The Mid and East Antrim Borough Housing Monitor Report 2024 has been prepared by the Development Plan Team within Mid and East Antrim Borough Council using Housing Land Availability Monitor information. The 2024 Housing Monitor Report is the ninth summary produced by Mid and East Antrim Borough Council relating to the availability of land for housing development across the Borough and comprises tabular information extracted from the Housing Monitor Database. In terms of output tables, survey work was undertaken by the Development Plan Team for each of the monitored sites as recorded in the Housing Monitor Database for the period 01 June 2023 to 31 May 2024. The survey was based on applications approved during the period 1 April 2023 to 31 March 2024. This report uses the housing baseline established by the Regional Development Strategy for Northern Ireland 2025 (RDS), i.e. the end of December 1998 and shows housing land availability across the Borough for those settlements designated in the Local Development Plan 2030 - Plan Strategy. The Housing Monitor Maps which spatially reflect the information shown in the summary tables contained within this report can be viewed online here.
30
31
Purpose This report contains the findings of the Annual Housing Monitor for the survey period between 01 June 2023 to 31 May 2024 (the physical survey of housing monitor sites was undertaken during May 2024) and provides information on the methodology involved in undertaking the Housing Monitor. To ensure that there is an adequate and continuous supply of available housing land within the Borough over the lifetime of the LDP it is essential to record the number of dwelling completions and the level of housing land supply remaining available within the settlements on a yearly basis. Therefore the purpose of the annual Housing Monitor is:
1. To monitor the course of housing development in settlements with regard to the RDS; 2. To monitor progress of housing development in settlements in accordance with the provisions of prevailing Development Plans; 3. To inform the preparation of the LDP with regard to the allocation of land for housing; and 4. To provide information on the available potential for further housing development in settlements.
Methodology
The Housing Monitor assessment is based on an annual survey of housing monitor sites within the Borough. This survey year ran from the 01 June 2023 to 31 May 2024 (the physical survey of housing monitor sites was undertaken during May 2024. The Survey covers all settlements as defined in Local Development Plan 2030 Plan Strategy but excludes all dwellings in the open countryside. It identifies the number of dwelling units completed and the area of land developed and records the available potential of land and dwellings that remains undeveloped on monitored sites within settlements. It should be noted that apartments are included in the Housing Monitor as dwellings. Monitored sites include those identified from the previous annual survey that were not recorded as complete as well as any newly identified sites. They are sites that are identified as potentially suitable for residential development in prevailing development plans through zonings and any other urban sites that have been granted planning permission for residential development through a planning application or planning appeal. There may be other land within settlements that is not included in the housing monitor. However, such land becomes a monitored site once identified as suitable for residential development. It is current practice to keep within the Housing Monitor database those sites that have received planning approval for housing but has expired, unless a known change in circumstances arises such as;
(a) having subsequently been
refused planning permission for residential development; or
(b) being developed for non-
Adjustments as necessary will thus be made as part of the review undertaken in future annual housing monitor work.
The Housing Monitor records net housing gain for each site. This involves taking account of fit (c) where the LDP revises this housing that is lost to make way for potential. new housing. It is acknowledged that there may be instances where In these circumstances a previously the gross total may not have monitored site will be removed from taken account of fit housing the monitor. which was replaced. Where this is Sites with planning permission which identified, appropriate adjustment has now expired and have not yet will be made in the following years commenced will now not be physically Housing Monitor. For example, monitored. These sites will still be redevelopment of a site that retained within the Housing Monitor contained 1 dwelling for 10 Database for information purposes apartments, is recorded as a gain of but will not be included in any 9 dwelling units. summary data tables. It is also acknowledged that some By restricting the actual survey to of the potential land for housing 'live' sites, i.e. those with extant development in settlements might planning permission and zoned not be realised due to various housing sites, this ensures that a focus constraints or the refusal of is maintained on the deliverability of landowners to release their land for housing. development. These matters will be further investigated during the In order to calculate potential course of preparing the Local dwellings available in situations where Development Plan. only the site area (and not the exact number of dwellings is known), an It should be noted that the Housing estimate of likely density is used. This Monitor methodology has evolved is based, where possible, on given and improved since its inception. characteristics such as site location, This will in some instances affect landform or adjacent development direct comparison with the form and density. Where this information from previous years. approach has not been considered suitable, an average density (normally 25 units per hectare) has been applied to the site. Clearly, where actual development densities vary from that assumed, it will have implications for the accuracy of estimates compared with actual available potential. residential use; or
Headline Figures A total of 435 units were completed within the Borough in the period between 01 June 2023 to 31 May 2024 with a total of 19.03 ha of land developed.
