CIP Budget 2019-2028

Page 1

Capital Improvement Program Fiscal Years 2019—2028 Metropolitan Sewerage District of Buncombe County, North Carolina

2028 Riverside Drive

Phone: (828)-254-9646

W.H. Mull Building

Website: www.msdbc.org

Asheville, North Carolina


Metropolitan Sewerage District of Buncombe County, North Carolina Fiscal Years 2019—2028

Board of Directors Board Member

Representative of

M. Jerry Vehaun, Chairman

Town of Woodfin

E. Glenn Kelly, Vice-Chairman

Town of Biltmore Forest

Jackie W. Bryson, Secretary/Treasurer

Town of Woodfin

Matt Ashley, Jr.

Town of Montreat

Ellen Frost

County of Buncombe

Jim Holland

County of Buncombe

Esther Manheimer

City of Asheville

Chris Pelly

City of Asheville

Robert Pressley

County of Buncombe

Al P. Root

Town of Weaverville

Gwen Wisler

City of Asheville

Robert C. Watts

Town of Black Mountain

CIP Committee Members Robert C. Watts, Chairman Matt Ashley, Jr. Chris Pelly Robert Pressley

Cathy Ball, P.E.

City of Asheville

Alex Carmichael

Town of Montreat

Selena D. Coffey

Town of Weaverville

Marcus Jones, P.E.

Henderson County/Cane Creek Water & Sewer District

Jonathan Kanipe

Town of Biltmore Forest

Joseph Martin

Woodfin Sanitary Water & Sewer District

Matt Settlemyer

Town of Black Mountain

Jason Young

Town of Woodfin

Thomas E. Hartye, P.E.

General Manager

Ed Bradford, P.E.

Director of Engineering


Capital Improvement Program Fiscal Years 2019—2028

Overview


NCDENR-DWQ has requested that the following information be provided in this document, in accordance with the Compliance Inspection Report for MSD’s Collection System Permit WQCS00004. Goal Statement The mission of the MSD Capital Improvement Program is to produce, manage, and complete engineering projects for the repair and rehabilitation of the District’s collection system and Water Reclamation Facility (WRF). This shall be undertaken in the most efficient and effective manner necessary to ensure the reliable delivery and treatment of wastewater at an equitable price and in an environmentally sensitive manner.

Description of Existing Facilities

Collection System The MSD service area covers approximately 180 square miles. MSD provides service to areas along the French Broad River Valley and the Swannanoa River Valley as far as Ridgecrest. There are over 1,020 miles of public sanitary sewer line, 30 pump stations within the collection system, and approximately 29,933 manholes system wide. Less than 65 miles are large interceptors with diameters ranging from 24" to 66". One third of the balance is small 6" lines and two-thirds are medium size lines ranging from 8" up to 24". Most of this pipe is between 50 and 100 years old, and is in dire need of rehabilitation or replacement. The District’s 55,000 customer accounts reflect a service population of approximately 130,000 people. Water Reclamation Facility The Water Reclamation Facility (WRF) is a 40MGD secondary treatment plant serving Buncombe County (specifically Asheville, Biltmore Forest, Black Mountain, Montreat, Weaverville, Woodfin and Buncombe County at large), in addition to portions of Henderson County. Overall, MSD serves a combined customer population of 130,000, and over 30 separately billed industries. The facility treats a current average daily flow of approximately 20 MGD. The WRF is an attached growth design, comprised of 152 rotating biological contactors (RBC’s), which provide full secondary treatment. These RBC’s provide 450-500 acres (3+ acres each unit) of surface area for biological growth. MSD’s facility is believed to be the largest RBC plant in the world. The plant consists of: Preliminary Treatment Components   

IDI Barscreens (2 units) w/screenings compactor and shaftless screw conveyer Influent Pumps (3 units) – 35 MGD rated capacity each Aerated Grit Chambers (3 units) w/associated grit and grease removal


Primary Treatment Components  Primary Microscreens (7 units) – 250 micron screens Secondary Treatment Components  1st Stage RBC’s (44 units)  2nd Stage RBC’s (72 units)  3rd Stage RBC’s ( 36 units)  Intermediate Pumps (3 units) – pump water to clarifier from 3rd RBC stage  Intermediate Clarifier (4 cells – total volume 2 MG)  Microfiltration via AASI AquaDisk Units (16 units) Disinfection Components  Sodium Hypochlorite solution – average feed 1000 gallons/day at 8% solution strength Residuals Handling Components  Gravity Thickeners (2 units) – 100 foot-diameter each  2.5 Meter Belt Presses (2 units)  Fluidized Bed Incinerator (40DT/day rated)  Alkaline Stabilization Facility (40DT/day rated) Energy Management Components   

Two separate power circuits for plant, with Automatic Transfer Switch if one fails 4 Megawatt total from three Diesel Generators (emergency backup power for WRF; will maintain full treatment processes during a power outage) 850 Kilowatt Hydro Turbines (3 units) – induction units (French Broad River source)

Automation Components  SCADA (Supervisory Control and Data Acquisition) – full automated control of WRF Sludge Management Plan  MSD utilizes its fluidized bed incinerator as its primary residual management option, with alkaline stabilization as a secondary management option – as well as maintains an arrangement with the Buncombe County landfill (lined) for emergencies. Presently the facility is managing 12-15 DT’s per day of residuals. The facilities are designed for 40DT’s per day. Due to the lack of true primary clarifiers, most of the sludge generated at the facility is secondary in nature (i.e. sloughings from the RBC’s). Sludge is thickened in on-site gravity thickeners to a consistency of 4-7% solids at which time it is then pumped to the 2 1/2-meter belt presses. These units dewater the sludge to over 24% solids and then it is pumped to the incinerator. Air emissions from the incinerator are of excellent quality. Recent air emissions testing place removal efficiency of the air scrubbers at 99+% for regulated parameters, and air quality is further enhanced by a new filtration system added in 2016. Incinerator ash is thickened on-site via a gravity ash thickener and then pumped to an on-site lagoon. Groundwater is monitored in


accordance with NCDEQ requirements (up & down gradient). When alkaline stabilization operations are activated, a Class A (Eq.) product is produced and distributed to the public. The alkaline add-mixtures utilized in the process are fly ash, cement kiln dust (CKD) and lime kiln dust (LKD). The process incorporates the use of the "N-Viro" process when these alkaline products are utilized in accordance with the patented mix recipe. Due to the fact that the incinerator operations provide much more costeffective management, it is utilized as the primary option. Supplementary fuel is sometimes required due to the 24% solids content - natural gas via PSNC is utilized for this purpose. MSD also maintains an agreement with the local county landfill (lined) to dispose of dewatered sludge during emergency and/or maintenance activities. This provides a third residuals management alternative.


Capital Improvement Program Fiscal Years 2019—2028

Program Summary


METROPOLITAN SEWERAGE DISTRICT OF BUNCOMBE COUNTY, NORTH CAROLINA TEN YEAR CAPITAL IMPROVEMENT PROGRAM FY 2018-2019 through 2027-2028

PROJECT NAME

LOCATION OF PROJECT

PROJ. PROJECT MGR. NUMBER

PROJECT TOTAL FOOTAGE ESTIMATED COST

PIPE RATING

TOTAL EST. EXPENDS THRU FY 18

FY 18-19 BUDGET

FY 19-20

FOOTAGE

BUDGET

FY 20-21

FOOTAGE

BUDGET

FY 21-22

FOOTAGE

BUDGET

FY 22-23

FOOTAGE

BUDGET

FY 23-24

FOOTAGE

BUDGET

FY 24-25

FOOTAGE

BUDGET

FY 25-26

FOOTAGE

BUDGET

FY 26-27

FOOTAGE

BUDGET

FY 27-28

FOOTAGE

BUDGET

FOOTAGE

INTERCEPTOR AND WET WEATHER REHABILITATION Christian Creek Interceptor

Buncombe County

HC

2011110

24

12,379

$4,489,209

$73,431

$253,293

$2,073,500

Lower Swannanoa Interceptor

Asheville

EB

2004040

9

6,475

$5,478,400

$14,879

$0

$0

Middle Beaverdam Crk. @ I-26

Woodfin

OH

2010002

24

2,930

$1,293,650

$7,430

$0

$0

NW French Broad Interceptor

Asheville

EB/HC

2018084

N/A

10,650

$16,100,000

$0

$0

$0

South French Broad Relief Int.

Buncombe County

HC

2017070

N/A

36,330

$35,135,250

$95,000

$40,000

South French Broad Int. - Lining

Biltmore Estate

HC

2011033

8

21,913

$4,855,416

$2,986,416

$1,073,000

Beaverdam Creek WW (CDM #10)

Buncombe County

EB

2001191

27

5,500

$1,506,000

$0

$0

South Swannanoa WW (CDM #4)

Asheville

EB

2001195

23

8,040

$3,020,000

$0

$0

104,217

71,877,925

$3,177,156

$1,366,293

1.0000

1.0000

1.0000

$71,877,925

$3,177,156

$1,366,293

SUBTOTAL Inflation per ENR Const. Cost Index

3.03% 104,217

SUBTOTAL with inflation

PROJECT NAME

LOCATION OF PROJECT

PROJ. PROJECT MGR. NUMBER

PIPE RATING

PROJECT TOTAL FOOTAGE ESTIMATED COST

TOTAL EST. EXPENDS THRU FY 18

5,111

$0

$0

$0

$0

$0

$33,021

$12,500

$5,418,000

$0

$0

$7,070

$34,000

$3,250

$0

$0

$1,241,900

2,930

$0

$0

$0

$0

$0

$1,050,000

$1,050,000

$4,666,667

3,550

$0

$0

$0

$0

$8,610,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$1,506,000

$0

$0

$0

$0

$0

$0

$0

6,190

1.0615

$2,961,855

BUDGET

$2,599,500

10,165

FOOTAGE

0

1.0937

$2,759,416

6,190

FY 20-21 BUDGET

$0

$0

BUDGET

0

1.1268 0

FY 21-22

FOOTAGE

$40,091

$45,175

BUDGET

9,082

1.1610 0

FY 22-23

FOOTAGE

$8,656,500

$10,049,879

BUDGET

$14,031,250

15,557

1.1961 9,082

FY 23-24

FOOTAGE

9,082

$0

$0

$0

10,165

$8,610,000

$0

$0

$2,874,750

9,082

6,475

$0

3,976

FY 19-20

FOOTAGE

6,190

$510,000

$796,000

1.0303 5,111

$2,089,500 $0

$5,250 5,111

FY 18-19 BUDGET

6,189

$16,783,347

BUDGET

9,082

15,557

FOOTAGE

5,500

$11,166,000

14,582

9,084

$0 $0

$0

$0

$3,020,000

8,040

$0

$12,725,000

17,124

$5,908,567

1.2697

$13,760,795

14,582

FY 25-26 BUDGET

$8,655,000 $0

1.2324

FY 24-25

FOOTAGE

$8,610,000

FOOTAGE

$16,157,248

17,124

FY 26-27 BUDGET

FOOTAGE

$7,729,572

Arden

HC

2014012

39

1,833

$519,330

$5,480

$0

$0

$0

$30,250

Aurora Drive

Asheville

DP

2017145

53

2,500

$708,500

$0

$10,000

$5,500

$47,000

$646,000

Beale Road at Copney Lane

Asheville

DP

2009129

47

4,027

$1,445,925

$15,725

$0

$16,200

$151,000

Beaucatcher Rd. @ Kenilworth Rd.

E. Asheville

SA

2015219

35

1,370

$521,900

$19,500

$37,600

$0

$464,800

Bellevue Road

S. Asheville

DP

2015175

49

1,100

$445,600

$9,600

$0

$5,000

$56,000

Bent Tree Road

Asheville

DP

2016102

60

925

$391,250

$4,500

$3,750

$54,000

$329,000

Buchanan Ave.

Asheville

SA

2014023

51

2,535

$973,800

$0

$28,000

$6,400

$59,000

$880,400

Caledonia Road

Asheville

HC

2014153

31

2,993

$1,008,400

$10,000

$355,600

$0

$154,000

$0

1,066

1,370

BUDGET

FOOTAGE

$0

$483,600

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

1,100

2,535

$488,800

1,927

$382,400

1,450

Asheville

SA

2015019

43

1,450

$439,400

$13,000

$0

$1,000

$43,000

$0

Cherokee Road

Asheville

DP

2009132

48

1,960

$701,680

$24,680

$0

$0

$101,000

$576,000

Chestnut Lodge Rd.

Black Mountain

SA

2014017

61

4,150

$1,300,000

$22,500

$16,500

$134,000

$1,127,000

$0

$0

$0

Cub Road

Asheville

OH

2018027

40

1,204

$425,600

$0

$0

$0

$0

$14,000

$76,000

$335,600

1,204

East Chestnut Ave @ Five Points

N. Asheville

SA

2015192

36

5,225

$1,733,800

$268,000

$0

$1,000

$80,800

$79,000

$0

$1,305,000

5,225

Elk Mountain Place

Woodfin

HC

2010094

48

4,101

$1,055,250

$18,000

$0

$164,000

$41,000

$832,250

$0

$0

Page 1 of 4

$0 $0

$1,263,000

Chatham Road

4,150

$0 $0

$0

$0

4,027

1,833

$0 $375,000

925

2,500

1,960

4,101

$0

6,480

FY 27-28

GENERAL SEWER REHABILITATION Atkins Street

6,480

1.3082

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0


METROPOLITAN SEWERAGE DISTRICT OF BUNCOMBE COUNTY, NORTH CAROLINA TEN YEAR CAPITAL IMPROVEMENT PROGRAM FY 2018-2019 through 2027-2028 PROJECT NAME

LOCATION OF PROJECT

PROJ. PROJECT MGR. NUMBER

PIPE RATING

PROJECT TOTAL FOOTAGE ESTIMATED COST

TOTAL EST. EXPENDS THRU FY 18

FY 18-19 BUDGET

FY 19-20

FOOTAGE

BUDGET

FY 20-21

FOOTAGE

BUDGET

FY 21-22

FOOTAGE

BUDGET

FY 22-23

FOOTAGE

BUDGET

FY 23-24

FOOTAGE

BUDGET

FY 24-25

FOOTAGE

BUDGET

FY 25-26

FOOTAGE

BUDGET

FY 26-27

FOOTAGE

BUDGET

FY 27-28

FOOTAGE

BUDGET

FOOTAGE

GENERAL SEWER REHABILITATION continued… Fairmont Road

N. Asheville

DP

2015017

31

3,900

$1,196,000

$0

$0

$0

$0

$0

$15,000

$8,500

$59,500

$0

Forestdale Drive

S. Asheville

DP

2014002

33

2,600

$843,000

$0

$0

$0

$0

$12,000

$17,500

$104,000

$0

$709,500

908

$1,113,000 2,600

3,900

$0

$0

$0

$0

$0

$0

$0

$0

Four Inch Main - Dry Ridge Rd.

Asheville

DP

2012009

58

908

$362,600

$39,100

$323,500

$0

$0

$0

$0

$0

$0

Harmony Lane

Asheville

DP

2016103

35

670

$125,000

$0

$0

$0

$0

$0

$2,500

$0

$122,500

Hazel Mill Rd @ Richland St.

Asheville

SA

2014016

26

3,300

$934,700

$0

$0

$0

$0

$0

$17,000

$9,400

$94,000

$0

$814,300

Hendersonville @ Rosscraggon 2

Arden

OH

2009150

68

4,163

$1,549,013

$1,205,010

$343,503

$0

$0

$0

$0

$0

$0

Highland Farms Road

Black Mountain

HC

2018018

65

1,131

$271,250

$0

$5,700

$0

$0

$0

$0

$0

$0

Hill Street

Asheville

SA

2015018

54

2,088

$697,200

$10,000

$687,200

$0

$0

$0

$0

$0

Horizon Hill Rd. (Hy-Vu Drive)

Asheville

SA

2008084

51

713

$228,444

$10,444

$0

Howland Rd. @ Sunset Trail

Asheville

DP

2012134

43

1,033

$391,600

$7,500

$0

$0

$4,500

Jarnaul Avenue

N. Asheville

HC

2016104

75

5,330

$1,526,100

$18,500

$154,250

$165,000

$1,188,350

Johnston Blvd. @ Providence Rd.

W. Asheville

DP

2014013

37

2,000

$544,150

$8,150

$0

$0

Kenilworth @ Springdale Rd.

Asheville

HC

2014010

42

2,524

$747,350

$6,800

$299,700

Kimberly Ave. @ Sedley Avenue

Asheville

OH

2018029

35

3,005

$984,000

$0

$0

Lakeshore Dr. @ Merrimon Ave.

N. Asheville

HC

2014177

25

362

$211,600

$8,866

$0

Lincoln Avenue

Asheville

HC

2013103

26

1,415

$398,370

$2,870

$0

$0

Lining Contract No. 9

Various

DP

2017031

NA

11,000

$1,102,000

$200,000

$0

$902,000

1,040

2,088

1,061

670

$0 3,300

$0

$0

$0

$0

$750

$6,000

$258,800

$0

$0

$0

$0

$0

$0

$0

$218,000

713

$0

$0

$0

$0

$0

$66,000

$313,600

1,033

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$9,000

$53,000

$474,000

$0

$0

$0

$0

$69,250

$0

$0

$371,600

$0

$0

$0

$0

$0

$0

$0

$0

$31,000

$116,000

$837,000

$0

$0

$0

$0

$0

$1,800

$0

$3,000

$96,134

$101,800

362

$0

$0

$0

$0

$0

$0

$395,500

1,415

$0

$0

$0

$0

$0

$0

$0

$52,500

$0

$492,300

$0

$0

$0

11,000

5,330

1,131

3,005

$0 $0 $0 $0

Logan Avenue

W. Asheville

SA

2017256

48

1,884

$562,500

$0

$17,700

Long Shoals Rd. @ Allen Ave.

Arden

HC

2010013

59

621

$286,472

$98,872

$187,600

Lynn Cove Road

Beaverdam

DP

2015010

35

5,589

$1,547,000

$0

$0

$25,000

$0

$15,000

Manetta Rd. @ Johnson Dr.

N. Asheville

SA

2014022

20

6,500

$1,895,700

$0

$0

$0

$0

$0

Meadow Road @ Train Yard

Asheville

HC

2015207

37

2,001

$727,000

$9,000

$0

$0

$0

$45,000

$4,000

$669,000

Memory Lane

Asheville

OH

2016099

56

1,900

$787,885

$27,231

$760,750

$0

$0

$0

$0

$0

Mitchell Avenue

W. Asheville

SA

2014185

23

3,360

$991,300

$0

$0

$0

$0

$0

$17,000

$1,000

Montford Ave. @ Montford Park

Asheville

HC

2017144

50

1,258

$367,150

$0

$0

$0

$6,300

$6,750

$60,000

$294,100

$0

Mountainbrook Rd. @ Chunns Cove

Asheville

DP

2010112

55

2,800

$983,515

$21,015

$0

$156,000

$806,500

2,800

$0

$0

$0

$0

$0

$0

$0

New Haw Creek Rd. @ Dogwood Grove

E. Asheville

SA

2014021

31

1,900

$632,500

$9,500

$7,600

$61,000

$554,400

1,900

$0

$0

$0

$0

$0

$0

$0

New Haw Creek @ Water Booster Station

Asheville

OH

2016250

80

90

$32,100

$1,000

$5,100

$26,000

$0

$0

$0

$0

$0

New Stock Road

Woodfin

DP

2015011

45

9,020

$2,402,500

$36,000

$0

$0

$0

$0

$0

$0

$0

New Walnut St. @ Riverside Dr.

Asheville

DP

2017007

63

1,180

$357,000

$5,000

$47,000

$305,000

$0

$0

$0

$0

$0

North Lexington @ I-240

Asheville

SA

2014182

47

210

$93,970

$2,570

$0

North Market Street

Asheville

SA

2014019

26

1,064

$284,400

$5,300

$0

Northwest Ave. @ No. 215

Swannanoa

HC

2018017

84

251

$63,350

$0

$1,250

621

1,900

90

1,884

1,463

2,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$91,000

$0

$1,416,000

$0

$0

$0

$33,000

$7,000

$110,000

$0

$0

$1,745,700

$0

$0

$0

$0

$0

$0

$0

$0

$4,800

$65,000

$0

$903,500

$0

$0

$0

2,001

1,258

5,589

$0

$0

$0

$6,500

$76,000

$2,284,000

$0

$0

$0

$0

$2,000

$0

$89,400

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$1,500

$0

$277,600

$1,500

$0

$60,600

$0

$0

$0

$0

$0

$0

1,180

Page 2 of 4

251

9,020

210

6,500

3,360

1,064


METROPOLITAN SEWERAGE DISTRICT OF BUNCOMBE COUNTY, NORTH CAROLINA TEN YEAR CAPITAL IMPROVEMENT PROGRAM FY 2018-2019 through 2027-2028 PROJECT NAME

LOCATION OF PROJECT

PROJ. PROJECT MGR. NUMBER

PIPE RATING

PROJECT TOTAL FOOTAGE ESTIMATED COST

TOTAL EST. EXPENDS THRU FY 18

FY 18-19 BUDGET

FY 19-20

FOOTAGE

BUDGET

FY 20-21

FOOTAGE

BUDGET

FY 21-22

FOOTAGE

BUDGET

FY 22-23

FOOTAGE

BUDGET

FY 23-24

FOOTAGE

BUDGET

FY 24-25

FOOTAGE

BUDGET

FY 25-26

FOOTAGE

BUDGET

FY 26-27

FOOTAGE

BUDGET

FY 27-28

FOOTAGE

BUDGET

FOOTAGE

GENERAL SEWER REHABILITATION continued… Oakland Drive @ Church Street

Black Mountain

DP

2015177

27

575

$171,000

$0

$0

$0

$0

$0

$0

$2,500

$2,500

$29,000

$137,000

Old Haw Creek Rd. @ Greenbriar Rd.

E. Asheville

HC

2012109

56

3,755

$1,172,600

$129,700

$1,043,900

3,755

$0

$0

$0

$0

$0

$0

$0

$0

Old West Chapel Road

Asheville

DP

2014004

53

5,200

$1,560,000

$112,000

$1,448,000

5,200

$0

$0

$0

$0

$0

$0

$0

$0

$0

Owenby Lane @ US Hwy 70

Black Mountain

OH

2018033

85

1,426

$492,345

$0

$15,500

$0

$76,845

$400,000

$0

$0

$0

$0

$0

$0

Riverside Dr. @ Riverside Baptist

Asheville

OH

2016251

40

510

$168,450

$0

$0

$0

$0

$5,500

$19,200

$143,750

$0

$0

$0

$0

Riverview Drive

Asheville

HC

2013104

24

2,302

$650,680

$7,880

$0

$0

$0

$0

$0

$0

$0

$0

$0

$642,800

Royal Pines Drive - PRP 47009

Arden

SA

2007020

35

2,888

$10,100

$0

$0

$0

$6,500

$17,000

$0

$0

$784,500

$0

$0

Sand Hill Road @ Baker Place

W. Asheville

SA

2015223

22

550

$155,000

$0

$0

$0

$0

$0

$3,000

$1,000

$0

$0

$0

$151,500

Smokey Park Hwy @ Sand Hill Rd.

Enka

OH

2018035

TBD

590

$237,750

$0

$0

$0

$0

$0

$6,500

$63,750

$167,500

$0

$0

$0

S. Main St. @ Reems Creek Rd.

Weaverville

HC

2017012

51

565

$187,450

$0

$0

$46,050

$11,000

$130,400

565

$0

$0

$0

$0

$0

$0

Springside Rd. @ Overlook Rd.

S. Asheville

SA

2012127

52

4,056

$1,370,700

$31,300

$108,000

$0

$0

$1,231,400

4,056

$0

$0

$0

$0

$0

$0

Starnes Avenue

Asheville

HC

2014154

22

2,871

$896,500

$0

$0

$0

$0

$0

$14,300

Sulphur Springs Rd. @ Covington St.

W. Asheville

DP

2014006

44

1,350

$463,000

$5,500

$0

$0

$10,000

$103,000

$344,500

Sweeten Creek Rd. @ Buck Shoals Rd.

S. Asheville

HC

2014015

51

918

$326,920

$6,920

$7,000

$44,500

$6,500

Sweeten Creek Rd. @ Mills Gap Rd.

Asheville

SA

2014189

46

2,325

$679,000

$24,000

$4,000

$105,000

$546,000

US 70 @ Jordan Road

Swannanoa

DP

2015014

21

4,550

$1,443,000

$0

$0

$0

Walnut St. @ N. Lexington Ave.

Asheville

DP

2017008

42

1,550

$463,500

$0

$0

$0

$818,100

$262,000

590

$0

$0

$82,000

$0

$800,200

$0

$0

$0

$0 $0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$20,000

$0

$20,000

$100,500

$39,000

$0

$1,263,500

$0

$7,000

$0

$456,500

$0

$0

$0

$0

$0

$0

1,550

Asheville

SA

2014018

54

2,350

$1,141,100

$11,500

$0

$1,129,600

$0

$0

$0

$0

$0

$0

W. Asheville

SA

2014183

33

4,100

$1,348,200

$0

$0

$0

$21,000

$500

$28,200

$160,000

$184,000

$954,500

West Crabapple Lane

W. Asheville

DP

2014005

67

N/A

$124,800

$3,800

$9,000

$112,000

$0

$0

$0

$0

$0

$0

Weaverville

HC

2015194

27

582

$168,780

$2,380

$0

Various

MS

2002101

N/A

200,000

$43,100,000

$4,164,404

$4,400,000

Surveys for Design

Various

EB

2002060

N/A

N/A

$500,000

$0

$50,000

Future Projects - Non Critical

Various

EB

Varies

Varies

SUBTOTAL Inflation per ENR Const. Cost Index

Varies

$0

$0

$93,436,029

$6,653,197

$10,377,703

1.0000

1.0000

1.0000

$93,436,029

$6,653,197

$10,377,703

3.03% 364,156

SUBTOTAL with inflation

PROJECT NAME

Varies 364,156

LOCATION OF PROJECT

PROJ. PROJECT MGR. NUMBER

PIPE RATING

PROJECT TOTAL FOOTAGE ESTIMATED COST

TOTAL EST. EXPENDS THRU FY 18

$0 20,000

20,000

$50,000

34,620

34,620

BUDGET

38,800

38,800

BUDGET

42,427

42,427

BUDGET

41,193

41,193

BUDGET

$10,454,126

35,581

BUDGET

29,854

29,854

BUDGET

29,588

$166,400

582

$0

20,000

$4,300,000

29,588

30,134

2,871

4,550

20,000

$10,134,800

41,197

1.3082

$8,987,112

BUDGET

550

$0

$7,078,000

30,134

FY 26-27

FOOTAGE

2,302

$50,000

1.2697

$8,763,645

BUDGET

$0

$0

$7,111,134

FY 25-26

FOOTAGE

$0

$0

$50,000

1.2324

$8,912,802

$0

$4,300,000

$0

$7,451,300

FY 24-25

FOOTAGE

20,000

$50,000

1.1961

FY 23-24

FOOTAGE

$4,300,000

$0 35,581

1.1610

$11,958,159

20,000

$50,000

$9,004,700

4,100

$0

$4,300,000

$0

$10,612,300

FY 22-23

FOOTAGE

20,000

$50,000

1.1268

$12,020,277

$0

$4,300,000

$0

$10,990,650

FY 21-22

FOOTAGE

20,000

$50,000

1.0937

$10,880,024

$0

$4,300,000

$0

$10,249,495

FY 20-21

FOOTAGE

20,000

$50,000

1.0615

$8,178,779

$0

$4,300,000

$0

$7,938,250

FY 19-20

FOOTAGE

20,000

$50,000

1.0303 37,639

$0

$4,300,000

$0 37,639

FY 18-19 BUDGET

$0

$4,300,000

$0

$0

Waynesville Ave. @ Brownwood Ave.

SSD Rehab. & Replacement

2,888

$0

$0

2,325

918

1,350

510

Walnut Street @ Rankin Ave.

Wildwood Park

2,350

1,426

575

$13,258,320

41,197

FY 27-28

FOOTAGE

BUDGET

FOOTAGE

PRIVATE SEWER REHABILITATION Dogwood Rd. @ White Pine Circle

Arden

OH

2014132

56

580

$208,750

$5,800

$0

$0

$14,000

$188,950

$0

$0

$0

$0

Homeland Park

Asheville

OH

2016248

48

930

$286,750

$0

$0

$10,000

$0

$17,500

$259,250

930

$0

$0

$0

$0

$0

Old County Home Rd PSR

W. Asheville

SA

2015221

48

2,650

$743,900

$20,000

$0

$15,400

$14,000

$0

$694,500

2,650

$0

$0

$0

$0

$0

4,160

$1,239,400

$25,800

$0

$953,750

3,580

1.0000

1.0000

1.0000

$1,239,400

$25,800

$0

SUBTOTAL Inflation per ENR Const. Cost Index SUBTOTAL with inflation

3.03% 4,160

0

$25,400

0

1.0303 0

$26,170

$28,000

0

1.0615 0

$29,723

Page 3 of 4

$206,450

580

580

1.0937 0

$225,791

$0

1.1268 580

$1,074,705

$0

0

1.1610 3,580

$0

$0

0

1.1961 0

$0

$0

0

1.2324 0

$0

$0

$0

0

1.2697 0

$0

$0

0

1.3082 0

$0

0


METROPOLITAN SEWERAGE DISTRICT OF BUNCOMBE COUNTY, NORTH CAROLINA TEN YEAR CAPITAL IMPROVEMENT PROGRAM FY 2018-2019 through 2027-2028 PROJECT NAME

LOCATION OF PROJECT

PROJ. PROJECT MGR. NUMBER

PIPE RATING

PROJECT TOTAL FOOTAGE ESTIMATED COST

TOTAL EST. EXPENDS THRU FY 18

FY 18-19 BUDGET

FY 19-20

FOOTAGE

BUDGET

FY 20-21

FOOTAGE

BUDGET

FY 21-22

FOOTAGE

BUDGET

FY 22-23

FOOTAGE

BUDGET

FY 23-24

FOOTAGE

BUDGET

FY 24-25

FOOTAGE

BUDGET

FY 25-26

FOOTAGE

BUDGET

FY 26-27

FOOTAGE

BUDGET

FY 27-28

FOOTAGE

BUDGET

FOOTAGE

TREATMENT PLANT, PUMP STATIONS & GENERAL CAPITAL IMPROVEMENTS Avery Creek PS Improvements

Arden

DP

2018008

N/A

0

$500,000

$0

$500,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

Biological Treatment

MSD-Treatment Plant

HC

2016063

N/A

0

$45,500,000

$0

$0

$0

$0

$0

$500,000

$2,500,000

$2,500,000

$10,000,000

$18,000,000

$12,000,000

Building and Facility Rehabilitation

MSD-Treatment Plant

$68,000

Carrier Bridge Capacity Improvements

Asheville

Flow Monitoring

HC

2002068

N/A

0

$786,000

$20,950

$139,000

$80,000

$91,000

$68,000

$68,000

$68,000

$68,000

$68,000

$68,000

EB/HC

2018089

N/A

0

$17,800,000

$0

$0

$0

$1,150,000

$1,150,000

$5,166,667

$5,166,667

$5,166,666

$0

$0

$0

MSD-Treatment Plant

SA

2008013

N/A

0

$442,535

$312,535

$50,000

$40,000

$40,000

$0

$0

$0

$0

$0

$0

$0

Intermediate Clarifier Slide Gates

MSD-Treatment Plant

HC

2017022

N/A

0

$243,000

$0

$243,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

Plant Headworks Improvements

MSD-Treatment Plant

HC

2015004

N/A

0

$11,995,950

$8,809,950

$3,186,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

Plant High Rate Primary Treatment

MSD-Treatment Plant

HC

2015054

N/A

0

$16,950,595

$1,185,595

$3,509,500

$10,527,000

$1,728,500

$0

$0

$0

$0

$0

$0

$0

General Capital Equipment

Varies

EB

2016072

N/A

0

$1,500,000

$133,242

$150,000

$150,000

$150,000

$150,000

$150,000

$150,000

$150,000

$150,000

$150,000

$150,000

0

$95,718,080

$10,462,272

$7,777,500

1.0000

1.0000

1.0000

$95,718,080

$10,462,272

$7,777,500

SUBTOTAL Inflation per ENR Const. Cost Index

3.03% 0

SUBTOTAL with inflation

PROJECT NAME

LOCATION OF PROJECT

PROJ. PROJECT MGR. NUMBER

PIPE RATING

PROJECT TOTAL FOOTAGE ESTIMATED COST

TOTAL EST. EXPENDS THRU FY 18

0

0

1.0303 0

FY 18-19 BUDGET

$10,797,000

$11,124,149

BUDGET

0

1.0615 0

FY 19-20

FOOTAGE

$3,159,500

$3,353,866

BUDGET

0

1.0937 0

FY 20-21

FOOTAGE

$1,368,000

$1,496,157

BUDGET

0

1.1268 0

FY 21-22

FOOTAGE

$5,884,667

$6,630,964

BUDGET

0

1.1610 0

FY 22-23

FOOTAGE

$7,884,667

$9,153,809

BUDGET

0

1.1961 0

FY 23-24

FOOTAGE

$7,884,666

$9,431,168

BUDGET

0

1.2324 0

FY 24-25

FOOTAGE

$10,218,000

$12,592,495

BUDGET

0

1.2697 0

FY 25-26

FOOTAGE

$18,218,000

$23,131,846

BUDGET

0

1.3082 0

FY 26-27

FOOTAGE

$12,218,000

$15,983,556

0

FY 27-28

FOOTAGE

BUDGET

FOOTAGE

DESIGN, ROW, & CONSTRUCTION MANAGEMENT EXPENSES Design, ROW, & Const. Mgmt. Exp.

MSD/ENG

EB

N/A

N/A

SUBTOTAL

0

$30,722,347

$2,476,474

$2,705,222

0

$30,722,347

$2,476,474

$2,705,222

$2,779,330 0

$2,851,153

$2,779,330

0

$2,925,039

$2,851,153

0

$3,001,101

$2,925,039

0

$3,143,616

$3,001,101

0

$3,215,794

$3,143,616

0

$3,290,041

$3,215,794

0

$3,366,324

$3,290,041

0

$3,444,727

$3,366,324

0

$3,444,727

0

BUDGET SUMMARY

PROJECT NAME

LOCATION OF PROJECT

PROJ. PROJECT MGR. NUMBER

PIPE RATING

PROJECT TOTAL FOOTAGE ESTIMATED COST

472,533

SUBTOTAL with Inflation

$292,993,781

TOTAL EST. EXPENDS THRU FY 18 $22,794,899

TOTAL

BUDGET $22,226,718

FY 19-20

FOOTAGE 42,750

BUDGET $25,070,283

FY 20-21

FOOTAGE 44,785

BUDGET

FY 21-22

FOOTAGE

$19,874,182

44,990

BUDGET $16,667,264

FY 22-23

FOOTAGE 43,007

BUDGET $22,710,105

FY 23-24

FOOTAGE 44,773

BUDGET $32,801,431

FY 24-25

FOOTAGE 44,663

BUDGET $38,343,111

FY 25-26

FOOTAGE 45,411

BUDGET $38,406,976

FY 26-27

FOOTAGE 44,170

BUDGET $51,642,530

FY 27-28

FOOTAGE 47,258

BUDGET $40,416,175

FOOTAGE 47,677

$1,000,000

CONTINGENCY REIMBURSEMENT PROJECTS

FY 18-19

Various

Various

Various

0

$1,216,000

$22,930

$266,000

0

$150,000

0

$100,000

0

$100,000

0

$100,000

0

$100,000

0

$100,000

0

$100,000

0

$100,000

0

$100,000

0

472,533

$294,209,781

$22,817,829

$23,492,718

42,750

$25,220,283

44,785

$19,974,182

44,990

$16,767,264

43,007

$22,810,105

44,773

$32,901,431

44,663

$38,443,111

45,411

$38,506,976

44,170

$51,742,530

47,258

$40,516,175

47,677

Page 4 of 4


METROPOLITAN SEWERAGE DISTRICT OF BUNCOMBE COUNTY, NORTH CAROLINA TEN YEAR CAPITAL IMPROVEMENT PROGRAM FY 2018-2019 through 2027-2028 MUNICIPAL SUMMARIES PROJECT NAME

LOCATION OF PROJECT

PROJ. MGR.

PROJECT NUMBER

PIPE RATING

TOTAL ESTIMATED COST

PROJECT FOOTAGE

TOTAL EST. EXPENDS THRU FY 18

FY 18-19 BUDGET

FY 19-20

FOOTAGE

BUDGET

FY 20-21

FOOTAGE

BUDGET

FY 21-22

FOOTAGE

BUDGET

FY 22-23

FOOTAGE

BUDGET

FY 23-24

FOOTAGE

BUDGET

FY 24-25

FOOTAGE

BUDGET

FY 25-26

FOOTAGE

BUDGET

FY 26-27

FOOTAGE

BUDGET

FY 27-28

FOOTAGE

BUDGET

FOOTAGE

BUNCOMBE COUNTY Atkins Street

Arden

HC

2014012

39

1,833

$519,330

$5,480

$0

$0

$0

$30,250

$0

$483,600

$0

$0

$0

$0

Avery Creek PS Improvements

Arden

DP

2018008

N/A

0

$500,000

$0

$500,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

Dogwood Rd. @ White Pine Circle

Arden

OH

2014132

56

580

$208,750

$5,800

$0

$0

$14,000

$188,950

$0

$0

$0

$0

$0

$0

Hendersonville @ Rosscraggon 2

Arden

OH

2009150

68

4,163

$1,549,013

$1,205,010

$343,503

1,040

$0

$0

$0

$0

$0

$0

$0

$0

$0

Long Shoals Rd. @ Allen Ave.

Arden

HC

2010013

59

621

$286,472

$98,872

$187,600

621

$0

$0

$0

$0

$0

$0

$0

$0

$0

Royal Pines Drive - PRP 47009

Arden

SA

2007020

35

2,888

$818,100

$10,100

$0

$0

$0

$6,500

$17,000

$0

$0

$784,500

$0

$0

Lynn Cove Road

Beaverdam

DP

2015010

35

5,589

$1,547,000

$0

$0

South French Broad Int. - Lining

Biltmore Estate

HC

2011033

8

21,913

$4,855,416

$2,986,416

$1,073,000

$25,000 5,111

$796,000

$0

$15,000

$91,000

$0

$1,416,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

6,189

$2,089,500

Buncombe County

EB

2001191

27

5,500

$1,506,000

$0

$0

$0

Christian Creek Interceptor

Buncombe County

HC

2011110

24

12,379

$4,489,209

$73,431

$253,293

$2,073,500

South French Broad Relief Int.

Buncombe County

HC

2017070

N/A

42,400

$35,135,250

$95,000

$40,000

$5,250

Smokey Park Hwy @ Sand Hill Rd.

Enka

OH

2018035

TBD

590

$237,750

$0

$0

$0

$0

$0

Northwest Ave. @ No. 215

Swannanoa

HC

2018017

84

251

$63,350

$0

$1,250

$1,500

$0

$60,600

US 70 @ Jordan Road

Swannanoa

DP

2015014

21

4,550

$1,443,000

$0

$0

$0

$0

$20,000

103,257

$53,158,640

$4,480,109

$2,398,646

1.0000

1.0000

1.0000

$53,158,640

$4,480,109

$2,398,646

Inflation per ENR Const. Cost Index

3.03% 103,257

SUBTOTAL with inflation

PROJECT NAME

LOCATION OF PROJECT

PROJ. MGR.

