 D7 D7 D7 D7 D7 D7 600 P1B P2 P1A P1B P1B P2 P2 P2 715 300 850 850 850 300 P1A P1A P1A P1A 6880 BW1 BW1 BW1 BW1 BW1 BW1 2290 BW1 P1 D6 D6 P1A P3A P1A 450 P1 P1 2250 P3A P3A P3A P3A P3A P3A P2 2015 100 D6 D6 1410 1970 P3A P3B 2250 P3A P3A P3A P3A 2700 815 150 1385 1400 1645 1050 1550 470 BW1 SLIDING FOLDING PARTITION 1850 100 P3B P3A P1A 3000 4495 P1 P3B P1 P1B BW1 BW1 3900 P1A 100 1500 2345 P3B 800 100 100 P3A P4 P4 P1A 1400 P1A P1B P1A P3A P1A P3B 100 P1A EX EX 750 P5 P5 6700 795 P6A P6 P6 100 P2 P1A P1 100 300 100 D4 P1 2330 1250 1215 2250 450 750 P1A 1215 R500 1770 4315 450 450 P1 P1 P3A P1 P3A P1B 5920 5920 2815 P3A P3A P1 P1 1050 P2A P1A P3B P3B 7510 7190 2500 2485 2500 820 3900 ALIGN P3A P1A 3900 285 300 D4 D4 100 100 300 P1A P1A P1 P2 P2 600 450 1440 P3A 715 P1A BW1 900 BW1 300 100 300 300 P1A P2 P1A P1A P1A 300 300 1200 D2A 800 BW1 P1A P3A 3170 P3A P1A D6 100 300 100 P1 P3B PLOT DATE: FILE: Mehak Chhabra 17-01-2023 Z:\Shared\Space Matrix\SMDC India\SMDC GGN\Workplace\Jobs\22-DL0008_SHL, Gurugram\Studio\Interiors\50 Construction\B1 Blockna me\10 Sheet Files\2 Plans\New folder\Drawings\01-plans\as build\B1-I-22F01_Partition Marking Plan_A.dwg PLUMBING ELE HVAC PM NOTES: 1) 2) ONLY. 3) DRAWING. GET PARTITION / WALL LEGEND TYPE DESCRIPTION P1A 100MM THK PARTITION ONE SIDE FULL CLADDING & OTHER SIDE GYPSUM P1B P2 GLASS PARTITION FULL HEIGHT UPTO +2400MM LEVEL P3A 75MM THK GYPSUM CLADDING P1 100MM THK BOTH SIDE GYPSUM 100MM THK PARTITION BOTH SIDE FULL CLADDING P3B 75MM THK FULL CLADDING 150MM THK BLOCK MASONARY WALL BW1 150MM THK BLOCK MASONARY WALL LEDGE WALL UPTO +1200MM BW2 P4 200MM THK PARTITION ONE SIDE FULL CLADDING & OTHER SIDE GYPSUM P4A 200MM THK PARTITION ONE SIDE FULL CLADDING & OTHER SIDE GYPSUM WITH TV NICHE P2A GLASS PARTITION FULL HEIGHT UPTO +2550MM LEVEL P5 175MM THK GYPSUM CLADDING P5A 175MM THK GYPSUM CLADDING WITH TV NICHE P6 175MM THK BRICK TILE CLADDING P6A 130MM THK FIRE RATED GYPSUM PARTITION P7 175MM THK BRICK TILE CLADDING WITH TV NICHE
04 SHL Re ected Ceiling Plan REVISION NOTE SCALE: Matrix Design Consultants Pvt Ltd BANGKOK BANGALORE DELHI PUNE MUMBAI HYDERABAD KOLKATA CHENNAI www.spacematrix.com ..\shl_logo.jpg & DOOR MARKING PLAN FLOOR B1-I-22F02 R3 1:100 PEGASUS ONE, BLOCK B, SECTOR-53 A, GOLF COURSE ROAD, GURUGRAM HARYANA 122002, TEL:+91 12449 08230 CONSULTANT ZSA ENGINEERING SERVICES 8, CLUB DRIVE ROAD, MG ROAD, GHITORNI, NEW DELHI-100030, PHONE: 011-26503018; FAX-26503019 Email: zsa.phe.services@gmail.com; zulfi_sb@yahoo.co.in ELECTRO CONSULTANTS A-222,SHIVALIK, MALVIYA NAGAR, NEW DELHI. PHONE: +91 11 26684140 FAX: THERMAL