PERCENTAGE DISTRIBUTION OF UNITS BUILT Ballymena
Main Towns Ballymena Carrickfergus Larne Main Towns Total
23.68%
58.62%
Larne
Small Towns, Villages & Small Settlements
9.89%
2024 SUMMARY TABLES • • • • • • • • •
No. of Units Completed 20232024 103 255 34 392
No. of Units Completed 20222023 0 0 8 4 11 23
No. of Units Completed 20232024 0 0 0 7 3 10
No. of Units Completed 20222023 2 0 1 0 0 0 1 0 15 0 29 48
No. of Units Completed 20232024 6 0 0 0 6 0 1 0 9 0 11 33
No. of Units Completed 20222023 0 0 0 0 0 0
No. of Units Completed 20232024 0 0 0 0 0 0 0 0
260
435
Area Developed 2023-2024
% of Borough Total
3.63 12.11 1.55 17.28
23.68% 58.62% 7.82% 90.11%
Area Developed 2023-2024
% of Borough Total
0.00 0.00 0.00 0.41 0.13 0.54
0.00% 0.00% 0.00% 1.61% 0.69% 2.30%
Area Developed 2023-2024
% of Borough Total
0.32 0.00 0.00 0.00 0.14 0.00 0.03 0.00 0.17 0.00 0.56 1.21
1.38% 0.00% 0.00% 0.00% 1.38% 0.00% 0.23% 0.00% 2.07% 0.00% 2.53% 7.59%
Area Developed 2023-2024
% of Borough Total
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
19.03
100.00%
Carrickfergus Small Towns
7.82%
No. of Units Completed 20222023 133 1 55 189
The Site Ref column indicates the unique Housing Monitor record number. The Urban Fabric / Greenfield column identifies if the site is either Greenfield or within the Urban Fabric Potential Yield (Units) column shows the total number of dwellings which could be accommodated within all monitored sites within each settlement. Potential Area (HA) column shows the total residual hectarage which could be accommodated within all monitored sites within each settlement The Units Complete column show the total number of units completed within each monitored site within each settlement as of the 31 May 2024. (For the purposes of this survey a building is defined as 'completed' when watertight.) The Build Rate column shows the number of dwellings recorded as completed on each monitored site between 01 June 2023 to 31 May 2024. The Area Developed shows the total amount of land developed for housing within each monitored site between 01 June 2023 to 31 May 2024. The Total Area Developed shows the total amount of land developed for housing within each monitored site as of 31 May 2024. The Status column shows the current status of the monitored site.
Ahoghill Broughshane Cullybackey Greenisland Whitehead Small Towns Total
Villages Ballycarry Ballygalley Ballystrudder Cargan Carnlough Clough Glenarm Glynn Kells and Connor Martinstown Portglenone Villages Total
Small Settlements Carncastle Crosshill Glenoe Grange Corner Magheramorne Mullaghboy Trooperslane Small Settlements Total Borough Total
Potential Site Yield (Units)
Potential Site Yield (Ha)
Remaining Potential (Units)
Remaining Potential (Ha)
Total Units Complete As Of 31 May 2024
Build Rate 01 June 2023 To 31 May 2024
Total Area Area Developed Developed As Of 01 June 2023 To 31 May 2024 31 May 2024
Type Of Site
Urban Fabric Or Greenfield
NILUD Site Status 2024
2778 13340 13535 13922 14020 14977 15265 15366 15456 15479 15511 15541 15569
Zoned Residential Infill Site Zoned Residential Zoned Residential Whiteland Redevelopment Site Redevelopment Site Redevelopment Site Infill Site Infill Site Zoned Residential Redevelopment Site Infill Site
Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Greenfield Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric
Not Started Not Started Not Started Not Started Development On-Going Not Started Development On-Going Not Started Development On-Going Not Started Not Started Not Started Not Started Settlement Subtotal
34 11 13 33 13 17 6 6 1 2 3 3 1 143
1.37 0.10 0.54 1.69 0.82 0.78 0.24 0.05 0.11 0.05 0.10 0.14 0.11 6.1
34 11 13 33 11 17 2 6 1 2 3 3 1 137
1.37 0.10 0.54 1.69 0.69 0.78 0.08 0.05 0.11 0.05 0.10 0.14 0.11 5.81
0 0 0 0 2 0 4 0 0 0 0 0 0 6
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0.00 0.00 0.00 0.00 0.13 0.00 0.16 0.00 0.00 0.00 0.00 0.00 0.00 0.29
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2673 14733 14751 15436 15513
Redevelopment Site Additional Units Redevelopment Site Whiteland Whiteland
Greenfield Within the Urban Fabric Within the Urban Fabric Greenfield Greenfield
Development On-Going Not Started Development On-Going Development On-Going Not Started Settlement Subtotal
69 14 50 22 21 176
2.56 0.39 4.50 1.36 0.94 9.75
7 14 50 18 21 110
0.26 0.39 4.50 1.11 0.94 7.20
62 0 0 4 0 66
2 0 0 4 0 6
2.30 0.00 0.00 0.25 0.00 2.55
0.07 0.00 0.00 0.25 0.00 0.32