PROJECT NUMBER

PIPE RATING

PROJECT FOOTAGE

TOTAL ESTIMATED COST

TOTAL EST. EXPENDS THRU FY 18

6,772

6,772

$2,901,250

10,165

$2,989,158

BUDGET

$2,613,500

6,190

1.0615 10,165

FY 19-20

FOOTAGE

6,190

$510,000

1.0303

FY 18-19 BUDGET

$0

FOOTAGE

6,190

FY 20-21 BUDGET

$0

$0

$0

$0

$1,506,000

$0

$0

$0

$0

$0

$0

$0

$8,610,000

$6,500 $0 $0

251

$321,300

831

1.0937

$2,774,278

$351,400

BUDGET

$114,500

0

1.1268 831

FY 21-22

FOOTAGE

5,589

2,888

3,976

Beaverdam Creek WW (CDM #10)

SUBTOTAL

580

1,833

$129,021

0

BUDGET

$8,610,000

$63,750

$167,500

590

$0

$0

$0

$0

$0

$0

$0

$20,000

$100,500

$39,000

$0

$1,263,500

4,550

$1,263,500

4,550

$9,177,350

12,433

16,779

1.1961

$10,654,567

BUDGET

$10,294,000

12,433

$12,313,070

BUDGET

$10,939,500

18,988

1.2324 16,779

FY 24-25

FOOTAGE

10,600

$0

10,600

FY 23-24

FOOTAGE

$0

$8,610,000

1.1610

FY 22-23

FOOTAGE

10,600

5,500

$13,481,660

BUDGET

10,600

18,988

FOOTAGE

$8,655,000

10,600

1.3082

$10,989,468

10,600

FY 26-27 BUDGET

$0 $0

1.2697

FY 25-26

FOOTAGE

$8,655,000

$1,652,907

FY 27-28

FOOTAGE

BUDGET

FOOTAGE

CITY OF ASHEVILLE Aurora Drive

Asheville

DP

2017145

53

2,500

$708,500

$0

$10,000

$5,500

$47,000

$646,000

Beale Road at Copney Lane

Asheville

DP

2009129

47

4,027

$1,445,925

$15,725

$0

$16,200

$151,000

$0

Bent Tree Road

Asheville

DP

2016102

60

925

$391,250

$4,500

$3,750

$54,000

$329,000

Buchanan Ave.

Asheville

SA

2014023

51

2,535

$973,800

$0

$28,000

$6,400

$59,000

1,066

925

2,500

$0 $880,400

$0 $1,263,000

2,535

4,027

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0 $0

Caledonia Road

Asheville

HC

2014153

31

2,993

$1,008,400

$10,000

$355,600

$0

$154,000

$0

$488,800

Carrier Bridge Capacity Improvements

Asheville

EB/HC

2018089

N/A

0

$17,800,000

$0

$0

$0

$1,150,000

$1,150,000

$5,166,667

Chatham Road

Asheville

SA

2015019

43

1,450

$439,400

$13,000

$0

$1,000

$43,000

$0

$382,400

Cherokee Road

Asheville

DP

2009132

48

1,960

$701,680

$24,680

$0

$0

$101,000

$576,000

$0

$0

Cub Road

Asheville

OH

2018027

40

1,204

$425,600

$0

$0

$0

$0

$14,000

$76,000

$335,600

Four Inch Main - Dry Ridge Rd.

Asheville

DP

2012009

58

908

$362,600

$39,100

$323,500

$0

$0

$0

$0

Harmony Lane

Asheville

DP

2016103

35

670

$125,000

$0

$0

$0

$0

$0

Hazel Mill Rd @ Richland St.

Asheville

SA

2014016

26

3,300

$934,700

$0

$0

$0

$0

$0

908

2,088

1,960

1,927

$0

$0

$0

$0

$5,166,667

$5,166,666

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$2,500

$0

$122,500

$17,000

$9,400

$94,000

1,450

1,204

670

$0

$0

$0

$814,300

$0 3,300

$0

Hill Street

Asheville

SA

2015018

54

2,088

$697,200

$10,000

$687,200

$0

$0

$0

$0

Homeland Park

Asheville

OH

2016248

48

930

$286,750

$0

$0

$10,000

$0

$17,500

$259,250

Horizon Hill Rd. (Hy-Vu Drive)

Asheville

SA

2008084

51

713

$228,444

$10,444

$0

$0

$0

$0

$218,000

713

$0

$0

$0

$0

$0

Howland Rd. @ Sunset Trail

Asheville

DP

2012134

43

1,033

$391,600

$7,500

$0

$0

$4,500

$66,000

$313,600

1,033

$0

$0

$0

$0

$0

Kenilworth @ Springdale Rd.

Asheville

HC

2014010

42

2,524

$747,350

$6,800

$299,700

$69,250

$0

$0

$371,600

1,463

$0

$0

$0

Kimberly Ave. @ Sedley Avenue

Asheville

OH

2018029

35

3,005

$984,000

$0

$0

$0

$0

$0

$31,000

$0

$0

$0

1,061

Page 1 of 4

930

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$116,000

$837,000

3,005

4,550


METROPOLITAN SEWERAGE DISTRICT OF BUNCOMBE COUNTY, NORTH CAROLINA TEN YEAR CAPITAL IMPROVEMENT PROGRAM FY 2018-2019 through 2027-2028 MUNICIPAL SUMMARIES LOCATION OF PROJECT

PROJECT NAME

PROJ. MGR.

PROJECT NUMBER

PIPE RATING

PROJECT FOOTAGE

TOTAL ESTIMATED COST

TOTAL EST. EXPENDS THRU FY 18

FY 18-19 BUDGET

FY 19-20

FOOTAGE

BUDGET

FY 20-21

FOOTAGE

BUDGET

FY 21-22

FOOTAGE

BUDGET

FY 22-23

FOOTAGE

BUDGET

FY 23-24

FOOTAGE

BUDGET

FY 24-25

FOOTAGE

BUDGET

FY 25-26

FOOTAGE

BUDGET

FY 26-27

FOOTAGE

BUDGET

FY 27-28

FOOTAGE

BUDGET

FOOTAGE

CITY OF ASHEVILLE continued… Lincoln Avenue

Asheville

HC

2013103

26

1,415

$398,370

$2,870

$0

$0

$0

$0

$0

$0

$0

Lower Swannanoa Interceptor

Asheville

EB

2004040

9

6,475

$5,478,400

$14,879

$0

$0

$0

$0

$33,021

$12,500

$5,418,000

Meadow Road @ Train Yard

Asheville

HC

2015207

37

2,001

$727,000

$9,000

$0

$0

$0

$45,000

$4,000

$669,000

Memory Lane

Asheville

OH

2016099

56

1,900

$787,885

$27,231

$760,750

$0

$0

$0

$0

$0

Montford Ave. @ Montford Park

Asheville

HC

2017144

50

1,258

$367,150

$0

$0

$0

$6,300

$6,750

$60,000

$294,100

Mountainbrook Rd. @ Chunns Cove

Asheville

DP

2010112

55

2,800

$983,515

$21,015

$0

$156,000

$0

$0

New Haw Creek @ Water Booster Station

Asheville

OH

2016250

80

90

$32,100

$1,000

$5,100

$26,000

90

$0

$0

$0

New Walnut St. @ Riverside Dr.

Asheville

DP

2017007

63

1,180

$357,000

$5,000

$47,000

$305,000

1,180

$0

$0

$0

North Lexington @ I-240

Asheville

SA

2014182

47

210

$93,970

$2,570

$0

$0

$2,000

$0

$89,400

North Market Street

Asheville

SA

2014019

26

1,064

$284,400

$5,300

$0

$0

$0

$0

NW French Broad Interceptor

Asheville

EB/HC

2018084

N/A

10,650

$16,100,000

$0

$0

$0

$0

$0

1,900

5,200

$806,500

2,800

$0

$395,500

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$1,500

$0

$277,600

1,064

$0

$0

$0

$1,050,000

$1,050,000

$4,666,667

3,550

210

2,001

1,258

6,475

1,415

$0

Old West Chapel Road

Asheville

DP

2014004

53

5,200

$1,560,000

$112,000

$1,448,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

Riverview Drive

Asheville

HC

2013104

24

2,302

$650,680

$7,880

$0

$0

$0

$0

$0

$0

$0

$0

$0

$642,800

South Swannanoa WW (CDM #4)

Asheville

EB

2001195

23

8,040

$3,020,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

$3,020,000

Starnes Avenue

Asheville

HC

2014154

22

2,871

$896,500

$0

$0

$0

$0

$0

$14,300

$0

$0

$82,000

$0

$800,200

Sweeten Creek Rd. @ Mills Gap Rd.

Asheville

SA

2014189

46

2,325

$679,000

$24,000

$4,000

$105,000

$546,000

$0

$0

$0

$0

$0

$0

$0

Walnut St. @ N. Lexington Ave.

Asheville

DP

2017008

42

1,550

$463,500

$0

$0

$0

$0

$0

$0

$0

Walnut Street @ Rankin Ave.

Asheville

SA

2014018

54

2,350

$1,141,100

$11,500

$0

$1,129,600

$0

$0

$0

$0

Riverside Dr. @ Riverside Baptist

Asheville

OH

2016251

40

510

$168,450

$0

$0

$0

$0

$0

$0

$0

2,350

2,325

$0

$7,000

$0

$456,500

$0

$0

$0

$0

$0

$5,500

$19,200

$143,750

1,550

510

8,040

Beaucatcher Rd. @ Kenilworth Rd.

E. Asheville

SA

2015219

35

1,370

$521,900

$19,500

$37,600

$0

$464,800

1,370

$0

$0

$0

$0

$0

$0

$0

New Haw Creek Rd. @ Dogwood Grove

E. Asheville

SA

2014021

31

1,900

$632,500

$9,500

$7,600

$61,000

$554,400

1,900

$0

$0

$0

$0

$0

$0

$0

Old Haw Creek Rd. @ Greenbriar Rd.

E. Asheville

HC

2012109

56

3,755

$1,172,600

$129,700

$1,043,900

East Chestnut Ave @ Five Points

N. Asheville

SA

2015192

36

5,225

$1,733,800

$268,000

$0

3,755

$0

$0

$0

$0

$0

$1,000

$80,800

$79,000

$0

$1,305,000

$0

$15,000

$8,500

$0

$0

$0

5,225

$0

$0

$0

$0

$0

$0

$0

$0

$59,500

$0

$1,113,000

$0

$0

$0

Fairmont Road

N. Asheville

DP

2015017

31

3,900

$1,196,000

$0

$0

$0

$0

Jarnaul Avenue

N. Asheville

HC

2016104

75

5,330

$1,526,100

$18,500

$154,250

$165,000

$1,188,350

Lakeshore Dr. @ Merrimon Ave.

N. Asheville

HC

2014177

25

362

$211,600

$8,866

$0

$0

$0

$0

$1,800

$0

$3,000

$96,134

$101,800

Manetta Rd. @ Johnson Dr.

N. Asheville

SA

2014022

20

6,500

$1,895,700

$0

$0

$0

$0

$0

$33,000

$7,000

$110,000

$0

$0

$1,745,700

Bellevue Road

S. Asheville

DP

2015175

49

1,100

$445,600

$9,600

$0

$5,000

$56,000

$375,000

$0

$0

$0

$0

$0

$0

Forestdale Drive

S. Asheville

DP

2014002

33

2,600

$843,000

$0

$0

$0

$0

$12,000

$17,500

$104,000

$0

$709,500

$0

$0

Springside Rd. @ Overlook Rd.

S. Asheville

SA

2012127

52

4,056

$1,370,700

$31,300

$108,000

$0

$0

$1,231,400

4,056

$0

$0

$0

$0

$0

$0

Sweeten Creek Rd. @ Buck Shoals Rd.

S. Asheville

HC

2014015

51

918

$326,920

$6,920

$7,000

$44,500

$6,500

$262,000

918

$0

$0

$0

$0

Johnston Blvd. @ Providence Rd.

W. Asheville

DP

2014013

37

2,000

$544,150

$8,150

$0

$0

$0

$9,000

$0

$0

$0

$0

Logan Avenue

W. Asheville

SA

2017256

48

1,884

$562,500

$0

$17,700

$52,500

$0

$492,300

Mitchell Avenue

W. Asheville

SA

2014185

23

3,360

$991,300

$0

$0

$0

$0

Old County Home Rd PSR

W. Asheville

SA

2015221

48

2,650

$743,900

$20,000

$0

$15,400

$14,000

Sand Hill Road @ Baker Place

W. Asheville

SA

2015223

22

550

$155,000

$0

$0

$0

$0

$0

$3,000

Sulphur Springs Rd. @ Covington St.

W. Asheville

DP

2014006

44

1,350

$463,000

$5,500

$0

$0

$10,000

$103,000

$344,500

Waynesville Ave. @ Brownwood Ave.

W. Asheville

SA

2014183

33

4,100

$1,348,200

$0

$0

$0

$21,000

$500

West Crabapple Lane

W. Asheville

DP

2014005

67

N/A

$124,800

$3,800

$9,000

$112,000

$0

$0

139,866

$79,650,489

$925,330

$5,357,650

1.0000

1.0000

1.0000

$79,650,489

$925,330

$5,357,650

SUBTOTAL Inflation per ENR Const. Cost Index SUBTOTAL with inflation

3.03% 139,866

15,978

$2,340,350

3,620

1.0303 15,978

$2,411,263

$5,795,150

5,330

14,650

1.0615 3,620

$6,151,657

Page 2 of 4

1,100

$0

362

$0

$0

$0 $474,000

$0

$0

$0

$0

$0

$0

$0

$17,000

$1,000

$4,800

$65,000

$0

$903,500

$0

$694,500

$0

$0

$0

$0

$0

$5,978,350

1,884

14,953

$6,538,414

2,650

$1,000

$0

$0

$0

$151,500

$0

$0

$0

$0

$0

$28,200

$160,000

$184,000

$954,500

$0

$0

$0

$0

$10,017,238

1,350

15,753

1.1268 14,953

2,000

$11,287,631

$9,264,017

13,748

1.1610 15,753

$10,755,184

$11,999,466

10,150

1.1961 13,748

$14,353,047

$2,958,634

4,100

6,700

1.2324 10,150

$3,646,172

$0

$0

$0

$0

$6,494,600

17,017

1.2697 6,700

$8,246,355

2,871

$0

$53,000

1.0937 14,650

2,600

3,900

2,302

$0

$9,187,967

6,500

3,360

550

20,197

1.3082 17,017

$12,019,675

20,197


METROPOLITAN SEWERAGE DISTRICT OF BUNCOMBE COUNTY, NORTH CAROLINA TEN YEAR CAPITAL IMPROVEMENT PROGRAM FY 2018-2019 through 2027-2028 MUNICIPAL SUMMARIES PROJECT NAME

LOCATION OF PROJECT

PROJ. MGR.

PROJECT NUMBER

PIPE RATING

PROJECT FOOTAGE

TOTAL ESTIMATED COST

TOTAL EST. EXPENDS THRU FY 18

FY 18-19 BUDGET

FY 19-20

FOOTAGE

BUDGET

FY 20-21

FOOTAGE

BUDGET

FY 21-22

FOOTAGE

BUDGET

FY 22-23

FOOTAGE

BUDGET

FY 23-24

FOOTAGE

BUDGET

FY 24-25

FOOTAGE

BUDGET

FY 25-26

FOOTAGE

BUDGET

FY 26-27

FOOTAGE

BUDGET

FY 27-28

FOOTAGE

BUDGET

FOOTAGE

TOWN OF BLACK MOUNTAIN Chestnut Lodge Rd.

Black Mountain

SA

2014017

61

4,150

$1,300,000

$22,500

$16,500

$134,000

$1,127,000

Highland Farms Road

Black Mountain

HC

2018018

65

1,131

$271,250

$0

$5,700

$750

$6,000

$258,800

Oakland Drive @ Church Street

Black Mountain

DP

2015177

27

575

$171,000

$0

$0

$0

$0

$0

Owenby Lane @ US Hwy 70

Black Mountain

OH

2018033

85

1,426

$492,345

$0

$15,500

7,282

$2,234,595

$22,500

$37,700

1.0000

1.0000

1.0000

$2,234,595

$22,500

$37,700

SUBTOTAL Inflation per ENR Const. Cost Index

3.03% 7,282

SUBTOTAL with inflation

PROJECT NAME

LOCATION OF PROJECT

PROJ. MGR.

PROJECT NUMBER

PIPE RATING

PROJECT FOOTAGE

TOTAL ESTIMATED COST

TOTAL EST. EXPENDS THRU FY 18

$0 0

FY 18-19 BUDGET

$76,845

$134,750

0

1.0303 0

$138,833

BUDGET

$1,209,845

4,150

1.0615 0

FY 19-20

FOOTAGE

4,150

$1,284,272

BUDGET

1,131

4,150

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$2,500

$2,500

$29,000

$137,000

$400,000

1,426

$0

2,557

$0

$720,518

BUDGET

$0 0

1.1268 2,557

FY 21-22

FOOTAGE

$0

$658,800 1.0937

FY 20-21

FOOTAGE

$0

$0

BUDGET

0

1.1610 0

FY 22-23

FOOTAGE

$0

$2,500

$2,902

BUDGET

0

1.1961 0

FY 23-24

FOOTAGE

$0

$2,500

0

FY 24-25

FOOTAGE

BUDGET

0

$35,739

BUDGET

$0 $0

$137,000

575

1.2697 0

FY 25-26

FOOTAGE

$0 575

$0

$29,000 1.2324

$2,990

$0

$173,952

575

FY 26-27

FOOTAGE

BUDGET

$0

0

1.3082 $0

0

FY 27-28

FOOTAGE

BUDGET

FOOTAGE

TOWN OF WEAVERVILLE S. Main St. @ Reems Creek Rd.

Weaverville

HC

2017012

51

565

$187,450

$0

$0

$46,050

$11,000

$130,400

Wildwood Park

Weaverville

HC

2015194

27

582

$168,780

$2,380

$0

$0

$0

$0

1,147

$356,230

$2,380

$0

1.0000

1.0000

1.0000

$356,230

$2,380

$0

SUBTOTAL Inflation per ENR Const. Cost Index

3.03% 1,147

SUBTOTAL with inflation

PROJECT NAME

LOCATION OF PROJECT

PROJ. MGR.

PROJECT NUMBER

PIPE RATING

PROJECT FOOTAGE

TOTAL ESTIMATED COST

TOTAL EST. EXPENDS THRU FY 18

0

0

1.0303 0

FY 18-19 BUDGET

$46,050

$47,445

BUDGET

0

1.0615 0

FY 19-20

FOOTAGE

$11,000

$11,677

BUDGET

$130,400

565

1.0937 0

FY 20-21

FOOTAGE

565

$142,616

BUDGET

$0

$0

$0

$0

$0

$0

$0

$166,400

582

$166,400

582

$0

0

1.1268 565

FY 21-22

FOOTAGE

$0 $0

$0

BUDGET

0

1.1610 0

FY 22-23

FOOTAGE

$0

$0

BUDGET

0

1.1961 0

FY 23-24

FOOTAGE

$0

$0

BUDGET

0

1.2324 0

FY 24-25

FOOTAGE

$0

1.2697

$0

0

FY 25-26

FOOTAGE

BUDGET

$0

$211,282

BUDGET

$0

0

1.3082 582

FY 26-27

FOOTAGE

$0

$0

0

FY 27-28

FOOTAGE

BUDGET

FOOTAGE

TOWN OF WOODFIN Elk Mountain Place

Woodfin

HC

2010094

48

4,101

$1,055,250

$18,000

$0

$164,000

$41,000

$832,250

$0

$0

$0

$0

$0

$0

Middle Beaverdam Crk. @ I-26

Woodfin

OH

2010002

24

2,930

$1,293,650

$7,430

$0

$0

$0

$0

$7,070

$34,000

$3,250

$0

$0

$1,241,900

New Stock Road

Woodfin

DP

2015011

45

9,020

$2,402,500

$36,000

$0

$0

$6,500

$76,000

$2,284,000

9,020

$0

$0

$0

$0

$0

16,051

$4,751,400

$61,430

$0

$2,291,070

9,020

$34,000

1.0000

1.0000

1.0000

$4,751,400

$61,430

$0

SUBTOTAL Inflation per ENR Const. Cost Index SUBTOTAL with inflation

3.03% 16,051

0

$164,000

0

1.0303 0

$168,969

$47,500

0

1.0615 0

$50,422

Page 3 of 4

$908,250

4,101

4,101

1.0937 0

$993,337

1.1268 4,101

$2,581,625

0

1.1610 9,020

$39,473

$3,250

0

1.1961 0

$3,887

$0

0

1.2324 0

$0

$0

0

1.2697 0

$0

$1,241,900

2,930

2,930

1.3082 0

$1,624,650

2,930


METROPOLITAN SEWERAGE DISTRICT OF BUNCOMBE COUNTY, NORTH CAROLINA TEN YEAR CAPITAL IMPROVEMENT PROGRAM FY 2018-2019 through 2027-2028 MUNICIPAL SUMMARIES PROJECT NAME

LOCATION OF PROJECT

PROJ. MGR.

PROJECT NUMBER

PIPE RATING

PROJECT FOOTAGE

TOTAL ESTIMATED COST

TOTAL EST. EXPENDS THRU FY 18

FY 18-19 BUDGET

FY 19-20

FOOTAGE

BUDGET

FY 20-21

FOOTAGE

BUDGET

FY 21-22

FOOTAGE

BUDGET

FY 22-23

FOOTAGE

BUDGET

FY 23-24

FOOTAGE

BUDGET

FY 24-25

FOOTAGE

BUDGET

FY 25-26

FOOTAGE

BUDGET

FY 26-27

FOOTAGE

BUDGET

FY 27-28

FOOTAGE

BUDGET

FOOTAGE

MISCELLANEOUS PROJECTS AND LINE ITEMS Biological Treatment

MSD-Treatment Plant

HC

2016063

N/A

0

$45,500,000

$0

$0

$0

$0

$0

$500,000

$2,500,000

$2,500,000

$10,000,000

$18,000,000

$12,000,000

Building and Facility Rehabilitation

MSD-Treatment Plant

HC

2002068

N/A

0

$786,000

$20,950

$139,000

$80,000

$91,000

$68,000

$68,000

$68,000

$68,000

$68,000

$68,000

$68,000

Flow Monitoring

MSD-Treatment Plant

SA

2008013

N/A

0

$442,535

$312,535

$50,000

$40,000

$40,000

$0

$0

$0

$0

$0

$0

$0

Intermediate Clarifier Slide Gates

MSD-Treatment Plant

HC

2017022

N/A

0

$243,000

$0

$243,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

Plant Headworks Improvements

MSD-Treatment Plant

HC

2015004

N/A

0

$11,995,950

$8,809,950

$3,186,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

Plant High Rate Primary Treatment

MSD-Treatment Plant

HC

2015054

N/A

0

$16,950,595

$1,185,595

$3,509,500

$10,527,000

$1,728,500

$0

$0

$0

$0

$0

$0

$0

General Capital Equipment

Varies

EB

2016072

N/A

0

$1,500,000

$133,242

$150,000

$150,000

$150,000

$150,000

$150,000

$150,000

$150,000

$150,000

$150,000

$150,000

Future Projects - Non Critical

Various

EB

Varies

Varies

Varies

Varies

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

Lining Contract No. 9

Various

DP

2017031

NA

11,000

$1,102,000

$200,000

$0

$902,000

11,000

$0

$0

$0

$0

$0

$0

$0

$0

SSD Rehab. & Replacement

Various

MS

2002101

N/A

200,000

$43,100,000

$4,164,404

$4,400,000

$4,300,000

20,000

$4,300,000

Surveys for Design

Various

EB

2002060

N/A

N/A

$500,000

$0

$50,000

211,000

$122,120,080

$14,826,676

$11,727,500

1.0000

1.0000

1.0000

$122,120,080

$14,826,676

$11,727,500

SUBTOTAL Inflation per ENR Const. Cost Index

3.03% 211,000

SUBTOTAL with inflation

PROJECT NAME

LOCATION OF PROJECT

PROJ. MGR.

PROJECT NUMBER

PIPE RATING

PROJECT FOOTAGE

TOTAL ESTIMATED COST

TOTAL EST. EXPENDS THRU FY 18

20,000

$50,000 $20,000

FY 18-19 BUDGET

$16,049,000

$31,000

1.0303 20,000

$16,535,285

31,000

BUDGET

$6,359,500

$20,000

$6,750,724

BUDGET

20,000

20,000

$4,568,000

$20,000

$4,995,940

BUDGET

20,000

20,000

$5,068,000

$20,000

$5,710,727

BUDGET

20,000

20,000

$7,068,000

$20,000

$8,205,689

BUDGET

20,000

20,000

$7,068,000

$20,000

$8,454,321

BUDGET

20,000

20,000

$14,568,000

$20,000

$17,953,364

BUDGET

20,000

20,000

$22,568,000

$20,000

$28,655,149

BUDGET

20,000

$16,568,000

$20,000

1.3082 20,000

FY 26-27

FOOTAGE

$4,300,000 $50,000

1.2697

FY 25-26

FOOTAGE

$4,300,000 $50,000

1.2324

FY 24-25

FOOTAGE

$4,300,000 $50,000

1.1961

FY 23-24

FOOTAGE

$4,300,000 $50,000

1.1610

FY 22-23

FOOTAGE

$4,300,000 $50,000

1.1268

FY 21-22

FOOTAGE

$4,300,000 $50,000

1.0937

FY 20-21

FOOTAGE

$4,300,000 $50,000

1.0615

FY 19-20

FOOTAGE

20,000

$50,000

$21,674,215

20,000

FY 27-28

FOOTAGE

BUDGET

FOOTAGE

DESIGN, ROW, & CONSTRUCTION MANAGEMENT EXPENSES Design, ROW, & Const. Mgmt. Exp.

MSD/ENG

EB

N/A

N/A

SUBTOTAL

0

$30,722,347

$2,476,474

$2,705,222

0

$30,722,347

$2,476,474

$2,705,222

$2,779,330 0

$2,851,153

$2,779,330

0

$2,925,039

$2,851,153

0

$3,001,101

$2,925,039

0

$3,143,616

$3,001,101

0

$3,215,794

$3,143,616

0

$3,290,041

$3,215,794

0

$3,366,324

$3,290,041

0

$3,444,727

$3,366,324

0

$3,444,727

0

BUDGET SUMMARY

PROJECT NAME

LOCATION OF PROJECT

PROJ. MGR.

PROJECT NUMBER

PIPE RATING

PROJECT FOOTAGE

TOTAL ESTIMATED COST

478,603

SUBTOTAL with Inflation

$292,993,781

TOTAL EST. EXPENDS THRU FY 18 $22,794,899

TOTAL

BUDGET $22,226,718

FY 19-20

FOOTAGE 42,750

BUDGET $25,070,283

FY 20-21

FOOTAGE 44,785

BUDGET

FY 21-22

FOOTAGE

$19,874,182

44,990

BUDGET $16,667,264

FY 22-23

FOOTAGE 43,007

BUDGET $22,710,105

FY 23-24

FOOTAGE 44,773

BUDGET $32,801,431

FY 24-25

FOOTAGE 46,181

BUDGET $38,343,111

FY 25-26

FOOTAGE 46,929

BUDGET $38,406,976

FY 26-27

FOOTAGE 45,688

BUDGET $51,642,530

FY 27-28

FOOTAGE 48,774

BUDGET $40,416,175

FOOTAGE 47,677

$1,000,000

CONTINGENCY REIMBURSEMENT PROJECTS

FY 18-19

Various

Various

Various

0

$1,216,000

$22,930

$266,000

0

$150,000

0

$100,000

0

$100,000

0

$100,000

0

$100,000

0

$100,000

0

$100,000

0

$100,000

0

$100,000

0

478,603

$294,209,781

$22,817,829

$23,492,718

42,750

$25,220,283

44,785

$19,974,182

44,990

$16,767,264

43,007

$22,810,105

44,773

$32,901,431

46,181

$38,443,111

46,929

$38,506,976

45,688

$51,742,530

48,774

$40,516,175

47,677

Page 4 of 4


Capital Improvement Program Fiscal Years 2019—2028

Project Schedule


CIP PROJECT TIMELINE ID

Project Name

Project #

P. R.

Duration

Christian Creek Int.

2011110 24

1856 days

2

Christian Creek Int.

2011110 24

3

Christian Creek Int.

2011110 24

4

Lower Swannanoa Int.

5 6 7

Start

Finish

Plats

Proj. Mgr. Resource Names

Sat 6/1/13

Sat 6/30/18

365 days

Sun 7/1/18

Sun 6/30/19

480 days

Mon 12/31/18

Thu 4/23/20

2004040 9

365 days

Fri 7/1/22

Fri 6/30/23

Lower Swannanoa Int.

2004040 9

366 days

Sat 7/1/23

Sun 6/30/24

Lower Swannanoa Int.

2004040 9

365 days

Mon 7/1/24

Mon 6/30/25

Middle Beaverdam Crk. @ US 19-23

2010002 24

1826 days

Sun 7/1/18

Fri 6/30/23

8

Middle Beaverdam Crk. @ US 19-23

2010002 24

366 days

Sat 7/1/23

Sun 6/30/24

9

Middle Beaverdam Crk. @ US 19-23

2010002 24

154 days

Thu 7/1/27

Wed 12/1/27

10

NW French Broad Interceptor

2018084

500

730 days

Tue 7/1/25

Wed 6/30/27

Ed/Hunter Design

11

NW French Broad Interceptor

2018084

500

1096 days

Thu 7/1/27

Sun 6/30/30

Ed/Hunter Construction

12

South French Broad Relief Int.

2017070 0

885 days

Sun 7/1/18

Tue 12/1/20

13

South French Broad Relief Int.

2017070 0

211 days

Wed 12/2/20

Wed 6/30/21

14

1

Hunter Design 28

2

4

South French Broad Int. - Lining

Hunter Design

16

South French Broad Int. - Lining

2011033 8

1676 days

Wed 7/1/15

Fri 1/31/20

Hunter Construction

17

Atkins Street

2014012 39

1827 days

Wed 7/1/15

Tue 6/30/20

18

Atkins Street

2014012 39

365 days

Thu 7/1/21

Thu 6/30/22

19

Atkins Street

2014012 39

124 days

Sat 7/1/23

Wed 11/1/23

20

Aurora Drive

2017145 53

547 days

Tue 1/1/19

Tue 6/30/20

21

Aurora Drive

2017145 53

365 days

Wed 7/1/20

Wed 6/30/21

22

Aurora Drive

2017145 53

123 days

Thu 7/1/21

Sun 10/31/21

23

Beale Road @ Copney Lane

2009129 47

2922 days

Thu 7/1/10

Sat 6/30/18

24

Beale Road @ Copney Lane

2009129 47

365 days

Wed 7/1/20

Wed 6/30/21

25

Beale Road @ Copney Lane

2009129 47

153 days

Fri 7/1/22

Wed 11/30/22

26

Beaucatcher Rd @ Kenilworth Rd

2015219 43

537 days

Tue 1/10/17

Sat 6/30/18

27

Beaucatcher Rd @ Kenilworth Rd

2015219

43

365 days

Sun 7/1/18

Sun 6/30/19

28

Beaucatcher Rd @ Kenilworth Rd

2015219 43

145 days

Wed 7/1/20

Sun 11/22/20

29

Bellevue Road

2015175 49

730 days

Sat 7/1/17

Sun 6/30/19

30

Bellevue Road

2015175 49

731 days

Mon 7/1/19

Wed 6/30/21

31

Bellevue Road

2015175 49

123 days

Thu 7/1/21

Sun 10/31/21

32

Bent Tree Road

2016102 60

730 days

Sat 7/1/17

Sun 6/30/19

33

Bent Tree Road

2016102 60

366 days

Mon 7/1/19

Tue 6/30/20

34

Bent Tree Road

2016102 60

92 days

Wed 7/1/20

Wed 9/30/20

35

Darin Design 14

1

Darin Design 8

Darin Design 4

Mon 1/31/22

Shaun Construction

38

Caledonia Road

2014153 31

1827 days

Wed 7/1/15

Tue 6/30/20

Hunter Design

39

Caledonia Road

2014153 31

365 days

Wed 7/1/20

Wed 6/30/21

40

Caledonia Road

2014153 31

150 days

Fri 7/1/22

Sun 11/27/22

41

Chatham Road

2015019 43

1218 days

Wed 3/1/17

Tue 6/30/20

42

Chatham Road

2015019 43

365 days

Wed 7/1/20

Wed 6/30/21

43

Chatham Road

2015019 43

150 days

Fri 7/1/22

Sun 11/27/22

44

Sat 6/30/18

2014017 61

546 days

Wed 1/2/19

Tue 6/30/20

Chestnut Lodge Road

2014017 61

335 days

Wed 7/1/20

Mon 5/31/21

50

Craggy Street @ Old US70

2015209 2

365 days

Fri 7/1/22

Fri 6/30/23

51

Craggy Street @ Old US70

2015209 2

365 days

Sun 7/2/23

Sun 6/30/24

52

Craggy Street @ Old US70

2015209 2

90 days

Tue 7/1/25

Sun 9/28/25

53

Cub Road

2018027

40

365 days

Thu 7/1/21

Thu 6/30/22

54

Cub Road

2018027

40

365 days

Fri 7/1/22

Fri 6/30/23

55

40

9

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

2022 Dec Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

2023 Dec Jan

Feb

Mar

Apr

May

Jun

ROW

Design ROW Construction gn ROW Construction

ROW Construction sign ROW Construction sign ROW Construction

8

Design

Shaun ROW

ROW Construction

Hunter ROW

ROW

Hunter Construction

Construction

Shaun Design 5

Design

Shaun ROW

ROW

Shaun Construction Darin Design 10

Construction gn

Darin ROW

ROW

Darin Construction

Construction

Shaun Design 19

Shaun ROW

ROW

Shaun Construction

Construction

Hunter Design 3

Design

Hunter ROW Hunter Construction Owen Design

12

2018027

124 days

Sat 7/1/23

Wed 11/1/23

Owen Construction

East Chestnut Ave @ Five Points

2015192 36

1188 days

Sat 7/1/17

Wed 9/30/20

Shaun Design

57

East Chestnut Ave @ Five Points

2015192 36

638 days

Thu 10/1/20

Thu 6/30/22

58

East Chestnut Ave @ Five Points

2015192 36

366 days

Sat 7/1/23

Sun 6/30/24

59

Elk Mtn. Place

2010094 48

2221 days

Fri 6/1/12

Sat 6/30/18

60

Elk Mtn. Place

2010094 48

731 days

Mon 7/1/19

Wed 6/30/21

61

Elk Mtn. Place

2010094 48

210 days

Thu 7/1/21

Wed 1/26/22

62

Fairmont Road

2015017 31

730 days

Thu 7/1/21

Fri 6/30/23

63

Fairmont Road

2015017 31

731 days

Sat 7/1/23

Mon 6/30/25

64

Fairmont Road

2015017 31

153 days

Wed 7/1/26

Mon 11/30/26

65

Forestdale Drive

2014002 33

730 days

Thu 7/1/21

Fri 6/30/23

66

Forestdale Drive

2014002 33

366 days

Sat 7/1/23

Sun 6/30/24

23

Design

Owen ROW

Cub Road

Created by: Cheryl Rice

2021 Dec Jan

ROW

Shaun Design

56

Note: Project durations are based on a 7 day week.

Nov

Design

Darin Construction

Wed 6/30/21

Chestnut Lodge Road

Oct

Design

Darin ROW

Thu 7/1/21

49

Sep

Darin Construction

Wed 7/1/20

48

Aug

Design

Darin ROW

215 days

Mon 12/31/18

Jul

Construction

Shaun Construction

365 days

Sat 4/30/16

Jun

ROW

Shaun ROW

2014023 13

976 days

May

Shaun Design

2014023 13

2014017 61

Apr

Darin Construction

Buchanan Ave.

Chestnut Lodge Road

Mar

Darin ROW

Buchanan Ave.

47

Feb

Darin Construction

37

Wed 6/30/21

2020 Dec Jan

Darin ROW

Tue 6/30/20

Sun 10/31/21

Nov

gn

Darin Design 7

Sun 7/1/18

Thu 7/1/21

Oct

Hunter Construction

731 days

Wed 7/1/20

Sep

Hunter ROW

2014023 13

123 days

Aug

Hunter Design 3

Buchanan Ave.

365 days

Jul

Hunter Construction

36

2009132 48

Jun

Hunter ROW

Fri 8/31/12

2009132 48

May

Hunter Design 16

Wed 6/30/27

Cherokee Road

Apr

Owen Construction

Sat 7/1/23

Cherokee Road

Mar

Owen ROW

Wed 2/1/12

46

Feb

Ed Construction

213 days

Thu 7/1/10

2019 Dec Jan

Owen Design

1461 days

2922 days

Nov

Ed ROW

2011033 8

2009132 48

Oct

Ed Design

2017070

Cherokee Road

Sep

Hunter Construction

South French Broad Relief Int.

45

Aug

Hunter ROW

15

0

Jul

ROW

Design

Shaun ROW

ROW

Shaun Construction Hunter Design 34

gn

Hunter ROW

ROW

Hunter Construction

Construction

Darin Design 11

Design

Darin ROW Darin Construction Darin Design

22

Design

Darin ROW

Design P.E.R.

Construction

Inactive Milestone

Manual Task

Manual Summary Rollup

Start-only

External Tasks

ROW

External Milestone

Inactive Summary

Duration-only

Manual Summary

Finish-only

External Milestone

1

Deadline

Last Updated: Thu 4/5/18


CIP PROJECT TIMELINE ID

Project Name

Project #

P. R.

Duration

Start

Finish

Plats

67

Forestdale Drive

2014002 33

123 days

Tue 7/1/25

68

Four Inch Main - Dry Ridge Rd.

2012009 58

1096 days

Tue 7/1/14

Fri 6/30/17

69

Four Inch Main - Dry Ridge Rd.

2012009 58

365 days

Sat 7/1/17

Sat 6/30/18

70

Four Inch Main - Dry Ridge Rd.

2012009 58

153 days

Mon 7/1/19

Sat 11/30/19

71

Harmony Lane

2016103 35

365 days

Fri 7/1/22

Fri 6/30/23

72

Harmony Lane

2016103 35

183 days

Mon 7/1/24

Mon 12/30/24

73

Hazel Mill Rd. @ Richland St.

2014016 26

639 days

Sat 10/1/22

Sun 6/30/24

74

Hazel Mill Rd. @ Richland St.

2014016 26

365 days

Mon 7/1/24

Mon 6/30/25

75

Hazel Mill Rd. @ Richland St.

2014016 26

260 days

Wed 7/1/26

Wed 3/17/27

76

2009150 68

1290 days

Sun 7/1/12

Mon 1/11/16

2009150 68

720 days

Tue 1/12/16

Sun 12/31/17

2009150 68

546 days

Mon 1/1/18

Sun 6/30/19

79

Hendersonville Rd. @ Rosscraggon Ph. 2 Hendersonville Rd. @ Rosscraggon Ph. 2 Hendersonville Rd. @ Rosscraggon Ph. 2 Highland Farms Road

2018018 65

184 days

Mon 7/1/19

Tue 12/31/19

80

Highland Farms Road

2018018 65

365 days

Wed 7/1/20

Wed 6/30/21

81

Highland Farms Road

2018018 65

90 days

Thu 7/1/21

Tue 9/28/21

Hunter Construction

82

Hill Street

2015018 54

212 days

Wed 5/3/17

Thu 11/30/17

Shaun Design

83

Hill Street

2015018 54

159 days

Sun 7/1/18

Thu 12/6/18

Shaun Construction

84

Horizon Hill Rd. @ Hy-Vu Dr.

2008084 51

1127 days

Wed 7/1/09

Tue 7/31/12

Shaun Design

85

Horizon Hill Rd. @ Hy-Vu Dr.

2008084 51

183 days

Wed 8/1/12

Wed 1/30/13

86

Horizon Hill Rd. @ Hy-Vu Dr.