FACTOR UNIT NO-210 VIPUL BUSINESS PARK, SOHNA ROAD, SECTOR-48 GURUGRAM - 122004 (HARYANA) Tel : 0124 4521885 E MAIL thermal_factor@yahoo.com SHL INFINITY TOWER-TOWER C, 2ND FLOOR, DLF PHASE 2, SECTOR 24, GURUGRAM, HARYANA 122002 DIMENSIONS ARE IN MM UNLESS SPECIFIED. REFER THIS DRAWING FOR MARKING OF PARTITIONS REFER ALL DRAWINGS MENTIONED IN THIS CONTRACTOR TO CONSTRUCT / SUPPLY MOCKUP / SAMPLE & FROM THE CLIENTS & ARCHITECTS DESCRIPTION 100MM THK FULL HEIGHT PARTITION GLASS PARTITION 150MM THK BLOCK MASONARY WALL LEDGE WALL UPTO +1200MM 150MM THK BLOCK MASONARY WALL DOOR LEGEND TYPE OPENING SIZE LINTEL HT. FIRE RATED GLASS DOOR 1800 2400 1200 2400 1200 2400 SOLID FLUSH DOOR 1000 2400 FIRE RATED DOOR WITH VISION PANEL (ACD) 1000 2400 SOLID FLUSH DOOR 900 2400 SOLID FLUSH DOOR 800 AREA MAIN ENTRY OFFICE ENTRY MEETING RM BOARD RM SERVER RM FIRE RATED GLASS DOOR 1200 2400 OFFICE ENTRY GLASS DOOR 2400 PHONE BOOTH STORE RM SOLID FLUSH DOOR WITH VENTILATION GRILL 1000 2400 TOILETS GLASS DOOR SOLID FLUSH DOOR WITH VENTILATION GRILL 1200 2400 HANDICAP TOILETS BUILD 07.04.2022 ISSUED FOR CONSTRUCTION 20.04.2022 REVISED SEE CLOUDED AREA 17.05.2022 REVISED SEE CLOUDED AREA LIFT S. LIFT S. LIFT SHAFT LIFT SHAFT LIFT L.V. SHAFT ELEC. SHAFT F.H.C. FOR FUTURE SPARE SHAFT SHAFT PLUM. FOR FUTURE SPARE SHAFT SHAFT PLUM. LIFT LIFT LIFT LIFT LIFT FIRE CURTAIN F02-REC-01 F02-4MT-01 F02-4MT-02 F02-3MT-01 F02-6MT-01 F02-6MT-02 F02-6MT-03 F02-6MT-04 F02-6MT-05 F02-10MT-01 F02-2PB-01 F02-2PB-02 F02-1PB-01 F02-1PB-02 F02-1PB-03 F02-1PB-05 F02-1PB-04 F02-STO-01 F02-MAIL-01 F02-MED-01 F02-1PB-10 F02-1PB-09 F02-1PB-08 F02-1PB-07 F02-1PB-06 F02-1PB-11 F02-CAF-01 F02-TUC-01 F02-PAN-01 F02-VIR-01 F02-SER-01 F02-DIS-01 F02-WEL-01 F02-REP-01 F02-REP-02 F02-REP-03 F02-BRE-01 F02-FAC-01 F02-LT-01 F02-LT-02 F02-LT-03 F02-GT-01 F02-GT-02 F02-GT-03 F02-HT-01 F02-WCAF-01 F02-LOU-01 F02-2MT-01 F02-BOA-01 F02-6MT-06 F02-6MT-07 F02-10TR-01 F02-INN-01 F02-10TR-02 F02-IT-01 F02-FIN-01 F02-1PB-13 L2 L2 L4-A L2 L2 L2 L2 L4-A L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L6 L5 L5 L6 L7 L6-A L6 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L2 L4-A L2 L2 L2 L2 L7 L7 L4 L4 L4 L4 L6 L6 L4 L4 L4 L4 L4 L4 L4 L4 L4 L7 L7 L7 L7 L6 L4 L4 L4 L4 L4 L4 L4 L4 L6 L2 L2 L2 L2 L6 L8 L8 L8 L8 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L4 L4 L4 L4 L4 L4 L4 L4 L2 L2 L2 L4-A L4-A L2 L2 L1 L1 L1 L1 R L7 L7 L8 L8 L8 L8 L8 L8 L6 L6 L8 L8 L8 L7 L7 L8 L8 L8 L8 L8 L8 L8 L8 L8 L8 L8 L8 L8 L8 L4 L4 L4 L4 L4 L4 L4 L4 L8 L8 L8 L8 SD L2 L8 L8 L8 L8 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L8 L8 L8 L8 L8 L8 