14110 Infill Site Within the Urban Fabric 14322 Redevelopment Site Within the Urban Fabric 15520 Infill Site Greenfield
Development On-Going Development On-Going Not Started Settlement Subtotal
1 10 1 12
0.08 0.11 0.11 0.3
1 10 1 12
0.08 0.11 0.11 0.30
0 0 0 0
0 0 0 0
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
2690 2691 2694 2698 2699 2700 2701 2715 2716 2719 2724 2730
Not Started Not Started Development On-Going Development On-Going Not Started Not Started Not Started Not Started Not Started Not Started Not Started Not Started
28 12 63 7 8 24 10 3 10 44 28 423
1.12 0.52 3.65 0.81 0.60 1.87 0.40 0.54 0.77 1.77 0.85 16.90
28 12 9 5 8 24 10 3 10 44 28 423
1.12 0.52 0.52 0.58 0.60 1.87 0.40 0.54 0.77 1.77 0.85 16.90
0 0 54 2 0 0 0 0 0 0 0 0
0 0 1 0 0 0 0 0 0 0 0 0
0.00 0.00 3.13 0.23 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
SETTLEMENT/ NILUD REF
Ahoghill
Ballycarry
Ballygalley
Ballymena Zoned Residential Zoned Residential Zoned Residential Zoned Residential Zoned Residential Zoned Residential Zoned Residential Whiteland Zoned Residential Zoned Residential Whiteland Zoned Residential
Greenfield Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Greenfield Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Greenfield
SETTLEMENT/ NILUD REF
2732 2733 2734 2735 2741 13418 13891 14011 14607 14610 14611 14675 15002 15118 15127 15151 15163 15284 15302 15338 15355 15360 15368 15369 15392 15396 15399 15406 15407 15417 15426 15433 15439 15451 15452 15460 15461 15465 15467 15471 15474 15480 15482 15484 15485
Type Of Site
Urban Fabric Or Greenfield
NILUD Site Status 2024
Zoned Residential Zoned Residential Zoned Residential Zoned Residential Zoned Residential Infill Site Infill Site Whiteland Zoned Residential Zoned Residential Zoned Residential Additional Units Additional Units Redevelopment Site Zoned Residential Infill Site Whiteland Infill Site Redevelopment Site Zoned Residential Redevelopment Site Redevelopment Site Infill Site Infill Site Redevelopment Site Redevelopment Site Infill Site Zoned Residential Zoned Residential Infill Site Redevelopment Site Redevelopment Site Whiteland Whiteland Whiteland Infill Site Infill Site Additional Units Additional Units Infill Site Redevelopment Site Zoned Residential Redevelopment Site Redevelopment Site Redevelopment Site
Greenfield Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Greenfield Greenfield Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Greenfield Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Greenfield Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric
Not Started Not Started Not Started Not Started Development On-Going Not Started Not Started Development On-Going Not Started Not Started Not Started Development On-Going Not Started Not Started Not Started Development On-Going Not Started Complete Development On-Going Development On-Going Development On-Going Development On-Going Not Started Not Started Complete Development On-Going Development On-Going Not Started Not Started Not Started Not Started Not Started Development On-Going Complete Development On-Going Not Started Not Started Complete Not Started Not Started Not Started Not Started Not Started Not Started Not Started
Potential Site Yield (Units)
Potential Site Yield (Ha)
Remaining Potential (Units)
Remaining Potential (Ha)
Total Units Complete As Of 31 May 2024
Build Rate 01 June 2023 To 31 May 2024
244 8 26 41 137 2 1 46 28 46 4 1 2 5 10 1 10 2 26 4 12 14 2 1 3 9 1 125 92 1 9 2 136 12 11 1 1 4 1 1 4 2 3 7 3
9.76 0.34 0.80 1.66 5.48 0.04 0.12 1.20 1.10 1.17 0.16 0.03 0.55 0.06 0.60 0.17 0.41 0.09 0.29 0.30 0.20 0.07 0.33 0.26 0.30 0.15 0.08 14.64 3.68 0.07 0.17 0.08 4.82 0.43 0.34 0.06 0.12 0.03 0.02 0.33 0.05 0.22 0.06 0.08 0.21
244 8 26 41 97 2 1 46 28 46 4 1 2 5 10 1 10 0 26 4 12 14 2 1 0 9 1 125 92 1 9 2 34 0 11 1 1 0 1 1 4 2 3 7 3
9.76 0.34 0.80 1.66 3.88 0.04 0.12 1.20 1.10 1.17 0.16 0.03 0.55 0.06 0.60 0.17 0.41 0.00 0.29 0.30 0.20 0.07 0.33 0.26 0.00 0.15 0.08 14.64 3.68 0.07 0.17 0.08 1.21 0.00 0.34 0.06 0.12 0.00 0.02 0.33 0.05 0.22 0.06 0.08 0.21
0 0 0 0 40 0 0 0 0 0 0 0 0 0 0 0 0 2 0 0 0 0 0 0 3 0 0 0 0 0 0 0 102 12 0 0 0 4 0 0 0 0 0 0 0
0 0 0 0 9 0 0 0 0 0 0 0 0 0 0 0 0 2 0 0 0 0 0 0 3 0 0 0 0 0 0 0 46 12 0 0 0 4 0 0 0 0 0 0 0
Total Area Area Developed Developed As Of 01 June 2023 To 31 May 2024 31 May 2024 0.00 0.00 0.00 0.00 1.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.09 0.00 0.00 0.00 0.00 0.00 0.00 0.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.62 0.43 0.00 0.00 0.00 0.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.09 0.00 0.00 0.00 0.00 0.00 0.00 0.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.64 0.43 0.00 0.00 0.00 0.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Potential Site Yield (Units)