2008084 51

105 days

Fri 7/1/22

Thu 10/13/22

87

Howland Rd. @ Sunset Trail

2012134 43

2557 days

Tue 7/1/14

Wed 6/30/21

88

Howland Rd. @ Sunset Trail

2012134 43

365 days

Thu 7/1/21

Thu 6/30/22

89

Howland Rd. @ Sunset Trail

2012134 43

92 days

Fri 7/1/22

Fri 9/30/22

90

Jarnaul Avenue

2016104 75

518 days

Sat 7/1/17

Fri 11/30/18

91

Jarnaul Avenue

2016104 75

578 days

Sat 12/1/18

Tue 6/30/20

92

Jarnaul Avenue

2016104 75

240 days

Wed 7/1/20

Thu 2/25/21

93

Johnston Blvd @ Providence Rd.

2014013 37

3834 days

Sun 1/1/12

Thu 6/30/22

94

Johnston Blvd @ Providence Rd.

2014013 37

365 days

Fri 7/1/22

Fri 6/30/23

95

Johnston Blvd @ Providence Rd.

2014013 37

123 days

Sat 7/1/23

Tue 10/31/23

96

Kenilworth Rd. @ Springdale

2014010 42

2007 days

Wed 1/1/14

Sun 6/30/19

97

Kenilworth Rd. @ Springdale

2014010 42

366 days

Mon 7/1/19

Tue 6/30/20

98

Kenilworth Rd. @ Springdale

2014010 42

90 days

Fri 7/1/22

Wed 9/28/22

99

Kimberly Ave. @ Sedley Avenue

2018029

35

365 days

Fri 7/1/22

Fri 6/30/23

100

Kimberly Ave. @ Sedley Avenue

2018029

35

365 days

Sat 7/1/23

Sat 6/29/24

101

Kimberly Ave. @ Sedley Avenue

2018029

35

123 days

Mon 7/1/24

Thu 10/31/24

102

Lakeshore Dr. @ Merrimon

2014177 25

2191 days

Fri 7/1/16

Thu 6/30/22

103

Lakeshore Dr. @ Merrimon

2014177 25

365 days

Tue 7/1/25

Tue 6/30/26

104

Lakeshore Dr. @ Merrimon

2014177 25

93 days

Wed 7/1/26

Thu 10/1/26

Hunter Construction

105

Lincoln Ave.

2013103 26

1643 days

Sun 1/1/12

Thu 6/30/16

Hunter Design

106

Lincoln Ave.

2013103 26

90 days

Wed 7/1/26

Mon 9/28/26

Hunter Construction

107

Logan Avenue

2017256 48

365 days

Sun 7/1/18

Sun 6/30/19

108

Logan Avenue

2017256 48

366 days

Mon 7/1/19

Tue 6/30/20

109

Logan Avenue

2017256 48

176 days

Thu 7/1/21

Thu 12/23/21

110

Long Shoals Rd. @ Allen Ave.

2010013 59

1887 days

Tue 5/1/12

Fri 6/30/17

111

Long Shoals Rd. @ Allen Ave.

2010013 59

365 days

Sat 7/1/17

Sat 6/30/18

112

Long Shoals Rd. @ Allen Ave.

2010013 59

153 days

Sun 7/1/18

Fri 11/30/18

113

Lynn Cove Road

2015010 31

1095 days

Wed 7/1/20

Fri 6/30/23

114

Lynn Cove Road

2015010 31

366 days

Sat 7/1/23

Sun 6/30/24

115

Lynn Cove Road

2015010 31

184 days

Tue 7/1/25

Wed 12/31/25

116

Manetta Rd. @ Johnson Dr.

2014022 20

1765 days

Sun 9/1/19

Sun 6/30/24

117

Manetta Rd. @ Johnson Dr.

2014022 20

365 days

Mon 7/1/24

Mon 6/30/25

118

Manetta Rd. @ Johnson Dr.

2014022 20

365 days

Thu 7/1/27

Thu 6/29/28

Shaun Construction

119

Meadow Rd. @ Train Yard

2015207 37

2376 days

Wed 7/1/15

Fri 12/31/21

Hunter Design

120

Meadow Rd. @ Train Yard

2015207 37

365 days

Thu 7/1/21

Thu 6/30/22

121

Meadow Rd. @ Train Yard

2015207 37

124 days

Sat 7/1/23

Wed 11/1/23

122

Memory Lane

2016099 56

457 days

Fri 7/1/16

Sat 9/30/17

123

Memory Lane

2016099 56

92 days

Sun 10/1/17

Sun 12/31/17

124

Memory Lane

2016099 56

124 days

Sun 7/1/18

Thu 11/1/18

Owen Construction

125

Mitchell Ave.

2014185 23

1096 days

Fri 7/1/22

Mon 6/30/25

Shaun Design

126

Mitchell Ave.

2014185 23

365 days

Tue 7/1/25

Tue 6/30/26

127

Mitchell Ave.

2014185 23

264 days

Thu 7/1/27

Mon 3/20/28

Shaun Construction

128

Montford Ave. @ Montford Park

2017144 50

365 days

Thu 7/1/21

Thu 6/30/22

Hunter Design

129

Montford Ave. @ Montford Park

2017144 50

365 days

Fri 7/1/22

Fri 6/30/23

130

Montford Ave. @ Montford Park

2017144 50

90 days

Sat 7/1/23

Thu 9/28/23

131

Mountainbrook @ Chunns Cove

2010112

2557 days

Fri 7/1/11

Sat 6/30/18

77 78

Note: Project durations are based on a 7 day week. Created by: Cheryl Rice

55

Fri 10/31/25

Proj. Mgr. Resource Names

Darin Construction

Jul

Aug

Sep

Oct

Nov

2019 Dec Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

2020 Dec Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

2021 Dec Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

2022 Dec Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

2023 Dec Jan

Feb

Mar

Apr

May

Jun

Darin Design 3

Darin ROW Darin Construction

Construction

Darin Design

Design

Darin Construction Shaun Design 14

Shaun ROW Shaun Construction Owen Design

20

Owen ROW Owen Construction

Construction

Hunter Design 1

1

Design

Hunter ROW

ROW Construction

Construction

Shaun ROW Shaun Construction

Construction

Darin Design 6

Darin ROW

ROW

Darin Construction

Construction

Hunter Design 34

Hunter ROW

ROW

Hunter Construction

Construction

Darin Design 12

Design

Darin ROW

ROW

Darin Construction Hunter Design 11

Hunter ROW

ROW

Hunter Construction

Construction

Owen Design 13

Design

Owen ROW Owen Construction Hunter Design

4

Design

Hunter ROW

Shaun Design 12

Design

Shaun ROW

ROW

Shaun Construction

Construction

Hunter Design 6

Hunter ROW Hunter Construction

Construction

Darin Design 20

Design

Darin ROW Darin Construction Shaun Design

10

2

Design

Shaun ROW

Design

Hunter ROW

ROW

Hunter Construction Owen Design 6

8

9

Owen ROW Construction

Shaun ROW

Design

Hunter ROW

ROW

Hunter Construction Darin Design

Design

Design P.E.R.

Construction

Inactive Milestone

Manual Task

Manual Summary Rollup

Start-only

External Tasks

ROW

External Milestone

Inactive Summary

Duration-only

Manual Summary

Finish-only

External Milestone

2

Deadline

Last Updated: Thu 4/5/18


CIP PROJECT TIMELINE ID

Project Name

Project #

P. R.

Mountainbrook @ Chunns Cove

2010112 55

133

Mountainbrook @ Chunns Cove

134

New Haw Creek Rd. @ Dogwood Grove New Haw Creek Rd. @ Dogwood Grove New Haw Creek Rd. @ Dogwood Grove New Haw Creek Rd. @ Water Booster New Haw Creek Rd. @ Water Booster New Haw Creek Rd. @ Water Booster New Stock Road

141 142

Duration

Start

Finish

Plats

731 days

Sun 7/1/18

Tue 6/30/20

2010112 55

123 days

Wed 7/1/20

Sat 10/31/20

2014021 31

1735 days

Tue 7/1/14

Sun 3/31/19

2014021 31

457 days

Mon 4/1/19

Tue 6/30/20

2014021 31

177 days

Wed 7/1/20

Thu 12/24/20

2016250 80

730 days

Fri 7/1/16

Sat 6/30/18

2016250 80

365 days

Sun 7/1/18

Sun 6/30/19

2016250 80

93 days

Mon 7/1/19

Tue 10/1/19

Owen Construction

2015011 45

1826 days

Fri 7/1/16

Wed 6/30/21

Darin Design

New Stock Road

2015011 45

365 days

Thu 7/1/21

Thu 6/30/22

New Stock Road

2015011 45

304 days

Fri 7/1/22

Sun 4/30/23

Darin Construction

143

New Walnut St. @ Riverside Dr.

2017007 63

822 days

Fri 7/1/16

Sun 9/30/18

Darin Design

144

New Walnut St. @ Riverside Dr.

2017007 63

273 days

Mon 10/1/18

Sun 6/30/19

145

New Walnut St. @ Riverside Dr.

2017007 63

92 days

Mon 7/1/19

Mon 9/30/19

146

North Lexington @ I-240

2014182 47

6089 days

Tue 3/1/05

Sun 10/31/21

Shaun Design

147

North Lexington @ I-240

2014182 47

90 days

Fri 7/1/22

Wed 9/28/22

Shaun Construction

148

North Market Street

2014019 41

976 days

Fri 5/1/15

Sun 12/31/17

Shaun Design

149

North Market Street

2014019 41

126 days

Thu 7/1/27

Wed 11/3/27

Shaun Construction

150

Northwest Ave. @ No. 215

2018017

84

365 days

Sun 7/1/18

Sun 6/30/19

Hunter Design

151

Northwest Ave. @ No. 215

2018017

84

365 days

Tue 7/2/19

Tue 6/30/20

152

Northwest Ave. @ No. 215

2018017

84

90 days

Thu 7/1/21

Tue 9/28/21

153

Oakland Dr. @ Church St.

2015177 27

366 days

Sat 7/1/23

Sun 6/30/24

154

Oakland Dr. @ Church St.

2015177 27

730 days

Mon 7/1/24

Tue 6/30/26

155

Oakland Dr. @ Church St.

2015177 27

92 days

Wed 7/1/26

Wed 9/30/26

156

Old Haw Creek Rd. @ Greenbriar Rd. 2012109 56

1611 days

Fri 2/1/13

Fri 6/30/17

157

Old Haw Creek Rd. @ Greenbriar Rd. 2012109 56

549 days

Sat 7/1/17

Mon 12/31/18

158

Old Haw Creek Rd. @ Greenbriar Rd. 2012109 56

181 days

Tue 1/1/19

Sun 6/30/19

159

Old West Chapel Road

2014004 53

1096 days

Tue 7/1/14

Fri 6/30/17

160

Old West Chapel Road

2014004 53

549 days

Sat 7/1/17

Mon 12/31/18

161

Old West Chapel Road

2014004 53

120 days

Tue 1/1/19

Tue 4/30/19

Darin Construction

162

Owenby Lane @ US Hwy 70

2018033

85

589 days

Tue 11/20/18

Tue 6/30/20

Owen Design

163

Owenby Lane @ US Hwy 70

2018033

85

365 days

Wed 7/1/20

Wed 6/30/21

164

Owenby Lane @ US Hwy 70

2018033

85

124 days

Thu 7/1/21

Mon 11/1/21

Owen Construction

165

Riverside Dr @ Riverside Baptist

2016251 40

549 days

Thu 7/1/21

Sat 12/31/22

Owen Design

166

Riverside Dr @ Riverside Baptist

2016251 40

181 days

Sun 1/1/23

Fri 6/30/23

167

Riverside Dr @ Riverside Baptist

2016251 40

124 days

Sat 7/1/23

Wed 11/1/23

168

Riverview Drive

2013104 24

1125 days

Fri 6/1/12

Tue 6/30/15

Hunter Design

169

Riverview Drive

2013104 24

184 days

Thu 7/1/27

Fri 12/31/27

Hunter Construction

170

Royal Pines Dr. - PRP 47009

2007020 35

4018 days

Fri 7/1/11

Thu 6/30/22

171

Royal Pines Dr. - PRP 47009

2007020 35

365 days

Fri 7/1/22

Fri 6/30/23

172

Royal Pines Dr. - PRP 47009

2007020 35

236 days

Tue 7/1/25

Sat 2/21/26

173

Sandhill Rd @ Baker Pl

2015223 22

975 days

Thu 7/1/21

Fri 3/1/24

174

Sandhill Rd @ Baker Pl

2015223 22

96 days

Thu 7/1/27

Mon 10/4/27

175

Smokey Park Hwy @ Sand Hill Rd.

2018035 0

365 days

Fri 7/1/22

Fri 6/30/23

176

Smokey Park Hwy @ Sand Hill Rd.

2018035 0

365 days

Sun 7/2/23

Sun 6/30/24

177

Smokey Park Hwy @ Sand Hill Rd.

2018035 0

63 days

Sat 8/31/24

Fri 11/1/24

178

South Main St. @ Reems Creek Rd.

2017012 51

366 days

Mon 7/1/19

Tue 6/30/20

179

South Main St. @ Reems Creek Rd.

2017012 51

365 days

Wed 7/1/20

Wed 6/30/21

180

South Main St. @ Reems Creek Rd.

2017012 51

93 days

Thu 7/1/21

Fri 10/1/21

181

Springside Rd. @ Overlook

2012127 52

1218 days

Sun 3/1/15

Sat 6/30/18

182

Springside Rd. @ Overlook

2012127 52

365 days

Sun 7/1/18

Sun 6/30/19

183

Springside Rd. @ Overlook

2012127 52

215 days

Thu 7/1/21

Mon 1/31/22

Shaun Construction

184

Starnes Avenue

2014154 22

366 days

Sat 7/1/23

Sun 6/30/24

Hunter Design

185

Starnes Avenue

2014154 22

365 days

Tue 7/1/25

Tue 6/30/26

186

Starnes Avenue

2014154 22

150 days

Thu 7/1/27

Sat 11/27/27

187

Sulphur Springs Rd @ Covington

2014006 44

365 days

Wed 7/1/20

Wed 6/30/21

188

Sulphur Springs Rd @ Covington

2014006 44

365 days

Thu 7/1/21

Thu 6/30/22

189

Sulphur Springs Rd @ Covington

2014006 44

123 days

Fri 7/1/22

Mon 10/31/22

190

Sweeten Creek @ Buck Shoals

2014015 51

1461 days

Wed 7/1/15

Sun 6/30/19

191

Sweeten Creek @ Buck Shoals

2012133 51

731 days

Mon 7/1/19

Wed 6/30/21

192

Sweeten Creek @ Buck Shoals

2014015 51

90 days

Thu 7/1/21

Tue 9/28/21

Hunter Construction

193

Sat 7/1/17

Sun 6/30/19

Shaun Design

132

135 136 137 138 139 140

Sweeten Creek @ Mills Gap

2014189 46

730 days

194

Sweeten Creek @ Mills Gap

2014189 46

366 days

Mon 7/1/19

Tue 6/30/20

195

Sweeten Creek @ Mills Gap

2014189 46

202 days

Wed 7/1/20

Mon 1/18/21

196

US 70 @ Jordan Road

2015014 21

1096 days

Thu 7/1/21

Sun 6/30/24

Note: Project durations are based on a 7 day week. Created by: Cheryl Rice

18

Proj. Mgr. Resource Names

Darin ROW

Jul

Aug

Sep

Oct

Nov

2019 Dec Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

2020 Dec Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

2021 Dec Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

2022 Dec Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

2023 Dec Jan

Feb

Mar

Apr

May

Jun

ROW

Darin Construction

Construction

Shaun Design 11

Shaun ROW

ROW

Shaun Construction

Construction

Owen Design 1

5

4

Owen ROW

ROW Construction Design

Darin ROW

ROW Construction

Darin ROW

ROW

Darin Construction

2

Construction Design Construction

Design

Hunter ROW

ROW

Hunter Construction

Construction

Darin Design 4

Darin ROW Darin Construction Hunter Design

19

Hunter ROW Hunter Construction

Construction

Darin Design 14

11

1

Darin ROW Construction Design

Owen ROW

ROW Construction Design

Owen ROW

ROW

Owen Construction

Shaun Design 2

Design

Shaun ROW

ROW

Shaun Construction Shaun Design

Design

Shaun Construction Owen Design 1

Design

Owen ROW Owen Construction Hunter Design

5

Design

Hunter ROW

ROW

Hunter Construction

Construction

Shaun Design 8

4

Shaun ROW

ROW Construction

Hunter ROW Hunter Construction Darin Design

13

Design

Darin ROW

ROW

Darin Construction

Construction

Hunter Design 3

5

Hunter ROW

ROW Construction sign

Shaun ROW

ROW

Shaun Construction

Construction

Darin Design

Design

Design P.E.R.

Construction

Inactive Milestone

Manual Task

Manual Summary Rollup

ROW

External Milestone

Inactive Summary

Duration-only

Manual Summary

3

Start-only

External Tasks

Finish-only

External Milestone

Deadline

Last Updated: Thu 4/5/18


CIP PROJECT TIMELINE ID

Project Name

Project #

P. R.

Duration

Start

Finish

Plats

32

Proj. Mgr. Resource Names

197

US 70 @ Jordan Road

2015014 21

730 days

Mon 7/1/24

Tue 6/30/26

Darin ROW

198

US 70 @ Jordan Road

2015014 21

184 days

Thu 7/1/27

Fri 12/31/27

Darin Construction

199

Walnut Street @ N. Lexington

2017008 42

365 days

Thu 7/1/21

Thu 6/30/22

Darin Design

200

Walnut Street @ N. Lexington

2017008 42

309 days

Sat 7/1/23

Sat 5/4/24

201

Walnut Street @ Rankin

2014018 42

912 days

Fri 1/1/16

Sat 6/30/18

Shaun Design

202

Walnut Street @ Rankin

2014018 42

204 days

Mon 7/1/19

Mon 1/20/20

Shaun Construction

203

Waynesville Ave. @ Brownwood

2014183 33

1095 days

Wed 7/1/20

Fri 6/30/23

204

Waynesville Ave. @ Brownwood

2014183 33

731 days

Sat 7/1/23

Mon 6/30/25

205

Waynesville Ave. @ Brownwood

2014183 33

309 days

Tue 7/1/25

Tue 5/5/26

206

West Crabapple Lane

2014005 67

1461 days

Wed 7/1/15

Sun 6/30/19

207

West Crabapple Lane

2014005 67

184 days

Mon 7/1/19

Tue 12/31/19

208

West Crabapple Lane

2014005 67

91 days

Wed 1/1/20

Tue 3/31/20

209

Wildwood Park

2015194 27

366 days

Wed 7/1/15

Thu 6/30/16

Hunter Design

210

Wildwood Park

2015194 27

92 days

Wed 7/1/26

Wed 9/30/26

Hunter Construction

211

Dogwood Rd. @ White Pine Circle

2014132 56

730 days

Sat 7/1/17

Sun 6/30/19

212

Dogwood Rd. @ White Pine Circle

2014132 56

731 days

Mon 7/1/19

Wed 6/30/21

213

Dogwood Rd. @ White Pine Circle

2014132 56

124 days

Thu 7/1/21

Mon 11/1/21

Owen Construction

214

Homeland Park

2016248 48

1218 days

Wed 3/1/17

Tue 6/30/20

Owen Design

215

Homeland Park

2016248 48

365 days

Thu 7/1/21

Thu 6/30/22

216

Homeland Park

2016248 48

124 days

Fri 7/1/22

Tue 11/1/22

Owen Construction

217

Shaun Design

Nov

2019 Dec Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

2020 Dec Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

2021 Dec Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

2022 Dec Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

2023 Dec Jan

Feb

Mar

Apr

May

Jun

Design

Construction Design

Shaun Construction Darin Design 12

Darin ROW

ROW

Darin Construction

Owen Design 7

9

sign ROW Construction Design

Owen ROW

Wed 3/1/17

Tue 6/30/20

Old County Home Rd PSR

2015221 48

365 days

Wed 7/1/20

Wed 6/30/21

219

Old County Home Rd PSR

2015221 48

222 days

Fri 7/1/22

Tue 2/7/23

Shaun Construction

220

Avery Creek PS Improvements

2018008

365 days

Sun 7/1/18

Sun 6/30/19

Darin Construction

221

Biological Treatment

2016063 0

365 days

Fri 7/1/22

Fri 6/30/23

Hunter Pre. Eng. Rep.

222

Biological Treatment

2016063 0

731 days

Sat 7/1/23

Mon 6/30/25

223

Biological Treatment

2016063 0

1096 days

Tue 7/1/25

Fri 6/30/28

224

Carrier Bridge Capacity Improve.

2018089 0

2372 days

Tue 1/1/13

Sun 6/30/19

225

Carrier Bridge Capacity Improve.

2018089 0

366 days

Mon 7/1/19

Tue 6/30/20

226

Carrier Bridge Capacity Improve.

2018089 0

549 days

Thu 7/1/21

Sat 12/31/22

Hunter Construction

Flow Monitoring

2008013 0

4017 days

Tue 7/1/08

Sun 6/30/19

Shaun Construction

228

Intermediate Clarifier Slide Gates

2017022 0

365 days

Sun 7/1/18

Sun 6/30/19

Hunter Construction

229

Plant Headworks Improvements

2015004 0

551 days

Wed 7/1/15

Sun 1/1/17

Hunter Design

230

Plant Headworks Improvements

2015004 0

730 days

Mon 1/2/17

Tue 1/1/19

Hunter Construction

231

Plant High Rate Primary Treatment

2015054 0

730 days

Fri 7/1/16

Sat 6/30/18

Hunter Design

232

Plant High Rate Primary Treatment

2015054 0

1096 days

Sun 7/1/18

Wed 6/30/21

Hunter Construction

14

Construction

Owen ROW

1218 days

Created by: Cheryl Rice

Oct

Shaun ROW

2015221 48

Note: Project durations are based on a 7 day week.

Sep

Shaun Design 47

Old County Home Rd PSR

227

Aug

Darin Construction

218

0

Jul

ROW Construction Design

Shaun ROW

ROW Construction Construction

Hunter Design Hunter Construction Hunter Design 2

Design

Hunter ROW

ROW Construction Construction Construction

Construction

Design P.E.R.

Construction

Inactive Milestone

Manual Task

Manual Summary Rollup

Start-only

External Tasks

ROW

External Milestone

Inactive Summary

Duration-only

Manual Summary

Finish-only

External Milestone

4

Deadline

Last Updated: Thu 4/5/18


Capital Improvement Program Fiscal Years 2019—2028

Interceptor & Wet Weather Projects


CH R D

BO TA N

YD R

AVERY LN

LN

RD U SA

O NO

RD

EL

KE

N

D

R ST

SP

O

E UP

ER

RD

OV GC N I R

PINE

TR E

D

NOT TO SCALE

DALYA RD

I40 W I40 E SLEEPY HOLLOW LN

WY

W IL S O N RD

W

BU

BUCKEYE ACCESS RD

N

EY CK

AN D

of BUNCOMBE COUNTY, NORTH CAROLINA

Budget Map

R

ALDON DR

L KEN

D ER

REGER AVE GREAT LAUREL DR

METROPOLITAN SEWERAGE DISTRICT

GOOSE CREEK RD

0H US 7

E DR W AR RE RD ALEM NEW S

RD GLEN CABLE

Christian Creek Interceptor Project No. 2011110

S IGG BR

TU

N

R RD

/

MO

SNEAKING CREEK

LN

EN S

STE V

RD MOFFITT NOLL DR E RIV R K

FFIT T BR AN

DR

E RD

A E IDG LR

B

PORTE RS CO V

LN TEEM S

L ER R Y TR

RW AY SY LVE ST E

EASTM OOR D R

DIN RED B

R CA

S

CREEK RD

M JI H NC A R

CHRISTIA N

YOW DR

WITS END TRL

ROWLAND RD

ON RD BURLES


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Christian Creek Interceptor

LOCATION:

Buncombe County

TYPE:

Interceptor

PIPE RATING:

24

PROJECT NO.

2011110

TOTAL LF:

12,379

PROJECT BUDGET:

$4,489,209.00

PROJECT ORIGIN:

SSO's, Line Condition, Undersized

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$30,079.00

$30,079.00

$4,500.00

$515.00

55360 - EASEMENT PLATS

$21,630.00

$21,630.00

55370 - LEGAL FEES

$45,000.00

$20,937.00

55330 - DESIGN 55340 - PERMITS

$4,500.00

55350 - SPECIAL STUDIES

$24,063.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION

$200,000.00

55400 - APPRAISAL

$10,000.00

55410 - CONDEMNATION

$30,000.00

55420 - CONSTRUCTION

$4,107,000.00

$200,000.00 $10,000.00 $270.00

$14,730.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$10,000.00

55450 - SURVEY - ASBUILT

$31,000.00

TOTAL AMOUNT

$4,489,209.00

$73,431.00

ENGINEER:

MSD

HC

R.O.W. ACQUISITION:

MSD

# PLATS: [ 28

$0.00

$253,293.00

ESTIMATED BUDGETS - FY 20 - 28 ]

CONTRACTOR:

FY 19-20

$2,073,500.00

FY 20-21

$2,089,500.00

CONSTRUCTION ADM:

MSD

FY 21-22

$0.00

INSPECTION:

MSD

FY 22-23

$0.00

FY 23-24

$0.00

FY 24-25

$0.00

Asheville. The project includes the replacement of approximately 12,379 LF of existing 8-inch VCP sewer FY 25-26 pipe with new 8", 12" and 16" DIP. The existing lines serve a large collection area and are undersized. FY 26-27 Additionally, they are in poor structural condition and have experienced multiple SSO's.

$0.00

FY 27-28

$0.00

PROJECT DESCRIPTION: This project is located along Christian Creek, between US 70 Hwy and I-40, east of

SPECIAL PROJECT NOTES:

$0.00


W IE V ER

/

DR

H DR

Lower Swannanoa Interceptor Project No. 2004040

WINERY RD

MEADOW RD

TE C DE

NOT TO SCALE

ST U NT CI R

CIR TANS

TC

OT

E

DR

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

EA S

G LOD

HUNTSMAN PL

E ST

METROPOLITAN SEWERAGE DISTRICT

P AP

T

RD

LS

CH OA

OW EL

R

MC D

T DU NS SAIN

V RI

AMBOY RD

ST

DE

N LYMA RST DR

VA N

U FERNIH

T

RD

R VICTO

R W DO LS

RB ILT

O SH C TM EL

IA RD


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Lower Swannanoa Interceptor

LOCATION:

Asheville

TYPE:

Interceptor

PIPE RATING:

9

PROJECT NO.

2004040

TOTAL LF:

6,475

PROJECT BUDGET:

$5,478,400.00

PROJECT ORIGIN:

WW SSO's at Splitter box

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$14,879.00

$37,900.00

55330 - DESIGN 55340 - PERMITS

$5,000.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$3,000.00

55370 - LEGAL FEES

$2,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION

$10,000.00

55400 - APPRAISAL

$2,500.00

55410 - CONDEMNATION 55420 - CONSTRUCTION

$5,415,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$3,000.00

55450 - SURVEY - ASBUILT TOTAL AMOUNT

$5,478,400.00

$14,879.00

ENGINEER:

MSD

EB

R.O.W. ACQUISITION:

MSD

# PLATS: [ 2 ]

CONTRACTOR:

$0.00

$0.00

ESTIMATED BUDGETS - FY 20 - 28 FY 19-20

$0.00

FY 20-21

$0.00

CONSTRUCTION ADM:

MSD

FY 21-22

$0.00

INSPECTION:

MSD

FY 22-23

$33,021.00

FY 23-24

$12,500.00

FY 24-25

$5,418,000.00

PROJECT DESCRIPTION: This project is to eliminate problems associated with the splitter box and the FY 25-26

$0.00

downstream twin 36-inch lines.

SPECIAL PROJECT NOTES:

This portion of line is also included in the SFB/Carrier Bridge PER project.

FY 26-27

$0.00

FY 27-28

$0.00


OK

O KW R PA

OD

E AV

E

SNYDER DR

I26 W I26 E WASHINGTON AVE

R

Middle Beaverdam at I-26 Project No. 2010002

O BR L DA

/

OL D

CR DA M BE AV E

RD

JONES ST

OD

N FI

RD NOT TO SCALE

PUF F IN L N

RV IL

ELKDA

RD

LE D R

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

LE

METROPOLITAN SEWERAGE DISTRICT

DEERVIEW LN

EE K

HIGH ST

N

O W

MOORE S T

WE AV E

PELZER ST

E AV


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Middle Beaverdam Crk. @ I-26

LOCATION:

Woodfin

TYPE:

Interceptor

PIPE RATING:

24

PROJECT NO.

2010002

TOTAL LF:

2,930

PROJECT BUDGET:

$1,293,650.00

PROJECT ORIGIN:

SSO's, Work Orders, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$10,000.00

$7,430.00

55330 - DESIGN 55340 - PERMITS

$3,250.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$4,500.00

55370 - LEGAL FEES

$4,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION

$30,000.00

55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$1,230,400.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$4,000.00

55450 - SURVEY - ASBUILT

$7,500.00

TOTAL AMOUNT

$1,293,650.00

$7,430.00

ENGINEER:

MSD

OH

R.O.W. ACQUISITION:

MSD

# PLATS: [ 4

CONTRACTOR:

$0.00

$0.00

ESTIMATED BUDGETS - FY 20 - 28 ]

FY 19-20

$0.00

FY 20-21

$0.00

CONSTRUCTION ADM:

MSD

FY 21-22

$0.00

INSPECTION:

MSD

FY 22-23

$7,070.00

FY 23-24

$34,000.00

FY 24-25

$3,250.00

PROJECT DESCRIPTION: This project will install 24-inch ductile iron pipe along Beaverdam Creek. It will FY 25-26

$0.00

also replace a 4-inch main at rear of lots on Washington Ave. and along the east side of US 19-23 just north FY 26-27 of the railroad. Lines are in poor condition, and the 4-inch lines are undersized. FY 27-28

SPECIAL PROJECT NOTES:

$0.00 $1,241,900.00

This project is a combination of Middle Beaverdam Creek Ph. 2, Washington Ave 4" Main, and Woodfin Ave @ US 19-23.


/

South French Broad Relief Interceptor Project No. 2017070 NOT TO SCALE

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

METROPOLITAN SEWERAGE DISTRICT


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

South French Broad Relief Int.

LOCATION:

Buncombe County

TYPE:

Interceptor

PIPE RATING:

N/A

PROJECT NO.

2017070

TOTAL LF:

36,330

PROJECT BUDGET:

$35,135,250.00

PROJECT ORIGIN:

2001 WW System Master Plan (CDM)

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$95,000.00

$95,000.00

55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES

$40,000.00

55360 - EASEMENT PLATS

$5,250.00

55370 - LEGAL FEES

$40,000.00

$10,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION

$500,000.00

55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$34,400,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$40,000.00

55450 - SURVEY - ASBUILT

$45,000.00

TOTAL AMOUNT

$35,135,250.00

$0.00

ENGINEER:

MSD

HC

R.O.W. ACQUISITION:

MSD

# PLATS: [ 5 ]

CONTRACTOR:

$95,000.00

$40,000.00

ESTIMATED BUDGETS - FY 20 - 28 FY 19-20

$5,250.00

FY 20-21

$510,000.00

CONSTRUCTION ADM:

MSD

FY 21-22

$0.00

INSPECTION:

MSD

FY 22-23

$0.00

FY 23-24

$8,610,000.00

FY 24-25

$8,610,000.00

PROJECT DESCRIPTION: This project includes paralleling existing 36" and 48" interceptors with a new 60" FY 25-26

$8,610,000.00

line from Dingle Creek north to Carrier Bridge PS. The new interceptor will provide relief to the existing FY 26-27 system during wet weather. FY 27-28

SPECIAL PROJECT NOTES:

This project is currently phased over four years.

$8,655,000.00 $0.00


W

K OA

VI

DIS

D

SO

AK S

JO NE

HILL

SF AR

RD

MR D

D

DA I

I26

E

RY R D

WINERY RD

Y OLD FERR

South French Broad Interceptor Lining Project No. 2011033

CI R

KNO B

RIDGEFIELD BLVD

DR

PIN E LN

I40 E

DEER PARK

RD

NOT TO SCALE

RD

I40 W

RD

MI

O LD SH IL RD

RO AC

O H

AP P RD

A

FO

R

T ES

L

F IF

RD

RD

RC

BUSBE E

D CE

H D

O KS

RD OH

HD

R

LAMBETH DR

T FRI

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

RD

L SHI

METROPOLITAN SEWERAGE DISTRICT

D

ID E

KR LOC M E H WY E PK RIDG E U L B RUN USE O H E R

BR O

RD OD WO H T SOU

R

I40 E

D

/

RD

LD FI E

MORRIS R

COFFEY CIR

SAR

I40 W

E OAKVIEW RD

E DG E W

RD

0W

EW

TO I 4

TERRAINE LN

LL

HI

RA

RD

PO ND

DR

ME Y

D

D CE R

I26 W

RD

FR E

DR I TH FA RD CASE

MO NT

BRAD ST

ILLE R RSONV HENDE

IDL

W

EW O OD DR

D

RD R

BREV A

I26 R TA

FE

IS AV ALT

RD

RD

C E OKE H ER

RR Y

RD P FA RM R

RD

REED ST WA L ES ST

PL

SHE E

OLD

U

LONDON RD

AY RW I FA

P L AT EA

RD D OL

FA RM

RD

SERV I

YR D PO N RD OLD RIVER

TH

Y N

G LE RD EG LE

SH TO N CI M

E OLD OVERLOOK RD

I 40 TO

N LO L VA

RD

W

NE PA RK

I26

PI P

V ST

D OL TO

NA BUE UYVESANT RD HILLT OP RD

R GE ID

CARIBOU RD

D OL E RE

T DS

R HE AM RD ISTA RD ST


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

South French Broad Int. - Lining

LOCATION:

Biltmore Estate

TYPE:

Interceptor

PIPE RATING:

8

PROJECT NO.

2011033

TOTAL LF:

21,913

PROJECT BUDGET:

$4,855,416.00

PROJECT ORIGIN:

Line Condition, Inflow & Infiltration

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES

$360.00

$360.00

$4,847,450.00

$1,639,745.00

$1,342,705.00

$1,071,000.00

$7,606.00

$1,266.00

$2,340.00

$2,000.00

$4,855,416.00

$1,641,371.00

$1,345,045.00

$1,073,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION 55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT

5,111 ENGINEER:

MSD

HC

R.O.W. ACQUISITION:

N/A

# PLATS: [ 0 ]

CONTRACTOR:

ESTIMATED BUDGETS - FY 20 - 28 FY 19-20

$796,000.00

FY 20-21

$0.00

CONSTRUCTION ADM:

MSD

FY 21-22

$0.00

INSPECTION:

MSD

FY 22-23

$0.00

FY 23-24

$0.00

FY 24-25

$0.00

southern terminus of the project is located where the Dingle Creek Int. flows into the South French Broad Int. FY 25-26 The project consists of CIPP lining approx. 22,000 LF of existing 36-inch Reinforced Concrete Pipe. The line is FY 26-27 a major source of inflow and infiltration. Construction will be phased over several years.

$0.00

FY 27-28

$0.00

PROJECT DESCRIPTION: This project is located within the Biltmore Estate along the French Broad River. The

SPECIAL PROJECT NOTES:

6,195LF in FY 16-17; 6,631LF in FY 17-18; 5,111LF in FY 18-19; 3,976LF in FY 19-20. Pricing includes manhole rehab.

$0.00


VI EW

RD

BRO OKC L IFF D

L

OLD

C LFE WO

DU OVE

D OO NW RD

RD

N

RY L

CARTER COVE RD

BL A

CK BE R

NOT TO SCALE

E AV BE

NA

RD

DL

E GL

N

DR AY W N

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

N DO

NN LY

N PO

METROPOLITAN SEWERAGE DISTRICT

RD

Beaverdam Creek WW Project No. 2001191

P

HL

D

T PL

RD

IP WH

DA MR

F CRO PINE

RD

DR

AM RD

R

ORS

IDE D

E H

ILL RW O O

B EA VER

T RD

BEAVERDAM CT

OK P

R

BRO

S CLUB

ERN GOV

C RI C AN BR

CI R

UR Y

FER N

OAK DR

RD

/

SK Y

W OO DB

L KENT P

RD

EST

E ALL ER V

E

TERRE TRL

PL WOO D STR AD

GE V RI D

RD G ST ON Y

DR IE W IR

S BLACK

GOVE RNOR C

F CRO PINE

VI EW DOW MEA

E

FAIR CR

V BEA

N PI DG RI

Y RD


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Beaverdam Creek WW (CDM #10)

LOCATION:

Buncombe County

TYPE:

Wet Weather Int.

PIPE RATING:

27

PROJECT NO.

2001191

TOTAL LF:

5,500

PROJECT BUDGET:

$1,506,000.00

PROJECT ORIGIN:

CDM Master Plan

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$1,506,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT

ENGINEER:

$1,506,000.00

MSD

R.O.W. ACQUISITION:

$0.00

EB # PLATS: [

CONTRACTOR:

$0.00

$0.00

ESTIMATED BUDGETS - FY 20 - 28 ]

FY 19-20

$0.00

FY 20-21

$0.00

CONSTRUCTION ADM:

MSD

FY 21-22

$0.00

INSPECTION:

MSD

FY 22-23

$0.00

FY 23-24

$0.00

FY 24-25

$0.00

PROJECT DESCRIPTION: This was identified as a potential rehabilitation project to improve wet weather flow FY 25-26

$1,506,000.00

conveyance, as specified in the Master Plan developed by CDM. It is located in the North Asheville area and FY 26-27 is comprised of 5,500 LF of 8-inch through 12-inch diameter pipe. FY 27-28

SPECIAL PROJECT NOTES:

CDM Master Plan Project #10

$0.00 $0.00


/

NW French Broad Interceptor Project No. 2018084 NOT TO SCALE

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

METROPOLITAN SEWERAGE DISTRICT


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

NW French Broad Interceptor

LOCATION:

Asheville

TYPE:

Wet Weather Interceptor

PIPE RATING:

N/A

PROJECT NO.

2018084

TOTAL LF:

10,650

PROJECT BUDGET:

$16,100,000.00

PROJECT ORIGIN:

CDM Preliminary Engineering Report

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN

$2,100,000.00

55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$14,000,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT

$16,100,000.00

$0.00

ENGINEER:

CDM

EB/HC

R.O.W. ACQUISITION:

MSD

# PLATS: [ 10 ]

CONTRACTOR:

$0.00

$0.00

ESTIMATED BUDGETS - FY 20 - 28 FY 19-20

$0.00

FY 20-21

$0.00

CONSTRUCTION ADM:

MSD

FY 21-22

$0.00

INSPECTION:

MSD

FY 22-23

$0.00

FY 23-24

$0.00

PROJECT DESCRIPTION: This project is to implement the recommendations of the French Broad/Carrier Bridge FY 24-25

Preliminary Engineering Report. This project will provide needed capacity and alleviate wet weather flows entering the system from the south and west areas of the District in the event that the Carrier Bridge Pump FY 25-26 Station is eliminated. The estimated costs shown are planning level only, and incorporate the removal of the FY 26-27 Carrier Bridge Pump Station and the construction of a new 60-inch interceptor from Carrier Bridge to Smith Mill FY 27-28 Creek. SPECIAL PROJECT NOTES:

CDM - PER

$0.00 $1,050,000.00 $1,050,000.00 $4,666,667.00


PI C

KW

IC K

LENOIR ST

ON

E RIV

I LL RM

DR

ME

S EA

W VIE OAK

L DY LO

IE TV

N AN SW

VE WA

RD

N

RD DISTRICT

South Swannanoa WW Project No. 2001195

AV E

STICK LN

/

TH

PS OM

ST

RD

DUNKIRK RD

CH ILE S

OA AN

R

ER IV

RD EY AN V L MU

NOT TO SCALE

ST

R PINE D WHITE

FOURTH S T

MC

E S AV

THIRD ST

LN R AR TH U AL Y UR SA

T SIM P

SO

NS

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

D

GLENDALE AVE METROPOLITAN SEWERAGE DISTRICT

FAIRVIE WR

DO

LE CHI

FIRST ST

T

ER ON T S T

MAIN S

T TS

W ST

A ST

ES

LOWE AVE

LN W O

E

RD

G

L CA

NIA DO

OD

RD RTH ILWO N E K

S EA

CRESTV IE

L CO

LO V

R

T

NN RAVE

ER D

YC

EST

R

EJ O

D ITT BR

N E AV

L E AV FRADY LN

TCH WES

LE G LE DA

A BL

K OC

WINDING RD

DR


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

South Swannanoa WW (CDM #4)

LOCATION:

Asheville

TYPE:

Wet Weather Int.