L8 L8 L8 L8 L8 L8 L6 L8 L8 L8 L8 L8 L8 L8 L2 L2 SP L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L6 L6 L6 L8 L8 L8 L8 L8 L8 L8 L8 L8 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L8 L8 L8 L6 L8 L8 L8 L8 L8 L8 L8 L8 L8 L8 L8 L8 L8 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L1 L1 L4-A L2 L2 R SD L1 L1 L1 L1 R R SP L1 R L2 L2 R L2 L2 L11 L11 L11 L11 L11 L11 L11 L11 L11 L11 L11 L11 L11 L3 L3 L3 L3 L3 L3 L3 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L8 L8 R L2 L2 SP SP SP L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L7 L8 L8 L8 L8 L8 L8 L7 L7 L7 L8 L8 L8 L8 L8 L2 L4-A L2 L4 L4 L4 L4 L4 L4 L4 L4 L8 L8 L8 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L6 L8 L8 L8 L8 L8 L8 L8 L8 L8 L8 L8 L8 L8 L8 L8 L8 L8 L8 L8 L6 L8 SP SD L2 L2 SP L2 L8 L8 L2 L2 L2 L2 L2 L1 L1 L1 SP L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 SP SP SP SP L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 SP L12 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 OPEN CEILING OPEN CEILING OPEN CEILING OPEN CEILING OPEN CEILING OPEN CEILING OPEN CEILING OPEN CEILING OPEN CEILING OPEN CEILING OPEN CEILING OPEN CEILING OPEN CEILING OPEN CEILING OPEN CEILING OPEN CEILING OPEN CEILING OPEN CEILING OPEN CEILING OPEN CEILING OPEN CEILING OPEN CEILING OPEN CEILING OPEN CEILING L10 L10 L10 L10 3190 2600 2600 2600 2350 2345 955 2910 2910 2910 2920 1445 4500 EQ 880 1760 1760 1760 1760 1760 1760 1760 1760 1760 880 2300 750 1735 1735 1735 1735 1735 1735 1735 1735 1735 1735 1735 1735 1735 1735 1735 1735 1735 1735 1735 1735 1735 1735 1735 1625 1625 1625 1625 1815 1815 1815 1815 1805 1825 1525 1745 1745 1745 1875 3750 1875 1875 795 1100 1835 1835 1835 1835 1835 1740 1740 1740 1740 1740 1740 1740 1740 1740 1740 1740 1740 1740 1740 795 1735 1735 1735 1735 1735 1735 1735 1735 1735 1735 1735 1220 1800 1800 1800 1195 1190 2050 2050 2050 2050 2050 2050 2050 2050 2050 2050 1950 1950 1615 2000 2000 2000 2000 1800 1800 860 18001500 1800 1800 745 1120 1655 1655 1655 1415 3805 925 1800 1800 1800 745 805 685 1800 1800 1800 700 1575 1800 1800 1045 1985 1985 1985 1985 1985 1985 1985 1985 1985 1985 1985 1985 900 935 1800 1800 1800 750 600 600 600 600 760 595 2705 3140 450 450 450 450 450 3175 450 450 1785 1785 1785 1785 1785 1785 1785 1785 1785 1785 1785 500 1820 1820 1820 1820 1820 1870 1600 1600 EQ EQ EQ EQ 1700 1700 1700 600 600 600 630 1500 1500 1500 1500 1500 1500 630 600 600 600 1700 1700 1700 1700 1700 1700 1700 725 1065 450 L4 L4 L4 L4 L8 L8 L8 L8 L8 L8 L12 L4 L4 L6 L6 3910 2275 1540 1670 1265 1110 1380 720 1860 1105 1355 1355 675 675 1500 660 EQ 960 L2 L2 L2 L2 