Potential Site Yield (Ha)
Remaining Potential (Units)
Remaining Potential (Ha)
Total Units Complete As Of 31 May 2024
Build Rate 01 June 2023 To 31 May 2024
Total Area Area Developed Developed As Of 01 June 2023 To 31 May 2024 31 May 2024
Type Of Site
Urban Fabric Or Greenfield
NILUD Site Status 2024
Infill Site Redevelopment Site Redevelopment Site Redevelopment Site Redevelopment Site Infill Site Zoned Residential Whiteland Redevelopment Site Whiteland Whiteland Additional Units Infill Site Infill Site Additional Units Infill Site Redevelopment Site Additional Units Infill Site Infill Site Zoned Residential Redevelopment Site Infill Site Redevelopment Site Redevelopment Site Infill Site Redevelopment Site Redevelopment Site Infill Site Redevelopment Site Redevelopment Site Redevelopment Site Redevelopment Site Additional Units Additional Units Additional Units
Within the Urban Fabric Within the Urban Fabric Greenfield Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Greenfield Greenfield Within the Urban Fabric Greenfield Greenfield Within the Urban Fabric Within the Urban Fabric Greenfield Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric
Not Started Complete Development On-Going Not Started Not Started Not Started Not Started Not Started Complete Not Started Not Started Not Started Complete Not Started Not Started Not Started Not Started Not Started Not Started Not Started Development On-Going Not Started Not Started Not Started Development On-Going Not Started Not Started Not Started Not Started Development On-Going Not Started Not Started Not Started Not Started Not Started Not Started Settlement Subtotal
5 14 39 9 14 1 6 5 16 22 16 2 1 1 2 1 3 2 1 1 44 10 1 1 5 1 1 21 6 19 2 20 6 2 2 1 2064
0.02 0.26 1.57 0.02 0.21 0.12 0.30 0.31 0.60 1.27 0.51 0.02 0.04 0.05 0.01 0.21 0.02 0.03 0.12 0.08 1.25 0.07 0.12 0.01 0.03 0.05 0.01 0.11 0.02 0.07 0.01 0.08 0.08 0.31 0.01 0.01 88.94
5 0 31 9 14 1 6 5 0 22 16 2 0 1 2 1 3 2 1 1 44 10 1 1 5 1 1 21 6 19 2 20 6 2 2 1 1806
0.02 0.00 1.25 0.02 0.21 0.12 0.30 0.31 0.00 1.27 0.51 0.02 0.00 0.05 0.01 0.21 0.02 0.03 0.12 0.08 1.25 0.07 0.12 0.01 0.03 0.05 0.01 0.11 0.02 0.07 0.01 0.08 0.08 0.31 0.01 0.01 78.29
0 14 8 0 0 0 0 0 16 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 258
0 14 2 0 0 0 0 0 9 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 103
0.00 0.26 0.32 0.00 0.00 0.00 0.00 0.00 0.60 0.00 0.00 0.00 0.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.65
0.00 0.26 0.08 0.00 0.00 0.00 0.00 0.00 0.34 0.00 0.00 0.00 0.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.63
13723 Redevelopment Site Within the Urban Fabric 14361 Whiteland Within the Urban Fabric 15169 Additional Units Within the Urban Fabric
Development On-Going Development On-Going Not Started Settlement Subtotal
13 25 4 42
0.42 0.58 0.24 1.24
9 25 4 38
0.29 0.58 0.24 1.11
4 0 0 4
0 0 0 0
0.13 0.00 0.00 0.13
0.00 0.00 0.00 0.00
13924 Zoned Residential
Not Started
9
0.34
9
0.34
0
0
0.00
0.00
SETTLEMENT/ NILUD REF 15487 15488 15489 15490 15494 15503 15507 15509 15514 15515 15516 15519 15521 15527 15529 15531 15537 15538 15539 15540 15543 15556 15557 15558 15562 15563 15564 15567 15568 15571 15572 15573 15576 15577 15584 15586
Ballystrudder
Broughshane Greenfield
Potential Site Yield (Units)
Potential Site Yield (Ha)
Remaining Potential (Units)
Remaining Potential (Ha)
Total Units Complete As Of 31 May 2024
Build Rate 01 June 2023 To 31 May 2024
Total Area Area Developed Developed As Of 01 June 2023 To 31 May 2024 31 May 2024
Urban Fabric Or Greenfield
NILUD Site Status 2024
Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric
Not Started Development On-Going Development On-Going Settlement Subtotal
7 35 3 54
0.25 1.51 0.23 2.33
7 2 3 21
0.25 0.09 0.23 0.91
0 33 0 33
0 0 0 0
0.00 1.42 0.00 1.42
0.00 0.00 0.00 0.00
14937 Whiteland Greenfield 15158 Infill Site Within the Urban Fabric 15463 Redevelopment Site Within the Urban Fabric
Development On-Going Development On-Going Not Started Settlement Subtotal
57 3 7 67
2.00 0.09 0.44 2.53
57 3 7 67
2.00 0.09 0.44 2.53
0 0 0 0
0 0 0 0
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
15245 Infill Site Within the Urban Fabric 14759 Redevelopment Site Greenfield
Development On-Going Not Started Settlement Subtotal