PIPE RATING:

23

PROJECT NO.

2001195

TOTAL LF:

8,040

PROJECT BUDGET:

$3,020,000.00

PROJECT ORIGIN:

CDM Master Plan

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$3,020,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT

ENGINEER:

$3,020,000.00

MSD

R.O.W. ACQUISITION:

$0.00

EB # PLATS: [

CONTRACTOR:

$0.00

$0.00

ESTIMATED BUDGETS - FY 20 - 28 ]

FY 19-20

$0.00

FY 20-21

$0.00

CONSTRUCTION ADM:

MSD

FY 21-22

$0.00

INSPECTION:

MSD

FY 22-23

$0.00

FY 23-24

$0.00

FY 24-25

$0.00

PROJECT DESCRIPTION: This was identified as a potential rehabilitation project to improve wet weather flow FY 25-26

$0.00

conveyance, as specified in the Master Plan developed by CDM. It is located in the Biltmore area near FY 26-27 Sweeten Creek, and is comprised of 8,040 LF of 18-inch through 42-inch diameter pipe.

$3,020,000.00

FY 27-28

$0.00

SPECIAL PROJECT NOTES:

CDM Master Plan Project #4


This Page Intentionally Blank


Capital Improvement Program Fiscal Years 2019—2028

General Sewer Rehabilitation Projects


HOAL

TRADE ST

L MAPLE

NOT TO SCALE

T POND S

N

LANCE LN

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

T

METROPOLITAN SEWERAGE DISTRICT

S ATKINS

RD

Atkins Street Project No. 2014012

S RD

LOVER

LE ONVIL

/

S LONG

RS HENDE

S LN

IR MIAMI C


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Atkins Street

LOCATION:

Arden

TYPE:

General Sewer Rehab.

PIPE RATING:

39

PROJECT NO.

2014012

TOTAL LF:

1,833

PROJECT BUDGET:

$519,330.00

PROJECT ORIGIN:

SSO's, Work Orders, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$5,480.00

$5,480.00

55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$2,250.00

55370 - LEGAL FEES

$3,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION

$25,000.00

55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$477,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$2,000.00

55450 - SURVEY - ASBUILT

$4,600.00

TOTAL AMOUNT

$519,330.00

$5,480.00

ENGINEER:

MSD

HC

R.O.W. ACQUISITION:

MSD

# PLATS: [ 3

CONTRACTOR:

$0.00

$0.00

ESTIMATED BUDGETS - FY 20 - 28 ]

FY 19-20

$0.00

FY 20-21

$0.00

CONSTRUCTION ADM:

MSD

FY 21-22

$30,250.00

INSPECTION:

MSD

FY 22-23

$0.00

FY 23-24

$483,600.00

FY 24-25

$0.00

PROJECT DESCRIPTION: This project is located in Arden just north of Lake Julian. Approximately 1,833 LF of existing 6-inch vitrified clay pipe will be replaced with new 8-inch ductile iron pipe. The existing sewer FY 25-26 line is in poor condition due to roots, fractures, and sags in the line. The line is undersized and has flooded FY 26-27 houses in the area. FY 27-28 SPECIAL PROJECT NOTES:

$0.00 $0.00 $0.00


RA RO

LL HI D EN E AL RD

Aurora Drive Project No. 2017145 NOT TO SCALE

KE

RTH WO NIL

DR E BOR ALIS

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

S KNL

METROPOLITAN SEWERAGE DISTRICT

L RD

/

DR RD

ALE

A OR

RIN GD

R AU

RTH RD

AU R HE C AT UC

KENILW O

A BE

SP

E TUNN

RD

LN


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Aurora Drive

LOCATION:

Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

53

PROJECT NO.

2017145

TOTAL LF:

2,500

PROJECT BUDGET:

$708,500.00

PROJECT ORIGIN:

Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$10,000.00

$10,000.00

55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$5,500.00

55370 - LEGAL FEES

$7,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION

$40,000.00

55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$640,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$1,000.00

55450 - SURVEY - ASBUILT

$5,000.00

TOTAL AMOUNT

$708,500.00

$0.00

ENGINEER:

MSD

DP

R.O.W. ACQUISITION:

MSD

# PLATS: [ 7

CONTRACTOR:

$0.00

$10,000.00

ESTIMATED BUDGETS - FY 20 - 28 ]

FY 19-20

$5,500.00

FY 20-21

$47,000.00

CONSTRUCTION ADM:

MSD

FY 21-22

$646,000.00

INSPECTION:

MSD

FY 22-23

$0.00

FY 23-24

$0.00

FY 24-25

$0.00

PROJECT DESCRIPTION: This project runs along Aurora Drive in the Kenilworth area of Asheville. The project begins on Aurora Drive, runs through several properties, and ends on Springdale Rd. The existing 6” FY 25-26 clay pipes have structural defects, heavy root intrusions, and deteriorating manholes. All of these problems FY 26-27 contribute to I/I issues. FY 27-28 SPECIAL PROJECT NOTES:

$0.00 $0.00 $0.00


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Beale Road at Copney Lane

LOCATION:

Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

47

PROJECT NO.

2009129

TOTAL LF:

4,027

PROJECT BUDGET:

$1,445,925.00

PROJECT ORIGIN:

SSO's, Access, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$15,725.00

$15,725.00

55330 - DESIGN 55340 - PERMITS

$1,200.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$15,000.00

55370 - LEGAL FEES

$14,000.00

55380 - ACQUISITION SERVICES

$14,000.00

55390 - COMPENSATION

$110,000.00

55400 - APPRAISAL

$3,000.00

55410 - CONDEMNATION

$10,000.00

55420 - CONSTRUCTION

$1,250,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$3,000.00

55450 - SURVEY - ASBUILT

$10,000.00

TOTAL AMOUNT

$1,445,925.00

$15,725.00

ENGINEER:

MSD

DP

R.O.W. ACQUISITION:

Consultant

# PLATS: [ 14 ]

CONTRACTOR:

$0.00

$0.00

ESTIMATED BUDGETS - FY 20 - 28 FY 19-20

$16,200.00

FY 20-21

$151,000.00

CONSTRUCTION ADM:

MSD

FY 21-22

$0.00

INSPECTION:

MSD

FY 22-23

$1,263,000.00

FY 23-24

$0.00

FY 24-25

$0.00

PROJECT DESCRIPTION: This project ties into the Lake Julian Ph. 4 project just west of Glen Bridge Road and extends northward to Ducker Road and Lower Glen Bridge Road. It serves several major manufacturing FY 25-26 sites. The lines are in poor condition with broken segments and leaking joints, have resulted in SSO's, and FY 26-27 are difficult to access for maintenance and repairs. FY 27-28 SPECIAL PROJECT NOTES:

$0.00 $0.00 $0.00


RA RO DR

HI

E LL

ND

E AL RD

Beaucatcher Road at Kenilworth Road Project No. 2015219

T CT URAN

RD NOT TO SCALE

S KNL

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

KE

RTH WO NIL

METROPOLITAN SEWERAGE DISTRICT

L RD

/

AU

RD

A BE R HE C AT UC

TH KENILWOR

A REST

E TUNN


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Beaucatcher Rd. @ Kenilworth Rd.

LOCATION:

E. Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

35

PROJECT NO.

2015219

TOTAL LF:

1,370

PROJECT BUDGET:

$521,900.00

PROJECT ORIGIN:

Work Orders, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$19,500.00

$6,500.00

$13,000.00

55330 - DESIGN 55340 - PERMITS

$1,000.00

$1,000.00

$600.00

$600.00

$1,000.00

$1,000.00

$35,000.00

$35,000.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$463,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$1,000.00

55450 - SURVEY - ASBUILT

$800.00

TOTAL AMOUNT

$521,900.00

$6,500.00

ENGINEER:

MSD

SA

R.O.W. ACQUISITION:

MSD

# PLATS: [ 1 ]

CONTRACTOR:

$13,000.00

$37,600.00

ESTIMATED BUDGETS - FY 20 - 28 FY 19-20

$0.00

FY 20-21

$464,800.00

CONSTRUCTION ADM:

MSD

FY 21-22

$0.00

INSPECTION:

MSD

FY 22-23

$0.00

FY 23-24

$0.00

FY 24-25

$0.00

PROJECT DESCRIPTION: This project is located in East Asheville and is comprised of 1370 LF of 8-inch FY 25-26

$0.00

ductile iron pipe. The existing line is aging 6" orangeburg pipe in poor shape with a large amount of root FY 26-27 intrusion. FY 27-28

SPECIAL PROJECT NOTES:

$0.00 $0.00


HE

AMHERST RD

/

RD

NVIL LE

NDE RSO

RD UN DT OP

MILL STON E

DR

MAGNUM WAY

Bellevue Road Project No. 2015175

RO

LE AN HURST RD

NOT TO SCALE

E BELLEVU

RD

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

METROPOLITAN SEWERAGE DISTRICT

JAN DR


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Bellevue Road

LOCATION:

S. Asheville

TYPE:

General Sewer Rehab

PIPE RATING:

49

PROJECT NO.

2015175

TOTAL LF:

1,100

PROJECT BUDGET:

$445,600.00

PROJECT ORIGIN:

Work Orders, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$9,600.00

$9,600.00

55330 - DESIGN 55340 - PERMITS

$5,000.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$5,000.00

55370 - LEGAL FEES

$8,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION

$30,000.00

55400 - APPRAISAL

$3,000.00

55410 - CONDEMNATION

$10,000.00

55420 - CONSTRUCTION

$370,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$1,000.00

55450 - SURVEY - ASBUILT

$4,000.00

TOTAL AMOUNT

$445,600.00

$9,600.00

ENGINEER:

MSD

DP

R.O.W. ACQUISITION:

MSD

# PLATS: [ 8

CONTRACTOR:

$0.00

$0.00

ESTIMATED BUDGETS - FY 20 - 28 ]

FY 19-20

$5,000.00

FY 20-21

$56,000.00

CONSTRUCTION ADM:

MSD

FY 21-22

$375,000.00

INSPECTION:

MSD

FY 22-23

$0.00

FY 23-24

$0.00

FY 24-25

$0.00

PROJECT DESCRIPTION: This project is located in South Asheville along properties on Bellevue Road. The FY 25-26

$0.00

project will replace 1,100 LF of 6-inch VCP and PVC. The existing lines are in bad condition and have too FY 26-27 many point repairs. FY 27-28

SPECIAL PROJECT NOTES:

$0.00 $0.00


EB D

D

Bent Tree Road Project No. 2016102

RR

EE R D CHERO K

RIA

NOT TO SCALE

ET

SUNSET DR

T T SM

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

METROPOLITAN SEWERAGE DISTRICT

SU NS

R EE R

SUNS E

INGWA Y DR CROWN

T BENT

T

OLD TOLL RD

S

SM

E CR D OO TW

/

BL U

CRESTWOOD LN

RD WESTHAVEN DR


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Bent Tree Road

LOCATION:

Asheville

TYPE:

General Sewer Rehab

PIPE RATING:

60

PROJECT NO.

2016102

TOTAL LF:

925

PROJECT BUDGET:

$391,250.00

PROJECT ORIGIN:

SSO's, Work Orders, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$4,500.00

$4,500.00

55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$3,750.00

55370 - LEGAL FEES

$4,000.00

$3,750.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION

$50,000.00

55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$325,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$500.00

55450 - SURVEY - ASBUILT

$3,500.00

TOTAL AMOUNT

$391,250.00

$0.00

ENGINEER:

MSD

DP

R.O.W. ACQUISITION:

MSD

# PLATS: [ 4

CONTRACTOR:

$4,500.00

$3,750.00

ESTIMATED BUDGETS - FY 20 - 28 ]

FY 19-20

$54,000.00

FY 20-21

$329,000.00

CONSTRUCTION ADM:

MSD

FY 21-22

$0.00

INSPECTION:

MSD

FY 22-23

$0.00

FY 23-24

$0.00

FY 24-25

$0.00

PROJECT DESCRIPTION: This project runs adjacent to Bent Tree Rd. in Asheville. The project begins on Old FY 25-26

$0.00

Toll Rd., crosses Bent Tree Rd., and ends at Crestwood Rd. There are numerous structural problems and FY 26-27 bends within the lines which contribute to I/I issues. FY 27-28

SPECIAL PROJECT NOTES:

$0.00 $0.00


OR BILTM

N ANA

WHITE FAWN PL

AVE

/

A N PL

H BUC FLORENC E ST NOT TO SCALE

ND FAW

Buchanan Avenue Project No. 2014023

N BUCHA

E WHIT R

E AVE

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

METROPOLITAN SEWERAGE DISTRICT


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Buchanan Ave.

LOCATION:

Asheville

TYPE:

Pipe Rated Projects

PIPE RATING:

51

PROJECT NO.

2014023

TOTAL LF:

2,535

PROJECT BUDGET:

$973,800.00

PROJECT ORIGIN:

Work Orders, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$28,000.00

$28,000.00

55330 - DESIGN 55340 - PERMITS

$1,000.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$5,400.00

55370 - LEGAL FEES

$9,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION

$50,000.00

55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$877,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$2,000.00

55450 - SURVEY - ASBUILT

$1,400.00

TOTAL AMOUNT

$973,800.00

$0.00

ENGINEER:

MSD

SA

R.O.W. ACQUISITION:

MSD

# PLATS: [ 9

CONTRACTOR:

$0.00

$28,000.00

ESTIMATED BUDGETS - FY 20 - 28 ]

FY 19-20

$6,400.00

FY 20-21

$59,000.00

CONSTRUCTION ADM.:

MSD

FY 21-22

$880,400.00

INSPECTION:

MSD

FY 22-23

$0.00

FY 23-24

$0.00

FY 24-25

$0.00

PROJECT DESCRIPTION: This project is located in downtown Asheville near Biltmore Ave. and is FY 25-26 comprised of 2,535 LF of 8-inch ductile iron pipe. The existing line is 6-inch clay with heavy root intrusion, FY 26-27 fractures, and one section exposed along a steep grade. FY 27-28 SPECIAL PROJECT NOTES:

$0.00 $0.00 $0.00


R STE

LIN

GS

T

/

RO

AVE

N LI

E

RD

KEN ILWO OD P L

Caledonia Road Project No. 2014153

CA L

RE BILTMO

D O NI A

AVE

EB

IR

ILLA

C

A ALY D UNA

G

L UNADIL

CASTLE ST

NG

NOT TO SCALE

BO W LI

PA R

K

RD

PELH A

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

IA DON

ST

RD

METROPOLITAN SEWERAGE DISTRICT

M RD

E CAL

E LL LOW


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Caledonia Road

LOCATION:

Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

31

PROJECT NO.

2014153

TOTAL LF:

2,993

PROJECT BUDGET:

$1,008,400.00

PROJECT ORIGIN:

SSO's, Work Orders, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$10,000.00

$9,800.00

$200.00

55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$6,000.00

55370 - LEGAL FEES

$8,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION

$140,000.00

55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$833,000.00

$351,000.00

55440 - TESTING

$4,000.00

$2,000.00

55450 - SURVEY - ASBUILT

$7,400.00

$2,600.00

55430 - CONST. CONTRACT ADM.

TOTAL AMOUNT

$1,008,400.00

$9,800.00

$200.00

$355,600.00 1066

ENGINEER:

MSD

HC

R.O.W. ACQUISITION:

MSD

# PLATS: [ 8

CONTRACTOR:

ESTIMATED BUDGETS - FY 20 - 28 ]

FY 19-20

$0.00

FY 20-21

$154,000.00

CONSTRUCTION ADM.:

MSD

FY 21-22

$0.00

INSPECTION:

MSD

FY 22-23

$488,800.00

FY 23-24

$0.00

FY 24-25

$0.00

PROJECT DESCRIPTION: This project is located at the Caledonia Rd. entrance to the Kenilworth neighborhood, approx. 0.3 mile south of the Mission Hospital campus. The project includes replacement of FY 25-26 approx. 2,993 LF of 8-inch and 10-inch VCP and Transite pipe with new 8"and 12" DIP. The existing pipe FY 26-27 has structural defects which have resulted in multiple SSO's. FY 27-28 SPECIAL PROJECT NOTES:

This project overlaps with Biltmore WW (CDM #3, MSD Project# 2001192), which is a Non-Critical project. A portion of this project is being coordinated with the City of Asheville.

$0.00 $0.00 $0.00


/

DA YT O

SALEM AVE

N

RD

Chatham Road Project No. 2015019 NOT TO SCALE

TER

LL

RD

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

METROPOLITAN SEWERAGE DISTRICT

CHATHAM RD

CLEARVIEW

EDG

O KN OD O EW

ME

R R IMO NA VE


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Chatham Road

LOCATION:

Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

43

PROJECT NO.

2015019

TOTAL LF:

1,450

PROJECT BUDGET:

$439,400.00

PROJECT ORIGIN:

Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$13,000.00

$13,000.00

55330 - DESIGN 55340 - PERMITS

$1,000.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$3,000.00

55370 - LEGAL FEES

$5,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION

$35,000.00

55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$380,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$1,000.00

55450 - SURVEY - ASBUILT

$1,400.00

TOTAL AMOUNT

$439,400.00

$0.00

ENGINEER:

MSD

SA

R.O.W. ACQUISITION:

N/A

# PLATS: [ 5 ]

CONTRACTOR:

$13,000.00

$0.00

ESTIMATED BUDGETS - FY 20 - 28 FY 19-20

$1,000.00

FY 20-21

$43,000.00

CONSTRUCTION ADM:

MSD

FY 21-22

$0.00

INSPECTION:

MSD

FY 22-23

$382,400.00

FY 23-24

$0.00

FY 24-25

$0.00

PROJECT DESCRIPTION: This project is located in North Asheville near W.T. Weaver Blvd. and is comprised FY 25-26

$0.00

of 1,450 LF of 8-inch ductile iron pipe. The existing line is 6-inch vitrified clay pipe in poor condition with FY 26-27 heavy root intrusion. FY 27-28 SPECIAL PROJECT NOTES:

$0.00 $0.00


ER G

UD

PL

PL

CE LI A

CLYDE ST

ST

PL

RO KE ER D

Cherokee Road Project No. 2009132

BLAIR S T

CH E

D

/

HILLSIDE ST

LENNOX

EDWIN

BOND ST

OAK

LN

CAN T ERB

NOT TO SCALE

URY RD N

E NS

TD

R

LA N D RD

SU

WOO D RD

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

METROPOLITAN SEWERAGE DISTRICT

FAIRMON T

TR

N CRE SCENT ST

TTE S T

CHARLO

E AV LE R D

CROSS BANBUR Y E PL

NT RD FAIRM O

E

T

K OC RD ALBEMA R

T

DR ALBEMAR L

OR AR CH VON RUCK C

MU

XC

A D R

LE

O NN

R R VON RUCK TE

R TE CE


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Cherokee Road

LOCATION:

Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

48

PROJECT NO.

2009132

TOTAL LF:

1,960

PROJECT BUDGET:

$701,680.00

PROJECT ORIGIN:

SSO's, Access, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$15,680.00

$15,680.00

55330 - DESIGN 55340 - PERMITS

$500.00

$500.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$8,500.00

55370 - LEGAL FEES

$4,770.00

$3,730.00

$20,450.00

$4,230.00

$10,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION

$75,000.00

55400 - APPRAISAL

$6,000.00

55410 - CONDEMNATION

$10,000.00

55420 - CONSTRUCTION

$570,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$1,000.00

55450 - SURVEY - ASBUILT

$5,000.00

TOTAL AMOUNT

$701,680.00

ENGINEER:

MSD

DP

R.O.W. ACQUISITION:

MSD

# PLATS: [ 10

$0.00

ESTIMATED BUDGETS - FY 20 - 28 ]

CONTRACTOR:

FY 19-20

$0.00

FY 20-21

$101,000.00

CONSTRUCTION ADM:

MSD

FY 21-22

$576,000.00

INSPECTION:

MSD

FY 22-23

$0.00

FY 23-24

$0.00

FY 24-25

$0.00

Macon Ave. @ Sunset Parkway project to an existing manhole east of Cambridge Road in North Asheville. FY 25-26 The line is old vitrified clay pipe and is in very poor condition. Several segments are under houses, walls or FY 26-27 other physical features which make repairs very difficult.

$0.00

FY 27-28

$0.00

PROJECT DESCRIPTION: This project will replace (or pipe burst) the existing sewer main from the end of the

SPECIAL PROJECT NOTES:

$0.00


MBLY DR

T NU RD

B WOOD N END L

/

CH T ES E DG O L

Chestnut Lodge Road Project No. 2014017

Y

ST

HE R

RO N

W HI TE

PI N

E

DR LAUREL L N

FOREST L N

DYER DR

IDGE R D

NOT TO SCALE

M EN TR D

BLUE R

KE

BLUE RIDGE ASSE

W LN ALP INE SHA DO

ORY DR ARM CE

LD O LA AP G RD

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

METROPOLITAN SEWERAGE DISTRICT


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Chestnut Lodge Rd.

LOCATION:

Black Mountain

TYPE:

General Sewer Rehab.

PIPE RATING:

61

PROJECT NO.

2014017

TOTAL LF:

4,150

PROJECT BUDGET:

$1,300,000.00

PROJECT ORIGIN:

SSO's, Access, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$22,500.00

$22,500.00

55330 - DESIGN 55340 - PERMITS

$1,000.00

$1,000.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$11,500.00

$11,500.00

55370 - LEGAL FEES

$19,000.00

$4,000.00

55380 - ACQUISITION SERVICES

$19,000.00

55390 - COMPENSATION

$85,000.00

55400 - APPRAISAL

$5,000.00

55410 - CONDEMNATION

$10,000.00

55420 - CONSTRUCTION

$1,122,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$2,000.00

55450 - SURVEY - ASBUILT

$3,000.00

TOTAL AMOUNT

$1,300,000.00

$22,500.00

ENGINEER:

MSD

SA

R.O.W. ACQUISITION:

Consultant

# PLATS: [ 19

CONTRACTOR:

$0.00

$16,500.00

ESTIMATED BUDGETS - FY 20 - 28 ]

FY 19-20

$134,000.00

FY 20-21

$1,127,000.00

CONSTRUCTION ADM:

MSD

FY 21-22

$0.00

INSPECTION:

MSD

FY 22-23

$0.00

FY 23-24

$0.00

FY 24-25

$0.00

PROJECT DESCRIPTION: This project is located in Black Mountain near Blue Ridge Road and is comprised of 4,150 LF of 8-inch ductile iron pipe. The existing line is 6-inch and 8-inch clay with root FY 25-26 problems, fractures, and multiple SSO's. FY 26-27 FY 27-28 SPECIAL PROJECT NOTES:

$0.00 $0.00 $0.00


/

VILLAS CT

HILL

LN

TIN Y

RD

Cub Road Project No. 2018027

L

CUB PL

P KIRBY

JO HN BL VD

NOT TO SCALE

ST ON N RIDGE RU N N ER L

DARCUS LN

Budget Map

METROPOLITAN SEWERAGE DISTRICT of BUNCOMBE COUNTY, NORTH CAROLINA

CIR IONA

SO SO WA Y

AR CED

D CUB R


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Cub Road

LOCATION:

Asheville

TYPE:

General Sewer Rehab

PIPE RATING:

40

PROJECT NO.

2018027

TOTAL LF:

1,204

PROJECT BUDGET:

$425,600.00

PROJECT ORIGIN:

CSR's, MH Overflow, Work Orders

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$13,500.00

55330 - DESIGN 55340 - PERMITS

$500.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$9,000.00

55370 - LEGAL FEES

$12,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION

$55,000.00

55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$331,100.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$1,000.00

55450 - SURVEY - ASBUILT

$3,500.00

TOTAL AMOUNT

$425,600.00

$0.00

ENGINEER:

MSD

OH

R.O.W. ACQUISITION:

TBD

# PLATS: [ 12 ]

CONTRACTOR:

$0.00

$0.00

ESTIMATED BUDGETS - FY 20 - 28 FY 19-20

$0.00

FY 20-21

$0.00

CONSTRUCTION ADM:

MSD

FY 21-22

$14,000.00

INSPECTION:

MSD

FY 22-23

$76,000.00

FY 23-24

$335,600.00

FY 24-25

$0.00

Hill pump station near Patton Hill Rd. Currently this public system planned for rehabilitation consists of FY 25-26 approximately 1,204 LF of existing 8-inch VCP to be replaced with 8-inch DIP. This 8-inch VCP system is full FY 26-27 of sags, bellies, heavy root intrusion, deteriorating manholes and bad service connections.

$0.00

FY 27-28

$0.00

PROJECT DESCRIPTION: This project is located in Southwest Asheville one lot east of MSD's Villas of Cedar

SPECIAL PROJECT NOTES:

$0.00


T ES W

OL GN A M

E ST S Y TH

VE IA A

UN YO

G

ST

YS WA D OA

IZ EL

T

ET AB H PL

E RO N MO

PL

HIGHLAND ST

East Chestnut Avenue at Five Points Project No. 2015192

ES

ST

AVE OW

BR

W

CH

UT TN

R OD WO HOLLAND ST NOT TO SCALE

ELOISE ST

L MERRIMON AV E of BUNCOMBE COUNTY, NORTH CAROLINA

BROAD ST

CLAXTON P

Budget Map

METROPOLITAN SEWERAGE DISTRICT

E CHESTNUT ST

ST

/

OC

AL A

ST

ST RE AVE

FOR MOUNT C LA

W PL DRO O O W FULTON S T

AND

MAXWELL ST

L HOL


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

East Chestnut Ave @ Five Points

LOCATION:

N. Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

36

PROJECT NO.

2015192

TOTAL LF:

5,225

PROJECT BUDGET:

$1,733,800.00

PROJECT ORIGIN:

MH Overflows, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$53,000.00

$53,000.00

55330 - DESIGN 55340 - PERMITS

$1,000.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$13,800.00

55370 - LEGAL FEES

$23,000.00

55380 - ACQUISITION SERVICES

$23,000.00

55390 - COMPENSATION

$100,000.00

55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$1,515,000.00

$215,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$3,000.00

55450 - SURVEY - ASBUILT

$2,000.00

TOTAL AMOUNT

$1,733,800.00

$0.00

ENGINEER:

MSD

SA

R.O.W. ACQUISITION:

Consultant

# PLATS: [ 23 ]

CONTRACTOR:

$268,000.00

$0.00

ESTIMATED BUDGETS - FY 20 - 28 FY 19-20

$1,000.00

FY 20-21

$80,800.00

CONSTRUCTION ADM:

MSD

FY 21-22

$79,000.00

INSPECTION:

MSD

FY 22-23

$0.00

FY 23-24

$1,305,000.00

FY 24-25

$0.00

PROJECT DESCRIPTION: This project is located in North Asheville and is comprised of 5,225 LF of 8-inch FY 25-26

$0.00

ductile iron pipe. The existing line is aging 6", 8", and 10" VCP in poor shape with multiple structural defects FY 26-27 per segment. FY 27-28

SPECIAL PROJECT NOTES:

$0.00 $0.00


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Elk Mountain Place

LOCATION:

Woodfin

TYPE:

General Sewer Rehab.

PIPE RATING:

48

PROJECT NO.

2010094

TOTAL LF:

4,101

PROJECT BUDGET:

$1,055,250.00

PROJECT ORIGIN:

SSO's, Access, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$18,000.00

$18,000.00

55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$25,000.00

55370 - LEGAL FEES

$35,000.00

55380 - ACQUISITION SERVICES

$45,000.00

55390 - COMPENSATION

$100,000.00

55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$820,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$2,000.00

55450 - SURVEY - ASBUILT

$10,250.00

TOTAL AMOUNT

$1,055,250.00

$18,000.00

ENGINEER:

MSD

HC

R.O.W. ACQUISITION:

Consultant

# PLATS: [ 34 ]

CONTRACTOR:

$0.00

$0.00

ESTIMATED BUDGETS - FY 20 - 28 FY 19-20

$164,000.00

FY 20-21

$41,000.00

CONSTRUCTION ADM:

MSD

FY 21-22

$832,250.00

INSPECTION:

MSD

FY 22-23

$0.00

FY 23-24

$0.00

FY 24-25

$0.00

PROJECT DESCRIPTION: This project is located south of Elk Mountain Rd. between I-26 and the French FY 25-26

$0.00

Broad river. It is comprised of approximately 4,101 LF of 8-inch ductile iron pipe. The existing vitrified clay FY 26-27 pipe sewer line is in poor condition and has experienced SSO's. FY 27-28 SPECIAL PROJECT NOTES:

$0.00 $0.00


ON

N

CAN T

AV E

Y PK W

/

L OAK

SU

T N SE

ERB

URY

RD N

RD

Fairmont Road Project No. 2015017 NOT TO SCALE

SU

M AC

KWY

L

D

D NT R FAIR MO

DR NS E

T

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

METROPOLITAN SEWERAGE DISTRICT

CH E

LAND WOO D FAIRMONT R

D ER RO KE

ET P

DP

DR OW ER MAY FL

S SUN

OO EW G RID

RD MO U TO WN

RD

NTA IN

E GL

E AL ND


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Fairmont Road

LOCATION:

N. Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

31

PROJECT NO.

2015017

TOTAL LF:

3,900

PROJECT BUDGET:

$1,196,000.00

PROJECT ORIGIN:

SSO's, Access, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$15,000.00

55330 - DESIGN 55340 - PERMITS

$500.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$8,500.00

55370 - LEGAL FEES

$9,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION

$50,000.00

55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$1,100,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$3,000.00

55450 - SURVEY - ASBUILT

$10,000.00

TOTAL AMOUNT

$1,196,000.00

$0.00

ENGINEER:

MSD

DP

R.O.W. ACQUISITION:

MSD

# PLATS: [ 11

CONTRACTOR:

$0.00

$0.00

ESTIMATED BUDGETS - FY 20 - 28 ]

FY 19-20

$0.00

FY 20-21

$0.00

CONSTRUCTION ADM:

MSD

FY 21-22

$0.00

INSPECTION:

MSD

FY 22-23

$15,000.00

FY 23-24

$8,500.00

FY 24-25

$59,500.00

PROJECT DESCRIPTION: This project is located in North Asheville approximately 0.25 miles east of FY 25-26

$0.00

Charlotte St. The project will run along roads and properties from Glendale Rd. to Sunset Dr. The 6-inch FY 26-27 clay lines are in poor condition which have caused manhole overflows and SSOs.

$1,113,000.00

FY 27-28

$0.00

SPECIAL PROJECT NOTES:


BU

ER SB E

R BOU

NE L

N

PINE

RD

RD VISTA

O BR

WN

ST

ST

ORE

LE INO SEM

M ARD

D

R FO

Forestdale Drive Project No. 2014002

WN TO

RD

COR

R ST ER

/

LON E

D

A BUEN

H AM

DR

OU IB

LE

R CA

DA EST

RD

E OR

OO NW DEA

CT

NOT TO SCALE

L RIA

T

M ARD

ST S

T RE S

E IMP

DM O E AR

E FOR

DC

ST

IR

K

E WHIT

E RD

DR OO SW

CI R of BUNCOMBE COUNTY, NORTH CAROLINA

Budget Map

METROPOLITAN SEWERAGE DISTRICT

RO C

V I LL

CIR

L

D HEN ON ER S

OD NWO DAW

M ADA

HI L

L ST N EL

ES DR WHISPERING PIN

D

RD OAK


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Forestdale Drive

LOCATION:

S. Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

33

PROJECT NO.

2014002

TOTAL LF:

2,600

PROJECT BUDGET:

$843,000.00

PROJECT ORIGIN:

SSO's, Work Orders, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$12,000.00

55330 - DESIGN 55340 - PERMITS

$500.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$17,000.00

55370 - LEGAL FEES

$22,000.00

55380 - ACQUISITION SERVICES

$22,000.00

55390 - COMPENSATION

$60,000.00

55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$700,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$3,000.00

55450 - SURVEY - ASBUILT

$6,500.00

TOTAL AMOUNT

$843,000.00

$0.00

ENGINEER:

MSD

DP

R.O.W. ACQUISITION:

Consultant

# PLATS: [ 22 ]

CONTRACTOR:

$0.00

$0.00

ESTIMATED BUDGETS - FY 20 - 28 FY 19-20

$0.00

FY 20-21

$0.00

CONSTRUCTION ADM:

MSD

FY 21-22

$12,000.00

INSPECTION:

MSD

FY 22-23

$17,500.00

FY 23-24

$104,000.00

FY 24-25

$0.00

PROJECT DESCRIPTION: This project begins at Carnell St. and ends at Caribou Rd. The system runs along FY 25-26

$709,500.00

side roads and properties parallel to Hendersonville Rd. System Services crews have reported numerous FY 26-27 problems including multiple SSO's. The existing pipes will be replaced with 8-inch ductile iron pipe. FY 27-28 SPECIAL PROJECT NOTES:

$0.00 $0.00


/

RD

KY

LN

RD WINDSOR

C LU

Four Inch Main - Dry Ridge Road Project No. 2012009

Y DR

E DG RI

NOT TO SCALE

R

D

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

B

R

D METROPOLITAN SEWERAGE DISTRICT

R VE A BE

K O O

E ED G

D

LA WN R

Y DR R GE RID


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Four Inch Main - Dry Ridge Rd.

LOCATION:

Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

58

PROJECT NO.

2012009

TOTAL LF:

908

PROJECT BUDGET:

$362,600.00

PROJECT ORIGIN:

Problematic Orangeburg Four Inch Sewer

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$5,100.00

$4,728.00

$372.00

55330 - DESIGN 55340 - PERMITS

$1,000.00

$1,000.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$4,000.00

$2,975.00

$1,025.00

55370 - LEGAL FEES

$4,000.00

$1,701.00

$2,299.00

$25,000.00

$2,882.00

$22,118.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$320,000.00

$320,000.00

55440 - TESTING

$1,000.00

$1,000.00

55450 - SURVEY - ASBUILT

$2,500.00

$2,500.00

55430 - CONST. CONTRACT ADM.

TOTAL AMOUNT

$362,600.00

$12,286.00

ENGINEER:

MSD

DP

R.O.W. ACQUISITION:

MSD

# PLATS: [ 3 ]

CONTRACTOR:

$26,814.00

$323,500.00

ESTIMATED BUDGETS - FY 20 - 28 FY 19-20

$0.00

FY 20-21

$0.00

CONSTRUCTION ADM:

MSD

FY 21-22

$0.00

INSPECTION:

MSD

FY 22-23

$0.00

FY 23-24

$0.00

FY 24-25

$0.00

PROJECT DESCRIPTION: This project is a 4-inch main and extends from Dry Ridge Rd. to Lucky Lane and FY 25-26

$0.00

Windsor Rd. in Asheville. This project is in the area north of Merrimon Ave. and east of Stratford Rd. The FY 26-27 existing line is a 4-inch Orangeburg pipe which is in poor condition. FY 27-28 SPECIAL PROJECT NOTES:

$0.00 $0.00


Harmony Lane Project No. 2016103

HARMONY LN

ST

/

R

DR

NT

P CY

ME

HA RC

S ES

NOT TO SCALE

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

W RD

METROPOLITAN SEWERAGE DISTRICT

FAIR VIE

MURPHY ST

ROBIN ST


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Harmony Lane

LOCATION:

Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

35

PROJECT NO.

2016103

TOTAL LF:

670

PROJECT BUDGET:

$125,000.00

PROJECT ORIGIN:

Under Sized, Maintenance Issues

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$2,500.00

55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$120,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$500.00

55450 - SURVEY - ASBUILT

$2,000.00

TOTAL AMOUNT

ENGINEER:

$125,000.00

MSD

R.O.W. ACQUISITION:

$0.00

DP # PLATS: [ 0 ]

CONTRACTOR:

$0.00

$0.00

ESTIMATED BUDGETS - FY 20 - 28 FY 19-20

$0.00

FY 20-21

$0.00

CONSTRUCTION ADM:

MSD

FY 21-22

$0.00

INSPECTION:

MSD

FY 22-23

$2,500.00

FY 23-24

$0.00

FY 24-25

$122,500.00

This project is along Harmony Lane in Asheville's Oakley area. The existing FY 25-26 system has two parallel lines that collect on both side of the street. Problems with the system consist of root FY 26-27 intrusion, poor access for maintenance, and close proximity to houses. PROJECT DESCRIPTION:

FY 27-28 SPECIAL PROJECT NOTES:

$0.00 $0.00 $0.00


A BR

I24

0E

PA TT O N AV ET O I24 I24 0 E I240 0W W T OP AT T O NA VE W

L VANDA

N NG NI ST

/

MILL B ROO K

R

RD

L HAZE

MILL

WORLE Y

RD

PL

ANNIE ST

Hazel Mill Road at Richland Street Project No. 2014016

AVE TON T A P

RICH LAND ST

L

N AVE PATTO

ND

DP

S LA RU

NOT TO SCALE

WE S TW OO

DR

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

SE RI

TO X METROPOLITAN SEWERAGE DISTRICT

N SU

ST AW AY

E PATTON AV

AY AVE RIDGEW

IA AVE


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Hazel Mill Rd @ Richland St.

LOCATION:

Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

26

PROJECT NO.

2014016

TOTAL LF:

3,300

PROJECT BUDGET:

$934,700.00

PROJECT ORIGIN:

SSO's, Work Orders, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$17,000.00

55330 - DESIGN 55340 - PERMITS

$1,000.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$8,400.00

55370 - LEGAL FEES

$14,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION

$80,000.00

55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$810,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$2,000.00

55450 - SURVEY - ASBUILT

$2,300.00

TOTAL AMOUNT

$934,700.00

$0.00

ENGINEER:

MSD

SA

R.O.W. ACQUISITION:

MSD

# PLATS: [

CONTRACTOR:

$0.00

$0.00

ESTIMATED BUDGETS - FY 20 - 28 14

]

FY 19-20

$0.00

FY 20-21

$0.00

CONSTRUCTION ADM:

MSD

FY 21-22

$0.00

INSPECTION:

MSD

FY 22-23

$17,000.00

FY 23-24

$9,400.00

FY 24-25

$94,000.00

PROJECT DESCRIPTION: This project is located in West Asheville, near the Bowen Bridge, and consists of 3,300 LF of 8-inch ductile iron pipe. The current pipe is 6-inch and 8-inch clay and PVC. Lines are FY 25-26 undersized and in poor condition with multiple pipe sags, cracks, and fractures. FY 26-27

$814,300.00

FY 27-28

$0.00

SPECIAL PROJECT NOTES:

$0.00


S ATKINS

T

LE E ST

SCRA S ROS

R GGON

RO

S

D

SC RA

G

G O

N

DR RD

D OL

NOT TO SCALE

Hendersonville Road at Rosscraggon Drive Phase 2 Project No. 2009150

POND ST

T

N UR

ER PIK

BR A

EW OO

DR

D

of BUNCOMBE COUNTY, NORTH CAROLINA

H LN BIRC

MB L

MOUNTAIN RD

Budget Map

METROPOLITAN SEWERAGE DISTRICT

CHERRY ST

D

SOUTHWAY GARDEN RD

K RD SWEETEN CREE

/

ST ATKINS

S H ER M

W CITRA ST

TR L

LE R D

AN S

D E ST W C A SC A

IL RSONV HENDE

T

AZ A

C GON

LE A

CRAG ROSS

FI

AP AY NW A I P


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Hendersonville Rd. @ Rosscraggon Ph. 2

LOCATION:

Arden

TYPE:

General Sewer Rehab.