L4-A L2 L2 L4-A 450 450 450 450 450 450 450 L2 L2 L2 L2 L2 L2 L2 L2 L6 L13 L13 L2 L2 L2 L2 L2 L2 L4-A L4-A L4-A L4-A L2 L2 L2 L2 L2 L2 L2 L2 L9 L14 L14 SP 590 1905 1905 1905 1905 430 EQ EQ 150 150 EQ 2195 2195 EQ EQ L2 L1 R SD SP SD SP L1 R SYMBOL L1 L11 SYMBOL DESCRIPTION FROM FINISHED FLOOR LEVEL LEVEL FROM RAISED FLOOR LEVEL FROM FINISHED FLOOR LEVEL 200 X 200 MM PLY PELMET FOR PROJECTION FINISHED FLOOR LEVEL GRID START POINT GYPSUM BOARD CEILING AT +2700 mm LEVEL METAL BUFFLE CEILING AT +2700 mm LEVEL WOODEN BUFFLE CEILING AT +2550 mm LEVEL LAMINATED CEILING AT +2400 mm LEVEL FROM GYPSUM BOARD CEILING AT +2400 mm LEVEL 1200 X 300 GRID CEILING AT +2700 mm LEVEL C REV CLIENT PROJECT DATE: PROJECT PURPOSE TITLE Space SINGAPORE REFLECTED SECOND B1-I-25F02 07.10.2022 MEHAK GROUND 18-DL0006 ELE CONSULTANT DLF CYBER NOTES: 1) 2) 3) DRAWING. 4) GET APPROVAL CONSTRUCTION. R0 R1 R2
04 SHL
DESCRIPTION x 600 MM DOWNLIGHT FIXTURE CIRCULAR LED RECESSED DOWNLIGHT FIXTURE COVE LIGHT RETURN AIR GRILL - BOTTOM THROW CONTINUOUS VERTICLE AC RETURN AIR GRILL SMOKE DETECTOR SPEAKER SPRINKLER MM - SUSPENDED LIGHT FIXTURE SQUARE LED RECESSED DOWNLIGHT FIXTURE DECORATIVE PENDANT LIGHT FIXTURE DECORATIVE PENDANT LIGHT FIXTURE DECORATIVE PENDANT LIGHT FIXTURE CIRCULAR LED PENDANT DOWNLIGHT FIXTURE DECORATIVE PENDANT LIGHT FIXTURE RECESSED CHANNEL LIGHT FIXTURE X 600 MM AC SUPPLY AIR DIFFUSER X 600 MM AC RETURN AIR DIFFUSER SUPPLY AIR GRILL - BOTTOM THROW CONTINUOUS VERTICAL AC SUPPLY GRILL DECORATIVE PENDANT LIGHT FIXTURE RECESSED LIGHT RECESSED CHANNEL LIGHT FIXTURE DECORATIVE PENDANT LIGHT FIXTURE REVISION NOTE SCALE: Design Consultants Pvt Ltd BANGALORE KOLKATA CHENNAI www.spacematrix.com ..\shl_logo.jpg CEILING PLAN FLOOR B1-I-25F02 R2 1:100 Shivika PEGASUS ONE, BLOCK B, SECTOR-53 A, GOLF COURSE ROAD, HARYANA 122002, TEL:+91 12449 08230 ELECTRO CONSULTANTS A-222,SHIVALIK, MALVIYA NAGAR, NEW DELHI. PHONE: +91 11 26684140 FAX: SHL INFINITY TOWER-TOWER C, 2ND FLOOR, PHASE 2, SECTOR 24, GURUGRAM, HARYANA 122002 ARE IN MM UNLESS SPECIFIED. THIS DRAWING FOR RCP ONLY. ALL DRAWINGS MENTIONED IN THIS CONSTRUCT SUPPLY MOCKUP / SAMPLE & THE CLIENTS & ARCHITECTS BEFORE BUILD ISSUED FOR CONSTRUCTION ISSUED FOR CONSTRUCTION REVISED SEE CLOUDED AREA LIFT S. LIFT S. LIFT SHAFT LIFT SHAFT LIFT L.V. SHAFT ELEC. SHAFT F.H.C. FOR FUTURE SPARE SHAFT SHAFT PLUM. FOR FUTURE SPARE SHAFT SHAFT LIFT LIFT LIFT LIFT LIFT FIRE CURTAIN CT-02 CT-02 CT-02 CT-02 CT-02 CT-02 CT-02 CT-02 CT-02 CT-02 CT-01 CT-01 CT-01 CT-01 CT-01 CT-01 CT-01 CT-01 CT-03 CT-03 CT-03 CT-03 CT-03 CT-03 CT-03 CT-03 CT-03 CT-03 CT-03 CT-03 