1 5 6
0.07 0.58 0.65
1 5 6
0.07 0.58 0.65
0 0 0
0 0 0
0.00 0.00 0.00
0.00 0.00 0.00
14075 14160 14161 15325 15424 15525 15536 15560
Infill Site Redevelopment Site Redevelopment Site Additional Units Infill Site Infill Site Infill Site Redevelopment Site
Greenfield Greenfield Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric
Complete Development On-Going Development On-Going Development On-Going Not Started Not Started Not Started Complete Settlement Subtotal
3 61 6 2 1 1 1 3 78
0.07 2.26 0.20 0.24 0.03 0.21 0.02 0.07 3.1
0 21 1 1 1 1 1 0 26
0.00 0.78 0.03 0.12 0.03 0.21 0.02 0.00 1.19
3 40 5 1 0 0 0 3 52
3 0 0 0 0 0 0 3 6
0.07 1.48 0.17 0.12 0.00 0.00 0.00 0.07 1.91
0.07 0.00 0.00 0.00 0.00 0.00 0.00 0.07 0.14
17818 17820 17877 17928 17944 18067 18069 18070 18071 18073 18496 18798 19364 19892 20629 20853 20968 20970
Zoned Residential Zoned Residential Zoned Residential Redevelopment Site Zoned Residential Zoned Residential Zoned Residential Zoned Residential Zoned Residential Zoned Residential Whiteland Redevelopment Site Infill Site Redevelopment Site Redevelopment Site Zoned Residential Zoned Residential Zoned Residential
Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Greenfield Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric
Not Started Not Started Not Started Not Started Development On-Going Not Started Not Started Not Started Not Started Not Started Development On-Going Development On-Going Not Started Complete Development On-Going Development On-Going Not Started Development On-Going
214 403 18 3 54 5 6 6 8 285 8 32 1 7 9 146 125 296
8.56 16.12 0.19 0.22 1.28 0.19 0.25 0.29 0.29 11.39 0.10 0.77 0.05 0.02 0.36 6.54 4.95 12.88
214 403 18 3 12 5 6 6 8 285 8 32 1 0 9 12 125 110
8.56 16.12 0.19 0.22 0.28 0.19 0.25 0.29 0.29 11.39 0.10 0.77 0.05 0.00 0.36 0.54 4.95 4.79
0 0 0 0 42 0 0 0 0 0 0 0 0 7 0 134 0 186
0 0 0 0 0 0 0 0 0 0 0 0 0 7 0 134 0 29
0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.02 0.00 6.00 0.00 8.09
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.02 0.00 6.00 0.00 1.26
SETTLEMENT/ NILUD REF
Type Of Site
15096 Zoned Residential 15359 Zoned Residential 15542 Zoned Residential
Cargan
Carncastle
Carnlough
Carrickfergus
Potential Site Yield (Units)
Potential Site Yield (Ha)
Remaining Potential (Units)
Remaining Potential (Ha)
Total Units Complete As Of 31 May 2024
Build Rate 01 June 2023 To 31 May 2024
Total Area Area Developed Developed As Of 01 June 2023 To 31 May 2024 31 May 2024
Type Of Site
Urban Fabric Or Greenfield
NILUD Site Status 2024
Zoned Residential Infill Site Whiteland Zoned Residential Redevelopment Site Zoned Industrial Zoned Residential Redevelopment Site Redevelopment Site Infill Site Additional Units Additional Units Additional Units Additional Units Whiteland Infill Site Infill Site Additional Units Additional Units Redevelopment Site Redevelopment Site Redevelopment Site Redevelopment Site Infill Site Redevelopment Site Redevelopment Site Infill Site Additional Units Redevelopment Site
Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Greenfield Greenfield Greenfield Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric
Development On-Going Not Started Development On-Going Development On-Going Not Started Development On-Going Not Started Not Started Not Started Not Started Not Started Complete Complete Not Started Not Started Development On-Going Complete Not Started Not Started Complete Not Started Not Started Development On-Going Not Started Complete Not Started Not Started Not Started Not Started Settlement Subtotal
59 1 29 157 4 363 2 1 3 1 4 9 8 1 32 1 1 2 6 4 5 2 12 1 14 2 1 3 13 2367
2.07 0.50 0.92 5.11 0.06 30.02 0.05 0.05 0.01 0.04 0.06 0.11 0.14 0.03 1.31 0.30 0.16 0.42 0.22 0.23 0.03 0.12 0.11 0.05 0.18 0.02 0.03 0.01 0.14 106.95
49 1 29 139 4 315 2 1 3 1 4 0 0 1 32 1 0 2 6 0 5 2 12 1 0 2 1 3 13 1886
1.72 0.50 0.92 4.52 0.06 26.05 0.05 0.05 0.01 0.04 0.06 0.00 0.00 0.03 1.31 0.30 0.00 0.42 0.22 0.00 0.03 0.12 0.11 0.05 0.00 0.02 0.03 0.01 0.14 86.11
10 0 0 18 0 48 0 0 0 0 0 9 8 0 0 0 1 0 0 4 0 0 0 0 14 0 0 0 0 481
0 0 0 1 0 48 0 0 0 0 0 9 8 0 0 0 1 0 0 4 0 0 0 0 14 0 0 0 0 255
0.35 0.00 0.00 0.59 0.00 3.97 0.00 0.00 0.00 0.00 0.00 0.11 0.14 0.00 0.00 0.00 0.16 0.00 0.00 0.23 0.00 0.00 0.00 0.00 0.18 0.00 0.00 0.00 0.00 20.84
0.00 0.00 0.00 0.04 0.00 3.97 0.00 0.00 0.00 0.00 0.00 0.11 0.14 0.00 0.00 0.00 0.16 0.00 0.00 0.23 0.00 0.00 0.00 0.00 0.18 0.00 0.00 0.00 0.00 12.11
14358 Redevelopment Site Greenfield 15475 Redevelopment Site Within the Urban Fabric