PIPE RATING:

68

PROJECT NO.

2009150

TOTAL LF:

4,163

PROJECT BUDGET:

$1,549,013.00

PROJECT ORIGIN:

SSO's, Access, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$32,560.00

$32,560.00

$23,346.00

$23,346.00

55360 - EASEMENT PLATS

$11,140.00

$11,140.00

55370 - LEGAL FEES

$34,335.00

$21,670.00

$81,379.00

$81,379.00

$1,361,753.00

$3,742.00

55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES

$12,665.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$1,018,508.00

$339,503.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$1,000.00

$500.00

55450 - SURVEY - ASBUILT

$3,500.00

$3,500.00

TOTAL AMOUNT

$1,549,013.00

$173,837.00

ENGINEER:

MSD

OH # PLATS: [

$1,031,173.00

$343,503.00

ESTIMATED BUDGETS - FY 20 - 28

R.O.W. ACQUISITION:

MSD

FY 19-20

$0.00

CONTRACTOR:

TERRY BROTHERS

FY 20-21

$0.00

CONSTRUCTION ADM:

MSD

FY 21-22

$0.00

INSPECTION:

MSD

FY 22-23

$0.00

FY 23-24

$0.00

FY 24-25

$0.00

PROJECT DESCRIPTION: This project begins at US 25 just south of the railway spur line that goes into the Duke FY 25-26

$0.00

20

]

Energy plant and will include lines on Old Furnace Rd. and Azalea Rd. The existing lines are in very poor condition FY 26-27 with high infiltration due to cracks, broken pipes, and bad joints. FY 27-28

SPECIAL PROJECT NOTES:

$0.00 $0.00


/

HIGHLA ND

PERIDOT PT

NOT TO SCALE

LUCKADOO LN

FARMS RD

TR

L

KITZIES CT

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

N GO WA

METROPOLITAN SEWERAGE DISTRICT

RD

Highland Farms Road Project No. 2018018

OAKEN HILL PL

R BE TA E CL NA


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Highland Farms Road

LOCATION:

Black Mountain

TYPE:

General Sewer Rehab.

PIPE RATING:

65

PROJECT NO.

2018018

TOTAL LF:

1,131

PROJECT BUDGET:

$271,250.00

PROJECT ORIGIN:

Work Orders, Line Size and Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$5,700.00

$5,700.00

55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$750.00

55370 - LEGAL FEES

$1,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION

$5,000.00

55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$254,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$2,000.00

55450 - SURVEY - ASBUILT

$2,800.00

TOTAL AMOUNT

$271,250.00

$0.00

ENGINEER:

MSD

HC

R.O.W. ACQUISITION:

MSD

# PLATS: [ 1

CONTRACTOR:

$0.00

$5,700.00

ESTIMATED BUDGETS - FY 20 - 28 ]

FY 19-20

$750.00

TBD

FY 20-21

$6,000.00

CONSTRUCTION ADM:

MSD

FY 21-22

$258,800.00

INSPECTION:

MSD

FY 22-23

$0.00

FY 23-24

$0.00

FY 24-25

$0.00

the Old US70 @ Pine Circle project, completed in 2016. Approx. 1,131 LF of existing 8" VCP will be replaced FY 25-26 with new 8" DIP. The existing sewer has multiple sags that catch rags and debris, and has also experienced FY 26-27 many SSOs.

$0.00

FY 27-28

$0.00

PROJECT DESCRIPTION: This project is located adjacent to the WNC Veterans Cemetary, just upstream of

SPECIAL PROJECT NOTES:

$0.00


O ST

HI

LL

ST

ST

ST

R BA D EL FI E AV

Hill Street Project No. 2015018

O YW A H

TO

NOT TO SCALE

D

ST

OR

D O

TF ON M

E AV

4 I2

0

W

0W I24 0 E I24

I240

O RO

N

OTIS ST

T

ST

DS

SE

LT VE

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

ET

OO AYW H O

E CH

Y RR

METROPOLITAN SEWERAGE DISTRICT

T CARTER S

/

U HO

L NP

EL

CL

HOUSTON ST

A CH MI

AN

ST

IN GM

N SO JA

TO

Y BA

AV E

ST

E

GU ER DG

0

E AV

I24

F NT MO D OR

E

ST

BROAD AV

T N FRENCH

OR SH

ST N ANN

ST


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Hill Street

LOCATION:

Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

54

PROJECT NO.

2015018

TOTAL LF:

2,088

PROJECT BUDGET:

$697,200.00

PROJECT ORIGIN:

SSO's, Access, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$9,000.00

$6,500.00

$2,500.00

55330 - DESIGN 55340 - PERMITS

$1,000.00

$1,000.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$685,000.00

$685,000.00

55440 - TESTING

$1,000.00

$1,000.00

55450 - SURVEY - ASBUILT

$1,200.00

$1,200.00

55430 - CONST. CONTRACT ADM.

TOTAL AMOUNT

$697,200.00

$6,500.00

ENGINEER:

MSD

SA

R.O.W. ACQUISITION:

N/A

# PLATS: [ 0

CONTRACTOR:

$3,500.00

$687,200.00

ESTIMATED BUDGETS - FY 20 - 28 ]

FY 19-20

$0.00

FY 20-21

$0.00

CONSTRUCTION ADM:

MSD

FY 21-22

$0.00

INSPECTION:

MSD

FY 22-23

$0.00

FY 23-24

$0.00

FY 24-25

$0.00

PROJECT DESCRIPTION: This project is located in Asheville near Montford Ave. and is comprised of 2,088 FY 25-26

$0.00

LF of 8-inch ductile iron pipe. The existing line is 6-inch vitrified clay pipe in poor condition with multiple FY 26-27 severe structural defects. FY 27-28

SPECIAL PROJECT NOTES:

$0.00 $0.00


E PA TH R

ELL S T

/

STILL W

D

DR HY V U

Horizon Hill Road (Hy-Vu Drive) Project No. 2008084

FENNER A VE

LOOKOUT DR

SANDON C IR NOT TO SCALE

FEN N

ER

AVE

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

NT RD

METROPOLITAN SEWERAGE DISTRICT

LARCHMO

E D AV

BRID L

RD LA N

N L ROS E

ZO RI O H L HI


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Horizon Hill Rd. (Hy-Vu Drive)

LOCATION:

Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

51

PROJECT NO.

2008084

TOTAL LF:

713

PROJECT BUDGET:

$228,444.00

PROJECT ORIGIN:

SSO's, Work Orders, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$4,900.00

$4,900.00

55360 - EASEMENT PLATS

$1,370.00

$1,370.00

55370 - LEGAL FEES

$1,450.00

$1,450.00

$2,690.00

$2,690.00

$216,034.00

$34.00

55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES

55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION 55430 - CONST. CONTRACT ADM. 55440 - TESTING

$1,000.00

55450 - SURVEY - ASBUILT

$1,000.00

TOTAL AMOUNT

$228,444.00

$10,444.00

ENGINEER:

MSD

SA

R.O.W. ACQUISITION:

MSD

# PLATS: [ 1

CONTRACTOR:

$0.00

$0.00

ESTIMATED BUDGETS - FY 20 - 28 ]

FY 19-20

$0.00

FY 20-21

$0.00

CONSTRUCTION ADM:

MSD

FY 21-22

$0.00

INSPECTION:

MSD

FY 22-23

$218,000.00

FY 23-24

$0.00

FY 24-25

$0.00

PROJECT DESCRIPTION: This project is located in Asheville near Merrimon Avenue. It consists of 713 LF of FY 25-26

$0.00

8-inch ductile iron pipe. The current 8-inch Orangeburg and vitrified clay line has had repeated overflows FY 26-27 due to root intrusion and pipe collapse. FY 27-28

SPECIAL PROJECT NOTES:

$0.00 $0.00


N

ER

D

/

RD

O B

E ST

C MA

GE RID

E AV

WOODLAN D RD

IR FA

O M

NT

RD

Howland Road at Sunset Trail Project No. 2012034

L

ON

P OD O W

D AND R HOWL

LA TR

NOT TO SCALE

SU

E NS

SU

ED

NT MO

TT

RL

DR T NS E

Budget Map

METROPOLITAN SEWERAGE DISTRICT of BUNCOMBE COUNTY, NORTH CAROLINA

KEE R D CHER O CHEROKEE RD

GE

E GL

L DA


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Howland Rd. @ Sunset Trail

LOCATION:

Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

43

PROJECT NO.

2012134

TOTAL LF:

1,033

PROJECT BUDGET:

$391,600.00

PROJECT ORIGIN:

SSO's, Work Orders, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$7,500.00

$4,600.00

$2,900.00

$4,600.00

$2,900.00

55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$4,500.00

55370 - LEGAL FEES

$6,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION

$60,000.00

55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$310,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$1,000.00

55450 - SURVEY - ASBUILT

$2,600.00

TOTAL AMOUNT

$391,600.00

ENGINEER:

MSD

DP

R.O.W. ACQUISITION:

MSD

# PLATS: [

CONTRACTOR:

$0.00

ESTIMATED BUDGETS - FY 20 - 28 6

]

FY 19-20

$0.00

FY 20-21

$4,500.00

CONSTRUCTION ADM:

MSD

FY 21-22

$66,000.00

INSPECTION:

MSD

FY 22-23

$313,600.00

FY 23-24

$0.00

FY 24-25

$0.00

PROJECT DESCRIPTION: This project will replace an existing 8-inch main from 5 Howland Rd. up to the rear FY 25-26

$0.00

of 371 Sunset Dr. System Services recently completed another portion of this system due to SSO's and line FY 26-27 condition. FY 27-28 SPECIAL PROJECT NOTES:

$0.00 $0.00


Y PA

RK R

NT AIN

RD

VALLEY P A

ELKWOO D AVE

RK RD

RN RD ALLESA SAREVA PL

DR

RD OAK KNOLL

Jarnaul Avenue Project No. 2016104

S LAKE

R

NOT TO SCALE

RE CT ALCLA

MORANCE AVE

D HORE

JARNAUL AVE

W

/

MO U

D

DR

M

EL K

EASTWAY ST

VALL E

RIDGE

IR LC

ST ALCLARE DR

PELZER

GI NE L

NORT H

E PIN DO EA

Budget Map

METROPOLITAN SEWERAGE DISTRICT of BUNCOMBE COUNTY, NORTH CAROLINA

WESTWOOD RD

RONSANNE PKWY

GLEN FALLS RD


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Jarnaul Avenue

LOCATION:

N. Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

75

PROJECT NO.

2016104

TOTAL LF:

5,330

PROJECT BUDGET:

$1,526,100.00

PROJECT ORIGIN:

SSO's, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$18,500.00

$18,500.00

55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$29,250.00

$29,250.00

55370 - LEGAL FEES

$40,000.00

$30,000.00

55380 - ACQUISITION SERVICES

$50,000.00

$20,000.00

$200,000.00

$75,000.00

55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$1,173,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$2,000.00

55450 - SURVEY - ASBUILT

$13,350.00

TOTAL AMOUNT

$1,526,100.00

$18,500.00

ENGINEER:

MSD

HC

R.O.W. ACQUISITION:

Consultant

# PLATS: [

CONTRACTOR:

$0.00

$154,250.00

ESTIMATED BUDGETS - FY 20 - 28 39

]

FY 19-20

$165,000.00

FY 20-21

$1,188,350.00

CONSTRUCTION ADM:

MSD

FY 21-22

$0.00

INSPECTION:

MSD

FY 22-23

$0.00

FY 23-24

$0.00

FY 24-25

$0.00

PROJECT DESCRIPTION: This project is located in North Asheville, between Elkwood Ave. (to the west) and Beaver Lake (to the east). The project consists of replacing approx. 5,330 LF of existing 4" and 6" VCP FY 25-26 with new 8" DIP. The existing lines and manholes are in poor structural condition and have experienced FY 26-27 multiple SSOs and manhole overflows. FY 27-28 SPECIAL PROJECT NOTES:

$0.00 $0.00 $0.00


/

NOT TO SCALE

H LS WI

DR IRE

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

METROPOLITAN SEWERAGE DISTRICT

ST

Johnston Boulevard at Providence Road Project No. 2014013

PR

DEBRA LN

D CE R

ER

O VI D EN

TH LU


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Johnston Blvd. @ Providence Rd.

LOCATION:

W. Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

37

PROJECT NO.

2014013

TOTAL LF:

2,000

PROJECT BUDGET:

$544,150.00

PROJECT ORIGIN:

SSO's, Access, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$8,150.00

55330 - DESIGN

$8,150.00 .

55340 - PERMITS

$5,000.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$9,000.00

55370 - LEGAL FEES

$12,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION

$36,000.00

55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$470,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$500.00

55450 - SURVEY - ASBUILT

$3,500.00

TOTAL AMOUNT

$544,150.00

$8,150.00

ENGINEER:

MSD

DP

R.O.W. ACQUISITION:

MSD

# PLATS: [

$0.00

$0.00

ESTIMATED BUDGETS - FY 20 - 28 12

]

CONTRACTOR:

FY 19-20

$0.00

FY 20-21

$0.00

CONSTRUCTION ADM:

MSD

FY 21-22

$9,000.00

INSPECTION:

MSD

FY 22-23

$53,000.00

FY 23-24

$474,000.00

FY 24-25

$0.00

PROJECT DESCRIPTION: This project is located in West Asheville, approx. 0.6 miles west of New Leicester Hwy. The project consists of replacing 2,000 LF of existing 6-inch vitrified clay and PVC pipe with FY 25-26 new 8-inch ductile iron pipe. The existing line contains many offset joints and bends, and is in poor structural FY 26-27 condition. FY 27-28 SPECIAL PROJECT NOTES:

Providence Road was added to this with additional 1000 LF.

$0.00 $0.00 $0.00


OO

KIRKM AN RD

BR

K

RD

R RA D

Kenilworth Road at Springdale Road Project No. 2014010

O AUR

NOT TO SCALE

LE E AL ND

AR

R TH R D

L HI

KENILW O

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

METROPOLITAN SEWERAGE DISTRICT

DR

RD

S DELANO

/

CL E

RD LE SPR

O

ING DA

R AU RA

RD


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Kenilworth @ Springdale Rd.

LOCATION:

Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

42

PROJECT NO.

2014010

TOTAL LF:

2,524

PROJECT BUDGET:

$747,350.00

PROJECT ORIGIN:

Work Orders, Line Condition, Access

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$6,800.00

$6,800.00

55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$8,250.00

55370 - LEGAL FEES

$11,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION

$50,000.00

55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$661,000.00

$295,000.00

55440 - TESTING

$4,000.00

$2,000.00

55450 - SURVEY - ASBUILT

$6,300.00

$2,700.00

55430 - CONST. CONTRACT ADM.

TOTAL AMOUNT

$747,350.00

$6,800.00

$0.00

$299,700.00 1061

ENGINEER:

MSD

HC

R.O.W. ACQUISITION:

MSD

# PLATS: [

CONTRACTOR:

ESTIMATED BUDGETS - FY 20 - 28 11

]

FY 19-20

$69,250.00

FY 20-21

$0.00

CONSTRUCTION ADM:

MSD

FY 21-22

$0.00

INSPECTION:

MSD

FY 22-23

$371,600.00

FY 23-24

$0.00

FY 24-25

$0.00

PROJECT DESCRIPTION: This project is located in Kenilworth at the intersection of Kenilworth Rd. and Springdale Rd. Approximately 2,524 LF of existing 6-inch vitrified clay pipe will be replaced with 8-inch FY 25-26 ductile iron pipe. The existing line has voids, cracks, roots, and fractures, and has experienced multiple FY 26-27 SSOs. FY 27-28 SPECIAL PROJECT NOTES:

City of Asheville to pave Kenilworth Rd in summer 2019. Portions of project in Kenilworth Rd. to be constructed in FY 18-19.

$0.00 $0.00 $0.00


MELROSE AVE

LOCKLEY AVE

/

SYRLIN ST

AVE

L

SEDL E

D

Y AVE

LYN R

Kimberly Avenue at Sedley Avenue Project No. 2018029

WOODVA LE AVE

NOT TO SCALE

GR

OD WO OVE

OLL

RD

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

CLU

N BK

METROPOLITAN SEWERAGE DISTRICT

RD

D DR LYN WO O

GRAC E

L

E W OO DR D MA P

WAR WICK P

K RLY O KIMB ERLY KN

XT AD E NOLL RO LL RD KIMB E

KIMB ERLY AVE PL CLU B

CLUB RD COUNTRY

PL SU MN ER

LYNMAR

WILDWOOD AVE


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Kimberly Ave. @ Sedley Avenue

LOCATION:

Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

35

PROJECT NO.

2018029

TOTAL LF:

3,005

PROJECT BUDGET:

$984,000.00

PROJECT ORIGIN:

CSR's, Work Orders, MH Overflows

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$30,000.00

55330 - DESIGN 55340 - PERMITS

$1,000.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$3,000.00

55370 - LEGAL FEES

$13,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION

$100,000.00

55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$827,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$2,000.00

55450 - SURVEY - ASBUILT

$8,000.00

TOTAL AMOUNT

$984,000.00

$0.00

ENGINEER:

MSD

OH

R.O.W. ACQUISITION:

MSD

# PLATS: [ 13 ]

CONTRACTOR:

$0.00

$0.00

ESTIMATED BUDGETS - FY 20 - 28 FY 19-20

$0.00

FY 20-21

$0.00

CONSTRUCTION ADM:

MSD

FY 21-22

$0.00

INSPECTION:

MSD

FY 22-23

$31,000.00

FY 23-24

$116,000.00

FY 24-25

$837,000.00

nature of construction along this corridor, the existing 6-inch VCP will be replaced with 3,005LF of 8-inch FY 25-26 HDPE through pipe bursting operations. This 6-inch VCP line is in poor structural condition, roots present FY 26-27 throughout, miss-aligned joints, and problematic spur lines.

$0.00

FY 27-28

$0.00

PROJECT DESCRIPTION: This project is located in North Asheville along Kimberly Ave. Due to the sensitive

SPECIAL PROJECT NOTES:

$0.00


LAK E SHO RE DR

Lakeshore Drive at Merrimon Avenue Project No. 2014177

MOUNT VERNON CIR

/

ON ALY

RR I M ON AV E NOT TO SCALE

ME

ERN S MT V

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

AVE

SO N

DR

METROPOLITAN SEWERAGE DISTRICT

CLAIRMONT

JO HN

OTTARI RD


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Lakeshore Dr. @ Merrimon Ave.

LOCATION:

N. Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

25

PROJECT NO.

2014177

TOTAL LF:

362

PROJECT BUDGET:

$211,600.00

PROJECT ORIGIN:

Work Orders, Line Condition, Access

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$1,800.00

55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$3,000.00

55370 - LEGAL FEES

$5,000.00

$543.00

$100,000.00

$8,323.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$99,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$2,000.00

55450 - SURVEY - ASBUILT

$800.00

TOTAL AMOUNT

$211,600.00

$8,866.00

ENGINEER:

MSD

HC

R.O.W. ACQUISITION:

MSD

# PLATS: [ 4 ]

CONTRACTOR:

$0.00

$0.00

ESTIMATED BUDGETS - FY 20 - 28 FY 19-20

$0.00

FY 20-21

$0.00

CONSTRUCTION ADM:

MSD

FY 21-22

$0.00

INSPECTION:

MSD

FY 22-23

$1,800.00

FY 23-24

$0.00

FY 24-25

$3,000.00

PROJECT DESCRIPTION: This project is located near the intersection of Lakeshore Dr. and Merrimon Ave. FY 25-26 in North Asheville. It consists of replacing approximately 362 LF of 6-inch VCP with 8-inch DIP. The existing FY 26-27 pipe is fractured and generally in poor condition.

$101,800.00

FY 27-28

$0.00

SPECIAL PROJECT NOTES:

This project was originally 838 LF. In FY 16-17, System Services replaced all line segments within Lakeshore Dr. in

order to meet the City of Asheville's paving schedule. SS also rerouted a section of line at 15 Lakeshore Dr. which previously ran underneath a home.

$96,134.00


/

FR E

ST

R TY

LIB E

LN

M

ED O

PISGAH VIEW AVE

W RALEIGH RD

LINCOLN AVE

SCHOOL RD E

Lincoln Avenue Project No. 2013103

KENMORE ST

NOT TO SCALE

WINSTON AVE

CONCORD PL

BRISTOL PL E BROADVIEW AV

D WI LM IN G TO NR E

EO

RA

BL VD

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

RALEIGH RD

ON T

METROPOLITAN SEWERAGE DISTRICT

CLEVELAND AV

COTTAGE COVE LN

E NEWBERN AV


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Lincoln Avenue

LOCATION:

Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

26

PROJECT NO.

2013103

TOTAL LF:

1,415

PROJECT BUDGET:

$398,370.00

PROJECT ORIGIN:

Work Orders, Line Condition, Access

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$2,870.00

$2,870.00

55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$389,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$3,000.00

55450 - SURVEY - ASBUILT

$3,500.00

TOTAL AMOUNT

$398,370.00

$2,870.00

ENGINEER:

MSD

HC

R.O.W. ACQUISITION:

N/A

# PLATS: [

CONTRACTOR:

$0.00

$0.00

ESTIMATED BUDGETS - FY 20 - 28 0

]

FY 19-20

$0.00

FY 20-21

$0.00

CONSTRUCTION ADM:

MSD

FY 21-22

$0.00

INSPECTION:

MSD

FY 22-23

$0.00

FY 23-24

$0.00

FY 24-25

$0.00

PROJECT DESCRIPTION: This project is located in the Oakley neighborhood in southeast Asheville, just FY 25-26 north of I-40. It consists of replacing approximately 1,415 LF of existing 6-inch vitrified clay pipe with 8-inch FY 26-27 ductile iron pipe. The existing line is in very poor structural condition.

$395,500.00

FY 27-28

$0.00

SPECIAL PROJECT NOTES:

$0.00


/

Lining Contract No. 9 Project No. 2017031 NOT TO SCALE

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

METROPOLITAN SEWERAGE DISTRICT


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Lining Contract No. 9

LOCATION:

Various

TYPE:

General Sewer Rehab

PIPE RATING:

NA

PROJECT NO.

2017031

TOTAL LF:

11,000

PROJECT BUDGET:

$1,102,000.00

PROJECT ORIGIN:

Access, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$1,100,000.00

$200,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$2,000.00

55450 - SURVEY - ASBUILT TOTAL AMOUNT

ENGINEER:

$1,102,000.00

MSD

R.O.W. ACQUISITION:

$200,000.00

$0.00

DP # PLATS: [ 0 ]

CONTRACTOR:

$0.00

ESTIMATED BUDGETS - FY 20 - 28 FY 19-20

$902,000.00

FY 20-21

$0.00

CONSTRUCTION ADM:

MSD

FY 21-22

$0.00

INSPECTION:

MSD

FY 22-23

$0.00

FY 23-24

$0.00

FY 24-25

$0.00

PROJECT DESCRIPTION: This is a trenchless technology project that includes lining substandard sewer lines FY 25-26

$0.00

with either CIPP or Fold and Form pipe. Existing manholes will be repaired or replaced as part of this work.

SPECIAL PROJECT NOTES:

FY 26-27

$0.00

FY 27-28

$0.00


SU

R

/

MILLBROOK RD

LUNA LN

AV E S

VIL LE

Logan Avenue Project No. 2017256

WA YN E

HOUNDS EAR DR

ED

T RS DE AV E

IS NR

AV ON

AV E

S

G

LD NO

LO

Y RE

AV E

ST

AN

AY AVE RIDGEW

CR AV E NS T

NOT TO SCALE

VE RI

RL

IR

K IN

LN

DR

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

METROPOLITAN SEWERAGE DISTRICT

RI V

RD O D H A YW O

IA GEORG

NC

E R VI EW

GA LO

EU ID CL VD BL

RD


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Logan Avenue

LOCATION:

W. Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

48

PROJECT NO.

2017256

TOTAL LF:

1,884

PROJECT BUDGET:

$562,500.00

PROJECT ORIGIN:

Work Orders, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$10,000.00

$10,000.00

$1,000.00

$500.00

$7,200.00

$7,200.00

55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES

$12,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION

$40,000.00

55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$490,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$1,000.00

55450 - SURVEY - ASBUILT

$1,300.00

TOTAL AMOUNT

ENGINEER:

$562,500.00

MSD

R.O.W. ACQUISITION:

$0.00

$0.00

SA # PLATS: [

CONTRACTOR:

$17,700.00

ESTIMATED BUDGETS - FY 20 - 28 12 ]

FY 19-20

$52,500.00

FY 20-21

$0.00

CONSTRUCTION ADM:

MSD

FY 21-22

$492,300.00

INSPECTION:

MSD

FY 22-23

$0.00

FY 23-24

$0.00

FY 24-25

$0.00

PROJECT DESCRIPTION: This project is located in West Asheville near Craven St. and consists of 1,884 LF FY 25-26

$0.00

of 8" DIP. The existing clay pipe is undersized and has a large number of pipe defects.

SPECIAL PROJECT NOTES:

FY 26-27

$0.00

FY 27-28

$0.00


LE

Y

/

IU AD T S

M

OP LO

S RD HOAL

Long Shoals Road at Allen Avenue Project No. 2010013

S LONG

SCOTTISH CIR NOT TO SCALE

ALLEN AVE

Budget Map

METROPOLITAN SEWERAGE DISTRICT

POND ST

S R RD MILLE

of BUNCOMBE COUNTY, NORTH CAROLINA

MIRABELLE CT

SCOTTISH CIR

W SUMMIT AVE

HEN

GE D R

SKY EXC HAN

D ER D E R SO N VIL L

S EN

IR MIAMI C


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Long Shoals Rd. @ Allen Ave.

LOCATION:

Arden

TYPE:

General Sewer Rehab.

PIPE RATING:

59

PROJECT NO.

2010013

TOTAL LF:

621

PROJECT BUDGET:

$286,472.00

PROJECT ORIGIN:

SSO's, Work Orders, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$11,025.00

$11,025.00

55360 - EASEMENT PLATS

$6,000.00

$4,280.00

$1,720.00

55370 - LEGAL FEES

$6,000.00

$2,543.00

$3,457.00

55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES

55380 - ACQUISITION SERVICES 55390 - COMPENSATION

$40,000.00

$40,000.00

55400 - APPRAISAL

$3,500.00

$3,500.00

55410 - CONDEMNATION

$7,500.00

$7,500.00

55420 - CONSTRUCTION

$208,847.00

$24,847.00

$184,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$2,000.00

$2,000.00

55450 - SURVEY - ASBUILT

$1,600.00

$1,600.00

TOTAL AMOUNT

$286,472.00

$42,695.00

ENGINEER:

MSD

HC

R.O.W. ACQUISITION:

MSD

# PLATS: [ 6

CONTRACTOR:

$56,177.00

$187,600.00

ESTIMATED BUDGETS - FY 20 - 28 ]

FY 19-20

$0.00

FY 20-21

$0.00

CONSTRUCTION ADM:

MSD

FY 21-22

$0.00

INSPECTION:

MSD

FY 22-23

$0.00

FY 23-24

$0.00

FY 24-25

$0.00

PROJECT DESCRIPTION: This project is located at the west end of Allen Ave., close to the intersection of FY 25-26

$0.00

Hendersonville Rd. and Long Shoals Rd. in Arden. It is comprised of approximately 621 LF of 8-inch ductile FY 26-27 iron pipe. There are structural problems at various locations, and the line is in poor condition overall. FY 27-28 SPECIAL PROJECT NOTES:

This project as originally designed was 2,263LF. In FY 16-17, MSD approved a sewer allocation for the Skyland

Exchange development located in the middle of the proposed CIP project. Skyland Exchange will install new 8" sewer through the proposed development.

$0.00 $0.00


RD

N

C

LN

LN

Lynn Cove Road Project No. 2015010

WEBB COVE RD

BEES MOUN TAIN DR

N LY

WT LA E AL RD

TR EC H EE LN

ER D

NOT TO SCALE

GS of BUNCOMBE COUNTY, NORTH CAROLINA

Budget Map

METROPOLITAN SEWERAGE DISTRICT

RD

DG

/

ER AV E B

DR

M DA

ORS ER N V O G

ER

ST ON YR

DG

T GE RID

PO

NOR C IR

R NY STO

DR

R

V GE RID I EW

ND IDE

IDE D

RD

BE

CLU BS

N SU S NY

GOVE R

E OV

BB WE IN SPR


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Lynn Cove Road

LOCATION:

Beaverdam

TYPE:

General Sewer Rehab.

PIPE RATING:

35

PROJECT NO.

2015010

TOTAL LF:

5,589

PROJECT BUDGET:

$1,547,000.00

PROJECT ORIGIN:

SSO's, Work Orders, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$25,000.00

55330 - DESIGN 55340 - PERMITS

$1,000.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$15,000.00

55370 - LEGAL FEES

$20,000.00

55380 - ACQUISITION SERVICES

$20,000.00

55390 - COMPENSATION

$50,000.00

55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$1,400,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$2,000.00

55450 - SURVEY - ASBUILT

$14,000.00

TOTAL AMOUNT

$1,547,000.00

$0.00

ENGINEER:

MSD

DP

R.O.W. ACQUISITION:

Consultant

# PLATS: [ 20

CONTRACTOR:

$0.00

$0.00

ESTIMATED BUDGETS - FY 20 - 28 ]

FY 19-20

$25,000.00

FY 20-21

$0.00

CONSTRUCTION ADM:

MSD

FY 21-22

$15,000.00

INSPECTION:

MSD

FY 22-23

$91,000.00

FY 23-24

$0.00

FY 24-25

$1,416,000.00

PROJECT DESCRIPTION: This project is located off of Beaverdam Rd. The project runs through multiple FY 25-26

$0.00

properties along Lynn Cove Rd. from Governor Circle to 225 Lynn Cove Rd. These lines and manholes have FY 26-27 heavy I/I which have created multiple SSOs. FY 27-28

SPECIAL PROJECT NOTES:

$0.00 $0.00


RE D

R

NA VE

/

ME R

RIM O

SH O

RNE

AVE

GRACELYN RD

CLAIRMON T

RD

E

JO HN SO N DR

OTTARI R D

KELE H

E RD

ER A

LY

MAYW O

NOT TO SCALE

D

AD RD

OD R

HAMPST E

HOLBOR N

IRVING S T AVE OAKLAWN WOODVAL E AVE

Manetta Road at Johnson Drive Project No. 2014022

MELROSE AV

GRACE AV E PL

WARWIC K

D MANETTA R

D

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

NG FI

C

DR

METROPOLITAN SEWERAGE DISTRICT

IF GR

VD BL

A BL

OO KW

REDWOOD RD D C LU B R COUNTR Y

E AVE LORRAIN

ALY STON E

AVE KIMB ERLY

LAK E

OSB O

RD LYN WO OD


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Manetta Rd. @ Johnson Dr.

LOCATION:

N. Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

20

PROJECT NO.

2014022

TOTAL LF:

6,500

PROJECT BUDGET:

$1,895,700.00

PROJECT ORIGIN:

SSO's, Work Orders, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$33,000.00

55330 - DESIGN 55340 - PERMITS

$1,000.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$6,000.00

55370 - LEGAL FEES

$10,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION

$100,000.00

55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$1,740,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$3,000.00

55450 - SURVEY - ASBUILT

$2,700.00

TOTAL AMOUNT

$1,895,700.00

$0.00

ENGINEER:

MSD

SA

R.O.W. ACQUISITION:

MSD

# PLATS: [ 10

CONTRACTOR:

$0.00

$0.00

ESTIMATED BUDGETS - FY 20 - 28 ]

FY 19-20

$0.00

FY 20-21

$0.00

CONSTRUCTION ADM:

MSD

FY 21-22

$0.00

INSPECTION:

MSD

FY 22-23

$33,000.00

FY 23-24

$7,000.00

FY 24-25

$110,000.00

PROJECT DESCRIPTION: This project is located in North Asheville near Merrimon Ave and consists of 6,500 LF of 8-inch ductile iron pipe. The existing clay pipe is undersized and has voids, fractures, and root FY 25-26 intrusions which have contributed to multiple SSO's. FY 26-27 FY 27-28 SPECIAL PROJECT NOTES:

$0.00 $0.00 $1,745,700.00


/

PE R

SIS

TE

NC

ED

R

D

OW AD ME

RD

Meadow Road at Train Yard Project No. 2015207

IA R TOR C I V

DE NT

NOT TO SCALE

ST U CI R

C O A PR

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

METROPOLITAN SEWERAGE DISTRICT

AP

D R H


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Meadow Road @ Train Yard

LOCATION:

Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

37

PROJECT NO.

2015207

TOTAL LF:

2,001

PROJECT BUDGET:

$727,000.00

PROJECT ORIGIN:

Line Condition, Undersized

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$9,000.00

$7,000.00

$2,000.00

$7,000.00

$2,000.00

55330 - DESIGN 55340 - PERMITS

$4,000.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$3,000.00

55370 - LEGAL FEES

$7,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION

$35,000.00

55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$662,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$2,000.00

55450 - SURVEY - ASBUILT

$5,000.00

TOTAL AMOUNT

$727,000.00

ENGINEER:

MSD

HC

R.O.W. ACQUISITION:

MSD

# PLATS: [ 4 ]

CONTRACTOR:

$0.00

ESTIMATED BUDGETS - FY 20 - 28 FY 19-20

$0.00

FY 20-21

$0.00

CONSTRUCTION ADM:

MSD

FY 21-22

$45,000.00

INSPECTION:

MSD

FY 22-23

$4,000.00

FY 23-24

$669,000.00

FY 24-25

$0.00

PROJECT DESCRIPTION: This project is located in Asheville on Meadow Rd. between the Biltmore Estate FY 25-26

$0.00

and AB Tech College. It consists of replacing 2,001 LF of existing 6" VCP with new 8" DIP. The existing line FY 26-27 is in poor condition, is undersized, and runs underneath various structures. FY 27-28 SPECIAL PROJECT NOTES:

$0.00 $0.00


RIVER S

RD

TONE T

/

PINEDALE

RL

Memory Lane Project No. 2016099

MEMORY LN

LH

AV E

N

NOT TO SCALE

RD BULL MOUNTAIN RD

BE L

FOREST LN

DEERWOOD DR

NIXON TE R

RD

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

METROPOLITAN SEWERAGE DISTRICT

LINDSE Y


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Memory Lane

LOCATION:

Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

56

PROJECT NO.

2016099

TOTAL LF:

1,900

PROJECT BUDGET:

$787,885.00

PROJECT ORIGIN:

SSO's, Work Orders, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$9,000.00

$9,000.00

55360 - EASEMENT PLATS

$3,500.00

$3,500.00

55370 - LEGAL FEES

$4,000.00

$3,146.00

$10,635.00

$10,635.00

55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES

$950.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$755,000.00

$755,000.00

55440 - TESTING

$1,000.00

$1,000.00

55450 - SURVEY - ASBUILT

$4,750.00

$4,750.00

55430 - CONST. CONTRACT ADM.

TOTAL AMOUNT

$787,885.00

$26,281.00

ENGINEER:

MSD

OH

R.O.W. ACQUISITION:

MSD

# PLATS: [ 6 ]

CONTRACTOR:

$950.00

$760,750.00

ESTIMATED BUDGETS - FY 20 - 28 FY 19-20

$0.00

FY 20-21

$0.00

CONSTRUCTION ADM:

MSD

FY 21-22

$0.00

INSPECTION:

MSD

FY 22-23

$0.00

FY 23-24

$0.00

FY 24-25

$0.00

PROJECT DESCRIPTION: This project is located in East Asheville running along Memory Lane and Nixon FY 25-26

$0.00

Terrace. It consists of replacing existing 4-inch and 6-inch VCP with new 8" DIP. This line has experienced FY 26-27 one SSO, has mis-aligned joints, roots, fractures and bottle necks with a section of 4" VCP. FY 27-28

SPECIAL PROJECT NOTES:

$0.00 $0.00


WI LB

UR

G R

D

EE

NR

NB

IA

R

RD

E AV

N UR

W

PL

C MA

VE EA

Mitchell Avenue Project No. 2014185

IR RD

DYS A

NOT TO SCALE

BELLE A

RT S

T

CRAGGY AVE

DR

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

OAKWOOD ST

METROPOLITAN SEWERAGE DISTRICT

E AV

/

R

ON TT A P

ILB W

DR

AVE

DR ID

MITCHELL A VE

RE HI

U DR

AVE BLUE RIDGE

AVE PIN ELL AS

ILS W

RD

BELMONT AVE

O YW A H

D O

COVINGTON ST

D BALSAM

O KW R PA

O

CLOYES ST

ST

EW O

R

T A NG L

LU

E TH PACE LN

RD MILDRE D AVE

DE VI

OD

O PR E NC R HE N RO

RD


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Mitchell Avenue

LOCATION:

W. Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

23

PROJECT NO.

2014185

TOTAL LF:

3,360

PROJECT BUDGET:

$991,300.00

PROJECT ORIGIN:

Work Orders, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$17,000.00

55330 - DESIGN 55340 - PERMITS

$1,000.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$4,800.00

55370 - LEGAL FEES

$5,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION

$60,000.00

55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$900,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$2,000.00

55450 - SURVEY - ASBUILT

$1,500.00

TOTAL AMOUNT

$991,300.00

$0.00

ENGINEER:

MSD

SA

R.O.W. ACQUISITION:

MSD

# PLATS: [ 8 ]

CONTRACTOR:

$0.00

$0.00

ESTIMATED BUDGETS - FY 20 - 28 FY 19-20

$0.00

FY 20-21

$0.00

CONSTRUCTION ADM:

MSD

FY 21-22

$0.00

INSPECTION:

MSD

FY 22-23

$17,000.00

FY 23-24

$1,000.00

FY 24-25

$4,800.00

PROJECT DESCRIPTION: This project is located in West Asheville between Patton Ave. and Haywood FY 25-26 Rd. and is comprised of 3,360 LF of 8-inch ductile iron pipe. The existing line is 6-inch vitrified clay pipe in FY 26-27 poor condition, with multiple pipe defects that cannot be adequately repaired by point repairs. FY 27-28 SPECIAL PROJECT NOTES:

$65,000.00 $0.00 $903,500.00


N DA

L VIL

EP

PEARSON D R

F NT MO D OR

L

AS ET N WA

T

Montford Avenue at Montford Park Project No. 2017144

E AV

/

WATAUGA ST

NOT TO SCALE

LA

ND

AV E

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

BE R

UB CA

S LE

METROPOLITAN SEWERAGE DISTRICT

CU M

SOCO ST

D CIR CUMBERLAN

T


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Montford Ave. @ Montford Park

LOCATION:

Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

50

PROJECT NO.

2017144

TOTAL LF:

1,258

PROJECT BUDGET:

$367,150.00

PROJECT ORIGIN:

Sags, Structural Defects, Soil Pipe

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$6,300.00

55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$6,750.00

55370 - LEGAL FEES

$10,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION

$50,000.00

55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$289,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$2,000.00

55450 - SURVEY - ASBUILT

$3,100.00

TOTAL AMOUNT

$367,150.00

$0.00

ENGINEER:

MSD

HC

R.O.W. ACQUISITION:

N/A

# PLATS: [ 9 ]

CONTRACTOR:

$0.00

$0.00

ESTIMATED BUDGETS - FY 20 - 28 FY 19-20

$0.00

FY 20-21

$6,300.00

CONSTRUCTION ADM:

MSD

FY 21-22

$6,750.00

INSPECTION:

MSD

FY 22-23

$60,000.00

FY 23-24

$294,100.00

FY 24-25

$0.00

PROJECT DESCRIPTION: This project is located just south of Montford Park and includes the replacement FY 25-26 of approximately 1,258 LF of existing 8" VCP with new 8" DIP. The existing pipe has sags, multiple structural FY 26-27 defects, and areas where the pipe is almost non-existent. FY 27-28 SPECIAL PROJECT NOTES:

$0.00 $0.00 $0.00


Y

DR

/

NE

RD CH

UNN S CO VE

NOT TO SCALE

Mountainbrook Road at Chunns Cove Road Project No. 2010112

R BROOK TE

IEW DR ROLLING V

HO

N CIR CRAFTSM A

DR VIEW CHUN NS

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

METROPOLITAN SEWERAGE DISTRICT

MOUNTAINBROOK RD

LN A LL STE G


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Mountainbrook Rd. @ Chunns Cove

LOCATION:

Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

55

PROJECT NO.