CT-03 CT-06 CT-06 CT-07 CT-01 CT-01 CT-01 CT-05 CT-06 CT-01 CT-09 WD-01 WD-01 WD-01 VL-01 VL-01 VT-01 VT-01 VT-01 VT-01 VT-01 VT-01 FF-01 VT-01 VT-01 TL-01 VT-01 TL-02 3030 1865 5135 3180 6945 19035 7385 1905 2230 1840 1705 1500 17240 9125 10320 8485 5045 3485 2775 2235 2655 1600 6915 7940 6455 7285 2900 2735 1510 7445 6320 2980 6630 9210 20710 3760 2670 2735 4100 2515 20705 8035 18870 3450 4685 3900 12210 6080 7190 9640 5575 7205 6260 7405 4075 3415 2000 5240 4125 3810 5240 3875 3800 4000 4445 4350 2245 2100 1500 2715 3255 3180 2860 2860 3180 3180 9230 9410 15345 985 8410 18910 4205 1915 2935 6570 9290 8155 3895 1915 3900 3065 4055 3065 2485 1700 2590 5670 39735 5505 R565 R590 R600 R665 R475 R600 R600 R600 R600 R600 R1210 R290 R300 R300 R600 R600 R600 1560 2735 12085 3000 1800 3185 4355 3000 9640 1685 5415 1480 6985 5700 1500 1285 1335 1335 2470 2510 1970 VT-01 VT-01 VT-01 VT-01 VT-01 FFL ± 0000 FFL ± 0000 FFL ± 0000 RFL +300MM RFL +300MM RFL +300MM FFL ± 0000 FFL ± 0000 FM-01 VT-01 FFL ± 0000 FFL ± 0000 TL-01 TL-01 CT-03 VT-01 VT-01 VT-01 VT-01 VT-01 1655 6250 7285 3945 2300 1820 5935 9135 VT-01 CT-03 2090 WD-01 CT-04 7510 7190 5920 4615 4835 CT-02 CT-02 CT-02 CT-02 CT-02 CT-03 CT-03 955 R1215 R600 895 R600 5920 1330 CT-03 CT-03 CT-03 CT-03 CT-02 CT-03 CT-03 CT-03 CT-03 CT-03 CT-03 CT-03 CT-03 CT-03 CT-03 CT-03 CT-06 CT-08 CT-08 CT-07 CT-10 CT-09 CT-10 CT-03 VT-01 VT-01 START POINT 965 305 1600 3410 745 1070 REV CLIENT PROJECT DATE: PROJECT PURPOSE PLOT DATE: FILE: TITLE Space FLOORING SECOND B1-I-26F02 12.10.2022 MEHAK Mehak Chhabra 17-01-2023 Z:\Shared\Space Matrix\SMDC India\SMDC GGN\Workplace\Jobs\22-DL0008_SHL, Gurugram\Studio\Interiors\50 Construction\B1 Blockna me\10 Sheet Files\2 Plans\New folder\Drawings\01-plans\as build\B1-I-26F01_Flooring Plan_A.dwg GROUND 18-DL0006 PLUMBING ELE HVAC PM DLF NOTES: 01) 02) 03) 04) 05) 06) 07) SYMBOL DESCRIPTION CARPET FLOOR CT 01 CARPET FLOOR CT 02 CARPET FLOOR CT 03 CARPET FLOOR CT 04 CARPET FLOOR CT 05 & 06 CARPET FLOOR CT 06 SYMBOL DESCRIPTION ENGINEERED WOOD FLOOR - WD 01 PATTERN TILE - TL-01 PATTERN TILE - TL-02 VINYL FLOOR VL 01 FALSE FLOOR FF 01 BASIC TILE FLOOR - VT 01 FOOT MAT WITH TILE BASE FLOOR TRANSITION PROFILE RUG CARPET FLOOR CT 07 & 08 CARPET FLOOR CT 09 & 10 R0 R1
Flooring Layout Plan
05 Urban Hub of Excellence
Master Plan/Competition/Telangana State Urban Hub of Excellence
(October 2021)
Design Brief : The campus for Telangana State Urban Hub of Excellence to be built on a contoured site constituting the following spaces: Auditorium, Amphitheatre, Hub of Urban Innovation, Residence, Cafeteria etc.