Not Started Not Started Settlement Subtotal
16 2 18
0.73 0.09 0.82
16 2 18
0.73 0.09 0.82
0 0 0
0 0 0
0.00 0.00 0.00
0.00 0.00 0.00
14266 Additional Units
Within the Urban Fabric
Development On-Going Settlement Subtotal
9 9
0.30 0.3
6 6
0.20 0.20
3 3
0 0
0.10 0.10
0.00 0.00
2806 2807 2809 2810 2813
Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric
Not Started Development On-Going Not Started Not Started Not Started
19 26 19 21 40
0.75 0.70 0.75 0.86 1.62
19 14 19 21 40
0.75 0.38 0.75 0.86 1.62
0 12 0 0 0
0 0 0 0 0
0.00 0.32 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
SETTLEMENT/ NILUD REF 21075 21530 21546 21559 21570 21573 21577 21580 21581 21586 21588 21589 21593 21595 21597 21599 21601 21602 21603 21605 21606 21607 21608 21609 21610 21611 21615 21616 21620
Clough
Crosshill
Cullybackey Zoned Residential Zoned Residential Zoned Residential Zoned Residential Zoned Residential
Potential Site Yield (Units)
Potential Site Yield (Ha)
Remaining Potential (Units)
Remaining Potential (Ha)
Total Units Complete As Of 31 May 2024
Build Rate 01 June 2023 To 31 May 2024
Total Area Area Developed Developed As Of 01 June 2023 To 31 May 2024 31 May 2024
Type Of Site
Urban Fabric Or Greenfield
NILUD Site Status 2024
13360 13704 13927 14585 14590 14805 15362 15416 15442 15457 15530 15550 15553 15555 15559 15570 15580 15582
Whiteland Zoned Residential Zoned Residential Additional Units Zoned Residential Whiteland Infill Site Infill Site Zoned Residential Redevelopment Site Additional Units Infill Site Infill Site Infill Site Infill Site Infill Site Redevelopment Site Redevelopment Site
Within the Urban Fabric Within the Urban Fabric Greenfield Within the Urban Fabric Within the Urban Fabric Greenfield Within the Urban Fabric Within the Urban Fabric Greenfield Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric
Not Started Not Started Not Started Development On-Going Not Started Not Started Not Started Development On-Going Not Started Not Started Not Started Not Started Not Started Not Started Development On-Going Not Started Development On-Going Not Started Settlement Subtotal
2 14 29 7 6 53 1 1 14 8 1 1 4 1 1 2 24 14 308
0.16 0.55 1.17 0.49 0.26 2.11 0.15 0.26 0.55 0.23 0.10 0.03 0.04 0.09 0.04 0.29 0.15 0.61 11.96
2 14 29 7 6 53 1 1 14 8 1 1 4 1 1 2 24 14 296
0.16 0.55 1.17 0.49 0.26 2.11 0.15 0.26 0.55 0.23 0.10 0.03 0.04 0.09 0.04 0.29 0.15 0.61 11.64
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.32
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
14138 14840 15371 15548
Redevelopment Site Additional Units Whiteland Infill Site
Within the Urban Fabric Within the Urban Fabric Greenfield Within the Urban Fabric
Development On-Going Development On-Going Development On-Going Not Started Settlement Subtotal
11 5 1 2 19
0.47 0.12 0.33 0.06 0.98
11 3 1 2 17
0.47 0.07 0.33 0.06 0.93
0 2 0 0 2
0 1 0 0 1
0.00 0.05 0.00 0.00 0.05
0.00 0.03 0.00 0.00 0.03
15545 Infill Site
Within the Urban Fabric
Not Started Settlement Subtotal
6 6
0.29 0.29
6 6
0.29 0.29
0 0
0 0
0.00 0.00
0.00 0.00
15129 Whiteland
Greenfield
Development On-Going Settlement Subtotal
124 124
4.24 4.24
124 124
4.24 4.24
0 0
0 0
0.00 0.00
0.00 0.00
15499 Infill Site
Within the Urban Fabric
Not Started Settlement Subtotal
1 1
0.09 0.09
1 1
0.09 0.09
0 0
0 0
0.00 0.00
0.00 0.00
17854 17939 18075 18076 18077 21097
Greenfield Greenfield Greenfield Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric
Not Started Development On-Going Not Started Not Started Not Started Not Started
109 40 9 9 10 2
4.40 2.04 0.35 0.34 0.39 0.50
109 3 9 9 10 2
4.40 0.15 0.35 0.34 0.39 0.50
0 37 0 0 0 0
0 4 0 0 0 0
0.00 1.89 0.00 0.00 0.00 0.00
0.00 0.21 0.00 0.00 0.00 0.00
SETTLEMENT/ NILUD REF
Glenarm
Glenoe
Glynn
Grange Corner
Greenisland Zoned Residential Whiteland Zoned Residential Zoned Residential Zoned Residential Infill Site
Potential Site Yield (Units)
Potential Site Yield (Ha)
Remaining Potential (Units)
Remaining Potential (Ha)
Total Units Complete As Of 31 May 2024
Build Rate 01 June 2023 To 31 May 2024
Total Area Area Developed Developed As Of 01 June 2023 To 31 May 2024 31 May 2024
Type Of Site
Urban Fabric Or Greenfield
NILUD Site Status 2024
21387 21517 21518 21520 21525 21541 21561 21566 21574 21590 21596 21598 21612 21613 21617 21619
Zoned Residential Zoned Residential Infill Site Additional Units Infill Site Infill Site Zoned Residential Infill Site Redevelopment Site Infill Site Redevelopment Site Infill Site Infill Site Infill Site Infill Site Infill Site
Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric
Development On-Going Not Started Not Started Development On-Going Not Started Not Started Not Started Not Started Not Started Not Started Development On-Going Not Started Complete Not Started Not Started Not Started Settlement Subtotal
65 25 1 2 1 1 24 1 21 1 18 1 1 1 1 1 344
3.27 1.01 0.06 0.10 0.10 0.15 0.95 0.13 0.77 0.04 0.41 0.15 0.11 0.05 0.14 0.13 15.59
8 25 1 2 1 1 24 1 21 1 18 1 0 1 1 1 249
0.40 1.01 0.06 0.10 0.10 0.15 0.95 0.13 0.77 0.04 0.41 0.15 0.00 0.05 0.14 0.13 10.73
57 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 95
2 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 7
2.87 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.11 0.00 0.00 0.00 4.86
0.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.11 0.00 0.00 0.00 0.41
2820 2821 2823 14817 15070 15497 15561 15574 15589
Whiteland Zoned Residential Zoned Residential Zoned Residential Redevelopment Site Infill Site Redevelopment Site Infill Site Whiteland
Within the Urban Fabric Greenfield Greenfield Greenfield Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric
Development On-Going Development On-Going Development On-Going Not Started Development On-Going Not Started Development On-Going Not Started Development On-Going Settlement Subtotal
33 110 24 11 1 1 1 1 2 184
0.79 2.27 0.83 0.44 0.05 0.19 0.03 0.13 0.15 4.88
11 42 24 11 1 1 1 1 2 94
0.26 0.87 0.83 0.44 0.05 0.19 0.03 0.13 0.15 2.95
22 68 0 0 0 0 0 0 0 90
9 0 0 0 0 0 0 0 0 9
0.53 1.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.93
0.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.17
2614 2619 2630 2637 13730 13860 14035 14207 14631 14734 14822 14874 15087 15104 15170
Zoned Residential Zoned Residential Zoned Residential Zoned Residential Zoned Residential Whiteland Additional Units Zoned Residential Infill Site Redevelopment Site Additional Units Redevelopment Site Additional Units Zoned Residential Whiteland
Greenfield Greenfield Within the Urban Fabric Greenfield Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Greenfield Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric
Not Started Not Started Not Started Development On-Going Not Started Complete Development On-Going Development On-Going Not Started Not Started Development On-Going Not Started Not Started Complete Not Started
274 102 26 248 37 31 13 135 2 60 12 26 7 19 8
10.95 3.68 1.05 5.91 1.48 0.90 0.41 5.64 0.03 1.90 0.89 0.10 0.29 0.67 0.05
274 102 26 248 37 0 5 31 2 60 7 26 7 0 8
10.95 3.68 1.05 5.91 1.48 0.00 0.16 1.30 0.03 1.90 0.52 0.10 0.29 0.00 0.05
0 0 0 0 0 31 8 104 0 0 5 0 0 19 0
0 0 0 0 0 7 0 1 0 0 1 0 0 4 0
0.00 0.00 0.00 0.00 0.00 0.90 0.25 4.34 0.00 0.00 0.37 0.00 0.00 0.67 0.00
0.00 0.00 0.00 0.00 0.00 0.27 0.00 0.04 0.00 0.00 0.07 0.00 0.00 0.14 0.00
SETTLEMENT/ NILUD REF
Kells and Connor
Larne
Potential Site Yield (Units)
Potential Site Yield (Ha)
Remaining Potential (Units)
Remaining Potential (Ha)
Total Units Complete As Of 31 May 2024
Build Rate 01 June 2023 To 31 May 2024
Total Area Area Developed Developed As Of 01 June 2023 To 31 May 2024 31 May 2024
Type Of Site
Urban Fabric Or Greenfield
NILUD Site Status 2024
Infill Site Redevelopment Site Redevelopment Site Redevelopment Site Zoned Residential Zoned Residential Redevelopment Site Additional Units Infill Site Additional Units Redevelopment Site Other Zoning Additional Units Infill Site Redevelopment Site Zoned Residential Redevelopment Site Zoned Residential Zoned Residential Redevelopment Site Whiteland Infill Site Infill Site Zoned Residential Redevelopment Site Additional Units Infill Site Infill Site Additional Units Additional Units Infill Site
Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Greenfield Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Greenfield Within the Urban Fabric Greenfield Within the Urban Fabric Within the Urban Fabric Greenfield Within the Urban Fabric Within the Urban Fabric Greenfield Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric
Development On-Going Not Started Not Started Not Started Not Started Not Started Development On-Going Not Started Complete Not Started Not Started Not Started Not Started Not Started Not Started Development On-Going Not Started Not Started Not Started Development On-Going Not Started Not Started Not Started Not Started Not Started Not Started Not Started Not Started Not Started Not Started Not Started Settlement Subtotal