2010112

TOTAL LF:

2,800

PROJECT BUDGET:

$983,515.00

PROJECT ORIGIN:

SSO's, Access, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$11,515.00

$11,515.00

$9,500.00

$2,575.00

$6,925.00

$14,090.00

$6,925.00

55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES

$18,000.00

55380 - ACQUISITION SERVICES

$25,000.00

55390 - COMPENSATION

$100,000.00

55400 - APPRAISAL

$3,000.00

55410 - CONDEMNATION

$10,000.00

55420 - CONSTRUCTION

$800,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$1,500.00

55450 - SURVEY - ASBUILT

$5,000.00

TOTAL AMOUNT

$983,515.00

ENGINEER:

MSD

DP

R.O.W. ACQUISITION:

Consultant

# PLATS: [ 18

$0.00

ESTIMATED BUDGETS - FY 20 - 28 ]

CONTRACTOR:

FY 19-20

$156,000.00

FY 20-21

$806,500.00

CONSTRUCTION ADM:

MSD

FY 21-22

$0.00

INSPECTION:

MSD

FY 22-23

$0.00

FY 23-24

$0.00

FY 24-25

$0.00

Rd. (off Chunns Cove Rd.) where access and maintenance is extremely difficult and will move those lines to FY 25-26 public street rights of way. This project will also eliminate one high aerial creek crossing where existing FY 26-27 support piers are failing due to erosion.

$0.00

FY 27-28

$0.00

PROJECT DESCRIPTION: This project will relocate lines from the rear yards of lots fronting on Mountainbrook

SPECIAL PROJECT NOTES:

$0.00


/

HE SD AR D

NOT TO SCALE

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

LA R K R D

METROPOLITAN SEWERAGE DISTRICT

PE

RD EK OL

D H AW CRE

K RD

DOGWOOD GRV

M M RS I

C R EE NEW HAW

New Haw Creek Road at Dogwood Grove Project No. 2014021

BE T

MEADO W

LN N O


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

New Haw Creek Rd. @ Dogwood Grove LOCATION:

E. Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

31

PROJECT NO.

2014021

TOTAL LF:

1,900

PROJECT BUDGET:

$632,500.00

PROJECT ORIGIN:

SSO's, Work Orders, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$9,500.00

$4,925.00

$4,575.00

55330 - DESIGN 55340 - PERMITS

$1,000.00

$1,000.00

$6,600.00

$6,600.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES

$11,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION

$50,000.00

55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$552,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$1,000.00

55450 - SURVEY - ASBUILT

$1,400.00

TOTAL AMOUNT

$632,500.00

$4,925.00

ENGINEER:

MSD

SA

R.O.W. ACQUISITION:

MSD

# PLATS: [ 11

$4,575.00

$7,600.00

ESTIMATED BUDGETS - FY 20 - 28 ]

CONTRACTOR:

FY 19-20

$61,000.00

FY 20-21

$554,400.00

CONSTRUCTION ADM:

MSD

FY 21-22

$0.00

INSPECTION:

MSD

FY 22-23

$0.00

FY 23-24

$0.00

FY 24-25

$0.00

8-inch ductile iron pipe. Existing 4-inch and 6-inch clay pipe is undersized, with fractures, root intrusion, and FY 25-26 misaligned joints. Existing 8-inch ductile iron pipe has corrosion issues. Existing manholes are in poor FY 26-27 condition.

$0.00

FY 27-28

$0.00

PROJECT DESCRIPTION: This project is in East Asheville near Haw Creek Rd., and consists of 1,900 LF of

SPECIAL PROJECT NOTES:

$0.00


/

CR

RD

NOT TO SCALE

New Haw Creek Road at Water Booster Station Project No. 2016250

I240 W X7 TUNNEL RD TO

W NE

W HA

K EE

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

METROPOLITAN SEWERAGE DISTRICT

0 W & I240 E TUNNEL RD TO I24


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

New Haw Creek @ Water Booster Station

LOCATION:

Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

80

PROJECT NO.

2016250

TOTAL LF:

90

PROJECT BUDGET:

$32,100.00

PROJECT ORIGIN:

SSO's, Work Orders, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$1,000.00

$1,000.00

55330 - DESIGN 55340 - PERMITS

$500.00

$500.00

$600.00

$600.00

$1,000.00

$1,000.00

$3,000.00

$3,000.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$24,750.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$750.00

55450 - SURVEY - ASBUILT

$500.00

TOTAL AMOUNT

$32,100.00

$0.00

ENGINEER:

MSD

OH

R.O.W. ACQUISITION:

MSD

# PLATS: [

CONTRACTOR:

$1,000.00

$5,100.00

ESTIMATED BUDGETS - FY 20 - 28 1

]

FY 19-20

$26,000.00

FY 20-21

$0.00

CONSTRUCTION ADM:

MSD

FY 21-22

$0.00

INSPECTION:

MSD

FY 22-23

$0.00

FY 23-24

$0.00

FY 24-25

$0.00

PROJECT DESCRIPTION: This project is located at the southwest end of New Haw Creek Rd. adjacent to the COA Water Booster Station. It consists of replacing 90LF of existing 8-inch VCP with new 8-inch DIP. The line FY 25-26 has multiple sags, structural defects, and accessibility issues due to existing large diameter water and gas lines in FY 26-27 the vicinity. FY 27-28 SPECIAL PROJECT NOTES:

$0.00 $0.00 $0.00


D

HILL R

R

D

W O O DY LN FO

X

C

HA

SE

RD

W FOX C HASE RD

LA N

BIRD

IL SW

D RD

RDG

ER OW D FL RD

New Stock Road Project No. 2015011

EL D R

DR

E BLU

AN ALEX

HAP D ER C

PLEASANT HILL DR

DR

EE K

Y TR L

D WOO

/

WD

R

WR

CR

DIPIT

L

RD

HI

L GO

IE DV

AD

VIE

DWS

RICE M

CHADWICK WADE

FAR ID

GO LD

HIL L

SERE N

O KN

DP

RD NOT TO SCALE

BR U

CT

SH

V EA W

MAR LWO OD

CT

W OO

LL

D

RD

E DR

D

KNOB

RD

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

ER R

STONE Y

GARRISON R

LEM DR A B EM B

LOFTIN ST

E DR LAKESHOR

D

NA VE METROPOLITAN SEWERAGE DISTRICT

RD

AND

E

HIGH L

VI ER

KSID

HEATHER CT

CRE E

RD

CT CRANDON

FIR W

I26 E

N AIKE

OO D

EN R D S HAV

RD OOS T ROB IN R

O WO LL

RD

FOXWOOD DR

W DR

T PA

TI

LN

AC

DR

OR N

I W LE NK

PINE Y

LN

RD

RI PE BRIA RWO OD

E LN RIDG SHAD O

S RUFU

I26 W

S RD

ROSS RD

W NE CK TO E

APPLE C

E

FE RN AD GL

DL OO W D AN S LL

TEA

SI JO

Y

MER RIM O

LA E CK LN

B ER R Y LN

COUNTRY OAK DR

LN LOWRY

G


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

New Stock Road

LOCATION:

Woodfin

TYPE:

General Sewer Rehab.

PIPE RATING:

45

PROJECT NO.

2015011

TOTAL LF:

9,020

PROJECT BUDGET:

$2,402,500.00

PROJECT ORIGIN:

SSO's, Undersized Pipe

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$36,000.00

$36,000.00

55330 - DESIGN 55340 - PERMITS

$1,000.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$6,500.00

55370 - LEGAL FEES

$5,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION

$70,000.00

55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$2,250,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$10,000.00

55450 - SURVEY - ASBUILT

$24,000.00

TOTAL AMOUNT

$2,402,500.00

$0.00

ENGINEER:

MSD

DP

R.O.W. ACQUISITION:

MSD

# PLATS: [

CONTRACTOR:

$36,000.00

$0.00

ESTIMATED BUDGETS - FY 20 - 28 5

]

FY 19-20

$0.00

FY 20-21

$6,500.00

CONSTRUCTION ADM:

MSD

FY 21-22

$76,000.00

INSPECTION:

MSD

FY 22-23

$2,284,000.00

FY 23-24

$0.00

FY 24-25

$0.00

PROJECT DESCRIPTION: This project runs along New Stock Rd. in Woodfin. The project begins at Nichols FY 25-26

$0.00

Hill Dr. & New Stock Rd., runs under I-26, and ends at Weaverville Rd. The existing 8-inch lines have FY 26-27 structural issues which have led to root intrusion and multiple SSOs. FY 27-28 SPECIAL PROJECT NOTES:

$0.00 $0.00


/

AV E E L KW O

O

D

ST UT NE

WW AL N

EL

BU OL D

ST RH

OD ES

LN WA LN UT NOT TO SCALE

TAYLOR ST RD

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

METROPOLITAN SEWERAGE DISTRICT

LN

New Walnut Street at Riverside Drive Project No. 2017007

TR

DA VE KW OO

E

LE

DR

6 I2

IL

V RI DE SI R E

W RN SV

ST HI LL

ST N OJ A

N IO UN 6 I2

P PO R LA


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

New Walnut St. @ Riverside Dr.

LOCATION:

Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

63

PROJECT NO.

2017007

TOTAL LF:

1,180

PROJECT BUDGET:

$357,000.00

PROJECT ORIGIN:

Multiple Sags, Undersized Pipe

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$5,000.00

$5,000.00

55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$3,000.00

$3,000.00

55370 - LEGAL FEES

$4,000.00

$4,000.00

$40,000.00

$40,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$300,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$1,000.00

55450 - SURVEY - ASBUILT

$4,000.00

TOTAL AMOUNT

$357,000.00

$0.00

ENGINEER:

MSD

DP

R.O.W. ACQUISITION:

MSD

# PLATS: [

CONTRACTOR:

$5,000.00

$47,000.00

ESTIMATED BUDGETS - FY 20 - 28 4

]

FY 19-20

$305,000.00

FY 20-21

$0.00

CONSTRUCTION ADM:

MSD

FY 21-22

$0.00

INSPECTION:

MSD

FY 22-23

$0.00

FY 23-24

$0.00

FY 24-25

$0.00

PROJECT DESCRIPTION: This project runs along Riverside Drive and New Walnut Street. The project begins FY 25-26

$0.00

on Riverside Drive, continues onto New Walnut Street, and extends under I-26. The existing 6-inch clay FY 26-27 pipes have multiple sags and yearly maintenance is needed. FY 27-28 SPECIAL PROJECT NOTES:

$0.00 $0.00


ST

TO

I24

0E

IN AV E

IN FL

0W

North Lexington Avenue at I-240 Project No. 2014182

D OO W Y HA

TO

K RAN

TS

T

/

ST

ST

0W

T

I24

AVE NOT TO SCALE

0E

ON INGT LE X

EE

BR

AY W D OA

4 I2

I24

N

O BR

E I240

TO

W

IMON

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

40 E

METROPOLITAN SEWERAGE DISTRICT

O I2

AVE ST T WAY D A BRO

ER R TO M

0

ST DFIN WOO

AY W D A

ST

4 I2

ST

SS WA A I H

Y RR

PL

E CH

N

IZ EL H ET AB

ST

BR YS WA D OA

O BR AY W D A


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

North Lexington @ I-240

LOCATION:

Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

47

PROJECT NO.

2014182

TOTAL LF:

210

PROJECT BUDGET:

$93,970.00

PROJECT ORIGIN:

Work Orders, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$2,570.00

$2,570.00

55330 - DESIGN 55340 - PERMITS

$2,000.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$88,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$1,000.00

55450 - SURVEY - ASBUILT

$400.00

TOTAL AMOUNT

$93,970.00

$2,570.00

ENGINEER:

MSD

SA

R.O.W. ACQUISITION:

N/A

# PLATS: [

CONTRACTOR:

$0.00

$0.00

ESTIMATED BUDGETS - FY 20 - 28 0

]

FY 19-20

$0.00

FY 20-21

$2,000.00

CONSTRUCTION ADM:

MSD

FY 21-22

$0.00

INSPECTION:

MSD

FY 22-23

$89,400.00

FY 23-24

$0.00

FY 24-25

$0.00

PROJECT DESCRIPTION: This project is located in downtown Asheville near the I-240 on ramp from FY 25-26 Broadway St. and is comprised of 450 LF of 8-inch ductile iron pipe. The existing line is 4-inch vitrified clay FY 26-27 pipe with a history of stoppages and overflows. FY 27-28 SPECIAL PROJECT NOTES:

$0.00 $0.00 $0.00


T BE I ZA

TO

I24

W

AY ADW O R B

ON INGT LE X AVE

N FLI

E

D BROA

A OLIN CAR

TS

K RAN

T

D OO W Y HA

LY

T WAY S

LN

LE A TING

E

E WA

LN U T

T LY REN A LANG

LY

VE IN A

ST

North Market Street Project No. 2014019

T ST

I2 40

ELM ST

A LK ERS W LAWY

ST

I240E

ET S

NU WAL

O ST T

NA VE

BROADWAY ST TO

IMO

AVE UCE N SPR

/

N EN A

ND VA

0W

K CHIC

L

0E

I24

E

ERR

RK N MA

TP BIL ER

T

I24

40 I2

0E

TO

N

EE S HIAWASS

D OO W Y HA

ST

AY W D OA

E CH

ST

ST

Y RR

E I240

V ON A RRIM E M TO

WT OM

S IN

BR

H

PL CENTRA L

EL F OD WO 240 OI TT ST NOT TO SCALE

40 W

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

R SON D DAVID

S

I2 T TO

METROPOLITAN SEWERAGE DISTRICT

CO

T

D HAR ORC

S GE

IN ST

E LL

WOO DF

I240 E TO CHARLO TTE ST

ORCHARD ST

ST VALLEY S T

I240

OAK


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

North Market Street

LOCATION:

Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

26

PROJECT NO.

2014019

TOTAL LF:

1,064

PROJECT BUDGET:

$284,400.00

PROJECT ORIGIN:

Work Orders, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$5,300.00

$3,875.00

$1,425.00

$3,875.00

$1,425.00

55330 - DESIGN 55340 - PERMITS

$500.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$1,000.00

55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$276,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$1,000.00

55450 - SURVEY - ASBUILT

$600.00

TOTAL AMOUNT

ENGINEER:

$284,400.00

MSD

R.O.W. ACQUISITION:

SA # PLATS: [ 0

CONTRACTOR:

$0.00

ESTIMATED BUDGETS - FY 20 - 28 ]

FY 19-20

$0.00

FY 20-21

$0.00

CONSTRUCTION ADM:

MSD

FY 21-22

$0.00

INSPECTION:

MSD

FY 22-23

$0.00

FY 23-24

$0.00

FY 24-25

$0.00

PROJECT DESCRIPTION: This project is located in downtown Asheville and consists of 1,064 LF of 8-inch ductile iron pipe. The existing 6-inch clay line is undersized, has multiple structural issues, and has FY 25-26 caused flooded structures. FY 26-27

$1,500.00

FY 27-28

$277,600.00

SPECIAL PROJECT NOTES:

$0.00


HAR LE S

TON

O

AVE

NB

Northwest Avenue at No. 215 Project No. 2018017

WC

E AV HE

D LV DB N U

NOT TO SCALE

of BUNCOMBE COUNTY, NORTH CAROLINA

Budget Map

METROPOLITAN SEWERAGE DISTRICT

E AV

/

E

R NO S WE TH

HAWTHORN E AV

L DE D OO LW

VE TA


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Northwest Ave. @ No. 215

LOCATION:

Swannanoa

TYPE:

General Sewer Rehab.

PIPE RATING:

84

PROJECT NO.

2018017

TOTAL LF:

251

PROJECT BUDGET:

$63,350.00

PROJECT ORIGIN:

Structural Condition, SSOs

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$1,250.00

$1,250.00

55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$1,500.00

55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$58,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$2,000.00

55450 - SURVEY - ASBUILT

$600.00

TOTAL AMOUNT

ENGINEER:

$63,350.00

MSD

R.O.W. ACQUISITION:

$0.00

HC # PLATS: [ 2

CONTRACTOR:

$0.00

$1,250.00

ESTIMATED BUDGETS - FY 20 - 28 ]

FY 19-20

$1,500.00

FY 20-21

$0.00

CONSTRUCTION ADM:

MSD

FY 21-22

$60,600.00

INSPECTION:

MSD

FY 22-23

$0.00

FY 23-24

$0.00

FY 24-25

$0.00

PROJECT DESCRIPTION: This project is in the Grovemont community of Swannanoa and includes the replacement of approx. 251 LF of existing 6" VCP and CIP with new 8" DIP. The existing line is in poor FY 25-26 structural condition and has a section of highly corroded CIP. The line runs parallel with a creek and has FY 26-27 overflowed on multiple occasions. FY 27-28 SPECIAL PROJECT NOTES:

$0.00 $0.00 $0.00


/

PINE ST

CHURCH ST

LN S PA RK

Oakland Drive at Church Street Project No. 2015177

OAKLAND DR

NOT TO SCALE

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

PINE ST

METROPOLITAN SEWERAGE DISTRICT

AIN ST MOUNT


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Oakland Drive @ Church Street

LOCATION:

Black Mountain

TYPE:

General Sewer Rehab

PIPE RATING:

27

PROJECT NO.

2015177

TOTAL LF:

575

PROJECT BUDGET:

$171,000.00

PROJECT ORIGIN:

Access, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$2,500.00

55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$2,500.00

55370 - LEGAL FEES

$4,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION

$25,000.00

55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$135,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$500.00

55450 - SURVEY - ASBUILT

$1,500.00

TOTAL AMOUNT

$171,000.00

$0.00

ENGINEER:

MSD

DP

R.O.W. ACQUISITION:

MSD

# PLATS: [ 4 ]

CONTRACTOR:

$0.00

$0.00

ESTIMATED BUDGETS - FY 20 - 28 FY 19-20

$0.00

FY 20-21

$0.00

CONSTRUCTION ADM:

MSD

FY 21-22

$0.00

INSPECTION:

MSD

FY 22-23

$0.00

FY 23-24

$2,500.00

FY 24-25

$2,500.00

PROJECT DESCRIPTION: This project is located in Black Mountain running through properties from Pine St FY 25-26

$29,000.00

to Oakland Dr. The project will replace 575 LF of 4-inch Orangeburg and 6-inch VCP. The existing lines are FY 26-27 in poor condition and have too many point repairs.

$137,000.00

FY 27-28

$0.00

SPECIAL PROJECT NOTES:


PO

LN

GAR

CIR

CT

D

CT

RD

NOT TO SCALE

TRCE

N T LN

Old Haw Creek Road at Greenbriar Road Project No. 2012109

TRILLIU M

HAW CREEK

RIAR RD GREENB

S

N MELTO

DR

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

OLD HAW CR EEK RD

METROPOLITAN SEWERAGE DISTRICT

RD

/

L LN

OR

SPRUCE H IL

CT

C CIS

SPRUCE HILL

AL TRAF

NK WI

L HP

A TENN

ING RSH N PE

RT WO

ROCKING PORCH RDG

C RO

NG KI

H RC

R PE G HIN

ROSE

RD

HEDG E

Y PRESSLE TRINITY CHAPEL

RD


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Old Haw Creek Rd. @ Greenbriar Rd.

LOCATION:

E. Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

56

PROJECT NO.

2012109

TOTAL LF:

3,755

PROJECT BUDGET:

$1,172,600.00

PROJECT ORIGIN:

SSO's, Work Orders, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$18,000.00

$14,700.00

$3,300.00

55360 - EASEMENT PLATS

$13,200.00

$13,200.00

55370 - LEGAL FEES

$14,000.00

$10,225.00

$4,775.00

$70,000.00

$25,029.00

$44,971.00

55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES

55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL

$7,000.00

$3,500.00

$3,500.00

55410 - CONDEMNATION

$20,000.00

$10,000.00

$10,000.00

55420 - CONSTRUCTION

$1,017,000.00

$1,017,000.00

55440 - TESTING

$4,000.00

$4,000.00

55450 - SURVEY - ASBUILT

$9,400.00

$9,400.00

55430 - CONST. CONTRACT ADM.

TOTAL AMOUNT

$1,172,600.00

$63,154.00

ENGINEER:

MSD

HC

R.O.W. ACQUISITION:

MSD

# PLATS: [

CONTRACTOR:

$66,546.00

$1,043,900.00

ESTIMATED BUDGETS - FY 20 - 28 19 ]

FY 19-20

$0.00

FY 20-21

$0.00

CONSTRUCTION ADM:

MSD

FY 21-22

$0.00

INSPECTION:

MSD

FY 22-23

$0.00

FY 23-24

$0.00

FY 24-25

$0.00

PROJECT DESCRIPTION: This project is located in the Haw Creek neighborhood of E. Asheville along Old Haw Creek Rd. and Greenbriar Rd. It consists of replacing approximately 3,755 LF of existing 6-inch vitrified FY 25-26 clay pipe with 8-inch ductile iron pipe. The existing line is in poor condition and has been subject to frequent FY 26-27 overflows. FY 27-28 SPECIAL PROJECT NOTES:

$0.00 $0.00 $0.00


RC

T

CR EE

K

ME R NT

WA Y

CH A ST

I40 W SWEETEN CREEK RD TO I40 E

RD CRAYTON

CR AY TO N

TE

D

/

CO

STRATUS LN

O LD

C R AYT ON R

T H AP E L R

SCHOOL RD E

PISGAH VIEW AVE

D

OAKVIEW PARK RD

PINNACLE VIEW RD

AVE

LOOMIS AVE

WENTW ORTH A V

LAMAR

FOX DR

DOGW OOD D R

PORTER RD

HARRIS RD

OAKLE Y

W RALEIGH RD

LORA LN

I40 E

ES

WINSTON AVE

LINCOLN AVE

Old West Chapel Road Project No. 2014004

W C

EE

E BROADVIEW AV

ST RTY LIB E

LN DO M

VE S

CT

L

RD IA

E

CLEVELAND AV E

EO RA

G ST

NOT TO SCALE

MEET IN

RALEIGH RD

ON T BL VD

DR

R

RR

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

E

R TE PO

D

METROPOLITAN SEWERAGE DISTRICT

ONTEORA OAKS DR

BONDO RD

PORTER R D

D EW

CE

I ADV BRO

JA NI

TO E I24 0

FR

W I40

WILLIAMSBURG PL

R

CHESTNUT TE

ROBERTS RD


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Old West Chapel Road

LOCATION:

Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

53

PROJECT NO.

2014004

TOTAL LF:

5,200

PROJECT BUDGET:

$1,560,000.00

PROJECT ORIGIN:

SSO's, Work Orders, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$34,000.00

$33,720.00

$280.00

55360 - EASEMENT PLATS

$14,000.00

$11,050.00

$2,950.00

55370 - LEGAL FEES

$14,000.00

$5,484.00

$8,516.00

55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES

55380 - ACQUISITION SERVICES 55390 - COMPENSATION

$65,000.00

55400 - APPRAISAL

$50,000.00

$15,000.00

$6,000.00

$6,000.00

55410 - CONDEMNATION

$10,000.00

$10,000.00

55420 - CONSTRUCTION

$1,400,000.00

$1,400,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT

$2,000.00

$2,000.00

$15,000.00

$15,000.00

$1,560,000.00

$50,254.00

ENGINEER:

MSD

DP

R.O.W. ACQUISITION:

MSD

# PLATS: [ 14

CONTRACTOR:

$61,746.00

$1,448,000.00

ESTIMATED BUDGETS - FY 20 - 28 ]

FY 19-20

$0.00

FY 20-21

$0.00

CONSTRUCTION ADM:

MSD

FY 21-22

$0.00

INSPECTION:

MSD

FY 22-23

$0.00

FY 23-24

$0.00

FY 24-25

$0.00

PROJECT DESCRIPTION: This project is located near the intersection of Sweeten Creek Rd. and I-40. The existing 8-inch and 10-inch clay pipe will be replaced with 8-inch ductile iron pipe and 8-inch and 12-inch FY 25-26 HDPE. There have been multiple sanitary sewer overflows on this line. This project will consist of replacing FY 26-27 the existing pipes by pipe bursting and dig & replace. FY 27-28 SPECIAL PROJECT NOTES:

Majority of the original project was completed under 2015218 Lining Contract No. 8.

$0.00 $0.00 $0.00


R FO

R ST

N BLU

E RID

B NES

DR ITT

/

WALK

D GE R

NS SAXO

O TAYL

ST

WAY

CARVER AVE

Owenby Lane at Old US Hwy 70 Project No. 2018033

OWENBY LN

NE TU

ER ST WALK NOT TO SCALE

Y OLD US 70 HW

LOCUST ST

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

HWY

E

METROPOLITAN SEWERAGE DISTRICT

US 70

CENTRAL A V CRAGGY ST


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Owenby Lane @ US Hwy 70

LOCATION:

Black Mountain

TYPE:

General Sewer Rehab.

PIPE RATING:

85

PROJECT NO.

2018033

TOTAL LF:

1,426

PROJECT BUDGET:

$492,345.00

PROJECT ORIGIN:

CSR's, Heavy I & I, SSO's

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$15,000.00

$15,000.00

$500.00

$500.00

55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$9,500.00

55370 - LEGAL FEES

$11,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION

$56,345.00

55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$395,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$1,000.00

55450 - SURVEY - ASBUILT

$4,000.00

TOTAL AMOUNT

$492,345.00

$0.00

ENGINEER:

MSD

OH

R.O.W. ACQUISITION:

TBD

# PLATS: [

11

CONTRACTOR:

$0.00

$15,500.00

ESTIMATED BUDGETS - FY 20 - 28 11

]

FY 19-20

$0.00

FY 20-21

$76,845.00

CONSTRUCTION ADM:

MSD

FY 21-22

$400,000.00

INSPECTION:

MSD

FY 22-23

$0.00

FY 23-24

$0.00

FY 24-25

$0.00

PROJECT DESCRIPTION: This project is located in Black Mountain along Old US Hwy 70 starting near the intersection of Owenby Lane. It consists of approximately 1,426 LF of existing 6-inch VCP to be replaced FY 25-26 with 8-inch DIP. This 6-inch VCP system has heavy I & I issues and routinely floods 106 Owenby Lane FY 26-27 causing multiple SSO's over the past few years. FY 27-28 SPECIAL PROJECT NOTES:

$0.00 $0.00 $0.00


NOT TO SCALE

Riverside Drive at Riverside Baptist Church Project No. 2016251

IDE DR

/

S RIVER

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

METROPOLITAN SEWERAGE DISTRICT


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Riverside Dr. @ Riverside Baptist

LOCATION:

Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

40

PROJECT NO.

2016251

TOTAL LF:

510

PROJECT BUDGET:

$168,450.00

PROJECT ORIGIN:

Work Orders, Excessive Infiltration

DESCRIPTION

ESTIMATED PROJECT COST

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$5,500.00

55330 - DESIGN 55340 - PERMITS

$10,000.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$700.00

55370 - LEGAL FEES

$1,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION

$7,500.00

55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$140,250.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$1,000.00

55450 - SURVEY - ASBUILT

$2,500.00

TOTAL AMOUNT

$168,450.00

$0.00

ENGINEER:

MSD

OH

R.O.W. ACQUISITION:

MSD

# PLATS: [ 1

CONTRACTOR:

$0.00

$0.00

ESTIMATED BUDGETS - FY 20 - 28 ]

FY 19-20

$0.00

FY 20-21

$0.00

CONSTRUCTION ADM:

MSD

FY 21-22

$5,500.00

INSPECTION:

MSD

FY 22-23

$19,200.00

FY 23-24

$143,750.00

FY 24-25

$0.00

PROJECT DESCRIPTION: This project is located along Riverside Drive at the Riverside Baptist Church. It consists replacing approximately 510 LF of existing 6-inch VCP with 8-inch DIP or lining the entire length FY 25-26 (pending further investigation). Although this segment is structurally unsound and experiences heavy inflow FY 26-27 and infiltration at the road it doesn't have many service calls or any SSO's. FY 27-28 SPECIAL PROJECT NOTES:

Possible RR Encroachment

$0.00 $0.00 $0.00


L

DP

SHORT TRE

K RD

ALY

O BR WN OD WO

RLY

DT

N ST NOT TO SCALE

R BA

T

T LE

STON

TS

ST

Y WA

E T AV

E AV

T

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

DEPOT ST

JOHN ST METROPOLITAN SEWERAGE DISTRICT

ST

Riverview Drive Project No. 2013104

RD W

ST

LN

LIVING

BEV E

OL MB

N

AV E

T

R VE I Y R WA D EN

NK LI

R

KI EL

AV ON

S WE

SUCCESS AVE LD MBO

ST

/

HOWARD ST

MONT ST

MILLBRO O

N SU

DR

PL

WE S TW OO

T

TREMONT S

E RIS

LE A VE

SVI L

WAY NE

AV E WA

DEAVER S T

WA

EY

RD

OA KL

S

G

N D OL

LO

Y RE IR

AN

NC

O

GA LO

H A YW O

EN

RD

V CRA

ED

D

ID RS

EUCLID BLVD

ES YN A P

RIVERVIEW DR

E RIV R TS

LYMA

E ROB

L RA PH

OLD LYMAN ST

ST


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Riverview Drive

LOCATION:

Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

24

PROJECT NO.

2013104

TOTAL LF:

2,302

PROJECT BUDGET:

$650,680.00

PROJECT ORIGIN:

SSO's, Access, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$7,880.00

$7,880.00

55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$633,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$4,000.00

55450 - SURVEY - ASBUILT

$5,800.00

TOTAL AMOUNT

$650,680.00

$7,880.00

ENGINEER:

MSD

HC

R.O.W. ACQUISITION:

N/A

# PLATS: [ 0

CONTRACTOR:

$0.00

$0.00

ESTIMATED BUDGETS - FY 20 - 28 ]

FY 19-20

$0.00

FY 20-21

$0.00

CONSTRUCTION ADM:

MSD

FY 21-22

$0.00

INSPECTION:

MSD

FY 22-23

$0.00

FY 23-24

$0.00

FY 24-25

$0.00

PROJECT DESCRIPTION: This project is located in Asheville near the Haywood Rd. bridge. The project FY 25-26 consists of replacing approx. 2,302 LF of existing 6-inch vitrified clay pipe with 8-inch ductile iron pipe. The FY 26-27 existing line is in poor condition and has experienced multiple overflows. FY 27-28 SPECIAL PROJECT NOTES:

$0.00 $0.00 $642,800.00


S

VILLE RSON E D N HE

RD

SY

T

ORE CAM

ES DR ROYAL PIN

T

ST

K BLA E DR

RD T TREE S PEACH NOT TO SCALE

MOR E T

DR

O COL

RL

N

R

DEN LIN ST

E

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

CT METROPOLITAN SEWERAGE DISTRICT

R NY D

CED A

E

ND

R TE PL M A

LE

Royal Pines Drive - PRP 47009 Project No. 2007020

TE R

APPIAN WAY

SYC A

OD OD RH

RO ND

RIPPON CT

P MA

/

LN

C RY ER B L EK

D RD

T

S RY RE NC

ES

HEYWOO

ES

EN LIND

E ET

FO R

MY L RT

N ST

BLAKE CT ER CH L RD

E SW LAUR E

MU

L ER

LIND E

P PO T AR


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Royal Pines Drive - PRP 47009

LOCATION:

Arden

TYPE:

Pipe Rated Projects

PIPE RATING:

35

PROJECT NO.

2007020

TOTAL LF:

2,888

PROJECT BUDGET:

$818,100.00

PROJECT ORIGIN:

Pipe Rating Program

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$10,100.00

$10,100.00

55330 - DESIGN 55340 - PERMITS

$5,000.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$1,500.00

55370 - LEGAL FEES

$2,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION

$15,000.00

55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$780,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$2,000.00

55450 - SURVEY - ASBUILT

$2,500.00

TOTAL AMOUNT

$818,100.00

$10,100.00

ENGINEER:

MSD

SA

R.O.W. ACQUISITION:

MSD

# PLATS: [ 2 ]

CONTRACTOR:

$0.00

$0.00

ESTIMATED BUDGETS - FY 20 - 28 FY 19-20

$0.00

FY 20-21

$0.00

CONSTRUCTION ADM.:

MSD

FY 21-22

$6,500.00

INSPECTION:

MSD

FY 22-23

$17,000.00

FY 23-24

$0.00

FY 24-25

$0.00

This project is located in South Asheville and is comprised of 2,888 LF of 8-inch FY 25-26 ductile iron pipe. The existing line is 8-inch vitrified clay pipe which has had a history of root problems. FY 26-27

$784,500.00

FY 27-28

$0.00

PROJECT DESCRIPTION:

SPECIAL PROJECT NOTES:

$0.00


ER PL

N SA

D

LL HI

RD

NOT TO SCALE

NE DR

A M

N

A IL ST

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

R KA

EN

PL

METROPOLITAN SEWERAGE DISTRICT

D

Sand Hill Road at Baker Place Project No. 2015223

BA K

SHELBU R

ER

/

L

ST CARRIE R

CARRIER P

SALOLA S T

SH URN E LB


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Sand Hill Road @ Baker Place

LOCATION:

W. Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

22

PROJECT NO.

2015223

TOTAL LF:

550

PROJECT BUDGET:

$155,000.00

PROJECT ORIGIN:

Work Orders, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$3,000.00

55330 - DESIGN 55340 - PERMITS

$1,000.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$150,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$1,000.00

55450 - SURVEY - ASBUILT

$0.00

TOTAL AMOUNT

ENGINEER:

$155,000.00

MSD

R.O.W. ACQUISITION:

$0.00

SA # PLATS: [ 0 ]

CONTRACTOR:

$0.00

$0.00

ESTIMATED BUDGETS - FY 20 - 28 FY 19-20

$0.00

FY 20-21

$0.00

CONSTRUCTION ADM:

MSD

FY 21-22

$0.00

INSPECTION:

MSD

FY 22-23

$3,000.00

FY 23-24

$1,000.00

FY 24-25

$0.00

PROJECT DESCRIPTION: This project is located in West Asheville and is comprised of 550 LF of 8-inch FY 25-26

$0.00

ductile iron pipe. The existing line is a 6-inch VCP with mulitple structural defects and access issues due to FY 26-27 being located under several houses. FY 27-28

SPECIAL PROJECT NOTES:

$0.00 $151,500.00


/

Y HW

UR Y RD

ILL

Smokey Park Highway at Sand Hill Road Project No. 2018035

SM

RK Y PA E K O

AS B

SA H ND NOT TO SCALE

RD

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

METROPOLITAN SEWERAGE DISTRICT


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Smokey Park Hwy @ Sand Hill Rd.

LOCATION:

Enka

TYPE:

General Sewer Rehab.

PIPE RATING:

TBD

PROJECT NO.

2018035

TOTAL LF:

590

PROJECT BUDGET:

$237,750.00

PROJECT ORIGIN:

Work Orders, Unmapped

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$6,000.00

55330 - DESIGN 55340 - PERMITS

$500.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$1,750.00

55370 - LEGAL FEES

$2,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION

$60,000.00

55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$165,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$1,000.00

55450 - SURVEY - ASBUILT

$1,500.00

TOTAL AMOUNT

$237,750.00

$0.00

ENGINEER:

MSD

OH

R.O.W. ACQUISITION:

MSD

# PLATS: [ 2

CONTRACTOR:

$0.00

$0.00

ESTIMATED BUDGETS - FY 20 - 28 ]

FY 19-20

$0.00

FY 20-21

$0.00

CONSTRUCTION ADM:

MSD

FY 21-22

$0.00

INSPECTION:

MSD

FY 22-23

$6,500.00

FY 23-24

$63,750.00

FY 24-25

$167,500.00

This project is located in Enka at the intersection of Smokey Park Hwy and Sand FY 25-26 Hill Rd. It consists of approximately 590 LF of existing 4-inch and 8-inch VCP to be replaced with 8-inch DIP. FY 26-27 This system is currently unmapped and possibly has 4-inch service lines tying to inactive sewer. PROJECT DESCRIPTION:

FY 27-28 SPECIAL PROJECT NOTES:

$0.00 $0.00 $0.00


/

South Main Street at Reems Creek Road Project No. 2017012

N

ST

NOT TO SCALE

RE EM

S

C

S

I MA

RD

LN

RE EK

K EL

K

W AY

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

CR AN

METROPOLITAN SEWERAGE DISTRICT

BA L


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

S. Main St. @ Reems Creek Rd.

LOCATION:

Weaverville

TYPE:

General Sewer Rehab.

PIPE RATING:

51

PROJECT NO.

2017012

TOTAL LF:

565

PROJECT BUDGET:

$187,450.00

PROJECT ORIGIN:

Line condition, Access

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$2,300.00

55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$3,750.00

55370 - LEGAL FEES

$5,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION

$35,000.00

55400 - APPRAISAL

$3,500.00

55410 - CONDEMNATION

$7,500.00

55420 - CONSTRUCTION

$127,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$2,000.00

55450 - SURVEY - ASBUILT

$1,400.00

TOTAL AMOUNT

$187,450.00

$0.00

ENGINEER:

MSD

HC

R.O.W. ACQUISITION:

MSD

# PLATS: [ 5

CONTRACTOR:

$0.00

$0.00

ESTIMATED BUDGETS - FY 20 - 28 ]

FY 19-20

$46,050.00

FY 20-21

$11,000.00

CONSTRUCTION ADM:

MSD

FY 21-22

$130,400.00

INSPECTION:

MSD

FY 22-23

$0.00

FY 23-24

$0.00

FY 24-25

$0.00

PROJECT DESCRIPTION: This project is located on S. Main Street in Weaverville, approximately 0.7 mile south of downtown and adjacent to the intersection with Reems Creek Road. The project consists of FY 25-26 replacing approx. 513 LF of existing 6" and 8" VCP with 565 LF of new 8" DIP. The existing lines routinely cause stoppages in flow and require frequent maintenance. Maintenance is made difficult by several FY 26-27 structures located over the existing lines. FY 27-28

SPECIAL PROJECT NOTES:

$0.00 $0.00 $0.00


IR

R

OVERLOOK RD

SPRINGSIDE RD

S LONG

Springside Road at Overlook Road Project No. 2012127

OVERLOOK CT

LIVING SAVIOR WAY

OT D

CT

CIR FO X RED

CON IFER

BRIARCLIFF DR

MANATEE CT

/

PINC H

RED FOX C

IR

MIAMI CIR

S RD

NOT TO SCALE

HOAL

SPRING FO R EST C

GSID SPRIN K E PAR

AK F

ST

ISH C

IR

DR

W SUMMIT AVE

SCOT T

ALLEN AVE

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

METROPOLITAN SEWERAGE DISTRICT

T POND S

OR E

DR

MAUDE A VE

HARRIS S T

SO

BEV LYN


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Springside Rd. @ Overlook Rd.

LOCATION:

S. Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

52

PROJECT NO.