Site Analysis
Design
05 Urban Hub of Excellence
Master Plan
06 Hotel Lobby
Interior Design/Designing/Hotel Lobby(November 2021)
Design Brief : To design a 500 sq.m. Hotel Lobby. Layout Planning along with sections, elevations, re ected ceiling plan, ooring layout etc. Imagining a theme and to present the idea behind the design using a mood board.
Moodboard
KEY PLAN (1:250) X RESTAURANT ELEVATOR ELEVATOR WAITING AREA ATRIUM 2400 1200 CHAAL CHAAL 1200 600 600 VAULTED RECEPTION MUQARNAS GRAND STAIRCASE MIRROR ARCHED CORRIDOR WALLPAPER PATTERNED MOULDING RECESSED BACKLIT ARCH DIWAN SEATING AREA ON RAISED PLATFORM 450 730 2950 4500 1300 700 1300 2450 1130 1770 1185 2700 ELEVATION X (1:100) MBS SPA KEY PLAN (1:250) INTERIOR DESIGN II HOTEL LOBBY ELEVATION X X SUBMITTED BY: MOULIKA MATHUR (00759301618), KUMKUM BHARDWAJ (10859301618) , MEHAK CHHABRA (09459301618) ARCHED WINDOWS PENDANT LIGHTS CAFE COUNTER CAFE SITTING RAISED PLATFORM WAITING AREA DIWAN SEATING AREA RAISED PLATFORM RECESSED BACKLIT ARCH 1200 600 3350 450 850 1700 1120 2810 75 1275 1175 450 3200 MBS SPA INTERIOR DESIGN II HOTEL LOBBY ELEVATION Y SUBMITTED BY: MOULIKA MATHUR (00759301618), KUMKUM BHARDWAJ (10859301618) MEHAK CHHABRA (09459301618) KEY PLAN (1:250) Y ELEVATION Y (1:100) MBS SPA INTERIOR DESIGN II HOTEL LOBBY ELEVATION Z SUBMITTED BY: MOULIKA MATHUR (00759301618), KUMKUM BHARDWAJ (10859301618) , MEHAK CHHABRA (09459301618) KEY PLAN (1:250) RAISED PLATFORM PENDANT LIGHTS STORAGE CABINETS CAFE COUNTER CAFE SEATING WAITING AREA SCREEN MAIN ENTRANCE CAFE SEATING ARCHED WINDOWS ELEVATION Z (1:100) Z 6000 600 2750 2400 675 1800 4800 1870 1650 3200 2800 1960 310 1000 1800 1000 1000 1000 BALANCE EQ EQ EQ EQ 2200 2200 2200 2200 1500 EQ EQ 900 3500 1000 EQ EQ EQ EQ 1000 EQ EQ EQ EQ 1000 1800 EQ EQ EQ MBS SPA INTERIOR DESIGN II HOTEL LOBBY REFLECTED CEILING PLAN (1:100) SUBMITTED BY: MOULIKA MATHUR (00759301618), KUMKUM BHARDWAJ (10859301618) MEHAK CHHABRA (09459301618) DOME CEILING LIGHT PENDANT LIGHT 1772 1500 1500 REFLECTED CEILING PLAN FLOORING LAYOUT MBS SPA INTERIOR DESIGN - II FLOORING PLAN HOTEL RECEPTION LOBBY SCALE - 1:150 JAISALMER YELLOW MARBLE BLUE TILE CARRARA WHITE MARBLE 1200 600 SUBMITTED BY: MOULIKA MATHUR (00759301618), KUMKUM BHARDWAJ (10859301618) MEHAK CHHABRA (09459301618) 06 Hotel Lobby Sectional Elevation
YELLOW MARBLE MARBLE ----
----
Thank you
07 Photography