Skip to main content

The Local Paper. Lilydale and Yarra Valley Express Edition. Wed., June 12, 2024

Page 1

Melbourne

Observer FREE COPY INSIDE

LILYDALE & YARRA VALLEY EXPRESS EDITION

Local and Independent. Not associated with any other publication in this area.

Phone: 1800 231 311.

www.LocalPaper.com.au

www.AdvertiseFree.com.au

‘The Local Paper’ is published by Local Media Pty Ltd

WEDNESDAY, JUNE 12, 2024

CONCRETER Small, big, all areas All types of work 40 years experience

H-G17

0418 991 998

YARRA VALLEY TRAIL WORKS UNDERWAY Star Tree Services

QUALIFIED ARBORISTS • Tree Removal • Tree Surgery & Pruning • Consultations & Reports • Elm Leaf Beetle Control • Mulch & Firewood Sales

5783 3170

Specialists in Family Law, Wills, Estates and Conveyancing

Lic. No. 117616 ● Hot water units ● Blockages ● Renovations ● Gas fitting ● Drainage

0431 067 583

www.9yardsplumbing.com.au

EXCAVATION Bob The Bobcat Man Tipper, Bobcat, 6 Tonne Excavtor Specialising in tight access Will go through small spaces

0418 991 998 PROMOTE YOUR BUSINESS ON THE FRONT-PAGE FROM $39 PER FORTNIGHT Your business can have front-page prominence in a local edition of The Local Paper for just $39 per fortnight if you order a 23-issue pre-paid package totalling $897. Limited offer. First-in basis.

The Local Paper Phone 1800 231 311, 0450 399 932 editor@LocalPaper.com.au

Free Quotes. Full Insurance Cover www.treeservices.com.au mail@treeservices.com.au

● Works are underway between Yering and Yarra Glen. ■ Construction of the Yarra Valley Trail con“The Yarra Valley Trail already goes from tinues with works now taking place at the Yering Lilydale to Coldstream with plans that it will connect up to Healesville and then onto Seville to Yarra Glen section. This will see approximately 1.1 kilometres and link with the Warburton to Lilydale Trail. of trail along the historic railway take place and Our trails are incredibly popular and help to imincludes the restoration of the two heritage bridges prove our wellbeing and social connection,” said Todorov. which were part of the former Lilydale to CrRyrie Ward Councillor Fiona McAllister said: Healesville train line. "The Yarra Valley Trail is a great addition to our These iconic bridges will be preserved and community, promoting outdoor activity and conreinforced with a concealed steel framework, necting people with the beautiful landscapes of ensuring their longevity and safety. our region. We are thrilled to see that construcYarra Ranges Mayor, Cr Sophie Todorov, tion has begun on this section of the trail.” highlighted its importance in the region - with Traffic control measures are currently in trails being a favourite amongst residents and place on Melba Highway during construction hours to ensure the safety of workers and motourists alike. torists. Council appreciates the community's patience and understanding during this period. "We understand that construction can be inconvenient, and we thank everyone for their cooperation. The long-term benefits of this trail will be substantial, providing a safe, off-road path for walking, cycling, and enjoying the natural beauty of the area," said Cr McAllister. Upon completion, Stage 1B will form an integral part of an 11km off-road route stretching from Lilydale to Yarra Glen. This trail will connect users to the Yarra Valley Railway, the Yarra Valley Trail Northern Loop and future extensions, including Stage 2A from Yarra Glen to Tarrawarra.

FIREWOOD Murray River Redgum Yes! ... We Deliver. P: 1300 87 87 25 E: yarravalley@ brazzen.com.au

PAUL’S FENCING 25 Years’ Experience Specialsiing in: paling and picket fences and gates

0410 061 180

Water Tank Cleaning, Vacuuming and Repair Service with minimal water loss. Bulk Water Deliveries available.


Turn static files into dynamic content formats.

Create a flipbook
The Local Paper. Lilydale and Yarra Valley Express Edition. Wed., June 12, 2024 by Ash Long - Issuu