2012127

TOTAL LF:

4,056

PROJECT BUDGET:

$1,370,700.00

PROJECT ORIGIN:

SSO's, Work Orders, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$21,500.00

$21,500.00

55330 - DESIGN 55340 - PERMITS

$2,000.00

$2,000.00

$7,800.00

$7,800.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES

$13,000.00

$13,000.00

$95,000.00

$95,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$1,226,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$2,000.00

55450 - SURVEY - ASBUILT

$3,400.00

TOTAL AMOUNT

$1,370,700.00

$21,500.00

ENGINEER:

MSD

SA

R.O.W. ACQUISITION:

MSD

# PLATS: [ 8

CONTRACTOR:

$9,800.00

$108,000.00

ESTIMATED BUDGETS - FY 20 - 28 ]

FY 19-20

$0.00

FY 20-21

$0.00

CONSTRUCTION ADM:

MSD

FY 21-22

$1,231,400.00

INSPECTION:

MSD

FY 22-23

$0.00

FY 23-24

$0.00

FY 24-25

$0.00

PROJECT DESCRIPTION: This project is located in South Asheville near Overlook Rd. and is comprised of 4,056 LF of 8-inch ductile iron pipe. The existing line is 6-inch and 8-inch vitrified clay pipe in poor shape, FY 25-26 with a history of SSO's at various points. FY 26-27 FY 27-28 SPECIAL PROJECT NOTES:

$0.00 $0.00 $0.00


A BE

R

N DE

E AV

B

DP

L

MB CU L ER

N MO

W I240

D AN

T E AV

RD FO

E AV

ON

TF

NOT TO SCALE

N

ON

CH TO

&M

ST

HA IS RR

T YS ER R

E CH

Y RR

I24

0E

E AV

I2

W 40

O YW A H

AY W

OD

TO

ST

TO

I 24

0W

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

BR

D OA

ST

I24

0E

METROPOLITAN SEWERAGE DISTRICT

T

/

SH

T OR

TS

Starnes Avenue Project No. 2014154

M CU

N LA ER

A ST

ES RN

IN FL

ST

ST


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Starnes Avenue

LOCATION:

Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

22

PROJECT NO.

2014154

TOTAL LF:

2,871

PROJECT BUDGET:

$896,500.00

PROJECT ORIGIN:

SSO's, Work Orders, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$14,300.00

55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$3,000.00

55370 - LEGAL FEES

$4,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION

$75,000.00

55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$790,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$3,000.00

55450 - SURVEY - ASBUILT

$7,200.00

TOTAL AMOUNT

$896,500.00

$0.00

ENGINEER:

MSD

HC

R.O.W. ACQUISITION:

MSD

# PLATS: [ 4 ]

CONTRACTOR:

$0.00

$0.00

ESTIMATED BUDGETS - FY 20 - 28 FY 19-20

$0.00

FY 20-21

$0.00

CONSTRUCTION ADM:

MSD

FY 21-22

$0.00

INSPECTION:

MSD

FY 22-23

$14,300.00

FY 23-24

$0.00

FY 24-25

$0.00

PROJECT DESCRIPTION: This project is located near downtown Asheville, just north of I-240. Approximately 2,871 LF of existing 6-inch VCP will be replaced with 8-inch DIP along portions of Short St., FY 25-26 Cumberland Ave., Starnes Ave., Harrison St., and Flint St. Portions of the existing pipe were installed circa FY 26-27 1900, and have numerous structural defects. FY 27-28 SPECIAL PROJECT NOTES:

$82,000.00 $0.00 $800,200.00


PAT T O NA VE

/

PR I N C E TO N DR

ST

BRAMLETT CT

BELMONT AVE

NOT TO SCALE

Sulphur Springs Road at Covington Street Project No. 2014006

HARV A

RD P L

DARTMOUTH

E ND AV ORMO

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

S RD

METROPOLITAN SEWERAGE DISTRICT

SULPHUR SPRING

REDFERN ST

CLINTON AVE

COVINGTON ST


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Sulphur Springs Rd. @ Covington St. LOCATION:

W. Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

44

PROJECT NO.

2014006

TOTAL LF:

1,350

PROJECT BUDGET:

$463,000.00

PROJECT ORIGIN:

SSO's, Access, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$5,500.00

$5,500.00

55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$10,000.00

55370 - LEGAL FEES

$13,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION

$90,000.00

55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$340,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$1,000.00

55450 - SURVEY - ASBUILT

$3,500.00

TOTAL AMOUNT

$463,000.00

$0.00

ENGINEER:

MSD

DP

R.O.W. ACQUISITION:

MSD

# PLATS: [

CONTRACTOR:

$5,500.00

$0.00

ESTIMATED BUDGETS - FY 20 - 28 13

]

FY 19-20

$0.00

FY 20-21

$10,000.00

CONSTRUCTION ADM:

MSD

FY 21-22

$103,000.00

INSPECTION:

MSD

FY 22-23

$344,500.00

FY 23-24

$0.00

FY 24-25

$0.00

This project begins in the area of the Sulphur Springs Rd. / Delaware Ave. intersection and runs through the back properties along Belmont Ave. The existing 6-inch clay pipe will be FY 25-26 replaced with 8-inch ductile iron pipe. The 6-inch clay line has had numerous problems and runs under a FY 26-27 house. PROJECT DESCRIPTION:

FY 27-28 SPECIAL PROJECT NOTES:

Belmont Ave. added to this with additional 500 LF

$0.00 $0.00 $0.00


K RD

O RS I LL NV

WA ER

EN LD

D

DR

/

LN OCK PEAC NOT TO SCALE

IS CHR R OL CHO S T

Sweeten Creek Road at Buck Shoals Road Project No. 2014015

KS

E ND

C BU

HE

RD

PENSACOLA

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

SUMTER ST

METROPOLITAN SEWERAGE DISTRICT

AVE

RD

S AL HO

LN KEY L

TAM PA B LVD H TS

E CRE TE N E E SW

E COV

ARG O

N LN PIGEO

PENSAC O LA

DY WIN

D


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Sweeten Creek Rd. @ Buck Shoals Rd.

LOCATION:

S. Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

51

PROJECT NO.

2014015

TOTAL LF:

918

PROJECT BUDGET:

$326,920.00

PROJECT ORIGIN:

SSO's, Access, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$4,670.00

$4,670.00

55330 - DESIGN 55340 - PERMITS

$4,000.00

$4,000.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$2,250.00

55370 - LEGAL FEES

$3,000.00

$2,250.00 $3,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION

$40,000.00

55400 - APPRAISAL

$3,500.00

55410 - CONDEMNATION

$7,500.00

55420 - CONSTRUCTION

$257,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$2,000.00

55450 - SURVEY - ASBUILT

$3,000.00

TOTAL AMOUNT

$326,920.00

$4,670.00

ENGINEER:

MSD

HC

R.O.W. ACQUISITION:

MSD

# PLATS: [ 3

CONTRACTOR:

$2,250.00

$7,000.00

ESTIMATED BUDGETS - FY 20 - 28 ]

FY 19-20

$44,500.00

FY 20-21

$6,500.00

CONSTRUCTION ADM:

MSD

FY 21-22

$262,000.00

INSPECTION:

MSD

FY 22-23

$0.00

FY 23-24

$0.00

FY 24-25

$0.00

PROJECT DESCRIPTION: This project is located in Royal Pines on Buck Shoals Rd. between Hendersonville FY 25-26

$0.00

Rd. (US 25) and Sweeten Creek Rd. (US 25A). Approx. 918 LF of existing 6-inch vitrified clay pipe will be FY 26-27 replaced with 8-inch ductile iron pipe. The existing line is in poor condition and is undersized. FY 27-28

SPECIAL PROJECT NOTES:

This project was originally 1,330LF. In FY16-17, System Services constructed all line segments on Buck Shoals Road in

order to share costs of paving with the City of Asheville. COA had multiple waterline breaks on Buck Shoals Rd., resulting in major damage to the road.

$0.00 $0.00


HENDERSONVILLE RD

/

C EN EE T

ALP I

Sweeten Creek Road at Mills Gap Road Project No. 2014189

SW

D KR RE E

RID

GE

DR

CA NOT TO SCALE

NE

LN EL ST E

AP

RD

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

SG

METROPOLITAN SEWERAGE DISTRICT

MI LL


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Sweeten Creek Rd. @ Mills Gap Rd.

LOCATION:

Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

46

PROJECT NO.

2014189

TOTAL LF:

2,325

PROJECT BUDGET:

$679,000.00

PROJECT ORIGIN:

SSO's, Work Orders, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$24,000.00

$24,000.00

55330 - DESIGN 55340 - PERMITS

$1,000.00

$1,000.00

55360 - EASEMENT PLATS

$3,000.00

$3,000.00

55370 - LEGAL FEES

$5,000.00

55350 - SPECIAL STUDIES

55380 - ACQUISITION SERVICES 55390 - COMPENSATION

$100,000.00

55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$544,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$1,000.00

55450 - SURVEY - ASBUILT

$1,000.00

TOTAL AMOUNT

$679,000.00

$0.00

ENGINEER:

MSD

SA

R.O.W. ACQUISITION:

MSD

# PLATS: [ 5

CONTRACTOR:

$24,000.00

$4,000.00

ESTIMATED BUDGETS - FY 20 - 28 ]

FY 19-20

$105,000.00

FY 20-21

$546,000.00

CONSTRUCTION ADM:

MSD

FY 21-22

$0.00

INSPECTION:

MSD

FY 22-23

$0.00

FY 23-24

$0.00

FY 24-25

$0.00

PROJECT DESCRIPTION: This project is located in South Asheville near Mills Gap Rd. and is comprised of FY 25-26

$0.00

2,325 LF of 8-inch ductile iron pipe. The existing line is 6-inch and 8-inch vitrified clay pipe in poor condition, FY 26-27 with a history of SSO's. FY 27-28 SPECIAL PROJECT NOTES:

$0.00 $0.00


YC

LR

D

DEW DROP RD

US 70 at Jordan Road Project No. 2015014

HERSHEL LN

RD RED

/

N GI

H SC

ZANMI RD

E AP

JORDAN RD

LAURA LN

LEE RD

US 70 HWY

RD

MARTIN

ROAD

NOT TO SCALE

EXT

DR

R BU

IR

RA V

ME

D LO P TO ST

RE D

EA

EN

D

TOL S TOY TRL

MARTIN RD

I40 E EYE ACC ESS

I40 W

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

BUC K

AV E

Y HW

RD

70 US

METROPOLITAN SEWERAGE DISTRICT

W RA Y

D OL D DR ER WO O RIV

R N

LN

A FR IN KL

Y N WA

BYA S

YR M

E TL

O SAMS

RD


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

US 70 @ Jordan Road

LOCATION:

Swannanoa

TYPE:

General Sewer Rehab.

PIPE RATING:

21

PROJECT NO.

2015014

TOTAL LF:

4,550

PROJECT BUDGET:

$1,443,000.00

PROJECT ORIGIN:

Access, Line Condition, Work Orders

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$20,000.00

55330 - DESIGN 55340 - PERMITS

$500.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$20,000.00

55370 - LEGAL FEES

$32,000.00

55380 - ACQUISITION SERVICES

$32,000.00

55390 - COMPENSATION

$75,000.00

55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$1,250,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$1,500.00

55450 - SURVEY - ASBUILT

$12,000.00

TOTAL AMOUNT

$1,443,000.00

$0.00

ENGINEER:

MSD

DP

R.O.W. ACQUISITION:

Consultant

# PLATS: [ 32

CONTRACTOR:

$0.00

$0.00

ESTIMATED BUDGETS - FY 20 - 28 ]

FY 19-20

$0.00

FY 20-21

$0.00

CONSTRUCTION ADM:

MSD

FY 21-22

$20,000.00

INSPECTION:

MSD

FY 22-23

$0.00

FY 23-24

$20,000.00

FY 24-25

$100,500.00

PROJECT DESCRIPTION: This project is located in Swannanoa along US 70. The project begins at McBrayer FY 25-26

$39,000.00

Ave., crosses under US 70 at Martin Rd., and ends at Burgins Chapel Rd. The existing 8-inch vitrified clay FY 26-27 pipe is in poor condition. This is a potential lining project. FY 27-28

SPECIAL PROJECT NOTES:

$0.00 $1,263,500.00


N

INGT LE X

VE ON A NOT TO SCALE

ER LAWY

K AR M S

BROAD T WAY S

K RAN

IN AV

ET

LN

E

LY REN A LANG

N PAC K SQ

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

K

METROPOLITAN SEWERAGE DISTRICT

S WAL

T

Walnut Street at North Lexington Avenue Project No. 2017008

R K ET

GE ST

LY

ST

N MA

E COLL

LE A TING

LN U T

UCE S N SPR T

/

T ST

A OLIN CAR

NU WAL

E WA

UCE S S SPR

ST

ST


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Walnut St. @ N. Lexington Ave.

LOCATION:

Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

42

PROJECT NO.

2017008

TOTAL LF:

1,550

PROJECT BUDGET:

$463,500.00

PROJECT ORIGIN:

Line Condition, Undersized Pipe

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$7,000.00

55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$450,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$1,500.00

55450 - SURVEY - ASBUILT

$5,000.00

TOTAL AMOUNT

$463,500.00

$0.00

ENGINEER:

MSD

DP

R.O.W. ACQUISITION:

MSD

# PLATS: [ 0

$0.00

$0.00

ESTIMATED BUDGETS - FY 20 - 28 ]

CONTRACTOR:

FY 19-20

$0.00

FY 20-21

$0.00

CONSTRUCTION ADM:

MSD

FY 21-22

$7,000.00

INSPECTION:

MSD

FY 22-23

$0.00

FY 23-24

$456,500.00

FY 24-25

$0.00

N. Lexington Ave., runs along Walnut Street and down side roads of Langren Alley, Market Street, and FY 25-26

$0.00

Lawyers Walk, and ends near the corner of E. Walnut Street. The existing 6-inch and 8-inch clay pipes have FY 26-27 structural issues and yearly maintenance is needed.

$0.00

FY 27-28

$0.00

PROJECT DESCRIPTION: This project runs along Walnut Street in downtown Asheville. The project begins at

SPECIAL PROJECT NOTES:


0W E 0 I24

D OO W Y HA

TS K RAN

T E STAG LN

PAGE AVE

E RY AV OHEN

IS OT

VE IN A

DS OO W Y HA T

RK ALY BATTERY PA

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

KS S PAC

K SQ

NOT TO SCALE

N PAC METROPOLITAN SEWERAGE DISTRICT

GE ST

Y E AL

E COLL

L TING

T ST LY REN A LANG

Walnut Street at Rankin Avenue Project No. 2014018

AVE

AVE

T

LN U E WA

Q

T

N PATTO

N ON INGT LE X

S NUT WAL

ALY

ST WALL

L

K EN CHIC LN

K AVE Y PAR R E T BAT

ND VA

TP BIL ER

A OLIN CAR

T WAY S

Q TLE S

TO

D BROA

BAT

ST

0E IN FL

ET S

/

I24

I24

RK N MA

ST


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Walnut Street @ Rankin Ave.

LOCATION:

Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

54

PROJECT NO.

2014018

TOTAL LF:

2,350

PROJECT BUDGET:

$1,141,100.00

PROJECT ORIGIN:

Access, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$11,500.00

$9,900.00

$1,600.00

$9,900.00

$1,600.00

55330 - DESIGN 55340 - PERMITS

$500.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$1,126,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$1,000.00

55450 - SURVEY - ASBUILT

$2,100.00

TOTAL AMOUNT

$1,141,100.00

ENGINEER:

MSD

SA

R.O.W. ACQUISITION:

MSD

# PLATS: [

$0.00

ESTIMATED BUDGETS - FY 20 - 28 0

]

CONTRACTOR:

FY 19-20

$1,129,600.00

FY 20-21

$0.00

CONSTRUCTION ADM:

MSD

FY 21-22

$0.00

INSPECTION:

MSD

FY 22-23

$0.00

FY 23-24

$0.00

FY 24-25

$0.00

PROJECT DESCRIPTION: This project is located in downtown Asheville and consists of 2,350 LF of 8-inch FY 25-26

$0.00

FY 26-27

$0.00

FY 27-28

$0.00

ductile iron pipe. The current 6-inch clay line is undersized and deteriorated, with many structural problems.

SPECIAL PROJECT NOTES:

This project is being coordinated with a larger City of Asheville project in the downtown area.


DE LLW OO

E

DS

T

MIL LB

ST

SHORT TRE MONT ST

N SU

RIS

R ED

BR O

W NW O O

D

S WA YN E

AV E

RD

RG I A ST

AV ON

SUCCESS AVE

GE O

NOT TO SCALE

Waynesville Avenue at Brownwood Avenue Project No. 2014183

EZELLE

ROO K R WORLEY PL D

ST

AV E

S WE

T

D EN

V RI

K

Y WA

N LI ER

LN

RIVERVIEW DR

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

METROPOLITAN SEWERAGE DISTRICT

DR

/

SEV

BR A

D

KS R

NO A

ST

G

NN IN

S TW OO DP L

AND

TREMONT ST

AV E VIL LE

AV E

RICH L

OA K

WE

ST DE AV E

R

PL LE Y

E

G

V IA A

LO

RD

AN

DAL VAN

S

W AM BO

LD NO

H A YW O

DR

Y RE IR

LD T

AN

NC

O D

GA LO

AL Y

SL RU LYMA N ST

E AV CR T NS

DE

EUCLID BLVD

V RI SI ER


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Waynesville Ave. @ Brownwood Ave.

LOCATION:

W. Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

33

PROJECT NO.

2014183

TOTAL LF:

4,100

PROJECT BUDGET:

$1,348,200.00

PROJECT ORIGIN:

Access, Line Condition, SSO's.

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$21,000.00

55330 - DESIGN 55340 - PERMITS

$500.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$28,200.00

55370 - LEGAL FEES

$47,000.00

55380 - ACQUISITION SERVICES

$47,000.00

55390 - COMPENSATION

$250,000.00

55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$950,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$2,000.00

55450 - SURVEY - ASBUILT

$2,500.00

TOTAL AMOUNT

$1,348,200.00

$0.00

ENGINEER:

MSD

SA

R.O.W. ACQUISITION:

Consultant

# PLATS: [ 47

$0.00

$0.00

ESTIMATED BUDGETS - FY 20 - 28 ]

CONTRACTOR:

FY 19-20

$0.00

FY 20-21

$21,000.00

CONSTRUCTION ADM:

MSD

FY 21-22

$500.00

INSPECTION:

MSD

FY 22-23

$28,200.00

FY 23-24

$160,000.00

FY 24-25

$184,000.00

and is comprised of 4,100 LF of 8-inch ductile iron pipe. The existing line is 8-inch vitrified clay pipe that is in FY 25-26 poor condition with heavy root intrusion, structural defects, and I&I problems, resulting in a large history of FY 26-27 SSO's.

$954,500.00

FY 27-28

$0.00

PROJECT DESCRIPTION: This project is located in West Asheville between Haywood Rd. and Craven St.

SPECIAL PROJECT NOTES:

$0.00


ES

RL

VE R

SA

ILL

ES

LN

R GA

ND LA

LN

CH D

CRABAPPLE LN

West Crabapple Lane Project No. 2014005

DR

LD WI R RY R E

IL O

/

NE T

CT

BAYO N

N CEN VIN

CR LE

A

E

A

LN

NOT TO SCALE

AB CR

LE PP

K RD

Budget Map

METROPOLITAN SEWERAGE DISTRICT of BUNCOMBE COUNTY, NORTH CAROLINA

A ND O ROU

LN C R EEK

W P AP AB

U Q H

BEAVER

RD GIBSON

LW


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

West Crabapple Lane

LOCATION:

W. Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

67

PROJECT NO.

2014005

TOTAL LF:

1,720

PROJECT BUDGET:

$124,800.00

PROJECT ORIGIN:

SSO's, Access, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$3,800.00

$3,800.00

55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$9,000.00

55370 - LEGAL FEES

$9,000.00

$12,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION

$100,000.00

55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION 55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT

$124,800.00

$3,800.00

ENGINEER:

MSD

DP

R.O.W. ACQUISITION:

MSD

# PLATS: [

CONTRACTOR:

$0.00

$9,000.00

ESTIMATED BUDGETS - FY 20 - 28 12 ]

FY 19-20

$112,000.00

FY 20-21

$0.00

CONSTRUCTION ADM:

MSD

FY 21-22

$0.00

INSPECTION:

MSD

FY 22-23

$0.00

FY 23-24

$0.00

FY 24-25

$0.00

This project is on West Crabapple Lane which is a private road. The existing FY 25-26 8-inch clay pipe is in poor condition and will be replaced with 8-inch ductile iron pipe. System Services FY 26-27 crews have reported multiple structural defects which are resulting in major infiltration and inflow. PROJECT DESCRIPTION:

FY 27-28 SPECIAL PROJECT NOTES:

This project will be a part of Lining Contract No. 9.

$0.00 $0.00 $0.00


/

WO O

DP AR

KK

NL

Wildwood Park Project No. 2015194

WILDWOO D PARK

N MAIN ST NOT TO SCALE

OAKLAND ST

S

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

METROPOLITAN SEWERAGE DISTRICT

CH E

WIL D

ST TN UT


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Wildwood Park

LOCATION:

Weaverville

TYPE:

General Sewer Rehab.

PIPE RATING:

27

PROJECT NO.

2015194

TOTAL LF:

582

PROJECT BUDGET:

$168,780.00

PROJECT ORIGIN:

Pipe Fractures, Roots, Location

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$2,380.00

$2,380.00

55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$163,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$2,000.00

55450 - SURVEY - ASBUILT

$1,400.00

TOTAL AMOUNT

ENGINEER:

$168,780.00

MSD

R.O.W. ACQUISITION:

$2,380.00

HC # PLATS: [ 0 ]

CONTRACTOR:

$0.00

$0.00

ESTIMATED BUDGETS - FY 20 - 28 FY 19-20

$0.00

FY 20-21

$0.00

CONSTRUCTION ADM:

MSD

FY 21-22

$0.00

INSPECTION:

MSD

FY 22-23

$0.00

FY 23-24

$0.00

FY 24-25

$0.00

PROJECT DESCRIPTION: This project is located in Weaverville at the corner of N Main St. and Wildwood FY 25-26

$0.00

Park. It consists of installing 582 LF of 8-inch DIP to replace existing 8-inch VCP. The existing pipe has FY 26-27 multiple fractures, root problems, and runs underneath multiple structures making maintenance difficult.

$166,400.00

FY 27-28

$0.00

SPECIAL PROJECT NOTES:


This Page Intentionally Blank


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

SSD Rehab. & Replacement

PROJECT:

LOCATION:

Various

(Annual) TYPE:

General Sewer Rehab.

PIPE RATING:

N/A

PROJECT NO.

2002101

TOTAL LF:

200,000

PROJECT BUDGET:

$43,100,000.00

PROJECT ORIGIN:

In-house Capital Improvements

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$43,100,000.00

$1,701,319.00

$2,463,085.00

$4,400,000.00

$43,100,000.00

$1,701,319.00

$2,463,085.00

$4,400,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT

20000 ENGINEER:

MSD

MS

R.O.W. ACQUISITION:

MSD

# PLATS: [

ESTIMATED BUDGETS - FY 20 - 28 ]

CONTRACTOR:

FY 19-20

$4,300,000.00

FY 20-21

$4,300,000.00

CONSTRUCTION ADM:

MSD

FY 21-22

$4,300,000.00

INSPECTION:

MSD

FY 22-23

$4,300,000.00

FY 23-24

$4,300,000.00

FY 24-25

$4,300,000.00

PROJECT DESCRIPTION: This line item is for the replacement of capital assets using in-house construction

crews and materials. This includes new taps, small repairs, lining, as well as larger rehabilitation projects. FY 25-26 Also included is paving when required for these repairs and rehabilitation projects. FY18-19 includes $100,000 for contracted clearing of District owned rights-of-way. The total estimated project cost shown is FY 26-27 the total within the ten year window. FY 27-28

SPECIAL PROJECT NOTES:

Capitalized Labor & Misc.

$1,628,416 Materials / Year

Fuel Allocation

Paving Contracts

$1,254,155 Estimated L.F. per year

$100,000

$4,300,000.00 $4,300,000.00 $4,300,000.00 $1,417,429.00 20,000


Metropolitan Sewerage District of Buncombe County, North Carolina CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

SUMMARY - In-House Projects

ACCOUNT:

GENERAL

DATE OF REPORT:

January 2018

PROJECT BUDGET:

Funded through 2002101 PROJECT NO.

PROJECT LOCATION

WORK ORDER NO.

CONST. YEAR

TOTAL LINEAR FOOTAGE

Barnard Avenue @ Lookout

2017231

Asheville 28804

236089

FY 18-19

200

Bearden Avenue @ Cumberland Avenue

2017207

Asheville 28801

247286

FY 18-19

425

110 Beaver Drive

2017247

Asheville 28804

210211

FY 18-19

425

Bell Road @ New Hawk Creek Road

2017244

Asheville 28805

248044

FY 18-19

725

2017233

Asheville 28801

247631

FY 18-19

823

77 Dellwood Street

2017216

Asheville 28804

237568

FY 18-19

200

44 Dogwood Grove

2017243

Asheville 28805

248033

FY 18-19

525

East Grovestone Quarry

2017245

Blk. Mtn. 28711

213459

FY 18-19

780

56 Fairway Drive

2017165

Asheville 28805

240884

FY 18-19

451

Fisherman Trail @ Hendersonville Road

2017215

Arden 28704

247458

FY 18-19

810

Haywood Road @ Swannanoa Avenue

2017240

Asheville 28805

248197

FY 18-19

1,100

500 Laurel Avenue

2017209

Blk. Mtn. 28711

247281

FY 18-19

230

Lees Creek Road @ Erwin Hills Road

2017242

Asheville 28806

247904

FY 18-19

130

Livingston Street @ Erskine Street

2017128

Asheville 28801

247502

FY 18-19

710

12 Mayflower Drive

2017217

Asheville 28804

247347

FY 18-19

350

105 Midland Avenue

2017299

Blk. Mtn. 28711

242836

FY 18-19

810

72 Mimosa Drive

2017230

Asheville 28804

207261

FY 18-19

440

15 New Jersey Avenue

2017210

Asheville 28806

238782

FY 18-19

250

350 Old Haw Creek Road

2012106

Asheville 28805

47802

FY 18-19

1,537

905 Patton Avenue

2017246

Asheville 28806

220384

FY 18-19

187

Royal Pines Drive @ Mount Royal Drive

2017232

Arden 28704

247812

FY 18-19

850

106 Seventh Street

2017219

Blk. Mtn. 28711

225198

FY 18-19

200

149 State Street

2017120

Asheville 28806

237791

FY 18-19

265

Vandalia Avenue

2017241

Asheville 28806

248041

FY 18-19

1,325

Waynesville Avenue @ Brownwood Ave.

2017208

Asheville 28806

247283

FY 18-19

370

West Skyland Circle

2017191

Asheville 28804

246546

FY 18-19

520

169 Windsor Road

2017046

Asheville 28804

240566

FY 18-19

390

DESCRIPTION

55 Congress Street

TOTAL FOOTAGE NOTES:

15,028

In addition to the projects identified above, an additional 5,000 linear feet of sewer rehabilitation footage is expected through completion of previously identified projects, emergency repairs, and other activities during FY 2018-2019.


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2018-2019

PROJECT:

Barnard Avenue @ Lookout Road

LOCATION:

Asheville (28804)

TYPE:

In House General Sewer Rehab

WORK ORDER:

236089

PROJECT NO.

2017231

TOTAL LF:

200

PROJECT BUDGET:

Funded through Project 2002101

PROJECT ORIGIN:

In-House Capital Improvements

ENGINEER:

MSD

R.O.W. ACQUISITION:

MSD

CONTRACTOR:

MSD

CONSTRUCTION ADM:

MSD In-House

INSPECTION:

MSD In-House

# PLATS: [

0 ]

PROJECT DESCRIPTION: Project consists of replacing approximately 200 LF of existing sewer with 8-inch DIP, by way of dig and replace construction.

SPECIAL PROJECT NOTES:


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2018-2019

PROJECT:

Bearden Ave. @ Cumberland Ave.

LOCATION:

Asheville (28801)

TYPE:

In House General Sewer Rehab

WORK ORDER:

247286

PROJECT NO.

2017207

TOTAL LF:

425

PROJECT BUDGET:

Funded through Project 2002101

PROJECT ORIGIN:

In-House Capital Improvements

ENGINEER:

MSD

R.O.W. ACQUISITION:

MSD

CONTRACTOR:

MSD

CONSTRUCTION ADM:

MSD In-House

INSPECTION:

MSD In-House

# PLATS: [

0 ]

PROJECT DESCRIPTION: Project consists of replacing approximately 425 LF of existing sewer with 8-inch HDPE, by way of pipebursting.

SPECIAL PROJECT NOTES:


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2018-2019

PROJECT:

110 Beaver Drive

LOCATION:

Woodfin (28804)

TYPE:

In House General Sewer Rehab

WORK ORDER:

210211

PROJECT NO.

2017247

TOTAL LF:

425

PROJECT BUDGET:

Funded through Project 2002101

PROJECT ORIGIN:

In-House Capital Improvements

ENGINEER:

MSD

R.O.W. ACQUISITION:

MSD

CONTRACTOR:

MSD

CONSTRUCTION ADM:

MSD In-House

INSPECTION:

MSD In-House

# PLATS: [

1 ]

PROJECT DESCRIPTION: Project consists of replacing approximately 425 LF of existing sewer with 8-inch DIP, by way of dig and replace construction.

SPECIAL PROJECT NOTES:


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2018-2019

PROJECT:

Bell Road @ New Haw Creek Road

LOCATION:

Asheville (28805)

TYPE:

In House General Sewer Rehab

WORK ORDER:

248044

PROJECT NO.

2017244

TOTAL LF:

725

PROJECT BUDGET:

Funded through Project 2002101

PROJECT ORIGIN:

In-House Capital Improvements

ENGINEER:

MSD

R.O.W. ACQUISITION:

MSD

CONTRACTOR:

MSD

CONSTRUCTION ADM:

MSD In-House

INSPECTION:

MSD In-House

# PLATS: [ 0 ]

PROJECT DESCRIPTION: Project consists of replacing approximately 725 LF of existing sewer with 8-inch DIP, by way of dig and replace construction.

SPECIAL PROJECT NOTES:


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2018-2019

PROJECT:

55 Congress Street

LOCATION:

Asheville (28801)

TYPE:

In House General Sewer Rehab

WORK ORDER:

247631

PROJECT NO.

2017233

TOTAL LF:

823

PROJECT BUDGET:

Funded through Project 2002101

PROJECT ORIGIN:

In-House Capital Improvements

ENGINEER:

MSD

R.O.W. ACQUISITION:

MSD

CONTRACTOR:

MSD

CONSTRUCTION ADM:

MSD In-House

INSPECTION:

MSD In-House

# PLATS: [

0 ]

PROJECT DESCRIPTION: Project consists of replacing approximately 823 LF of existing 6-inch sewer with 8-inch DIP, by way of dig and replace construction.

SPECIAL PROJECT NOTES:


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2018-2019

PROJECT:

77 Dellwood Street

LOCATION:

Asheville (28804)

TYPE:

In House General Sewer Rehab

WORK ORDER:

237568

PROJECT NO.

2017216

TOTAL LF:

200

PROJECT BUDGET:

Funded through Project 2002101

PROJECT ORIGIN:

In-House Capital Improvements

ENGINEER:

MSD

R.O.W. ACQUISITION:

MSD

CONTRACTOR:

MSD

CONSTRUCTION ADM:

MSD In-House

INSPECTION:

MSD In-House

# PLATS: [

0 ]

PROJECT DESCRIPTION: Project consists of replacing approximately 200 LF of existing sewer with 8-inch HDPE, by way of pipebursting.

SPECIAL PROJECT NOTES:


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2018-2019

PROJECT:

44 Dogwood Grove

LOCATION:

Asheville (28805)

TYPE:

In House General Sewer Rehab

WORK ORDER:

248033

PROJECT NO.

2017243

TOTAL LF:

525

PROJECT BUDGET:

Funded through Project 2002101

PROJECT ORIGIN:

In-House Capital Improvements

ENGINEER:

MSD

R.O.W. ACQUISITION:

MSD

CONTRACTOR:

MSD

CONSTRUCTION ADM:

MSD In-House

INSPECTION:

MSD In-House

# PLATS: [ 5 ]

PROJECT DESCRIPTION: Project consists of replacing approximately 525 LF of existing 6-inch sewer with 8-inch DIP, by way of dig and replace construction.

SPECIAL PROJECT NOTES:


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2018-2019

PROJECT:

East Grovestone Quarry

LOCATION:

Black Mountain (28711)

TYPE:

In House General Sewer Rehab

WORK ORDER:

213459

PROJECT NO.

2017245

TOTAL LF:

780

PROJECT BUDGET:

Funded through Project 2002101

PROJECT ORIGIN:

In-House Capital Improvements

ENGINEER:

MSD

R.O.W. ACQUISITION:

MSD

CONTRACTOR:

MSD

CONSTRUCTION ADM:

MSD In-House

INSPECTION:

MSD In-House

# PLATS: [

0 ]

PROJECT DESCRIPTION: Project consists of replacing approximately 780 LF of existing sewer with 8-inch DIP, by way of dig and replace construction.

SPECIAL PROJECT NOTES:


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2018-2019

PROJECT:

56 Fairway Drive

LOCATION:

Asheville (28805)

TYPE:

In House General Sewer Rehab

WORK ORDER:

240884

PROJECT NO.

2017165

TOTAL LF:

451

PROJECT BUDGET:

Funded through Project 2002101

PROJECT ORIGIN:

In-House Capital Improvements

ENGINEER:

MSD

R.O.W. ACQUISITION:

MSD

CONTRACTOR:

MSD

CONSTRUCTION ADM:

MSD In-House

INSPECTION:

MSD In-House

# PLATS: [

4 ]

PROJECT DESCRIPTION: Project consists of replacing approximately 451 LF of existing sewer with 8-inch, by way of pipebursting and dig and replace

construction.

SPECIAL PROJECT NOTES:


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2018-2019

PROJECT:

Fishermans Trl @ Hendersonville Rd.

LOCATION:

Arden (28704)

TYPE:

In House General Sewer Rehab

WORK ORDER:

247458

PROJECT NO.

2017215

TOTAL LF:

810

PROJECT BUDGET:

Funded through Project 2002101

PROJECT ORIGIN:

In-House Capital Improvements

ENGINEER:

MSD

R.O.W. ACQUISITION:

MSD

CONTRACTOR:

MSD

CONSTRUCTION ADM:

MSD In-House

INSPECTION:

MSD In-House

# PLATS: [

1 ]

PROJECT DESCRIPTION: Project consists of replacing approximately 810 LF of 18-inch VCP with DIP, by way of dig and replace construction.

SPECIAL PROJECT NOTES:


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2018-2019

PROJECT:

Haywood Road @ Swannanoa Ave.

LOCATION:

Asheville (28805)

TYPE:

In House General Sewer Rehab

WORK ORDER:

248197

PROJECT NO.

2017240

TOTAL LF:

1,100

PROJECT BUDGET:

Funded through Project 2002101

PROJECT ORIGIN:

In-House Capital Improvements

ENGINEER:

MSD

R.O.W. ACQUISITION:

MSD

CONTRACTOR:

MSD

CONSTRUCTION ADM:

MSD In-House

INSPECTION:

MSD In-House

# PLATS: [

0 ]

PROJECT DESCRIPTION: Project consists of replacing approximately 1,100 LF of existing sewer with 8-inch HDPE, by way of pipebursting.

SPECIAL PROJECT NOTES:


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2018-2019

PROJECT:

500 Laurel Avenue

LOCATION:

Black Mountain (28711)

TYPE:

In House General Sewer Rehab

WORK ORDER:

247281

PROJECT NO.

2017209

TOTAL LF:

230

PROJECT BUDGET:

Funded through Project 2002101

PROJECT ORIGIN:

In-House Capital Improvements

ENGINEER:

MSD

R.O.W. ACQUISITION:

MSD

CONTRACTOR:

MSD

CONSTRUCTION ADM:

MSD In-House

INSPECTION:

MSD In-House

# PLATS: [

1 ]

PROJECT DESCRIPTION: Project consists of replacing approximately 230 LF of existing sewer with 8-inch HDPE, by way of pipebursting.

SPECIAL PROJECT NOTES:


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2018-2019

PROJECT:

Lees Creek Rd. @ Erwin Hills Rd.

LOCATION:

Woodfin (28806)

TYPE:

In House General Sewer Rehab

WORK ORDER:

247904

PROJECT NO.

2017242

TOTAL LF:

130

PROJECT BUDGET:

Funded through Project 2002101

PROJECT ORIGIN:

In-House Capital Improvements

ENGINEER:

MSD

R.O.W. ACQUISITION:

MSD

CONTRACTOR:

MSD

CONSTRUCTION ADM:

MSD In-House

INSPECTION:

MSD In-House

# PLATS: [ 0 ]

PROJECT DESCRIPTION: Project consists of replacing approximately 130 LF of existing sewer with 8-inch HDPE and DIP to facilitate more efficient maintenance

operations.

SPECIAL PROJECT NOTES:


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2018-2019

PROJECT:

Livingston Street @ Erskine

LOCATION:

Asheville (28801)

TYPE:

In House General Sewer Rehab

WORK ORDER:

247502

PROJECT NO.

2017128

TOTAL LF:

710

PROJECT BUDGET:

Funded through Project 2002101

PROJECT ORIGIN:

In-House Capital Improvements

ENGINEER:

MSD

R.O.W. ACQUISITION:

MSD

CONTRACTOR:

MSD

CONSTRUCTION ADM:

MSD In-House

INSPECTION:

MSD In-House

# PLATS: [

0 ]

PROJECT DESCRIPTION: Project consists of replacing approximately 710 LF of existing 6-inch sewer with 8-inch HDPE, by way of pipebursting.

SPECIAL PROJECT NOTES:


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2018-2019

PROJECT:

12 Mayflower Drive

LOCATION:

Asheville (28804)

TYPE:

In House General Sewer Rehab

WORK ORDER:

247347

PROJECT NO.

2017217

TOTAL LF:

350

PROJECT BUDGET:

Funded through Project 2002101

PROJECT ORIGIN:

In-House Capital Improvements

ENGINEER:

MSD

R.O.W. ACQUISITION:

MSD

CONTRACTOR:

MSD

CONSTRUCTION ADM:

MSD In-House

INSPECTION:

MSD In-House

# PLATS: [

1 ]

PROJECT DESCRIPTION: Project consists of replacing approximately 350 LF of existing sewer with 8-inch HDPE, by way of pipebursting.

SPECIAL PROJECT NOTES:


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2018-2019

PROJECT:

105 Midland Avenue

LOCATION:

Black Mountain (28711)

TYPE:

In House General Sewer Rehab

WORK ORDER:

242836

PROJECT NO.

2017229

TOTAL LF:

810

PROJECT BUDGET:

Funded through Project 2002101

PROJECT ORIGIN:

In-House Capital Improvements

ENGINEER:

MSD

R.O.W. ACQUISITION:

MSD

CONTRACTOR:

MSD

CONSTRUCTION ADM:

MSD In-House

INSPECTION:

MSD In-House

# PLATS: [

0 ]

PROJECT DESCRIPTION: Project consists of replacing approximately 810 LF of existing 6-inch sewer with 8-inch DIP, by way of dig and replace construction.

SPECIAL PROJECT NOTES:


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2018-2019

PROJECT:

72 Mimosa Drive

LOCATION:

Asheville (28804)

TYPE:

In House General Sewer Rehab

WORK ORDER:

207261

PROJECT NO.

2017230

TOTAL LF:

440

PROJECT BUDGET:

Funded through Project 2002101

PROJECT ORIGIN:

In-House Capital Improvements

ENGINEER:

MSD

R.O.W. ACQUISITION:

MSD

CONTRACTOR:

MSD

CONSTRUCTION ADM:

MSD In-House

INSPECTION:

MSD In-House

# PLATS: [

0 ]

PROJECT DESCRIPTION: Project consists of replacing approximately 440 LF of existing 6-inch sewer with 8-inch HDPE, by way of pipebursting.

SPECIAL PROJECT NOTES:


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2018-2019

PROJECT:

15 New Jersey Avenue

LOCATION:

Asheville (28806)

TYPE:

In House General Sewer Rehab

WORK ORDER:

238782

PROJECT NO.