1 87 112 20 189 61 8 7 4 1 10 156 1 2 3 119 10 32 5 22 1 1 1 192 2 1 1 1 1 1 2 2054
0.05 2.27 6.42 0.87 8.87 0.58 0.57 0.11 0.01 0.02 0.27 14.09 0.01 0.15 0.01 5.56 0.20 1.66 0.11 1.34 0.07 0.08 0.10 3.46 0.17 0.02 0.05 0.21 0.02 0.02 0.12 81.44
1 87 112 20 189 61 8 7 0 1 10 156 1 2 3 93 10 32 5 6 1 1 1 192 2 1 1 1 1 1 2 1841
0.05 2.27 6.42 0.87 8.87 0.58 0.57 0.11 0.00 0.02 0.27 14.09 0.01 0.15 0.01 4.35 0.20 1.66 0.11 0.37 0.07 0.08 0.10 3.46 0.17 0.02 0.05 0.21 0.02 0.02 0.12 72.70
0 0 0 0 0 0 0 0 4 0 0 0 0 0 0 26 0 0 0 16 0 0 0 0 0 0 0 0 0 0 0 213
0 0 0 0 0 0 0 0 2 0 0 0 0 0 0 10 0 0 0 9 0 0 0 0 0 0 0 0 0 0 0 34
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.00 0.00 0.00 0.00 0.00 0.00 1.21 0.00 0.00 0.00 0.97 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.74
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.46 0.00 0.00 0.00 0.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.55
15322 Infill Site 15419 Infill Site 15535 Infill Site
Greenfield Within the Urban Fabric Greenfield
Development On-Going Not Started Not Started Settlement Subtotal
1 1 1 3
0.29 0.16 0.08 0.53
1 1 1 3
0.29 0.16 0.08 0.53
0 0 0 0
0 0 0 0
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
13341 Infill Site
Within the Urban Fabric
Development On-Going Settlement Subtotal
3 3
0.24 0.24
1 1
0.08 0.08
2 2
0 0
0.16 0.16
0.00 0.00
SETTLEMENT/ NILUD REF 15171 15266 15363 15364 15388 15389 15402 15410 15415 15420 15432 15453 15469 15498 15502 15505 15512 15518 15522 15526 15528 15544 15552 15565 15575 15578 15579 15581 15585 15587 15588
Magheramorne
Martinstown
SETTLEMENT/ NILUD REF
Type Of Site
Urban Fabric Or Greenfield
NILUD Site Status 2024
Potential Site Yield (Units)
Potential Site Yield (Ha)
Remaining Potential (Units)
Remaining Potential (Ha)
Total Units Complete As Of 31 May 2024
Build Rate 01 June 2023 To 31 May 2024
Total Area Area Developed Developed As Of 01 June 2023 To 31 May 2024 31 May 2024
Mullaghboy 15546 Infill Site 15533 Infill Site
Greenfield Within the Urban Fabric
Not Started Not Started Settlement Subtotal
3 1 4
0.34 0.09 0.43
3 1 4
0.34 0.09 0.43
0 0 0
0 0 0
0.00 0.00 0.00
0.00 0.00 0.00
14571 14644 14861 15027 15427 15430 15454 15495 15500 15504 15532 15547 15566 15583
Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Greenfield Within the Urban Fabric Within the Urban Fabric Greenfield Greenfield Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric
Development On-Going Not Started Development On-Going Not Started Not Started Development On-Going Development On-Going Development On-Going Not Started Not Started Not Started Not Started Not Started Development On-Going Settlement Subtotal
3 7 2 27 5 3 49 40 1 1 2 2 3 4 149
0.22 0.33 0.25 1.09 0.10 0.06 1.70 2.13 0.05 0.11 0.04 0.05 0.05 0.08 6.26
2 7 2 27 5 3 2 27 1 1 2 2 3 4 88
0.15 0.33 0.25 1.09 0.10 0.06 0.07 1.44 0.05 0.11 0.04 0.05 0.05 0.08 3.86
1 0 0 0 0 0 47 13 0 0 0 0 0 0 61
0 0 0 0 0 0 2 9 0 0 0 0 0 0 11
0.07 0.00 0.00 0.00 0.00 0.00 1.63 0.69 0.00 0.00 0.00 0.00 0.00 0.00 2.40
0.00 0.00 0.00 0.00 0.00 0.00 0.07 0.48 0.00 0.00 0.00 0.00 0.00 0.00 0.56
20635 Infill Site Within the Urban Fabric 19834 Redevelopment Site Within the Urban Fabric
Not Started Development On-Going Settlement Subtotal
1 10 11
0.32 0.35 0.67
1 10 11
0.32 0.35 0.67
0 0 0
0 0 0
0.00 0.00 0.00
0.00 0.00 0.00
17961 18082 18083 20291 21540 21582 21591 21614 21618
Development On-Going Not Started Development On-Going Complete Not Started Not Started Not Started Not Started Not Started Settlement Subtotal
4 15 20 1 1 1 1 18 1 62
0.12 0.58 0.90 0.03 0.12 0.14 0.04 0.18 0.04 2.15
4 15 9 0 1 1 1 18 1 50
0.12 0.58 0.41 0.00 0.12 0.14 0.04 0.18 0.04 1.63
0 0 11 1 0 0 0 0 0 12
0 0 2 1 0 0 0 0 0 3
0.00 0.00 0.50 0.03 0.00 0.00 0.00 0.00 0.00 0.53
0.00 0.00 0.10 0.03 0.00 0.00 0.00 0.00 0.00 0.13
Borough Total
8308
352.76
6918
295.90
1390
435
56.86
19.03
Portglenone Infill Site Redevelopment Site Additional Units Zoned Residential Infill Site Redevelopment Site Whiteland Infill Site Infill Site Infill Site Redevelopment Site Redevelopment Site Redevelopment Site Additional Units
Trooperslane
Whitehead Infill Site Zoned Residential Zoned Residential Redevelopment Site Infill Site Additional Units Additional Units Redevelopment Site Infill Site
Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric Within the Urban Fabric
Mid and East Antrim Borough Council Planning Office Silverwood Business Park 190 Raceview Road Ballymena BT42 4HZ T: 028 2563 3500 E: planning@midandeastantrim.gov.uk W: www.midandeastantrim.gov.uk