2017210

TOTAL LF:

250

PROJECT BUDGET:

Funded through Project 2002101

PROJECT ORIGIN:

In-House Capital Improvements

ENGINEER:

MSD

R.O.W. ACQUISITION:

MSD

CONTRACTOR:

MSD

CONSTRUCTION ADM:

MSD In-House

INSPECTION:

MSD In-House

# PLATS: [

0 ]

PROJECT DESCRIPTION: Project consists of replacing approximately 250 LF of existing sewer with 8-inch DIP, by way of dig and replace construction.

SPECIAL PROJECT NOTES:


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2018-2019

PROJECT:

350 Old Haw Creek Road

LOCATION:

Asheville (28805)

TYPE:

In House General Sewer Rehab

WORK ORDER:

47802

PROJECT NO.

2012106

TOTAL LF:

1,537

PROJECT BUDGET:

Funded through Project 2002101

PROJECT ORIGIN:

In-House Capital Improvements

ENGINEER:

MSD

R.O.W. ACQUISITION:

MSD

CONTRACTOR:

MSD

CONSTRUCTION ADM:

MSD In-House

INSPECTION:

MSD In-House

# PLATS: [

0 ]

PROJECT DESCRIPTION: Project consists of replacing approximately 1,537 LF of existing sewer with 8-inch DIP, by way of dig and replace construction.

SPECIAL PROJECT NOTES:


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2018-2019

PROJECT:

905 Patton Avenue

LOCATION:

Asheville (28806)

TYPE:

In House General Sewer Rehab

WORK ORDER:

220384

PROJECT NO.

2017246

TOTAL LF:

187

PROJECT BUDGET:

Funded through Project 2002101

PROJECT ORIGIN:

In-House Capital Improvements

ENGINEER:

MSD

R.O.W. ACQUISITION:

MSD

CONTRACTOR:

MSD

CONSTRUCTION ADM:

MSD In-House

INSPECTION:

MSD In-House

# PLATS: [

2 ]

PROJECT DESCRIPTION: Project consists of replacing approximately 187 LF of existing sewer with 8-inch DIP, by way of dig and replace construction.

SPECIAL PROJECT NOTES:


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2018-2019

PROJECT:

Royal Pines Drive @ Mount Royal

LOCATION:

Arden (28704)

TYPE:

In House General Sewer Rehab

WORK ORDER:

247812

PROJECT NO.

2017232

TOTAL LF:

850

PROJECT BUDGET:

Funded through Project 2002101

PROJECT ORIGIN:

In-House Capital Improvements

ENGINEER:

MSD

R.O.W. ACQUISITION:

MSD

CONTRACTOR:

MSD

CONSTRUCTION ADM:

MSD In-House

INSPECTION:

MSD In-House

# PLATS: [

0 ]

PROJECT DESCRIPTION: Project consists of replacing approximately 850 LF of existing 6-inch sewer with 8-inch HDPE, by way of pipebursting.

SPECIAL PROJECT NOTES:


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2018-2019

PROJECT:

106 Seventh Street

LOCATION:

Black Mountain (28711)

TYPE:

In House General Sewer Rehab

WORK ORDER:

225198

PROJECT NO.

2017219

TOTAL LF:

200

PROJECT BUDGET:

Funded through Project 2002101

PROJECT ORIGIN:

In-House Capital Improvements

ENGINEER:

MSD

R.O.W. ACQUISITION:

MSD

CONTRACTOR:

MSD

CONSTRUCTION ADM:

MSD In-House

INSPECTION:

MSD In-House

# PLATS: [ 0

]

PROJECT DESCRIPTION: Project consists of replacing approximately 200 LF of existing sewer with 8-inch DIP, by way of dig and replace construction.

SPECIAL PROJECT NOTES:


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2018-2019

PROJECT:

149 State Street

LOCATION:

Asheville (28806)

TYPE:

In House General Sewer Rehab

WORK ORDER:

237791

PROJECT NO.

2017120

TOTAL LF:

265

PROJECT BUDGET:

Funded through Project 2002101

PROJECT ORIGIN:

In-House Capital Improvements

ENGINEER:

MSD

R.O.W. ACQUISITION:

MSD

CONTRACTOR:

MSD

CONSTRUCTION ADM:

MSD In-House

INSPECTION:

MSD In-House

# PLATS: [

2

]

PROJECT DESCRIPTION: Project consists of replacing approximately 265 LF of existing sewer with 8-inch DIP, by way of dig and replace construction.

SPECIAL PROJECT NOTES:


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2018-2019

PROJECT:

Vandalia Avenue

LOCATION:

Asheville (28806)

TYPE:

In House General Sewer Rehab

WORK ORDER:

248041

PROJECT NO.

2017241

TOTAL LF:

1,325

PROJECT BUDGET:

Funded through Project 2002101

PROJECT ORIGIN:

In-House Capital Improvements

ENGINEER:

MSD

R.O.W. ACQUISITION:

MSD

CONTRACTOR:

MSD

CONSTRUCTION ADM:

MSD In-House

INSPECTION:

MSD In-House

# PLATS: [

0 ]

PROJECT DESCRIPTION: Project consists of replacing approximately 1,325 LF of existing 6-inch sewer with 8-inch DIP, by way of dig and replace construction.

SPECIAL PROJECT NOTES:


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2018-2019

PROJECT:

Waynesville Avenue @ Brownwood

LOCATION:

Asheville (28806)

TYPE:

In House General Sewer Rehab

WORK ORDER:

247283

PROJECT NO.

2017208

TOTAL LF:

370

PROJECT BUDGET:

Funded through Project 2002101

PROJECT ORIGIN:

In-House Capital Improvements

ENGINEER:

MSD

R.O.W. ACQUISITION:

MSD

CONTRACTOR:

MSD

CONSTRUCTION ADM:

MSD In-House

INSPECTION:

MSD In-House

# PLATS: [

2 ]

PROJECT DESCRIPTION: Project consists of replacing approximately 370 LF of existing sewer with 8-inch DIP, by way of dig and replace construction.

SPECIAL PROJECT NOTES:


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2018-2019

PROJECT:

West Skyland Circle

LOCATION:

Woodfin (28804)

TYPE:

In House General Sewer Rehab

WORK ORDER:

246546

PROJECT NO.

2017191

TOTAL LF:

520

PROJECT BUDGET:

Funded through Project 2002101

PROJECT ORIGIN:

In-House Capital Improvements

ENGINEER:

MSD

R.O.W. ACQUISITION:

MSD

CONTRACTOR:

MSD

CONSTRUCTION ADM:

MSD In-House

INSPECTION:

MSD In-House

# PLATS: [

0 ]

PROJECT DESCRIPTION: Project consists of replacing approximately 520 LF of existing sewer with 8-inch DIP, by way of dig and replace construction.

SPECIAL PROJECT NOTES:


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2018-2019

PROJECT:

169 Windsor Road

LOCATION:

Asheville (28804)

TYPE:

In House General Sewer Rehab

WORK ORDER:

240566

PROJECT NO.

2017046

TOTAL LF:

390

PROJECT BUDGET:

Funded through Project 2002101

PROJECT ORIGIN:

In-House Capital Improvements

ENGINEER:

MSD

R.O.W. ACQUISITION:

MSD

CONTRACTOR:

MSD

CONSTRUCTION ADM:

MSD In-House

INSPECTION:

MSD In-House

# PLATS: [

1 ]

PROJECT DESCRIPTION: Project consists of replacing approximately 390 LF of existing 4-inch orangeburg sewer with 8-inch PVC, by way of dig and replace

construction.

SPECIAL PROJECT NOTES:


This Page Intentionally Blank


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Surveys for Design

LOCATION:

Various

TYPE:

General Sewer Rehab.

PIPE RATING:

N/A

PROJECT NO.

2002060

TOTAL LF:

N/A

PROJECT BUDGET:

$500,000.00

PROJECT ORIGIN:

Surveys for future projects

DESCRIPTION

ESTIMATED PROJECT COST

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$500,000.00

$50,000.00

55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION 55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT

$500,000.00

$0.00

ENGINEER:

EB

R.O.W. ACQUISITION:

# PLATS: [

$0.00

$50,000.00

ESTIMATED BUDGETS - FY 20 - 28 ]

FY 19-20

$50,000.00

CONTRACTOR:

FY 20-21

$50,000.00

CONSTRUCTION ADM:

FY 21-22

$50,000.00

INSPECTION:

FY 22-23

$50,000.00

FY 23-24

$50,000.00

FY 24-25

$50,000.00

line item provides for surveying needs for these new projects, in order that preliminary work may begin prior FY 25-26 to being formally incorporated into the next year's CIP. This helps to ensure projects are completed FY 26-27 efficiently.

$50,000.00

FY 27-28

$50,000.00

PROJECT DESCRIPTION: New rehabilitation projects are generated continuously throughout the year. This

SPECIAL PROJECT NOTES:

Funds are transferred out to provide Survey for Design for Future Projects. Total estimated project cost shown is the total within the ten year window.

$50,000.00


This Page Intentionally Blank


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Future Projects - Non Critical

LOCATION:

Various

TYPE:

General Sewer Rehab.

PIPE RATING:

N/A

PROJECT NO.

Various

TOTAL LF:

0

PROJECT BUDGET:

Varies

PROJECT ORIGIN:

SSO's; Work orders; Line condition

Engineer

Project Number

Craggy Street @ Old US 70

HC

Merrimon Ave. @ Clearview Terrace

OH

White Oak Road

DP

2015193

3

960

$280,250

Riverside Dr. @ Silverline Plastic

SA

2012007

4

400

$118,220

Four Inch Main - Reddick Road

OH

2018034

5

635

$203,700

Lionel Place

DP

2015009

6

308

$95,700

Tunnel Rd. @ White Pine Drive

OH

2016101

6

170

$50,800

Oakley Road @ School Road

OH

2018031

7

600

$184,750

Project

Pipe Rating

Project Footage

Estimated Cost

2015209

2

1,000

$284,150

2007012

2

500

$324,990

Upper Grassy Branch Rd. @ Maxwell Rd.

SA

2010096

7

1,000

$257,310

Four Mile Creek WW (CDM #1)

EB

2001193

8

3,400

$952,000

Haw Creek WW (CDM #6)

EB

2001194

8

3,800

$1,064,000

Braddock Way - PRP 20002

OH

2006025

8

3,848

$1,435,790

Weston Road @ Tampa Blvd.

HC

2015208

8

400

$114,150

Herron Avenue

SA

2014186

9

2,060

$603,800

Merrimon Ave. @ Coleman Ave.

DP

2014009

9

2,800

$820,000

Oakwood Street

HC

2014115

9

976

$310,750

Four Inch Main - College Street

SA

2012128

10

1,000

$440,500

Wood Avenue @ Parker Road

SA

2014188

10

1,050

$298,000

Biltmore WW (CDM #3)

EB

2001192

12

2,200

$660,000

Central Avenue @ I-240

SA

2014180

12

990

Cumberland Avenue

HC

2014014

12

4,587

Louisana Avenue

DP

2015174

12

2,150

$640,000

Weaverville Rd. @ Reynolds Mountain

OH

2018036

12

415

$130,600

$329,100 $1,295,750

Bear Creek Road

SA

2011117

13

2,800

$803,100

Elk Park Drive - PRP 35001

SA

2006028

13

2,242

$550,046

Elkwood Ave. @ Norman Austin Drive

DP

2014008

13

600

$178,100

Sweeten Creek Road @ Weston Road

SA

2014187

13

1,775

$460,400

Broadway St. @ Bordeau Place

DP

2009034

14

475

$283,750

Forest Hill Drive @ Warwick Road

SA

2014020

14

3,400

$961,600

Town Branch Interceptor Phase III

DP

2017158

14

3,600

$2,349,500

Knauth Road

SA

2015220

15

400

Lakeview @ Glen Falls Road

DP

2014007

15

4,200

Page 1 of 2

$129,500 $1,380,500


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Future Projects - Non Critical

LOCATION:

Various

TYPE:

General Sewer Rehab.

PIPE RATING:

N/A

PROJECT NO.

Various

TOTAL LF:

0

PROJECT BUDGET:

Varies

PROJECT ORIGIN:

SSO's; Work orders; Line condition

Engineer

Project Number

Pipe Rating

Project Footage

Lower Glendale Avenue

HC

2012083

15

2,716

$874,450

Dingle Creek Interceptor

OH

2006010

15

7,871

$2,783,698

Adams Street

SA

2012126

16

2,630

$781,400

Lakewood Drive @ Dudley Ave.

HC

2015016

16

280

$98,150

North Street @ Broadway Street

OH

2018030

16

1,067

$329,000

Project

Estimated Cost

Riverside Dr. @ Norton Drive

SA

2015222

16

700

$226,700

Stratford Road

DP

2015013

16

2,020

$568,000

Battery Park Alley

SA

2016107

17

250

$74,700

Douglas Place PSR

SA

2011116

17

588

$148,480

Hill Street @ Cross Place

OH

2016249

18

254

$68,750

Haywood Rd. @ Wellington Street

SA

2016105

18

782

$125,000

Lower Melody Lane

DP

2013027

19

1,180

$349,500

Old Toll Rd. @ Blue Briar Road

OH

2018032

19

185

$62,200

Arlington Street

DP

2015008

20

2,600

$747,000

Jonestown Road @ Riverside Drive

OH

2018028

22

1,890

$608,500

79,754

$25,836,334

TOTAL AMOUNT

PROJECT DESCRIPTION: This is a listing of projects which have low Pipe Ratings and are therefore less critical than

other projects within the Ten Year CIP. All projects are reprioritized each year, and the schedule for the entire program is adjusted based on project criticality.

SPECIAL PROJECT NOTES:

Page 2 of 2


Capital Improvement Program Fiscal Years 2019—2028

Private Sewer Rehabilitation Projects


IT WH IN EP EC

DOGWOOD RD

Dogwood Road at White Pine Circle PSR Project No. 2014132 NOT TO SCALE

IR

/

WHITE OAK RD

IR FA KS OA RD

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

METROPOLITAN SEWERAGE DISTRICT


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2017 - 2018

PROJECT:

Dogwood Rd. @ White Pine Circle

LOCATION:

Arden

TYPE:

Private Sewer Rehab.

PIPE RATING:

56

PROJECT NO.

2014132

TOTAL LF:

580

PROJECT BUDGET:

$208,750.00

PROJECT ORIGIN:

Work Orders, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$5,800.00

$5,800.00

55330 - DESIGN 55340 - PERMITS

$500.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$6,500.00

55370 - LEGAL FEES

$7,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$187,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$500.00

55450 - SURVEY - ASBUILT

$1,450.00

TOTAL AMOUNT

$208,750.00

$0.00

ENGINEER:

MSD

OH

R.O.W. ACQUISITION:

MSD

# PLATS: [ 7

CONTRACTOR:

$5,800.00

$0.00

ESTIMATED BUDGETS - FY 20 - 28 ]

FY 19-20

$0.00

FY 20-21

$14,000.00

CONSTRUCTION ADM:

MSD

FY 21-22

$188,950.00

INSPECTION:

MSD

FY 22-23

$0.00

FY 23-24

$0.00

FY 24-25

$0.00

PROJECT DESCRIPTION: This project is located in South Asheville east of the intersection of Hendersonville FY 25-26

$0.00

Rd. (US-25) and Royal Oaks Rd.; more specifically, running along the rear of properties fronting Dogwood FY 26-27 Rd. It consists of replacing approximately 580 LF of existing 4-inch Orangeburg with 8-inch DIP. FY 27-28 SPECIAL PROJECT NOTES:

$0.00 $0.00


/

RD

R

RD

Homeland Park PSR Project No. 2016248

N AN W S

A O AN

ER IV

RD OD O EW PIN IR AC S MO MI

RHODODENDRON DR

SPRUCE DR A AZALE

UTU S

DR

AR B

RN

VIEW ORS DR NOT TO SCALE

DR

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

PL METROPOLITAN SEWERAGE DISTRICT

PINE CON E

D D PARK R HOMELA N

E GOV

OTEEN PARK

E COTTAG

RD


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2017 - 2018

PROJECT:

Homeland Park

LOCATION:

Asheville

TYPE:

Private Sewer Rehab.

PIPE RATING:

48

PROJECT NO.

2016248

TOTAL LF:

930

PROJECT BUDGET:

$286,750.00

PROJECT ORIGIN:

Work Orders, Existing 4" in poor condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$10,000.00

55330 - DESIGN 55340 - PERMITS

$500.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$8,000.00

55370 - LEGAL FEES

$9,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$255,750.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$1,000.00

55450 - SURVEY - ASBUILT

$2,500.00

TOTAL AMOUNT

$286,750.00

$0.00

ENGINEER:

MSD

OH

R.O.W. ACQUISITION:

MSD

# PLATS: [ 9

CONTRACTOR:

$0.00

$0.00

ESTIMATED BUDGETS - FY 20 - 28 ]

FY 19-20

$10,000.00

FY 20-21

$0.00

CONSTRUCTION ADM.:

MSD

FY 21-22

$17,500.00

INSPECTION:

MSD

FY 22-23

$259,250.00

FY 23-24

$0.00

FY 24-25

$0.00

PROJECT DESCRIPTION: This project is located in East Asheville just south of the intersection of Swannanoa River Rd. and Tunnel Rd. in a subdivision called Homeland Park. It consistis of approximately FY 25-26 930 LF of existing 4-inch VCP to be replaced with 8-inch DIP. This 4-inch private sewer is the main line for FY 26-27 this subdivision and is full of roots with numerous service calls. FY 27-28 SPECIAL PROJECT NOTES:

$0.00 $0.00 $0.00


L AI

LN

ISH

CO

VE

SS

RD

JO HN

T

D

R BA

O

RD

ROLLING HILL DR

OP

NOT TO SCALE

MILL CREEK LO

Old County Home Road PSR Project No. 2015221

N

L W

JOAN WAY

/

AM

DA AN

G

RD

IN N

CA

MC K

A CH

E MB

LN

AIN RL

LO N

DR

CE LE I

BA

R

PL

WL RN O

WISTERIA C T

MAGNOLIA WAY

LN

ME LI A

GRAY CT

N EY LN

SYD

ER D

L BA

CE AN

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

CT

METROPOLITAN SEWERAGE DISTRICT

GW OO DL N

LANDIS

EL I

WESTWOOD DR

HO AD A

H HEAT

RD OLD COUNTY HOME

VIFA NIA R

RD M E CO MP

T O ND R

Y SPIVE

W NE R S TE Y HW


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2017 - 2018

PROJECT:

Old County Home Rd PSR

LOCATION:

W. Asheville

TYPE:

Private Sewer Rehab.

PIPE RATING:

48

PROJECT NO.

2015221

TOTAL LF:

2,650

PROJECT BUDGET:

$743,900.00

PROJECT ORIGIN:

Problematic Four Inch Line

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$20,000.00

$20,000.00

55330 - DESIGN 55340 - PERMITS

$1,000.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$14,400.00

55370 - LEGAL FEES

$14,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$690,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$2,000.00

55450 - SURVEY - ASBUILT

$2,500.00

TOTAL AMOUNT

$743,900.00

$0.00

ENGINEER:

MSD

SA

R.O.W. ACQUISITION:

MSD

# PLATS: [ 14 ]

CONTRACTOR:

$20,000.00

$0.00

ESTIMATED BUDGETS - FY 20 - 28 FY 19-20

$15,400.00

FY 20-21

$14,000.00

CONSTRUCTION ADM:

MSD

FY 21-22

$0.00

INSPECTION:

MSD

FY 22-23

$694,500.00

FY 23-24

$0.00

FY 24-25

$0.00

PROJECT DESCRIPTION: This project is located in West Asheville and is comprised of 2,650 LF of 8-inch FY 25-26

$0.00

ductile iron pipe. The existing line is a problematic 4-inch private sewer line composed of PVC and VCP with FY 26-27 many defects. FY 27-28

SPECIAL PROJECT NOTES:

$0.00 $0.00


This Page Intentionally Blank


Capital Improvement Program Fiscal Years 2019—2028

Treatment Plant, Pump Stations,& General Capital Improvements


/

NN

B

D

NOT TO SCALE

R RD

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

E PINN

METROPOLITAN SEWERAGE DISTRICT

D SE

Avery Creek Pump Station Improvements Project No. 2018008

E GL

ER

GE R

G RID

GLE RID NN B


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Avery Creek PS Improvements

LOCATION:

Arden

TYPE:

Pump Station Improvements

PIPE RATING:

N/A

PROJECT NO.

2018008

TOTAL LF:

0

PROJECT BUDGET:

$500,000.00

PROJECT ORIGIN:

Capacity Improvements

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

EST. BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$500,000.00

$500,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT

ENGINEER:

$500,000.00

MSD

R.O.W. ACQUISITION:

$0.00

DP # PLATS: [

CONTRACTOR:

$0.00

$500,000.00

ESTIMATED BUDGETS - FY 20 - 28 0

]

FY 19-20

$0.00

FY 20-21

$0.00

CONSTRUCTION ADM.:

MSD

FY 21-22

$0.00

INSPECTION:

MSD

FY 22-23

$0.00

FY 23-24

$0.00

FY 24-25

$0.00

PROJECT DESCRIPTION: This project is located in Arden off of Glenn Bridge Rd. This pump station is FY 25-26

$0.00

receiving flows over the design capacity and needs to be upgraded to meet current and future flows. FY 26-27 Significant upgrades will be necessary to accommodate much larger pumps. FY 27-28

SPECIAL PROJECT NOTES:

$0.00 $0.00


/

V RI

Biological Treatment Project No. 2016063

ED SI D R E R NOT TO SCALE

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

METROPOLITAN SEWERAGE DISTRICT


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Biological Treatment

LOCATION:

MSD-Treatment Plant

TYPE:

Treatment Plant

PIPE RATING:

N/A

PROJECT NO.

2016063

TOTAL LF:

0

PROJECT BUDGET:

$45,500,000.00

PROJECT ORIGIN:

Future Regulatory Requirements

ESTIMATED PROJECT COST

DESCRIPTION

55310 - PRELIM. ENGINEERING

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

EST. BUDGET FY 18-19

$500,000.00

55320 - SURVEY - DESIGN 55330 - DESIGN

$5,000,000.00

55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$40,000,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT

ENGINEER:

$45,500,000.00

MSD

R.O.W. ACQUISITION:

$0.00

$0.00

HC # PLATS: [

$0.00

ESTIMATED BUDGETS - FY 20 - 28 0

]

FY 19-20

$0.00

CONTRACTOR:

MSD

FY 20-21

$0.00

CONSTRUCTION ADM.:

MSD

FY 21-22

$0.00

INSPECTION:

MSD

FY 22-23

$500,000.00

FY 23-24

$2,500,000.00

FY 24-25

$2,500,000.00

PROJECT DESCRIPTION: This project is the final and largest recommendation from the Plant Facilities Plan. FY 25-26

$10,000,000.00

It will replace the Rotating Biological Contactors (RBC's) with an alternative biological treatment technology. FY 26-27 This project will be driven by regulatory requirements. FY 27-28 SPECIAL PROJECT NOTES:

$18,000,000.00 $12,000,000.00


This Page Intentionally Blank


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Building and Facility Rehabilitation

LOCATION:

MSD-Treatment Plant

TYPE:

Treatment Plant - Annual

PIPE RATING:

N/A

PROJECT NO.

2002068

TOTAL LF:

0

PROJECT BUDGET:

$786,000.00

PROJECT ORIGIN:

Miscellaneous building repairs

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

EST. BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES

$20,000.00

$20,000.00

55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$766,000.00

$20,950.00

$786,000.00

$20,950.00

$119,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT

ENGINEER:

MSD

HC

R.O.W. ACQUISITION:

MSD

# PLATS: [

CONTRACTOR:

$0.00

$139,000.00

ESTIMATED BUDGETS - FY 20 - 28 0

]

FY 19-20

$80,000.00

FY 20-21

$91,000.00

CONSTRUCTION ADM.:

MSD

FY 21-22

$68,000.00

INSPECTION:

MSD

FY 22-23

$68,000.00

FY 23-24

$68,000.00

FY 24-25

$68,000.00

PROJECT DESCRIPTION: This item is for the replacement of larger capital items such as roofing systems, FY 25-26

$68,000.00

HVAC, and subcontracts on buildings and structures within the MSD campus and treatment plant facility. FY 26-27 Total estimated project cost shown is the total within the ten year window. FY 27-28 SPECIAL PROJECT NOTES:

For FY 18-19 $89,000 for General Facility maintenance; $20,000 in Special Studies for Mull Bldg. HVAC study; $30,000 for new groundwater monitoring wells.

$68,000.00 $68,000.00


TO CLIF

N AV

E

AY MW

MEADOW RD

Carrier Bridge Capacity Improvements Project No. 2018089

EA S TR

AMBOY RD

ST

/

UP

RA

VE

DR

LAMB AVE

W RVIE RIVE

JOY NE

N LYMA NOT TO SCALE

SW AY

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

METROPOLITAN SEWERAGE DISTRICT

FAC ILIT IE


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Carrier Bridge Capacity Improvements

LOCATION:

Asheville

TYPE:

Pump Station Improvements

PIPE RATING:

N/A

PROJECT NO.

2018089

TOTAL LF:

0

PROJECT BUDGET:

$17,800,000.00

PROJECT ORIGIN:

CDM Preliminary Engineering Report

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

EST. BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN

$2,300,000.00

55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$15,500,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT

$17,800,000.00

$0.00

ENGINEER:

CDM

EB/HC

R.O.W. ACQUISITION:

MSD

# PLATS: [

CONTRACTOR:

$0.00

$0.00

ESTIMATED BUDGETS - FY 20 - 28 3

]

FY 19-20

$0.00

FY 20-21

$1,150,000.00

CONSTRUCTION ADM.:

MSD

FY 21-22

$1,150,000.00

INSPECTION:

MSD

FY 22-23

$5,166,667.00

FY 23-24

$5,166,667.00

PROJECT DESCRIPTION: This project is to implement the recommendations of the French Broad/Carrier FY 24-25

$5,166,666.00

Bridge Preliminary Engineering Report. This project will increase the capacity of the Carrier Bridge Pump FY 25-26 Station and alleviate wet weather flows entering the system from the south and west areas of the District. The estimated costs shown are planning level only, and incorporate a new pump station, a 10 million gallon tank FY 26-27 near Carrier Bridge, and associated piping. FY 27-28 SPECIAL PROJECT NOTES:

CDM - PER

$0.00 $0.00 $0.00


This Page Intentionally Blank


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Flow Monitoring

LOCATION:

MSD-Treatment Plant

TYPE:

Treatment Plant

PIPE RATING:

N/A

PROJECT NO.

2008013

TOTAL LF:

0

PROJECT BUDGET:

$442,535.00

PROJECT ORIGIN:

Maintenance of Permanent Flow Monitors

ESTIMATED PROJECT COST

DESCRIPTION

55310 - PRELIM. ENGINEERING

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

EST. BUDGET FY 18-19

$41,905.00

$41,905.00

$400,630.00

$261,505.00

$9,125.00

$50,000.00

$442,535.00

$303,410.00

$9,125.00

$50,000.00

55320 - SURVEY - DESIGN 55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION 55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT

ENGINEER:

MSD

SA

R.O.W. ACQUISITION:

N/A

# PLATS: [

CONTRACTOR:

ESTIMATED BUDGETS - FY 20 - 28 0

]

FY 19-20

$40,000.00

FY 20-21

$40,000.00

CONSTRUCTION ADM.:

MSD

FY 21-22

$0.00

INSPECTION:

MSD

FY 22-23

$0.00

FY 23-24

$0.00

FY 24-25

$0.00

PROJECT DESCRIPTION: This project is for expenses related to the continued operation, maintenance, and FY 25-26

$0.00

improvements of the District's flow monitoring program.

SPECIAL PROJECT NOTES:

FY 26-27

$0.00

FY 27-28

$0.00


/

NOT TO SCALE

Intermediate Clarifier Slide Gate Replacement Project No. 2017022

E DR RIVERSID

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

METROPOLITAN SEWERAGE DISTRICT


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Intermediate Clarifier Slide Gates

LOCATION:

MSD-Treatment Plant

TYPE:

Treatment Plant

PIPE RATING:

N/A

PROJECT NO.

2017022

TOTAL LF:

0

PROJECT BUDGET:

$243,000.00

PROJECT ORIGIN:

Obsolete equipment

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

EST. BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$243,000.00

$243,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT

$243,000.00

$0.00

ENGINEER:

MSD

HC

R.O.W. ACQUISITION:

MSD

# PLATS: [

$0.00

$243,000.00

ESTIMATED BUDGETS - FY 20 - 28 0

]

CONTRACTOR:

FY 19-20

$0.00

FY 20-21

$0.00

CONSTRUCTION ADM.:

MSD

FY 21-22

$0.00

INSPECTION:

MSD

FY 22-23

$0.00

FY 23-24

$0.00

FY 24-25

$0.00

the intermediate clarifier. The existing slide gates are original to the intermediate clarifier construction and FY 25-26

$0.00

are approximately 29 years old. The slide gates are necessary for isolating the four clarifier basins and are FY 26-27 in poor condition and difficult to operate.

$0.00

FY 27-28

$0.00

PROJECT DESCRIPTION: This project is for the replacement of eight slide gates in the influent channel of

SPECIAL PROJECT NOTES:


ED

Plant Headworks Improvements Project No. 2015004

R

/

VE RI ID RS NOT TO SCALE

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

METROPOLITAN SEWERAGE DISTRICT


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Plant Headworks Improvements

LOCATION:

MSD-Treatment Plant

TYPE:

Treatment Plant

PIPE RATING:

N/A

PROJECT NO.

2015004

TOTAL LF:

0

PROJECT BUDGET:

$11,995,950.00

PROJECT ORIGIN:

Facilities Plan Update - HDR

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

EST. BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES

$2,250.00

$2,250.00

$804,351.00

$804,351.00

$32,000.00

$1,500.00

$8,522.00

$8,522.00

$540.00

$540.00

$10,808,490.00

$2,725,212.00

$4,995,278.00

$3,088,000.00

$328,000.00

$124,868.00

$115,132.00

$88,000.00

$11,797.00

$1,797.00

$11,995,950.00

$3,669,040.00

$30,500.00

55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION 55430 - CONST. CONTRACT ADM. 55440 - TESTING

$10,000.00

55450 - SURVEY - ASBUILT TOTAL AMOUNT

ENGINEER:

HDR

HC

R.O.W. ACQUISITION:

N/A

# PLATS: [ 0 ]

CONTRACTOR:

$5,140,910.00

$3,186,000.00

ESTIMATED BUDGETS - FY 20 - 28 FY 19-20

$0.00

Judy Construction

FY 20-21

$0.00

CONSTRUCTION ADM.:

MSD/HDR

FY 21-22

$0.00

INSPECTION:

MSD/HDR

FY 22-23

$0.00

FY 23-24

$0.00

PROJECT DESCRIPTION: This project is a recommendation from the Facilities Plan Update, a WRF master FY 24-25

$0.00

planning document completed by HDR in April 2015. This project consists of a new influent screening FY 25-26 facility, new grit removal system, fine screening facility, and surge/equalization basins and pumping station at the French Broad River WRF. The upgrades will improve downstream water quality and shave peak FY 26-27 flows into the WRF. FY 27-28 SPECIAL PROJECT NOTES:

$0.00 $0.00 $0.00


ED

Plant High Rate Primary Treatment Project No. 2015054

R

/

VE RI ID RS NOT TO SCALE

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

METROPOLITAN SEWERAGE DISTRICT


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Plant High Rate Primary Treatment

LOCATION:

MSD-Treatment Plant

TYPE:

Treatment Plant

PIPE RATING:

N/A

PROJECT NO.

2015054

TOTAL LF:

0

PROJECT BUDGET:

$16,950,595.00

PROJECT ORIGIN:

Facilities Plan Update - HDR

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

EST. BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN

$3,000.00

$3,000.00

$1,224,171.00

$704,829.00

$7,219.00

$7,219.00

$630.00

$630.00

$467,342.00

$52,000.00

55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION 55430 - CONST. CONTRACT ADM. 55440 - TESTING

$15,090,000.00

$3,320,000.00

$603,000.00

$133,000.00

$22,575.00

$2,575.00

$16,950,595.00

$718,253.00

$4,500.00

55450 - SURVEY - ASBUILT TOTAL AMOUNT

ENGINEER:

CDM

HC

R.O.W. ACQUISITION:

N/A

# PLATS: [ 0 ]

CONTRACTOR:

$467,342.00

$3,509,500.00

ESTIMATED BUDGETS - FY 20 - 28 FY 19-20

$10,527,000.00

FY 20-21

$1,728,500.00

CONSTRUCTION ADM.:

TBD

FY 21-22

$0.00

INSPECTION:

TBD

FY 22-23

$0.00

FY 23-24

$0.00

FY 24-25

$0.00

PROJECT DESCRIPTION: This project is a recommendation from the Facilities Plan Update, a WRF master FY 25-26

$0.00

planning document completed by HDR in April 2015. High rate primary treatment will improve water quality FY 26-27 ahead of the RBC's thereby extending their useful life and improving treatment efficiency. FY 27-28 SPECIAL PROJECT NOTES:

$0.00 $0.00


This Page Intentionally Blank


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

General Capital Equipment

LOCATION:

Varies

TYPE:

General Capital

PIPE RATING:

N/A

PROJECT NO.

2016072

TOTAL LF:

0

PROJECT BUDGET:

$1,500,000.00

PROJECT ORIGIN:

T. Hartye, S. Powell

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

EST. BUDGET FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$1,500,000.00

$133,242.00

$1,500,000.00

$133,242.00

$150,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT

ENGINEER:

MSD

EB

R.O.W. ACQUISITION:

N/A

# PLATS: [

CONTRACTOR:

$0.00

$150,000.00

ESTIMATED BUDGETS - FY 20 - 28 0

]

FY 19-20

$150,000.00

N/A

FY 20-21

$150,000.00

CONSTRUCTION ADM.:

MSD

FY 21-22

$150,000.00

INSPECTION:

MSD

FY 22-23

$150,000.00

FY 23-24

$150,000.00

FY 24-25

$150,000.00

PROJECT DESCRIPTION: This is for the purchase of capital equipment in excess of $15,000.00. Examples FY 25-26

$150,000.00

include pumps, plant equipment, computer servers, large concrete saws, etc.

SPECIAL PROJECT NOTES:

Total Estimated project cost shown is the total within the ten year window.

FY 26-27

$150,000.00

FY 27-28

$150,000.00


Capital Improvement Program Fiscal Years 2019—2028

Design, Right of Way, & Construction Management Expenses


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Design, ROW, & Const. Mgmt. Exp.

LOCATION:

MSD/ENG

FUND:

F01

PIPE RATING:

N/A

ACCOUNT CODE:

N/A

TOTAL LF:

0

PROJECT BUDGET:

$30,722,347.00

PROJECT ORIGIN:

CIP Expenses

ESTIMATED PROJECT COST

DESCRIPTION

SALARIES & BENEFITS

TOTAL EXPENDS THRU 12/31/17

EST. COST JAN - JUNE 2018

EST. BUDGET FY 18-19

$27,077,442.00

$946,244.00

$1,176,071.63

$2,361,979.00

$1,792,733.00

$71,594.00

$81,264.43

$156,381.00

$186,311.00

$7,475.00

$7,475.00

$16,252.00

$1,665,861.00

$73,599.00

$112,751.00

$170,610.00

$30,722,347.00

$1,098,912.00

$1,377,562.06

$2,705,222.00

(Includes Proj. Mgmt., ROW, Const. and a portion of GIS and Plan. & Dev.)

SUPPLIES (Includes Proj. Mgmt., ROW, Const. and a portion of GIS and Plan. & Dev.)

FLEET

CAPITAL EQUIPMENT

DEBT EXPENSE (Bond Debt Expenses)

TOTAL AMOUNT

ENGINEER:

N/A

EB

R.O.W. ACQUISITION:

N/A

PLATS: [

CONTRACTOR:

ESTIMATED BUDGETS - FY '19 -'27 ]

FY 19-20

$2,779,330.36

N/A

FY 20-21

$2,851,152.87

CONSTRUCTION ADMINISTRATION:

N/A

FY 21-22

$2,925,038.97

INSPECTION:

N/A

FY 22-23

$3,001,101.14

FY 23-24

$3,143,615.98

FY 24-25

$3,215,794.28

PROJECT DESCRIPTION: This line item is for expenses related to the District's Capital Improvement Program FY 25-26

$3,290,041.06

(CIP). Included are salaries for the CIP Division, capital equipment, and bond debt expenses related to the FY 26-27 financing of the CIP program. FY 27-28 SPECIAL PROJECT NOTES:

$3,366,323.65 $3,444,726.77

Future years assume 3.0% increase per year for all items except Debt Expenses. Estimated Debt Expenses provided by the Finance Department. Total Estimated Project Cost shown is the total within the ten year window.


Capital Improvement Program Fiscal Years 2019—2028

Reimbursement Projects


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Developer Reimbursements

TYPE:

Reimbursement - Annual

PROJECT NO.

PROJECT BUDGET:

DESCRIPTION

LOCATION:

Various

2004051

TOTAL LF:

0

$1,216,000.00

PROJECT ORIGIN:

Economic Development Policy

ESTIMATED

TOTAL EXPENDS

EST. COST

EST. BUDGET

PROJECT COST

THRU 12/31/17

JAN - JUNE 18

FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$1,216,000.00

$22,930.00

$266,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT

$1,216,000.00

$0.00

ENGINEER:

KJ

R.O.W. ACQUISITION:

# PLATS: [

$22,930.00

$266,000.00

ESTIMATED BUDGETS - FY '19 -'27 ]

FY 19-20

$150,000.00

CONTRACTOR:

FY 20-21

$100,000.00

CONSTRUCTION ADM:

FY 21-22

$100,000.00

INSPECTION:

FY 22-23

$100,000.00

FY 23-24

$100,000.00

FY 24-25

$100,000.00

PROJECT DESCRIPTION: This is for reimbursements for extensions that qualify under the District's FY 25-26

$100,000.00

Extension Policy. Refer to the "Policy and Procedures for the Extension of Sewer Service" for further FY 26-27 information. FY 27-28

SPECIAL PROJECT NOTES:

Total estimated project cost shown is the total within the ten year window. $200,000 per year is approved.

The Olivette Project reimbursement (for the pump station) is scheduled for FY18. Reimbursement for Olivette's Master Plan Interceptor is scheduled for FY19.

$100,000.00 $100,000.00


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2018 - 2019

PROJECT:

Black Mtn. Annex. - Craigmont Rd.

TYPE:

Reimbursement

PROJECT NO.

PROJECT BUDGET:

DESCRIPTION

LOCATION:

Black Mountain

1992173

TOTAL LF:

0

$0.00

PROJECT ORIGIN:

Consolidation Agreements

ESTIMATED

TOTAL EXPENDS

EST. COST

EST. BUDGET

PROJECT COST

THRU 12/31/17

JAN - JUNE 18

FY 18-19

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION 55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT

ENGINEER:

$0.00

Administered by Town of Black Mountain

R.O.W. ACQUISITION:

$0.00

$0.00

ESTIMATED BUDGETS - FY '19 -'27

EB # PLATS: [

CONTRACTOR:

$0.00

]

FY 19-20

$0.00

FY 20-21

$0.00

CONSTRUCTION ADM:

Administered by Town of Black Mountain

FY 21-22

$0.00

INSPECTION:

MSD/Black Mountain

FY 22-23

$0.00

FY 23-24

$0.00

FY 24-25

$0.00

PROJECT DESCRIPTION: Reimbursement project in accordance with Consolidation Agreement. Estimated FY 25-26

$0.00

project cost was $420,000 in FY 07.

SPECIAL PROJECT NOTES:

MSD Share is 35% in accordance with Consolidation Agreement. Project will be budgeted when town decides to construct it.

FY 26-27

$0.00

FY 27-28

$0.00